TARGET PRODUKSI JARAK WAKTU
LOKASI KERJA PAKET PELEDAKAN JARAK TANAH
NO BATUBARA KUALITAS S/R LOKASI KERJA PENIMBUNAN BATUBARA TANAH BATUBARA KETERANGAN
PENAMBANGAN KONTRAK TANAH (BCM) (BCM) (METER)
(TON) BATUBARA (METER) (JAM) (JAM)
STRIPPING
I PIT 1 Volume Per Seam
a. Overburden 300,000 - - Counterweight +8 s.d +13 500 A1/BB50LS : - MT
150,000 - Disposal +120 2,500 A2/BB50LS : 30,000 MT
B1/BB50LS : 172,000 MT
b. Material Lumpur SPPH 2899 341 0 B2/BB50HS : 55,000 MT
c. Topsoil C/BB52HS : 55,000 MT
d. Batubara 202,000 BB 50 LS - Dump Hopper 3 4,600
55,000 BB 50 HS - Dump Hopper 3 4,600
55,000 BB 52 HS - TS 1A Extention 4,300
SUB TOTAL 450,000 312,000 1.44 :1 - 1,833 4,547
II PIT 1 UTARA Volume Per Seam
a. Overburden 635,000 - BF PIT 3 Barat 3,200 A1/BB52LS: 70,000 MT
b. Topsoil 15,000 - Finalisasi BFP3B +91 4,000 A2/BB52LS: 100,000 MT
341 0
c. Material Lumpur SPPH 2899 20,000 - BF PIT 3 Barat +66 4,000 B1/BB52LS: 90,000 MT
c. Batubara 29,000 BB 50 HS - Dump Hopper 3 3,200 B2/BB50HS : 29,000 MT
670,000 205,000 BB 52 LS - Dump Hopper 4 2,600
55,000 BB 52 LS - Temporary 1G 1,000
SUB TOTAL 670,000 289,000 2.32 :1 3,242 2,356
III PIT 3 TIMUR Volume Per Seam
a. Overburden 100,000 - - BF PIT 3 Timur 1,000 A1/BB52LS: 24,000 MT
b. Lumpur A2/BB52LS: 24,000 MT
SPPH 2899 127 310
c. Top Soil - - Final BF PIT 3 Timur 2,500 B1/BB52LS : 10,000 MT
c. Batubara 58,000 BB 52 LS - Dump Hopper 4 2,900 B2/BB52HS : 10,000 MT
100,000 20,000 BB 52 HS - Dump Hopper 4 2,900 C/BB52HS : 10,000 MT
SUB TOTAL 100,000 78,000 1.28 :1 - 1,000 2,900
TOTAL STRIPPING 1,220,000 679,000 1.80 : 1 2,539 3,425
12 391 12.61 30 Hal : 6 dari 9
MINGGU
PERTAMA KEDUA KETIGA KEEMPAT KELIMA

SATUAN
NO KEGIATAN ALAT KAPASITAS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 KETERANGAN

1 PENGGALIAN OVERBURDEN
167,000 BCM 38,967 38,967 38,967 38,967 11,133
SB - 1x PC1250 (EX-032) SB - 1x PC1250 (EX-032) SB - 1x PC1250 (EX-032) SB - 1x PC1250 (EX-032) SB - 1x PC1250 (EX-032)
FLEET 1 SBS
SBS - 4x HD465 SBS - 4x HD465 SBS - 4x HD465 SBS - 4x HD465 SBS - 4x HD465
SBS - 1x CAT340FL (EX406) SBS - 1x CAT340FL (EX406) SBS - 1x CAT340FL (EX406) SBS - 1x CAT340FL (EX406) SBS - 1x CAT340FL (EX406)
FLEET 2 SBS
SBS - 5x DT CWE380 SBS - 5x DT CWE380 SBS - 5x DT CWE380 SBS - 5x DT CWE380 SBS - 5x DT CWE380
2 PENGGALIAN BATUBARA
90,000 TON 21,000 21,000 21,000 21,000 6,000

MTN - 1x CAT 340 (EX3032) MTN - 1x CAT 340 (EX3032) MTN - 1x CAT 340 (EX3032) MTN - 1x CAT 340 (EX3032) MTN - 1x CAT 340 (EX3032)
FLEET 1 MADHANI
SM - 6x H500 SM - 6x H500 SM - 6x H500 SM - 6x H500 SM - 6x H500
TOTAL OVERBURDEN 167,000 BCM
TOTAL BATUBARA 90,000 TON
SR 1.86
PERALATAN YANG DIGUNAKAN (LOKASI : PIT 1 UTARA)
PT. SATRIA BAHANA SARANA
PERIODE : BULAN DESEMBER 2018
Hal : 5 dari 9

TOTAL JAM KERJA JAM KERJA JUMLAH ALAT PRODUKTIVIT KAPASITAS


NO KEGIATAN DESKRIPSI VOLUME SATUAN JENIS ALAT C/N
ALAT ALAT/unit (UNIT) AS ALAT

1 PENAMBANGAN
TANAH
a. Penggalian
- Tanah 645,000 BCM FLEET 1 SBS - PC2000* EX-2001 332 332 1 561 186,000
FLEET 2 SBS - PC2000 EX-2002 341 341 1 561 191,000
FLEET 3 MTN - L9000 EX-5038 341 341 1 441 150,000
FLEET 4 SBS - CAT 390FL EX1009 151 151 1 441 67,000
- Penggalian Jalan AWR FLEET 5 AU-EC330 AU-02 276 276 1 150 41,000
- Penggalian Topsoil Jalan AWR FLEET 5 AU-EC330 AU-02 65 65 1 150 10,000

