Every
Project Technical Certificate of Consinment.
1.1.1 Screed
Specifications. Confermance
Auto Level Specified Strength TDS & MSDS R H
Verify that it is
Level Marking for all the Once for every Company
1.2.1
rooms. Drawings taken w.r.t slab ___ Company Specifications. new location. Specifications. R H
level.
Verify that it is
W.R.T level marking mark Once for every Company
1.2.2
the level of screed. Drawings taken w.r.t. to level ___ Shop Drawing new location. Specifications. R H
marking.
Tiya marking for the Verify the Once for every Company
1.2.4 Method statement ___ Shop Drawing R R
screed. thickness. new location. Specifications.
Application of cement
slurry @2kg of cement Accordingly cement Once for every Company
1.2.6 Method statement should be ___ CPWD specifications R R
should be spread over consumed in Kg. new location. Specifications.
area of 1 Sq.m