RAB KOLAM TERBARU Koreksi
RAB KOLAM TERBARU Koreksi
I PEKERJAAN TANAH
II PEKERJAAN BETON
III PEKERJAAN BESI
IV PEKERJAAN LANTAI
C. PEKERJAAN LAIN-LAIN
I PEKERJAAN PERSIAPAN
II PEKERJAAN PEMBORAN DAN PEMBUATAN SUMUR BOR
III PEKERJAAN KONSTRUKSI SUMUR
IV PEKERJAAN PENGETESAN SUMUR
V PENGADAAN POMPA AIR , ACCESSORIS
VI PEKERJAAN LISTRIK
TERBILANGTUJUH
: MILYAR ENAM RATUS SEMBILAN PULUH SATU JUTA
SETARUS DELAPAN PULUH TIGA RIBU RUPIAH
Direktur Utama
SI
BIAYA (RAB)
JUMLAH
8,407,500.00
213,942,644.37
2,519,263,359.16
2,101,856,792.61
457,014,504.92
91,635,082.63
479,235,268.64
252,346,941.22
94,920,728.35
5,795,000.00
231,920,279.92
133,192,362.58
20,612,184.25
209,702,539.59
172,140,047.25
6,991,985,235.48
( 10 % x A) 699,198,523.55
( A + B) 7,691,183,759.03 7691183759.02784
7,691,183,000.00
UH SATU JUTA
ceh Timur, 24 Maret 2016
Kontraktor Pelaksana
T.MINA FAJAR ABADI
M. Yusuf
Direktur Utama
NAMA PROYEK : PENINGKATAN SARANA DAN PRASARANA OLAH RAGA
KEGIATAN : PEMBANGUNAN KOLAM RENANG TAHAP IV DI STADION KANJURUHAN KEPANJEN
LOKASI : KECAMATAN KEPANJEN KAB. MALANG
II PEKERJAAN TANAH
1 Galian tanah
2 Urugan kembali
3 Urugan sirtu
4 Urugan Tanah
5 Pemadatan Tanah
6 Urugan pasir
I PEKERJAAN TANAH
1 Galian Tanah
2 Bor Strous
3 urugan pasir
4 Urugan Tanah kembali
5 Urugan Sirtu
6 Urugan Tanah
7 Pemadatan Tanah
II PEKERJAAN BETON
1 Beton Pondasi Pile cape dan footplate
- Beton mutu fc'= 25 Mpa (K300) slump (12 ± 2) cm, w/c = 0,58
- Pembesian dengan besi ulir
- Pembesian dengan besi polos
- Pasang bekisting untuk pondasi
8 Plat Lantai
- Beton mutu fc'= 25 Mpa (K300) slump (12 ± 2) cm, w/c = 0,58
- Pembesian dengan besi polos
- Pasang bekisting untuk plat lantai
10 Tangga :
- Beton mutu fc'= 25 Mpa (K300) slump (12 ± 2) cm, w/c = 0,58
- Pembesian dengan besi polos
- Pasang bekisting untuk tangga
III PEKERJAAN BESI
1 Pasang WF 200 x 100 x 8 x 5,5
2 Pasang WF 100 x 50 x 7 x 5
3 Plat Baja
4 Plat Plendes t 19 mm
5 Baut Angker D 19 mm
6 Karet
IV PEKERJAAN LANTAI
1 Pasang lantai keramik ukuran 40 x 40 cm warna/motif
2 Pas. Grating / Grill PVC 25 cm
3 Pegangan Tangga
C. PEKERJAAN LAIN-LAIN
I PEKERJAAN PERSIAPAN
1 Penyetelan mesin bor dan buat bak sirkulasi
2 Pengadaan Air pemboran
VI PEKERJAAN LISTRIK
1 Pasang Listrik Baru 131.000 w
2 Uang Jaminan Layanan (UJL)
3 Panel Pompa 40 x 60 x 20 Lengkap
4 Kabel Blended Conduktor 4 x 25 mm
5 Kabel Power NYYHY 4 x 6 mm
6 Kabel WLC 3 x 1,5 mm
AGA
DION KANJURUHAN KEPANJEN
Harga Jumlah
Volume Satuan Harga
(Rp. ) (Rp. )
M. Yusuf
Direktur Utama
2 ANALISA BIAYA KONTRUKSI PEKERJAAN TANAH DAN TAMAN
2.1.1 Tenaga
2.5.1 Tenaga
2.9.1 Tenaga
2.10.1 Bahan
2.10.2 Tenaga
2.10.2 Tenaga
2.11.1 Bahan
2.11.2 Tenaga
2.48.1 Tenaga
3.1.1 Bahan
3.1.2 Tenaga
3.2.1 Bahan
3.2.2 Tenaga `
7.1.1 Bahan
7.1.2 Tenaga
7.2.1 Bahan
7.2.2 Tenaga
7.3.1 Bahan
7.3.2 Tenaga
7.4.1 Bahan
7.4.2 Tenaga
7.5.1 Bahan
7.5.2 Tenaga
7.6.1 Bahan
7.6.2 Tenaga
No Uraian Satuan Koef
1 Pembantu Tukang Org 0.125
2 Tukang kayu Org 0.250
3 Kepala tukang Org 0.025
4 Mandor Org 0.005
TOTAL
7.7 1 M² Pasang bekisting untuk kolom
7.7.1 Bahan
7.7.2 Tenaga
7.8.1 Bahan
7.8.2 Tenaga
7.9.1 Bahan
7.9.2 Tenaga
7.10.1 Bahan
7.10.2 Tenaga
10.1.1 Bahan
10.1.2 Tenaga
10.2.1 Bahan
10.2.2 Tenaga
10.3.1 Bahan
10.3.2 Tenaga
10.4.1 Bahan
10.4.2 Tenaga
10.5.1 Bahan
10.5.2 Tenaga
10.6.1 Bahan
10.6.2 Tenaga
10.6.1 Bahan
10.6.2 Tenaga
10.7.1 Bahan
10.7.2 Tenaga
10.8.1 Bahan
10.9.1 Bahan
10.9.2 Tenaga
10.10.1 Bahan
10.10.2 Tenaga
10.11 Memasang 1 bh bak kontrol pasangan batu bata ukuran 30 x 30 cm, tinggi 35 cm
10.11.1 Bahan
10.11.2 Tenaga
10.12.1 Bahan
10.12.2 Tenaga
10.13 Memasang 1 buah bak kontrol pasangan batu bata ukuran 60 x 60 tinggi 65 cm
10.13.1 Bahan
10.13.2 Tenaga
10.14.2 Tenaga
10.15.1 Bahan
10.15.2 Tenaga
10.16.1 Bahan
10.16.2 Tenaga
10.17.1 Bahan
10.17.2 Tenaga
10.17.1 Bahan
10.17.2 Tenaga
10.17.1 Bahan
10.17.2 Tenaga
10.18.1 Bahan
10.18.2 Tenaga
10.19.1 Bahan
10.19.2 Tenaga
10.20.1 Bahan
10.20.2 Tenaga
10.30.1 Bahan
10.30.2 Tenaga
No Uraian Satuan Koef
1 Pembantu Tukang Org 0.081
2 Tukang Batu Org 0.135
3 Kepala Tukang Org 0.0135
4 Mandor Org 0.0041
TOTAL
10.30 Memasang 1 m' pipa PVC diameter 10''
10.30.1 Bahan
10.30.2 Tenaga
10.18.1 Bahan
10.18.2 Tenaga
11.1.1 Bahan
11.1.2 Tenaga
11.1.1 Bahan
11.1.2 Tenaga
11.1.1 Bahan
11.1.2 Tenaga
11.10.1 Bahan
11.10.2 Tenaga
11.11.1 Bahan
11.11.2 Tenaga
4.1 Bahan
4.2 Tenaga
No Uraian Satuan Koef
1 Pembantu Tukang Org 0.140
2 Tukang Besi Org 0.067
3 Kepala Tukang Besi Org 0.007
4 Mandor Org 0.007
TOTAL
11.11.2 1 unit Memasang Pegangan Tangga
Bahan
Tenaga
11.1.1 Bahan
11.1.2 Tenaga
13.5.1 Bahan
13.5.2 Tenaga
13.7.1 Bahan
13.7.2 Tenaga
13.8.1 Bahan
13.8.2 Tenaga
29,800.00
14,285.00
18,625.00
248,427.20
235,178.05
Harga Jumlah Harga
181,190.04 217,428.05
217,428.05
74,500.00
381,934.90
1,189,098.39
1,284,967.44
207,096.66
230,640.81
217,350.32
192,080.82
2,187,350.00
166,991.11
291,841.11
1,012,536.11
677,464.11
1,025,049.85
1,379,197.00
152,285.04
x 60 tinggi 65 cm 643,671.91
68,628.50
Harga Jumlah Harga
46,365 48,683.73
16,228 5,679.77
54,363.50
59,689.92
101,432.04
244,798.44
47,367.00
N SANITASI
198,801.92
590,663.42
201,575.96
26,091
35,736
25,891
26,123
Rp 109,784.95
60,098
212,935.00
187,677.58
207,420.08
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
1 Engineer dan Crew L26 Ls 1.0000
B BAHAN
1 Solar Industri M483 ltr 150.0000
2 Minyak Pelumas M484 ltr 2.7857
3 Grease M485 kg 0.5000
C PERALATAN
1 Sewa Mesin Bor E01 hari 1.0000
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
1 Engineer dan Crew Ls 1.0000
B BAHAN
1 Solar Industri ltr 150.0000
2 Minyak Pelumas ltr 2.7857
3 Grease kg 0.5000
C PERALATAN
1 Sewa Mesin Bor hari 1.0000
2 Sewa Compresor hari 1.2500
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B BAHAN
C PERALATAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
631,963.75 631,963.75
631,963.75
7,595.59 569,669.18
47,614.14 238,070.70
44,213.13 44,213.13
851,953.01
1,874,991.60 1,874,991.60
10,301,610.00 2,575,402.50
4,450,394.10
5,934,310.86
631,963.75 631,963.75
631,963.75
7,595.59 569,669.18
47,614.14 238,070.70
44,213.13 44,213.13
851,953.01
1,874,991.60 1,874,991.60
10,301,610.00 2,575,402.50
4,450,394.10
5,934,310.86
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
631,963.75 631,963.75
631,963.75
7,595.59 569,669.18
47,614.14 238,070.70
44,213.13 44,213.13
851,953.01
1,874,991.60 1,874,991.60
10,301,610.00 2,575,402.50
4,450,394.10
5,934,310.86
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
631,963.75 631,963.75
631,963.75
7,595.59 569,669.18
47,614.14 238,070.70
44,213.13 44,213.13
851,953.01
1,874,991.60 1,874,991.60
10,301,610.00 2,575,402.50
4,450,394.10
5,934,310.86
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
631,963.75 631,963.75
631,963.75
7,595.59 569,669.18
47,614.14 238,070.70
44,213.13 44,213.13
851,953.01
1,874,991.60 1,874,991.60
10,301,610.00 2,575,402.50
4,450,394.10
5,934,310.86
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
631,963.75 631,963.75
631,963.75
7,595.59 569,669.18
47,614.14 238,070.70
44,213.13 44,213.13
851,953.01
1,874,991.60 1,874,991.60
10,301,610.00 2,575,402.50
4,450,394.10
5,934,310.86
600,000.00 2,400,000.00
2,400,000.00
1,901,608.20 1,901,608.20
542,190.00 542,190.00
216,876.00 216,876.00
2,660,674.20
5,060,674.20
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
631,963.75 631,963.75
631,963.75
7,595.589 531,691.23
47,614.14 95,228.28
626,919.51
4,809,718.20 4,809,718.20
1,874,991.60 1,874,991.60
1,221,406.20 1,221,406.20
7,906,116.00
9,164,999.26
Pembesaran lubang (Reaming) lubang bor Ø 8 3/4" - Ø 12"
kedalaman 0 - 25 m kecepatan pemboran 18 m'/hr
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
631,963.75 631,963.75
631,963.75
7,595.59 569,669.18
47,614.14 238,070.70
44,213.13 44,213.13
851,953.01
1,874,991.60 1,874,991.60
6,600,000.00 1,650,000.00
3,524,991.60
5,008,908.36
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
631,963.75 631,963.75
631,963.75
7,595.59 569,669.18
47,614.14 238,070.70
44,213.13 44,213.13
851,953.01
1,874,991.60 1,874,991.60
6,600,000.00 1,650,000.00
3,524,991.60
5,008,908.36
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
631,963.75 631,963.75
631,963.75
7,595.59 569,669.18
47,614.14 238,070.70
44,213.13 44,213.13
851,953.01
1,874,991.60 1,874,991.60
6,600,000.00 1,650,000.00
3,524,991.60
5,008,908.36
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
631,963.75 631,963.75
631,963.75
7,595.59 569,669.18
47,614.14 238,070.70
44,213.13 44,213.13
851,953.01
1,874,991.60 1,874,991.60
6,600,000.00 1,650,000.00
3,524,991.60
5,008,908.36
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
631,963.75 631,963.75
631,963.75
7,595.59 569,669.18
47,614.14 238,070.70
44,213.13 44,213.13
851,953.01
1,874,991.60 1,874,991.60
6,600,000.00 1,650,000.00
3,524,991.60
5,008,908.36
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
631,963.75 631,963.75
631,963.75
7,595.59 569,669.18
47,614.14 238,070.70
44,213.13 44,213.13
851,953.01
