Result
FS Phil Philspec AG&P SIGBC
Accepted 854 953 329 59
Waiting for result 3 15 19 0
Cancelled 90 43 7 0
Reject 5 0 0 0
Total 952 1011 355 59
Discipline
Status
FS Phil Philspec AG&P SIGBC
On-schedule 511 878 317 59
Re-schedule 241 99 36 0
Additional 206 109 30 0
Total 958 1086 383 59
cipline
Sum
MRI SJ E&I Insulation
88 48 0 2331
4 0 0 41
0 0 0 140
0 0 0 5
92 48 0 2517
cipline
Sum
MRI SJ E&I Insulation
79 33 0 1877
13 2 0 391
1 13 0 359
93 48 0 2627
Inspection Notification Log Sheet
Inspection Schedule
Inspection Party
Inspection Inspection
SN Log Date Inspection Detail Activities Area / Location
Notification Number SC VPCI PMC Date
3 / 732
Time Subcontractor Inspector Discipline Remarks
4 / 732
Inspection Notification Log Sheet
Inspection Result
Inspection Notification Inspection Party Inspection
SN Log Date Number Inspection Detail Activities Area / Location Date
SC VPCI PMC
Penetrant Test
8 18-Feb-19 JGSS1EP-VPCI-PSP-1039 NDE Ambulong Shop H W SW 19-Feb-19
A04A5001-QO-04041-T1 Jt. 3
5 / 732
Visual Welding Inspection (Post)
10 18-Feb-19 JGSS1EP-VPCI-PSP-1042 Welding Radiant End Wall Grid A&F @ H-0305 Area 300 H W SW 19-Feb-19
77212651-305-CT-01-E-110302
JG Summit Site
Welding Visual Visual Inspection at Piperack C
15 19-Feb-19 JGSS1EP-VPCI-AGP-0305 AREA 600 / H W SW 19-Feb-19
Inspection Dwg. No. A01A5001-RT-26052-01 FW JT.10
PIPERACK C
17 18-Feb-19 JGSS1EP-VPCI-PSP-1038 Painting & Coating Final DFT Check and Visual Inspection of Finish Coat Ambulong Shop H W SW 19-Feb-19
6 / 732
Magnetic Test
Radiant End Wall Grid A&F @ H-0305
20 18-Feb-19 JGSS1EP-VPCI-PSP-1044 NDE 77212651-305-CT-01-E-110302 Area 300 H W SW 19-Feb-19
Bent Steel Column 10 @ H-0305
77212651-305-CT-01-E-140302
Ultrasonic Test
Radiant End Wall Grid A&F @ H-0305
21 18-Feb-19 JGSS1EP-VPCI-PSP-1045 NDE 77212651-305-CT-01-E-110302 Area 300 H W SW 19-Feb-19
Bent Steel Column 10 @ H-0305
77212651-305-CT-01-E-140302
Inspection Schedule
Inspection Notification Inspection Party Inspection
SN Log Date Inspection Detail Activities Area / Location
Number SC VPCI PMC Date
7 / 732
Blasting & Primer Application Inspection of 94pcs Pipe
1 19-Feb-19 JGSS1EP-VPCI-AGP-0309 Painting & Coating AG&P Yard 1 H W SW 20-Feb-19
Support CS 1B & pipespools CS 2A & 2E
4 19-Feb-19 JGSS1EP-VPCI-PSP-1068 PWHT Post-Weld Heat Treatment (G-SC-PWHT-0036) Ambulong Shop H SW/R R 20-Feb-19
Elevation/ Levelness/
5 19-Feb-19 JGSS1EP-VPCI-PSP-1061 Centering Inspection of Z-0901 Area 900 H W SW 20-Feb-19
Centering / Plumbness
Elevation/ Levelness/
6 19-Feb-19 JGSS1EP-VPCI-PSP-1062 Centering Inspection of Z-0902 Area 900 H W SW 20-Feb-19
Centering / Plumbness
Astec Laboratory
9 19-Feb-19 JGSS1EP-VPCI-PSP-1052 Laboratory Testing 7 Days Compressive Strength Test for STR-0701 H SW SW 20-Feb-19
Laguna
8 / 732
Final Inspection of Equipment No., Orientation, Levelness,
Elevation and Centering of Process Water Stripper Reboiler
13 19-Feb-19 JGSS1EP-VPCI-PSP-1058 Equipment Installation Area 400 H W SW 20-Feb-19
E-0408B
DWG No. A3-JGS1EP-HAN-DD-E0408B-001
9 / 732
Painting Materials application and compatibility test based
on the existing paint at Heater Area:
1. ZINC RICH EPOXY (BARRIER 80)
21 18-Feb-19 JGSS1EP-VPCI-PSP-1046 Painting & Coating 2. HIGH BUILD MIO EPOXY COAT DPG 2 Area H W SW 20-Feb-19
3. ACRYLIC ALIPATIC POLYURETHANE (JOTUN
HARDTOP XP)
4. EPOXY NOVALAC (JOTUN EPOXY HR)
Welding Visual
26 19-Feb-19 JGSS1EP-VPCI-AGP-0310 Notification for Fit-up of SS AG&P Yard 1 H W SW 20-Feb-19
Inspection
29 19-Feb-19 JGSS1EP-VPCI-PSP-1065 Visual Inspection Notification for Inspection of All Nozzle @ D-0907 Area 900 H W SW 20-Feb-19
30 19-Feb-19 JGSS1EP-VPCI-PSP-1066 Visual Inspection Notification for Inspection of All Nozzle @ D-0911 Area 900 H W SW 20-Feb-19
10 / 732
31 19-Feb-19 JGSS1EP-VPCI-PSP-1067 Visual Inspection Notification for Inspection of All Nozzle @ E-0913 Area 900 H W SW 20-Feb-19
11 / 732
Time Subcontractor Inspector Discipline Result
12 / 732
Randal
0900H Philspec Mechanical Accepted
Fernandez
Randal
0900H Philspec Mechanical Accepted
Fernandez
0900H
AG&P Allan Magadia Structural Accepted
0900H
Mark Darrel
to AG&P Piping Accepted
Aranas
1100H
0900H
Mark Darrel
to AG&P Mechanical Accepted
Aranas
1100H
13 / 732
Randal
1000H Philspec Mechanical Accepted
Fernandez
Randal
1000H Philspec Mechanical Accepted
Fernandez
14 / 732
0800H AG&P Arvin Balitaan Piping On-schedule
Randal
0830H Philspec Mechanical On-schedule
Fernandez
Randal
0830H Philspec Mechanical On-schedule
Fernandez
Randal
0900H Philspec Mechanical On-schedule
Fernandez
Randal
0900H Philspec Mechanical On-schedule
Fernandez
Randal
0900H Philspec Mechanical On-schedule
Fernandez
15 / 732
Randal
0900H Philspec Mechanical On-schedule
Fernandez
Randal
0900H Philspec Mechanical On-schedule
Fernandez
Randal
0900H Philspec Mechanical On-schedule
Fernandez
0900H
AG&P Ralph Rabuyo Structural Additional
16 / 732
0900H Philspec Ermer Valdez Painting Re-schedule
0900H
Mark Darrel
to AG&P Piping On-schedule
Aranas
1100H
0900H
Mark Darrel
to AG&P Piping On-schedule
Aranas
1100H
Randal
1000H Philspec Mechanical On-schedule
Fernandez
Randal
1000H Philspec Mechanical On-schedule
Fernandez
Randal
1000H Philspec Mechanical On-schedule
Fernandez
17 / 732
Randal
1000H Philspec Mechanical On-schedule
Fernandez
Randal
1500H Philspec Mechanical Additional
Fernandez
18 / 732
Inspection Notification Log Sheet
FS PHIL
ASTEC,
JGSS1EP-VPCI- Sampling of Joint inspection/witness (Ø10mm,
2 18-May-18 Calamba City, H H R 19-May-18
FSP-0002 Deformed steel bar Ø12mm, Ø16mm, Ø20mm, Ø25mm).
Laguna.
JGSS1EP-VPCI- Joint Inspection/Checking of Bored pile
3 22-May-18 Pre-pouring Heater FDN H H R 23-May-18
FSP-0003 location @ H-305.
19 / 732
JGSS1EP-VPCI- Concrete placement inspection of Test
8 29-May-18 Concrete Pouring Heater FDN H W SW 30-May-18
FSP-0007 Pile @ H-305
Checking of Bored pile rebar cage
JGSS1EP-VPCI-
9 4-Jun-18 Pre-pouring fabrication prior to installation for H-305. Laydown H W SW 5-Jun-18
FSP-0008
Pile Rebar Length (11m- 1 pc).
Checking of installation of Bored Pile
JGSS1EP-VPCI-
10 4-Jun-18 Pre-pouring No.1 prior to concrete pouring. (Pile Heater FDN H W SW 5-Jun-18
FSP-0009
Rebar Length = 11 m) @H305
Checking of installation of Test Pile No.2
JGSS1EP-VPCI-
11 4-Jun-18 Pre-pouring prior to concrete pouring. (Pile Rebar Heater FDN H W SW 5-Jun-18
FSP-0010
Length = 11 m @H305
Concrete placement inspection of Test
JGSS1EP-VPCI-
12 5-Jun-18 Concrete Pouring Pile 2 and Bored Pile No.24, Seq. 1 @ H- Heater FDN H W SW 6-Jun-18
FSP-0011
305
JGSS1EP-VPCI- Concrete Trial Joint inspection/witness of trial batch DMCI Batching
13 6-Jun-18 H W SW 6-Jun-18
FSP-0012 Batch (Concrete Strength = 28Mpa) Plant
Elevation, rebar, forms, concrete
JGSS1EP-VPCI-
14 6-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 6-Jun-18
FSP-0013
7, Seq. 17 @ H-305
20 / 732
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
18 7-Jun-18 Concrete Pouring placement inspection for Bored Pile No.6 Heater FDN H W SW 8-Jun-18
FSP-0017
@ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
19 8-Jun-18 Concrete Pouring placement inspection for Bored Pile Heater FDN H W SW 9-Jun-18
FSP-0018
No.28, Sequence No. 24 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
20 8-Jun-18 Concrete Pouring placement inspection for Bored Pile Heater FDN H W SW 9-Jun-18
FSP-0019
No.16, Sequence No. 25 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
21 9-Jun-18 Concrete Pouring placement inspection for Bored Pile Heater FDN H W SW 11-Jun-18
FSP-0020
No.17, Sequence No. 21 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
22 11-Jun-18 Concrete Pouring placement inspection for Bored Pile Heater FDN H W SW 12-Jun-18
FSP-0021
No.10, Sequence No. 23 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
23 11-Jun-18 Concrete Pouring placement inspection for Bored Pile Heater FDN H W SW 12-Jun-18
FSP-0022
No.27, Sequence No. 26 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
24 11-Jun-18 Concrete Pouring placement inspection for Bored Pile Heater FDN H W SW 12-Jun-18
FSP-0023
No.25, Sequence No. 27 @ H-305
7th day Compressive Strength Test of
Brgy.
Bored Pile No. 24, Bored Pile No. 7 and
JGSS1EP-VPCI- Pinamucan
25 12-Jun-18 Laboratory Testing Trial Batch Concrete Cylindrical Sample H SW SW 13-Jun-18
FSP-0024 Ibaba, Batangas
(28 mpa @ 28 days) @ Quantum
City
Laboratory.
7th day Compressive Strength Test of Brgy.
JGSS1EP-VPCI- Bored Pile No. 15, Bored Pile No. 9 Pinamucan
26 13-Jun-18 Laboratory Testing H SW SW 14-Jun-18
FSP-0025 Cylindrical Sample (28 mpa @ 28 days) Ibaba, Batangas
@ Quantum Laboratory. City
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
27 14-Jun-18 Concrete Pouring placement inspection for Bored Pile No.6, Heater FDN H W SW 14-Jun-18
FSP-0026
Sequence No. 14 @ H-305
21 / 732
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
28 14-Jun-18 Concrete Pouring placement inspection for Bored Pile No.5, Heater FDN H W SW 15-Jun-18
FSP-0027
Sequence No. 18 @ H-305
22 / 732
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
37 16-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 18-Jun-18
FSP-0036
13, Sequence No. 8 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
38 16-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 18-Jun-18
FSP-0037
5, Sequence No. 18 @ H-305
Inspection/Witness Sampling of ASTEC,
JGSS1EP-VPCI-
39 16-Jun-18 Laboratory Testing Deformed Reinforcing Steel Bar Calamba City, H W SW 18-Jun-18
FSP-0038
(Ø10mm). Laguna.
ASTEC,
JGSS1EP-VPCI- Inspection/Witness Sampling of Soil
40 16-Jun-18 Laboratory Testing Calamba City, H W SW 18-Jun-18
FSP-0039 Sample for Quality Test.
Laguna.
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
41 18-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 19-Jun-18
FSP-0040
3, Sequence No. 12 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
42 18-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 19-Jun-18
FSP-0041
14, Sequence No. 2 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
43 18-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 19-Jun-18
FSP-0042
20, Sequence No. 10 @ H-305
23 / 732
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
47 19-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 20-Jun-18
FSP-0046
29 (Test Pile #2) @ H-305
7th day Compressive Strength Test of
Bored Pile No. 10, Bored Pile No. 25 and
JGSS1EP-VPCI- Quantum
48 20-Jun-18 Laboratory Testing Bored Pile No. 6 Concrete Cylindrical H SW SW 21-Jun-18
FSP-0047 Laboratory
Sample (28 mpa @ 28 days) @
Quantum Laboratory.
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
49 20-Jun-18 Concrete Pouring placement inspection for Bored Pile No. 1 Heater FDN H W SW 20-Jun-18
FSP-0048
@ H-305
24 / 732
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
56 23-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 23-Jun-18
FSP-0055
21 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
57 23-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 23-Jun-18
FSP-0056
13 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
58 23-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 25-Jun-18
FSP-0057
12 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
59 23-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 25-Jun-18
FSP-0058
29 @ H-305
7th day Compressive Strength Test of
JGSS1EP-VPCI- Bored Pile No. 22, Bored Pile No. 5 Quantum
60 23-Jun-18 Laboratory Testing H SW SW 25-Jun-18
FSP-0059 Concrete Cylindrical Sample (28 Mpa @ Laboratory
28 days)
14th day Compressive Strength Test of
JGSS1EP-VPCI- Bored Pile No. 16, Bored Pile No. 17 Quantum
61 23-Jun-18 Laboratory Testing H SW SW 25-Jun-18
FSP-0060 Concrete Cylindrical Sample (28 Mpa @ Laboratory
28 days)
7th day Compressive Strength Test of
JGSS1EP-VPCI- Bored Pile No. 3, Bored Pile No. 14 Quantum
62 25-Jun-18 Laboratory Testing H SW SW 26-Jun-18
FSP-0061 Concrete Cylindrical Sample (28 Mpa @ Laboratory
28 days)
7th day Compressive Strength Test of
JGSS1EP-VPCI- Bored Pile No. 20 and Bored Pile No. 1 Quantum
63 26-Jun-18 Laboratory Testing H SW SW 27-Jun-18
FSP-0062 Concrete Cylindrical Sample (28 Mpa @ Laboratory
28 days)
7th day Compressive Strength Test of
Bored Pile No. 18 and 28th day
JGSS1EP-VPCI- Quantum
64 27-Jun-18 Laboratory Testing Compressive Strength Test of Test Pile H SW SW 28-Jun-18
FSP-0063 Laboratory
No. 1 Concrete Cylindrical Sample (28
Mpa @ 28 days)
25 / 732
7th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
65 28-Jun-18 Laboratory Testing Bored Pile No. 2 Concrete Cylindrical H SW SW 29-Jun-18
FSP-0064 Laboratory
Sample (28 Mpa @ 28 days)
26 / 732
DMCI, Batching
JGSS1EP-VPCI- Joint Inspection/Witness of Trial Batch Plant, Brgy.
73 4-Jul-18 Laboratory Testing H W SW 4-Jul-18
FSP-0072 (Concrete Strength = 24 Mpa & 10 Mpa) Simlong
Batsangas City
27 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
81 7-Jul-18 Laboratory Testing Test (By Sand Cone Method) @ STR- Area 900 H W SW 7-Jul-18
FSP-0080
0904
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
82 7-Jul-18 Laboratory Testing Test (By Sand Cone Method) @ G-0610 Area 600 H W SW 7-Jul-18
FSP-0081
A/B
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
83 7-Jul-18 Concrete Pouring Area 900 H W SW 7-Jul-18
FSP-0082 Inspection for Lean Concrete of STR-
0904
Quantum
28th day Compressive Strength Test of Laboaratory,
JGSS1EP-VPCI- Bored Pile No. 16 and Bored Pile No. 17 Brgy.
85 7-Jul-18 Laboratory Testing H SW SW 9-Jul-18
FSP-0084 Concrete Cylindrical Sample (28 Mpa @ Pinamucan
28 days) Ibaba, Batangas
City
28 / 732
28th day Compressive Strength Test of
Bored Pile No. 27 Concrete Cylindrical
JGSS1EP-VPCI- Quantum
88 10-Jul-18 Concrete Pouring Sample (28 Mpa @ 28 days) and 7th day H W SW 11-Jul-18
FSP-0087 Laboratory
Compressive Strength Test of Trial Batch
(10 Mpa and 24 Mpa @ 28 days.)
29 / 732
28th day Compressive Strength Test of
Bored Pile No. 23 and Bored Pile No. 11
Concrete Cylindrical Sample (28 Mpa @
JGSS1EP-VPCI- 28 days) and 7th day Compressive Quantum
93 13-Jul-18 Laboratory Testing H SW SW 14-Jul-18
FSP-0092 Strength Test of Lean Concrete @ G- Laboratory
0610A/B, Area 600 and Structure -0904
@ Area 900. Cylindrical Sample (10 Mpa
@ 28 days)
30 / 732
Elevation, Location,Anchor Bolt Setting,
JGSS1EP-VPCI- Formworks and Concrete Placement
99 14-Jul-18 Concrete Pouring Area 600 H W SW 16-Jul-18
FSP-0098 Inspection for Pedestal @ D-0690, Area
600.
31 / 732
Elevation, Location,Anchor Bolt Setting,
JGSS1EP-VPCI- Formworks and Concrete Placement
107 18-Jul-18 Concrete Pouring Area 900 H W SW 19-Jul-18
FSP-0106 Inspection for Pedestal @ Structure-904,
Area 900.
DMCI, Batching
JGSS1EP-VPCI- Joint Inspection/Witness of Trial Batch Plant
112 19-Jul-18 Laboratory Testing H SW SW 20-Jul-18
FSP-0111 (Concrete Strength = 15 Mpa @ 28 days) (Brgy.Simlong,
Batangas City)
DMCI, Batching
JGSS1EP-VPCI- Joint Inspection/Witness of Trial Batch Plant
113 19-Jul-18 Laboratory Testing H SW SW 20-Jul-18
FSP-0112 (Concrete Strength = 24 Mpa @ 3 days) (Brgy.Simlong,
Batangas City)
32 / 732
7th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
115 20-Jul-18 Laboratory Testing Lean Concrete @ H-305 Heater H SW SW 21-Jul-18
FSP-0114 Laboratory
Foundation.
33 / 732
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
123 21-Jul-18 Concrete Pouring Area 600 H W SW 21-Jul-18
FSP-0122 Inspection for Lean Concrete of D-653,
Area 600
34 / 732
Elevation, Location, Anchor Bolt Setting,
JGSS1EP-VPCI- Formworks and Concrete Placement
131 23-Jul-18 Concrete Pouring Area 600 H W SW 24-Jul-18
FSP-0130 Inspection for Pedestal @ D-0654, Area
600.
DMCI, Batching
1 day Compressive Strength Test of Trial
JGSS1EP-VPCI- Plant
136 25-Jul-18 Laboratory Testing Batch ( Re-Trial Batch of 24 Mpa @ 3 H SW SW 25-Jul-18
FSP-0135 (Brgy.Simlong,
days
Batangas City)
JGSS1EP-VPCI- 7th day Compressive Strength Test of Quantum
137 26-Jul-18 Laboratory Testing H SW SW 27-Jul-18
FSP-0136 Trial Batch (15 Mpa @ 28 days.) Laboratory
JGSS1EP-VPCI- 3rd day Compressive Strength Test of Quantum
138 26-Jul-18 Laboratory Testing H SW SW 27-Jul-18
FSP-0137 Re-Trial Batch (24 Mpa @ 3 days) Laboratory
Visual Inspection of Installed
Reinforcement Bottom Bar, Size,
JGSS1EP-VPCI- Post Concrete
139 26-Jul-18 Lapslice Length, Spacing and number of Area 300 H W SW 27-Jul-18
FSP-0138 Placement
pieces of Foundation at H-305, Area 300
Heater Foundation.
35 / 732
JGSS1EP-VPCI- Welder's Qualification Test (3 Fillet
140 26-Jul-18 Pre-qualification Laydown H W SW 27-Jul-18
FSP-0139 Welders)
36 / 732
7th day Compressive Strength Test of
JGSS1EP-VPCI- Lean Concrete @ H-305 (Gridline D-A) Quantum
148 28-Jul-18 Laboratory Testing H SW SW 30-Jul-18
FSP-0147 Heater Foundation, Area 300 (10 Mpa @ Laboratory
28 days).
37 / 732
JGSS1EP-VPCI- 28th day Compressive Strength Test of Quantum
155 31-Jul-18 Laboratory Testing H SW SW 1-Aug-18
FSP-0154 Trial Batch 2 (24 Mpa @ 28 days.) Laboratory
38 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
162 2-Aug-18 Concrete Pouring Area 900 H W SW 3-Aug-18
FSP-0161 Placement Inspection for Foundation of
Structure-0903 (F5) DPG-2, Area 900.
39 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) @ 3rd
169 3-Aug-18 Laboratory Testing Area 900 H SW SW 4-Aug-18
FSP-0168 Layer of
Structure-0904, Area 900.
Concrete Placement Inspection for
JGSS1EP-VPCI-
170 4-Aug-18 Concrete Pouring Foundation of (F3) Structure-0903 DPG- Area 900 H W SW 6-Aug-18
FSP-0169
2, Area 900
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
171 4-Aug-18 Concrete Pouring Area 900 H W SW 6-Aug-18
FSP-0170 Inspection for Lean Concrete of R-0902,
Area 900
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
172 6-Aug-18 Laboratory Testing Test (By Sand Cone Method) @ D-0600, Area 600 H SW SW 6-Aug-18
FSP-0171
Area 600.
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
173 6-Aug-18 Concrete Pouring Area 600 H W SW 6-Aug-18
FSP-0172 Inspection for Lean Concrete of D-0600,
Area 600
28th day Compressive Strength Test of
JGSS1EP-VPCI- Foundation @D-0690, Area 600 (24 mpa Quantum
174 6-Aug-18 Laboratory Testing H SW SW 7-Aug-18
FSP-0173 @ Laboratory
28 days).
7th day Compressive Strength Test of
JGSS1EP-VPCI- Lean Concrete @Structure-0903 &DPG- Quantum
175 6-Aug-18 Laboratory Testing H SW SW 7-Aug-18
FSP-0174 2 (F1 & F5), Area 900 (10 mpa @ 28 Laboratory
days).
7th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
176 6-Aug-18 Laboratory Testing (Temporary Facility) VPCI Slab (24 mpa H SW SW 7-Aug-18
FSP-0175 Laboratory
@ 28 days).
28th day Compressive Strength Test of
JGSS1EP-VPCI- Foundation @ G-610A/B, Area 600 (24 Quantum
177 7-Aug-18 Laboratory Testing H SW SW 8-Aug-18
FSP-0176 mpa @ Laboratory
28 days).
40 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
178 7-Aug-18 Concrete Pouring Area 600 H W SW 8-Aug-18
FSP-0177 Placement Inspection for Foundation of
G-0600A/B, Area 600.
41 / 732
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
185 8-Aug-18 Pre-pouring Area 600 H W SW 9-Aug-18
FSP-0184 Pedestal @
D-0652 &D-0653, Area 600.
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
186 8-Aug-18 Pre-pouring Area 900 H W SW 9-Aug-18
FSP-0185 Pedestal @ (F1) Structure-0903 & DPG-
2, Area 900.
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
187 8-Aug-18 Pre-pouring Area 900 H W SW 9-Aug-18
FSP-0186 Pedestal @ (F3) Structure-0903 & DPG-
2, Area 900.
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
188 8-Aug-18 Pre-pouring Area 900 H W SW 9-Aug-18
FSP-0187 Pedestal @ (F5) Structure-0903 & DPG-
2, Area 900.
28th day Compressive Strength Test of
JGSS1EP-VPCI- Foundation @ S-0904, Area 900 (24 mpa Quantum
189 9-Aug-18 Laboratory Testing H SW SW 10-Aug-18
FSP-0188 @ Laboratory
28 days).
21st day Compressive Strength Test of
JGSS1EP-VPCI- Lean Concrete @ F1 & F3 Structure- Quantum
190 9-Aug-18 Laboratory Testing H SW SW 10-Aug-18
FSP-0189 0903 & DPG-2, Area 900 (10 mpa @ 28 Laboratory
days).
Concrete Placement Inspection for
JGSS1EP-VPCI-
191 9-Aug-18 Concrete Pouring Foundation of H-0305 Heater Area 300 H W SW 10-Aug-18
FSP-0190
Foundation, Area 300.
42 / 732
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
193 10-Aug-18 prior to backfilling of Foundation @ D- Area 600 H SW SW 11-Aug-18
FSP-0192 Placement
0652 & D-0653, Area 600.