- Lumpur 20,000 BCM FLEET 4 CAT 390FL/1009** EX1009 90 90 1 221 20,000

- Topsoil 5,000 BCM FLEET 1 SBS - PC2000* EX-2001 9 9 1 561 5,000

4 670,000

b. Pengangkutan
- Tanah BCM FLEET 1 SBS - HD 785 1,992 332 6 95 189,000
FLEET 2 SBS - HD 785 2,046 341 6 95 194,000
FLEET 3 MTN - CAT777 2,046 341 6 75 153,000
FLEET 4 SBS - HD 785 755 151 5 95 72,000
- Penggalian Jalan AWR FLEET 5 SBS - CWE380 1,104 276 4 38 42,000
- Penggalian Topsoil Jalan AWR FLEET 5 SBS - CWE380 260 65 4 38 10,000

- Lumpur BCM FLEET 2 SBS - HD 785 450 90 5 48 21,000

- Topsoil BCM FLEET 1 SBS - HD 785 54 9 6 95 5,000

23 686,000

c. Pembongkaran
PEN - D375 DZ302 380 380 1 974 370,000
PEN - D375 DZ303 380 380 1 974 370,000

2 740,000

d. Perataan Disposal MTN - D8R BD6051 410 410 1 600 246,000


SBS- D375 DZ509 410 410 1 1,200 492,000

2 738,000
BATUBARA
a. Penggalian 339,000 TON
FLEET 1 SBS - PC400 EX401 310 310 1 250 78,000
FLEET 2 SBS - PC400 EX405 310 310 1 250 78,000
FLEET 3 AU - Volvo EC480 AU04 310 310 1 250 78,000
FLEET 4 CAT 390FL/1009** EX1009 100 100 1 550 55,000

4 289,000

b. Pengangkutan
FLEET 1 SBS - CWE380 1,860 310 6 42 78,000
FLEET 2 SM - HINO500 1,860 310 6 42 78,000
FLEET 3 SM - HINO500 1,860 310 6 42 78,000
FLEET 4 SBS - HD 785 500 100 5 113 57,000

23 291,000

c. Pembongkaran PEN - D 375 DZ304 200 200 1 830 166,000


SBS - D375 DZ507 250 250 1 830 208,000
2 374,000

TOTAL MATERIAL 939,048 BCM

STRIPPING RATIO 1.98

2 GENERAL Rawatan Jalan, Perapian Slope, dan Drainage SBS - CAT14M GD 008 341 341 1
SBS - GD 825 GD 201 341 341 1
Lighting Tower Mega Lighting Tower 720 360 2
Tower Lamp 2,520 360 7
Penyiraman Jalan SBS - WT Scania WT304 341 341 1
Truck Solar SBS - Fuel Truck 341 341 1
Penirisan Tambang KSB - Pompa DND 200 KSB-44 600 600 1
KSB - Pompa DND 200 KSB-36 600 600 1
Lokasi di BFP3B KSB - Pompa DND 200 KSB-42 600 600 1
Note:
* 1 Fleet PC2000(EX2001) dialokasikan untuk loading top soil dan overburden
** 1 Fleet CAT390(EX1009) dialokasikan untuk loading lumpur,overburden,dan batubara
Minggu - 5
Pit 1
- Interburden L9100 Penggalian Interburden Expose B1-B2 RL -12
- M. Lunak L9100 Penggalian Interburden Expose B1-B2 RL -4
- Interburden L9100 Penggalian Interburden Expose B2-C RL -4
- Batubara EC480 Penggalian batubara seam B1 RL-4
- Batubara CAT340 Penggalian batubara seam B1 RL-4
- Batubara CAT340 Penggalian batubara seam B2 RL-12
- Batubara CAT390FL Penggalian batubara seam C RL -12
Pit 1 Utara
5 - Overburden PC2000 Penggalian prestripping topsoil/ OB A1 Sisi Barat Utara RL +55, +46 62,806 #VALUE!
- M. Lumpur PC2000 Penggalian Interburden Expose A1 RL -12, -16
- Interburden L9100 Penggalian Interburden Expose A1,A2 RL +6, -3
- Batubara EC480 Penggalian batubara seam B1 RL -3
- Batubara EC480 Penggalian batubara seam B1 RL -3
- Batubara PC400 Penggalian batubara seam B2 RL -12
- Batubara PC400 Penggalian batubara seam B2 RL -12
Pit 3 Timur
- Overburden PC1250 Penggalian overburden expose A1,A2,B1,B2,C RL +48
- Batubara CAT340 Penggalian seam A1, A2,B1,B2,C RL+52
- Batubara ZX350H Penggalian seam A1, A2,B1,B2,C RL+52

Rencana Penimbunan Urutan Pekerjaan Request Level Jarak ( Meter )

Minggu - 1
Pit 1
- Interburden L9100 Dumping di counterweight Pit 1 RL +2, +8 500
- M. Lunak L9100 Dumping di disposal Pit 1 RL +114, +120 3,000
- Interburden L9100 Dumping di disposal Pit 1 RL +114, +120 3,000
1
Pit 1 Utara
- Overburden PC2000 Dumping di Disposal backfill Pit 3 Barat RL +70, +76, +91 3,200
- M. Lumpur PC2000 Dumping di Disposal Lumpur backfill Pit 3 Barat RL +69, +68 4,000
- Interburden L9100 Dumping di Disposal backfill Pit 3 Barat RL +70, +76 3,200
- Topsoil PC2000 Penghamparan humus restorasi RL +91 4,000
Pit 3 Timur
- Overburden PC1250 Dumping di final backfill PIT 3 Timur RL +64, +70 1,500
- Topsoil CAT340FL Final BF PIT 3 Timur RL +64, +70 2,500
Minggu - 2
Pit 1
- Interburden L9100 Dumping di counterweight Pit 1 RL +2, +8 500
- M. Lunak L9100 Dumping di disposal Pit 1 RL +114, +120 3,000
- Interburden L9100 Dumping di disposal Pit 1 RL +114, +120 3,000
Pit 1 Utara
2
- Overburden PC2000 Dumping di Disposal backfill Pit 3 Barat RL +70, +76 3,200
- M. Lumpur PC2000 Dumping di Disposal Lumpur backfill Pit 3 Barat RL +69, +68 4,000
- Interburden L9100 Dumping di Disposal backfill Pit 3 Barat RL +70, +76 3,200

