Date Approved : 27 May 2015

UNIT PRICES FOR AMBON REGION


A. Labor Salary
Unit Price (Rp)
NO DESCRIPTION Unit Jurnal HSBB Edisi 34 Other
Tahun 2015
1 Unskilled workers (Pekerja Tidak Terampil) OH 60,000
Skilled workers (Pekerja Terampil)
2 OH 70,000
3 Helper (Mechanic, Operator, Driver) OH 75,000
4 Operator OH 150,000
5 Mason (Tukang Batu) OH 100,000
6 Diver OH 110,000
7 Foreman (Kepala Tukang) OH 125,000
8 Head Foreman (Mandor) OH 150,000

B. Material Prices
Unit Price (Rp)
NO DESCRIPTION Unit Jurnal HSBB Edisi 34 Other
Tahun 2015
A. BASICLY MATERIAL
I. Sand
1.1 Sand fill (Pasir Urug / Timbunan) m3 190,000
1.2 Sand Pair (Pasir Pasang) m3 200,000
1.3 Sand for Concrete (Pasir Beton) m3 200,000
II. Red Soil m3 159,000
III. Gravel (Kerikil) m3 320,000
IV. Sand Stone (Sirtu) m3 160,000
V. Portland Cement Tonasa (50 kg) zak 70,000
VI. White Cement (40kg) zak 110,000
VII. River Stone (Batu Kali)
7.1 Cobblestone (Batu bulat utuh) m3 179,000
7.2 Crushed Stone 10/15 (Batu pecah 10-15 cm) m3 223,000
7.3 Crushed Stone 5/7 (Batu pecah 5-7 cm) m3 170,000
7.4 Crushed Stone 3/5 (Batu pecah 3-5 cm) m3 220,000
7.5 Crushed Stone 2/3 (Batu pecah 2-3 cm) m3 250,000
7.6 Crushed Stone 1/2 (Batu pecah 1-2 cm) m3 500,000
7.7 Coral reef (Batu Karang) m3 140,000
VIII. ROCK
1 Rock 10-60 kg m3 177,273
2 Rock 60-300 kg m3 196,970
3 Rock 300-1000 kg m3 236,364

B. IRON MATERIAL
I. Plain Reinforcement (Besi Beton Polos)
1.1 Iron kg 10,000
1.2 d = 6 mm btng 38,500
1.3 d = 8 mm btng 64,000
1.4 d = 10 mm btng 104,000
1.5 d = 12 mm btng 147,000
1.7 d = 16 mm btng 260,000
1.8 d = 19 mm btng 350,000
1.9 d = 22 mm btng 462,000

C. WOOD MATERIAL
I. WOOD CLASS I 67,435,000
II. WOOD CLASS II 2,800,000
III. WOOD CLASS III
IV. TRIPLEKS UK. 122X244 CM
4.1 Tripleks 2 mm lmbr 53,500
4.2 Tripleks 3 mm lmbr 71,000
4.3 Tripleks 4 mm lmbr 55,000
4.4 Tripleks 6 mm lmbr 99,000
4.5 Tripleks 9 mm lmbr 131,000
4.6 Teakwood 3 mm lmbr 97,500 85,500
4.7 Plywood t. 3mm lmbr 98,000

D. ROAD MATERIAL
I. Geotextile m2 21,615
II. Geomattress m2 71,500
III. Asphalt kg 16,000

E. FUEL
I. Solar ltr 10,100
II. Premium ltr 7,800
III Oil ltr 75,000

F. OTHER
I. Nail kg 25,000
II. Formwork Oil ltr 29,000

C. Rental Cost
Unit Price (Rp)
NO DESCRIPTION Unit Jurnal HSBB Edisi 34 Other
Tahun 2015
1 Tug Boat Hour 900,000
2 Barge Hour 1,852,683
3 Excavator Hour 400,000
4 Wheel loader Hour 350,000
5 Buldozer Hour 500,000
6 Square Pontoon Hour 215,000
7 Dump truck Hour 200,000
8 Crawler crane Hour 800,000
9 Theodolit Hour 50,000
10 Vibro Roller Hour 350,000
11 Passenger Boat (Sampan) Hour 65,000

Note :
1 Responsibilities of tenants includes mobilization and demobilization equpments, fuel, meals allowance, eat
accommodation operator / mechanic, security, insurance and any taxes / levies
2 The minimum rental period 210 hours (1 month)
3 Production Year of Heavy Equipment 2008 - 2010
N

