Anda di halaman 1dari 732

Discipline

Result
FS Phil Philspec AG&P SIGBC
Accepted 854 953 329 59
Waiting for result 3 15 19 0
Cancelled 90 43 7 0
Reject 5 0 0 0
Total 952 1011 355 59

Discipline
Status
FS Phil Philspec AG&P SIGBC
On-schedule 511 878 317 59
Re-schedule 241 99 36 0
Additional 206 109 30 0
Total 958 1086 383 59
cipline
Sum
MRI SJ E&I Insulation
88 48 0 2331
4 0 0 41
0 0 0 140
0 0 0 5
92 48 0 2517

cipline
Sum
MRI SJ E&I Insulation
79 33 0 1877
13 2 0 391
1 13 0 359
93 48 0 2627
Inspection Notification Log Sheet
Inspection Schedule
Inspection Party
Inspection Inspection
SN Log Date Inspection Detail Activities Area / Location
Notification Number SC VPCI PMC Date

3 / 732
Time Subcontractor Inspector Discipline Remarks

4 / 732
Inspection Notification Log Sheet
Inspection Result
Inspection Notification Inspection Party Inspection
SN Log Date Number Inspection Detail Activities Area / Location Date
SC VPCI PMC

Application for Surface Preparation Inspection (SSPC-


1 18-Feb-19 JGSS1EP-VPCI-PSP-1035 Painting & Coating Ambulong Shop H W SW 19-Feb-19
SP10) prior to Primer Coat Application

Primer Inspection prior to Application of Intermediate Coat


2 18-Feb-19 JGSS1EP-VPCI-PSP-1040 Painting & Coating Area 300 H W SW 2/19-23/2019
(1st radiant) to (4th Radiant) bare steel area

Application for Primer Coat Inspection prior to Application of


3 18-Feb-19 JGSS1EP-VPCI-PSP-1037 Painting & Coating Ambulong Shop H W SW 19-Feb-19
Top Coat

Notification for Destructive (X-Cut) Test for Test Plate. Paint


4 18-Feb-19 JGSS1EP-VPCI-PSP-1036 Painting & Coating Ambulong Shop H W SW 19-Feb-19
System 2E and 1A (Mock up Test)

1.0 Final Visual & DFT inspection of 26 spools with CS-2E


2.0 Final Visual & DFT inspection of 10 spools with CS-2A
5 18-Feb-19 JGSS1EP-VPCI-AGP-0304 Painting & Coating (N7.5R RED) AG&P Yard 1 H W SW 19-Feb-19
3.0 Blasting & Primer Application Inspection of Pipe spools
with CS-2A & 2E

Welding Qualification Test


GLEN M. EVANGELISTA (PSP-W-182)
6 18-Feb-19 JGSS1EP-VPCI-PSP-1033 WQT Ambulong Shop H W SW 19-Feb-19
ROLLY B. SALDITOS (PSP-W-183)
JONATHAN D. ABADEJOS (PSP-W-184)

Visual Welding Inspection (Post)


7 18-Feb-19 JGSS1EP-VPCI-PSP-1034 Welding Report No.: DWR-PHS-0219 Ambulong Shop H W SW 19-Feb-19
Report No.: DWR-PHS-0221

Penetrant Test
8 18-Feb-19 JGSS1EP-VPCI-PSP-1039 NDE Ambulong Shop H W SW 19-Feb-19
A04A5001-QO-04041-T1 Jt. 3

Visual Welding Inspection (Post)


9 18-Feb-19 JGSS1EP-VPCI-PSP-1041 Welding DPG 2 Area H W SW 19-Feb-19
Report No.: DWR-PHS-0220

5 / 732
Visual Welding Inspection (Post)
10 18-Feb-19 JGSS1EP-VPCI-PSP-1042 Welding Radiant End Wall Grid A&F @ H-0305 Area 300 H W SW 19-Feb-19
77212651-305-CT-01-E-110302

Visual Welding Inspection (Post)


11 18-Feb-19 JGSS1EP-VPCI-PSP-1043 Welding Bent Steel Column 10 @ H-0305 Area 300 H W SW 19-Feb-19
77212651-305-CT-01-E-140302

28th Day Compressive Testing of Structure 0606 Grout


Specimen for Grid 06-A1/06-A2 and Grid 06-Aa/06-Ab. See ASTEC, Calamba,
12 18-Feb-19 JGSS1EP-VPCI-AGP-0301 Erection Work H SW SW 19-Feb-19
attached Drawing No. A1-JGS1EP-EPC1-A06-DD-15-E001 Laguna
Rev.0

Notification for RT Reports & RT Film Review


13 18-Feb-19 JGSS1EP-VPCI-AGP-0302 WQT AG&P Yard 1 H W SW 19-Feb-19
WQT held last Feb 15~16, 2019

Final Bolt Tightening Inspection of Structure 0603


Framing Plat at T.O.S. Elevation +84700 (A1-JGS1EP-
EPC1-A06-DD-15-E002 Rev.1)
JG Summit Site
14 19-Feb-19 JGSS1EP-VPCI-AGP-0306 Erection Work Framing Elevation at Grid "05-Ca" (A1-JGS1EP-EPC1-A06- H W SW 19-Feb-19
STR 0603
DD-15-E004 Rev.0)
Framing Elevation at Grid "05-Cc" (A1-JGS1EP-EPC1-A06-
DD-15-E009 Rev.0)

JG Summit Site
Welding Visual Visual Inspection at Piperack C
15 19-Feb-19 JGSS1EP-VPCI-AGP-0305 AREA 600 / H W SW 19-Feb-19
Inspection Dwg. No. A01A5001-RT-26052-01 FW JT.10
PIPERACK C

Receiving Inspection of Platform and Ladder for Equipment


JG Summit Site
16 19-Feb-19 JGSS1EP-VPCI-AGP-0307 Material Inspection No. D-0600 H W R 19-Feb-19
Laydown 1 Area
Dwg No. A1-JGS1EP-FRH-DD-D0600-014

17 18-Feb-19 JGSS1EP-VPCI-PSP-1038 Painting & Coating Final DFT Check and Visual Inspection of Finish Coat Ambulong Shop H W SW 19-Feb-19

Welding Visual Visual Inspection:


18 18-Feb-19 JGSS1EP-VPCI-AGP-0303 AG&P Yard 1 H W SW 19-Feb-19
Inspection see reference DWR-AGP-073 - to follow

Elevation, Location, Surface Preparation, Formworks,


19 19-Feb-19 JGSS1EP-VPCI-FSP-0954 Concrete Pouring Rebarworks, Anchor Bolt Setting and Concrete Placement Area 600 H W SW 19-Feb-19
Inspection of Foundation @ LS-619

6 / 732
Magnetic Test
Radiant End Wall Grid A&F @ H-0305
20 18-Feb-19 JGSS1EP-VPCI-PSP-1044 NDE 77212651-305-CT-01-E-110302 Area 300 H W SW 19-Feb-19
Bent Steel Column 10 @ H-0305
77212651-305-CT-01-E-140302

Ultrasonic Test
Radiant End Wall Grid A&F @ H-0305
21 18-Feb-19 JGSS1EP-VPCI-PSP-1045 NDE 77212651-305-CT-01-E-110302 Area 300 H W SW 19-Feb-19
Bent Steel Column 10 @ H-0305
77212651-305-CT-01-E-140302

28th day Compressive Strength Test of Remaining


Concrete Pavement @ Z-0901 & Z-0902/ Pedestal @ S-
0407 (F1 & F2)/ Foundation @ LS-609, LS-610, LS-611,
22 19-Feb-19 JGSS1EP-VPCI-FSP-0952 Laboratory Testing Quantum Laboratory H SW SW 19-Feb-19
LS-617/ Foundation @ LP-N01/ Spillwall @ Z-0901 & Z-
0902/ Lean Concrete @ LF-7001, LF-7002, LF-7003, LF-
7004, LF-6137, LF-6138, LF-8001 (24 Mpa @ 28 Days)

7th day Compressive Strength Test of Foundation @ LS-


23 19-Feb-19 JGSS1EP-VPCI-FSP-0953 Laboratory Testing 612, LS-613 & LF-8001/ Pedestal @ LS-616 (24 Mpa @ 28 Quantum Laboratory H SW SW 19-Feb-19
Days)

Elevation, Location, Surface Preparation, Formworks and


24 12-Feb-19 JGSS1EP-VPCI-FSP-0946 Concrete Pouring Concrete Placement Inspection of Lean Concrete @ LF- Area 600 H W SW 19-Feb-19
6146.

Radiographic Test Report (NR-PHS-RT-0072)


A01A5001-HG-26006-03 Jt. 16
A07A5001-HG-06008-T1 Jt. 3
25 19-Feb-19 JGSS1EP-VPCI-PSP-1047 NDE A07A5001-P-27001-T1 Jt. 4,5,6, Ambulong Shop H W SW 19-Feb-19
A07A5001-P-27008-01 Jt . 8,9,10,11
A07A5001-P-27021-01 Jt. 6,8,9
A07A5001-P-27022-01 Jt. 5,6,7,9,11,12

Inspection Schedule
Inspection Notification Inspection Party Inspection
SN Log Date Inspection Detail Activities Area / Location
Number SC VPCI PMC Date

7 / 732
Blasting & Primer Application Inspection of 94pcs Pipe
1 19-Feb-19 JGSS1EP-VPCI-AGP-0309 Painting & Coating AG&P Yard 1 H W SW 20-Feb-19
Support CS 1B & pipespools CS 2A & 2E

Application for Surface Preparation Inspection (SSPC-


2 19-Feb-19 JGSS1EP-VPCI-PSP-1051 Painting & Coating Ambulong Shop H W SW 20-Feb-19
SP10) prior to Primer Coat Application

Application for Surface Preparation Inspection prior to


3 19-Feb-19 JGSS1EP-VPCI-PSP-1056 Painting & Coating Area 300 H W SW 20-Feb-19
Mastic Painting Inside Radiant Section

4 19-Feb-19 JGSS1EP-VPCI-PSP-1068 PWHT Post-Weld Heat Treatment (G-SC-PWHT-0036) Ambulong Shop H SW/R R 20-Feb-19

Elevation/ Levelness/
5 19-Feb-19 JGSS1EP-VPCI-PSP-1061 Centering Inspection of Z-0901 Area 900 H W SW 20-Feb-19
Centering / Plumbness

Elevation/ Levelness/
6 19-Feb-19 JGSS1EP-VPCI-PSP-1062 Centering Inspection of Z-0902 Area 900 H W SW 20-Feb-19
Centering / Plumbness

Welding Qualification Test


ALEX A. CASTILLO (PSP-W-108)
7 19-Feb-19 JGSS1EP-VPCI-PSP-1049 WQT MARCELINO A. MEDRANO JR. (PSP-W-186) Ambulong Shop H W SW 20-Feb-19
FELIPE I. DRIZ (PSP-W-187)
EDMAR C. SENTINERIAL (PSP-W-188)

Visual Welding Inspection (Post)


8 19-Feb-19 JGSS1EP-VPCI-PSP-1050 Welding Ambulong Shop H W SW 20-Feb-19
Report No.: DWR-PHS-0223

Astec Laboratory
9 19-Feb-19 JGSS1EP-VPCI-PSP-1052 Laboratory Testing 7 Days Compressive Strength Test for STR-0701 H SW SW 20-Feb-19
Laguna

14 Days Compressive Strength Test forEpoxy Grout Astec Laboratory


10 19-Feb-19 JGSS1EP-VPCI-PSP-1053 Laboratory Testing H SW SW 20-Feb-19
(Pocket Hole) - Pumps - G-0909 A/B & G-0805 Laguna

Visual Welding Inspection (Post)


11 19-Feb-19 JGSS1EP-VPCI-PSP-1054 Welding DPG 2 Area H W SW 20-Feb-19
Report No.: DWR-PHS-0222

Weekly Welding Activity (In-Process)


12 19-Feb-19 JGSS1EP-VPCI-PSP-1055 Welding Area 300 H W SW 2/20-23/2019
Convection Module 1 to 7 @ H-0305

8 / 732
Final Inspection of Equipment No., Orientation, Levelness,
Elevation and Centering of Process Water Stripper Reboiler
13 19-Feb-19 JGSS1EP-VPCI-PSP-1058 Equipment Installation Area 400 H W SW 20-Feb-19
E-0408B
DWG No. A3-JGS1EP-HAN-DD-E0408B-001

Final Inspection of Equipment No., Orientation, Levelness,


Elevation and Centering of Quench Oil Sidestream Strainer
14 19-Feb-19 JGSS1EP-VPCI-PSP-1059 Equipment Installation Area 400 H W SW 20-Feb-19
Y-0415A
DWG No. A3-JGS1EP-FUJ-DD-Y0415AB-001

Final Inspection of Equipment No., Orientation, Levelness,


Elevation and Centering of Quench Oil Sidestream Strainer
15 19-Feb-19 JGSS1EP-VPCI-PSP-1060 Equipment Installation Area 400 H W SW 20-Feb-19
Y-0415B
DWG No. A3-JGS1EP-FUJ-DD-Y0415AB-001

Notification for Pipe Spool Release


16 20-Feb-19 JGSS1EP-VPCI-PSP-1070 Visual Inspection Ambulong Shop H W SW 20-Feb-19
(PST No. 28)

Final Visual Inspection of Gusset Plate at Inter Connecting


Piperack-1
GP004 and GP006 per Dwg. No. A1-JGS1EP-EPC1-A06-
DD-15-J004 Rev.0
GP007 per Dwg. No. A1-JGS1EP-EPC1-A06-DD-15-J005
JG Summit Site
17 19-Feb-19 JGSS1EP-VPCI-AGP-0313 Erection Work Rev.0 H W SW 20-Feb-19
AREA 600
GP006 per Dwg. No. A1-JGS1EP-EPC1-A06-DD-15-J003
Rev.0
GP006 per Dwg. No. A1-JGS1EP-EPC1-A06-DD-15-J006
Rev.0

Final Bolt Tightening Inspection at Framing Plan at T.O.S.


JG Summit Site
18 19-Feb-19 JGSS1EP-VPCI-AGP-0314 Erection Work EL. +79900 Grid 05-F3-05-P36/05-Fb-05-Fc1. H W SW 20-Feb-19
AREA 600
Structure 0604

Final Bolt Tightening Inspection at Framing Plan at T.O.S.


JG Summit Site
19 19-Feb-19 JGSS1EP-VPCI-AGP-0315 Erection Work EL. +84500 Grid 05-P36/05-Fd-05-Fe. H W SW 20-Feb-19
AREA 600
Structure 0604

Final Visual Inspection for Column C002, C003, C005 and


JG Summit Site
20 19-Feb-19 JGSS1EP-VPCI-AGP-0316 Erection Work C006 baseplate to existing column. H W SW 20-Feb-19
AREA 600
Structure 0603

9 / 732
Painting Materials application and compatibility test based
on the existing paint at Heater Area:
1. ZINC RICH EPOXY (BARRIER 80)
21 18-Feb-19 JGSS1EP-VPCI-PSP-1046 Painting & Coating 2. HIGH BUILD MIO EPOXY COAT DPG 2 Area H W SW 20-Feb-19
3. ACRYLIC ALIPATIC POLYURETHANE (JOTUN
HARDTOP XP)
4. EPOXY NOVALAC (JOTUN EPOXY HR)

Fit-up Inspection at Piperack C JG Summit Site


Welding Visual
22 19-Feb-19 JGSS1EP-VPCI-AGP-0311 A01A5001-RT-26036-01 JT. 06 AREA 600 / H W SW 20-Feb-19
Inspection
A01A5001-RT-26037-02 JT. 13 PIPERACK C

Visual Inspection at Piperack C JG Summit Site


Welding Visual
23 19-Feb-19 JGSS1EP-VPCI-AGP-0312 A01A5001-RT-26036-01 JT. 06 AREA 600 / H W SW 20-Feb-19
Inspection
A01A5001-RT-26037-02 JT. 13 PIPERACK C

Intermediate Coat Inspection prior to Top coat application


24 19-Feb-19 JGSS1EP-VPCI-PSP-1057 Painting & Coating Area 300 H W SW 2/20-23/2019
(1st radiant) to (4th Radiant) bare steel area

Welding Visual Visual Inspection:


25 19-Feb-19 JGSS1EP-VPCI-AGP-0308 AG&P Yard 1 H W SW 20-Feb-19
Inspection see reference DWR-AGP-074 - to follow

Welding Visual
26 19-Feb-19 JGSS1EP-VPCI-AGP-0310 Notification for Fit-up of SS AG&P Yard 1 H W SW 20-Feb-19
Inspection

Bolt Tightening Inspection of Secondary Members of STR-


27 19-Feb-19 JGSS1EP-VPCI-PSP-1063 Bolt Tightening 0605 Area 600 H W SW 20-Feb-19
A3-JGS1EP-EPC1-A07-DD-15-E002/E003/E004/E005

Notification for Inspection of Nozzle No.14 Flange Only @


28 19-Feb-19 JGSS1EP-VPCI-PSP-1064 Visual Inspection Area 900 H W SW 20-Feb-19
C-0903

29 19-Feb-19 JGSS1EP-VPCI-PSP-1065 Visual Inspection Notification for Inspection of All Nozzle @ D-0907 Area 900 H W SW 20-Feb-19

30 19-Feb-19 JGSS1EP-VPCI-PSP-1066 Visual Inspection Notification for Inspection of All Nozzle @ D-0911 Area 900 H W SW 20-Feb-19

10 / 732
31 19-Feb-19 JGSS1EP-VPCI-PSP-1067 Visual Inspection Notification for Inspection of All Nozzle @ E-0913 Area 900 H W SW 20-Feb-19

Bolt Tightening Inspection of STR-0903 EL+83000


32 15-Feb-19 JGSS1EP-VPCI-PSP-1000 Bolt Tightening Area 900 H W SW 20-Feb-19
A3-JGS1EP-EPC1-A07-DD-15-E002

Elevation, Location, Surface Preparation, Formworks,


33 19-Feb-19 JGSS1EP-VPCI-FSP-0955 Concrete Pouring Rebarworks, Embedded Items and Concrete Placement Laydown H W SW 20-Feb-19
Inspection of Guard Post (Removable Type)

Elevation/ Levelness/ Levelness and Elevation Inspection of STR-0703


34 18-Feb-19 JGSS1EP-VPCI-PSP-1030 Area 700 H W SW 20-Feb-19
Centering / Plumbness A3-JGS1EP-EPC1-A07-DD-15-443

Bolt Tightening Inspection of STR-0703


35 18-Feb-19 JGSS1EP-VPCI-PSP-1031 Bolt Tightening Area 700 H W SW 20-Feb-19
A3-JGS1EP-EPC1-A07-DD-15-443

Grouting Inspection of Z-0901 and Z-0902


36 20-Feb-19 JGSS1EP-VPCI-PSP-1069 Grouting A1-JGS1EP-EPC1-A09-DD-10-141 Area 900 H W SW 20-Feb-19
A1-JGS1EP-EPC1-A09-DD-10-151

Radiographic Test Report (NR-PHS-RT-0069 after G-SC-


37 19-Feb-19 JGSS1EP-VPCI-PSP-1048 NDE Ambulong Shop H W SW 20-Feb-19
AF_PWHT-0010)

11 / 732
Time Subcontractor Inspector Discipline Result

0800-1400H Philspec Ermer Valdez Painting Accepted

0800-1400H Philspec Ermer Valdez Painting Accepted

0800-1530H Philspec Ermer Valdez Painting Accepted

0830-1030H Philspec Ermer Valdez Painting Accepted

0830-1430H AG&P Ermer Valdez Painting Accepted

0900H Philspec Ramon Castillo Piping Accepted

0900H Philspec Ramon Castillo Piping Accepted

0900H Philspec Ramon Castillo Piping Accepted

0900H Philspec Dennis Matira Piping Accepted

12 / 732
Randal
0900H Philspec Mechanical Accepted
Fernandez

Randal
0900H Philspec Mechanical Accepted
Fernandez

0900H AG&P Allan Magadia Structural Waiting for result

0900H AG&P Arvin Balitaan Piping Accepted

0900H
AG&P Allan Magadia Structural Accepted

0900H
Mark Darrel
to AG&P Piping Accepted
Aranas
1100H

0900H
Mark Darrel
to AG&P Mechanical Accepted
Aranas
1100H

0900-1130H Philspec Ermer Valdez Painting Accepted

0930H AG&P Arvin Balitaan Piping Accepted

0945H Fsphil Allan Magadia CIVIL Accepted

13 / 732
Randal
1000H Philspec Mechanical Accepted
Fernandez

Randal
1000H Philspec Mechanical Accepted
Fernandez

1000H Fsphil Allan Magadia CIVIL Accepted

1000H Fsphil Allan Magadia CIVIL Accepted

1015H Fsphil Allan Magadia CIVIL Accepted

1900H Philspec Ramon Castillo Piping Waiting for result

Time Subcontractor Inspector Discipline Remarks

14 / 732
0800H AG&P Arvin Balitaan Piping On-schedule

0800-1400H Philspec Ermer Valdez Painting On-schedule

0800-1400H Philspec Ermer Valdez Painting On-schedule

0800-1800H Philspec Ramon Castillo Piping On-schedule

Randal
0830H Philspec Mechanical On-schedule
Fernandez

Randal
0830H Philspec Mechanical On-schedule
Fernandez

0900H Philspec Ramon Castillo Piping On-schedule

0900H Philspec Ramon Castillo Piping On-schedule

Randal
0900H Philspec Mechanical On-schedule
Fernandez

Randal
0900H Philspec Mechanical On-schedule
Fernandez

0900H Philspec Dennis Matira Piping On-schedule

Randal
0900H Philspec Mechanical On-schedule
Fernandez

15 / 732
Randal
0900H Philspec Mechanical On-schedule
Fernandez

Randal
0900H Philspec Mechanical On-schedule
Fernandez

Randal
0900H Philspec Mechanical On-schedule
Fernandez

0900H Philspec Ramon Castillo Piping Additional

0900H
AG&P Ralph Rabuyo Structural Additional

0900H AG&P Ralph Rabuyo Structural Additional

0900H AG&P Ralph Rabuyo Structural Additional

0900H AG&P Ralph Rabuyo Structural Additional

16 / 732
0900H Philspec Ermer Valdez Painting Re-schedule

0900H
Mark Darrel
to AG&P Piping On-schedule
Aranas
1100H

0900H
Mark Darrel
to AG&P Piping On-schedule
Aranas
1100H

0900-1200H Philspec Ermer Valdez Painting On-schedule

0930H AG&P Arvin Balitaan Piping On-schedule

0930H AG&P Arvin Balitaan Piping On-schedule

1000H Philspec Ralph Rabuyo Structural On-schedule

Randal
1000H Philspec Mechanical On-schedule
Fernandez

Randal
1000H Philspec Mechanical On-schedule
Fernandez

Randal
1000H Philspec Mechanical On-schedule
Fernandez

17 / 732
Randal
1000H Philspec Mechanical On-schedule
Fernandez

1030H Philspec Allan Magadia Structural Re-schedule

1330H Fsphil Allan Magadia CIVIL Re-schedule

1330H Philspec Allan Magadia Structural Re-schedule

1400H Philspec Allan Magadia Structural Re-schedule

Randal
1500H Philspec Mechanical Additional
Fernandez

1900H Philspec Ramon Castillo Piping On-schedule

18 / 732
Inspection Notification Log Sheet
FS PHIL

Inspection Inspection Party


SN Log Date Notification Inspection Detail Activities Area / Location Inspection Date
Number SC VPCI PMC

JGSS1EP-VPCI- Sampling of Joint inspection/witness (16mm Ø, TBM 2/Heater


1 17-May-18 H H R 19-May-18
FSP-0001 Deformed steel bar 12mmØ, 20mmØ) Fdn

ASTEC,
JGSS1EP-VPCI- Sampling of Joint inspection/witness (Ø10mm,
2 18-May-18 Calamba City, H H R 19-May-18
FSP-0002 Deformed steel bar Ø12mm, Ø16mm, Ø20mm, Ø25mm).
Laguna.
JGSS1EP-VPCI- Joint Inspection/Checking of Bored pile
3 22-May-18 Pre-pouring Heater FDN H H R 23-May-18
FSP-0003 location @ H-305.

Joint Inspection/Checking of Bored pile


JGSS1EP-VPCI-
4 23-May-18 Pre-pouring rebar cage fabrication prior to installation Laydown H H R 24-May-18
FSP-0004
for H-305, Heater Foundation.

Joint Inspection/Checking of Bored pile


JGSS1EP-VPCI-
5 23-May-18 Pre-pouring rebar cage installation prior to concreting Heater FDN H H R 24-May-18
FSP-0004
for H-305.
JGSS1EP-VPCI- Concrete placement inspection of Test
6 24-May-18 Concrete Pouring Heater FDN H H R 25-May-18
FSP-0005 Pile @ H-305

Joint Inspection/Checking of Bored pile


rebar cage fabrication prior to installation
JGSS1EP-VPCI-
7 26-May-18 Pre-pouring for H-305, Heater Foundation. Pile Rebar Laydown H H R 28-May-18
FSP-0006
Length; (11m - 19 pcs), (13m - 2 pcs),
(15m - 1 pc), for Test Pile (1 pc)

19 / 732
JGSS1EP-VPCI- Concrete placement inspection of Test
8 29-May-18 Concrete Pouring Heater FDN H W SW 30-May-18
FSP-0007 Pile @ H-305
Checking of Bored pile rebar cage
JGSS1EP-VPCI-
9 4-Jun-18 Pre-pouring fabrication prior to installation for H-305. Laydown H W SW 5-Jun-18
FSP-0008
Pile Rebar Length (11m- 1 pc).
Checking of installation of Bored Pile
JGSS1EP-VPCI-
10 4-Jun-18 Pre-pouring No.1 prior to concrete pouring. (Pile Heater FDN H W SW 5-Jun-18
FSP-0009
Rebar Length = 11 m) @H305
Checking of installation of Test Pile No.2
JGSS1EP-VPCI-
11 4-Jun-18 Pre-pouring prior to concrete pouring. (Pile Rebar Heater FDN H W SW 5-Jun-18
FSP-0010
Length = 11 m @H305
Concrete placement inspection of Test
JGSS1EP-VPCI-
12 5-Jun-18 Concrete Pouring Pile 2 and Bored Pile No.24, Seq. 1 @ H- Heater FDN H W SW 6-Jun-18
FSP-0011
305
JGSS1EP-VPCI- Concrete Trial Joint inspection/witness of trial batch DMCI Batching
13 6-Jun-18 H W SW 6-Jun-18
FSP-0012 Batch (Concrete Strength = 28Mpa) Plant
Elevation, rebar, forms, concrete
JGSS1EP-VPCI-
14 6-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 6-Jun-18
FSP-0013
7, Seq. 17 @ H-305

Elevation, rebar, forms, concrete


JGSS1EP-VPCI-
15 7-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 7-Jun-18
FSP-0014
15, Seq. 3 & Test Pile No. 2 @H-305

7th day Compressive Strength Test of Brgy


JGSS1EP-VPCI- Test Pile No. 1 Concrete Cylindrical Pinamucan
16 7-Jun-18 Laboratory Testing H SW SW 7-Jun-18
FSP-0015 Sample (24 mpa @ 28 days) @ DMCI Ibaba, Batangas
IN-HOUSE LABORATORY City

Elevation, Rebar, Forms, Concrete


JGSS1EP-VPCI-
17 7-Jun-18 Concrete Pouring placement inspection for Bored Pile Heater FDN H W SW 8-Jun-18
FSP-0016
No.26, Seq. 28 @ H-305

20 / 732
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
18 7-Jun-18 Concrete Pouring placement inspection for Bored Pile No.6 Heater FDN H W SW 8-Jun-18
FSP-0017
@ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
19 8-Jun-18 Concrete Pouring placement inspection for Bored Pile Heater FDN H W SW 9-Jun-18
FSP-0018
No.28, Sequence No. 24 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
20 8-Jun-18 Concrete Pouring placement inspection for Bored Pile Heater FDN H W SW 9-Jun-18
FSP-0019
No.16, Sequence No. 25 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
21 9-Jun-18 Concrete Pouring placement inspection for Bored Pile Heater FDN H W SW 11-Jun-18
FSP-0020
No.17, Sequence No. 21 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
22 11-Jun-18 Concrete Pouring placement inspection for Bored Pile Heater FDN H W SW 12-Jun-18
FSP-0021
No.10, Sequence No. 23 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
23 11-Jun-18 Concrete Pouring placement inspection for Bored Pile Heater FDN H W SW 12-Jun-18
FSP-0022
No.27, Sequence No. 26 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
24 11-Jun-18 Concrete Pouring placement inspection for Bored Pile Heater FDN H W SW 12-Jun-18
FSP-0023
No.25, Sequence No. 27 @ H-305
7th day Compressive Strength Test of
Brgy.
Bored Pile No. 24, Bored Pile No. 7 and
JGSS1EP-VPCI- Pinamucan
25 12-Jun-18 Laboratory Testing Trial Batch Concrete Cylindrical Sample H SW SW 13-Jun-18
FSP-0024 Ibaba, Batangas
(28 mpa @ 28 days) @ Quantum
City
Laboratory.
7th day Compressive Strength Test of Brgy.
JGSS1EP-VPCI- Bored Pile No. 15, Bored Pile No. 9 Pinamucan
26 13-Jun-18 Laboratory Testing H SW SW 14-Jun-18
FSP-0025 Cylindrical Sample (28 mpa @ 28 days) Ibaba, Batangas
@ Quantum Laboratory. City
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
27 14-Jun-18 Concrete Pouring placement inspection for Bored Pile No.6, Heater FDN H W SW 14-Jun-18
FSP-0026
Sequence No. 14 @ H-305

21 / 732
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
28 14-Jun-18 Concrete Pouring placement inspection for Bored Pile No.5, Heater FDN H W SW 15-Jun-18
FSP-0027
Sequence No. 18 @ H-305

Elevation, Rebar, Forms, Concrete


JGSS1EP-VPCI-
29 14-Jun-18 Concrete Pouring placement inspection for Bored Pile Heater FDN H W SW 15-Jun-18
FSP-0028
No.11, Sequence No. 19 @ H-305
7th day Compressive Strength Test of Brgy.
JGSS1EP-VPCI- Bored Pile No. 26 Concrete Cylindrical Pinamucan
30 14-Jun-18 Laboratory Testing H SW SW 15-Jun-18
FSP-0029 Sample (28 mpa @ 28 days) @ Ibaba, Batangas
Quantum Laboratory. City
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
31 15-Jun-18 Concrete Pouring placement inspection for Bored Pile No.4, Heater FDN H W SW 15-Jun-18
FSP-0030
Sequence No. 16 @ H-305
7th day Compressive Strength Test of Brgy.
JGSS1EP-VPCI- Bored Pile No. 28 Concrete Cylindrical Pinamucan
32 15-Jun-18 Laboratory Testing H SW SW 16-Jun-18
FSP-0031 Sample (28 mpa @ 28 days) @ Ibaba, Batangas
Quantum Laboratory. City
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
33 15-Jun-18 Concrete Pouring placement inspection for Bored Pile No.8, Heater FDN H W SW 16-Jun-18
FSP-0032
Sequence No. 22 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
34 16-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 16-Jun-18
FSP-0033
23, Sequence No. 9 @ H-305

7th day Compressive Strength Test of


JGSS1EP-VPCI- Bored Pile No. 16 and Bored Pile No. 17
35 16-Jun-18 Laboratory Testing Heater FDN H SW SW 18-Jun-18
FSP-0034 Concrete Cylindrical Sample (28 mpa @
28 days) @ Quantum Laboratory.

Elevation, Rebar, Forms, Concrete


JGSS1EP-VPCI-
36 16-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 18-Jun-18
FSP-0035
22, Sequence No. 4 @ H-305

22 / 732
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
37 16-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 18-Jun-18
FSP-0036
13, Sequence No. 8 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
38 16-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 18-Jun-18
FSP-0037
5, Sequence No. 18 @ H-305
Inspection/Witness Sampling of ASTEC,
JGSS1EP-VPCI-
39 16-Jun-18 Laboratory Testing Deformed Reinforcing Steel Bar Calamba City, H W SW 18-Jun-18
FSP-0038
(Ø10mm). Laguna.
ASTEC,
JGSS1EP-VPCI- Inspection/Witness Sampling of Soil
40 16-Jun-18 Laboratory Testing Calamba City, H W SW 18-Jun-18
FSP-0039 Sample for Quality Test.
Laguna.
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
41 18-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 19-Jun-18
FSP-0040
3, Sequence No. 12 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
42 18-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 19-Jun-18
FSP-0041
14, Sequence No. 2 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
43 18-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 19-Jun-18
FSP-0042
20, Sequence No. 10 @ H-305

7th day Compressive Strength Test of


Bored Pile No. 27 and 14th day
JGSS1EP-VPCI- Quantum
44 19-Jun-18 Laboratory Testing Compressive Strength Test of Trial Batch H SW SW 20-Jun-18
FSP-0043 Laboratory
Concrete Cylindrical Sample (28 mpa @
28 days) @ Quantum Laboratory.

Elevation, Rebar, Forms, Concrete


JGSS1EP-VPCI-
45 19-Jun-18 Concrete Pouring placement inspection for Bored Pile No. 2 Heater FDN H W SW 20-Jun-18
FSP-0044
@ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
46 19-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 20-Jun-18
FSP-0045
19,@ H-305

23 / 732
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
47 19-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 20-Jun-18
FSP-0046
29 (Test Pile #2) @ H-305
7th day Compressive Strength Test of
Bored Pile No. 10, Bored Pile No. 25 and
JGSS1EP-VPCI- Quantum
48 20-Jun-18 Laboratory Testing Bored Pile No. 6 Concrete Cylindrical H SW SW 21-Jun-18
FSP-0047 Laboratory
Sample (28 mpa @ 28 days) @
Quantum Laboratory.
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
49 20-Jun-18 Concrete Pouring placement inspection for Bored Pile No. 1 Heater FDN H W SW 20-Jun-18
FSP-0048
@ H-305

JGSS1EP-VPCI- 7th day Compressive Strength Test of Quantum


50 21-Jun-18 Laboratory Testing Bored Pile No. 4 and Bored Pile No. 8 H SW SW 22-Jun-18
FSP-0049 Laboratory
Concrete Cylindrical Sample (28 mpa @
28 days) @ Quantum Laboratory.
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
51 21-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 21-Jun-18
FSP-0050
18 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
52 22-Jun-18 Concrete Pouring placement inspection for Bored Pile No. 2 Heater FDN H W SW 22-Jun-18
FSP-0051
@ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
53 22-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 22-Jun-18
FSP-0052
29 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
54 22-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 22-Jun-18
FSP-0053
19 @ H-305
7th day Compressive Strength Test of
JGSS1EP-VPCI- Bored Pile No. 23, Bored Pile No. 11 Quantum
55 22-Jun-18 Laboratory Testing H SW SW 23-Jun-18
FSP-0054 Concrete Cylindrical Sample (28Mpa @ Laboratory
28 days)

24 / 732
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
56 23-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 23-Jun-18
FSP-0055
21 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
57 23-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 23-Jun-18
FSP-0056
13 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
58 23-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 25-Jun-18
FSP-0057
12 @ H-305
Elevation, Rebar, Forms, Concrete
JGSS1EP-VPCI-
59 23-Jun-18 Concrete Pouring placement inspection for Bored Pile No. Heater FDN H W SW 25-Jun-18
FSP-0058
29 @ H-305
7th day Compressive Strength Test of
JGSS1EP-VPCI- Bored Pile No. 22, Bored Pile No. 5 Quantum
60 23-Jun-18 Laboratory Testing H SW SW 25-Jun-18
FSP-0059 Concrete Cylindrical Sample (28 Mpa @ Laboratory
28 days)
14th day Compressive Strength Test of
JGSS1EP-VPCI- Bored Pile No. 16, Bored Pile No. 17 Quantum
61 23-Jun-18 Laboratory Testing H SW SW 25-Jun-18
FSP-0060 Concrete Cylindrical Sample (28 Mpa @ Laboratory
28 days)
7th day Compressive Strength Test of
JGSS1EP-VPCI- Bored Pile No. 3, Bored Pile No. 14 Quantum
62 25-Jun-18 Laboratory Testing H SW SW 26-Jun-18
FSP-0061 Concrete Cylindrical Sample (28 Mpa @ Laboratory
28 days)
7th day Compressive Strength Test of
JGSS1EP-VPCI- Bored Pile No. 20 and Bored Pile No. 1 Quantum
63 26-Jun-18 Laboratory Testing H SW SW 27-Jun-18
FSP-0062 Concrete Cylindrical Sample (28 Mpa @ Laboratory
28 days)
7th day Compressive Strength Test of
Bored Pile No. 18 and 28th day
JGSS1EP-VPCI- Quantum
64 27-Jun-18 Laboratory Testing Compressive Strength Test of Test Pile H SW SW 28-Jun-18
FSP-0063 Laboratory
No. 1 Concrete Cylindrical Sample (28
Mpa @ 28 days)

25 / 732
7th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
65 28-Jun-18 Laboratory Testing Bored Pile No. 2 Concrete Cylindrical H SW SW 29-Jun-18
FSP-0064 Laboratory
Sample (28 Mpa @ 28 days)

7th day Compressive Strength Test of


JGSS1EP-VPCI- Bored Pile No. 21, Bored Pile No. 19 and Quantum
66 29-Jun-18 Laboratory Testing H SW SW 30-Jun-18
FSP-0065 Bored Pile No. 13 Concrete Cylindrical Laboratory
Sample (28 Mpa @ 28 days)

7th day Compressive Strength Test of


JGSS1EP-VPCI- Bored Pile No. 29 and Bored Pile No. 12 Quantum
67 30-Jun-18 Laboratory Testing H SW SW 02-Jul-18
FSP-0066 Concrete Cylindrical Sample (28 Mpa @ Laboratory
28 days)
Joint Inspection/Witness Sampling of ASTEC,
JGSS1EP-VPCI-
68 2-Jul-18 Laboratory Testing Deformed Reinforcing Steel Bar Calamba City, H W SW 3-Jul-18
FSP-0067
(Ø32mm). Laguna.

JGSS1EP-VPCI- Joint Inspection/Witness of Field Density


69 3-Jul-18 Laboratory Testing Area 600 H W SW 4-Jul-18
FSP-0068 Test (By Sand Cone Method) @D-0690

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
70 3-Jul-18 Laboratory Testing Test (By Sand Cone Method) @ G- Area 600 H W SW 4-Jul-18
FSP-0069
0610A/B

28th day Compressive Strength Test of


JGSS1EP-VPCI- Bored Pile No. 24 and Bored Pile No. 7 Quantum
71 3-Jul-18 Laboratory Testing H SW SW 4-Jul-18
FSP-0070 and Trial Batch No. 1 Concrete Laboratory
Cylindrical Sample (28 Mpa @ 28 days)

Joint Inspection/Witness Sampling of ASTEC,


JGSS1EP-VPCI-
72 4-Jul-18 Laboratory Testing Deformed Reinforcing Steel Bar Calamba City, H W SW 4-Jul-18
FSP-0071
(Ø20mm). Laguna.

26 / 732
DMCI, Batching
JGSS1EP-VPCI- Joint Inspection/Witness of Trial Batch Plant, Brgy.
73 4-Jul-18 Laboratory Testing H W SW 4-Jul-18
FSP-0072 (Concrete Strength = 24 Mpa & 10 Mpa) Simlong
Batsangas City

28th day Compressive Strength Test of


JGSS1EP-VPCI- Bored Pile No. 15 and Bored Pile No. 9 Quantum
74 4-Jul-18 Laboratory Testing H SW SW 5-Jul-18
FSP-0073 Concrete Cylindrical Sample (28 Mpa @ Laboratory
28 days)
Joint Inspection/Witness Sampling of ASTEC,
JGSS1EP-VPCI-
75 5-Jul-18 Laboratory Testing Deformed Reinforcing Steel Bar Calamba City, H W SW 6-Jul-18
FSP-0074
(Ø12mm). Laguna.

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
76 5-Jul-18 Laboratory Testing Bored Pile No. 26 Concrete Cylindrical H SW SW 6-Jul-18
FSP-0075 Laboratory
Sample (28 Mpa @ 28 days)

JGSS1EP-VPCI- Elevation, Location and Formworks


77 6-Jul-18 Concrete Pouring Area 600 H W SW 6-Jul-18
FSP-0076 Inspection for Lean Concrete of D-690
Elevation, Location and Formworks
JGSS1EP-VPCI-
78 6-Jul-18 Concrete Pouring Inspection for Lean Concrete of G- Area 600 H W SW 6-Jul-18
FSP-0077
0610A/B
Joint Inspection/Witness Sampling of ASTEC,
JGSS1EP-VPCI-
79 6-Jul-18 Laboratory Testing Deformed Reinforcing Steel Bar Calamba City, H W SW 6-Jul-18
FSP-0078
(Ø28mm). Laguna.
Quantum
Laboaratory,
28th day Compressive Strength Test of
JGSS1EP-VPCI- Brgy.
80 6-Jul-18 Laboratory Testing Bored Pile No. 28 Concrete Cylindrical H SW SW 7-Jul-18
FSP-0079 Pinamucan
Sample (28 Mpa @ 28 days)
Ibaba, Batangas
City

27 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
81 7-Jul-18 Laboratory Testing Test (By Sand Cone Method) @ STR- Area 900 H W SW 7-Jul-18
FSP-0080
0904
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
82 7-Jul-18 Laboratory Testing Test (By Sand Cone Method) @ G-0610 Area 600 H W SW 7-Jul-18
FSP-0081
A/B
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
83 7-Jul-18 Concrete Pouring Area 900 H W SW 7-Jul-18
FSP-0082 Inspection for Lean Concrete of STR-
0904

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI-
84 7-Jul-18 Concrete Pouring Formworks and Concrete Placement Area 600 H W SW 9-Jul-18
FSP-0083
Inspection for Foundation of D-0690

Quantum
28th day Compressive Strength Test of Laboaratory,
JGSS1EP-VPCI- Bored Pile No. 16 and Bored Pile No. 17 Brgy.
85 7-Jul-18 Laboratory Testing H SW SW 9-Jul-18
FSP-0084 Concrete Cylindrical Sample (28 Mpa @ Pinamucan
28 days) Ibaba, Batangas
City

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI-
86 9-Jul-18 Concrete Pouring Formworks and Concrete Placement Area 600 H W SW 10-Jul-18
FSP-0085
Inspection for Foundation of G-610A/B

Material Inspection of Delivered Anchor


JGSS1EP-VPCI-
87 10-Jul-18 Material Inspection Bolts (M30 Type 1, M36 Type 1, M48 Laydown H W SW 11-Jul-18
FSP-0086
Type 1, M42 Type 1, M56 Type 1)

28 / 732
28th day Compressive Strength Test of
Bored Pile No. 27 Concrete Cylindrical
JGSS1EP-VPCI- Quantum
88 10-Jul-18 Concrete Pouring Sample (28 Mpa @ 28 days) and 7th day H W SW 11-Jul-18
FSP-0087 Laboratory
Compressive Strength Test of Trial Batch
(10 Mpa and 24 Mpa @ 28 days.)

28th day Compressive Strength Test of


JGSS1EP-VPCI- Bored Pile No. 10, Bored Pile No. 25 and Quantum
89 11-Jul-18 Laboratory Testing H SW SW 12-Jul-18
FSP-0088 Bored Pile No. 6 Concrete Cylindrical Laboratory
Sample (28 Mpa @ 28 days)

28th day Compressive Strength Test of


Bored Pile No. 4 and Bored Pile No. 8
JGSS1EP-VPCI- Concrete Cylindrical Sample (28 Mpa @ Quantum
90 12-Jul-18 Laboratory Testing H SW SW 13-Jul-18
FSP-0089 28 days) and 7th day Compressive Laboratory
Strength Test of Lean Concrete @ D-
0690, Area 600.
Checking of rebar installation prior
JGSS1EP-VPCI-
91 12-Jul-18 Pre-pouring formworks closure of Pedestal @ D- Area 600 H W SW 13-Jul-18
FSP-0090
0690, Area 600.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
92 12-Jul-18 Concrete Pouring Area 900 H W SW 13-Jul-18
FSP-0091 Placement Inspection for Foundation of
Structure-0904 @ Area 900

29 / 732
28th day Compressive Strength Test of
Bored Pile No. 23 and Bored Pile No. 11
Concrete Cylindrical Sample (28 Mpa @
JGSS1EP-VPCI- 28 days) and 7th day Compressive Quantum
93 13-Jul-18 Laboratory Testing H SW SW 14-Jul-18
FSP-0092 Strength Test of Lean Concrete @ G- Laboratory
0610A/B, Area 600 and Structure -0904
@ Area 900. Cylindrical Sample (10 Mpa
@ 28 days)

JGSS1EP-VPCI- Witness of Pile Load Test @ H-305,


94 14-Jul-18 Laboratory Testing Heater FDN H W SW 14-Jul-18
FSP-0093 Heater Foundation

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
95 14-Jul-18 Concrete Pouring Heater FDN H W SW 14-Jul-18
FSP-0094 Inspection for Lean Concrete @ H-305
Foundation
JGSS1EP-VPCI- Post Concrete Checking of surface preparation prior to
96 14-Jul-18 Area 600 H W SW 16-Jul-18
FSP-0095 Placement backfilling @ D-0690.
JGSS1EP-VPCI- Post Concrete Checking of surface preparation prior to
97 14-Jul-18 Area 600 H W SW 16-Jul-18
FSP-0096 Placement backfilling @ G-0610A/B.
28th day Compressive Strength Test of
JGSS1EP-VPCI- Bored Pile No. 5 and Bored Pile No. 22 Quantum
98 14-Jul-18 Laboratory Testing H SW SW 16-Jul-18
FSP-0097 Concrete Cylindrical Sample (28 Mpa @ Laboratory
28 days).

30 / 732
Elevation, Location,Anchor Bolt Setting,
JGSS1EP-VPCI- Formworks and Concrete Placement
99 14-Jul-18 Concrete Pouring Area 600 H W SW 16-Jul-18
FSP-0098 Inspection for Pedestal @ D-0690, Area
600.

28th day Compressive Strength Test of


Bored Pile No. 3 and Bored Pile No. 14
JGSS1EP-VPCI- Concrete Cylindrical Sample (28 Mpa @ Quantum
100 16-Jul-18 Laboratory Testing H SW SW 17-Jul-18
FSP-0099 28 days) and 7th day Compressive Laboratory
Strength Test of Foundation @ D-690,
Area 600 (24 Mpa @ 28 days).

Elevation, Location, Rebar Works


JGSS1EP-VPCI-
101 16-Jul-18 Pre-pouring Inspection prior to fomworks closure of Area 900 H W SW 17-Jul-18
FSP-0100
Pedestal @ Structure-904, Area 900.

JGSS1EP-VPCI- 15th day Compressive Strength Test of Quantum


102 17-Jul-18 Laboratory Testing H SW SW 18-Jul-18
FSP-0101 Trial Batch (10 Mpa @ 28 days.) Laboratory

JGSS1EP-VPCI- 14th day Compressive Strength Test of Quantum


103 17-Jul-18 Laboratory Testing H SW SW 18-Jul-18
FSP-0102 Trial Batch (4 Mpa @ 28 days.) Laboratory

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
104 17-Jul-18 Laboratory Testing Bored Pile No. 20 Concrete Cylindrical H SW SW 18-Jul-18
FSP-0103 Laboratory
Sample (28 Mpa @ 28 days)

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
105 17-Jul-18 Laboratory Testing Bored Pile No. 1 Concrete Cylindrical H SW SW 18-Jul-18
FSP-0104 Laboratory
Sample (28 Mpa @ 28 days)

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
106 18-Jul-18 Laboratory Testing Bored Pile No. 18 Concrete Cylindrical H SW SW 19-Jul-18
FSP-0105 Laboratory
Sample (28 Mpa @ 28 days)

31 / 732
Elevation, Location,Anchor Bolt Setting,
JGSS1EP-VPCI- Formworks and Concrete Placement
107 18-Jul-18 Concrete Pouring Area 900 H W SW 19-Jul-18
FSP-0106 Inspection for Pedestal @ Structure-904,
Area 900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI-
108 19-Jul-18 Concrete Pouring Formworks and Concrete Placement Area 600 H W SW 20-Jul-18
FSP-0107
Inspection for Lean Concrete of D-654

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
109 19-Jul-18 Concrete Pouring Area 900 H W SW 20-Jul-18
FSP-0108 Inspection for Lean Concrete of F3 DPG-
2, Area 900

7th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
110 19-Jul-18 Laboratory Testing Foundation @ S-904, Area 900 (24 Mpa H SW SW 20-Jul-18
FSP-0109 Laboratory
@ 28 days).

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
111 19-Jul-18 Laboratory Testing Bored Pile No. 2 Concrete Cylindrical H SW SW 20-Jul-18
FSP-0110 Laboratory
Sample (28 Mpa @ 28 days)

DMCI, Batching
JGSS1EP-VPCI- Joint Inspection/Witness of Trial Batch Plant
112 19-Jul-18 Laboratory Testing H SW SW 20-Jul-18
FSP-0111 (Concrete Strength = 15 Mpa @ 28 days) (Brgy.Simlong,
Batangas City)

DMCI, Batching
JGSS1EP-VPCI- Joint Inspection/Witness of Trial Batch Plant
113 19-Jul-18 Laboratory Testing H SW SW 20-Jul-18
FSP-0112 (Concrete Strength = 24 Mpa @ 3 days) (Brgy.Simlong,
Batangas City)

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete
114 20-Jul-18 prior to backfilling of Foundation and Area 900 H W SW 21-Jul-18
FSP-0113 Placement
Pedestal @ S-904, Area 900.

32 / 732
7th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
115 20-Jul-18 Laboratory Testing Lean Concrete @ H-305 Heater H SW SW 21-Jul-18
FSP-0114 Laboratory
Foundation.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
116 20-Jul-18 Concrete Pouring Area 600 H W SW 21-Jul-18
FSP-0115 Placement Inspection for Foundation of
D-654, Area 600

Elevation, Location, Anchor Bolt Setting,


JGSS1EP-VPCI- Formworks and Concrete Placement
117 20-Jul-18 Concrete Pouring Area 900 H W SW 21-Jul-18
FSP-0116 Inspection for Pedestal @ S-0904, Area
900.

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
118 20-Jul-18 Laboratory Testing Bored Pile No. 21 Concrete Cylindrical H SW SW 21-Jul-18
FSP-0117 Laboratory
Sample (28 Mpa @ 28 days)

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
119 20-Jul-18 Laboratory Testing Bored Pile No. 19 Concrete Cylindrical H SW SW 21-Jul-18
FSP-0118 Laboratory
Sample (28 Mpa @ 28 days)

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
120 20-Jul-18 Laboratory Testing Bored Pile No. 13 Concrete Cylindrical H SW SW 21-Jul-18
FSP-0119 Laboratory
Sample (28 Mpa @ 28 days)
JGSS1EP-VPCI- 1 day Compressive Strength Test of Trial Quantum
121 21-Jul-18 Laboratory Testing H SW SW 21-Jul-18
FSP-0120 Batch (24 Mpa @ 3 days) Laboratory

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
122 21-Jul-18 Concrete Pouring Area 600 H W SW 21-Jul-18
FSP-0121 Inspection for Lean Concrete of D-652,
Area 600 including D-653.

33 / 732
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
123 21-Jul-18 Concrete Pouring Area 600 H W SW 21-Jul-18
FSP-0122 Inspection for Lean Concrete of D-653,
Area 600

JGSS1EP-VPCI- 3 days Compressive Strength Test of Quantum


124 21-Jul-18 Laboratory Testing H SW SW 23-Jul-18
FSP-0123 Trial Batch (24 Mpa @ 3 days) Laboratory

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
125 21-Jul-18 Laboratory Testing Bored Pile No. 29 Concrete Cylindrical H SW SW 23-Jul-18
FSP-0124 Laboratory
Sample (28 Mpa @ 28 days)

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
126 21-Jul-18 Laboratory Testing Bored Pile No. 12 Concrete Cylindrical H SW SW 23-Jul-18
FSP-0125 Laboratory
Sample (28 Mpa @ 28 days)

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
127 23-Jul-18 Concrete Pouring Heater FDN H W SW 23-Jul-18
FSP-0126 Inspection for Lean Concrete @ H-305,
Heater Foundation (Gridline D-A)

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
128 23-Jul-18 Laboratory Testing Test (By Sand Cone Method) @ D-0652 Area 600 H SW SW 24-Jul-18
FSP-0127
and D-0653, Area 600
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
129 23-Jul-18 prior to backfilling of Foundation and Area 900 H W SW 24-Jul-18
FSP-0128 Placement
Pedestal @ S-0904, Area 900.

JGSS1EP-VPCI- Trial Batch ( Re-Trial Batch of 24 Mpa @ Quantum


130 23-Jul-18 Laboratory Testing H SW SW 24-Jul-18
FSP-0129 3 days) Laboratory

34 / 732
Elevation, Location, Anchor Bolt Setting,
JGSS1EP-VPCI- Formworks and Concrete Placement
131 23-Jul-18 Concrete Pouring Area 600 H W SW 24-Jul-18
FSP-0130 Inspection for Pedestal @ D-0654, Area
600.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
132 24-Jul-18 Concrete Pouring Area 900 H W SW 24-Jul-18
FSP-0131 Inspection for Lean Concrete of F1 DPG-
2, Area 900 and S-903

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
133 24-Jul-18 Laboratory Testing Test (By Sand Cone Method) @ DPG-2 Area 900 H SW SW 24-Jul-18
FSP-0132
F1, Area 900

JGSS1EP-VPCI- 28th day Compressive Strength Test of Quantum


134 24-Jul-18 Laboratory Testing H SW SW 25-Jul-18
FSP-0133 Trial Batch 2 (24 Mpa @ 28 days.) Laboratory

JGSS1EP-VPCI- 28th day Compressive Strength Test of Quantum


135 24-Jul-18 Laboratory Testing H SW SW 25-Jul-18
FSP-0134 Trial Batch 3 (10 Mpa @ 28 days.) Laboratory

DMCI, Batching
1 day Compressive Strength Test of Trial
JGSS1EP-VPCI- Plant
136 25-Jul-18 Laboratory Testing Batch ( Re-Trial Batch of 24 Mpa @ 3 H SW SW 25-Jul-18
FSP-0135 (Brgy.Simlong,
days
Batangas City)
JGSS1EP-VPCI- 7th day Compressive Strength Test of Quantum
137 26-Jul-18 Laboratory Testing H SW SW 27-Jul-18
FSP-0136 Trial Batch (15 Mpa @ 28 days.) Laboratory
JGSS1EP-VPCI- 3rd day Compressive Strength Test of Quantum
138 26-Jul-18 Laboratory Testing H SW SW 27-Jul-18
FSP-0137 Re-Trial Batch (24 Mpa @ 3 days) Laboratory
Visual Inspection of Installed
Reinforcement Bottom Bar, Size,
JGSS1EP-VPCI- Post Concrete
139 26-Jul-18 Lapslice Length, Spacing and number of Area 300 H W SW 27-Jul-18
FSP-0138 Placement
pieces of Foundation at H-305, Area 300
Heater Foundation.

35 / 732
JGSS1EP-VPCI- Welder's Qualification Test (3 Fillet
140 26-Jul-18 Pre-qualification Laydown H W SW 27-Jul-18
FSP-0139 Welders)

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
141 27-Jul-18 Concrete Pouring Area 900 H W SW 27-Jul-18
FSP-0140 Placement Inspection for Foundation of
F3 DPG-2, Area 900

7th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
142 27-Jul-18 Laboratory Testing Pedestal @ S-904, Area 900 (24 Mpa @ H SW SW 28-Jul-18
FSP-0141 Laboratory
28 days).
7th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
143 27-Jul-18 Laboratory Testing Foundation @ D-0654, Area 600 (24 Mpa H SW SW 28-Jul-18
FSP-0142 Laboratory
@ 28 days).
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
144 27-Jul-18 prior to backfilling of Foundation and Area 600 H W SW 28-Jul-18
FSP-0143 Placement
Pedestal @ D-0654, Area 600.

Visual Inspection of Installed


Reinforcement Top Bar, Size, Lapslice
JGSS1EP-VPCI- Post Concrete
145 27-Jul-18 Length, Spacing, number of pieces and Area 300 H W SW 28-Jul-18
FSP-0144 Placement
Formworks of Foundation at H-305, Area
300 Heater Foundation.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
146 28-Jul-18 Concrete Pouring Area 900 H W SW 28-Jul-18
FSP-0145 Inspection for Lean Concrete of
Structure-903 (F5) DPG-2, Area 900

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
147 28-Jul-18 Concrete Pouring Area 300 H W SW 30-Jul-18
FSP-0146 Placement Inspection for Foundation of
H-305 Heater Foundation, Area 300

36 / 732
7th day Compressive Strength Test of
JGSS1EP-VPCI- Lean Concrete @ H-305 (Gridline D-A) Quantum
148 28-Jul-18 Laboratory Testing H SW SW 30-Jul-18
FSP-0147 Heater Foundation, Area 300 (10 Mpa @ Laboratory
28 days).

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
149 28-Jul-18 Concrete Pouring Area 900 H W SW 30-Jul-18
FSP-0148 Placement Inspection for Foundation of
F3 DPG-2, Area 900

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
150 28-Jul-18 Laboratory Testing Test (By Sand Cone Method) @ Area 900 H SW SW 30-Jul-18
FSP-0149
Structure-903 (F5) DPG-2, Area 900

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
151 30-Jul-18 Concrete Pouring Area 900 H W SW 31-Jul-18
FSP-0150 Inspection for (remaining) Lean Concrete
of Structure-0903 (F1) DPG-2, Area 900

7th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
152 30-Jul-18 Laboratory Testing Lean Concrete @ Structure-0903 (F1) H SW SW 31-Jul-18
FSP-0151 Laboratory
DPG-2, Area 900 (10 Mpa @ 28 days).

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
153 30-Jul-18 Laboratory Testing Test (By Sand Cone Method) @ R-0902, Area 900 H SW SW 31-Jul-18
FSP-0152
Area 900

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
154 28-Jul-18 Concrete Pouring Area 900 H W SW 28-Jul-18
FSP-0153 Inspection for Lean Concrete of
Structure-903 (F5) DPG-2, Area 900

37 / 732
JGSS1EP-VPCI- 28th day Compressive Strength Test of Quantum
155 31-Jul-18 Laboratory Testing H SW SW 1-Aug-18
FSP-0154 Trial Batch 2 (24 Mpa @ 28 days.) Laboratory

JGSS1EP-VPCI- 28th day Compressive Strength Test of Quantum


156 31-Jul-18 Laboratory Testing H SW SW 1-Aug-18
FSP-0155 Trial Batch 3 (10 Mpa @ 28 days.) Laboratory

7th day Compressive Strength Test of


JGSS1EP-VPCI- Pedestal @D-0654, Area 600 and Lean Quantum
157 31-Jul-18 Laboratory Testing H SW SW 1-Aug-18
FSP-0156 Concrete @ D-0652 & D-0653, Area 600 Laboratory
(24 Mpa @28 days)

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
158 2-Aug-18 Laboratory Testing Lean Concrete @ D-0690, Area 600 (10 H SW SW 3-Aug-18
FSP-0157 Laboratory
mpa @ 28 days).

JGSS1EP-VPCI- 14th day Compressive Strength Test of Quantum


159 2-Aug-18 Laboratory Testing H SW SW 3-Aug-18
FSP-0158 Trial Batch (15 Mpa @ 28 days.) Laboratory

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
160 2-Aug-18 Concrete Pouring Area 600 H W SW 3-Aug-18
FSP-0159 Placement Inspection for Foundation of
D-0652 & D-0653, Area 600.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
161 2-Aug-18 Concrete Pouring Area 900 H W SW 3-Aug-18
FSP-0160 Placement Inspection for Foundation of
Structure-0903 (F1) DPG-2, Area 900.

38 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
162 2-Aug-18 Concrete Pouring Area 900 H W SW 3-Aug-18
FSP-0161 Placement Inspection for Foundation of
Structure-0903 (F5) DPG-2, Area 900.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI- Test (By Sand Cone Method) @ R-0902
163 2-Aug-18 Laboratory Testing Area 900 H SW SW 3-Aug-18
FSP-0162 DPG-2,
Area 900.
28th day Compressive Strength Test of
JGSS1EP-VPCI- Lean Concrete @ S-0904, Area 900 and Quantum
164 3-Aug-18 Laboratory Testing H SW SW 4-Aug-18
FSP-0163 G-0610A/B, Area 600 (10 mpa @ 28 Laboratory
days).
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) @ G-0600
165 3-Aug-18 Laboratory Testing Area 600 H SW SW 4-Aug-18
FSP-0164 A/B,
Area 600. (Under Foundation)

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
166 3-Aug-18 Concrete Pouring Area 600 H W SW 4-Aug-18
FSP-0165 Inspection for Lean Concrete of G-0600
A/B, Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
167 3-Aug-18 Laboratory Testing Test (By Sand Cone Method) @ 1st Area 600 H SW SW 4-Aug-18
FSP-0166
Layer & 2nd layer of D-0654, Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI- Test (By Sand Cone Method) @ 3rd
168 3-Aug-18 Laboratory Testing Area 600 H SW SW 4-Aug-18
FSP-0167 Layer of
D-0690, Area 600.

39 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) @ 3rd
169 3-Aug-18 Laboratory Testing Area 900 H SW SW 4-Aug-18
FSP-0168 Layer of
Structure-0904, Area 900.
Concrete Placement Inspection for
JGSS1EP-VPCI-
170 4-Aug-18 Concrete Pouring Foundation of (F3) Structure-0903 DPG- Area 900 H W SW 6-Aug-18
FSP-0169
2, Area 900
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
171 4-Aug-18 Concrete Pouring Area 900 H W SW 6-Aug-18
FSP-0170 Inspection for Lean Concrete of R-0902,
Area 900
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
172 6-Aug-18 Laboratory Testing Test (By Sand Cone Method) @ D-0600, Area 600 H SW SW 6-Aug-18
FSP-0171
Area 600.
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
173 6-Aug-18 Concrete Pouring Area 600 H W SW 6-Aug-18
FSP-0172 Inspection for Lean Concrete of D-0600,
Area 600
28th day Compressive Strength Test of
JGSS1EP-VPCI- Foundation @D-0690, Area 600 (24 mpa Quantum
174 6-Aug-18 Laboratory Testing H SW SW 7-Aug-18
FSP-0173 @ Laboratory
28 days).
7th day Compressive Strength Test of
JGSS1EP-VPCI- Lean Concrete @Structure-0903 &DPG- Quantum
175 6-Aug-18 Laboratory Testing H SW SW 7-Aug-18
FSP-0174 2 (F1 & F5), Area 900 (10 mpa @ 28 Laboratory
days).
7th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
176 6-Aug-18 Laboratory Testing (Temporary Facility) VPCI Slab (24 mpa H SW SW 7-Aug-18
FSP-0175 Laboratory
@ 28 days).
28th day Compressive Strength Test of
JGSS1EP-VPCI- Foundation @ G-610A/B, Area 600 (24 Quantum
177 7-Aug-18 Laboratory Testing H SW SW 8-Aug-18
FSP-0176 mpa @ Laboratory
28 days).

40 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
178 7-Aug-18 Concrete Pouring Area 600 H W SW 8-Aug-18
FSP-0177 Placement Inspection for Foundation of
G-0600A/B, Area 600.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
179 7-Aug-18 Concrete Pouring Area 600 H W SW 8-Aug-18
FSP-0178 Placement Inspection for Foundation of
D-0600, Area 600.

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete
180 7-Aug-18 prior to backfilling of Foundation @ Area 900 H SW SW 8-Aug-18
FSP-0179 Placement
Structure-0903 & DPG-2 (F1), Area 900.

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete
181 7-Aug-18 prior to backfilling of Foundation @ Area 900 H SW SW 8-Aug-18
FSP-0180 Placement
Structure-0903 & DPG-2 (F3), Area 900.

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete
182 7-Aug-18 prior to backfilling of Foundation @ Area 900 H SW SW 8-Aug-18
FSP-0181 Placement
Structure-0903 & DPG-2 (F5), Area 900.

21st day Compressive Strength Test of


JGSS1EP-VPCI- Pedestal @ D-0690, Area 600/Lean Quantum
183 8-Aug-18 Laboratory Testing H SW SW 9-Aug-18
FSP-0182 Concrete @ D-0654, Area 600 (24 mpa Laboratory
@ 28 days).
Elevation, Location, Anchor Bolt Setting,
JGSS1EP-VPCI- Formworks and Concrete Placement
184 8-Aug-18 Concrete Pouring Area 600 H W SW 9-Aug-18
FSP-0183 Inspection for Pedestal @ D-0652 & D-
0653, Area 600.

41 / 732
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
185 8-Aug-18 Pre-pouring Area 600 H W SW 9-Aug-18
FSP-0184 Pedestal @
D-0652 &D-0653, Area 600.
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
186 8-Aug-18 Pre-pouring Area 900 H W SW 9-Aug-18
FSP-0185 Pedestal @ (F1) Structure-0903 & DPG-
2, Area 900.
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
187 8-Aug-18 Pre-pouring Area 900 H W SW 9-Aug-18
FSP-0186 Pedestal @ (F3) Structure-0903 & DPG-
2, Area 900.
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
188 8-Aug-18 Pre-pouring Area 900 H W SW 9-Aug-18
FSP-0187 Pedestal @ (F5) Structure-0903 & DPG-
2, Area 900.
28th day Compressive Strength Test of
JGSS1EP-VPCI- Foundation @ S-0904, Area 900 (24 mpa Quantum
189 9-Aug-18 Laboratory Testing H SW SW 10-Aug-18
FSP-0188 @ Laboratory
28 days).
21st day Compressive Strength Test of
JGSS1EP-VPCI- Lean Concrete @ F1 & F3 Structure- Quantum
190 9-Aug-18 Laboratory Testing H SW SW 10-Aug-18
FSP-0189 0903 & DPG-2, Area 900 (10 mpa @ 28 Laboratory
days).
Concrete Placement Inspection for
JGSS1EP-VPCI-
191 9-Aug-18 Concrete Pouring Foundation of H-0305 Heater Area 300 H W SW 10-Aug-18
FSP-0190
Foundation, Area 300.

28th day Compressive Strength Test of


JGSS1EP-VPCI- Lean Concrete @ H-0305 Gridline F-D, Quantum
192 10-Aug-18 Laboratory Testing H SW SW 11-Aug-18
FSP-0191 Heater Foundation, Area 300 (10 mpa @ Laboratory
28 days).

42 / 732
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
193 10-Aug-18 prior to backfilling of Foundation @ D- Area 600 H SW SW 11-Aug-18
FSP-0192 Placement
0652 & D-0653, Area 600.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
194 10-Aug-18 Concrete Pouring Area 600 H W SW 11-Aug-18
FSP-0193 Placement Inspection for Foundation of
D-0600, Area 600.

7th day Compressive Strength Test of


JGSS1EP-VPCI- Foundation @ D-0652 & D-0653, Area Quantum
195 11-Aug-18 Laboratory Testing H SW SW 13-Aug-18
FSP-0194 600 Laboratory
(24 Mpa @ 28 days).
7th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
196 11-Aug-18 Laboratory Testing Lean Concrete @ D-0600 / G-0600A/B, H SW SW 13-Aug-18
FSP-0195 Laboratory
Area 600 (10 Mpa @ 28 days).

7th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
197 11-Aug-18 Laboratory Testing Foundation @ F3 & F5 Structure-0903 & H SW SW 13-Aug-18
FSP-0196 Laboratory
DPG-2, Area 900 (24 Mpa @ 28 days).

7th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
198 13-Aug-18 Laboratory Testing Foundation @ F1 Structure-0903 & H SW SW 13-Aug-18
FSP-0197 Laboratory
DPG-2, Area 900 (24 Mpa @ 28 days).

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
199 13-Aug-18 Laboratory Testing Test (By Sand Cone Method) @ R-0902, Area 900 H SW SW 14-Aug-18
FSP-0198
Area 900

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
200 13-Aug-18 Laboratory Testing Test (By Sand Cone Method) @ Area 900 H SW SW 14-Aug-18
FSP-0199
Structure-0905, Area 900

43 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
201 13-Aug-18 Laboratory Testing Test (By Sand Cone Method) @ Area 900 H SW SW 14-Aug-18
FSP-0200
Structure-0905, Area 900
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
202 13-Aug-18 Concrete Pouring Area 900 H SW SW 14-Aug-18
FSP-0201 Inspection for Lean Concrete of R-0902,
Area 900

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
203 13-Aug-18 Concrete Pouring Area 900 H SW SW 14-Aug-18
FSP-0202 Inspection for Lean Concrete of
Structure-0905, Area 900

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
204 13-Aug-18 Concrete Pouring Area 600 H SW SW 14-Aug-18
FSP-0203 Inspection for Lean Concrete of STR-
0601, F2

Elevation, Location, Anchor Bolt Setting,


JGSS1EP-VPCI- Formworks and Concrete Placement
205 13-Aug-18 Concrete Pouring Area 900 H W SW 14-Aug-18
FSP-0204 Inspection for Pedestal @ F1 Structure-
0903 & DPG-2, Area 900.

Elevation, Location, Anchor Bolt Setting,


JGSS1EP-VPCI- Formworks and Concrete Placement
206 13-Aug-18 Concrete Pouring Area 900 H W SW 14-Aug-18
FSP-0205 Inspection for Pedestal @ F3 Structure-
0903 & DPG-2, Area 900.

Elevation, Location, Anchor Bolt Setting,


JGSS1EP-VPCI- Formworks and Concrete Placement
207 13-Aug-18 Concrete Pouring Area 900 H W SW 14-Aug-18
FSP-0206 Inspection for Pedestal @ F5 Structure-
0903 & DPG-2, Area 900.

44 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
208 14-Aug-18 Laboratory Testing Test (By Sand Cone Method) 1st & 2nd Area 600 H SW SW 15-Aug-18
FSP-0207
Layer @ D-0652 and D-0653, Area 600

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
209 14-Aug-18 Laboratory Testing Test (By Sand Cone Method) 3rd Layer Area 600 H SW SW 15-Aug-18
FSP-0208
@ D-0654, Area 600
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
210 14-Aug-18 Laboratory Testing Test (By Sand Cone Method) 4th Layer Area 600 H SW SW 15-Aug-18
FSP-0209
@ D-0690, Area 600

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
211 14-Aug-18 Laboratory Testing Test (By Sand Cone Method) 4th Layer Area 900 H SW SW 15-Aug-18
FSP-0210
@ Structure-0904, Area 900

Elevation, Location, Anchor Bolt Setting,


JGSS1EP-VPCI- Formworks and Concrete Placement
212 14-Aug-18 Concrete Pouring Area 600 H W SW 15-Aug-18
FSP-0211 Inspection for Pedestal @D-0600, Area
600.
28th day Compressive Strength Test of
JGSS1EP-VPCI- Pedestal @ D-0690, Area 600/Lean Quantum
213 15-Aug-18 Laboratory Testing H SW SW 16-Aug-18
FSP-0212 Concrete @ D-0654, Area 600 (24 mpa Laboratory
@ 28 days).

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
214 16-Aug-18 Concrete Pouring Area 600 H W SW 16-Aug-18
FSP-0213 Placement Inspection for Foundation of
F2 @ Structure-0601, Area 600.

28th day Compressive Strength Test of


JGSS1EP-VPCI- Lean Concrete @ F1 & F3 Structure- Quantum
215 16-Aug-18 Laboratory Testing H SW SW 17-Aug-18
FSP-0214 0903 & DPG-2, Area 900 (10 mpa @ 28 Laboratory
days).

45 / 732
JGSS1EP-VPCI- 28th day Compressive Strength Test of Quantum
216 16-Aug-18 Laboratory Testing H SW SW 17-Aug-18
FSP-0215 Trial Batch (15 Mpa @ 28 days.) Laboratory

Elevation, Location, Anchor Bolt Setting,


JGSS1EP-VPCI- Formworks and Concrete Placement
217 16-Aug-18 Concrete Pouring Area 600 H W SW 17-Aug-18
FSP-0216 Inspection for Pedestal @D-0600, Area
600.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) @
218 17-Aug-18 Laboratory Testing Area 900 H SW SW 17-Aug-18
FSP-0217 Structure-0903 & DPG-2 (F1), Area 900,
1st & 2nd layer
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) @
219 17-Aug-18 Laboratory Testing Area 900 H SW SW 17-Aug-18
FSP-0218 Structure-0903 & DPG-2 (F3), Area 900,
1st & 2nd layer
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) @
220 17-Aug-18 Laboratory Testing Area 900 H SW SW 17-Aug-18
FSP-0219 Structure-0903 & DPG-2 (F5), Area 900,
1st & 2nd layer

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
221 17-Aug-18 Laboratory Testing Test (By Sand Cone Method) 5th Layer Area 900 H SW SW 17-Aug-18
FSP-0220
@ Structure-0904, Area 900

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
222 17-Aug-18 Laboratory Testing Test (By Sand Cone Method) 3rd - 6th Area 600 H SW SW 17-Aug-18
FSP-0221
Layer @ D-0652 and D-0653, Area 600

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
223 17-Aug-18 Laboratory Testing Test (By Sand Cone Method) 4th -65th Area 600 H SW SW 17-Aug-18
FSP-0222
Layer @ D-0654, Area 600
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
224 17-Aug-18 Laboratory Testing Test (By Sand Cone Method) 5th Layer Area 600 H SW SW 17-Aug-18
FSP-0223
@ D-0690, Area 600

46 / 732
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete prior to backfilling of Foundation and
225 17-Aug-18 Area 900 H SW SW 18-Aug-18
FSP-0224 Placement Pedestal @ Structure-0903 & DPG-2
(F1), Area 900.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete prior to backfilling of Foundation and
226 17-Aug-18 Area 900 H SW SW 18-Aug-18
FSP-0225 Placement Pedestal @ Structure-0903 & DPG-2
(F3), Area 900.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete prior to backfilling of Foundation and
227 17-Aug-18 Area 900 H SW SW 18-Aug-18
FSP-0226 Placement Pedestal @ Structure-0903 & DPG-2
(F5), Area 900.
28th day Compressive Strength Test of
JGSS1EP-VPCI- Pedestal @ Structure-0904, Area 900 / Quantum
228 17-Aug-18 Laboratory Testing H SW SW 18-Aug-18
FSP-0227 Foundation @ D-0654, Area 600 (24 mpa Laboratory
@ 28 days).
7th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
229 17-Aug-18 Laboratory Testing Pedestal @ D-0652 & D-0653, Area 600 H SW SW 18-Aug-18
FSP-0228 Laboratory
(24 mpa @ 28 days).
7th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
230 17-Aug-18 Laboratory Testing Foundation @ D-0600, Area 600 (24 mpa H SW SW 18-Aug-18
FSP-0229 Laboratory
@ 28 days).

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
231 17-Aug-18 Concrete Pouring Area 900 H W SW 18-Aug-18
FSP-0230 Placement Inspection for Foundation @
Structure-0905, Area 900.

Elevation, Location, Anchor Bolt Setting,


JGSS1EP-VPCI- Formworks and Concrete Placement
232 17-Aug-18 Concrete Pouring Area 600 H W SW 18-Aug-18
FSP-0231 Inspection for Pedestal @ F2 Structure-
0601, Area 600.

47 / 732
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
233 18-Aug-18 Concrete Pouring Area 900 H W SW 18-Aug-18
FSP-0232 Inspection for Lean Concrete of D-0910,
Area 900.
Checking of rebar installation prior to
JGSS1EP-VPCI-
234 18-Aug-18 Pre-pouring formworks closure of Pedestal @ Area 900 H W SW 20-Aug-18
FSP-0233
Structure-0905, Area 900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
235 18-Aug-18 Concrete Pouring Area 600 H W SW 20-Aug-18
FSP-0234 Inspection for Lean Concrete of F2
Structure-0604, Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI- Test (By Sand Cone Method) 3rd Layer
236 18-Aug-18 Laboratory Testing Area 900 H SW SW 20-Aug-18
FSP-0235 of F1, F3 & F5 @ Structure-0903 & DPG-
2, Area 900.
28th day Compressive Strength Test of
JGSS1EP-VPCI- Lean Concrete @ H-0305 Gridline D-A, Quantum
237 18-Aug-18 Laboratory Testing H SW SW 20-Aug-18
FSP-0236 Heater Foundation, Unit 300 (10 mpa @ Laboratory
28 days).
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
238 18-Aug-18 Concrete Pouring Area 900 H W SW 20-Aug-18
FSP-0237 Inspection for Lean Concrete of D-0909,
Area 900.
28th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
239 20-Aug-18 Laboratory Testing Lean Concrete @ F1 Structure-0903, H SW SW 21-Aug-18
FSP-0238 Laboratory
Area 900 (10 mpa @ 28 days).

7th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
240 20-Aug-18 Laboratory Testing Pedestal @ F1, F3 & F5 Structure-0903 H SW SW 21-Aug-18
FSP-0239 Laboratory
& DGP-2, Area 900 (24 mpa @ 28 days).

48 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
241 20-Aug-18 Concrete Pouring Area 900 H W SW 21-Aug-18
FSP-0240 Placement Inspection for Foundation @
D-0910, Area 900.

JGSS1EP-VPCI- Witness of Pile Integrity Test @ H-305,


242 20-Aug-18 Laboratory Testing Heater FDN H SW SW 21-Aug-18
FSP-0241 Heater Foundation, Area 300.
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
243 21-Aug-18 Concrete Pouring Area 900 H W SW 22-Aug-18
FSP-0242 Inspection for Lean Concrete of D-0909,
Area 900.
28th day Compressive Strength Test of
JGSS1EP-VPCI- Pedestal @D-0654, Area 600 / Lean Quantum
244 21-Aug-18 Laboratory Testing H SW SW 22-Aug-18
FSP-0243 Concrete @ D-0652 & D-0653, Area 600 Laboratory
(24 Mpa @28 days)
7th day Compressive Strength Test of
JGSS1EP-VPCI- Lean Concrete @ Structure-0905, Area Quantum
245 21-Aug-18 Laboratory Testing H SW SW 22-Aug-18
FSP-0244 900 Laboratory
(10 mpa @ 28 days).
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
246 22-Aug-18 prior to backfilling of Foundation and Area 600 H SW SW 23-Aug-18
FSP-0245 Placement
Pedestal @ D-0600, Area 600.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete prior to backfilling of Foundation and
247 22-Aug-18 Area 600 H SW SW 23-Aug-18
FSP-0246 Placement Pedestal @ Structure-0601 (F2), Area
600.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
248 22-Aug-18 Laboratory Testing Test (By Sand Cone Method) 1st to 4th Area 600 H SW SW 23-Aug-18
FSP-0247
Layer @ D-0600, Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
249 22-Aug-18 Laboratory Testing Test (By Sand Cone Method) 1st to 4th Area 600 H SW SW 23-Aug-18
FSP-0248
Layer of F2 @ Structure-0601, Area 600.

49 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
250 22-Aug-18 Laboratory Testing Test (By Sand Cone Method) of F2 @ Area 600 H SW SW 23-Aug-18
FSP-0249
Structure-0604, Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
251 22-Aug-18 Laboratory Testing Test (By Sand Cone Method) 7th Layer Area 600 H SW SW 23-Aug-18
FSP-0250
@ D-0652 & D-0653, Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
252 22-Aug-18 Laboratory Testing Test (By Sand Cone Method) 7th Layer Area 600 H SW SW 23-Aug-18
FSP-0251
@ D-0654, Area 600.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
253 22-Aug-18 Laboratory Testing Test (By Sand Cone Method) of F1 @ Area 600 H SW SW 23-Aug-18
FSP-0252
Structure-0601, Area 600.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
254 22-Aug-18 Concrete Pouring Area 600 H W SW 23-Aug-18
FSP-0253 Inspection for Lean Concrete of F2 @
Structure-0604, Area 600.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
255 22-Aug-18 Concrete Pouring Area 600 H W SW 23-Aug-18
FSP-0254 Inspection for Lean Concrete of F1 @
Structure-0601, Area 600.

7th day Compressive Strength Test of


JGSS1EP-VPCI- Foundation of F2 @ Structure-0601, Area Quantum
256 22-Aug-18 Laboratory Testing H SW SW 23-Aug-18
FSP-0255 600 / Lean Concrete @ R-0902, Area Laboratory
900 (24 mpa @ 28 days).
7th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
257 23-Aug-18 Laboratory Testing Pedestal @ D-0600, Area 600 (24 mpa H SW SW 24-Aug-18
FSP-0256 Laboratory
@ 28 days).
Concrete Placement Inspection for
JGSS1EP-VPCI-
258 23-Aug-18 Concrete Pouring Foundation of H-0305 Heater Area 300 H W SW 24-Aug-18
FSP-0257
Foundation, Area 300.

50 / 732
7th day Compressive Strength Test of
Foundation @ Structure-0905, Area 900 /
JGSS1EP-VPCI- Quantum
259 24-Aug-18 Laboratory Testing F2 Pedestal @ Structure-0601, Area H SW SW 25-Aug-18
FSP-0258 Laboratory
600 / Lean Concrete @ D-0910 (24 mpa
@ 28 days).
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
260 25-Aug-18 Concrete Pouring Area 900 H W SW 28-Aug-18
FSP-0259 Placement Inspection for Foundation @
R-0902.
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
261 27-Aug-18 Concrete Pouring Setting and Concrete Placement Area 900 H W SW 28-Aug-18
FSP-0260
Inspection for Pedestal @ S-0905, Area
900.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
262 27-Aug-18 Concrete Pouring Area 900 H W SW 28-Aug-18
FSP-0261 Placement Inspection for Foundation @
D-0909, Area 900.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
263 27-Aug-18 Concrete Pouring Setting and Concrete Placement Area 300 H W SW 28-Aug-18
FSP-0262
Inspection for Pedestal (P3) @ H-305,
Heater Fdn.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI-
264 27-Aug-18 Pre-pouring Rebar Works Inspection prior to closure Area 900 H W SW 28-Aug-18
FSP-0263
of Pedestal @ D-0910, Area 900

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
265 27-Aug-18 Laboratory Testing Test (By Sand Cone Method) 1st to 4th Area 600 H SW SW 28-Aug-18
FSP-0264
Layer @ D-0600, Area 600.

51 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
266 27-Aug-18 Laboratory Testing Test (By Sand Cone Method) 1st to 2nd Area 600 H SW SW 28-Aug-18
FSP-0265
Layer of F2 @ Structure-0601, Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
267 27-Aug-18 Laboratory Testing Test (By Sand Cone Method) of F2 @ Area 600 H SW SW 28-Aug-18
FSP-0266
Structure-0604, Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
268 27-Aug-18 Laboratory Testing Test (By Sand Cone Method) 7th Layer Area 600 H SW SW 28-Aug-18
FSP-0267
@ D-0652 & D-0653, Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
269 27-Aug-18 Laboratory Testing Test (By Sand Cone Method) 7th Layer Area 600 H SW SW 28-Aug-18
FSP-0268
@ D-0654, Area 600.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
270 27-Aug-18 Laboratory Testing Test (By Sand Cone Method) of F1 @ Area 600 H SW SW 28-Aug-18
FSP-0269
Structure-0601, Area 600.
28th day Compressive Strength Test of
JGSS1EP-VPCI- Lean Concrete @Structure-0903 &DPG- Quantum
271 27-Aug-18 Laboratory Testing H SW SW 28-Aug-18
FSP-0270 2 (F1 & F5), Area 900 (10 mpa @ 28 Laboratory
days).
28th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
272 27-Aug-18 Laboratory Testing (Temporary Facility) VPCI Slab (24 mpa H SW SW 28-Aug-18
FSP-0271 Laboratory
@ 28 days).
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
273 28-Aug-18 Laboratory Testing Test (By Sand Cone Method) @ Analyzer Area 600 H SW SW 28-Aug-18
FSP-0272
Shelter #13, Area 600.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
274 28-Aug-18 Concrete Pouring Area 600 H W SW 28-Aug-18
FSP-0273 Inspection for Lean Concrete of Analyzer
Shelter #13, Area 600.

52 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) 4th Layer of
275 28-Aug-18 Laboratory Testing Area 900 H SW SW 28-Aug-18
FSP-0274 F1, F3 & F5 @ Structure-0903 & DPG-2,
Area 900.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
276 28-Aug-18 Laboratory Testing Test (By Sand Cone Method) 6th - 7th Area 900 H SW SW 28-Aug-18
FSP-0275
Layer @ Structure-0904, Area 900

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete
277 28-Aug-18 prior to backfilling of Foundation @ H- Area 300 H SW SW 28-Aug-18
FSP-0276 Placement
0305, Heater Foundation, Area 300.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) 1st - 5th
278 28-Aug-18 Laboratory Testing Area 300 H SW SW 28-Aug-18
FSP-0277 Layer @ H-0305, Heater Foundation,
Area 300.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
279 29-Aug-18 Concrete Pouring Area 600 H W SW 29-Aug-18
FSP-0278 Placement Inspection for Foundation of
F2 @ Structure-0604, Area 600.

1st Day Compressive Strength Test of


P3 @H-0305, Heater Foundation, Area
JGSS1EP-VPCI- Quantum
280 29-Aug-18 Laboratory Testing 300 / Foundation @ D-0909, Area 900 / H SW SW 29-Aug-18
FSP-0279 Laboratory
Lean Concrete @ Analyzer Shelter #13,
Area 600 (24 Mpa @ 3 days).

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete
281 29-Aug-18 prior to backfilling of Foundation and Area 900 H SW SW 30-Aug-18
FSP-0280 Placement
Pedestal @ Structure-0905, Area 900.

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete
282 29-Aug-18 prior to backfilling of Foundation @ R- Area 900 H SW SW 30-Aug-18
FSP-0281 Placement
0902, Area 900.

53 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
283 29-Aug-18 Concrete Pouring Area 600 H W SW 30-Aug-18
FSP-0282 Placement Inspection for Foundation of
F1 @ Structure-0601, Area 600.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
284 29-Aug-18 Concrete Pouring Area 900 H W SW 30-Aug-18
FSP-0283 Inspection for Lean Concrete of F3 @ K-
0901 Compressor Shelter, Area 900.

Elevation, Location,Surface Preparation,


Formworks and Concrete Placement
JGSS1EP-VPCI-
285 29-Aug-18 Concrete Pouring Inspection for Lean Concrete of Base Area 900 H W SW 30-Aug-18
FSP-0284
Mat @ K-0901 Compressor Shelter, Area
900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
286 29-Aug-18 Concrete Pouring Area 600 H W SW 30-Aug-18
FSP-0285 Inspection for Lean Concrete @
Structure-0606, Area 600.

7th day Compressive Strength Test of


Foundation @ D-0910, Area 900 / Lean
Concrete of F1 @ Structure-0601, Area
JGSS1EP-VPCI- Quantum
287 29-Aug-18 Laboratory Testing 600 / Lean Concrete Concrete @ D- H SW SW 30-Aug-18
FSP-0286 Laboratory
0909, Area 900 / Lean Concrete of F2 @
Structre-0604, Area 600 (24 mpa @ 28
days).

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
288 29-Aug-18 Concrete Pouring Area 600 H W SW 30-Aug-18
FSP-0287 Placement Inspection for Foundation @
Analyzer Shelter #13, Area 600.

54 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
289 29-Aug-18 Concrete Pouring Area 600 H W SW 30-Aug-18
FSP-0288 Placement Inspection for Foundation of
G-0600A/B, Area 600.

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete
290 30-Aug-18 prior to backfilling of P3 Pedestal @ H- Area 300 H SW SW 31-Aug-18
FSP-0289 Placement
0305 Heater Foundation, Area 300.
Joint Inspection/Survey of Actual As-Buit
JGSS1EP-VPCI- Post Concrete Location & Elevation of Anchor Bolts of
291 30-Aug-18 Area 300 H SW SW 31-Aug-18
FSP-0290 Placement P3 Pedestal @ H-0305 Heater
Foundation, Area 300.
7th day Compressive Strength Test of
JGSS1EP-VPCI- Foundation @ H-0305 Heater Quantum
292 30-Aug-18 Laboratory Testing H SW SW 31-Aug-18
FSP-0291 Foundation, Area 300 (24 mpa @ 28 Laboratory
days).

3rd Day Compressive Strength Test of


P3 @H-0305, Heater Foundation, Area
JGSS1EP-VPCI- Quantum
293 30-Aug-18 Laboratory Testing 300 / Foundation @ D-0909, Area 900 / H SW SW 31-Aug-18
FSP-0292 Laboratory
Lean Concrete @ Analyzer Shelter #13,
Area 600 (24 Mpa @ 3 days).

Elevation, Location, Rebar Works


JGSS1EP-VPCI- Inspection prior to fomworks closure of
294 30-Aug-18 Pre-pouring Area 300 H W SW 31-Aug-18
FSP-0293 P2 Pedestal @ H-0305 Heater
Foundation, Area 300.

JGSS1EP-VPCI- Partial Handover of H-0305, Heater


295 31-Aug-18 Handover Area 300 H SW SW 31-Aug-18
FSP-0294 Foundation Pedestal (P3).

55 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
296 31-Aug-18 Concrete Pouring Setting and Concrete Placement Area 300 H W SW 1-Sep-18
FSP-0295
Inspection for Pedestal (P2) @ H-305,
Heater Foundation, Area 300.

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete
297 1-Sep-18 prior to backfilling of Foundation @ Area 600 H SW SW 3-Sep-18
FSP-0296 Placement
Analyzer Shelter #13, Area 600.

28th day Compressive Strength Test of


JGSS1EP-VPCI- Foundation @ D-0652 & D-0653, Area Quantum
298 1-Sep-18 Laboratory Testing H SW SW 3-Sep-18
FSP-0297 600 / Lean Concrete @ D-0600 & G- Laboratory
0600, Area 600 (24 mpa @ 28 days).

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
299 1-Sep-18 Laboratory Testing Foundation of F3 & F5 @ Structure-0903 H SW SW 3-Sep-18
FSP-0298 Laboratory
& DPG-2, Area 900 (24 mpa @ 28 days).

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
300 1-Sep-18 Laboratory Testing Foundation of F1 @ Structure-0903 & H SW SW 3-Sep-18
FSP-0299 Laboratory
DPG-2, Area 900 (24 mpa @ 28 days).

2nd Day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
301 3-Sep-18 Laboratory Testing P2 @H-0305, Heater Foundation, Area H SW SW 3-Sep-18
FSP-0300 Laboratory
300 (24 Mpa @ 3 days).
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
302 3-Sep-18 prior to backfilling of P2 Pedestal @ H- Area 300 H SW SW 4-Sep-18
FSP-0301 Placement
0305 Heater Foundation, Area 300.

56 / 732
7th Day Compressive Strength Test of
P3 @H-0305, Heater Foundation, Area
JGSS1EP-VPCI- Quantum
303 3-Sep-18 Laboratory Testing 300 / Foundation @ D-0909, Area 900 / H SW SW 4-Sep-18
FSP-0302 Laboratory
Lean Concrete @ Analyzer Shelter #13,
Area 600 (24 Mpa @ 3 days).

3rd Day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
304 3-Sep-18 Laboratory Testing P2 @H-0305, Heater Foundation, Area H SW SW 4-Sep-18
FSP-0303 Laboratory
300 (24 Mpa @ 3 days).
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
305 4-Sep-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 5-Sep-18
FSP-0304
Inspection for Pedestal @ G-0600A/B,
Area 600.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
306 4-Sep-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 5-Sep-18
FSP-0305
Inspection for Pedestal of F2 @
Structure-0604, Area 600.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
307 4-Sep-18 Concrete Pouring Setting and Concrete Placement Area 900 H W SW 5-Sep-18
FSP-0306
Inspection for Pedestal @ D-0910, Area
900.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
308 4-Sep-18 Concrete Pouring Setting and Concrete Placement Area 900 H W SW 5-Sep-18
FSP-0307
Inspection for Pedestal @ D-0909, Area
900.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
309 4-Sep-18 Laboratory Testing Test (By Sand Cone Method) @ G- Area 900 H SW SW 5-Sep-18
FSP-0308
0909A/B, Area 900.

57 / 732
7th Day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
310 4-Sep-18 Laboratory Testing F2 Foundation @ Structure-0604, Area H SW SW 5-Sep-18
FSP-0309 Laboratory
600 (24 Mpa @ 28 days).
7th Day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
311 4-Sep-18 Laboratory Testing Foundation @ R-0902, Area 900 (24 Mpa H SW SW 5-Sep-18
FSP-0310 Laboratory
@ 28 days).
7th Day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
312 4-Sep-18 Laboratory Testing Pedestal @ Structure-0905, Area 900 (24 H SW SW 5-Sep-18
FSP-0311 Laboratory
Mpa @ 28 days).
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
313 4-Sep-18 Pre-pouring Area 300 H W SW 5-Sep-18
FSP-0312 P1 (GL F-11m& F-12) Pedestal @ H-
0305 Heater Foundation, Area 300.
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
314 4-Sep-18 Pre-pouring Area 300 H W SW 5-Sep-18
FSP-0313 P1a (GL-E-11) Pedestal @ H-0305
Heater Foundation.
Surface Preparation, Formworks, Anchor
Bolt Setting and Concrete Placement
JGSS1EP-VPCI-
315 4-Sep-18 Concrete Pouring Inspection for P1 (GL F-11, F-12) Area 300 H W SW 5-Sep-18
FSP-0314
Pedestal @ H-0305 Heater Foundation,
Area 300.

Surface Preparation, Formworks, Anchor


JGSS1EP-VPCI- Bolt Setting and Concrete Placement
316 4-Sep-18 Concrete Pouring Area 300 H W SW 5-Sep-18
FSP-0315 Inspection for P1a (GL E-11) Pedestal @
H-0305 Heater Foundation, Area 300.

7th Day Compressive Strength Test of


JGSS1EP-VPCI- Foundation @ Analyzer Shelter #13, Area Quantum
317 5-Sep-18 Laboratory Testing H SW SW 6-Sep-18
FSP-0316 600 / F1 Foundation @ Structure-0601, Laboratory
Area 600 (24 Mpa @ 28 days).

58 / 732
1st Day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
318 6-Sep-18 Laboratory Testing P1 @H-0305, Heater Foundation, Area H SW SW 6-Sep-18
FSP-0317 Laboratory
300 (24 Mpa @ 3 days).
1st Day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
319 6-Sep-18 Laboratory Testing P1a @H-0305, Heater Foundation, Area H SW SW 6-Sep-18
FSP-0318 Laboratory
300 (24 Mpa @ 3 days).
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) 6th - 7th
320 6-Sep-18 Laboratory Testing Area 300 H SW SW 7-Sep-18
FSP-0319 Layer @ H-0305, Heater Foundation,
Area 300.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
321 6-Sep-18 Concrete Pouring Placement Inspection for Paving @ H- Area 300 H W SW 7-Sep-18
FSP-0320
0305 (Gridline C-F), Heater Foundation,
Area 300.

7th Day Compressive Strength Test of


Foundation @ G-0600 A/B, Area 600 /
JGSS1EP-VPCI- Lean Concrete @ Structure-0601, Area Quantum
322 6-Sep-18 Laboratory Testing H SW SW 7-Sep-18
FSP-0321 600 / Lean Concrete @ K-0901 Laboratory
Compressor Shelter, Area 900(24 Mpa @
28 days).

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI- Test (By Sand Cone Method) of Sub-
323 6-Sep-18 Laboratory Testing Area 300 H SW SW 7-Sep-18
FSP-0322 Base Coarse @ H-0305, Heater
Foundation, Area 300.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete prior to backfilling of P1 Pedestal (Grid-
324 6-Sep-18 Area 300 H SW SW 7-Sep-18
FSP-0323 Placement line F) @ H-0305 Heater Foundation,
Area 300.

59 / 732
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete prior to backfilling of P1a Pedestal (Grid-
325 6-Sep-18 Area 300 H SW SW 7-Sep-18
FSP-0324 Placement line E) @ H-0305 Heater Foundation,
Area 300.
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
326 7-Sep-18 Pre-pouring Area 300 H W SW 7-Sep-18
FSP-0325 P1 Pedestal (Grid-line A)@ H-0305
Heater Foundation, Area 300.
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
327 7-Sep-18 Pre-pouring Area 300 H W SW 7-Sep-18
FSP-0326 P1a Pedestal (Grid-line B)@ H-0305
Heater Foundation, Area 300.
Formworks, Anchor Bolt Setting and
JGSS1EP-VPCI- Concrete Placement Inspection for P1
328 7-Sep-18 Concrete Pouring Area 300 H W SW 7-Sep-18
FSP-0327 (Pedestal Grid-line A)@ H-0305 Heater
Foundation, Area 300.
Formworks, Anchor Bolt Setting and
JGSS1EP-VPCI- Concrete Placement Inspection for P1a
329 7-Sep-18 Concrete Pouring Area 300 H W SW 7-Sep-18
FSP-0328 (Pedestal Grid-line B)@ H-0305 Heater
Foundation, Area 300.
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
330 7-Sep-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 8-Sep-18
FSP-0329
Inspection for Pedestal @ G-0600A/B,
Area 600.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks, Rebar works and Concrete
331 7-Sep-18 Concrete Pouring Area 600 H W SW 11-Sep-18
FSP-0330 Placement Inspection for Foundation (F2)
@ Structure-0606, Area 600.

60 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
332 7-Sep-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 8-Sep-18
FSP-0331
Inspection for Pedestal of F2 @
Structure-0604, Area 600.

JGSS1EP-VPCI-
333 7-Sep-18 Handover Handover of Str-0904, Area 900 Area 900 H W SW 11-Sep-18
FSP-0332

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
334 8-Sep-18 Laboratory Testing Pedestal @ D-0652 & D-0653, Area 600 H SW SW 8-Sep-18
FSP-0333 Laboratory
(24 mpa @ 28 days).
28th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
335 8-Sep-18 Laboratory Testing Foundation @ D-0600, Area 600 (24 mpa H SW SW 8-Sep-18
FSP-0334 Laboratory
@ 28 days).
3rd day Compressive Strength Test of
JGSS1EP-VPCI- Pedestal (P1 & P1A) @ H-305, Heater Quantum
336 8-Sep-18 Laboratory Testing H SW SW 8-Sep-18
FSP-0335 Foundation, Area 300 (24 mpa @ 3 Laboratory
days).
7th day Compressive Strength Test of
JGSS1EP-VPCI- Pedestal (P2) @ H-305, Heater Quantum
337 8-Sep-18 Laboratory Testing H SW SW 8-Sep-18
FSP-0336 Foundation, Area 300 (24 mpa @ 3 Laboratory
days).
3rd day Compressive Strength Test of
JGSS1EP-VPCI- Pedestal P1 (G.L A) and P1A (G.L B) @ Quantum
338 8-Sep-18 Laboratory Testing H SW SW 10-Sep-18
FSP-0337 H-305, Heater Foundation, Area 300 (24 Laboratory
mpa @ 3 days).
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
339 8-Sep-18 Concrete Pouring Setting and Concrete Placement Unit 900 H W SW 11-Sep-18
FSP-0338
Inspection for Pedestal @ D-0910, Area
900.

61 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
340 8-Sep-18 Concrete Pouring Setting and Concrete Placement Unit 900 H W SW 11-Sep-18
FSP-0339
Inspection for Pedestal @ D-0909, Area
900.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
341 8-Sep-18 Concrete Pouring Setting and Concrete Placement Unit 900 H W SW 11-Sep-18
FSP-0340
Inspection for Pedestal @ R-0902, Area
900.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
342 8-Sep-18 Concrete Pouring Unit 900 H W SW 11-Sep-18
FSP-0341 Placement Inspection for Base Mat
Foundation @ K-0901, Area 900.

28th day Compressive Strength Test of


Pedestal @ F1, F3 & F5 Structure-0903
JGSS1EP-VPCI- Quantum
343 10-Sep-18 Laboratory Testing & DGP-2, Area 900 / Lean Concrete of H SW SW 11-Sep-18
FSP-0342 Laboratory
F2 @ Structure-0601, Area 600(24 mpa
@ 28 days).

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
344 10-Sep-18 Laboratory Testing Test (By Sand Cone Method) 8th Layer Area 300 H SW SW 10-Sep-18
FSP-0343
@ H-0305, Heater Foundation, Area 300.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
345 11-Sep-18 Laboratory Testing Test (By Sand Cone Method) @ G- Area 900 H SW SW 11-Sep-18
FSP-0344
0909A/B, Area 900.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) 6th - 7th
346 11-Sep-18 Laboratory Testing Area 300 H SW SW 12-Sep-18
FSP-0345 Layer (Grid-line C - A) @ H-0305, Heater
Foundation, Area 300.

62 / 732
28th day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
347 11-Sep-18 Laboratory Testing Lean Concrete @ Structure-0905, Area H SW SW \
FSP-0346 Laboratory
900 (10 mpa @ 28 days).
7th day Compressive Strength Test of
JGSS1EP-VPCI- Pedestal P1 & P1a (Grid-line E - F) @ H- Astec
348 11-Sep-18 Laboratory Testing H SW SW 12-Sep-18
FSP-0347 0305, Heater Foundation, Area 300 (24 Laboratory
mpa @ 3 days).
1st day Compressive Strength Test of
JGSS1EP-VPCI- Concrete Pavement (Grid-line F - C) @ Astec
349 11-Sep-18 Laboratory Testing H SW SW 12-Sep-18
FSP-0348 H-0305, Heater Foundation, Area 300 (24 Laboratory
mpa @ 3 days).
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) @ G-
350 12-Sep-18 Laboratory Testing Area 900 H SW SW 12-Sep-18
FSP-0349 0908A/B / G-0910A/B / G-0907AB, Area
900.
Elevation, Location,Surface Preparation,
Formworks and Concrete Placement
JGSS1EP-VPCI-
351 12-Sep-18 Concrete Pouring Inspection for Lean Concrete @ G- Area 900 H W SW 12-Sep-18
FSP-0350
0908A/B / G-0910A/B / G-0907A/B, Area
900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks, Rebar works and Concrete
352 12-Sep-18 Concrete Pouring Area 600 H W SW 12-Sep-18
FSP-0351 Placement Inspection for Foundation (F2)
@ Structure-0606, Area 600.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
353 12-Sep-18 Concrete Pouring Placement Inspection for Paving @ H- Area 300 H W SW 12-Sep-18
FSP-0352
0305 (Gridline C-F), Heater Foundation,
Area 300.

63 / 732
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
354 12-Sep-18 Concrete Pouring Area 900 H W SW 12-Sep-18
FSP-0353 Inspection for Lean Concrete @ G-
0909A/B, Area 900.
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
355 12-Sep-18 Concrete Pouring Setting and Concrete Placement Unit 600 H W SW 13-Sep-18
FSP-0354
Inspection for Pedestal of F1 @
Structure-0601, Area 600.
28th day Compressive Strength Test of
ASTEC,
JGSS1EP-VPCI- Foundation (F2) @ Structure-0601, Area
356 12-Sep-18 Laboratory Testing Calamba City, H SW SW 13-Sep-18
FSP-0355 600 / Lean Concrete @ R-0902, Area
Laguna.
900 (24 mpa @ 28 days).

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
357 13-Sep-18 Laboratory Testing Test (By Sand Cone Method) 1st Layer Area 900 H SW SW 13-Sep-18
FSP-0356
@ Structure-0905, Area 900.

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
358 13-Sep-18 Laboratory Testing Pedestal @ D-0600, Area 600 (24 mpa H SW SW 14-Sep-18
FSP-0357 Laboratory
@ 28 days).
7th day Compressive Strength Test of
JGSS1EP-VPCI- Pedestal P1 & P1a (Grid-line A-B) @ H- Quantum
359 13-Sep-18 Laboratory Testing H SW SW 14-Sep-18
FSP-0358 0305, Heater Foundation, Area 300 (24 Laboratory
mpa @ 3 days).
3rd day Compressive Strength Test of
JGSS1EP-VPCI- Concrete Pavement (Grid-line F - C) @ Quantum
360 13-Sep-18 Laboratory Testing H SW SW 14-Sep-18
FSP-0359 H-0305, Heater Foundation, Area 300 (24 Laboratory
mpa @ 3 days).
1st day Compressive Strength Test of
JGSS1EP-VPCI- Concrete Pavement (Grid-line C - A) @ Quantum
361 13-Sep-18 Laboratory Testing H SW SW 14-Sep-18
FSP-0360 H-0305, Heater Foundation, Area 300 (24 Laboratory
mpa @ 3 days).
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
362 13-Sep-18 Laboratory Testing Test (By Sand Cone Method) 2nd - 4th Area 900 H SW SW 14-Sep-18
FSP-0361
Layer @ Structure-0905, Area 900.

64 / 732
Elevation, Location,Surface Preparation,
Formworks, Rebar works and Concrete
JGSS1EP-VPCI-
363 13-Sep-18 Concrete Pouring Placement Inspection for Foundation of Area 900 H W SW 14-Sep-18
FSP-0362
Base Mat @ K-0901 Compressor Shelter,
Area 900. Location, Surface Preparation,
Elevation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
364 13-Sep-18 Concrete Pouring Setting and Concrete Placement Unit 600 H W SW 14-Sep-18
FSP-0363
Inspection for Pedestal of F2 @
Structure-0606, Area 600.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
365 14-Sep-18 prior to backfilling of Foundation and Area 900 H SW SW 15-Sep-18
FSP-0364 Placement
Pedestal @ D-0909, Area 900.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
366 14-Sep-18 prior to backfilling of Foundation and Area 900 H SW SW 15-Sep-18
FSP-0365 Placement
Pedestal @ D-0910, Area 900.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
367 14-Sep-18 prior to backfilling of Foundation and Area 900 H SW SW 15-Sep-18
FSP-0366 Placement
Pedestal @ R-0902, Area 900.
28th day Compressive Strength Test of
Foundation @ Structure-0905, Area 900 / ASTEC,
JGSS1EP-VPCI-
368 14-Sep-18 Laboratory Testing F2 Pedestal @ Structure-0601, Area Calamba City, H SW SW 15-Sep-18
FSP-0367
600 / Lean Concrete @ D-0910 (24 mpa Laguna.
@ 28 days).
7th day Compressive Strength Test of
ASTEC,
JGSS1EP-VPCI- Pedestal (F2) @ Structure-0604, Area
369 14-Sep-18 Laboratory Testing Calamba City, H SW SW 15-Sep-18
FSP-0368 600 / Pedestal @ G-0600A/B, Area 600
Laguna.
(24 mpa @ 28 days).

Elevation, Location, Surface Preparation,


Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
370 14-Sep-18 Concrete Pouring Placement Inspection for Remaining Area 300 H W SW 14-Sep-18
FSP-0369
Pavement @ (North Side) H-0305,
Heater Foundation, Area 300.

65 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
371 14-Sep-18 Concrete Pouring Placement Inspection for Remaining Area 300 H W SW 14-Sep-18
FSP-0370
Pavement @ (South Side) H-0305,
Heater Foundation, Area 300.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks, Rebar works and Concrete
372 14-Sep-18 Concrete Pouring Area 600 H W SW 14-Sep-18
FSP-0371 Placement Inspection for Lean Concrete
(F1) @ Structure-0606, Area 600.

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete prior to backfilling of Foundation and
373 15-Sep-18 Area 600 H SW SW 15-Sep-18
FSP-0372 Placement Pedestal @ Structure-0601 (F1), Area
600.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete prior to backfilling of Foundation and
374 15-Sep-18 Area 900 H SW SW 15-Sep-18
FSP-0373 Placement Pedestal @ Structure-0604 (F2), Area
600.
4th day Compressive Strength Test of
JGSS1EP-VPCI- Concrete Pavement (Grid-line C - A) @ Quantum
375 15-Sep-18 Laboratory Testing H SW SW 17-Sep-18
FSP-0374 H-0305, Heater Foundation, Area 300 (24 Laboratory
mpa @ 3 days).
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
376 17-Sep-18 Laboratory Testing Test (By Sand Cone Method) @ E-0914, Area 900 H SW SW 17-Sep-18
FSP-0375
Area 900.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
377 17-Sep-18 Laboratory Testing Test (By Sand Cone Method) @ E-0917, Area 900 H SW SW 17-Sep-18
FSP-0376
Area 900.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
378 17-Sep-18 Laboratory Testing Test (By Sand Cone Method) @ Z-0901 Area 900 H SW SW 17-Sep-18
FSP-0377
& Z-0902, Area 900.

66 / 732
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks, Rebar works and Concrete
379 17-Sep-18 Concrete Pouring Area 600 H W SW 17-Sep-18
FSP-0378 Placement Inspection for Foundation @
G-0910A/B, Area 900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks, Rebar works and Concrete
380 17-Sep-18 Concrete Pouring Area 600 H W SW 17-Sep-18
FSP-0379 Placement Inspection for Foundation @
G-0909A/B, Area 900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks, Rebar works and Concrete
381 17-Sep-18 Concrete Pouring Area 600 H W SW 17-Sep-18
FSP-0380 Placement Inspection for Foundation @
G-0907A/B, Area 900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks, Rebar works and Concrete
382 17-Sep-18 Concrete Pouring Area 600 H W SW 17-Sep-18
FSP-0381 Placement Inspection for Foundation @
G-0908A/B, Area 900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks, Rebar works and Concrete
383 17-Sep-18 Concrete Pouring Area 600 H W SW 17-Sep-18
FSP-0382 Placement Inspection for Foundation (F1)
@ Structure-0606, Area 600.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
384 17-Sep-18 Concrete Pouring Area 900 H W SW 17-Sep-18
FSP-0383 Inspection for Lean Concrete @ E-0914,
Area 900.
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
385 17-Sep-18 Concrete Pouring Area 900 H W SW 17-Sep-18
FSP-0384 Inspection for Lean Concrete @ E-0917,
Area 900.

67 / 732
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
386 17-Sep-18 Concrete Pouring Area 900 H W SW 17-Sep-18
FSP-0385 Inspection for Lean Concrete @ Z-0901,
Area 900.
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
387 17-Sep-18 Concrete Pouring Area 900 H W SW 17-Sep-18
FSP-0386 Inspection for Lean Concrete @ Z-0902,
Area 900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks, Rebar works and Concrete
388 17-Sep-18 Concrete Pouring Area 900 H W SW 18-Sep-18
FSP-0387 Placement Inspection for Foundation @
E-0914, Area 900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks, Rebar works and Concrete
389 17-Sep-18 Concrete Pouring Area 900 H W SW 18-Sep-18
FSP-0388 Placement Inspection for Foundation @
E-0917, Area 900.

7th day Compressive Strength Test of


ASTEC,
JGSS1EP-VPCI- Concrete Pavement (Grid-line F - C) @
390 17-Sep-18 Laboratory Testing Calamba City, H SW SW 18-Sep-18
FSP-0389 H-0305, Heater Foundation, Area 300 (24
Laguna.
mpa @ 3 days).
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete prior to backfilling of Foundation of Base
391 18-Sep-18 Area 900 H SW SW 19-Sep-18
FSP-0390 Placement Mat @ K-0901 Compressor Shelter, Area
900.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
392 18-Sep-18 Laboratory Testing Test (By Sand Cone Method) @ D-0640, Area 600 H SW SW 19-Sep-18
FSP-0391
Area 600. 6th & 7th layer
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
393 18-Sep-18 Concrete Pouring Area 600 H W SW 19-Sep-18
FSP-0392 Inspection for Lean Concrete @ D-0640,
Area 600.

68 / 732
7th day Compressive Strength Test of
ASTEC,
JGSS1EP-VPCI- Concrete Pavement (Grid-line F - C) @
394 18-Sep-18 Laboratory Testing Calamba City, H SW SW 19-Sep-18
FSP-0393 H-0305, Heater Foundation, Area 300 (24
Laguna.
mpa @ 28 days).

7th day Compressive Strength Test of


Pedestal @ R-0902 / D-0909 / D-0910, ASTEC,
JGSS1EP-VPCI-
395 18-Sep-18 Laboratory Testing Area 900 / Lean Concrete @ G- Calamba City, H SW SW 19-Sep-18
FSP-0394
0909A/B / G-0910A/B / G-0908A/B / G- Laguna.
0907A/B, Area 900 (24 mpa @ 28 days).

7th day Compressive Strength Test of


ASTEC,
JGSS1EP-VPCI- Foundation of F2 @ Structure-0606 /
396 18-Sep-18 Laboratory Testing Calamba City, H SW SW 19-Sep-18
FSP-0395 Pedestal of F1 @ Structure-0601, Area
Laguna.
600 (24 mpa @ 28 days).
7th day Compressive Strength Test of
JGSS1EP-VPCI- Concrete Pavement (Grid-line C - A) @ Quantum
397 18-Sep-18 Laboratory Testing H SW SW 19-Sep-18
FSP-0396 H-0305, Heater Foundation, Area 300 (24 Laboratory
mpa @ 3 days).
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Box
JGSS1EP-VPCI-
398 19-Sep-18 Concrete Pouring Setting and Concrete Placement Area 900 H W SW 20-Sep-18
FSP-0397
Inspection for Pedestal @ G-0910A/B,
Area 900.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Box
JGSS1EP-VPCI-
399 19-Sep-18 Concrete Pouring Setting and Concrete Placement Area 900 H W SW 20-Sep-18
FSP-0398
Inspection for Pedestal @ G-0909A/B,
Area 900.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Box
JGSS1EP-VPCI-
400 19-Sep-18 Concrete Pouring Setting and Concrete Placement Area 900 H W SW 20-Sep-18
FSP-0399
Inspection for Pedestal @ G-0907A/B,
Area 900.

69 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Box
JGSS1EP-VPCI-
401 19-Sep-18 Concrete Pouring Setting and Concrete Placement Area 900 H W SW 20-Sep-18
FSP-0400
Inspection for Pedestal @ G-0908A/B,
Area 900.

28th day Compressive Strength Test of


Foundation @ D-0910, Area 900 / Lean
Concrete of F1 @ Structure-0601, Area ASTEC,
JGSS1EP-VPCI-
402 19-Sep-18 Laboratory Testing 600 / Lean Concrete Concrete @ D- Calamba City, H SW SW 20-Sep-18
FSP-0401
0909, Area 900 / Lean Concrete of F2 @ Laguna.
Structre-0604, Area 600 (24 mpa @ 28
days).

7th day Compressive Strength Test of the


ASTEC,
JGSS1EP-VPCI- Remaining Pavement @ (North Side) H-
403 19-Sep-18 Laboratory Testing Calamba City, H SW SW 20-Sep-18
FSP-0402 0305, Heater Foundation, Area 300 (24
Laguna.
mpa @ 28 days).

Elevation, Location,Surface Preparation,


Formworks, Rebar works and Concrete
JGSS1EP-VPCI-
404 19-Sep-18 Concrete Pouring Placement Inspection of Pre-Cast Area 300 H W SW 20-Sep-18
FSP-0403
Foundation @ Catch Basin (CB-NP01),
Heater Foundation, Area 300.

Elevation, Location,Surface Preparation,


Formworks, Rebar works and Concrete
JGSS1EP-VPCI-
405 19-Sep-18 Concrete Pouring Placement Inspection of Pre-Cast Area 900 H W SW 20-Sep-18
FSP-0404
Foundation @ Catch Basin (CB-NP02),
DPG-2, Area 900.

70 / 732
Elevation, Location,Surface Preparation,
Formworks, Rebar works and Concrete
JGSS1EP-VPCI-
406 19-Sep-18 Concrete Pouring Placement Inspection of Pre-Cast Area 900 H W SW 20-Sep-18
FSP-0405
Foundation @ Catch Basin (CB-NP03),
DPG-2, Area 900.

Elevation, Location,Surface Preparation,


Formworks, Rebar works and Concrete
JGSS1EP-VPCI-
407 19-Sep-18 Concrete Pouring Placement Inspection of Pre-Cast Area 900 H W SW 20-Sep-18
FSP-0406
Foundation @ Catch Basin (CB-NP05),
DPG-2, Area 900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
408 20-Sep-18 Concrete Pouring Area 300 H SW SW 20-Sep-18
FSP-0407 Inspection for Lean Concrete @ Analyzer
Shelter #12, Area 300.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
409 20-Sep-18 Concrete Pouring Placement Inspection for Spill Wall Area 300 H W SW 20-Sep-18
FSP-0408
(North & West) @ Heater Foundation,
Area 300.

28th day Compressive Strength Test of


ASTEC,
JGSS1EP-VPCI- Foundation @ H-0305 Heater
410 20-Sep-18 Laboratory Testing Calamba City, H SW SW 21-Sep-18
FSP-0409 Foundation, Area 300 (24 mpa @ 28
Laguna.
days).

7th day Compressive Strength Test of the


Remaining Pavement @ (South Side) H- ASTEC,
JGSS1EP-VPCI-
411 20-Sep-18 Laboratory Testing 0305, Heater Foundation, Area 300 / Calamba City, H SW SW 20-Sep-18
FSP-0410
Lean Concrete @ Structure-0606 (F1) Laguna.
(24 mpa @ 28 days).

71 / 732
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
412 21-Sep-18 Concrete Pouring Area 400 H W SW 21-Sep-18
FSP-0411 Inspection for Lean Concrete @ Quench
Piperack, Area 400 (F2)

7th day Compressive Strength Test of


ASTEC,
JGSS1EP-VPCI- Foundation (Base Mat) @ K-0901
413 21-Sep-18 Laboratory Testing Calamba City, H SW SW 22-Sep-18
FSP-0412 Compressor Shelter, Area 900 (24 mpa
Laguna.
@ 28 days).
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
414 21-Sep-18 Concrete Pouring Area 600 H W SW 21-Sep-18
FSP-0413 Inspection for Lean Concrete @ Z-0651,
Area 600.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
415 22-Sep-18 Concrete Pouring Area 400 H W SW 22-Sep-18
FSP-0414 Inspection for Lean Concrete @ Quench
Piperack (F1), Area 400.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks, Anchor Bolt
416 22-Sep-18 Concrete Pouring Area 900 H W SW 22-Sep-18
FSP-0415 Setting and Inspection for Pedestal @ E-
0914, Area 900.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks, Anchor Bolt
417 22-Sep-18 Concrete Pouring Area 900 H W SW 22-Sep-18
FSP-0416 Setting and Inspection for Pedestal @ E-
0917, Area 900.

72 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
418 22-Sep-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 22-Sep-18
FSP-0417
Inspection for Pedestal (F1) @
Structure-0606, Area 900.

Elevation, Location,Surface Preparation,


Formworks, Rebar works and Concrete
JGSS1EP-VPCI-
419 22-Sep-18 Concrete Pouring Placement Inspection of Pre-Cast Area 900 H W SW 22-Sep-18
FSP-0418
Foundation @ Catch Basin (CB-NO02),
DPG-2, Area 900.

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete
420 22-Sep-18 prior to backfilling of Foundation and Area 900 H SW SW 24-Sep-18
FSP-0419 Placement
Pedestal @ G-0910A/B, Area 900.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
421 22-Sep-18 prior to backfilling of Foundation and Area 900 H SW SW 24-Sep-18
FSP-0420 Placement
Pedestal @ G-0909A/B, Area 900.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
422 22-Sep-18 prior to backfilling of Foundation and Area 900 H SW SW 24-Sep-18
FSP-0421 Placement
Pedestal @ G-0907A/B, Area 900.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
423 22-Sep-18 prior to backfilling of Foundation and Area 900 H SW SW 24-Sep-18
FSP-0422 Placement
Pedestal @ G-0908A/B, Area 900.
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks, Rebar works and Inspection
424 22-Sep-18 Pre-pouring Area 400 H W SW 24-Sep-18
FSP-0423 for Foundation @ Quench Piperack (F1),
Area 400.
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks, Rebar works and Inspection
425 22-Sep-18 Pre-pouring Area 400 H W SW 24-Sep-18
FSP-0424 for Foundation @ Quench Piperack (F2),
Area 400.

73 / 732
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI-
426 22-Sep-18 Pre-pouring Formworks, Rebar works and Inspection Area 600 H W SW 24-Sep-18
FSP-0425
for Foundation @ Z-0651, Area 600.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
427 22-Sep-18 Concrete Pouring Area 600 H W SW 24-Sep-18
FSP-0426 Inspection for Lean Concrete @
Structure-0605, Area 600.

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete prior to backfilling of Foundation and
428 24-Sep-18 Area 600 H SW SW 25-Sep-18
FSP-0427 Placement Pedestal @ Structure-0606 (F1 & F2),
Area 600.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) @
429 24-Sep-18 Laboratory Testing Area 600 H SW SW 25-Sep-18
FSP-0428 Structure-0601 (F1), Area 600. 1st-8th
layer
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) @ G-
430 24-Sep-18 Laboratory Testing Area 900 H SW SW 25-Sep-18
FSP-0429 0910A/B / G-0909A/B / G-0907A/B / G-
0908A/B, Area 900.

Elevation, Location,Surface Preparation,


Formworks and Concrete Placement
JGSS1EP-VPCI-
431 24-Sep-18 Pre-pouring Inspection for Lean Concrete @ Catch Area 900 H W SW 25-Sep-18
FSP-0430
Basin (CB-NP02 / CB-NP03 / CB-NP05)
DPG-2, Area 900.

7th day Compressive Strength Test of


JGSS1EP-VPCI- Foundation @ G-0909A/B / G-0907A/B / Quantum
432 24-Sep-18 Laboratory Testing H SW SW 25-Sep-18
FSP-0431 G-0910A/B / G-0908A/B (24 mpa @ 28 Laboratory
days).

74 / 732
7th day Compressive Strength Test of
Foundation (F1) @ Structure-0606 /
JGSS1EP-VPCI- Quantum
433 24-Sep-18 Laboratory Testing Pedestal (F2) @ Structure-0606, Area H SW SW 25-Sep-18
FSP-0432 Laboratory
600 / Lean Concrete @ E-0914 / E-0917,
Area 900 (24 mpa @ 28 days).

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete
434 25-Sep-18 prior to backfilling of Foundation and Area 900 H SW SW 26-Sep-18
FSP-0433 Placement
Pedestal @ Structure-0905, Area 900.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
435 25-Sep-18 Laboratory Testing Test (By Sand Cone Method) 6th-7th Area 900 H SW SW 26-Sep-18
FSP-0434
Layer @ Structure-0905, Area 900.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
436 25-Sep-18 Laboratory Testing Test (By Sand Cone Method) 1st-4th Area 600 H SW SW 26-Sep-18
FSP-0435
Layer @ Structure-0606, Area 600.

Elevation, Location,Surface Preparation,


Formworks, Rebar works, Embedded
FS Phil
JGSS1EP-VPCI- Items and Concrete Placement
437 25-Sep-18 Pre-pouring Fabrication H W SW 26-Sep-18
FSP-0436 Inspection of Pre-Cast Wall @ Catch
Shop
Basin (CB-NP01), Heater Foundation,
Area 300.

Elevation, Location,Surface Preparation,


Formworks, Rebar works, Embedded FS Phil
JGSS1EP-VPCI-
438 25-Sep-18 Pre-pouring Items and Concrete Placement Fabrication H W SW 26-Sep-18
FSP-0437
Inspection of Pre-Cast Wall @ Catch Shop
Basin (CB-NP02), DPG-2, Area 900.

75 / 732
Elevation, Location,Surface Preparation,
Formworks, Rebar works, Embedded FS Phil
JGSS1EP-VPCI-
439 25-Sep-18 Pre-pouring Items and Concrete Placement Fabrication H W SW 26-Sep-18
FSP-0438
Inspection of Pre-Cast Wall @ Catch Shop
Basin (CB-NP03), DPG-2, Area 900.

Elevation, Location,Surface Preparation,


Formworks, Rebar works, Embedded FS Phil
JGSS1EP-VPCI-
440 25-Sep-18 Pre-pouring Items and Concrete Placement Fabrication H W SW 26-Sep-18
FSP-0439
Inspection of Pre-Cast Wall @ Catch Shop
Basin (CB-NP05), DPG-2, Area 900.

28th Day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
441 25-Sep-18 Laboratory Testing F2 Foundation @ Structure-0604, Area H SW SW 26-Sep-18
FSP-0440 Laboratory
600 (24 Mpa @ 28 days).
28th Day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
442 25-Sep-18 Laboratory Testing Foundation @ R-0902, Area 900 (24 Mpa H SW SW 26-Sep-18
FSP-0441 Laboratory
@ 28 days).
28th Day Compressive Strength Test of
JGSS1EP-VPCI- Quantum
443 25-Sep-18 Laboratory Testing Pedestal @ Structure-0905, Area 900 (24 H SW SW 26-Sep-18
FSP-0442 Laboratory
Mpa @ 28 days).
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) @
444 26-Sep-18 Laboratory Testing Area 600 H SW SW 26-Sep-18
FSP-0443 Structure-0601 (F2), Area 600. 3rd-9th
layer
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) @
445 26-Sep-18 Laboratory Testing Area 600 H SW SW 27-Sep-18
FSP-0444 Structure-0604 (F2), Area 600. 1st-5th
layer

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
446 26-Sep-18 Laboratory Testing Test (By Sand Cone Method) @ Z-0901, Area 900 H SW SW 27-Sep-18
FSP-0445
Area 900. prior to lean concrete

76 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
447 26-Sep-18 Laboratory Testing Test (By Sand Cone Method) @ Z-0902, Area 900 H SW SW 27-Sep-18
FSP-0446
Area 900, R-0902. prior to lean concrete

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete prior to backfilling of Foundation and
448 26-Sep-18 Area 900 H SW SW 27-Sep-18
FSP-0447 Placement Pedestal @ DPG-2 Piperack (East Side),
Area 900.

28th Day Compressive Strength Test of


ASTEC,
JGSS1EP-VPCI- Foundation @ Analyzer Shelter #13, Area
449 26-Sep-18 Laboratory Testing Calamba City, H SW SW 27-Sep-18
FSP-0448 600 / F1 Foundation @ Structure-0601,
Laguna.
Area 600 (24 Mpa @ 28 days).

28th Day Compressive Strength Test of


Foundation @ G-0600 A/B, Area 600 /
ASTEC,
JGSS1EP-VPCI- Lean Concrete @ Structure-0606, Area
450 27-Sep-18 Laboratory Testing Calamba City, H SW SW 28-Sep-18
FSP-0449 600 / Lean Concrete @ K-0901
Laguna.
Compressor Shelter, Area 900(24 Mpa @
28 days).

7th Day Compressive Strength Test of


Pedestal @ G-0909A/B / G-0907A/B / G- ASTEC,
JGSS1EP-VPCI-
451 27-Sep-18 Laboratory Testing 0910A/B / G-0908A/B / Foundation @ E- Calamba City, H SW SW 28-Sep-18
FSP-0450
0914 / E-0917, Area 900 (24 Mpa @ 28 Laguna.
days).

77 / 732
7th Day Compressive Strength Test of
Lean Concrete @ Z-0651, Area 600 /
Pre-Cast Foundation @ CB-NP01, CB-
ASTEC,
JGSS1EP-VPCI- NP02, CB-NP03, CB-NP05 / Lean
452 27-Sep-18 Laboratory Testing Calamba City, H SW SW 28-Sep-18
FSP-0451 Concrete @ Quench Piperack, Area 400 /
Laguna.
Spill Wall @ H-0305 (North & West),
Heater Foundation, Area 300 (24 Mpa @
28 days).

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
453 27-Sep-18 Laboratory Testing Test (By Sand Cone Method) 1st - 3rd Area 900 H SW SW 27-Sep-18
FSP-0452
Layer @ D-0909 / D-0910, Area 900.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI- Test (By Sand Cone Method) @ Humper
454 27-Sep-18 Laboratory Testing Area 400 H SW SW 27-Sep-18
FSP-0453 Area (Chemical Injection) near Structure-
0406, Area 400.
Visual Inspection of concrete surface
prior to Concrete Placement of
JGSS1EP-VPCI- Post Concrete
455 27-Sep-18 Foundation @ K-0901 Compressor Area 900 H SW SW 27-Sep-18
FSP-0454 Placement
Shelter (F1, F2, F3, F4 & Girder), Area
900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks, Rebar works, Concrete
456 28-Sep-18 Pre-pouring Area 600 H W SW 28-Sep-18
FSP-0455 placement inspection for Paving @
Analyzer Shelter #13.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI- Test (By Sand Cone Method) @ K-0901
457 28-Sep-18 Laboratory Testing Area 900 H SW SW 28-Sep-18
FSP-0456 Compressor Shelter (F1, F2, F3, F4 &
Girder), Area 900.

78 / 732
7th day Compressive Strength Test of
Pedestal @ Structure-0606 (F1), Area
600 / Lean Concrete @ Quench Piperack
ASTEC,
JGSS1EP-VPCI- (F1), Area 400 / Spillwall @ H-0305
458 28-Sep-18 Laboratory Testing Calamba City, H SW SW 29-Sep-18
FSP-0457 (South Side), Heater Foundation, Area
Laguna.
300 / Pre-Cast Foundation @ Catch
Basin (CB-NP02 ) DPG-2, Area 900 (24
mpa @ 28 days).
Joint Inspection/Witness of Field Density
Test (By Sand Cone Method) In-between
JGSS1EP-VPCI-
459 28-Sep-18 Laboratory Testing Analyzer Shelter #13, D-0600 and G- Area 600 H SW SW 28-Sep-18
FSP-0458
0600A/B, Area 600. prior to concrete
pavement
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
460 29-Sep-18 Pre-pouring Area 900 H SW SW 29-Sep-18
FSP-0459 Inspection for Lean Concrete @ Z-0901,
Area 900.
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
461 29-Sep-18 Pre-pouring Area 900 H SW SW 29-Sep-18
FSP-0460 Inspection for Lean Concrete @ Z-0902,
Area 900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks, Rebar works and Concrete
462 29-Sep-18 Pre-pouring Area 900 H W SW 29-Sep-18
FSP-0461 Placement Inspection for Foundation @
Z-0901, Area 900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks, Rebar works and Concrete
463 29-Sep-18 Pre-pouring Area 900 H W SW 29-Sep-18
FSP-0462 Placement Inspection for Foundation @
Z-0902, Area 900.

Concrete Placement Inspection for


JGSS1EP-VPCI-
464 29-Sep-18 Concrete Pouring Foundation @ Quench Piperack (F1), Area 400 H W SW 1-Oct-18
FSP-0463
Area 400.

79 / 732
Concrete Placement Inspection for
JGSS1EP-VPCI-
465 29-Sep-18 Concrete Pouring Foundation @ Quench Piperack (F2), Area 400 H W SW 1-Oct-18
FSP-0464
Area 400.
JGSS1EP-VPCI- Concrete Placement Inspection for
466 29-Sep-18 Concrete Pouring Area 600 H W SW 1-Oct-18
FSP-0465 Foundation @ Z-0651, Area 600.
JGSS1EP-VPCI- Concrete Placement Inspection for
467 29-Sep-18 Concrete Pouring Area 900 H W SW 1-Oct-18
FSP-0466 Pedestal @ E-0914, Area 900.
JGSS1EP-VPCI- Concrete Placement Inspection for
468 29-Sep-18 Concrete Pouring Area 900 H W SW 1-Oct-18
FSP-0467 Pedestal @ E-0917, Area 900.
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
469 29-Sep-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 1-Oct-18
FSP-0468
Inspection for Foundation @ D-0640,
Area 600.
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
470 29-Sep-18 Concrete Pouring Area 900 H SW SW 1-Oct-18
FSP-0469 Inspection for Lean Concrete @LP-0601,
Area 600.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
471 29-Sep-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 1-Oct-18
FSP-0470
Inspection for Pre-Cast Foundation @ E-
0690, Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
472 29-Sep-18 Laboratory Testing Test (By Sand Cone Method) 1st & 2nd Area 600 H SW SW 1-Oct-18
FSP-0471
Layer @ G-0610A/B, Area 600.

80 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks and Concrete
JGSS1EP-VPCI- Placement Inspection for Foundation
473 29-Sep-18 Concrete Pouring Area 900 H W SW 1-Oct-18
FSP-0472 and Girder @ K-0901 Compressor
Shelter (F1, F2, F3, F4 & FG1), Area
900.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
474 29-Sep-18 Concrete Pouring Area 900 H W SW 1-Oct-18
FSP-0473 Placement Inspection for Foundation @
C-0902, Area 900.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI- Test (By Sand Cone Method) 5th - 6th
475 1-Oct-18 Laboratory Testing Area 600 H SW SW 2-Oct-18
FSP-0474 Layer @ Structure-0606 (F1 & F2), Area
600.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
476 1-Oct-18 Laboratory Testing Test (By Sand Cone Method) @C-0903, Area 900 H SW SW 2-Oct-18
FSP-0475
Area 900.
Elevation, Location, Surface Preparation,
Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
477 1-Oct-18 Concrete Pouring Placement Inspection for Concrete Area 400 H W SW 2-Oct-18
FSP-0476
Pavement @ Chemical Injection, Area
400.
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
478 1-Oct-18 Concrete Pouring Area 900 H SW SW 2-Oct-18
FSP-0477 Inspection for Lean Concrete @ C-0903,
Area 900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
479 1-Oct-18 Concrete Pouring Area 600 H SW SW 2-Oct-18
FSP-0478 Inspection for Lean Concrete @
Structure-0605, Area 600.

81 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
480 1-Oct-18 Concrete Pouring Area 600 H W SW 2-Oct-18
FSP-0479 Placement Inspection for Foundation @
Structure-0605, Area 600.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
481 2-Oct-18 Concrete Pouring Area 600 H SW SW 2-Oct-18
FSP-0480 Inspection for Lean Concrete @ D-0693,
Area 600.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
482 2-Oct-18 Concrete Pouring Area 600 H SW SW 2-Oct-18
FSP-0481 Inspection for Lean Concrete @ LP-
0601, Area 600.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
483 2-Oct-18 Concrete Pouring Area 600 H SW SW 2-Oct-18
FSP-0482 Inspection for Lean Concrete @ E-
0623B, Area 600.

Elevation, Location,Surface Preparation,


Formworks, Rebar works, Embedded
JGSS1EP-VPCI- Items and Concrete Placement
484 2-Oct-18 Concrete Pouring Area 300 H W SW 2-Oct-18
FSP-0483 Inspection of Pre-Cast Wall @ Catch
Basin (CB-NP01), Heater Foundation,
Area 300.

Elevation, Location,Surface Preparation,


Formworks, Rebar works, Embedded
JGSS1EP-VPCI-
485 2-Oct-18 Concrete Pouring Items and Concrete Placement Area 900 H W SW 2-Oct-18
FSP-0484
Inspection of Pre-Cast Wall @ Catch
Basin (CB-NP02), DPG-2, Area 900.

82 / 732
Elevation, Location,Surface Preparation,
Formworks, Rebar works, Embedded
JGSS1EP-VPCI-
486 2-Oct-18 Concrete Pouring Items and Concrete Placement Area 900 H W SW 2-Oct-18
FSP-0485
Inspection of Pre-Cast Wall @ Catch
Basin (CB-NP03), DPG-2, Area 900.

Elevation, Location,Surface Preparation,


Formworks, Rebar works, Embedded
JGSS1EP-VPCI-
487 2-Oct-18 Concrete Pouring Items and Concrete Placement Area 900 H W SW 2-Oct-18
FSP-0486
Inspection of Pre-Cast Wall @ Catch
Basin (CB-NP05), DPG-2, Area 900.

