LOW VOLTAGE MOTORS

weg australia - reference list for large machines


Customer : Abon Engineering
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
3 HGF315 250KW 416V 4 60 B35L May 2007 Mining

Customer : Aerodyne Fans


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 HGF315E 400kW 415V 4 1997 Fan

Customer : Aireng
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF355 355KW 415V 6 50 B3R December 2005 Fan
1 HGF450 550KW 690V 8 June 2008 Fan
MGF450 9000KW 690V 6 August 2008 Fan

Customer : Alberton Electrical Services


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
AGA315 460kW 415V 2 B3L DOL December 2006 Wine

Customer : Alcan
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
6 HGF355 280KW 415V 6 B3R July 2005 Fan
3 HGF450 500KW 415V 8 B3R g
August 2005 p
Fan & Pump
3 HGF355 355KW 415V 6 B3R August 2005 Fan & Pump
2 HGF315 355KW 415V 4 B3R August 2005 Fan & Pump
1 HGF355 280KW 415V 6 B3R August 2005 Fan & Pump
9 HGF355 280KW 415V 6 B3R August 2005 Fan & Pump
2 HGF450 500KW 415V 6 B3R September 2005 Fan & Pump
1 HGF400 560KW 415V 4 B3R September 2005 Fan & Pump
6 HGF355 355KW 415V 6 B3R October 2005 Fan & Pump
2 HGF355 400KW 415V 4 B3R October 2005 Fan & Pump
2 HGF450 560KW 415V 6 B3R October 2005 Fan & Pump
6 HGF355 280KW 415V 8 B3R November 2005 Fan & Pump

Customer : Allstate Exploration N.L


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
3 HGF315D 300KW 415V 2 June  1997 Pump

Customer : Alpha Electrics


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 MGF450 675KW 415V 6 B3R IP65 VSD April 2008 Mill

08/05/2009 CTRL
LOW VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : Arrow Electrical
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF315 225KW 415V 4 B3R DOL June 2008 Mining
1 HGF315 225KW 415V 4 B3R DOL July 2008 Mining
1 FAF280 75HP 415V 8 B3R May  2008 Mining

Customer : Austcold Regrigeration


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 HGF355 320kW 380V 2 B3R Y/Delta June 2009 Oil & Gas

Customer : Austral Shipping


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF315 355KW 690V 4 August 2004 Shipping

Customer : Australian Paper


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 HGF315 315KW 415V 4 B3R VSD September 2006 Paper
2 HGF355 250KW 415V 10 B3R IP55 DOL November 2006 Paper
2 HGF315 315KW 415V 4 B3R VSD December 2006 Paper
1 HGF355 250KW 415V 8 50Hz B3R August 2006 Paper

Customer : Avlec
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Cowal Gold 1 HGF355 355kW 690V 6 B3R VSD April 2009 Mining

Customer : AWM Electrical


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF355 500KW 415V 4 50Hz B3R May 2006
2 HGF315 315KW 415V 4 50Hz B3R May 2006

Customer : Barrick
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Cowal Spares 1 HGF355 450KW 690V 4 50Hz B3R April  2006 Pump
Cowal Spares 1 HGF355 355KW 690V 6 50Hz B3R April  2006 Pump
Cowal Spares 1 HGF355 400KW 690V 2 50Hz B3R April 2006 Pump

Customer : Bell Pumps


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 HGF315E 400KW 415V 4 June 1998 Pump

08/05/2009 CTRL
LOW VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : Caltex
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF315 205KW 415V 2 50Hz B3R March 2006 Pump

Customer : Comsteel
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF355D 380KW 415V 6 May  1999 Fan

Customer : CSI - Crushing Services International


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF450 1000kW 415V 4 50Hz B3R IP55 VSD August 2009 Mining

Customer : Comp Air


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF355C 400KW 415V 2 September 2000 Compressor

Customer : Darwin Electric


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 MGF355 205KW 415V 8 50Hz B3L IP65 April  2007 Pump

Customer : Davidsons Electrical


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 FAF315 75KW 415V 6 50Hz B3R May  2006 Conveyor Drives

Customer : Dowding & Mills


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF355 355kW 415V 6 B3R IP55 DOL April 2009

Customer : Eltin Ltd


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF315E 355KW 415V 4 September 1998
1 HGF400A 600KW 415V 4 September 1998

Customer : EMSS
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
WNT 1 HGF400 400KW 415V 8 50Hz B3R IC415 VFD September 2008 Fan