1,874,991.60 1,874,991.60
6,600,000.00 1,650,000.00
3,524,991.60
5,008,908.36
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
65,000.00 195,000.00
82,500.00 82,500.00
277,500.00
542,190.00 542,190.00
542,190.00
819,690.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
65,000.00 195,000.00
82,500.00 82,500.00
277,500.00
542,190.00 542,190.00
542,190.00
819,690.00
Pengadaan dan pemasangan pipa screen PVC-AW Ø 10"
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
65,000.00 195,000.00
82,500.00 82,500.00
277,500.00
547,365.45 547,365.45
547,365.45
824,865.45
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
65,000.00 13,000.00
82,500.00 8,250.00
21,250.00
35,391.45 35,391.45
35,391.45
56,641.45
Pengadaan dan pemasangan pipa sounding SWL PVC-AW Ø 1"
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
65,000.00 13,000.00
82,500.00 8,250.00
21,250.00
10,755.69 10,755.69
10,755.69
32,005.69
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
65,000.00 146,250.00
82,500.00 61,875.00
208,125.00
349,959.00 384,954.90
384,954.90
64,077.00 102,523.20
593,079.90
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
65,000.00 136,500.00
82,500.00 28,875.00
85,000.00 2,975.00
95,000.00 9,975.00
178,325.00
1,774.44 794,949.12
243,985.50 116,241.66
48.75 10,480.78
921,671.56
1,099,996.56
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
631,963.75 631,963.75
631,963.75
7,705.00 1,155,750.00
48,300.00 134,550.00
44,850.00 22,425.00
1,312,725.00
1,902,000.00 1,902,000.00
1,902,000.00
3,846,688.75
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
631,963.75 631,963.75
631,963.75
7,595.59 1,139,338.35
47,614.14 132,639.39
44,213.13 22,106.57
1,294,084.31
1,874,991.60 1,874,991.60
2,425,068.00 3,031,335.00
4,906,326.60
6,832,374.66
c 10,679,063.41
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
631,963.75 26,331.82
26,331.82
7,595.59 36,079.05
47,614.14 2,256.00
38,335.05
4,809,718.20 200,404.93
1,874,991.60 78,124.65
1,221,406.20 50,891.93
329,421.50
394,088.37
STANDART SATUAN HARGA BAHAN
KABUPATEN MALANG
2016
HARGA
NO JENIS BAHAN SATUAN (Rp.)
1 2 3 4
KABUPATEN MALANG
TAHUN 2016
NO JENIS PEKERJAAN
I PEKERJAAN TANAH
SNI I. 1 Galian Tanah Biasa sedalam 1 meter
SNI I. 2 Urugan Kembali
SNI I. 3 Pemadatan Tanah
SNI I. 4 Urugan Pasir
SNI I. 5 Urugan Tanah
SNI I. 5 Urugan Sirtu
SNI I. 6 Bor Strouse
II PEKERJAAN BETON
SNI II. 1 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr
SNI II. 2 Membuat beton bertulang 1 Pc : 2 Ps : 3 Kr
SNI II. 3 Membuat beton bertulang 1 Pc : 1 1/2 Ps : 2 1/2 Kr
SNI II. 4 Pembesian dengan besi polos atau besi ulir
SNI II. 5 Pasang bekisting untuk pondasi
SNI II. 6 Pasang bekisting untuk sloof
SNI II. 7 Pasang bekisting untuk kolom
SNI II. 8 Pasang bekisting untuk balok
SNI II. 9 Pasang bekisting untuk lantai
SNI II. 10 Pasang bekisting untuk tangga
SATUAN HARGA
Upah / m3 29,800.00
Upah / m3
14,285.00
Upah / m3 18,625.00
Upah + Bahan / m3
248,427.20
Upah + Bahan / m3 235,178.05
Upah + Bahan / m3