Elevation, Location,Surface Preparation,


Formworks, Rebar works, Embedded
JGSS1EP-VPCI-
488 3-Oct-18 Concrete Pouring Items and Concrete Placement Area 900 H W SW 3-Oct-18
FSP-0487
Inspection of Pre-Cast Wall @ Catch
Basin (CB-NO01), DPG-2, Area 900.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
489 3-Oct-18 Concrete Pouring Area 600 H W SW 3-Oct-18
FSP-0488 Placement Inspection for Paving @
Analyzer Shelter #13, Area 600.

Elevation, Location, Rebar Works


JGSS1EP-VPCI-
490 3-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 900 H W SW 4-Oct-18
FSP-0489
Pedestal @ C-0902, Area 900.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
491 3-Oct-18 Concrete Pouring Area 900 H W SW 4-Oct-18
FSP-0490 Placement Inspection for Foundation @
C-0903, Area 900.

83 / 732
Elevation, Location, Rebar Works
JGSS1EP-VPCI-
492 3-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 600 H W SW 4-Oct-18
FSP-0491
Pedestal @ Z-0651, Area 600.
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
493 4-Oct-18 Pre-pouring Area 400 H W SW 4-Oct-18
FSP-0492 Pedestal @ Quench Piperack (F1), Area
400.
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
494 4-Oct-18 Pre-pouring Area 400 H W SW 4-Oct-18
FSP-0493 Pedestal @ Quench Piperack (F2), Area
400.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
495 4-Oct-18 prior to backfilling of Foundation @ Z- Area 900 H SW SW 4-Oct-18
FSP-0494 Placement
0901 & Z-0902, Area 900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
496 4-Oct-18 Concrete Pouring Area 500 H SW SW 4-Oct-18
FSP-0495 Inspection for Lean Concrete @ D-
0510C, Area 500.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
497 4-Oct-18 Concrete Pouring Area 600 H W SW 4-Oct-18
FSP-0496 Placement Inspection for Concrete
Pavement @ D-0600, Area 600.

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete
498 4-Oct-18 prior to backfilling of Foundation @ K- Area 900 H SW SW 5-Oct-18
FSP-0497 Placement
0901 Compressor Shelter, Area 900.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
499 4-Oct-18 prior to backfilling of Foundation @ E- Area 900 H SW SW 5-Oct-18
FSP-0498 Placement
0914, Area 900, including pedestal.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
500 4-Oct-18 prior to backfilling of Foundation @ E- Area 900 H SW SW 5-Oct-18
FSP-0499 Placement
0917, Area 900, including pedestal.

84 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
501 5-Oct-18 Concrete Pouring Area 600 H W SW 6-Oct-18
FSP-0500 Placement Inspection for Foundation @
E-0623B, Area 600.

28th day Compressive Strength Test of


ASTEC,
JGSS1EP-VPCI- Pedestal (F2) @ Structure-0604, Area
502 5-Oct-18 Laboratory Testing Calamba City, H SW SW 6-Oct-18
FSP-0501 600 / Pedestal @ G-0600A/B, Area 600
Laguna.
(24 mpa @ 28 days).
Elevation, Location, Surface Preparation,
Formworks, Anchor Bolt Setting and
JGSS1EP-VPCI-
503 6-Oct-18 Concrete Pouring Concrete Placement Inspection for Area 400 H W SW 6-Oct-18
FSP-0502
Pedestal @ Quench Piperack (F1), Area
400.

Elevation, Location, Surface Preparation,


Formworks, Anchor Bolt Setting and
JGSS1EP-VPCI-
504 6-Oct-18 Concrete Pouring Concrete Placement Inspection for Area 400 H W SW 6-Oct-18
FSP-0503
Pedestal @ Quench Piperack (F2), Area
400.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
505 6-Oct-18 Concrete Pouring Area 500 H W SW 6-Oct-18
FSP-0504 Placement Inspection for Foundation @
D-0510C, Area 500.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
506 6-Oct-18 Concrete Pouring Placement Inspection for Concrete Area 600 H W SW 6-Oct-18
FSP-0505
Pavement @ Structure-0601 (F2), Area
600.

85 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
507 6-Oct-18 Concrete Pouring Placement Inspection for Concrete Area 400 H W SW 6-Oct-18
FSP-0506
Pavement @ Chemical Injection, Area
400.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
508 6-Oct-18 Laboratory Testing Test (By Sand Cone Method) 7th - 8th Area 600 H SW SW 6-Oct-18
FSP-0507
Layer @ Structure-0606, Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI- Test (By Sand Cone Method) Sub-Base
509 6-Oct-18 Laboratory Testing Area 600 H SW SW 6-Oct-18
FSP-0508 @ Structure-0601 (F1), Area 600 prior to
concrete pavement.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
510 6-Oct-18 Concrete Pouring Placement Inspection for Spill Wall @ Area 600 H W SW 6-Oct-18
FSP-0509
Analyzer Shelter #13, D-0600 &
Structure-0601, Area 600.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
511 6-Oct-18 Concrete Pouring Area 600 H W SW 8-Oct-18
FSP-0510 Placement Inspection for Foundation @
D-0693, Area 600.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
512 6-Oct-18 Concrete Pouring Area 600 H W SW 8-Oct-18
FSP-0511 Placement Inspection for Foundation @
Lp-601, Area 600.

Elevation, Location, Rebar Works


JGSS1EP-VPCI-
513 6-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 600 H W SW 8-Oct-18
FSP-0512
Pedestal @ Structure-0605, Area 600.

86 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
514 8-Oct-18 Concrete Pouring Placement Inspection for Concrete Area 600 H W SW 8-Oct-18
FSP-0513
Pavement @ Structure-0601 (F1), Area
600.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
515 8-Oct-18 Concrete Pouring Area 700 H SW SW 8-Oct-18
FSP-0514 Inspection for Lean Concrete @ R-
0701C, Area 700.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
516 8-Oct-18 Concrete Pouring Area 600 H SW SW 8-Oct-18
FSP-0515 Inspection for Lean Concrete @ E-0624F,
Area 600.

Elevation, Location, Rebar Works


Inspection prior to fomworks closure of
JGSS1EP-VPCI-
517 8-Oct-18 Pre-pouring Pedestal/Column (1st Lift of Column) @ Area 900 H W SW 9-Oct-18
FSP-0516
Base Mat, K-0901 Compressor Shelter,
Area 900, including Pedestal P1.

7th day Compressive Strength Test of


Foundation @ Z-0651, Area 600 / Pre-
JGSS1EP-VPCI- Quantum
518 9-Oct-18 Laboratory Testing Cast Wall @ Catch Basin CB-NP01, Area H SW SW 9-Oct-18
FSP-0517 Laboratory
300, NP02, NP03 & NP05, DPG-2, Area
900 (24 mpa @ 28 days).

28th day Compressive Strength Test of


JGSS1EP-VPCI- Concrete Pavement (Grid-line F - C) @ Quantum
519 9-Oct-18 Laboratory Testing H SW SW 9-Oct-18
FSP-0518 H-0305, Heater Foundation, Area 300 (24 Laboratory
mpa @ 28 days).

87 / 732
7th day Compressive Strength Test of
Foundation @ Z-0901, Z-0902, Area 900,
JGSS1EP-VPCI- D-0640, Area 600 / Lean Concrete @ Z- Quantum
520 9-Oct-18 Laboratory Testing H SW SW 9-Oct-18
FSP-0519 0901, Z-0902 & C-0903, Area 900 / Pre- Laboratory
Cast Wall @ CB-NO01, DPG-2, Area 900
(24 mpa @ 28 days).

7th day Compressive Strength Test of


Foundation @ Quench Piperack (F1 &
JGSS1EP-VPCI- Quantum
521 9-Oct-18 Laboratory Testing F2), Area 400 / Lean Concrete @ D- H SW SW 9-Oct-18
FSP-0520 Laboratory
0693, LP-601 & E-0623B, Area 600 (24
mpa @ 28 days).
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) 1st Layer
522 9-Oct-18 Laboratory Testing Area 400 H SW SW 10-Oct-18
FSP-0521 @ Quench Piperack (F1), Area 400 and
2nd layer

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
523 9-Oct-18 Laboratory Testing Test (By Sand Cone Method) 1st Layer Area 400 H SW SW 10-Oct-18
FSP-0522
@ Quench Piperack (F2), Area 400.

Joint Inspection/Witness of Field Density


Test (By Sand Cone Method) In-between
JGSS1EP-VPCI- Structure-0903, DPG-2 Piperack, R-
524 9-Oct-18 Laboratory Testing Area 900 H SW SW 10-Oct-18
FSP-0523 0902, E-0914, E-0917 , G-0906A/B, G-
0907A/B, G-0908A/B, G-0909A/B & G-
0910A/B, Area 900. 6th and 7th layer

28th day Compressive Strength Test of


Pedestal @ R-0902 / D-0909 / D-0910,
JGSS1EP-VPCI- Quantum
525 9-Oct-18 Laboratory Testing Area 900 / Lean Concrete @ G- H SW SW 10-Oct-18
FSP-0524 Laboratory
0909A/B / G-0910A/B / G-0908A/B / G-
0907A/B, Area 900 (24 mpa @ 28 days).

88 / 732
28th day Compressive Strength Test of
JGSS1EP-VPCI- Foundation of F2 @ Structure-0606 / Quantum
526 9-Oct-18 Laboratory Testing H SW SW 10-Oct-18
FSP-0525 Pedestal of F1 @ Structure-0601, Area Laboratory
600 (24 mpa @ 28 days).

7th day Compressive Strength Test of


Foundation @ K-0901 (F1, F2, F3, F4 &
JGSS1EP-VPCI- FG1), C-0902, Area 900 / Pedestal @ E- Quantum
527 9-Oct-18 Laboratory Testing H SW SW 10-Oct-18
FSP-0526 0914 & E-0917, Area 900 / Concrete Laboratory
Pavement @ Chemical Injection, Area
400 (24 mpa @ 28 days).

7th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
528 9-Oct-18 Laboratory Testing Concrete Pavement @ Analyzer Shelter H SW SW 10-Oct-18
FSP-0527 Laboratory
#13, Area 600 (24 mpa @ 28 days).

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
529 10-Oct-18 Concrete Pouring Area 700 H W SW 10-Oct-18
FSP-0528 Placement Inspection for Foundation @
R-0701C, Area 700.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
530 10-Oct-18 Concrete Pouring Area 600 H W SW 10-Oct-18
FSP-0529 Inspection for Lean Concrete @ E-0690,
Area 600.
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
531 10-Oct-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 11-Oct-18
FSP-0530
Inspection for Foundation @ E-0690,
Area 600.

89 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Formworks, Anchor Bolt Setting and
532 10-Oct-18 Concrete Pouring Area 600 H W SW 11-Oct-18
FSP-0531 Concrete Placement Inspection for
Pedestal @ Z-0651, Area 600.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Formworks, Anchor Bolt Setting and
533 10-Oct-18 Concrete Pouring Area 900 H W SW 11-Oct-18
FSP-0532 Concrete Placement Inspection for
Pedestal @ C-0902, Area 900.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Formworks, Anchor Bolt Setting and
534 10-Oct-18 Concrete Pouring Area 900 H W SW 11-Oct-18
FSP-0533 Concrete Placement Inspection for
Pedestal @ C-0903, Area 900.

28th day Compressive Strength Test of


JGSS1EP-VPCI- the Remaining Pavement @ (North Quantum
535 10-Oct-18 Laboratory Testing H SW SW 11-Oct-18
FSP-0534 Side) H-0305, Heater Foundation, Area Laboratory
300 (24 mpa @ 28 days).

7th day Compressive Strength Test of


JGSS1EP-VPCI- Lean Concrete @ D-0510C, Area 500 / Quantum
536 10-Oct-18 Laboratory Testing H SW SW 11-Oct-18
FSP-0535 Concrete Pavement @ D-0600, Area 600 Laboratory
(24 mpa @ 28 days).
Elevation, Location, Rebar Works
JGSS1EP-VPCI-
537 11-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 900 H W SW 11-Oct-18
FSP-0536
Pedestal @ C-0902, Area 900.
Elevation, Location, Rebar Works
JGSS1EP-VPCI-
538 11-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 900 H W SW 11-Oct-18
FSP-0537
Pedestal @ C-0903, Area 900.
Elevation, Location, Rebar Works
JGSS1EP-VPCI-
539 11-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 600 H W SW 11-Oct-18
FSP-0538
Pedestal @ Z-0651, Area 600.

90 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Formworks, Anchor Bolt Setting and
540 11-Oct-18 Concrete Pouring Area 600 H W SW 12-Oct-18
FSP-0539 Concrete Placement Inspection for
Pedestal @ Structure-0605, Area 600.

Elevation, Location, Surface Preparation,


Formworks, Anchor Bolt Setting and
JGSS1EP-VPCI-
541 11-Oct-18 Concrete Pouring Concrete Placement Inspection for Area 900 H W SW 12-Oct-18
FSP-0540
Pedestal F1, & F4 @ K-0901
Compressor Shelter, Area 900.

28th day Compressive Strength Test of


the Remaining Pavement @ (South ASTEC,
JGSS1EP-VPCI-
542 11-Oct-18 Laboratory Testing Side) H-0305, Heater Foundation, Area Calamba City, H SW SW 12-Oct-18
FSP-0541
300 / Lean Concrete @ Structure-0606 Laguna.
(F1) (24 mpa @ 28 days).

7th day Compressive Strength Test of


Foundation @ C-0903, Area 900,
ASTEC,
JGSS1EP-VPCI- Structure-0605, Area 600 / Lean
543 11-Oct-18 Laboratory Testing Calamba City, H SW SW 12-Oct-18
FSP-0542 Concrete @ Strcuture-0605, Area 600 /
Laguna.
Concrete Pavement @ Structure-0601
(F2), Area 600 (24 mpa @ 28 days).

Elevation, Location,Surface Preparation,


Formworks and Concrete Placement
JGSS1EP-VPCI-
544 12-Oct-18 Concrete Pouring Inspection for Lean Concrete @ Area 600 H SW SW 12-Oct-18
FSP-0543
Structure-0604 (F3), Area 600 & spillwall
@ STR-601 (F1)

Elevation, Location, Rebar Works


JGSS1EP-VPCI-
545 12-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 700 H W SW 12-Oct-18
FSP-0544
Pedestal @ R-0701C, Area 700.

91 / 732
Elevation, Location, Rebar Works
JGSS1EP-VPCI-
546 12-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 500 H W SW 12-Oct-18
FSP-0545
Pedestal @ D-0510C, Area 500.
Elevation, Location, Rebar Works
JGSS1EP-VPCI-
547 12-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 600 H W SW 12-Oct-18
FSP-0546
Pedestal @ D-0693, Area 600.
Elevation, Location, Rebar Works
JGSS1EP-VPCI-
548 12-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 600 H W SW 12-Oct-18
FSP-0547
Pedestal @ E-0623B, Area 600.
Elevation, Location, Rebar Works
JGSS1EP-VPCI-
549 12-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 600 H W SW 12-Oct-18
FSP-0548
Pedestal @ LP-601, Area 600.

28th day Compressive Strength Test of ASTEC,


JGSS1EP-VPCI-
550 12-Oct-18 Laboratory Testing Foundation @ K-0901 Compressor Calamba City, H SW SW 13-Oct-18
FSP-0549
Shelter, Area 900 (24 mpa @ 28 days). Laguna.

7th day Compressive Strength Test of


ASTEC,
JGSS1EP-VPCI- Pedestal @ Quench Piperack (F1 & F2),
551 12-Oct-18 Laboratory Testing Calamba City, H SW SW 13-Oct-18
FSP-0550 Area 400 / Spillwall @ Chemical Injection
Laguna.
@ Area 400 (24 mpa @ 28 days).

7th day Compressive Strength Test of


Foundation @ D-0510C, Area 500, E- ASTEC,
JGSS1EP-VPCI-
552 12-Oct-18 Laboratory Testing 0623B, Area 600 / Spillwall @ Analyzer Calamba City, H SW SW 13-Oct-18
FSP-0551
Shelter #13, D-0600 & Structure-0601 Laguna.
(F2), Area 600 (24 mpa @ 28 days).

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
553 13-Oct-18 Concrete Pouring Area 800 H SW SW 15-Oct-18
FSP-0552 Inspection for Lean Concrete @ G-0805,
Area 800.

92 / 732
Elevation, Location, Surface Preparation,
Formworks, Anchor Bolt Setting and
Concrete Placement Inspection for
JGSS1EP-VPCI-
554 13-Oct-18 Concrete Pouring Pedestal F1 (Gridline Pa), F2, F3 & F4 Area 900 H W SW 15-Oct-18
FSP-0553
(Gridline Pb) / 1st Lift of Column of Base
Mat @ K-0901 Compressor Shelter, Area
900.

7th day Compressive Strength Test of


Foundation @ D-0693 & LP-601 / Lean ASTEC,
JGSS1EP-VPCI-
555 13-Oct-18 Laboratory Testing Concrete @ R-0701C / Concrete Calamba City, H SW SW 15-Oct-18
FSP-0554
Pavement & Spillwall @ Structure-0601 Laguna.
(F1 & F2) (24 mpa @ 28 days).

Elevation, Location,Surface Preparation,


Formworks and Concrete Placement
JGSS1EP-VPCI-
556 15-Oct-18 Concrete Pouring Inspection for Lean Concrete Area 600 H SW SW 15-Oct-18
FSP-0555
(Remaining, East Side) @ Structure-
0604 (F3) , Area 600.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Anchor Bolt Setting and Concrete
557 15-Oct-18 Concrete Pouring Area 500 H W SW 16-Oct-18
FSP-0556 Placement Inspection for Pedestal @ D-
0510C, Area 500.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Anchor Bolt Setting and Concrete
558 15-Oct-18 Concrete Pouring Area 700 H W SW 16-Oct-18
FSP-0557 Placement Inspection for Pedestal @ R-
0701C, Area 700. "Octagon"

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Anchor Bolt Setting and Concrete
559 15-Oct-18 Concrete Pouring Area 600 H W SW 16-Oct-18
FSP-0558 Placement Inspection for Pedestal @ D-
0693, Area 600.

93 / 732
28th day Compressive Strength Test of
ASTEC,
JGSS1EP-VPCI- Foundation @ G-0909A/B / G-0907A/B /
560 15-Oct-18 Laboratory Testing Calamba City, H SW SW 16-Oct-18
FSP-0559 G-0910A/B / G-0908A/B (24 mpa @ 28
Laguna.
days).

28th day Compressive Strength Test of


Foundation (F1) @ Structure-0606 / ASTEC,
JGSS1EP-VPCI-
561 15-Oct-18 Laboratory Testing Pedestal (F2) @ Structure-0606, Area Calamba City, H SW SW 16-Oct-18
FSP-0560
600 / Lean Concrete @ E-0914 / E-0917, Laguna.
Area 900 (24 mpa @ 28 days).

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
562 16-Oct-18 Concrete Pouring Area 800 H SW SW 15-Oct-18
FSP-0561 Inspection for Lean Concrete @ D-0811,
Area 800.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
563 16-Oct-18 Concrete Pouring Area 800 H SW SW 15-Oct-18
FSP-0562 Inspection for Lean Concrete @ G-
0811A/B, Area 800.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
564 16-Oct-18 Concrete Pouring Area 800 H W SW 17-Oct-18
FSP-0563 Placement Inspection for Foundation @
G-0811A/B Area 800.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
565 16-Oct-18 Concrete Pouring Area 800 H W SW 17-Oct-18
FSP-0564 Placement Inspection for Foundation @
D-0811 Area 800.

94 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Box
JGSS1EP-VPCI-
566 16-Oct-18 Concrete Pouring Setting and Concrete Placement Area 800 H W SW 17-Oct-18
FSP-0565
Inspection for Foundation @ G-0805
Area 800.
7th day Compressive Strength Test of
ASTEC,
JGSS1EP-VPCI- Foundation @ R-0701C, Area 700 / Lean
567 16-Oct-18 Laboratory Testing Calamba City, H SW SW 17-Oct-18
FSP-0566 Concrete @ E-0624EF, Area 600 (24
Laguna.
mpa @ 28 days).

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
568 17-Oct-18 Concrete Pouring Area 600 H W SW 18-Oct-18
FSP-0567 Placement Inspection for Foundation @
Structure-0604 (F3), Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
569 17-Oct-18 Laboratory Testing Test (By Sand Cone Method) 1st - 5th Area 600 H SW SW 18-Oct-18
FSP-0568
Layer @ Z-0651, Area 600.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
570 18-Oct-18 Concrete Pouring Area 600 H W SW 19-Oct-18
FSP-0569 Placement Inspection for Foundation @
G-0906A/B, Area 600.

28th Day Compressive Strength Test of


Pedestal @ G-0909A/B / G-0907A/B / G- ASTEC,
JGSS1EP-VPCI-
571 18-Oct-18 Laboratory Testing 0910A/B / G-0908A/B / Foundation @ E- Calamba City, H SW SW 19-Oct-18
FSP-0570
0914 / E-0917, Area 900 (24 Mpa @ 28 Laguna.
days).

95 / 732
28th Day Compressive Strength Test of
Lean Concrete @ Z-0651, Area 600 /
Pre-Cast Foundation @ CB-NP01, CB-
ASTEC,
JGSS1EP-VPCI- NP02, CB-NP03, CB-NP05 / Lean
572 18-Oct-18 Laboratory Testing Calamba City, H SW SW 19-Oct-18
FSP-0571 Concrete @ Quench Piperack, Area 400 /
Laguna.
Spill Wall @ H-0305 (North & West),
Heater Foundation, Area 300 (24 Mpa @
28 days).

7th day Compressive Strength Test of


ASTEC,
JGSS1EP-VPCI- Pedestal @ C-0902, C-0903, K-0901
573 18-Oct-18 Laboratory Testing Calamba City, H SW SW 19-Oct-18
FSP-0572 F1&F4 (Gridline Pc), Area 900 (24 mpa
Laguna.
@ 28 days).

7th day Compressive Strength Test of


Pedestal @ Z-0651, Area 600 / Lean
ASTEC,
JGSS1EP-VPCI- Concrete @ Structure-0604 (F3) West
574 18-Oct-18 Laboratory Testing Calamba City, H SW SW 19-Oct-18
FSP-0573 Side, Area 600 / Spillwall @ Structure-
Laguna.
0601 (F1), Area 600 (24 mpa @ 28
days).

Joint Inspection/Witness of Field Density


Test (By Sand Cone Method) @ Sub-
JGSS1EP-VPCI-
575 18-Oct-18 Laboratory Testing Base In-between R-0902, E-0914, E- Area 900 H SW SW 19-Oct-18
FSP-0574
0917 , G-0907A/B, G-0908A/B, G-
0909A/B & G-0910A/B, Area 900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
576 19-Oct-18 Concrete Pouring Area 600 H SW SW 19-Oct-18
FSP-0575 Inspection for Lean Concrete @ E-
0611C, Area 600.

96 / 732
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete prior to backfilling of Foundation &
577 19-Oct-18 Area 900 H SW SW 20-Oct-18
FSP-0576 Placement Pedestal @ K-0901 Compressor Shelter,
Area 900.

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete
578 19-Oct-18 prior to backfilling of Foundation & Area 600 H SW SW 20-Oct-18
FSP-0577 Placement
Pedestal @ Structure-0605, Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI- Test (By Sand Cone Method) 1st - 8th
579 19-Oct-18 Laboratory Testing Area 900 H SW SW 20-Oct-18
FSP-0578 Layer @ K-0901 Compressor Shelter,
Area 900.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
580 19-Oct-18 Laboratory Testing Test (By Sand Cone Method) 1st - 9th Area 600 H SW SW 20-Oct-18
FSP-0579
Layer @ Structure-0605, Area 600.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks and Concrete
JGSS1EP-VPCI- Placement Inspection for Concrete
581 19-Oct-18 Concrete Pouring Area 900 H SW SW 20-Oct-18
FSP-0580 Pavement in-between R-0902, E-0914,
E-0917 , G-0907A/B, G-0908A/B, G-
0909A/B & G-0910A/B, Area 900.

28th day Compressive Strength Test of


Pedestal @ Structure-0606 (F1), Area
600 / Lean Concrete @ Quench Piperack
JGSS1EP-VPCI- (F1), Area 400 , D-0640, Area 600 / Quantum
582 19-Oct-18 Laboratory Testing H SW SW 20-Oct-18
FSP-0581 Spillwall @ H-0305 (South Side), Heater Laboratory
Foundation, Area 300 / Pre-Cast
Foundation @ Catch Basin (CB-NP02 )
DPG-2, Area 900 (24 mpa @ 28 days).

97 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
583 20-Oct-18 Laboratory Testing Test (By Sand Cone Method) @ Analyzer Area 300 H SW SW 22-Oct-18
FSP-0582
Shelter #12, Area 300.

7th day Compressive Strength Test of


Pedestal @ F1 (Gridline Pa), F2, F3, F4
(Gridline Pb) K-0901, Area 900,
Structure-0605, Area 600 / 1st Lift of
JGSS1EP-VPCI- Quantum
584 20-Oct-18 Laboratory Testing Column @ Base Mat of K-0901, Area 900 H SW SW 22-Oct-18
FSP-0583 Laboratory
/ Lean Concrete @ Structure-0604 (F3)
Remaining @ East Side, Area 600, D-
0811, G-0811A/B, G-0805, Area 800 (24
mpa @ 28 days).

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
585 22-Oct-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 23-Oct-18
FSP-0584
Inspection for Pedestal @ E-0623B,
Area 600.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks, Rebar works and Concrete
586 22-Oct-18 Concrete Pouring Area 600 H W SW 23-Oct-18
FSP-0585 Placement Inspection for Foundation @
E-0611C, Area 600.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
587 23-Oct-18 Concrete Pouring Area 600 H SW SW 24-Oct-18
FSP-0587 Inspection for Lean Concrete @
Structure-0604 (F1), Area 600.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
588 24-Oct-18 Concrete Pouring Setting and Concrete Placement Area 900 H W SW 24-Sep-18
FSP-0588
Inspection for Pedestal @ G-0906A/B,
Area 900.

98 / 732
Joint Inspection/Witness of Field Density
Test (By Sand Cone Method) of Sub-
JGSS1EP-VPCI-
589 24-Oct-18 Laboratory Testing Base Inbetween Structure-0903 F1 & F3, Area 900 H SW SW 25-Oct-18
FSP-0589
K-0901 F1, FG1 & F4, D-0910 & D-0909,
Area 900.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
590 25-Oct-18 Concrete Pouring Area 800 H W SW 25-Oct-18
FSP-0590 Placement Inspection for Foundation @
G-0811A/B Area 800.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
591 25-Oct-18 Concrete Pouring Setting and Concrete Placement Area 300 H W SW 26-Oct-18
FSP-0591
Inspection for Foundation @ Analyzer
Shelter #12, Area 300.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
592 25-Oct-18 Concrete Pouring Area 600 H W SW 26-Oct-18
FSP-0592 Placement Inspection for Foundation @
E-0624E/F, Area 600.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
593 25-Oct-18 Concrete Pouring Area 600 H W SW 26-Oct-18
FSP-0593 Placement Inspection for Foundation @
Structure-0604 (F1), Area 600.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
594 25-Oct-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 26-Oct-18
FSP-0594
Inspection for Pedestal @ E-0623B, Area
600.

99 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
595 25-Oct-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 26-Oct-18
FSP-0595
Inspection for Pedestal @ D-0693, Area
600.
7th day Compressive Strength Test of
JGSS1EP-VPCI- Lean Concrete @ E-0611C, Area 600 / Quantum
596 25-Oct-18 Laboratory Testing H SW SW 26-Oct-18
FSP-0596 Foundation @ (F3) Structure-0604 (24 Laboratory
mpa @ 28 days).

7th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
597 25-Oct-18 Laboratory Testing Pedestal @ R-0701C, Area 700, D- H SW SW 26-Oct-18
FSP-0597 Laboratory
0510C, Area 500 (24 mpa @ 28 days).

7th day Compressive Strength Test of


JGSS1EP-VPCI- Foundation @ G-0805, D-0811, Area Quantum
598 25-Oct-18 Laboratory Testing H SW SW 26-Oct-18
FSP-0598 800, G-0906A/B, Area 900 (24 mpa @ 28 Laboratory
days).

Elevation, Location, Surface Preparation,


Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
599 26-Oct-18 Concrete Pouring Placement Inspection for Concrete Area 900 H SW SW 26-Oct-18
FSP-0599
Pavement in-between Structure-0903, G-
0909A/B & G-0908A/B, Area 900.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
600 27-Oct-18 Concrete Pouring Area 900 H SW SW 27-Oct-18
FSP-0600 Placement Inspection for Concrete
Pavement @ Structure-0904, Area 900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
601 27-Oct-18 Concrete Pouring Area 400 H SW SW 27-Oct-18
FSP-0601 Inspection for Lean Concrete @
Structure-0406, Area 400.

100 / 732
Elevation, Location, Rebar Works
JGSS1EP-VPCI- Inspection prior to fomworks closure of
602 27-Oct-18 Pre-pouring Area 600 H W SW 29-Oct-18
FSP-0602 Pedestal @ Structure-0604 (F1), Area
600.
Elevation, Location, Rebar Works
JGSS1EP-VPCI-
603 27-Oct-18 Pre-pouring Inspection prior to fomworks closure of Area 600 H W SW 29-Oct-18
FSP-0603
Pedestal @ E-0611C, Area 600.
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
604 27-Oct-18 Concrete Pouring Area 900 H SW SW 29-Oct-18
FSP-0604 Inspection for Lean Concrete @ D-0912,
Area 900.
Elevation, Location,Surface Preparation,
JGSS1EP-VPCI- Formworks and Concrete Placement
605 27-Oct-18 Concrete Pouring Area 900 H SW SW 29-Oct-18
FSP-0605 Inspection for Lean Concrete @ D-0908,
Area 900.

28th day Compressive Strength Test of


Foundation @ Z-0651, Area 600 /
JGSS1EP-VPCI- Precast Wall @ Catch Basin CB-NP01, Quantum
606 27-Oct-18 Laboratory Testing H SW SW 29-Oct-18
FSP-0606 Heater Foundation, Area 300, NP02, Laboratory
NP03 & NPO5 DPG-2, Area 900 (24 mpa
@ 28 days).

7th day Compressive Strength Test of


Concrete Pavement Inbetween R-0902,
JGSS1EP-VPCI- Quantum
607 27-Oct-18 Laboratory Testing Structure-0903, E-0917, E-0914, G- H SW SW 29-Oct-18
FSP-0607 Laboratory
0909A/B, G-0910A/B & G-0907A/B (24
mpa @ 28 days).

28th day Compressive Strength Test of


Foundation @ Z-0901, Z-0902, Area 900,
JGSS1EP-VPCI- D-0640, Area 600 / Lean Concrete @ Z- Quantum
608 29-Oct-18 Laboratory Testing H SW SW 30-Oct-18
FSP-0608 0901, Z-0902 & C-0903, Area 900 / Pre- Laboratory
Cast Wall @ CB-NO01, DPG-2, Area 900
(24 mpa @ 28 days).

101 / 732
28th day Compressive Strength Test of
Foundation @ Quench Piperack (F1 &
JGSS1EP-VPCI- Quantum
609 29-Oct-18 Laboratory Testing F2), Area 400 / Lean Concrete @ D- H SW SW 30-Oct-18
FSP-0609 Laboratory
0693, LP-601 & E-0623B, Area 600 (24
mpa @ 28 days).
Elevation, Location, Surface
Preparation, Rebar Works, Formworks
JGSS1EP-VPCI-
610 29-Oct-18 Concrete Pouring and Concrete Placement Inspection Area 400 H W SW 30-Oct-18
FSP-0610
for Foundation @ Structure-0406,
Area 600.
Joint Inspection/Witness of Field
JGSS1EP-VPCI- Density Test (By Sand Cone Method)
611 29-Oct-18 Laboratory Testing Area 900 H SW SW 30-Oct-18
FSP-0611 of Sub-Base Inbetween C-0902, C-
0903 & G-0906A/B, Area 900.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
612 30-Oct-18 Concrete Pouring Area 900 H W SW 30-Oct-18
FSP-0612 Placement Inspection for Spillwall @
DPG-2 Piperack, Area 900.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
613 30-Oct-18 Concrete Pouring Area 900 H W SW 30-Oct-18
FSP-0613 Placement Inspection for Spillwall @
Structure-0904, Area 900.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks and Concrete
Placement Inspection for Concrete
JGSS1EP-VPCI-
614 30-Oct-18 Concrete Pouring Pavement Inbetween G-0906A/B, G- Area 900 H W SW 31-Oct-18
FSP-0614
0907A/B, G-0908A/B, G-0910A/B, C-
0902, C-0903 & D-0912, DPG-2, Area
900.

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
615 30-Oct-18 Laboratory Testing Concrete Pavement @ Analyzer Shelter H SW SW 31-Oct-18
FSP-0615 Laboratory
#13, Area 600 (24 mpa @ 28 days).

102 / 732
28th day Compressive Strength Test of
JGSS1EP-VPCI- Foundation @ K-0901, Area 900 / Quantum
616 30-Oct-18 Laboratory Testing H SW SW 31-Oct-18
FSP-0616 Concrete Pavement @ Chemical Laboratory
Injection, Area 400 (24 mpa @ 28 days).

7th day Compressive Strength Test of


JGSS1EP-VPCI- Foundation @ E-0611C / Lean Concrete Quantum
617 30-Oct-18 Laboratory Testing H SW SW 31-Oct-18
FSP-0617 @ Structure-0604 (F1), Area 600 (24 Laboratory
mpa @ 28 days).
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) 1st - 3rd
618 31-Oct-18 Laboratory Testing Area 900 H SW SW 31-Oct-18
FSP-0618 Layer Inbetween C-0902, C-0903 & G-
0906A/B, Area 900.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
619 31-Oct-18 Laboratory Testing Test (By Sand Cone Method) of Sub- Area 900 H SW SW 31-Oct-18
FSP-0619
Base @ Struture-0904, Area 900.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
620 31-Oct-18 Laboratory Testing Test (By Sand Cone Method) @ Area 400 H SW SW 31-Oct-18
FSP-0620
Strcuture-0406, Area 400.
Elevation, Location, Surface Preparation,
Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
621 31-Oct-18 Concrete Pouring Setting and Concrete Placement Area 800 H W SW 31-Oct-18
FSP-0621
Inspection for Pedestal @ G-0811A/B,
Area 800.

Elevation, Location,Surface Preparation,


Formworks and Concrete Placement
JGSS1EP-VPCI-
622 31-Oct-18 Concrete Pouring Inspection for Lean Concrete @ Area 900 H SW SW 31-Oct-18
FSP-0622
Structure-0903 (F4) DPG-2 Piperack,
Area 900.

103 / 732
28th day Compressive Strength Test of
JGSS1EP-VPCI- Lean Concrete @ D-0510C, Area 500 / Quantum
623 31-Oct-18 Laboratory Testing H SW SW 1-Nov-18
FSP-0623 Concrete Pavement @ D-0600, Area 600 Laboratory
(24 mpa @ 28 days).

7th day Compressive Strength Test of


JGSS1EP-VPCI- Foundation @ G-0811A/B (West Fdn.), Quantum
624 31-Oct-18 Laboratory Testing H SW SW 1-Nov-18
FSP-0624 Area 800 / Pedestal @ G-0906A/B, Area Laboratory
900 (24 mpa @ 28 days).

28th day Compressive Strength Test of


Foundation @ C-0903, Area 900,
JGSS1EP-VPCI- Structure-0605, Area 600 / Lean Quantum
625 1-Nov-18 Laboratory Testing H SW SW 2-Nov-18
FSP-0625 Concrete @ Strcuture-0605, Area 600 / Laboratory
Concrete Pavement @ Structure-0601
(F2), Area 600 (24 mpa @ 28 days).

7th day Compressive Strength Test of


JGSS1EP-VPCI- Foundation @ Analyzer Shelter #12, Area Quantum
626 1-Nov-18 Laboratory Testing H SW SW 2-Nov-18
FSP-0626 300 / Structure-0604 (F1), Area 600 (24 Laboratory
mpa @ 28 days).

7th day Compressive Strength Test of


Pedestal @ D-0693, Area 600 / Concrete
JGSS1EP-VPCI- Quantum
627 1-Nov-18 Laboratory Testing Pavement Inbetween Structure-0903, G- H SW SW 2-Nov-18
FSP-0627 Laboratory
0909A/B & G-0908A/B, Area 900 (24
mpa @ 28 days).

Elevation, Location, Rebar Works


JGSS1EP-VPCI-
628 2-Nov-18 Pre-pouring Inspection prior to fomworks closure of Area 400 H W SW 2-Nov-18
FSP-0628
Pedestal @ Structure-0406, Area 400.

Elevation, Location, Rebar Works


JGSS1EP-VPCI-
629 2-Nov-18 Pre-pouring Inspection prior to fomworks closure of Area 600 H W SW 2-Nov-18
FSP-0629
Pedestal @ E-0624EF, Area 600.

104 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
630 2-Nov-18 Laboratory Testing Test (By Sand Cone Method) 1st - 4th Area 500 H SW SW 5-Nov-18
FSP-0630
Layer @ D-0510C, Area 500.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
631 2-Nov-18 Laboratory Testing Test (By Sand Cone Method) of Sub- Area 500 H SW SW 5-Nov-18
FSP-0631
Base @ D-0510C, Area 500.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
632 2-Nov-18 Concrete Pouring Area 600 H SW SW 5-Nov-18
FSP-0632 Inspection for Lean Concrete @ D-0651
& D-0691, Area 600.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
633 2-Nov-18 Concrete Pouring Setting and Concrete Placement Area 900 H W SW 5-Nov-18
FSP-0633
Inspection for Foundation @ D-0912,
Area 900.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
634 2-Nov-18 Concrete Pouring Setting and Concrete Placement Area 700 H W SW 5-Nov-18
FSP-0634
Inspection for Pedestal (P1) @ R-
0701C, Area 700.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
635 2-Nov-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 5-Nov-18
FSP-0635
Inspection for Pedestal (F1 & F3) @
Structure-0604, Area 600.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
636 2-Nov-18 Concrete Pouring Area 400 H W SW 5-Nov-18
FSP-0636 Placement Inspection for Foundation
(F4) @ Structure-0903, Area 900.

105 / 732
30th day Compressive Strength Test of
Foundation @ D-0510C, Area 500, E-
JGSS1EP-VPCI- Quantum
637 2-Nov-18 Laboratory Testing 0623B, Area 600 / Spillwall @ Analyzer H SW SW 5-Nov-18
FSP-0637 Laboratory
Shelter # 13, D-0600 & Structure-0601
(F2), Area 600 (24 MPa @ 28 days).

30th day Compressive Strength Test of


JGSS1EP-VPCI- Pedestal @ Quench Piperack (F1 & F2), Quantum
638 2-Nov-18 Laboratory Testing H SW SW 5-Nov-18
FSP-0638 Area 400 / Spillwall @ Chemical Laboratory
Injection, Area 400 (24 MPa @ 28 days).

9th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
639 2-Nov-18 Laboratory Testing Concrete Pavement @ Structure-0904, H SW SW 5-Nov-18
FSP-0639 Laboratory
Area 900 (24 MPa @ 28 days).
9th day Compressive Strength Test of
Lean Concrete @ Structure-0406, Area
JGSS1EP-VPCI- Quantum
640 2-Nov-18 Laboratory Testing 400 / Foundation @ E-0624EF, Area H SW SW 5-Nov-18
FSP-0640 Laboratory
600 / Pedestal @ E-0623B, Area 600 (24
MPa @ 28 days).

28th day Compressive Strength Test of


Foundation @ D-0693 & LP-601, Area
JGSS1EP-VPCI- 600 / Lean Concrete @ R-0701C, Area Quantum
641 2-Nov-18 Laboratory Testing H SW SW 5-Nov-18
FSP-0641 700 / Concrete Pavement & Spillwall @ Laboratory
Structure-0601 F1 & F2, Area 600 (24
MPa @ 28 days).

Material Inspection of Delivered Anchor


JGSS1EP-VPCI-
642 5-Nov-18 Material Inspection Bolts (M30 Type 1, M36 Type 1, M48 Laydown H SW SW 5-Nov-18
FSP-0642
Type 1, M20 Type 1, M10 Type 1).

106 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Anchor Bolt Setting and
643 5-Nov-18 Concrete Pouring Area 400 H W SW 5-Nov-18
FSP-0643 Concrete Placement Inspection for
Pedestal @ Structure-0406, Area 400.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
644 5-Nov-18 Laboratory Testing Test (By Sand Cone Method) @ K-0901 Area 900 H SW SW 5-Nov-18
FSP-0644
Lube Oil Console, Area 900.

Elevation, Location, Rebar Works


JGSS1EP-VPCI- Inspection prior to fomworks closure of
645 5-Nov-18 Pre-pouring Area 900 H W SW 6-Nov-18
FSP-0645 Pedestal @ (F4) Structure-0903 & DPG-
2, Area 900.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
646 5-Nov-18 Concrete Pouring Area 900 H SW SW 6-Nov-18
FSP-0646 Inspection for Lean Concrete @ K-0901
Lube Oil Console, Area 900.

7th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
647 5-Nov-18 Laboratory Testing Foundation @ Structure-0406, Area 400 H SW SW 6-Nov-18
FSP-0647 Laboratory
(24 MPa @ 28 days).
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
648 5-Nov-18 Laboratory Testing Test (By Sand Cone Method) 1st - 3rd Area 600 H SW SW 5-Nov-18
FSP-0648
Layer @ D-0693, Area 600.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
649 5-Nov-18 Concrete Pouring Area 900 H W SW 5-Nov-18
FSP-0649 Placement Inspection for remaining
Spillwall @ DPG-2, Area 900.

JGSS1EP-VPCI- Material Inspection of Delivered Steel


650 6-Nov-18 Material Inspection Laydown H SW SW 6-Nov-18
FSP-0650 Grating.

107 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
651 6-Nov-18 Laboratory Testing Test (By Sand Cone Method) 1st - 5th Area 600 H SW SW 7-Nov-18
FSP-0651
Layer @ E-0623B, Area 600.

28th day Compressive Strength Test of


JGSS1EP-VPCI- Foundation @ R-0701C, Area 700 / Lean Quantum
652 6-Nov-18 Laboratory Testing H SW SW 7-Nov-18
FSP-0652 Concrete @ E-0624EF, Area 600 (24 Laboratory
MPa @ 28 days).

7th day Compressive Strength Test of


Concrete Pavement @ C-0903, C-0902,
G-0906A/B, G-0908A/B, G-0907A/B, G-
0910A/B / Spillwall @ Structure-0904, R-
JGSS1EP-VPCI- Quantum
653 6-Nov-18 Laboratory Testing 0908, Structure-0903 & DPG-2, Area 900 H SW SW 7-Nov-18
FSP-0653 Laboratory
/ Pedestal @ G-0811A/B, Area 800 /
Lean Concrete @ Structure-0903 &
DPG-2 (F4), Area 900 (24 MPa @ 28
days).

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
654 6-Nov-18 Concrete Pouring Area 600 H W SW 7-Nov-18
FSP-0654 Placement Inspection for Foundation @
D0651 & D-0691, Area 600.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Anchor Bolt Setting and
655 6-Nov-18 Concrete Pouring Area 600 H W SW 7-Nov-18
FSP-0655 Concrete Placement Inspection for
Pedestal @ E-0611C, Area 600.

2nd day Compressive Strength Test of


Pedestal @ Structure-0604 (F1 & F3),
JGSS1EP-VPCI- Quantum
656 7-Nov-18 Laboratory Testing Area 600, R-0701C (P1), Area 700 / Lean H SW SW 7-Nov-18
FSP-0656 Laboratory
Concrete @ D-651 &D-0691, Area 600
(24 MPa @ 3 days).

108 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Anchor Bolt Setting and
657 7-Nov-18 Concrete Pouring Area 600 H W SW 8-Nov-18
FSP-0657 Concrete Placement Inspection for
Pedestal @ E-0624EF, Area 600.

3rd day Compressive Strength Test of


Pedestal @ Structure-0604 (F1 & F3),
JGSS1EP-VPCI- Quantum
658 7-Nov-18 Laboratory Testing Area 600, R-0701C (P1), Area 700 / Lean H SW SW 8-Nov-18
FSP-0658 Laboratory
Concrete @ D-651 &D-0691, Area 600
(24 MPa @ 3 days).

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
659 8-Nov-18 Concrete Pouring Setting and Concrete Placement Area 900 H W SW 8-Nov-18
FSP-0659
Inspection for Pedestal @ D-0912, Area
900.

Elevation, Location, Surface Preparation,


Rebar Works, Anchor Bolt Setting and
JGSS1EP-VPCI-
660 8-Nov-18 Concrete Pouring Concrete Placement Inspection for Area 900 H W SW 8-Nov-18
FSP-0660
Pedestal @ Structure-0903 & DPG-2
(F4), Area 900.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
661 8-Nov-18 Concrete Pouring Setting and Concrete Placement Area 900 H W SW 8-Nov-18
FSP-0661
Inspection for Foundation @ K-0901
Lube Oil Console, Area 900.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
662 8-Nov-18 Concrete Pouring Area 600 H W SW 8-Nov-18
FSP-0662 Placement Inspection of Modified
Pedestal @ D-0690, Area 600.

109 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Anchor Bolt Setting and
663 8-Nov-18 Concrete Pouring Area 600 H W SW 8-Nov-18
FSP-0663 Concrete Placement Inspection for
Pedestal @ LP-601, Area 600.

Elevation, Location, Rebar Works


JGSS1EP-VPCI-
664 8-Nov-18 Pre-pouring Inspection prior to fomworks closure of Area 600 H W SW 9-Nov-18
FSP-0664
Pedestal @ D-0651 & D-0691, Area 600.

28th day Compressive Strength Test of


JGSS1EP-VPCI- Pedestal @ C-0902, C-0903, K-0901 Quantum
665 8-Nov-18 Laboratory Testing H SW SW 9-Nov-18
FSP-0665 F1&F4 (Gridline Pc), Area 900 (24 mpa Laboratory
@ 28 days).

28th day Compressive Strength Test of


Pedestal @ Z-0651, Area 600 / Lean
JGSS1EP-VPCI- Concrete @ Structure-0604 (F3) West Quantum
666 8-Nov-18 Laboratory Testing H SW SW 9-Nov-18
FSP-0666 Side, Area 600 / Spillwall @ Structure- Laboratory
0601 (F1), Area 600 (24 mpa @ 28
days).

1st day Compressive Strength Test of


Pedestal @ Structure-0903 & DGP2 (F4),
JGSS1EP-VPCI- Quantum
667 8-Nov-18 Laboratory Testing D-0912, Area 900 / Concrete Pavement H SW SW 9-Nov-18
FSP-0667 Laboratory
@ DPG-2 (Restoration), 24 mpa @ 3
days.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
668 9-Nov-18 prior to backfilling of Foundation & Area 700 H SW SW 9-Nov-18
FSP-0668 Placement
Pedestal @ R-0701C, Area 700.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete prior to backfilling of Foundation &
669 9-Nov-18 Area 600 H SW SW 9-Nov-18
FSP-0669 Placement Pedestal @ Structure-0604 (F1 & F3),
Area 600.

110 / 732
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
670 9-Nov-18 prior to backfilling of Foundation & Area 400 H SW SW 9-Nov-18
FSP-0670 Placement
Pedestal @ Structure-0406, Area 400.

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete
671 9-Nov-18 prior to backfilling of Foundation & Area 600 H SW SW 9-Nov-18
FSP-0671 Placement
Pedestal @ E-0623B, Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
672 9-Nov-18 Laboratory Testing Test (By Sand Cone Method) 1st - 4th Area 700 H SW SW 9-Nov-18
FSP-0672
Layer @ R-0701C, Area 700.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
673 9-Nov-18 Laboratory Testing Test (By Sand Cone Method) 1st - 6th Area 400 H SW SW 9-Nov-18
FSP-0673
Layer @ Structure-0406, Area 400.

28th day Compressive Strength Test of


Pedestal @ F1 (Gridline Pa), F2, F3, F4
(Gridline Pb) K-0901, Area 900,
Structure-0605, Area 600 / 1st Lift of
JGSS1EP-VPCI- Quantum
674 12-Nov-18 Laboratory Testing Column @ Base Mat of K-0901, Area 900 H SW SW 12-Nov-18
FSP-0674 Laboratory
/ Lean Concrete @ Structure-0604 (F3)
Remaining @ East Side, Area 600, D-
0811, G-0811A/B, G-0805, Area 800 (24
mpa @ 28 days).

7th day Compressive Strength Test of


Pedestal @ Structure-0604 (F1 & F3),
JGSS1EP-VPCI- Quantum
675 12-Nov-18 Laboratory Testing Area 600, R-0701C (P1), Area 700 / Lean H SW SW 12-Nov-18
FSP-0675 Laboratory
Concrete @ D-651 &D-0691, Area 600
(24 MPa @ 3 days).

111 / 732
7th day Compressive Strength Test of
Lean Concrete @ K-0901 Lube Oil
Console, Area 900 / Pedestal @
JGSS1EP-VPCI- Quantum
676 12-Nov-18 Laboratory Testing Structure-0406, Area 400 / Spillwall @ H SW SW 12-Nov-18
FSP-0676 Laboratory
DPG-2, Area 900 / Foundation @ D-
0912, Structure-0903 & DPG-2 (F4), Area
900 (24 MPa @ 28 days).

4th day Compressive Strength Test of


Pedestal @ Structure-0903 & DGP2 (F4),
JGSS1EP-VPCI- Quantum
677 12-Nov-18 Laboratory Testing D-0912, Area 900 / Concrete Pavement H SW SW 12-Nov-18
FSP-0677 Laboratory
@ DPG-2 (Restoration), 24 mpa @ 3
days.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete prior to backfilling of Foundation &
678 12-Nov-18 Area 900 H SW SW 12-Nov-18
FSP-0678 Placement Pedestal @ Structure-0903 & DPG-2
(F4), Area 900.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) 1st - 4th
679 12-Nov-18 Laboratory Testing Area 900 H SW SW 12-Nov-18
FSP-0679 Layer @ Structure-0903 & DPG-2 (F4),
Area 900.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
680 12-Nov-18 Laboratory Testing Test (By Sand Cone Method) of Sub- Area 700 H SW SW 12-Nov-18
FSP-0680
Base Course @ R-0701C, Area 700.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI- Test (By Sand Cone Method) of Sub-
681 12-Nov-18 Laboratory Testing Area 400 H SW SW 12-Nov-18
FSP-0681 Base Course @ Structure-0406, Area
400.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
682 12-Nov-18 Concrete Pouring Area 600 H SW SW 12-Nov-18
FSP-0682 Inspection for Lean Concrete @ E-
00690, Area 600.

112 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
683 12-Nov-18 Laboratory Testing Test (By Sand Cone Method) @ E-0405, Area 400 H SW SW 12-Nov-18
FSP-0683
Area 400.
Joint Inspection/Witness of Field
JGSS1EP-VPCI-
684 12-Nov-18 Laboratory Testing Density Test (By Sand Cone Method) Area 500 H SW SW 13-Nov-18
FSP-0684
@ E-0509B, Area 500.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
685 12-Nov-18 Concrete Pouring Area 500 H SW SW 13-Nov-18
FSP-0685 Inspection for Lean Concrete @ E-
0509B, Area 500.

Elevation, Location,Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
686 12-Nov-18 Concrete Pouring Area 400 H SW SW 13-Nov-18
FSP-0686 Inspection for Lean Concrete @ E-
0405R, Area 400.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Anchor Bolt Setting and
687 12-Nov-18 Concrete Pouring Area 600 H W SW 13-Nov-18
FSP-0687 Concrete Placement Inspection for
Pedestal @ D-0651 & D-0691, Area 600.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks, Anchor Bolt
JGSS1EP-VPCI-
688 12-Nov-18 Concrete Pouring Setting and Concrete Placement Area 600 H W SW 13-Nov-18
FSP-0688
Inspection for Foundation @ E-0690,
Area 600.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
689 13-Nov-18 Concrete Pouring Area 700 H W SW 14-Nov-18
FSP-0689 Placement Inspection for Concrete
Pavement @ R-0701C, Area 700.

113 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
690 13-Nov-18 Concrete Pouring Area 500 H W SW 14-Nov-18
FSP-0690 Placement Inspection for Concrete
Pavement @ D-0510C, Area 500.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
691 14-Nov-18 Laboratory Testing Test (By Sand Cone Method) @ E- Area 400 H SW SW 14-Nov-18
FSP-0691
0401B, Area 400.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
692 14-Nov-18 Laboratory Testing Test (By Sand Cone Method) @ Area 400 H SW SW 14-Nov-18
FSP-0692
Structure-0407, Area 400.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
693 14-Nov-18 Concrete Pouring Placement Inspection for Restoration of Area 400 H W SW 14-Nov-18
FSP-0693
Concrete Pavement @ Structure-0406,
Area 400.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
694 14-Nov-18 Concrete Pouring Area 400 H SW SW 14-Nov-18
FSP-0694 Placement Inspection for Lean Concrete
@ E-0401B, Area 400.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
695 14-Nov-18 Concrete Pouring Area 400 H SW SW 14-Nov-18
FSP-0695 Placement Inspection for Lean Concrete
@ Structure-0407, Area 400.

7th day Compressive Strength Test of


JGSS1EP-VPCI- Foundation @ D-0651 & D-0691, Area Quantum
696 14-Nov-18 Laboratory Testing H SW SW 15-Nov-18
FSP-0696 600 / Pedestal @ D-0690, Area 600 (24 Laboratory
MPa @ 28 days).

7th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
697 14-Nov-18 Laboratory Testing Pedestal @ E-0624EF, E-0611C & LP- H SW SW 15-Nov-18
FSP-0697 Laboratory
601, Area 600 (24 MPa @ 28 days).

114 / 732
7th day Compressive Strength Test of
Pedestal @ Structure-0903 & DGP2 (F4),
JGSS1EP-VPCI- Quantum
698 14-Nov-18 Laboratory Testing D-0912, Area 900 / Concrete Pavement H SW SW 15-Nov-18
FSP-0698 Laboratory
@ DPG-2 (Restoration), 24 mpa @ 3
days.
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) @ East &
699 14-Nov-18 Laboratory Testing Area 300 H SW SW 15-Nov-18
FSP-0699 West Side of Analyzer Shelter #12, Area
300.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
700 14-Nov-18 Concrete Pouring Placement Inspection of Concrete Area 300 H W SW 15-Nov-18
FSP-0700
Pavement @ East & West Side of
Analyzer Shelter #12, Area 300.

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete
701 15-Nov-18 prior to backfilling of Foundation & Area 600 H SW SW 16-Nov-18
FSP-0701 Placement
Pedestal @ E-0624EF, Area 600.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
702 15-Nov-18 prior to backfilling of Foundation & Area 600 H SW SW 16-Nov-18
FSP-0702 Placement
Pedestal @ E-0611C, Area 600.
Visual Inspection of concrete surface
JGSS1EP-VPCI- Post Concrete
703 15-Nov-18 prior to backfilling of Foundation & Area 600 H SW SW 16-Nov-18
FSP-0703 Placement
Pedestal @ LP-601, Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
704 15-Nov-18 Laboratory Testing Test (By Sand Cone Method) 1st - 2nd Area 600 H SW SW 16-Nov-18
FSP-0704
Layer @ E-0624EF, Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
705 15-Nov-18 Laboratory Testing Test (By Sand Cone Method) 1st - 2nd Area 600 H SW SW 16-Nov-18
FSP-0705
Layer @ E-0611C, Area 600.

115 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks and Concrete
JGSS1EP-VPCI- Placement Inspection for Restoration of
706 15-Nov-18 Concrete Pouring Area 900 H SW SW 16-Nov-18
FSP-0706 Concrete Pavement @ DPG-2 near D-
0902, G-0906A/B & Structure-0903 (F4),
Area 900.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
707 15-Nov-18 Concrete Pouring Area 900 H SW SW 16-Nov-18
FSP-0707 Placement Inspection of Foundation @
D-0908, Area 900.

28th day Compressive Strength Test of


JGSS1EP-VPCI- Lean Concrete @ E-0611C, Area 600 / Quantum
708 15-Nov-18 Laboratory Testing H SW SW 16-Nov-18
FSP-0708 Foundation @ (F3) Structure-0604 (24 Laboratory
mpa @ 28 days).

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
709 15-Nov-18 Laboratory Testing Pedestal @ R-0701C, Area 700, D- H SW SW 16-Nov-18
FSP-0709 Laboratory
0510C, Area 500 (24 mpa @ 28 days).

28th day Compressive Strength Test of


JGSS1EP-VPCI- Foundation @ G-0805, D-0811, Area Quantum
710 15-Nov-18 Laboratory Testing H SW SW 16-Nov-18
FSP-0710 800, G-0906A/B, Area 900 (24 mpa @ 28 Laboratory
days).

Visual Inspection of concrete surface


JGSS1EP-VPCI- Post Concrete
711 16-Nov-18 prior to backfilling of Foundation & Area 600 H SW SW 16-Nov-18
FSP-0711 Placement
Pedestal @ D-0651 & D-0691, Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
712 16-Nov-18 Laboratory Testing Test (By Sand Cone Method) 1st - 4th Area 600 H SW SW 16-Nov-18
FSP-0712
Layer @ D-0651 & D-0691, Area 600.

116 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
713 16-Nov-18 Concrete Pouring Placement Inspection for Restoration of Area 500 H SW SW 16-Nov-18
FSP-0713
Concrete Pavement @ D-0510C, Area
500.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
714 16-Nov-18 Concrete Pouring Placement Inspection for Restoration of Area 700 H SW SW 16-Nov-18
FSP-0714
Concrete Pavement @ R-0701C, Area
700.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
715 16-Nov-18 Concrete Pouring Area 500 H SW SW 17-Nov-18
FSP-0715 Placement Inspection of Foundation @
E-0509B, Area 500.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
716 16-Nov-18 Concrete Pouring Area 400 H SW SW 17-Nov-18
FSP-0716 Placement Inspection of Foundation @
E-0405R, Area 400.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
717 16-Nov-18 Concrete Pouring Area 400 H SW SW 17-Nov-18
FSP-0717 Placement Inspection of Foundation @
E-0401B, Area 400.

7th day Compressive Strength Test of


Foundation @ K-0901 Lube Oil Console,
JGSS1EP-VPCI- Quantum
718 16-Nov-18 Laboratory Testing Area 900 / Lean Concrete @ E-0690, H SW SW 17-Nov-18
FSP-0718 Laboratory
Area 600 (24 mpa @ 28 days).
LaboratorD724:E733y Testing

117 / 732
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI- Test (By Sand Cone Method) 1st - 3rd
719 17-Nov-18 Laboratory Testing Area 400 H SW SW 17-Nov-18
FSP-0719 Layer @ FW-39871, Area 400.
LaboratorD725:E733y Testing

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
720 17-Nov-18 Laboratory Testing Test (By Sand Cone Method) 1st - 3rd Area 600 H SW SW 17-Nov-18
FSP-0720
Layer @ FW-39906, Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
721 17-Nov-18 Laboratory Testing Test (By Sand Cone Method) 1st - 3rd Area 600 H SW SW 17-Nov-18
FSP-0721
Layer @ FW-39870, Area 600.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
722 17-Nov-18 Concrete Pouring Area 400 H SW SW 17-Nov-18
FSP-0722 Inspection of Lean Concrete @ Y-
0415A/B, Area 400.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
723 17-Nov-18 Concrete Pouring Placement Inspection for Remaining Area 300 H SW SW 17-Nov-18
FSP-0723
Concrete Pavement @ H-0305 (near
Manhole), Heater Foundation, Area 300.

Elevation, Location, Rebar Works


JGSS1EP-VPCI-
724 17-Nov-18 Pre-pouring Inspection prior to fomworks closure of Area 500 H W SW 19-Nov-18
FSP-0724
Pedestal @ E-0509B, Area 500.
Elevation, Location, Rebar Works
JGSS1EP-VPCI-
725 17-Nov-18 Pre-pouring Inspection prior to fomworks closure of Area 400 H W SW 19-Nov-18
FSP-0725
Pedestal @ E-0405R, Area 400.
Elevation, Location, Rebar Works
JGSS1EP-VPCI-
726 17-Nov-18 Pre-pouring Inspection prior to fomworks closure of Area 400 H W SW 19-Nov-18
FSP-0726
Pedestal @ E-0401B, Area 400.

118 / 732
28th day Compressive Strength Test of
Concrete Pavement Inbetween R-0902,
JGSS1EP-VPCI- Quantum
727 17-Nov-18 Laboratory Testing Structure-0903, E-0917, E-0914, G- H SW SW 19-Nov-18
FSP-0727 Laboratory
0909A/B, G-0910A/B & G-0907A/B (24
mpa @ 28 days).

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
728 19-Nov-18 Laboratory Testing Test (By Sand Cone Method) 1st - 4th Area 600 H SW SW 19-Nov-18
FSP-0728
Layer @ Structure-0604 (F3), Area 600.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
729 19-Nov-18 Laboratory Testing Test (By Sand Cone Method) 1st - 4th Area 600 H SW SW 19-Nov-18
FSP-0729
Layer @ Structure-0604 (F1), Area 600.

Joint Inspection/Witness of Trial Batch


JGSS1EP-VPCI- Quantum
730 19-Nov-18 Laboratory Testing (Concrete Strength = 30 Mpa @ 28 H SW SW 20-Nov-18
FSP-0730 Laboratory
days).
Joint Inspection/Witness of Field Density
JGSS1EP-VPCI-
731 20-Nov-18 Laboratory Testing Test (By Sand Cone Method) @ E- Area 400 H SW SW 20-Nov-18
FSP-0731
0407C, Area 400.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
732 20-Nov-18 Concrete Pouring Area 400 H SW SW 20-Nov-18
FSP-0732 Placement Inspection for Lean Concrete
@ E-0407C, Area 400.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Anchor Box Setting and
733 20-Nov-18 Concrete Pouring Area 400 H W SW 20-Nov-18
FSP-0733 Concrete Placement Inspection for
Pedestal @ E-0405R, Area 400.

119 / 732
Elevation, Location, Surface Preparation,
JGSS1EP-VPCI- Rebar Works, Anchor Bolt Setting and
734 20-Nov-18 Concrete Pouring Area 400 H W SW 20-Nov-18
FSP-0734 Concrete Placement Inspection for
Pedestal @ E-0401B, Area 400.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Anchor Bolt Setting and
735 20-Nov-18 Concrete Pouring Area 900 H W SW 20-Nov-18
FSP-0735 Concrete Placement Inspection for
Pedestal @ D-0908, Area 900.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
736 20-Nov-18 Concrete Pouring Placement Inspection for Humper & Area 900 H W SW 20-Nov-18
FSP-0736
Spillwall @ DPG-2 inbetween C-0903 &
Structure-0904, Area 900.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
737 20-Nov-18 Concrete Pouring Area 500 H W SW 21-Nov-18
FSP-0737 Placement Inspection for Humper &
Spillwall @ D-0510C, Area 500.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
738 20-Nov-18 Concrete Pouring Area 700 H W SW 21-Nov-18
FSP-0738 Placement Inspection for Spillwall @ R-
0701C, Area 700.

28th day Compressive Strength Test of


JGSS1EP-VPCI- Foundation @ E-0611C / Lean Concrete Quantum
739 20-Nov-18 Laboratory Testing H SW SW 21-Nov-18
FSP-0739 @ Structure-0604 (F1), Area 600 (24 Laboratory
mpa @ 28 days).

120 / 732
7th day Compressive Strength Test of
Pedestal @ D-0651 & D-0691, Area 600 /
JGSS1EP-VPCI- Concrete Pavemnent @ Structure-0406, Quantum
740 20-Nov-18 Laboratory Testing H SW SW 21-Nov-18
FSP-0740 Area 400 / Lean Concrete @ E-0509B, Laboratory
E-0405R, E-0401B, Area 400 (24 mpa @
28 days).

Elevation, Location, Rebar Works


JGSS1EP-VPCI-
741 20-Nov-18 Pre-pouring Inspection prior to fomworks closure of Area 700 H W SW 21-Nov-18
FSP-0741
Pedestal @ E-0703, Area 700.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Anchor Bolt Setting and
742 20-Nov-18 Concrete Pouring Area 700 H W SW 21-Nov-18
FSP-0742 Concrete Placement Inspection for
Pedestal @ E-0703, Area 700.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Anchor Bolt Setting and
743 21-Nov-18 Concrete Pouring Area 500 H W SW 21-Nov-18
FSP-0743 Concrete Placement Inspection for
Pedestal @ E-0509B, Area 500.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
744 21-Nov-18 Laboratory Testing Test (By Sand Cone Method) @ Area 400 H SW SW 22-Nov-18
FSP-0744
Structure-0407 (F3), Area 400.

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Formworks and Concrete Placement
745 21-Nov-18 Concrete Pouring Area 400 H W SW 22-Nov-18
FSP-0745 Inspection of Lean Concrete @
Structure-0407 (F3), Area 400.

121 / 732
Elevation, Location, Surface Preparation,
Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
746 21-Nov-18 Concrete Pouring Placement Inspection for 2nd Lift of Area 900 H W SW 22-Nov-18
FSP-0746
Column & Slab of Base Mat @ K-0901
Compressor Shelter, Area 900.

28th day Compressive Strength Test of


JGSS1EP-VPCI- Foundation @ G-0811A/B (West Quantum
747 21-Nov-18 Laboratory Testing H SW SW 22-Nov-18
FSP-0747 Foundation), Area 800 / Pedestal @ G- Laboratory
0906A/B, Area 900 (24 mpa @ 28 days).

7th day Compressive Strength Test of


JGSS1EP-VPCI- Concrete Pavement @ R-0701C, Area Quantum
748 21-Nov-18 Laboratory Testing H SW SW 22-Nov-18
FSP-0748 700, D-0510C, Area 500 / Foundation @ Laboratory
E-0690, Area 600 (24 mpa @ 28 days).

Elevation, Location, Surface Preparation,


JGSS1EP-VPCI- Rebar Works, Formworks and Concrete
749 21-Nov-18 Concrete Pouring Area 400 H W SW 22-Nov-18
FSP-0749 Placement Inspection of Foundation @
E-0407C, Area 400.

28th day Compressive Strength Test of


JGSS1EP-VPCI- Foundation @ Analyzer Shelter #12, Area Quantum
750 22-Nov-18 Laboratory Testing H SW SW 23-Nov-18
FSP-0750 300 / Structure-0604 (F1), Area 600 (24 Laboratory
mpa @ 28 days).

28th day Compressive Strength Test of


Pedestal @ D-0693, Area 600 / Concrete
JGSS1EP-VPCI- Quantum
751 22-Nov-18 Laboratory Testing Pavement Inbetween Structure-0903, G- H SW SW 23-Nov-18
FSP-0751 Laboratory
0909A/B & G-0908A/B, Area 900 (24
mpa @ 28 days).

122 / 732
7th day Compressive Strength Test of
Restoration of Concrete Pavement @
DPG-2 near C-0902, F-0906A/B &
JGSS1EP-VPCI- Quantum
752 22-Nov-18 Laboratory Testing Structure-0903 (F4, Area 900, D-0510C, H SW SW 23-Nov-18
FSP-0752 Laboratory
Area 500, R-0701C, Area 700 /
Foundation @ D-0908, Area 900 (24 mpa
@ 28 days).

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
753 23-Nov-18 Laboratory Testing Test (By Sand Cone Method) of Sub- Area 500 H SW SW 24-Nov-18
FSP-0753
Base Course @ D-0510C, Area 500.

Joint Inspection/Witness of Field Density


JGSS1EP-VPCI-
754 23-Nov-18 Laboratory Testing Test (By Sand Cone Method) of Sub- Area 900 H SW SW 24-Nov-18
FSP-0754
Base Course @ Z-0902, Area 900.

Elevation, Location, Surface Preparation,


Rebar Works, Formworks and Concrete
JGSS1EP-VPCI-
755 23-Nov-18 Concrete Pouring Placement Inspection of Concrete Area 500 H W SW 24-Nov-18
FSP-0755
Pavement @ East & West of D-0510C,
Area 500.

28th day Compressive Strength Test of


JGSS1EP-VPCI- Quantum
756 23-Nov-18 Laboratory Testing Concrete Pavement @ Structure-0904, H SW SW 24-Nov-18
FSP-0756 Laboratory
Area 900 (24 MPa @ 28 days).

28th day Compressive Strength Test of


Lean Concrete @ Structure-0406, Area
JGSS1EP-VPCI- Quantum
757 23-Nov-18 Laboratory Testing 400 / Foundation @ E-0624EF, Area H SW SW 24-Nov-18
FSP-0757 Laboratory
600 / Pedestal @ E-0623B, Area 600 (24
MPa @ 28 days).

123 / 732
7th day Compressive Strength Test of
Concrete Pavement @ Analyzer Shelter
#12, Area 300 / Foundation @ E-0509B,
JGSS1EP-VPCI- Area 500, E-0405R & E-0401B, Area 400 Quantum
758 23-Nov-18 Laboratory Testing H SW SW 24-Nov-18
FSP-0758 / Remaining Concrete Pavement @ H- Laboratory
0305 near Manhole / Restoration of
Concrete Pavement @ H-0305, Area 300
(24 mpa @ 28 days).

124 / 732
Accepted 854
511 On-schedule Waiting for result 3
241 Re-schedule Cancelled 90
206 Additional Reject 5
Time Subcontractor Inspector Discipline Status Result Remarks Date Transmitted

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Accepted at JGSS1EP-VPCI-
1300H FS Phil Allan Magadia CIVIL On-schedule Cancelled 26-Dec-18
FSP-0006

Accepted at JGSS1EP-VPCI-
1400H FS Phil Allan Magadia CIVIL On-schedule Cancelled 26-Dec-18
FSP-0007

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

125 / 732
0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Cave-in sandy material at the


0800H FS Phil Allan Magadia CIVIL On-schedule Cancelled 26-Dec-18
bottom of casing

1300H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Samples to be tested for


1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18
7,14&28days

1600H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Sample should pass the


1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18
designed strength @ 28 days

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

126 / 732
1400H FS Phil Allan Magadia CIVIL On-schedule Cancelled Accepted at JGSS1EP-VPCI- 26-Dec-18
FSP-0026

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Reschedule 11Jun2018/
1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted 26-Dec-18
Not yet ready

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Reschedule 14Jun2018/
1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted 26-Dec-18
Not yet ready

Reschedule 13Jun2018/
1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted 26-Dec-18
Not yet ready

Reschedule 14Jun2018/
1600H FS Phil Allan Magadia CIVIL Re-schedule Accepted 26-Dec-18
Not yet ready

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1600H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

127 / 732
Accepted at JGSS1EP-VPCI-
1000H FS Phil Allan Magadia CIVIL On-schedule Cancelled 26-Dec-18
FSP-0037

Reschedule 16Jun2018/
1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted 26-Dec-18
Not yet ready

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Failed. Final result shall be


0900H FS Phil Allan Magadia CIVIL On-schedule Reject based on the compressive 26-Dec-18
strength @ 28 days.

0930H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

128 / 732
Accepted at JGSS1EP-VPCI-
1330H FS Phil Allan Magadia CIVIL On-schedule Cancelled 26-Dec-18
FSP-0056

1530H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Base data shall be used in


1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18
Field Density Test

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1330H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Reschedule 20Jun2018/
1530H FS Phil Allan Magadia CIVIL Re-schedule Accepted 26-Dec-18
Not yet ready

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Accepted at JGSS1EP-VPCI-
0900H FS Phil Allan Magadia CIVIL On-schedule Cancelled 26-Dec-18
FSP-0051

Accepted at JGSS1EP-VPCI-
1100H FS Phil Allan Magadia CIVIL On-schedule Cancelled 26-Dec-18
FSP-0053

129 / 732
Accepted at JGSS1EP-VPCI-
1500H FS Phil Allan Magadia CIVIL On-schedule Cancelled 26-Dec-18
FSP-0058

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Accepted at JGSS1EP-VPCI-
1400H FS Phil Allan Magadia CIVIL On-schedule Cancelled 26-Dec-18
FSP-0058

Reschedule 23Jun2018/
1600H FS Phil Allan Magadia CIVIL Re-schedule Accepted 26-Dec-18
Not yet ready

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

130 / 732
1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1600H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Final acceptance shall be


1400H FS Phil Allan Magadia CIVIL On-schedule Accepted based on the 28th day 26-Dec-18
compressive test result.

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Final acceptance shall be


1500H FS Phil Allan Magadia CIVIL On-schedule Accepted based on the 28th day 26-Dec-18
compressive test result.

131 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Reschedule 05Jul2018/
1300H FS Phil Allan Magadia CIVIL Re-schedule Reject 26-Dec-18
Result was 87% and 84%

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 14-Feb-19

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted

132 / 732
Concrete samples to be tested
1100H FS Phil Allan Magadia CIVIL On-schedule Accepted
for 7 days, 14 days & 28 days.

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

133 / 732
1330H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Reschedule 11Jul2018/
1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18
Not yet ready

1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted

134 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted Latest drawing attached.

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted Latest drawing attached. 26-Dec-18

135 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Results were based on the


verification and conclusions
made by TERMS Concrete
and Materials Lab to the three
types of static load tests
carried out by SHINHWA GTI
namely Axial Compressive,
Axial Uplift and Lateral Load
1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted
Test. Pile Integrity Test results
were inconclusive that further
test verification shall be
carried out. PIT not included in
the report. Lateral Test
(16/07/2018); Tension test
(17/07/2018); Axial Test
(19/07/2018).

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Reschedule 20Jul2018/
1000H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
Not yet ready

1030H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 12-Feb-19

136 / 732
1600H FS Phil Allan Magadia CIVIL On-schedule Accepted 12-Feb-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

Reschedule 20Jul2018/
0900H FS Phil Allan Magadia CIVIL Re-schedule Accepted
Not yet ready

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

Should pass the required


1500H FS Phil Allan Magadia CIVIL On-schedule Accepted compressive strength @28
days.

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

137 / 732
Reschedule 20Jul2018/
Not yet ready/
1600H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
Accepted at JGSS1EP-VPCI-
FSP-0116

1330H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Sample should pass the


1500H FS Phil Allan Magadia CIVIL On-schedule Accepted
required strength @ 28 days

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

Concrete cyclinder samples


1000H FS Phil Allan Magadia CIVIL On-schedule Accepted shall be tested at 7 days and
28 days.

Concrete cyclinder samples


shall be tested at 1 day, 3 days
1000H FS Phil Allan Magadia CIVIL On-schedule Accepted
and 7 days. Submit concrete
mix design MAR for approval.

Pedestal needs concrete


1000H FS Phil Allan Magadia CIVIL On-schedule Cancelled repair. Please refer to VPCI-
PMC-QSR-0006.

138 / 732
Should pass the required
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted compressive strength @28
days.

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

Should pass the required


1000H FS Phil Allan Magadia CIVIL On-schedule Accepted
strength @ 3 days.

Reschedule 24Jul2018/
Requirement for FDT prior to
1400H FS Phil Allan Magadia CIVIL Re-schedule Cancelled lean concrete./Not yet ready. 24-Jan-19
Accepted at JGSS1EP-VPCI-
FSP-0127

139 / 732
Reschedule 24Jul2018/
Requirement for FDT prior to
1400H FS Phil Allan Magadia CIVIL Re-schedule Cancelled lean concrete./Not yet ready.
Accepted at JGSS1EP-VPCI-
FSP-0127

Reschedule 24Jul2018/
No laboratory technician
1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted
available. Sample was tested
@ 4 days.

Reschedule 24Jul2018/
1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted No laboratory technician 24-Jan-19
available

Reschedule 24Jul2018/
1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted No laboratory technician
available

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1330H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

9000H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

6 pcs cylindrical samples have


1000H FS Phil Allan Magadia CIVIL On-schedule Accepted to be tested for 1 day, 3 days
& 7 days.

140 / 732
Reschedule 25Jul2018/
1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready/ 24-Jan-19
Document was reviewed.

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1530H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1530H FS Phil Allan Magadia CIVIL On-schedule Accepted

9000H FS Phil Allan Magadia CIVIL On-schedule Accepted

141 / 732
Fracture test and evaluation
1400H FS Phil Allan Magadia CIVIL On-schedule Accepted done & accepted for the 3
Fillet Welders.

1400H FS Phil Allan Magadia CIVIL On-schedule Cancelled No concrete available.

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

9000H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted

Due to FDT requirement.


1500H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Accepted at JGSS1EP-VPCI-
FSP-0153

Awaiting final pouring


8000H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
schedule

142 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

Pouring schedule to include F1


9000H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
and F5 foundations

8300H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

9000H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1530H FS Phil Allan Magadia CIVIL On-schedule Reject Failed test result.

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

143 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

8000H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

04Aug18 - Rebars to rectify


8300H FS Phil Allan Magadia CIVIL Re-schedule Accepted 30-Jan-19
06Aug18 -Schedule of pouring

144 / 732
04Aug18 -Rebars to rectify.
Formworks not yet fix.
9000H FS Phil Allan Magadia CIVIL Re-schedule Accepted 24-Jan-19
06Aug18 - Schedule of
pouring

03Aug18 - Technician not


1530H FS Phil Allan Magadia CIVIL Re-schedule Reject available.
Failed test result.

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1030H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

06Aug18 - Schedule of
1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted
pouring

1030H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1st & 2nd layer backfill were


1030H FS Phil Allan Magadia CIVIL Re-schedule Accepted 24-Jan-19
sand and no FDT conducted.

145 / 732
1st & 2nd layer backfill were
1030H FS Phil Allan Magadia CIVIL Re-schedule Accepted 24-Jan-19
sand and no FDT conducted.

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted

FDT requirement prior to lean


1430H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
concrete.

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

146 / 732
1400H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not yet ready.

1430H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not yet ready.

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

1030H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1100H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready. 14-Feb-19

147 / 732
8300H FS Phil Allan Magadia CIVIL Additional Accepted 24-Jan-19

9000H FS Phil Allan Magadia CIVIL Additional Accepted 24-Jan-19

9300H FS Phil Allan Magadia CIVIL Additional Accepted 24-Jan-19

1000H FS Phil Allan Magadia CIVIL Additional Accepted 24-Jan-19

3000H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

3000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

Bored Pile Test Certificate not


1000H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
yet certified

1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready. 26-Dec-18

148 / 732
1100H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1400H FS Phil Allan Magadia CIVIL Additional Accepted 30-Jan-19

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1400H FS Phil Allan Magadia CIVIL Additional Accepted 24-Jan-19

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready. 24-Jan-19

Not yet ready. FDT was not


conducted due to hard rock
1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted
strata at the bottom of
foundation. FDT not required.

149 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

8000H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready. 24-Jan-19

8300H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready. 26-Dec-18

9000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

9300H FS Phil Allan Magadia CIVIL On-schedule Accepted 14-Feb-19

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1030H FS Phil Allan Magadia CIVIL On-schedule Accepted 14-Feb-19

150 / 732
1350H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1430H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready. 24-Jan-19

8300H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not yet ready.

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1400H FS Phil Allan Magadia CIVIL Additional Accepted 26-Dec-18

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted 24-Jan-19

151 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

8300H FS Phil Allan Magadia CIVIL On-schedule Accepted 14-Feb-19

1400H FS Phil Allan Magadia CIVIL Additional Accepted 24-Jan-19

1400H FS Phil Allan Magadia CIVIL Additional Accepted 24-Jan-19

1430H FS Phil Allan Magadia CIVIL Additional Accepted 24-Jan-19

1430H FS Phil Allan Magadia CIVIL Additional Accepted 24-Jan-19

1500H FS Phil Allan Magadia CIVIL Additional Accepted 24-Jan-19

1500H FS Phil Allan Magadia CIVIL Additional Accepted 24-Jan-19

1530H FS Phil Allan Magadia CIVIL Re-schedule Accepted 24-Jan-19

152 / 732
1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1430H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

9000H FS Phil Allan Magadia CIVIL On-schedule Accepted 14-Feb-19

9300H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

153 / 732
Hard rock strata was observed
9000H FS Phil Allan Magadia CIVIL Additional Accepted at the bottom of foundation. 24-Jan-19
No FDT required.

8300H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

9000H FS Phil Allan Magadia CIVIL On-schedule Cancelled Not yet ready.

9300H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted 24-Jan-19

1000H FS Phil Allan Magadia CIVIL Re-schedule Cancelled

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 24-Jan-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 4-Jan-19

154 / 732
9000H FS Phil Allan Magadia CIVIL Re-schedule Accepted 24-Jan-19

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted

Hard rock strata was observed


9000H FS Phil Allan Magadia CIVIL Re-schedule Accepted at the bottom of foundation. 5-Feb-19
No FDT required.

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

8000H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

8000H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

No available laboratory
8300H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
technician

No available laboratory
8300H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
technician

155 / 732
No available laboratory
9000H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
technician

No available laboratory
9000H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
technician

No available laboratory
9300H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
technician

No available laboratory
9300H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
technician

Hard rock strata was observed


1300H FS Phil Allan Magadia CIVIL On-schedule Accepted at the bottom of foundation. 5-Feb-19
No FDT required.

Hard rock strata was observed


1400H FS Phil Allan Magadia CIVIL On-schedule Accepted at the bottom of foundation. 5-Feb-19
No FDT required.

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Machine is defective 5-Feb-19

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Machine is defective 5-Feb-19

8300H FS Phil Allan Magadia CIVIL Re-schedule Accepted 5-Feb-19

156 / 732
1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted Machine is defective 5-Feb-19

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

0900H FS Phil Allan Magadia CIVIL Re-schedule Accepted 5-Feb-19

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

0830H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

0830H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

157 / 732
0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

0930H FS Phil Allan Magadia CIVIL On-schedule Cancelled FDT not required

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

1030H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

1100H FS Phil Allan Magadia CIVIL On-schedule Cancelled FDT not required

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Machine is defective 5-Feb-19

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Machine is defective 5-Feb-19

1100H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

1300H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

158 / 732
0930H FS Phil Allan Magadia CIVIL On-schedule Cancelled Not ready

0930H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

Concrete repair has to be


1500H FS Phil Allan Magadia CIVIL Additional Accepted 5-Feb-19
done.

1400H FS Phil Allan Magadia CIVIL Additional Accepted 5-Feb-19

1300H FS Phil Allan Magadia CIVIL Additional Accepted 5-Feb-19

1500H FS Phil Allan Magadia CIVIL Additional Accepted

Concrete repair on pedestals


8000H FS Phil Allan Magadia CIVIL On-schedule Accepted
have to be done.

8300H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

159 / 732
1300H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

Different elevation; not yet


1330H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
ready

1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yot ready 5-Feb-19

1430H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yot ready 5-Feb-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

1500H FS Phil Allan Magadia CIVIL Additional Accepted 5-Feb-19

160 / 732
1530H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yot ready 5-Feb-19

8000H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

8300H FS Phil Allan Magadia CIVIL On-schedule Accepted

Confirmatiob shall be at 28
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19
days test.

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1300H FS Phil Allan Magadia CIVIL Additional Accepted 5-Feb-19

1300H FS Phil Allan Magadia CIVIL Additional Accepted VPCI-PL-0010

161 / 732
Cut exposed tie rods and
1300H FS Phil Allan Magadia CIVIL Additional Accepted 5-Feb-19
repair concrete defects.

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 5-Feb-19

1500H FS Phil Allan Magadia CIVIL Additional Accepted 5-Feb-19

Remaining tie rods to be


0800H FS Phil Allan Magadia CIVIL Re-schedule Cancelled
removed.

162 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1300H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Still no concrete request

1400H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not yet ready

1500H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not yet ready

1600H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not yet ready

0900H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not yet ready

163 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

0930H FS Phil Allan Magadia CIVIL On-schedule Accepted

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

1030H FS Phil Allan Magadia CIVIL Additional Accepted

1100H FS Phil Allan Magadia CIVIL Additional Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

164 / 732
1500H FS Phil Allan Magadia CIVIL Additional Accepted

1500H FS Phil Allan Magadia CIVIL Additional Accepted

0900H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready

1300H FS Phil Allan Magadia CIVIL Re-schedule Accepted VPCI-PL-0015

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

0930H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready

1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready

165 / 732
1030H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not yet ready

1400H FS Phil Allan Magadia CIVIL Additional Accepted

1400H FS Phil Allan Magadia CIVIL Additional Accepted

1430H FS Phil Allan Magadia CIVIL Additional Accepted

1430H FS Phil Allan Magadia CIVIL Additional Accepted

1300H FS Phil Allan Magadia CIVIL On-schedule Accepted

1430H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not ready

166 / 732
1400H FS Phil Allan Magadia CIVIL On-schedule Accepted

see attach completion release


0900H FS Phil Allan Magadia CIVIL Re-schedule Accepted
notice F2 comments.

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted

167 / 732
1100H FS Phil Allan Magadia CIVIL Re-schedule Accepted

1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted 18-Feb-19

1500H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not ready

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Laboratory not available 18-Feb-19

1500H FS Phil Allan Magadia CIVIL Additional Accepted with duplicate IR # 0322 18-Feb-19

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

168 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

0930H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

1300H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

1330H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

169 / 732
1430H FS Phil Allan Magadia CIVIL Additional Accepted 18-Feb-19

1300H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

1400H FS Phil Allan Magadia CIVIL Additional Accepted 18-Feb-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

1500H FS Phil Allan Magadia CIVIL On-schedule Cancelled Quantum lab not available

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

0830H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

170 / 732
1300H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not ready 18-Feb-19

1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not ready 18-Feb-19

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

0930H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Feb-19

1500H FS Phil Allan Magadia CIVIL Additional Accepted 18-Feb-19

171 / 732
1530H FS Phil Allan Magadia CIVIL Additional Accepted 18-Feb-19

1600H FS Phil Allan Magadia CIVIL Additional Cancelled Not ready

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

1030H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

0830H FS Phil Allan Magadia CIVIL Additional Accepted

0900H FS Phil Allan Magadia CIVIL Additional Accepted

0930H FS Phil Allan Magadia CIVIL Re-schedule Cancelled

172 / 732
1300H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not ready

1330H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not ready

1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not ready

1430H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not ready

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted No concrete available.

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted No concrete available.

1530H FS Phil Allan Magadia CIVIL Re-schedule Accepted No concrete available.

173 / 732
1530H FS Phil Allan Magadia CIVIL Re-schedule Cancelled No concrete available.

1600H FS Phil Allan Magadia CIVIL Re-schedule Cancelled No concrete available.

1300H FS Phil Allan Magadia CIVIL Re-schedule Accepted NCP shutdown

1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted NCP shutdown

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Rescheduled by technician

0830H FS Phil Allan Magadia CIVIL On-schedule Accepted

0900H FS Phil Allan Magadia CIVIL Re-schedule Accepted NCP shutdown

1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted NCP shutdown

174 / 732
1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Rescheduled by technician

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Rescheduled by technician

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Rescheduled by technician

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Rescheduled by technician

1300H FS Phil Allan Magadia CIVIL Re-schedule Accepted NCP shutdown

1330H FS Phil Allan Magadia CIVIL Re-schedule Accepted NCP shutdown

1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted NCP shutdown

175 / 732
1430H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not ready

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Rescheduled by technician

1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted Rescheduled by technician

0900H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not ready

0930H FS Phil Allan Magadia CIVIL Re-schedule Accepted NCP shutdown

176 / 732
1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not ready

1030H FS Phil Allan Magadia CIVIL Re-schedule Accepted Not ready

1100H FS Phil Allan Magadia CIVIL Additional Cancelled Not ready

1530H FS Phil Allan Magadia CIVIL Re-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

177 / 732
1300H FS Phil Allan Magadia CIVIL Additional Accepted

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

1530H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1300H FS Phil Allan Magadia CIVIL On-schedule Accepted

1330H FS Phil Allan Magadia CIVIL Re-schedule Accepted No concrete available.

1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted

178 / 732
1430H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

0830H FS Phil Allan Magadia CIVIL On-schedule Accepted

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted

0930H FS Phil Allan Magadia CIVIL On-schedule Accepted

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

1300H FS Phil Allan Magadia CIVIL Re-schedule Accepted No concrete available.

1330H FS Phil Allan Magadia CIVIL Re-schedule Accepted No concrete available.

179 / 732
1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted 26-Dec-18

1430H FS Phil Allan Magadia CIVIL Re-schedule Cancelled not ready

0830H FS Phil Allan Magadia CIVIL On-schedule Accepted

0930H FS Phil Allan Magadia CIVIL Re-schedule Accepted

1000H FS Phil Allan Magadia CIVIL Re-schedule Cancelled

1330H FS Phil Allan Magadia CIVIL Re-schedule Cancelled No concrete available.

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

180 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

0830H FS Phil Allan Magadia CIVIL On-schedule Accepted

0930H FS Phil Allan Magadia CIVIL On-schedule Accepted

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

1300H FS Phil Allan Magadia CIVIL On-schedule Cancelled

1330H FS Phil Allan Magadia CIVIL On-schedule Cancelled

181 / 732
1400H FS Phil Allan Magadia CIVIL On-schedule Cancelled

1430H FS Phil Allan Magadia CIVIL On-schedule Cancelled

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

0830H FS Phil Allan Magadia CIVIL On-schedule Accepted

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted

182 / 732
0930H FS Phil Allan Magadia CIVIL On-schedule Accepted

1000H FS Phil Allan Magadia CIVIL On-schedule Cancelled

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

183 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1500H FS Phil Allan Magadia CIVIL Additional Accepted

1530H FS Phil Allan Magadia CIVIL Additional Accepted

1600H FS Phil Allan Magadia CIVIL Additional Cancelled

1300H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not ready

0830H FS Phil Allan Magadia CIVIL Additional Accepted

184 / 732
1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

1530H FS Phil Allan Magadia CIVIL On-schedule Accepted

1300H FS Phil Allan Magadia CIVIL Additional Accepted

1330H FS Phil Allan Magadia CIVIL Additional Accepted

1400H FS Phil Allan Magadia CIVIL Additional Accepted

1430H FS Phil Allan Magadia CIVIL Additional Accepted

1300H FS Phil Allan Magadia CIVIL On-schedule Accepted

185 / 732
1330H FS Phil Allan Magadia CIVIL On-schedule Accepted

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1430H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1530H FS Phil Allan Magadia CIVIL On-schedule Accepted

1600H FS Phil Allan Magadia CIVIL On-schedule Cancelled wrong identification

1630H FS Phil Allan Magadia CIVIL On-schedule Cancelled not ready

0830H FS Phil Allan Magadia CIVIL On-schedule Accepted

186 / 732
0900H FS Phil Allan Magadia CIVIL On-schedule Accepted

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

0830H FS Phil Allan Magadia CIVIL On-schedule Accepted

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1300H FS Phil Allan Magadia CIVIL On-schedule Accepted

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

1430H FS Phil Allan Magadia CIVIL On-schedule Accepted

187 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

0930H FS Phil Allan Magadia CIVIL Additional Accepted

1000H FS Phil Allan Magadia CIVIL Additional Accepted

1030H FS Phil Allan Magadia CIVIL Additional Accepted 29-Jan-19

1300H FS Phil Allan Magadia CIVIL Additional Accepted

1330H FS Phil Allan Magadia CIVIL Additional Accepted

188 / 732
1400H FS Phil Allan Magadia CIVIL Additional Accepted

1430H FS Phil Allan Magadia CIVIL Additional Accepted

0830H FS Phil Allan Magadia CIVIL Additional Accepted

0930H FS Phil Allan Magadia CIVIL Additional Accepted

0830H FS Phil Allan Magadia CIVIL On-schedule Cancelled Not ready

1300H FS Phil Allan Magadia CIVIL On-schedule Accepted 26-Dec-18

189 / 732
0930H FS Phil Allan Magadia CIVIL On-schedule Cancelled Not ready

1000H FS Phil Allan Magadia CIVIL Additional Accepted

1030H FS Phil Allan Magadia CIVIL Additional Accepted

1100H FS Phil Allan Magadia CIVIL Additional Accepted

1400H FS Phil Allan Magadia CIVIL Additional Accepted 29-Jan-19

1500H FS Phil Allan Magadia CIVIL Additional Accepted

0830H FS Phil Allan Magadia CIVIL Additional Accepted

0900H FS Phil Allan Magadia CIVIL Re-schedule Accepted

0930H FS Phil Allan Magadia CIVIL Re-schedule Accepted

190 / 732
1300H FS Phil Allan Magadia CIVIL On-schedule Accepted 29-Jan-19

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

0800H FS Phil Allan Magadia CIVIL Additional Accepted

0830H FS Phil Allan Magadia CIVIL Additional Accepted

0900H FS Phil Allan Magadia CIVIL Additional Accepted 29-Jan-19

0930H FS Phil Allan Magadia CIVIL Additional Accepted

191 / 732
1000H FS Phil Allan Magadia CIVIL Additional Accepted Pavement only

0900H FS Phil Allan Magadia CIVIL Additional Accepted

0930H FS Phil Allan Magadia CIVIL Additional Accepted

1400H FS Phil Allan Magadia CIVIL Additional Accepted

1300H FS Phil Allan Magadia CIVIL On-schedule Accepted

1330H FS Phil Allan Magadia CIVIL On-schedule Accepted

1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted

192 / 732
1430H FS Phil Allan Magadia CIVIL Re-schedule Accepted

1500H FS Phil Allan Magadia CIVIL Additional Accepted

1530H FS Phil Allan Magadia CIVIL Re-schedule Accepted

0830H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL Additional Accepted 26-Dec-18

1500H FS Phil Allan Magadia CIVIL Additional Accepted

193 / 732
1500H FS Phil Allan Magadia CIVIL Additional Accepted 26-Dec-18

1500H FS Phil Allan Magadia CIVIL Additional Accepted 29-Jan-19

0830H FS Phil Allan Magadia CIVIL On-schedule Accepted

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted

0930H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

194 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Jan-19

Final acceptance shall be


1500H FS Phil Allan Magadia CIVIL On-schedule Accepted based on the 28th day
compressive test result.

1000H FS Phil Allan Magadia CIVIL Additional Accepted

1400H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not ready

1300H FS Phil Allan Magadia CIVIL On-schedule Cancelled Not ready

195 / 732
1400H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Jan-19

1430H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Jan-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 16-Jan-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

Final acceptance shall be


1500H FS Phil Allan Magadia CIVIL On-schedule Accepted based on the 28th day 29-Jan-19
compressive test result.

0830H FS Phil Allan Magadia CIVIL Additional Accepted 18-Jan-19

0900H FS Phil Allan Magadia CIVIL Additional Accepted 16-Jan-19

0930H FS Phil Allan Magadia CIVIL Re-schedule Accepted 18-Jan-19

196 / 732
1300H FS Phil Allan Magadia CIVIL Re-schedule Accepted

1330H FS Phil Allan Magadia CIVIL Re-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

Final acceptance shall be


1500H FS Phil Allan Magadia CIVIL On-schedule Accepted based on the 28th day 16-Jan-19
compressive test result.

Hard rock subgrade, no FDT


1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted
required.

1430H FS Phil Allan Magadia CIVIL Re-schedule Accepted

197 / 732
1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted 29-Jan-19

1530H FS Phil Allan Magadia CIVIL Re-schedule Accepted

1600H FS Phil Allan Magadia CIVIL Additional Accepted 29-Jan-19

1630H FS Phil Allan Magadia CIVIL Additional Cancelled not ready

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

Final acceptance shall be


1000H FS Phil Allan Magadia CIVIL On-schedule Accepted based on the 28th day
compressive test result.

Final acceptance shall be


1000H FS Phil Allan Magadia CIVIL On-schedule Accepted based on the 28th day 29-Jan-19
compressive test result.

1300H FS Phil Allan Magadia CIVIL On-schedule Accepted

198 / 732
1330H FS Phil Allan Magadia CIVIL On-schedule Accepted

Final acceptance shall be


1500H FS Phil Allan Magadia CIVIL On-schedule Accepted based on the 28th day
compressive test result.

1530H FS Phil Allan Magadia CIVIL Additional Cancelled Duplicate of FSP-0543

1300H FS Phil Allan Magadia CIVIL On-schedule Accepted 29-Jan-19

1330H FS Phil Allan Magadia CIVIL Re-schedule Accepted

14000H FS Phil Allan Magadia CIVIL On-schedule Cancelled Not ready

199 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1600H FS Phil Allan Magadia CIVIL Additional Accepted

Hard rock subgrade, no FDT


1630H FS Phil Allan Magadia CIVIL Additional Accepted
required.

1300H FS Phil Allan Magadia CIVIL Re-schedule Cancelled Not ready

1330H FS Phil Allan Magadia CIVIL Re-schedule Accepted

200 / 732
1400H FS Phil Allan Magadia CIVIL Re-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1300H FS Phil Allan Magadia CIVIL Re-schedule Accepted

0830H FS Phil Allan Magadia CIVIL Re-schedule Accepted 18-Jan-19

In lieu of backfill material &


1300H FS Phil Allan Magadia CIVIL On-schedule Accepted lean concrete, foundation was
thickened.

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

201 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Jan-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Jan-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Jan-19

0900H FS Phil Allan Magadia CIVIL Additional Accepted

Hard rock subgrade, no FDT


1500H FS Phil Allan Magadia CIVIL Additional Accepted
required.

202 / 732
0830H FS Phil Allan Magadia CIVIL On-schedule Accepted

0900H FS Phil Allan Magadia CIVIL On-schedule Accepted

0930H FS Phil Allan Magadia CIVIL Re-schedule Accepted

1000H FS Phil Allan Magadia CIVIL Re-schedule Accepted

1300H FS Phil Allan Magadia CIVIL Re-schedule Accepted

1000H FS Phil Allan Magadia CIVIL On-schedule Accepted

203 / 732
0830H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1300H FS Phil Allan Magadia CIVIL On-schedule Cancelled

1330H FS Phil Allan Magadia CIVIL On-schedule Accepted

1300H FS Phil Allan Magadia CIVIL On-schedule Accepted

1330H FS Phil Allan Magadia CIVIL Re-schedule Accepted

204 / 732
0830H FS Phil Allan Magadia CIVIL Re-schedule Accepted

1300H FS Phil Allan Magadia CIVIL Additional Accepted

1300H FS Phil Allan Magadia CIVIL On-schedule Accepted

1330H FS Phil Allan Magadia CIVIL On-schedule Accepted

1400H FS Phil Allan Magadia CIVIL On-schedule Accepted

1430H FS Phil Allan Magadia CIVIL Re-schedule Accepted 29-Jan-19

205 / 732
1500H FS Phil Allan Magadia CIVIL Re-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 29-Jan-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1530H FS Phil Allan Magadia CIVIL Additional Accepted

1300H FS Phil Allan Magadia CIVIL Additional Accepted

1400H FS Phil Allan Magadia CIVIL Additional Accepted

206 / 732
0830H FS Phil Allan Magadia CIVIL Re-schedule Accepted

0900H FS Phil Allan Magadia CIVIL Re-schedule Accepted

1300H FS Phil Allan Magadia CIVIL Re-schedule Cancelled

1330H FS Phil Allan Magadia CIVIL Re-schedule Cancelled

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 18-Jan-19

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted

1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 16-Jan-19

207 / 732
1500H FS Phil Allan Magadia CIVIL On-schedule Accepted 29-Jan-19

1300H Fsphil Allan Magadia CIVIL On-schedule Accepted

0830H Fsphil Allan Magadia CIVIL On-schedule Accepted

1330H Fsphil Allan Magadia CIVIL Additional Accepted

1430H Fsphil Allan Magadia CIVIL Additional Accepted

1300H Fsphil Allan Magadia CIVIL On-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

208 / 732
1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

0830H Fsphil Allan Magadia CIVIL Additional Accepted 16-Jan-19

0900H Fsphil Allan Magadia CIVIL Additional Accepted

0930H Fsphil Allan Magadia CIVIL Additional Accepted

1300H Fsphil Allan Magadia CIVIL Additional Accepted

1030H Fsphil Allan Magadia CIVIL Additional Accepted

209 / 732
1500H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1500H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1500H Fsphil Allan Magadia CIVIL Re-schedule Accepted 16-Jan-19

1500H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1500H Fsphil Allan Magadia CIVIL Re-schedule Accepted

0900H Fsphil Allan Magadia CIVIL On-schedule Accepted

1000H Fsphil Allan Magadia CIVIL On-schedule Accepted

210 / 732
0830H Fsphil Allan Magadia CIVIL On-schedule Accepted

0900H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1300H Fsphil Allan Magadia CIVIL On-schedule Accepted

1330H Fsphil Allan Magadia CIVIL On-schedule Accepted

1400H Fsphil Allan Magadia CIVIL On-schedule Accepted

1430H Fsphil Allan Magadia CIVIL On-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Waiting for result

211 / 732
1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

1000H Fsphil Allan Magadia CIVIL Additional Accepted

212 / 732
1530H Fsphil Allan Magadia CIVIL Additional Accepted

0830H Fsphil Allan Magadia CIVIL On-schedule Accepted

0930H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1300H Fsphil Allan Magadia CIVIL On-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

1600H Fsphil Allan Magadia CIVIL Additional Accepted

1630H Fsphil Allan Magadia CIVIL Additional Accepted

1000H Fsphil Allan Magadia CIVIL Additional Accepted

213 / 732
0830H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

1300H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1330H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1500H Fsphil Allan Magadia CIVIL Additional Accepted

214 / 732
1300H Fsphil Allan Magadia CIVIL On-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

1330H Fsphil Allan Magadia CIVIL Additional Accepted

1400H Fsphil Allan Magadia CIVIL Additional Accepted

1430H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1500H Fsphil Allan Magadia CIVIL Additional Accepted

215 / 732
1530H Fsphil Allan Magadia CIVIL Additional Accepted

0830H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted 16-Jan-19

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted 18-Jan-19

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

0900H Fsphil Allan Magadia CIVIL Additional Accepted

0930H Fsphil Allan Magadia CIVIL Additional Accepted

216 / 732
1000H Fsphil Allan Magadia CIVIL Additional Accepted

1030H Fsphil Allan Magadia CIVIL Additional Accepted

1300H Fsphil Allan Magadia CIVIL Additional Accepted

1400H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1500H Fsphil Allan Magadia CIVIL Additional Accepted

1500H Fsphil Allan Magadia CIVIL Additional Accepted

217 / 732
1500H Fsphil Allan Magadia CIVIL Additional Accepted

1500H Fsphil Allan Magadia CIVIL Additional Accepted

1300H Fsphil Allan Magadia CIVIL Additional Accepted

1330H Fsphil Allan Magadia CIVIL Additional Accepted

1400H Fsphil Allan Magadia CIVIL Additional Accepted

1430H Fsphil Allan Magadia CIVIL Additional Accepted

0830H Fsphil Allan Magadia CIVIL Additional Accepted

218 / 732
1500H Fsphil Allan Magadia CIVIL Additional Accepted

0830H Fsphil Allan Magadia CIVIL Re-schedule Accepted

0930H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1000H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1300H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1400H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1300H Fsphil Allan Magadia CIVIL Re-schedule Accepted

219 / 732
1330H Fsphil Allan Magadia CIVIL Re-schedule Accepted

0830H Fsphil Allan Magadia CIVIL Additional Accepted

Not ready, still concrete


0900H Fsphil Allan Magadia CIVIL Additional Cancelled
breaking

0930H Fsphil Allan Magadia CIVIL Additional Accepted

1000H Fsphil Allan Magadia CIVIL Additional Accepted

Not ready, still concrete


1030H Fsphil Allan Magadia CIVIL Additional Cancelled
breaking

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

220 / 732
1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

0830H Fsphil Allan Magadia CIVIL Additional Accepted

0900H Fsphil Allan Magadia CIVIL Re-schedule Accepted

0830H Fsphil Allan Magadia CIVIL On-schedule Accepted

0900H Fsphil Allan Magadia CIVIL On-schedule Accepted

0930H Fsphil Allan Magadia CIVIL On-schedule Accepted

1000H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1030H Fsphil Allan Magadia CIVIL Re-schedule Cancelled

221 / 732
1300H Fsphil Allan Magadia CIVIL On-schedule Accepted

1330H Fsphil Allan Magadia CIVIL On-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted 29-Jan-19

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

0800H Fsphil Allan Magadia CIVIL Additional Accepted

1100H Fsphil Allan Magadia CIVIL Additional Accepted

222 / 732
1400H Fsphil Allan Magadia CIVIL Additional Accepted

1430H Fsphil Allan Magadia CIVIL Additional Accepted

0900H Fsphil Allan Magadia CIVIL On-schedule Accepted

0930H Fsphil Allan Magadia CIVIL On-schedule Accepted

1030H Fsphil Allan Magadia CIVIL On-schedule Accepted

1000H Fsphil Allan Magadia CIVIL On-schedule Accepted

223 / 732
0800H Fsphil Allan Magadia CIVIL On-schedule Accepted

0830H Fsphil Allan Magadia CIVIL On-schedule Accepted

0900H Fsphil Allan Magadia CIVIL Additional Accepted

1300H Fsphil Allan Magadia CIVIL Additional Accepted

1400H Fsphil Allan Magadia CIVIL Additional Accepted

0830H Fsphil Allan Magadia CIVIL Re-schedule Accepted

0900H Fsphil Allan Magadia CIVIL Re-schedule Accepted

0930H Fsphil Allan Magadia CIVIL Re-schedule Accepted

224 / 732
1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

1000H Fsphil Allan Magadia CIVIL Additional Accepted

1030H Fsphil Allan Magadia CIVIL Additional Accepted

1300H Fsphil Allan Magadia CIVIL Re-schedule Accepted

0830H Fsphil Allan Magadia CIVIL Additional Accepted

0900H Fsphil Allan Magadia CIVIL Additional Accepted

0930H Fsphil Allan Magadia CIVIL Additional Accepted

225 / 732
1000H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1030H Fsphil Allan Magadia CIVIL Additional Accepted

1100H Fsphil Allan Magadia CIVIL Additional Accepted

1300H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1330H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

226 / 732
1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

1400H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1430H Fsphil Allan Magadia CIVIL Re-schedule Cancelled

1500H Fsphil Allan Magadia CIVIL Re-schedule Accepted

0830H Fsphil Allan Magadia CIVIL Re-schedule Cancelled

0900H Fsphil Allan Magadia CIVIL Re-schedule Accepted

227 / 732
1300H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1500H Fsphil Allan Magadia CIVIL Re-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

1330H Fsphil Allan Magadia CIVIL On-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

228 / 732
1500H Fsphil Allan Magadia CIVIL On-schedule Accepted

0830H Fsphil Allan Magadia CIVIL Re-schedule Accepted

0900H Fsphil Allan Magadia CIVIL Re-schedule Cancelled

1000H Fsphil Allan Magadia CIVIL Re-schedule Cancelled

1000H Fsphil Allan Magadia CIVIL On-schedule Accepted

1000H Fsphil Allan Magadia CIVIL On-schedule Accepted

229 / 732
1000H Fsphil Allan Magadia CIVIL On-schedule Accepted

230 / 732
Date
Closed

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

231 / 732
28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

232 / 732
28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

233 / 732
28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

234 / 732
28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

235 / 732
28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

236 / 732
28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

237 / 732
28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

28-Dec-18

15-Feb-19

238 / 732
8-Jan-19

8-Jan-19

8-Jan-19

21-Jan-19

8-Jan-19

239 / 732
8-Jan-19

8-Jan-19

8-Jan-19

8-Jan-19

8-Jan-19

8-Jan-19

240 / 732
8-Jan-19

8-Jan-19

8-Jan-19

8-Jan-19

241 / 732
8-Jan-19

8-Jan-19

12-Feb-19

242 / 732
12-Feb-19

25-Jan-19

243 / 732
25-Jan-19

28-Jan-19

244 / 732
25-Jan-19

25-Jan-19

25-Jan-19

245 / 732
25-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

246 / 732
25-Jan-19

25-Jan-19

25-Jan-19

247 / 732
25-Jan-19

248 / 732
25-Jan-19

25-Jan-19

25-Jan-19

249 / 732
25-Jan-19

31-Jan-19

250 / 732
25-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

251 / 732
25-Jan-19

25-Jan-19

21-Jan-19

252 / 732
25-Jan-19

25-Jan-19

28-Jan-19

15-Feb-19

253 / 732
25-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

28-Jan-19

28-Jan-19

254 / 732
25-Jan-19

31-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

255 / 732
25-Jan-19

28-Jan-19

28-Jan-19

15-Feb-19

28-Jan-19

256 / 732
25-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

28-Jan-19

25-Jan-19

257 / 732
25-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

258 / 732
25-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

28-Jan-19

259 / 732
25-Jan-19

5-Jan-19

25-Jan-19

25-Jan-19

25-Jan-19

5-Jan-19

260 / 732
25-Jan-19

6-Feb-19

6-Feb-19

6-Feb-19

6-Feb-19

6-Feb-19

261 / 732
6-Feb-19

6-Feb-19

6-Feb-19

6-Feb-19

6-Feb-19

262 / 732
6-Feb-19

6-Feb-19

6-Feb-19

6-Feb-19

6-Feb-19

6-Feb-19

12-Feb-19

263 / 732
6-Feb-19

12-Feb-19

6-Feb-19

6-Feb-19

6-Feb-19

6-Feb-19

12-Feb-19

264 / 732
6-Feb-19

6-Feb-19

6-Feb-19

6-Feb-19

6-Feb-19

265 / 732
12-Feb-19

12-Feb-19

12-Feb-19

6-Feb-19

12-Feb-19

266 / 732
12-Feb-19

6-Feb-19

6-Feb-19

21-Jan-19

6-Feb-19

267 / 732
12-Feb-19

6-Feb-19

6-Feb-19

6-Feb-19

6-Feb-19

6-Feb-19

268 / 732
269 / 732
270 / 732
271 / 732
272 / 732
273 / 732
274 / 732
275 / 732
276 / 732
277 / 732
278 / 732
279 / 732
280 / 732
281 / 732
282 / 732
283 / 732
21-Jan-19

284 / 732
285 / 732
21-Jan-19

286 / 732
287 / 732
288 / 732
289 / 732
21-Jan-19

290 / 732
291 / 732
21-Jan-19

292 / 732
21-Jan-19

17-Jan-19

17-Jan-19

293 / 732
30-Jan-19

294 / 732
17-Jan-19

295 / 732
30-Jan-19

296 / 732
30-Jan-19

30-Jan-19

297 / 732
298 / 732
21-Jan-19

299 / 732
17-Jan-19

30-Jan-19

300 / 732
21-Jan-19

301 / 732
21-Jan-19

21-Jan-19

17-Jan-19

30-Jan-19

21-Jan-19

17-Jan-19

21-Jan-19

302 / 732
17-Jan-19

303 / 732
30-Jan-19

30-Jan-19

30-Jan-19

304 / 732
30-Jan-19

305 / 732
306 / 732
21-Jan-19

307 / 732
21-Jan-19

21-Jan-19

21-Jan-19

308 / 732
309 / 732
310 / 732
30-Jan-19

311 / 732
30-Jan-19

312 / 732
21-Jan-19

17-Jan-19

313 / 732
30-Jan-19

314 / 732
17-Jan-19

315 / 732
17-Jan-19

316 / 732
317 / 732
318 / 732
319 / 732
320 / 732
321 / 732
17-Jan-19

21-Jan-19

322 / 732
323 / 732
324 / 732
325 / 732
326 / 732
327 / 732
30-Jan-19

328 / 732
329 / 732
330 / 732
331 / 732
332 / 732
333 / 732
334 / 732
335 / 732
336 / 732
Receive Return to
From Sub Sub

337 / 732
338 / 732
339 / 732
340 / 732
341 / 732
342 / 732
343 / 732
344 / 732
345 / 732
346 / 732
347 / 732
348 / 732
349 / 732
350 / 732
351 / 732
352 / 732
353 / 732
354 / 732
355 / 732
356 / 732
357 / 732
358 / 732
359 / 732
360 / 732
361 / 732
362 / 732
363 / 732
364 / 732
365 / 732
366 / 732
367 / 732
368 / 732
369 / 732
370 / 732
371 / 732
372 / 732
373 / 732
374 / 732
375 / 732
376 / 732
377 / 732
378 / 732
379 / 732
380 / 732
381 / 732
382 / 732
383 / 732
384 / 732
385 / 732
386 / 732
387 / 732
388 / 732
389 / 732
390 / 732
391 / 732
392 / 732
393 / 732
394 / 732
395 / 732
396 / 732
397 / 732
398 / 732
399 / 732
400 / 732
401 / 732
402 / 732
403 / 732
404 / 732
405 / 732
406 / 732
407 / 732
408 / 732
409 / 732
410 / 732
411 / 732
412 / 732
413 / 732
414 / 732
415 / 732
416 / 732
417 / 732
418 / 732
419 / 732
420 / 732
421 / 732
422 / 732
423 / 732
424 / 732
425 / 732
426 / 732
427 / 732
428 / 732
429 / 732
430 / 732
431 / 732
432 / 732
433 / 732
434 / 732
435 / 732
436 / 732
437 / 732
438 / 732
439 / 732
440 / 732
441 / 732
442 / 732
Inspection Notification Log Sheet
PHILSPEC

Inspection Party
Inspection Notification
SN Log Date Inspection Detail Activities Area / Location
Number SC VPCI

1 28-Aug-18 JGSS1EP-VPCI-PSP-0001 WQT Welder's Qualification Test Fabrication Shop H SW

Fit-Up Activity
2 28-Aug-18 JGSS1EP-VPCI-PSP-0002 Fit-Up Fabrication Shop H SW
PGD-29001-2"-A1D-N (0MM) Jt. 1,2,3,4

Welding Activity
3 28-Aug-18 JGSS1EP-VPCI-PSP-0003 Welding PGD-29002-2"-A1D-N (0MM) Jt. 2&3 Fabrication Shop H W
DWS-29027-4"-H1D20-N (0MM) Jt. 6&10

Fit-Up Activity
4 30-Aug-18 JGSS1EP-VPCI-PSP-0004 Fit-Up OWS-29028-01,OWS-29028-02,PGD- Fabrication Shop H SW
29001-01,PGD-29001-02
Welding Activity
5 30-Aug-18 JGSS1EP-VPCI-PSP-0005 Welding OWS-29028-01,OWS-29028-02,PGD- Fabrication Shop H W
29001-01,PGD-29001-02
OWS-29028-01; OWS-29028-02; PGD-
6 30-Aug-18 JGSS1EP-VPCI-PSP-0006 Fit-Up Fabrication Shop H SW
29001-01; OWS-29027-01
Daily Welding Activity
7 30-Aug-18 JGSS1EP-VPCI-PSP-0007 Welding OWS-29028-01; OWS-29028-02; PGD- Fabrication Shop H SW
29001-01; OWS-29027-01
OWS-29028-02 Jt. 9,10; PGD-29001-01
8 30-Aug-18 JGSS1EP-VPCI-PSP-0008 Welding Fabrication Shop H W
Jt. 3,4,6,10
9 31-Aug-18 JGSS1EP-VPCI-PSP-0009 Fit-Up Daily Fit-U Activity Fabrication Shop H SW
10 31-Aug-18 JGSS1EP-VPCI-PSP-0010 Welding Daily Welding Activity Fabrication Shop H SW

443 / 732
Visual Welding Inspection (Post)
PGD-29001-2"-A1DU-N (0MM) Jt.
11 31-Aug-18 JGSS1EP-VPCI-PSP-0011 Welding Fabrication Shop H W
12,13,14,15,16; OWS-29028-01-H1D20-
N-(0MM) Jt. 1,2
12 1-Sep-18 JGSS1EP-VPCI-PSP-0012 Fit-Up Daily Fit-U Activity Fabrication Shop H SW
13 1-Sep-18 JGSS1EP-VPCI-PSP-0013 Welding Daily Welding Activity Fabrication Shop H SW

"Visual Welding Inspection (Post)


OWS-29028-6""-H1D20-N (0MM) Jt. 3,4
PGD-29001-2""-A1DU-N (0MM) Jt.
5,18,19,20,21,22
14 1-Sep-18 JGSS1EP-VPCI-PSP-0014 Welding Fabrication Shop H W
OWS-29027-6""-H1D20-N (0MM) Jt.
1,2,3
OWS-29028-4""-H1D20-N (0MM) Jt.
5,6,7"

15 3-Sep-18 JGSS1EP-VPCI-PSP-0015 Fit-Up Daily Fit-U Activity Fabrication Shop H SW


16 3-Sep-18 JGSS1EP-VPCI-PSP-0016 Welding Daily Welding Activity Fabrication Shop H SW
Visual Welding Inspection (Post)
PGD-29001-02 Jt.
17 3-Sep-18 JGSS1EP-VPCI-PSP-0017 Welding 2,3,5,6,7,9,11,15,17,19,21,23 Fabrication Shop H W
PGD-29011-01 Jt. 1,2,3,8
IL-0802-1"-A1D Jt. 1,2,3,4,5,6

18 4-Sep-18 JGSS1EP-VPCI-PSP-0018 Fit-Up Daily Fit-U Activity Fabrication Shop H SW

19 4-Sep-18 JGSS1EP-VPCI-PSP-0019 Welding Daily Welding Activity Fabrication Shop H SW

Visual Welding Inspection (Post)


PGD-29025-01 Jt. 1,2,3,4,6,7
20 4-Sep-18 JGSS1EP-VPCI-PSP-0020 Welding PGD-29031-01 Jt. 1,2,3,4 Fabrication Shop H W
PGD-29001-02 Jt. 25
PGD-29013-01 Jt. 2,8,19,21,22,23,24

444 / 732
Welder's Qualification Test
Christopher C. Casilla
21 4-Sep-18 JGSS1EP-VPCI-PSP-0021 WQT Gerald M. Cabral Fabrication Shop H W
Emil A. Bautista
Michael Andreau A. Caraan
22 5-Sep-18 JGSS1EP-VPCI-PSP-0022 Fit-Up Daily Fit-Up Activity Fabrication Shop H SW
23 5-Sep-18 JGSS1EP-VPCI-PSP-0023 Welding Daily Welding Activity Fabrication Shop H SW
Visual Welding Inspection (Post)
PGD-29003-01 Jt. 1,2,3,5
PGD-29013-01 Jt. 6,13,15
OWS-29027-01 Jt. 10
24 5-Sep-18 JGSS1EP-VPCI-PSP-0024 Welding Fabrication Shop H W
PGD-29001-01 Jt. 9
PGD-29011-01 Jt. 5
PGD-29004-01 Jt. 5
PGD-29010-01 Jt. 2,3
25 6-Sep-18 JGSS1EP-VPCI-PSP-0025 Fit-Up Daily Fit-Up Activity Fabrication Shop H SW
26 6-Sep-18 JGSS1EP-VPCI-PSP-0026 Welding Daily Welding Activity Fabrication Shop H SW
Visual Welding Inspection (Post)
PGD-29010-01 Jt. 5
PGD-29001-02 Jt. 13,20,27
27 6-Sep-18 JGSS1EP-VPCI-PSP-0027 Welding PGD-29004-01 Jt. 1,2,3 Fabrication Shop H W
PGD-29031-01 Jt. 6,7
PGD-29030-01 Jt. 1,2,3,4,6,7
PGD-29013-01 Jt. 9,10,12
28 7-Sep-18 JGSS1EP-VPCI-PSP-0028 Fit-Up Daily Fit-Up Activity Fabrication Shop H SW
29 7-Sep-18 JGSS1EP-VPCI-PSP-0029 Welding Daily Welding Activity Fabrication Shop H SW
Visual Welding Inspection (Post)
PGD-29008-01 Jt. 2,3,5
PGD-29012-01 Jt. 2,3,5
30 7-Sep-18 JGSS1EP-VPCI-PSP-0030 Welding Fabrication Shop H SW
OWS-29027-01 Jt. 4,6,7
PGD-29013-01 Jt. 4,17,18
OWS-29028-02 Jt. 1,2,3

445 / 732
31 8-Sep-18 JGSS1EP-VPCI-PSP-0031 Fit-Up Daily Fit-Up Activity Fabrication Shop H SW

32 8-Sep-18 JGSS1EP-VPCI-PSP-0032 Welding Daily Welding Activity Fabrication Shop H SW

Visual Welding Inspection (Post)


PGD-29008-01 Jt. 2,3,5
PGD-29012-01 Jt. 2,3,5
33 8-Sep-18 JGSS1EP-VPCI-PSP-0033 Welding Fabrication Shop H SW
OWS-29027-01 Jt. 4,6,7
PGD-29013-01 Jt. 4,17,18
OWS-29028-02 Jt. 1,2,3
34 11-Sep-18 JGSS1EP-VPCI-PSP-0034 Fit-Up Daily Fit-Up Activity Fabrication Shop H SW
35 11-Sep-18 JGSS1EP-VPCI-PSP-0035 Welding Daily Welding Activity Fabrication Shop H SW
Visual Welding Inspection (Post)
PGD-29006-01 Jt. 1,2,3,4,5
PGD-29007-01 Jt. 1,2,3,4,5
36 11-Sep-18 JGSS1EP-VPCI-PSP-0036 Welding Fabrication Shop H SW
PGD-29005-01 Jt. 1,2,3,4,5
PGD-29009-01 Jt.2,3,4,5
PGD-29024-01 Jt. 1,2,3

Inspection for Foundation Check of:


A. Location
37 11-Sep-18 JGSS1EP-VPCI-PSP-0037 Foundation Check H-0305 H SW
B. Dimension (Size/Projection)
C. Levelness for FDN Padding
Receiving Inspection Checklist
38 12-Sep-18 JGSS1EP-VPCI-PSP-0038 Material Inspection Fabrication Shop H W
Doc No.: VPCI-PSP-RIC-002
39 12-Sep-18 JGSS1EP-VPCI-PSP-0039 Fit-Up Daily Fit-Up Activity Fabrication Shop H SW
40 12-Sep-18 JGSS1EP-VPCI-PSP-0040 Fit-Up Daily Fit-Up Activity Fabrication Shop H SW
41 12-Sep-18 JGSS1EP-VPCI-PSP-0041 Welding Daily Welding Activity Fabrication Shop H SW
Visual Welding Inspection (Post)
42 12-Sep-18 JGSS1EP-VPCI-PSP-0042 Welding PGD-29002-01 Jt. 6,7 Fabrication Shop H W
PGD-29024-01 Jt. 4,5
Welder's Qualification Test
43 12-Sep-18 JGSS1EP-VPCI-PSP-0043 WQT Roberto Soriano Fabrication Shop H W
Domingo Gayeta

446 / 732
Inspection for Foundation Check of STR-
0904
44 12-Sep-18 JGSS1EP-VPCI-PSP-0044 Foundation Check A. Location STR-0904 H W
B. Dimension (Size/Projection)
C. Levelness for FDN Padding
45 12-Sep-18 JGSS1EP-VPCI-PSP-0045 Fit-Up Daily Fit-Up Activity Fabrication Shop H SW
46 12-Sep-18 JGSS1EP-VPCI-PSP-0046 Welding Daily Welding Activity Fabrication Shop H SW
Daily Fit-Up Activity
47 12-Sep-18 JGSS1EP-VPCI-PSP-0047 Fit-Up Fabrication Shop H SW
PGD-29001-02 Jt. 26
Visual Welding Inspection (Post)
48 12-Sep-18 JGSS1EP-VPCI-PSP-0048 Welding Fabrication Shop H W
PGD-29001-02 Jt. 26
Visual Welding Inspection (Post)
49 14-Sep-18 JGSS1EP-VPCI-PSP-0049 Welding Fabrication Shop H W
PGD-29030-01 Jt. 4,8,9
50 17-Sep-18 JGSS1EP-VPCI-PSP-0050 Fit-Up Daily Fit-Up Activity Fabrication Shop H SW
51 17-Sep-18 JGSS1EP-VPCI-PSP-0051 Welding Daily Welding Activity Fabrication Shop H SW
Material Inspection for Welding
52 18-Sep-18 JGSS1EP-VPCI-PSP-0052 Material Inspection VPCI Office H W
Consumables (TG-S308L)
Inspection for Foundation Check of STR-
0903 (Drawing No. A1-JGS1EP-EPC1-
A09-DD-15-E001)
53 18-Sep-18 JGSS1EP-VPCI-PSP-0053 Foundation Check STR-0903 H W
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding

54 18-Sep-18 JGSS1EP-VPCI-PSP-0054 Fit-Up Daily Fit-Up Activity SITE H SW

55 18-Sep-18 JGSS1EP-VPCI-PSP-0055 Welding Daily Welding Activity SITE H SW

Visual Welding Inspection (Post)


56 18-Sep-18 JGSS1EP-VPCI-PSP-0056 Welding SITE H W
PGD-29001-02 Jt. 31

447 / 732
Inspection for Foundation Check of H-
0305 (Drawing No.: A1-JGS1EP-EPC1-
A03-DD-10-002)
57 20-Sep-18 JGSS1EP-VPCI-PSP-0057 Foundation Check Area 300 H SW
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding
58 24-Sep-18 JGSS1EP-VPCI-PSP-0058 Fit-Up Daily Fit-Up Activity DPG-2 H SW
59 24-Sep-18 JGSS1EP-VPCI-PSP-0059 Welding Daily Welding Activity DPG-2 H SW
Visual Welding Inspection (Post)
60 24-Sep-18 JGSS1EP-VPCI-PSP-0060 Welding DPG-2 H W
PGD-29001-01 Jt. 7,8
61 25-Sep-18 JGSS1EP-VPCI-PSP-0061 Fit-Up Daily Fit-Up Activity DPG-2 H SW
62 25-Sep-18 JGSS1EP-VPCI-PSP-0062 Welding Daily Welding Activity DPG-2 H SW
Visual Welding Inspection (Post)
63 25-Sep-18 JGSS1EP-VPCI-PSP-0063 Welding DPG-2 H W
PGD-29001-01 Jt. 11
Plot of FSPhil Data vs. PHS Data
Plot of FSPhil Data vs. PHS Data (1mm
64 26-Sep-18 JGSS1EP-VPCI-PSP-0064 Survey Area 300 H W
Offset)
(SS-PHS-0001)
65 26-Sep-18 JGSS1EP-VPCI-PSP-0065 Fit-Up Daily Fit-Up Activity DPG2 H SW
66 26-Sep-18 JGSS1EP-VPCI-PSP-0066 Welding Daily Welding Activity DPG2 H SW
Visual Welding Inspection (Post)
67 26-Sep-18 JGSS1EP-VPCI-PSP-0067 Welding DPG2 H W
PGD-29013-01 Jt. F5,F11,F26
Inspection for Foundation Check of R-
0902 (Drawing No. A1-JGS1EP-EPC1-
A09-DD-15-E001)
68 26-Sep-18 JGSS1EP-VPCI-PSP-0068 Foundation Check Area 900 H W
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding
69 27-Sep-18 JGSS1EP-VPCI-PSP-0069 Fit-Up Daily Fit-Up Activity DPG-2 H SW
70 27-Sep-18 JGSS1EP-VPCI-PSP-0070 Welding Daily Welding Activity (In-Process) DPG-2 H SW
Visual Welding Inspection (Post)
71 27-Sep-18 JGSS1EP-VPCI-PSP-0071 Welding DPG-2 H W
PGD-29013-01 Jt. F25

448 / 732
Daily Fit-Up Activity
72 27-Sep-18 JGSS1EP-VPCI-PSP-0072 Fit-Up Fabrication Shop H SW
for SS Welding
Daily Welding Activity (In-Process)
73 27-Sep-18 JGSS1EP-VPCI-PSP-0073 Welding Fabrication Shop H SW
for SS Welding
74 28-Sep-18 JGSS1EP-VPCI-PSP-0074 Fit-Up Daily Fit-Up Activity DPG-2 H SW
75 28-Sep-18 JGSS1EP-VPCI-PSP-0075 Welding Daily Welding Activity (In-Process) DPG-2 H SW
Visual Welding Inspection (Post)
PGD-29001-01 Jt. 31,32
76 28-Sep-18 JGSS1EP-VPCI-PSP-0076 Welding DPG-2 H W
PGD-29001-02 Jt. 4,8,10
PGD-29008-01 Jt. 1
Daily Fit-Up Activity
77 28-Sep-18 JGSS1EP-VPCI-PSP-0077 Fit-Up Fabrication Shop H SW
for SS Welding
Daily Welding Activity (In-Process)
78 28-Sep-18 JGSS1EP-VPCI-PSP-0078 Welding Fabrication Shop H SW
for SS Welding
Visual Welding Inspection (Post)
79 28-Sep-18 JGSS1EP-VPCI-PSP-0079 Welding Fabrication Shop H W

Welder's Qualification Test


80 28-Sep-18 JGSS1EP-VPCI-PSP-0080 WQT Emil A. Bautista Ambulong Shop H W
Michael Andreau A. Caraan
Material Inspection for Welding
81 28-Sep-18 JGSS1EP-VPCI-PSP-0081 Material Inspection Consumables (E-7018) Kobelco LB-52- VPCI Office H W
18
82 1-Oct-18 JGSS1EP-VPCI-PSP-0082 Fit-Up Daily Fit-Up Activity DPG-2 H SW
83 1-Oct-18 JGSS1EP-VPCI-PSP-0083 Welding Daily Welding Activity (In-Process) DPG-2 H SW
Visual Inspection of Welding
PGD-29001-01 Jt. F17,F30,F33
84 1-Oct-18 JGSS1EP-VPCI-PSP-0084 Welding DPG-2 H W
PGD-29013-01 Jt. F27,F28,F29
PGD-29031-01 Jt. F5
Daily Fit-Up Activity
85 1-Oct-18 JGSS1EP-VPCI-PSP-0085 Fit-Up Fabrication Shop H SW
for SS Welding
Daily Welding Activity (In-Process)
86 1-Oct-18 JGSS1EP-VPCI-PSP-0086 Welding Fabrication Shop H SW
for SS Welding

449 / 732
Visual Inspection of Welding
87 1-Oct-18 JGSS1EP-VPCI-PSP-0087 Welding IL-24001-1/2"-A21A Jt. Fabrication Shop H W
5,6,7,11,12,13,14,16,18,19,20
Daily Welding Activity (In-Process)
88 1-Oct-18 JGSS1EP-VPCI-PSP-0088 Welding Fabrication Shop H SW
for Support Welding
Visual Inspection of Welding
89 1-Oct-18 JGSS1EP-VPCI-PSP-0089 Welding Fabrication Shop H W
IL-24001-1/2"-A21A Jt. 1,2,3,4
90 1-Oct-18 JGSS1EP-VPCI-PSP-0090 Fit-Up Daily Fit-Up Activity DPG-2 H SW
91 1-Oct-18 JGSS1EP-VPCI-PSP-0091 Welding Daily Welding Activity (In-Process) DPG-2 H SW
Visual Inspection of Welding
PGD-29009-01 Jt. F1
92 1-Oct-18 JGSS1EP-VPCI-PSP-0092 Welding PGD-29001-02 Jt. F1,F29,F30 DPG-2 H W
PGD-29011-01 Jt. F4,F6,F7
PGD-29025-01 Jt. F5
93 2-Oct-18 JGSS1EP-VPCI-PSP-0093 Fit-Up Daily Fit-Up Activity DPG-2 H SW
94 2-Oct-18 JGSS1EP-VPCI-PSP-0094 Welding Daily Welding Activity (In-Process) DPG-2 H SW
Visual Inspection of Welding
PGD-29001-01 Jt. F2,F29
PGD-29010-01 Jt. F1,F4
95 2-Oct-18 JGSS1EP-VPCI-PSP-0095 Welding DPG-2 H W
PGD-29012-01 Jt. F1
PGD-29013-01 Jt. F1,F20
PGD-29030-01 Jt. F5
Welder's Qualification Test
96 2-Oct-18 JGSS1EP-VPCI-PSP-0096 WQT Ronalyn M. Arcega (PSP-W-012) Ambulong Shop H W
Franco R. Ebreo (PSP-W-013)
Daily Fit-Up Activity
97 3-Oct-18 JGSS1EP-VPCI-PSP-0097 Fit-Up Fabrication Shop H SW
for SUS Welding
Daily Welding Activity (In-Process)
98 3-Oct-18 JGSS1EP-VPCI-PSP-0098 Welding Fabrication Shop H SW
for SUS Welding
Visual Inspection of Welding
99 3-Oct-18 JGSS1EP-VPCI-PSP-0099 Welding Fabrication Shop H W
IL-24001-1/2"-A21A Jt. 21,22,24

450 / 732
Inspection of Structural Foundation
Check of STR-0905 (Drawing No. A1-
JGS1EP-EPC1-A09-DD-15-551)
100 3-Oct-18 JGSS1EP-VPCI-PSP-0100 Foundation Check Area 900 H W
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding

Welder's Qualification Test


Edwin S. Camacho (PSP-W-015)
Jemerand G. Dilao (PSP-W-016)
101 4-Oct-18 JGSS1EP-VPCI-PSP-0101 WQT Ambulong Shop H W
Crispiniano R. De Chavez (PSP-W-017)
Rolando C. Robles (PSP-W-018)
Leony M. Catapang (PSP-W-019)

PMI of IL-24001-1/2"-A21A and IL-04187-


102 4-Oct-18 JGSS1EP-VPCI-PSP-0102 PMI Area 400 H SW/R
1/2"-A21A

103 4-Oct-18 JGSS1EP-VPCI-PSP-0103 NDE RT for PGD-29010-2"-A1D-N (0MM) Jt. 4 Area 400 H SW/R

Visual Inspection of Welding


104 4-Oct-18 JGSS1EP-VPCI-PSP-0104 Welding IL-24001-1/2"-A21A Jt. Area 400 H W
F8,F9,F10,F15,17,F23,24,F25
105 4-Oct-18 JGSS1EP-VPCI-PSP-0105 Line Check Final line check Area 400 H W
106 4-Oct-18 JGSS1EP-VPCI-PSP-0106 Pressure Test Pressure Test Area 400 H H
107 5-Oct-18 JGSS1EP-VPCI-PSP-0107 Welding Daily Welding Activity (In-Process) DPG-2 H SW
Welder's Qualification Test
Ronald B. Jasa (PSP-W-020)
108 5-Oct-18 JGSS1EP-VPCI-PSP-0108 WQT Rogelio A. Aquino Jr. (PSP-W-022) Ambulong Shop H W
Jomar L. Punzalan (PSP-W-023)
Martin C. Sagadal (PSP-W-024)

451 / 732
Inspection of Mechanical Foundation
Check of G-0907 A/B (Drawing No. A1-
JGS1EP-EPC1-A09-DD-10-101)
109 5-Oct-18 JGSS1EP-VPCI-PSP-0109 Foundation Check Area 900 H W
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding

Inspection of Mechanical Foundation


Check of G-0908 A/B (Drawing No. A1-
JGS1EP-EPC1-A09-DD-10-111)
110 5-Oct-18 JGSS1EP-VPCI-PSP-0110 Foundation Check Area 900 H SW
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding

Inspection of Mechanical Foundation


Check of G-0909 A/B (Drawing No. A1-
JGS1EP-EPC1-A09-DD-10-121)
111 5-Oct-18 JGSS1EP-VPCI-PSP-0111 Foundation Check Area 900 H SW
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding

Inspection of Mechanical Foundation


Check of G-0910 A/B (Drawing No. A1-
JGS1EP-EPC1-A09-DD-10-131)
112 5-Oct-18 JGSS1EP-VPCI-PSP-0112 Foundation Check Area 900 H W
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding
113 6-Oct-18 JGSS1EP-VPCI-PSP-0113 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW
114 6-Oct-18 JGSS1EP-VPCI-PSP-0114 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Welder's Qualification Test
115 6-Oct-18 JGSS1EP-VPCI-PSP-0115 WQT Ambulong Shop H W
Dennis H. Noriega (PSP-W-025)

452 / 732
Inspection of Mechanical Foundation
Check of D-0909 (Drawing No. A3-
JGS1EP-A7MI-D-0909-001)
116 6-Oct-18 JGSS1EP-VPCI-PSP-0116 Foundation Check Area 900 H W
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding

Inspection of Mechanical Foundation


Check of D-0910 (Drawing No. A3-
JGS1EP-A7MI-D-0909-001)
117 6-Oct-18 JGSS1EP-VPCI-PSP-0117 Foundation Check Area 900 H W
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding
Final Line Check for PGD Line of (HT-
118 6-Oct-18 JGSS1EP-VPCI-PSP-0118 Line Check Area 400 H W
UG-PGD-PS-001)
119 8-Oct-18 JGSS1EP-VPCI-PSP-0119 Welding HDPE Daily Fit-up Activity Ambulong Shop H SW
120 8-Oct-18 JGSS1EP-VPCI-PSP-0120 Welding HDPE Daily Welding Activity (In-process) Ambulong Shop H SW

Hydro Test for PGD Line of (HT-UG-


121 8-Oct-18 JGSS1EP-VPCI-PSP-0121 Pressure Test Area 900 H H
PGD-PS-001)
122 8-Oct-18 JGSS1EP-VPCI-PSP-0122 Fit-Up Daily Fit-Up Activity Area 400 H SW
123 8-Oct-18 JGSS1EP-VPCI-PSP-0123 Welding Daily Welding Activity (In-Process) Area 400 H SW
Visual Welding Inspection (Post)
124 8-Oct-18 JGSS1EP-VPCI-PSP-0124 Welding IL-04187-01 Jt. F17,F18 Area 400 H W
IL-24001-01 Jt. F25
Visual Welding Inspection (Post)
125 8-Oct-18 JGSS1EP-VPCI-PSP-0125 Welding OWS-90001-01 Jt. 4,5 Ambulong Shop H W
OWS-90002-01 Jt. 5,6
HDPE Visual Inspection of Welding
126 8-Oct-18 JGSS1EP-VPCI-PSP-0126 Welding FW-39880-01 Jt. 3,6,7,8,11 Ambulong Shop H W
FW-39861-01 Jt. 3,4,5

453 / 732
HDPE Visual Inspection of Welding
FW-39870-01 Jt. 4,5,6,8,9
127 9-Oct-18 JGSS1EP-VPCI-PSP-0127 Welding Ambulong Shop H W
FW-39871-01 Jt. 7,9,10,11,4
FW-39874-01 Jt. 3
Visual Welding Inspection (Post)
OWS-90002-01 Jt. 3,2
128 9-Oct-18 JGSS1EP-VPCI-PSP-0128 Welding Ambulong Shop H W
OWS-51606-01 Jt. 6 ,2,3,4
OWS-90001 Jt. 2

Inspection for UG Wrapping Activity @


129 10-Oct-18 JGSS1EP-VPCI-PSP-0129 Wrapping DPG-2 H W
DPG2 Area (Preparation for Holiday Test)

Inspection of Mechanical Foundation


Elevation/ Levelness/ Check of Z-0901 (Drawing No. A3-
130 10-Oct-18 JGSS1EP-VPCI-PSP-0130 Area 900 H SW
Centering / Plumbness JGS1EP-PMK-DD-0901-009)
A. Elevation
Inspection of Mechanical Foundation
Elevation/ Levelness/ Check of Z-0902 (Drawing No. A3-
131 10-Oct-18 JGSS1EP-VPCI-PSP-0131 Area 900 H SW
Centering / Plumbness JGS1EP-PMK-DD-0901-009)
A. Elevation
Holiday Test for PGD Line of (HT-UG-
132 10-Oct-18 JGSS1EP-VPCI-PSP-0132 Holiday Test Area 900 H W
PGD-PS-001)
Welder's Qualification Test
Jessica V. Mirasol (PSP-W-030)
133 10-Oct-18 JGSS1EP-VPCI-PSP-0133 WQT Ambulong Shop H W
Judeth C. Ricafrente (PSP-W-031)
Joel E. Ebora (PSP-W-033)
134 10-Oct-18 JGSS1EP-VPCI-PSP-0134 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW
135 10-Oct-18 JGSS1EP-VPCI-PSP-0135 Welding Daily Welding Activity Ambulong Shop H SW
Visual Welding Inspection (Post)
136 10-Oct-18 JGSS1EP-VPCI-PSP-0136 Welding Ambulong Shop H W
CWI-24002-01 Jt. 3,8

454 / 732
HDPE Visual Welding Inspection (Post)
FW-39906-01 Jt. 3,4,5,7,8,9,10,11
137 10-Oct-18 JGSS1EP-VPCI-PSP-0137 Welding FW-39871-01 Jt. 3,5,8 Ambulong Shop H W
FW-39874-01 Jt. 6,7
FW-39807-01 Jt. 4,8

Elevation/ Levelness/ Elevation/ plumbness for Cracking


138 11-Oct-18 JGSS1EP-VPCI-PSP-0138 Area 300 H SW
Centering / Plumbness Heater Radiant Panel

Gusset plate welding visual inspection


139 11-Oct-18 JGSS1EP-VPCI-PSP-0139 Welding Area 900 H W
(Post) 6pcs for STR-0904

140 11-Oct-18 JGSS1EP-VPCI-PSP-0140 Welding Daily Welding Activity Ambulong Shop H SW


Visual Welding Inspection (Post)
141 11-Oct-18 JGSS1EP-VPCI-PSP-0141 Welding Ambulong Shop H W
CWI-24002-01 Jt. 3,8

HDPE Visual Welding Inspection (Post)


142 11-Oct-18 JGSS1EP-VPCI-PSP-0142 Welding Ambulong Shop H W
FW-39880-01 Jt. 4,5

143 12-Oct-18 JGSS1EP-VPCI-PSP-0143 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW


Inspection of Mechanical Foundation
Elevation/ Levelness/ Check of Z-0914 (Drawing No. A3-
144 12-Oct-18 JGSS1EP-VPCI-PSP-0144 Area 900 H SW
Centering / Plumbness JGS1EP-HAN-DD-E-0914-001)
A. Elevation
Inspection of Mechanical Foundation
Elevation/ Levelness/ Check of Z-0917 (Drawing No. A3-
145 12-Oct-18 JGSS1EP-VPCI-PSP-0145 Area 900 H SW
Centering / Plumbness JGS1EP-HAN-DD-E-0917-001)
A. Elevation
146 12-Oct-18 JGSS1EP-VPCI-PSP-0146 Fit-Up Daily Fit-Up Activity Area 300 H SW
147 12-Oct-18 JGSS1EP-VPCI-PSP-0147 Welding Daily Welding Activity (In-Process) Area 300 H SW
148 12-Oct-18 JGSS1EP-VPCI-PSP-0148 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW
149 12-Oct-18 JGSS1EP-VPCI-PSP-0149 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW

455 / 732
Visual Welding Inspection (Post)
OWS-25001-01 Jt. 3,4,6,7,8
150 12-Oct-18 JGSS1EP-VPCI-PSP-0150 Welding Ambulong Shop H W
CWR-31360-01 Jt. 5,11
CWI-24002-01 Jt. 2

Welder's Qualification Test


Francis C. Abrea (PSP-W-036)
Jay C. Baruel (PSP-W-037)
151 12-Oct-18 JGSS1EP-VPCI-PSP-0151 WQT Aldrin F. Morillo (PSP-W-038) Ambulong Shop H W
Wilmar G. Garcia (PSP-W-039)
Aldrin L. Reyes (PSP-W-040)
Limuel R. Magtibay (PSP-W-041)

HDPE Visual Welding Inspection (Post)


152 12-Oct-18 JGSS1EP-VPCI-PSP-0152 Welding Ambulong Shop H W
FW-39807-01 Jt. 5,7

153 13-Oct-18 JGSS1EP-VPCI-PSP-0153 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW


154 13-Oct-18 JGSS1EP-VPCI-PSP-0154 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
OWS-50601-01 Jt. 2,4,5
155 13-Oct-18 JGSS1EP-VPCI-PSP-0155 Welding Ambulong Shop H W
CWR-31360-01 Jt. 9
CWS-31360-01 Jt. 11,14
156 13-Oct-18 JGSS1EP-VPCI-PSP-0156 Fit-Up Daily Fit-Up Activity Area 300 H SW
157 13-Oct-18 JGSS1EP-VPCI-PSP-0157 Welding Daily Welding Activity (In-Process) Area 300 H SW
158 13-Oct-18 JGSS1EP-VPCI-PSP-0158 Fit-Up Daily Fit-Up Activity Area 400 H SW

Inspection of Structural Foundation


Check of Quench Piperack (Drawing No.
A1-JGS1EP-EPC1-A04-DD-15-187)
159 13-Oct-18 JGSS1EP-VPCI-PSP-0159 Foundation Check Area 900 H W
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding

456 / 732
Welder's Qualification Test
Christopher C. Casilla (PSP-W-003)
160 13-Oct-18 JGSS1EP-VPCI-PSP-0160 WQT Bryan M. Dalangin (PSP-W-042) Ambulong Shop H W
Nestor A. Antenor (PSP-W-043)
Lemar Leandro A. Aranda (PSP-W-045)

Visual Welding Inspection (Post)


161 15-Oct-18 JGSS1EP-VPCI-PSP-0161 Welding Area 900 H W
PGD-29001-02 Jt. F35,F36
162 15-Oct-18 JGSS1EP-VPCI-PSP-0162 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW
163 15-Oct-18 JGSS1EP-VPCI-PSP-0163 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
164 15-Oct-18 JGSS1EP-VPCI-PSP-0164 Welding Ambulong Shop H W
CWS-31360-01 Jt. 5,6,9,12
Inspection for Heater
-Elevation
165 15-Oct-18 JGSS1EP-VPCI-PSP-0165 Foundation Check Area 300 H W
-Centering
-Plumbness
Welder's Qualification Test
166 15-Oct-18 JGSS1EP-VPCI-PSP-0166 WQT Ambulong Shop H W
CONRADO CARINGAL JR (049)
167 16-Oct-18 JGSS1EP-VPCI-PSP-0167 Pressure Test Manifold Hydro Test Ambulong Shop W W
168 16-Oct-18 JGSS1EP-VPCI-PSP-0168 Fit-Up Daily Fit-Up Activity Area 900 H SW
169 16-Oct-18 JGSS1EP-VPCI-PSP-0169 Welding Daily Welding Activity (In-Process) Area 900 H SW
Visual Welding Inspection (Post)
170 16-Oct-18 JGSS1EP-VPCI-PSP-0170 Welding PCS-90001-01 Jt. 2 Area 900 H W
PCS-90002-01 Jt. 1,2,3
Inspection for UG Wrapping Activity @
DPG2 Area
171 16-Oct-18 JGSS1EP-VPCI-PSP-0171 Wrapping DPG-2 H W
PCS-90001-01 Jt. 2
PCS-90002-01 Jt. 1,2,3
172 16-Oct-18 JGSS1EP-VPCI-PSP-0172 Fit-Up Daily Fit-Up Activity Area 900 H SW
173 16-Oct-18 JGSS1EP-VPCI-PSP-0173 Welding Daily Welding Activity (In-Process) Area 900 H SW

457 / 732
Visual Welding Inspection (Post)
PGD-29027-01 Jt. 2,3,4,5,1
174 16-Oct-18 JGSS1EP-VPCI-PSP-0174 Welding Area 900 H W
PGD-29001-02 Jt. 18,14,16,32,33,24
PCS-90002-01 Jt.1,3
Holiday Test for PCS Line of
175 16-Oct-18 JGSS1EP-VPCI-PSP-0175 Holiday Test Area 900 H W
(PCS-90002-01 Jt. 1,2,3)
176 16-Oct-18 JGSS1EP-VPCI-PSP-0176 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
177 16-Oct-18 JGSS1EP-VPCI-PSP-0177 Welding Ambulong Shop H W
CWR-31360-01 Jt. 7,2

RT for NR-PHS-RT-003 (PGD-290001-01


Jt. 26
178 16-Oct-18 JGSS1EP-VPCI-PSP-0178 NDE Area 900 H SW/R
PGD-290002-01 Jt.6)
NR-PHS-RT-004 (PGD-290001-02 Jt. 35)

Final Line Check for UG Wrapping


179 16-Oct-18 JGSS1EP-VPCI-PSP-0179 Line Check DPG-2 H W
Activity @ DPG2 Area (PCS-90001-01)

180 17-Oct-18 JGSS1EP-VPCI-PSP-0180 NDE RT for PGD-29001-02 Jt. 26 DPG-2 H SW/R


181 17-Oct-18 JGSS1EP-VPCI-PSP-0181 Fit-Up Daily Fit-Up Activity Area 900 H SW
182 17-Oct-18 JGSS1EP-VPCI-PSP-0182 Welding Daily Welding Activity (In-Process) Area 900 H SW
Visual Welding Inspection (Post)
183 17-Oct-18 JGSS1EP-VPCI-PSP-0183 Welding PGD-29002-01 Jt. F5 Area 900 H W
PGD-29001-02 Jt. F34,F37

Welder's Qualification Test


Marvin A. Panganiban (W-053) - SMAW
184 17-Oct-18 JGSS1EP-VPCI-PSP-0184 WQT Ambulong Shop H W
Ruel F. Baes (W-054) - SMAW
Efren M. Manalo (W-056) - GTAW

185 17-Oct-18 JGSS1EP-VPCI-PSP-0185 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW


186 17-Oct-18 JGSS1EP-VPCI-PSP-0186 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
187 17-Oct-18 JGSS1EP-VPCI-PSP-0187 Welding CWS-24002-01 Jt. 2 Ambulong Shop H W
P-29059-01 Jt. 8

458 / 732
188 17-Oct-18 JGSS1EP-VPCI-PSP-0188 NDE RT for PGD-29001-02 Jt. 14 DPG-2 H SW/R
189 18-Oct-18 JGSS1EP-VPCI-PSP-0189 Fit-Up Daily Fit-Up Activity Area 900 H SW
190 18-Oct-18 JGSS1EP-VPCI-PSP-0190 Welding Daily Welding Activity (In-Process) Area 900 H SW
Visual Welding Inspection (Post)
191 18-Oct-18 JGSS1EP-VPCI-PSP-0191 Welding OWS-29028-01 Jt. F5 Area 900 H W
OWS-29028-02 Jt. F4,F8
Wrapping for OWS Line
192 18-Oct-18 JGSS1EP-VPCI-PSP-0192 Wrapping OWS-29028-01 Jt. 2,3,4,F5 Area 900 H W
OWS-29028-02 Jt. 1,2,3,F4,5,6,7,F8

193 18-Oct-18 JGSS1EP-VPCI-PSP-0193 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW


194 18-Oct-18 JGSS1EP-VPCI-PSP-0194 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
195 18-Oct-18 JGSS1EP-VPCI-PSP-0195 Welding Ambulong Shop H W
P-29002-02 Jt. 3,10 (AG)

196 19-Oct-18 JGSS1EP-VPCI-PSP-0196 NDE PT for PGD-29001-02 Jt. F12 & Jt 25 Area 900 H SW/R
197 19-Oct-18 JGSS1EP-VPCI-PSP-0197 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW
198 19-Oct-18 JGSS1EP-VPCI-PSP-0198 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
P-29002-02 Jt. 7
199 19-Oct-18 JGSS1EP-VPCI-PSP-0199 Welding P-29057-02 Jt. 3 Ambulong Shop H W
P-29023-01 Jt. 6
P-29001-01 Jt. 5
200 19-Oct-18 JGSS1EP-VPCI-PSP-0200 Fit-Up Daily Fit-Up Activity Area 900 H SW
201 19-Oct-18 JGSS1EP-VPCI-PSP-0201 Welding Daily Welding Activity (In-Process) Area 900 H SW
Visual Welding Inspection (Post)
202 19-Oct-18 JGSS1EP-VPCI-PSP-0202 Welding Area 900 H W
PCS-90003-01 Jt. F2,F3

Holiday Test for OWS Line


OWS-29028-01 Jt. 2,3,4,F5
203 19-Oct-18 JGSS1EP-VPCI-PSP-0203 Holiday Test Area 900 H W
OWS-29028-02 Jt. 1,2,3,F4,5,6,7,F8,F11
PCS-90001-01 Jt. 2

459 / 732
Welder's Qualification Test
204 19-Oct-18 JGSS1EP-VPCI-PSP-0204 WQT Ambulong Shop H W
Giannah Lei R. Clarin (W-060) - SMAW

Gusset plate welding visual inspection


205 19-Oct-18 JGSS1EP-VPCI-PSP-0205 Welding Area 400 H W
(Post)
Visual Welding Inspection (Post)
206 20-Oct-18 JGSS1EP-VPCI-PSP-0206 Welding Area 900 H W
PCS-90003-01 Jt.1,5
Wrapping for PCS Line
207 20-Oct-18 JGSS1EP-VPCI-PSP-0207 Wrapping Area 900 H W
PCS-90003-01 Jt. 1, 5
Holiday Test for PCS Line
208 20-Oct-18 JGSS1EP-VPCI-PSP-0208 Holiday Test Area 900 H W
PCS-90003-01 Jt. 1, 5
Final Line Check for PCS Line of (HT-
209 20-Oct-18 JGSS1EP-VPCI-PSP-0209 Line Check Area 900 H W
UG-PCS-PS-002)
210 20-Oct-18 JGSS1EP-VPCI-PSP-0210 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW
211 20-Oct-18 JGSS1EP-VPCI-PSP-0211 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
A09A5001-P-29059-01 Jt. 12
212 20-Oct-18 JGSS1EP-VPCI-PSP-0212 Welding Ambulong Shop H W
A09A5001-P-29012-01 Jt. 5
A09A5001-P-29040-01 Jt. 2

Inspection for Equipment Foundation


Check of C-0902 at Area 900
(Drawing#:A1-JGS1EP-EPC1-A09-DD-
213 20-Oct-18 JGSS1EP-VPCI-PSP-0213 Foundation Check 10-001) Area 900 H W
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding

Inspection for Equipment Foundation


Check of C-0903 at Area 900
(Drawing#:A1-JGS1EP-EPC1-A09-DD-
214 20-Oct-18 JGSS1EP-VPCI-PSP-0214 Foundation Check 10-021) Area 900 H W
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding

460 / 732
Final Line Check for PGD Line of (HT-
215 20-Oct-18 JGSS1EP-VPCI-PSP-0215 Line Check Area 400 H W
UG-PGD-PS-002)
Hydro Test for PGD Line of (HT-UG-
216 20-Oct-18 JGSS1EP-VPCI-PSP-0216 Pressure Test Area 900 H H
PGD-PS-002)
217 22-Oct-18 JGSS1EP-VPCI-PSP-0217 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW
218 22-Oct-18 JGSS1EP-VPCI-PSP-0218 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
219 22-Oct-18 JGSS1EP-VPCI-PSP-0219 Welding A09A5001-MS-29004-01 Jt. 9 Ambulong Shop H W
A09A5001-P-29059-02 Jt. 8
220 22-Oct-18 JGSS1EP-VPCI-PSP-0220 Fit-Up Daily Fit-Up Activity 300 H SW
221 22-Oct-18 JGSS1EP-VPCI-PSP-0221 Welding Daily Welding Activity (In-Process) 300 H SW
Visual Welding Inspection (Post)
222 22-Oct-18 JGSS1EP-VPCI-PSP-0222 Welding Area 300 H W
PCS-90001-01

Welder's Qualification Test


Maricon A. Arrevalo (W-063) - GT/SM
Margarita H. Panganiban (W-064) -
GT/SM
Uzzelette R. Magtibay (W-065) - SMAW
223 22-Oct-18 JGSS1EP-VPCI-PSP-0223 WQT Kristine Cae D. Magnaye (W-066) - Ambulong Shop H W
SMAW
Ruben D. Acuña (W-067) - SMAW
Noly A. Panganiban (W-068) - SMAW
Baldomero Jumaguit Jr. (PSP-W-034A) -
SMAW

Holiday Test for PCS Line


224 22-Oct-18 JGSS1EP-VPCI-PSP-0224 Holiday Test Area 300 H W
PCS-90001-01 Jt. 2, 3
Final Line Check for PCS Line of (HT-
225 22-Oct-18 JGSS1EP-VPCI-PSP-0225 Line Check Area 300 H W
UG-PCS-PS-004)

461 / 732
Visual Welding Inspection (Post)
PGD-29001-01 Jt. 2M1
226 23-Oct-18 JGSS1EP-VPCI-PSP-0226 Welding Area 900 H W
PGD-29001-02 Jt. 7M1, 9M1, 10M1, 12,
25M1, 28, 31M1

Wrapping for PGD Line


PGD-29001-01 Jt. 2M1
PGD-29001-02 Jt. 7M1, 9M1, 10M1, 12,
227 23-Oct-18 JGSS1EP-VPCI-PSP-0227 Wrapping Area 900 H W
13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23,
24, 25M1, 28, 31M1, 32, 33, 34, 35, 36,
37

Holiday Test for PGD Line


PGD-29001-01 Jt. 2M1
PGD-29001-02 Jt. 7M1, 9M1, 10M1, 12,
228 23-Oct-18 JGSS1EP-VPCI-PSP-0228 Holiday Test Area 900 H W
13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23,
24, 25M1, 28, 31M1, 32, 33, 34, 35, 36,
37
229 23-Oct-18 JGSS1EP-VPCI-PSP-0229 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW
230 23-Oct-18 JGSS1EP-VPCI-PSP-0230 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
231 23-Oct-18 JGSS1EP-VPCI-PSP-0231 Welding Ambulong Shop H W
A01A5001-P-29059-01 Jt. 3,5
232 24-Oct-18 JGSS1EP-VPCI-PSP-0232 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW
233 24-Oct-18 JGSS1EP-VPCI-PSP-0233 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
A00A5001-OWS-24001-01 Jt. 2,3
234 24-Oct-18 JGSS1EP-VPCI-PSP-0234 Welding A00A5001-OWS-24001-02 Jt. 2,3 Ambulong Shop H W
A00A5001-ND-23003-01 Jt. 3,4
A01A5001-P-29057-03 Jt. 6

462 / 732
Welder's Qualification Test
Adrian Z. Panganiban (W-069) - SMAW
235 24-Oct-18 JGSS1EP-VPCI-PSP-0235 WQT Felix R. Bagui (W-072) - GT/SM Ambulong Shop H W
Ronilo R. Bagui (W-073) - GT/SM
John Carlo I. Barola (W-074) - GT/SM

Post Visual Inspection of Gusset Plate


236 24-Oct-18 JGSS1EP-VPCI-PSP-0236 Welding Welding (Drawing No.: A1-JGS1EP- Area 400 H W
EPC1-A04-DD-15-E003)
Magnetic Test (NDE) of Gusset Plate
237 24-Oct-18 JGSS1EP-VPCI-PSP-0237 NDE Welding (Drawing No.: A1-JGS1EP- Area 400 H W
EPC1-A04-DD-15-E003)
238 25-Oct-18 JGSS1EP-VPCI-PSP-0238 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW
239 25-Oct-18 JGSS1EP-VPCI-PSP-0239 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW

Visual Welding Inspection (Post)


240 25-Oct-18 JGSS1EP-VPCI-PSP-0240 Welding Ambulong Shop H W
A00A5001-OWS-24001-01 Jt. 10,11,13

Welder's Qualification Test


Mark Anthony A. Maderazo (W-075) -
SMAW
Abner A. Pintor (W-076) - GT/SM
241 25-Oct-18 JGSS1EP-VPCI-PSP-0241 WQT Ambulong Shop H W
Isagani C. Umali (W-077) - GT/SM
Marvin A. Alcaraz (W-078) - GT/SM
Baldomero Jumaguit Jr. (PSP-W-034A) -
GT/SM
242 25-Oct-18 JGSS1EP-VPCI-PSP-0242 Fit-Up Daily Fit-Up Activity Area 900 H SW
243 25-Oct-18 JGSS1EP-VPCI-PSP-0243 Welding Daily Welding Activity (In-Process) Area 900 H SW
Visual Welding Inspection (Post)
244 25-Oct-18 JGSS1EP-VPCI-PSP-0244 Welding Area 900 H W
A00A5001-PCS-23412-01 Jt. 1
Wrapping for PCS Line
245 25-Oct-18 JGSS1EP-VPCI-PSP-0245 Wrapping Area 900 H W
A00A5001-PCS-23412-01 Jt. 1

463 / 732
Holiday Test for PCS Line
246 25-Oct-18 JGSS1EP-VPCI-PSP-0246 Holiday Test Area 900 H W
A00A5001-PCS-23412-01 Jt. 1
Final Line Check for PCS Line of (HT-
247 25-Oct-18 JGSS1EP-VPCI-PSP-0247 Line Check Area 900 H W
UG-PCS-PS-005)
248 26-Oct-18 JGSS1EP-VPCI-PSP-0248 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW
249 26-Oct-18 JGSS1EP-VPCI-PSP-0249 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
250 26-Oct-18 JGSS1EP-VPCI-PSP-0250 Welding Ambulong Shop H W
A00A5001-OWS-24001-01 Jt. 1,7

Welder's Qualification Test


Renancio Mungcal (W-001) -
251 26-Oct-18 JGSS1EP-VPCI-PSP-0251 WQT Ambulong Shop H W
GTAW/SMAW
Elmo Omaga (W-002) - GTAW/SMAW

252 27-Oct-18 JGSS1EP-VPCI-PSP-0252 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW


253 27-Oct-18 JGSS1EP-VPCI-PSP-0253 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
254 27-Oct-18 JGSS1EP-VPCI-PSP-0254 Welding A00A5001-OWS-24001-02 Jt. 6,7 Ambulong Shop H W
A09A5001-P-29002-02 Jt. 12

255 27-Oct-18 JGSS1EP-VPCI-PSP-0255 NDE MT for Spreader Beam Area 400 H SW/R
256 29-Oct-18 JGSS1EP-VPCI-PSP-0256 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW
257 29-Oct-18 JGSS1EP-VPCI-PSP-0257 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW
Visual Welding Inspection (Post)
A09A5001-P-29041-01 Jt. 2,3,4
A09A5001-P-29023-01 Jt. 2,3,7,8
258 29-Oct-18 JGSS1EP-VPCI-PSP-0258 Welding A09A5001-P-29059-01 Jt. 5,16 Ambulong Shop H W
A09A5001-P-29002-02 Jt. 13
A09A5001-P-29002-01 Jt. 6,7
A09A5001-P-29042-01 Jt. 8,9
PT Activity for Lifting Accessories
259 29-Oct-18 JGSS1EP-VPCI-PSP-0259 NDE Area 900 H SW/R
(Shuckles)

464 / 732
Inspection for Foundation Check of K-
0901 at Area 900 (Drawing#:A1-
JGS1EP-EPC1-A09-DD-15-521)
260 29-Oct-18 JGSS1EP-VPCI-PSP-0260 Foundation Check Area 900 H SW
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding

Inspection for Foundation Check of G-


0605 at Area 600 (Drawing#:A1-
JGS1EP-EPC1-A06-DD-15-3D)
261 29-Oct-18 JGSS1EP-VPCI-PSP-0261 Foundation Check Area 600 H SW
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding

Inspection for Foundation Padding Check


of G-0805 at Area 800 (Drawing#:A1-
JGS1EP-EPC1-A06-DD-15)
262 29-Oct-18 JGSS1EP-VPCI-PSP-0262 Foundation Check Area 800 H SW
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding

263 30-Oct-18 JGSS1EP-VPCI-PSP-0263 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW

264 30-Oct-18 JGSS1EP-VPCI-PSP-0264 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW

465 / 732
Visual Welding Inspection (Post)
A09A5001-P-29059-01 Jt. 7,10,11,14
A09A5001-P-29002-02 Jt. 6,11
A09A5001-P-29059-02 Jt. 5,6,9,10
A09A5001-P-29060-02 Jt. 2,3
A09A5001-P-29005-01 Jt. 7
265 30-Oct-18 JGSS1EP-VPCI-PSP-0265 Welding Ambulong Shop H W
A09A5001-P-29041-01 Jt. 11
A09A5001-P-29040-01 Jt. 3,4
A00A5001-OWS-24001-02 Jt. 1
A09A5001-SV-29005-01 Jt. 2,4
A09A5001-P-29001-01 Jt. 9,10,11
A09A5001-P-29059-01 Jt. 2

Welding Activity (In Process) of Gusset


266 30-Oct-18 JGSS1EP-VPCI-PSP-0266 Welding Plate Welding @ Strl 703 (Drawing No.: Area 700 H W
A1-JGS1EP-EPC1-A07-DD-15-3D)

Visual Welding Inspection (Post)


A09A5001-P-29040-01 Jt. 8,9
A09A5001-P-29001-01 Jt. 1,2,3,13
A09A5001-P-29059-01 Jt. 2
A09A5001-MS-29004-01 Jt. 4,5,7
A09A5001-SV-29005-01 Jt. 6,7
267 31-Oct-18 JGSS1EP-VPCI-PSP-0267 Welding A00A5001-FW-39871-01 Jt. 13,14 Ambulong Shop H W
A00A5001-FW-39870-01 Jt. 11,12
A09A5001-P-29041-01 Jt. 13
A09A5001-SV-29004-01 Jt. 6
A09A5001-P-29012-01 Jt. 2,3,4
A09A5001-P-29059-02 Jt. 9,10
A09A5001-SV-29004-01 Jt. 5

268 1-Nov-18 JGSS1EP-VPCI-PSP-0268 Fit-Up Daily Fit-Up Activity Ambulong Shop H SW

269 1-Nov-18 JGSS1EP-VPCI-PSP-0269 Welding Daily Welding Activity (In-Process) Ambulong Shop H SW

466 / 732
Visual Welding Inspection (Post)
A00A5001-FW-39861-01 Jt. 6,7
A09A5001-P-29059-02 Jt. 2
A09A5001-P-29059-01 Jt. 15
A00A5001-PGD-29034-01 Jt.
270 1-Nov-18 JGSS1EP-VPCI-PSP-0270 Welding Ambulong Shop H W
9,11,12,15,17,18
A01A5001-P-29059-01 Jt. 8
A09A5001-P-29003-01 Jt. 14,15
A09A5001-P-29069-02 Jt. 17
A09A5001-P-29057-02 Jt. 4

271 2-Nov-18 JGSS1EP-VPCI-PSP-0271 Fit-Up Weekly Fit-Up Activity Ambulong Shop H SW


272 2-Nov-18 JGSS1EP-VPCI-PSP-0272 Welding Weekly Welding Activity (In-Process) Ambulong Shop H SW
273 2-Nov-18 JGSS1EP-VPCI-PSP-0273 Welding Visual Welding Inspection (Post) Ambulong Shop H W
274
275
Inspection for Foundation Padding Check
of R-0701 at Area 700, Drawing#:A1-
JGS1EP-EPC1-A07-DD-10-001/002
276 5-Nov-18 JGSS1EP-VPCI-PSP-0276 Foundation Check (Report#: EQ-PHS-018) Area 700 H SW
A. Location
B. Dimension (Size/Projection)
C. Levelness for FDN Padding

467 / 732
et Accepted

878 On-schedule Waiting for result

99 Re-schedule Cancelled

109 Additional Reject


tion Party
Inspection Date Time Subcontractor Inspector Discipline Status Result
PMC

SW 28-Aug-18 1300H Philspec Ramon Castillo Piping On-schedule Accepted

SW 28-Aug-18 1300H Philspec Ramon Castillo Piping Re-schedule Accepted

SW 28-Aug-18 1500H Philspec Ramon Castillo Piping Re-schedule Accepted

SW 30-Aug-18 1000H Philspec Ramon Castillo Piping Additional Accepted

SW 30-Aug-18 1300H Philspec Ramon Castillo Piping Additional Accepted

SW 31-Aug-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 31-Aug-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 31-Aug-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted


SW 01-Sep-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted
SW 01-Sep-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

468 / 732
SW 01-Sep-18 0800H Philspec Ramon Castillo On-schedule Accepted

SW 03-Sep-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted


SW 03-Sep-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 03-Sep-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 04-Sep-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted


SW 04-Sep-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 04-Sep-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 5-Sep-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 5-Sep-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 5-Sep-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

469 / 732
SW 5-Sep-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 06-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted


SW 06-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted

SW 06-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted

SW 07-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted


SW 07-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted

SW 07-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted

SW 08-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted


SW 08-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted

SW 08-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted

470 / 732
SW 10-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted

SW 10-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted

SW 10-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted

SW 11-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted


SW 11-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted

SW 11-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted

SW 11-Sep-18 0800H Philspec Randal Fernandez Mechanical On-schedule Accepted

R 12-Sep-18 1030H Philspec Ramon Castillo Mechanical Additional Accepted


SW 12-Sep-18 1030H Philspec Ramon Castillo Piping Additional Accepted
SW 13-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted
SW 13-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted

SW 13-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted

SW 13-Sep-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

471 / 732
SW 13-Sep-18 0900H Philspec Randal Fernandez Structural On-schedule Accepted

SW 14-Sep-18 0730H Philspec Ramon Castillo Piping Additional Accepted


SW 14-Sep-18 0730H Philspec Ramon Castillo Piping Additional Accepted
SW 14-Sep-18 0730H Philspec Ramon Castillo Piping Additional Accepted

SW 14-Sep-18 0730H Philspec Ramon Castillo Piping Additional Accepted

SW 15-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted


SW 18-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted
SW 18-Sep-18 0730H Philspec Ramon Castillo Piping On-schedule Accepted
R 18-Sep-18 0730H Philspec Randal Fernandez Piping On-schedule Accepted

SW 19-Sep-18 0900H Philspec Randal Fernandez Structural On-schedule Accepted

SW 19-Sep-18 0800H Philspec Randal Fernandez Piping Re-schedule Accepted

SW 19-Sep-18 0800H Philspec Randal Fernandez Piping Re-schedule Accepted

SW 19-Sep-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted

472 / 732
W 21-Sep-18 0800H Philspec Randal Fernandez Mechanical On-schedule Accepted

SW 25-Sep-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted


SW 25-Sep-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted
SW 25-Sep-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted
SW 26-Sep-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted
SW 26-Sep-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted
SW 26-Sep-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted

R 26-Sep-18 1400H Philspec Randal Fernandez Mechanical On-schedule Accepted

SW 27-Sep-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted


SW 27-Sep-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted
SW 27-Sep-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted

SW 27-Sep-18 0900H Philspec Randal Fernandez Structural On-schedule Accepted

SW 28-Sep-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted


SW 28-Sep-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted
SW 28-Sep-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted

473 / 732
SW 28-Sep-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 28-Sep-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted


SW 29-Sep-18 1000H Philspec Randal Fernandez Piping On-schedule Accepted
SW 29-Sep-18 1000H Philspec Randal Fernandez Piping On-schedule Accepted

SW 29-Sep-18 1000H Philspec Randal Fernandez Piping On-schedule Accepted

SW 29-Sep-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 29-Sep-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 29-Sep-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 29-Sep-18 1330H Philspec Ramon Castillo Piping On-schedule Accepted

R 29-Sep-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted

SW 01-Oct-18 1000H Philspec Randal Fernandez Piping On-schedule Accepted


SW 01-Oct-18 1000H Philspec Randal Fernandez Piping On-schedule Accepted

SW 01-Oct-18 1000H Philspec Randal Fernandez Piping On-schedule Accepted

SW 01-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 01-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

474 / 732
SW 01-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 02-Oct-18 0800H Philspec Ramon Castillo Piping Additional Accepted

SW 02-Oct-18 0800H Philspec Ramon Castillo Piping Additional Accepted


SW 02-Oct-18 1000H Philspec Randal Fernandez Piping Additional Accepted
SW 02-Oct-18 1000H Philspec Randal Fernandez Piping Additional Accepted

SW 02-Oct-18 1000H Philspec Randal Fernandez Piping Additional Accepted

SW 03-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted


SW 03-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted

SW 03-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted

SW 04-Oct-18 0830H Philspec Ramon Castillo Piping On-schedule Accepted

SW 04-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 04-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 04-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

475 / 732
W 04-Oct-18 0900H Philspec Allan Magadia Structural On-schedule Accepted

SW 05-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

R 05-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted

R 05-Oct-18 1800H Philspec Randal Fernandez Piping On-schedule Accepted

SW 05-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted

SW 05-Oct-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted


SW 05-Oct-18 1000H Philspec Randal Fernandez Piping On-schedule Accepted
SW 06-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted

SW 06-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

476 / 732
SW 06-Oct-18 0900H Philspec Randal Fernandez Mechanical On-schedule Accepted

SW 06-Oct-18 0930H Philspec Randal Fernandez Mechanical On-schedule Accepted

SW 06-Oct-18 1000H Philspec Randal Fernandez Mechanical On-schedule Accepted

SW 06-Oct-18 1030H Philspec Randal Fernandez Mechanical On-schedule Accepted

SW 08-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted


SW 08-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted
SW 08-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

477 / 732
SW 08-Oct-18 0900H Philspec Randal Fernandez Mechanical On-schedule Accepted

SW 08-Oct-18 0900H Philspec Randal Fernandez Mechanical On-schedule Accepted

SW 08-Oct-18 0830H Philspec Randal Fernandez Piping On-schedule Accepted


SW 08-Oct-18 1000H Philspec Ramon Castillo Piping Additional Accepted
SW 08-Oct-18 1000H Philspec Ramon Castillo Piping Additional Accepted

SW 09-Oct-18 1330H Philspec Randal Fernandez Piping Additional Accepted


SW 09-Oct-18 0800H Philspec Randal Fernandez Piping Additional Accepted
SW 09-Oct-18 0800H Philspec Randal Fernandez Piping Additional Accepted

SW 09-Oct-18 0900H Philspec Randal Fernandez Piping Additional Accepted

SW 09-Oct-18 0800H Philspec Ramon Castillo Piping Additional Accepted

SW 09-Oct-18 0800H Philspec Ramon Castillo Piping Additional Accepted

478 / 732
SW 10-Oct-18 0800H Philspec Ramon Castillo Piping Additional Accepted

SW 10-Oct-18 0800H Philspec Ramon Castillo Piping Additional Accepted

SW 10-Oct-18 0830H Philspec Randal Fernandez Piping Additional Accepted

SW 11-Oct-18 0800H Philspec Randal Fernandez Mechanical Additional Accepted

SW 11-Oct-18 0800H Philspec Randal Fernandez Mechanical Additional Accepted

SW 11-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted

SW 11-Oct-18 0900H & 1300H Philspec Ramon Castillo Piping On-schedule Accepted

SW 11-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted


SW 11-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted
SW 11-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

479 / 732
SW 11-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 11-Oct-18 1500H Philspec Randal Fernandez Mechanical Re-schedule Cancelled

SW 11-Oct-18 1600H Philspec Randal Fernandez Structural Additional Accepted

SW 12-Oct-18 0800H Philspec Randal Fernandez Piping Additional Accepted


SW 12-Oct-18 0800H Philspec Randal Fernandez Piping Additional Accepted

SW 12-Oct-18 0800H Philspec Randal Fernandez Piping Additional Accepted

SW 12-Oct-18 0800H Philspec Randal Fernandez Piping Additional Accepted

SW 12-Oct-18 0800H Philspec Randal Fernandez Mechanical Additional Accepted

SW 12-Oct-18 0800H Philspec Randal Fernandez Mechanical Additional Accepted

SW 13-Oct-18 0800H Philspec Randal Fernandez Piping Additional Accepted


SW 13-Oct-18 0800H Philspec Randal Fernandez Piping Additional Accepted
SW 13-Oct-18 0800H Philspec Ramon Castillo Piping Additional Accepted
SW 13-Oct-18 0800H Philspec Ramon Castillo Piping Additional Accepted

480 / 732
SW 13-Oct-18 0900H Philspec Ramon Castillo Piping Additional Accepted

SW 13-Oct-18 0900H Philspec Ramon Castillo Piping Additional Accepted

SW 13-Oct-18 0800H Philspec Ramon Castillo Piping Additional Accepted

SW 15-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted


SW 15-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

SW 15-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 15-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted


SW 15-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted
SW 15-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted

SW 15-Oct-18 0900H Philspec Randal Fernandez Structural On-schedule Accepted

481 / 732
SW 15-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 15-Oct-18 0800H Philspec Randal Fernandez Piping Additional Accepted


SW 16-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted
SW 16-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted
SW 16-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 16-Oct-18 0900H Philspec Randal Fernandez Structural On-schedule Cancelled

SW 16-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted


W 16-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted
SW 17-Oct-18 0830H Philspec Randal Fernandez Piping On-schedule Accepted
SW 17-Oct-18 0830H Philspec Randal Fernandez Piping On-schedule Accepted

SW 17-Oct-18 0830H Philspec Randal Fernandez Piping On-schedule Accepted

SW 17-Oct-18 1000H Philspec Ramon Castillo Piping On-schedule Accepted

SW 17-Oct-18 1330H Philspec Randal Fernandez Piping On-schedule Accepted


SW 17-Oct-18 1330H Philspec Randal Fernandez Piping On-schedule Accepted

482 / 732
SW 17-Oct-18 1330H Philspec Randal Fernandez Piping On-schedule Accepted

SW 17-Oct-18 1000H Philspec Randal Fernandez Piping On-schedule Accepted


SW 17-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted
SW 17-Oct-18 0800H Philspec Ramon Castillo Piping On-schedule Accepted

R 16-Oct-18 1800H Philspec Randal Fernandez Piping Additional Cancelled

SW 17-Oct-18 1100H Philspec Randal Fernandez Piping Re-schedule Accepted

R 17-Oct-18 1700-2200H Philspec Randal Fernandez Piping Additional Cancelled


SW 18-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted
SW 18-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted

SW 18-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted

SW 18-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 18-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted


SW 18-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 18-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

483 / 732
R 18-Oct-18 1130-1300H Philspec Randal Fernandez Piping Re-schedule Accepted
SW 19-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted
SW 19-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted

SW 19-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted

SW 19-Oct-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted

SW 19-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted


SW 19-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted
SW 19-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

R 19-Oct-18 0800H-1000H Philspec Randal Fernandez Piping Additional Accepted


SW 20-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted
SW 20-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 20-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 20-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted


SW 20-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted
SW 20-Oct-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted

SW 20-Oct-18 1000H Philspec Randal Fernandez Piping On-schedule Accepted

484 / 732
SW 20-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 20-Oct-18 0900H Philspec Randal Fernandez Structural On-schedule Accepted

SW 22-Oct-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted

SW 22-Oct-18 0930H Philspec Randal Fernandez Piping On-schedule Accepted

SW 22-Oct-18 1000H Philspec Randal Fernandez Piping On-schedule Accepted

SW 22-Oct-18 1030H Philspec Randal Fernandez Piping On-schedule Accepted


SW 22-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted
SW 22-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 22-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 22-Oct-18 0900H Philspec Randal Fernandez Mechanical Re-schedule Accepted

SW 22-Oct-18 1000H Philspec Randal Fernandez Mechanical On-schedule Accepted

485 / 732
SW 18-Oct-18 1330H Philspec Randal Fernandez Piping Re-schedule Accepted

SW 18-Oct-18 1500H Philspec Randal Fernandez Piping Re-schedule Accepted


SW 23-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted
SW 23-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 23-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 23-Oct-18 0900H Philspec Arvin Balitaan Piping On-schedule Accepted


SW 23-Oct-18 0900H Philspec Arvin Balitaan Piping On-schedule Accepted
SW 23-Oct-18 0900H Philspec Arvin Balitaan Piping On-schedule Accepted

SW 23-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 23-Oct-18 0900H Philspec Bryan Aguila Piping On-schedule Accepted

SW 23-Oct-18 1000H Philspec Bryan Aguila Piping On-schedule Accepted

486 / 732
SW 23-Oct-18 1000H Philspec Arvin Balitaan Piping Additional Accepted

SW 23-Oct-18 1430H Philspec Arvin Balitaan Piping Additional Accepted

SW 23-Oct-18 1700H Philspec Arvin Balitaan Piping Additional Accepted

SW 24-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted


SW 24-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted
SW 24-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted
SW 25-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted
SW 25-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 25-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

487 / 732
SW 25-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 25-Oct-18 0900H Philspec Randal Fernandez Structural On-schedule Accepted

SW 25-Oct-18 1000H Philspec Randal Fernandez Structural On-schedule Accepted

SW 26-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted


SW 26-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 26-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 26-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 26-Oct-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted


SW 26-Oct-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted
SW 26-Oct-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted

SW 26-Oct-18 0930H Philspec Randal Fernandez Piping On-schedule Accepted

488 / 732
SW 26-Oct-18 1000H Philspec Randal Fernandez Piping On-schedule Accepted

SW 26-Oct-18 1030H Philspec Randal Fernandez Piping On-schedule Accepted


SW 27-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted
SW 27-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted
SW 27-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 27-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 29-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted


SW 29-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 29-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

R 29-Oct-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted


SW 30-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted
SW 30-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 30-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

R 30-Oct-18 0900H Philspec Randal Fernandez Piping On-schedule Accepted

489 / 732
SW 30-Oct-18 0900H Philspec Randal Fernandez Mechanical Additional Accepted

SW 30-Oct-18 0900H Philspec Randal Fernandez Mechanical Additional Accepted

SW 30-Oct-18 1000H Philspec Randal Fernandez Mechanical Additional Accepted

SW 31-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 31-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

490 / 732
SW 31-Oct-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 31-Oct-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted

SW 01-Nov-18 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 02-Nov-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted

SW 02-Nov-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted

491 / 732
SW 02-Nov-18 0800H Philspec Randal Fernandez Piping On-schedule Accepted

SW 11/5-10/2018 0900H Philspec Ramon Castillo Piping On-schedule Accepted


SW 11/5-10/2018 0900H Philspec Ramon Castillo Piping On-schedule Accepted
SW 11/5-10/2018 0900H Philspec Ramon Castillo Piping On-schedule Accepted

SW 06-Nov-18 1000H Philspec Randal Fernandez Mechanical On-schedule Accepted

492 / 732
Inspection Notification Log Sheet
AG&P

Inspection Party
Inspection
SN Log Date Inspection Detail Activities Area / Location
Notification Number SC VPCI PMC

JGSS1EP-VPCI-AGP-
1 7-Aug-18 Material Inspection U/G Piping Materials AG&P Yard 1 H W SW
0001
JGSS1EP-VPCI-AGP- To test 20 Welders: 2”GTAW &; 6”
2 23-Aug-18 WQT AG&P Yard 1 H W SW
0002 GTAW/SMAW
Inspection of Welding Consumables;
JGSS1EP-VPCI-AGP-
3 23-Aug-18 Material Inspection Material traceability; Lay-out & cutting; AG&P Yard 1 H W SW
0003
Fit-up; Welding
JGSS1EP-VPCI-AGP-
4 28-Aug-18 WQT 31 Welders AG&P Yard 1 H W SW
0004
JGSS1EP-VPCI-AGP-
5 1-Oct-18 WQT 15 Welders AG&P Yard 1 H W SW
0005

JGSS1EP-VPCI-AGP- (Film Review)'Approximate 67 WQT


6 5-Oct-18 WQT AG&P Yard 1 H W SW
0006 welded coupons

JGSS1EP-VPCI-AGP- (Film Review)'Approximate 67 WQT


7 8-Oct-18 WQT AG&P Yard 1 H W SW
0007 welded coupons

Dwg # A00A5001-CWS-25001-01 Rev.02


JGSS1EP-VPCI-AGP-
8 9-Oct-18 Piping Fabrication Dwg # A00A5001-CWI-25001-01 Rev.02 AG&P Yard 1 I SW SW
0008
- Lay-out & cutting

493 / 732
Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
9 11-Oct-18 Dwg # A00A5001-CWI-25001-01 Rev.02 AG&P Yard 1 H SW SW
0009 Inspection
Jt. 3

Visual Inspection
Dwg # A00A5001-CWI-25001-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
10 11-Oct-18 Jt. 2,5 AG&P Yard 1 H SW SW
0010 Inspection
Dwg # A00A5001-CWS-25001-01 Rev.02
Jt. 3,7

Visual Inspection
Dwg # A00A5001-CWI-25001-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
11 11-Oct-18 Jt. 2,3, 5 AG&P Yard 1 H W SW
0011 Inspection
Dwg # A00A5001-CWS-25001-01 Rev.02
Jt. 3,7

JGSS1EP-VPCI-AGP- Dwg # A00A5001-CWI-25001-01 Rev.02


12 10-Oct-18 Piping Fabrication AG&P Yard 1 H SW SW
0012 Jt. 3

Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
13 10-Oct-18 Dwg # A00A5001-CWI-25001-01 Rev.02 AG&P Yard 1 H SW SW
0013 Inspection
Jt. 3

Dwg # A00A5001-CWI-25001-01 Rev.02


JGSS1EP-VPCI-AGP- Jt. 2,5
14 11-Oct-18 Piping Fabrication AG&P Yard 1 H SW SW
0014 Dwg # A00A5001-CWS-25001-01 Rev.02
Jt. 3,7

494 / 732
Visual Inspection
Dwg # A00A5001-CWI-25001-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
15 11-Oct-18 Jt. 2,5 AG&P Yard 1 H SW SW
0015 Inspection
Dwg # A00A5001-CWS-25001-01 Rev.02
Jt. 3,7

JGSS1EP-VPCI-AGP- Dwg # A00A5001-CWS-25001-01 Rev.02


16 11-Oct-18 Piping Fabrication AG&P Yard 1 H SW SW
0016 Jt. 8

Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
17 12-Oct-18 Dwg # A00A5001-CWS-25001-01 Rev.02 AG&P Yard 1 H SW SW
0017 Inspection
Jt. 5,8

Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
18 12-Oct-18 Dwg # A00A5001-CWS-25001-01 Rev.02 AG&P Yard 1 H SW SW
0018 Inspection
Jt. 5,8

JGSS1EP-VPCI-AGP- Dwg # A00A5001-CWI-26001-01 Rev.02


19 12-Oct-18 Piping Fabrication AG&P Yard 1 H SW SW
0019 Jt. 2,7,8

Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
20 15-Oct-18 Dwg # A00A5001-CWI-26001-01 Rev.02 AG&P Yard 1 H SW SW
0020 Inspection
Jt. 2,5

Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
21 15-Oct-18 Dwg # A00A5001-CWI-26001-01 Rev.02 AG&P Yard 1 H W SW
0021 Inspection
Jt. 2,5

JGSS1EP-VPCI-AGP-
22 16-Oct-18 WQT 1G Rotated ( 9 Welders) AG&P Yard 1 H W SW
0022

495 / 732
Visual Inspection
Dwg # A00A5001-CWI-25001-01 Rev.02
- Jt.6
JGSS1EP-VPCI-AGP- Welding Visual
23 17-Oct-18 Dwg # A00A5001-CWI-26001-01 Rev.02 AG&P Yard 1 H SW SW
0023 Inspection
- Jt.3
Dwg # A00A5001-CWS-25001-01 Rev.02
- Jt.2

Visual Inspection
Dwg # A00A5001-CWI-25001-01 Rev.02
- Jt.6
JGSS1EP-VPCI-AGP- Welding Visual
24 17-Oct-18 Dwg # A00A5001-CWI-26001-01 Rev.02 AG&P Yard 1 H W SW
0024 Inspection
- Jt.3
Dwg # A00A5001-CWS-25001-01 Rev.02
- Jt.2

JGSS1EP-VPCI-AGP- Dwg # A00A5001-CWI-26001-01 Rev.02


25 17-Oct-18 Piping Fabrication AG&P Yard 1 H SW SW
0025 - Jt.3, 6

Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
26 17-Oct-18 Dwg # A00A5001-CWI-26001-01 Rev.02 AG&P Yard 1 H W SW
0026 Inspection
- Jt.7, 8

Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
27 18-Oct-18 Dwg # A00A5001-CWI-26001-01 Rev.02 AG&P Yard 1 H SW SW
0027 Inspection
- Jt.7, 8

496 / 732
Visual Inspection
Dwg # A00A5001-CWI-26001-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
28 18-Oct-18 - Jt.6 AG&P Yard 1 H SW SW
0028 Inspection
Dwg # A00A5001-CWI-26002-01 Rev.02
- Jt.13, 15

Visual Inspection
Dwg # A00A5001-CWI-26001-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
29 18-Oct-18 - Jt.6 AG&P Yard 1 H W SW
0029 Inspection
Dwg # A00A5001-CWI-26002-01 Rev.02
- Jt.13, 15

Dwg # A00A5001-CWS-26004-01 Rev.02


JGSS1EP-VPCI-AGP- - Jt.4, 5
30 18-Oct-18 Piping Fabrication AG&P Yard 1 H SW SW
0030 Dwg # A00A5001-CWI-26002-01 Rev.02
- Jt.13, 15

Dwg # A00A5001-CWI-26002-01 Rev.02


JGSS1EP-VPCI-AGP- - Jt.5, 7, 9
31 19-Oct-18 Piping Fabrication AG&P Yard 1 H SW SW
0031 Dwg # A00A5001-CWS-26004-01 Rev.02
- Jt.6

Visual Inspection
Dwg # A00A5001-CWI-26002-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
32 19-Oct-18 - Jt.7 AG&P Yard 1 H SW SW
0032 Inspection
Dwg # A00A5001-CWS-26004-01 Rev.02
- Jt.4, 6

497 / 732
Visual Inspection
Dwg # A00A5001-CWI-26002-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
33 19-Oct-18 - Jt.7 AG&P Yard 1 H W SW
0033 Inspection
Dwg # A00A5001-CWS-26004-01 Rev.02
- Jt.4, 6

JGSS1EP-VPCI-AGP- Dwg # A00A5001-CWI-26002-01 Rev.02


34 22-Oct-18 Piping Fabrication AG&P Yard 1 H SW SW
0034 - Jt.8

Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
34 22-Oct-18 Dwg # A00A5001-CWI-26002-01 Rev.02 AG&P Yard 1 H SW SW
0034 Inspection
- Jt.8

Visual Inspection
Dwg # A00A5001-CWI-26002-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
34 22-Oct-18 - Jt.5, 9 AG&P Yard 1 H W SW
0034 Inspection
Dwg # A00A5001-CWS-26004-01 Rev.02
- Jt.5

Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual
35 23-Oct-18 Dwg # A00A5001-CWI-26002-01 Rev.02 AG&P Yard 1 H W SW
0035 Inspection
- Jt.5, 8, 9

Dwg # A00A5001-CWS-26004-01 Rev.02


JGSS1EP-VPCI-AGP- - Jt.19
36 25-Oct-18 Piping Fabrication AG&P Yard 1 H SW SW
0036 Dwg # A00A5001-CWI-26002-01 Rev.02
- Jt.11

498 / 732
PL 15 X 1829MM X 6096MM, A36 - 1 PC
PL 25MM X 1219MM X 1524MM, A36 - 1
PC
PL 20MM X 1829MM X 6096MM, A36 - 1
PC
JGSS1EP-VPCI-AGP- CHANNEL, TAPERED FLANGE, 200 X
37 25-Oct-18 Material Inspection AG&P Yard 1 H W SW
0037 80 X 7.5 X 11 X 6000MM, ASTM A36 - 1
PC
ROUND BAR, 60MMØ X 6000MM, JIS
G3101 EQ. A36 - 1 PC
ROUND BAR, 60MMØ X 6000MM, JIS
G3101 EQ. A36 - 1 PC

Visual Inspection
Dwg # A00A5001-CWS-26004-01 Rev.02
JGSS1EP-VPCI-AGP- Welding Visual
38 26-Oct-18 - Jt.19 AG&P Yard 1 H W SW
0038 Inspection
Dwg # A00A5001-CWI-26002-01 Rev.02
- Jt.11

-6G GTAW (3)


JGSS1EP-VPCI-AGP-
39 29-Oct-18 WQT -1G ROTATED (4) AG&P Yard 1 H W SW
0039
- 6G GTAW/SMAW (10)
THINNER 91-92
THINNER 21-06
PAINT, DIMETCOTE 9 GRAY
JGSS1EP-VPCI-AGP- PAINT, HI-TEMP 1027, LIGHT GRAY
40 29-Oct-18 Material Inspection AG&P Yard 1 H W SW
0040 THINNER 21-25
PAINT, SIGMATHERM 230 PINK
PLATE, CS, 6 X 1219 X 2438MM, A36
PLATE, 12 X 1220 X 12000MM, S355ML

PLATE, 12 X 1220 X 12000MM, S355ML


JGSS1EP-VPCI-AGP- PLATE 12 X 1200 X 2400MM, SS316
41 30-Oct-18 Material Inspection AG&P Yard 1 H W SW
0041 PLATE 12 X 1500 X 1800M, SS316
PLATE 13 X 2400 X 12000MM, S275J2

499 / 732
JGSS1EP-VPCI-AGP- Notification for RT Reports & RT Film
42 7-Nov-18 WQT AG&P Yard 1 H W SW
0042 Review WQT held last Oct 31, 2018

45° ELBOW 20" SCH STD ASTM


A234WPB-17 (1 PC)
90° ELBOW 14" SCH STD ASTM
A234WPB-17 (4 PCS)
90° ELBOW 20" SCH STD ASTM
A234WPB-17 (4 PCS)
WN RF 14" SCH STD B16.5 300# (5
PCS)
JGSS1EP-VPCI-AGP-
43 9-Nov-18 Material Inspection 2.4MM TIG WIRE LOT # U2TG153619 AG&P Yard 1 H W SW
0043
(ER308LCF)
3.2MM E7018 LOT# PL511001 /
PL514015 / PL518009 (ESAB)
3.2MM E7018 LOT#
50810302/50915301/50914302/
50914303 (HOBART)
1.2MM E71T-1C H8 LOT#
PF160A5C47A (ESAB)

500 / 732
PIPE, SEAMLESS, BE, 4", SCH STD,
ASME A106-B, EXT'L PE COATED - HT#
1812208
PIPE, SEAMLESS, BE, 14", SCH STD,
ASME A106-B, EXT'L PE COATED - HT#
1737666
ELBOW, SEAMLESS, BW, CS, 45°, 4"
JGSS1EP-VPCI-AGP-
44 14-Nov-18 Material Inspection SCH STD, A234-WPB - HT# EA465 AG&P Yard 1 H W SW
0044
REDUCER CONCENTRIC, CEAMLESS,
BW, CS, 6" X 4", SCH STD, A234-
WPB(PE.C)- HT# DN869
PIPE, SEAMLESS, BE, 20", SCH STD,
ASME A106-B, EXT'L PE COATED - HT#
679194

JGSS1EP-VPCI-AGP- Welding Visual


45 14-Nov-18 Notification for Daily Fit-up Activities: AG&P Yard 1 H SW SW
0045 Inspection
JGSS1EP-VPCI-AGP- Welding Visual
45 14-Nov-18 Notification for Daily Welding Activities: AG&P Yard 1 H SW SW
0045 Inspection
JGSS1EP-VPCI-AGP- Welding Visual Notification for Visual Inspection:
45 14-Nov-18 AG&P Yard 1 H W SW
0045 Inspection A00A5001-CWI-26002-01 JT.2,17
JGSS1EP-VPCI-AGP- Welding Visual Notification for Daily Fit-up Activities:
46 15-Nov-18 SIMLONG SITE H SW SW
0046 Inspection STRUCTURE 0604
JGSS1EP-VPCI-AGP- Welding Visual
47 15-Nov-18 Notification for Daily Fit-up Activities: AG&P Yard 1 H SW SW
0047
JGSS1EP-VPCI-AGP- Inspection
Welding Visual
47 15-Nov-18 Notification for Daily Welding Activities: AG&P Yard 1 H SW SW
0047 Inspection
Notification for Visual Inspection:
JGSS1EP-VPCI-AGP- Welding Visual
47 15-Nov-18 Notification for Daily Fit-up JT.3,
A00A5001-CWI-26002-01 Activities:
25 AG&P Yard 1 H W SW
0047 Inspection Notification for Daily Welding
A00A5001-CWS-26004-01 JT.Activities:
9,15, 17
Notification for Daily
VisualFit-up Activities:
Inspection:
JGSS1EP-VPCI-AGP- Welding Visual Notification for Daily Welding
A00A5001-CWS-26003-01 JT.Activities:
2
48 17-Nov-18 Notification for Visual Inspection: AG&P Yard 1 H SW SW
0048 Inspection A00A5001-CWS-26004-01 JT. 21, 24,
JGSS1EP-VPCI-AGP- Welding Visual A00A5001-CWS-26003-01
26, 27 JT. 2
48 17-Nov-18 AG&P Yard 1 H SW SW
0048 Inspection A00A5001-CWS-26004-01
A00A5001-ND-25001-01 JT.JT. 5 21, 24,
26, 27
A00A5001-ND-25002-01 JT. 5
A00A5001-ND-25001-01 JT. 5
501 / 732
A00A5001-ND-25002-01 JT. 5
Notification for Daily Fit-up Activities:
Notification for Daily Welding Activities:
Notification for Visual Inspection:
SMAW ELECTRODE CS, E7018-1H4,
JGSS1EP-VPCI-AGP- Welding Visual A00A5001-CWS-26003-01
3.2MM HOBART 18-1 LOT#JT. 2
48 17-Nov-18 AG&P Yard 1 H W SW
0048 Inspection A00A5001-CWS-26004-01
50914301~50914303, 50915301 JT. 21, 24,
26, 27
WIRE, FILLER, GTAW, 2.4MMØ
A00A5001-ND-25001-01
ER308L, METRODE ER308LCF JT. 5 LOT#
JGSS1EP-VPCI-AGP- A00A5001-ND-25002-01
U2TG153619 JT. 5
49 19-Nov-18 Material Inspection AG&P Yard 1 H W SW
0049 SMAW ELECTRODE CS, E7018-1H4,
2.6MM HOBART 18-1 LOT# 5326701,
JGSS1EP-VPCI-AGP- Welding Visual 50415701,
50 19-Nov-18 Notification 50409701
for Daily Fit-up Activities: AG&P Yard 1 H SW SW
0050 Inspection
JGSS1EP-VPCI-AGP- Welding Visual
50 19-Nov-18 Notification for Daily Welding Activities: AG&P Yard 1 H SW SW
0050 Inspection
Notification for Visual Inspection:
JGSS1EP-VPCI-AGP- Welding Visual
50 19-Nov-18 A00A5001-CWS-26004-01 JT. 08,13, 22 AG&P Yard 1 H W SW
0050 Inspection
A00A5001-ND-25001-01 JT. 1, 2, 3
JGSS1EP-VPCI-AGP- Welding Visual
51 20-Nov-18 Notification for Daily Fit-up Activities: AG&P Yard 1 H SW SW
0051 Inspection

JGSS1EP-VPCI-AGP- Welding Visual


51 20-Nov-18 Notification for Daily Welding Activities: AG&P Yard 1 H SW SW
0051 Inspection

Notification for Visual Inspection:


JGSS1EP-VPCI-AGP- Welding Visual A00A5001-CWS-26004-01 JT. 23
51 20-Nov-18 AG&P Yard 1 H W SW
0051 Inspection A00A5001-ND-25001-01 JT. 8, 9
A00A5001-ND-25002-01 JT. 1, 3
JGSS1EP-VPCI-AGP- Welding Visual
52 21-Nov-18 Notification for Daily Fit-up Activities: AG&P Yard 1 H SW SW
0052 Inspection
JGSS1EP-VPCI-AGP- Welding Visual
52 21-Nov-18 Notification for Daily Welding Activities: AG&P Yard 1 H SW SW
0052 Inspection

JGSS1EP-VPCI-AGP- Welding Visual Notification for Visual Inspection:


53 21-Nov-18 AG&P Yard 1 H W SW
0052 Inspection A00A5001-OWS-26001-01 JT. 1, 2, 3, 4

JGSS1EP-VPCI-AGP- Welding Visual Area 600


53 22-Nov-18 Notification for Daily Welding Activities: H SW SW
0053 Inspection STR604

502 / 732
Notification for Visual Inspection:
A1-JGS1EP-EPCI-A06-DD-15-G077-JT-
SF082, JT-GP004
JGSS1EP-VPCI-AGP- Welding Visual Area 600
53 22-Nov-18 A1-JGS1EP-EPCI-A06-DD-15-V035-JT- H W SW
0053 Inspection STR604
GB030
JGSS1EP-VPCI-AGP- A1-JGS1EP-EPCI-A06-DD-15-G109-JT-
Thinner No. 25 Jotun Lot# 1793594,
54 22-Nov-18 Material Inspection GP001 AG&P Yard 1 H W SW
0054 1525985
JGSS1EP-VPCI-AGP- Paint, Resist 86, Jotun Lot No.
54 22-Nov-18 Material Inspection AG&P Yard 1 H W SW
0054 1756188,1750319,1750315

JGSS1EP-VPCI-AGP- Welding Visual


55 22-Nov-18 Notification for Daily Fit-up Activities: AG&P Yard 1 H SW SW
0055 Inspection
JGSS1EP-VPCI-AGP- Welding Visual
55 22-Nov-18 Notification for Daily Welding Activities: AG&P Yard 1 H SW SW
0055 Inspection
Notification for Visual Inspection:
A00A5001-ND-25002-01 JT. 2
JGSS1EP-VPCI-AGP- Welding Visual
55 22-Nov-18 A00A5001-ND-25001-01 JT. 7 AG&P Yard 1 H W SW
0055 Inspection
A00A5001-ND-24001-01 JT. 2, 3
Elevation/
JGSS1EP-VPCI-AGP- Levelness/ JG Summit Area
56 23-Nov-18 Notification for Mechanical Daily Activities H SW SW
0056 Centering / 600 STR 0604
Elevation/
Plumbness
JGSS1EP-VPCI-AGP- Levelness/ Notification for Pad & Grouting Level JG Summit Area
56 23-Nov-18 H SW SW
0056 Centering / inspection 600 STR 0604
Plumbness

A1-JGS1EP-EPC1-A06-DD-10-
Elevation/
191/Foundation for Z-0651
JGSS1EP-VPCI-AGP- Levelness/ JG Summit Area
56 23-Nov-18 A1-JGS1EP-EPC1-A06-DD-15- H SW SW
0056 Centering / 600 STR 0604
E001/foundation for Column Structure-
Plumbness
0604 of F1,F2,F3,P36
JGSS1EP-VPCI-AGP-
57 26-Nov-18 Material Inspection Welding Consumables AG&P Yard 1 H W SW
0057

JGSS1EP-VPCI-AGP- Notification for material Receiving


58 26-Nov-18 Material Inspection AG&P Yard 1 H W SW
0058 Inspection for Above Ground Fittings

503 / 732
JGSS1EP-VPCI-AGP- Welding Visual JG Summit Area
59 27-Nov-18 Notification for Daily Fit-up Activities: H SW SW
0059 Inspection 600 STR 0604
JGSS1EP-VPCI-AGP- Welding Visual JG Summit Area
59 27-Nov-18 Notification for Daily Welding Activities: H SW SW
0059 Inspection 600 STR 0604

Notification for Visual Inspection:


A1-JGS1EP-EPC1-A06-DD-15-G079-JT-
GP001
A1-JGS1EP-EPC1-A06-DD-15-G004-JT-
GP008
A1-JGS1EP-EPC1-A06-DD-15-G002-JT-
GP005,JT-SF081 JT-SF081
JGSS1EP-VPCI-AGP- Welding Visual JG Summit Area
59 27-Nov-18 A1-JGS1EP-EPC1-A06-DD-15-G037-JT- H W SW
0059 Inspection 600 STR 0604
GP005, JT-SF081
A1-JGS1EP-EPC1-A06-DD-15-V006-JT-
GB029, JT-SF051
A1-JGS1EP-EPC1-A06-DD-15-V019-JT-
GB029, JT-SF051
A1-JGS1EP-EPC1-A06-DD-15-V019-JT-
GB030, JT-SF050

JGSS1EP-VPCI-AGP- Notification for material Receiving


60 27-Nov-18 Material Inspection AG&P Yard 1 H W SW
0060 Inspection for Above Ground Fittings

JGSS1EP-VPCI-AGP- Notification for material Receiving


61 29-Nov Material Inspection AG&P Yard 1 H W SW
0061 Inspection for Above Ground Fittings
Elevation/
JGSS1EP-VPCI-AGP- Levelness/ Notification for Daily Mechanical Activities Area 600
62 30-Nov-18 H SW SW
0062 Centering / Padding Plate Elevation Inspection JGC Site
Plumbness
JG Summit Area
JGSS1EP-VPCI-AGP- Welding Visual
63 22-Nov-18 Notification for Daily Fit-up Activities: between 600 H SW SW
0063 Inspection
and 500Area
JG Summit
JGSS1EP-VPCI-AGP- Welding Visual
63 22-Nov-18 Notification for Daily Welding Activities: between 600 H SW SW
0063 Inspection
and 500

504 / 732
Notification for Visual Inspection: JG Summit Area
JGSS1EP-VPCI-AGP- Welding Visual
63 22-Nov-18 A00A5001-CWI-26002-01-06-07 JT-26 between 600 H W SW
0063 Inspection
and 500
JGSS1EP-VPCI-AGP- Material Receiving Inspection for Above
64 03-Dec-18 Material Inspection AG&P Yard 1 H W SW
0064 Ground Fittings
JG Summit Site
JGSS1EP-VPCI-AGP- Welding Visual
65 04-Dec-18 Notification for Daily Fit-up Activities: Area 600 and H SW SW
0065 Inspection
601 Site
JG Summit
JGSS1EP-VPCI-AGP- Welding Visual
65 04-Dec-18 Notification for Daily Welding Activities: Area 600 and H SW SW
0065 Inspection
601
JG Summit Site
JGSS1EP-VPCI-AGP- Welding Visual Notification for Visual Inspection:
65 04-Dec-18 Area 600 and H W SW
0065 Inspection A00A5001-OWS-26001-01 JT. 1, 2, 3, 4
601
Elevation/
JG Summit Site
JGSS1EP-VPCI-AGP- Levelness/
66 04-Dec-18 Daily Mechanical Activities: Area 600 and H W SW
0066 Centering /
Elevation/ 601
Plumbness JG Summit Site
JGSS1EP-VPCI-AGP- Levelness/ Pad & Grouting Level Inspection
66 04-Dec-18 Area 600 and H W SW
0066 Centering / Elevetion
601
Plumbness
A1-JGS1EP-EPC1-A06-DD-10-001
Foundation for D-600
A1-JGS1E-EPC1-A06-DD-10-011
Foundation for
Elevation/ D-0640
JG Summit Site
JGSS1EP-VPCI-AGP- Levelness/ A1-JGS1E-EPC1-A06-DD-10-131
66 04-Dec-18 Area 600 and H W SW
0066 Centering / Foundation for
601
Plumbness E-0624E/F

A1-JGS1EP-EPC1-A06-DD-15-E001
Foundation for Column 05-Bc1 and 05-
B1a Str-0601

JGSS1EP-VPCI-AGP- Paint, Resist 86, Jotun Lot No.


