Anda di halaman 1dari 3

ROTARY Drilling Co. Ltd. Approved by: ……………………….

Syrian Branch Effective Date: 11th April 1998


Rig 65
Page 1 of 3

P R O C E D U R E F O R U S E & M A I N TA I N C A M P
H2S ALARM EQUIPMENT

I NTRODUCTION

This procedure has issued for using and maintaining ROTARY Rig 65’s
Camp H2S alarm equipment.

U SING OF C AMP H 2 S ALERT EQUIPMENT

There are three reasons to use Camp H 2S alert equipment:

1. In case of real H2S situation in rigsite it is the MIC (Man-In-Charge)


decision to alert Camp to leave it immediately.
2. If only one qualified person available on rigsite as member of search
& rescue team the off duty toolpusher has to be alerted in camp by
using alert remote switch in radio room. (MIC decision)
3. Additional reason for use can be an H 2S drill in camp as per ROTARY
HSE Drills Frequency Plan.

There are no more possibilities to use that alert!

E QUIPM ENT L AY - OUT

The camp alert system divided into two parts. First part is the remote
switch located in radio room at rigsite. In “ON” position it operates the
alarm devices on camp. Second part is consist of a flashlight and a siren
at the shorten sidewall of medic caravan in camp.

A LERT SIGNALS

The three reasons for use alert equipment have two different types of
signal.

410268860.DOC
ROTARY Drilling Co. Ltd. Approved by: ……………………….
Syrian Branch Effective Date: 11th April 1998
Rig 65
Page 2 of 3

SITUATION ACTIONS SIREN FLASHLIGHT


Real H2S at rigsite Headcount & leave Camp Continuous Flash
No available Medic or Camp boss alerts Interrupted Flash
person for search off duty TP who proceeds to
team rig with Medic
H2S Drill in Camp Depend on MIC As per MIC Flash
request

M AINTENANCE PROGRAMME

FREQUENCY WHAT WHERE CHECK FOR WHO


DAILY Remote Rigsit Damage, power cable, surface Electricia
switch e defects n
Flashlight Cam Damage, power cable, bulb, Electricia
p isolation n
Siren Cam Damage, cover plate, power Electricia
p cable n
WEEKLY Remote Rigsit Damage, power cable, surface Electricia
switch e defects, function test n
Flashlight Cam Damage, power cable, bulb, Electricia
p isolation, function test n
Siren Cam Damage, cover plate, power Electricia
p cable, func-tion test n
AFTER RIG UP Full function test has to be carried out

The electrician has to fill up the checklist form after every inspection.
These filled forms have to be kept at rigsite. (See attachment for
checklist)

410268860.DOC
ROTARY Drilling Co. Ltd. Approved by: ……………………….
Syrian Branch Effective Date: 11th April 1998
Rig 65
Page 3 of 3

410268860.DOC

Anda mungkin juga menyukai