2 Laid in 150mm & 100mmdia. PN10/HDPE Double Wall Corrugated pipes, excavation of tar
macadam road, excavation soil to be remove from site reinstatement fully with sand including g meter 1533 250.75 384,399.75
supply and installation of pipes, pipes joints, sand and tar macadam road resurfacing including
thermal plastics road making etc
712,531.20