RENCANA ANGGARAN BIAYA

PEKERJAAN PERBAIKAN LANTAI 2 GEDUNG D


PUSAT PEMANFAATAN PENGINDERAAN JAUH (PUSFATJA)

NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

I RUANG KOMUNAL
A PEKERJAAN PERSIAPAN

1 Persiapan Pembersihan sebelum pelaksanaan 1.00 ls 1,000,000.00


2 Mobilisasi 1.00 ls 1,500,000.00
3 Pengukuran 1.00 ls 537,000.00
Jumlah

B PEKERJAAN TANAH DAN BONGKARAN

1 Bongkar Lantai Granit Tile di pakai lagi 110.00 m2 30,000.00


2 Bongkar Rabat bawah Lantai (spesi) 110.00 m2 17,500.00
3 Buang Bongkaran 1.00 ls 1,500,000.00

Jumlah
C PEKERJAAN PASANGAN

1 Pasang Kembali Granit Existing 60.00 m2 70,000.00


2 Homogenous Tile Uk. 60x60 Polished Standard 50.00 m2 355,000.00
(indogres atau valentino Granite tile)

Jumlah
ll RUANG RAPAT BESAR

A PEKERJAAN TANAH DAN BONGKARAN

1 Bongkar Lantai Granit Tile di pakai lagi 132.00 m2 30,000.00


2 Bongkar Rabat bawah Lantai (spesi) 132.00 m2 17,500.00

Jumlah
B PEKERJAAN PASANGAN
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

1 Pasang Kembali Granit Existing 52.80 m2 30,000.00


2 Homogenous Tile Uk. 60x60 Polished Standard 79.20 m2 355,000.00
(indogres atau valentino Granite tile)

Jumlah
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

D PEKERJAAN LAIN-LAIN

1 Perapihan bekas kerja 1.00 ls 500,000.00


Jumlah

a Jumlah Keseluruhan
b PPN
Jumlah
Dibulatkan

Terbilang :

Tujuh puluh lima juta rupiah.

Jakarta, Januari 2
Diperiksa / Disetujui Oleh : Dibuat Oleh :
Pejabat Pembuat Komitmen
PUSAT PEMANFAATAN PENGINDERAAN JAUH (PUSFATJA) CV. METRO ESTET

HARIS HENEKDIKTUS SALMON CH GOGA


NIP. 19780403 200912 1002 DIREKTUR
A ANGGARAN BIAYA
ERBAIKAN LANTAI 2 GEDUNG D
N PENGINDERAAN JAUH (PUSFATJA)

JUMLAH HARGA
SATUAN

1,000,000.00
1,500,000.00
537,000.00
3,037,000.00

3,300,000.00
1,925,000.00
1,500,000.00

6,725,000.00

4,200,000.00
17,750,000.00

21,950,000.00

3,960,000.00
2,310,000.00

6,270,000.00
JUMLAH HARGA
SATUAN

1,584,000.00
28,116,000.00

29,700,000.00
JUMLAH HARGA
SATUAN

500,000.00
500,000.00

68,182,000.00
6,818,200.00
75,000,200.00
75,000,000.00

Jakarta, Januari 2018


Dibuat Oleh :

CV. METRO ESTETIKA

SALMON CH GOGALI, MA
DIREKTUR
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PEKERJAAN PEMBANGUNAN GEDUNG NEGARA
TAHUN ANGGARAN 2017

NO. URAIAN HARGA UPAH HARGA SATUAN

1 2 3 4

1 Pekerja @Rp. 90,000.00 / OH


2 Mandor @Rp. 130,000.00 / OH
3 Tukang Batu @Rp. 120,000.00 / OH
4 Tukang Kayu @Rp. 120,000.00 / OH
5 Tukang Besi @Rp. 120,000.00 / OH
6 Tukang Keramik @Rp. 120,000.00 / OH
7 Tukang Plafond @Rp. 120,000.00 / OH
8 Tukang Pasang Pipa @Rp. 120,000.00 / OH
9 Tukang Cat @Rp. 120,000.00 / OH
10 Tukang Setengah Terampil @Rp. 90,000.00 / OH
11 Kepala Tukang @Rp. 130,000.00 / OH
12 Alat Bantu @Rp. 85,000.00 / Jam
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4

A TIMBUNAN / GALIAN
1 Tanah Timbun/Merah @Rp. 100,000.00 / M3
2 Pasir Timbun / Urug @Rp. 261,000.00 / M3
3 Pasir Pasang @Rp. 273,000.00 / M3
4 Pasir beton @Rp. 273,000.00 / M3
5 Sirtu @Rp. 131,700.00 / M3
6 Tanah Humus @Rp. 107,250.00 / M3

B BAHAN PEREKAT
1 Portland Cement (PC) 50 Kg @Rp. 1,500.00 / Kg
2 Cement Putih @Rp. 2,300.00 / Kg
3 Lem Kayu @Rp. 56,100.00 / Kg
4 Lem Vinyl / Karet @Rp. 67,350.00 / Kg
5 Perekat Kaca @Rp. 114,750.00 / Kg
6 Waterfroof @Rp. 80,000.00 / Kg

C BATU / BATU CETAKAN


1 Batu Krikil / Koral 3 - 5 cm @Rp. 270,000.00 / M3
2 Batu Krikil / Koral 5 - 7 cm @Rp. 170,900.00 / M3
3 Batu Krikil / Koral 7 - 10 cm @Rp. 155,900.00 / M3
4 Batu Belah/Kali 10 - 15 cm @Rp. 239,000.00 / M3
5 Batu Belah/Kali 15 - 20 cm @Rp. 239,000.00 / M3
6 Batu Pecah 1 - 2 cm @Rp. 296,000.00 / M3
7 Batu Pecah 2 - 3 cm @Rp. 261,000.00 / M3
8 Batu Pecah 3 - 5 cm @Rp. 270,000.00 / M3
9 Batu Pecah 5 - 7 cm @Rp. 150,200.00 / M3
10 Batu Kacang /jagung 0,5 - 1 cm @Rp. 202,700.00 / M3
11 Batu Splyt @Rp. 239,000.00 / M3
Bata ringan 100x200x600 @Rp. 1,280,000.00 / M3
Bata ringan 100x400x600 @Rp. 1,304,000.00 / M3
12 Batu Bata biasa 5x10x20 cm @Rp. 1,000.00 / Bh
13 Batu Bata Mesin 5x10x20 cm @Rp. 720.00 / Bh
14 Batu Bataco 6x12x24 cm @Rp. 3,000.00 / Bh
15 Batu Krawang 10x10x20 cm @Rp. 3,030.00 / Bh
16 Batu Krawang 10x15x15 cm @Rp. 3,470.00 / Bh
17 Batu Krawang 10x20x20 cm @Rp. 3,740.00 / Bh
18 Concrete Block (CB) 10 @Rp. 5,000.00 / Bh
19 Concrete Block (CB) 15 @Rp. 7,000.00 / Bh
20 Concrete Block (CB) 20 @Rp. 11,000.00 / Bh
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4
21 Bondbeam 40x20x20 cm @Rp. 21,000.00 / Bh
22 Con Block warna type Holland tb 6 cm @Rp. 1,720.00 / Bh
23 Con Block warna type Uni pave tb 6 cm @Rp. 1,600.00 / Bh
24 Con Block warna type Dosex Six tb 6 cm @Rp. 1,840.00 / Bh
25 Con Block warna type Hexagon tb 6 cm @Rp. 1,710.00 / Bh
26 Con Block K 125 @Rp. 1,750.00 / Bh
27 Con Block K 175 @Rp. 2,700.00 / Bh