43 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
201 13-Aug-18 Laboratory Testing Test (By Sand Cone Method) @ Area 900 H SW SW 14-Aug-18
FSP-0200
Structure-0905, Area 900
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
202 13-Aug-18 Concrete Pouring Area 900 H SW SW 14-Aug-18
FSP-0201 Inspection for Lean Concrete of R-0902,
Area 900
44 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
208 14-Aug-18 Laboratory Testing Test (By Sand Cone Method) 1st & 2nd Area 600 H SW SW 15-Aug-18
FSP-0207
Layer @ D-0652 and D-0653, Area 600
45 / 732
JGSS1EP-VPCI- 28th day Compressive Strength Test of Quantum
216 16-Aug-18 Laboratory Testing H SW SW 17-Aug-18
FSP-0215 Trial Batch (15 Mpa @ 28 days.) Laboratory
46 / 732
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete prior to backfilling of Foundation and
225 17-Aug-18 Area 900 H SW SW 18-Aug-18
FSP-0224 Placement Pedestal @ Structure-0903 & DPG-2
(F1), Area 900.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete prior to backfilling of Foundation and
226 17-Aug-18 Area 900 H SW SW 18-Aug-18
FSP-0225 Placement Pedestal @ Structure-0903 & DPG-2
(F3), Area 900.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete prior to backfilling of Foundation and
227 17-Aug-18 Area 900 H SW SW 18-Aug-18
FSP-0226 Placement Pedestal @ Structure-0903 & DPG-2
(F5), Area 900.
28th day Compressive Strength Test of
JGSS1EP-VPCI- Pedestal @ Structure-0904, Area 900 / Quantum
228 17-Aug-18 Laboratory Testing H SW SW 18-Aug-18
FSP-0227 Foundation @ D-0654, Area 600 (24 mpa Laboratory
@ 28 days).
7th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
229 17-Aug-18 Laboratory Testing Pedestal @ D-0652 & D-0653, Area 600 H SW SW 18-Aug-18
FSP-0228 Laboratory
(24 mpa @ 28 days).
7th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
230 17-Aug-18 Laboratory Testing Foundation @ D-0600, Area 600 (24 mpa H SW SW 18-Aug-18
FSP-0229 Laboratory
@ 28 days).
47 / 732
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
233 18-Aug-18 Concrete Pouring Area 900 H W SW 18-Aug-18
FSP-0232 Inspection for Lean Concrete of D-0910,
Area 900.
Checking of rebar installation prior to
JGSS1EP-VPCI-
234 18-Aug-18 Pre-pouring formworks closure of Pedestal @ Area 900 H W SW 20-Aug-18
FSP-0233
Structure-0905, Area 900.
48 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
241 20-Aug-18 Concrete Pouring Area 900 H W SW 21-Aug-18
FSP-0240 Placement Inspection for Foundation @
D-0910, Area 900.
49 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
250 22-Aug-18 Laboratory Testing Test (By Sand Cone Method) of F2 @ Area 600 H SW SW 23-Aug-18
FSP-0249
Structure-0604, Area 600.
50 / 732
7th day Compressive Strength Test of
Foundation @ Structure-0905, Area 900 /
JGSS1EP-VPCI- Quantum
259 24-Aug-18 Laboratory Testing F2 Pedestal @ Structure-0601, Area H SW SW 25-Aug-18
FSP-0258 Laboratory
600 / Lean Concrete @ D-0910 (24 mpa
@ 28 days).
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
260 25-Aug-18 Concrete Pouring Area 900 H W SW 28-Aug-18
FSP-0259 Placement Inspection for Foundation @
R-0902.
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
261 27-Aug-18 Concrete Pouring Setting and Concrete Placement Area 900 H W SW 28-Aug-18
FSP-0260
Inspection for Pedestal @ S-0905, Area
900.
51 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
266 27-Aug-18 Laboratory Testing Test (By Sand Cone Method) 1st to 2nd Area 600 H SW SW 28-Aug-18
FSP-0265
Layer of F2 @ Structure-0601, Area 600.
52 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) 4th Layer of
275 28-Aug-18 Laboratory Testing Area 900 H SW SW 28-Aug-18
FSP-0274 F1, F3 & F5 @ Structure-0903 & DPG-2,
Area 900.
53 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
283 29-Aug-18 Concrete Pouring Area 600 H W SW 30-Aug-18
FSP-0282 Placement Inspection for Foundation of
F1 @ Structure-0601, Area 600.
54 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
289 29-Aug-18 Concrete Pouring Area 600 H W SW 30-Aug-18
FSP-0288 Placement Inspection for Foundation of
G-0600A/B, Area 600.
55 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
296 31-Aug-18 Concrete Pouring Setting and Concrete Placement Area 300 H W SW 1-Sep-18
FSP-0295
Inspection for Pedestal (P2) @ H-305,
Heater Foundation, Area 300.
56 / 732
7th Day Compressive Strength Test of
P3 @H-0305, Heater Foundation, Area
JGSS1EP-VPCI- Quantum
303 3-Sep-18 Laboratory Testing 300 / Foundation @ D-0909, Area 900 / H SW SW 4-Sep-18
FSP-0302 Laboratory
Lean Concrete @ Analyzer Shelter #13,
Area 600 (24 Mpa @ 3 days).
57 / 732
7th Day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
310 4-Sep-18 Laboratory Testing F2 Foundation @ Structure-0604, Area H SW SW 5-Sep-18
FSP-0309 Laboratory
600 (24 Mpa @ 28 days).
7th Day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
311 4-Sep-18 Laboratory Testing Foundation @ R-0902, Area 900 (24 Mpa H SW SW 5-Sep-18
FSP-0310 Laboratory
@ 28 days).
7th Day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
312 4-Sep-18 Laboratory Testing Pedestal @ Structure-0905, Area 900 (24 H SW SW 5-Sep-18
FSP-0311 Laboratory
Mpa @ 28 days).
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
313 4-Sep-18 Pre-pouring Area 300 H W SW 5-Sep-18
FSP-0312 P1 (GL F-11m& F-12) Pedestal @ H-
0305 Heater Foundation, Area 300.
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
314 4-Sep-18 Pre-pouring Area 300 H W SW 5-Sep-18
FSP-0313 P1a (GL-E-11) Pedestal @ H-0305
Heater Foundation.
Surface Preparation, Formworks, Anchor
Bolt Setting and Concrete Placement
JGSS1EP-VPCI-
315 4-Sep-18 Concrete Pouring Inspection for P1 (GL F-11, F-12) Area 300 H W SW 5-Sep-18
FSP-0314
Pedestal @ H-0305 Heater Foundation,
Area 300.
58 / 732
1st Day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
318 6-Sep-18 Laboratory Testing P1 @H-0305, Heater Foundation, Area H SW SW 6-Sep-18
FSP-0317 Laboratory
300 (24 Mpa @ 3 days).
1st Day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
319 6-Sep-18 Laboratory Testing P1a @H-0305, Heater Foundation, Area H SW SW 6-Sep-18
FSP-0318 Laboratory
300 (24 Mpa @ 3 days).
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) 6th - 7th
320 6-Sep-18 Laboratory Testing Area 300 H SW SW 7-Sep-18
FSP-0319 Layer @ H-0305, Heater Foundation,
Area 300.
59 / 732
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete prior to backfilling of P1a Pedestal (Grid-
325 6-Sep-18 Area 300 H SW SW 7-Sep-18
FSP-0324 Placement line E) @ H-0305 Heater Foundation,
Area 300.
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
326 7-Sep-18 Pre-pouring Area 300 H W SW 7-Sep-18
FSP-0325 P1 Pedestal (Grid-line A)@ H-0305
Heater Foundation, Area 300.
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
327 7-Sep-18 Pre-pouring Area 300 H W SW 7-Sep-18
FSP-0326 P1a Pedestal (Grid-line B)@ H-0305
Heater Foundation, Area 300.
Formworks, Anchor Bolt Setting and
JGSS1EP-VPCI- Concrete Placement Inspection for P1
328 7-Sep-18 Concrete Pouring Area 300 H W SW 7-Sep-18
FSP-0327 (Pedestal Grid-line A)@ H-0305 Heater
Foundation, Area 300.
Formworks, Anchor Bolt Setting and
JGSS1EP-VPCI- Concrete Placement Inspection for P1a
329 7-Sep-18 Concrete Pouring Area 300 H W SW 7-Sep-18
FSP-0328 (Pedestal Grid-line B)@ H-0305 Heater
Foundation, Area 300.
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
330 7-Sep-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 8-Sep-18
FSP-0329
Inspection for Pedestal @ G-0600A/B,
Area 600.
60 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
332 7-Sep-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 8-Sep-18
FSP-0331
Inspection for Pedestal of F2 @
Structure-0604, Area 600.
JGSS1EP-VPCI-
333 7-Sep-18 Handover Handover of Str-0904, Area 900 Area 900 H W SW 11-Sep-18
FSP-0332
61 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
340 8-Sep-18 Concrete Pouring Setting and Concrete Placement Unit 900 H W SW 11-Sep-18
FSP-0339
Inspection for Pedestal @ D-0909, Area
900.
62 / 732
28th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
347 11-Sep-18 Laboratory Testing Lean Concrete @ Structure-0905, Area H SW SW \
FSP-0346 Laboratory
900 (10 mpa @ 28 days).
7th day Compressive Strength Test of
JGSS1EP-VPCI- Pedestal P1 & P1a (Grid-line E - F) @ H- Astec
348 11-Sep-18 Laboratory Testing H SW SW 12-Sep-18
FSP-0347 0305, Heater Foundation, Area 300 (24 Laboratory
mpa @ 3 days).
1st day Compressive Strength Test of
JGSS1EP-VPCI- Concrete Pavement (Grid-line F - C) @ Astec
349 11-Sep-18 Laboratory Testing H SW SW 12-Sep-18
FSP-0348 H-0305, Heater Foundation, Area 300 (24 Laboratory
mpa @ 3 days).
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) @ G-
350 12-Sep-18 Laboratory Testing Area 900 H SW SW 12-Sep-18
FSP-0349 0908A/B / G-0910A/B / G-0907AB, Area
900.
Elevation, Location,Surface Preparation,
Formworks and Concrete Placement
JGSS1EP-VPCI-
351 12-Sep-18 Concrete Pouring Inspection for Lean Concrete @ G- Area 900 H W SW 12-Sep-18
FSP-0350
0908A/B / G-0910A/B / G-0907A/B, Area
900.
63 / 732
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
354 12-Sep-18 Concrete Pouring Area 900 H W SW 12-Sep-18
FSP-0353 Inspection for Lean Concrete @ G-
0909A/B, Area 900.
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
355 12-Sep-18 Concrete Pouring Setting and Concrete Placement Unit 600 H W SW 13-Sep-18
FSP-0354
Inspection for Pedestal of F1 @
Structure-0601, Area 600.
28th day Compressive Strength Test of
ASTEC,
JGSS1EP-VPCI- Foundation (F2) @ Structure-0601, Area
356 12-Sep-18 Laboratory Testing Calamba City, H SW SW 13-Sep-18
FSP-0355 600 / Lean Concrete @ R-0902, Area
Laguna.
900 (24 mpa @ 28 days).
64 / 732
Elevation, Location,Surface Preparation,
Formworks, Rebar works and Concrete
JGSS1EP-VPCI-
363 13-Sep-18 Concrete Pouring Placement Inspection for Foundation of Area 900 H W SW 14-Sep-18
FSP-0362
Base Mat @ K-0901 Compressor Shelter,
Area 900. Location, Surface Preparation,
Elevation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
364 13-Sep-18 Concrete Pouring Setting and Concrete Placement Unit 600 H W SW 14-Sep-18
FSP-0363
Inspection for Pedestal of F2 @
Structure-0606, Area 600.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
365 14-Sep-18 prior to backfilling of Foundation and Area 900 H SW SW 15-Sep-18
FSP-0364 Placement
Pedestal @ D-0909, Area 900.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
366 14-Sep-18 prior to backfilling of Foundation and Area 900 H SW SW 15-Sep-18
FSP-0365 Placement
Pedestal @ D-0910, Area 900.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
367 14-Sep-18 prior to backfilling of Foundation and Area 900 H SW SW 15-Sep-18
FSP-0366 Placement
Pedestal @ R-0902, Area 900.
28th day Compressive Strength Test of
Foundation @ Structure-0905, Area 900 / ASTEC,
JGSS1EP-VPCI-
368 14-Sep-18 Laboratory Testing F2 Pedestal @ Structure-0601, Area Calamba City, H SW SW 15-Sep-18
FSP-0367
600 / Lean Concrete @ D-0910 (24 mpa Laguna.
@ 28 days).
7th day Compressive Strength Test of
ASTEC,
JGSS1EP-VPCI- Pedestal (F2) @ Structure-0604, Area
369 14-Sep-18 Laboratory Testing Calamba City, H SW SW 15-Sep-18
FSP-0368 600 / Pedestal @ G-0600A/B, Area 600
Laguna.
(24 mpa @ 28 days).
65 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
371 14-Sep-18 Concrete Pouring Placement Inspection for Remaining Area 300 H W SW 14-Sep-18
FSP-0370
Pavement @ (South Side) H-0305,
Heater Foundation, Area 300.
66 / 732
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks, Rebar works and Concrete
379 17-Sep-18 Concrete Pouring Area 600 H W SW 17-Sep-18
FSP-0378 Placement Inspection for Foundation @
G-0910A/B, Area 900.
67 / 732
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
386 17-Sep-18 Concrete Pouring Area 900 H W SW 17-Sep-18
FSP-0385 Inspection for Lean Concrete @ Z-0901,
Area 900.
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
387 17-Sep-18 Concrete Pouring Area 900 H W SW 17-Sep-18
FSP-0386 Inspection for Lean Concrete @ Z-0902,
Area 900.
68 / 732
7th day Compressive Strength Test of
ASTEC,
JGSS1EP-VPCI- Concrete Pavement (Grid-line F - C) @
394 18-Sep-18 Laboratory Testing Calamba City, H SW SW 19-Sep-18
FSP-0393 H-0305, Heater Foundation, Area 300 (24
Laguna.
mpa @ 28 days).
69 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Box
JGSS1EP-VPCI-
401 19-Sep-18 Concrete Pouring Setting and Concrete Placement Area 900 H W SW 20-Sep-18
FSP-0400
Inspection for Pedestal @ G-0908A/B,
Area 900.
70 / 732
Elevation, Location,Surface Preparation,
Formworks, Rebar works and Concrete
JGSS1EP-VPCI-
406 19-Sep-18 Concrete Pouring Placement Inspection of Pre-Cast Area 900 H W SW 20-Sep-18
FSP-0405
Foundation @ Catch Basin (CB-NP03),
DPG-2, Area 900.
71 / 732
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
412 21-Sep-18 Concrete Pouring Area 400 H W SW 21-Sep-18
FSP-0411 Inspection for Lean Concrete @ Quench
Piperack, Area 400 (F2)
72 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
418 22-Sep-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 22-Sep-18
FSP-0417
Inspection for Pedestal (F1) @
Structure-0606, Area 900.
73 / 732
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI-
426 22-Sep-18 Pre-pouring Formworks, Rebar works and Inspection Area 600 H W SW 24-Sep-18
FSP-0425
for Foundation @ Z-0651, Area 600.
74 / 732
7th day Compressive Strength Test of
Foundation (F1) @ Structure-0606 /
JGSS1EP-VPCI- Quantum
433 24-Sep-18 Laboratory Testing Pedestal (F2) @ Structure-0606, Area H SW SW 25-Sep-18
FSP-0432 Laboratory
600 / Lean Concrete @ E-0914 / E-0917,
Area 900 (24 mpa @ 28 days).
75 / 732
Elevation, Location,Surface Preparation,
Formworks, Rebar works, Embedded FS Phil
JGSS1EP-VPCI-
439 25-Sep-18 Pre-pouring Items and Concrete Placement Fabrication H W SW 26-Sep-18
FSP-0438
Inspection of Pre-Cast Wall @ Catch Shop
Basin (CB-NP03), DPG-2, Area 900.
76 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
447 26-Sep-18 Laboratory Testing Test (By Sand Cone Method) @ Z-0902, Area 900 H SW SW 27-Sep-18
FSP-0446
Area 900, R-0902. prior to lean concrete
77 / 732
7th Day Compressive Strength Test of
Lean Concrete @ Z-0651, Area 600 /
Pre-Cast Foundation @ CB-NP01, CB-
ASTEC,
JGSS1EP-VPCI- NP02, CB-NP03, CB-NP05 / Lean
452 27-Sep-18 Laboratory Testing Calamba City, H SW SW 28-Sep-18
FSP-0451 Concrete @ Quench Piperack, Area 400 /
Laguna.
Spill Wall @ H-0305 (North & West),
Heater Foundation, Area 300 (24 Mpa @
28 days).
78 / 732
7th day Compressive Strength Test of
Pedestal @ Structure-0606 (F1), Area
600 / Lean Concrete @ Quench Piperack
ASTEC,
JGSS1EP-VPCI- (F1), Area 400 / Spillwall @ H-0305
458 28-Sep-18 Laboratory Testing Calamba City, H SW SW 29-Sep-18
FSP-0457 (South Side), Heater Foundation, Area
Laguna.
300 / Pre-Cast Foundation @ Catch
Basin (CB-NP02 ) DPG-2, Area 900 (24
mpa @ 28 days).
Joint Inspection/Witness of Field Density
Test (By Sand Cone Method) In-between
JGSS1EP-VPCI-
459 28-Sep-18 Laboratory Testing Analyzer Shelter #13, D-0600 and G- Area 600 H SW SW 28-Sep-18
FSP-0458
0600A/B, Area 600. prior to concrete
pavement
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
460 29-Sep-18 Pre-pouring Area 900 H SW SW 29-Sep-18
FSP-0459 Inspection for Lean Concrete @ Z-0901,
Area 900.
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
461 29-Sep-18 Pre-pouring Area 900 H SW SW 29-Sep-18
FSP-0460 Inspection for Lean Concrete @ Z-0902,
Area 900.
79 / 732
Concrete Placement Inspection for
JGSS1EP-VPCI-
465 29-Sep-18 Concrete Pouring Foundation @ Quench Piperack (F2), Area 400 H W SW 1-Oct-18
FSP-0464
Area 400.
JGSS1EP-VPCI- Concrete Placement Inspection for
466 29-Sep-18 Concrete Pouring Area 600 H W SW 1-Oct-18
FSP-0465 Foundation @ Z-0651, Area 600.
JGSS1EP-VPCI- Concrete Placement Inspection for
467 29-Sep-18 Concrete Pouring Area 900 H W SW 1-Oct-18
FSP-0466 Pedestal @ E-0914, Area 900.
JGSS1EP-VPCI- Concrete Placement Inspection for
468 29-Sep-18 Concrete Pouring Area 900 H W SW 1-Oct-18
FSP-0467 Pedestal @ E-0917, Area 900.
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
469 29-Sep-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 1-Oct-18
FSP-0468
Inspection for Foundation @ D-0640,
Area 600.
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
470 29-Sep-18 Concrete Pouring Area 900 H SW SW 1-Oct-18
FSP-0469 Inspection for Lean Concrete @LP-0601,
Area 600.
80 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks and Concrete
JGSS1EP-VPCI- Placement Inspection for Foundation
473 29-Sep-18 Concrete Pouring Area 900 H W SW 1-Oct-18
FSP-0472 and Girder @ K-0901 Compressor
Shelter (F1, F2, F3, F4 & FG1), Area
900.
81 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
480 1-Oct-18 Concrete Pouring Area 600 H W SW 2-Oct-18
FSP-0479 Placement Inspection for Foundation @
Structure-0605, Area 600.
82 / 732
Elevation, Location,Surface Preparation,
Formworks, Rebar works, Embedded
JGSS1EP-VPCI-
486 2-Oct-18 Concrete Pouring Items and Concrete Placement Area 900 H W SW 2-Oct-18
FSP-0485
Inspection of Pre-Cast Wall @ Catch
Basin (CB-NP03), DPG-2, Area 900.
83 / 732
Elevation, Location, Rebar Works
JGSS1EP-VPCI-
492 3-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 600 H W SW 4-Oct-18
FSP-0491
Pedestal @ Z-0651, Area 600.
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
493 4-Oct-18 Pre-pouring Area 400 H W SW 4-Oct-18
FSP-0492 Pedestal @ Quench Piperack (F1), Area
400.
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
494 4-Oct-18 Pre-pouring Area 400 H W SW 4-Oct-18
FSP-0493 Pedestal @ Quench Piperack (F2), Area
400.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
495 4-Oct-18 prior to backfilling of Foundation @ Z- Area 900 H SW SW 4-Oct-18
FSP-0494 Placement
0901 & Z-0902, Area 900.
84 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
501 5-Oct-18 Concrete Pouring Area 600 H W SW 6-Oct-18
FSP-0500 Placement Inspection for Foundation @
E-0623B, Area 600.
85 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
507 6-Oct-18 Concrete Pouring Placement Inspection for Concrete Area 400 H W SW 6-Oct-18
FSP-0506
Pavement @ Chemical Injection, Area
400.
86 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
514 8-Oct-18 Concrete Pouring Placement Inspection for Concrete Area 600 H W SW 8-Oct-18
FSP-0513
Pavement @ Structure-0601 (F1), Area
600.
87 / 732
7th day Compressive Strength Test of
Foundation @ Z-0901, Z-0902, Area 900,
JGSS1EP-VPCI- D-0640, Area 600 / Lean Concrete @ Z- Quantum
520 9-Oct-18 Laboratory Testing H SW SW 9-Oct-18
FSP-0519 0901, Z-0902 & C-0903, Area 900 / Pre- Laboratory
Cast Wall @ CB-NO01, DPG-2, Area 900
(24 mpa @ 28 days).
88 / 732
28th day Compressive Strength Test of
JGSS1EP-VPCI- Foundation of F2 @ Structure-0606 / Quantum
526 9-Oct-18 Laboratory Testing H SW SW 10-Oct-18
FSP-0525 Pedestal of F1 @ Structure-0601, Area Laboratory
600 (24 mpa @ 28 days).
89 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Formworks, Anchor Bolt Setting and
532 10-Oct-18 Concrete Pouring Area 600 H W SW 11-Oct-18
FSP-0531 Concrete Placement Inspection for
Pedestal @ Z-0651, Area 600.
90 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Formworks, Anchor Bolt Setting and
540 11-Oct-18 Concrete Pouring Area 600 H W SW 12-Oct-18
FSP-0539 Concrete Placement Inspection for
Pedestal @ Structure-0605, Area 600.
91 / 732
Elevation, Location, Rebar Works
JGSS1EP-VPCI-
546 12-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 500 H W SW 12-Oct-18
FSP-0545
Pedestal @ D-0510C, Area 500.
Elevation, Location, Rebar Works
JGSS1EP-VPCI-
547 12-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 600 H W SW 12-Oct-18
FSP-0546
Pedestal @ D-0693, Area 600.
Elevation, Location, Rebar Works
JGSS1EP-VPCI-
548 12-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 600 H W SW 12-Oct-18
FSP-0547
Pedestal @ E-0623B, Area 600.
Elevation, Location, Rebar Works
JGSS1EP-VPCI-
549 12-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 600 H W SW 12-Oct-18
FSP-0548
Pedestal @ LP-601, Area 600.
92 / 732
Elevation, Location, Surface Preparation,
Formworks, Anchor Bolt Setting and
Concrete Placement Inspection for
JGSS1EP-VPCI-
554 13-Oct-18 Concrete Pouring Pedestal F1 (Gridline Pa), F2, F3 & F4 Area 900 H W SW 15-Oct-18
FSP-0553
(Gridline Pb) / 1st Lift of Column of Base
Mat @ K-0901 Compressor Shelter, Area
900.
93 / 732
28th day Compressive Strength Test of
ASTEC,
JGSS1EP-VPCI- Foundation @ G-0909A/B / G-0907A/B /
560 15-Oct-18 Laboratory Testing Calamba City, H SW SW 16-Oct-18
FSP-0559 G-0910A/B / G-0908A/B (24 mpa @ 28
Laguna.
days).
94 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Box
JGSS1EP-VPCI-
566 16-Oct-18 Concrete Pouring Setting and Concrete Placement Area 800 H W SW 17-Oct-18
FSP-0565
Inspection for Foundation @ G-0805
Area 800.
7th day Compressive Strength Test of
ASTEC,
JGSS1EP-VPCI- Foundation @ R-0701C, Area 700 / Lean
567 16-Oct-18 Laboratory Testing Calamba City, H SW SW 17-Oct-18
FSP-0566 Concrete @ E-0624EF, Area 600 (24
Laguna.
mpa @ 28 days).
95 / 732
28th Day Compressive Strength Test of
Lean Concrete @ Z-0651, Area 600 /
Pre-Cast Foundation @ CB-NP01, CB-
ASTEC,
JGSS1EP-VPCI- NP02, CB-NP03, CB-NP05 / Lean
572 18-Oct-18 Laboratory Testing Calamba City, H SW SW 19-Oct-18
FSP-0571 Concrete @ Quench Piperack, Area 400 /
Laguna.
Spill Wall @ H-0305 (North & West),
Heater Foundation, Area 300 (24 Mpa @
28 days).
96 / 732
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete prior to backfilling of Foundation &
577 19-Oct-18 Area 900 H SW SW 20-Oct-18
FSP-0576 Placement Pedestal @ K-0901 Compressor Shelter,
Area 900.