Customer : Engineering Transmission


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF355 400KW 415V 6 B3T November 2008 Paper

08/05/2009 CTRL
LOW VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : Everflow Pumps
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 HGF400B 260KW 400V 12 January  2001 Pump

Customer : Flaktwoods
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF450 400KW 415V 12 July  2004 Fan
3 HGF355 338KW 660V 6 50Hz B3L October 2005 Impeller
4 HGF355 338KW 660V 6 50Hz B3R October 2005 Impeller
4 HGF400 469KW 660V 6 50Hz B3L October 2005 Impeller
3 HGF400 469KW 660V 6 50Hz B3R October 2005 Impeller
10 HGF450 600KW 660V 50Hz V1 December 2005 Impeller

Customer : Flowserve
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Melbourne Water Yuroke 2 HGF355 450KW 415V 4 B3R IP55 DOL October 2008 Water

Customer : Fortescue Metal Group


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Pilbara Iron Ore 1 HGF400 450KW 690V 6 50Hz B3R IP65 VSD October 2008 Mining
Pilbara Iron Ore 4 HGF450 630KW 690V 6 50Hz B3R IP65 VSD October 2008 Mining

Customer : GR Engineering
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Jubilee Mines 1 HGF355 355KW 415V 6 50Hz B3R IP55 VSD February  2008 Mining

Customer : GRD Minproc


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Chelopec ‐ Bulgaria 1 MGW315 365KW 380V 2 B3L IP55 DOL August 2007 Mining

Customer : Huntly Power Station


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 HGF355 450KW 415V 4 50Hz B3R August 2006 Pump

Customer : HQ Electrical
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF400L 400KW 690V 6 B3 IP65 March 2007 Sugar

08/05/2009 CTRL
LOW VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : Isering Electrics
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 FAF250 37KW 415V 4 50Hz B3T February  2006
1 FAF250 37KW 415V 4 50Hz B3T June 2007
2 FAF250 37KW 415V 50Hz B3T September 2007
1 FAF250 37KW 415V 4 50Hz B3T April 2008 Mining
2 HGF315 220KW 415V 6 50Hz V1 IP56 July 2008 Mining
2 HGF315 220KW 415V 6 50Hz V1 IP65 November 2008 Mining
1 HGF315 220KW 415V 4P 50Hz B3R IP55 DOL December 2008 Mining

Customer : Isis Sugar


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF355 280KW 415V 8 50Hz B5R IP55 November 2006 Pump

Customer : Johnson Controls


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
SO2 Liquefaction 1 HGF355 355kW 525V 2 50Hz VSD May 2009
SO2 Liquefaction 1 HGF400 560kW 525V 2 50Hz VSD May 2009

Customer : ITT Flygt


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
y y
Sydney Water 6 HGF355 430KW 415V 4 B3R IP56 VVVF November 2008 Water

Customer : KSB Ajax Pumps


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Huntly Power Station 2 HGF355 450KW 415V 4 50Hz B3R August 2005 Pump

Customer : KSB Ajax


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Yabulu 1 HGF355 350KW 415V 4 50Hz B3R March 2006 Pump

Customer : LE Jarvis
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF315 400KW 415V 4 B3R VSD November 2006
CBC 1 HGF355  350KW 600V 4 50Hz B3L December 2005
Malcolm Thomsom Pumps 1 HGF355 450KW 415V 4 50Hz B3R September 2006 Pump
1 HGF355 450KW 415V 4 B3R IP65 VSD August 2007 Mining
1 HGF355 375KW 415V 4 B3R IP65 December 2007 Mining
2 HGF5810 500KW 460V 2 60Hz F2 IP65 May 2008 Pump

08/05/2009 CTRL
LOW VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : Marlin Coast
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 HGF400 400KW 415V 6 B35R IP55 March 2008 Pump
2 HGF500 800KW 415V 8 50Hz V1 IP56 March 2008 Pump

Customer : Metso
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 MAF450 450KW 525V 10 50Hz B3R March 2007 Crusher
Ne Weipa ‐ WNT 1 HGF400 355KW 415V 10 50Hz B3R IP56 VFD September 2008 Mining
Ne Weipa ‐ WNT 1 HGF400 355KW 415V 10 50Hz B3L VSD January 2009 Mining

Customer : Minepro
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 FAF315 75KW 415V 6 50Hz B3T September 2005 Crusher
1 HGF450 400KW 415V 12 50Hz B3R February  2006
1 FAF315 75KW 415V 6 50Hz B3R July 2006

