TYPICAL SECTION
B9 B6 B5
600
D1
600
B2
B9 B6 B5
H
h
600
D1
D2
600 600
B2 B1 B3 B4
B
H
h
B9 B1 B3 B4
B7
B8
2
300
D
B6
B1 B3 B4
B
B9 B1 B3 B4
B7
B8
B6
FOR WIDENING
B5 B6
D 2D 1
D 2D 1
100
B5 B6
D 2D 1
D 2D 1
100
H
B1 B4
100 100
500
D3
B2 B3
B5 B6
D1
D1
B1 B4
D3
B2 B3
Sl. Length Breadt
Description Unit No. Depth (m) Quantity
No. (m) h (m)
4
Sl. Length Breadt
Description Unit No. Depth (m) Quantity
No. (m) h (m)
Independent Returnwall on AR side 2 10.60 3.84 3.15 256.19
Toe wall on side slopes AL 2 15.45 2.10 1.65 107.05
AR 2 11.39 2.10 1.65 78.92
5
Sl. Length Breadt
Description Unit No. Depth (m) Quantity
No. (m) h (m)
Pier - 1 1 2.00 1.20 2.45 5.88
Pier - 2 1 2.00 1.20 2.45 5.88
Pier - 3 1 2.00 1.20 2.45 5.88
Pier - 4 1 2.00 1.20 1.95 4.68
Pier - 5 1 2.00 1.20 1.95 4.68
Pier - 6 1 2.00 1.20 1.95 4.68
Pier - 7 0 2.00 1.20 2.45 0.00
Independent Returnwall on AL side 2 10.60 4.45 1.85 174.70
Independent Returnwall on AR side 2 10.60 4.45 1.85 174.70
Toe wall AL 2 15.45 0.60 0.30 5.56
2 15.45 1.85 1.20 68.59
AR side 2 11.39 0.60 0.30 4.10
2 11.39 1.85 1.20 50.56
6
Sl. Length Breadt
Description Unit No. Depth (m) Quantity
No. (m) h (m)
Approach Slab
2 16.00 3.50 0.30 33.60
7
Sl. Length Breadt
Description Unit No. Depth (m) Quantity
No. (m) h (m)
1 4.00 2.80 0.50 1.12
Pier-3
1 10.50 1.20 4.93 62.14
Top cap 1 10.50 2.80 0.50 14.70
1 14.50 2.80 0.70 28.42
1 4.00 2.80 0.50 5.60
Pier-4
1 10.50 1.20 4.52 56.89
Top cap 1 10.50 2.80 0.50 14.70
1 14.50 2.80 0.70 28.42
1 4.00 2.80 0.50 2.80
Pier-5
1 10.50 1.20 4.23 53.32
Top cap 1 10.50 2.80 0.50 14.70
1 14.50 2.80 0.70 28.42
1 4.00 2.80 0.50 2.80
Pier-6
1 10.50 1.20 4.18 52.64
Top cap 1 10.50 2.80 0.50 14.70
1 14.50 2.80 0.70 28.42
1 4.00 2.80 0.50 2.80
Pier-7
0 10.50 1.20 -3.57 0.00
Top cap 0 10.50 2.80 0.50 0.00
0 14.50 2.80 0.70 0.00
0 4.00 2.80 0.50 0.00
b) in RC Girder
End Block 49 4.00 Area = 1.08 211.68
Tapering 49 2.40 Area = 0.94 110.25
Mid Section 49 13.60 Area = 0.80 529.79
8
Sl. Length Breadt
Description Unit No. Depth (m) Quantity
No. (m) h (m)
Foundations 1 wt = 134.00 134.00
Filter media with stone crushed
aggregates abutments/return walls as per
1.12 Cu.m. 137.33
clause 2504.2.2 and Tech. Spec.
