10 proposal points
1. Centralized market + urban garden- the location is strategically chosen
because of its centrality within the urban fabric ( urban action)= changing the
urban grid
Opening of streets- increase connectivity to the area through a centralized axis
in order to provide a better mobility
3. Tramvia- minimal intervention over the area with maximum of connectivity
y
-less noisy and polluting than a bus
-occupies a narrower lane
-accesibility is easier
-reduction of number of accidents due to less number of private
vehicles on the road
improves the economic attractivness of the urban area
Transformation of streets in pedestrian-low road accidents
-more independent movement and
active play for children
-high rates of walking and cycling
-low atmospheric emissions
5. Stitch / Sew Sant Marti using Cristobal de Moura- changing the section to
accomodate for the tram and pedestrian
-defining the landscape
with the buiklings
6. New bicycle lanes-anyone can gave access to safe routes to get anywhere in the
area
+ The topography allows adapting to cach road section and
the input and needs outlined by local residents
7. New green areas-provides recreational opportunities
~creates a green aliemative rpute through the area
substituting gray infrastructure
~aesthetics
8. Residential buildings-they permit some services or work opportunities
-in order to achieve 100 dwellings per block (balance the
density of the area)
9. Area activities-creating workshops for different exhibitions in the area
10. Facilities for research and development of new technologies and technics-it
fits the programme of the 22@ Project