Customer : Murray Goulburn Co-op


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF315 400KW 415V 4 January  2004 Dairy

Customer : Outokumpu
p Technology
gy
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF315 315KW 415V 6 50Hz B3R IP66 June 2007 Mining
Yabulu 2 HGF450 500KW 415V 6 50Hz B3R February  2005 Mining

Customer : Philip Cheesman


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF355 500KW 415V 4 50Hz B3R March 2006 Pump

Customer : Pilbara Infrastructure


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
8 HGF500 750KW 690V 6 50Hz B3R IP65 April 2007 Mill
4 HGF500 710KW 690V 6 50Hz B3R IP65 April 2007 Mill
5 HGF500 1000KW 690V 6 50Hz B3R IP65 May 2007 Mill
FMG Spares 1 HGF500 1000KW 690V 6 50Hz B3R IP65 May 2007 Mill
FMG Spares 1 HGF500 750KW 690V 6 50Hz B3R IP65 May 2007 Mill
FMG Spares 1 HGF500 710KW 690V 6 50Hz B3R IP65 May 2007 Mill

08/05/2009 CTRL
LOW VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : Prime Pump Company
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Clermont Coal 1 HGF355 450KW 690V 4 B3R IP56 DOL December 2008 Mining

Customer : PT Kaltin Supacoal


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
White Energy 1 HGF450 500KW 690V 6 50Hz B3R VSD May 2008 Mill
White Energy 1 HGF355 336KW 690V 6 50Hz B3R VSD May 2008 Mill

Customer : QAL
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF450 710KW 415V 4 50Hz B3L December 2006 Refiner

Customer : REDT - WEG Europe


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 BF355MLJ 450KW 415V 4 50Hz B3R IP55 September 2007 Mining

Customer : Rexel Australia


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF355 350KW 415V 2 50Hz B3 IP56 February  2006 Pump

Customer : Rossi Gearmotors Australia


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Mt. Arthur Coal Project 2 HGF355 355kW 415V 6 B3R VSD June 2009 Mining

Customer : Sedgman Limited


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Acland CHPP 2 Upgrade 1 HGF355 450kW 415V 4 50Hz B3R VSD October 2009 Mining

Customer : Siemens
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Mt. Arthur Coal ‐ MAC 20 1 HGF400 500kW 415V 4 B3R VSD June 2009 Mining
Mt. Arthur Coal ‐ MAC 20 3 HGF400 500kW 415V 4 B3L VSD June 2009 Mining
Mt. Arthur Coal ‐ MAC 20 1 HGF315 355kW 415V 4 B3R VSD June 2009 Mining
Mt. Arthur Coal ‐ MAC 20 5 HGF315 355kW 415V 4 B3L VSD June 2009 Mining

Customer : Stewarts Electric


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF400 550KW 415V 4 50Hz B3T August 2007 Pump

08/05/2009 CTRL
LOW VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : Sunrise Dam
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
3 HGF355 355KW 415V 6 March 2001 Pump

Customer : Supply Direct


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF400B 600KW 415V 4 June 1999 Mining

Customer : TK & L
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
ACTEW Hume & Deakin Raw Water Pumps 2 HGF450A 580KW 415V 6 November 2003 Pump
2 HGF450 580KW 415V 6 March 2004 Pump

Customer : Torishima
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
4 HGF400 600KW 415V 4 50Hz B3T IP56 February  2008 Pump
Gibson Island Desalination 3 HGF400 600KW 415V 4 50Hz B3R IP56 September  2008 Desalination

Customer : United Group Resources


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 FAF315 75KW 415V 6 50Hz January  2007 Lift

Customer : Van Leer Australia


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF355E 260KW 415V 8 1996 Mixer
1 HGF355E 260KW 415V 8 1997 Mixer

Customer : Visy Paper


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 HGF355 500KW 415V 4 June 1995 Pump
1 HGF355 400KW 415V 6 1997 Mixer
Andina ‐ Chile 2 HGF6806 400HP 380V 4 June 1997 Pump
1 HGF355C 400KW 415V 6 August 1999 Vacuum Pump
1 HGF355 355KW 415V 6 January  2001 Paper
1 HGF355 355KW 415V 4 50Hz B3R March 2006 Paper

Customer : Warkworth
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF355 450KW 415V 4 50Hz B3L October 2005