262,551.35
Upah + Bahan / m1 74,500.00
I PEKERJAAN TANAH
1 Galian Tanah
2 Bor Strous
3 urugan pasir
4 Urugan Tanah kembali
5 Urugan Sirtu
6 Urugan Tanah
7 Pemadatan Tanah
II PEKERJAAN BETON
1 Beton Pondasi Pile cape dan footplate
- Beton mutu fc'= 25 Mpa (K300) slump (12 ± 2) cm, w/c = 0,58
- Pembesian dengan besi ulir
- Pembesian dengan besi polos
- Pasang bekisting untuk pondasi
8 Plat Lantai
- Beton mutu fc'= 25 Mpa (K300) slump (12 ± 2) cm, w/c = 0,58
- Pembesian dengan besi polos
- Pasang bekisting untuk plat lantai
10 Tangga :
- Beton mutu fc'= 25 Mpa (K300) slump (12 ± 2) cm, w/c = 0,58
- Pembesian dengan besi polos
- Pasang bekisting untuk tangga
IV PEKERJAAN LANTAI
1 Pasang lantai keramik ukuran 40 x 40 cm warna/motif
2 Pas. Grating / Grill PVC 25 cm
3 Pegangan Tangga
C. PEKERJAAN LAIN-LAIN
I PEKERJAAN PERSIAPAN
1 Penyetelan mesin bor dan buat bak sirkulasi
2 Pengadaan Air pemboran
VI PEKERJAAN LISTRIK
1 Pasang Listrik Baru 131.000 w
2 Uang Jaminan Layanan (UJL)
3 Panel Pompa 40 x 60 x 20 Lengkap
4 Kabel Blended Conduktor 4 x 25 mm
5 Kabel Power NYYHY 4 x 6 mm
6 Kabel WLC 3 x 1,5 mm
PROGRESS (%)
KOMULATIF (%)
RENCA
KURV
SS (%) 0.13
TIF (%) 7,011,547,718.23 0.1
RENCANA
KURVA -S
MINGGU KE :
2
0.04
0.01
0.29
0.02
0.10
0.01
0.00
0.11
0.44
1.00
1.1
RENCANA
KURVA -S
MINGGU KE :
3 4 5 6 7 8 9 10 11 12 13
0.04
0.01
0.29
1.09 1.09
0.11 0.11
0.01
0.03 0.03
2.50
0.02 0.02
1.16
1.60
0.43
0.35 0.35
0.14 0.14
0.63
0.39 0.39
0.20 0.20
0.22 0.22
1.17
0.75 0.75 0.75
0.21 0.21 0.21
0.23 0.23 0.23
0.37
0.29 0.29 0.29
0.07 0.07 0.07
0.12 0.12 0.12
0.45
0.38 0.38
0.15 0.15
0.13 0.13
0.15
0.29
0.09
0.26
0.36
0.29 0.29 0.29
0.09 0.09 0.09
0.25 0.25 0.25
0.04
0.11
0.03
0.08
0.15
0.14 0.14
0.05 0.05
0.06 0.06
0.30
0.35 0.35
0.11 0.11
0.15 0.15
0.77
0.57 0.57
0.28 0.28
0.39 0.39
0.06
0.09
0.12
0.60
0.56 0.56
0.67 0.67
0.56 0.56
1.11 1.11
0.09 0.09
1.27 1.27
0.15
0.08
0.16
0.14
0.92
1.70
0.80
0.11
0.44
0.08
0.16
0.19
0.89
0.04
0.50
0.68
0.07
0.05 0.05
0.02 0.02
0.04 0.04
0.38
0.21 0.21
0.07 0.07
0.12 0.12
0.12
0.09 0.09
0.03 0.03
0.10 0.10
0.02
0.02 0.02
0.01 0.01
0.03 0.03
0.03
0.05
5.04 5.14 4.95 3.43 4.59 2.69 4.58 5.70 5.61 1.97 3.68
6.2 11.3 16.3 19.7 24.3 27.0 31.6 37.3 42.9 44.8 48.5
MINGGU KE :
14 15 16 17 18 19 20 21 22 23 24
0.92 0.92 0.92 0.92 0.92
1.70 1.70 1.70 1.70 1.70
0.80 0.80 0.80 0.80 0.80
0.08
0.21
0.25
1.17 1.17 1.17
2.71 2.71
1.67 1.67
0.49 0.49
0.45 0.45
0.61 0.61
0.03 0.03
0.04 0.04
0.02
0.03
0.05
0.05
0.03 0.03
0.04 0.04
0.05
0.16
0.05
0.15
0.41
0.54
0.49
0.53 0.53
0.31 0.31
0.67 0.67
0.03
0.04
0.26 0.26
0.31 0.31
0.35 0.35
0.03 0.03
0.03
0.06
0.14
0.18
0.21
0.30
0.42
0.71
0.04
0.13
0.10
0.12
0.15
0.20
0.26
0.36
1.11
0.29
0.35
0.02
0.06
0.02
0.04
0.00
0.15
0.13
1.21 1.21
0.26 0.26
0.00
0.01
0.01
0.02
0.02
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.07
0.91 0.91
3.50 3.85 3.49 3.53 6.16 5.81 7.25 6.76 6.39 1.56 2.50
52.0 55.9 59.4 62.9 69.0 74.9 82.1 88.9 95.3 96.8 99.3
25
0.01
0.32
0.13
0.00
0.15
0.06
0.67
100.0