67 04-Dec-18 Material Inspection AG&P Yard 1 H W R
0067 1756188,1752387, 1742929, 1750315
JGSS1EP-VPCI-AGP- Paint, Epoxy HR, Jotun Lot No. 179844,
68 05-Dec-18 Material Inspection AG&P Yard 1 H W R
0068 179843, 179841

505 / 732
JGSS1EP-VPCI-AGP-
69 06-Dec-18 Material Inspection Above Ground Fittings AG&P Yard 1 H W R
0069

JGSS1EP-VPCI-AGP- Thinner No. 23, Jotun Lot#


70 06-Dec-18 Material Inspection AG&P Yard 1 H W R
0070 1804523,1657335, 1769699, 1804522

JGSS1EP-VPCI-AGP-
71 07-Dec-18 WQT PIPING / STRUCTURAL/ TANKS AG&P Yard 1 H W SW
0071
JGSS1EP-VPCI-AGP- Welding Visual
72 07-Dec-18 Notification for Daily Fit-up Activities: AG&P Yard 1 H SW SW
0072 Inspection
JGSS1EP-VPCI-AGP- Welding Visual
72 07-Dec-18 Notification for Daily Welding Activities: AG&P Yard 1 H SW SW
0072 Inspection

JGSS1EP-VPCI-AGP- Welding Visual Notification for Visual Inspection:


72 07-Dec-18 AG&P Yard 1 H W SW
0072 Inspection A00A5001-CWR-05017-01 JT. 15
JG Summit Area
JGSS1EP-VPCI-AGP- Welding Visual between 600
73 07-Dec-18 Notification for Daily Fit-up Activities: H SW SW
0073 Inspection and 500 and
JG Summit S-
Area
JGSS1EP-VPCI-AGP- Welding Visual 0601
between 600
73 07-Dec-18 Notification for Daily Welding Activities: H SW SW
0073 Inspection JG
andSummit
500 andArea
S-
JGSS1EP-VPCI-AGP- Welding Visual Notification for Visual Inspection: between
0601 600
73 07-Dec-18 H W SW
0073 Inspection A00A5001-CWR-05017-01 JT. 15 and 500 and S-
0601
JGSS1EP-VPCI-AGP- Notification for Mock-up Testing of
74 07-Dec-18 Mock-up Testing AG&P Yard 1 H W SW
0074 Coating System 1A, 2E, 2L
JGSS1EP-VPCI-AGP-
74 07-Dec-18 Mock-up Testing Blasting & Primer Application AG&P Yard 1 H W SW
0074
JGSS1EP-VPCI-AGP- Notification for Mock-up Testing of
74 07-Dec-18 Mock-up Testing AG&P Yard 1 H W SW
0074 Coating System 1A

JGSS1EP-VPCI-AGP-
74 07-Dec-18 Mock-up Testing Final DFT & Visual Inspection AG&P Yard 1 H W SW
0074

506 / 732
JGSS1EP-VPCI-AGP- Notification for Mock-up Testing of
74 07-Dec-18 Mock-up Testing AG&P Yard 1 H W SW
0074 Coating System 2E, 2L

JGSS1EP-VPCI-AGP- Primer Inspection prior to Top Coat


74 07-Dec-18 Mock-up Testing AG&P Yard 1 H W SW
0074 Application

JGSS1EP-VPCI-AGP- Notification for Mock-up Testing of


74 07-Dec-18 Mock-up Testing AG&P Yard 1 H W SW
0074 Coating System 2E, 2L
JGSS1EP-VPCI-AGP-
74 07-Dec-18 Mock-up Testing Final DFT & Visual Inspection AG&P Yard 1 H W SW
0074
JGSS1EP-VPCI-AGP- Notification for Mock-up Testing of
74 07-Dec-18 Mock-up Testing AG&P Yard 1 H W SW
0074 Coating System 1A, 2E, 2L
JGSS1EP-VPCI-AGP-
74 07-Dec-18 Mock-up Testing Adhesion Testing AG&P Yard 1 H W SW
0074 JG Summit Area
JGSS1EP-VPCI-AGP- Welding Visual between 600
75 10-Dec-18 Notification for Daily Fit-up Activities: H SW SW
0075 Inspection and 500 and
JG Summit S-
Area
JGSS1EP-VPCI-AGP- Welding Visual 0601
between 600
75 10-Dec-18 Notification for Daily Welding Activities: H SW SW
0075 Inspection and 500 and S-
0601
Notification for Visual Inspection:
JG Summit Area
A00A5001-CWS-26004-01-05/06 JT-
JGSS1EP-VPCI-AGP- Welding Visual between 600
75 10-Dec-18 16,JT-18 H W SW
0075 Inspection and 500 and S-
A1-JGS1EP-EPC1-A06-DD-15-V010
0601
Elevation/ (MV008) JT-1,2,3
JG Summit Site
JGSS1EP-VPCI-AGP- Levelness/
76 10-Dec-18 Daily Mechanical Activities: Area 400, 500, H W SW
0076 Centering /
Elevation/ 600 Site
JG Summit
Plumbness
JGSS1EP-VPCI-AGP- Levelness/ Pad & Grouting Level Inspection
76 10-Dec-18 Area 400, 500, H W SW
0076 Centering / Elevetion
600
Plumbness JG Summit Site
JGSS1EP-VPCI-AGP- Welding Visual
76 10-Dec-18 Notification for Daily Fit-up Activities: Area 400, 500, H SW SW
0076 Inspection
600
JG Summit Site
JGSS1EP-VPCI-AGP- Welding Visual
76 10-Dec-18 Notification for Daily Welding Activities: Area 400, 500, H SW SW
0076 Inspection
600

507 / 732
A1-JGS1EP-EPC1-A06-DD-10-001
Foundation for E-0401B
A1-JGS1E-EPC1-A06-DD-15-006
JG Summit Site
JGSS1EP-VPCI-AGP- Welding Visual Foundation for str-0606 Column C001,
76 10-Dec-18 Area 400, 500, H SW SW
0076 Inspection C002, C003,C004
600
A1-JGS1E-EPC1-A06-DD-15-V008 JT-4,
JT-5, JT-6
A00A5001-CWI-26002-01-06-08-R JT-16

JGSS1EP-VPCI-AGP- Welding Visual


77 10-Dec-18 Notification for Daily Fit-up Activities: AG&P Yard 1 H SW SW
0077 Inspection
JGSS1EP-VPCI-AGP- Welding Visual
77 10-Dec-18 Notification for Daily Welding Activities: AG&P Yard 1 H SW SW
0077 Inspection
JGSS1EP-VPCI-AGP- Welding Visual Notification for Visual Inspection:
77 10-Dec-18 AG&P Yard 1 H W SW
0077 Inspection A00A5001-CWR-26003-01 JT. 2
JGSS1EP-VPCI-AGP- Welding Visual JG Summit Site
78 11-Dec-18 Notification for Daily Fit-up Activities: H SW SW
0078 Inspection Area 500

JGSS1EP-VPCI-AGP- Welding Visual JG Summit Site


78 11-Dec-18 Notification for Daily Welding Activities: H SW SW
0078 Inspection Area 500

JGSS1EP-VPCI-AGP- Welding Visual Notification for Visual Inspection: JG Summit Site


78 11-Dec-18 H W SW
0078 Inspection A00A5001-ND-25002-01-01 - JT-4 Area 500

JGSS1EP-VPCI-AGP- Welding Visual JG Summit Site


79 11-Dec-18 Notification for Daily Fit-up Activities: H SW SW
0079 Inspection Area 600
JGSS1EP-VPCI-AGP- Welding Visual JG Summit Site
79 11-Dec-18 Notification for Daily Welding Activities: H SW SW
0079 Inspection Area 600

508 / 732
Notification for Visual Inspection:
A1-JGS1E-EPC1-A06-DD-15-G004 JT-
GP025 and
JGSS1EP-VPCI-AGP- Welding Visual JT-SF017-2pcs Girder-G004 STR-0601 JG Summit Site
79 11-Dec-18 H W SW
0079 Inspection A1-JGS1E-EPC1-A06-DD-15-G007 JT- Area 600
GP017 and
JT-SF016-2pcs Girder-G007 STR-0601

JGSS1EP-VPCI-AGP- Welding Visual


80 11-Dec-18 Notification for Daily Fit-up Activities: AG&P Yard 1 H SW SW
0080 Inspection

JGSS1EP-VPCI-AGP- Welding Visual


80 11-Dec-18 Notification for Daily Welding Activities: AG&P Yard 1 H SW SW
0080 Inspection

Notification for Visual Inspection:


JGSS1EP-VPCI-AGP- Welding Visual
80 11-Dec-18 A00A5001-CWR-26003-01 JT. 4 AG&P Yard 1 H W SW
0080 Inspection
A00A5001-CWR-05017-01 JT. 16

JGSS1EP-VPCI-AGP- PAINT, PENGUARD EXPRESS MIO


81 11-Dec-18 Material Inspection AG&P Yard 1 H SW R
0081 BATCH# 1780178, 1791426

JGSS1EP-VPCI-AGP-
81 11-Dec-18 Material Inspection THINNER NO.17 BATCH# 1832712 AG&P Yard 1 H SW R
0081
JGSS1EP-VPCI-AGP-
81 11-Dec-18 Material Inspection THINNER NO.10 BATCH# 1820353 AG&P Yard 1 H SW R
0081

PAINT, HARDTOP XP GRAY MUNSELL


JGSS1EP-VPCI-AGP-
81 11-Dec-18 Material Inspection NO.N-6.75 AG&P Yard 1 H SW R
0081
BATCH# 1818788, 1821759

509 / 732
PAINT, HARDTOP XP GRAY MUNSELL
JGSS1EP-VPCI-AGP-
81 11-Dec-18 Material Inspection NO.N-5.5 AG&P Yard 1 H SW R
0081
BATCH# 1807479, 1818788, 1821759

JGSS1EP-VPCI-AGP- PAINT, PENGUARD EXPRESS MIO


81 11-Dec-18 Material Inspection AG&P Yard 1 H SW R
0081 BATCH# 1782066, 1720419
JGSS1EP-VPCI-AGP- Welding Visual JG Summit Site
82 13-Dec-18 Notification for Daily Fit-up Activities: H SW SW
0082 Inspection AREA 500
JGSS1EP-VPCI-AGP- Welding Visual JG Summit Site
82 13-Dec-18 Notification for Daily Welding Activities: H SW SW
0082 Inspection AREA 500

Notification for Visual Inspection:


JGSS1EP-VPCI-AGP- Welding Visual JG Summit Site
82 13-Dec-18 A00A5001-CWI-26002-01-05JT-12,JT-14 H W SW
0082 Inspection AREA 500

JGSS1EP-VPCI-AGP- Notification for RT Reports & RT Film


83 13-Dec-18 WQT AG&P Yard 1 H W SW
0083 Review WQT held last Dec 10~11, 2018
JGSS1EP-VPCI-AGP- Welding Visual
84 14-Dec-18 Notification for Daily Fit-up Activities: JG Summit Site H SW SW
0084 Inspection
JGSS1EP-VPCI-AGP- Welding Visual
84 14-Dec-18 Notification for Daily Welding Activities: JG Summit Site H SW SW
0084 Inspection
Notification for Visual Inspection:
JGSS1EP-VPCI-AGP- Welding Visual 1.AA005001CWI-26002-01-08R /09R JT-
84 14-Dec-18 JG Summit Site H W SW
0084 Inspection 19
2.AA005001-OWS-26001-01-02 JT-6

JGSS1EP-VPCI-AGP- Mock up Test Plate for coating system 1B


85 14-Dec-18 Mock-up Testing AG&P Yard 1 H W SW
0085 and 2B Blasting & Primer Appliation

510 / 732
Notification for Levelness, Plumbness
and Elevation Survey Activities:
1. A1-JGS1E-EPC1-A06-DD-15-E004
Framing Plan at TOS EL.+73300 & at
TOS EL.+73800
2. A1-JGS1E-EPC1-A06-DD-15-E016
Elevation/ Framing EL. at Grid 05-F1 & at Grid 05-
JG SUMMIT
JGSS1EP-VPCI-AGP- Levelness/ F1a
86 15-Dec-18 SITE H W SW
0086 Centering / 3. A1-JGS1E-EPC1-A06-DD-15-E017
AREA 500
Plumbness Framing EL. at Grid 05-F2
4. A1-JGS1E-EPC1-A06-DD-15-E024
Framing EL. at Grid 05-Fc1 and at Grid
05-Fc2
5. A1-JGS1E-EPC1-A06-DD-15-E028
Framing EL. at Grid 05-Fd1 and at Grid
05-Fd2

A1-JGS1EP-EPC1-A05-DD-10-001 D-
JGSS1EP-VPCI-AGP- 0510C JG SUMMIT
87 15-Dec-18 Erection Work H W SW
0087 A1-JGS1EP-EPC1-A06-DD-10-121 D- SITE
0651 / D-0691

JGSS1EP-VPCI-AGP- JG SUMMIT
88 15-Dec-18 Wrapping A00A5001-OWS-26001-01 JT. 6 H W SW
0088 SITE

JGSS1EP-VPCI-AGP- Inspection of UG Piping JG Summit Site


89 15-Dec-18 Holiday Test H W SW
0089 A00A5001-OWS-26001-01 JT. 6 AREA 600

511 / 732
Coating & Wrapping
A00A5001-ND-25001-01-01/02 JT-
JGSS1EP-VPCI-AGP- 1,2,3,4,5 JG SUMMIT
90 17-Dec-18 Tape Wrapping H SW SW
0090 A00A5001-ND-24001-01-01 JT-1,2,3 SITE Area 500
A00A5001-ND-25002-01-01/02 JT-
1,2,3,4,5

Holiday Testing
A00A5001-ND-25001-01-01/02 JT-
JGSS1EP-VPCI-AGP- 1,2,3,4,5 JG SUMMIT
91 17-Dec-18 Holiday Test H SW SW
0091 A00A5001-ND-24001-01-01 JT-1,2,3 SITE Area 500
A00A5001-ND-25002-01-01/02 JT-
1,2,3,4,5

Primer Inspection prior to Second Coat


JGSS1EP-VPCI-AGP- Application (8:00am onwards)
92 17-Dec-18 Painting & Coating AG&P Yard 1 H W SW
0092 2nd Coat Application prior to Top Coat
Application (1:30pm onwards)

JGSS1EP-VPCI-AGP- Pipe 56" HT# RK526634 (3pcs)


93 17-Dec-18 Material Inspection AG&P Yard 1 H W R
0093 FLANGE WN 36" A092220-8824D (1pc)

Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual A00A5001-ND-25001-01-01-02- JT-4 JG SUMMIT
94 17-Dec-18 H SW SW
0094 Inspection AA00A5001-CWS-26004-01 JT-14 JT-20 SITE Area 500
AA00A5001-ND-24001-01 JT-1

JGSS1EP-VPCI-AGP- Mock-up Test Plate for Coating System


95 18-Dec-18 Mock-up Testing AG&P Yard 1 H W SW
0095 1B & 2A:Final DFT & Visual Inspection

JGSS1EP-VPCI-AGP- RT FILM Review./ Signing of RT Reports


96 18-Dec-18 WQT AG&P Yard 1 H W SW
0096 (WQT held last Dec 10~11)
JG SUMMIT
A1-JGS1E-EPC1-A06-DD-15-G001
JGSS1EP-VPCI-AGP- SITE
97 19-Dec-18 Piping Fabrication Rev.0 - Fit-up inspection of Gusset plate H SW SW
0097 Area 600/S-
SF015 to GP026 for Girder-G001
0601

512 / 732
JG SUMMIT
JGSS1EP-VPCI-AGP- Final Line A00A5001-OWS-26001-01
98 19-Dec-18 SITE H W SW
0098 Checking (HT-UG-OWS-AP-001)
Area 600

Coating & Wrapping


JG SUMMIT
JGSS1EP-VPCI-AGP- A00A5001-ND-25001-01 - 02 / 03 JT-
99 19-Dec-18 Tape Wrapping SITE H SW SW
0099 6,7,8,9,10,11
Area 600
A00A5001-ND-25002-01 - 02 JT-6,7.8

A00A5001-ND-25001-01 - 02 / 03 JT- JG SUMMIT


JGSS1EP-VPCI-AGP-
100 19-Dec-18 Holiday Test 6,7,8,9,10,11 SITE H W SW
0100
A00A5001-ND-25002-01 - 02 JT-6,7.8 Area 600

JGSS1EP-VPCI-AGP- Welder's Qualification Test


101 20-Dec-18 WQT AG&P Yard 1 H W SW
0101 PIPING / STRUCTURAL

Visual Inspection
Welding Joint/Piping
A00A5001-CWS-26004-01-02 / 03 JT-11
JGSS1EP-VPCI-AGP- Welding Visual JG SUMMIT
102 20-Dec-18 A00A5001-CWI-26001-01-02 JT-9 H W SW
0102 Inspection SITE Area 500
A00A5001-ND-25002-01-02 JT-6 ,7,8
A00A5001-ND-25001-01-02 JT-6 ,10,11
A00A5001-CWI-26002-01-3 JT-10

A1-JGS1E-EPC1-A06-DD-15-G001
JG SUMMIT
JGSS1EP-VPCI-AGP- Rev.0 - Fit-up inspection of Stiffener Plate
103 18-Dec-18 Piping Fabrication SITE Area H SW SW
0103 SF015 (2 Pcs.) and Gusset plate GP026
600/S-0601
for Girder-G001, Structural 0601

A00A5001-ND-25001-01
JGSS1EP-VPCI-AGP- Final Line JG SUMMIT
104 20-Dec-18 A00A5001-ND-25002-01 H W SW
0104 Checking SITE Area 600
(HT-UG-ND-AP-002&003)

513 / 732
A1-JGS1E-EPC1-A06-DD-15-V001
Rev.0 - Fit-up Inspection of Gusset Plate
GB022 and Stiffener SF011 to existing
column H244x175x7x11 JG SUMMIT
JGSS1EP-VPCI-AGP-
105 20-Dec-18 Piping Fabrication SITE Area H SW SW
0105
A1-JGS1E-EPC1-A06-DD-15-V007 600/S-0601
Rev.0 - Fit-up Inspection of One-Vbrace-
V007 to existing column H340x250x9x14

JGSS1EP-VPCI-AGP- for Pipie Support & Pipes for Above


106 20-Dec-18 Material Inspection AG&P Yard 1 H W R
0106 Ground

Visual Inspection
A1-JGS1E-EPC1-A06-DD-15-V001
Rev.0 - Fit-up Inspection of Gusset Plate
GB022 and Stiffener SF011 to existing
JG SUMMIT
JGSS1EP-VPCI-AGP- Welding Visual column H244x175x7x11
107 21-Dec-18 SITE AREA H W SW
0107 Inspection
600/S-0601
A1-JGS1E-EPC1-A06-DD-15-V007
Rev.0 - Fit-up Inspection of One-Vbrace-
V007 to existing column H340x250x9x14

UG Piping
JGSS1EP-VPCI-AGP- A00A5001-CWS-26004-01-06 JT-28 JG SUMMIT
108 21-Dec-18 Piping Fabrication H SW SW
0108 A00A5001-CWI-26002-01-01 JT-1 SITE Area 600
A00A5001-CWI-26001-01-02 / 03 JT-4

JGSS1EP-VPCI-AGP- Final Line JG SUMMIT


109 21-Dec-18 HT-UG-ND-AP-001 H W SW
0109 Checking SITE Area 600

514 / 732
Test Plate for Coating System 1B & 2A
Installation of dollies on the test plate
JGSS1EP-VPCI-AGP- (Dec 26, 8:30am onwards)
110 21-Dec-18 Mock-up Testing AG&P Yard 1 H W SW
0110
Pull-off adhesion testing (Dec 27, 2:00pm
Pad Elevation Levelness Inspection
onwards)
Check for Equipment Foundation
Elevation/ A1-JGS1EP-EPC1-A06-DD-10-091 / E-
JGSS1EP-VPCI-AGP- Levelness/ 611C JG SUMMIT
111 22-Dec-18 H W SW
0111 Centering / A1-JGS1EP-EPC1-A06-DD-10-121 / E- SITE Area 600
Plumbness 623B
A1-JGS1EP-EPC1-A06-DD-10-151 / G-
0600A/B
JGSS1EP-VPCI-AGP-
112 26-Dec-18 Material Inspection Above Ground Pipes AG&P Yard 1 H W R
0112

Inspection of UG Piping
A00A5001-CWS-26004-01-08 JT-25
(Area 500)
A00A5001-CWI-26002-01-02 / 01 JT-4 JG Summit Site
JGSS1EP-VPCI-AGP-
113 26-Dec-18 Piping Fabrication (Area 500) AREA 500 and H SW SW
0113
A00A5001-CWS-25001-01- 03 / 02 JT-6 Lay Down Area
( Lay Down Area)
A00A5001-CWI-25001-01- 01 JT-1
( Lay Down Area)

515 / 732
Visual Inspection
UG Piping
A00A5001-CWS-26004-01-08 JT-25
(Area 500)
JG Summit Site
JGSS1EP-VPCI-AGP- Welding Visual A00A5001-CWI-26002-01-02 / 01 JT-4
114 27-Dec-18 AREA 500 and H W SW
0114 Inspection (Area 500)
Lay Down Area
A00A5001-CWS-25001-01- 03 / 02 JT-6
( Lay Down Area)
A00A5001-CWI-25001-01- 01 JT-1
( Lay Down Area)

JGSS1EP-VPCI-AGP- A1-JGS1EP-FRH-DD-D0600 JG Summit Site


115 27-Dec-18 Erection Work H W SW
0115 A1-JGS1EP-FRH-DD-D0640 AREA 600

A00A5001-CWS-26004-01 / Test
Package No.
JGSS1EP-VPCI-AGP- Final Line Test Package No.HT-UG-CWS-AP-003 JG Summit Site
116 27-Dec-18 H W SW
0116 Checking A00A5001-CWS-26002-01 / Test AREA 500
Package No.
Test Package No.HT-UG-CWI-AP-003

JG Summit Site
JGSS1EP-VPCI-AGP- Manifold No.: 17061-MN-005
117 27-Dec-18 Pressure Test Tempacil H W SW
0117 AGP-18059-E-D-20-1001.01

Visual Inspection
JGSS1EP-VPCI-AGP- Welding Visual UG Piping JG Summit Site
118 28-Dec-18 H W SW
0118 Inspection A00A5001-CWI-26002-01-01 JT-1 (Area AREA 500
500)

516 / 732
UG Pipe
A00A5001-CWS-26004-01
JGSS1EP-VPCI-AGP- JG Summit Site
119 28-Dec-18 Hydro Test Test Package No.HT-UG-CWS-AP-003 H W SW
0119 AREA 500
A00A5001-CWS-26002-01
Test Package No.HT-UG-CWI-AP-003

Visual Inspection
UG Piping JG Summit Site
JGSS1EP-VPCI-AGP- Welding Visual
120 29-Dec-18 A00A5001-CWS-25001-01-01 / 02 / 03 Lay Down H W SW
0120 Inspection
JT9 , and JT-4 Area
A00A5001-CWI-26002-01-01/02 JT-4

UG Piping
A00A5001-CWI-25001-01 JG Summit Site
JGSS1EP-VPCI-AGP-
121 2-Jan-19 Hydro Test Test Package N0. HT-UG-CWI-AP-002 Lay Down H W SW
0121
A00A5001-CWS-25001-01 Area
Test Package N0. HT-UG-CWS-AP-002

A00A5001-CWI-25001-01
JG Summit Site
JGSS1EP-VPCI-AGP- Final Line Test Package N0. HT-UG-CWI-AP-002
122 2-Jan-19 Lay Down H W SW
0122 Checking A00A5001-CWS-25001-01
Area
Test Package N0. HT-UG-CWS-AP-002

Elevation/ Pad Elevation Levelness Inspection


JGSS1EP-VPCI-AGP- Levelness/ Check for Equipment Foundation JG Summit Site
123 3-Jan-19 H W SW
0123 Centering / A1-JGS1EP-EPC1-A06-DD-10-171 / G- Area 600
Plumbness 0610A/B

517 / 732
Field Joint Wrapping Application
A00A5001-CWS-26004-01
Test Package No.HT-UG-CWS-AP-003
A00A5001-CWI-26002-01 JG Summit Site
JGSS1EP-VPCI-AGP-
124 3-Jan-19 Wrapping Test Package No.HT-UG-CWI-AP-003 AREA 600 and H W SW
0124
A00A5001-CWI-25001-01 Lay Down Area
Test Package N0. HT-UG-CWI-AP-002
A00A5001-CWS-25001-01
Test Package N0. HT-UG-CWS-AP-002

JGSS1EP-VPCI-AGP- RT Reports & RT Film Review


125 3-Jan-19 WQT AG&P Yard 1 H W SW
0125 WQT held last Dec 10~11, 2018
Alignment Inspection for Equipment D-
JGSS1EP-VPCI-AGP- Equipment 0600/D-0640 JG Summit Site
126 3-Jan-19 H W SW
0126 Inspection Dwg # A1-JGS1EP-FRH-DD-D0600 AREA 600
A1-JGS1EP-FRH-DD-D0640
A1-JGS1E-EPC1-A06-DD-15-E001 Rev.
JG Summit Site
JGSS1EP-VPCI-AGP- 01 - Bolt Tightening at Grid "05-Fc1"/"05-
127 3-Jan-19 Bolt Tightening AREA 600 / H W SW
0127 Fc2" to "05-F1"/" from EL. +66300 to EL.
S-0604
+82300

A1-JGS1E-EPC1-A06-DD-15-3D Rev. 0 - JG Summit Site


JGSS1EP-VPCI-AGP-
128 3-Jan-19 Erection Work Initial survey for all erected member of AREA 600 / H W SW
0128
Structure 0601 of Area 600. S-0601

518 / 732
A00A5001-CWS-26004-01
Test Package No.HT-UG-CWS-AP-003
A00A5001-CWI-26001-01
JG Summit Site
JGSS1EP-VPCI-AGP- Test Package No.HT-UG-CWI-AP-003
129 4-Jan-19 Holiday Test AREA 600 and H W SW
0129 A00A5001-CWI-25001-01
Lay Down Area
Test Package N0. HT-UG-CWI-AP-002
A00A5001-CWS-25001-01
Test Package N0. HT-UG-CWS-AP-002

JGSS1EP-VPCI-AGP-
130 4-Jan-19 Material Inspection Above Ground Pipes & Electrode AG&P Yard 1 H W R
0130
Examination of S-0604 & 0601
A1-JGS1EP-EPC1-A06-DD-15-V010
JGSS1EP-VPCI-AGP-
131 4-Jan-19 NDE A1-JGS1EP-EPC1-A06-DD-15-V001 AG&P Yard 1 H W R
0131
A1-JGS1EP-EPC1-A06-DD-15-V035 (1/2
& 2/2)

A00A5001-CWI-25001-01
JGSS1EP-VPCI-AGP- Test Package N0. HT-UG-CWI-AP-002 JG Summit Site
132 4-Jan-19 Air Blow & Flushing H W SW
0132 A00A5001-CWS-25001-01 Lay Down Area
Test Package N0. HT-UG-CWS-AP-002

Equipment D-0600 / D-0640


JGSS1EP-VPCI-AGP- JG Summit Site
133 4-Jan-19 Grouting Dwg# A1-JGS1EP-FRH-DD-D0600 H W SW
0133 Lay Down Area
Dwg# A1-JGS1EP-FRH-DD-D0640

Receiving Inspection for Equipment No.


Z-0651 / D-0690
JGSS1EP-VPCI-AGP- JG Summit Site
134 4-Jan-19 Material Inspection Z-0651 / D-0690 H W SW
0134 Lay Down Area
Dwg# A0-JGS1EP-SPP-DD-Z0651
Dwg# A1-JGS1EP-FRH-DD-D0690

519 / 732
A1-JGS1E-EPC1-A06-DD-15-EO16 /
EO17 & E024 - Elavation Survey on JG Summit Site
JGSS1EP-VPCI-AGP-
135 5-Jan-19 Erection Work Framing Elevation at Grid "05-F1" / "05- Area 600 / S- H W SW
0135
F2" and "05-Fc1" from EL. +66300 to EL. 0604
+82300. (see attached drawing)

A1-JGS1E-EPC1-A06-DD-15-EO16 /
Elevation/
EO17 & E024 - Plumbness Survey on JG Summit Site
JGSS1EP-VPCI-AGP- Levelness/
136 5-Jan-19 Framing Elevation at Grid "05-F1" / "05- Area 600 / S- H W SW
0136 Centering /
F2" and "05-Fc1" from EL. +66300 to EL. 0604
Plumbness
+73800. (see attached drawing)

JGSS1EP-VPCI-AGP-
137 7-Jan-19 Material Inspection Above Ground Pipes & Fittings AG&P Yard 1 H W R
0137
JGSS1EP-VPCI-AGP- Above Ground Piping Raw Materials &
138 7-Jan-19 Painting & Coating AG&P Yard 1 H W SW
0138 Fittings
Elevation/ Pad Leveling Inspection for D-0693 / E-
JGSS1EP-VPCI-AGP- Levelness/ 0690 JG Summit Site
139 7-Jan-19 H W SW
0139 Centering / Dwg# A1-JGS1EP-FRH-DD-D0693 Area 600
Plumbness Dwg# A1-JGS1EP-FCG-DD-E0690

Visual Inspection of Joint 1 for weld joint


between Gusset Plate GP008 to existing
JG Summit Site
JGSS1EP-VPCI-AGP- Welding Visual coumn H350X350X12X19 AT EL. 79900
140 9-Jan-19 AREA 600 / H W SW
0140 Inspection Grid 05-Fb/05-F3 of Structure 0604
S-0604
(Dwg No. A1-JGS1EP-EPC1-A06-DD-15-
G039)

Equipment Alignment Inspection for Z-


JGSS1EP-VPCI-AGP- Equipment 0651 / D-0690 JG Summit Site
141 9-Jan-19 H W SW
0141 Inspection Dwg# A1-JGS1EP-SPP-DD-Z0651 AREA 600
Dwg# A1-JGS1EP-FRH-DD-D0690

520 / 732
Visual Inspection of Joint 1, 2 and 3 for
weld joint between Gusset Plate to
JG Summit Site
JGSS1EP-VPCI-AGP- Welding Visual existing coumn H244X175X7X11 AT EL.
142 9-Jan-19 AREA 600 / H W SW
0142 Inspection 72460 Grid 05-Bc1/05-B2 of Structure
S-0601
0601 (Dwg No. A1-JGS1EP-EPC1-A06-
DD-15-G010)

Equipment Alignment Inspection for E-


JGSS1EP-VPCI-AGP- Equipment JG Summit Site
143 10-Jan-19 0624E/F H W SW
0143 Inspection AREA 600
Dwg# A3-JGS1EP-HAN-DD-E0624EF

Inspection of 288 kgs. Of SMAW


JGSS1EP-VPCI-AGP- JG Summit Site
144 10-Jan-19 Material Inspection Electrodes, CS, E7018-1H4, 3.2MM, H W R
0144 AREA 600
Hobart 18-1 with Lot No. 50914302
JGSS1EP-VPCI-AGP-
145 11-Jan-19 WQT Witnessing PQT for Repair Welding AG&P Yard 1 H W SW
0145
JGSS1EP-VPCI-AGP-
146 11-Jan-19 Material Inspection Above Ground Fittings AG&P Yard 1 H W R
0146
JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection
147 11-Jan-19 AG&P Yard 1 H W SW
0147 Inspection A01A5001-MS-06003-05 JT. 8 & 7

JGSS1EP-VPCI-AGP-
148 11-Jan-19 Material Inspection Abrassive Materials ;Garnet 30/60 AG&P Yard 1 H W R
0148

Bolt Tightening Inspection for Equipment


JGSS1EP-VPCI-AGP- JG Summit Site
149 12-Jan-19 Bolt Tightening No. E-0624E/F H W SW
0149 AREA 600
Dwg # A3-JGS1EP-HAN-DD-E0624EF

JGSS1EP-VPCI-AGP- Equipment No. E-0401B JG Summit Site


150 12-Jan-19 Material Inspection H W R
0150 Dwg # A3-JGS1EP-HAN-DD-E0401B AREA 600

521 / 732
Final Bolt Tightening Inspection on
Structure 0604 of Area 600 - Grid 05-F1 - JG Summit Site
JGSS1EP-VPCI-AGP-
151 12-Jan-19 Erection Work 05-F2/05-Fc1 - 05-Fc3 from EL. +66300 AREA 600 / S- H W SW
0151
to EL. +82300 (Dwg. No. A1-JGS1EP- 0604
EPC1-A06-DD-15-E017 Rev. 0)

Elevation/ Final Plumbness Survey of column for


JG Summit Site
JGSS1EP-VPCI-AGP- Levelness/ Structure 0601 at Grid "05-Bc" and "05-
152 12-Jan-19 AREA 600 / S- H W SW
0152 Centering / Bc1" with Dwg No. A1-JGS1EP-EPC1-
0601
Plumbness A06-DD-15-E005 Rev. 0

Final Elevation Survey for Structure 0601 JG Summit Site


JGSS1EP-VPCI-AGP-
153 12-Jan-19 Erection Work with Dwg No. A1-JGS1EP-EPC1-A06- AREA 600 / S- H W SW
0153
DD-15-3D Rev. 0 0601

Receiving Inspection for Equipment No.


JGSS1EP-VPCI-AGP- JG Summit Site
154 9-Jan-19 Material Inspection E-0624E/F H W R
0154 AREA 600
Dwg# A3-JGS1EP-HAN-DD-E0624EF

Alignment Inspection for Equipment No.


JGSS1EP-VPCI-AGP- Equipment JG Summit Site
155 14-Jan-19 E-0401B H W SW
0155 Inspection AREA 600
Dwg # A3-JGS1EP-HAN-DD-E0401B

Grouting Inspection for Equipment No.


JGSS1EP-VPCI-AGP- JG Summit Site
156 14-Jan-19 Grouting D-0690 H W SW
0156 AREA 600
Dwg # A1-JGS1EP-FRH-DD-D0690

Grout Compressive Strength Test (After 7 ASTEC,


JGSS1EP-VPCI-AGP-
157 14-Jan-19 Laboratory Testing days of grouting) Calamba H SW SW
0157
Equipment No. D-0600 / D-0640 Laboratory

522 / 732
JG Summit Site
JGSS1EP-VPCI-AGP- Final Elevation Survey for Structure 0606
158 14-Jan-19 Erection Work AREA 600 / S- H W SW
0158 at Area 600
0606

JG Summit Site
JGSS1EP-VPCI-AGP- Final Plumbness Survey for Structure
159 14-Jan-19 Erection Work AREA 600 / S- H W SW
0159 0606 at Area 600
0606

JGSS1EP-VPCI-AGP- Inspection of Raw Matls for Above


160 15-Jan-19 Material Inspection AG&P Yard 1 H W R
0160 Ground Pipe & Fittings
Visual Inspection:
JGSS1EP-VPCI-AGP- Welding Visual
161 15-Jan-19 AG&P Yard 1 H W SW
0161 Inspection A01A5001-P-26027-02 JT. 11
A01A5001-P-26027-01 JT. 9

Final Bolt Tightening Inspection for JG Summit Site


JGSS1EP-VPCI-AGP-
162 17-Jan-19 Erection Work Structure 0606 of Area 600 at all AREA 600 / S- H W SW
0162
Elevation. 0606

Final Beam Elevation Survey for JG Summit Site


JGSS1EP-VPCI-AGP-
163 17-Jan-19 Erection Work Structure 0606 of Area 600 at all AREA 600 / S- H W SW
0163
Elevation. 0606

JG Summit Site
JGSS1EP-VPCI-AGP- Final Column Plumbness Survey for
164 17-Jan-19 Erection Work AREA 600 / S- H W SW
0164 Structure 0606 of Area 600 at all Side.
0606

Final Bolt Tightening Inspection for JG Summit Site


JGSS1EP-VPCI-AGP-
165 17-Jan-19 Erection Work Structure 0601 of Area 600 at all AREA 600 / S- H W SW
0165
Elevation. 0601

523 / 732
Final Beam Elevation Survey for JG Summit Site
JGSS1EP-VPCI-AGP-
166 17-Jan-19 Erection Work Structure 0601 of Area 600 at all AREA 600 / S- H W SW
0166
Elevation. 0601

JG Summit Site
JGSS1EP-VPCI-AGP- Final Column Plumbness Survey for
167 17-Jan-19 Erection Work AREA 600 / S- H W SW
0167 Structure 0601 of Area 600 at all Side.
0601

Witness groutening activities of Structure JG Summit Site


JGSS1EP-VPCI-AGP-
168 17-Jan-19 Grouting 0604 at Grid 05-F1_05-F2/05-Fc1_05- AREA 600 / S- H W SW
0168
Fc2 0604

Visual Inspection on welded joint


JG Summit Site
JGSS1EP-VPCI-AGP- between MV010 and to existing column
169 17-Jan-19 Erection Work AREA 600 / S- H W SW
0169 H340X250X9X14 at Grid 05-Bc/05-B3-
0601
05-B4 EL. +71300 Structure 0601

JGSS1EP-VPCI-AGP- Inspection of Raw Matls for Above


170 17-Jan-19 Material Inspection AG&P Yard 1 H W R
0170 Ground Pipe & Fittings
Visual Inspection:
JGSS1EP-VPCI-AGP- Welding Visual
171 17-Jan-19 AG&P Yard 1 H W SW
0171 Inspection A01A5001-P-26027-02 JT. 11
A01A5001-P-26027-01 JT. 9

JG Summit Site
JGSS1EP-VPCI-AGP- Witness groutening activities of Structure
172 17-Jan-19 Erection Work AREA 600 / S- H W SW
0172 0601 at Grid 05-B1a_05-B4/05-Bc1
0601

JGSS1EP-VPCI-AGP- Welders Qualification Test for PIPING /


173 18-Jan-19 WQT AG&P Yard 1 H W SW
0173 STRUCTURAL/TANK

Grouting Inspection for Equipment No. E-


JGSS1EP-VPCI-AGP- JG Summit Site
174 19-Jan-19 Grouting 0401B Dwg # A3-JGS1EP-HAN-DD- H W SW
0174 AREA 600
E0401B

524 / 732
Receiving Inspection for Equipment No.
JGSS1EP-VPCI-AGP-
175 19-Jan-19 Material Inspection D-0510C Dwg # A1-JGS1EP-FRH-DD- Wharf area H W R
0175
D0510C

Witness groutening activities on four (4) JG Summit Site


JGSS1EP-VPCI-AGP-
176 19-Jan-19 Erection Work columns of Structure 0606 (Dwg. No. A1- AREA 600 / S- H W SW
0176
JGS1EP-EPC1-A06-DD-15-E001 Rev.0) 0606

Inspection of modifide/cut handrail JG Summit Site


JGSS1EP-VPCI-AGP-
177 19-Jan-19 Erection Work HR010 at Structure 0606 (see attached AREA 600 / S- H W SW
0177
dwg. And photos) 0606

Dimensional and visual inspection of


JG Summit Site
JGSS1EP-VPCI-AGP- relocated gusset plate GB006 at
178 19-Jan-19 Erection Work AREA 600 / S- H W SW
0178 Structure 0606 (see attached Dw. And
0606
photo)

Inspection on relocated bolt holes of JG Summit Site


JGSS1EP-VPCI-AGP-
179 19-Jan-19 Erection Work Vertical Brace V002 of Structure 0601. AREA 600 / S- H W SW
0179
(see attached Dwg. And photo) 0601

Punch Clearance (Punch list no. VPCI-


JGSS1EP-VPCI-AGP- PL-0128 Damaged Anchor Bolt for JG Summit Site
180 19-Jan-19 Punch Clearance H W SW
0180 Equipment No. E-0401B ) AREA 400
Dwg # A3-JGS1EP-HAN-DD-E0401B

525 / 732
Receiving Inspection for Equipment No.
D-0652, D-0653, D-0654, D-0693, E-
0402R, E-0503R, E-0622R
Dwg # A1-JGS1EP-FRH-DD-D0652, A1-
JGSS1EP-VPCI-AGP- JG Summit Site
181 19-Jan-19 Material Inspection JGS1EP-FRH-DD-D0653, A1-JGS1EP- H W R
0181 Laydown Area
FRH-DD-D0654, A1-JGS1EP-FRH-DD-
D0693, A3-JGS1EP-HAN-DD-E0402R,
A3-JGS1EP-HAN-DD-E0503R, A3-
JGS1EP-HAN-DD-E0622R

JGSS1EP-VPCI-AGP- Blasting & Primer Application Inspection


182 21-Jan-19 Painting & Coating AG&P Yard 1 H W SW
0182 of Piping Raw Materials Pipes & Fittings

JGSS1EP-VPCI-AGP- Inspection of Raw Matls for Above


183 21-Jan-19 Material Inspection AG&P Yard 1 H W R
0183 Ground Pipe & Fittings, Consumables

Visual Inspection:
JGSS1EP-VPCI-AGP- Welding Visual
184 21-Jan-19 AG&P Yard 1 H W SW
0184 Inspection A01A5001-P-26027-02 JT. 3,5,14
A01A5001-P-26027-01 JT. 1,2,12

Witness for the anchor bolt tightening JG Summit Site


JGSS1EP-VPCI-AGP-
185 22-Jan-19 Erection Work (snug tight) for column C022, C023, AREA 600 / S- H W SW
0185
C028 and C029 of Structure 0604 0604

Final Bolt Tightening Inspection at


JG Summit Site
JGSS1EP-VPCI-AGP- Structure 0604 Grid 05-Fd1 - 05-Fe/05-
186 22-Jan-19 Erection Work AREA 600 / S- H W SW
0186 F1a-05-F2. A1-JGS1EP-EPC1-A06-DD-
0604
15-3D Rev.2
Final Dimensional Survey for column
plumbness of Structure 0604 Grid 05- JG Summit Site
JGSS1EP-VPCI-AGP-
187 22-Jan-19 Erection Work Fd1-05-Fe/05-F1a-05-F2. See attached AREA 600 / S- H W SW
0187
drawing no. A1-JGS1EP-EPC1-A06-DD- 0604
15-3D Rev.2

526 / 732
Final Dimensional Survey for elevation
checking of Structure 0604 Grid 05-Fd1- JG Summit Site
JGSS1EP-VPCI-AGP-
188 22-Jan-19 Erection Work 05-Fe/05-F1a-05-F2. See attached AREA 600 / S- H W SW
0188
drawing no. A1-JGS1EP-EPC1-A06-DD- 0604
15-3D Rev.2

Compressive Testing of Structure 0604 ASTEC,


JGSS1EP-VPCI-AGP-
189 22-Jan-19 Erection Work Grouting Sample at ASTEC Laboratory in Calamba H SW SW
0189
Calamba, Laguna Laboratory

Receiving Inspection for Equipment No.


JGSS1EP-VPCI-AGP- E-0619B, E-0623B JG Summit Site
190 22-Jan-19 Material Inspection H W R
0190 Dwg # A3-JGS1EP-HAN-DD-E0619B, AREA 600
A3-JGS1EP-HAN-DD-E0623B

Compressive Strength Test (after 7 days ASTEC,


JGSS1EP-VPCI-AGP-
191 22-Jan-19 Laboratory Testing of grouting) for Equipment No. D-0690 Calamba H SW SW
0191
Dwg # A3-JGS1EP-HAN-DD-D-0690 Laboratory

Alignment Inspection for Equipment No.


JGSS1EP-VPCI-AGP- Equipment JG Summit Site
192 23-Jan-19 E-0619B Dwg # A3-JGS1EP-HAN-DD- H W SW
0192 Inspection AREA 600
E0619B
Notification for Receiving Inspection for
Equipment No. E-0610B/ G-0600AB/ G-
JGSS1EP-VPCI-AGP- 0610AB JG Summit Site
193 23-Jan-19 Material Inspection H W R
0193 Dwg # A3-JGS1EP-HAN-DD-E0610B, Lay-down
A3-JGS1EP-DBP-DD-0600, A3-JGS1EP-
DBP-DD-0610

Witness for the anchor bolt tightening JG Summit Site


JGSS1EP-VPCI-AGP-
194 23-Jan-19 Erection Work (snug tight) for column C002 & C003 of AREA 600 / S- H W SW
0194
Structure 0601 0601

527 / 732
Compressive Testing of Structure 0601 ASTEC,
JGSS1EP-VPCI-AGP-
195 23-Jan-19 Erection Work Grouting Sample at ASTEC Laboratory in Calamba H SW SW
0195
Calamba, Laguna Laboratory
Blasting & Primer Application Inspection
JGSS1EP-VPCI-AGP-
196 23-Jan-19 Painting & Coating of 7 PCS 90° ELBOW 8" SYSTEM 2A, & AG&P Yard 1 H W SW
0196
3 PCS 8" RAW PIPE
Visual Inspection:
JGSS1EP-VPCI-AGP- Welding Visual A01A5001-P-26027-01 JT. 8
197 23-Jan-19 AG&P Yard 1 H W SW
0197 Inspection A04A5001-QW-04044-01 JT. 2
A06A5001-P-26022-02 JT.1, 6

Visual Inspection of Seal Weld (on


JGSS1EP-VPCI-AGP- Welding Visual Sliding Plate) for Equipment No. E- JG Summit Site
198 24-Jan-19 H W SW
0198 Inspection 0624E/F AREA 600
Dwg # A3-JGS1EP-HAN-DD-E0624E/F

Compressive Strength Test (after 7 days


of grouting) for Equipment No. Z-0651, E- ASTEC,
JGSS1EP-VPCI-AGP-
199 24-Jan-19 Laboratory Testing 0624E/F Calamba H SW SW
0199
Dwg # A1-JGS1EP-SPP-DD-Z0651, A3- Laboratory
JGS1EP-HAN-DD-E0624EF

Visual Inspection:

A04A5001-QW-24014-02 JT. 011,


012,1,2
A01A5001-FW-39822-01 JT. 19,21,22
JGSS1EP-VPCI-AGP- Welding Visual
200 24-Jan-19 A04A5001-P-04049-01 JT. 5,19,20,14,2 AG&P Yard 1 H W SW
0200 Inspection
A01A5001-RT-26037-02 JT. 5,6
A01A5001-P-26027-02 JT. 12
A01A5001-RT-26027-02 JT. 14
A01A5001-RT-26037-02 JT.1,8
A01A5001-RT-26036-01 JT. 24,25

528 / 732
Alignment Inspection for Equipment No.
E-0623B Dwg # A3-JGS1EP-HAN-DD-
JGSS1EP-VPCI-AGP- Equipment JG Summit Site
201 25-Jan-19 E0623B H W SW
0201 Inspection AREA 600
D-0510C Dwg # A1-JGS1EP-FRH-DD-
D0510C

Inspection of Consumable Matls for


Blasting
STEEL GRIT GL 25 BATCH#
JGSS1EP-VPCI-AGP-
202 25-Jan-19 Material Inspection 2018120304 (7MTR TON) AG&P Yard 1 H W R
0202
STEEL SHOT S390 BATCH#
2018120305 (18 MTR TON)

Visual Inspection:

A04A5001-QW-04044-01 JT. 1,3


A04A5001-QW-04014-02 JT. 7
JGSS1EP-VPCI-AGP- Welding Visual
203 25-Jan-19 A06A5001-RT-26034-01 JT. 24, 15,17 AG&P Yard 1 H W SW
0203 Inspection
A01A5001-RT-26037-02 JT. 12
A01A5001-FW-39822-01 JT. 4
A04A5001-P-04049-01 JT. 7

ASTEC,
JGSS1EP-VPCI-AGP- Compressive Testing of Structure 0606
204 25-Jan-19 Laboratory Testing Calamba H SW SW
0204 Grouting Sample
Laboratory

Witness Grouting Pouring on Structural JG Summit Site


JGSS1EP-VPCI-AGP-
205 26-Jan-19 Erection Work 0604 column C024, C025, C027 and AREA 600 / S- H W SW
0205
C028 0604

529 / 732
JG Summit Site
JGSS1EP-VPCI-AGP- Final Bolt Tightening Inspection at all AREA 600 /
206 26-Jan-19 Erection Work H W SW
0206 elevation Interconnecting
Pipe Rack-1

JG Summit Site
JGSS1EP-VPCI-AGP- Final Plumbness Survey Inspection at all AREA 600 /
207 26-Jan-19 Erection Work H W SW
0207 elevation Interconnecting
Pipe Rack-1

JG Summit Site
JGSS1EP-VPCI-AGP- Final Elevation/Levelness Check Survey AREA 600 /
208 26-Jan-19 Erection Work H W SW
0208 Inspection at all elevation Interconnecting
Pipe Rack-1

Witness for the anchor bolt tightening JG Summit Site


JGSS1EP-VPCI-AGP-
209 29-Jan-19 Erection Work (snug tight) for column C001, C002, AREA 600 / S- H W SW
0209
C003 and C004 of Structure 0606 0606

Grout Inspection for Equipment No. E-


JG Summit Site
JGSS1EP-VPCI-AGP- 0623B, D-0510C Dwg # A3-JGS1EP-
210 29-Jan-19 Grouting AREA 500 / H W SW
0210 HAN-DD-E0623B, A1-JGS1EP-FRH-DD-
600
D0510C
Alignment Inspection for Equipment No.
D-0652, D-0653, D-0654 Dwg # A1-
JGSS1EP-VPCI-AGP- Equipment JG Summit Site
211 29-Jan-19 JGS1EP-FRH-DD-D0652, A1-JGS1EP- H W SW
0211 Inspection AREA 600
FRH-DD-D0653, A1-JGS1EP-FRH-DD-
D0654

530 / 732
Visual Inspection:
A06A5001-RT-26034-02 JT. 13,20,12
A06A5001-RT-26005-02 JT. 2
A06A5001-P-26003-01 JT. 6,5
A04A5001-QW-04043-01 JT. 2,3
A01A5001-P-26027-02 JT.10
JGSS1EP-VPCI-AGP- Welding Visual
212 29-Jan-19 A04A5001-P-04049-01 JT.4, 15,17 AG&P Yard 1 H W SW
0212 Inspection
A01A5001-RT-26036-01 JT. 21,16
A01A5001-RT-26052-01 JT.2
A05A5001-P-25006-02 JT. 13, 4
A01A5001-RT-29001-03 JT. 2,17
A06A5001-RT-29001-02 JT. 14,15

JGSS1EP-VPCI-AGP- Inspection of Raw Matls:


213 29-Jan-19 Material Inspection AG&P Yard 1 H W R
0213 PL 6MM X 1219 X 2438

Notification for Receiving Inspection for


Equipment No. E-0620B, E-0690, G-
0608AR/BR, E-0601AM/BM
JGSS1EP-VPCI-AGP- JG Summit Site
214 29-Jan-19 Material Inspection Dwg # A1-JGS1EP-FCG-DD-E0620B, H W R
0214 Laydown Area
A1-JGS1EP-FCG-DD-E0690, A3-
JGS1EP-DBP-DD-0608, A3-JGS1EP-
HAN-DD-E0601AMBM

Compressive Strength Test (after 7 days ASTEC,


JGSS1EP-VPCI-AGP-
215 29-Jan-19 Laboratory Test of grouting) for Equipment No. E-0401B Calamba H SW SW
0215
Dwg # A3-JGS1EP-HAN-DD-E0401B Laboratory

Alignment Inspection for Equipment No.


JGSS1EP-VPCI-AGP- Equipment JG Summit Site
216 29-Jan-19 D-0693 H W SW
0216 Inspection AREA 600
Dwg # A1-JGS1EP-FRH-DD-D0693

531 / 732
Visual Inspection:
A06A5001-RT-26034-01 JT,5
A04A5001-P-04048-02 JT. 6, 3
A05A5006-P-25006-02 JT.15
A01A5001-RT-26052-01 JT.3,5
JGSS1EP-VPCI-AGP- Welding Visual A06A5001-P-26003-01 JT. 5,6
217 29-Jan-19 AG&P Yard 1 H W SW
0217 Inspection A06A5001-RT-26034-02 JT. 11,12, 2
A04A5001-QW-24014-02 JT. 6
A06A5001-FW-39844-01 JT. 9, 1,6
A06A5001-RT-29001-02 JT.
9,10,11,18,19

Receiving Inspection for Equipment No.


JGSS1EP-VPCI-AGP- JG Summit Site
218 30-Jan-19 Material Inspection E-0608R H W R
0218 Laydown Area
Dwg # A1-JGS1EP-FCG-DD-E0608R

Alignment Inspection for Equipment No.


JGSS1EP-VPCI-AGP- Equipment JG Summit Site
219 30-Jan-19 E-0610B H W SW
0219 Inspection AREA 600
Dwg # A3-JGS1EP-HAN-DD-E0610B

JGSS1EP-VPCI-AGP-
220 30-Jan-19 Piping Fabrication Final Inspection of Pipe Supports AG&P Yard 1 H SW SW
0220

Final Bolt Tightening Inspection on JG Summit Site


JGSS1EP-VPCI-AGP-
221 30-Jan-19 Erection Work Framing Plan at T.O.S. EL. +70300 and AREA 600 / S- H W SW
0221
at T.O.S. EL. + 74600 0604

532 / 732
Visual Inspection:
A05A5001-P-25006-02 JT. 2,3, 11, 8
A04A5001-P-04049-01 JT. 8, 11
A01A5001-FW-39822-01 JT. 9, 12
A01A5001-RT-26037-02 JT. 2
A05A5001-P-25017-01 JT. 2
A01A5001-P-26022-02 JT. 14, 15
JGSS1EP-VPCI-AGP- Welding Visual
222 30-Jan-19 A06A5001-P-26003-01 JT. 7 AG&P Yard 1 H W SW
0222 Inspection
A065001-RT-26005-02 JT. 4, 10
A06A5001-RT-26034-01 JT. 18
A04A5001-P-04048-01 JT. 2,3, 7,8
A06A5001-FW-39844-01 JT. 3,4
A06A5001-P-26003-01 JT. 9
A01A5001-RT-29001-03 JT. 15, 9,10,11
A01A5001-RT-29001-02 JT. 1, 2

Grout Inspection for Equipment No. D-


0652, D-0653, D-0654 Dwg # A1-
JGSS1EP-VPCI-AGP- JG Summit Site
223 31-Jan-19 Grouting JGS1EP-FRH-DD-D0652, A1-JGS1EP- H W SW
0223 AREA 600
FRH-DD-D0653, A1-JGS1EP-FRH-DD-
D0654
Alignment Inspection for Equipment No.
JGSS1EP-VPCI-AGP- Equipment JG Summit Site
224 31-Jan-19 G-0610A/B H W SW
0224 Inspection AREA 600
Dwg # A3-JGS1EP-DBP-DD-0610
JGSS1EP-VPCI-AGP-
225 31-Jan-19 WQT Welders Qualification T Witnessing AG&P Yard 1 H W SW
0225

533 / 732
Visual Inspection:
A01A5001-RT-26037-02 JT. 3
A01A5001-RT-26036-01 JT. 20, 11,15
A06A5001-P-26003-01 JT. 3
A01A5001-P-26027-01 JT. 12
JGSS1EP-VPCI-AGP- Welding Visual
226 31-Jan-19 A01A5001-P-26022-02 JT. 5,6,16 AG&P Yard 1 H W SW
0226 Inspection
A01A5001-RT-26037-01 JT. 13,16,21,4
A06A5001-FW-39876-01 JT. 13
A06A5001-RT-26037-01 JT. 15,5,1
A06A5001-RT-26052-02 JT. 3
A01A5001-RT-26052-01 JT. 6

Visual Inspection:
A06A5001-RT-26052-02 JT.11, 6,8
A01A5001-P-26093-01 JT. 10
A06A5001-FW-39876-01 JT. 12,13,
8,5,1,29,15,17,10,27,5
A06A5001-RT-26036-03 JT. 1,8,3
A01A5001-RT-26036-01 JT. 9
A01A5001-RT-26004-02 JT. 2
JGSS1EP-VPCI-AGP- Welding Visual
227 1-Feb-19 A01A5001-HG-26002-T1 JT. 3,4,5 AG&P Yard 1 H W SW
0227 Inspection
A06A5001-LSS-26001-01 JT. 5, 3
A06A5001-RT-26036-02 JT. 5
A06A5001-RT-26037-01 JT. 11
A06A5001-RT-26034-02 JT. 6
A06A5001-LSS-26001-02 JT.16
A01A5001-RT-26037-01 JT. 1,10
A04A5001-WO-25002-01 JT. 6,15,16,18

534 / 732
FINAL BOLT TIGHTENING INSPECTION
JGSS1EP-VPCI-AGP- JG Summit Site
228 1-Feb-19 Erection Work AT FRAMING PLAN AT T.O.S EL +74600 H W SW
0228 AREA 600
(See attached drawing) S-0604

Elevation/ Check Foundation alignment and


JGSS1EP-VPCI-AGP- Levelness/ coordinate JG Summit Site
229 1-Feb-19 H W SW
0229 Centering / Dwg# A1-JGS1EP-EPC1-A06-DD-10-141 AREA 600
Plumbness E-0690
A06A5001-RT-26037-01 JT. 2, 8
A06A5001-P-
26003-01 JT. 8
A06A5001-RT-26052-01 JT. 4, 10
A06A5001-
RT-26034-01 JT. 12, 14
A05A5001-P-25006-
01 JT. 14
A01A5001-P-26022-02 JT. 11, 12
A06A5001-RT-26036-03
JT. 4
JGSS1EP-VPCI-AGP- Welding Visual A06A5001-FW-39849-01 JT. 4, 2, 9, 6,
230 2-Feb-19 AG&P Yard 1 H W SW
0230 Inspection 16, 14
A01A5001-P-26093-01 JT. 5, 16
A06A5001-P-26022-02 JT. 12, 13
A01A5001-RT-
26004-02 JT. 6, 16, 14
A06A5001-LSS-26001-02 JT. 11
A06A5001-RT-26036-02
JT. 9 A01A5001-
RT-26037-01 JT. 22
A04A5001-WO-25002-01
JT.20,21,22,23,12,13

535 / 732
Inspection of Raw Matls for Above
JGSS1EP-VPCI-AGP-
231 3-Feb-19 Material Inspection Ground Pipe & Fittings AG&P Yard 1 H W R
0231
RIC-135, 136,138, 139

Visual Inspection:
A01A5001-RT-26039-01 JT. 2
A01A5001-RT-26037-01 JT.18,11
A06A5001-P-26020-02 JT. 7
A01A5001-RT-26004-02 JT. 15, 9, 8
A01A5001-RT-26004-01 JT. 15
A06A5001-RT-26037-01 JT. 14
JGSS1EP-VPCI-AGP- Welding Visual A06A5001-FW-39849-01 JT. 12
232 3-Feb-19 AG&P Yard 1 H W SW
0232 Inspection A05A5001-P-25006-02 JT. 6
A06A5001-RT-26036-02 JT. 3
A06A5001-P-26022-02 JT. 7
A06A5001-RT-26052-02 JT. 1
A01A5001-P-26022-02 JT. 9
A06A5001-FW-39847-02 JT. 15, 16, 18,
8, 9, 10

Compressive Strength Test (after 28days


of grouting) for Equipment No. D-0600, ASTEC,
JGSS1EP-VPCI-AGP-
233 4-Feb-19 Laboratory Test D-0640 Calamba, H SW SW
0233
Dwg # A1-JGS1EP-FRH-DD-D0600, A1- Laguna
JGS1EP-FRH-DD-D0640
Elevation/
Leveling Inspection for Equipment No. G-
JGSS1EP-VPCI-AGP- Levelness/ JG Summit Site
234 4-Feb-19 0600A/B H W SW
0234 Centering / AREA 600
Dwg # A3-JGS1EP-DBP-DD-0600
Plumbness

536 / 732
Visual Inspection of Seal Weld (on
JGSS1EP-VPCI-AGP- Welding Visual JG Summit Site
235 4-Feb-19 Sliding Plate) for Equipment No. E-0623B H W SW
0235 Inspection AREA 600
Dwg # A3-JGS1EP-HAN-DD-E0623B

Alignment Inspection for Equipment No.