D KAYU / LANGIT - LANGIT


1 Balok Kayu Jati @Rp. 23,925,000.00 / M3
2 Papan Kayu Jati @Rp. 24,104,440.00 / M3
3 Balok Kayu Damar Laut @Rp. 9,350,000.00 / M3
4 Papan Kayu Damar Laut @Rp. 9,650,000.00 / M3
5 Balok Kayu Meranti Batu @Rp. 9,075,000.00 / M3
6 Papan Kayu Meranti Batu @Rp. 9,375,000.00 / M3
7 Balok Kayu Kapur @Rp. 6,490,000.00 / M3
8 Papan kayu Kapur @Rp. 6,790,000.00 / M3
9 Balok Kayu Meranti Kls I @Rp. 5,225,000.00 / M3
10 Papan Kayu Meranti Kls I @Rp. 5,475,000.00 / M3
11 Kayu Sembarang/Bekisting @Rp. 2,005,476.96 / M3
12 Kayu Bakar @Rp. 187,000.00 / M3
13 Papan Lambersering/Rider @Rp. 225,000.00 / M2
14 Kayu Lat Asbes 5x30x400 mm @Rp. 7,430.00 / Btg
15 Kayu Kaso 5 - 7 /400 cm @Rp. 57,000.00 / Btg
16 Kayu Dolken / Kayu Laut Ø 7,5 - 10 / 400 cm @Rp. 15,540.00 / Btg
17 Bambu Ø 6 - 8 /600 cm @Rp. 36,000.00 / Btg
18 Bilik Bambu @Rp. 16,340.00 / M2
19 Kayu Profil 1" @Rp. 6,270.00 / M'
20 Kayu Profil 2" @Rp. 12,540.00 / M'
21 Kayu Profil 3" @Rp. 18,810.00 / M'
22 Kayu Profil 4" @Rp. 25,080.00 / M'
23 Profil Gypsum 2" @Rp. 4,600.00 / M'
24 Profil Gypsum 3" @Rp. 5,450.00 / M'
25 Profil Gypsum 4" @Rp. 6,660.00 / M'
26 Profil Gypsum 6" @Rp. 7,870.00 / M'
27 Plywood 120x240 tbl. 18 mm @Rp. 233,640.00 / Lbr
28 Plywood 120x240 tbl. 12 mm @Rp. 155,760.00 / Lbr
29 Plywood 120x240 tbl. 9 mm @Rp. 134,000.00 / Lbr
30 Plywood 120x240 tbl. 6 mm @Rp. 77,880.00 / Lbr
31 Plywood 120x240 tbl. 4 mm @Rp. 51,920.00 / Lbr
32 Teakwood 120x240 tbl. 3 mm @Rp. 130,000.00 / Lbr
33 Triplek Jati 120x240 tbl. 3 mm @Rp. 85,250.00 / Lbr
34 Triplek Sungkai 120x240 tbl. 3 mm @Rp. 47,000.00 / Lbr
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4
35 Formika 120x240 @Rp. 74,250.00 / Lbr
36 Soft Board 120x240 tbl. 4 mm @Rp. 55,990.00 / Lbr
37 Soft Board 120x240 tbl. 6 mm @Rp. 84,150.00 / Lbr
38 Soft Board 120x240 tbl. 9 mm @Rp. 126,230.00 / Lbr
39 Soft Board 120x240 tbl. 12 mm @Rp. 168,250.00 / Lbr
40 Gypsum 120x240 tbl. 6 mm @Rp. 59,950.00 / Lbr
41 Gypsum 120x240 tbl. 9 mm @Rp. 90,000.00 / Lbr
42 Gypsum 120x240 tbl. 12 mm @Rp. 93,500.00 / Lbr
43 Asbes Lokal 100x100 cm @Rp. 9,350.00 / Lbr
44 Asbes Atrisco 100x100 cm t= 4 mm @Rp. 11,550.00 / Lbr
45 Asbes Atrisco 100x100 cm t= 5 mm @Rp. 14,440.00 / Lbr
46 Asbes Atrisco 100x100 cm t= 6 mm @Rp. 17,330.00 / Lbr
47 Akustik 30x30 cm @Rp. 8,540.00 / Lbr
48 Akustik 30x60 cm @Rp. 17,070.00 / Lbr
49 Akustik 60x120 cm @Rp. 68,290.00 / Lbr
50 Rangka Furing Ceiling Gypsum @Rp. 52,250.00 / M2
51 Rangka Furing Dinding Gypsum @Rp. 63,800.00 / M2
52 Tepung Dempul @Rp. 5,000.00 / Kg
53 Kain kasa/Paper Tape @Rp. 57,750.00 / Roll

