Preservation Check Schedule Preservation Manpower List

Sub-Contractor: AG&P
Project Name: JG Summit Stage1 Expansion Project 11/Jan/19

Arrival of Day N2 Pressure (MPa)


No EQ No. Description Location Period Person in charge Remark No Name Position Remark
Equipment
Mon Tue Wed Thu Fri Sat Sun 18/Jan/19 25/Jan/19

1 E-0401B Naphtha Feed Preheater 10/Dec/18 Installed Weekly 0.15 Larry P. Alaba 1 Larry Patenio Alaba QC Inspector

2 D-0600 HP Depropanizer Feed K.O. Drum 21/Dec/18 Installed Weekly 0.65 Larry P. Alaba 2 Salvador Delacruz Mechanical Foreman
3 D-0640 Condensate Pot for E-0640 21/Dec/18 Installed Weekly 0.02 Larry P. Alaba 3 Romeo Sode Millwright

4 Z-0651 Parallel Coldbox Package 07/Jan/19 Installed Weekly 0.67 Larry P. Alaba
5 D-0690 Light Tertiary Refrigerant Accumulator B 07/Jan/19 Installed Weekly 0.66 Larry P. Alaba

6 E-0624E/F Tertiary Refrigerant Condenser 07/Jan/19 Installed Weekly 0 Larry P. Alaba N2 re-charging is scheduled on 18 Jan.
7 E-0610B Demethanizer Side Reboiler 16/Jan/19 Laydown Weekly 0.9 Larry P. Alaba

8 E-0601AM/BM Tube Bundle for HP Depropanizer Reboiler 16/Jan/19 Laydown Weekly in the box Larry P. Alaba for S/D
9 D-0652 Demethanizer Feed Separator B No. 2 17/Jan/19 Laydown Weekly covered Larry P. Alaba

10 D-0653 Demethanizer Feed Separator B No. 3 17/Jan/19 Laydown Weekly covered Larry P. Alaba
11 D-0654 Hydrogen/Methane Separator B 17/Jan/19 Laydown Weekly covered Larry P. Alaba

12 D-0693 Medium Tertiary Refrigerant Drum B 17/Jan/19 Laydown Weekly 0.06 Larry P. Alaba
13 E-0402R Ethane Recycle Preheater 17/Jan/19 Laydown Weekly 0.09 Larry P. Alaba for S/D

14 E-0503R Charge Gas Compressor 3rd Stage Aftercooler 17/Jan/19 Laydown Weekly 0.08 Larry P. Alaba for S/D
15 E-0622R Hydrogen/Methane Compressor Aftercooler 17/Jan/19 Laydown Weekly 0.09 Larry P. Alaba for S/D

16
17

18
19

20
21

22
23

24
25

26
27

28
29

30
31

32
33

34
35
PRESERVATION MAINTENANCE LOG SHEET
STATIC EQUIPMENT
EQ No. - E-0401B (Naphtha Feed Preheater) Y - yes, N - no, NA - not applic

Temporary Nozzle covers shall be:


A. Checked regularly to prevent moisture, sand etc
B. If covers are missing, to be replaced,
C. Protective coating to be re-applied after metal nozzle cover opened
D. Check Upon arrival N2 press and while storage, positive gas pressure is maintained as per below vendors' requirement
E. Small Item to be stored in warehouse location with tag identification
F. Air Fin cooler fin tube protection by wooden panels and desiccant
G. Internal Parts storage with tag in accordance to vendors' instruction
H. No Moist retaining materials for SS vessels' temp supports. Provide shield to protect vessels when wood supports used
I. Tell tale holes to be filled with grease.

daily checked; A,B,C,D,E,F,G,H,I weekly checked; monthly checked;

No. Date A B C D E F G H I Person in charge Signature


1

10

11

12
N - no, NA - not applicable

onthly checked;

Remark
PRESERVATION MAINTENANCE LOG SHEET
STATIC EQUIPMENT
EQ No. - D-0600 (HP Depropanizer Feed K.O. Drum) Y - yes, N - no, NA - not applic

Temporary Nozzle covers shall be:


A. Checked regularly to prevent moisture, sand etc
B. If covers are missing, to be replaced,
C. Protective coating to be re-applied after metal nozzle cover opened
D. Check Upon arrival N2 press and while storage, positive gas pressure is maintained as per below vendors' requirement
E. Small Item to be stored in warehouse location with tag identification
F. Air Fin cooler fin tube protection by wooden panels and desiccant
G. Internal Parts storage with tag in accordance to vendors' instruction
H. No Moist retaining materials for SS vessels' temp supports. Provide shield to protect vessels when wood supports used
I. Tell tale holes to be filled with grease.

daily checked; A,B,C,D,E,F,G,H,I weekly checked; monthly checked;

No. Date A B C D E F G H I Person in charge Signature


1

10

11

12
N - no, NA - not applicable

onthly checked;

Remark
PRESERVATION MAINTENANCE LOG SHEET
STATIC EQUIPMENT
EQ No. - D-0640 (Condensate Pot for E-0640) Y - yes, N - no, NA - not applic

Temporary Nozzle covers shall be:


A. Checked regularly to prevent moisture, sand etc
B. If covers are missing, to be replaced,
C. Protective coating to be re-applied after metal nozzle cover opened
D. Check Upon arrival N2 press and while storage, positive gas pressure is maintained as per below vendors' requirement
E. Small Item to be stored in warehouse location with tag identification
F. Air Fin cooler fin tube protection by wooden panels and desiccant
G. Internal Parts storage with tag in accordance to vendors' instruction
H. No Moist retaining materials for SS vessels' temp supports. Provide shield to protect vessels when wood supports used
I. Tell tale holes to be filled with grease.

daily checked; A,B,C,D,E,F,G,H,I weekly checked; monthly checked;

No. Date A B C D E F G H I Person in charge Signature


1

10

11

12
N - no, NA - not applicable

onthly checked;

Remark
PRESERVATION MAINTENANCE LOG SHEET
PACKAGE ITEM
EQ No. : Z-0651 (Parallel Coldbox Package) Y - yes, N - no, NA - not applic

Temporary Nozzle covers shall be:


A. Checked regularly to prevent moisture, sand etc
B. If covers are missing, to be replaced,
C. Protective coating to be re-applied after metal nozzle cover opened
D. Check Upon arrival N2 press and while storage, positive gas pressure is maintained as per below vendors' requirement
E. Small Item to be stored in warehouse location with tag identification
F. Air Fin cooler fin tube protection by wooden panels and desiccant
G. Internal Parts storage with tag in accordance to vendors' instruction
H. No Moist retaining materials for SS vessels' temp supports. Provide shield to protect vessels when wood supports used
I. Tell tale holes to be filled with grease.

daily checked; A,B,C,D,E,F,G,H,I weekly checked; monthly checked;

No. Date A B C D E F G H I Person in charge Signature


1

10

11

12
N - no, NA - not applicable

onthly checked;

Remark
PRESERVATION MAINTENANCE LOG SHEET
STATIC EQUIPMENT
EQ No. : D-0690 (Light Tertiary Refrigerant Accumulator B) Y - yes, N - no, NA - not applic

Temporary Nozzle covers shall be:


A. Checked regularly to prevent moisture, sand etc
B. If covers are missing, to be replaced,
C. Protective coating to be re-applied after metal nozzle cover opened
D. Check Upon arrival N2 press and while storage, positive gas pressure is maintained as per below vendors' requirement
E. Small Item to be stored in warehouse location with tag identification
F. Air Fin cooler fin tube protection by wooden panels and desiccant
G. Internal Parts storage with tag in accordance to vendors' instruction
H. No Moist retaining materials for SS vessels' temp supports. Provide shield to protect vessels when wood supports used
I. Tell tale holes to be filled with grease.

daily checked; A,B,C,D,E,F,G,H,I weekly checked; monthly checked;

No. Date A B C D E F G H I Person in charge Signature


1

10

11

12
N - no, NA - not applicable

onthly checked;

Remark
PRESERVATION MAINTENANCE LOG SHEET
STATIC EQUIPMENT
EQ No. : E-0624E/F (Parallel Coldbox Package) Y - yes, N - no, NA - not applic

Temporary Nozzle covers shall be:


A. Checked regularly to prevent moisture, sand etc
B. If covers are missing, to be replaced,
C. Protective coating to be re-applied after metal nozzle cover opened
D. Check Upon arrival N2 press and while storage, positive gas pressure is maintained as per below vendors' requirement
E. Small Item to be stored in warehouse location with tag identification
F. Air Fin cooler fin tube protection by wooden panels and desiccant
G. Internal Parts storage with tag in accordance to vendors' instruction
H. No Moist retaining materials for SS vessels' temp supports. Provide shield to protect vessels when wood supports used
I. Tell tale holes to be filled with grease.

daily checked; A,B,C,D,E,F,G,H,I weekly checked; monthly checked;

No. Date A B C D E F G H I Person in charge Signature


1

10

11

12
N - no, NA - not applicable

onthly checked;

Remark
PRESERVATION MAINTENANCE LOG SHEET
STATIC EQUIPMENT
EQ No. : E-0610B(Demethanizer Side Reboiler) Y - yes, N - no, NA - not applic

Temporary Nozzle covers shall be:


A. Checked regularly to prevent moisture, sand etc
B. If covers are missing, to be replaced,
C. Protective coating to be re-applied after metal nozzle cover opened
D. Check Upon arrival N2 press and while storage, positive gas pressure is maintained as per below vendors' requirement
E. Small Item to be stored in warehouse location with tag identification
F. Air Fin cooler fin tube protection by wooden panels and desiccant
G. Internal Parts storage with tag in accordance to vendors' instruction
H. No Moist retaining materials for SS vessels' temp supports. Provide shield to protect vessels when wood supports used
I. Tell tale holes to be filled with grease.

daily checked; A,B,C,D,E,F,G,H,I weekly checked; monthly checked;

No. Date A B C D E F G H I Person in charge Signature


1

10

11

12
N - no, NA - not applicable

onthly checked;

Remark
PRESERVATION MAINTENANCE LOG SHEET
STATIC EQUIPMENT
EQ No. : E-0601AM(Tube Bundle for HP Depropanizer Reboiler) Y - yes, N - no, NA - not applic

Temporary Nozzle covers shall be:


A. Checked regularly to prevent moisture, sand etc
B. If covers are missing, to be replaced,
C. Protective coating to be re-applied after metal nozzle cover opened
D. Check Upon arrival N2 press and while storage, positive gas pressure is maintained as per below vendors' requirement
E. Small Item to be stored in warehouse location with tag identification
F. Air Fin cooler fin tube protection by wooden panels and desiccant
G. Internal Parts storage with tag in accordance to vendors' instruction
H. No Moist retaining materials for SS vessels' temp supports. Provide shield to protect vessels when wood supports used
I. Tell tale holes to be filled with grease.

daily checked; A,B,C,D,E,F,G,H,I weekly checked; monthly checked;

No. Date A B C D E F G H I Person in charge Signature


1

10

11

12
N - no, NA - not applicable

onthly checked;

Remark
PRESERVATION MAINTENANCE LOG SHEET
STATIC EQUIPMENT
EQ No. : E-0601BM(Tube Bundle for HP Depropanizer Reboiler) Y - yes, N - no, NA - not applic

Temporary Nozzle covers shall be:


A. Checked regularly to prevent moisture, sand etc
B. If covers are missing, to be replaced,
C. Protective coating to be re-applied after metal nozzle cover opened
D. Check Upon arrival N2 press and while storage, positive gas pressure is maintained as per below vendors' requirement
E. Small Item to be stored in warehouse location with tag identification
F. Air Fin cooler fin tube protection by wooden panels and desiccant
G. Internal Parts storage with tag in accordance to vendors' instruction
H. No Moist retaining materials for SS vessels' temp supports. Provide shield to protect vessels when wood supports used
I. Tell tale holes to be filled with grease.

daily checked; A,B,C,D,E,F,G,H,I weekly checked; monthly checked;

No. Date A B C D E F G H I Person in charge Signature


1

10

11

12
N - no, NA - not applicable

onthly checked;

Remark

Anda mungkin juga menyukai