JGSS1EP-VPCI-AGP- Equipment JG Summit Site
236 4-Feb-19 E-0690 H W SW
0236 Inspection AREA 600
Dwg # A1-JGS1EP-FCG-DD-E0690

JGSS1EP-VPCI-AGP- Blasting/Primer Application Inspection of


237 4-Feb-19 Painting & Coating AG&P Yard 1 H W SW
0237 95 pcs Pipe Support Coating System 1B

Visual Inspection:
JGSS1EP-VPCI-AGP- Welding Visual
238 4-Feb-19 Estimated Joints - 39 joints AG&P Yard 1 H W SW
0238 Inspection
see reference DWR-059 - to follow
Compressive Testing of Structure 0604
Grout Specimen for Grid 05-F1-05-F2/05- ASTEC,
JGSS1EP-VPCI-AGP-
239 5-Feb-19 Laboratory Test Fd1-05-Fd2. See attached Drawing No. Calamba, H SW SW
0239
A1-JGS1EP-EPC1-A06-DD-15-E001 Laguna
Rev.1

JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection:


240 5-Feb-19 AG&P Yard 1 H W SW
0240 Inspection see reference DWR-AGP-060 - to follow

Grout Inspection for Equipment No. D-


JGSS1EP-VPCI-AGP- JG Summit Site
241 6-Feb-19 Grouting 0693 H W SW
0241 AREA 600
Dwg # A1-JGS1EP-FRH-DD-D0693
Primer Inspection prior to Intermediate
JGSS1EP-VPCI-AGP-
242 6-Feb-19 Painting & Coating coating of Pipe Support & Baseplates AG&P Yard 1 H W SW
0242
Coating System 1B

Final Visual Inspection to P001 Baseplate


JGSS1EP-VPCI-AGP- JG Summit Site
243 6-Feb-19 Erection Work to Existing Column (See attached H W SW
0243 AREA 600
Drawing), Inter Connecting Piperack-1

537 / 732
Final Visual Inspection to G015
JGSS1EP-VPCI-AGP- Baseplate to Existing Column (See JG Summit Site
244 6-Feb-19 Erection Work H W SW
0244 attached Drawing), Inter Connecting AREA 600
Piperack-1
Final Visual Inspection to G017
JGSS1EP-VPCI-AGP- Baseplate to Existing Column (See JG Summit Site
245 6-Feb-19 Erection Work H W SW
0245 attached Drawing), Inter Connecting AREA 600
Piperack-1
Final Inspection after the final cutting on
JGSS1EP-VPCI-AGP- top & bottom Flange of Beam B002 & JG Summit Site
246 6-Feb-19 Erection Work H W SW
0246 B056 that clashing to cable tray. AREA 600
Structure 0604

Final Bolt Tightening Inspection on grid


JGSS1EP-VPCI-AGP- 05-P31-05-P32 / 05-Pf-05-Pg-05-Ph-05- JG Summit Site
247 6-Feb-19 Erection Work H W SW
0247 Pi (Elevation +80500 to +82800). See AREA 600
attached Drawing, Structure 0604

Compressive Testing of Structure 0604


Grout Specimen for Grid 05-F1-05-F2/05- ASTEC,
JGSS1EP-VPCI-AGP-
248 6-Feb-19 Grouting Fc1-05-Fc2. See attached Drawing No. Calamba, H SW SW
0248
A1-JGS1EP-EPC1-A06-DD-15-E001 Laguna
Rev.1

JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection:


249 6-Feb-19 AG&P Yard 1 H W SW
0249 Inspection see reference DWR-AGP-061 - to follow

Blasting & Primer Application Inspection


JGSS1EP-VPCI-AGP-
250 6-Feb-19 Painting & Coating of Pipespool: 16pcs Coating Sysytem 2E AG&P Yard 1 H W SW
0250
9 pc CS 2A

538 / 732
Visual Inspection of Seal Weld (on
JGSS1EP-VPCI-AGP- Welding Visual JG Summit Site
251 7-Feb-19 Sliding Plate) for Equipment No.E-0619B H W SW
0251 Inspection AREA 600
Dwg # A3-JGS1EP-HAN-DD-E-0619B

JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection:


252 7-Feb-19 AG&P Yard 1 H W SW
0252 Inspection see reference DWR-AGP-062 - to follow

1.0 Intermiate Inspection prior to Top


Coat of Pipe supports & Baseplates
JGSS1EP-VPCI-AGP-
253 7-Feb-19 Painting & Coating 2.0 Primer Inspection prior to AG&P Yard 1 H W SW
0253
Intermediate Coat Application of Pipe
Spools Coating System 2A

Final Bolt Tightening Inspection of


JGSS1EP-VPCI-AGP- JG Summit Site
254 8-Feb-19 Erection Work Handrail at T.O.S. EL. +72460 and at H W SW
0254 AREA 600
T.O.S. EL. +73500 for Structure 0601

Final Bolt Tightening Inspection of Ladder


JGSS1EP-VPCI-AGP- JG Summit Site
255 8-Feb-19 Erection Work LD001, LD002 and LD003 installed at H W SW
0255 AREA 600
Structure 0601
Final Inspection for the alignment and
JGSS1EP-VPCI-AGP- JG Summit Site
256 8-Feb-19 Erection Work proper installation of grating at T.O.S. EL. H W SW
0256 AREA 600
+73500 for Structure 0601

Witness Final Survey Inspection for the


JGSS1EP-VPCI-AGP- JG Summit Site
257 8-Feb-19 Erection Work plumbenss of column C018, C019, C020, H W SW
0257 AREA 600
C030, and C031 for Structure 0604

Grout Inspection of Anchor box for


JGSS1EP-VPCI-AGP- JG Summit Site
258 8-Feb-19 Grouting Equipment No. G-0600A/B H W SW
0258 AREA 600
Dwg # A3-JGS1EP-DBP-DD-0600

539 / 732
Compressive Strength Test (after 7 days
of grouting) for Equipment No. D-0653,
ASTEC,
JGSS1EP-VPCI-AGP- D-0654, E-0623B
259 8-Feb-19 Laboratory Test Calamba, H SW SW
0259 Dwg # A1-JGS1EP-FRH-DD-D0653, A1-
Laguna
JGS1EP-FRH-DD-D0654, A3-JGS1EP-
HAN-DD-E0623B

Witness surveying of column plumbness JG Summit Site


JGSS1EP-VPCI-AGP- at Inter Connecting Piperack-1 at T.O.S. Inter
260 8-Feb-19 Erection Work H W SW
0260 EL. +80500 (Grid 05_P31-05-P32/05- Connecting
Pf_05-Pg_05-Ph_05-Pl Piperack-1

JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection:


261 8-Feb-19 AG&P Yard 1 H W SW
0261 Inspection see reference DWR-AGP-063 - to follow

JGSS1EP-VPCI-AGP-
262 8-Feb-19 WQT Welders Qualification Testing/ Witnessing AG&P Yard 1 H W SW
0262

1.0 Blasting & Primer Application Inspection


of Pipespool with Coating System 2A & 2E
JGSS1EP-VPCI-AGP- 2.0 Primer Inspection of 16 spools with CS-
263 8-Feb-19 Painting & Coating AG&P Yard 1 H W SW
0263 2E prior to Top Coat Application
3.0 Intermediate Coat Inspection of 9spools
with CS-2A prior to Top Coat Application

Witness surveying of elevation levelness at


JG Summit Site
JGSS1EP-VPCI-AGP- Inter Connecting Piperack-1 at T.O.S. EL.
264 9-Feb-19 Erection Work Inter Connecting H W SW
0264 +82800 (Grid 05_P31-05-P32/05-Pf_05-
Piperack-1
Pg_05-Ph_05-Pl)
JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection:
265 9-Feb-19 AG&P Yard 1 H W SW
0265 Inspection see reference DWR-AGP-064 - to follow
JGSS1EP-VPCI-AGP- Inspection of Raw Matls for Above Ground:
266 9-Feb-19 Material Inspection AG&P Yard 1 H W R
0266 Pipes RIC-0140~0147

540 / 732
1.0 Final Visual & DFT inspection of 26
spools with CS-2E and 9 spools with CS-
2A
2.0 Final Visual & DFT inspection of 100
JGSS1EP-VPCI-AGP-
267 9-Feb-19 Painting & Coating pcs pipe supports & 62 pcs base plates AG&P Yard 1 H W SW
0267
with CS-1B
3.0 Blasting & Primer Application
Inspection of Pipe spools with CS-2A &
2E

JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection:


268 10-Feb-19 AG&P Yard 1 H W SW
0268 Inspection see reference DWR-AGP-065 - to follow

28th Day Compressive Testing of


Structure 0604A Grout Specimen for Grid
JGSS1EP-VPCI-AGP- JG Summit Site
269 11-Feb-19 Grouting 05-F1-05-F2/05-Fc1-05-Fc2. See H SW SW
0269 AREA 600
attached Drawing No. A1-JGS1EP-
EPC1-A06-DD-15-E001 Rev.1

Compressive Strength Test (after 28days ASTEC,


JGSS1EP-VPCI-AGP-
270 11-Feb-19 Laboratory Test of grouting) for Equipment No. D-0690 Calamba, H SW SW
0270
Dwg # A3-JGS1EP-HAN-DD-D-0690 Laguna

Compressive Strength Test (after 7 days


of grouting) for Equipment No. D-0652, ASTEC,
JGSS1EP-VPCI-AGP-
271 11-Feb-19 Laboratory Test D-0693 Calamba, H SW SW
0271
Dwg # A1-JGS1EP-FRH-DD-D0652, A1- Laguna
JGS1EP-FRH-DD-D0693,

JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection:


272 11-Feb-19 AG&P Yard 1 H W SW
0272 Inspection see reference DWR-AGP-066 - to follow

541 / 732
Final Bolt Tightening Inspection at
Framing Plan at T.O.S. EL. + 79900 Grid
JGSS1EP-VPCI-AGP- JG Summit Site
273 11-Feb-19 Erection Work 05-Fd-05-Fe/05-F3-05-P36. (Dwg. No. H W SW
0273 AREA 600
A1JGS1EP-EPC1-A06-DD-15-E009 Rev.
0). Structure 0604
JGSS1EP-VPCI-AGP- Inspection of Raw Matls for Above
274 11-Feb-19 Material Inspection AG&P Yard 1 H W R
0274 Ground: Fittings-RIC-0148

Receiving Inspection for Equipment No.


E-0508R, E-0618R, E-0611C, E-0509B,
E-0600
JGSS1EP-VPCI-AGP- Dwg # A3-JGS1EP-HAN-DD-E0508R, JG Summit Site
275 12-Feb-19 Material Inspection H W R
0275 A3-JGS1EP-HAN-DD-E0618R, A3- Laydown Area
JGS1EP-HAN-DD-E0611C, A3-JGS1EP-
HAN-DD-E0509B, A3-JGS1EP-HAN-DD-
E0600

JGSS1EP-VPCI-AGP- Inspection of Raw Matls for Above


276 12-Feb-19 Material Inspection AG&P Yard 1 H W R
0276 Ground: Consumables RIC-0149

JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection:


277 12-Feb-19 AG&P Yard 1 H W SW
0277 Inspection see reference DWR-AGP-067 - to follow

Witness surveying of column plumbness


at Structure 0604.
Framing Elevation at Grid "05-F3" for
C001, C003, C005, C016 and C017
JGSS1EP-VPCI-AGP- JG Summit Site
278 13-Feb-19 Erection Work (Dwg. No. A1-JGS1EP-EPC1-A06-DD- H W SW
0278 AREA 600
15-E018)
Framing Elevation at Grid "05-P36" for
C002, C004 and C006 (Dwg. No. A1-
JGS1EP-EPC1-A06-DD-15-E018)

542 / 732
Witness surveying of beam elevation at
Structure 0604.
Framing Elevation at Grid "05-F3" (Dwg.
No. A1-JGS1EP-EPC1-A06-DD-15-E018
Rev.1)
Framing Elevation at Grid "05-P36"
JGSS1EP-VPCI-AGP- (Dwg. No. A1-JGS1EP-EPC1-A06-DD- JG Summit Site
279 13-Feb-19 Erection Work H W SW
0279 15-E020 Rev.0) AREA 600
Framing Elevation at Grid "05-Fc" and
"05-Fd" (Dwg. No. A1-JGS1EP-EPC1-
A06-DD-15-E022 Rev.0)
Framing Elevation at Grid "05-Fe" (Dwg.
No. A1-JGS1EP-EPC1-A06-DD-15-E023
Rev.1)

JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection:


280 13-Feb-19 0280 Inspection see reference DWR-AGP-068 - to follow
AG&P Yard 1 H W SW

Blasting & Primer Application Inspection of


JGSS1EP-VPCI-AGP-
281 13-Feb-19 0281
Painting & Coating Pipespool with Coating System 2A & 2E AG&P Yard 1 H W SW

Alignment Inspection for Equipment No.


E-0509B, E-0600, E-0611C
JGSS1EP-VPCI-AGP- Equipment JG Summit Site
282 14-Feb-19 Dwg # A3-JGS1EP-HAN-DD-E0509B, H W SW
0282 Inspection AREA 600
A3-JGS1EP-HAN-DD-E0600, A3-
JGS1EP-HAN-DD-E0611C

Receiving Inspection for Equipment No.


D-0691, E-0504AR/BR, E-0507BR
JGSS1EP-VPCI-AGP- JG Summit Site
283 14-Feb-19 Material Inspection Dwg # A1-JGS1EP-FRH-DD-D0691, A3- H W R
0283 Laydown Area
JGS1EP-HAN-DD-E0504AR,BR, A3-
JGS1EP-HAN-DD-E0507BR

543 / 732
Compressive Strength Test (after 28days
of grouting) for Equipment No. Z-0651, E- ASTEC,
JGSS1EP-VPCI-AGP-
284 14-Feb-19 Laboratory Test 0624E/F Calamba, H SW SW
0284
Dwg # A1-JGS1EP-SPP-DD-Z0651, A3- Laguna
JGS1EP-HAN-DD-E0624EF

Compressive Strength Test (after 7 days


of grouting) for Equipment No. D-0510C,
ASTEC,
JGSS1EP-VPCI-AGP- E-0690, G-0600A/B
285 14-Feb-19 Laboratory Test Calamba, H SW SW
0285 Dwg # A1-JGS1EP-FRH-DD-D0510C,
Laguna
A1-JGS1EP-FCG-DD-E0690, A3-
JGS1EP-DBP-DD-0600

Alignment Inspection for Equipment No.


JGSS1EP-VPCI-AGP- Equipment E-0620B, D-0691 JG Summit Site
286 14-Feb-19 H W SW
0286 Inspection Dwg # A1-JGS1EP-FCG-DD-E0620B, AREA 600
A1-JGS1EP-FRH-DD-D0691

544 / 732
Final Visual Inspection for Gusset Plate
Structure Inter Connecting Piperack-1
GP008 at EL. +80500 / Grid Pk-05-Pi/05-
Pa-05-P31 (A1-JGS1EP-EPC1-A06-DD-
15-B012 Rev.0)
GP016 at EL. +80500 / Grid Pj-05-PK/05-
P31-05-P33 (A1-JGS1EP-EPC1-A06-
DD-15-B009 Rev.0)
GP015 at EL. +80500 / Grid Pj-05-PK/05-
JGSS1EP-VPCI-AGP- P31-05-P33 (A1-JGS1EP-EPC1-A06- JG Summit Site
287 14-Feb-19 Erection Work H W SW
0287 DD-15-B009 Rev.0) AREA 600
GP003 at EL. +80500 / Grid Pj-05-PK/05-
P31-05-P33 (A1-JGS1EP-EPC1-A06-
DD-15-B010 Rev.0)
GP006 at EL. +80500 / Grid Pj-05-PK/05-
P31-05-P33 (A1-JGS1EP-EPC1-A06-
DD-15-J001 Rev.0)
GP015 at EL. +80500 / Grid Pj-05-PK/05-
P31-05-P33 (A1-JGS1EP-EPC1-A06-
DD-15-B008 Rev.0)

witness surveying of column plumbness


JGSS1EP-VPCI-AGP- at Structure 0603 Grid 05-C1-05-C2-05- JG Summit
288 14-Feb-19 Erection Work H W SW
0288 C3/05-Ca-05-Cb-05-Cc Dwg. No. A1- Site / STR-0603
JGS1EP-EPC1-A06-dd-DD-15-001 Rev.0

witness surveying of levelness/elevation


at T.O.S. EL. +84700 Grid 05-C1-05-C2-
JGSS1EP-VPCI-AGP- JG Summit
289 14-Feb-19 Erection Work 05-C3/05-Ca-05-Cb-05-Cc Dwg. No. A1- H W SW
0289 Site / STR-0603
JGS1EP-EPC1-A06-dd-DD-15-002 Rev.0
Structure 0603

545 / 732
28th Day Compressive Testing of
Structure 0601 Grout Specimen for Grid ASTEC,
JGSS1EP-VPCI-AGP-
290 14-Feb-19 Erection Work 05-Bc_1/05-B1a and 05-Bc_1/05-B4. Calamba, H SW SW
0290
Dwg. No. A-JGS1EP-EPC1-A06-DD-15- Laguna
3D Rev.0

Final Bolt Tightening Inspection at T.O.S.


JGSS1EP-VPCI-AGP- EL. +84500 Grid 05-F3-05-P36/05-Fd-05- JG Summit
291 14-Feb-19 Erection Work H W SW
0291 Fe. Dwg. No. A1-JGS1EP-EPC1-A06- Site / STR-0604
DD-15-E011 Rev.1 Structure 0604

JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection:


292 14-Feb-19 AG&P Yard 1 H W SW
0292 Inspection see reference DWR-AGP-069 - to follow

JGSS1EP-VPCI-AGP-
293 14-Feb-19 WQT Welders Qualification Testing/ Witnessing AG&P Yard 1 H W SW
0293
1.0 Blasting & Primer Application of
Pipespool CS 2A & 2E
JGSS1EP-VPCI-AGP-
294 14-Feb-19 Painting & Coating 2.0 Final Visual & DFT inpsection of Pipe AG&P Yard 1 H W SW
0294 spools:
15pcs CS 2E & 5 pcs CS 2E

Receiving Inspection for Equipment No.


JGSS1EP-VPCI-AGP- E-0506R, E-0507AR JG Summit Site
295 15-Feb-19 Material Inspection H W R
0295 Dwg # A3-JGS1EP-HAN-DD-E0506R, Laydown Area
A3-JGS1EP-HAN-DD-E0507AR

Grouting Inspection for Equipment No. E-


0509B, E-0611C, D-0691
JGSS1EP-VPCI-AGP- JG Summit Site
296 15-Feb-19 Grouting Dwg # A3-JGS1EP-HAN-DD-E0509B, H W SW
0296 AREA 600
A3-JGS1EP-HAN-DD-E0611C, A1-
JGS1EP-FRH-DD-D0691

JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection:


297 15-Feb-19 AG&P Yard 1 H W SW
0297 Inspection see reference DWR-AGP-070 - to follow

546 / 732
Fit-up Inspection at Piperack C JG Summit Site
JGSS1EP-VPCI-AGP- Welding Visual
298 16-Feb-19 Dwg. No. A01A5001-RT-26052-01-03 & Area 600 H W SW
0298 Inspection
04 FW JT.10 Piperack C

JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection:


299 16-Feb-19 AG&P Yard 1 H W SW
0299 Inspection see reference DWR-AGP-071 - to follow

JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection:


300 17-Feb-19 AG&P Yard 1 H W SW
0300 Inspection see reference DWR-AGP-072 - to follow

28th Day Compressive Testing of


Structure 0606 Grout Specimen for Grid ASTEC,
JGSS1EP-VPCI-AGP-
301 18-Feb-19 Erection Work 06-A1/06-A2 and Grid 06-Aa/06-Ab. See Calamba, H SW SW
0301
attached Drawing No. A1-JGS1EP- Laguna
EPC1-A06-DD-15-E001 Rev.0

Notification for RT Reports & RT Film


JGSS1EP-VPCI-AGP-
302 18-Feb-19 WQT Review AG&P Yard 1 H W SW
0302
WQT held last Feb 15~16, 2019

JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection:


303 18-Feb-19 AG&P Yard 1 H W SW
0303 Inspection see reference DWR-AGP-073 - to follow

1.0 Final Visual & DFT inspection of 26


spools with CS-2E
2.0 Final Visual & DFT inspection of 10
JGSS1EP-VPCI-AGP-
304 18-Feb-19 Painting & Coating spools with CS-2A (N7.5R RED) AG&P Yard 1 H W SW
0304
3.0 Blasting & Primer Application
Inspection of Pipe spools with CS-2A &
2E

Visual Inspection at Piperack C JG Summit Site


JGSS1EP-VPCI-AGP- Welding Visual
305 19-Feb-19 Dwg. No. A01A5001-RT-26052-01 FW AREA 600 / H W SW
0305 Inspection
JT.10 PIPERACK C

547 / 732
Final Bolt Tightening Inspection of
Structure 0603
Framing Plat at T.O.S. Elevation +84700
(A1-JGS1EP-EPC1-A06-DD-15-E002
JGSS1EP-VPCI-AGP- JG Summit Site
306 19-Feb-19 Erection Work Rev.1) H W SW
0306 STR 0603
Framing Elevation at Grid "05-Ca" (A1-
JGS1EP-EPC1-A06-DD-15-E004 Rev.0)
Framing Elevation at Grid "05-Cc" (A1-
JGS1EP-EPC1-A06-DD-15-E009 Rev.0)

Receiving Inspection of Platform and


JG Summit Site
JGSS1EP-VPCI-AGP- Ladder for Equipment No. D-0600
307 19-Feb-19 Material Inspection Laydown 1 H W R
0307 Dwg No. A1-JGS1EP-FRH-DD-D0600-
Area
014

JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection:


308 19-Feb-19 AG&P Yard 1 H W SW
0308 Inspection see reference DWR-AGP-074 - to follow

Blasting & Primer Application Inspection


JGSS1EP-VPCI-AGP-
309 19-Feb-19 Painting & Coating of 94pcs Pipe Support CS 1B & AG&P Yard 1 H W SW
0309
pipespools CS 2A & 2E
JGSS1EP-VPCI-AGP- Welding Visual
310 19-Feb-19 Notification for Fit-up of SS AG&P Yard 1 H W SW
0310 Inspection

Fit-up Inspection at Piperack C JG Summit Site


JGSS1EP-VPCI-AGP- Welding Visual
311 19-Feb-19 A01A5001-RT-26036-01 JT. 06 AREA 600 / H W SW
0311 Inspection
A01A5001-RT-26037-02 JT. 13 PIPERACK C

Visual Inspection at Piperack C JG Summit Site


JGSS1EP-VPCI-AGP- Welding Visual
312 19-Feb-19 A01A5001-RT-26036-01 JT. 06 AREA 600 / H W SW
0312 Inspection
A01A5001-RT-26037-02 JT. 13 PIPERACK C

548 / 732
Final Visual Inspection of Gusset Plate at
Inter Connecting Piperack-1
GP004 and GP006 per Dwg. No. A1-
JGS1EP-EPC1-A06-DD-15-J004 Rev.0
GP007 per Dwg. No. A1-JGS1EP-EPC1-
JGSS1EP-VPCI-AGP- JG Summit Site
313 19-Feb-19 Erection Work A06-DD-15-J005 Rev.0 H W SW
0313 AREA 600
GP006 per Dwg. No. A1-JGS1EP-EPC1-
A06-DD-15-J003 Rev.0
GP006 per Dwg. No. A1-JGS1EP-EPC1-
A06-DD-15-J006 Rev.0

Final Bolt Tightening Inspection at


JGSS1EP-VPCI-AGP- Framing Plan at T.O.S. EL. +79900 Grid JG Summit Site
314 19-Feb-19 Erection Work H W SW
0314 05-F3-05-P36/05-Fb-05-Fc1. AREA 600
Structure 0604
Final Bolt Tightening Inspection at
JGSS1EP-VPCI-AGP- Framing Plan at T.O.S. EL. +84500 Grid JG Summit Site
315 19-Feb-19 Erection Work H W SW
0315 05-P36/05-Fd-05-Fe. AREA 600
Structure 0604
Final Visual Inspection for Column C002,
JGSS1EP-VPCI-AGP- C003, C005 and C006 baseplate to JG Summit Site
316 19-Feb-19 Erection Work H W SW
0316 existing column. AREA 600
Structure 0603
Final Bolt Tightening Inspection at Framing
Plan at T.O.S. EL. +84500 Grid 05-F3-05-
JGSS1EP-VPCI-AGP- JG Summit Site
317 20-Feb-19 0317
Erection Work P36/05-Fb-05-Fc per A1-JGS1EP-EPC1-
AREA 600
H W SW
A06-DD-15-E011 Rev.1
Structure 0604

Final Visual Inspection for Column C003,


JGSS1EP-VPCI-AGP- C004 and C009 baseplate to existing column. JG Summit Site
318 20-Feb-19 0318
Erection Work
A1-JGS1EP-EPC1-A06-DD-15-E001 Rev.0 AREA 600
H W SW
Structure 0603

549 / 732
JGSS1EP-VPCI-AGP- Welding Visual Visual Inspection:
319 20-Feb-19 0319 Inspection see reference DWR-AGP-075 - to follow
AG&P Yard 1 H W SW

550 / 732
551 / 732
et Accepted

317 On-schedule Waiting for result

36 Re-schedule Cancelled

30 Additional Reject

Date Time Subcontractor Inspector Discipline Status Result

8-Aug-18 1000H AG&P Arvin Balitaan Piping On-schedule Accepted

24-Aug-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

24-Aug-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

29-Aug-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

2-Oct-18 0800H AG&P Bryan Aguila Piping On-schedule Accepted

8-Oct-18 0800H AG&P Arvin Balitaan Piping On-schedule Cancelled

9-Oct-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

10-Oct-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

552 / 732
12-Oct-18 0800H AG&P Arvin Balitaan Piping Additional Accepted

12-Oct-18 0800H AG&P Arvin Balitaan Piping Additional Accepted

12-Oct-18 0800H AG&P Arvin Balitaan Piping Additional Accepted

10-Oct-18 0800H AG&P Arvin Balitaan Piping Additional Accepted

10-Oct-18 0800H AG&P Arvin Balitaan Piping Additional Accepted

11-Oct-18 0800H AG&P Arvin Balitaan Piping Additional Accepted

553 / 732
11-Oct-18 0800H AG&P Arvin Balitaan Piping Additional Accepted

12-Oct-18 0800H AG&P Arvin Balitaan Piping Additional Accepted

12-Oct-18 0800H AG&P Arvin Balitaan Piping Additional Accepted

12-Oct-18 0800H AG&P Arvin Balitaan Piping Additional Accepted

15-Oct-18 0800H AG&P Arvin Balitaan Piping Additional Accepted

16-Oct-18 0800H AG&P Arvin Balitaan Piping Additional Accepted

16-Oct-18 0800H AG&P Arvin Balitaan Piping Additional Accepted

18-Oct-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

554 / 732
17-Oct-18 1300H AG&P Arvin Balitaan Piping Additional Accepted

17-Oct-18 1300H AG&P Arvin Balitaan Piping Additional Accepted

17-Oct-18 1300H AG&P Arvin Balitaan Piping Additional Accepted

18-Oct-18 1300H AG&P Arvin Balitaan Piping On-schedule Accepted

19-Oct-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

555 / 732
19-Oct-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

19-Oct-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

19-Oct-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

22-Oct-18 0800H AG&P Ramon Castillo Piping On-schedule Accepted

22-Oct-18 0800H AG&P Ramon Castillo Piping On-schedule Accepted

556 / 732
22-Oct-18 0800H AG&P Ramon Castillo Piping On-schedule Accepted

23-Oct-18 0800H AG&P Ramon Castillo Piping On-schedule Accepted

23-Oct-18 0800H AG&P Ramon Castillo Piping On-schedule Accepted

23-Oct-18 0800H AG&P Ramon Castillo Piping On-schedule Accepted

24-Oct-18 0800H AG&P Ramon Castillo Piping On-schedule Accepted

26-Oct-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

557 / 732
26-Oct-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

29-Oct-18 0800H AG&P Ramon Castillo Piping On-schedule Accepted

31-Oct-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

31-Oct-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

31-Oct-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

558 / 732
08-Nov-18 0800H AG&P Bryan Aguila Piping On-schedule Accepted

12-Nov-18 0800H AG&P Bryan Aguila Piping On-schedule Accepted

559 / 732
15-Nov-18 0800H AG&P Bryan Aguila Piping On-schedule Accepted

15-Nov-18 0800H AG&P Bryan Aguila Piping On-schedule Accepted

15-Nov-18 0800H AG&P Bryan Aguila Piping On-schedule Accepted

15-Nov-18 0800H AG&P Bryan Aguila Piping On-schedule Accepted

16-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted


16-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted
16-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

16-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

19-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

19-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

560 / 732
19-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

20-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

20-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

20-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

20-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

21-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

21-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

21-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

22-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

22-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

22-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

23-Nov-18 1300H AG&P Arvin Balitaan Piping On-schedule Accepted

561 / 732
23-Nov-18 1300H AG&P Arvin Balitaan Piping On-schedule Accepted

23-Nov-18 0800H AG&P Arvin Balitaan Painting On-schedule Accepted

23-Nov-18 0800H AG&P Arvin Balitaan Painting On-schedule Accepted

22-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

22-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

22-Nov-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

24-Nov-18 0800H AG&P Arvin Balitaan Mechanical On-schedule Accepted

24-Nov-18 0800H AG&P Arvin Balitaan Mechanical On-schedule Accepted

24-Nov-18 0800H AG&P Arvin Balitaan Mechanical On-schedule Accepted

27-Nov-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

27-Nov-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

562 / 732
28-Nov-18 1300H AG&P Arvin Balitaan Piping On-schedule Accepted

28-Nov-18 1300H AG&P Arvin Balitaan Piping On-schedule Accepted

28-Nov-18 1300H AG&P Arvin Balitaan Piping On-schedule Accepted

28-Nov-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

03-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

01-Dec-18 0700H AG&P Ramon Castillo Mechanical On-schedule Accepted

3-Dec-18 0700H AG&P Ramon Castillo Piping On-schedule Accepted

3-Dec-18 0700H AG&P Ramon Castillo Piping On-schedule Accepted

563 / 732
3-Dec-18 0700H AG&P Ramon Castillo Piping On-schedule Accepted

Arvin Balitaan/
04-Dec-18 0700H AG&P Piping On-schedule Accepted
Ramon Castillo

05-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

05-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

05-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

05-Dec-18 0900H AG&P Arvin Balitaan Mechanical On-schedule Accepted

05-Dec-18 0900H AG&P Arvin Balitaan Mechanical On-schedule Accepted

05-Dec-18 0900H AG&P Arvin Balitaan Mechanical On-schedule Accepted

05-Dec-18 0800H AG&P Ermer Valdez Painting On-schedule Accepted

06-Dec-18 0800H AG&P Ermer Valdez Painting On-schedule Accepted

564 / 732
07-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

07-Dec-18 0700H AG&P Ermer Valdez Painting On-schedule Accepted

Dec
0800H AG&P Arvin Balitaan Piping On-schedule Waiting for result
10~11,2018
10-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

10-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

10-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

08-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

08-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

08-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

10-Dec-18 0830H AG&P Ermer Valdez Painting On-schedule Accepted

10-Dec-18 0830H AG&P Ermer Valdez Painting On-schedule Accepted

11-Dec-18 0830H AG&P Ermer Valdez Painting On-schedule Accepted

11-Dec-18 0830H AG&P Ermer Valdez Painting On-schedule Accepted

565 / 732
11-Dec-18 0830H AG&P Ermer Valdez Painting On-schedule Accepted

11-Dec-18 0830H AG&P Ermer Valdez Painting On-schedule Accepted

12-Dec-18 0830H AG&P Ermer Valdez Painting On-schedule Accepted

12-Dec-18 0830H AG&P Ermer Valdez Painting On-schedule Accepted

19-Dec-18 0830H AG&P Ermer Valdez Painting On-schedule Accepted

19-Dec-18 0830H AG&P Ermer Valdez Painting On-schedule Accepted

11-Dec-18 0900H AG&P Ramon Castillo Piping On-schedule Accepted

11-Dec-18 0900H AG&P Ramon Castillo Piping On-schedule Accepted

11-Dec-18 0900H AG&P Ramon Castillo Piping On-schedule Accepted

11-Dec-18 0900H AG&P Ramon Castillo Mechanical On-schedule Accepted

11-Dec-18 0900H AG&P Ramon Castillo Mechanical On-schedule Accepted

11-Dec-18 0900H AG&P Ramon Castillo Piping On-schedule Accepted

11-Dec-18 0900H AG&P Ramon Castillo Piping On-schedule Accepted

566 / 732
11-Dec-18 0900H AG&P Ramon Castillo Piping On-schedule Accepted

11-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

11-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

11-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

12-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

12-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

12-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

12-Dec-18 0900H AG&P Arvin Balitaan Structural On-schedule Accepted

12-Dec-18 0900H AG&P Arvin Balitaan Structural On-schedule Accepted

567 / 732
12-Dec-18 0900H AG&P Arvin Balitaan Structural On-schedule Accepted

12-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

12-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

12-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

13-Dec-18 8:30 AG&P Ermer Valdez Painting On-schedule Accepted

13-Dec-18 8:30 AG&P Ermer Valdez Painting On-schedule Accepted

13-Dec-18 8:30 AG&P Ermer Valdez Painting On-schedule Accepted

13-Dec-18 8:30 AG&P Ermer Valdez Painting On-schedule Accepted

568 / 732
13-Dec-18 8:30 AG&P Ermer Valdez Painting On-schedule Accepted

13-Dec-18 8:30 AG&P Ermer Valdez Painting On-schedule Accepted

14-Dec-18 1300H AG&P Arvin Balitaan Piping On-schedule Accepted

14-Dec-18 1300H AG&P Arvin Balitaan Piping On-schedule Accepted

14-Dec-18 1300H AG&P Arvin Balitaan Piping On-schedule Accepted

14-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

15-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted


15-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

15-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

17-Dec-18 0830H AG&P Ermer Valdez Painting On-schedule Accepted

569 / 732
17-Dec-18 0900H AG&P Arvin Balitaan Mechanical On-schedule Accepted

17-Dec-18 0900H AG&P Arvin Balitaan Mechanical On-schedule Accepted

17-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

17-Dec-18 0900H AG&P Arvin Balitaan Painting On-schedule Accepted

570 / 732
18-Dec-18 0900H AG&P Ermer Valdez Painting On-schedule Accepted

18-Dec-18 0900H AG&P Ermer Valdez Painting Re-schedule Accepted

0800H
18-Dec-18 AG&P Ermer Valdez Painting On-schedule Accepted
1330H

18-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

18-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

19-Dec-18 1300H AG&P Ermer Valdez Painting On-schedule Accepted

19-Dec-18 1300H AG&P Arvin Balitaan Piping On-schedule Accepted

20-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

571 / 732
20-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

0800H-
20-Dec-18 AG&P Ermer Valdez Painting On-schedule Accepted
1700H

0800H-
20-Dec-18 AG&P Ermer Valdez Painting On-schedule Accepted
1700H

Piping/Structu
21-Dec-18 8:00 AM AG&P Arvin Balitaan On-schedule Accepted
ral

Arvin Balitaan/
21-Dec-18 0900H AG&P Piping On-schedule Accepted
Ramon Castillo

19-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

Arvin Balitaan/
21-Dec-18 0900H AG&P Piping On-schedule Accepted
Ramon Castillo

572 / 732
Arvin Balitaan/
21-Dec-18 0900H AG&P Piping On-schedule Accepted
Ramon Castillo

21-Dec-18 0700H AG&P Arvin Balitaan Piping On-schedule Accepted

22-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

22-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

22-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

573 / 732
DEC
0830H AG&P Ermer Valdez Painting On-schedule Accepted
26~27,2018

26-Dec-18 0900H AG&P Arvin Balitaan Mechanical Re-schedule Accepted

Arvin Balitaan/Bryan
27-Dec-18 0700H AG&P Piping On-schedule Accepted
Aguila

28-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

574 / 732
28-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

28-Dec-18 0800H AG&P Arvin Balitaan Mechanical On-schedule Accepted

28-Dec-18 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

28-Dec-18 0900H AG&P Arvin Balitaan Piping Re-schedule Cancelled

29-Dec-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

575 / 732
29-Dec-18 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

02-Jan-19 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

02-Jan-19 1300H AG&P Arvin Balitaan Piping Re-schedule Accepted

02-Jan-19 1300H AG&P Arvin Balitaan Piping Additional Accepted

03-Jan-19 0900H AG&P Arvin Balitaan Mechanical On-schedule Accepted

576 / 732
4-Jan-2019 &
0900H AG&P Ermer Valdez Painting On-schedule Accepted
5-Jan-19

Arvin Balitaan
04-Jan-19 0800H AG&P Piping On-schedule Accepted
/Ramon Castillo

04-Jan-19 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

04-Jan-19 0900H AG&P Allan Magadia Structural Re-schedule Cancelled

04-Jan-19 0900H AG&P Allan Magadia Structural Re-schedule

577 / 732
0800H-
07-Jan-19 AG&P Ermer Valdez Painting Re-schedule Accepted
1700H

07-Jan-19 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

04-Jan-19 1000H AG&P Arvin Balitaan Structural Additional Waiting for result

05-Jan-19 1000H AG&P Arvin Balitaan Piping On-schedule Accepted

0800H-
07-Jan-19 AG&P Arvin Balitaan Mechanical Re-schedule Accepted
1700H

0800H-
07-Jan-19 AG&P Arvin Balitaan Mechanical Re-schedule Accepted
1700H

578 / 732
07-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

07-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

08-Jan-19 0800H AG&P Ramon Castillo Piping On-schedule Accepted

08-Jan-19 0800H AG&P Ermer Valdez Painting On-schedule Accepted

0900H
08-Jan-19 AG&P Arvin Balitaan Mechanical On-schedule Accepted
-1000H

10-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

1300H-
10-Jan-19 AG&P Arvin Balitaan Mechanical On-schedule Accepted
1500H

579 / 732
10-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

1300H-
11-Jan-19 AG&P Arvin Balitaan Mechanical On-schedule Accepted
1500H

11-Jan-19 0830H AG&P Arvin Balitaan Structural On-schedule Cancelled

Jan 15-17, 0800H


AG&P Arvin Balitaan Piping On-schedule
2019 onwards

14-Jan-19 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

14-Jan-19 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

14-Jan-19 0900H AG&P Ermer Valdez Painting Re-schedule Accepted

0800H-
14-Jan-19 AG&P Arvin Balitaan Mechanical On-schedule
1000H

1000H-
14-Jan-19 AG&P Arvin Balitaan Mechanical On-schedule Accepted
1100H

580 / 732
14-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

14-Jan-19 1000H AG&P Allan Magadia Structural On-schedule Accepted

14-Jan-19 1000H AG&P Allan Magadia Structural On-schedule Accepted

1300-
10-Jan-19 AG&P Arvin Balitaan Mechanical On-schedule Accepted
1500H

0800H
15-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Accepted
1000H

0800H
15-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Accepted
1800H

1400H
15-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Waiting for result
1700H

581 / 732
15-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

15-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

16-Jan-19 1300H AG&P Ramon Castillo Piping On-schedule Accepted

16-Jan-19 1300H AG&P Ramon Castillo Piping On-schedule Accepted

18-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

18-Jan-19 1000H AG&P Allan Magadia Structural On-schedule Accepted

18-Jan-19 1000H AG&P Allan Magadia Structural On-schedule Accepted

18-Jan-19 1000H AG&P Allan Magadia Structural Re-schedule Accepted

582 / 732
18-Jan-19 1000H AG&P Allan Magadia Structural On-schedule Accepted

18-Jan-19 1000H AG&P Allan Magadia Structural On-schedule Accepted

18-Jan-19 1300H AG&P Allan Magadia Structural On-schedule Accepted

18-Jan-19 0800H AG&P Allan Magadia Structural On-schedule Accepted

Arvin Balitaan/
18-Jan-19 0800H AG&P Piping On-schedule
Ramon Castillo

Arvin Balitaan/
18-Jan-19 0900H AG&P Piping On-schedule
Ramon Castillo

18-Jan-19 0800H AG&P Allan Magadia Structural Re-schedule Accepted

Arvin
JAN 22- Piping/Structu
0800H AG&P Balitaan/Ramon On-schedule Accepted
23,2019 ral
Castillo
1300H
19-Jan-19 to AG&P Mark Darrel Aranas Mechanical Re-schedule Accepted
1800H

583 / 732
1000H
19-Jan-19 to AG&P Arvin Balitaan Mechanical Re-schedule Accepted
1200H

21-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

21-Jan-19 0900H AG&P Allan Magadia Structural Re-schedule Accepted

21-Jan-19 0900H AG&P Allan Magadia Structural Re-schedule Accepted

21-Jan-19 0900H AG&P Allan Magadia Structural Re-schedule Accepted

0800H
21-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Accepted
1000H

584 / 732
1000H
21-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule
1200H

22-Jan-19 0800H AG&P Ermer Valdez Painting On-schedule Accepted

Arvin
22-Jan-19 0900H AG&P Balitaan/Ramon Piping On-schedule Accepted
Castillo

Arvin
22-Jan-19 0900H AG&P Balitaan/Ramon Piping On-schedule Accepted
Castillo

23-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

23-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

23-Jan-19 1000H AG&P Allan Magadia Structural On-schedule Accepted

585 / 732
23-Jan-19 1000H AG&P Allan Magadia Structural On-schedule Accepted

23-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

0900H
23-Jan-19 to AG&P Ramon Castillo Mechanical On-schedule Accepted
1100H

1300H
23-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Waiting for result
1700H

0900H
24-Jan-19 to AG&P Arvin Balitaan Mechanical Re-schedule Accepted
1100H

1300H
24-Jan-19 to AG&P Arvin Balitaan Mechanical Re-schedule Accepted
1500H

24-Jan-19 0900H AG&P Allan Magadia Structural Re-schedule Accepted

586 / 732
24-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Waiting for result

24-Jan-19 0800H AG&P Ermer Valdez Painting On-schedule Accepted

24-Jan-19 0900H AG&P Ramon Castillo Piping On-schedule Accepted

0900H
25-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Accepted
1000H

1300H
25-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Waiting for result
1700H

25-Jan-19 0900H AG&P Ramon Castillo Piping On-schedule Accepted

587 / 732
0900H
26-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Accepted
1200H

28-Jan-19 0930H AG&P Ermer Valdez Painting On-schedule Accepted

26-Jan-19 0900H AG&P Ramon Castillo Piping On-schedule Accepted

26-Jan-19 0900H AG&P Allan Magadia Structural Additional Waiting for result

28-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

588 / 732
28-Jan-19 0900H AG&P Allan Magadia Structural Re-schedule Accepted

28-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

28-Jan-19 0900H AG&P Allan Magadia Structural Re-schedule Accepted

29-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

0800H
29-Jan-19 to AG&P Arvin Balitaan Mechanical Re-schedule
1700H

0900H
29-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Accepted
1100H

589 / 732
30-Jan-19 0900H AG&P Ramon Castillo Piping On-schedule Accepted

30-Jan-19 0930H AG&P Ramon Castillo Piping On-schedule Accepted

0900H
30-Jan-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Accepted
1100H

1300H
30-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Waiting for result
1600H

1600H
30-Jan-19 to AG&P Arvin Balitaan Mechanical On-schedule Accepted
1800H

590 / 732
30-Jan-19 0930H AG&P Ramon Castillo Piping On-schedule Accepted

0900H
31-Jan-19 to AG&P Mark Darrel Aranas Mechanical On-schedule
1100H

1600H
31-Jan-19 to AG&P Mark Darrel Aranas Mechanical Re-schedule Accepted
1800H

31-Jan-19 0930H AG&P Arvin Balitaan Piping On-schedule Accepted

31-Jan-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

591 / 732
31-Jan-19 0930H AG&P Arvin Balitaan Piping On-schedule Accepted

0900H
01-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule
1100H

1600H
01-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Cancelled
1800H
PIPING/STR
Feb 01~7,2019 0800H AG&P Arvin Balitaan On-schedule Waiting for result
UCTURAL

592 / 732
01-Feb-19 0930H AG&P Arvin Balitaan Piping On-schedule Accepted

02-Feb-19 0930H AG&P Ramon Castillo Piping On-schedule Accepted

593 / 732
02-Feb-19 0900H AG&P Allan Magadia Structural Re-schedule Accepted

02-Feb-19 0900H AG&P Mark Darrel Aranas Mechanical Re-schedule Accepted

04-Feb-19 0900H AG&P Ramon Castillo Piping On-schedule Accepted

594 / 732
04-Feb-19 0800H AG&P Ramon Castillo Piping Additional Accepted

04-Feb-19 0930H AG&P Ramon Castillo Piping Additional Accepted

0900H
05-Feb-19 to AG&P Arvin Balitaan Mechanical On-schedule Waiting for result
1100H

0900H
06-Feb-19 to AG&P Mark Darrel Aranas Mechanical Re-schedule Cancelled
1100H

595 / 732
1300H
06-Feb-19 to AG&P Arvin Balitaan Mechanical On-schedule Accepted
1500H

1500H
06-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Accepted
1700H

05-Feb-19 0800H AG&P Ermer Valdez Painting On-schedule Accepted

05-Feb-19 0930H AG&P Ramon Castillo Piping On-schedule Accepted

06-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Waiting for result

06-Feb-19 0930H AG&P Ramon Castillo Piping On-schedule Accepted

1300H
06-Feb-19 to AG&P Arvin Balitaan Mechanical Additional Accepted
1500H

07-Feb-19 1330H AG&P Ermer Valdez Painting On-schedule Accepted

07-Feb-19 0900H AG&P Allan Magadia Structural Re-schedule Accepted

596 / 732
07-Feb-19 0900H AG&P Allan Magadia Structural Re-schedule Accepted

07-Feb-19 0900H AG&P Allan Magadia Structural Re-schedule Accepted

07-Feb-19 0900H AG&P Allan Magadia Structural Re-schedule Accepted

07-Feb-19 0900H AG&P Allan Magadia Structural Re-schedule Accepted

07-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Cancelled

07-Feb-19 0930H AG&P Ramon Castillo Piping On-schedule Accepted

07-Feb-19 0900H AG&P Ermer Valdez Painting On-schedule Accepted

597 / 732
0900H
08-Feb-19 to AG&P Mark Darrel Aranas Mechanical Re-schedule
1100H

08-Feb-19 0930H AG&P Ramon Castillo Piping On-schedule Accepted

08-Feb-19 1400H AG&P Ermer Valdez Painting On-schedule Accepted

09-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

09-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

09-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

09-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

0900H
09-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Accepted
1100H

598 / 732
1300H
09-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Waiting for result
1700H

09-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

09-Feb-19 0930H AG&P Ramon Castillo Piping On-schedule

Feb PIPING/STR
0800H AG&P Ramon Castillo On-schedule
11~12,2019 UCTURAL

09-Feb-19 0800-0900H AG&P Ermer Valdez Painting On-schedule

09-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

10-Feb-19 0930H AG&P Arvin Balitaan Piping Re-schedule Accepted

10-Feb-19 0800H AG&P Arvin Balitaan Piping Re-schedule Accepted

599 / 732
11-Feb-19 0830H AG&P Ermer Valdez Painting On-schedule Accepted

11-Feb-19 0930H AG&P Arvin Balitaan Piping On-schedule Accepted

12-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Waiting for result

1300H
12-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Waiting for result
1700H

1300H
12-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Waiting for result
1700H

12-Feb-19 0930H AG&P Arvin Balitaan Piping On-schedule Accepted

600 / 732
12-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

12-Feb-19 0800H AG&P Arvin Balitaan Piping On-schedule Accepted

0900H
13-Feb-19 to AG&P Mark Darrel Aranas Mechanical Re-schedule Accepted
1100H

13-Feb-19 0930H AG&P Arvin Balitaan Piping On-schedule Accepted

13-Feb-19 0830H AG&P Arvin Balitaan Piping On-schedule Accepted

14-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

601 / 732
14-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

14-Feb-19 0830H AG&P Arvin Balitaan Piping On-schedule Accepted

14-Feb-19 0830H AG&P Ermer Valdez Painting On-schedule Accepted

1500H
15-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Accepted
1700H

1000H
15-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Accepted
1100H

602 / 732
1300H
15-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Waiting for result
1600H

1300H
15-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Waiting for result
1600H

1500H
15-Feb-19 to AG&P Mark Darrel Aranas Mechanical On-schedule Accepted
1700H

603 / 732
15-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

15-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

15-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

604 / 732
15-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Waiting for result

15-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Accepted

15-Feb-19 0830H AG&P Arvin Balitaan Piping On-schedule Accepted

Feb
0800H AG&P Arvin Balitaan Piping On-schedule
15~16,2019

15-Feb-19 1400H AG&P Ermer Valdez Painting On-schedule Accepted

0900H
Feb. 16, 2019 to AG&P Mark Darrel Aranas Mechanical On-schedule Accepted
1100H

1000H
Feb. 18, 2019 to AG&P Mark Darrel Aranas Mechanical On-schedule
1700H

16-Feb-19 0830H AG&P Arvin Balitaan Piping On-schedule Accepted

605 / 732
0900H
18-Feb-19 to AG&P Mark Darrel Aranas PIPING On-schedule Accepted
1100H

17-Feb-19 0930H AG&P Arvin Balitaan PIPING On-schedule Accepted

18-Feb-19 0930H AG&P Arvin Balitaan PIPING Additional

19-Feb-19 0900H AG&P Allan Magadia Structural On-schedule Waiting for result

19-Feb-19 0900H AG&P Arvin Balitaan Piping On-schedule Accepted

19-Feb-19 0930H AG&P Arvin Balitaan Piping On-schedule Accepted

0830-
19-Feb-19 AG&P Ermer Valdez Painting On-schedule Accepted
1430H

0900H
19-Feb-19 to AG&P Mark Darrel Aranas Piping Additional Accepted
1100H

606 / 732
0900H
19-Feb-19 AG&P Allan Magadia Structural Additional Accepted

0900H
19-Feb-19 to AG&P Mark Darrel Aranas Mechanical Additional Accepted
1100H

20-Feb-19 0930H AG&P Arvin Balitaan Piping On-schedule

20-Feb-19 0800H AG&P Arvin Balitaan Piping On-schedule

20-Feb-19 0930H AG&P Arvin Balitaan Piping On-schedule

0900H
20-Feb-19 to AG&P Mark Darrel Aranas Piping On-schedule
1100H

0900H
20-Feb-19 to AG&P Mark Darrel Aranas Piping On-schedule
1100H

607 / 732
0900H
20-Feb-19 AG&P Ralph Rabuyo Structural Additional

20-Feb-19 0900H AG&P Ralph Rabuyo Structural Additional

20-Feb-19 0900H AG&P Ralph Rabuyo Structural Additional

20-Feb-19 0900H AG&P Ralph Rabuyo Structural Additional

21-Feb-19 0900H AG&P Ralph Rabuyo Structural On-schedule

21-Feb-19 0900H AG&P Ralph Rabuyo Structural On-schedule

608 / 732
21-Feb-19 0930H AG&P Arvin Balittan Piping On-schedule

609 / 732
610 / 732
Mark Darrel Aranas

611 / 732
329
19
7
0
Date Receive Return to
Remarks Date Closed Transmittal No.
Transmitted From Sub Sub

Conflict in format

Conflict in format

612 / 732
613 / 732
614 / 732
615 / 732
616 / 732
617 / 732
618 / 732
619 / 732
620 / 732
621 / 732
VPCI-PMC-Q-T-
09-Jan-19 10-Jan-19
0021
VPCI-PMC-Q-T-
09-Jan-19 10-Jan-19
0021

622 / 732
with comment

VPCI-PMC-Q-T-
17-Dec-18 17-Dec-18
0003

623 / 732
VPCI-PMC-Q-T-
17-Dec-18 17-Dec-18
0003
VPCI-PMC-Q-T-
17-Dec-18 17-Dec-18
0003

VPCI-PMC-Q-T-
17-Dec-18 17-Dec-18
0003

VPCI-PMC-Q-T-
09-Jan-19 10-Jan-19
0021
VPCI-PMC-Q-T-
09-Jan-19 10-Jan-19
0021

624 / 732
VPCI-PMC-Q-T-
09-Jan-19 10-Jan-19
0021

625 / 732
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017

VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017

VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017

626 / 732
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017

VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017

627 / 732
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017

VPCI-PMC-Q-T-
09-Jan-19 1/10/2019
0021

VPCI-PMC-Q-T-
09-Jan-19 1/10/2019
0021
VPCI-PMC-Q-T-
09-Jan-19 1/10/2019
0021

VPCI-PMC-Q-T-
09-Jan-19 1/10/2019
0021

628 / 732
VPCI-PMC-Q-T-
09-Jan-19 1/10/2019
0021

VPCI-PMC-Q-T-
09-Jan-19 1/10/2019
0021

4 welders failed

Correction on paint
system 1B & 2A

629 / 732
VPCI-PMC-Q-T-
17-Dec-18 17-Dec-18
0003

VPCI-PMC-Q-T-
17-Dec-18 17-Dec-18
0003

VPCI-PMC-Q-T-
28-Dec-18 28-Dec-18
0009
Additional
Jt.1,2,3,4,5,7,8
VPCI-PMC-Q-T-
28-Dec-18 28-Dec-18
0009

630 / 732
VPCI-PMC-Q-T-
28-Dec-18 28-Dec-18
0009

VPCI-PMC-Q-T-
28-Dec-18 28-Dec-18
0009

631 / 732
VPCI-PMC-Q-T-
04-Jan-18 08-Jan-18
0013

VPCI-PMC-Q-T-
28-Dec-18 28-Dec-18
0009

VPCI-PMC-Q-T-
28-Dec-18 28-Dec-18
0009

Visually Accepted
Waiting for RT Results

VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017

VPCI-PMC-Q-T-
04-Jan-18 08-Jan-18
0013

632 / 732
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017

VPCI-PMC-Q-T-
04-Jan-18 08-Jan-18
0013

633 / 732
VPCI-PMC-Q-T-
07-Jan-18 08-Jan-19
0017

634 / 732
Work in Progress

635 / 732
VPCI-PMC-Q-T-
07-Jan-19 08-Jan-19
0017

636 / 732
VPCI-PMC-Q-T-
Work in Progress 09-Jan-19 09-Jan-19
0021

VPCI-PMC-Q-T-
18-Feb-19 19-Feb-19
0052

not yet ready

On-going

637 / 732
VPCI-PMC-Q-T-
09-Jan-19 09-Jan-19
0021

MPI Results

VPCI-PMC-Q-T-
18-Feb-19
0052

VPCI-PMC-Q-T-
18-Feb-19
0052

638 / 732
VPCI-PMC-Q-T-
22-Jan-19 23-Jan-19
0031

VPCI-PMC-Q-T-
22-Jan-19 23-Jan-19
0031

VPCI-PMC-Q-T-
18-Feb-19 19-Feb-19
0052

VPCI-PMC-Q-T-
18-Feb-19 19-Feb-19
0052

639 / 732
for verification of VPCI-PMC-Q-T-
18-Feb-19 19-Feb-19
consumable 0052

for verification of
consumable

Work in Progress

VPCI-PMC-Q-T-
01-Feb-19 02-Feb-19
0040

Work on Progress
torque wrench not
available

VPCI-PMC-Q-T-
18-Feb-19
0052

640 / 732
VPCI-PMC-Q-T-
22-Jan-19 23-Jan-19
0031

VPCI-PMC-Q-T-
18-Feb-19
0052

VPCI-PMC-Q-T-
18-Feb-19 19-Feb-19
0052

Dwg # A1-JGS1EP-
SPP-DD-Z0651
VPCI-PMC-Q-T-
Dwg # A3-JGS1EP- 18-Feb-19
0052
HAN-DD-E0624EF-
cancelled

641 / 732
VPCI-PMC-Q-T-
22-Jan-19 23-Jan-19
0031

VPCI-PMC-Q-T-
22-Jan-19 23-Jan-19
0031

VPCI-PMC-Q-T-
22-Jan-19 23-Jan-19
0031

VPCI-PMC-Q-T-
30-Jan-19 31-Jan-19
0039

642 / 732
VPCI-PMC-Q-T-
21-Jan-19 22-Jan-19
0030

VPCI-PMC-Q-T-
21-Jan-19 22-Jan-19
0030

Work in Progress

VPCI-PMC-Q-T-
18-Feb-19
0052

643 / 732
VPCI-PMC-Q-T-
18-Feb-19
0052

644 / 732
VPCI-PMC-Q-T-
Work in Progress 18-Feb-19
0052

VPCI-PMC-Q-T-
24-Jan-19 0032

VPCI-PMC-Q-T-
24-Jan-19 25-Jan-19 0032

VPCI-PMC-Q-T-
30-Jan-19 31-Jan-19
0039

VPCI-PMC-Q-T-
24-Jan-19 25-Jan-19 0032

645 / 732
VPCI-PMC-Q-T-
24-Jan-19 25-Jan-19 0032

VPCI-PMC-Q-T-
with punch/Ramoan 18-Feb-19
0052

VPCI-PMC-Q-T-
Work in Progress 18-Feb-19 19-Feb-19
0052

VPCI-PMC-Q-T-
18-Feb-19 19-Feb-19
0052

VPCI-PMC-Q-T-
30-Jan-19 31-Jan-19
0039

646 / 732
VPCI-PMC-Q-T-
Work in Progress 18-Feb-19 19-Feb-19
0052

647 / 732
Work in Progress

28-Jan-19

VPCI-PMC-Q-T-
30-Jan-19 31-Jan-19
0039

648 / 732
VPCI-PMC-Q-T-
2-Feb-19 5-Feb-19
0041

VPCI-PMC-Q-T-
2-Feb-19 5-Feb-19
0041

VPCI-PMC-Q-T-
2-Feb-19 5-Feb-19
0041

VPCI-PMC-Q-T-
2-Feb-19 5-Feb-19
0041

Work in Progress

649 / 732
650 / 732
Work in Progress

VPCI-PMC-Q-T-
14-Feb-19 15-Feb-19
0048

651 / 732
Work in Progress

652 / 732
653 / 732
VPCI-PMC-Q-T-
14-Feb-19 15-Feb-19
0048

654 / 732
655 / 732
656 / 732
VPCI-PMC-Q-T-
14-Feb-19
0048

657 / 732
Work in Progress

VPCI-PMC-Q-T-
14-Feb-19 15-Feb-19
0048

VPCI-PMC-Q-T-
14-Feb-19 15-Feb-19
0048

658 / 732
VPCI-PMC-Q-T-
14-Feb-19 15-Feb-19
0048

Feb. 11, 2019

VPCI-PMC-Q-T-
14-Feb-19 15-Feb-19
0048

659 / 732
660 / 732
VPCI-PMC-Q-T-
14-Feb-19 15-Feb-19
0048

VPCI_PMC-T-Q-
18-Feb-19 0050

661 / 732
VPCI_PMC-T-Q-
19-Feb-19 0050

662 / 732
E0620B,-cancelled

663 / 732
664 / 732
Work in progress

Work in Progress

665 / 732
666 / 732
667 / 732
668 / 732
669 / 732
670 / 732
Inspection Notification Log Sheet Accepted 48
ELECTRICAL 33 On-schedule Waiting for result 0
2 Re-schedule Cancelled 0
13 Additional Reject 0
Inspection Inspection Party
Inspection
SN Log Date Notification Main Activity Detail Activities Area / Location Date
Time Subcontractor Inspector Discipline Status Result Remarks Date Closed
Number SC VPCI PMC

JGSS1EP-VPCI- Earthing Cable Depth, size & location check of earthing Charmaine
1 16-Aug-18 Area 600 N/A W SW 17-Aug-18 1000H N/A Electrical On-schedule Accepted VPCI-PL-0005 17-Aug-18
EE-0001 Installation cable trench. Perez

1. Depth, size & location check of earthing


JGSS1EP-VPCI- Earthing Cable Charmaine
2 18-Aug-18 cable trench. Area 900 N/A W SW 20-Aug-18 1400H N/A Electrical On-schedule Accepted VPCI-PL-0006. 20-Aug-18
EL-0002 Termination Perez
2. Bonding and Grounding Connection

1. Depth, size & location check of earthing


JGSS1EP-VPCI- Earthing Cable Charmaine
3 18-Aug-18 cable trench. Area 600 N/A W SW 20-Aug-18 1400H N/A Electrical On-schedule Accepted 23-Aug-18
EL-0003 Termination Perez
2. Bonding and Grounding Connection
1. Depth, size & location check of earthing
JGSS1EP-VPCI- Earthing Cable Area 600 / Charmaine
4 22-Aug-18 cable trench. N/A W SW 23-Aug-18 1400H N/A Electrical On-schedule Accepted 24-Aug-18
EL-0004 Termination STR-0601 Perez
2. Bonding and Grounding Connection

1. Installation of test well & earthing electrode


2. Depth,Size & Location Check
JGSS1EP-VPCI- Earthing Rod Charmaine
5 23-Aug-18 3. Bonding & grounding connection Area 900 N/A W SW 5-Sep-18 1100H N/A Electrical Re-schedule Accepted VPCI-PL-0007 05-Sep-18
EL-0005 Installation Perez
4. Measure earth resistance of earthing
electrode

1. Installation of Earthing Electrode


2. Depth,size and Location Check
JGSS1EP-VPCI- Earthing Rod Charmaine
6 28-Aug-18 3. Bonding and Grounding Connection Area 600 N/A W SW 5-Sep-18 1100H N/A Electrical Re-schedule Accepted VPCI-PL-0008 05-Sep-18
EL-0006 Installation Perez
4. Measure earth resistance of earthing
electrode
1. Depth, size & location check of earthing
JGSS1EP-VPCI- Earthing Cable Charmaine
7 28-Aug-18 cable trench. Area 300 N/A W SW 29-Aug-18 1400H SJ E&I, INC. Electrical On-schedule Accepted VPCI-PL-0009 04-Sep-18
EL-0007 Installation Perez
2. Bonding and Grounding Connection
Laying of grounding cables
1. Depth, size & location check of earthing
JGSS1EP-VPCI- Earthing Cable Charmaine going to foundation to be
8 28-Aug-18 cable trench. Area 900 N/A W SW 29-Aug-18 1400H SJ E&I, INC. Electrical On-schedule Accepted 03-Sep-18
EL-0008 Installation Perez completed after concrete
2. Bonding and Grounding Connection
pouring
1. Installation of Test Well & earthing
electrode
2. Depth, Size & Location Check
JGSS1EP-VPCI- Earthing Rod Charmaine
9 10-Sep-18 3. Bonding & Grounding Connection Area 600 N/A W SW 10-Sep-18 1000H SJ E&I, INC. Electrical Additional Accepted VPCI-PL-0012 10-Sep-18
EL-0009 Installation Perez
4. Grounding bus bar installation
5. Measure earth resistance of earthing
electrode
1. Installation of Test Well
JGSS1EP-VPCI- Earthing Rod 2. Depth, Size & Location Check Charmaine
10 10-Sep-18 Area 900 N/A W SW 10-Sep-18 1400H SJ E&I, INC. Electrical Additional Accepted VPCI-PL-0013 10-Sep-18
EL-0010 Installation 3. Bonding & Grounding Connection Perez
4. Grounding bus bar installation
1. Installation of Test Well & earthing
electrode
2. Depth, Size & Location Check Final Elevation of grounding pit
JGSS1EP-VPCI- Earthing Rod Area 900 / Charmaine
11 12-Sep-18 3. Bonding & Grounding Connection N/A W SW 12-Sep-18 1400H SJ E&I, INC. Electrical Additional Accepted to be confirmed after backfilling 12-Sep-18
EL-0011 Installation DPG-II Perez
4. Grounding bus bar installation by civil
5. Measure earth resistance of earthing
electrode
JGSS1EP-VPCI- Earthing Cable 1. Depth, Size & Location Check Area 900 / Charmaine To reflect change in location in
12 17-Sep-18 N/A W SW 18-Sep-18 0900H SJ E&I, INC. Electrical On-schedule Accepted 18-Sep-18
EL-0012 Installation 2. Bonding & Grounding Connection near D-0811 Perez as-built drawing
JGSS1EP-VPCI- Earthing Cable 1. Depth, Size & Location Check Charmaine To reflect location change in as
13 24-Sep-18 Area 600 N/A W SW 25-Sep-18 1000H SJ E&I, INC. Electrical On-schedule Accepted 25-Sep-18
EL-0013 Installation 2. Bonding & Grounding Connection Perez built drawing
1. Depth, Size & Location Check
JGSS1EP-VPCI- Earthing Bus Bar Inner 600 Charmaine To reflect location change in as
14 26-Sep-18 2. Bonding & Grounding Connection N/A W SW 26-Sep-18 1000H SJ E&I, INC. Electrical Additional Accepted 26-Sep-18
EL-0014 Installation near E-0607 Perez built drawing
3. Grounding bus bar installation
Area 0400
JGSS1EP-VPCI- Earthing Cable 1. Depth, Size & Location Check Charmaine
15 28-Sep-18 Chemical N/A W SW 28-Sep-18 0900H SJ E&I, INC. Electrical Additional Accepted 28-Sep-18
EL-0015 Installation 2. Bonding & Grounding Connection Perez
Injection
JGSS1EP-VPCI- Earthing Cable 1. Depth, Size & Location Check Area 0600 Charmaine
16 28-Sep-18 N/A W SW 28-Sep-18 1030H SJ E&I, INC. Electrical Additional Accepted 28-Sep-18
EL-0016 Installation 2. Bonding & Grounding Connection E-619 Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Charmaine
17 3-Oct-18 Area 600 (E-640) N/A W SW 3-Oct-18 1400H SJ E&I, INC. Electrical Additional Accepted 03-Oct-18
EL-0017 installation 2. Bonding & Grounding Connection Perez

671 / 732
Area 0400
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Charmaine Laying of cables not yet
18 5-Oct-18 E-0407C, E- N/A W SW 5-Oct-18 1300H SJ E&I, INC. Electrical Additional Accepted 05-Oct-18
EL-0018 installation 2. Bonding & Grounding Connection Perez completed
0401B
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check DGP II Charmaine
19 8-Oct-18 N/A W SW 8-Oct-18 1400H SJ E&I, INC. Electrical Additional Accepted 10-Oct-18
EL-0019 installation 2. Bonding & Grounding Connection Area 900 Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Z-0601 Charmaine
20 9-Oct-18 N/A W SW 10-Oct-18 1000H SJ E&I, INC. Electrical On-schedule Accepted 10-Oct-18
EL-0020 installation 2. Bonding & Grounding Connection Area 600 Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check STR-0905 Charmaine
21 11-Oct-18 N/A W SW 11-Oct-18 0900H SJ E&I, INC. Electrical Additional Accepted 12-Oct-18
EL-0021 installation 2. Bonding & Grounding Connection Area 900 Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Analyzer Shelter Charmaine
22 11-Oct-18 N/A W SW 11-Oct-18 1000H SJ E&I, INC. Electrical Additional Accepted 12-Oct-18
EL-0022 installation 2. Bonding & Grounding Connection #12 Area 0300 Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check DPG-II Charmaine
23 13-Oct-18 N/A W SW 15-Oct-18 1000H SJ E&I, INC. Electrical On-schedule Accepted 15-Oct-18
EL-0023 installation 2. Bonding & Grounding Connection Area 900 Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check DPG-II Charmaine
24 16-Oct-18 N/A W SW 17-Oct-18 0900H SJ E&I, INC. Electrical On-schedule Accepted 19-Oct-18
EL-0024 installation 2. Bonding & Grounding Connection Area 900 Perez
Area 0400
JGSS1EP-VPCI- Aboveground Earthing 1. Location Check Charmaine
25 16-Oct-18 Chemical N/A W SW 17-Oct-18 1030H SJ E&I, INC. Electrical On-schedule Accepted 17-Oct-18
EL-0025 cable installation 2. Bonding & Grounding Connection Perez
Injection
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0800 Charmaine
26 18-Oct-18 N/A W SW 19-Oct-18 0900H SJ E&I, INC. Electrical On-schedule Accepted 19-Oct-18
EL-0026 installation 2. Bonding & Grounding Connection G-0805 Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0900 Charmaine
27 20-Oct-18 N/A W SW 22-Oct-18 1500H SJ E&I, INC. Electrical On-schedule Accepted 2 Cables, no PVC Stub-up 22-Oct-18
EL-0027 installation 2. Bonding & Grounding Connection DPG-II Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0900 Charmaine
28 23-Oct-18 N/A W SW 24-Oct-18 1100H SJ E&I, INC. Electrical On-schedule Accepted 25-Oct-18
EL-0028 installation 2. Bonding & Grounding Connection DPG-II Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 500 Charmaine
29 23-Oct-18 N/A W SW 24-Oct-18 0900H SJ E&I, INC. Electrical On-schedule Accepted 24-Oct-18
EL-0029 installation 2. Bonding & Grounding Connection D-510C Perez
1 Bonding & grounding connection
JGSS1EP-VPCI- Final Ground Area 0900 Charmaine
30 24-Oct-18 2. Measure earth resistance of earthing N/A W SW 25-Oct-18 1000H SJ E&I, INC. Electrical On-schedule Accepted 26-Oct-18
EL-0030 Resistance Testing DPG-II Perez
electrode
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0600 Charmaine
31 29-Oct-18 N/A W SW 30-Oct-18 1000H SJ E&I, INC. Electrical On-schedule Accepted 30-Oct-18
EL-0031 installation 2. Bonding & Grounding Connection D-0693 Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0500 Charmaine Laying of cables not yet
32 30-Oct-18 N/A W SW 31-Oct-18 1000H SJ E&I, INC. Electrical On-schedule Accepted 31-Oct-18
EL-0032 installation 2. Bonding & Grounding Connection E-0405R Perez completed
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0400 Charmaine Laying of cables not yet
33 5-Nov-18 N/A W SW 6-Nov-18 0900H SJ E&I, INC. Electrical On-schedule Accepted 06-Nov-18
EL-0033 installation 2. Bonding & Grounding Connection Y-0402 A/B Perez completed
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0600 Charmaine
34 7-Nov-18 N/A W SW 8-Nov-18 0800H SJ E&I, INC. Electrical On-schedule Accepted 8-Nov-18
EL-0034 installation 2. Bonding & Grounding Connection E-0623B Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0300 Charmaine Laying of cables not yet
35 7-Nov-18 N/A W SW 8-Nov-18 1000H SJ E&I, INC. Electrical On-schedule Accepted 8-Nov-18
EL-0035 installation 2. Bonding & Grounding Connection G-0401D Perez completed
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0700 Charmaine
36 12-Nov-18 N/A W SW 13-Nov-18 0900H SJ E&I, INC. Electrical On-schedule Accepted 13-Nov-18
EL-0036 installation 2. Bonding & Grounding Connection R-0701C Perez
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Area 0700 Charmaine
37 15-Nov-18 N/A W SW 15-Nov-18 0900H SJ E&I, INC. Electrical Additional Accepted 15-Nov-18
EL-0037 installation 2. Bonding & Grounding Connection E-0703B Perez
Area 0600
JGSS1EP-VPCI- Earthing cable 1. Depth, Size & Location Check Charmaine
38 17-Nov-18 D-0651, D-0691, N/A W SW 19-Nov-18 0900H SJ E&I, INC. Electrical On-schedule Accepted 19-Nov-18
EL-0038 installation 2. Bonding & Grounding Connection Perez
D-0690
Welder's Qualification Test for Electrical
Supports:
REJECTED:
JOEY D. CUETO
JGSS1EP-VPCI- Charmaine JOEY D. CUETO
39 19-Nov-18 WQT ROMANO O. AYATON Ambulong Shop H W SW 20-Nov-18 10:00AM SJ E&I, INC. Electrical On-schedule Accepted 20-Nov-18
EL-0039 Perez EDWELL R. PENALOSA
EDWELL R. PENALOSA
LEXTER A. BUENO
CHRISTIAN ROY C. CUETO
LEXTER A. BUENO
UNIT 300
JGSS1EP-VPCI- Earthing Cable 1. Depth, Size & Location Check Charmaine
40 22-Nov-18 ANALYZER H W SW 23-Nov-18 09:00AM SJ E&I, INC. Electrical On-schedule Accepted 23-Nov-18
EL-0040 Installation 2. Bonding & Grounding Connection Perez
SHELTER #12
JGSS1EP-VPCI- Earthing Cable 1. Depth, Size & Location Check UNIT 700 Charmaine
41 22-Nov-18 H W SW 23-Nov-18 09:30AM SJ E&I, INC. Electrical On-schedule Accepted 23-Nov-18
EL-0041 Installation 2. Bonding & Grounding Connection R-0701C Perez
JGSS1EP-VPCI- Earthing Cable 1. Depth, Size & Location Check UNIT 500 Charmaine
42 22-Nov-18 H W SW 23-Nov-18 10:00AM SJ E&I, INC. Electrical On-schedule Accepted 23-Nov-18
EL-0042 Installation 2. Bonding & Grounding Connection E-0509B Perez
Welder's Qualification Test for Electrical
Supports:
JGSS1EP-VPCI- AMBULONG
43 23-Nov-18 WQT JOEY D. CUETO H W SW 23-Nov-18 1030H SJ E&I, INC. Bryan Aguila Electrical Additional Accepted 23-Nov-18
EL-0043 SHOP
EDWELL R. PENALOSA
LEXTER A. BUENO
JGSS1EP-VPCI- Earthing Cable 1. Depth, Size & Location Check UNIT 600 Charmaine
44 23-Nov-18 H W SW 24-Nov-18 10:00AM SJ E&I, INC. Electrical On-schedule Accepted 24-Nov-18
EL-0044 Installation 2. Bonding & Grounding Connection E-0623B Perez
1. Vendor Data check EPC1
JGSS1EP-VPCI- Material Receiving Nestor
45 23-Nov-18 2. Certificate Check FABRICATION H W SW 24-Nov-18 08:00AM SJ E&I, INC. Electrical On-schedule Accepted 24-Nov-18
MRI-EL-0003 Inspection Mendoza
3. Visual Check SHOP