Pit 3 Timur
- Interburden PC1250 Dumping di final backfill PIT 3 Timur RL +70, +76 1,500
Minggu -3
Pit 1
- Interburden L9100 Dumping di counterweight Pit 1 RL +8, +14, +20 500
- M. Lunak L9100 Dumping di disposal Pit 1 RL +120, +126 3,000
- Interburden L9100 Dumping di disposal Pit 1 RL +120, +126 3,000
Pit 1 Utara
3
- Overburden PC2000 Dumping di Disposal backfill Pit 3 Barat RL +76, +82 3,200
- Interburden PC2000 Dumping di Disposal backfill Pit 3 Barat RL +76, +82 3,200
- Interburden L9100 Dumping di Disposal backfill Pit 3 Barat RL +70, +76 3,200

Pit 3 Timur
- Interburden PC1250 Dumping di final backfill PIT 3 Timur RL +70, +76 1,500
Minggu -4
Pit 1
- Interburden L9100 Dumping di counterweight Pit 1 RL +8, +14, +20 500
- M. Lunak L9100 Dumping di disposal Pit 1 RL +120, +126 3,000
- Interburden L9100 Dumping di disposal Pit 1 RL +120, +126 3,000
Pit 1 Utara
4
- Overburden PC2000 Dumping di Disposal backfill Pit 3 Barat RL +82, +87 3,200
- Interburden PC2000 Dumping di Disposal backfill Pit 3 Barat RL +82, +87 3,200
- Interburden L9100 Dumping di Disposal backfill Pit 3 Barat RL +70, +76 3,200

Pit 3 Timur
- Overburden PC1250 Dumping di final backfill PIT 3 Timur RL +70, +76 1,500
Minggu -5
Pit 1
- Interburden L9100 Dumping di counterweight Pit 1 RL +8, +14, +20 500
- M. Lunak L9100 Dumping di disposal Pit 1 RL +120, +126 3,000
- Interburden L9100 Dumping di disposal Pit 1 RL +120, +126 3,000
Pit 1 Utara
5
- Overburden PC2000 Dumping di Disposal backfill Pit 3 Barat RL +82, +87 3,200
- Interburden PC2000 Dumping di Disposal backfill Pit 3 Barat RL +82, +87 3,200
- Interburden L9100 Dumping di Disposal backfill Pit 3 Barat RL +70, +76 3,200

Pit 3 Timur
- Overburden PC1250 Dumping di final backfill PIT 3 Timur RL +76 1,500
ROUTING SLIP RENCANA KERJA KONTRAKTOR
PIT BANKO BARAT
SPPH 2899
PT. SATRIA BAHANA SARANA
PERIODE : BULAN OKTOBER 2017

NO NAMA PENERIMA SATUAN KERJA PT BUKIT ASAM Tanda Tangan Penerima

1
1

2
2

3
3

4
4

5
5
Air Masuk 12.5
JADWAL KEGIATAN PEMOMPAAN BANKO BARAT 1,090,600 P1U
PERIODE : NOPEMBER 2018 365,750 P1U
PT. SATRIA BAHANA SARANA 225,635 P3T
PIT 1 835,488 308550 CH 342.3 22 20 Hal : 9 dari 9
PENIRISAN TAMBANG
Volume Air ( M3 )
Rencana Total
Catchment Area CH Rencana Debit
NO Lokasi Type Pompa Jam Jalan Rencana Rpm Yang Ada
(Ha) (mm) (M3/Jam) Yang Masuk (M3) Terpompa Sisa Air (M3) Keterangan
Mingguan Jam Jalan (M3)

Minggu 1 184,800
1 x Pompa KSB 38 600 Elevasi Air Awal bulan -7
Minggu 2 277,200
1 Sump Timur Pit 1 328 350 660 1,300 230,000 1,090,600 225,000 Estimasi elevasi Air di akhir
Minggu 3 277,200 bulan -8
2x Pompa MTN 01, 02 600
Minggu 4 277,200
Minggu 5 79,200
Minggu 1 168,000
Minggu 2 168,000 Elevasi Air Awal bulan 0
2 x Pompa KSB 36, 44
2 Sump Pit 1 Utara 110 350 Minggu 3 600 600 1,300 158,000 365,750 168,000 0 Estimasi elevasi Air di akhir
Minggu 4 168,000 bulan -8
Minggu 5 48,000
Minggu 1 84,000
Minggu 2 84,000 Elevasi Air Awal bulan +41,8
Sump Backfilling Pit 3 1 x Pompa KSB 42
3 67.86 350 Minggu 3 600 600 1,300 2,300,000 225,635 84,000 2,165,635 Estimasi elevasi Air di akhir
Barat
Minggu 4 84,000 bulan +39,7
Minggu 5 24,000
Air Masuk 12.5
KEGIATAN PEMOMPAAN PIT 1 BANKO BARAT 418,946 P1U
PERIODE : 1-12 NOPEMBER 2018 #REF! P1U
PT. SATRIA BAHANA SARANA #REF! P3T
PIT 1 835,488 #REF! CH 342.3 20 20 Hal : 9 dari 9
PENIRISAN TAMBANG
Volume Air ( M3 )
Rencana Total
Catchment Area CH Aktual Debit
NO Lokasi Type Pompa Jam Jalan Rencana Rpm Yang Ada
(Ha) (mm) (M3/Jam) Yang Masuk (M3) Terpompa Sisa Air (M3) Keterangan
Mingguan Jam Jalan (M3)

Minggu 1
1 x Pompa KSB 38
Minggu 2 Elevasi Air Awal bulan : -5.11
1 Sump Timur Pit 1 328 134.45 240 1,300 500,000 418,946 486,946
Minggu 3 600 432,000 Elevasi Air di hari ke 12 : -5.5
2x Pompa MTN 01, 02
Minggu 4
Minggu 5
SUMP PIT 1 TIMUR
Date of Penurunan &
April 2018 Monitoring Monitoring Kenaikan Air
SUMP PU- SUMP PU- Sump PU-
Awal Akhir (m) KSB0038 MTN4007 MTN4008

