a9L 36L ePdf ± c+lst ug]{ / O:6Ld]6 eGbf 36L / a9L vr{ ePsf] d'Vo sf/0f pNn]v ug]{M
:jLs[t l8hfOg / :k]lzlkms]zg adf]lhdsf] sfd ePsf] elg k|dfl0ft ug]{
k]z ug]{sf] ;lx k|=csf] ;lx cWoIfsf] ;lx r]s ug]{sf] ;lx :jLs[t ug]
0.00
0.00
0.00
#DIV/0!
29-3-2073
km/s
d'No s}lkmot
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
29-3-2073
km/s
d'No s}lkmot
0.00
....................
Prepared By:
Final Measurement
S. N Particulars Nos. Length Width Height Quantity Unit Rate Amount
Gable walls 3.00 5.25 0.36 0.78 4.38
Long wall of Varendha 1.00 15.96 0.23 0.78 2.87
2 side walls of Verandah 2.00 0.71 0.23 0.78 0.26
Total Qty 22.93 Cu.m 0 -
4 Brick work in c/s (1:6) in superstructure
Third footing
Grid A & B (including 2.0 14.86 0.23 2.10 14.35
buttresses)
Grid 1, 3 & 5 3.0 6.02 0.23 2.10 8.72
Triangular portion of 3.0 3.13 0.23 1.27 2.74
Gable(0.5x6)
Deduction
RCC band on gable walls (3.0) 6.48 0.23 0.05 (0.22)
D (2.0) 1.15 0.23 2.10 (1.11)
D1 (2.0) 0.95 0.23 2.10 (0.92)
W (12.0) 0.95 0.23 1.38 (3.61)
Total Brick mosonary work 19.96 Cu.m 0 -
5 PCC (1:2:4)
a In DPC
Along A & B 2.0 14.9 0.2 0.1 0.5
Along 1,3 & 5 3.0 6.0 0.2 0.1 0.3
In gable band 3.0 6.5 0.2 0.1 0.3
In flooring 2.0 7.0 6.0 0.1 4.2
In verandah 1.0 14.6 1.4 0.1 1.0
Platform 1.0 2.9 1.0 0.1 0.1
In base of posts 10.0 0.5 0.5 0.1 0.3
b In Sill band 0.0
Along A & B 2.0 14.9 0.2 0.1 0.5
Along 1,3 & 5 3.0 6.0 0.2 0.1 0.3
c In lintel band 0.0
Along A & B 2.0 14.9 0.2 0.2 1.0
Along 1,3 & 5 3.0 6.0 0.2 0.2 0.6
Total PCC (1:2:4) 9.23 Cu.m 0 -
6 PCC (1:3:6) in foundation of columns
Column 10 0.77 0.77 0.54 3.17
Total PCC (1:3:6) 3.17 Cu.m 0 -
7 Reinforcements
a 10 dia bar (0.61 kg/m)
i) In DPC band
Along A & B 6 15 * * 58
Along 1,3 & 5 9 7* * 40
ii) In Sill band
Along A & B 4 15 * * 39
Along 1,3 & 5 6 7* * 27
iii) In lintel band
Along A & B 8 15 * * 77
Along 1,3 & 5 12 7* * 54
Vertical rods along 1, 3 & 5 6 7 25
iii) In the inclined parts of 9 7 * * 40
gable walls Total 10 dia bar 361 Kg 0 -
....................