Cl.710.1.4 of IRC:78
Behind Abutment - AL 1 16.00 0.60 4.06 38.97
Behind Abutment - AR 1 16.00 0.60 1.53 14.68
Independent Returnwall on AL side 2 10.00 0.60 4.06 48.71
Independent Returnwall on AR side 2 10.00 0.60 1.53 18.35
below pitching 4 55.42 0.15 16.63
9
Sl. Length Breadt
Description Unit No. Depth (m) Quantity
No. (m) h (m)
2 10.00 20.00
2 10.00 20.00
2.00 2.00
10
Sl. Length Breadt
Description Unit No. Depth (m) Quantity
No. (m) h (m)
Painting of concrete hand rails/
parapets/ crash barriers with two coats
1.28 of enamel paint as per Technical Sq.m 804.60
Specification and the directions of the
Engineer
Abutment shaft
AL 1.00 19.00 1.00 19.00
AR 1.00 19.00 1.00 19.00
Pier Cap
Pier 6.00 34.60 0.70 145.32
6.00 26.60 0.50 79.80
12.00 9.60 0.50 57.60
Abutment cap
2.00 19.40 0.90 34.92
2.00 18.50 0.60 22.20
11
Sl. Length Breadt
Description Unit No. Depth (m) Quantity
No. (m) h (m)
12
Sl. Length Breadt
Description Unit No. Depth (m) Quantity
No. (m) h (m)
AL 1 16.60 8.10 0.00 0.00
AR 1 16.60 8.10 0.00 0.00
Pier - 1 1 13.10 7.20 0.00 0.00
Pier - 2 1 13.10 7.20 0.00 0.00
Pier - 3 0 13.10 7.20 0.00 0.00
Independent Returnwall on AL side 2 10.60 5.00 0.00 0.00
Independent Returnwall on AR side 2 10.60 4.85 0.00 0.00
13
Sl. Length Breadt
Description Unit No. Depth (m) Quantity
No. (m) h (m)
Pier - 2 1 12.80 6.90 0.15 13.25
Pier - 3 0 12.80 6.90 0.15 0.00
Independent Returnwall on A1 side 2 10.30 4.70 0.15 14.53
Independent Returnwall on A2 side 2 10.30 4.55 0.15 14.07
Toe wall 2 14.98 1.80 0.15 8.09
2 14.48 1.80 0.15 7.82
14
Sl. Length Breadt
Description Unit No. Depth (m) Quantity
No. (m) h (m)
Projection 1 16.00 0.30 0.30 1.44
Triangle portion 1 16.00 0.30 0.30 0.72
Abutment - AR (Shaft) 1 16.00 0.75 2.88 34.51
1 16.00 0.45 2.88 10.35
Monolithic Return Wall AR 2 3.80 0.80 2.88 17.49
Abutment Cap AR 1 16.00 0.75 0.60 7.20
Triangle portion 2 16.00 0.45 0.60 4.32
1 16.00 1.70 0.90 24.48
Dirt wall 1 16.00 0.30 1.95 9.36
Projection 1 16.00 0.30 0.30 1.44
Triangle portion 1 16.00 0.30 0.30 0.72
Piers
Pier-1
1 10.50 1.00 5.76 60.52
Top cap 1 10.50 2.80 0.50 14.70
1 14.50 2.80 0.70 28.42
1 4.00 2.80 0.50 2.80
Pier-2
1 10.50 1.00 5.16 54.22
Top cap 1 14.50 2.80 0.50 20.30
1 14.50 2.80 0.70 28.42
1 4.00 2.80 0.50 2.80
Pier-3
0 10.50 1.00 -3.02 0.00
Top cap 0 14.50 2.80 0.50 0.00
0 14.50 2.80 0.70 0.00
b) in RC Girder
End Block 21 4.00 Area = 0.87 73.08
Tapering 21 2.40 Area = 0.78 39.31
Mid Section 21 8.60 Area = 0.69 124.61
15
Sl. Length Breadt
Description Unit No. Depth (m) Quantity
No. (m) h (m)
Filter media with stone crushed
aggregates abutments/return walls as per
1.12 Cu.m. 190.54
clause 2504.2.2 and Tech. Spec.