08/05/2009 CTRL
LOW VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : WEIR Engineering Ermington
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Worsley Alumina 2 HGF355 315kW 415V 8 B3R VSD August 2009 Aluminium
Worsley Alumina 2 HGF315 132kW 415V 6 B3R VSD August 2009 Aluminium
Worsley Alumina 4 HGF355 315kW 415V 8 B3R VSD August 2009 Aluminium

Customer : WEIR Minerals


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Masbate 2 HGF315 355KW 380V 4 60Hz B3R IP56 VVVF November 2008
Kinsevere  2 HGF355 400kW 525V 4 B3R IP55 VSD March 2009 Mining

Customer : Xstrata Technology


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Spinifex 1 HGF400 500KW 690V 4 50Hz B3R IP56 VSD May 2009 Mining

08/05/2009 CTRL
HIGH VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : AALBORG
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
3 HGF315 185KW 6.6KV 4 60Hz B3R IP56 Ex‐n October 2007 Oil & Gas

Customer : Abon Engineering


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Barro Alto 4 HGF315 250KW 4KV 4 60Hz B35R June 2008 Mining
Barro Alto 1 HGF315 355KW 4KV 4 60Hz B35R June 2008 Mining

Customer : Aireng
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
QNI Yabulu 1 HGF315 330KW 3.3KW 4 50Hz B3R April  2006 Fan
1 HGF450 830KW 3.3KV 8 50Hz B3R IP65 February 2008 Mining
1 HGF400 640KW 3.3KV 6 50Hz IP65 December 2007 Mining

Customer : Alcan
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
6 HGF400 630KW 4 B3R January 2006 Fan & Pump
2 MAF800M 2000KW 6600V 12 50Hz D5 IP65 LRS July 2006 Mill
2 MAF800M 650HP 6600V 8 50Hz F1 August 2008 Crusher
1 HGF500 900KW 6.6KV 6 B3R IP65 DOL August 2008 Mining
Alcan Gove G3 1 HGF400 500KW 6.6KV 6 50Hz B3R IP65 DOL November 2008 Miningg

Customer : Alpha Electric


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 MGI630 2500KW 3.3KV 8 B3R IP56 VSD June 2007 Mining
1 HGF7006 1375HP 3.3KV 4 V1 IP55 June 2007 Mining
1 HGF5810 556HP 3.3KV 6 V1 IP55 March 2008 Pump
1 HGF450 1025KW 3.3KV 4 50Hz V1 IP55 DOL June 2008 Pump
1 HGF5810 415KW 3.3KV 6 V1 IP55 DOL November 2008

Customer : Arrow Electrical


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF315 315kW 3.3kV 4 B3L DOL June 2009 Mining

Customer : Amcor
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF355 450KW 3300V 4 50Hz January 2004 Pulp & Paper

08/05/2009 CTRL
HIGH VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : Ausenco
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 MGF800 4750KW 6.6KV 8 B3L IP65 VSD May 2007 Shipping
1 MGF630 2000KW 6.6KV 8 B3L IP65 VSD May 2007 Shipping

Customer : Auslec
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF355 350KW 6600V 4 B3R DOL November 2006 Steel
1 HGF315 250KW 600V 4 B3R DOL February 2007 Mining
Onesteel 1 HGF315 250KW 6.6KV B3R IP56 April  2008 Mining

Customer : Austcold
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
4 MGF500 1400KW 11KV 2 B3R IP55 August 2007 Refrigeration

Customer : Australian Paper


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF560 750KW 3300V 10 50Hz March 2005 Pulp & Paper
1 MAF800 5000KW 11000V 4 50Hz June 2005 Pulp & Paper
3 HGF355 315KW 3.3KV 6 B3R IP56 DOL Marh 2007 Paper
2 HGF355 250KW 3.3KV 8 B3R IP55 April  2008 Mill

Customer : Barrick
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 MGF710 1300KW 3.3KV 12 50Hz B3R February 2005 Pump
1 MGF710 1300KW 3.3KV 12 50Hz B3R February 2006

Customer : BHP Hastings


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF400 600KW 6600V 4 December 2000 Steel

Customer : Bob White Electrix


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF355 375kW 6600V 4 B3L IP65 DOL April 2009

Customer : Boyne Green Carbon


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 MAF500 710KW 11KV 4 50Hz B3L July 2005 Ball Mill