Prepared By:
Final Measurement
S. N Particulars Nos. Length Width Height Quantity Unit Rate Amount
b 4.75 dia bar (0.132kg/m) @ 150 c/c
In DPC band (47*3 + 102*2) 343 0* * 13
In Sill band (47*3 + 102*2) 343 0* * 13
In lintel band 343 1* * 35
In gable band 126 0* * 5
Total 4.75 dia bar 66 kg 0 -
8 Sal Wood Framework for doors & windows
a Door frames
D 2.00 5.21 0.08 0.10 0.08
D1 2.00 5.04 0.08 0.10 0.08
b Window frames 12.00 4.95 0.08 0.10 0.47
Total 0.632 cu.m 0 -
9 Sal Wood Shutter for doors & windows
D (2056 x 900) Single shutter 2.00 2.06 * 0.90 3.70
D1 (2070 x 900) Single shutter 2.00 2.07 * 0.90 3.73
b Window Shutter 12.00 1.35 * 0.90 14.58
Total door shutters 22.01 sq.m 0 -
10 Roof structure(Truss)
Posts NB 80M 10.00 3.43 * * 290.86
Plates at bottom of 10.00 0.30 0.30 0.01 70.74
post(300X300X10)
Plates at top of post(10x2) 20.00 0.20 0.20 0.01 62.88
Truss
i. Top Rafter-Front (NB 32 L) 5.00 4.99
ii. Top Rafter-Back (NB 32 L) 5.00 4.14
iii. Bottom rafter (NB 32 L) 10.00 3.37
iv. Inclined struts outer (NB 32 5.00 0.92
L)
v. Vertical struts (At the 10.00 0.88
supports) NB 32 L) * * 241.96
Vertical struts NB 25 L (4x5) 20.00 0.88 * * 35.22
Inclined struts NB 25 L
4x5 20.00 1.15 * * 46.03
2x5 10.00 1.12 * * 22.55
Pipe for anchoring translucent 16.00 3.58 * * 115.20
sheetsforNB
Pipe 25 L CGI sheets
anchoring 8.00 3.32 * * 53.39
NB 25 Lwith 12 dia bar
Lacing 80.00 0.59 * * 42.01
between
NB 50 L pipes for anchoring
for purlin (4.14 kg/m) 22.00 3.58 * * 325.70
translucent sheets (10x8) 22.00 4.31 * * 392.19
Dia 16 bar for wind bracing 8.00 4.83 * * 61.05
....................
Prepared By:
Final Measurement
S. N Particulars Nos. Length Width Height Quantity Unit Rate Amount
Front & back side 2.00 14.86 * 2.30 68.36
Sides
From plinth to top of door 2.00 6.71 * 2.30 30.87
level
Triangular portion of side 1.00 6.72 * 1.27 8.53
gables (2 xof
Deduction 0.5)
openings
D -4.00 1.10 * 2.10 -4.62
D1 -4.00 0.90 * 2.10 -3.78
W -24.00 0.90 * 1.35 -14.58
Total White Cement paint 252.31 sq.m 0 -
14 CGI sheet roofing (inclined
part)
a) Roofing
Front part 1.00 15.00 5.50 82.50
Back part 1.00 15.00 4.50 67.50
Total CGI roofing 150.00 Sqm 0 -
15 GI sheets roofing
For ridge 1.00 15.00 * 15.00 Rm 0 -
16 Translucent sheets 2.00 15.00 0.75 22.50 Sqm 0 -
17 Desk and Bench 16.00 16.00 Sets 0 -
18 Ply wood for False Ceiling 1.00 13.00 6.00 78.00 Sq m 0 -
19 Earthfilling work
Room 2.00 6.95 6.00 0.60 50.04
Varandha 1.00 14.40 1.50 0.60 12.96
Total Earth Filling 63.00 Cum 0 -
20 Transportation & Misc. 1.00 1.00 ls 0 -
Total Amount -
....................
Prepared By:
Government of nepal
Department of Education
District Education Office, Tanahun
Name of School: F/Y:2074-075
Project : 2 Room Truss Building
Pre-Estimate
S. N Particulars Nos. Length Width Height Quantity Unit Rate Amount
1 Earthwork in excavation in Foundation
In Column 10.0 1.00 1.00 1.00 10.00
In Wall -
Long wall 2.00 10.40 0.47 0.52 5.03
Short wall 3.00 5.25 0.47 0.52 3.81
Long wall of Varendha 1.00 15.96 0.36 0.34 1.93
2 side walls of Verandah 2.00 0.71 0.36 0.34 0.17
3 side walls of ramp 3.00 0.75 0.36 0.34 0.27
Long wall of ramp 1.00 7.56 0.36 0.34 0.91
In steps 1.00 2.29 0.90 0.13 0.26
Total Qty 22 cu.m
2 Stone soling (150mm)
a In Foundation
In Column 10.0 1.00 1.00 0.15 1.50
In Wall -
Long wall 2.00 10.40 0.47 0.15 1.49
Short wall 3.00 5.25 0.47 0.15 1.13
Long wall of Varendha 1.00 15.96 0.36 0.15 0.86
2 side walls of Verandah 2.00 0.71 0.36 0.15 0.08
3 side walls of ramp 3.00 0.75 0.36 0.15 0.12
Long wall of ramp 1.00 7.56 0.36 0.15 0.41
In steps 1.00 2.29 0.90 0.15 0.31
b In flooring
In rooms 2.00 6.97 6.02 0.15 12.76
In verandah -
Left 1.00 5.86 1.16 0.15 1.03
Middle 1.00 2.57 2.26 0.15 0.88
Right 1.00 5.75 1.16 0.15 1.01
Ramp 1.00 7.02 0.87 0.15 0.93
Total Stone soling work 22 cu.m
3 Stone masonary in (1:6)
a cement
Columnmotar
10.0 1.00 1.00 0.85 8.48
(10.0) 0.50 0.50 0.10 (0.25)
(10.0) 0.77 0.77 0.54 (3.17)
b Walls
i) First footing
Walls between columns 8.00 2.60 0.47 0.15 1.47
Gable walls 3.00 5.25 0.47 0.15 1.11
Long wall of Varendha 1.00 15.96 0.36 0.15 0.85
2 side walls of Verandah 2.00 0.71 0.36 0.15 0.08
3 side walls of ramp 3.00 0.75 0.36 0.15 0.12
....................