E BESI / ALUMINIUM
1 Besi Beton polos @Rp. 11,000.00 / Kg
2 Besi Beton Ulir @Rp. 11,000.00 / Kg
3 Besi Profil WF/INP @Rp. 15,000.00 / Kg
4 Besi siku @Rp. 11,990.00 / Kg
5 Besi CNP @Rp. 13,090.00 / Kg
6 Besi Plat Strip @Rp. 11,880.00 / Kg
7 Besi Plat Polos @Rp. 13,630.00 / Kg
8 Kawat Besi Beton @Rp. 16,500.00 / Kg
9 Kawat Licin / Seng Polos @Rp. 22,530.00 / Kg
10 Kawat Duri @Rp. 4,030.00 / M'
11 Kawat Nyamuk @Rp. 11,980.00 / M2
12 Kawat Kasa @Rp. 13,920.00 / M2
13 Kawat Harmonika # 1" @Rp. 23,600.00 / M2
14 Kawat Burung @Rp. 12,710.00 / M2
15 Pagar kawat BRC 120 Polos @Rp. 246,000.00 / Lbr
16 Pintu Besi @Rp. 816,750.00 / M2
17 Pintu gulung Besi @Rp. 828,850.00 / M2
18 Pintu Lipat Besi @Rp. 837,320.00 / M2
19 Pintu Rolling Door @Rp. 465,850.00 / M2
20 Jerajak besi Bermotif @Rp. 347,270.00 / M2
21 Jerajak Besi Strip @Rp. 312,180.00 / M2
22 Rangka Baja Ringan @Rp. 190,000.00 / M2
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4
23 Kosen Pintu Aluminium (80 x 210) Coklat @Rp. 405,350.00 / Bh
24 Kosen Pintu Aluminium (80 x 210) Putih @Rp. 371,470.00 / Bh
25 Kosen Jendela aluminium (120x60) Coklat @Rp. 287,380.00 / Bh
26 Kosen Jendela aluminium (120x60) Putih @Rp. 248,050.00 / Bh
27 Pintu Aluminium ( 80 x 210) Coklat @Rp. 711,480.00 / Bh
28 Pintu Aluminium ( 80 x 210) Putih @Rp. 609,840.00 / Bh
29 Jendela Aluminium + Kaca 5 mm (120 x 60) Coklat @Rp. 304,920.00 / Bh
30 Jendela Aluminium + Kaca 5 mm (120 x 60) Putih @Rp. 261,360.00 / Bh
31 Kosen Pintu / Jendela Aluminium Coklat @Rp. 78,000.00 / M'
32 Kosen Pintu / Jendela Aluminium Putih @Rp. 98,000.00 / M'
33 Daun Jendela Aluminium Coklat @Rp. 54,450.00 / M'
34 Daun Jendela Aluminium Putih @Rp. 48,400.00 / M'
35 Profil Aluminium T @Rp. 8,470.00 / M'
36 Ventions Blinds @Rp. 163,350.00 / M2
37 Verticals Blinds @Rp. 175,450.00 / M2
38 Bingkai Naco Niki Hitam @Rp. 201,660.00 / M2
39 Bingkai Naco Niki Putih @Rp. 168,060.00 / M2
40 Paku Beton 0,5 - 2" @Rp. 310.00 / Bh
41 Paku Beton 2" - 5" @Rp. 530.00 / Bh
42 Paku Biasa 0,5 - 2" @Rp. 15,000.00 / Kg
43 Paku Biasa 2" - 5" @Rp. 15,000.00 / Kg
44 Sekrup macam ukuran @Rp. 21,180.00 / Kg
45 Sekrup 0,5 - 2" @Rp. 420.00 / Bh
46 Sekrup fisher @Rp. 360.00 / Bh
47 Baut Ø 5/8" - 8" @Rp. 17,000.00 / Bh
48 Baut Angker Ø 3/4" - 10" @Rp. 45,380.00 / Bh
49 Baut Ramset / Dina Bolt @Rp. 2,000.00 / Bh
50 Rangka Atap Twin light @Rp. 302,500.00 / M2

F PENUTUP LANTAI DAN DINDING


1 Ubin Granito 30 x 30 cm @Rp. 26,260.00 / Bh
2 Ubin Granito 40 x 40 cm @Rp. 46,590.00 / Bh
3 Ubin Granito 60 x 60 cm @Rp. 104,670.00 / Bh
4 Ubin Mosaik 30 x 30 cm @Rp. 13,920.00 / Bh
5 Ubin Marmer Ex. DN @Rp. 261,970.00 / M2
6 Ubin teralux marmer 30 x 30 cm @Rp. 27,230.00 / Bh
7 Ubin teralux marmer 40 x 40 cm @Rp. 48,400.00 / Bh
8 Ubin teralux marmer 60 x 60 cm @Rp. 109,510.00 / Bh
9 Ubin keramik 10 x 20 cm @Rp. 1,210.00 / Bh
10 Ubin keramik 15 x 15 cm @Rp. 1,400.00 / Bh
11 Ubin keramik 20 x 20 cm @Rp. 4,000.00 / Bh
12 Ubin keramik 20 x 25 cm @Rp. 3,150.00 / Bh
13 Ubin keramik 25 x 25 cm @Rp. 3,870.00 / Bh
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4
14 Ubin keramik 30 x 30 cm @Rp. 9,990.00 / Bh
15 Ubin keramik 30 x 30 cm anti slip @Rp. 9,990.00 / Bh
16 Ubin keramik 40 x 40 cm @Rp. 19,200.00 / Bh
17 Ubin keramik 60 x 60 cm @Rp. 9,680.00 / Bh
18 Ubin keramik 80 x 80 cm @Rp. 9,680.00 / Bh
19 Ubin keramik 100 x 100 cm @Rp. 9,680.00 / Bh
20 Ubin keramik artistik 5 x 20 cm @Rp. 910.00 / Bh
21 Ubin keramik artistik 10 x 10 cm @Rp. 910.00 / Bh
22 Ubin keramik artistik 10 x 20 cm @Rp. 1,760.00 / Bh
23 Ubin keramik Essenza 30 x 30 cm @Rp. 21,180.00 / Bh
24 Ubin keramik Essenza 40 x 40 cm @Rp. 37,630.00 / Bh
25 Porselin 11 x 11 cm Putih @Rp. 1,210.00 / Bh
26 Porselin 11 x 11 cm, warna @Rp. 145.00 / Bh
27 Porselin 15 x 15 cm, putih @Rp. 2,300.00 / Bh
28 Porselin 15 x 15 cm, warna @Rp. 2,540.00 / Bh
29 Plint ubin teralux marmer 10 x 30 cm @Rp. 16,340.00 / Bh
30 Plint ubin teralux marmer 10 x 40 cm @Rp. 29,040.00 / Bh
31 Plint ubin teralux marmer 10 x 60 cm @Rp. 65,700.00 / Bh
32 Plint ubin granito 10 x 30 cm @Rp. 27,950.00 / Bh
33 Plint ubin granito 10 x 40 cm @Rp. 62,800.00 / Bh
34 Plint ubin granito 10 x 60 cm @Rp. 157,180.00 / Bh
35 Plint ubin keramik 10 x 30 cm @Rp. 4,110.00 / Bh
36 Plint ubin keramik 10 x 40 cm @Rp. 5,690.00 / Bh
37 Plint ubin keramik 10 x 60 cm @Rp. 8,110.00 / Bh
38 Plint ubin keramik 15 x 30 cm @Rp. 5,810.00 / Bh
39 Plint ubin keramik 15 x 40 cm @Rp. 7,740.00 / Bh
40 Plint ubin keramik 15 x 60 cm @Rp. 11,620.00 / Bh
41 Batu Lapis Dinding 7x3x24 @Rp. 2,040.00 / Bh
42 Batu Tempel Hitam @Rp. 104,500.00 / M2
43 Batu Poros @Rp. 114,680.00 / M2
44 Carpet @Rp. 90,750.00 / M2
45 Carpet 80 % wool, 20 % nylon @Rp. 87,450.00 / M2
46 Feltex carpet 100 % wool-T-21 @Rp. 85,250.00 / M2
47 Underlyer tebal 6 mm / rubber corrugated @Rp. 104,500.00 / M2
48 Vynil asbes 30 x 30 cm @Rp. 8,230.00 / Bh
49 Vynil karet 30 x 30 cm KL I @Rp. 9,800.00 / Bh
50 Vynil karet 30 x 30 cm KL II @Rp. 9,080.00 / Bh
51 Vynil motif kembang ex DN 30 x 30 cm @Rp. 9,440.00 / Bh
52 Vynil wall covering lebar 50 cm @Rp. 63,250.00 / M2
53 Perquet Jati @Rp. 368,500.00 / M2
54 Gymfloor @Rp. 79,750.00 / M2
55 Paku Pancing 60 - 230 @Rp. 720.00 / Bh
56 Sekrup 3,5" @Rp. 410.00 / Bh
57 Sekrup 3,5" @Rp. 20,350.00 / Kg
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4
Granito tile 60 x 60 @Rp. 201,600.00 / M2
Semen Warna @Rp. 11,000.00 / Kg