Remark

OH = Orang / Hari
OH = Man / day

Remark

Contractor

Contractor
Contractor
Contractor

Assumptions
PT. KUG
Assumptions
Contractor

Contractor

Contractor

Contractor
Contractor

PT Geosinindo

Pertamina 12 May 2015


Pertamina 12 May 2015

Remark

From Site
, meals allowance, eat operator, shelter /
Date Approved : 27 May 2015

UNIT PRICES FOR MAKASSAR REGION


A. Labour Salary
Unit Price (Rp)
NO DESCRIPTION Unit Jurnal HSBB Edisi 34 Other
Tahun 2015
1 Unskilled workers (Pekerja Tidak Terampil) OH 50,000
Skilled workers (Pekerja Terampil)
2 OH 70,000
3 Mason (Tukang Batu) OH 100,000
4 Foreman (Kepala Tukang) OH 125,000
5 Heavy Equipment Operator OH 150,000
6 Head Foreman (Mandor) OH 150,000

B. Material Prices
Unit Price (Rp)
NO Unit Jurnal HSBB Edisi 34
URAIAN Other
Tahun 2015
A. BASICLY MATERIAL
I. Sand
1.1 Sand fill (Pasir Urug / Timbunan) m3 89,000
1.2 Sand Pair (Pasir Pasang) m3 100,000
1.3 Sand for Concrete (Pasir Beton) m3 148,000
II. Red Soil m3 50,000
III. Gravel (Kerikil) m3 277,000
IV. Sand Stone (Sirtu) m3 177,000
V Portland Cement (50 kg) zak 43,000
VI. White Cement (40kg) zak 53,000
VII. River Stone (Batu Kali)
7.1 Cobblestone (Batu bulat utuh) m3 152,000
7.2 Crushed Stone 7-10 cm m3 237,000
7.3 Crushed Stone 5-7 cm m3 256,000
7.4 Crushed Stone 3-5 cm m3 262,000
7.5 Crushed Stone 2-3 cm m3 267,000
7.6 Crushed Stone 1-2 cm m3 272,000
7.7 Rock m3 160,000
VIII. ROCK
1 Rock 10-300 kg m3 118,800
2 Rock 300-900 kg m3 132,000
3 Rock 900-1200 kg m3 158,400

B. IRON MATERIAL
I. Plain Reinforcement (Besi Beton Polos)
1.1 d = 4 mm btng 24,000
1.2 d = 6 mm btng 35,500
1.3 d = 8 mm btng 50,000
1.4 d = 10 mm btng 75,000
1.5 d = 12 mm btng 106,000
1.6 d = 14 mm btng 131,000
1.7 d = 16 mm btng 165,000
1.8 d = 19 mm btng 200,000
1.9 d = 22 mm btng 325,000
II. Screw Reinforcement (Besi Beton Ulir)
2.1 d = 13 mm btng 110,000
2.2 d = 16 mm btng 165,000
2.3 d = 29 mm btng 227,000

C. WOOD MATERIAL
I. WOOD CLASS I
1.1 Sawmil saws Beam m3 10,300,000
1.2 Sawmil saws Boards m3 10,550,000
1.3 Sansaw saws Beam m3 8,750,000
1.4 Sansaw saws Boards m3 8,800,000
II. WOOD CLASS II
2.1 Beam m3 4,800,000
2.2 Board m3 4,850,000
III. WOOD CLASS II
3.1 Beam m3 2,900,000
3.2 Board m3 3,475,000
IV. TRIPLEKS UK. 122X244 CM
4.1 Tripleks 2 mm lmbr 53,500
4.2 Tripleks 3 mm lmbr 71,000
4.3 Tripleks 6 mm lmbr 99,000
4.4 Tripleks 9 mm lmbr 131,000
4.5 Teakwood 3 mm lmbr 97,500

D. ROAD MATERIAL
I. Geotextile m2 35,000
II. Geomattress m2 40,000
III. Aspal kg 16,000

E. FUEL
I. Solar ltr 10,100
II. Premium ltr 7,800
III Minyak Pelumas ltr 69,000

F. OTHER
I. Nail kg 17,500
II. Formwork Oil ltr 29,000
C. Rental Cost
Unit Price (Rp)
NO DESCRIPTION Unit Jurnal HSBB Edisi 34 Other
Tahun 2015
1 Tug Boat Hour 810,000
2 Barge Hour 1,667,415
3 Excavator Hour 360,000
4 Wheel loader Hour 315,000
5 Buldozer Hour 450,000
6 Square Pontoon Hour 193,500
7 Dump truck Hour 180,000
8 Crawler crane Hour 720,000
9 Theodolit Hour 50,000
10 Vibro Roller Hour 315,000
11 Passenger Boat (Sampan) Hour 65,000
65000

Note :
1 Responsibilities of tenants includes mobilization and demobilization equpments, fuel, meals allowance, eat
shelter / accommodation operator / mechanic, security, insurance and any taxes / levies
2 The minimum rental period 210 hours (1 month)
3 Production Year of Heavy Equipment 2008 - 2010
ION