Prepared By
Pre-Estimate
S. N Particulars Nos. Length Width Height Quantity Unit Rate Amount
Long wall of ramp 1.00 7.56 0.36 0.15 0.40
Steps 1.00 5.75 0.90 0.15 0.78
1.00 5.75 0.60 0.15 0.52
1.00 5.75 0.30 0.15 0.26
ii) Second footing
Walls between columns 8.00 2.60 0.36 0.78 5.78
Gable walls 3.00 5.25 0.36 0.78 4.38
Long wall of Varendha 1.00 15.96 0.23 0.61 2.23
2 side walls of Verandah 2.00 0.71 0.23 0.61 0.20
2 side walls of ramp 3.00 0.75 0.23 0.61 0.31
Long wall of ramp 1.00 7.56 0.23 0.30 0.53
Total Qty 24 Cu.m
4 Brick work in c/s (1:6) in superstructure
Third footing
Buttresses 16.0 0.36 0.12 2.10 1.37
Grid A & B (including 2.00 14.86 0.23 2.10 14.35
buttresses)
Grid 1, 3 & 5 3.00 6.02 0.23 2.10 8.72
Triangular portion of 3.00 3.13 0.23 1.27 2.74
Gable(0.5x6)
Deduction
RCC band on gable walls (3.00) 6.48 0.23 0.05 (0.22)
Deduction of buttresses at (3.00) 0.36 0.12 0.68 (0.08)
front
D (2.00) 1.15 0.23 2.10 (1.11)
D1 (2.00) 0.95 0.23 2.10 (0.92)
W (12.0) 0.95 0.23 1.38 (3.61)
Total Brick mosonary work 21.25 Cu.m
5 PCC (1:2:4)
a In DPC
Buttresses 16.0 0.4 0.1 0.1 0.0
Along A & B 2.0 14.9 0.2 0.1 0.5
Along 1,3 & 5 3.0 6.0 0.2 0.1 0.3
In gable band 3.0 6.5 0.2 0.1 0.3
In flooring 2.0 7.0 6.0 0.1 4.2
In verandah 1.0 14.6 1.4 0.1 1.0
Deduction of buttresses -4.0 0.4 0.1 0.1 0.0
Platform 1.0 2.9 1.0 0.1 0.1
In base of posts 10.0 0.5 0.5 0.1 0.3
Ramp 1.0 7.2 1.0 0.1 0.4
b In Sill band 0.0
Buttresses 16.0 0.4 0.1 0.1 0.0
Along A & B 2.0 14.9 0.2 0.1 0.5
Along 1,3 & 5 3.0 6.0 0.2 0.1 0.3
c In lintel band 0.0
Buttresses 16.0 0.1 0.3 0.2 0.1
Along A & B 2.0 14.9 0.2 0.2 1.0
Along 1,3 & 5 3.0 6.0 0.2 0.2 0.6
Total PCC (1:2:4) 9.78 Cu.m
6 PCC (1:3:6) in foundation of
Column columns 10 0.77 0.77 0.54 3.17
....................
