Anda di halaman 1dari 2

PT.

PATCO ELEKTRONIK TEKNOLOGI Approved by Checked by Prepared by


JOB DESCRIPTION

TITLE PED SUPERVISOR EFF. DATE


DOC. NO JD-PED-0003 PAGE 1 of 2
REV. NO A3 ISSUED BY PED

Personnel Qualification :
Education : Senior High School , D3/ S1 Graduate
Experience : Min. 4 years for Senior High School and 2 years for D3/ S1 Graduate.
General Requirement : Understand ISO 9000, ISO 14000, 5S, RoHS, Written English
Special Requirement : Computer Literate / Photoshop , Technical Drawing knowledge ,
Autocad knowledge , Electrical wiring , Understand Programmable Logic
Control
Report to : Production Engineering Division Ass. Manager/ Manager.
Division/ Department : Operation Support / Production Engineering Division .

1. JOB AND RESPONSIBILITY


1.1. Responsible to study, planning & preparation work sequence for new project.
1.2. Responsible to ensure that all document related with new project have been fully
documented from customer and internal document.
1.3. Responsible to prepare equipment, jig and utility and the others document for new
project.
1.4. Responsible to calculate and analyze electrical equipment, water and air for preparation
the new project (utility).
1.5. Responsible to ensure that new project good running.
1.6. Responsible to select new qualified staff.
1.7. To train and educate the subordinate.
1.8. Responsible to direct implementation of quality Management System and Environmental
Management System on their section
DATE DESCRIPTION OF REVISION REASON OF REVISION RESP. PERSON
03-05-04 Add ISO 9000 and ISO 14000 , Quality Implementasi ISO 14000 Manto .S
Management System and Environmental
Management System
04-04-06 Additional General & Special Requirement Customer Requirement Nofita Pancasari
07-04-09 Delete Responsibility for Infrastructure Move this job to GA Dept Yunus W.
installation , repair & maintenance
PT. PATCO ELEKTRONIK TEKNOLOGI
JOB DESCRIPTION

TITLE PED SUPERVISOR EFF. DATE


DOC. NO JD-PED-0003 PAGE 2 of 2
REV. NO A3 ISSUED BY PED

2. AUTHORITY
2.1. To check and give approval for tools, machine and equipment design.
2.2. To stop production process with approval from Manager/ Asst. Manager/ Supervisor if any
problem on the equipment.

DATE DESCRIPTION OF REVISION REASON OF REVISION RESP. PERSON


03-05-04 Add ISO 9000 and ISO 14000 , Quality Implementasi ISO 14000 Manto .S
Management System and Environmental
Management System
04-04-06 Additional General & Special Requirement Customer Requirement Nofita Pancasari
07-04-09 Delete Responsibility for Infrastructure Move this job to GA Dept Yunus W.
installation , repair & maintenance

Anda mungkin juga menyukai