Anda di halaman 1dari 1

AC : Apron Conveyor HP : Hopper 71

AS : Air Slide JB : Junction Box


BC : Belt Conveyor KL : Kiln
351.AS5
341.WS1
BE : Bucket Elevator PH : Suspension Preheater

441.EP1 441.SK1
BF : Bag Filter PM : Packing Machine
341 SK1 351.AS6 351.AS7
TANAH LIAT 341.CT1 441.DB3 BI : Bin PP : Pneumatic Pump
341.FN2
441.FNR 441.FNS

341.EP1 BM : Ball Mill RF : Rotary Feeder


241.BC4 451.SC1 GYPSUM / TRASS
251.HP1 341.FN3 BS : Blending Silo RR : Reclaimer
BATU KAPUR
421.AS5
251.AC1 421.AS4 BW : Belt Scale RM : Raw Mill
411 BS1 411 BS2 441DB4
241.BC5 341.SC3 561.AS1
251.CR1 241 TR 1 CC : Clinker Cooler SC : Screw Conveyor
341.SC1 341.FN4 451.SC2 511.HP1
251.BW1
LIMESTONE/ 241 BC6 451.BF1 631.AS1 CN : Cyclone SK : Stack
231.HP1 LIMESTONE 341.SC2 1 511.AC1
CLAY MIX 341.SC4 1
251.BC1
CR : Crusher SR : Separator
231.FE1 2 2 451.SC3 511.BC1
341.SC5 451.FN1
231.CR1 341 CN4
341.CN3 451.SC4 CT : Conditioning Tower SS : Storage
241.BW1 321.RR1 441.PH1 441.PH2
321.VF1 341.CN2 �
341.CN1
DB : Drag Conveyor TR : Tripper
351.BI1 421.AS1 3
3 511.CR1 521.BC7
241.BC1 451.DB3 631.AS4 EP : Electrostatic Presipitator VF : Vibrating Feeder
321.BC6 321.BC1 541.BF2
421 BI1 4 SILO 2 FE : Wobbler Feeder VS : Vibrating Screen
4 451.BI1 SILO 1
PASIR SILIKA/ CLINKER STORAGE SILO
521.BI1 541.FN2
321.BC2
COPPER SLAG 331.BC2
351.AS2
541.FN3
631.VS1 FM : Flow Meter WF : Weight Feeder
511.BC2
321.HP1 331.BC3 351.AS3 511.BC3 541.SC2 FN : Fan WS : Water Spray
SLC ILC 541.CN1 631.AS6
321.BC3 321.AC1 511.BI4 511.BI5 511.BI6
541.AS2
241.BC3 341.RM1 351.AS1 421.BI2 421.BI3 521.BC2
541.BC2 Aliran debu dan gas
521.BC1
321.BC4
421.FM1 421.FM2 521.BC3 542.WF1
542.WF2
542.WF3
541.BI1
541.AS3
411.AS1 631.BI1
351 AS4 411.AS2 521.BE1
631.BSC1
421.AS3 542.BC1 541.GA1 541.AS5
BATU KAPUR 321.BC5 441.KL1 521.BC4
511.BE1
541.SR1 Aliran material
421.AS2 631.AS5
341.FN1 541.CR1
351 BE1 521.BC6
411.JB1
331.BI1 331.BI2 331.BI3 331.BI4 541.BF1
341BC1 341 BC2 441.CC1 521.BC5 541.AS4
541.BC3
341.BC4 341.BC3 511.BC4 541.BM1 631.BI2
231.HP2 631.BF1
541.BC4 561.BE1 631.FN1
231.FE2 341.BC5 441.CR1 511.BI1 511.BI2 511.BI3 541.FN1 631.AS2 DIAGRAM ALIR PROSES PEMBUATAN SEMEN
231.CR2 331.AC2 421.BE3 541.SC1
331.AC1 441.FN7 FN8 PT. SEMEN INDONESIA (PERSERO) Tbk.
241.BW2 341 BE1 441.FN1 631.PM1
631.BW1
PABRIK TUBAN
441.FN9 541.WF2 541.AS1
541.WF1 541.WF3 631.AS3
441.FNB 441.FND 441.FNF 441.FNH 441.FNJ
441.FN2 631.BC3
241.BC2 441.DB1 541.BC1 631.BC1 631.BC2
521.BE2
421.BE1 541.BE2 631.BC5 631.BC4 DISUSUN OLEH :
331.WF1 331.WF2 331.WF3 331.WF4 421.BE4 441.FNA 441.FNC 441.FNE 441.FNG 441.FNI 441.FNK
631.BE1
WIDYA ASTUTIK
441.DB2 541.BE1
631.BE2 631.SC1 21030113060079
331.BC1
421.BE2
PROGRAM STUDI DIPLOMA III TEKNIK KIMIA
PROGRAM DIPLOMA FAKULTAS TEKNIK DOSEN PEMBIMBING :
UNIVERSITAS DIPONEGORO Ir. Hj. DWI HANDAYANI, MT
SEMARANG NIP. 195510081992032001
2016
Skala 1 : 1.000
Gambar 6. Diagram Alir Proses Pembuatan Semen PT. Semen Indonesia (Persero) Tbk. Pabrik Tuban

Anda mungkin juga menyukai