BILL OF QUANTITIES UNDERGROUND CABLE 33KV

SCHEDULE BILL OF QUANTITIES FOR ERECTION WORKS FOR TERENGGANU

Item Description Unit Quantity Rate Total


1 Laid in 150mm & 100mmdia. PN10/HDPE Double Wall Corrugated pipes, excavation along clay
soil of mainly road shoulder, reinstatement fully with a sand including supply and installation of meter 2181 150.45 328,131.45
pipes, pipes joins, etc & sand and grass/trees replanting where necessary

2 Laid in 150mm & 100mmdia. PN10/HDPE Double Wall Corrugated pipes, excavation of tar
macadam road, excavation soil to be remove from site reinstatement fully with sand including g meter 1533 250.75 384,399.75
supply and installation of pipes, pipes joints, sand and tar macadam road resurfacing including
thermal plastics road making etc
712,531.20

PREPARED BY: VERIFICATION BY: APPROVE BY: