TAGIHAN KERJA PEKERJAAN TAMBAH

No. Kontrak : Subkontraktor : PT. RENTAL BORNEO


Pekerjaan : PEK TAMBAHAN PROYEK SARFAS KALIMARAU BERAU PT. PERTAMINA UPMS V BALIKPAPAN No. Tagihan Kerja : 03 ( Tiga )
Tanggal : 29 Januari 2018

KONTRAK

NO. JENIS PEKERJAAN VOL SAT HARGA SATUAN JUMLAH HARGA JUMLAH HARGA TAGIHAN BULAN LALU TAGIHAN BULAN INI TAGIHAN S/D BULAN INI

MATERIAL JASA MATERIAL JASA

1 CONCRETE GUARD AREA LOADING UN LOADING


Beton ; Mutu Beton K - 275 kg/cm2 ; Pembesian D 16 ; Mutu Baja fy = 400 MPa 12.94 m3 3,442,950.00 568,886.50 44,538,001.20 7,359,115.76 51,897,116.96 51,897,116.96 51,897,116.96
Bekisting kayu papan kelas III 2x pakai

2 LANTAI MODULAR FUEL STORAGE TANK


Beton ; Mutu Beton K - 275 kg/cm2 ; Pembesian Wermesh M6 22.90 m3 3,442,950.00 568,886.50 78,843,555.00 13,027,500.85 91,871,055.85 91,871,055.85 91,871,055.85
Bekisting kayu papan kelas III 2x pakai

3 LANTAI MODULAR SUPPLY PUMP SET


Beton ; Mutu Beton K - 275 kg/cm2 ; Pembesian D 13 ; Mutu Baja fy = 400 MPa 1.29 m3 3,442,950.00 568,886.50 4,437,962.55 733,294.70 5,171,257.25 5,171,257.25 5,171,257.25
Bekisting kayu papan kelas III 2x pakai

4 LANTAI MODULAR RECEIVING PUMP SET


Beton ; Mutu Beton K - 275 kg/cm2 ; Pembesian D 13 ; Mutu Baja fy = 400 MPa 1.29 m3 3,442,950.00 568,886.50 4,437,962.55 733,294.70 5,171,257.25 5,171,257.25 5,171,257.25
Bekisting kayu papan kelas III 2x pakai

5 LANTAI MODULAR ELECTRICAL HOUSE 2 x 20 ft


Beton ; Mutu Beton K - 275 kg/cm2 ; Pembesian D 13 ; Mutu Baja fy = 400 MPa 2.55 m3 3,442,950.00 568,886.50 8,762,307.75 1,447,816.14 10,210,123.89 10,210,123.89 10,210,123.89
Bekisting kayu papan kelas III 2x pakai

6 LANTAI DIESEL OIL DAILY TANK


Beton ; Mutu Beton K - 275 kg/cm2 ; Pembesian D 13 ; Mutu Baja fy = 400 MPa 1.62 m3 3,442,950.00 568,886.50 5,572,070.28 920,685.91 6,492,756.19 6,492,756.19 6,492,756.19
Bekisting kayu papan kelas III 2x pakai

7 LANTAI GUDANG LIMBAH B3, 3m x 2.2m


Beton ; Mutu Beton K - 275 kg/cm2 ; Pembesian D 13 ; Mutu Baja fy = 400 MPa 1.31 m3 3,442,950.00 568,886.50 4,496,492.70 742,965.77 5,239,458.47 5,239,458.47 5,239,458.47
Bekisting kayu papan kelas III 2x pakai

8 LIGHTING POLE (Tiang Listrik)


Baut Angkur ; Anchor Bolt ASTM A-307, dia 16 - Panjang 400mm 56.00 bh 150,000.00 33,000.00 8,400,000.00 1,848,000.00 10,248,000.00 10,248,000.00 10,248,000.00

JUMLAH 159,488,352.03 26,812,673.83 186,301,025.86 - 186,301,025.86 186,301,025.86

Diperiksa/disetujui Dibuat oleh,


Disetujui oleh,
KONTRAKTOR
Diperiksa oleh, SUBKONTRAKTOR
PT. BHUMI
PT. BHUMI PHALA PHALA PERKASA
PERKASA PT. BHUMI PHALA PERKASA RENTAL BORNEO, CV

GERY GUNARA RIZAL ARIAWAN RIZAL


RIZAL ARIAWAN
DIREKTUR SITE MANAGER
SITE MANAGER DIREKTUR DIREKTUR