1-Nov-18 0.00
2-Nov-18 0 -5.11 -5.11 -5.11 -5.11
3-Nov-18 0 -0.73 -5.84 -5.84 -5.84
4-Nov-18 0 0.23 -5.62 -5.62 -5.62
5-Nov-18 0 1.12 -4.50 -4.50 -4.50
6-Nov-18 0 -0.13 -4.63 -4.63 -4.63
7-Nov-18 0 0.00 -4.63 -4.63 -4.63
8-Nov-18 0 0.00 -4.63 -4.63 -4.63
9-Nov-18 0 0.00 -4.63 -4.63 -4.63
10-Nov-18 0 0.04 -4.59 -4.59 -4.59
11-Nov-18 0 -0.21 -4.80 -4.80 -4.80
12-Nov-18 0 -0.70 -5.50 -5.50 -5.50
PT. SATRIA BAHANA SARANA
TANJUNG ENIM HEAD OFFICE

- Produktivitas D375

DESKRIPSI UNIT FORMULA

- Jarak RIPPING dan DOZING meter J


- Lebar spasi ripping meter LK
- Penetrasi ripper meter p = fbr x dr
- Kapasitas Blade lcm KB
- Kecepatan maju m/min f
- Kecepatan Mundur m/min r
- Waktu fix minutes z
- Cycle Time menit Ct =f/J+r/J+z
- Faktor Koreksi FK =fk x ef x so

Produktivitas Overburden lcm/jam


bcm/jam
ton /jam

Asumsi :
- faktor blade dan ripper (fbr) 0.80
- faktor kecepatan (fk) 0.95
- efisiensi waktu (ef) 0.85
- skil operator (so) 0.95
- maksimum kedalaman ripper (dr) 1.10
catt : batubara (bituminus) dengan density 0.85

- Produktivitas D155

DESKRIPSI UNIT FORMULA

- Jarak RIPPING dan DOZING meter J


- Lebar spasi ripping meter LK
- Penetrasi ripper meter p = fbr x dr
- Kapasitas Blade lcm KB
- Kecepatan maju m/min f
- Kecepatan Mundur m/min r
- Waktu fix minutes z
- Cycle Time menit Ct =f/J+r/J+z
- Faktor Koreksi FK =fk x ef x so

Produktiviti Overburden lcm/jam


bcm/jam
Produktiviti batubara ton/jam

Asumsi :
- faktor blade dan ripper (fbr) 0.80
- faktor kecepatan (fk) 0.90
- efisiensi waktu (ef) 0.84
- skil operator (so) 0.90
- maksimum kedalaman ripper (dr) 1.22
catt : batubara (bituminus) dengan density 0.85
PT. SATRIA BAHANA SARANA
TANJUNG ENIM HEAD OFFICE

DOZER REQUIREMENT CALCULATION (TAHAP 2)

RIPPING (cross DOZING RIP. & DOZ. NO ACTIVITY


ripping)

PIT 2 BANKO BARAT


30.00 15.00 1 Pemberaian Material Tanah
1.20 2 Pemberaian Material Batubara
0.88 3 Dozing Material Blasting, General
18.50
58.33 108.33
75.00 163.33 4 Penyebaran Material Disposal
0.58 0.30
1.50 0.53 5 Land Clearing, Rawatan Jalan & General
0.77 0.77
6 General slooping, Bundwall, Drainage
Rawatan Kolam Pengendapan Lumpur
974 1606 606
702 1,158 437
829 1367 516

ton/lcm

- Produktivitas D85

RIPPING (cross DOZING RIP. & DOZ. DESKRIPSI


ripping)

30.00 20.00 - Jarak RIPPING dan DOZING


0.90 - Lebar spasi ripping
0.98 - Penetrasi ripper
11.80 - Kapasitas Blade
41.67 61.67 - Kecepatan maju
66.67 136.67 - Kecepatan Mundur
0.42 0.30 - Waktu fix
1.59 0.77 - Cycle Time
0.68 0.68 - Faktor Koreksi

675 622 324 Produksi overburden perjam


487 449 233
675 622 324

Asumsi :
- faktor blade dan ripper (fbr)
- faktor kecepatan (fk)
- efisiensi waktu (ef)
- skil operator (so)
- maksimum kedalaman ripper (dr)
catt : batubara (bituminus) dengan density
BAHANA SARANA
M HEAD OFFICE

CULATION (TAHAP 2)

VOL %VOL MODEL PRODTY NEED HRS EFF WHRS REQ.


Bcm ALAT Bcm/Hr

12,622,184 48% D375 437 13,768 4,167 3


2,367,474 100% D375 516 4,588 4,167 1
- - D375 - - 4,167 1
5

12,622,184 65% D155 449 18,288 4,167 4

- - D85 - - 1

- - PC200 - - 4,167 1
- - PC200 (Long Arm) - - - 1

PSI UNIT FORMULA RIPPING (cross DOZING RIP. & DOZ.


ripping)

meter J 20.00 20.00


meter LK 1.20
meter p = fbr x dr 0.00
lcm KB 6.80
m/min f 41.67 54.17
m/min r 66.67 100.00
minutes z 0.42 0.30
menit Ct =f/J+r/J+z 1.20 0.87
FK =fk x ef x so 0.68 0.68

lcm/jam QR, QD, KP 318 0


bcm/jam 244 0

0.80
0.90
0.84
0.90
1.10
0.85
PT. SATRIA BAHANA SARANA
TANJUNG ENIM HEAD OFFICE

MATERIAL CHARACTERISTICS
density (tonnes/bcm) : 2.08 486 1,011
density (tonnes/lcm) : 1.50
swell factor (lcm/bcm) : 1.39
density (tonnes/bcm) : 1.26
density (tonnes/lcm) : 0.85
swell factor (lcm/bcm) : 1.48
PEKERJAAN TANAH
ASUMSI UNIT PC2000 PC1250
SPEED HAULER HD785 HD785 HD465 A40E
In pit speed (load) km/jam 10.00 10.00 10.00 10.00
Disposal speed (load) km/jam 10.00 10.00 10.00 10.00
Haul speed (load) HD km/jam 25.00 25.00 25.00 22.00
Disposal speed (empty) km/jam 12.00 12.00 12.00 12.00
In pit speed (empty) km/jam 12.00 12.00 12.00 12.00
Travel speed (empty) km/jam 37.00 37.00 37.00 25.00

