EHS RISK ASSESSMENT

Ref : HMRP - 08 B Rev 00


Project : Hyderabad Metro Rail
Client : Hyderabad Metro Rail limited
Independent Engineer : Louis Berger Consulting Pvt. ltd
Concessionaire : L&T Metro Rail Hyderabad Limited
Contractor : L&T Construction PT&D IC (POWER SUPPLY & SCADA PROJECT)

Activity considered : Backfilling Date: 05.09.12

Severity rating
Hazard / Environment Aspect

Probability
Risk / Residual

rating
Sl.no Activity Existing control measures Imapct Additional Control measures Risk / Action by
Source / Situation /
Possible outcome People at risk level Impact
Act

1) Ensuring pathway clear 2)


1) Undulations of the Ensuring existence of any power
earth 1) Fall of machinery lines & take LC if applicable 1) No workmen shall undertake
2) Obstruction by 2) Electrocution Vehicle 3) Vehicle having all basic safety rest beneath the vehicle
Approach to the
1 existing power lines 3) Injury to workmen operator & requirements(reverse horn, 4 5 High 2) Deploying a signal man for Low Supervisor
work area
3) Roll over person 4) Struck of the helper warning signals, guards etc) supervising the vehicle (forward,
4) Loaded vehicle / loaded vehicle 4) Authorize operator with obeying reverse etc)
dumper to all statutory documents & also
PUC certificate.

1) Noise / smoke shall be within


1) Hit by machinery 1) Injury to workmen Vehicle 1) Operator / workmen shall be
acceptable limits (ambient
2) Expel of dust 2) Respiratory operator, provided with nose mask,ear plug
Backfilling of the monitoring systems) Site Engineer
2 3) Noise diseases helper & etc 2) 4 4 High Low
pit 2) Helper shall be engaged for / Supervisor
4) Mis- 3) Ear damage workmen NO person shall stand in the swing
guiding adverse movements of the
communication 4) Eye irritation working around area of the machine
vehicle

FOR LTC FOR LTMRHL