97 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
583 20-Oct-18 Laboratory Testing Test (By Sand Cone Method) @ Analyzer Area 300 H SW SW 22-Oct-18
FSP-0582
Shelter #12, Area 300.
98 / 732
Joint Inspection/Witness of Field Density
Test (By Sand Cone Method) of Sub-
JGSS1EP-VPCI-
589 24-Oct-18 Laboratory Testing Base Inbetween Structure-0903 F1 & F3, Area 900 H SW SW 25-Oct-18
FSP-0589
K-0901 F1, FG1 & F4, D-0910 & D-0909,
Area 900.
99 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
595 25-Oct-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 26-Oct-18
FSP-0595
Inspection for Pedestal @ D-0693, Area
600.
7th day Compressive Strength Test of
JGSS1EP-VPCI- Lean Concrete @ E-0611C, Area 600 / Quantum
596 25-Oct-18 Laboratory Testing H SW SW 26-Oct-18
FSP-0596 Foundation @ (F3) Structure-0604 (24 Laboratory
mpa @ 28 days).
100 / 732
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
602 27-Oct-18 Pre-pouring Area 600 H W SW 29-Oct-18
FSP-0602 Pedestal @ Structure-0604 (F1), Area
600.
Elevation, Location, Rebar Works
JGSS1EP-VPCI-
603 27-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 600 H W SW 29-Oct-18
FSP-0603
Pedestal @ E-0611C, Area 600.
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
604 27-Oct-18 Concrete Pouring Area 900 H SW SW 29-Oct-18
FSP-0604 Inspection for Lean Concrete @ D-0912,
Area 900.
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
605 27-Oct-18 Concrete Pouring Area 900 H SW SW 29-Oct-18
FSP-0605 Inspection for Lean Concrete @ D-0908,
Area 900.
101 / 732
28th day Compressive Strength Test of
Foundation @ Quench Piperack (F1 &
JGSS1EP-VPCI- Quantum
609 29-Oct-18 Laboratory Testing F2), Area 400 / Lean Concrete @ D- H SW SW 30-Oct-18
FSP-0609 Laboratory
0693, LP-601 & E-0623B, Area 600 (24
mpa @ 28 days).
Elevation, Location, Surface
Preparation, Rebar Works, Formworks
JGSS1EP-VPCI-
610 29-Oct-18 Concrete Pouring and Concrete Placement Inspection Area 400 H W SW 30-Oct-18
FSP-0610
for Foundation @ Structure-0406,
Area 600.
Joint Inspection/Witness of Field
JGSS1EP-VPCI- Density Test (By Sand Cone Method)
611 29-Oct-18 Laboratory Testing Area 900 H SW SW 30-Oct-18
FSP-0611 of Sub-Base Inbetween C-0902, C-
0903 & G-0906A/B, Area 900.
102 / 732
28th day Compressive Strength Test of
JGSS1EP-VPCI- Foundation @ K-0901, Area 900 / Quantum
616 30-Oct-18 Laboratory Testing H SW SW 31-Oct-18
FSP-0616 Concrete Pavement @ Chemical Laboratory
Injection, Area 400 (24 mpa @ 28 days).
103 / 732
28th day Compressive Strength Test of
JGSS1EP-VPCI- Lean Concrete @ D-0510C, Area 500 / Quantum
623 31-Oct-18 Laboratory Testing H SW SW 1-Nov-18
FSP-0623 Concrete Pavement @ D-0600, Area 600 Laboratory
(24 mpa @ 28 days).
104 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
630 2-Nov-18 Laboratory Testing Test (By Sand Cone Method) 1st - 4th Area 500 H SW SW 5-Nov-18
FSP-0630
Layer @ D-0510C, Area 500.
105 / 732
30th day Compressive Strength Test of
Foundation @ D-0510C, Area 500, E-
JGSS1EP-VPCI- Quantum
637 2-Nov-18 Laboratory Testing 0623B, Area 600 / Spillwall @ Analyzer H SW SW 5-Nov-18
FSP-0637 Laboratory
Shelter # 13, D-0600 & Structure-0601
(F2), Area 600 (24 MPa @ 28 days).
106 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Anchor Bolt Setting and
643 5-Nov-18 Concrete Pouring Area 400 H W SW 5-Nov-18
FSP-0643 Concrete Placement Inspection for
Pedestal @ Structure-0406, Area 400.
107 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
651 6-Nov-18 Laboratory Testing Test (By Sand Cone Method) 1st - 5th Area 600 H SW SW 7-Nov-18
FSP-0651
Layer @ E-0623B, Area 600.
108 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Anchor Bolt Setting and
657 7-Nov-18 Concrete Pouring Area 600 H W SW 8-Nov-18
FSP-0657 Concrete Placement Inspection for
Pedestal @ E-0624EF, Area 600.
109 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Anchor Bolt Setting and
663 8-Nov-18 Concrete Pouring Area 600 H W SW 8-Nov-18
FSP-0663 Concrete Placement Inspection for
Pedestal @ LP-601, Area 600.
110 / 732
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
670 9-Nov-18 prior to backfilling of Foundation & Area 400 H SW SW 9-Nov-18
FSP-0670 Placement
Pedestal @ Structure-0406, Area 400.
111 / 732
7th day Compressive Strength Test of
Lean Concrete @ K-0901 Lube Oil
Console, Area 900 / Pedestal @
JGSS1EP-VPCI- Quantum
676 12-Nov-18 Laboratory Testing Structure-0406, Area 400 / Spillwall @ H SW SW 12-Nov-18
FSP-0676 Laboratory
DPG-2, Area 900 / Foundation @ D-
0912, Structure-0903 & DPG-2 (F4), Area
900 (24 MPa @ 28 days).
112 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
683 12-Nov-18 Laboratory Testing Test (By Sand Cone Method) @ E-0405, Area 400 H SW SW 12-Nov-18
FSP-0683
Area 400.
Joint Inspection/Witness of Field
JGSS1EP-VPCI-
684 12-Nov-18 Laboratory Testing Density Test (By Sand Cone Method) Area 500 H SW SW 13-Nov-18
FSP-0684
@ E-0509B, Area 500.
113 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
690 13-Nov-18 Concrete Pouring Area 500 H W SW 14-Nov-18
FSP-0690 Placement Inspection for Concrete
Pavement @ D-0510C, Area 500.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
691 14-Nov-18 Laboratory Testing Test (By Sand Cone Method) @ E- Area 400 H SW SW 14-Nov-18
FSP-0691
0401B, Area 400.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
692 14-Nov-18 Laboratory Testing Test (By Sand Cone Method) @ Area 400 H SW SW 14-Nov-18
FSP-0692
Structure-0407, Area 400.
114 / 732
7th day Compressive Strength Test of
Pedestal @ Structure-0903 & DGP2 (F4),
JGSS1EP-VPCI- Quantum
698 14-Nov-18 Laboratory Testing D-0912, Area 900 / Concrete Pavement H SW SW 15-Nov-18
FSP-0698 Laboratory
@ DPG-2 (Restoration), 24 mpa @ 3
days.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) @ East &
699 14-Nov-18 Laboratory Testing Area 300 H SW SW 15-Nov-18
FSP-0699 West Side of Analyzer Shelter #12, Area
300.
115 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks and Concrete
JGSS1EP-VPCI- Placement Inspection for Restoration of
706 15-Nov-18 Concrete Pouring Area 900 H SW SW 16-Nov-18
FSP-0706 Concrete Pavement @ DPG-2 near D-
0902, G-0906A/B & Structure-0903 (F4),
Area 900.
116 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
713 16-Nov-18 Concrete Pouring Placement Inspection for Restoration of Area 500 H SW SW 16-Nov-18
FSP-0713
Concrete Pavement @ D-0510C, Area
500.
117 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) 1st - 3rd
719 17-Nov-18 Laboratory Testing Area 400 H SW SW 17-Nov-18
FSP-0719 Layer @ FW-39871, Area 400.
LaboratorD725:E733y Testing
118 / 732
28th day Compressive Strength Test of
Concrete Pavement Inbetween R-0902,
JGSS1EP-VPCI- Quantum
727 17-Nov-18 Laboratory Testing Structure-0903, E-0917, E-0914, G- H SW SW 19-Nov-18
FSP-0727 Laboratory
0909A/B, G-0910A/B & G-0907A/B (24
mpa @ 28 days).
119 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Anchor Bolt Setting and
734 20-Nov-18 Concrete Pouring Area 400 H W SW 20-Nov-18
FSP-0734 Concrete Placement Inspection for
Pedestal @ E-0401B, Area 400.
120 / 732
7th day Compressive Strength Test of
Pedestal @ D-0651 & D-0691, Area 600 /
JGSS1EP-VPCI- Concrete Pavemnent @ Structure-0406, Quantum
740 20-Nov-18 Laboratory Testing H SW SW 21-Nov-18
FSP-0740 Area 400 / Lean Concrete @ E-0509B, Laboratory
E-0405R, E-0401B, Area 400 (24 mpa @
28 days).
121 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
746 21-Nov-18 Concrete Pouring Placement Inspection for 2nd Lift of Area 900 H W SW 22-Nov-18
FSP-0746
Column & Slab of Base Mat @ K-0901
Compressor Shelter, Area 900.
122 / 732
7th day Compressive Strength Test of
Restoration of Concrete Pavement @
DPG-2 near C-0902, F-0906A/B &
JGSS1EP-VPCI- Quantum
752 22-Nov-18 Laboratory Testing Structure-0903 (F4, Area 900, D-0510C, H SW SW 23-Nov-18
FSP-0752 Laboratory
Area 500, R-0701C, Area 700 /
Foundation @ D-0908, Area 900 (24 mpa
@ 28 days).
123 / 732
7th day Compressive Strength Test of
Concrete Pavement @ Analyzer Shelter
#12, Area 300 / Foundation @ E-0509B,
JGSS1EP-VPCI- Area 500, E-0405R & E-0401B, Area 400 Quantum
758 23-Nov-18 Laboratory Testing H SW SW 24-Nov-18
FSP-0758 / Remaining Concrete Pavement @ H- Laboratory
0305 near Manhole / Restoration of
Concrete Pavement @ H-0305, Area 300
(24 mpa @ 28 days).
124 / 732
Accepted 854
511 On-schedule Waiting for result 3
241 Re-schedule Cancelled 90
206 Additional Reject 5
Time Subcontractor Inspector Discipline Status Result Remarks Date Transmitted
Accepted at JGSS1EP-VPCI-
1300H FS Phil Allan Magadia CIVIL On-schedule Cancelled 26-Dec-18
FSP-0006
Accepted at JGSS1EP-VPCI-
1400H FS Phil Allan Magadia CIVIL On-schedule Cancelled 26-Dec-18
FSP-0007
125 / 732
0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18
126 / 732
1400H FS Phil Allan Magadia CIVIL On-schedule Cancelled Accepted at JGSS1EP-VPCI- 26-Dec-18
FSP-0026
Reschedule 11Jun2018/
1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted 26-Dec-18
Not yet ready
Reschedule 14Jun2018/
1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted 26-Dec-18
Not yet ready
Reschedule 13Jun2018/
1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted 26-Dec-18
Not yet ready
Reschedule 14Jun2018/
1600H FS Phil Allan Magadia CIVIL Re-schedule Accepted 26-Dec-18
Not yet ready
127 / 732
Accepted at JGSS1EP-VPCI-
1000H FS Phil Allan Magadia CIVIL On-schedule Cancelled 26-Dec-18
FSP-0037
Reschedule 16Jun2018/
1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted 26-Dec-18
Not yet ready
128 / 732
Accepted at JGSS1EP-VPCI-
1330H FS Phil Allan Magadia CIVIL On-schedule Cancelled 26-Dec-18
FSP-0056
Reschedule 20Jun2018/
1530H FS Phil Allan Magadia CIVIL Re-schedule Accepted 26-Dec-18
Not yet ready
Accepted at JGSS1EP-VPCI-
0900H FS Phil Allan Magadia CIVIL On-schedule Cancelled 26-Dec-18
FSP-0051
Accepted at JGSS1EP-VPCI-
1100H FS Phil Allan Magadia CIVIL On-schedule Cancelled 26-Dec-18
FSP-0053
129 / 732
Accepted at JGSS1EP-VPCI-
1500H FS Phil Allan Magadia CIVIL On-schedule Cancelled 26-Dec-18
FSP-0058
Accepted at JGSS1EP-VPCI-
1400H FS Phil Allan Magadia CIVIL On-schedule Cancelled 26-Dec-18
FSP-0058
Reschedule 23Jun2018/
1600H FS Phil Allan Magadia CIVIL Re-schedule Accepted 26-Dec-18
Not yet ready
130 / 732
1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18
131 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18
Reschedule 05Jul2018/
1300H FS Phil Allan Magadia CIVIL Re-schedule Reject 26-Dec-18
Result was 87% and 84%
132 / 732
Concrete samples to be tested
1100H FS Phil Allan Magadia CIVIL On-schedule Accepted
for 7 days, 14 days & 28 days.
133 / 732
1330H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18
Reschedule 11Jul2018/
1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18
Not yet ready
134 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18
1000H FS Phil Allan Magadia CIVIL On-schedule Accepted Latest drawing attached.
1400H FS Phil Allan Magadia CIVIL On-schedule Accepted Latest drawing attached. 26-Dec-18
135 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18
Reschedule 20Jul2018/
1000H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
Not yet ready
136 / 732
1600H FS Phil Allan Magadia CIVIL On-schedule Accepted 12-Feb-19
Reschedule 20Jul2018/
0900H FS Phil Allan Magadia CIVIL Re-schedule Accepted
Not yet ready
137 / 732
Reschedule 20Jul2018/
Not yet ready/
1600H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
Accepted at JGSS1EP-VPCI-
FSP-0116
138 / 732
Should pass the required
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted compressive strength @28
days.
Reschedule 24Jul2018/
Requirement for FDT prior to
1400H FS Phil Allan Magadia CIVIL Re-schedule Cancelled lean concrete./Not yet ready. 24-Jan-19
Accepted at JGSS1EP-VPCI-
FSP-0127
139 / 732
Reschedule 24Jul2018/
Requirement for FDT prior to
1400H FS Phil Allan Magadia CIVIL Re-schedule Cancelled lean concrete./Not yet ready.
Accepted at JGSS1EP-VPCI-
FSP-0127
Reschedule 24Jul2018/
No laboratory technician
1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted
available. Sample was tested
@ 4 days.
Reschedule 24Jul2018/
1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted No laboratory technician 24-Jan-19
available
Reschedule 24Jul2018/
1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted No laboratory technician
available
140 / 732
Reschedule 25Jul2018/
1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready/ 24-Jan-19
Document was reviewed.
141 / 732
Fracture test and evaluation
1400H FS Phil Allan Magadia CIVIL On-schedule Accepted done & accepted for the 3
Fillet Welders.
142 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted
1530H FS Phil Allan Magadia CIVIL On-schedule Reject Failed test result.
143 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted
144 / 732
04Aug18 -Rebars to rectify.
Formworks not yet fix.
9000H FS Phil Allan Magadia CIVIL Re-schedule Accepted 24-Jan-19
06Aug18 - Schedule of
pouring
06Aug18 - Schedule of
1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted
pouring
145 / 732
1st & 2nd layer backfill were
1030H FS Phil Allan Magadia CIVIL Re-schedule Accepted 24-Jan-19
sand and no FDT conducted.
146 / 732
1400H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not yet ready.
1430H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not yet ready.
1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready. 14-Feb-19
147 / 732
8300H FS Phil Allan Magadia CIVIL Additional Accepted 24-Jan-19
1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready. 26-Dec-18
148 / 732
1100H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19
1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready. 24-Jan-19
149 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted
8000H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready. 24-Jan-19
8300H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready. 26-Dec-18
150 / 732
1350H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19
1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready. 24-Jan-19
8300H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not yet ready.
151 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19
152 / 732
1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19
153 / 732
Hard rock strata was observed
9000H FS Phil Allan Magadia CIVIL Additional Accepted at the bottom of foundation. 24-Jan-19
No FDT required.
9000H FS Phil Allan Magadia CIVIL On-schedule Cancelled Not yet ready.
154 / 732
9000H FS Phil Allan Magadia CIVIL Re-schedule Accepted 24-Jan-19
No available laboratory
8300H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
technician
No available laboratory
8300H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
technician
155 / 732
No available laboratory
9000H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
technician
No available laboratory
9000H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
technician
No available laboratory
9300H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
technician
No available laboratory
9300H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
technician
1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Machine is defective 5-Feb-19
1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Machine is defective 5-Feb-19
156 / 732
1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted Machine is defective 5-Feb-19
157 / 732
0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19
0930H FS Phil Allan Magadia CIVIL On-schedule Cancelled FDT not required
1100H FS Phil Allan Magadia CIVIL On-schedule Cancelled FDT not required
1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Machine is defective 5-Feb-19
1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Machine is defective 5-Feb-19
158 / 732
0930H FS Phil Allan Magadia CIVIL On-schedule Cancelled Not ready
159 / 732
1300H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19
1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yot ready 5-Feb-19
1430H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yot ready 5-Feb-19
160 / 732
1530H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yot ready 5-Feb-19
Confirmatiob shall be at 28
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19
days test.
161 / 732
Cut exposed tie rods and
1300H FS Phil Allan Magadia CIVIL Additional Accepted 5-Feb-19
repair concrete defects.
162 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted
1300H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Still no concrete request
1400H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not yet ready
1500H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not yet ready
1600H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not yet ready
0900H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not yet ready
163 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted
164 / 732
1500H FS Phil Allan Magadia CIVIL Additional Accepted
0900H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready
0930H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready
1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready
165 / 732
1030H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready
166 / 732
1400H FS Phil Allan Magadia CIVIL On-schedule Accepted
167 / 732
1100H FS Phil Allan Magadia CIVIL Re-schedule Accepted
1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Laboratory not available 18-Feb-19
1500H FS Phil Allan Magadia CIVIL Additional Accepted with duplicate IR # 0322 18-Feb-19
168 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19
169 / 732
1430H FS Phil Allan Magadia CIVIL Additional Accepted 18-Feb-19
1500H FS Phil Allan Magadia CIVIL On-schedule Cancelled Quantum lab not available
170 / 732
1300H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not ready 18-Feb-19
1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not ready 18-Feb-19
171 / 732
1530H FS Phil Allan Magadia CIVIL Additional Accepted 18-Feb-19
172 / 732
1300H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not ready
173 / 732
1530H FS Phil Allan Magadia CIVIL Re-schedule Cancelled No concrete available.
174 / 732
1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Rescheduled by technician
175 / 732
1430H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not ready
176 / 732
1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not ready
177 / 732
1300H FS Phil Allan Magadia CIVIL Additional Accepted
178 / 732
1430H FS Phil Allan Magadia CIVIL On-schedule Accepted
179 / 732
1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted 26-Dec-18
180 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted
181 / 732
1400H FS Phil Allan Magadia CIVIL On-schedule Cancelled
182 / 732
0930H FS Phil Allan Magadia CIVIL On-schedule Accepted
183 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18
184 / 732
1000H FS Phil Allan Magadia CIVIL On-schedule Accepted
185 / 732
1330H FS Phil Allan Magadia CIVIL On-schedule Accepted
186 / 732
0900H FS Phil Allan Magadia CIVIL On-schedule Accepted
187 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted
188 / 732
1400H FS Phil Allan Magadia CIVIL Additional Accepted
189 / 732
0930H FS Phil Allan Magadia CIVIL On-schedule Cancelled Not ready
190 / 732
1300H FS Phil Allan Magadia CIVIL On-schedule Accepted 29-Jan-19
191 / 732
1000H FS Phil Allan Magadia CIVIL Additional Accepted Pavement only
192 / 732
1430H FS Phil Allan Magadia CIVIL Re-schedule Accepted
193 / 732
1500H FS Phil Allan Magadia CIVIL Additional Accepted 26-Dec-18
194 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted
195 / 732
1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Jan-19
196 / 732
1300H FS Phil Allan Magadia CIVIL Re-schedule Accepted
197 / 732
1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted 29-Jan-19
198 / 732
1330H FS Phil Allan Magadia CIVIL On-schedule Accepted
199 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted
200 / 732
1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted
201 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Jan-19
202 / 732
0830H FS Phil Allan Magadia CIVIL On-schedule Accepted
203 / 732
0830H FS Phil Allan Magadia CIVIL On-schedule Accepted
204 / 732
0830H FS Phil Allan Magadia CIVIL Re-schedule Accepted
205 / 732
1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted
206 / 732
0830H FS Phil Allan Magadia CIVIL Re-schedule Accepted
207 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 29-Jan-19
208 / 732
1500H Fsphil Allan Magadia CIVIL On-schedule Accepted
209 / 732
1500H Fsphil Allan Magadia CIVIL Re-schedule Accepted
210 / 732
0830H Fsphil Allan Magadia CIVIL On-schedule Accepted
211 / 732
1500H Fsphil Allan Magadia CIVIL On-schedule Accepted
212 / 732
1530H Fsphil Allan Magadia CIVIL Additional Accepted
213 / 732
0830H Fsphil Allan Magadia CIVIL Re-schedule Accepted
214 / 732
1300H Fsphil Allan Magadia CIVIL On-schedule Accepted
215 / 732
1530H Fsphil Allan Magadia CIVIL Additional Accepted
216 / 732
1000H Fsphil Allan Magadia CIVIL Additional Accepted
217 / 732
1500H Fsphil Allan Magadia CIVIL Additional Accepted
218 / 732
1500H Fsphil Allan Magadia CIVIL Additional Accepted
219 / 732
1330H Fsphil Allan Magadia CIVIL Re-schedule Accepted
220 / 732
1500H Fsphil Allan Magadia CIVIL On-schedule Accepted
221 / 732
1300H Fsphil Allan Magadia CIVIL On-schedule Accepted
222 / 732
1400H Fsphil Allan Magadia CIVIL Additional Accepted
223 / 732
0800H Fsphil Allan Magadia CIVIL On-schedule Accepted
224 / 732
1500H Fsphil Allan Magadia CIVIL On-schedule Accepted
225 / 732
1000H Fsphil Allan Magadia CIVIL Re-schedule Accepted
226 / 732
1500H Fsphil Allan Magadia CIVIL On-schedule Accepted
227 / 732
1300H Fsphil Allan Magadia CIVIL Re-schedule Accepted
228 / 732
1500H Fsphil Allan Magadia CIVIL On-schedule Accepted
229 / 732
1000H Fsphil Allan Magadia CIVIL On-schedule Accepted
230 / 732
Date
Closed
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
231 / 732
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
232 / 732
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
233 / 732
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
234 / 732
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
235 / 732
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
236 / 732
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
237 / 732
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
28-Dec-18
15-Feb-19
238 / 732
8-Jan-19
8-Jan-19
8-Jan-19
21-Jan-19
8-Jan-19
239 / 732
8-Jan-19
8-Jan-19
8-Jan-19
8-Jan-19
8-Jan-19
8-Jan-19
240 / 732
8-Jan-19
8-Jan-19
8-Jan-19
8-Jan-19
241 / 732
8-Jan-19
8-Jan-19
12-Feb-19
242 / 732
12-Feb-19
25-Jan-19
243 / 732
25-Jan-19
28-Jan-19
244 / 732
25-Jan-19
25-Jan-19
25-Jan-19
245 / 732
25-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
246 / 732
25-Jan-19
25-Jan-19
25-Jan-19
247 / 732
25-Jan-19
248 / 732
25-Jan-19
25-Jan-19
25-Jan-19
249 / 732
25-Jan-19
31-Jan-19
250 / 732
25-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
251 / 732
25-Jan-19
25-Jan-19
21-Jan-19
252 / 732
25-Jan-19
25-Jan-19
28-Jan-19
15-Feb-19
253 / 732
25-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
28-Jan-19
28-Jan-19
254 / 732
25-Jan-19
31-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
255 / 732
25-Jan-19
28-Jan-19
28-Jan-19
15-Feb-19
28-Jan-19
256 / 732
25-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
28-Jan-19
25-Jan-19
257 / 732
25-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
258 / 732
25-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
28-Jan-19
259 / 732
25-Jan-19
5-Jan-19
25-Jan-19
25-Jan-19
25-Jan-19
5-Jan-19
260 / 732
25-Jan-19
6-Feb-19
6-Feb-19
6-Feb-19
6-Feb-19
6-Feb-19
261 / 732
6-Feb-19
6-Feb-19
6-Feb-19
6-Feb-19
6-Feb-19
262 / 732
6-Feb-19
6-Feb-19
6-Feb-19
6-Feb-19
6-Feb-19
6-Feb-19
12-Feb-19
263 / 732
6-Feb-19
12-Feb-19
6-Feb-19
6-Feb-19
6-Feb-19
6-Feb-19
12-Feb-19
264 / 732
6-Feb-19
6-Feb-19
6-Feb-19
6-Feb-19
6-Feb-19
265 / 732
12-Feb-19
12-Feb-19
12-Feb-19
6-Feb-19
12-Feb-19
266 / 732
12-Feb-19
6-Feb-19
6-Feb-19
21-Jan-19
6-Feb-19
267 / 732
12-Feb-19
6-Feb-19
6-Feb-19
6-Feb-19
6-Feb-19
6-Feb-19
268 / 732
269 / 732
270 / 732
271 / 732
272 / 732
273 / 732
274 / 732
275 / 732
276 / 732
277 / 732
278 / 732
279 / 732
280 / 732
281 / 732
282 / 732
283 / 732
21-Jan-19
284 / 732
285 / 732
21-Jan-19
286 / 732
287 / 732
288 / 732
289 / 732
21-Jan-19
290 / 732
291 / 732
21-Jan-19
292 / 732
21-Jan-19
17-Jan-19
17-Jan-19
293 / 732
30-Jan-19
294 / 732
17-Jan-19
295 / 732
30-Jan-19
296 / 732
30-Jan-19
30-Jan-19
297 / 732
298 / 732
21-Jan-19
299 / 732
17-Jan-19
30-Jan-19
300 / 732
21-Jan-19
301 / 732
21-Jan-19
21-Jan-19
17-Jan-19
30-Jan-19
21-Jan-19
17-Jan-19
21-Jan-19
302 / 732
17-Jan-19
303 / 732
30-Jan-19
30-Jan-19
30-Jan-19
304 / 732
30-Jan-19
305 / 732
306 / 732
21-Jan-19
307 / 732
21-Jan-19
21-Jan-19
21-Jan-19
308 / 732
309 / 732
310 / 732
30-Jan-19
311 / 732
30-Jan-19
312 / 732
21-Jan-19
17-Jan-19
313 / 732
30-Jan-19
314 / 732
17-Jan-19
315 / 732
17-Jan-19
316 / 732
317 / 732
318 / 732
319 / 732
320 / 732
321 / 732
17-Jan-19
21-Jan-19
322 / 732
323 / 732
324 / 732
325 / 732
326 / 732
327 / 732
30-Jan-19
328 / 732
329 / 732
330 / 732
331 / 732
332 / 732
333 / 732
334 / 732
335 / 732
336 / 732
Receive Return to
From Sub Sub
337 / 732
338 / 732
339 / 732
340 / 732
341 / 732
342 / 732
343 / 732
344 / 732
345 / 732
346 / 732
347 / 732
348 / 732
349 / 732
350 / 732
351 / 732
352 / 732
353 / 732
354 / 732
355 / 732
356 / 732
357 / 732
358 / 732
359 / 732
360 / 732
361 / 732
362 / 732
363 / 732
364 / 732
365 / 732
366 / 732
367 / 732
368 / 732
369 / 732
370 / 732
371 / 732
372 / 732
373 / 732
374 / 732
375 / 732
376 / 732
377 / 732
378 / 732
379 / 732
380 / 732
381 / 732
382 / 732
383 / 732
384 / 732
385 / 732
386 / 732
387 / 732
388 / 732
389 / 732
390 / 732
391 / 732
392 / 732
393 / 732
394 / 732
395 / 732
396 / 732
397 / 732
398 / 732
399 / 732
400 / 732
401 / 732
402 / 732
403 / 732
404 / 732
405 / 732
406 / 732
407 / 732
408 / 732
409 / 732
410 / 732
411 / 732
412 / 732
413 / 732
414 / 732
415 / 732
416 / 732
417 / 732
418 / 732
419 / 732
420 / 732
421 / 732
422 / 732
423 / 732
424 / 732
425 / 732
426 / 732
427 / 732
428 / 732
429 / 732
430 / 732
431 / 732
432 / 732
433 / 732
434 / 732
435 / 732
436 / 732
437 / 732
438 / 732
439 / 732
440 / 732
441 / 732
442 / 732
Inspection Notification Log Sheet
PHILSPEC
Inspection Party
Inspection Notification
SN Log Date Inspection Detail Activities Area / Location
Number SC VPCI
Fit-Up Activity
2 28-Aug-18 JGSS1EP-VPCI-PSP-0002 Fit-Up Fabrication Shop H SW
PGD-29001-2"-A1D-N (0MM) Jt. 1,2,3,4
Welding Activity
3 28-Aug-18 JGSS1EP-VPCI-PSP-0003 Welding PGD-29002-2"-A1D-N (0MM) Jt. 2&3 Fabrication Shop H W
DWS-29027-4"-H1D20-N (0MM) Jt. 6&10
Fit-Up Activity
4 30-Aug-18 JGSS1EP-VPCI-PSP-0004 Fit-Up OWS-29028-01,OWS-29028-02,PGD- Fabrication Shop H SW
29001-01,PGD-29001-02
Welding Activity
5 30-Aug-18 JGSS1EP-VPCI-PSP-0005 Welding OWS-29028-01,OWS-29028-02,PGD- Fabrication Shop H W
29001-01,PGD-29001-02
OWS-29028-01; OWS-29028-02; PGD-
6 30-Aug-18 JGSS1EP-VPCI-PSP-0006 Fit-Up Fabrication Shop H SW
29001-01; OWS-29027-01
Daily Welding Activity
7 30-Aug-18 JGSS1EP-VPCI-PSP-0007 Welding OWS-29028-01; OWS-29028-02; PGD- Fabrication Shop H SW
29001-01; OWS-29027-01
OWS-29028-02 Jt. 9,10; PGD-29001-01
8 30-Aug-18 JGSS1EP-VPCI-PSP-0008 Welding Fabrication Shop H W
Jt. 3,4,6,10
9 31-Aug-18 JGSS1EP-VPCI-PSP-0009 Fit-Up Daily Fit-U Activity Fabrication Shop H SW
10 31-Aug-18 JGSS1EP-VPCI-PSP-0010 Welding Daily Welding Activity Fabrication Shop H SW
443 / 732
Visual Welding Inspection (Post)
PGD-29001-2"-A1DU-N (0MM) Jt.