CYCLE TIME
Manuver&Spotting time DT menit 0.50 0.50 0.50 0.50
In Pit Time (load) menit 1.80 1.80 1.80 1.80
Disposal Time (load) menit 1.20 1.20 1.20 1.20
Manuver and Dumping time menit 1.00 1.00 1.00 1.00
Disposal Time (empty) menit 1.00 1.00 1.00 1.00
In Pit Time (empty) menit 1.50 1.50 1.50 1.50

TOTAL + Hauling & Traveling TOTAL JARAK PER AREA UNIT TOTAL CT TANAH
JARAK In Pit Dist Haul Dist Dump Area PC2000 PC1250
(km) (km) (km) (km) HD785 HD785 HD465 A40E

0.525 0.300 0.025 0.200 menit 10 12 10 9


0.625 0.300 0.125 0.200 menit 11 13 10 10
0.725 0.300 0.225 0.200 menit 11 13 11 10
0.825 0.300 0.325 0.200 menit 12 14 11 11
0.925 0.300 0.425 0.200 menit 12 14 12 11
1.025 0.300 0.525 0.200 menit 12 14 12 12
1.125 0.300 0.625 0.200 menit 13 15 12 12
1.225 0.300 0.725 0.200 menit 13 15 13 13
1.325 0.300 0.825 0.200 menit 14 16 13 13
1.425 0.300 0.925 0.200 menit 14 16 14 14
1.525 0.300 1.025 0.200 menit 15 16 14 14
1.625 0.300 1.125 0.200 menit 15 17 14 15
1.725 0.300 1.225 0.200 menit 15 17 15 15
1.825 0.300 1.325 0.200 menit 16 18 15 16
1.925 0.300 1.425 0.200 menit 16 18 16 16
2.025 0.300 1.525 0.200 menit 17 18 16 17
2.125 0.300 1.625 0.200 menit 17 19 17 17
2.225 0.300 1.725 0.200 menit 17 19 17 18
2.325 0.300 1.825 0.200 menit 18 20 17 18
2.425 0.300 1.925 0.200 menit 18 20 18 19
2.525 0.300 2.025 0.200 menit 19 20 18 20
2.625 0.300 2.125 0.200 menit 19 21 19 20
2.725 0.300 2.225 0.200 menit 19 21 19 21
2.825 0.300 2.325 0.200 menit 20 22 19 21
2.925 0.300 2.425 0.200 menit 20 22 20 22
3.025 0.300 2.525 0.200 menit 21 22 20 22
3.125 0.300 2.625 0.200 menit 21 23 21 23
3.225 0.300 2.725 0.200 menit 21 23 21 23
3.325 0.300 2.825 0.200 menit 22 24 21 24
3.425 0.300 2.925 0.200 menit 22 24 22 24
3.525 0.300 3.025 0.200 menit 23 24 22 25
3.625 0.300 3.125 0.200 menit 23 25 23 25
3.725 0.300 3.225 0.200 menit 23 25 23 26
3.825 0.300 3.325 0.200 menit 24 26 23 26
3.925 0.300 3.425 0.200 menit 24 26 24 27
4.025 0.300 3.525 0.200 menit 25 26 24 27
4.125 0.300 3.625 0.200 menit 25 27 25 28
4.225 0.300 3.725 0.200 menit 25 27 25 28
4.325 0.300 3.825 0.200 menit 26 28 25 29
4.425 0.300 3.925 0.200 menit 26 28 26 29
Density m3 Ton
batubara 0.85 23.46 20
OB 1.50 14.0 21

PEKERJAAN TANAH PEK. BATUBARA


PC800 PC400 PC300 PC200 PC1250 PC800 PC400 PC800 PC400
HD465 A40E A40E K380 K380 K380 HD465 HD465 P440 P360 P440 P360 FM260 FM260
10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
25.00 22.00 22.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00
12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00
12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00
37.00 25.00 25.00 37.00 37.00 37.00 37.00 37.00 37.00 37.00 37.00 37.00 37.00 37.00

0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80
1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
1.00 1.00 1.00 1.00 1.00 1.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50

TOTAL CT TANAH TOTAL CT BATUBARA


PC800 PC400 PC300 PC200 PC1250 PC800 PC400 PC800 PC400
HD465 A40E A40E K380 K380 K380 HD465 HD465 P440 P360 P440 P360 FM260 FM260

