Anda di halaman 1dari 8

DISEÑO DE COLUMNAS

COLUMNA 3-B
METRADOS DE CARGAS:

*)el valor de 300kg/m² para losa aligerada de 20cm de espesor es tomado del
libro”Analisis E. de Edificios” de San Bartolome

*1ER PISO :
CARGA MUERTA:

a)Losa =
300 ( Kg/ m²) x [(2+1.75) x ( 3+2.75) ] - [ (0.4 x 0.35)+(0.3x5.35)+(0.25x3.4)] =
5690.25
b) Viga Principal = (0.3 x 0.45) [ (2.8 + 2.55) x2400] = 1733.40
c)Viga Secundaria. = (0.25x 0.3) [ ( 1.825+1.575)x 2400] = 612.00
d)Columna (Peso Propio) = [ 0.4 x (0.35) ] x(2.8 +0.2 ) x2400 =1008.00
e)Tabiqueria repartida=(180 Kg/m²) [(2 +1.75) x(3+ 2.75) – (0.4x0.35)] =3856.05
f) Piso acabado = (100 kg/m²) [ (2+1.75)x(3+2.75) – (0.4x0.35)] = 2142.25

Σ WD = 15041.95
CARGA VIVA

a) sobrecarga = (200 kg/m²) [ (2+1.75)x(3+2.75) – (0.4x0.35)] = 4284.5

Σ WL = 4284.5

*2do PISO :
CARGA MUERTA:
a)Losa =
300 ( Kg/ m²) x [(2+1.75) x ( 3+2.75) ] - [ (0.4 x 0.35)+(0.3x5.35)+(0.25x3.4)] =
5690.25
b) Viga Principal = (0.3 x 0.45) [ (2.8 + 2.55) x2400] = 1733.40
c)Viga Secundaria. = (0.25x 0.3) [ ( 1.825+1.575)x 2400] = 612.00
d)Columna (Peso Propio) = [ 0.4 x (0.35) ] x(2.5 +0.2 ) x2400 =907.200
e)Tabiqueria repartida=(180 Kg/m²) [(2 +1.75) x(3+ 2.75) – (0.4x0.35)] =3856.05
f) Piso acabado = (100 kg/m²) [ (2+1.75)x(3+2.75) – (0.4x0.35)] = 2142.25

Σ WD = 14941.15
CARGA VIVA

a) sobrecarga = (200 kg/m²) [ (2+1.75)x(3+2.75) – (0.4x0.35)] = 4284.5

Σ WL = 4284.5

*3er PISO :
CARGA MUERTA:

a)Losa =
300 ( Kg/ m²) x [(2+1.75) x ( 3+2.75) ] - [ (0.4 x 0.35)+(0.3x5.35)+(0.25x3.4)] =
5690.25
b) Viga Principal = (0.3 x 0.45) [ (2.8 + 2.55) x2400] = 1733.40
c)Viga Secundaria. = (0.25x 0.3) [ ( 1.825+1.575)x 2400] = 612.00
d)Columna (Peso Propio) = [ 0.4 x (0.35) ] x(2.5 +0.2 ) x2400 =907.200
e)Tabiqueria repartida=(180 Kg/m²) [(2 +1.75) x(3+ 2.75) – (0.4x0.35)] =3856.05
f) Piso acabado = (100 kg/m²) [ (2+1.75)x(3+2.75) – (0.4x0.35)] = 2142.25

Σ WD = 14941.15
CARGA VIVA

a) sobrecarga = (200 kg/m²) [ (2+1.75)x(3+2.75) – (0.4x0.35)] = 4284.5

Σ WL = 4284.5
AZOTEA:

CARGA MUERTA:

a)Losa =
300 ( Kg/ m²) x [(2+1.75) x ( 3+2.75) ] - [ (0.4 x 0.35)+(0.3x5.35)+(0.25x3.4)] =
5690.25
b) Viga Principal = (0.3 x 0.45) [ (2.8 + 2.55) x2400] = 1733.40
c)Viga Secundaria. = (0.25x 0.3) [ ( 1.825+1.575)x 2400] = 612.00
d)Columna (Peso Propio) = [ 0.4 x (0.35) ] x(2.5 +0.2 ) x2400 =907.200
e) Piso acabado = (100 kg/m²) [ (2+1.75)x(3+2.75) – (0.4x0.35)] = 2142.25

Σ WD = 11085.100kg
CARGA VIVA

a) sobrecarga = (100 kg/m²) [ (2+1.75)x(3+2.75) – (0.4x0.35)] = 2142.25


Σ WL = 2142.25kg

SUMATORIA DE CARGAS QUE LLEGA A LA COLUMNA 3-B

WD WL
Primer piso= 15041.95 4284.5
2do piso = 14941.15 4284.5
3er piso = 14941.15 4284.5
azotea = 11085.10 2142.25