08/05/2009 CTRL
HIGH VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : Caltex
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
3 MGF400 500KW 11KV 2 50Hz B3L April  2006 Pump
1 MGF500 1370KW 11KV 2 50Hz B3R April  2006 Compressor
1 MGF400 475KW 6.3KV 2 50Hz B3R May 2006 Compressor
2 MGF630 2800KW 11KV 4 50Hz B3R May 2006 Compressor

Customer : Cement Australia


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 MAF710 2400KW 11KV 6 50Hz B3L February 2007 Cement
1 MAF800 5200KW 11KV 6 OLS July 2008 Cement
1 HGF450 560KW 11KV 6 50Hz B3R July 2008 Cement

Customer : Champion Compressors


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF315 250KW 3.3KV 4 50Hz B35T IP56 DOL January 2008

Customer : Comalco
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF400 550KW 3300V 6 50Hz February 2004 Metals

Customer : Continental Carbon


P j t
Project Quantity
Q tit Line/Frame O t t
Output V lt
Voltage P l
Poles Hertz Mounting IP Starting Supply Date Segment
1 MGF450E 450KW 11000V 2 November 1998 Blower

Customer : Coogee Energy


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 HGF355 300KW 300V 2 V1 IP56 Ex‐n October 2007 Oil & Gas

Customer : Cowal Gold Project


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 MGF710 1300KW 3300V 12 50Hz May 2005 Mining

Customer : Darwin Electric Motor Rewind


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF355 3.3KV 6 50Hz V1 February 2006
2 MGF315 280KW 3.3KV 4 50Hz B3L IP65 March 2006
1 MGW500 1850KW 6.6KV 4 B3L September 2008 Mining
1 MGW500 1350KW 6.6KV 2 B3R August 2008 Mining
1 MAW500 1100kW 11kV 6 50Hz B3R IP56 LRS December 2009 Cement

08/05/2009 CTRL
HIGH VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : Davidsons Electrical
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF315 220KW 3.3KV 4 50Hz B3R IP65 May 2007 Mining
1 HGF315 220KW 3.3KV 4 50Hz B3R IP65 November 2007 Mining
1 MGF355 500KW 3.3KV 4 B3R May 2008 Mill

Customer : ECC International


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 HGF355B 355KW 3300V 4 July 1997 Blower

Customer : Emsby
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Alcan 1 HGF500 1050KW 6600V 4 50Hz B3R IP65 October 2007 Mining

Customer : Falk Australia


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Mesa A 1 HGF355 355KW 3300V 4 B3R VSD November 2008 Mining
Mesa A 2 HGF400 700KW 3300V 4 B3R VSD November 2008 Mining

Customer : Flakt Woods


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF315 300KW 6600V 4 50Hz B3R IP56 DOL December  2008

Customer : Flowserve
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Sun Water 4 MAF560 2000KW 11KV 4 50Hz B3R LRS May 2006 Pump
Sun Water 4 MAF500 1100KW 11KV 4 50Hz B3R LRS May 2006 Pump
3 MGW450 1600KW 3300V 50Hz May 2007 Water
3 MGW500 2100KW 3300V 50Hz May 2007 Water

Customer : G & D Donnelly


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF400 450KW 3300V 8 50Hz B3R January 2006

Customer : Gemco
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Hatch 7 HGF315 280KW 3.3KV 4 B3R IP65 DOL Mining

08/05/2009 CTRL
HIGH VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : GR Engineering
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF450 1000KW 3.3KV 6 IP56 July 2008 Mining

Customer : Hagemeyer
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF315 175KW 6.6KV 4 50Hz B3R April  2006 Pump
1 HGF355 450KW 3300V 4 April  2004 Fan

Customer : Hansen Transmissions


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
NeWeipa 1 HGF355 450KW 3300V 4 February 2004 Conveyor

Customer : Henty Goldmine


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF450 800KW 3300V 6 50Hz May 2002 Mining

Customer : Huntly Power Station


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 MGW560 1700KW 11KV 2 50Hz B3R October 2005

Customer : Hydrolink
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Sh j h
Sharjah 1 MGP355 500KW 6
6.6KV
6KV 4 50H
50Hz B3R M
May 2006 P
Pump

Customer : i-Power
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 MGF560 750KW 4160V 12 50Hz B3R February 2005 Mill
1 MGF630 1500KW 4160V 10 50Hz B3R February 2005 Mill
1 HGF500 1250KW 4160V 8 50Hz B3R December 2005 Mill