Prepared By
Pre-Estimate
S. N Particulars Nos. Length Width Height Quantity Unit Rate Amount
Total PCC (1:3:6) 3.17 Cu.m
7 Reinforcements
a 10 dia bar (0.61 kg/m)
i) In DPC band
Along A & B 6 15 * * 58
Along 1,3 & 5 9 7* * 40
ii) In Sill band
Along A & B 4 15 * * 39
Along 1,3 & 5 6 7* * 27
iii) In lintel band
Along A & B 8 15 * * 77
Along 1,3 & 5 12 7* * 54
Vertical rods along 1, 3 & 5 6 7 25
iii) In the inclined parts of 9 7* * 40
gable walls Total 10 dia bar 361 Kg
b 4.75 dia bar (0.132kg/m) @ 150 c/c
In DPC band (47*3 + 102*2) 343 0* * 13
In Sill band (47*3 + 102*2) 343 0* * 13
In lintel band 343 1* * 35
In gable band 126 0* * 5
Total 4.75 dia bar 66 kg
8 Sal Wood Framework for doors & windows
a Door frames
D 2.00 5.21 0.08 0.10 0.08
D1 2.00 5.04 0.08 0.10 0.08
b Window frames 12.00 4.95 0.08 0.10 0.47
Total 0.632 cu.m
9 Sal Wood Shutter for doors & windows
D (2056 x 900) Single 2.00 2.06 * 0.90 3.70
shutter
D1 (2070 x 900) Single 2.00 2.07 * 0.90 3.73
b shutter
Window Shutter 12.00 1.35 * 0.90 14.58
Total door shutters 22.01 sq.m
10 Roof structure(Truss)
Posts NB 80M 10.00 3.43 * * 290.86
Plates at bottom of 10.00 0.30 0.30 0.01 70.74
post(300X300X10)
Plates at top of post(10x2) 20.00 0.20 0.20 0.01 62.88
Truss
i. Top Rafter-Front (NB 32 5.00 4.99
L)
ii. Top Rafter-Back (NB 32 5.00 4.14
iii. Bottom rafter (NB 32 L) 10.00
L) 3.37
iv. Inclined struts outer (NB 5.00 0.92
32Vertical
v. L) struts (At the 10.00 0.88
supports) NB 32 L) * * 241.96
Vertical struts NB 25 L 20.00 0.88 * * 35.22
(4x5)
Inclined struts NB 25 L
4x5 20.00 1.15 * * 46.03
2x5 10.00 1.12 * * 22.55
Pipe for anchoring 16.00 3.58 * * 115.20
translucent sheets NB 25 L
....................
Prepared By
Pre-Estimate
S. N Particulars Nos. Length Width Height Quantity Unit Rate Amount
Pipe for anchoring CGI 8.00 3.32 * * 53.39
sheets NB 25 L
Lacing with 12 dia bar 80.00 0.59 * * 42.01
between
NB 50 L pipes for anchoring
for purlin (4.14 22.00 3.58 * * 325.70
translucent sheets (10x8)
kg/m) 22.00 4.31 * * 392.19
Dia 16 bar for wind bracing 8.00 4.83 * * 61.05
....................
Prepared By
Pre-Estimate
S. N Particulars Nos. Length Width Height Quantity Unit Rate Amount
Total Cement plaster (1:4) 299.40 sq.m
12 Cement punning (1:2)
Steps (0.9 +0.6) 1.00 5.75 * 1.50 8.62
In flooring 2.00 6.97 6.02 83.92
In verandah 1.00 14.63 1.39 20.26
1.00 3.03 1.10 3.33
Total Qty 116.13 Sq.m
13 2 coat snowceme paint
a Rooms 4.00 6.02 * 2.30 55.38
4.00 6.97 * 2.30 64.12
b Trinagular portion of gable 4.00 6.46 * 1.26 32.64
wall
Sides of opening 0.00
D Verticle 2 x 2 4.00 0.23 * 2.10 1.93
Horizontal 2 x 1 2.00 0.23 * 1.10 0.51
D1 Verticle 2 x 2 4.00 0.23 * 2.10 1.93
Horizontal 2 x 1 2.00 0.23 * 0.90 0.41
W Verticle 2 x 2 24.00 0.23 * 1.35 7.45
Horizontal 2 x 2 12.00 0.23 * 0.90 2.48
Sides of Buttresses at 4.00 3.00 * 0.12 1.38
middle gable
Gable band 2.00 6.74 * 0.05 0.67
Deduction of openings
D -2.00 1.10 * 2.10 -4.62
D1 -2.00 0.90 * 2.10 -3.78
W -12.00 0.90 * 1.35 -14.58
Total White Cement paint 145.94 sq.m
14 CGI sheet roofing (inclined
part)
a) Roofing
Front part 1.00 15.00 5.50 82.50
Back part 1.00 15.00 4.50 67.50
Total CGI roofing 150.00 Sqm
15 GI sheets roofing
For ridge 1.00 15.00 * 15.00 Rm
16 Translucent sheets 2.00 15.00 0.75 22.50 Sqm
17 Desk and Bench 16.00 16.00 Sets
18 Ply wood for False Ceiling 1.00 13.94 6.00 83.64 Sq m
19 Earthfilling work
Room 2.00 6.95 6.00 0.50 41.70
Varandha 1.00 14.40 1.50 0.50 10.80
Total Earth Filling 52.50 Cum
20 Transportation & Misc. 1.00 1.00 ls
Total Amount -
....................