I. SCOPE OF WORK
The work to be undertaken in this contract shall include:
a. Furnishing of all necessary materials, labor and equipment required in the
construction.
b. Complete construction of the building in accordance with the plan and specification
submitted herewith.
c. All works took be done shall be in the highest quality of workmanship and to the
fullest intent of the plan and specification unless otherwise specified by the
Engineer.
IV. LOCATION
a. The proper structure is to be created.
b. The building shall be staked out and grade established by the Engineer or his
authorized representative.
c. All materials shall be stored within our near sure work and shall be conducted in
such a manner as to preserve all works by the Engineer.
VI. EXCAVATION
a. All excavation required for foundation indicated on the site drawing shall be done by
the contractor by his expense.
b. Excavation shall be done in accordance from the bottom of the excavation before
setting up the footing and no footing shall be rest on fill.
c. All fills shall be placed 1 layer not exceeding 150mm thickness, each layer is to be
compacted by wetting, tamping and rolling.
d. After forms have been removed from wall footing and piers, the materials from
excavation shall be used for backfilling. Materials not used shall be placed on an
immediate premise as directed by the Engineer provided the contractor shall not
require moving such materials more than 50 meters.
VIII. FRAMING
a. All framing shall be mortised and tenoned and fitted together with closed tight joints
in approved manner. No joint on the purlins will be allowed between bearings. Ask
openings shall have frames or dimensions shown on the drawings.
X. STEEL/METAL WORKS
a. All structural steel shall conform to the Structural Steel Specification and to the
requirements of NSCP 2010.
XII. CEILING
a. The ceiling shall be furnished with ¼" x 4" x 8' plywood. Trap door shall be provided
in the ceiling which shall be framed so as to appear as part of the ceiling rooms.
XIII. TILES
a. Sample of tiles shall be submitted to the Engineer for approval as to quality, texture,
size, color and all tiles to be used in this construction shall conform in every aspect
to the approved samples.
b. Plain cement for wains coating of toilet and bathroom wall. For toilet floor, it shall be
finished with ceramics mosaic tiles or glazed tiles.
XVI. PLUMBING
a. The contractor shall furnish all labor materials required for the complete
installations of plumbing system including all the necessary fixture shown on the
drawing or as specified herein. It shall include the water service connection from
main water source to the building in all fixtures, the wall and vent pipes and all
piping connections to septic vault or main sewer line.
XVII. PAINTING
a. All painting materials shall have first grade quality and shall meet the requirements
of the Government Standard Specifications and shall be approved and delivered in
original container. No ready mixed paint shall be allowed.
b. All wood surfaces to be painted shall be thoroughly cleaned before any paint is
applied. All saps, knots and defects shall be dried and free from dir, grease or alkali,
and sufficient time shall be allowed between coats.
c. No painting shall be done in wet weather. All works shall be done in first class
workmanship. No succeeding costs shall be done it applied unless the preceding
costs have been inspected and accepted by the Engineer.
XVIII. MISCELLANEOUS
a. Any work in connection with this specifications, which are not specified herewith but
necessary to have and desired by the owner with the approval of the Engineer shall
be done in the best and approved manner in accordance with the standard practice
and based on reasonable interpretation of the plan.