PROYEK PEMBANGUNAN PENINGKATAN


JEMBATAN PANGGUNG
DESA ARGOMULYO KEC. CANGKRINGAN
(PENGAMATAN PEKERJAAN GELAGAR DAN
DIAFRAGMA)

LAPORAN KERJA PRAKTIK

NILTU FADLAL RAHMAN


5140811162

PROGRAM STUDI TEKNIK SIPIL


FAKULTAS SAINS DAN TEKNOLOGI
UNIVERSITAS TEKNOLOGI YOGYAKARTA

YOGYAKARTA
2017

xiii
`

PROYEK PEMBANGUNAN PENINGKATAN


JEMBATAN PANGGUNG
DESA ARGOMULYO KEC. CANGKRINGAN
(PENGAMATAN PEKERJAAN GELAGAR DAN
DIAFRAGMA)

LAPORAN KERJA PRAKTIK

Diajukan sebagai salah satu syarat untuk memperoleh gelar Sarjana

NILTU FADLAL RAHMAN


5140811162

PROGRAM STUDI TEKNIK SIPIL


FAKULTAS SAINS DAN TEKNOLOGI
UNIVERSITAS TEKNOLOGI YOGYAKARTA

YOGYAKARTA
2018

xiii
`

HALAMAN PENGESAHAN
LAPORAN KERJA PRAKTIK

PROYEK PEMBANGUNAN PENINGKATAN JEMBATAN


PANGGUNG
DESA ARGOMULYO KEC. CANGKRINGAN
(PENGAMATAN PEKERJAAN GELAGAR DAN
DIAFRAGMA)

Disusun oleh:

NILTU FADLAL RAHMAN


5140811162

Telah dipertahankan di depan Dewan Penguji


pada ....................

Nama Jabatan Tanda TanganTanggal

Algazt Aryad M, S.T., M.Eng. Dosen Pembimbing .................... .............

Laporan kerja praktik ini telah diterima sebagai salah satu persyaratan untuk
memperoleh gelar Sarjana pada Program Studi Teknik Sipil.

Yogyakarta, …………………….

Ketua Program Studi Teknik Sipil

M. Yani Bhayusukma, Ph.D


NIK 110104060

xiii
`

HALAMAN PERSEMBAHAN

Alhamdulillah laporan kerja praktik ini penulis persembahkan untuk:

Allah SWT yang senantiasa melindungi dan menyertai hamba-Nya dalam setiap
langkah hidup.

Kedua orang tua tercinta, Bapak Salimun dan Ibu Kartini yang telah memberikan
doa, semangat serta dukungan untuk kesuksesan anakmu ini.

Teman sepenanggungan Hannif Noor Ikhsan dan Andung Sulistyo yang menemani
masa kerja praktik selama 2 bulan.

Teman-teman karib, Bebadra, Mukhtar Nabil, Tri Hidayati, Oktavia Ninta


terimakasih atas kebersamaan, suka dan duka yang diberikan selama ini, dan
terimakasih sudah menjadi sahabat sekaligus keluarga yang berharga. Terkhusus
yang telah banyak memberi dukungan dan motivasi selama penyusunan Laporan
Kerja Praktik.

Teman-teman seperjuangan Teknik Sipil 2014, Muhamad Imam, Zuvika Alfi Aulia,
Reni Tantira, Andung Sulistyo, Hannif Noor, Edo Bagus B, Fredy Pradana, Wulan
Nurjanah, Prawira Mukti, Miftahkul Anam, Puspa Unggul, Feby Arynditya yang
telah berbagi suka maupun duka selama 3 tahun ini.

xiii
`

PERNYATAAN KEASLIAN PENULISAN

Yang bertanda tangan di bawah ini, saya:

Nama : Niltu Fadlal Rahman

NIM : 5140811162

Program Studi : Teknik Sipil

Fakultas : Sains dan Teknologi

Menyatakan bahwa laporan kerja praktik dengan judul: “PENGAMATAN


PEKERJAAN GIRDER DAN DIAFRAGMA JEMBATAN PANGGUNG” ini
adalah hasil karya saya sendiri, tidak mengandung plagiat dan semua sumber baik
yang dikutip maupun dirujuk telah saya nyatakan dengan mengikuti tata cara dan
etika penulisan karya ilmiah yang benar.