11 10 11 9 11 12 16 18 17 15 17 16 16 18
12 11 12 9 11 12 16 18 17 15 17 16 17 18
12 11 12 10 11 13 17 18 18 16 18 17 17 19
12 12 13 10 12 13 17 19 18 16 18 17 17 19
13 12 13 11 12 14 17 19 19 16 18 18 18 19
13 13 14 11 13 14 18 20 19 17 19 18 18 20
14 13 14 11 13 14 18 20 19 17 19 18 19 20
14 14 15 12 13 15 19 20 20 18 20 19 19 21
14 14 15 12 14 15 19 21 20 18 20 19 19 21
15 15 16 13 14 16 19 21 21 18 20 20 20 22
15 15 16 13 15 16 20 22 21 19 21 20 20 22
16 16 17 13 15 16 20 22 21 19 21 20 21 22
16 16 17 14 15 17 21 22 22 20 22 21 21 23
16 17 18 14 16 17 21 23 22 20 22 21 21 23
17 17 18 15 16 18 21 23 23 20 22 22 22 24
17 18 19 15 17 18 22 24 23 21 23 22 22 24
18 18 19 15 17 19 22 24 23 21 23 22 23 24
18 19 20 16 17 19 23 24 24 22 24 23 23 25
18 19 20 16 18 19 23 25 24 22 24 23 23 25
19 20 21 17 18 20 23 25 25 22 24 24 24 26
19 20 21 17 19 20 24 26 25 23 25 24 24 26
20 21 22 17 19 21 24 26 25 23 25 24 25 26
20 21 22 18 19 21 25 26 26 24 26 25 25 27
20 22 23 18 20 21 25 27 26 24 26 25 25 27
21 22 23 19 20 22 25 27 27 24 26 26 26 28
21 23 24 19 21 22 26 28 27 25 27 26 26 28
22 23 24 19 21 23 26 28 28 25 27 26 27 28
22 24 25 20 21 23 27 28 28 26 28 27 27 29
22 24 25 20 22 23 27 29 28 26 28 27 27 29
23 25 26 21 22 24 27 29 29 26 28 28 28 30
23 25 27 21 23 24 28 30 29 27 29 28 28 30
24 26 27 21 23 25 28 30 30 27 29 29 29 30
24 26 28 22 23 25 29 30 30 28 30 29 29 31
24 27 28 22 24 25 29 31 30 28 30 29 29 31
25 28 29 23 24 26 29 31 31 28 30 30 30 32
25 28 29 23 25 26 30 32 31 29 31 30 30 32
26 29 30 23 25 27 30 32 32 29 31 31 31 32
26 29 30 24 25 27 31 32 32 30 32 31 31 33
27 30 31 24 26 27 31 33 32 30 32 31 31 33
27 30 31 25 26 28 31 33 33 30 32 32 32 34
PT. SATRIA BAHANA SARANA
TANJUNG ENIM HEAD OFFICE

1. LOADER PRODUCTIVITY
UNIT PEKERJAAN TANAH
DESCRIPTION SIMBOL PC2000 PC1250 PC800 PC400
HD785 HD785 HD465 A40E HD465 A40E K380 A40E
Bucket Cap'ty q lcm 12.00 6.50 6.50 6.50 4.50 4.50 4.50 3.20
Swell Factor SF 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39
Bucket Fill Factor k % 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Cycle time (load only) CT sec 30 25 25 25 24 24 24 23
Job Effeciency E % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Prod'ty formula Qf bcm/hr 788 512 512 512 369 369 369 274
Prodty Target Qt bcm/hr 630 504 504 504 369 369 369 250
Coefisien prod'ty C % 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Number of passing n pass 5.14 9.48 5.42 3.89 7.82 5.62 2.60 7.90
Volume to load Vol bcm 42.17 42.17 24.09 17.30 24.09 17.30 8.00 17.30
4.02 5.02 2.87 2.06 3.91 2.81 1.30 4.15
Loading time (CT in full) LT min 3.38 5.21 2.97 2.14 4.12 2.96 1.37 3.99
Produtivity Loader Q bcm/hr 748 486 486 486 350 350 350 260
9 5 3 7 6 3 8
Number of passing n pass 5 9 5 4 8 6 3 8
Loading time LT min 3.4 5.2 3.0 2.1 4.1 3.0 1.4 4.0
Volume to load Vol bcm 42 42 24 17 24 17 8 17
Standard Vessel Ves Cap bcm 42 42 24 17 24 17 8 17
Loose Density 14.94 11.95 20.92 29.13 15.34 21.35 46.18 14.45
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 2 3 4 5 6 7 8 9 10
2. HAULER PRODUCTIVITY
UNIT PEKERJAAN TANAH
DESCRIPTION JARAK PC2000 PC1250 EC700 PC400
(KM) HD785 HD785 HD465 A40E HD465 A40E A40E

