Anda di halaman 1dari 5

ACHMAD FACHRIANSYAH (1115030001) PROJECT WORK 1

KADITHA BOYAN KUSUMA WARDANI (1115030076)

PERHITUNGAN RING BALOK ANAK MEMANJANG

1. Data Perencanaan
Data - Data yang diperlukan
L Balok = 4500 mm
H Balok = 400 mm
B Balok = 250 mm
Selimut Beton = 40 mm
D Tulangan Utama = 18 mm
ɸ Sengkang = 10 mm
As D 22 = 254.47 mm²
As ɸ 10 = 78.540 mm²
d = 341 mm
d' = 59 mm
f'c = 22 MPa
fy D = 400 MPa
fy ɸ = 240 MPa
β1 = 0.85

2 Gaya Dalam
DL + SDL LL EX EY
tumpuanlapangan tumpuanlapangan tumpuan lapangan tumpuan lapangan
M 18.035 11.408 4.782 3.7297 14.286 7.5191 2.7047 1.6307
V 24.015 9.3986 5.0684 2.3446 8.0519 8.0519 2.1221 1.5659

Kombinasi Pembebanan
M (kNm)
Kombinasi Pembebanan
tumpuanlapangan
1. 1,4 DL 25.249 15.971
2. 1,2 DL + 1,6 LL 29.293 19.657
3. 1,2 DL + LL + FX + 0,3 FY 41.521 25.427
4. 1,2 DL + LL + FX - 0,3 FY 39.898 24.449
5. 1,2 DL + LL - FX + 0.3 FY 12.949 10.389
6. 1,2 DL + LL - FX -0.3 FY 11.326 9.4109
7. 0,9 DL + FX + 0,3 FY 31.329 18.275
8. 0,9 DL + FX - 0,3 FY 29.706 17.297
9. 0,9 DL - FX + 0,3 FY 2.7568 3.2372
10. 0,9 DL - FX - 0,3 FY 1.134 2.2588
11. 1,2 DL + LL + 0,3 FX + FY 33.414 21.306
12. 1,2 DL + LL + 0,3 FX - FY 28.005 18.044
13. 1,2 DL + LL - 0,3 FX + FY 24.843 16.794
14. 1,2 DL + LL - 0,3 FX - FY 19.433 13.533

Teknik Sipil - Teknik Konstruksi Gedung


Politeknik Negeri Jakarta 169
ACHMAD FACHRIANSYAH (1115030001) PROJECT WORK 1
KADITHA BOYAN KUSUMA WARDANI (1115030076)

MAKSIMUM 41.521 25.427

- Perhitungan Tulangan Utama Tumpuan


Syarat Kekakuan Mn1 < Mu/ɸ
Diambil Mu terbesar= 41.521 KN.m
Mn = Mu/0,8
= 41,52/0,8
= 51.901 KN.m
1 .Rasio Tulangan
ρmin = 1,4/fy
= 1,4/400
= 0.004
ρbal = β1 . 0,85 . F'c 600
fy 600 + fy
= 0,85 . 0,85 . 30 600
400 600 + 400
= 0.024
ρ1 = 20% . ρbal
= 20% . 0,024
= 0.005
ρmin < ρ1 OK
As1 = ρ1 . B. d
= 0,005 . 250.392
= 406.515 mm²

2. Hitung Momen Nominal Balok Tulangan Tunggal, Mn1


a = As1 . Fy
0,85 . F'c . B
= 554.338 . 250
0,85 . 22 . 250
= 34.782 mm
Mn1 = As1 . Fy . (d - a/2)
= 406,515 . 400 . (341 - 34,78/2)
= 5E+07 N.mm 52.621 KN.m

3. Periksa Apakah Penampang Cukup Bertulangan Tunggal Atau Rangkap


Syarat Mn1 < Mu/ɸ Tulangan Tunggal

Mn2 = Mu/ɸ - Mn1


= 51,901 - 52.621

Teknik Sipil - Teknik Konstruksi Gedung


Politeknik Negeri Jakarta 170
ACHMAD FACHRIANSYAH (1115030001) PROJECT WORK 1
KADITHA BOYAN KUSUMA WARDANI (1115030076)

= -0.719 KN.m

4. Cek Apakah Tulangan Tekan Sudah Leleh


ρ - ρ' > β1 . 0,85 . F'c . d' 600
fy .d 600 - fy

ρ1 > 600
0,85 . 0,85 . 22 . 59
400 . 341 600 - 400
0.005 < 0.021 Tulangan Tekan Belum Leleh

Tulangan Tekan Belum Leleh, maka :


fs' = 600 . (1 - (β1 . 0,85 . f'c . d')/((ρ - ρ') . fy . d))
= 600 . (1 - (0,85 . 0,85 . 22 . 59)/(0,013 . 400 . 341))
= -265.103 MPa