Segala sesuatu yang berkaitan dengan pelanggaran seperti yang dinyatakan di atas,
sepenuhnya menjadi tanggung jawab penulis.

Yogyakarta, April 2018

Penulis,

Niltu Fadlal Rahman

5140811162

xiii
`

KATA PENGANTAR

Puji syukur saya panjatkan kepada Tuhan Yang Maha Esa, karena atas
berkat dan rahmat-Nya, saya dapat menyelesaikan kerja praktik ini. Penulisan
laporan kerja praktik ini dilakukan untuk memenuhi salah satu syarat pencapaian
gelar Sarjana Teknik Sipil pada Program Studi Teknik Sipil, Fakultas Sains dan
Teknologi, Universitas Teknologi Yogyakarta.
Penulis menyadari bahwa masih terdapat banyak kekurangan dalam
penulisan laporan kerja praktik, sehingga penulis sangat mengharapkan adanya
kritik dan serta tanggapan yang berguna bagi laporan kerja praktik ini.

Selama penyusunan laporan kerja praktik penulis telah mendapatkan


bimbingan, dorongan, dan bantuan yang sangat berarti dari berbagai pihak, baik
secara langsung maupun tidak langsung. Pada kesempatan ini penulis ingin
menyampaikan terimakasih sedalam-dalamnya kepada:

1. Bapak Dr. Bambang Moertono S, MM., CA., Akt., selaku Rektor


Universitas Teknologi Yogyakarta,
2. Bapak M. Yani Bhayusukma, Ph.D, selaku Ketua Program Studi Teknik
Sipil Fakultas Sains dan Teknologi Universitas Teknologi Yogyakarta,
3. Bapak Ir. Dibyo Susilo, M.M., M.T selaku Dosen Wali Program Studi
Teknik Sipil,
4. Bapak Algazt Aryad Masagala, S.T., M.Eng., selaku Dosen Pembimbing
Kerja Praktik,
5. Pihak PT. SEMARANG MULTICONS selaku pelaksana proyek
pembangunan Jembatan Panggung
6. Bapak Wasis Purwadi dan Bapak Bowo, Bapak Ngatman dan Bapak Bagyo
yang telah banyak membantu dalam usaha memperoleh data yang penulis
perlukan,
7. Orang tua dan keluarga penulis yang telah memberikan bantuan dukungan
material dan moral, dan
8. Teman-teman angkatan 2014 Program Studi Teknik Sipil Universitas
Teknologi Yogyakarta.

xiii
`

Akhir kata, saya berharap Tuhan Yang Maha Esa berkenan membalas segala
kebaikan semua pihak yang telah membantu. Semoga laporan kerja praktik ini
membawa manfaat bagi pengembangan ilmu.

Yogyakarta, Desember 2017


Penulis,

Niltu Fadlal Rahman


5140811162

xiii
`

DAFTAR ISI

HALAMAN JUDUL................................................................................................ i
HALAMAN PENGESAHAN ................................................................................. ii
HALAMAN PERSEMBAHAN ............................................................................ iii
HALAMAN PERNYATAAN KEASLIAN PENULISAN ................................... iv
KATA PENGANTAR ............................................................................................ v
ABSTRAK ............................................................................................................. vi
DAFTAR ISI .............................................................................................................
DAFTAR GAMBAR ........................................................................................... xiii
DAFTAR LAMPIRAN ......................................................................................... xv
BAB 1 PENDAHULUAN ..................................................................................... 1
1.1 LATAR BELAKANG .............................................................................. 1
1.2 TUJUAN PEMBANGUNAN DAN PENGAMATAN ............................ 2
1.3 DATA PROYEK ...................................................................................... 2
1.3.1 Data Proyek........................................................................................ 3
1.3.2 Lokasi Proyek .................................................................................... 3
1.3.3 Data Struktur ...................................................................................... 4
1.4 RUANG LINGKUP PENGAMATAN ..................................................... 4
1.5 METODE PENGUMPULAN DATA....................................................... 4
1.6 METODE PEMBAHASAN ..................................................................... 5
1.6.1 Studi Primer ....................................................................................... 5
1.6.2 Studi Literatur .................................................................................... 5
BAB 2 DASAR PERENCANAAN ....................................................................... 6
2.1 UMUM ...................................................................................................... 6
2.2 PEMILIHAN LOKASI JEMBATAN....................................................... 8
2.2.1 Aspek Lalu Lintas............................................................................8