G PENUTUP ATAP
1 Atap Genteng Palentong @Rp. 1,670.00 / Bh
2 Atap Genteng Palentong super @Rp. 3,980.00 / Bh
3 Atap Genteng Kodok @Rp. 2,170.00 / Bh
4 Atap Genteng Beton @Rp. 5,970.00 / Bh
5 Atap Genteng Keramik @Rp. 11,390.00 / Bh
6 Atap Genteng Aspal @Rp. 11,320.00 / Lbr
7 Atap Genteng Metal/Multi Roof 35 @Rp. 64,130.00 / M2
8 Atap Genteng Asbes cement 0,35 @Rp. 66,790.00 / Lbr
9 Atap Sirap @Rp. 1,030.00 / Bh
10 Atap Aluminium gelombang tebal 0,55 @Rp. 98,180.00 / Lbr
11 Atap seng Gelombang 3' x 6' bjls 35 @Rp. 68,000.00 / Lbr
12 Atap seng Super Deck 3' x 6' tbl 0,30 @Rp. 68,750.00 / Lbr
13 Roof light fibreglass gelombang @Rp. 46,390.00 / Lbr
14 Atap Asbes Gelombang 1,8 x 1,05 tbl.4 mm @Rp. 53,000.00 / Lbr
15 Atap Asbes Gelombang 2,1 x 1,05 tbl.4 mm @Rp. 62,000.00 / Lbr
16 Atap Asbes Gelombang 2,4 x 1,05 tbl.4 mm @Rp. 70,000.00 / Lbr
17 Atap Asbes Gelombang 2,7 x 1,05 tbl.4 mm @Rp. 89,000.00 / Lbr
18 Atap Asbes Gelombang 1,8 x 0,92 tbl.5 mm @Rp. 70,950.00 / Lbr
19 Atap Asbes Gelombang 2,1 x 0,92 tbl.5 mm @Rp. 77,000.00 / Lbr
20 Atap Asbes Gelombang 2,4 x 0,92 tbl.5 mm @Rp. 87,000.00 / Lbr
21 Atap Asbes Gelombang 2,7 x 0,92 tbl.5 mm @Rp. 106,810.00 / Lbr
22 Atap Asbes Gelombang 1,8 x 1,08 tbl.6 mm @Rp. 103,620.00 / Lbr
23 Atap Asbes Gelombang 2,1 x 1,08 tbl.6 mm @Rp. 120,450.00 / Lbr
24 Atap Asbes Gelombang 2,4 x 1,08 tbl.6 mm @Rp. 128,370.00 / Lbr
25 Atap Asbes Gelombang 2,7 x 1,08 tbl.6 mm @Rp. 155,430.00 / Lbr
26 Genteng bubung palentong @Rp. 9,350.00 / Bh
27 Genteng bubung palentong super @Rp. 12,740.00 / Bh
28 Genteng bubung kodok @Rp. 9,560.00 / Bh
29 Nok genteng beton @Rp. 13,440.00 / Bh
30 Nok genteng keramik @Rp. 15,040.00 / Bh
31 Nok Genteng Aspal @Rp. 29,350.00 / Bh
32 Nok Genteng Metal/Multi Roof (decra bond) @Rp. 41,140.00 / Bh
33 Nok Genteng Asbes cement 0,35 @Rp. 33,770.00 / Lbr
34 Nok Aluminium standard 40 cm 18 swg22 @Rp. 47,890.00 / M2
35 Bubung/Nok Stel Gelombang 0,92 m' tbl.5 mm @Rp. 19,590.00 / Lbr
36 Bubung/Nok Stel Gelombang 1,05 m' tbl.4 mm @Rp. 25,990.00 / Lbr
37 Bubung/Nok Stel Gelombang 1,08 m' tbl.6 mm @Rp. 28,510.00 / Lbr
38 Bubung/Nok Paten 0,92 m' tbl.5 mm @Rp. 36,810.00 / Lbr
39 Bubung/Nok Paten 1,05 m' tbl.4 mm @Rp. 30,950.00 / Lbr
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4
40 Bubung/Nok Paten 1,08 m' tbl.6 mm @Rp. 42,960.00 / Lbr
41 Bubung/Nok Stel Rata 0,92 m' tbl.5 mm @Rp. 36,080.00 / Lbr
42 Bubung/Nok Stel Rata 1,05 m' tbl.4 mm @Rp. 30,250.00 / Lbr
43 Bubung/Nok Stel Rata 1,08 m' tbl.6 mm @Rp. 40,600.00 / Lbr
44 Seng Plat 3" x 6" bjls 35 @Rp. 115,500.00 / Lbr
45 Seng Plat 3" x 6" bjls 30 @Rp. 103,950.00 / Lbr
46 Plastic aerator @Rp. 27,500.00 / Bh
47 Sisalation / aluminium foil @Rp. 77,200.00 / M2
48 Paku seng + Ring karet @Rp. 20,350.00 / Kg
49 Paku seng + Ring karet @Rp. 410.00 / Bh
50 Paku hak panjang 15 cm @Rp. 30,530.00 / Kg
51 Atap Seng Alumi Zinc warna 0,35 @Rp. 62,040.00 / M2
52 Atap Twin light @Rp. 74,250.00 / M2

H KUNCI DAN KACA


1 Kunci tanam antik @Rp. 214,500.00 / Bh
2 Kunci tanam biasa @Rp. 90,020.00 / Bh
3 Kunci tanam kamar mandi @Rp. 54,690.00 / Bh
4 Kunci silinder @Rp. 34,490.00 / Bh
5 Kunci selot @Rp. 27,230.00 / Bh
6 Kunci lemari @Rp. 12,340.00 / Bh
7 Engsel pintu 4" @Rp. 15,130.00 / Bh
8 Engsel jendela 3" @Rp. 22,000.00 / Bh
9 Engsel angin @Rp. 25,050.00 / Bh
10 Kait angin @Rp. 19,120.00 / Bh
11 Rel pintu dorong @Rp. 160,330.00 / Bh
12 Sealent @Rp. 39,330.00 / Kg
13 Spring Knip @Rp. 9,080.00 / Bh
14 Door closer @Rp. 109,750.00 / Bh
15 Door handle @Rp. 113,010.00 / Bh
16 Door stoop @Rp. 38,120.00 / Bh
17 Espanyolet @Rp. 88,450.00 / Bh
18 Kaca Block 20 x 20 cm @Rp. 26,020.00 / Bh
19 Kaca polos tbl.3 mm @Rp. 83,000.00 / M2
20 Kaca polos tbl.5 mm @Rp. 113,000.00 / M2
21 Kaca polos tbl.8 mm @Rp. 240,000.00 / M2
22 Kaca Reyben tbl.5 mm @Rp. 101,000.00 / M2
23 Kaca Reyben tbl.8 mm @Rp. 308,980.00 / M2
24 Kaca Buram tbl.3 mm @Rp. 72,600.00 / M2
25 Kaca Buram tbl.5 mm @Rp. 111,320.00 / M2
26 Kaca buram tbl.8 mm @Rp. 193,600.00 / M2
27 Kaca cermin tbl.5 mm @Rp. 161,700.00 / M2
28 Kaca cermin tbl.6 mm @Rp. 194,040.00 / M2
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4
29 Kaca cermin tbl.8 mm @Rp. 258,720.00 / M2
30 Kaca patri @Rp. 169,400.00 / M2
31 Kaca Wireglass @Rp. 151,250.00 / M2
32 Kaca Reyben Naco 30 x 60 cm tbl.5 mm @Rp. 13,590.00 / Lbr
33 Kaca Bening Naco 30 x 60 cm tbl.5 mm @Rp. 10,730.00 / Lbr