11 31-Aug-18 JGSS1EP-VPCI-PSP-0011 Welding Fabrication Shop H W
12,13,14,15,16; OWS-29028-01-H1D20-
N-(0MM) Jt. 1,2
12 1-Sep-18 JGSS1EP-VPCI-PSP-0012 Fit-Up Daily Fit-U Activity Fabrication Shop H SW
13 1-Sep-18 JGSS1EP-VPCI-PSP-0013 Welding Daily Welding Activity Fabrication Shop H SW
444 / 732
Welder's Qualification Test
Christopher C. Casilla
21 4-Sep-18 JGSS1EP-VPCI-PSP-0021 WQT Gerald M. Cabral Fabrication Shop H W
Emil A. Bautista
Michael Andreau A. Caraan
22 5-Sep-18 JGSS1EP-VPCI-PSP-0022 Fit-Up Daily Fit-Up Activity Fabrication Shop H SW
23 5-Sep-18 JGSS1EP-VPCI-PSP-0023 Welding Daily Welding Activity Fabrication Shop H SW
Visual Welding Inspection (Post)
PGD-29003-01 Jt. 1,2,3,5
PGD-29013-01 Jt. 6,13,15
OWS-29027-01 Jt. 10
24 5-Sep-18 JGSS1EP-VPCI-PSP-0024 Welding Fabrication Shop H W
PGD-29001-01 Jt. 9
PGD-29011-01 Jt. 5
PGD-29004-01 Jt. 5
PGD-29010-01 Jt. 2,3
25 6-Sep-18 JGSS1EP-VPCI-PSP-0025 Fit-Up Daily Fit-Up Activity Fabrication Shop H SW
26 6-Sep-18 JGSS1EP-VPCI-PSP-0026 Welding Daily Welding Activity Fabrication Shop H SW
Visual Welding Inspection (Post)
PGD-29010-01 Jt. 5
PGD-29001-02 Jt. 13,20,27
27 6-Sep-18 JGSS1EP-VPCI-PSP-0027 Welding PGD-29004-01 Jt. 1,2,3 Fabrication Shop H W
PGD-29031-01 Jt. 6,7
PGD-29030-01 Jt. 1,2,3,4,6,7
PGD-29013-01 Jt. 9,10,12
28 7-Sep-18 JGSS1EP-VPCI-PSP-0028 Fit-Up Daily Fit-Up Activity Fabrication Shop H SW
29 7-Sep-18 JGSS1EP-VPCI-PSP-0029 Welding Daily Welding Activity Fabrication Shop H SW
Visual Welding Inspection (Post)
PGD-29008-01 Jt. 2,3,5
PGD-29012-01 Jt. 2,3,5
30 7-Sep-18 JGSS1EP-VPCI-PSP-0030 Welding Fabrication Shop H SW
OWS-29027-01 Jt. 4,6,7
PGD-29013-01 Jt. 4,17,18
OWS-29028-02 Jt. 1,2,3
445 / 732
31 8-Sep-18 JGSS1EP-VPCI-PSP-0031 Fit-Up Daily Fit-Up Activity Fabrication Shop H SW
446 / 732
Inspection for Foundation Check of STR-
0904
44 12-Sep-18 JGSS1EP-VPCI-PSP-0044 Foundation Check A. Location STR-0904 H W
B. Dimension (Size/Projection)
C. Levelness for FDN Padding
45 12-Sep-18 JGSS1EP-VPCI-PSP-0045 Fit-Up Daily Fit-Up Activity Fabrication Shop H SW
46 12-Sep-18 JGSS1EP-VPCI-PSP-0046 Welding Daily Welding Activity Fabrication Shop H SW
Daily Fit-Up Activity
47 12-Sep-18 JGSS1EP-VPCI-PSP-0047 Fit-Up Fabrication Shop H SW
PGD-29001-02 Jt. 26
Visual Welding Inspection (Post)
48 12-Sep-18 JGSS1EP-VPCI-PSP-0048 Welding Fabrication Shop H W
PGD-29001-02 Jt. 26
Visual Welding Inspection (Post)
49 14-Sep-18 JGSS1EP-VPCI-PSP-0049 Welding Fabrication Shop H W
PGD-29030-01 Jt. 4,8,9
50 17-Sep-18 JGSS1EP-VPCI-PSP-0050 Fit-Up Daily Fit-Up Activity Fabrication Shop H SW
51 17-Sep-18 JGSS1EP-VPCI-PSP-0051 Welding Daily Welding Activity Fabrication Shop H SW
Material Inspection for Welding
52 18-Sep-18 JGSS1EP-VPCI-PSP-0052 Material Inspection VPCI Office H W
Consumables (TG-S308L)
Inspection for Foundation Check of STR-
0903 (Drawing No. A1-JGS1EP-EPC1-
A09-DD-15-E001)
53 18-Sep-18 JGSS1EP-VPCI-PSP-0053 Foundation Check STR-0903 H W
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding
447 / 732
Inspection for Foundation Check of H-
0305 (Drawing No.: A1-JGS1EP-EPC1-
A03-DD-10-002)
57 20-Sep-18 JGSS1EP-VPCI-PSP-0057 Foundation Check Area 300 H SW
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding
58 24-Sep-18 JGSS1EP-VPCI-PSP-0058 Fit-Up Daily Fit-Up Activity DPG-2 H SW
59 24-Sep-18 JGSS1EP-VPCI-PSP-0059 Welding Daily Welding Activity DPG-2 H SW
Visual Welding Inspection (Post)
60 24-Sep-18 JGSS1EP-VPCI-PSP-0060 Welding DPG-2 H W
PGD-29001-01 Jt. 7,8
61 25-Sep-18 JGSS1EP-VPCI-PSP-0061 Fit-Up Daily Fit-Up Activity DPG-2 H SW
62 25-Sep-18 JGSS1EP-VPCI-PSP-0062 Welding Daily Welding Activity DPG-2 H SW
Visual Welding Inspection (Post)
63 25-Sep-18 JGSS1EP-VPCI-PSP-0063 Welding DPG-2 H W
PGD-29001-01 Jt. 11
Plot of FSPhil Data vs. PHS Data
Plot of FSPhil Data vs. PHS Data (1mm
64 26-Sep-18 JGSS1EP-VPCI-PSP-0064 Survey Area 300 H W
Offset)
(SS-PHS-0001)
65 26-Sep-18 JGSS1EP-VPCI-PSP-0065 Fit-Up Daily Fit-Up Activity DPG2 H SW
66 26-Sep-18 JGSS1EP-VPCI-PSP-0066 Welding Daily Welding Activity DPG2 H SW
Visual Welding Inspection (Post)
67 26-Sep-18 JGSS1EP-VPCI-PSP-0067 Welding DPG2 H W
PGD-29013-01 Jt. F5,F11,F26
Inspection for Foundation Check of R-
0902 (Drawing No. A1-JGS1EP-EPC1-
A09-DD-15-E001)
68 26-Sep-18 JGSS1EP-VPCI-PSP-0068 Foundation Check Area 900 H W
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding
69 27-Sep-18 JGSS1EP-VPCI-PSP-0069 Fit-Up Daily Fit-Up Activity DPG-2 H SW
70 27-Sep-18 JGSS1EP-VPCI-PSP-0070 Welding Daily Welding Activity (In-Process) DPG-2 H SW
Visual Welding Inspection (Post)
71 27-Sep-18 JGSS1EP-VPCI-PSP-0071 Welding DPG-2 H W
PGD-29013-01 Jt. F25
448 / 732
Daily Fit-Up Activity
72 27-Sep-18 JGSS1EP-VPCI-PSP-0072 Fit-Up Fabrication Shop H SW
for SS Welding
Daily Welding Activity (In-Process)
73 27-Sep-18 JGSS1EP-VPCI-PSP-0073 Welding Fabrication Shop H SW
for SS Welding
74 28-Sep-18 JGSS1EP-VPCI-PSP-0074 Fit-Up Daily Fit-Up Activity DPG-2 H SW
75 28-Sep-18 JGSS1EP-VPCI-PSP-0075 Welding Daily Welding Activity (In-Process) DPG-2 H SW
Visual Welding Inspection (Post)
PGD-29001-01 Jt. 31,32
76 28-Sep-18 JGSS1EP-VPCI-PSP-0076 Welding DPG-2 H W
PGD-29001-02 Jt. 4,8,10
PGD-29008-01 Jt. 1
Daily Fit-Up Activity
77 28-Sep-18 JGSS1EP-VPCI-PSP-0077 Fit-Up Fabrication Shop H SW
for SS Welding
Daily Welding Activity (In-Process)
78 28-Sep-18 JGSS1EP-VPCI-PSP-0078 Welding Fabrication Shop H SW
for SS Welding
Visual Welding Inspection (Post)
79 28-Sep-18 JGSS1EP-VPCI-PSP-0079 Welding Fabrication Shop H W
449 / 732
Visual Inspection of Welding
87 1-Oct-18 JGSS1EP-VPCI-PSP-0087 Welding IL-24001-1/2"-A21A Jt. Fabrication Shop H W
5,6,7,11,12,13,14,16,18,19,20
Daily Welding Activity (In-Process)
88 1-Oct-18 JGSS1EP-VPCI-PSP-0088 Welding Fabrication Shop H SW
for Support Welding
Visual Inspection of Welding
89 1-Oct-18 JGSS1EP-VPCI-PSP-0089 Welding Fabrication Shop H W
IL-24001-1/2"-A21A Jt. 1,2,3,4
90 1-Oct-18 JGSS1EP-VPCI-PSP-0090 Fit-Up Daily Fit-Up Activity DPG-2 H SW
91 1-Oct-18 JGSS1EP-VPCI-PSP-0091 Welding Daily Welding Activity (In-Process) DPG-2 H SW
Visual Inspection of Welding
PGD-29009-01 Jt. F1
92 1-Oct-18 JGSS1EP-VPCI-PSP-0092 Welding PGD-29001-02 Jt. F1,F29,F30 DPG-2 H W
PGD-29011-01 Jt. F4,F6,F7
PGD-29025-01 Jt. F5
93 2-Oct-18 JGSS1EP-VPCI-PSP-0093 Fit-Up Daily Fit-Up Activity DPG-2 H SW
94 2-Oct-18 JGSS1EP-VPCI-PSP-0094 Welding Daily Welding Activity (In-Process) DPG-2 H SW
Visual Inspection of Welding
PGD-29001-01 Jt. F2,F29
PGD-29010-01 Jt. F1,F4
95 2-Oct-18 JGSS1EP-VPCI-PSP-0095 Welding DPG-2 H W
PGD-29012-01 Jt. F1
PGD-29013-01 Jt. F1,F20
PGD-29030-01 Jt. F5
Welder's Qualification Test
96 2-Oct-18 JGSS1EP-VPCI-PSP-0096 WQT Ronalyn M. Arcega (PSP-W-012) Ambulong Shop H W
Franco R. Ebreo (PSP-W-013)
Daily Fit-Up Activity
97 3-Oct-18 JGSS1EP-VPCI-PSP-0097 Fit-Up Fabrication Shop H SW
for SUS Welding
Daily Welding Activity (In-Process)
98 3-Oct-18 JGSS1EP-VPCI-PSP-0098 Welding Fabrication Shop H SW
for SUS Welding
Visual Inspection of Welding
99 3-Oct-18 JGSS1EP-VPCI-PSP-0099 Welding Fabrication Shop H W
IL-24001-1/2"-A21A Jt. 21,22,24
450 / 732
Inspection of Structural Foundation
Check of STR-0905 (Drawing No. A1-
JGS1EP-EPC1-A09-DD-15-551)
100 3-Oct-18 JGSS1EP-VPCI-PSP-0100 Foundation Check Area 900 H W
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding
103 4-Oct-18 JGSS1EP-VPCI-PSP-0103 NDE RT for PGD-29010-2"-A1D-N (0MM) Jt. 4 Area 400 H SW/R
451 / 732
Inspection of Mechanical Foundation
Check of G-0907 A/B (Drawing No. A1-
JGS1EP-EPC1-A09-DD-10-101)
109 5-Oct-18 JGSS1EP-VPCI-PSP-0109 Foundation Check Area 900 H W
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding
452 / 732
Inspection of Mechanical Foundation
Check of D-0909 (Drawing No. A3-
JGS1EP-A7MI-D-0909-001)
116 6-Oct-18 JGSS1EP-VPCI-PSP-0116 Foundation Check Area 900 H W
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding
453 / 732
HDPE Visual Inspection of Welding
FW-39870-01 Jt. 4,5,6,8,9
127 9-Oct-18 JGSS1EP-VPCI-PSP-0127 Welding Ambulong Shop H W
FW-39871-01 Jt. 7,9,10,11,4
FW-39874-01 Jt. 3
Visual Welding Inspection (Post)
OWS-90002-01 Jt. 3,2
128 9-Oct-18 JGSS1EP-VPCI-PSP-0128 Welding Ambulong Shop H W
OWS-51606-01 Jt. 6 ,2,3,4
OWS-90001 Jt. 2
454 / 732
HDPE Visual Welding Inspection (Post)
FW-39906-01 Jt. 3,4,5,7,8,9,10,11
137 10-Oct-18 JGSS1EP-VPCI-PSP-0137 Welding FW-39871-01 Jt. 3,5,8 Ambulong Shop H W
FW-39874-01 Jt. 6,7
FW-39807-01 Jt. 4,8
455 / 732
Visual Welding Inspection (Post)
OWS-25001-01 Jt. 3,4,6,7,8
150 12-Oct-18 JGSS1EP-VPCI-PSP-0150 Welding Ambulong Shop H W
CWR-31360-01 Jt. 5,11
CWI-24002-01 Jt. 2
456 / 732
Welder's Qualification Test
Christopher C. Casilla (PSP-W-003)
160 13-Oct-18 JGSS1EP-VPCI-PSP-0160 WQT Bryan M. Dalangin (PSP-W-042) Ambulong Shop H W
Nestor A. Antenor (PSP-W-043)
Lemar Leandro A. Aranda (PSP-W-045)
457 / 732
Visual Welding Inspection (Post)
PGD-29027-01 Jt. 2,3,4,5,1
174 16-Oct-18 JGSS1EP-VPCI-PSP-0174 Welding Area 900 H W
PGD-29001-02 Jt. 18,14,16,32,33,24
PCS-90002-01 Jt.1,3
Holiday Test for PCS Line of
175 16-Oct-18 JGSS1EP-VPCI-PSP-0175 Holiday Test Area 900 H W
(PCS-90002-01 Jt. 1,2,3)
176 16-Oct-18 JGSS1EP-VPCI-PSP-0176 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
177 16-Oct-18 JGSS1EP-VPCI-PSP-0177 Welding Ambulong Shop H W
CWR-31360-01 Jt. 7,2
458 / 732
188 17-Oct-18 JGSS1EP-VPCI-PSP-0188 NDE RT for PGD-29001-02 Jt. 14 DPG-2 H SW/R
189 18-Oct-18 JGSS1EP-VPCI-PSP-0189 Fit-Up Daily Fit-Up Activity Area 900 H SW
190 18-Oct-18 JGSS1EP-VPCI-PSP-0190 Welding Daily Welding Activity (In-Process) Area 900 H SW
Visual Welding Inspection (Post)
191 18-Oct-18 JGSS1EP-VPCI-PSP-0191 Welding OWS-29028-01 Jt. F5 Area 900 H W
OWS-29028-02 Jt. F4,F8
Wrapping for OWS Line
192 18-Oct-18 JGSS1EP-VPCI-PSP-0192 Wrapping OWS-29028-01 Jt. 2,3,4,F5 Area 900 H W
OWS-29028-02 Jt. 1,2,3,F4,5,6,7,F8
196 19-Oct-18 JGSS1EP-VPCI-PSP-0196 NDE PT for PGD-29001-02 Jt. F12 & Jt 25 Area 900 H SW/R
197 19-Oct-18 JGSS1EP-VPCI-PSP-0197 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW
198 19-Oct-18 JGSS1EP-VPCI-PSP-0198 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
P-29002-02 Jt. 7
199 19-Oct-18 JGSS1EP-VPCI-PSP-0199 Welding P-29057-02 Jt. 3 Ambulong Shop H W
P-29023-01 Jt. 6
P-29001-01 Jt. 5
200 19-Oct-18 JGSS1EP-VPCI-PSP-0200 Fit-Up Daily Fit-Up Activity Area 900 H SW
201 19-Oct-18 JGSS1EP-VPCI-PSP-0201 Welding Daily Welding Activity (In-Process) Area 900 H SW
Visual Welding Inspection (Post)
202 19-Oct-18 JGSS1EP-VPCI-PSP-0202 Welding Area 900 H W
PCS-90003-01 Jt. F2,F3
459 / 732
Welder's Qualification Test
204 19-Oct-18 JGSS1EP-VPCI-PSP-0204 WQT Ambulong Shop H W
Giannah Lei R. Clarin (W-060) - SMAW
460 / 732
Final Line Check for PGD Line of (HT-
215 20-Oct-18 JGSS1EP-VPCI-PSP-0215 Line Check Area 400 H W
UG-PGD-PS-002)
Hydro Test for PGD Line of (HT-UG-
216 20-Oct-18 JGSS1EP-VPCI-PSP-0216 Pressure Test Area 900 H H
PGD-PS-002)
217 22-Oct-18 JGSS1EP-VPCI-PSP-0217 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW
218 22-Oct-18 JGSS1EP-VPCI-PSP-0218 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
219 22-Oct-18 JGSS1EP-VPCI-PSP-0219 Welding A09A5001-MS-29004-01 Jt. 9 Ambulong Shop H W
A09A5001-P-29059-02 Jt. 8
220 22-Oct-18 JGSS1EP-VPCI-PSP-0220 Fit-Up Daily Fit-Up Activity 300 H SW
221 22-Oct-18 JGSS1EP-VPCI-PSP-0221 Welding Daily Welding Activity (In-Process) 300 H SW
Visual Welding Inspection (Post)
222 22-Oct-18 JGSS1EP-VPCI-PSP-0222 Welding Area 300 H W
PCS-90001-01
461 / 732
Visual Welding Inspection (Post)
PGD-29001-01 Jt. 2M1
226 23-Oct-18 JGSS1EP-VPCI-PSP-0226 Welding Area 900 H W
PGD-29001-02 Jt. 7M1, 9M1, 10M1, 12,
25M1, 28, 31M1
462 / 732
Welder's Qualification Test
Adrian Z. Panganiban (W-069) - SMAW
235 24-Oct-18 JGSS1EP-VPCI-PSP-0235 WQT Felix R. Bagui (W-072) - GT/SM Ambulong Shop H W
Ronilo R. Bagui (W-073) - GT/SM
John Carlo I. Barola (W-074) - GT/SM
463 / 732
Holiday Test for PCS Line
246 25-Oct-18 JGSS1EP-VPCI-PSP-0246 Holiday Test Area 900 H W
A00A5001-PCS-23412-01 Jt. 1
Final Line Check for PCS Line of (HT-
247 25-Oct-18 JGSS1EP-VPCI-PSP-0247 Line Check Area 900 H W
UG-PCS-PS-005)
248 26-Oct-18 JGSS1EP-VPCI-PSP-0248 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW
249 26-Oct-18 JGSS1EP-VPCI-PSP-0249 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
250 26-Oct-18 JGSS1EP-VPCI-PSP-0250 Welding Ambulong Shop H W
A00A5001-OWS-24001-01 Jt. 1,7
255 27-Oct-18 JGSS1EP-VPCI-PSP-0255 NDE MT for Spreader Beam Area 400 H SW/R
256 29-Oct-18 JGSS1EP-VPCI-PSP-0256 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW
257 29-Oct-18 JGSS1EP-VPCI-PSP-0257 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
A09A5001-P-29041-01 Jt. 2,3,4
A09A5001-P-29023-01 Jt. 2,3,7,8
258 29-Oct-18 JGSS1EP-VPCI-PSP-0258 Welding A09A5001-P-29059-01 Jt. 5,16 Ambulong Shop H W
A09A5001-P-29002-02 Jt. 13
A09A5001-P-29002-01 Jt. 6,7
A09A5001-P-29042-01 Jt. 8,9
PT Activity for Lifting Accessories
259 29-Oct-18 JGSS1EP-VPCI-PSP-0259 NDE Area 900 H SW/R
(Shuckles)
464 / 732
Inspection for Foundation Check of K-
0901 at Area 900 (Drawing#:A1-
JGS1EP-EPC1-A09-DD-15-521)
260 29-Oct-18 JGSS1EP-VPCI-PSP-0260 Foundation Check Area 900 H SW
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding
264 30-Oct-18 JGSS1EP-VPCI-PSP-0264 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
465 / 732
Visual Welding Inspection (Post)
A09A5001-P-29059-01 Jt. 7,10,11,14
A09A5001-P-29002-02 Jt. 6,11
A09A5001-P-29059-02 Jt. 5,6,9,10
A09A5001-P-29060-02 Jt. 2,3
A09A5001-P-29005-01 Jt. 7
265 30-Oct-18 JGSS1EP-VPCI-PSP-0265 Welding Ambulong Shop H W
A09A5001-P-29041-01 Jt. 11
A09A5001-P-29040-01 Jt. 3,4
A00A5001-OWS-24001-02 Jt. 1
A09A5001-SV-29005-01 Jt. 2,4
A09A5001-P-29001-01 Jt. 9,10,11
A09A5001-P-29059-01 Jt. 2
269 1-Nov-18 JGSS1EP-VPCI-PSP-0269 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
466 / 732
Visual Welding Inspection (Post)
A00A5001-FW-39861-01 Jt. 6,7
A09A5001-P-29059-02 Jt. 2
A09A5001-P-29059-01 Jt. 15
A00A5001-PGD-29034-01 Jt.