56009.35 14995.75

DISEÑO COLUMNA 3-B

PUL= 14995.75
PUD= 56009.35
PU=1.4wd+1.7wl=103905.865kg
Mu= 2317.46 Kg-m(DEL DIAGRAMA DE MOMENTOS”ENVOLVENTE
TOTAL”)

a) PREDIMENSIONAMIENTO
*se estimara con un Pt=0,02

Ag>Pu/0.45(fc+fy*Pt)= 103905.865kg/0.45(210+4200*0.02)= 785.38 cm2

Se tiene una seccion de b=35 h=40

Area=35*40=1400cm>785.38

Se considera refuerzo en las caras paralelas: fierro de 3/4

Calculo de t y ‫ ﻵ‬:
r´= 5 t=h-2r´ =40-2*5=30

t= 30

‫=ﻵ‬t/h= 40/30=0.75(exisre diagrama no es necesario interpolar)

b) Calculo de Pu/bh y Mu/bh2


Pu/bh=103905/(35*40)= 74.218

Mu/bh2=2317.46*100/(35*40² )=4.138

Según los diagramas de iteraccion estos valores estan con un Pb=


0.004

c) Calculo del area del refuerzo

As=Pb*b*h=0.004*35*40=5.6cm2
Verificacion del Asmin=0.01*b*h=14cm
Se asumira el Asmin = 14cm

por tabla de diametros Se usaran 4Ø 1´´ Se colocaran estribos de Ø


3/8´´

d) Espaciamiento de los estribos fuera de la longitud de confinamiento

S<16db=16*2.54= 40.64 cm
S<48db=48*0.95= 45.6 cm
S< (b o h)= 35 cm

Se elige el menor = 35cm (sera nuestro espaciamiento maximo


e) Longitud de confinamiento Lo L= 2.8

Lo=L/6=2.8/6= 46.66
Lo=>seccion b o h= 40
Lo= 45

Se considera el mayor Lo= 45cm

e) Espaciamineto de los estribos dentro de la longitud de confinamiento

So minb/2= 35/2=17.5
h/2= 40/2=20
So min10cm

Se elige el menor So= 10 cm


*se colocara 1 estribo @ 5cm en la longitud de confinamiento el resto sera @ 10 cm
COLUMNA 3-C
METRADOS DE CARGAS:

*)el valor de 300kg/m² para losa aligerada de 20cm de espesor es tomado del
libro”Analisis E. de Edificios” de San Bartolome

*1ER PISO :
CARGA MUERTA:
a)Losa =
300 ( Kg/ m²) x [(2+1.75) x ( 2.75+2.75) ] - [ (0.4 x 0.35)+(0.3x5.1)+(0.25x3.4)] =
5431.5
b) Viga Principal = (0.3 x 0.45) [ (2.55+ 2.55) x2400] = 1652.4
c)Viga Secundaria. = (0.25x 0.3) [ ( 1.825+1.575)x 2400] = 612.00
d)Columna (Peso Propio) = [ 0.4 x (0.35) ] x(2.8 +0.2 ) x2400 =1008.00
e)Tabiqueria repartida=(180 Kg/m²)[(2 +1.75)x(2.75+ 2.75)– (0.4x0.35)] =3687.3
f) Piso acabado = (100 kg/m²) [ (2+1.75)x(2.75+2.75) – (0.4x0.35)] = 2048.5

Σ WD = 14439.7
CARGA VIVA

a) sobrecarga = (200 kg/m²) [ (2+1.75)x(2.75+2.75) – (0.4x0.35)] = 4097.00

Σ WL = 4097.00
*2do PISO :
CARGA MUERTA:

a)Losa =
300 ( Kg/ m²) x [(2+1.75) x ( 2.75+2.75) ] - [ (0.4 x 0.35)+(0.3x5.1)+(0.25x3.4)] =
5431.5
b) Viga Principal = (0.3 x 0.45) [ (2.55+ 2.55) x2400] = 1652.4
c)Viga Secundaria. = (0.25x 0.3) [ ( 1.825+1.575)x 2400] = 612.00
d)Columna (Peso Propio) = [ 0.4 x (0.35) ] x(2.5 +0.2 ) x2400 =907.2
e)Tabiqueria repartida=(180 Kg/m²)[(2 +1.75)x(2.75+ 2.75)– (0.4x0.35)] =3687.3
f) Piso acabado = (100 kg/m²) [ (2+1.75)x(2.75+2.75) – (0.4x0.35)] = 2048.5