I CAT / MINYAK
1 Cat dasar @Rp. 31,000.00 / Kg
2 Cat Tembok setara Vinilex @Rp. 31,000.00 / Kg
3 Cat Minyak untuk kayu @Rp. 60,000.00 / Kg
4 Cat Minyak untuk Besi @Rp. 60,000.00 / Kg
5 Cat Menie kayu @Rp. 30,000.00 / Kg
6 Cat Menie besi @Rp. 30,000.00 / Kg
7 Cat sending @Rp. 54,450.00 / Kg
8 Cat Melamix @Rp. 59,290.00 / Kg
9 Cat Vernis Jadi @Rp. 48,280.00 / Kg
10 Plamir @Rp. 18,500.00 / Kg
11 Dempul gypsum @Rp. 5,000.00 / Kg
12 Dempul Cat @Rp. 11,860.00 / Kg
13 Minyak Cat @Rp. 18,000.00 / Kg
14 Minyak Bekisting @Rp. 3,600.00 / Ltr
15 Residu / Kolter @Rp. 3,600.00 / Ltr
16 Soda api @Rp. 12,100.00 / Kg
17 Sabun @Rp. 10,290.00 / Kg
18 Kuas @Rp. 10,000.00 / Bh
19 Ampelas / Kertas pasir @Rp. 5,000.00 / Lbr
20 Wall paper @Rp. 30,610.00 / M2
21 Ijuk @Rp. 5,000.00 / kg

J SANITASI / PIPA
1 Kloset duduk / monoblok lengkap tangki @Rp. 1,931,600.00 / Bh
2 Kloset duduk / monoblok tanpa tangki @Rp. 1,391,500.00 / Bh
3 Kloset jongkok porselin @Rp. 225,280.00 / Bh
4 Bakkif Porselin @Rp. 3,025,000.00 / Bh
5 Wastafel @Rp. 526,350.00 / Bh
6 Urinoir @Rp. 557,480.00 / Bh
7 Kran air Ø 1/2" - 3/4" @Rp. 27,350.00 / Bh
8 Kran air leher angsa Ø 1/2" @Rp. 131,000.00 / Bh
9 Kran shower @Rp. 48,000.00 / Bh
10 Kran Cebok @Rp. 72,240.00 / Bh
11 Bak fibreglass 0,3 M3 @Rp. 181,500.00 / Bh
12 Bak fibreglass 1 M3 @Rp. 522,720.00 / Bh
13 Bak cuci piring stainless 2 lobang @Rp. 466,700.00 / Bh
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4
14 Bak cuci piring teraso 2 lobang @Rp. 272,250.00 / Bh
15 Tempat sabun keramik @Rp. 56,270.00 / Bh
16 Floor drain Ø 4" steinless @Rp. 15,000.00 / Bh
17 Stop kran Ø 3/4" @Rp. 27,500.00 / Bh
18 Tutup bak air Ø 1" Kuningan @Rp. 12,500.00 / Bh
19 Instalasi air bersih @Rp. 100,000.00 / Ttk
20 Instalasi air kotor/limbah @Rp. 125,000.00 / Ttk
21 Buis Beton 1/2 Ø 15 cm @Rp. 11,250.00 / M'
22 Buis Beton 1/2 Ø 20 cm @Rp. 17,790.00 / M'
23 Buis Beton 1/2 Ø 30 cm @Rp. 20,090.00 / M'
24 Buis Beton Ø 15 cm @Rp. 41,000.00 / M'
25 Buis Beton Ø 20 cm @Rp. 54,000.00 / M'
26 Buis Beton Ø 30 cm @Rp. 77,000.00 / M'
27 Buis Beton Ø 40 cm @Rp. 101,000.00 / M'
28 Buis Beton Ø 50 cm @Rp. 162,000.00 / M'
29 Buis Beton Ø 60 cm @Rp. 136,000.00 / M'
30 Buis Beton Ø 80 cm @Rp. 201,100.00 / M'
31 Buis Beton Ø 100 cm @Rp. 345,820.00 / M'
32 Pipa PVC Tipe AW Ø 1/2" @Rp. 25,300.00 / Btg
33 Pipa PVC Tipe AW Ø 3/4" @Rp. 7,440.00 / Btg
34 Pipa PVC Tipe AW Ø 1" @Rp. 13,620.00 / Btg
35 Pipa PVC Tipe AW Ø 1 1/2" @Rp. 19,670.00 / Btg
36 Pipa PVC Tipe AW Ø 2" @Rp. 23,190.00 / Btg
37 Pipa PVC Tipe AW Ø 2 1/2" @Rp. 26,620.00 / Btg
38 Pipa PVC Tipe AW Ø 3" @Rp. 29,840.00 / Btg
39 Pipa PVC Tipe AW Ø 4" @Rp. 49,920.00 / Btg
40 Pipa Besi Hitam Ø 1/2" @Rp. 14,770.00 / Btg
41 Pipa Besi Hitam Ø 3/4" @Rp. 20,140.00 / Btg
42 Pipa Besi Hitam Ø 1" @Rp. 29,520.00 / Btg
43 Pipa Besi Hitam Ø 1 1/2" @Rp. 37,580.00 / Btg
44 Pipa Besi Hitam Ø 2" @Rp. 47,600.00 / Btg
45 Pipa Besi Hitam Ø 2 1/2" @Rp. 50,220.00 / Btg
46 Pipa Galvanis Ø 1/2" @Rp. 14,770.00 / Btg
47 Pipa Galvanis Ø 3/4" @Rp. 20,140.00 / Btg
48 Pipa Galvanis Ø 1" @Rp. 29,520.00 / Btg
49 Pipa Galvanis Ø 1 1/4" @Rp. 33,560.00 / Btg
50 Pipa Galvanis Ø 1 1/2" @Rp. 37,580.00 / Btg
51 Pipa Galvanis Ø 2" @Rp. 47,600.00 / Btg
52 Pipa Galvanis Ø 2 1/2" @Rp. 52,440.00 / Btg
53 Fitting Pipa AW Ø 1" @Rp. /
54 Knee AW 1" @Rp. 5,230.00 / Bh
55 Tee AW 1" @Rp. 7,150.00 / Bh
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4
56 Socht AW 1" @Rp. 4,680.00 / Bh
57 F-Knee 1" @Rp. / Bh
58 F-Tee 1" @Rp. 11,500.00 / Bh
59 Bocht LL-D 1" @Rp. 24,750.00 / Bh
60 Union Socht 1" @Rp. 7,430.00 / Bh
61 D-Nipple 1" @Rp. 18,150.00 / Bh
62 Water Moer 1" @Rp. 29,500.00 / Bh
63 Water Drain @Rp. 10,000.00 / Bh

K PIPA GI
1 Pipa GI Medium SII uk. 1/2" 178,500.00 Batang
2 Pipa GI Medium SII uk. 3/4" 236,250.00 Batang
3 Pipa GI Medium SII uk. 1" 362,250.00 Batang
4 Pipa GI Medium SII dia 1 1/4 511,875.00 Batang
5 Pipa GI Medium SII uk. 1 1/2" 535,500.00 Batang
6 Pipa GI Medium SII uk. 2" 750,750.00 Batang
7 Pipa GI Medium SII uk. 2 1/2" 955,500.00 Batang
8 Pipa GI Medium SII uk. 3" 1,260,000.00 Batang
9 Pipa GI Medium SII uk. 4" 1,806,000.00 Batang
10 Pipa GI Medium SII uk. 6" 2,840,250.00 Batang
11 Pipa GI Medium SII uk. 8" 4,305,000.00 Batang
12 Pipa GI Medium SII uk. 10" 5,365,500.00 Batang
13 Pipa GI Medium SII uk. 12" 8,085,000.00 Batang
14 Pipa GI Medium SII uk. 14" 9,418,500.00 Batang
15 Pipa GI Medium SII uk. 16" 10,799,250.00 Batang
16 Pipa GI Medium SII uk. 20" 14,850,000.00 Batang

L PIPA STEEL POLOS


1 Pipa Steel Polos Medium SII uk. 1/2" 145,425.00 Batang
2 Pipa Steel Polos Medium SII uk. 3/4" 184,800.00 Batang
3 Pipa Steel Polos Medium SII uk. 1" 283,500.00 Batang
4 Pipa Steel Polos Medium SII uk. 1 1/2" 438,900.00 Batang
5 Pipa Steel Polos Medium SII uk. 2" 583,800.00 Batang
6 Pipa Steel Polos Medium SII uk. 3" 635,250.00 Batang
7 Pipa Steel Polos Medium SII uk. 4" 906,675.00 Batang
8 Pipa Steel Polos Medium SII uk. 6" 2,236,500.00 Batang
9 Pipa Steel Polos Medium SII uk. 8" 4,231,500.00 Batang
10 Pipa Steel Polos Medium SII uk. 10" 5,302,500.00 Batang
11 Pipa Steel Polos Medium SII uk. 12" 6,648,600.00 Batang
12 Pipa Steel Polos Medium SII uk. 14" 7,402,500.00 Batang
13 Pipa Steel Polos Medium SII uk. 16" 8,749,650.00 Batang
14 Pipa Steel Polos Medium SII uk. 18" 12,820,500.00 Batang
15 Pipa Steel Polos Medium SII uk. 20" 15,687,000.00 Batang
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4
16 Pipa Steel Polos Medium SII uk. 24" 18,881,100.00 Batang

M PIPA DCIP
1 Pipa DCIP Uk. 630 mm 2,976,750.00 Meter

N PIPA STEEL LINING


1 Pipa Steel Lining Cement non Wrapping dia. 6" 1,984,500.00 Batang
2 Pipa Steel Lining Cement non Wrapping dia. 8" 2,765,700.00 Batang
3 Pipa Steel Lining Cement non Wrapping dia. 10" 3,465,000.00 Batang
4 Pipa Steel Lining Cement non Wrapping dia. 12" 5,128,200.00 Batang
5 Pipa Steel Lining Cement non Wrapping dia. 14" 5,638,500.00 Batang
6 Pipa Steel Lining Cement non Wrapping dia. 16" 6,457,500.00 Batang
7 Pipa Steel Lining Cement non Wrapping dia. 18" 7,276,500.00 Batang
8 Pipa Steel Lining Cement non Wrapping dia. 20" 8,095,500.00 Batang
9 Pipa Steel Lining Cement non Wrapping dia. 22" 8,914,500.00 Batang
10 Pipa Steel Lining Cement non Wrapping dia. 24" 9,733,500.00 Batang
11 Pipa Steel Lining Cement with wrapping dia. 6" 6,804,000.00 Batang
12 Pipa Steel Lining Cement with wrapping dia. 8" 8,946,000.00 Batang
13 Pipa Steel Lining Cement with wrapping dia. 10" 11,182,500.00 Batang
14 Pipa Steel Lining Cement with wrapping dia. 12" 14,263,200.00 Batang
15 Pipa Steel Lining Cement with wrapping dia. 14" 15,671,250.00 Batang
16 Pipa Steel Lining Cement with wrapping dia. 16" 16,354,800.00 Batang
17 Pipa Steel Lining Cement with wrapping dia. 18" 20,172,600.00 Batang
18 Pipa Steel Lining Cement with wrapping dia. 20" 22,428,000.00 Batang
19 Pipa Steel Lining Cement with wrapping dia. 22" 24,677,100.00 Batang
20 Pipa Steel Lining Cement with wrapping dia. 24" 26,926,200.00 Batang

O PIPA ( TS. END) JIS


1 Pipa (Ts. End) JIS - Kelas VP 1/2" (4 meter) 34,650.00 Batang
2 Pipa (Ts. End) JIS - Kelas VP 3/4" (4 meter) 41,947.50 Batang
3 Pipa (Ts. End) JIS - Kelas VP 1" (4 meter) 60,585.00 Batang
4 Pipa (Ts. End) JIS - Kelas VP 1 1/4" (4 meter) 90,300.00 Batang
5 Pipa (Ts. End) JIS - Kelas VP 1 1/2" (4 meter) 106,785.00 Batang
6 Pipa (Ts. End) JIS - Kelas VP 2" (4 meter) 151,620.00 Batang
7 Pipa (Ts. End) JIS - Kelas VP 2 1/2" (4 meter) 195,300.00 Batang
8 Pipa (Ts. End) JIS - Kelas VP 3" (4 meter) 297,360.00 Batang
9 Pipa (Ts. End) JIS - Kelas VP 4" (4 meter) 460,215.00 Batang
10 Pipa (Ts. End) JIS - Kelas VP 5" (4 meter) 602,700.00 Batang
11 Pipa (Ts. End) JIS - Kelas VP 6" (4 meter) 904,680.00 Batang
12 Pipa (Ts. End) JIS - Kelas VP 8" (4 meter) 1,367,625.00 Batang
13 Pipa (Ts. End) JIS - Kelas VP 10" (4 meter) 2,090,025.00 Batang
14 Pipa (Ts. End) JIS - Kelas VP 12" (4 meter) 2,965,095.00 Batang
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4
15 Pipa (Ts. End) JIS - Kelas VU 1 1/2" (4 meter) 55,860.00 Batang
16 Pipa (Ts. End) JIS - Kelas VU 2" (4 meter) 70,455.00 Batang
17 Pipa (Ts. End) JIS - Kelas VU 2 1/2" (4 meter) 111,510.00 Batang
18 Pipa (Ts. End) JIS - Kelas VU 3" (4 meter) 156,345.00 Batang
19 Pipa (Ts. End) JIS - Kelas VU 4" (4 meter) 234,570.00 Batang
20 Pipa (Ts. End) JIS - Kelas VU 5" (4 meter) 369,810.00 Batang
21 Pipa (Ts. End) JIS - Kelas VU 6" (4 meter) 532,035.00 Batang
22 Pipa (Ts. End) JIS - Kelas VU 8" (4 meter) 887,250.00 Batang
23 Pipa (Ts. End) JIS - Kelas VU 10" (4 meter) 1,317,330.00 Batang
24 Pipa (Ts. End) JIS - Kelas VU 12" (4 meter) 1,849,680.00 Batang