270 1-Nov-18 JGSS1EP-VPCI-PSP-0270 Welding Ambulong Shop H W
9,11,12,15,17,18
A01A5001-P-29059-01 Jt. 8
A09A5001-P-29003-01 Jt. 14,15
A09A5001-P-29069-02 Jt. 17
A09A5001-P-29057-02 Jt. 4
467 / 732
et Accepted
99 Re-schedule Cancelled
468 / 732
SW 01-Sep-18 0800H Philspec Ramon Castillo On-schedule Accepted
469 / 732
SW 5-Sep-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted
470 / 732
SW 10-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted
471 / 732
SW 13-Sep-18 0900H Philspec Randal Fernandez Structural On-schedule Accepted
472 / 732
W 21-Sep-18 0800H Philspec Randal Fernandez Mechanical On-schedule Accepted
473 / 732
SW 28-Sep-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted
474 / 732
SW 01-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted
475 / 732
W 04-Oct-18 0900H Philspec Allan Magadia Structural On-schedule Accepted
476 / 732
SW 06-Oct-18 0900H Philspec Randal Fernandez Mechanical On-schedule Accepted
477 / 732
SW 08-Oct-18 0900H Philspec Randal Fernandez Mechanical On-schedule Accepted
478 / 732
SW 10-Oct-18 0800H Philspec Ramon Castillo Piping Additional Accepted
SW 11-Oct-18 0900H & 1300H Philspec Ramon Castillo Piping On-schedule Accepted
479 / 732
SW 11-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted
480 / 732
SW 13-Oct-18 0900H Philspec Ramon Castillo Piping Additional Accepted
481 / 732
SW 15-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted
482 / 732
SW 17-Oct-18 1330H Philspec Randal Fernandez Piping On-schedule Accepted
483 / 732
R 18-Oct-18 1130-1300H Philspec Randal Fernandez Piping Re-schedule Accepted
SW 19-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted
SW 19-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted
484 / 732
SW 20-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted
485 / 732
SW 18-Oct-18 1330H Philspec Randal Fernandez Piping Re-schedule Accepted
486 / 732
SW 23-Oct-18 1000H Philspec Arvin Balitaan Piping Additional Accepted
487 / 732
SW 25-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted
488 / 732
SW 26-Oct-18 1000H Philspec Randal Fernandez Piping On-schedule Accepted
489 / 732
SW 30-Oct-18 0900H Philspec Randal Fernandez Mechanical Additional Accepted
490 / 732
SW 31-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted
491 / 732
SW 02-Nov-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted
492 / 732
Inspection Notification Log Sheet
AG&P
Inspection Party
Inspection
SN Log Date Inspection Detail Activities Area / Location
Notification Number SC VPCI PMC
JGSS1EP-VPCI-AGP-
1 7-Aug-18 Material Inspection U/G Piping Materials AG&P Yard 1 H W SW
0001
JGSS1EP-VPCI-AGP- To test 20 Welders: 2”GTAW &; 6”
2 23-Aug-18 WQT AG&P Yard 1 H W SW
0002 GTAW/SMAW
Inspection of Welding Consumables;
JGSS1EP-VPCI-AGP-
3 23-Aug-18 Material Inspection Material traceability; Lay-out & cutting; AG&P Yard 1 H W SW
0003
Fit-up; Welding
JGSS1EP-VPCI-AGP-
4 28-Aug-18 WQT 31 Welders AG&P Yard 1 H W SW
0004
JGSS1EP-VPCI-AGP-
5 1-Oct-18 WQT 15 Welders AG&P Yard 1 H W SW
0005
493 / 732
Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
9 11-Oct-18 Dwg # A00A5001-CWI-25001-01 Rev.02 AG&P Yard 1 H SW SW
0009 Inspection
Jt. 3
Visual Inspection
Dwg # A00A5001-CWI-25001-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
10 11-Oct-18 Jt. 2,5 AG&P Yard 1 H SW SW
0010 Inspection
Dwg # A00A5001-CWS-25001-01 Rev.02
Jt. 3,7
Visual Inspection
Dwg # A00A5001-CWI-25001-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
11 11-Oct-18 Jt. 2,3, 5 AG&P Yard 1 H W SW
0011 Inspection
Dwg # A00A5001-CWS-25001-01 Rev.02
Jt. 3,7
Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
13 10-Oct-18 Dwg # A00A5001-CWI-25001-01 Rev.02 AG&P Yard 1 H SW SW
0013 Inspection
Jt. 3
494 / 732
Visual Inspection
Dwg # A00A5001-CWI-25001-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
15 11-Oct-18 Jt. 2,5 AG&P Yard 1 H SW SW
0015 Inspection
Dwg # A00A5001-CWS-25001-01 Rev.02
Jt. 3,7
Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
17 12-Oct-18 Dwg # A00A5001-CWS-25001-01 Rev.02 AG&P Yard 1 H SW SW
0017 Inspection
Jt. 5,8
Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
18 12-Oct-18 Dwg # A00A5001-CWS-25001-01 Rev.02 AG&P Yard 1 H SW SW
0018 Inspection
Jt. 5,8
Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
20 15-Oct-18 Dwg # A00A5001-CWI-26001-01 Rev.02 AG&P Yard 1 H SW SW
0020 Inspection
Jt. 2,5
Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
21 15-Oct-18 Dwg # A00A5001-CWI-26001-01 Rev.02 AG&P Yard 1 H W SW
0021 Inspection
Jt. 2,5
JGSS1EP-VPCI-AGP-
22 16-Oct-18 WQT 1G Rotated ( 9 Welders) AG&P Yard 1 H W SW
0022
495 / 732
Visual Inspection
Dwg # A00A5001-CWI-25001-01 Rev.02
- Jt.6
JGSS1EP-VPCI-AGP- Welding Visual
23 17-Oct-18 Dwg # A00A5001-CWI-26001-01 Rev.02 AG&P Yard 1 H SW SW
0023 Inspection
- Jt.3
Dwg # A00A5001-CWS-25001-01 Rev.02
- Jt.2
Visual Inspection
Dwg # A00A5001-CWI-25001-01 Rev.02
- Jt.6
JGSS1EP-VPCI-AGP- Welding Visual
24 17-Oct-18 Dwg # A00A5001-CWI-26001-01 Rev.02 AG&P Yard 1 H W SW
0024 Inspection
- Jt.3
Dwg # A00A5001-CWS-25001-01 Rev.02
- Jt.2
Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
26 17-Oct-18 Dwg # A00A5001-CWI-26001-01 Rev.02 AG&P Yard 1 H W SW
0026 Inspection
- Jt.7, 8
Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
27 18-Oct-18 Dwg # A00A5001-CWI-26001-01 Rev.02 AG&P Yard 1 H SW SW
0027 Inspection
- Jt.7, 8
496 / 732
Visual Inspection
Dwg # A00A5001-CWI-26001-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
28 18-Oct-18 - Jt.6 AG&P Yard 1 H SW SW
0028 Inspection
Dwg # A00A5001-CWI-26002-01 Rev.02
- Jt.13, 15
Visual Inspection
Dwg # A00A5001-CWI-26001-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
29 18-Oct-18 - Jt.6 AG&P Yard 1 H W SW
0029 Inspection
Dwg # A00A5001-CWI-26002-01 Rev.02
- Jt.13, 15
Visual Inspection
Dwg # A00A5001-CWI-26002-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
32 19-Oct-18 - Jt.7 AG&P Yard 1 H SW SW
0032 Inspection
Dwg # A00A5001-CWS-26004-01 Rev.02
- Jt.4, 6
497 / 732
Visual Inspection
Dwg # A00A5001-CWI-26002-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
33 19-Oct-18 - Jt.7 AG&P Yard 1 H W SW
0033 Inspection
Dwg # A00A5001-CWS-26004-01 Rev.02
- Jt.4, 6
Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
34 22-Oct-18 Dwg # A00A5001-CWI-26002-01 Rev.02 AG&P Yard 1 H SW SW
0034 Inspection
- Jt.8
Visual Inspection
Dwg # A00A5001-CWI-26002-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
34 22-Oct-18 - Jt.5, 9 AG&P Yard 1 H W SW
0034 Inspection
Dwg # A00A5001-CWS-26004-01 Rev.02
- Jt.5
Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
35 23-Oct-18 Dwg # A00A5001-CWI-26002-01 Rev.02 AG&P Yard 1 H W SW
0035 Inspection
- Jt.5, 8, 9
498 / 732
PL 15 X 1829MM X 6096MM, A36 - 1 PC
PL 25MM X 1219MM X 1524MM, A36 - 1
PC
PL 20MM X 1829MM X 6096MM, A36 - 1
PC
JGSS1EP-VPCI-AGP- CHANNEL, TAPERED FLANGE, 200 X
37 25-Oct-18 Material Inspection AG&P Yard 1 H W SW
0037 80 X 7.5 X 11 X 6000MM, ASTM A36 - 1
PC
ROUND BAR, 60MMØ X 6000MM, JIS
G3101 EQ. A36 - 1 PC
ROUND BAR, 60MMØ X 6000MM, JIS
G3101 EQ. A36 - 1 PC
Visual Inspection
Dwg # A00A5001-CWS-26004-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
38 26-Oct-18 - Jt.19 AG&P Yard 1 H W SW
0038 Inspection
Dwg # A00A5001-CWI-26002-01 Rev.02
- Jt.11
499 / 732
JGSS1EP-VPCI-AGP- Notification for RT Reports & RT Film
42 7-Nov-18 WQT AG&P Yard 1 H W SW
0042 Review WQT held last Oct 31, 2018
500 / 732
PIPE, SEAMLESS, BE, 4", SCH STD,
ASME A106-B, EXT'L PE COATED - HT#
1812208
PIPE, SEAMLESS, BE, 14", SCH STD,
ASME A106-B, EXT'L PE COATED - HT#
1737666
ELBOW, SEAMLESS, BW, CS, 45°, 4"
JGSS1EP-VPCI-AGP-
44 14-Nov-18 Material Inspection SCH STD, A234-WPB - HT# EA465 AG&P Yard 1 H W SW
0044
REDUCER CONCENTRIC, CEAMLESS,
BW, CS, 6" X 4", SCH STD, A234-
WPB(PE.C)- HT# DN869
PIPE, SEAMLESS, BE, 20", SCH STD,
ASME A106-B, EXT'L PE COATED - HT#
679194
502 / 732
Notification for Visual Inspection:
A1-JGS1EP-EPCI-A06-DD-15-G077-JT-
SF082, JT-GP004
JGSS1EP-VPCI-AGP- Welding Visual Area 600
53 22-Nov-18 A1-JGS1EP-EPCI-A06-DD-15-V035-JT- H W SW
0053 Inspection STR604
GB030
JGSS1EP-VPCI-AGP- A1-JGS1EP-EPCI-A06-DD-15-G109-JT-
Thinner No. 25 Jotun Lot# 1793594,
54 22-Nov-18 Material Inspection GP001 AG&P Yard 1 H W SW
0054 1525985
JGSS1EP-VPCI-AGP- Paint, Resist 86, Jotun Lot No.
54 22-Nov-18 Material Inspection AG&P Yard 1 H W SW
0054 1756188,1750319,1750315
A1-JGS1EP-EPC1-A06-DD-10-
Elevation/
191/Foundation for Z-0651
JGSS1EP-VPCI-AGP- Levelness/ JG Summit Area
56 23-Nov-18 A1-JGS1EP-EPC1-A06-DD-15- H SW SW
0056 Centering / 600 STR 0604
E001/foundation for Column Structure-
Plumbness
0604 of F1,F2,F3,P36
JGSS1EP-VPCI-AGP-
57 26-Nov-18 Material Inspection Welding Consumables AG&P Yard 1 H W SW
0057
503 / 732
JGSS1EP-VPCI-AGP- Welding Visual JG Summit Area
59 27-Nov-18 Notification for Daily Fit-up Activities: H SW SW
0059 Inspection 600 STR 0604
JGSS1EP-VPCI-AGP- Welding Visual JG Summit Area
59 27-Nov-18 Notification for Daily Welding Activities: H SW SW
0059 Inspection 600 STR 0604
504 / 732
Notification for Visual Inspection: JG Summit Area
JGSS1EP-VPCI-AGP- Welding Visual
63 22-Nov-18 A00A5001-CWI-26002-01-06-07 JT-26 between 600 H W SW
0063 Inspection
and 500
JGSS1EP-VPCI-AGP- Material Receiving Inspection for Above
64 03-Dec-18 Material Inspection AG&P Yard 1 H W SW
0064 Ground Fittings
JG Summit Site
JGSS1EP-VPCI-AGP- Welding Visual
65 04-Dec-18 Notification for Daily Fit-up Activities: Area 600 and H SW SW
0065 Inspection
601 Site
JG Summit
JGSS1EP-VPCI-AGP- Welding Visual
65 04-Dec-18 Notification for Daily Welding Activities: Area 600 and H SW SW
0065 Inspection
601
JG Summit Site
JGSS1EP-VPCI-AGP- Welding Visual Notification for Visual Inspection:
65 04-Dec-18 Area 600 and H W SW
0065 Inspection A00A5001-OWS-26001-01 JT. 1, 2, 3, 4
601
Elevation/
JG Summit Site
JGSS1EP-VPCI-AGP- Levelness/
66 04-Dec-18 Daily Mechanical Activities: Area 600 and H W SW
0066 Centering /
Elevation/ 601
Plumbness JG Summit Site
JGSS1EP-VPCI-AGP- Levelness/ Pad & Grouting Level Inspection
66 04-Dec-18 Area 600 and H W SW
0066 Centering / Elevetion
601
Plumbness
A1-JGS1EP-EPC1-A06-DD-10-001
Foundation for D-600
A1-JGS1E-EPC1-A06-DD-10-011
Foundation for
Elevation/ D-0640
JG Summit Site
JGSS1EP-VPCI-AGP- Levelness/ A1-JGS1E-EPC1-A06-DD-10-131
66 04-Dec-18 Area 600 and H W SW
0066 Centering / Foundation for
601
Plumbness E-0624E/F
A1-JGS1EP-EPC1-A06-DD-15-E001
Foundation for Column 05-Bc1 and 05-
B1a Str-0601
505 / 732
JGSS1EP-VPCI-AGP-
69 06-Dec-18 Material Inspection Above Ground Fittings AG&P Yard 1 H W R
0069
JGSS1EP-VPCI-AGP-
71 07-Dec-18 WQT PIPING / STRUCTURAL/ TANKS AG&P Yard 1 H W SW
0071
JGSS1EP-VPCI-AGP- Welding Visual
72 07-Dec-18 Notification for Daily Fit-up Activities: AG&P Yard 1 H SW SW
0072 Inspection
JGSS1EP-VPCI-AGP- Welding Visual
72 07-Dec-18 Notification for Daily Welding Activities: AG&P Yard 1 H SW SW
0072 Inspection
JGSS1EP-VPCI-AGP-
74 07-Dec-18 Mock-up Testing Final DFT & Visual Inspection AG&P Yard 1 H W SW
0074
506 / 732
JGSS1EP-VPCI-AGP- Notification for Mock-up Testing of
74 07-Dec-18 Mock-up Testing AG&P Yard 1 H W SW
0074 Coating System 2E, 2L
507 / 732
A1-JGS1EP-EPC1-A06-DD-10-001
Foundation for E-0401B
A1-JGS1E-EPC1-A06-DD-15-006
JG Summit Site
JGSS1EP-VPCI-AGP- Welding Visual Foundation for str-0606 Column C001,
76 10-Dec-18 Area 400, 500, H SW SW
0076 Inspection C002, C003,C004
600
A1-JGS1E-EPC1-A06-DD-15-V008 JT-4,
JT-5, JT-6
A00A5001-CWI-26002-01-06-08-R JT-16
508 / 732
Notification for Visual Inspection:
A1-JGS1E-EPC1-A06-DD-15-G004 JT-
GP025 and
JGSS1EP-VPCI-AGP- Welding Visual JT-SF017-2pcs Girder-G004 STR-0601 JG Summit Site
79 11-Dec-18 H W SW
0079 Inspection A1-JGS1E-EPC1-A06-DD-15-G007 JT- Area 600
GP017 and
JT-SF016-2pcs Girder-G007 STR-0601
JGSS1EP-VPCI-AGP-
81 11-Dec-18 Material Inspection THINNER NO.17 BATCH# 1832712 AG&P Yard 1 H SW R
0081
JGSS1EP-VPCI-AGP-
81 11-Dec-18 Material Inspection THINNER NO.10 BATCH# 1820353 AG&P Yard 1 H SW R
0081
509 / 732
PAINT, HARDTOP XP GRAY MUNSELL
JGSS1EP-VPCI-AGP-
81 11-Dec-18 Material Inspection NO.N-5.5 AG&P Yard 1 H SW R
0081
BATCH# 1807479, 1818788, 1821759
510 / 732
Notification for Levelness, Plumbness
and Elevation Survey Activities:
1. A1-JGS1E-EPC1-A06-DD-15-E004
Framing Plan at TOS EL.+73300 & at
TOS EL.+73800
2. A1-JGS1E-EPC1-A06-DD-15-E016
Elevation/ Framing EL. at Grid 05-F1 & at Grid 05-
JG SUMMIT
JGSS1EP-VPCI-AGP- Levelness/ F1a
86 15-Dec-18 SITE H W SW
0086 Centering / 3. A1-JGS1E-EPC1-A06-DD-15-E017
AREA 500
Plumbness Framing EL. at Grid 05-F2
4. A1-JGS1E-EPC1-A06-DD-15-E024
Framing EL. at Grid 05-Fc1 and at Grid
05-Fc2
5. A1-JGS1E-EPC1-A06-DD-15-E028
Framing EL. at Grid 05-Fd1 and at Grid
05-Fd2
A1-JGS1EP-EPC1-A05-DD-10-001 D-
JGSS1EP-VPCI-AGP- 0510C JG SUMMIT
87 15-Dec-18 Erection Work H W SW
0087 A1-JGS1EP-EPC1-A06-DD-10-121 D- SITE
0651 / D-0691
JGSS1EP-VPCI-AGP- JG SUMMIT
88 15-Dec-18 Wrapping A00A5001-OWS-26001-01 JT. 6 H W SW
0088 SITE
511 / 732
Coating & Wrapping
A00A5001-ND-25001-01-01/02 JT-
JGSS1EP-VPCI-AGP- 1,2,3,4,5 JG SUMMIT
90 17-Dec-18 Tape Wrapping H SW SW
0090 A00A5001-ND-24001-01-01 JT-1,2,3 SITE Area 500
A00A5001-ND-25002-01-01/02 JT-
1,2,3,4,5
Holiday Testing
A00A5001-ND-25001-01-01/02 JT-
JGSS1EP-VPCI-AGP- 1,2,3,4,5 JG SUMMIT
91 17-Dec-18 Holiday Test H SW SW
0091 A00A5001-ND-24001-01-01 JT-1,2,3 SITE Area 500
A00A5001-ND-25002-01-01/02 JT-
1,2,3,4,5
Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual A00A5001-ND-25001-01-01-02- JT-4 JG SUMMIT
94 17-Dec-18 H SW SW
0094 Inspection AA00A5001-CWS-26004-01 JT-14 JT-20 SITE Area 500
AA00A5001-ND-24001-01 JT-1
512 / 732
JG SUMMIT
JGSS1EP-VPCI-AGP- Final Line A00A5001-OWS-26001-01
98 19-Dec-18 SITE H W SW
0098 Checking (HT-UG-OWS-AP-001)
Area 600
Visual Inspection
Welding Joint/Piping
A00A5001-CWS-26004-01-02 / 03 JT-11
JGSS1EP-VPCI-AGP- Welding Visual JG SUMMIT
102 20-Dec-18 A00A5001-CWI-26001-01-02 JT-9 H W SW
0102 Inspection SITE Area 500
A00A5001-ND-25002-01-02 JT-6 ,7,8
A00A5001-ND-25001-01-02 JT-6 ,10,11
A00A5001-CWI-26002-01-3 JT-10
A1-JGS1E-EPC1-A06-DD-15-G001
JG SUMMIT
JGSS1EP-VPCI-AGP- Rev.0 - Fit-up inspection of Stiffener Plate
103 18-Dec-18 Piping Fabrication SITE Area H SW SW
0103 SF015 (2 Pcs.) and Gusset plate GP026
600/S-0601
for Girder-G001, Structural 0601
A00A5001-ND-25001-01
JGSS1EP-VPCI-AGP- Final Line JG SUMMIT
104 20-Dec-18 A00A5001-ND-25002-01 H W SW
0104 Checking SITE Area 600
(HT-UG-ND-AP-002&003)
513 / 732
A1-JGS1E-EPC1-A06-DD-15-V001
Rev.0 - Fit-up Inspection of Gusset Plate
GB022 and Stiffener SF011 to existing
column H244x175x7x11 JG SUMMIT
JGSS1EP-VPCI-AGP-
105 20-Dec-18 Piping Fabrication SITE Area H SW SW
0105
A1-JGS1E-EPC1-A06-DD-15-V007 600/S-0601
Rev.0 - Fit-up Inspection of One-Vbrace-
V007 to existing column H340x250x9x14
Visual Inspection
A1-JGS1E-EPC1-A06-DD-15-V001
Rev.0 - Fit-up Inspection of Gusset Plate
GB022 and Stiffener SF011 to existing
JG SUMMIT
JGSS1EP-VPCI-AGP- Welding Visual column H244x175x7x11
107 21-Dec-18 SITE AREA H W SW
0107 Inspection
600/S-0601
A1-JGS1E-EPC1-A06-DD-15-V007
Rev.0 - Fit-up Inspection of One-Vbrace-
V007 to existing column H340x250x9x14
UG Piping
JGSS1EP-VPCI-AGP- A00A5001-CWS-26004-01-06 JT-28 JG SUMMIT
108 21-Dec-18 Piping Fabrication H SW SW
0108 A00A5001-CWI-26002-01-01 JT-1 SITE Area 600
A00A5001-CWI-26001-01-02 / 03 JT-4
514 / 732
Test Plate for Coating System 1B & 2A
Installation of dollies on the test plate
JGSS1EP-VPCI-AGP- (Dec 26, 8:30am onwards)
110 21-Dec-18 Mock-up Testing AG&P Yard 1 H W SW
0110
Pull-off adhesion testing (Dec 27, 2:00pm
Pad Elevation Levelness Inspection
onwards)
Check for Equipment Foundation
Elevation/ A1-JGS1EP-EPC1-A06-DD-10-091 / E-
JGSS1EP-VPCI-AGP- Levelness/ 611C JG SUMMIT
111 22-Dec-18 H W SW
0111 Centering / A1-JGS1EP-EPC1-A06-DD-10-121 / E- SITE Area 600
Plumbness 623B
A1-JGS1EP-EPC1-A06-DD-10-151 / G-
0600A/B
JGSS1EP-VPCI-AGP-
112 26-Dec-18 Material Inspection Above Ground Pipes AG&P Yard 1 H W R
0112
Inspection of UG Piping
A00A5001-CWS-26004-01-08 JT-25
(Area 500)
A00A5001-CWI-26002-01-02 / 01 JT-4 JG Summit Site
JGSS1EP-VPCI-AGP-
113 26-Dec-18 Piping Fabrication (Area 500) AREA 500 and H SW SW
0113
A00A5001-CWS-25001-01- 03 / 02 JT-6 Lay Down Area
( Lay Down Area)
A00A5001-CWI-25001-01- 01 JT-1
( Lay Down Area)
515 / 732
Visual Inspection
UG Piping
A00A5001-CWS-26004-01-08 JT-25
(Area 500)
JG Summit Site
JGSS1EP-VPCI-AGP- Welding Visual A00A5001-CWI-26002-01-02 / 01 JT-4
114 27-Dec-18 AREA 500 and H W SW
0114 Inspection (Area 500)
Lay Down Area
A00A5001-CWS-25001-01- 03 / 02 JT-6
( Lay Down Area)
A00A5001-CWI-25001-01- 01 JT-1
( Lay Down Area)
A00A5001-CWS-26004-01 / Test
Package No.