5. Hitung Luas Tulangan Tekan


As' = Mn2/(fs' . (d - d'))
= 0 . 106/(180 . (341 - 59))
= 0.000 mm²

6. Hitung Luas Tulangan Tarik


As' = As2 = 0.000 mm²
As = As1 + As2
= 406.515 + 0
= 406.515 mm²

7 . Periksa Daktilitas Penampang (Jenis Keruntuhan)


- Cek terhadap ρmax tulangan rangkap
ρ = As/(B . d)
= 406.515/(250 . 341)
= 0.005
ρ' = As'/(B . d)
= 0/(250.341)
= 0.000

ρmax = (0,75 . ρbal) + (ρ' . fs'/fy)


= (0,75 . 0,024) + (0 .-256,1/400)
= 0.018
ρ < ρmax OK Under Reinforced
8. Cek Terhadap Mu
a = As . Fy - As' . Fs'
0,85 . F'c . B

Teknik Sipil - Teknik Konstruksi Gedung


Politeknik Negeri Jakarta 171
ACHMAD FACHRIANSYAH (1115030001) PROJECT WORK 1
KADITHA BOYAN KUSUMA WARDANI (1115030076)

= 554.338 . 400 - 0 . 180


0,85 . 30 . 250
= 34.782 mm
Mn = (As . Fy - As' . Fs') . (d - a/2) + (As' . Fs') . (d - d')
= (406,515 . 400 - 0 . -256,1) . (341 - 34,78/2) + (0 . 180) . (341 - 59)
= 5E+07 N.mm 52.621 KN.m
Mu < ɸMn
41.521 < 42.1 Balok Kuat

9 . Dipakai Diameter Tulangan Utama D18


As D18 = 254.47 mm²
Jumlah Tulangan Tarik
n = As/As D18
= 554.338/254,469
= 1.598 >>> 2
Jumlah Tulangan Tekan
n = As'/As D16
= 0/254,469
= 0.000 >>> 2 >>> minimal 1/2 dari tulangan tarik

10. Kontrol Penampatan Tulangan


- Tulangan Tarik
bperlu = 161 mm
bada = 250 mm
bperlu > bada Tulangan Dipasang 1 Lapis
Tulangan Tarik Dipasang 2 Lapis
- Tulangan Tekan
bperlu = 161 mm
bada = 250 mm
bperlu > bada Tulangan Dipasang 1 Lapis

11. Cek Kekuatan Balok dengan Tulangan Tarik Dipasang tidak 1 lapis
As = 3 . As D18
= 3 . 254,47 d'
= 763.407 mm²
d = 341 mm d
H
d = 341.0 mm
d' = 59.0 mm
As Tarik >>> 3 D18 = 508.94 mm²
As' Tekan >>> 2 D18 = 508.94 mm²
B

Teknik Sipil - Teknik Konstruksi Gedung


Politeknik Negeri Jakarta 172
ACHMAD FACHRIANSYAH (1115030001) PROJECT WORK 1
KADITHA BOYAN KUSUMA WARDANI (1115030076)

- Menghitung Rasio Tulangan Tekan dan Tulangan Tarik


ρmin = 1,4/fy
= 1,4/400 763.41
= 0.004
ρ = As/(B . d)
= ρ
763.407/(250 . 341) > ρmin OK
= 0.006
ρ' = As'/(B . d)
= 508,94/(250 . 341)ρ' > ρmin OK
= 0.006

- Memeriksa Apakah Tulangan Tekan Sudah Leleh atau Belum


ρ - ρ' = 0,009 - 0,006
= 0.000
k = β1. 0,85 . f'c . d' 600
fy . d 600 - fy
= 0,85 0,85 . 30 . 58 600
400 . 364,7 600 - 400
= 0.021
ρ - ρ' < k
0.000 < 0.021 Tulangan Tekan Belum Leleh

- Karena Tulangan Tekan Tekan Belum Leleh, maka


fs' = 600 . (1 - (0,85 . F'c . β1 . d')/((ρ - ρ') . Fy . d))
= 600 . (1 - (0,85 . 22 . 0,85 . 59)/(0,008 . 400 . 364,6))
= 117.72233 MPa
= 0 MPa
- Menghitung Kekuatan Balok
a = (As . Fy - As' . Fs')
0,85 . F'c . B
= (763,7 . 400 - 508,94 . 0)
0,85 . 22 . 250
= 43.55 mm

Mn = (As . Fy - As' . Fs') . (d - a/2) + (As' . Fs') . (d - d')


= (763.407. 400 - 508,94 . 0) . (341 - 47,9) + (508,94 . 0) . (341 - 59)
= 6E+07 N.mm 64.987 KN.m
Mu < ɸMn
41.521 < 51.989 Balok Kuat

Teknik Sipil - Teknik Konstruksi Gedung


Politeknik Negeri Jakarta 173