2.2.2 Aspek Teknis....................................................................................8

2.2.3 Aspek Estetika..................................................................................9

2.3 LAYOUT JEMBATAN ............................................................................. 9


2.4 PERTIMBANGAN LAYOUT JEMBATAN MELINTASI SUNGAI ...... 9

xiii
`

2.5 PENYELIDIKAN LOKASI ................................................................... 12


2.5.1 Pekerjaan Kantor (Office Work) ............................................................ 13
2.5.2 Pekerjaan Lapangan (Field Work) ........................................................ 13
2.6 PRELIMINARY DESIGN ........................................................................ 13
BAB 3 ORGANISASI PROYEK........................................................................16
3.1 TINJAUAN UMUM .............................................................................. 16
3.2 STRUKTUR ORGANISASI ................................................................. 16
3.2.1 Definisi Struktur Organisasi .................................................................. 16
3.2.2 Elemen Strutur Organisasi ..................................................................... 18
3.2.3 Faktor Penentu Struktur Organisasi ...................................................... 18
3.3 UNIT ORGANISASI

3.3.1 Pemilik Proyek ................................................................................. 19


3.3.1.1 Unit Organisasi Pemilik Proyek ................................................. 19
3.3.2 Kontraktor Pelaksana.......................................................................22

3.3.2.1 Unit Organisasi Kontraktor Pelaksana....................................23

3.3.3 Konsultan Pengawas........................................................................26

3.3.3.1 Unit Organisasi Konsultan......................................................26

3.4 MANAJEMEN PROYEK..............................................................................29

3.4.1 Site Engineer Manager (SEM)........................................................29

3.4.2 Site Operation Manager (SOM).....................................................29

3.4.3 Site Administration Manager (SAM)..............................................30

3.5 TAHAPAN MANAJEMEN PROYEK..........................................................30

3.5.1 Planning..........................................................................................30

3.5.2 Organizing................. .....................................................................30

3.5.1 Directing.........................................................................................30

3.5.1 Coordinating...................................................................................30

BAB 4 ADMINISTRASI PROYEK .................................................................. 31


4.1 UMUM .................................................................................................... 31
4.2 LAPORAN KERJA ................................................................................ 32

xiii
`

4.2.1 Laporan Harian ........................................................................................ 34


4.2.2 Laporan Mingguan .................................................................................. 34
4.2.3 Laporan Bulanan ..................................................................................... 34
4.3 RENCANA KERJA ................................................................................ 35
4.3.1 Time Schedule .................................................................................. 35
4.3.2 Kurva S ............................................................................................ 35
4.3.3 Gambar Kerja ................................................................................... 36
4.4 TENAGA KERJA ................................................................................... 36
4.4.1 Tenaga Kerja Tetap .......................................................................... 36
4.4.2 Tenaga Kerja Harian ........................................................................ 36
4.4.3 Tenaga Kerja Borongan ................................................................... 36
4.5 WAKTU DAN UPAH KERJA............................................................... 37
4.5.1 Waktu Kerja ..................................................................................... 37
4.5.2 Upah Kerja ....................................................................................... 37
BAB 5 BAHAN DAN ALAT .............................................................................. 38
5.1 UMUM .................................................................................................... 38
5.2 BAHAN .................................................................................................. 40
5.2.1 Semen............................................................................................... 40
5.2.2 Pasir........................................................................................................... 41
5.2.3 Kerikil ....................................................................................................... 42
5.2.4 Air... .......................................................................................................... 42
5.2.5 Beton Ready Mix ............................................................................. 43
5.2.6 Baja Tulangan...................................................................................43

