Rencana operasi kargo ini harus disiapkan oleh C / O disamping rencana rencana & muatan Load /
Offloading. Seluruh rencana harus dijelaskan kepada kru sebelum kedatangan bongkar muat pelabuhan,
dan dikirimkan ruang kontrol kargo dengan tanda terima kru.
1. Cargo Information
Grade
Charterer/Shipper
Stowage tank
Quantity B/L M/T M/T M/T
Ship M/T M/T M/T
Loading Port
Unloading port
SG or density
Loading temperature
Heat requirement During Voy N/A
Unloading N/A
Limitations N/A
Heat adjacent tank(max) NA
Cooling requirement YES/NO YES/NO YES/NO
N2 requirements YES/NO YES/NO YES/NO
1. pressure in tank 0.---------.Kg/sq.cm 0. Kg/sq.cm 0. Kg/sq.cm
2. oxygen content % % %
Pollution category
( X,Y,Z,OS, or Annex-I )
Ship type ( II, III or N/A )
Pre-wash requirements YES/NO YES/NO YES/NO
Viscosity, if required by IBC 16.2.6
Melting point by IBC 16.2.9, 16A
Flash point
Boiling point/Freezing point
Vapour pressure at 20℃
Flammable limit
Fire extinguishing agent
Cargo solubility
Cargo miscibility
Tank filling limits
Coating compatibility
Hazard ( IBC/BCH )
Vapour detection ( IBC/BCH )
Respiratory and eye protection (IBC/BCH)
Special requirement(IBC/BCH)
MFAG table
Refer to MSDS & IBC/BCH code for details of hazards and precautions (CDI item 5.1.40 to 5.1.58 )
1/4
FM-SOM-F-04-02-R00
♣ Some items may not be available prior to arrival, please get necessary information through local agent,
company or previous records which ever called the port in advance.
4. Loading/Unloading Sequence
Parcel 1) 2) 3) 4)
Name of cargos
Quantity of cargos(M/T)
Stowage
2/4
FM-SOM-F-04-02-R00
1) Topping Sequence :
11. Emergency procedure against incident such as cargo & oil spill, fire and so on.,)
3/4
FM-SOM-F-04-02-R00
2/O AB1
3/O AB2
PMN AB3
Tanda Tangan : .
4/4