Anda di halaman 1dari 4

RISK ASSESSMENT

Risk Assessment Area Risk Assessment DOC NO: RA-GE-SUEZ-046

Occupational Health &safety S Contract No.


&safety Safety
Environment E Rectification of penstocks in bldg. 589 Date: 16-02-2019
Quality Q

Sl. Description of Hazard Potential and P C Risk Precautionary Measures and Safeguards P C Risk
No Activity Consequences L/M/H to control the risk L/M/H

1. Shifting Manual handling, Work at 3 4 Med ➢ Vigiminute to be conducted by work supervisor 2 2 Low
materials height (for securing loads at prior to start work on daily basis
including top of the open body truck) ➢ Obtain PTW prior to start work
scaffolding Vehicle maneuvering, , ➢ Open body truck must be provided with
materials, tools Collision of vehicle and other adequate fall prevention
and acessories moving equipment with ➢ Traffic rules must be observed and followed
from storage personnel / other vehicles / ➢ All materials shall be unloaded (stored) keeping
area to work fixed objects, Fall of safe distance from traffic routes without
location using a personnel and materials, obstructing access and egress
truck property damage, Minor and ➢ PPE shall be worn by all personnel
major injuries
2 Entering to the Entry to the confined space, 4 5 High ➢ Obtain confined space entry permit 2 2 Low
chamber Narrow access to the ➢ Job specific TBT to be conducted for working in
(confined chamber, Access by ladder, confined space
space) Oxygen deficiency, presence ➢ Area shall be barricaded
of toxic and flammable gases ➢ All confined space interveners shall be third
(H2S, CH4, CO), LEL, party trained and certified
Fumes, Vapor, Excessive ➢ Use 24 volts lighting inside the chamber
heat and humid atmosphere ➢ Access ladder shall be secured
in the chamber, Biological ➢ Transferring of scaffolding materials into the
Hazards, Break up of water to chamber shall be done using a rope
the chamber from adjacent ➢ At least one forced ventilation and one forced
tanks, Fall into the chamber, exhaust shall be provided with duct
Falling materials, Injury, Fire, ➢ Atmospheric checking shall be done prior to
Explosion, Intoxication, enter inside the chamber using five gas detector
Asphyxia, Death ➢ Enter inside the chamber if atmosphere is safe
to occupy inside the chamber
➢ Use tripod with winch for emergency evacuation
from the chamber
➢ All interveners shall wear safety harness to
attach with tripod wire rope in the event of
emergency evacuation
➢ Atmosphere shall be monitored during full
course of work
➢ A Hole watch shall be appointed to keep records
of atmospheric inspection, keep communication
with workers and keep records of entry / exit of
the workers
➢ All required LOTO shall be done by O&M
➢ Apply rotation system for workers to avoid
continuous exposure in the chamber
➢ Supervisor shall be presented during the full
course of work
3 Erection and Hazards related to confined ➢ Follow all safe work procedure for working in
dismantling of space, transferring confined space mentioned as above
scaffolding in scaffolding materials through ➢ Transferring of scaffolding materials shall be
confined space narrow opening, Work at done by using a rope
Height, Fall of materials, Fall ➢ Materials don’t be allowed to through from top
from height, Collapse of ➢ Use only standard materials for erecting
scaffolding structure, Material scaffolding
damage, Injury, ➢ Scaffolders and inspector shall be third party
trained and certified
➢ Use only well erected and inspected scaffolding
➢ Ensure tagging on scaffold
➢ All workers shall be aware about tagging system
➢ Use all required ppe including safety harness for
working at height

4 Dismantling, Hazards related to confined 4 5 High ➢ Follow all confined space safe work procedure 2 2 Low
Re-installation space work and lifting, as mentioned above
of penstock Crushing, Injury, material ➢ Follow all safe lifting procedure as mentioned
gates damage, Fall of materials into above
chamber, Fall of personnel ➢ Follow all work at height safe procedure
➢ Use all required ppe

Signature :
Prepared by: ANISH DEV Date: 16-02-2019

Signature :
Reviewed by: CHARLES BERTHOLON Date: 16-02-2019

Signature :
Approved by: Date:

LOW = GREENP = Probability

MED = ORANGE C = Consequence

HIGH = RED R = Risk Level