JGSS1EP-VPCI-AGP- Final Line Test Package No.HT-UG-CWS-AP-003 JG Summit Site
116 27-Dec-18 H W SW
0116 Checking A00A5001-CWS-26002-01 / Test AREA 500
Package No.
Test Package No.HT-UG-CWI-AP-003
JG Summit Site
JGSS1EP-VPCI-AGP- Manifold No.: 17061-MN-005
117 27-Dec-18 Pressure Test Tempacil H W SW
0117 AGP-18059-E-D-20-1001.01
Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual UG Piping JG Summit Site
118 28-Dec-18 H W SW
0118 Inspection A00A5001-CWI-26002-01-01 JT-1 (Area AREA 500
500)
516 / 732
UG Pipe
A00A5001-CWS-26004-01
JGSS1EP-VPCI-AGP- JG Summit Site
119 28-Dec-18 Hydro Test Test Package No.HT-UG-CWS-AP-003 H W SW
0119 AREA 500
A00A5001-CWS-26002-01
Test Package No.HT-UG-CWI-AP-003
Visual Inspection
UG Piping JG Summit Site
JGSS1EP-VPCI-AGP- Welding Visual
120 29-Dec-18 A00A5001-CWS-25001-01-01 / 02 / 03 Lay Down H W SW
0120 Inspection
JT9 , and JT-4 Area
A00A5001-CWI-26002-01-01/02 JT-4
UG Piping
A00A5001-CWI-25001-01 JG Summit Site
JGSS1EP-VPCI-AGP-
121 2-Jan-19 Hydro Test Test Package N0. HT-UG-CWI-AP-002 Lay Down H W SW
0121
A00A5001-CWS-25001-01 Area
Test Package N0. HT-UG-CWS-AP-002
A00A5001-CWI-25001-01
JG Summit Site
JGSS1EP-VPCI-AGP- Final Line Test Package N0. HT-UG-CWI-AP-002
122 2-Jan-19 Lay Down H W SW
0122 Checking A00A5001-CWS-25001-01
Area
Test Package N0. HT-UG-CWS-AP-002
517 / 732
Field Joint Wrapping Application
A00A5001-CWS-26004-01
Test Package No.HT-UG-CWS-AP-003
A00A5001-CWI-26002-01 JG Summit Site
JGSS1EP-VPCI-AGP-
124 3-Jan-19 Wrapping Test Package No.HT-UG-CWI-AP-003 AREA 600 and H W SW
0124
A00A5001-CWI-25001-01 Lay Down Area
Test Package N0. HT-UG-CWI-AP-002
A00A5001-CWS-25001-01
Test Package N0. HT-UG-CWS-AP-002
518 / 732
A00A5001-CWS-26004-01
Test Package No.HT-UG-CWS-AP-003
A00A5001-CWI-26001-01
JG Summit Site
JGSS1EP-VPCI-AGP- Test Package No.HT-UG-CWI-AP-003
129 4-Jan-19 Holiday Test AREA 600 and H W SW
0129 A00A5001-CWI-25001-01
Lay Down Area
Test Package N0. HT-UG-CWI-AP-002
A00A5001-CWS-25001-01
Test Package N0. HT-UG-CWS-AP-002
JGSS1EP-VPCI-AGP-
130 4-Jan-19 Material Inspection Above Ground Pipes & Electrode AG&P Yard 1 H W R
0130
Examination of S-0604 & 0601
A1-JGS1EP-EPC1-A06-DD-15-V010
JGSS1EP-VPCI-AGP-
131 4-Jan-19 NDE A1-JGS1EP-EPC1-A06-DD-15-V001 AG&P Yard 1 H W R
0131
A1-JGS1EP-EPC1-A06-DD-15-V035 (1/2
& 2/2)
A00A5001-CWI-25001-01
JGSS1EP-VPCI-AGP- Test Package N0. HT-UG-CWI-AP-002 JG Summit Site
132 4-Jan-19 Air Blow & Flushing H W SW
0132 A00A5001-CWS-25001-01 Lay Down Area
Test Package N0. HT-UG-CWS-AP-002
519 / 732
A1-JGS1E-EPC1-A06-DD-15-EO16 /
EO17 & E024 - Elavation Survey on JG Summit Site
JGSS1EP-VPCI-AGP-
135 5-Jan-19 Erection Work Framing Elevation at Grid "05-F1" / "05- Area 600 / S- H W SW
0135
F2" and "05-Fc1" from EL. +66300 to EL. 0604
+82300. (see attached drawing)
A1-JGS1E-EPC1-A06-DD-15-EO16 /
Elevation/
EO17 & E024 - Plumbness Survey on JG Summit Site
JGSS1EP-VPCI-AGP- Levelness/
136 5-Jan-19 Framing Elevation at Grid "05-F1" / "05- Area 600 / S- H W SW
0136 Centering /
F2" and "05-Fc1" from EL. +66300 to EL. 0604
Plumbness
+73800. (see attached drawing)
JGSS1EP-VPCI-AGP-
137 7-Jan-19 Material Inspection Above Ground Pipes & Fittings AG&P Yard 1 H W R
0137
JGSS1EP-VPCI-AGP- Above Ground Piping Raw Materials &
138 7-Jan-19 Painting & Coating AG&P Yard 1 H W SW
0138 Fittings
Elevation/ Pad Leveling Inspection for D-0693 / E-
JGSS1EP-VPCI-AGP- Levelness/ 0690 JG Summit Site
139 7-Jan-19 H W SW
0139 Centering / Dwg# A1-JGS1EP-FRH-DD-D0693 Area 600
Plumbness Dwg# A1-JGS1EP-FCG-DD-E0690
520 / 732
Visual Inspection of Joint 1, 2 and 3 for
weld joint between Gusset Plate to
JG Summit Site
JGSS1EP-VPCI-AGP- Welding Visual existing coumn H244X175X7X11 AT EL.
142 9-Jan-19 AREA 600 / H W SW
0142 Inspection 72460 Grid 05-Bc1/05-B2 of Structure
S-0601
0601 (Dwg No. A1-JGS1EP-EPC1-A06-
DD-15-G010)
JGSS1EP-VPCI-AGP-
148 11-Jan-19 Material Inspection Abrassive Materials ;Garnet 30/60 AG&P Yard 1 H W R
0148
521 / 732
Final Bolt Tightening Inspection on
Structure 0604 of Area 600 - Grid 05-F1 - JG Summit Site
JGSS1EP-VPCI-AGP-
151 12-Jan-19 Erection Work 05-F2/05-Fc1 - 05-Fc3 from EL. +66300 AREA 600 / S- H W SW
0151
to EL. +82300 (Dwg. No. A1-JGS1EP- 0604
EPC1-A06-DD-15-E017 Rev. 0)
522 / 732
JG Summit Site
JGSS1EP-VPCI-AGP- Final Elevation Survey for Structure 0606
158 14-Jan-19 Erection Work AREA 600 / S- H W SW
0158 at Area 600
0606
JG Summit Site
JGSS1EP-VPCI-AGP- Final Plumbness Survey for Structure
159 14-Jan-19 Erection Work AREA 600 / S- H W SW
0159 0606 at Area 600
0606
JG Summit Site
JGSS1EP-VPCI-AGP- Final Column Plumbness Survey for
164 17-Jan-19 Erection Work AREA 600 / S- H W SW
0164 Structure 0606 of Area 600 at all Side.
0606
523 / 732
Final Beam Elevation Survey for JG Summit Site
JGSS1EP-VPCI-AGP-
166 17-Jan-19 Erection Work Structure 0601 of Area 600 at all AREA 600 / S- H W SW
0166
Elevation. 0601
JG Summit Site
JGSS1EP-VPCI-AGP- Final Column Plumbness Survey for
167 17-Jan-19 Erection Work AREA 600 / S- H W SW
0167 Structure 0601 of Area 600 at all Side.
0601
JG Summit Site
JGSS1EP-VPCI-AGP- Witness groutening activities of Structure
172 17-Jan-19 Erection Work AREA 600 / S- H W SW
0172 0601 at Grid 05-B1a_05-B4/05-Bc1
0601
524 / 732
Receiving Inspection for Equipment No.
JGSS1EP-VPCI-AGP-
175 19-Jan-19 Material Inspection D-0510C Dwg # A1-JGS1EP-FRH-DD- Wharf area H W R
0175
D0510C
525 / 732
Receiving Inspection for Equipment No.
D-0652, D-0653, D-0654, D-0693, E-
0402R, E-0503R, E-0622R
Dwg # A1-JGS1EP-FRH-DD-D0652, A1-
JGSS1EP-VPCI-AGP- JG Summit Site
181 19-Jan-19 Material Inspection JGS1EP-FRH-DD-D0653, A1-JGS1EP- H W R
0181 Laydown Area
FRH-DD-D0654, A1-JGS1EP-FRH-DD-
D0693, A3-JGS1EP-HAN-DD-E0402R,
A3-JGS1EP-HAN-DD-E0503R, A3-
JGS1EP-HAN-DD-E0622R
Visual Inspection:
JGSS1EP-VPCI-AGP- Welding Visual
184 21-Jan-19 AG&P Yard 1 H W SW
0184 Inspection A01A5001-P-26027-02 JT. 3,5,14
A01A5001-P-26027-01 JT. 1,2,12
526 / 732
Final Dimensional Survey for elevation
checking of Structure 0604 Grid 05-Fd1- JG Summit Site
JGSS1EP-VPCI-AGP-
188 22-Jan-19 Erection Work 05-Fe/05-F1a-05-F2. See attached AREA 600 / S- H W SW
0188
drawing no. A1-JGS1EP-EPC1-A06-DD- 0604
15-3D Rev.2
527 / 732
Compressive Testing of Structure 0601 ASTEC,
JGSS1EP-VPCI-AGP-
195 23-Jan-19 Erection Work Grouting Sample at ASTEC Laboratory in Calamba H SW SW
0195
Calamba, Laguna Laboratory
Blasting & Primer Application Inspection
JGSS1EP-VPCI-AGP-
196 23-Jan-19 Painting & Coating of 7 PCS 90° ELBOW 8" SYSTEM 2A, & AG&P Yard 1 H W SW
0196
3 PCS 8" RAW PIPE
Visual Inspection:
JGSS1EP-VPCI-AGP- Welding Visual A01A5001-P-26027-01 JT. 8
197 23-Jan-19 AG&P Yard 1 H W SW
0197 Inspection A04A5001-QW-04044-01 JT. 2
A06A5001-P-26022-02 JT.1, 6
Visual Inspection:
528 / 732
Alignment Inspection for Equipment No.
E-0623B Dwg # A3-JGS1EP-HAN-DD-
JGSS1EP-VPCI-AGP- Equipment JG Summit Site
201 25-Jan-19 E0623B H W SW
0201 Inspection AREA 600
D-0510C Dwg # A1-JGS1EP-FRH-DD-
D0510C
Visual Inspection:
ASTEC,
JGSS1EP-VPCI-AGP- Compressive Testing of Structure 0606
204 25-Jan-19 Laboratory Testing Calamba H SW SW
0204 Grouting Sample
Laboratory
529 / 732
JG Summit Site
JGSS1EP-VPCI-AGP- Final Bolt Tightening Inspection at all AREA 600 /
206 26-Jan-19 Erection Work H W SW
0206 elevation Interconnecting
Pipe Rack-1
JG Summit Site
JGSS1EP-VPCI-AGP- Final Plumbness Survey Inspection at all AREA 600 /
207 26-Jan-19 Erection Work H W SW
0207 elevation Interconnecting
Pipe Rack-1
JG Summit Site
JGSS1EP-VPCI-AGP- Final Elevation/Levelness Check Survey AREA 600 /
208 26-Jan-19 Erection Work H W SW
0208 Inspection at all elevation Interconnecting
Pipe Rack-1
530 / 732
Visual Inspection:
A06A5001-RT-26034-02 JT. 13,20,12
A06A5001-RT-26005-02 JT. 2
A06A5001-P-26003-01 JT. 6,5
A04A5001-QW-04043-01 JT. 2,3
A01A5001-P-26027-02 JT.10
JGSS1EP-VPCI-AGP- Welding Visual
212 29-Jan-19 A04A5001-P-04049-01 JT.4, 15,17 AG&P Yard 1 H W SW
0212 Inspection
A01A5001-RT-26036-01 JT. 21,16
A01A5001-RT-26052-01 JT.2
A05A5001-P-25006-02 JT. 13, 4
A01A5001-RT-29001-03 JT. 2,17
A06A5001-RT-29001-02 JT. 14,15
531 / 732
Visual Inspection:
A06A5001-RT-26034-01 JT,5
A04A5001-P-04048-02 JT. 6, 3
A05A5006-P-25006-02 JT.15
A01A5001-RT-26052-01 JT.3,5
JGSS1EP-VPCI-AGP- Welding Visual A06A5001-P-26003-01 JT. 5,6
217 29-Jan-19 AG&P Yard 1 H W SW
0217 Inspection A06A5001-RT-26034-02 JT. 11,12, 2
A04A5001-QW-24014-02 JT. 6
A06A5001-FW-39844-01 JT. 9, 1,6
A06A5001-RT-29001-02 JT.
9,10,11,18,19
JGSS1EP-VPCI-AGP-
220 30-Jan-19 Piping Fabrication Final Inspection of Pipe Supports AG&P Yard 1 H SW SW
0220
532 / 732
Visual Inspection:
A05A5001-P-25006-02 JT. 2,3, 11, 8
A04A5001-P-04049-01 JT. 8, 11
A01A5001-FW-39822-01 JT. 9, 12
A01A5001-RT-26037-02 JT. 2
A05A5001-P-25017-01 JT. 2
A01A5001-P-26022-02 JT. 14, 15
JGSS1EP-VPCI-AGP- Welding Visual
222 30-Jan-19 A06A5001-P-26003-01 JT. 7 AG&P Yard 1 H W SW
0222 Inspection
A065001-RT-26005-02 JT. 4, 10
A06A5001-RT-26034-01 JT. 18
A04A5001-P-04048-01 JT. 2,3, 7,8
A06A5001-FW-39844-01 JT. 3,4
A06A5001-P-26003-01 JT. 9
A01A5001-RT-29001-03 JT. 15, 9,10,11
A01A5001-RT-29001-02 JT. 1, 2
533 / 732
Visual Inspection:
A01A5001-RT-26037-02 JT. 3
A01A5001-RT-26036-01 JT. 20, 11,15
A06A5001-P-26003-01 JT. 3
A01A5001-P-26027-01 JT. 12
JGSS1EP-VPCI-AGP- Welding Visual
226 31-Jan-19 A01A5001-P-26022-02 JT. 5,6,16 AG&P Yard 1 H W SW
0226 Inspection
A01A5001-RT-26037-01 JT. 13,16,21,4
A06A5001-FW-39876-01 JT. 13
A06A5001-RT-26037-01 JT. 15,5,1
A06A5001-RT-26052-02 JT. 3
A01A5001-RT-26052-01 JT. 6
Visual Inspection:
A06A5001-RT-26052-02 JT.11, 6,8
A01A5001-P-26093-01 JT. 10
A06A5001-FW-39876-01 JT. 12,13,
8,5,1,29,15,17,10,27,5
A06A5001-RT-26036-03 JT. 1,8,3
A01A5001-RT-26036-01 JT. 9
A01A5001-RT-26004-02 JT. 2
JGSS1EP-VPCI-AGP- Welding Visual
227 1-Feb-19 A01A5001-HG-26002-T1 JT. 3,4,5 AG&P Yard 1 H W SW
0227 Inspection
A06A5001-LSS-26001-01 JT. 5, 3
A06A5001-RT-26036-02 JT. 5
A06A5001-RT-26037-01 JT. 11
A06A5001-RT-26034-02 JT. 6
A06A5001-LSS-26001-02 JT.16
A01A5001-RT-26037-01 JT. 1,10
A04A5001-WO-25002-01 JT. 6,15,16,18
534 / 732
FINAL BOLT TIGHTENING INSPECTION
JGSS1EP-VPCI-AGP- JG Summit Site
228 1-Feb-19 Erection Work AT FRAMING PLAN AT T.O.S EL +74600 H W SW
0228 AREA 600
(See attached drawing) S-0604
535 / 732
Inspection of Raw Matls for Above
JGSS1EP-VPCI-AGP-
231 3-Feb-19 Material Inspection Ground Pipe & Fittings AG&P Yard 1 H W R
0231
RIC-135, 136,138, 139
Visual Inspection:
A01A5001-RT-26039-01 JT. 2
A01A5001-RT-26037-01 JT.18,11
A06A5001-P-26020-02 JT. 7
A01A5001-RT-26004-02 JT. 15, 9, 8
A01A5001-RT-26004-01 JT. 15
A06A5001-RT-26037-01 JT. 14
JGSS1EP-VPCI-AGP- Welding Visual A06A5001-FW-39849-01 JT. 12
232 3-Feb-19 AG&P Yard 1 H W SW
0232 Inspection A05A5001-P-25006-02 JT. 6
A06A5001-RT-26036-02 JT. 3
A06A5001-P-26022-02 JT. 7
A06A5001-RT-26052-02 JT. 1
A01A5001-P-26022-02 JT. 9
A06A5001-FW-39847-02 JT. 15, 16, 18,
8, 9, 10
536 / 732
Visual Inspection of Seal Weld (on
JGSS1EP-VPCI-AGP- Welding Visual JG Summit Site
235 4-Feb-19 Sliding Plate) for Equipment No. E-0623B H W SW
0235 Inspection AREA 600
Dwg # A3-JGS1EP-HAN-DD-E0623B
Visual Inspection:
JGSS1EP-VPCI-AGP- Welding Visual
238 4-Feb-19 Estimated Joints - 39 joints AG&P Yard 1 H W SW
0238 Inspection
see reference DWR-059 - to follow
Compressive Testing of Structure 0604
Grout Specimen for Grid 05-F1-05-F2/05- ASTEC,
JGSS1EP-VPCI-AGP-
239 5-Feb-19 Laboratory Test Fd1-05-Fd2. See attached Drawing No. Calamba, H SW SW
0239
A1-JGS1EP-EPC1-A06-DD-15-E001 Laguna
Rev.1
537 / 732
Final Visual Inspection to G015
JGSS1EP-VPCI-AGP- Baseplate to Existing Column (See JG Summit Site
244 6-Feb-19 Erection Work H W SW
0244 attached Drawing), Inter Connecting AREA 600
Piperack-1
Final Visual Inspection to G017
JGSS1EP-VPCI-AGP- Baseplate to Existing Column (See JG Summit Site
245 6-Feb-19 Erection Work H W SW
0245 attached Drawing), Inter Connecting AREA 600
Piperack-1
Final Inspection after the final cutting on
JGSS1EP-VPCI-AGP- top & bottom Flange of Beam B002 & JG Summit Site
246 6-Feb-19 Erection Work H W SW
0246 B056 that clashing to cable tray. AREA 600
Structure 0604
538 / 732
Visual Inspection of Seal Weld (on
JGSS1EP-VPCI-AGP- Welding Visual JG Summit Site
251 7-Feb-19 Sliding Plate) for Equipment No.E-0619B H W SW
0251 Inspection AREA 600
Dwg # A3-JGS1EP-HAN-DD-E-0619B
539 / 732
Compressive Strength Test (after 7 days
of grouting) for Equipment No. D-0653,
ASTEC,
JGSS1EP-VPCI-AGP- D-0654, E-0623B
259 8-Feb-19 Laboratory Test Calamba, H SW SW
0259 Dwg # A1-JGS1EP-FRH-DD-D0653, A1-
Laguna
JGS1EP-FRH-DD-D0654, A3-JGS1EP-
HAN-DD-E0623B
JGSS1EP-VPCI-AGP-
262 8-Feb-19 WQT Welders Qualification Testing/ Witnessing AG&P Yard 1 H W SW
0262
540 / 732
1.0 Final Visual & DFT inspection of 26
spools with CS-2E and 9 spools with CS-
2A
2.0 Final Visual & DFT inspection of 100
JGSS1EP-VPCI-AGP-
267 9-Feb-19 Painting & Coating pcs pipe supports & 62 pcs base plates AG&P Yard 1 H W SW
0267
with CS-1B
3.0 Blasting & Primer Application
Inspection of Pipe spools with CS-2A &
2E
541 / 732
Final Bolt Tightening Inspection at
Framing Plan at T.O.S. EL. + 79900 Grid
JGSS1EP-VPCI-AGP- JG Summit Site
273 11-Feb-19 Erection Work 05-Fd-05-Fe/05-F3-05-P36. (Dwg. No. H W SW
0273 AREA 600
A1JGS1EP-EPC1-A06-DD-15-E009 Rev.
0). Structure 0604
JGSS1EP-VPCI-AGP- Inspection of Raw Matls for Above
274 11-Feb-19 Material Inspection AG&P Yard 1 H W R
0274 Ground: Fittings-RIC-0148
542 / 732
Witness surveying of beam elevation at
Structure 0604.
Framing Elevation at Grid "05-F3" (Dwg.
No. A1-JGS1EP-EPC1-A06-DD-15-E018
Rev.1)
Framing Elevation at Grid "05-P36"
JGSS1EP-VPCI-AGP- (Dwg. No. A1-JGS1EP-EPC1-A06-DD- JG Summit Site
279 13-Feb-19 Erection Work H W SW
0279 15-E020 Rev.0) AREA 600
Framing Elevation at Grid "05-Fc" and
"05-Fd" (Dwg. No. A1-JGS1EP-EPC1-
A06-DD-15-E022 Rev.0)
Framing Elevation at Grid "05-Fe" (Dwg.