Customer : Incitec
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 MAW710 4500KW 11000V 4 50Hz B3R IP65 LRS April 2009 Fertiliser
1 SEF1000 2600kW 11kV 18 50Hz B3L IP55 DOL November 2009 Fertiliser
Incitec Pivot 1 MGF450 1200kW 3300V 2 B3R DOL December 2009 Fertiliser

08/05/2009 CTRL
HIGH VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : Isenring
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
QAL 1 HGF450 750KW 3300V 6 50Hz B3R May 2006 Pump
QAL 3 HGF400 560KW 3300V 6 50Hz B3L May 2006 Pump
QAL 1 HGF355 220KW 3.3KV 8 50Hz B3R March 2006 Pump
Orica 2 HGF315 280KW 3.3KV 4 50Hz IP56 DOL July 2008 Mining

Customer : Keyeng
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 HGF315 315KW 1000V 2 B3R IP56 April  2008 Pump

Customer : Kimberly Clark Australia


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF355B 450KW 6600V 4 July 1998 Fan
2 HGF450C 750KW 6600V 2 November 1998 Compressor
1 HGF315C 185KW 6600V 4 December 1998 Fan

Customer : KSB Ajax


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Huntly Power Station 2 MGW560 1700KW 11KV 2 50Hz B3R October 2005 Pump
1 HGF400 355KW 3300V 4 50Hz September 2004 Cement
1 HGF400 355KW 3300V 8 50Hz September 2004 Cement
Stanwell Magnesium 4 MGF710B 2200KW 11000V 4 June 2003 Pump
Sugarloaf high Lift Pump Station
Sugarloaf high Lift Pump Station 5 MGW500 1980KW 6 6KV
6.6KV 4 B3L IP55 VSD January 2009 Water
Sugarloaf high Lift Pump Station 5 MGW500 1980KW 6.6KV 4 B3L IP55 VSD February 2009 Water

Customer : LE Jarvis
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 MGF355 375KW 3300V 4 50Hz B3 IP56 VFD February 2007
1 MAF450 525KW 3.3KV 4 50Hz B3L IP55 September 2007
1 MAF400 375KW 3.3KV 8 April  2008
1 MAW800 5500KW 6600V 4 50Hz B3R IP55 December 2008 Mill
Pilbara Iron Ore & Infrastructure 1 HGF315 220KW 3.3KV 4 50Hz B3R IP65 DOL November 2008 Mining

Customer : Macquarie Generation


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Bayswater Power Station 2 MGF315 132KW 3.3KV 2 50hZ B3R IP56 DOL January 2009 Power Station

08/05/2009 CTRL
HIGH VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : Marlin Coast
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Weipa ‐ Comalco 1 HGF400 650KW 3.3KV 4 50Hz B3R IP56 Mining

Customer : Metso Minerals


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
NeWeipa 2 HGF400 550KW 3300V 6 December 2003 Pump
2 HGF400 550KW 300V 6 April  2004 Mining
1 HGF355 450KW 3300V 4 50Hz December 2004 Mineral
CP Preston 1 MAF800 4800KW 11000V 6 50Hz B3R IP56 March 2008 Mining
CP Preston 1 MAF800 4800KW 11000V 6 50Hz B3L IP56 March 2008 Mining
CP Preston 1 MAF800 4800KW 11000V 6 50Hz B3R IP56 March 2008 Mining
CP Preston 1 MAF800 4800KW 11000V 6 50Hz B3L IP56 March 2008 Mining

Customer : MMD Australia


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
6 HGF355 400KW 3.3KV 4 B3R DOL September 2008

Customer : Minepro
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 HGF315 355KW 3300V 4 July 2004 Mining
1 HGF315 220KW 6.6KV 4 50Hz B3L IP55 April  2008 Mill
1 HGF355 300KW 6600V 6 B3L IP55 April  2008 Mill
1 HGF355 400kW 1000V 4 B3L DOL September 2009 Mining
1 MGW710 6716kW 11kV 4 D5 DOL April  2010 Power

Customer : Mt. Piper


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 MGR560 1650KW 11KV 4 50Hz V1 October 2005 Pump

Customer : Normandy Operations


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Pajingo 1 MAF560 2100KW 11000V 4 September 2001 Mill

Customer : NSW Sugar


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF500 900KW 6.6KV 6 50Hz B3R IP55 March 2007 Sugar
1 MAF630 2000KW 11KV 6 50Hz B3L IP55 March 2007 Sugar
4 HGF400 630KW 6.6KV 4 50Hz B3R IP55 February 2007 Sugar