P PIPA ( BELL END) JIS


1 Pipa (Bell End) JIS - Kelas VP 2" (4 meter) 156,135.00 Batang
2 Pipa (Bell End) JIS - Kelas VP 2 1/2" (4 meter) 205,380.00 Batang
3 Pipa (Bell End) JIS - Kelas VP 3" (4 meter) 313,635.00 Batang
4 Pipa (Bell End) JIS - Kelas VP 4" (4 meter) 481,635.00 Batang
5 Pipa (Bell End) JIS - Kelas VP 5" (4 meter) 667,170.00 Batang
6 Pipa (Bell End) JIS - Kelas VP 6" (4 meter) 954,240.00 Batang
7 Pipa (Bell End) JIS - Kelas VP 8" (4 meter) 1,442,805.00 Batang
8 Pipa (Bell End) JIS - Kelas VP 10" (4 meter) 2,198,175.00 Batang
9 Pipa (Bell End) JIS - Kelas VP 12" (4 meter) 3,144,855.00 Batang
10 Pipa (Bell End) JIS - Kelas VU 2" (4 meter) 74,970.00 Batang
11 Pipa (Bell End) JIS - Kelas VU 2 1/2" (4 meter) 121,590.00 Batang
12 Pipa (Bell End) JIS - Kelas VU 3" (4 meter) 172,725.00 Batang
13 Pipa (Bell End) JIS - Kelas VU 4" (4 meter) 256,095.00 Batang
14 Pipa (Bell End) JIS - Kelas VU 5" (4 meter) 434,280.00 Batang
15 Pipa (Bell End) JIS - Kelas VU 6" (4 meter) 581,700.00 Batang
16 Pipa (Bell End) JIS - Kelas VU 8" (4 meter) 962,430.00 Batang
17 Pipa (Bell End) JIS - Kelas VU 10" (4 meter) 1,425,585.00 Batang
18 Pipa (Bell End) JIS - Kelas VU 12" (4 meter) 2,029,545.00 Batang

Q PIPA ( TS. END) SNI


1 Pipa (Ts. End) SNI S-10 20mm (1/2") RRJ S.10 4,100.00 Meter
2 Pipa (Ts. End) SNI S-10 25mm (3/4") RRJ S.10 6,100.00 Meter
3 Pipa (Ts. End) SNI S-10 32mm (1") RRJ S.10 10,100.00 Meter
4 Pipa (Ts. End) SNI S-10 40mm (1 1/4") RRJ S.10 14,800.00 Meter
5 Pipa (Ts. End) SNI S-10 50mm (1 1/2") RRJ S.10 23,100.00 Meter
6 Pipa (Ts. End) SNI S-10 63mm (2") RRJ S.10 36,000.00 Meter
7 Pipa (Ts. End) SNI S-10 75mm (2 1/2") RRJ S.10 57,500.00 Meter
8 Pipa (Ts. End) SNI S-10 90mm (3") RRJ S.10 73,250.00 Meter
9 Pipa (Ts. End) SNI S-10 110mm (4") RRJ S.10 110,000.00 Meter
10 Pipa (Ts. End) SNI S-10 140mm (5") RRJ S.10 198,000.00 Meter
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4
11 Pipa (Ts. End) SNI S-10 160mm (6") RRJ S.10 233,000.00 Meter
12 Pipa (Ts. End) SNI S-10 200mm (8") RRJ S.10 406,000.00 Meter
13 Pipa (Ts. End) SNI S-10 225mm (8") RRJ S.10 513,000.00 Meter
14 Pipa (Ts. End) SNI S-10 250mm (10") RRJ S.10 630,315.00 Meter
15 Pipa (Ts. End) SNI S-10 315mm (12") RRJ S.10 1,006,000.00 Meter
16 Pipa (Ts. End) SNI S-10 63mm (2") RRJ S.12,5 29,400.00 Meter
17 Pipa (Ts. End) SNI S-10 75mm (2 1/2") RRJ S.12,5 47,000.00 Meter
18 Pipa (Ts. End) SNI S-10 90mm (3") RRJ S.12,5 61,000.00 Meter
19 Pipa (Ts. End) SNI S-10 110mm (4") RRJ S.12,5 89,000.00 Meter
20 Pipa (Ts. End) SNI S-10 140mm (5") RRJ S.12,5 163,000.00 Meter
21 Pipa (Ts. End) SNI S-10 160mm (6") RRJ S.12,5 191,000.00 Meter
22 Pipa (Ts. End) SNI S-10 200mm (8") RRJ S.12,5 330,000.00 Meter
23 Pipa (Ts. End) SNI S-10 225mm (8") RRJ S.12,5 415,000.00 Meter
24 Pipa (Ts. End) SNI S-10 250mm (10") RRJ S.12,5 516,000.00 Meter
25 Pipa (Ts. End) SNI S-10 315mm (12") RRJ S.12,5 824,000.00 Meter