5.2.7 Multiplex...........................................................................................44

5.2.8 Kawat Bendrat...................................................................................44

5.2 ALAT KONSTRUKSI............................................................................ 45


5.3.1 Molen ............................................................................................... 45
5.3.2 Meteran ............................................................................................ 45
5.3.3 Alat Penguji Slump Beton ................................................................ 46
5.3.4 Excavator ......................................................................................... 46
5.3.5 VIbrator ........................................................................................... 47

xiii
`

5.3.6 Stressing Hydraulic Pump.................................................................48

5.3.6 Mobile Crane.....................................................................................48

BAB 6 PELAKSANAAN PEKERJAAN ........................................................... 50


6.1 UMUM .................................................................................................... 50
6.2 PELAKSANAAN PEKERJAAN ........................................................... 51
6.2.1 Pekerjaan Pemasangan / Stressing Girder............................................ 51
6.2.2 Pemasangan Diafragma .......................................................................... 54
BAB 7 KESIMPULAN DAN SARAN ............................................................... 56
7.1 KESIMPULAN ....................................................................................... 56
7.2 SARAN ................................................................................................... 56
DAFTAR PUSTAKA ........................................................................................... 58

xiii
`

DAFTAR GAMBAR

Gambar 1 Lokasi Proyek ................................................................................. 3


Gambar 2.1 Skema Proses Perencanaan ............................................................. 7
Gambar 2.2 Diagram Alir Proses Perencanaan .................................................. 8
Gambar 2.3 Layout Jembatan yang Melintasi Sungai dan Lembah Datar ....... 10
Gambar 2.4 Perlintasam Jembatan pada Sungai dan Tributary ....................... 10
Gambar 2.5 Pengalihan atau Perbaikan Alur Sungai ....................................... 11
Gambar 3.1 Struktur Organisasi Proyek ........................................................... 16
Gambar 3.2 Struktur Organisasi Pelaksana Proyek .......................................... 19
Gambar 5.1 Semen ........................................................................................... 40
Gambar 5.2 Pasir .............................................................................................. 41
Gambar 5.3 Kerikil ........................................................................................... 42
Gambar 5.4 Air .................................................................................................. 42
Gambar 5.5 Beton Ready Mix .......................................................................... 43
Gambar 5.6 Baja Tulangan ............................................................................... 43
Gambar 5.7 Multiplex ....................................................................................... 44
Gambar 5.8 Kawat Bendrat .............................................................................. 44
Gambar 5.9 Molen ............................................................................................ 45
Gambar 5.10 Meteran ........................................................................................ 45
Gambar 5.11 Alat Penguji Slump Beton ........................................................... 46
Gambar 5.12 Excavator ..................................................................................... 46
Gambar 5.13 Vibrator Concrete ........................................................................ 47
Gambar 5.14 Stressing Hydraulic Pump ........................................................... 48
Gambar 5.13 Mobile Crane ............................................................................... 48
Gambar 6.1 Lokasi Girder Sementara .............................................................. 51
Gambar 6.2 Proses pemindahan girder menggunakan crane............................ 51
Gambar 6.3 Penyusunan girder untuk proses stressing .................................... 52
Gambar 6.4 Install Strand ................................................................................ 52
Gambar 6.5 Proses stressing ............................................................................. 53
Gambar 6.6 Setelah proses stressing ................................................................ 53
Gambar 6.7 Setelah proses grouting................................................................. 54

xiii
`

Gambar 6.8 Diafragma diangkat crane ............................................................. 54


Gambar 6.9 Proses stressing tiap bagian .......................................................... 55

xiii
`

DAFTAR LAMPIRAN

1. Surat Diterima Kerja Praktik .........................................................................


2. Surat Selesai Kerja Praktik ............................................................................
3. Lembar Asistensi Kerja Praktik ....................................................................
4. Gambar DED .................................................................................................
a. Layout Jembatan ........................................................................................
b. Tampak Memanjang Jembatan ..................................................................
c. Tampak Atas Jembatan ..............................................................................
d. Potongan Melintang Jembatan ..................................................................
e. Detail I Girder ............................................................................................
f. Detail Diafragma .......................................................................................