08/05/2009 CTRL
HIGH VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : One Steel
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 MGF500 1500KW 6600V 4 October 2003 Fan
1 MGF560 1500KW 11000V 6 50Hz February 2003 Metals
1 HGF315 250KW 6600V 4 50Hz January 2004 Metals
1 HGF355 250KW 6600V 6 50Hz June 2004 Metals

Customer : Outokumpu Technology


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 MAF710 3500KW 6600V 6 B3R IP55 LRS May 2007 Mining
1 MAF710 4500KW 6.6KV 6 50Hz B3R June 2006 Mining
1 MAF800 4600KW 11KV 6 50Hz IP56 August 2007 Mining
1 MAF710 2600KW 11KV 6 50Hz IP56 August 2007 Mining
3 MAF800 4300KW 13.8KV 6 60Hz B3R IP56 November 2007 Mining
Avery 1 MAF710 3100KW 11KV 6 50Hz B3R December 2007 Mining
1 MAI710 440KW 6.6KV 6 50Hz B3R IP55 October 2007 Mining

Customer : Outotec
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Sydvanranger 3 MAF710 4000KW 3.3KC 6 50Hz B3R LRS December 2008 Mining

Customer : Peerless
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
FPSO Cidade de Santos 4 HGF450 500kW 11kV 4 60Hz V1 DOL Oil & Gas

Customer : Pioneer
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 MAF900 5200KW 11000V 6 LRS August 2004 Sugar Mill
5 HGF450 900KW 3300V 4 August 2004 Sugar Mill
2 HGF400 500KW 3300V 4 August 2004 Sugar Mill

Customer : Polysius
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Krupp 1 MAF630 2550KW 11KV 6 B3L IP56 SER February 2008 Mining

08/05/2009 CTRL
HIGH VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : QAL
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF400 630KW 3.3KV 4 B3R DOL October 2006 Pump
Spares 3 HGF315 150KW 3.3KV 4 50Hz B3L IP65 February 2007 Mining
Spares 2 HGF400 450KW 3.3KV 6 50Hz V1 IP65 February 2007 Mining
Spares 1 HGF400 450KW 3.3KV 6 50Hz V1 IP65 June  2007 Pump
Spares 1 HGF315 150KW 3.3KV 4 50Hz B3L IP65 June 2007 Pump
1 HGF315 2800KW 3300V 4 50Hz V1 IP65 October 2007 Mining
1 MGF500 1600KW 3300V 6 February 2008 Mining
1 HGF500 750KW 3300V 6 50Hz B3L IP65 April  2008 Mill
1 HGF400 630KW 3.3KV 4 B3R DOL Mining
1 HGF500 750KW 3300V 6 50Hz B3L IP65 Mining
1 HGF315 225KW 3.3KV 4 50Hz B3L(D) IP65 Mining
1 HGF355 335KW 3300V 6 50Hz B3L IP65 DOL December 2008 Mining
1 HGF400 355kW 3300V 8 50Hz B3R IP65 DOL November 2009 Alumina

Customer : Qenos
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 MGF500 11000KW 11KV 6 50Hz B3R IP56 October 2007

Customer : Queensland Nickel


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Transfield 1 MGF500B 350HP 3300V 10 October 1999 Compressor
Transfield 1 MGF500 258KW 3300V 10 50Hz July 2004 Mining

Customer : Ruhrpump Australia


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF315E 300KW 6.6KV 4 V1 IP56 DOL November 2007 Oil & Gas

Customer : SDS Ausminco


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF500 560KW 6600V 10 50Hz B3R December 2005 Impeller

Customer : SIMS Metal


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 MAW1000L 6000HP 11000V 14 March 2004 Metal Shredder

Customer : Sir Samuel Mines NL


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Sinclair Nickel 1 HGF450 1MW 3.3KV 6 50Hz B3R IP56 VFD January 2009 Mining

08/05/2009 CTRL
HIGH VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : Sulzer
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Onesteel 4 HGF450 500KW 6.6KV 2 50Hz B3R August 2006 Pump
Onesteel 1 HGF450 500KW 6.6KV 2 50Hz B3R December 2007 Mining

Customer : Sun Water


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
4 MAF560 2000KW 11KV 4 50Hz B3R May 2006 Pump
4 MAF500 1100KW 11KW 4 50Hz B3R May 2006 Pump