0.000 0.525 bcm/hr 241 206 143 112 129 103 93


0.526 0.625 bcm/hr 232 199 138 106 124 98 89
0.626 0.725 bcm/hr 224 193 133 101 120 93 85
0.726 0.825 bcm/hr 216 187 128 96 116 89 82
0.826 0.925 bcm/hr 209 182 124 92 113 85 79
0.926 1.025 bcm/hr 202 177 120 88 109 82 76
1.026 1.125 bcm/hr 196 172 116 84 106 79 73
1.126 1.225 bcm/hr 190 167 112 81 103 76 71
1.226 1.325 bcm/hr 185 163 109 78 100 73 68
1.326 1.425 bcm/hr 179 159 106 75 97 71 66
1.426 1.525 bcm/hr 174 155 103 72 95 68 64
1.526 1.625 bcm/hr 170 151 100 70 92 66 62
1.626 1.725 bcm/hr 165 148 97 67 90 64 60
1.726 1.825 bcm/hr 161 144 94 65 88 62 58
1.826 1.925 bcm/hr 157 141 92 63 86 60 57
1.926 2.025 bcm/hr 153 138 90 61 84 58 55
2.026 2.125 bcm/hr 150 135 88 59 82 57 54
2.126 2.225 bcm/hr 146 132 85 58 80 55 52
2.226 2.325 bcm/hr 143 129 83 56 78 54 51
2.326 2.425 bcm/hr 140 127 82 55 77 52 50
2.426 2.525 bcm/hr 137 124 80 53 75 51 49
2.526 2.625 bcm/hr 134 122 78 52 73 50 47
2.626 2.725 bcm/hr 131 120 76 51 72 49 46
2.726 2.825 bcm/hr 128 117 75 49 71 47 45
2.826 2.925 bcm/hr 126 115 73 48 69 46 44
2.926 3.025 bcm/hr 123 113 72 47 68 45 43
3.026 3.125 bcm/hr 121 111 70 46 67 44 42
3.126 3.225 bcm/hr 119 109 69 45 65 43 42
3.226 3.325 bcm/hr 116 107 68 44 64 42 41
3.326 3.425 bcm/hr 114 106 66 43 63 42 40
3.426 3.525 bcm/hr 112 104 65 42 62 41 39
3.526 3.625 bcm/hr 110 102 64 41 61 40 38
3.626 3.725 bcm/hr 108 101 63 40 60 39 38
3.726 3.825 bcm/hr 107 99 62 40 59 38 37
3.826 3.925 bcm/hr 105 97 61 39 58 38 36
3.926 4.025 bcm/hr 103 96 60 38 57 37 36
4.026 4.125 bcm/hr 101 94 59 37 56 36 35
4.126 4.225 bcm/hr 100 93 58 37 55 36 34
4.226 4.325 bcm/hr 98 92 57 36 55 35 34
4.326 4.425 bcm/hr 97 90 56 35 54 35 33
N TANAH PEK. BATUBARA
PC400 PC300 PC200 PC1250 PC800 PC400 PC300 PC800 PC400
K380 K380 A40E K380 A40E HD465 HD465 VCO VOB VCO VOB VCO FM260 FM260
3.20 1.49 1.49 0.93 0.93 6.50 4.50 4.50 4.50 3.20 3.20 1.49 4.50 3.20
1.39 1.39 1.39 1.39 1.39 1.48 1.48 1.48 1.48 1.48 1.48 1.48 1.48 1.48 lcm/bcm
0.95 0.95 0.95 0.95 0.95 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
23 20 20 18 18 25 24 24 24 23 23 23 24 23
0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
274 147 147 102 102 455 328 328 328 243 243 113 328 243
250 225 225 161 161 455 328 328 328 286 286 225 328 243 bcm/hr
0.95 0.95 0.95 0.95 0.95 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
3.65 7.85 16.97 12.57 27.19 7.10 10.25 9.52 5.86 9.40 8.24 20.18 8.05 11.32
8.00 8.00 17.30 8.00 17.30 28.00 28.00 26.00 16.00 23.00 16.00 23.00 22.00 22.00
1.92 2.13 4.61 2.98 6.45 3.70 5.12 4.76 2.93 4.83 3.36 6.13 4.03 5.43
1.85 3.45 7.45 4.97 10.75 4.62 6.41 5.95 3.66 5.63 4.93 12.09 5.03 6.78
260 139 139 97 97 458 330 330 330 309 245 144 330 245 ton/hr
4 8 17 12.00 27.00 9-10 20
4 8 17 13 27 7 10 10 6 9 8 20 8 11
1.8 3.4 7.5 5.0 10.7 4.6 6.4 5.9 3.7 5.6 4.9 12.1 5.0 6.8
8 8 17 8 17 28 28 26 16 18 16 18 22 22
8 8 17 8 17 28 28 26 16 23 16 23 22 22
31.25 28.13 13.01 20.13 9.31 12.43 9.78
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
11 12 13 14 15 16 17 18 19 20 21

N TANAH PEKERJAAN BATUBARA


PC400 PC300 PC200 PC1250 PC800 PC400 PC800 PC400
K380 K380 K380 HD465 HD465 VCO VOB VCO VOB FM260 FM260

54 46 40 107 96 92 65 82 60 82 74
51 44 38 104 94 89 63 81 58 80 72
49 42 37 102 92 87 62 79 57 78 71
47 41 36 99 90 85 60 77 56 76 69
45 39 35 97 88 84 59 75 54 74 68
44 38 34 95 86 82 57 74 53 73 66
42 37 33 93 84 80 56 72 52 71 65
41 36 32 91 83 79 55 71 51 70 64
39 35 31 89 81 77 53 69 50 68 63
38 34 31 87 80 75 52 68 49 67 61
37 33 30 85 78 74 51 67 48 65 60
36 32 29 83 77 73 50 65 47 64 59
35 31 28 82 75 71 49 64 46 63 58
34 30 28 80 74 70 48 63 45 62 57
33 30 27 79 73 69 47 62 44 61 56
32 29 27 77 71 68 46 61 44 60 55
31 28 26 76 70 66 45 60 43 58 54
30 28 25 74 69 65 44 59 42 57 53
30 27 25 73 68 64 44 58 41 56 53
29 26 24 72 67 63 43 57 41 56 52
28 26 24 71 66 62 42 56 40 55 51
28 25 23 70 65 61 41 55 39 54 50
27 25 23 68 64 60 41 54 39 53 49
26 24 23 67 63 59 40 53 38 52 49
26 24 22 66 62 58 39 52 37 51 48
25 23 22 65 61 58 39 52 37 50 47
25 23 21 64 60 57 38 51 36 50 47
24 22 21 63 59 56 37 50 36 49 46
24 22 21 62 58 55 37 49 35 48 45
23 22 20 61 58 54 36 49 35 47 45
23 21 20 60 57 54 36 48 34 47 44
22 21 20 60 56 53 35 47 34 46 43
22 20 19 59 55 52 35 47 33 46 43
22 20 19 58 55 51 34 46 33 45 42
21 20 19 57 54 51 34 45 32 44 42
21 19 18 56 53 50 33 45 32 44 41
20 19 18 56 53 49 33 44 31 43 41
20 19 18 55 52 49 32 44 31 43 40
20 19 18 54 51 48 32 43 31 42 40
19 18 17 53 51 48 32 43 30 41 39
PT. SATRIA BAHANA SARANA
TANJUNG ENIM HEAD OFFICE

