Sub-Contractor: AG&P
Project Name: JG Summit Stage1 Expansion Project 11/Jan/19
1 E-0401B Naphtha Feed Preheater 10/Dec/18 Installed Weekly 0.15 Larry P. Alaba 1 Larry Patenio Alaba QC Inspector
2 D-0600 HP Depropanizer Feed K.O. Drum 21/Dec/18 Installed Weekly 0.65 Larry P. Alaba 2 Salvador Delacruz Mechanical Foreman
3 D-0640 Condensate Pot for E-0640 21/Dec/18 Installed Weekly 0.02 Larry P. Alaba 3 Romeo Sode Millwright
4 Z-0651 Parallel Coldbox Package 07/Jan/19 Installed Weekly 0.67 Larry P. Alaba
5 D-0690 Light Tertiary Refrigerant Accumulator B 07/Jan/19 Installed Weekly 0.66 Larry P. Alaba
6 E-0624E/F Tertiary Refrigerant Condenser 07/Jan/19 Installed Weekly 0 Larry P. Alaba N2 re-charging is scheduled on 18 Jan.
7 E-0610B Demethanizer Side Reboiler 16/Jan/19 Laydown Weekly 0.9 Larry P. Alaba
8 E-0601AM/BM Tube Bundle for HP Depropanizer Reboiler 16/Jan/19 Laydown Weekly in the box Larry P. Alaba for S/D
9 D-0652 Demethanizer Feed Separator B No. 2 17/Jan/19 Laydown Weekly covered Larry P. Alaba
10 D-0653 Demethanizer Feed Separator B No. 3 17/Jan/19 Laydown Weekly covered Larry P. Alaba
11 D-0654 Hydrogen/Methane Separator B 17/Jan/19 Laydown Weekly covered Larry P. Alaba
12 D-0693 Medium Tertiary Refrigerant Drum B 17/Jan/19 Laydown Weekly 0.06 Larry P. Alaba
13 E-0402R Ethane Recycle Preheater 17/Jan/19 Laydown Weekly 0.09 Larry P. Alaba for S/D
14 E-0503R Charge Gas Compressor 3rd Stage Aftercooler 17/Jan/19 Laydown Weekly 0.08 Larry P. Alaba for S/D
15 E-0622R Hydrogen/Methane Compressor Aftercooler 17/Jan/19 Laydown Weekly 0.09 Larry P. Alaba for S/D
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
PRESERVATION MAINTENANCE LOG SHEET
STATIC EQUIPMENT
EQ No. - E-0401B (Naphtha Feed Preheater) Y - yes, N - no, NA - not applic
10
11
12
N - no, NA - not applicable
onthly checked;
Remark
PRESERVATION MAINTENANCE LOG SHEET
STATIC EQUIPMENT
EQ No. - D-0600 (HP Depropanizer Feed K.O. Drum) Y - yes, N - no, NA - not applic
10
11
12
N - no, NA - not applicable
onthly checked;
Remark
PRESERVATION MAINTENANCE LOG SHEET
STATIC EQUIPMENT
EQ No. - D-0640 (Condensate Pot for E-0640) Y - yes, N - no, NA - not applic
10
11
12
N - no, NA - not applicable
onthly checked;
Remark
PRESERVATION MAINTENANCE LOG SHEET
PACKAGE ITEM
EQ No. : Z-0651 (Parallel Coldbox Package) Y - yes, N - no, NA - not applic
10
11
12
N - no, NA - not applicable
onthly checked;
Remark
PRESERVATION MAINTENANCE LOG SHEET
STATIC EQUIPMENT
EQ No. : D-0690 (Light Tertiary Refrigerant Accumulator B) Y - yes, N - no, NA - not applic
10
11
12
N - no, NA - not applicable
onthly checked;
Remark
PRESERVATION MAINTENANCE LOG SHEET
STATIC EQUIPMENT
EQ No. : E-0624E/F (Parallel Coldbox Package) Y - yes, N - no, NA - not applic
10
11
12
N - no, NA - not applicable
onthly checked;
Remark
PRESERVATION MAINTENANCE LOG SHEET
STATIC EQUIPMENT
EQ No. : E-0610B(Demethanizer Side Reboiler) Y - yes, N - no, NA - not applic
10
11
12
N - no, NA - not applicable
onthly checked;
Remark
PRESERVATION MAINTENANCE LOG SHEET
STATIC EQUIPMENT
EQ No. : E-0601AM(Tube Bundle for HP Depropanizer Reboiler) Y - yes, N - no, NA - not applic
10
11
12
N - no, NA - not applicable
onthly checked;
Remark
PRESERVATION MAINTENANCE LOG SHEET
STATIC EQUIPMENT
EQ No. : E-0601BM(Tube Bundle for HP Depropanizer Reboiler) Y - yes, N - no, NA - not applic
10
11
12
N - no, NA - not applicable
onthly checked;
Remark