Customer : Tarong Energy


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Nanango 1 MGF450E 645KW 6600V 4 January 2004
1 MGF800 4550KW 6600V 6 D5R December 2007 Power Station
1 MGF630 1450KW 6600V 12 D5R December 2007 Power Station

Customer : Tiwest Joint Venture


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
4 HGF315 380KW 3300V 4 December 2000 Compressor
Tiwest Expansion  4 MGF315 380kW 3300V 4 50Hz B3R IP56 DOL December 2009 Mining

Customer : TK & L
P j t
Project Quantity
Q tit Line/Frame O t t
Output V lt
Voltage P l
Poles Hertz Mounting IP Starting Supply Date Segment
2 355M/L 330KW 3300V 4 June 2004 Pump

Customer : Transfield
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 HGF400 675KW 3.3KV 4 50Hz B3R IP55 February 2007 Water

Customer : Warman Australia


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Andina ‐ Chile 2 HGF5809 250HP 4000V 4 June  1997 Pump
Andina ‐ Chile 1 HGF8007 800HP 4000V 4 June  1997 Pump
Andina ‐ Chile 2 HGF6808 600HP 4000V 4 June  1997 Pump
Andina ‐ Chile 4 HGF8807 1300HP 4000V 4 June  1997 Pump
Andina ‐ Chile 1 HGF5008 200HP 4000V 4 June  1997 Pump
La Escondida 8 HGF8010 800KW 4000V 4 July 2001
La Escondida 3 HGF5009 220KW 4000V 4 July 2001

08/05/2009 CTRL
HIGH VOLTAGE MOTORS
weg australia - reference list for large machines
Customer : Weir Engineering Ermington
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Worsley Alumina 8 HGF450 750kW 3300V 8 B3R VSD November 2009 Aluminium
Worsley Alumina 8 HGF450 630kW 3300V 8 B3R VSD November 2009 Aluminium
Worsley Alumina 3 HGF560 710kW 3300V 10 B3R VSD December 2009 Aluminium
Worsley Alumina 7 HGF355 400kW 3300V 6 B3R VSD August 2009 Aluminium
Worsley Alumina 3 HGF400 450kW 3300V 8 B3R VSD August 2009 Aluminium
Worsley Alumina 3 HGF500 560kW 3300V 10 B3R VSD January 2010 Aluminium
Worsley Alumina 2 HGF400 450kW 3300V 8 B3R VSD August 2009 Aluminium

Customer : Weir Minerals


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
Masbate 1 HGF450 900KW 4160V 4 60Hz B3R IP56 August 2008 Mining

Customer : Western Area NL


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
2 MAF450 700KW 3.3KV 6 IP65 LRS July 2008 Mining

Customer : Wiluna Gold Mine


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 KAF500E 1000KW 3300V 6 August 1998 Mining

Customer : Worley Parsons


Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 MGW800 3700KW 11KV 14 50Hz IP55 September 2008 Generation
1 MGP710 2100KW 11KV 10 V1 IP55 September 2008 Generation

Customer : Xstrata
Project Quantity Line/Frame Output Voltage Poles Hertz Mounting IP Starting Supply Date Segment
1 MAF630 2600KW 11KV 4 50Hz B3R OLS January 2007 Mining
1 MAF630 3000KW 11KV 4 50Hz B3R IP56 May 2007 Mill
2 MAF630 3000KW 11KV 4 50Hz B3R October 2007 Mining
1 MAF560 1130KW 11KV 50Hz B3L IP56 LRS August 2008 Mill
Mexico 2 MAF12007 3000KW 13.2KV 4 60HZ B3R LRS September 2008 Mill
1 MAF8010 1500KW 4.16KV 4 50Hz F1 IP56 LRS August 2008 Mill
1 MAF630 3000KW 11KV 4 50Hz B3R IP56 LRS August 2008 Mill
Penasquito 2 MAF12007 3000KW 13.2KV 4 60Hz B3R LRS November 2008
Prominent Hill 1 MAW630 3000KW 11KV 4 50Hz B3R IP56 Mining
Somincor 1 MAF560 1500KW 6KV 4 50Hz B3L IP56 LRS January 2009 Mining
Red Dog Mine 2 MAF8010 1500KW 4000V 4 60Hz F1 IP56 LRS April 2009 Mining
Spinifex 1 MAF500 1500KW 3300V 4 50Hz B3R IP56 LRS May 2009 Mining

08/05/2009 CTRL