Remark

OH = Orang / Hari

Remark

PT. BKS

Assumptions
PT. BKS
Assumptions
PT Geosinindo

Pertamina 12 May 2015


Pertamina 12 May 2015
Remark

P. Jawa Prices +30%

fuel, meals allowance, eat operator,


Date Approved : 27 May 2015

UNIT PRICES FOR SEMARANG REGION


A. Labour Salary
Unit Price (Rp)
NO DESCRIPTION Unit Jurnal HSBB Edisi
Other
34 Tahun 2015
1 Unskilled workers (Pekerja Tidak Terampil) OH 60,000
Skilled workers (Pekerja Terampil)
2 OH 75,000
3 Mason (Tukang Batu) OH 80,000
4 Foreman (Kepala Tukang) OH 90,000
5 Head Foreman (Mandor) OH 75,000

B. Material Prices
Unit Price (Rp)
NO DESCRIPTION Unit Jurnal HSBB Edisi
Other
34 Tahun 2015

A. BASICLY MATERIAL
I. Sand
1.1 Sand fill (Pasir Urug / Timbunan) m3 130,000
1.2 Sand Pair (Pasir Pasang) m3 210,000
1.3 Sand for Concrete (Pasir Beton) m3 250,000
II. Red Soil m3 65,000
III. Gravel (Kerikil) m3 270,000
IV. Sand Stone (Sirtu) m3 177,000
V Portland Cement
5.1 Holcim 40 kg zak 55,000
5.2 Holcim 50 kg zak 65,000
5.3 Cibinong 40 kg zak 54,500
5.4 Cibinong 50 kg zak 64,000
5.5 Cement colour kg 12,000
VI. White Cement
6.1 White Cement 40 kg zak 75,000
6.2 White Cement 50 kg zak 90,000
VII. River Stone (Batu Kali)
7.1 Cobblestone (Batu bulat utuh) m3 170,000
7.2 Crushed Stone 10-15 cm m3 200,000
7.3 Crushed Stone 5-7 cm m3 220,000
7.4 Crushed Stone 3-5 cm m3 230,000
7.5 Crushed Stone 2-3 cm m3 260,000
7.6 Crushed Stone 1-2 cm m3 270,000
7.7 Rock m3 160,000
VIII. ROCK
8.1 Rock 5-10 kg m3 160,000
8.2 Rock 20-100 kg m3 192,000
8.3 Rock 250-400 kg m3 220,000

B. IRON MATERIAL
1.1 Plain Reinforcement (Besi Beton Polos) kg 10,700
1.2 Screw Reinforcement (Besi Beton Ulir) kg 13,000
1.3 Prestress Reinforcement kg 17,200

C. WOOD MATERIAL
I. JATI
1.1 Board m3 23,000,000
1.2 Beam m3 20,500,000
II. KAMPER
2.1 Board m3 7,800,000
2.2 Beam m3 7,500,000
III. KRUING
3.1 Board m3 6,200,000
3.2 Beam m3 5,400,000
IV. MERANTI
4.1 Board m3 5,100,000
4.2 Beam m3 4,600,000
V. DOLKEN
5.1 Medium 8x10x400 cm bt 20,500
5.2 Small 6x7x400 cm bt 18,000
5.3 Large 10x12x400 cm bt 29,000
VI. TRIPLEKS UK. 122X244 CM
6.1 Tripleks 3 mm lmbr 55,000
6.2 Tripleks 4 mm lmbr 65,000
6.3 Tripleks 5 mm lmbr 72,000

D. ROAD MATERIAL
I. Geotextile m2 36,000
II. Geomattress m2 72,200
III. Aspal drum 1,800,000

E. FUEL
I. Solar ltr 10,100
II. Premium ltr 7,800
III Minyak Pelumas ltr

F. OTHER
I. Nail kg 15,000
II. Formwork Oil ltr 25,000

C. Rental Cost
Unit Price (Rp)
NO DESCRIPTION Unit
NO DESCRIPTION Unit Jurnal HSBB Edisi
Other
34 Tahun 2015

1 Tug Boat Hour 720,000


2 Barge Hour 1,100,000
3 Excavator Hour 290,100
4 Wheel loader Hour 243,700
5 Buldozer Hour 380,000
6 Square Pontoon Hour 167,000
7 Dump truck Hour 125,000
8 Crawler crane Hour 671,000
9 Theodolit Hour 50,000
10 Vibro Roller Hour 296,000
11 Passenger Boat (Sampan) Hour 50,000
65000

Note :
1 Responsibilities of tenants includes mobilization and demobilization equpments, fuel, meals allowance, eat operator,
shelter / accommodation operator / mechanic, security, insurance and any taxes / levies
2 The minimum rental period 210 hours (1 month)
3 Production Year of Heavy Equipment 2008 - 2010
GION

Remark

OH = Orang / Hari
(Man/day)

Remark

Assumptions
Assumptions
Assumptions

Ex. Pertamina 160 kg

Pertamina 12 May 2015


Pertamina 12 May 2015

Remark
Remark

eals allowance, eat operator,