Anda di halaman 1dari 5
anso1e Message tom Chairman of Central Bollers Board ‘About Central Bolers Board History of nian Soler Regulations Forevord Contents Chapter Wise Contents Regulation Wise Us of Amendments Indian Boilers ‘et 1023 bbe Foms Home Search Heb ContactUs BR 1050: Reg. 260 Indian Boiler Regulations - 1950 Reg, 360 Joints a) These Regulations provide for ordinary bolted ange joints. Special types of joints may be used, ‘subject to the approval of the Chief Inspector. b Arc welded butt joints of pipes or socket welded joints for pipes, valves and fiting shall be made by metalic shielded atc process and post weld heat treated effectively except in the following cases For Carbon steel - 0 The nominal wall thickness in case of butt joints does not exceed 20 mm or carbon content does not exceed 0.25%; O) The throat thickness of filet weld for socket welded joints or other types of joints does not exceed 20 mm or earbon content does not exceed 0.25%. Note. In ease of carbon content for above cases Fes between 0.25% >> Intps:pp.govin/stesidefaulltestoiler_rues_upéatedrag360.nim anso1e BR - 1950 Rag. 260-4 Indian Boiler Regulations - 1950 Message rom (Chairman of Cental ‘olers Board ‘About Cental Solers Board History of indian Boller Regulaions Contents Regulation Wise Ustof Amendments Indian Boilers “Act 1028 Ir Forms Home Search Help Contact Us Reg. 360 Joints (©) Such Butt-welded joints conform to Fig 28, () Tests on completed welds on pipelines: (1) Classification For the purpose of tests, pipelines shall be divided into two classes:- Class Il Pipelines for service conditions in which any one ofthe folowing Emits is exceeded'- [Design temperature [210°C (@25°F) [Design Pressure 17.6 kg/em* (250 ibs/eq in) Feed water 24.6 kglem® (350 Ibs/eqin) Class Il. -Pipelines for service conditions in which none ofthe foregoing liits is exceeded 2) Identification of Welds ‘The Welders’ identification mark shal be stamped without indentation, o stenclled adjacent to each completed weld. (3) Tests for Class | pipelines (0 Where the completed pipelines are not subjected to hydric test Where the completed pipelines are not tested by the application of hydraulie pressure the welds shall be subjected tothe folowing inspection procedure:- Piping over 102 mm. (4 in.) bore.-Al but.welds shall be subjected to non-destructive examination by radiographic or other approved methods. The entire circumference of the first five welds made by each welder shall be non-destructively examined. If these are found to be satisfactory and the Inspecting Officer or Inspector isn other respects satisfied wth the welding technique, methods of control and supervision employed, relaxation In the extent of non-destructive examination may be considered, but this relaxation shall in no case permit the non-destructive examination of less than one- third ofthe circumference of each ofthe remaining welds made by the Welder concerned, Piping 102 mm. (4) bore and under, but nat less than 38 mm. (1 %in.) bore.- Five percent of the butt-welds made by each welder wth a minimum of two welds per ‘Welder, selected at random shall be subjected to non-destructive examination by ether radiographic or other approved methods or may be cut out for visual examination and bend teste Next ==> Message from Chainan of Central Boilers Board* About Central Boller Board * History of nein Boller Iitpeulépp.govinvstesdefaulhlestociler rules_updatedeg® 00-1. 42.

Anda mungkin juga menyukai