Cl.710.1.4 of IRC:78
Behind Abutment - AL 1 16.00 0.60 3.82 36.71
Behind Abutment - AR 1 16.00 0.60 3.58 34.33
Independent Returnwall on AL side 2 10.00 0.60 3.82 45.89
Independent Returnwall on AR side 2 9.70 0.60 3.58 41.62
below pitching 4 53.31 0.15 31.99
16
Sl. Length Breadt
Description Unit No. Depth (m) Quantity
No. (m) h (m)
Providing and filling joint sealing
compound as per drawings with coarse
sand and 6 percent bitumen by weight
1.18 (0.083 kg/m bitumen) including cost and Rmtr 4 16.00 64.00
conveyance of all materials, labour, fixing
in position, etc., complete as per drawing
and Tech. Spec. Cl
2 10.00 20.00
2 10.00 20.00
17
Sl. Length Breadt
Description Unit No. Depth (m) Quantity
No. (m) h (m)
Pedstrals 42.00 3.20 0.25 33.60
Girders
End section 21.00 4.00 3.40 285.60
Mid section 21.00 8.60 3.70 668.22
Trapered section 21.00 2.40 3.55 178.92
Slab 1.00 45.00 16.40 738.00
Pier shaft
Pier-1 1.00 23.00 3.00 69.00
Pier-2 1.00 23.00 3.00 69.00
Pier-3 0.00 23.00 3.00 0.00
Abutment shaft
AL 1.00 18.40 1.00 18.40
AR 1.00 18.40 1.00 18.40
Pier Cap
Pier 1.00 34.60 0.70 24.22
1.00 23.00 0.50 11.50
2.00 9.60 0.50 9.60
Abutment cap
2.00 19.40 0.90 34.92
2.00 18.45 0.60 22.14
18
Highway/Drain Cost Estimate VUP Hazira
Sr No Item Description Unit Qty Rate Total
Construction of Subgrade with approved material statisfying the
1 requirements all leads and lifts complete as per Technical Specifications Cu.m 34450.00
Minimum CBR 8% -
Filling of median/island as per drawings and Technical specifications clause
2 Cu.m 3382.34
407 with selected earth -
Constructing granular sub-base (GSB) complete as per drawing and
3 Cu.m 13260.00
Technical specifications clause 401 -
Constructing Wet Mix Macadam (WMM) base complete as per drawing
4 Cum 16250.00
and Technical Specifications Clause 406 -
Providing and laying bituminous primer coat over granular surface as per
5
drawing and Technical Specifications Clause 502. (Slow Setting Emulsion)
Providing and laying Bituminous Concrete (BC) using 60/70 (VG 30) Grade
8 Bitumen with Modified Bitumen as per drawing and Technical Cum 2470.00
Specifications Clause 509
-
9 RCC Cover Drain (1.500m Width Section) -
i) Excavation Cum 6440.00 -
ii) PCC M15 Concrete Cum 470.00 -
iii) Base Slab (M-30) Cum 780.00 -
iv) Drain Wall (M-30) Cum 780.00 -
V) Top Slab (M-30) Cum 390.00 -
Vi) Steel Grate No. 170.00 -
vii) HYSD Steel Reinforcement 500D MT 87.86 -
Pavement markings with hot applied thermoplastic material complete as
10
per drawing and Technical Specifications clause 803
a) Lane/Centre line/Edge marking/ Traverse marking and any other marking Sqm 1733.33
-
S&F in position cut stone neatly dressed including earth work, C.C. 1:4:8 painting
11 with enamel paint engraving letters and numerals as per IRC standard design
complete.
i) 5th Km. Stone No.
ii) 200 M. Stone. No. 7.00
iii) Boundary Pillars No. 7.00
21
Sl. Length Breadth
Description Unit No. Depth (m) Quantity Rate Amount
No. (m) (m)
22
Sl. Length Breadth
Description Unit No. Depth (m) Quantity Rate Amount
No. (m) (m)
Providing weep holes in abutments, returnwalls, with
15.00 100mm dia AC pipes complete as per drawing and Tech. no's 536.00 0.00
Spec. Cl. 2706
Abutment - AL 1 27.50 8.50 1.00 234.00
Abutment - AR 1 27.50 8.50 1.00 234.00
Monolithic Return Wall- AL 2 2.00 8.50 1.00 34.00
Monolithic Return Wall- AR 2 2.00 8.50 1.00 34.00
23
Sl. Length Breadth
Description Unit No. Depth (m) Quantity Rate Amount
No. (m) (m)
c) Providing, Filling, grading and compaction with selected
soil meeting approved design parameters in layers in soil cum 123750.00 0.00
reinforced zone complete.
Approach sides
behing Abutment 2 500.00 27.5 4.50 123750.00
24
SUMMARY OF COST ESTIMATE FOR MAIN CORRIDOR
3 Bill No.3 GRANULAR SUB-BASE AND BASE COURSES #REF! #REF! #REF!
5 Bill No.5 SLAB, BOX AND PIPE CULVERTS #REF! #REF! #REF!
25