JOB HAZARD ANALYSIS/ ANALISA

BAHAYA KERJA

TASK/TUGAS: CONCRETING WORK /KERJA-KERJA KONKRIT DATE/TARIKH : 20/10/18 PTW NO:

REQUIRED PERSONNEL PROTECTIVE EQUIPMENT (PPE)/ PERALATAN PERLINDUNGAN DIRI YANG DIPERLUKAN (PPD) OTHER SAFETY REQUIREMENT/ KEPERLUAN KESELAMATAN TAMBAHAN

Hard Hat/ Topi Keselamatan √ Face Shield/ Pelindung Muka Work Vest/ Vest kerja √ Fire-Extinguisher/ Alat Pemadam Api √ Tagging/Locking/Lifting Rope/ Penanda/ Kunci/ Tali layang

Safety Boots/ Kasut keselamatan √ Welding Shield Ear Protector/ Perlindung telinga Gas Test/ Pemeriksaan Gas Barricade/ Penghadang √

Safety Glasses/Goggles/ Cermin mata


Apron/Gauntlet Safety Harness/ Abah-abah Keselamatan B.A Set Cold Work Permit/ Permit Kerja Sejuk
keselamatan

Gloves - Cotton/Leather/ Sarung tangan


√ Dust Mask/ Topeng Muka Eye-Wash Station/ Stesen Pencuci Mata Safety Signs/ Tanda Keselamatan √ Hot Work Permit/ Permit Kerja Panas
- Kain/ Kulit

Personal Film Badge/ Lencana Filem Fire Blankets (as required)/


Pocket Dosimeter/ Poket Dosimeter Supervision/ Pemantauan √
Persendirian Selimut Api (sekiranya perlu)

IMPACT OF HAZARDS (people, RISK LEVEL


SEQUENCE OF JOB STEPS ASSESSMENT OF HAZARDS LIKELIHOOD SEVERITY RECOMMENDATION TO CONTROL HAZARDS CONTIGENCY RESPONSIBLE PARTY
assets & environment) H/M/L/

1 Installation of formwork

1.1 Fabricate of formwork and i. Injury by sharp object People 3 2 M a Safety / Pre-job briefing before start work Proper supervision during fabricating
installion work & installation of formwork Site Civil Engineer

ii. Unsafe working platform b Inspected hand tools to be in use


Site Supervisor

iii. Congested area c Prepared safe working platform & use safety harnesses
above 2m height

d Proper access & working area

e Good housekeeping

f Proper PPE: safety helmet, safety harness, safety shoes,


cotton gloves.

2 Installation of rebar

2.1 Cutting and bending work Injury by sharp objects People 2 3 M Safety / Pre-job briefing before start work Regular maintenance of cutting and Site Civil Engineer
i. a bending machine

2.2 Setting, tying rebar and ii Trip and fall Material shall arrange properly and the sharp edges Site Supervisor
installation work b protected

iii Sharp/sheared ends of tie wire can injuries Loose object and hand tools shall secure properly
eyes c

iv
Struck by d Wear safety glasses while tying the rebar.

e Proper housekeeping

Proper PPE: safety helmet, safety harness, safety shoes,


f cotton gloves.

Unrestricted
IMPACT OF HAZARDS (people, RISK LEVEL
SEQUENCE OF JOB STEPS ASSESSMENT OF HAZARDS LIKELIHOOD SEVERITY RECOMMENDATION TO CONTROL HAZARDS CONTIGENCY RESPONSIBLE PARTY
assets & environment) H/M/L/

3 Placing concrete

3.1 Positioning excavator and i. Excavator / mix truck failure and fall into People & Assets 3 2 M a Safety / Pre-job briefing before start work Operation should be fully supervised Site Civil Engineer
ready mix truck trench by supervisor in- charge.
ii Workers run over/backed into by equipment b Inspection of all machineries & lifting tools Site Supervisor

iii. Hit by c Clear working area with obstruction

iv Struck by d No obstruction for the crane operator

3.2 Pouring concrete i. Hit by lowering and retrieving concrete bucket People 2 3 M i. Stay alert during lowering of concrete bucket Inspect excavator and concrete bucket Site Civil Engineer
before start the work

ii. Watch out for obstructing objects and slippery ground Operation should be fully supervised Site Supervisor
by supervisor in- charge.

iii. Watch out for stater bars

i. Proper receving load required Proper PPE: Safety helmet, safety


rubber boots, long sleeve shirt,
earmuff, safety vest, and cotton
gloves

4 Housekeeping i. Slip, Trip & Fall People 2 2 L i. Workers to do housekeeping on daily basis to prevent slip, Proper PPE: Safety helmet, safety Site Civil Engineer
ii Hit by Machinery trip and falls rubber boots, long sleeve shirt, Site Supervisor
earmuff, safety vest, and cotton
iii Cut by Tools ii. Waste materials to compile at a designated place gloves

L = Likelihood S=Severity RR=Risk Rating =LxS

5- Most likely: The most likely result of the hazard/ event being realized 1,2,3,4 -short term,interim risk reduction required.Long term risk reduction plan must be developed and
5-Catastrophic-Numerous fatalities, irrecoverable property damage and productivity
implemented - LOW

4- Possible:Has a good chance of occurring and is not unusual 5-Additional long term risk reduction required.If no further action can be reasonably taken,management
4-Fatal-Approximately one single fatality major property damage if hazard is realized
approval must be sought to continue the activity - MEDIUM

3- Conceivable:Might be occur at sometime in future 6-Risk is tolerable if reasonable safeguard/management systems are confired to be in place and consistent with
3-Serious-Non-fatal injury, permanent disability
relevant requirement of the risk mitigation closure guidelines - MEDIUM

2-Remote - Has not been known to occur after many years 2-Minor-Disabling but not permanent injury 7,8,9,10-Manage risk.No further risk reduction required.Risk reduction at management/team discretion - HIGH

1-Inconceivable - Is practically impossible and has never occurred 1-Negligible-Minor abrasions, bruises, cuts, first aid type injury

PREPARED BY ANALYSED BY REVIEWED BY

SIGNATURE : _____________________ SIGNATURE :_________________________ SIGNATURE :


NAME : _____________________ NAME :_________________________ NAME :
DEPT : _____________________ DEPT :_________________________ DEPT :
Unrestricted
IMPACT OF HAZARDS (people, RISK LEVEL
SEQUENCE OF JOB STEPS ASSESSMENT OF HAZARDS LIKELIHOOD SEVERITY RECOMMENDATION TO CONTROL HAZARDS CONTIGENCY RESPONSIBLE PARTY
assets & environment) H/M/L/

DATE : _____________________ DATE :_________________________ DATE :