JGSS1EP-VPCI- Underground Earthing 1. Depth, Size & Location Check UNIT 500 Charmaine
46 10-Dec-18 H W SW 11-Dec-18 09:00AM SJ E&I, INC. Electrical On-schedule Accepted 11-Dec-18
EL-0045 Cable Installation 2. Bonding & Grounding Connection E-0507AR/BR/CR Perez

672 / 732
JGSS1EP-VPCI- Underground Earthing 1. Depth, Size & Location Check UNIT 300 Charmaine
47 10-Dec-18 H W SW 11-Dec-18 10:00AM SJ E&I, INC. Electrical On-schedule Accepted 11-Dec-18
EL-0046 Cable Installation 2. Bonding & Grounding Connection Y-0401D Perez
Underground Earthing
JGSS1EP-VPCI- 1. Depth, Size & Location Check Area 300, 600 & Charmaine
48 7-Jan-19 Cable Installation for H W SW 8-Jan-19 10:00AM SJ E&I Electrical On-schedule Accepted
EL-0047 2. Bonding & Grounding Connection DPG-II Perez
Bus-Bar

673 / 732
Inspection Notification Log Sheet Accepted 36
ELECTRICAL 35 On-schedule Waiting for result 0
1 Re-schedule Cancelled 1
1 Additional Reject 0
Inspection Inspection Party
Inspection Receive Return to
SN Log Date Notification Main Activity Detail Activities Area / Location Time Subcontractor Inspector Discipline Status Result Remarks Date Closed Transmittal No.
SC VPCI PMC Date From Sub Sub
Number
1. Fabrication of ladder report
2.Visual Inspection for electrical support
1000 x 2970 x 500 mm (6 pcs)
JGSS1EP-SJEI- Fabrication of Ladder 1000 x 2000 x 500 mm (7 pcs) Nestor With punch (touch up-paint)
1 7-Dec-18 SJ E&I Fab H W SW 7-Dec-18 1400H SJ E&I Electrical Additional Accepted
EL-0001 support 500 x 1820 x 500 mm (16 pcs) Mendoza
1000 X 2450 X 1000 mm (1 pc)
500 x 2320 x 1000 mm (1 pc)

1. Fabrication of ladder support for


electrical tray.
JGSS1EP-SJEI- Fabrication of Ladder Nestor With punch (touch up-paint)
2 10-Dec-18 500 x 1820 x 500mm (19 pcs) SJ E&I Fab H W SW 11-Dec-18 1000H SJ E&I Electrical On-schedule Accepted
EL-0002 support Mendoza
2. Visual inspection for electrical ladder
support

Visual Inspection of welded and bolted


JGSS1EP-SJEI- Cable tray support electrical ladder support Nestor With punch (touch up
3 19-Dec-18 Area 900 H W SW 20-Dec-18 1000H SJ E&I Electrical On-schedule Accepted -paint,torque value of 74Nm)
EL-0003 installation 500mm x 1820mm x 500mm Mendoza

Visual Inspection for electical ladder


JGSS1EP-SJEI- Cable tray support support Nestor With punch (touch up
4 26-Dec-18 Area 900 to 700 H W SW 27-Dec-18 1000H SJ E&I Electrical On-schedule Accepted -paint,torque value of 74Nm)
EL-0004 installation 500mm x 1820mm x 500mm (23pcs) Mendoza

Visual Inspection for cable tray support


JGSS1EP-SJEI- Cable tray support Nestor With punch (final touch-up)
5 27-Dec-18 500mm x 1160mm x 500mm (20 pcs) Fabrication Shop H W SW 28-Dec-18 1000H SJ E&I Electrical On-schedule Accepted
EL-0005 fabrication Mendoza

JGSS1EP-SJEI- Cable tray support Visual Inspection for cable tray Nestor With punch (torque value of
6 27-Dec-18 Area 900 H W SW 28-Dec-18 1400H SJ E&I Electrical On-schedule Accepted 74Nm)
EL-0006 installation Mendoza

674 / 732
Inspection Notification Log Sheet (INSTRUM
Inspection Inspection Party
Sub-system
SN Log Date Notification System No. Inspection Activities Area / Location
No. SC VPCI PMC
Number

JGSS1EP-SJEI-IN- Visual Channel support prior to cable duct


1 28-Dec-18 X-1000-I-01 - Area 900 H W SW
0001 Inspection installation

Visual inspection of cable stopper


JGSS1EP-SJEI-IN- Visual
2 15-Jan-19 X-1000-I-01 X-1600-I-04 prior to cable duct installation Area 600 H W SW
0002 Inspection
(50mm x 50mm x 50mm)

Visual inspection of cable duct


JGSS1EP-SJEI-IN- Visual
3 21-Jan-19 X-1000-I-01 X-1900-I-07 installation 1000 mm x 300 mm x Area 900 H W SW
0003 Inspection
3000mm including support

Final inspection of the relocation of


Flow Transmitter FT-7016 at Area
700 including:
•Cable re-routing and cable testing
JGSS1EP-SJEI-IN- TAR-NCP-INST- Final
4 22-Jan-19 •Field instrument installation Area 700 H W SW
0004 MISC-005 Inspection
•Instrument piping and tubing
inspection
•Instrument piping and tubing test
and final inspection

Final inspection of FJB-03049 &


FJB-03050 at 300 area including:
JGSS1EP-SJEI-IN- Final
5 28-Jan-19 X-2000-I-01 X-2300-I-01 Instrument cable testing, Area 300 H W SW
0005 Inspection
Panel/Juntion Box installation and
Cable rerouting
Inspection Inspection Party
Sub-system
SN Log Date Notification System No. Inspection Activities Area / Location
No. SC VPCI PMC
Number

Site inspection of cable duct


JGSS1EP-SJEI-IN-
6 1-Feb-19 X-1000-I-01 X-1600-I-04 Site Inspection installation at Area 600 existing Area 600 H W SW
0006
main piperack

Inspection for Instrument Cable,


JGSS1EP-SJEI-IN- Continuity/Insulation Resistance
7 14-Feb-19 X-1000-I-01 Cable Testing Laydown H W SW
0007 Testing on cable drum at Laydown
Area

Inspection for Instrument Channel


JGSS1EP-SJEI-IN- Installation Frame Support Installation Prior to
8 16-Feb-19 X-2000-I-01 Area 600 H W SW
0008 Inspection Junction Box Installation at 0600
Area below Pipe Rack
Final inspection of the relocation of
Pressure Transmitter PC-6802 and
PC-6803 at Area 600 including:
Cable re-routing, field instrument
JGSS1EP-SJEI-IN- Final
9 20-Feb-19 installation Area 600 H W SW
0009 Inspection
Instrument piping and tubing
inspection
Instrument Piping and tubing test
and final inspection
Log Sheet (INSTRUMENT)
Inspection Related
Name of
Subcontractor Contruction Result
Date Time Inspector
Team

29 Dec. 2018 1000H SJ E&I R. Arago Instrument Accepted

16/01/2019
1000H SJ E&I R. Arago Instrument Accepted
resched

22-Jan-19 1000H SJ E&I R. Arago Instrument Accepted

23-Jan-19 0900H SJ E&I R. Arago Instrument Accepted

29-Jan-19 0900H SJ E&I R. Arago Instrument Accepted


Inspection Related
Name of
Subcontractor Contruction Result
Date Time Inspector
Team

4-Feb-19 0900H SJ E&I R. Arago Instrument Accepted

15-Feb-19 0900H SJ E&I R. Arago Instrument Accepted

18-Feb-19 1000H SJ E&I R. Arago Instrument Accepted

21-Feb-19 0900H SJ E&I R. Arago Instrument


Inspection Notification Log Sheet
SIGBC

Inspection Inspection Party


Inspection
SN Log Date Notification Inspection Detail Activities Area / Location Time
SC VPCI PMC Date
Number
(rebar, form, embedded, cleaning, etc) of lean
1 18-Apr-18 T-CCO-001 Pre-pouring VPCI Office H W R 19-Apr-18 0800H
concrete GL G1,H1,I1 = 3 nos.
(mixture, slump, temperature check, etc.) of lean
2 18-Apr-18 T-CCO-001 Concrete Pouring VPCI Office H W R 19-Apr-18 0800H
concrete GL G1,H1,I1 = 3 nos.
(rebar, form, embedded, cleaning, etc) of lean
3 19-Apr-18 T-CCO-002 Pre-pouring VPCI Office H W R 20-Apr-18 0800H
concrete GL A1 ~ F1 = 6 nos.
(mixture, slump, temperature check, etc.) of lean
4 19-Apr-18 T-CCO-002 Concrete Pouring VPCI Office H W R 20-Apr-18 0800H
concrete GL A1 ~ F1 = 6 nos.
(rebar, form, embedded, cleaning, etc) of lean
5 23-Apr-18 T-CCO-003 Pre-pouring VPCI Office H W R 24-Apr-18 0800H
concrete GL A-I Line 4 7 GL A & I Line 2 & 3
(mixture, slump, temperature check, etc.) of lean
6 23-Apr-18 T-CCO-003 Concrete Pouring VPCI Office H W R 24-Apr-18 0800H
concrete GL A-I Line 4 7 GL A & I Line 2 & 3

(rebar, form, embedded, cleaning, etc) of


7 23-Apr-18 T-CCO-004 Pre-pouring VPCI Office H W R 24-Apr-18 0800H
Footings GL A-H LINE 1 = 8 nos.

(mixture, slump, temperature check, etc.) of


8 23-Apr-18 T-CCO-004 Concrete Pouring VPCI Office H W R 24-Apr-18 0800H
Footings GL A-H LINE 1 = 8 nos.

(rebar, form, embedded, cleaning, etc) of Lean


9 23-Apr-18 T-CCO-005 Pre-pouring PMC Office H W R 24-Apr-18 0800H
concrete GL D3
(rebar, form, embedded, cleaning, etc) of
10 26-Apr-18 T-CCO-006 Pre-pouring Footings GL A1,B1,A2,A3 = 4 nos. PMC Office H W R 27-Apr-18 1000H

(mixture, slump, temperature check, etc.) of


11 26-Apr-18 T-CCO-006 Concrete Pouring Footings GL A1,B1,A2,A3 = 4 nos. PMC Office H W R 27-Apr-18 1100H

679 / 732
(rebar, form, embedded, cleaning, etc) of
12 26-Apr-18 T-CCO-007 Pre-pouring Footings GL I1,I2,I3,I4,H4,G4,E4,D4 = 8 nos. VPCI Office H W R 27-Apr-18 1000H

(mixture, slump, temperature check, etc.) of


13 26-Apr-18 T-CCO-007 Concrete Pouring VPCI Office H W R 27-Apr-18 1100H
Footings GL I1,I2,I3,I4,H4,G4,E4,D4 = 8 nos..

(rebar, form, embedded, cleaning, etc) of Lean


14 28-Apr-18 T-CCO-008 Pre-pouring PMC Office H W R 29-Apr-18 0800H
concrete GL C1,D1,E1,F1,F2,F3,E3 = 7nos.

(rebar, form, embedded, cleaning, etc) of


15 29-Apr-18 T-CCO-009 Pre-pouring PMC Office H W R 30-Apr-18 0800H
Footings GL A1,A2,A3,B1,C1,D3,D1 = 7nos.

(mixture, slump, temperature check, etc.) of


16 29-Apr-18 T-CCO-009 Concrete Pouring PMC Office H W R 30-Apr-18 1100H
Footings GL A1,A2,A3,B1,C1,D3,D1 = 7nos.

(rebar, form, embedded, cleaning, etc) of


17 29-Apr-18 T-CCO-009 Pre-pouring VPCI Office H W R 30-Apr-18 0800H
Footings GL A2,A3,A4,B4,C4 = 5 nos.

(mixture, slump, temperature check, etc.) of


18 29-Apr-18 T-CCO-009 Concrete Pouring VPCI Office H W R 30-Apr-18 1100H
Footings GL A2,A3,A4,B4,C4 = 5 nos.

(rebar, form, embedded, cleaning, etc) lean


19 2-May-18 T-CCO-010 Pre-pouring PMC Office H W R 2-May-18 0800H
concrete, GL F4.
(rebar, form, embedded, cleaning, etc) lean
20 2-May-18 T-CCO-010 Pre-pouring VPCI Office H W R 2-May-18 0800H
concrete, GL B3, C3.
(rebar, form, embedded, cleaning, etc) (Grid line
21 5-May-18 T-CCO-011 Pre-pouring A - I line 1 and Grid A and I line 2) VPCI Office H W R 5-May-18 1100H
Pedestals = 11 nos.

5-May-18 T-CCO-011 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) VPCI Office H W R 5-May-18 1300
22 Pedestals = 11 nos.
(rebar, form, embedded, cleaning, etc.) (Grid line
23 5-May-18 T-CCO-012 Pre-pouring A - I line 1 and Grid A and I line 2) VPCI Office H W R 5-May-18 1100H
Footing Tie Beam
(mixture, slump, temperature check, etc.) (Site)
24 5-May-18 T-CCO-012 Concrete Pouring VPCI Office H W R 5-May-18 1300
Footing Tie Beam
(rebar, form, embedded, cleaning, etc.) Footings
25 5-May-18 T-CCO-013 Pre-pouring VPCI Office H W R 5-May-18 1100H
(Grid Line F line 4) = 1 mo.

(mixture, slump, temperature check, etc.)


26 5-May-18 T-CCO-013 Concrete Pouring VPCI Office H W R 5-May-18 1300
Footings (Site)

680 / 732
(rebar, form, embedded, cleaning, etc.)
27 7-May-18 T-CCO-014 Pre-pouring FOUNDATION Grid line -Line (B-3, C-3, E-1,3, and PMC Office H W R 9-May-18 1100H
F-1,2,3) = 7 nos.

28 7-May-18 T-CCO-014 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) PMC Office H W R 9-May-18 1300

(rebar, form, embedded, cleaning, etc.)


29 7-May-18 T-CCO-015 Pre-pouring FOOTING the BEAM Grid line - Line (A AND I -3,4, VPCI Office H W R 9-May-18 1100H
A to I - 4)

30 7-May-18 T-CCO-015 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) VPCI Office H W R 9-May-18 1300

(rebar, form, embedded, cleaning, etc.)


31 7-May-18 T-CCO-016 Pre-pouring PEDESTAL Grid line - Line (A-3, 4, B-4, C-4, E-4, F- VPCI Office H W R 9-May-18 1100H
4, G-4, H-4, and I-3, 4) = 11 mos.

32 7-May-18 T-CCO-016 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) VPCI Office H W R 9-May-18 1300

(rebar, form, embedded, cleaning, etc.) (Grid line


33 10-May-18 T-CCO-017 Pre-pouring A to D - Line 1 to 3) VPCI Office H W R 10-May-18 1700H

34 10-May-18 T-CCO-017 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) VPCI Office H W R 10-May-18 1700H

(rebar, form, embedded, cleaning, etc.)


35 12-May-18 T-CCO-018 Pre-pouring SLAB on Grid - Remaining @ Grid Line A to D VPCI Office H W R 12-May-18 1000H
(East) and Grid Line 3 to 4 (North)

36 12-May-18 T-CCO-018 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) VPCI Office H W R 12-May-18 1100H

(rebar, form, embedded, cleaning, etc.)


37 15-May-18 T-CCO-019 Pre-pouring SLAB on Grid - Remaining @ Grid Line A to F VPCI Office H W R 16-May-18 1000H
(East) and Grid Line 2 to 4 (North)

38 15-May-18 T-CCO-019 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) VPCI Office H W R 16-May-18 1100H

(rebar, form, embedded, cleaning, etc.)


39 16-May-18 T-CCO-020 Pre-pouring SLAB on Grid - Remaining @ Grid Line G to I (East) VPCI Office H W R 17-May-18 1000H
and Grid Line 3 to 4 (North)

40 16-May-18 T-CCO-020 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) VPCI Office H W R 17-May-18 1100H

681 / 732
(rebar, form, embedded, cleaning, etc.)
41 15-May-18 T-CCO-021 Pre-pouring VPCI Office H W R 15-May-18 1000H
LEAN CONCRETE - SEPTIC TANK

42 15-May-18 T-CCO-021 Concrete Pouring (mixture, slump, temperature check, etc.) (Site) VPCI Office H W R 15-May-18 1100H

(rebar, form, embedded, cleaning, etc.)


43 20-May-18 T-CCO-022 Pre-pouring VPCI Office H W R 21-May-18 1000H
Slab-on grade GL D-H/1-4

(mixture, slump, temperature check, etc.) Slab-on


44 20-May-18 T-CCO-022 Concrete Pouring VPCI Office H W R 21-May-18 1100H
grade GL D-H/1-4

(rebar, form, embedded, cleaning, etc.)


45 29-May-18 T-CCO-023 Pre-pouring VPCI office H W R 30-May-18 1000H
Septic Tank foundation base
(mixture, slump, temperature check, etc.)Septic
46 29-May-18 T-CCO-023 Concrete Pouring VPCI office H W R 30-May-18 1100H
Tank foundation base
(rebar, form, embedded, cleaning, etc.)
47 29-May-18 T-CCO-024 Pre-pouring LEAN CONCRETE - SEPTIC TANK PMC Office H W R 30-May-18 1000H

(mixture, slump, temperature check, etc.) LEAN


48 29-May-18 T-CCO-024 Concrete Pouring PMC Office H W R 30-May-18 1100H
CONCRETE - SEPTIC TANK
(rebar, form, embedded, cleaning, etc.)
49 1-Jun-18 T-CCO-025 Pre-pouring VPCI office H W R 2-Jun-18 1000H
Slab-on grade GL G-I/1-3
(mixture, slump, temperature check, etc.) Slab-on
50 1-Jun-18 T-CCO-025 Concrete Pouring VPCI office H W R 2-Jun-18 1100H
grade GL G-I/1-3
(rebar, form, embedded, cleaning, etc.)
51 1-Jun-18 T-CCO-026 Pre-pouring PMC Office H W R 2-Jun-18 1000H
Footing tie beams, GL A-F/1-3
(mixture, slump, temperature check, etc.) Footing
52 1-Jun-18 T-CCO-026 Concrete Pouring PMC Office H W R 2-Jun-18 1100H
tie beams, GL A-F/1-3
(rebar, form, embedded, cleaning, etc.)
53 1-Jun-18 T-CCO-027 Pre-pouring Pedestals, GL A-F/1-3 PMC Office H W R 2-Jun-18 1000H

(mixture, slump, temperature check, etc.)


54 1-Jun-18 T-CCO-027 Concrete Pouring PMC Office H W R 2-Jun-18 1100H
Pedestals, GL A-F/1-3
(rebar, form, embedded, cleaning, etc.)
55 29-May-18 T-CCO-028 Pre-pouring VPCI office H W R 31-May-18 0800H
Foundation, Septic Tank
(mixture, slump, temperature check, etc.)
56 29-May-18 T-CCO-028 Concrete Pouring VPCI office H W R 31-May-18 0800H
Foundation, Septic Tank
Plumbness and levelness inspection for column
57 4-Jun-18 T-SER-001 Structural Erection VPCI office H W R 4-Jun-18 0800H
of VPCI office
Bolt tightening inspection of trusses of VPCI
58 19-Jul-18 T-SBO-001 Structural Bolting VPCI office H W R 19-Jul-18 0800H
office

682 / 732
Bolt tightening inspection for COLUMNS of VPCI
59 19-Jul-18 T-SBO-002 Structural Bolting VPCI office H W R 19-Jul-18 0800H
office

683 / 732
Accepted

59 On-schedule Waiting for result

0 Re-schedule Cancelled

0 Additional Reject

Subcontractor Inspector Discipline Status Result

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

684 / 732
VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

685 / 732
VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

686 / 732
VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Allan Magadia Civil On-schedule Accepted

VPCI Arvin Baitaan Civil On-schedule Accepted

VPCI Arvin Baitaan Civil On-schedule Accepted

687 / 732
VPCI Arvin Baitaan Civil On-schedule Accepted

688 / 732
Inspection Notification Log Sheet
MRI

Inspection Inspection Party


Inspection
SN Log Date Notification Inspection Detail Activities Area / Location
SC VPCI PMC Date
Number
JGS/KR/003 - UG materials (Pipe & Wrapping AG&P Yard 1, San
JGSS1EP-VPCI-MRI-PI- Material Inspection
1 2-Jul-18 Tape) Roque Bauan I W SW 3-Jul-18
0001 U/G Piping Materials JGS/KR/004 - UG Materials (Pipe & Fitting) Batangas
JGS/KR/003 - UG materials (Pipe & Wrapping AG&P Yard 1, San
JGSS1EP-VPCI-MRI-PI- Material Inspection
2 11-Aug-18 Tape) Roque Bauan I W SW 7-Aug-18
0002 U/G Piping Materials JGS/KR/004 - UG Materials (Pipe & Fitting) Batangas
JGSS1EP-VPCI-MRI-PI- Material Inspection of
3 29-Aug-18 JGS/KR/016 Flange EPC 1 Laydown I W SW 30-Aug-18
0003 UG material
JGSS1EP-VPCI-MRI-PI- Material Inspection of JGS/KR/014 Pipe & fitting material for relocation
4 31-Aug-18 Tempacil Area I W SW 1-Sep-18
0004 UG material work.
JGSS1EP-VPCI-MRI-PI- Material Inspection of
5 6-Sep-18 JGS/KR/017 UG Piping Urgent Fitting Tempacil Area I W SW 6-Sep-18
0005 UG material
JGSS1EP-VPCI-MRI- JGS/KR/002 Earthing & Lightning materials.
6 11-Aug-18 EE-0001 Material Inspection JGS/KR/006 Exothermic Weld Powder. VPCI Laydown Area H W SW 7-Aug-18

JGSSIEP-VPCI-MRI- Material Inspection


7 16-Jun-18 CBI-002, CBI-004, CBI-005, CBI-008 NCP laydown NA I SW 16-Jun-18
ME-0001 Heater Module
JGSSIEP-VPCI-MRI- Material Inspection
8 16-Jun-18 CBI-001, CBI-003, CBI-010 NCP laydown NA I SW 16-Jun-18
ME-0002 Heater Module
JGSSIEP-VPCI-MRI- Material Inspection
9 18-Jun-18 CBI-006, CBI-011, CBI-012, CBI-013 EPC1 Laydown NA I SW 18-Jun-18
ME-0003 Heater Module
JGSSIEP-VPCI-MRI- Material Inspection
10 19-Jun-18 CBI-015, CBI-016, CBI-017, CBI-019, CBI-020 EPC1 Laydown NA I SW 19-Jun-18
ME-0004 Heater Module

JGSSIEP-VPCI-MRI- Material Inspection


11 25-Jun-18 CBI-007, CBI-009, CBI-014, CBI-018, CBI-021 EPC1 Laydown NA I SW 25-Jun-18
ME-0005 Heater Module

JGSS1EP-VPCI-MRI- Material Inspection


12 26-Jul-18 CBI LHT Ship No. 2 - Gratings EPC1 Laydown NA I SW 26-Jul-18
ME-0006 Heater Module

689 / 732
JGSS1EP-VPCI-MRI- Material Inspection
13 01-Aug-18 CBI LHT Ship No. 2 - Parts and accessories EPC1 Laydown NA I SW 01-Aug-18
ME-0007 Heater Module
JGSS1EP-VPCI-MRI- Material Inspection CBI LHT Ship No. 2 - Convection Module and
14 EPC1 Laydown NA I SW 02-Aug-18
ME-0008 Heater Module Spreader Beam
JGSS1EP-VPCI-MRI- Material Inspection CBI LHT Ship No. 2 - Convection Module and
15 01-Aug-18 EPC1 Laydown NA I SW 01-Aug-18
ME-0009 Heater Module Structure and Loose item

JGSS1EP-VPCI-MRI- Material Inspection CBI LHT Ship No. 2 - Convection Module and
16 02-Aug-18 EPC1 Laydown NA I SW 02-Aug-18
ME-0010 Heater Module Structure and Loose item

JGSS1EP-VPCI-MRI- Material Inspection CBI LHT Ship No. 2 - Support frame and structure
17 15-Aug-18 EPC1 Laydown NA I SW 15-Aug-18
ME-0011 Heater Module and loose item
JGSS1EP-VPCI-MRI- Material Inspection Schmidtsche Schack - Mechanical Spool and
18 11-Sep-18 EPC1 Laydown NA I SW 11-Sep-18
ME-0012 Heater Module spare
JGSS1EP-VPCI-MRI- Material Inspection Schmidtsche Schack - Steam Drum
19 1-Sep-18 EPC1 Laydown NA I SW 3-Sep-18
ME-0013 Steam Drum Lummus technology - TLE
JGSS1EP-VPCI-MRI-CI- Material Inspection
20 28-May-18 Anchor Bolts & Templates EPC1 Area I W SW 28-May-18
0001
JGSS1EP-VPCI-MRI-CI- Material Inspection
21 12-Jul-18 Anchor Bolts & Templates EPC1 Area I W SW 13-Jul-18
0002
JGSS1EP-VPCI-MRI-CI-
22 10-Jul-18 0003 Material Inspection Anchor sleeves EPC1 Area I W SW 10-Jul-18

JGSS1EP-VPCI-MRI-CI- Material Inspection


23 22-Jul-18 JGS CN 007/008 Anchor Bolt & Template EPC1 Area I W SW 22-Jul-18
0004
JGSS1EP-VPCI-MRI-CI- Material Inspection
24 04-Aug-18 JGS-SPP-JP-001 Anchor bolt and Template EPC1 Area I W SW
0005
JGSS1EP-VPCI-MRI-CI- Material Inspection JGS/KSB/CN/001, JGS/KSB/CN/002 Anchor Bolt,
25 17-Aug-18 EPC1 Area I W SW 17-Aug-18
0006 sleeve and template
JGSS1EP-VPCI-MRI-CI- Material Inspection
26 17-Aug-18 JGS/KR/015 anchor bolt M30x610 and filter EPC1 Area I W SW 17-Aug-18
0007
JGSS1EP-VPCI-MRI-CI- Material Inspection
27 23-Aug-18 Filter for 18062 Anchor bolt Tempacil Area I W SW 24-Aug-18
0008
JGSS1EP-VPCI-MRI-CI- JGS/SPP/JP/002 Anchor Bolt Set (M30); Hex Nut
28 17-Sep-18 0009 Material Inspection (M30); Plain Washer (M30) Tempacil Area I W SW 17-Sep-18

JGSS1EP-VPCI-MRI-PI- Material Inspection


29 19-Sep-18 JGS/KR/019 Anti Corrosion Tape VPCI Office I W SW 19-Sep-18
0006
JGSS1EP-VPCI-MRI-PI- Material Inspection
30 19-Sep-18 JGS/KR/026 UG flange & coupling VPCI Office I W SW 19-Sep-18
0007

690 / 732
JGSS1EP-VPCI-MRI-CI- Material Inspection JGS/KR/018 - Gusset plate for steel structure
31 25-Sep-18 Tempacil Area I W SW 26-Sep-18
0010 fabricated steel
JGSS1EP-VPCI-MRI-PI- Material Inspection
32 27-Sep-18 Polyken Liquid Adhesive Systems #1027 VPCI Office I W SW 26-Sep-18
0009
JGSS1EP-VPCI-MRI-PI- Material Inspection
33 04-Oct-18 AG-1st Piping materials EPC 1 Laydown I W SW 04-Oct-18
0010
JGSS1EP-VPCI-MRI-PI- Material Inspection
34 04-Oct-18 UG Piping materials- Addition 1 EPC 1 Laydown I W SW 04-Oct-18
0011
JGSS1EP-VPCI-MRI-PI- Material Inspection
35 04-Oct-18 UG Piping materials EPC 1 Laydown I W SW 04-Oct-18
0012
JGSS1EP-VPCI-MRI-
36 11-Oct-18 Material Inspection TCCC-001 Pyro-Bloc CFC Warehouse I W SW 19-Oct-18
ME-0014
JGSS1EP-VPCI-MRI-
37 11-Oct-18 ME-0015 Material Inspection TCCC-002 HT Mastic CFC Warehouse I W SW 19-Oct-18

JGSS1EP-VPCI-MRI- Material Inspection TCCC-003 Cracking Heater System (parts &


38 11-Oct-18 CFC Warehouse I W SW 19-Oct-18
ME-0016 accessories)
JGSS1EP-VPCI-MRI- Material Inspection
39 11-Oct-18 TCCC-004 BK1100 CFC Warehouse I W SW 19-Oct-18
ME-0017
JGSS1EP-VPCI-MRI- Material Inspection
40 11-Oct-18 TCCC-005 Bricks CFC Warehouse I W SW 19-Oct-18
ME-0018
JGSS1EP-VPCI-MRI- Material Inspection
41 11-Oct-18 TCCC-006 Cast Guide CFC Warehouse I W SW 19-Oct-18
ME-0019
JGSS1EP-VPCI-MRI- Material Inspection
42 11-Oct-18 TCCC-007 Observation Doors CFC Warehouse I W SW 19-Oct-18
ME-0020
JGSS1EP-VPCI-MRI-
43 11-Oct-18 ME-0021 Material Inspection TCCC-008 Burners CFC Warehouse I W SW 19-Oct-18

44 11-Oct-18 JGSS1EP-VPCI-MRI- Material Inspection TCCC-009 Accessories for TLE CFC Warehouse I W SW 19-Oct-18
ME-0022
JGSS1EP-VPCI-MRI- Material Inspection
45 11-Oct-18 TCCC-010 Spring Hanger CFC Warehouse I W SW 19-Oct-18
ME-0023

JGSS1EP-VPCI-MRI-
46 11-Oct-18 ME-0024 Material Inspection TCCC-014 Transfer Line Valve & Decove CFC Warehouse I W SW 19-Oct-18

691 / 732
JGSS1EP-VPCI-MRI- Material Inspection
47 25-Oct-18 JGS-KR-027 Tailing Tower Vacuum System CFC Warehouse I W SW 26-Oct-18
ME-0025

JGSS1EP-VPCI-MRI-PI- Material Inspection


50 25-Oct-18 JGS-CN-013 AG-1st Piping Material EPC 1 Laydown I W SW 26-Oct-18
0014
JGSS1EP-VPCI-MRI-
51 29-Oct-18 SS-0001 Material Inspection JGS-KR-036 Fabricated Steel EPC 1 Laydown I W SW 29-Oct-18

JGSS1EP-VPCI-MRI-PI- Material Inspection


52 30-Oct-18 JGS-CN-012 AG Piping Material EPC 1 Laydown I W SW 31-Oct-18
0015
JGSS1EP-VPCI-MRI-PI- Material Inspection
53 30-Oct-18 JGS-KR-021AG Piping Material EPC 1 Laydown I W SW 1-Nov-18
0017
JGSS1EP-VPCI-MRI-PI- Material Inspection
54 30-Oct-18 JGS-KR-032 AG Piping Material EPC 1 Laydown I W SW 30-Oct-18
0018
JGSS1EP-VPCI-MRI-PI- Material Inspection
55 30-Oct-18 JGS-CN-012 AG Piping Material EPC 1 Laydown I W SW 31-Oct-18
0019
JGSS1EP-VPCI-MRI- Material Inspection
56 30-Oct-18 TCCC-0016 Induced Fan EPC 1 Laydown I W SW 30-Oct-18
ME-0027
JGSS1EP-VPCI-MRI-
57 30-Oct-18 ME-0028 Material Inspection TCCC-012 Radiant Coil EPC 1 Laydown I W SW 30-Oct-18

JGSS1EP-VPCI-MRI- Material Inspection


58 5-Nov-18 JGS-KR-035 AG Gusset Plate (Steel Plate- Painted) VPCI Tempacil I W SW 05-Nov-18
ME-0029
JGSS1EP-VPCI-MRI- Material Inspection
59 6-Nov-18 JGS-KR-031AG Piping Material EPC 1 Laydown I W SW 06-Nov-18
SS-0002
JGSS1EP-VPCI-MRI-PI- Material Inspection
60 9-Nov-18 E-Coupler (Local Purchase) EPC 1 Laydown I W SW 09-Nov-18
0020
JGSS1EP-VPCI-MRI-PI- Material Inspection
61 13-Nov-18 JGS-CN-030 Wrapping Tape Black/White Warehouse I W SW 14-Nov-18
0021

JGSS1EP-VPCI-MRI-PI- Material Inspection


62 JGS-KR-047 Flange EPC 1 Laydown I W SW
0022
JGSS1EP-VPCI-MRI-PI- Material Inspection
63 21-Nov-18 JGS-Th-081 Flange, Fitting, Bolt & Nut EPC 1 Laydown I W SW 14-Nov-18
0023
JGSS1EP-VPCI-MRI-PI- Material Inspection
64 24-Nov-18 JGS-US-070 Post Indicating valve EPC 1 Laydown I W SW 12-Dec-18
0024

692 / 732
JGSS1EP-VPCI-MRI-PI- Material Inspection
65 25-Nov-18 JGS-KR-085 Flange/45 Elbow/Lateral EPC 1 Laydown I W SW 29-Nov-18
0025
JGSS1EP-VPCI-MRI-PI- Material Inspection
66 26-Nov-18 JGS-KR-063 EPC 1 Laydown I W SW 26-Nov-18
0026
JGSS1EP-VPCI-MRI- Material Inspection
67 28-Nov-18 JGS-KR-046 EPC 1 Laydown I W SW 4-Dec-18
SS-0003
JGSS1EP-VPCI-MRI-PI- Material Inspection
68 29-Nov-18 Local-BC Petro Tape/Paste EPC 1 Warehouse I W SW 29-Nov-18
0026
JGSS1EP-VPCI-MRI-PI- Material Inspection
69 29-Nov-18 Local-BC Petro Tape/Paste EPC 1 Warehouse I W SW 29-Nov-18
0027
JGSS1EP-VPCI-MRI-PI-
70 30-Nov-18 Material Inspection JGS-KR-064 UG Piping Materials Add4 EPC 1 Warehouse I W SW 30-Nov-18
0028
JGSS1EP-VPCI-MRI-
71 1-Dec-18 SS-0004 Material Inspection JGS-KR-052 Structural Steel LOT 2 ADD EPC 1 Laydown I W SW 5-Dec-18

JGSS1EP-VPCI-MRI- Material Inspection


72 1-Dec-18 JGS-KR-066 Structural Steel LOT 1 EPC 1 Laydown I W SW 5-Dec-18
SS-0005

JGSS1EP-VPCI-MRI-PI- Material Inspection


73 1-Dec-18 JGS-KR-078 Polyken939-750R EPC 1 Warehouse I W SW 3-Dec-18
0030
JGSS1EP-VPCI-MRI- Material Inspection
74 4-Dec-18 JGS-US-070 Post Indicating Valve EPC 1 Warehouse I W SW
ME-0030
JGSS1EP-VPCI-MRI- Material Inspection
75 4-Dec-18 JGS-KR-051 Desuperheater, Gasket I W SW
ME-0031
JGSS1EP-VPCI-MRI- Material Inspection
76 5-Dec-18 JGS-KR-043 S&T HEX Lot 1 Han (KR) I W SW
ME-0032
JGSS1EP-VPCI-MRI-PI-
77 11-Dec-18 Material Inspection JGS-KR-065 CS SMLS Pipe EPC 1 Laydown 2 I W SW 11-Dec-18
0031
JGSS1EP-VPCI-MRI-PI- Material Inspection
78 18-Dec-18 JGS-CN-034 CS Pipe EPC 1 Laydown 1 I W SW 18-Dec-18
0029
JGSS1EP-VPCI-MRI-PI- Material Inspection
79 18-Dec-18 JGS-KR-053 AG-1st Piping Materials EPC 1 Laydown 2 I W SW 18-Dec-18
0033
JGSS1EP-VPCI-MRI-PI- Material Inspection
80 18-Dec-18 JGS-KR-044 CS Welded Pipe EPC 1 Laydown 2 I W SW 18-Dec-18
0034

JGSS1EP-VPCI-MRI- Material Inspection


81 19-Dec-18 JGS-KR-048 S&T Hex Lot 1 Han FR (KR) I W SW
ME-0033

693 / 732
JGSS1EP-VPCI-MRI- Material Inspection
82 19-Dec-18 JGS-CN-050 Drum LOT 1 (CNTR) I W SW
ME-0034

JGSS1EP-VPCI-MRI-
83 19-Dec-18 Material Inspection JGS-CN-055 Drum LOT 2 (BULK) I W SW
ME-0035

JGSS1EP-VPCI-MRI- Material Inspection


84 19-Dec-18 JGS-CN-057 DBP Centri. Pump LOT 1(CN) EPC Laydown I W SW 1-Feb-19
ME-0036

JGSS1EP-VPCI-MRI- Material Inspection


85 19-Dec-18 JGS-CN-062 Tower (FRHE)BULK (CN) I W SW
ME-0037

JGSS1EP-VPCI-MRI-PI- Material Inspection


86 20-Dec-18 JGS-CN-049 AG-1st PIPING Materials EPC 1 Laydown 1 I W SW 19-Dec-18
0032
JGSS1EP-VPCI-MRI- Material Inspection
87 21-Dec-18 JGS-KR-072 structural Steel Lot 3 Add EPC 1 Laydown 2 I W SW 11-Jan-19
SS-0006
JGSS1EP-VPCI-MRI- Material Inspection
88 28-Dec-18 JGS-KR-091 Structural Steel LOT 1 EPC 1 Laydown 2 I W SW 11-Jan-19
SS-0007

JGSS1EP-VPCI-MRI- Material Inspection


89 2-Jan-19 JGS-KR-069 S&T HEX Lot 1 Han Bulk (KR) I W SW
ME-0038

JGSS1EP-VPCI-MRI- Material Inspection


90 2-Jan-19 JGS-KSB-CN-002 R-0701C MAPD Converter I W SW
ME-0039

JGSS1EP-VPCI-MRI- Material Inspection


91 2-Jan-19 JGS-KSB-CN-003 Plaform & Ladder of R-0701 C I W SW
ME-0040

JGSS1EP-VPCI-MRI-
92 2-Jan-19 ME-0041 Material Inspection JGS-CN-055 Drum LOT 2 (BULK) I W SW

JGSS1EP-VPCI-MRI- Material Inspection


93 2-Jan-19 JGS-CN-062 Tower (FRHE)BULK (CN) I W SW
ME-0042

JGSS1EP-VPCI-MRI-PI-
94 7-Jan-19 0038 Material Inspection JGS-CN-045 CS/SS Fitting EPC1 Laydown I W SW 14-Jan-19

JGSS1EP-VPCI-MRI-PI- Material Inspection


95 7-Jan-19 JGS-KR-056 Pipes EPC1 Laydown I W SW 15-Jan-19
0039

694 / 732
JGSS1EP-VPCI-MRI-PI- Material Inspection
96 7-Jan-19 JGS-CN-058 Carbon Steel Seamless Pipe EPC1 Laydown I W SW 7-Jan-19
0042
JGSS1EP-VPCI-MRI-PI- Material Inspection
97 7-Jan-19 JGS-KR-100 Gasket I W SW
0044
JGSS1EP-VPCI-MRI- Material Inspection
98 8-Jan-19 JGS-KR-087 structural steel Lot 4 I W SW
SS-0008
JGSS1EP-VPCI-MRI- Material Inspection
99 8-Jan-19 JGS-KR-102 structural Steel LOT 5 I W SW
SS-0009
JGSS1EP-VPCI-MRI- Material Inspection
100 8-Jan-19 JGS-KR-083 API Pump (II) Motor (KR) I W SW
ME-0043
JGSS1EP-VPCI-MRI-PI-
101 11-Jan-19 Material Inspection JGS-KR-084 Butterfly Valve, Forged Valve EPC1 Laydown I W SW 15-Jan-19
0040
JGSS1EP-VPCI-MRI-PI-
102 11-Jan-19 0041 Material Inspection JGS-UA-022 CS/SS Pipe EPC1 Laydown I W SW 12-Jan-19

JGSS1EP-VPCI-MRI-PI- Material Inspection


103 11-Jan-19 JGS-CN-041 CS Pipe (SMLS) EPC1 Laydown I W SW 12-Jan-19
0043
JGSS1EP-VPCI-MRI-PI- Material Inspection
104 15-Jan-19 JGS-UG-096 CS Pipe EPC1 Laydown 2 I W SW 17-Jan-19
0046
JGSS1EP-VPCI-MRI- Material Inspection
105 17-Jan-19 JGS-IN-059 HEX E-0704 AR BR CNTR I W SW
ME-0044
JGSS1EP-VPCI-MRI-PI- Material Inspection
106 18-Jan-19 JGS-KR-077 Globe, Gate, Check EPC1 Warehouse I W SW 19-Jan-19
0037
JGSS1EP-VPCI-MRI- Material Inspection
107 18-Jan-19 JGS-CN-061 Drum Lot 3 (BULK) I W SW
ME-0045
JGSS1EP-VPCI-MRI-
108 18-Jan-19 ME-0046 Material Inspection JGS-KR-080 S&T HEX LOT 4 HAN BULK (KR) I W SW

JGSS1EP-VPCI-MRI- Material Inspection


109 18-Jan-19 JGS-KR-079 S&T HEX LOT 3 HAN BULK (KR) I W SW
ME-0047
JGSS1EP-VPCI-MRI-PI- Material Inspection
110 19-Jan-19 JGS-UA-075 CS Alloy Pipe EPC1 Laydown I W SW 14-Jan-19
0048
JGSS1EP-VPCI-MRI- Material Inspection
111 22-Jan-19 JGS-KR-099 Chemical Injection I W SW
ME-0048
JGSS1EP-VPCI-MRI- Material Inspection
112 23-Jan-19 JGS-MA-073 overhead crane I W SW
ME-0049
JGSS1EP-VPCI-MRI-PI- Material Inspection
113 24-Jan-19 JGS-KR-103 CS Welded Pipe EPC1 Laydown I W SW
0049

695 / 732
JGSS1EP-VPCI-MRI- Material Inspection
114 25-Jan-19 Local Purchase-PAINTS and Tinner Material AC Room I W SW 12-Feb-19
SS-0012
JGSS1EP-VPCI-MRI- Material Inspection
115 26-Jan-19 JGS-KR-151 Steel Plate (painted) I W SW
SS-0013
JGSS1EP-VPCI-MRI- Material Inspection
116 28-Jan-19 FSK-1812-22-1 Steel Structure Materials I W SW
SS-0011
JOTOMASTIC 90 RAL 7045 TELEGREY
JGSS1EP-VPCI-MRI- Material Inspection
117 29-Jan-19 JOTOMASTIC 90, STD COMP B I W SW 12-Feb-19
ME-0052 JOTUN THINNER NO. 17

HARDTOP XP N5.5
HARDTOP XP N5.5
JGSS1EP-VPCI-MRI- Material Inspection HARDTOP XP, COMP B
118 29-Jan-19 Material AC Room I W SW 12-Feb-19
ME-0053 JOTUN THINNER NO.10
HARDTOP XP, COMP B
HARDTOP XP 2.5Y8/12

JGSS1EP-VPCI-MRI- Material Inspection SOLVALITT ALUMINUM


119 29-Jan-19 Material AC Room I W SW 12-Feb-19
ME-0054 JOTUN THINNER NO.7

HARDTOP XP, COMP B


HARDTOP XP 2.5Y8/12
JGSS1EP-VPCI-MRI- Material Inspection BARRIER 80 COMP A
120 30-Jan-19 Material AC Room I W SW 12-Feb-19
ME-0055 BARRIER 80 COMP B
EPOXY HR LIGHT GREY CPA
EPOXY HR, COMP B

JGSS1EP-VPCI-MRI- Material Inspection


121 31-Jan-19 JGS-KR-162 STEEL PLATE (Painted) I W SW
SS-0014
JGSS1EP-VPCI-MRI-PI-
122 1-Feb-19 Material Inspection JGS-IN-042 SS PIPE (EFW) EPC Laydown 2 I W SW
0050
JGSS1EP-VPCI-MRI-PI- Material Inspection
123 1-Feb-19 JGS-KR-132 Flanges I W SW
0052
JGSS1EP-VPCI-MRI- Material Inspection JGS-KR-111 C-0605M Ethylene Fractionator
124 7-Feb-19 I W SW
ME-0060 Internal Parts
JGSS1EP-VPCI-MRI- Material Inspection
125 7-Feb-19 JGS-CN-120 SUZ Tower Internal Lot 1 I W SW
ME-0062
JGSS1EP-VPCI-MRI-PI- Material Inspection
126 8-Feb-19 JGS-IT-097 Flanges I W SW
0056
JGSS1EP-VPCI-MRI- Material Inspection
127 9-Feb-19 JGS-KR-028 Silencer I W SW
ME-0056

696 / 732
JGSS1EP-VPCI-MRI- Material Inspection
128 9-Feb-19 JGS-KR-067 'Filter (KR)_FUJ I W SW
ME-0057
JGSS1EP-VPCI-MRI- Material Inspection
129 9-Feb-19 JGS-KR-095 Drain Cone (KR)_KYE I W SW
ME-0059
JGSS1EP-VPCI-MRI- Material Inspection
130 9-Feb-19 JGS-CN-089 Anchor Bolts I W SW
ME-0061
JGSS1EP-VPCI-MRI- Material Inspection JGS-KSB-CN-004 R-0902 PGH Second Stage
131 9-Feb-19 I W SW
ME-0063 Reactor
JGSS1EP-VPCI-MRI- Material Inspection
132 9-Feb-19 JGS-SPP-JP-003 Parallel Cold Box Package I W SW
ME-0064
JGSS1EP-VPCI-MRI-
133 9-Feb-19 Material Inspection JGS-US-001 Anchor Sleeve I W SW
ME-0065
JGSS1EP-VPCI-MRI-
134 9-Feb-19 ME-0066 Material Inspection JGS-US-060 Anchor Bolt & Template for E-0405 R I W SW

JGSS1EP-VPCI-MRI-PI- Material Inspection


135 11-Feb-19 JGS-IN-074 SS Pipe (Welded/SMLS) I W SW
0055
JGSS1EP-VPCI-MRI-PI- Material Inspection
136 11-Feb-19 JGS-IT-090 Flanges I W SW
0057
JGSS1EP-VPCI-MRI- Material Inspection
137 13-Feb-19 Local Purchase-PAINTS and Thinner I W SW
SS-0015
JGSS1EP-VPCI-MRI-PI- Material Inspection
138 13-Feb-19 JGS-CN-023 SS SMLS PIPE EPC1 Laydown 2 I W SW
0058
JGSS1EP-VPCI-MRI-PI- Material Inspection
139 14-Feb-19 JGS-CN-114 CS Pipe (SmLS) EPC1 Laydown 2 I W SW
0060
JGSS1EP-VPCI-MRI-PI-
140 14-Feb-19 0059 Material Inspection JGS-CN-068 SS SMLS PIPE EPC1 Laydown 2 I W SW

AG&P Yard 1, San


JGSS1EP-VPCI-MRI-PI- Material Inspection
141 14-Feb-19 JGS-KR-107 CS ERW PIPE (DI below 16') Roque Bauan I W SW
0061 Batangas
AG&P Yard 1, San
JGSS1EP-VPCI-MRI-PI-
142 15-Feb-19 0054 Material Inspection JGS-IN-104 SS PIPE (WELDED) Roque Bauan I W SW
Batangas
JGSS1EP-VPCI-MRI-PI- Material Inspection
143 18-Feb-19 JGS-KR-138 Polyken939-750 R EPC 1 Warehouse I W SW
0062
144

697 / 732
Accepted

79 On-schedule Waiting for result

13 Re-schedule Cancelled

1 Additional Reject

Time Inspector Discipline Status Result

1400H Arvin Balitaan Piping On-schedule Accepted

1000H Arvin Balitaan Piping On-schedule Accepted

Randal
1000H Piping On-schedule Accepted
Fernandez
Randal
1000H Piping On-schedule Accepted
Fernandez
Randal
1000H Piping On-schedule Accepted
Fernandez

1000H Charmaine Perez Electrical Re-schedule Accepted

1000H Arvin Balitaan Mechanical On-schedule Accepted

1000H Arvin Balitaan Mechanical On-schedule Accepted

1000H Arvin Balitaan Mechanical On-schedule Accepted

1000H Arvin Balitaan Mechanical On-schedule Accepted

1000H Arvin Balitaan Mechanical On-schedule Accepted

1000H Arvin Balitaan Mechanical On-schedule Accepted

698 / 732
1000H Arvin Balitaan Mechanical On-schedule Accepted

1000H Arvin Balitaan Mechanical On-schedule Accepted

1000H Arvin Balitaan Mechanical On-schedule Accepted

1000H Arvin Balitaan Mechanical On-schedule Accepted

1000H Arvin Balitaan Mechanical On-schedule Accepted

Randal
1000H Mechanical On-schedule Accepted
Fernandez
Randal
1000H Mechanical On-schedule Accepted
Fernandez

1000H Arvin Balitaan Civil On-schedule Accepted

1000H Arvin Balitaan Civil On-schedule Accepted

1000H Arvin Balitaan Civil On-schedule Accepted

0830H Arvin Balitaan Civil On-schedule Accepted

Arvin Balitaan Civil Re-schedule Waiting for result

0900H Arvin Balitaan Civil On-schedule Accepted

0900H Arvin Balitaan Civil On-schedule Accepted

Randal
0900H Civil On-schedule Accepted
Fernandez

1340H Arvin Balitaan Civil On-schedule Accepted

Randal
1100H Piping On-schedule Accepted
Fernandez
Randal
1100H Piping On-schedule Accepted
Fernandez

699 / 732
0900H Arvin Balitaan Civil Additional Accepted

Randal
0900H Piping On-schedule Accepted
Fernandez

1420H Arvin Balitaan Piping Re-schedule Accepted

1350H Arvin Balitaan Piping Re-schedule Accepted

1350H Arvin Balitaan Piping Re-schedule Accepted

Randal
1000H Mechanical On-schedule Accepted
Fernandez
Randal
1000H Fernandez Mechanical On-schedule Accepted

Randal
1000H Mechanical Re-schedule Accepted
Fernandez
Randal
1000H Mechanical Re-schedule Waiting for result
Fernandez
Randal
1000H Mechanical On-schedule Accepted
Fernandez
Randal
1000H Mechanical Re-schedule Accepted
Fernandez
Randal
1000H Mechanical Re-schedule Accepted
Fernandez
Randal
1000H Fernandez Mechanical Re-schedule Accepted

1000H Randal Mechanical Re-schedule Accepted


Fernandez
Randal
1000H Mechanical Re-schedule Accepted
Fernandez

Randal
1000H Fernandez Mechanical Re-schedule Accepted

700 / 732
1000H Ramon Castillo Mechanical On-schedule Accepted

1500H Arvin Balitaan Piping On-schedule Accepted

0900H Arvin Balitaan Piping On-schedule Accepted

1430H Arvin Balitaan Piping On-schedule Accepted

1000H Ramon Castillo Piping On-schedule Accepted

1400H Arvin Balitaan Piping On-schedule Accepted

Randal
1300H Piping On-schedule Accepted
Fernandez
Randal Mechanical On-schedule Waiting for result
Fernandez
Randal
Fernandez Mechanical On-schedule Waiting for result

0900H Arvin Balitaan Mechanical On-schedule Accepted

1400H Arvin Balitaan Structural On-schedule Accepted

0900H Arvin Balitaan Piping On-schedule Accepted

1400H Arvin Balitaan Piping On-schedule Accepted

Bryan Aguila Piping

Arvin Balitaan Piping On-schedule Accepted

Bryan Aguila Piping On-schedule Accepted

701 / 732
Randal
0900H Piping On-schedule Accepted
Fernandez

Arvin Balitaan Piping On-schedule Accepted

0900H Allan Magadia Structural On-schedule Accepted

Arvin Balitaan Piping On-schedule Accepted

Arvin Balitaan Piping On-schedule Accepted

Arvin Balitaan Piping On-schedule Accepted

Allan Magadia Structural On-schedule Accepted

Allan Magadia Structural On-schedule Accepted

Randal
1300H Piping On-schedule Accepted
Fernandez
Randal Mechanical
Fernandez
Randal Mechanical
Fernandez

Ramon Castillo Mechanical

1130H Bryan Aguila Piping On-schedule Accepted

Arvin Balitaan Piping On-schedule Accepted

Arvin Balitaan Piping On-schedule Accepted

Arvin Balitaan Piping On-schedule Accepted

Randal Fernadez/ Mechanical


Ramon Castillo

702 / 732
Randal Fernadez/ Mechanical
Ramon Castillo

Randal Fernadez/
Mechanical
Ramon Castillo

Randal Fernadez/ Mechanical On-schedule Accepted


Ramon Castillo

Randal Fernadez/ Mechanical


Ramon Castillo

Arvin Balitaan Piping On-schedule Accepted

1000H Allan Magadia Structural On-schedule Accepted

1500H Allan Magadia Structural On-schedule Accepted

Randal Fernadez/ Mechanical On-schedule


Ramon Castillo

Randal Fernadez/ Mechanical


Ramon Castillo

Randal Fernadez/ Mechanical


Ramon Castillo

Randal Fernadez/
Ramon Castillo Mechanical

Randal Fernadez/ Mechanical


Ramon Castillo

Arvin Balitaan Piping On-schedule Accepted

Arvin Balitaan Piping On-schedule Accepted

703 / 732
Arvin Balitaan Piping On-schedule Accepted

Arvin Balitaan Piping

Allan Magadia Structural

Allan Magadia Structural

Ramon Castillo Mechanical

Arvin Balitaan Piping On-schedule Accepted

0900H Arvin Balitaan Piping On-schedule Accepted

1000H Arvin Balitaan Piping On-schedule Accepted

Arvin Balitaan Piping On-schedule Accepted

Randal Mechanical
Fernandez

Arvin Balitaan Piping On-schedule Accepted

Ramon Castillo Mechanical

Ramon Castillo Mechanical

Ramon Castillo Mechanical

Arvin Balitaan Piping On-schedule Accepted

Mark Darrel Mechanical


Aranas
Mark Darrel Mechanical
Aranas

Arvin Balitaan Piping

704 / 732
0800H Ermer Valdez Structural On-schedule Accepted

Allan Magadia Structural

Allan Magadia Structural

0800H Ermer Valdez Mechanical On-schedule Accepted

0800H Ermer Valdez Mechanical On-schedule Accepted

0800H Ermer Valdez Mechanical On-schedule Accepted

0800H Ermer Valdez Mechanical On-schedule Accepted

Allan Magadia Structural

Arvin Balitaan Piping

Arvin Balitaan Piping

Mark Darrel Mechanical


Aranas
Mark Darrel Mechanical
Aranas

Arvin Balitaan Piping

Randal Mechanical
Fernandez

705 / 732
Randal Mechanical
Fernandez
Randal Mechanical
Fernandez
Randal Mechanical
Fernandez
Mark Darrel Mechanical
Aranas
Mark Darrel Mechanical
Aranas
Mark Darrel
Mechanical
Aranas
Mark Darrel
Aranas Mechanical

Ramon Castillo Piping

Ramon Castillo Piping

Ermer Valdez Structural

Arvin Balitaan Piping

Arvin Balitaan Piping

Arvin Balitaan Piping

Arvin Balitaan Piping

Ramon Castillo Piping

Ramon Castillo Piping

706 / 732
88
4
0
0
Remarks Date Closed

VPCI-PL-0002

VPCI-PL-0001 16-Aug-18

Provide MTR. (Vendor's 18-Jun-18


document)
Provide MTR. (Vendor's 18-Jun-18
document)

19-Jun-18

Provide MTR. (Vendor's 20-Jun-18


document)
Provide MTR. (Vendor's
document) and provide cover 25-Jun-18
protection for preservation of
materials.

VPCI-PL-0003 27-Jul-18

707 / 732
VPCI-PL-0004 02-Aug-18

Need to provide P.O 08-Aug-18

Need to provide P.O 01-Aug-18

Need to provide P.O


No MTC (Material Test 02-Aug-18
Certificate)

15-Aug-18

VPCI-PL-0014 11-Sep-18

VPCI-PL-0011 03-Sep-18

Box not yet open

No MTC 20-Aug-18

No MTC 20-Aug-18

No MTC 18-Sep-18

VPCI-PL-0016 19-Sep-18

VPCI-PL-0017 19-Sep-18

708 / 732
709 / 732
Waiting for Material &
Mechanical Department to
open the package for
Inspection

punch

Test Report to be followed


valve tag o/s

710 / 732
Grating chips do not have
connection bolts

14 packages

Gusset plates attached to


girder G041-1 were bent
during pull out in the
container van

16 pcs 4" Dia Galvanized

711 / 732
712 / 732
713 / 732
714 / 732
715 / 732
Inspection Notification Log Sheet
INSULATION

Inspection Inspection Party


SN Log Date Notification Inspection Detail Activities Area / Location Date Time
Number SC VPCI PMC

719 / 732
Accepted

0 On-schedule Waiting for result

0 Re-schedule Cancelled

0 Additional Reject

Subcontractor Inspector Discipline Status Result

720 / 732
0
0
0
0
Receive Return to
Remarks Date Closed Transmittal No.
From Sub Sub

721 / 732
Inspection Legend
Accepted
Waiting for result
Cancelled
Reject

On-schedule
Re-schedule
Additional
Definition
Accepted Count - Accepted
Accepted 87.31%
Cancelled 11.19%
Reject 1.49%
Total Result 100.00%
Inspection Notification Log Sheet
Inspection Result
Inspection Notification Inspection Party Inspection
SN Log Date Number Inspection Detail Activities Area / Location Date
SC VPCI PMC

Welder's Qualification Test


CHRISTIAN A. ABRENICA (PSP-W-097)
JERIC F. MUÑOZ (PSP-W-098)
1 04-Dec-18 JGSS1EP-VPCI-PSP-0428 WQT Ambulong Shop H W SW 05-Dec-18
ALLAN A. MUÑOZ (PSP-W-099)
MARVIN EVASCO (PSP-W-100)
JAYSON D. JARDIN (PSP-W-101)

Radiographic Examination
(NR-PHS-RT-0014)
A01A5001-P-24007-03 Jt. 3
A01A5001-P-28008-01 Jt. 5
A01A5001-RT-29001-02 Jt. 11
A01A5001-WFL-29001-04 Jt. 7
A01A5001-WFL-29001-T1 Jt. 6
2 03-Dec-18 JGSS1EP-VPCI-PSP-0420 NDE A09A5001-LF-29002-01 Jt. 5 Ambulong Shop H SW/R R 04-Dec-18
A09A5001-MS-29007-02 Jt. 8
A09A5001-N2-29006-01 Jt. 5
A09A5001-P-29031-02 Jt. 16
A09A5001-P-29039-01 Jt. 7
A09A5001-P-29057-02 Jt. 9
A09A5001-P-29093-01 Jt. 1
A09A5001-RT-29001-01 Jt. 6

Radiographic Examination
(NR-PHS-RT-0015)
3 03-Dec-18 JGSS1EP-VPCI-PSP-0421 NDE A09A5001-P-29059-01 Jt. 1 Ambulong Shop H SW/R R 04-Dec-18
A09A5001-P-29092-01 Jt. 4
A09A5001-P-29092-01 Jt. 10

Radiographic Test Report (NR-PHS-RT-0016)


4 05-Dec-18 JGSS1EP-VPCI-PSP-0438 NDE A01A5001-MS-29007-01 Jt. 1 R1 Ambulong Shop H SW/R R 05-Dec-18
A09A5001-MS-29011-03 Jt. 5 T1

725 / 732
Radiographic Test Report (NR-PHS-RT-0017)
A01A5001-HG-29001-02 Jt. 20
A01A5001-P-24005-02 Jt. 3
A01A5001-P-24007-02 Jt. 13
A01A5001-P-24007-T1 Jt. 2
A01A5001-P-29011-02 Jt. 2
5 05-Dec-18 JGSS1EP-VPCI-PSP-0439 NDE A01A5001-P-29050-03 Jt. 7 Ambulong Shop H SW/R R 05-Dec-18
A03A5001-BB-23008-03 Jt. 3
A09A5001-P-29066-01 Jt. 2
A09A5001-PGD-29012-01 Jt. 6
A09A5001-PGD-29013-01 Jt. 4
A09A5001-PGD-29017-01 Jt. 9
A09A5001-WFL-29028-01 Jt. 2

Inspection Schedule

Inspection Notification Inspection Party Inspection


SN Log Date Inspection Detail Activities Area / Location
Number Date
SC VPCI PMC

Material Receiving Thinner No. 23, Jotun Lot# 1804523,1657335,


1 06-Dec-18 JGSS1EP-VPCI-AGP-0070 AG&P Yard 1 H W R 07-Dec-18
Inspection 1769699, 1804522

726 / 732
Material Receiving
2 06-Dec-18 JGSS1EP-VPCI-AGP-0069 Above Ground Fittings AG&P Yard 1 H W R 07-Dec-18
Inspection
Concrete surface prior to backfilling of Foundation
3 06-Dec-18 JGSS1EP-VPCI-FSP-0803 Visual Inspection Area 700 H SW SW 07-Dec-18
& Pedestal @ E-0703 Structure.

Welder's Qualification Test


4 06-Dec-18 JGSS1EP-VPCI-PSP-0446 WQT RONILO R. BAGUI (VP-PHS-022) Ambulong Shop H W SW 07-Dec-18
MARVIN A. ALCARAZ (VP-PHS-024)

Visual Welding Inspection (Post)


5 06-Dec-18 JGSS1EP-VPCI-PSP-0447 Welding Report No.: DWR-PHS-0121 Ambulong Shop H W SW 07-Dec-18

Visual Welding Inspection (Post)


6 06-Dec-18 JGSS1EP-VPCI-PSP-0448 Welding A00A5001-ND-24002-01 Jt. 1,2,3 Area 300 H W SW 07-Dec-18

Visual Welding Inspection (Post) @ Heater H-0305


Grid 11: Jt. 1,2,3,4,5,6,9
7 06-Dec-18 JGSS1EP-VPCI-PSP-0449 Welding Grid 12: Jt. 1,2,3,4,5,6,7,8,9,10,12 Area 300 H W SW 07-Dec-18

Visual Welding Inspection (Post)


8 06-Dec-18 JGSS1EP-VPCI-PSP-0451 Welding A00A5001-PGD-29034-01 Jt. 21,25,26 Area 900 H W SW 07-Dec-18

Request for Intermediate Coat Inspection of


9 06-Dec-18 JGSS1EP-VPCI-PSP-0452 Intermediate Convection Module 1 prior to Application of Final Area 900 H W SW 12/7-8/2018
Coat.

Primer Coat Inspection prior to application of


10 5-Dec-18 JGSS1EP-VPCI-PSP-0444 Primer Ambulong Shop H W SW 07-Dec-18
intermediate coat.

Intermediate Coat Inspection prior to application of


11 5-Dec-18 JGSS1EP-VPCI-PSP-0445 Intermediate Ambulong Shop H W SW 07-Dec-18
finish coat.

Elevation, Location,Surface Preparation, Formworks,


12 5-Dec-18 JGSS1EP-VPCI-FSP-0800 Concrete Pouring Rebar works and Concrete Placement Inspection of Area 400 H W SW 07-Dec-18
Foundation @ Structure-0407 (F2).

13 06-Dec-18 JGSS1EP-VPCI-PSP-0456 Grouting Radiant Through Area 300 H W SW 07-Dec-18

727 / 732
1. Fabrication of ladder report
2.Visual Inspection for electrical support
1000 x 2970 x 500 mm (6 pcs)
Fabrication of Ladder 1000 x 2000 x 500 mm (7 pcs)
14 7-Dec-18 JGSS1EP-SJEI-EL-0001 SJ E&I Fab H W SW 08-Dec-18
support 500 x 1820 x 500 mm (16 pcs)
1000 X 2450 X 1000 mm (1 pc)
500 x 2320 x 1000 mm (1 pc)

Orientation/Centerin Bottom Exchanger General Assembly @ Area E-


15 06-Dec-18 JGSS1EP-VPCI-PSP-0454 g/Elevation/Levelnes 0914 (Drawing#: A3-JGS1EP-HAN-DD-E-0914-001) Area 900 H W SW 07-Dec-18
s

Orientation/Centerin Bottom Exchanger General Assembly @ Area E-


16 06-Dec-18 JGSS1EP-VPCI-PSP-0455 g/Elevation/Levelnes 0917 (Drawing#: A3-JGS1EP-HAN-DD-E-0917-001) Area 900 H W SW 07-Dec-18
s

728 / 732
Time Subcontractor Inspector Discipline Result

0900H Philspec Ramon Castillo Piping Waiting for result

1900H Philspec Ramon Castillo Piping Waiting for result

1900H Philspec Ramon Castillo Piping Waiting for result

1900H Philspec Ramon Castillo Piping Waiting for result

729 / 732
1900H Philspec Ramon Castillo Piping Waiting for result

Time Subcontractor Inspector Discipline Remarks

0700H AG&P Ermer Valdez Painting Accepted

730 / 732
0700H AG&P Arvin Balitaan Piping Accepted

0900H Fsphil Allan Magadia Civil Accepted

0900H Philspec Ramon Castillo Piping Accepted

0900H Philspec Ramon Castillo Piping Accepted

Randal
0900H Philspec Piping Accepted
Fernandez

Randal
0900H Philspec Piping Accepted
Fernandez

Randal
0900H Philspec Fernandez Piping Accepted

0900-1700H Philspec Ermer Valdez Painting On-schedule

0900-1700H Philspec Ermer Valdez Painting Cancelled

0900-1700H Philspec Ermer Valdez Painting Cancelled

1000H Fsphil Allan Magadia Civil Cancelled

Randal
1000H Philspec Mechanical Accepted
Fernandez

731 / 732
Nestor
1400H SJ E&I Electrical Accepted
Mendoza

Randal
1500H Philspec Mechanical Accepted
Fernandez

Randal
1500H Philspec Mechanical Accepted
Fernandez

732 / 732