Σ WD = 14338.900
CARGA VIVA

a) sobrecarga = (200 kg/m²) [ (2+1.75)x(2.75+2.75) – (0.4x0.35)] = 4097.00

Σ WL = 4097.00
*3er PISO :
CARGA MUERTA:

a)Losa =
300 ( Kg/ m²) x [(2+1.75) x ( 2.75+2.75) ] - [ (0.4 x 0.35)+(0.3x5.1)+(0.25x3.4)] =
5431.5
b) Viga Principal = (0.3 x 0.45) [ (2.55+ 2.55) x2400] = 1652.4
c)Viga Secundaria. = (0.25x 0.3) [ ( 1.825+1.575)x 2400] = 612.00
d)Columna (Peso Propio) = [ 0.4 x (0.35) ] x(2.5 +0.2 ) x2400 =907.2
e)Tabiqueria repartida=(180 Kg/m²)[(2 +1.75)x(2.75+ 2.75)– (0.4x0.35)] =3687.3
f) Piso acabado = (100 kg/m²) [ (2+1.75)x(2.75+2.75) – (0.4x0.35)] = 2048.5

Σ WD = 14338.900
CARGA VIVA

a) sobrecarga = (200 kg/m²) [ (2+1.75)x(2.75+2.75) – (0.4x0.35)] = 4097.00


Σ WL = 4097.00
*AZOTEA :
CARGA MUERTA:

a)Losa =
300 ( Kg/ m²) x [(2+1.75) x ( 2.75+2.75) ] - [ (0.4 x 0.35)+(0.3x5.1)+(0.25x3.4)] =
5431.5
b) Viga Principal = (0.3 x 0.45) [ (2.55+ 2.55) x2400] = 1652.4
c)Viga Secundaria. = (0.25x 0.3) [ ( 1.825+1.575)x 2400] = 612.00
d)Columna (Peso Propio) = [ 0.4 x (0.35) ] x(2.5 +0.2 ) x2400 =907.2 f)
e)Piso acabado = (100 kg/m²) [ (2+1.75)x(2.75+2.75) – (0.4x0.35)] = 2048.5

Σ WD = 10651.60
CARGA VIVA

a) sobrecarga = (200 kg/m²) [ (2+1.75)x(2.75+2.75) – (0.4x0.35)] = 2048.5

Σ WL = 2048.5

SUMATORIA DE CARGAS QUE LLEGA A LA COLUMNA 3-B

WD WL
Primer piso= 14439.7 4097.00
2do piso = 14338.9 4097.00
3er piso = 14338.9 4097.00
azotea = 10651.6 2048.5

53769.1 14339.5

DISEÑO COLUMNA 3-B

PUL= 14339.5
PUD= 53769.1
PU=1.4wd+1.7wl=99653.89kg

Mu= 1422.82 Kg-m(DEL DIAGRAMA DE MOMENTOS”ENVOLVENTE


TOTAL”)

b) PREDIMENSIONAMIENTO
*se estimara con un Pt=0,02

Ag>Pu/0.45(fc+fy*Pt)= 99653.89kg /0.45(210+4200*0.02)=753.242cm2

Se tiene una seccion de b=35 h=40

Area=35*40=1400cm >753.242
Se considera refuerzo en las caras paralelas: fierro de 3/4

Calculo de t y ‫ ﻵ‬:
r´= 5 t=h-2r´ =40-2*5=30

t= 30

‫=ﻵ‬t/h= 40/30=0.75(exisre diagrama no es necesario interpolar)

b) Calculo de Pu/bh y Mu/bh2

Pu/bh=99653.89kg /(35*40)= 71.18

Mu/bh2=1422.82*100/(35*40² )=2.541

Según los diagramas de iteraccion estos valores estan con un Pb=


0.006

c) Calculo del area del refuerzo

As=Pb*b*h=0.006*35*40=8.4cm2
Verificacion del Asmin=0.01*b*h=14cm
Se asumira el Asmin = 14cm

por tabla de diametros Se usaran 4Ø 1´´ Se colocaran estribos de Ø


3/8´´

d) Espaciamiento de los estribos fuera de la longitud de confinamiento

S<16db=16*2.54= 40.64 cm
S<48db=48*0.95= 45.6 cm
S< (b o h)= 35 cm

Se elige el menor = 35cm (sera nuestro espaciamiento maximo


e) Longitud de confinamiento Lo L= 2.8

Lo=L/6=2.8/6= 46.66
Lo=>seccion b o h= 40
Lo= 45

Se considera el mayor Lo= 45cm

e) Espaciamineto de los estribos dentro de la longitud de confinamiento

So minb/2= 35/2=17.5
h/2= 40/2=20
So min10cm

Se elige el menor So= 10 cm


*se colocara 1 estribo @ 5cm en la longitud de confinamiento el resto sera @ 10 cm

Anda mungkin juga menyukai