No. A1-JGS1EP-EPC1-A06-DD-15-E023
Rev.1)
543 / 732
Compressive Strength Test (after 28days
of grouting) for Equipment No. Z-0651, E- ASTEC,
JGSS1EP-VPCI-AGP-
284 14-Feb-19 Laboratory Test 0624E/F Calamba, H SW SW
0284
Dwg # A1-JGS1EP-SPP-DD-Z0651, A3- Laguna
JGS1EP-HAN-DD-E0624EF
544 / 732
Final Visual Inspection for Gusset Plate
Structure Inter Connecting Piperack-1
GP008 at EL. +80500 / Grid Pk-05-Pi/05-
Pa-05-P31 (A1-JGS1EP-EPC1-A06-DD-
15-B012 Rev.0)
GP016 at EL. +80500 / Grid Pj-05-PK/05-
P31-05-P33 (A1-JGS1EP-EPC1-A06-
DD-15-B009 Rev.0)
GP015 at EL. +80500 / Grid Pj-05-PK/05-
JGSS1EP-VPCI-AGP- P31-05-P33 (A1-JGS1EP-EPC1-A06- JG Summit Site
287 14-Feb-19 Erection Work H W SW
0287 DD-15-B009 Rev.0) AREA 600
GP003 at EL. +80500 / Grid Pj-05-PK/05-
P31-05-P33 (A1-JGS1EP-EPC1-A06-
DD-15-B010 Rev.0)
GP006 at EL. +80500 / Grid Pj-05-PK/05-
P31-05-P33 (A1-JGS1EP-EPC1-A06-
DD-15-J001 Rev.0)
GP015 at EL. +80500 / Grid Pj-05-PK/05-
P31-05-P33 (A1-JGS1EP-EPC1-A06-
DD-15-B008 Rev.0)
545 / 732
28th Day Compressive Testing of
Structure 0601 Grout Specimen for Grid ASTEC,
JGSS1EP-VPCI-AGP-
290 14-Feb-19 Erection Work 05-Bc_1/05-B1a and 05-Bc_1/05-B4. Calamba, H SW SW
0290
Dwg. No. A-JGS1EP-EPC1-A06-DD-15- Laguna
3D Rev.0
JGSS1EP-VPCI-AGP-
293 14-Feb-19 WQT Welders Qualification Testing/ Witnessing AG&P Yard 1 H W SW
0293
1.0 Blasting & Primer Application of
Pipespool CS 2A & 2E
JGSS1EP-VPCI-AGP-
294 14-Feb-19 Painting & Coating 2.0 Final Visual & DFT inpsection of Pipe AG&P Yard 1 H W SW
0294 spools:
15pcs CS 2E & 5 pcs CS 2E
546 / 732
Fit-up Inspection at Piperack C JG Summit Site
JGSS1EP-VPCI-AGP- Welding Visual
298 16-Feb-19 Dwg. No. A01A5001-RT-26052-01-03 & Area 600 H W SW
0298 Inspection
04 FW JT.10 Piperack C
547 / 732
Final Bolt Tightening Inspection of
Structure 0603
Framing Plat at T.O.S. Elevation +84700
(A1-JGS1EP-EPC1-A06-DD-15-E002
JGSS1EP-VPCI-AGP- JG Summit Site
306 19-Feb-19 Erection Work Rev.1) H W SW
0306 STR 0603
Framing Elevation at Grid "05-Ca" (A1-
JGS1EP-EPC1-A06-DD-15-E004 Rev.0)
Framing Elevation at Grid "05-Cc" (A1-
JGS1EP-EPC1-A06-DD-15-E009 Rev.0)
548 / 732
Final Visual Inspection of Gusset Plate at
Inter Connecting Piperack-1
GP004 and GP006 per Dwg. No. A1-
JGS1EP-EPC1-A06-DD-15-J004 Rev.0
GP007 per Dwg. No. A1-JGS1EP-EPC1-
JGSS1EP-VPCI-AGP- JG Summit Site
313 19-Feb-19 Erection Work A06-DD-15-J005 Rev.0 H W SW
0313 AREA 600
GP006 per Dwg. No. A1-JGS1EP-EPC1-
A06-DD-15-J003 Rev.0
GP006 per Dwg. No. A1-JGS1EP-EPC1-
A06-DD-15-J006 Rev.0
549 / 732
JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection:
319 20-Feb-19 0319 Inspection see reference DWR-AGP-075 - to follow
AG&P Yard 1 H W SW
550 / 732
551 / 732
et Accepted
36 Re-schedule Cancelled
30 Additional Reject
552 / 732
12-Oct-18 0800H AG&P Arvin Balitaan Piping Additional Accepted
553 / 732
11-Oct-18 0800H AG&P Arvin Balitaan Piping Additional Accepted
554 / 732
17-Oct-18 1300H AG&P Arvin Balitaan Piping Additional Accepted
555 / 732
19-Oct-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted
556 / 732
22-Oct-18 0800H AG&P Ramon Castillo Piping On-schedule Accepted
557 / 732
26-Oct-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted
558 / 732
08-Nov-18 0800H AG&P Bryan Aguila Piping On-schedule Accepted
559 / 732
15-Nov-18 0800H AG&P Bryan Aguila Piping On-schedule Accepted
560 / 732
19-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted
561 / 732
23-Nov-18 1300H AG&P Arvin Balitaan Piping On-schedule Accepted
562 / 732
28-Nov-18 1300H AG&P Arvin Balitaan Piping On-schedule Accepted
563 / 732
3-Dec-18 0700H AG&P Ramon Castillo Piping On-schedule Accepted
Arvin Balitaan/
04-Dec-18 0700H AG&P Piping On-schedule Accepted
Ramon Castillo
564 / 732
07-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted
Dec
0800H AG&P Arvin Balitaan Piping On-schedule Waiting for result
10~11,2018
10-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted
565 / 732
11-Dec-18 0830H AG&P Ermer Valdez Painting On-schedule Accepted
566 / 732
11-Dec-18 0900H AG&P Ramon Castillo Piping On-schedule Accepted
567 / 732
12-Dec-18 0900H AG&P Arvin Balitaan Structural On-schedule Accepted
568 / 732
13-Dec-18 8:30 AG&P Ermer Valdez Painting On-schedule Accepted
569 / 732
17-Dec-18 0900H AG&P Arvin Balitaan Mechanical On-schedule Accepted
570 / 732
18-Dec-18 0900H AG&P Ermer Valdez Painting On-schedule Accepted
0800H
18-Dec-18 AG&P Ermer Valdez Painting On-schedule Accepted
1330H
571 / 732
20-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted
0800H-
20-Dec-18 AG&P Ermer Valdez Painting On-schedule Accepted
1700H
0800H-
20-Dec-18 AG&P Ermer Valdez Painting On-schedule Accepted
1700H
Piping/Structu
21-Dec-18 8:00 AM AG&P Arvin Balitaan On-schedule Accepted
ral
Arvin Balitaan/
21-Dec-18 0900H AG&P Piping On-schedule Accepted
Ramon Castillo
Arvin Balitaan/
21-Dec-18 0900H AG&P Piping On-schedule Accepted
Ramon Castillo
572 / 732
Arvin Balitaan/
21-Dec-18 0900H AG&P Piping On-schedule Accepted
Ramon Castillo
573 / 732
DEC
0830H AG&P Ermer Valdez Painting On-schedule Accepted
26~27,2018
Arvin Balitaan/Bryan
27-Dec-18 0700H AG&P Piping On-schedule Accepted
Aguila
574 / 732
28-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted
575 / 732
29-Dec-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted
576 / 732
4-Jan-2019 &
0900H AG&P Ermer Valdez Painting On-schedule Accepted
5-Jan-19
Arvin Balitaan
04-Jan-19 0800H AG&P Piping On-schedule Accepted
/Ramon Castillo
577 / 732
0800H-
07-Jan-19 AG&P Ermer Valdez Painting Re-schedule Accepted
1700H
04-Jan-19 1000H AG&P Arvin Balitaan Structural Additional Waiting for result
0800H-
07-Jan-19 AG&P Arvin Balitaan Mechanical Re-schedule Accepted
1700H
0800H-
07-Jan-19 AG&P Arvin Balitaan Mechanical Re-schedule Accepted
1700H
578 / 732
07-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted
0900H
08-Jan-19 AG&P Arvin Balitaan Mechanical On-schedule Accepted
-1000H
1300H-
10-Jan-19 AG&P Arvin Balitaan Mechanical On-schedule Accepted
1500H
579 / 732
10-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted
1300H-
11-Jan-19 AG&P Arvin Balitaan Mechanical On-schedule Accepted
1500H
0800H-
14-Jan-19 AG&P Arvin Balitaan Mechanical On-schedule
1000H
1000H-
14-Jan-19 AG&P Arvin Balitaan Mechanical On-schedule Accepted
1100H
580 / 732
14-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted
1300-
10-Jan-19 AG&P Arvin Balitaan Mechanical On-schedule Accepted
1500H
0800H
15-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Accepted
1000H
0800H
15-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Accepted
1800H
1400H
15-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Waiting for result
1700H
581 / 732
15-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted
582 / 732
18-Jan-19 1000H AG&P Allan Magadia Structural On-schedule Accepted
Arvin Balitaan/
18-Jan-19 0800H AG&P Piping On-schedule
Ramon Castillo
Arvin Balitaan/
18-Jan-19 0900H AG&P Piping On-schedule
Ramon Castillo
Arvin
JAN 22- Piping/Structu
0800H AG&P Balitaan/Ramon On-schedule Accepted
23,2019 ral
Castillo
1300H
19-Jan-19 to AG&P Mark Darrel Aranas Mechanical Re-schedule Accepted
1800H
583 / 732
1000H
19-Jan-19 to AG&P Arvin Balitaan Mechanical Re-schedule Accepted
1200H
0800H
21-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Accepted
1000H
584 / 732
1000H
21-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule
1200H
Arvin
22-Jan-19 0900H AG&P Balitaan/Ramon Piping On-schedule Accepted
Castillo
Arvin
22-Jan-19 0900H AG&P Balitaan/Ramon Piping On-schedule Accepted
Castillo
585 / 732
23-Jan-19 1000H AG&P Allan Magadia Structural On-schedule Accepted
0900H
23-Jan-19 to AG&P Ramon Castillo Mechanical On-schedule Accepted
1100H
1300H
23-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Waiting for result
1700H
0900H
24-Jan-19 to AG&P Arvin Balitaan Mechanical Re-schedule Accepted
1100H
1300H
24-Jan-19 to AG&P Arvin Balitaan Mechanical Re-schedule Accepted
1500H
586 / 732
24-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Waiting for result
0900H
25-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Accepted
1000H
1300H
25-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Waiting for result
1700H
587 / 732
0900H
26-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Accepted
1200H
26-Jan-19 0900H AG&P Allan Magadia Structural Additional Waiting for result
588 / 732
28-Jan-19 0900H AG&P Allan Magadia Structural Re-schedule Accepted
0800H
29-Jan-19 to AG&P Arvin Balitaan Mechanical Re-schedule
1700H
0900H
29-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Accepted
1100H
589 / 732
30-Jan-19 0900H AG&P Ramon Castillo Piping On-schedule Accepted
0900H
30-Jan-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Accepted
1100H
1300H
30-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Waiting for result
1600H
1600H
30-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Accepted
1800H
590 / 732
30-Jan-19 0930H AG&P Ramon Castillo Piping On-schedule Accepted
0900H
31-Jan-19 to AG&P Mark Darrel Aranas Mechanical On-schedule
1100H
1600H
31-Jan-19 to AG&P Mark Darrel Aranas Mechanical Re-schedule Accepted
1800H
591 / 732
31-Jan-19 0930H AG&P Arvin Balitaan Piping On-schedule Accepted
0900H
01-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule
1100H
1600H
01-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Cancelled
1800H
PIPING/STR
Feb 01~7,2019 0800H AG&P Arvin Balitaan On-schedule Waiting for result
UCTURAL
592 / 732
01-Feb-19 0930H AG&P Arvin Balitaan Piping On-schedule Accepted
593 / 732
02-Feb-19 0900H AG&P Allan Magadia Structural Re-schedule Accepted
594 / 732
04-Feb-19 0800H AG&P Ramon Castillo Piping Additional Accepted
0900H
05-Feb-19 to AG&P Arvin Balitaan Mechanical On-schedule Waiting for result
1100H
0900H
06-Feb-19 to AG&P Mark Darrel Aranas Mechanical Re-schedule Cancelled
1100H
595 / 732
1300H
06-Feb-19 to AG&P Arvin Balitaan Mechanical On-schedule Accepted
1500H
1500H
06-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Accepted
1700H
06-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Waiting for result
1300H
06-Feb-19 to AG&P Arvin Balitaan Mechanical Additional Accepted
1500H
596 / 732
07-Feb-19 0900H AG&P Allan Magadia Structural Re-schedule Accepted
597 / 732
0900H
08-Feb-19 to AG&P Mark Darrel Aranas Mechanical Re-schedule
1100H
0900H
09-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Accepted
1100H
598 / 732
1300H
09-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Waiting for result
1700H
Feb PIPING/STR
0800H AG&P Ramon Castillo On-schedule
11~12,2019 UCTURAL
599 / 732
11-Feb-19 0830H AG&P Ermer Valdez Painting On-schedule Accepted
12-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Waiting for result
1300H
12-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Waiting for result
1700H
1300H
12-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Waiting for result
1700H
600 / 732
12-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Accepted
0900H
13-Feb-19 to AG&P Mark Darrel Aranas Mechanical Re-schedule Accepted
1100H
601 / 732
14-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Accepted
1500H
15-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Accepted
1700H
1000H
15-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Accepted
1100H
602 / 732
1300H
15-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Waiting for result
1600H
1300H
15-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Waiting for result
1600H
1500H
15-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Accepted
1700H
603 / 732
15-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Accepted
604 / 732
15-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Waiting for result
Feb
0800H AG&P Arvin Balitaan Piping On-schedule
15~16,2019
0900H
Feb. 16, 2019 to AG&P Mark Darrel Aranas Mechanical On-schedule Accepted
1100H
1000H
Feb. 18, 2019 to AG&P Mark Darrel Aranas Mechanical On-schedule
1700H
605 / 732
0900H
18-Feb-19 to AG&P Mark Darrel Aranas PIPING On-schedule Accepted
1100H
19-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Waiting for result
0830-
19-Feb-19 AG&P Ermer Valdez Painting On-schedule Accepted
1430H
0900H
19-Feb-19 to AG&P Mark Darrel Aranas Piping Additional Accepted
1100H
606 / 732
0900H
19-Feb-19 AG&P Allan Magadia Structural Additional Accepted
0900H
19-Feb-19 to AG&P Mark Darrel Aranas Mechanical Additional Accepted
1100H
0900H
20-Feb-19 to AG&P Mark Darrel Aranas Piping On-schedule
1100H
0900H
20-Feb-19 to AG&P Mark Darrel Aranas Piping On-schedule
1100H
607 / 732
0900H
20-Feb-19 AG&P Ralph Rabuyo Structural Additional
608 / 732
21-Feb-19 0930H AG&P Arvin Balittan Piping On-schedule
609 / 732
610 / 732
Mark Darrel Aranas
611 / 732
329
19
7
0
Date Receive Return to
Remarks Date Closed Transmittal No.
Transmitted From Sub Sub
Conflict in format
Conflict in format
612 / 732
613 / 732
614 / 732
615 / 732
616 / 732
617 / 732
618 / 732
619 / 732
620 / 732
621 / 732
VPCI-PMC-Q-T-
09-Jan-19 10-Jan-19
0021
VPCI-PMC-Q-T-
09-Jan-19 10-Jan-19
0021
622 / 732
with comment
VPCI-PMC-Q-T-
17-Dec-18 17-Dec-18
0003
623 / 732
VPCI-PMC-Q-T-
17-Dec-18 17-Dec-18
0003
VPCI-PMC-Q-T-
17-Dec-18 17-Dec-18
0003
VPCI-PMC-Q-T-
17-Dec-18 17-Dec-18
0003
VPCI-PMC-Q-T-
09-Jan-19 10-Jan-19
0021
VPCI-PMC-Q-T-
09-Jan-19 10-Jan-19
0021
624 / 732
VPCI-PMC-Q-T-
09-Jan-19 10-Jan-19
0021
625 / 732
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
626 / 732
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
627 / 732
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
VPCI-PMC-Q-T-
09-Jan-19 1/10/2019
0021
VPCI-PMC-Q-T-
09-Jan-19 1/10/2019
0021
VPCI-PMC-Q-T-
09-Jan-19 1/10/2019
0021
VPCI-PMC-Q-T-
09-Jan-19 1/10/2019
0021
628 / 732
VPCI-PMC-Q-T-
09-Jan-19 1/10/2019
0021
VPCI-PMC-Q-T-
09-Jan-19 1/10/2019
0021
4 welders failed
Correction on paint
system 1B & 2A
629 / 732
VPCI-PMC-Q-T-
17-Dec-18 17-Dec-18
0003
VPCI-PMC-Q-T-
17-Dec-18 17-Dec-18
0003
VPCI-PMC-Q-T-
28-Dec-18 28-Dec-18
0009
Additional
Jt.1,2,3,4,5,7,8
VPCI-PMC-Q-T-
28-Dec-18 28-Dec-18
0009
630 / 732
VPCI-PMC-Q-T-
28-Dec-18 28-Dec-18
0009
VPCI-PMC-Q-T-
28-Dec-18 28-Dec-18
0009
631 / 732
VPCI-PMC-Q-T-
04-Jan-18 08-Jan-18
0013
VPCI-PMC-Q-T-
28-Dec-18 28-Dec-18
0009
VPCI-PMC-Q-T-
28-Dec-18 28-Dec-18
0009
Visually Accepted
Waiting for RT Results
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
VPCI-PMC-Q-T-
04-Jan-18 08-Jan-18
0013
632 / 732
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
VPCI-PMC-Q-T-
04-Jan-18 08-Jan-18
0013
633 / 732
VPCI-PMC-Q-T-
07-Jan-18 08-Jan-19
0017
634 / 732
Work in Progress
635 / 732
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
636 / 732
VPCI-PMC-Q-T-
Work in Progress 09-Jan-19 09-Jan-19
0021
VPCI-PMC-Q-T-
18-Feb-19 19-Feb-19
0052
On-going
637 / 732
VPCI-PMC-Q-T-
09-Jan-19 09-Jan-19
0021
MPI Results
VPCI-PMC-Q-T-
18-Feb-19
0052
VPCI-PMC-Q-T-
18-Feb-19
0052
638 / 732
VPCI-PMC-Q-T-
22-Jan-19 23-Jan-19
0031
VPCI-PMC-Q-T-
22-Jan-19 23-Jan-19
0031
VPCI-PMC-Q-T-
18-Feb-19 19-Feb-19
0052
VPCI-PMC-Q-T-
18-Feb-19 19-Feb-19
0052
639 / 732
for verification of VPCI-PMC-Q-T-
18-Feb-19 19-Feb-19
consumable 0052
for verification of
consumable
Work in Progress
VPCI-PMC-Q-T-
01-Feb-19 02-Feb-19
0040
Work on Progress
torque wrench not
available
VPCI-PMC-Q-T-
18-Feb-19
0052
640 / 732
VPCI-PMC-Q-T-
22-Jan-19 23-Jan-19
0031
VPCI-PMC-Q-T-
18-Feb-19
0052
VPCI-PMC-Q-T-
18-Feb-19 19-Feb-19
0052
Dwg # A1-JGS1EP-
SPP-DD-Z0651
VPCI-PMC-Q-T-
Dwg # A3-JGS1EP- 18-Feb-19
0052
HAN-DD-E0624EF-
cancelled
641 / 732
VPCI-PMC-Q-T-
22-Jan-19 23-Jan-19
0031
VPCI-PMC-Q-T-
22-Jan-19 23-Jan-19
0031
VPCI-PMC-Q-T-
22-Jan-19 23-Jan-19
0031
VPCI-PMC-Q-T-
30-Jan-19 31-Jan-19
0039
642 / 732
VPCI-PMC-Q-T-
21-Jan-19 22-Jan-19
0030
VPCI-PMC-Q-T-
21-Jan-19 22-Jan-19
0030
Work in Progress
VPCI-PMC-Q-T-
18-Feb-19
0052
643 / 732
VPCI-PMC-Q-T-
18-Feb-19
0052
644 / 732
VPCI-PMC-Q-T-
Work in Progress 18-Feb-19
0052
VPCI-PMC-Q-T-
24-Jan-19 0032
VPCI-PMC-Q-T-
24-Jan-19 25-Jan-19 0032
VPCI-PMC-Q-T-
30-Jan-19 31-Jan-19
0039
VPCI-PMC-Q-T-
24-Jan-19 25-Jan-19 0032
645 / 732
VPCI-PMC-Q-T-
24-Jan-19 25-Jan-19 0032
VPCI-PMC-Q-T-
with punch/Ramoan 18-Feb-19
0052
VPCI-PMC-Q-T-
Work in Progress 18-Feb-19 19-Feb-19
0052
VPCI-PMC-Q-T-
18-Feb-19 19-Feb-19
0052
VPCI-PMC-Q-T-
30-Jan-19 31-Jan-19
0039
646 / 732
VPCI-PMC-Q-T-
Work in Progress 18-Feb-19 19-Feb-19
0052
647 / 732
Work in Progress
28-Jan-19
VPCI-PMC-Q-T-
30-Jan-19 31-Jan-19
0039
648 / 732
VPCI-PMC-Q-T-
2-Feb-19 5-Feb-19
0041
VPCI-PMC-Q-T-
2-Feb-19 5-Feb-19
0041
VPCI-PMC-Q-T-
2-Feb-19 5-Feb-19
0041
VPCI-PMC-Q-T-
2-Feb-19 5-Feb-19
0041
Work in Progress
649 / 732
650 / 732
Work in Progress
VPCI-PMC-Q-T-
14-Feb-19 15-Feb-19
0048
651 / 732
Work in Progress
652 / 732
653 / 732
VPCI-PMC-Q-T-
14-Feb-19 15-Feb-19
0048
654 / 732
655 / 732
656 / 732
VPCI-PMC-Q-T-
14-Feb-19
0048
657 / 732
Work in Progress
VPCI-PMC-Q-T-
14-Feb-19 15-Feb-19
0048
VPCI-PMC-Q-T-
14-Feb-19 15-Feb-19
0048
658 / 732
VPCI-PMC-Q-T-
14-Feb-19 15-Feb-19
0048
VPCI-PMC-Q-T-
14-Feb-19 15-Feb-19
0048
659 / 732
660 / 732
VPCI-PMC-Q-T-
14-Feb-19 15-Feb-19
0048
VPCI_PMC-T-Q-
18-Feb-19 0050
661 / 732
VPCI_PMC-T-Q-
19-Feb-19 0050
662 / 732
E0620B,-cancelled
663 / 732
664 / 732
Work in progress
Work in Progress
665 / 732
666 / 732
667 / 732
668 / 732
669 / 732
670 / 732
Inspection Notification Log Sheet Accepted 48
ELECTRICAL 33 On-schedule Waiting for result 0
2 Re-schedule Cancelled 0
13 Additional Reject 0
Inspection Inspection Party
Inspection
SN Log Date Notification Main Activity Detail Activities Area / Location Date
Time Subcontractor Inspector Discipline Status Result Remarks Date Closed
Number SC VPCI PMC
JGSS1EP-VPCI- Earthing Cable Depth, size & location check of earthing Charmaine
1 16-Aug-18 Area 600 N/A W SW 17-Aug-18 1000H N/A Electrical On-schedule Accepted VPCI-PL-0005 17-Aug-18
EE-0001 Installation cable trench. Perez
671 / 732
Area 0400
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Charmaine Laying of cables not yet
18 5-Oct-18 E-0407C, E- N/A W SW 5-Oct-18 1300H SJ E&I, INC. Electrical Additional Accepted 05-Oct-18
EL-0018 installation 2. Bonding & Grounding Connection Perez completed
0401B
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check DGP II Charmaine
19 8-Oct-18 N/A W SW 8-Oct-18 1400H SJ E&I, INC. Electrical Additional Accepted 10-Oct-18
EL-0019 installation 2. Bonding & Grounding Connection Area 900 Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Z-0601 Charmaine
20 9-Oct-18 N/A W SW 10-Oct-18 1000H SJ E&I, INC. Electrical On-schedule Accepted 10-Oct-18
EL-0020 installation 2. Bonding & Grounding Connection Area 600 Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check STR-0905 Charmaine
21 11-Oct-18 N/A W SW 11-Oct-18 0900H SJ E&I, INC. Electrical Additional Accepted 12-Oct-18
EL-0021 installation 2. Bonding & Grounding Connection Area 900 Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Analyzer Shelter Charmaine
22 11-Oct-18 N/A W SW 11-Oct-18 1000H SJ E&I, INC. Electrical Additional Accepted 12-Oct-18
EL-0022 installation 2. Bonding & Grounding Connection #12 Area 0300 Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check DPG-II Charmaine
23 13-Oct-18 N/A W SW 15-Oct-18 1000H SJ E&I, INC. Electrical On-schedule Accepted 15-Oct-18
EL-0023 installation 2. Bonding & Grounding Connection Area 900 Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check DPG-II Charmaine
24 16-Oct-18 N/A W SW 17-Oct-18 0900H SJ E&I, INC. Electrical On-schedule Accepted 19-Oct-18
EL-0024 installation 2. Bonding & Grounding Connection Area 900 Perez
Area 0400
JGSS1EP-VPCI- Aboveground Earthing 1. Location Check Charmaine
25 16-Oct-18 Chemical N/A W SW 17-Oct-18 1030H SJ E&I, INC. Electrical On-schedule Accepted 17-Oct-18
EL-0025 cable installation 2. Bonding & Grounding Connection Perez
Injection
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0800 Charmaine
26 18-Oct-18 N/A W SW 19-Oct-18 0900H SJ E&I, INC. Electrical On-schedule Accepted 19-Oct-18
EL-0026 installation 2. Bonding & Grounding Connection G-0805 Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0900 Charmaine
27 20-Oct-18 N/A W SW 22-Oct-18 1500H SJ E&I, INC. Electrical On-schedule Accepted 2 Cables, no PVC Stub-up 22-Oct-18
EL-0027 installation 2. Bonding & Grounding Connection DPG-II Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0900 Charmaine
28 23-Oct-18 N/A W SW 24-Oct-18 1100H SJ E&I, INC. Electrical On-schedule Accepted 25-Oct-18
EL-0028 installation 2. Bonding & Grounding Connection DPG-II Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 500 Charmaine
29 23-Oct-18 N/A W SW 24-Oct-18 0900H SJ E&I, INC. Electrical On-schedule Accepted 24-Oct-18
EL-0029 installation 2. Bonding & Grounding Connection D-510C Perez
1 Bonding & grounding connection
JGSS1EP-VPCI- Final Ground Area 0900 Charmaine
30 24-Oct-18 2. Measure earth resistance of earthing N/A W SW 25-Oct-18 1000H SJ E&I, INC. Electrical On-schedule Accepted 26-Oct-18
EL-0030 Resistance Testing DPG-II Perez
electrode
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0600 Charmaine
31 29-Oct-18 N/A W SW 30-Oct-18 1000H SJ E&I, INC. Electrical On-schedule Accepted 30-Oct-18
EL-0031 installation 2. Bonding & Grounding Connection D-0693 Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0500 Charmaine Laying of cables not yet
32 30-Oct-18 N/A W SW 31-Oct-18 1000H SJ E&I, INC. Electrical On-schedule Accepted 31-Oct-18
EL-0032 installation 2. Bonding & Grounding Connection E-0405R Perez completed
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0400 Charmaine Laying of cables not yet
33 5-Nov-18 N/A W SW 6-Nov-18 0900H SJ E&I, INC. Electrical On-schedule Accepted 06-Nov-18
EL-0033 installation 2. Bonding & Grounding Connection Y-0402 A/B Perez completed
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0600 Charmaine
34 7-Nov-18 N/A W SW 8-Nov-18 0800H SJ E&I, INC. Electrical On-schedule Accepted 8-Nov-18
EL-0034 installation 2. Bonding & Grounding Connection E-0623B Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0300 Charmaine Laying of cables not yet
35 7-Nov-18 N/A W SW 8-Nov-18 1000H SJ E&I, INC. Electrical On-schedule Accepted 8-Nov-18
EL-0035 installation 2. Bonding & Grounding Connection G-0401D Perez completed
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0700 Charmaine
36 12-Nov-18 N/A W SW 13-Nov-18 0900H SJ E&I, INC. Electrical On-schedule Accepted 13-Nov-18
EL-0036 installation 2. Bonding & Grounding Connection R-0701C Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0700 Charmaine
37 15-Nov-18 N/A W SW 15-Nov-18 0900H SJ E&I, INC. Electrical Additional Accepted 15-Nov-18
EL-0037 installation 2. Bonding & Grounding Connection E-0703B Perez
Area 0600
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Charmaine
38 17-Nov-18 D-0651, D-0691, N/A W SW 19-Nov-18 0900H SJ E&I, INC. Electrical On-schedule Accepted 19-Nov-18
EL-0038 installation 2. Bonding & Grounding Connection Perez
D-0690
Welder's Qualification Test for Electrical
Supports:
REJECTED:
JOEY D. CUETO
JGSS1EP-VPCI- Charmaine JOEY D. CUETO
39 19-Nov-18 WQT ROMANO O. AYATON Ambulong Shop H W SW 20-Nov-18 10:00AM SJ E&I, INC. Electrical On-schedule Accepted 20-Nov-18
EL-0039 Perez EDWELL R. PENALOSA
EDWELL R. PENALOSA
LEXTER A. BUENO
CHRISTIAN ROY C. CUETO
LEXTER A. BUENO
UNIT 300
JGSS1EP-VPCI- Earthing Cable 1. Depth, Size & Location Check Charmaine
40 22-Nov-18 ANALYZER H W SW 23-Nov-18 09:00AM SJ E&I, INC. Electrical On-schedule Accepted 23-Nov-18
EL-0040 Installation 2. Bonding & Grounding Connection Perez
SHELTER #12
JGSS1EP-VPCI- Earthing Cable 1. Depth, Size & Location Check UNIT 700 Charmaine
41 22-Nov-18 H W SW 23-Nov-18 09:30AM SJ E&I, INC. Electrical On-schedule Accepted 23-Nov-18
EL-0041 Installation 2. Bonding & Grounding Connection R-0701C Perez
JGSS1EP-VPCI- Earthing Cable 1. Depth, Size & Location Check UNIT 500 Charmaine
42 22-Nov-18 H W SW 23-Nov-18 10:00AM SJ E&I, INC. Electrical On-schedule Accepted 23-Nov-18
EL-0042 Installation 2. Bonding & Grounding Connection E-0509B Perez
Welder's Qualification Test for Electrical
Supports:
JGSS1EP-VPCI- AMBULONG
43 23-Nov-18 WQT JOEY D. CUETO H W SW 23-Nov-18 1030H SJ E&I, INC. Bryan Aguila Electrical Additional Accepted 23-Nov-18
EL-0043 SHOP
EDWELL R. PENALOSA
LEXTER A. BUENO
JGSS1EP-VPCI- Earthing Cable 1. Depth, Size & Location Check UNIT 600 Charmaine
44 23-Nov-18 H W SW 24-Nov-18 10:00AM SJ E&I, INC. Electrical On-schedule Accepted 24-Nov-18
EL-0044 Installation 2. Bonding & Grounding Connection E-0623B Perez
1. Vendor Data check EPC1
JGSS1EP-VPCI- Material Receiving Nestor
45 23-Nov-18 2. Certificate Check FABRICATION H W SW 24-Nov-18 08:00AM SJ E&I, INC. Electrical On-schedule Accepted 24-Nov-18
MRI-EL-0003 Inspection Mendoza
3. Visual Check SHOP
JGSS1EP-VPCI- Underground Earthing 1. Depth, Size & Location Check UNIT 500 Charmaine
46 10-Dec-18 H W SW 11-Dec-18 09:00AM SJ E&I, INC. Electrical On-schedule Accepted 11-Dec-18
EL-0045 Cable Installation 2. Bonding & Grounding Connection E-0507AR/BR/CR Perez
672 / 732
JGSS1EP-VPCI- Underground Earthing 1. Depth, Size & Location Check UNIT 300 Charmaine
47 10-Dec-18 H W SW 11-Dec-18 10:00AM SJ E&I, INC. Electrical On-schedule Accepted 11-Dec-18
EL-0046 Cable Installation 2. Bonding & Grounding Connection Y-0401D Perez
Underground Earthing
JGSS1EP-VPCI- 1. Depth, Size & Location Check Area 300, 600 & Charmaine
48 7-Jan-19 Cable Installation for H W SW 8-Jan-19 10:00AM SJ E&I Electrical On-schedule Accepted
EL-0047 2. Bonding & Grounding Connection DPG-II Perez
Bus-Bar
673 / 732
Inspection Notification Log Sheet Accepted 36
ELECTRICAL 35 On-schedule Waiting for result 0
1 Re-schedule Cancelled 1
1 Additional Reject 0
Inspection Inspection Party
Inspection Receive Return to
SN Log Date Notification Main Activity Detail Activities Area / Location Time Subcontractor Inspector Discipline Status Result Remarks Date Closed Transmittal No.
