Anda di halaman 1dari 2

Contract Number

Client : Nanded City

Contractor Project manager/Engineer Doc.Ref.No. Rev.No.


ITP- CIV/03 0
DOCUMENT TYPE : DOCUMENT TITLE :
INSPECTION & TEST PLAN Screeding

Ref.SPEC. AL-HAT-13CC-SPC-00006_F-2 , Section -2 , SE-GAL-13CW-MST-00017_F-0 Page :- 1


Measuring and Control Control Inspection
Activity Activity Description Reference Document Inspection/Test Acceptance Criteria
Monitoring Device Frequency Document
No. Vendor NCDCL
1 INSPECTIONS

1.1 MATERIAL INSPECTION

Every
Project Technical Certificate of Consinment.
1.1.1 Screed
Specifications. Confermance
Auto Level Specified Strength TDS & MSDS R H

1.2 PROCESS INSPECTION

Verify that it is
Level Marking for all the Once for every Company
1.2.1
rooms. Drawings taken w.r.t slab ___ Company Specifications. new location. Specifications. R H
level.

Verify that it is
W.R.T level marking mark Once for every Company
1.2.2
the level of screed. Drawings taken w.r.t. to level ___ Shop Drawing new location. Specifications. R H
marking.

Verify that there is


Clean the area where Once for every Company
1.2.3
screeding is to be done. Method statement no chemical or ___ Shop Drawing new location. Specifications. R H
dust.
Contract Number
Client : Nanded City

Contractor Project manager/Engineer Doc.Ref.No. Rev.No.


ITP- CIV/03 0
DOCUMENT TYPE : DOCUMENT TITLE :
INSPECTION & TEST PLAN Screeding

Ref.SPEC. AL-HAT-13CC-SPC-00006_F-2 , Section -2 , SE-GAL-13CW-MST-00017_F-0 Page :- 1


Measuring and Control Control Inspection
Activity Activity Description Reference Document Inspection/Test Acceptance Criteria
Monitoring Device Frequency Document
No. Vendor NCDCL

Tiya marking for the Verify the Once for every Company
1.2.4 Method statement ___ Shop Drawing R R
screed. thickness. new location. Specifications.

Watering to be done for Verify that no Once for every Company


1.2.5 Method statement ___ Company Specifications. R R
screed area( not ponding). ponding is done. new location. Specifications.

Application of cement
slurry @2kg of cement Accordingly cement Once for every Company
1.2.6 Method statement should be ___ CPWD specifications R R
should be spread over consumed in Kg. new location. Specifications.
area of 1 Sq.m

Verify that the Once for every Company


1.2.7 Pouring of screed Method statement height of pouring is ___ Method statement R R
new location. Specifications.
not more than 1m.

H = Hold - Need approval to proceed activity( IR be raised 24 hrs in advance).


W = Witness - Activity shall not proceed without witnessing, Inspection record required as proof.( IR be raised 24 hrs in advance)
R = Review - Verification of compliances with specifications by review of the documentary avidance related to Q.C activities.
S = Surveillance - Inspection at random

Anda mungkin juga menyukai