FLEET REQUIREMENT CALCULATION (TAHAP 2)

based on uji petik PTBA

19.9
cek volume vessel Hino, ADT
cek lagi vol vessel 19.2

3. JUMLAH HAULER
UNIT PEKERJAAN TANAH
DESCRIPTION JARAK PC2000 PC1250 EC700 PC400 PC300
(KM) HD785 HD785 HD465 A40E HD465 A40E A40E K380 K380
0 0
0.000 0.500 3 2 3 4 3 3 3 5 3
0.526 0.625 3 2 4 5 3 4 3 5 3
0.626 0.725 3 3 4 5 3 4 3 5 3
0.726 0.825 3 3 4 5 3 4 3 6 3
0.826 0.925 4 3 4 5 3 4 3 6 4
0.926 1.025 4 3 4 6 3 4 3 6 4
1.026 1.125 4 3 4 6 3 4 4 6 4
1.126 1.225 4 3 4 6 3 5 4 6 4
1.226 1.325 4 3 4 6 4 5 4 7 4
1.326 1.425 4 3 5 6 4 5 4 7 4
1.426 1.525 4 3 5 7 4 5 4 7 4
1.526 1.625 4 3 5 7 4 5 4 7 4
1.626 1.725 5 3 5 7 4 5 4 7 4
1.726 1.825 5 3 5 7 4 6 4 8 5
1.826 1.925 5 3 5 8 4 6 5 8 5
1.926 2.025 5 4 5 8 4 6 5 8 5
2.026 2.125 5 4 6 8 4 6 5 8 5
2.126 2.225 5 4 6 8 4 6 5 9 5
2.226 2.325 5 4 6 9 4 6 5 9 5
2.326 2.425 5 4 6 9 5 7 5 9 5
2.426 2.525 5 4 6 9 5 7 5 9 5
2.526 2.625 6 4 6 9 5 7 6 9 6
2.626 2.725 6 4 6 10 5 7 6 10 6
2.726 2.825 6 4 6 10 5 7 6 10 6
2.826 2.925 6 4 7 10 5 8 6 10 6
2.926 3.025 6 4 7 10 5 8 6 10 6
3.026 3.125 6 4 7 11 5 8 6 10 6
3.126 3.225 6 4 7 11 5 8 6 11 6
3.226 3.325 6 5 7 11 5 8 6 11 6
3.326 3.425 7 5 7 11 6 8 7 11 6
3.426 3.525 7 5 7 12 6 9 7 11 7
3.526 3.625 7 5 8 12 6 9 7 12 7
3.626 3.725 7 5 8 12 6 9 7 12 7
3.726 3.825 7 5 8 12 6 9 7 12 7
3.826 3.925 7 5 8 12 6 9 7 12 7
3.926 4.025 7 5 8 13 6 9 7 12 7
4.026 4.125 7 5 8 13 6 10 7 13 7
4.126 4.225 7 5 8 13 6 10 8 13 7
4.226 4.325 8 5 9 14 6 10 8 13 7
4.326 4.425 8 5 9 14 6 10 8 14 8
NO ACTIVITY VOL
Bcm

PIT 2 BANKO BARAT


1 Penggal 12,622,184

2 Pengangkutan Tanah (2,5 Km)


PC2000 6,604,151
PC1250 6,018,033
Angkuta 500,000

3 General, Road Maint, Dewatering

PEK. BATUBARA
PC200 PC1250 PC800 PC400 PC800 PC400
K380 HD465 HD465 VCO VOB VCO VOB FM260 FM260

2 4 3 4 5 4 4 4 3
3 4 4 4 5 4 4 4 3
3 4 4 4 5 4 4 4 3
3 5 4 4 6 4 4 4 4
3 5 4 4 6 4 5 4 4
3 5 4 4 6 4 5 5 4
3 5 4 4 6 4 5 5 4
3 5 4 4 6 4 5 5 4
3 5 4 4 6 4 5 5 4
3 5 4 4 6 5 5 5 4
3 5 4 4 6 5 5 5 4
3 6 4 5 7 5 5 5 4
3 6 4 5 7 5 5 5 4
3 6 4 5 7 5 5 5 4
4 6 5 5 7 5 6 5 4
4 6 5 5 7 5 6 6 4
4 6 5 5 7 5 6 6 5
4 6 5 5 8 5 6 6 5
4 6 5 5 8 5 6 6 5
4 6 5 5 8 5 6 6 5
4 6 5 5 8 6 6 6 5
4 7 5 5 8 6 6 6 5
4 7 5 6 8 6 6 6 5
4 7 5 6 8 6 6 6 5
4 7 5 6 8 6 7 6 5
4 7 5 6 8 6 7 7 5
5 7 6 6 9 6 7 7 5
5 7 6 6 9 6 7 7 5
5 7 6 6 9 6 7 7 5
5 8 6 6 9 6 7 7 5
5 8 6 6 9 6 7 7 6
5 8 6 6 9 7 7 7 6
5 8 6 6 9 7 7 7 6
5 8 6 6 10 7 7 7 6
5 8 6 6 10 7 8 8 6
5 8 6 7 10 7 8 8 6
5 8 6 7 10 7 8 8 6
5 8 6 7 10 7 8 8 6
5 8 6 7 10 7 8 8 6
6 9 6 7 10 7 8 8 6
%VOL MODEL PRODTY NEED HRSE FF WHRS REQ.
ALAT Bcm/Hr Hr/Yr Hr/Yr

52% PC2000 800 8,255 4,167 2


48% PC1250 486 12,383 4,167 3

anah (2,5 Km)


100% HD785 179 36,895 4,167 9
100% HD785` 159 37,849 4,167 9
100% HD785 159 3,145 4,167 1
19

Maint, Dewatering PC200 1


1
9 Clay and Gravel dry 1 2 1
10 Clay and Gravel wet 2 2 1
11 Coal Bituminous Ash (max) 1 1 1
12 Coal Bituminous Ash (min) 1 1 1
13 Coal Raw Anthracite 1 2 1
14 Coal Raw Bituminous 1 1 1

16 Coal Washed Bituminous 1 1 1


17 Decomposed Rock 25% rock, 75% Eart2 2 1
18 Decomposed Rock 50% rock, 50% Eart2 2 1
19 Decomposed Rock 75% rock, 25% Eart2 3 1
20 Earth Dry packed 2 2 1

21 Earth Loam 1 2 1
22 Earth Wet excavated 2 2 1

Anda mungkin juga menyukai