SC VPCI PMC Date From Sub Sub
Number
1. Fabrication of ladder report
2.Visual Inspection for electrical support
1000 x 2970 x 500 mm (6 pcs)
JGSS1EP-SJEI- Fabrication of Ladder 1000 x 2000 x 500 mm (7 pcs) Nestor With punch (touch up-paint)
1 7-Dec-18 SJ E&I Fab H W SW 7-Dec-18 1400H SJ E&I Electrical Additional Accepted
EL-0001 support 500 x 1820 x 500 mm (16 pcs) Mendoza
1000 X 2450 X 1000 mm (1 pc)
500 x 2320 x 1000 mm (1 pc)
JGSS1EP-SJEI- Cable tray support Visual Inspection for cable tray Nestor With punch (torque value of
6 27-Dec-18 Area 900 H W SW 28-Dec-18 1400H SJ E&I Electrical On-schedule Accepted 74Nm)
EL-0006 installation Mendoza
674 / 732
Inspection Notification Log Sheet (INSTRUM
Inspection Inspection Party
Sub-system
SN Log Date Notification System No. Inspection Activities Area / Location
No. SC VPCI PMC
Number
16/01/2019
1000H SJ E&I R. Arago Instrument Accepted
resched
679 / 732
(rebar, form, embedded, cleaning, etc) of
12 26-Apr-18 T-CCO-007 Pre-pouring Footings GL I1,I2,I3,I4,H4,G4,E4,D4 = 8 nos. VPCI Office H W R 27-Apr-18 1000H
5-May-18 T-CCO-011 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) VPCI Office H W R 5-May-18 1300
22 Pedestals = 11 nos.
(rebar, form, embedded, cleaning, etc.) (Grid line
23 5-May-18 T-CCO-012 Pre-pouring A - I line 1 and Grid A and I line 2) VPCI Office H W R 5-May-18 1100H
Footing Tie Beam
(mixture, slump, temperature check, etc.) (Site)
24 5-May-18 T-CCO-012 Concrete Pouring VPCI Office H W R 5-May-18 1300
Footing Tie Beam
(rebar, form, embedded, cleaning, etc.) Footings
25 5-May-18 T-CCO-013 Pre-pouring VPCI Office H W R 5-May-18 1100H
(Grid Line F line 4) = 1 mo.
680 / 732
(rebar, form, embedded, cleaning, etc.)
27 7-May-18 T-CCO-014 Pre-pouring FOUNDATION Grid line -Line (B-3, C-3, E-1,3, and PMC Office H W R 9-May-18 1100H
F-1,2,3) = 7 nos.
28 7-May-18 T-CCO-014 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) PMC Office H W R 9-May-18 1300
30 7-May-18 T-CCO-015 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) VPCI Office H W R 9-May-18 1300
32 7-May-18 T-CCO-016 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) VPCI Office H W R 9-May-18 1300
34 10-May-18 T-CCO-017 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) VPCI Office H W R 10-May-18 1700H
36 12-May-18 T-CCO-018 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) VPCI Office H W R 12-May-18 1100H
38 15-May-18 T-CCO-019 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) VPCI Office H W R 16-May-18 1100H
40 16-May-18 T-CCO-020 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) VPCI Office H W R 17-May-18 1100H
681 / 732
(rebar, form, embedded, cleaning, etc.)
41 15-May-18 T-CCO-021 Pre-pouring VPCI Office H W R 15-May-18 1000H
LEAN CONCRETE - SEPTIC TANK
42 15-May-18 T-CCO-021 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) VPCI Office H W R 15-May-18 1100H
682 / 732
Bolt tightening inspection for COLUMNS of VPCI
59 19-Jul-18 T-SBO-002 Structural Bolting VPCI office H W R 19-Jul-18 0800H
office
683 / 732
Accepted
0 Re-schedule Cancelled
0 Additional Reject
684 / 732
VPCI Allan Magadia Civil On-schedule Accepted
685 / 732
VPCI Allan Magadia Civil On-schedule Accepted
686 / 732
VPCI Allan Magadia Civil On-schedule Accepted
687 / 732
VPCI Arvin Baitaan Civil On-schedule Accepted
688 / 732
Inspection Notification Log Sheet
MRI
689 / 732
JGSS1EP-VPCI-MRI- Material Inspection
13 01-Aug-18 CBI LHT Ship No. 2 - Parts and accessories EPC1 Laydown NA I SW 01-Aug-18
ME-0007 Heater Module
JGSS1EP-VPCI-MRI- Material Inspection CBI LHT Ship No. 2 - Convection Module and
14 EPC1 Laydown NA I SW 02-Aug-18
ME-0008 Heater Module Spreader Beam
JGSS1EP-VPCI-MRI- Material Inspection CBI LHT Ship No. 2 - Convection Module and
15 01-Aug-18 EPC1 Laydown NA I SW 01-Aug-18
ME-0009 Heater Module Structure and Loose item
JGSS1EP-VPCI-MRI- Material Inspection CBI LHT Ship No. 2 - Convection Module and
16 02-Aug-18 EPC1 Laydown NA I SW 02-Aug-18
ME-0010 Heater Module Structure and Loose item
JGSS1EP-VPCI-MRI- Material Inspection CBI LHT Ship No. 2 - Support frame and structure
17 15-Aug-18 EPC1 Laydown NA I SW 15-Aug-18
ME-0011 Heater Module and loose item
JGSS1EP-VPCI-MRI- Material Inspection Schmidtsche Schack - Mechanical Spool and
18 11-Sep-18 EPC1 Laydown NA I SW 11-Sep-18
ME-0012 Heater Module spare
JGSS1EP-VPCI-MRI- Material Inspection Schmidtsche Schack - Steam Drum
19 1-Sep-18 EPC1 Laydown NA I SW 3-Sep-18
ME-0013 Steam Drum Lummus technology - TLE
JGSS1EP-VPCI-MRI-CI- Material Inspection
20 28-May-18 Anchor Bolts & Templates EPC1 Area I W SW 28-May-18
0001
JGSS1EP-VPCI-MRI-CI- Material Inspection
21 12-Jul-18 Anchor Bolts & Templates EPC1 Area I W SW 13-Jul-18
0002
JGSS1EP-VPCI-MRI-CI-
22 10-Jul-18 0003 Material Inspection Anchor sleeves EPC1 Area I W SW 10-Jul-18
690 / 732
JGSS1EP-VPCI-MRI-CI- Material Inspection JGS/KR/018 - Gusset plate for steel structure
31 25-Sep-18 Tempacil Area I W SW 26-Sep-18
0010 fabricated steel
JGSS1EP-VPCI-MRI-PI- Material Inspection
32 27-Sep-18 Polyken Liquid Adhesive Systems #1027 VPCI Office I W SW 26-Sep-18
0009
JGSS1EP-VPCI-MRI-PI- Material Inspection
33 04-Oct-18 AG-1st Piping materials EPC 1 Laydown I W SW 04-Oct-18
0010
JGSS1EP-VPCI-MRI-PI- Material Inspection
34 04-Oct-18 UG Piping materials- Addition 1 EPC 1 Laydown I W SW 04-Oct-18
0011
JGSS1EP-VPCI-MRI-PI- Material Inspection
35 04-Oct-18 UG Piping materials EPC 1 Laydown I W SW 04-Oct-18
0012
JGSS1EP-VPCI-MRI-
36 11-Oct-18 Material Inspection TCCC-001 Pyro-Bloc CFC Warehouse I W SW 19-Oct-18
ME-0014
JGSS1EP-VPCI-MRI-
37 11-Oct-18 ME-0015 Material Inspection TCCC-002 HT Mastic CFC Warehouse I W SW 19-Oct-18
44 11-Oct-18 JGSS1EP-VPCI-MRI- Material Inspection TCCC-009 Accessories for TLE CFC Warehouse I W SW 19-Oct-18
ME-0022
JGSS1EP-VPCI-MRI- Material Inspection
45 11-Oct-18 TCCC-010 Spring Hanger CFC Warehouse I W SW 19-Oct-18
ME-0023
JGSS1EP-VPCI-MRI-
46 11-Oct-18 ME-0024 Material Inspection TCCC-014 Transfer Line Valve & Decove CFC Warehouse I W SW 19-Oct-18
691 / 732
JGSS1EP-VPCI-MRI- Material Inspection
47 25-Oct-18 JGS-KR-027 Tailing Tower Vacuum System CFC Warehouse I W SW 26-Oct-18
ME-0025
692 / 732
JGSS1EP-VPCI-MRI-PI- Material Inspection
65 25-Nov-18 JGS-KR-085 Flange/45 Elbow/Lateral EPC 1 Laydown I W SW 29-Nov-18
0025
JGSS1EP-VPCI-MRI-PI- Material Inspection
66 26-Nov-18 JGS-KR-063 EPC 1 Laydown I W SW 26-Nov-18
0026
JGSS1EP-VPCI-MRI- Material Inspection
67 28-Nov-18 JGS-KR-046 EPC 1 Laydown I W SW 4-Dec-18
SS-0003
JGSS1EP-VPCI-MRI-PI- Material Inspection
68 29-Nov-18 Local-BC Petro Tape/Paste EPC 1 Warehouse I W SW 29-Nov-18
0026
JGSS1EP-VPCI-MRI-PI- Material Inspection
69 29-Nov-18 Local-BC Petro Tape/Paste EPC 1 Warehouse I W SW 29-Nov-18
0027
JGSS1EP-VPCI-MRI-PI-
70 30-Nov-18 Material Inspection JGS-KR-064 UG Piping Materials Add4 EPC 1 Warehouse I W SW 30-Nov-18
0028
JGSS1EP-VPCI-MRI-
71 1-Dec-18 SS-0004 Material Inspection JGS-KR-052 Structural Steel LOT 2 ADD EPC 1 Laydown I W SW 5-Dec-18
693 / 732
JGSS1EP-VPCI-MRI- Material Inspection
82 19-Dec-18 JGS-CN-050 Drum LOT 1 (CNTR) I W SW
ME-0034
JGSS1EP-VPCI-MRI-
83 19-Dec-18 Material Inspection JGS-CN-055 Drum LOT 2 (BULK) I W SW
ME-0035
JGSS1EP-VPCI-MRI-
92 2-Jan-19 ME-0041 Material Inspection JGS-CN-055 Drum LOT 2 (BULK) I W SW
JGSS1EP-VPCI-MRI-PI-
94 7-Jan-19 0038 Material Inspection JGS-CN-045 CS/SS Fitting EPC1 Laydown I W SW 14-Jan-19
694 / 732
JGSS1EP-VPCI-MRI-PI- Material Inspection
96 7-Jan-19 JGS-CN-058 Carbon Steel Seamless Pipe EPC1 Laydown I W SW 7-Jan-19
0042
JGSS1EP-VPCI-MRI-PI- Material Inspection
97 7-Jan-19 JGS-KR-100 Gasket I W SW
0044
JGSS1EP-VPCI-MRI- Material Inspection
98 8-Jan-19 JGS-KR-087 structural steel Lot 4 I W SW
SS-0008
JGSS1EP-VPCI-MRI- Material Inspection
99 8-Jan-19 JGS-KR-102 structural Steel LOT 5 I W SW
SS-0009
JGSS1EP-VPCI-MRI- Material Inspection
100 8-Jan-19 JGS-KR-083 API Pump (II) Motor (KR) I W SW
ME-0043
JGSS1EP-VPCI-MRI-PI-
101 11-Jan-19 Material Inspection JGS-KR-084 Butterfly Valve, Forged Valve EPC1 Laydown I W SW 15-Jan-19
0040
JGSS1EP-VPCI-MRI-PI-
102 11-Jan-19 0041 Material Inspection JGS-UA-022 CS/SS Pipe EPC1 Laydown I W SW 12-Jan-19
695 / 732
JGSS1EP-VPCI-MRI- Material Inspection
114 25-Jan-19 Local Purchase-PAINTS and Tinner Material AC Room I W SW 12-Feb-19
SS-0012
JGSS1EP-VPCI-MRI- Material Inspection
115 26-Jan-19 JGS-KR-151 Steel Plate (painted) I W SW
SS-0013
JGSS1EP-VPCI-MRI- Material Inspection
116 28-Jan-19 FSK-1812-22-1 Steel Structure Materials I W SW
SS-0011
JOTOMASTIC 90 RAL 7045 TELEGREY
JGSS1EP-VPCI-MRI- Material Inspection
117 29-Jan-19 JOTOMASTIC 90, STD COMP B I W SW 12-Feb-19
ME-0052 JOTUN THINNER NO. 17
HARDTOP XP N5.5
HARDTOP XP N5.5
JGSS1EP-VPCI-MRI- Material Inspection HARDTOP XP, COMP B
118 29-Jan-19 Material AC Room I W SW 12-Feb-19
ME-0053 JOTUN THINNER NO.10
HARDTOP XP, COMP B
HARDTOP XP 2.5Y8/12
696 / 732
JGSS1EP-VPCI-MRI- Material Inspection
128 9-Feb-19 JGS-KR-067 'Filter (KR)_FUJ I W SW
ME-0057
JGSS1EP-VPCI-MRI- Material Inspection
129 9-Feb-19 JGS-KR-095 Drain Cone (KR)_KYE I W SW
ME-0059
JGSS1EP-VPCI-MRI- Material Inspection
130 9-Feb-19 JGS-CN-089 Anchor Bolts I W SW
ME-0061
JGSS1EP-VPCI-MRI- Material Inspection JGS-KSB-CN-004 R-0902 PGH Second Stage
131 9-Feb-19 I W SW
ME-0063 Reactor
JGSS1EP-VPCI-MRI- Material Inspection
132 9-Feb-19 JGS-SPP-JP-003 Parallel Cold Box Package I W SW
ME-0064
JGSS1EP-VPCI-MRI-
133 9-Feb-19 Material Inspection JGS-US-001 Anchor Sleeve I W SW
ME-0065
JGSS1EP-VPCI-MRI-
134 9-Feb-19 ME-0066 Material Inspection JGS-US-060 Anchor Bolt & Template for E-0405 R I W SW
697 / 732
Accepted
13 Re-schedule Cancelled
1 Additional Reject
Randal
1000H Piping On-schedule Accepted
Fernandez
Randal
1000H Piping On-schedule Accepted
Fernandez
Randal
1000H Piping On-schedule Accepted
Fernandez
698 / 732
1000H Arvin Balitaan Mechanical On-schedule Accepted
Randal
1000H Mechanical On-schedule Accepted
Fernandez
Randal
1000H Mechanical On-schedule Accepted
Fernandez
Randal
0900H Civil On-schedule Accepted
Fernandez
Randal
1100H Piping On-schedule Accepted
Fernandez
Randal
1100H Piping On-schedule Accepted
Fernandez
699 / 732
0900H Arvin Balitaan Civil Additional Accepted
Randal
0900H Piping On-schedule Accepted
Fernandez
Randal
1000H Mechanical On-schedule Accepted
Fernandez
Randal
1000H Fernandez Mechanical On-schedule Accepted
Randal
1000H Mechanical Re-schedule Accepted
Fernandez
Randal
1000H Mechanical Re-schedule Waiting for result
Fernandez
Randal
1000H Mechanical On-schedule Accepted
Fernandez
Randal
1000H Mechanical Re-schedule Accepted
Fernandez
Randal
1000H Mechanical Re-schedule Accepted
Fernandez
Randal
1000H Fernandez Mechanical Re-schedule Accepted
Randal
1000H Fernandez Mechanical Re-schedule Accepted
700 / 732
1000H Ramon Castillo Mechanical On-schedule Accepted
Randal
1300H Piping On-schedule Accepted
Fernandez
Randal Mechanical On-schedule Waiting for result
Fernandez
Randal
Fernandez Mechanical On-schedule Waiting for result
701 / 732
Randal
0900H Piping On-schedule Accepted
Fernandez
Randal
1300H Piping On-schedule Accepted
Fernandez
Randal Mechanical
Fernandez
Randal Mechanical
Fernandez
702 / 732
Randal Fernadez/ Mechanical
Ramon Castillo
Randal Fernadez/
Mechanical
Ramon Castillo
Randal Fernadez/
Ramon Castillo Mechanical
703 / 732
Arvin Balitaan Piping On-schedule Accepted
Randal Mechanical
Fernandez
704 / 732
0800H Ermer Valdez Structural On-schedule Accepted
Randal Mechanical
Fernandez
705 / 732
Randal Mechanical
Fernandez
Randal Mechanical
Fernandez
Randal Mechanical
Fernandez
Mark Darrel Mechanical
Aranas
Mark Darrel Mechanical
Aranas
Mark Darrel
Mechanical
Aranas
Mark Darrel
Aranas Mechanical
706 / 732
88
4
0
0
Remarks Date Closed
VPCI-PL-0002
VPCI-PL-0001 16-Aug-18
19-Jun-18
VPCI-PL-0003 27-Jul-18
707 / 732
VPCI-PL-0004 02-Aug-18
15-Aug-18
VPCI-PL-0014 11-Sep-18
VPCI-PL-0011 03-Sep-18
No MTC 20-Aug-18
No MTC 20-Aug-18
No MTC 18-Sep-18
VPCI-PL-0016 19-Sep-18
VPCI-PL-0017 19-Sep-18
708 / 732
709 / 732
Waiting for Material &
Mechanical Department to
open the package for
Inspection
punch
710 / 732
Grating chips do not have
connection bolts
14 packages
711 / 732
712 / 732
713 / 732
714 / 732
715 / 732
Inspection Notification Log Sheet
INSULATION
719 / 732
Accepted
0 Re-schedule Cancelled
0 Additional Reject
720 / 732
0
0
0
0
Receive Return to
Remarks Date Closed Transmittal No.
From Sub Sub
721 / 732
Inspection Legend
Accepted
Waiting for result
Cancelled
Reject
On-schedule
Re-schedule
Additional
Definition
Accepted Count - Accepted
Accepted 87.31%
Cancelled 11.19%
Reject 1.49%
Total Result 100.00%
Inspection Notification Log Sheet
Inspection Result
Inspection Notification Inspection Party Inspection
SN Log Date Number Inspection Detail Activities Area / Location Date
SC VPCI PMC
Radiographic Examination
(NR-PHS-RT-0014)
A01A5001-P-24007-03 Jt. 3
A01A5001-P-28008-01 Jt. 5
A01A5001-RT-29001-02 Jt. 11
A01A5001-WFL-29001-04 Jt. 7
A01A5001-WFL-29001-T1 Jt. 6
2 03-Dec-18 JGSS1EP-VPCI-PSP-0420 NDE A09A5001-LF-29002-01 Jt. 5 Ambulong Shop H SW/R R 04-Dec-18
A09A5001-MS-29007-02 Jt. 8
A09A5001-N2-29006-01 Jt. 5
A09A5001-P-29031-02 Jt. 16
A09A5001-P-29039-01 Jt. 7
A09A5001-P-29057-02 Jt. 9
A09A5001-P-29093-01 Jt. 1
A09A5001-RT-29001-01 Jt. 6
Radiographic Examination
(NR-PHS-RT-0015)
3 03-Dec-18 JGSS1EP-VPCI-PSP-0421 NDE A09A5001-P-29059-01 Jt. 1 Ambulong Shop H SW/R R 04-Dec-18
A09A5001-P-29092-01 Jt. 4
A09A5001-P-29092-01 Jt. 10
725 / 732
Radiographic Test Report (NR-PHS-RT-0017)
A01A5001-HG-29001-02 Jt. 20
A01A5001-P-24005-02 Jt. 3
A01A5001-P-24007-02 Jt. 13
A01A5001-P-24007-T1 Jt. 2
A01A5001-P-29011-02 Jt. 2
5 05-Dec-18 JGSS1EP-VPCI-PSP-0439 NDE A01A5001-P-29050-03 Jt. 7 Ambulong Shop H SW/R R 05-Dec-18
A03A5001-BB-23008-03 Jt. 3
A09A5001-P-29066-01 Jt. 2
A09A5001-PGD-29012-01 Jt. 6
A09A5001-PGD-29013-01 Jt. 4
A09A5001-PGD-29017-01 Jt. 9
A09A5001-WFL-29028-01 Jt. 2
Inspection Schedule
726 / 732
Material Receiving
2 06-Dec-18 JGSS1EP-VPCI-AGP-0069 Above Ground Fittings AG&P Yard 1 H W R 07-Dec-18
Inspection
Concrete surface prior to backfilling of Foundation
3 06-Dec-18 JGSS1EP-VPCI-FSP-0803 Visual Inspection Area 700 H SW SW 07-Dec-18
& Pedestal @ E-0703 Structure.
727 / 732
1. Fabrication of ladder report
2.Visual Inspection for electrical support
1000 x 2970 x 500 mm (6 pcs)
Fabrication of Ladder 1000 x 2000 x 500 mm (7 pcs)
14 7-Dec-18 JGSS1EP-SJEI-EL-0001 SJ E&I Fab H W SW 08-Dec-18
support 500 x 1820 x 500 mm (16 pcs)
1000 X 2450 X 1000 mm (1 pc)
500 x 2320 x 1000 mm (1 pc)
728 / 732
Time Subcontractor Inspector Discipline Result
729 / 732
1900H Philspec Ramon Castillo Piping Waiting for result
730 / 732
0700H AG&P Arvin Balitaan Piping Accepted
Randal
0900H Philspec Piping Accepted
Fernandez
Randal
0900H Philspec Piping Accepted
Fernandez
Randal
0900H Philspec Fernandez Piping Accepted
Randal
1000H Philspec Mechanical Accepted
Fernandez
731 / 732
Nestor
1400H SJ E&I Electrical Accepted
Mendoza
Randal
1500H Philspec Mechanical Accepted
Fernandez
Randal
1500H Philspec Mechanical Accepted
Fernandez
732 / 732