R PIPA ( BELL END/ RRJ) SNI


1 Pipa (Bell End/RRJ) SNI S-10 63mm (2") RRJ S.10 37,065.00 Meter
2 Pipa (Bell End/RRJ) SNI S-10 75mm (2 1/2") RRJ S.10 59,850.00 Meter
3 Pipa (Bell End/RRJ) SNI S-10 90mm (3") RRJ S.10 75,600.00 Meter
4 Pipa (Bell End/RRJ) SNI S-10 110mm (4") RRJ S.10 113,268.00 Meter
5 Pipa (Bell End/RRJ) SNI S-10 140mm (5") RRJ S.10 206,955.00 Meter
6 Pipa (Bell End/RRJ) SNI S-10 160mm (6") RRJ S.10 238,088.00 Meter
7 Pipa (Bell End/RRJ) SNI S-10 200mm (8") RRJ S.10 371,800.00 Meter
8 Pipa (Bell End/RRJ) SNI S-10 225mm (8") RRJ S.10 530,355.00 Meter
9 Pipa (Bell End/RRJ) SNI S-10 250mm (10") RRJ S.10 578,200.00 Meter
10 Pipa (Bell End/RRJ) SNI S-10 315mm (12") RRJ S.10 927,000.00 Meter
11 Pipa (Bell End/RRJ) SNI S-10 355mm (14") RRJ S.10 1,348,147.50 Meter
12 Pipa (Bell End/RRJ) SNI S-10 400mm (16") RRJ S.10 1,515,780.00 Meter
13 Pipa (Bell End/RRJ) SNI S-10 450mm (18") RRJ S.10 2,260,020.00 Meter
14 Pipa (Bell End/RRJ) SNI S-10 500mm (20") RRJ S.10 2,411,587.50 Meter
15 Pipa (Bell End/RRJ) SNI S-10 630mm (24") RRJ S.10 3,906,052.50 Meter
16 Pipa (Bell End/RRJ) SNI S-10 63mm (2") RRJ S.12,5 30,607.50 Meter
17 Pipa (Bell End/RRJ) SNI S-10 75mm (2 1/2") RRJ S.12,5 49,192.50 Meter
18 Pipa (Bell End/RRJ) SNI S-10 90mm (3") RRJ S.12,5 62,396.25 Meter
19 Pipa (Bell End/RRJ) SNI S-10 110mm (4") RRJ S.12,5 91,691.25 Meter
20 Pipa (Bell End/RRJ) SNI S-10 140mm (5") RRJ S.12,5 170,730.00 Meter
21 Pipa (Bell End/RRJ) SNI S-10 160mm (6") RRJ S.12,5 195,720.00 Meter
22 Pipa (Bell End/RRJ) SNI S-10 200mm (8") RRJ S.12,5 302,872.50 Meter
23 Pipa (Bell End/RRJ) SNI S-10 225mm (8") RRJ S.12,5 430,185.00 Meter
24 Pipa (Bell End/RRJ) SNI S-10 250mm (10") RRJ S.12,5 473,917.50 Meter
25 Pipa (Bell End/RRJ) SNI S-10 315mm (12") RRJ S.12,5 761,775.00 Meter
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4
26 Pipa (Bell End/RRJ) SNI S-10 355mm (14") RRJ S.12,5 1,105,440.00 Meter
27 Pipa (Bell End/RRJ) SNI S-10 400mm (16") RRJ S.12,5 1,232,910.00 Meter
28 Pipa (Bell End/RRJ) SNI S-10 450mm (18") RRJ S.12,5 1,853,040.00 Meter
29 Pipa (Bell End/RRJ) SNI S-10 500mm (20") RRJ S.12,5 1,963,867.50 Meter
30 Pipa (Bell End/RRJ) SNI S-10 630mm (24") RRJ S.12,5 3,189,873.75 Meter

S PIPA PVC
1 Pipa PVC (Ts. End) SNI 40mm Kelas A 1 1/4" 15,855.00 Meter
2 Pipa PVC (Ts. End) SNI 50mm Kelas A 1 1/2" 19,950.00 Meter
3 Pipa PVC (Ts. End) SNI 63mm Kelas A 2" 25,305.00 Meter
4 Pipa PVC (Ts. End) SNI 75mm Kelas A 2 1/2" 30,240.00 Meter
5 Pipa PVC (Ts. End) SNI 90mm Kelas A 3" 36,645.00 Meter
6 Pipa PVC (Ts. End) SNI 110mm Kelas A 4" 53,655.00 Meter
7 Pipa PVC (Ts. End) SNI 160mm Kelas A 6" 112,980.00 Meter
8 Pipa PVC (Ts. End) SNI 200mm Kelas A 8" 172,305.00 Meter
9 Pipa PVC (Ts. End) SNI 250mm Kelas A 10" 270,480.00 Meter
10 Pipa PVC (Ts. End) SNI 315mm Kelas A 12" 431,130.00 Meter
11 Pipa PVC (Bell End) SNI 63mm Kelas A 2" 26,355.00 Meter
12 Pipa PVC (Bell End) SNI 75mm Kelas A 2 1/2" 31,500.00 Meter
13 Pipa PVC (Bell End) SNI 90mm Kelas A 3" 38,010.00 Meter
14 Pipa PVC (Bell End) SNI 110mm Kelas A 4" 55,755.00 Meter
15 Pipa PVC (Bell End) SNI 160mm Kelas A 6" 117,180.00 Meter
16 Pipa PVC (Bell End) SNI 200mm Kelas A 8" 179,340.00 Meter
17 Pipa PVC (Bell End) SNI 250mm Kelas A 10" 281,715.00 Meter
18 Pipa PVC (Bell End) SNI 315mm Kelas A 12" 450,922.50 Meter
19 Pipa PVC (Bell End) SNI 400mm Kelas A 16" 732,637.50 Meter
20 Pipa PVC (Bell End) SNI 500mm Kelas A 20" 1,179,412.50 Meter
21 Pipa PVC (Bell End) SNI 630mm Kelas A 22" 1,847,370.00 Meter
22 Pipa PVC (Ts. End) SNI Kelas B 1 1/4" 26,145.00 Meter
23 Pipa PVC (Ts. End) SNI Kelas B 1 1/2" 33,285.00 Meter
24 Pipa PVC (Ts. End) SNI Kelas B 2" 42,630.00 Meter
25 Pipa PVC (Ts. End) SNI Kelas B 2 1/2" 51,187.50 Meter
26 Pipa PVC (Ts. End) SNI Kelas B 3" 61,897.50 Meter
27 Pipa PVC (Ts. End) SNI Kelas B 4" 76,387.50 Meter
28 Pipa PVC (Ts. End) SNI Kelas B 6" 140,070.00 Meter
29 Pipa PVC (Ts. End) SNI Kelas B 8" 214,200.00 Meter
30 Pipa PVC (Ts. End) SNI Kelas B 10" 338,047.50 Meter
31 Pipa PVC (Ts. End) SNI Kelas B 12" 532,770.00 Meter
32 Pipa PVC (Bell End) SNI Kelas B 2" 44,310.00 Meter
33 Pipa PVC (Bell End) SNI Kelas B 2 1/2" 53,130.00 Meter
34 Pipa PVC (Bell End) SNI Kelas B 3" 64,470.00 Meter
35 Pipa PVC (Bell End) SNI Kelas B 4" 79,485.00 Meter
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4
36 Pipa PVC (Bell End) SNI Kelas B 6" 145,320.00 Meter
37 Pipa PVC (Bell End) SNI Kelas B 8" 223,020.00 Meter
38 Pipa PVC (Bell End) SNI Kelas B 10" 352,275.00 Meter
39 Pipa PVC (Bell End) SNI Kelas B 12" 557,340.00 Meter
40 Pipa PVC (Bell End) SNI Kelas B 16" 913,080.00 Meter
41 Pipa PVC (Bell End) SNI Kelas B 20" 1,446,060.00 Meter
42 Pipa PVC (Bell End) SNI Kelas B 22" 2,296,980.00 Meter

T PIPA HDPE
1 Pipa HDPE 100 PN-12.5 20mm (1/2") SNI 6,562.50 Meter
2 Pipa HDPE 100 PN-12.5 25mm (3/4") SNI 9,502.50 Meter
3 Pipa HDPE 100 PN-12.5 32mm (1") SNI 15,487.50 Meter
4 Pipa HDPE 100 PN-12.5 40mm (1 1/4") SNI 23,520.00 Meter
5 Pipa HDPE 100 PN-12.5 50mm (1 1/2") SNI 31,841.25 Meter
6 Pipa HDPE 100 PN-12.5 63mm (2") SNI 50,636.25 Meter
7 Pipa HDPE 100 PN-12.5 75mm (2 1/2") SNI 71,006.25 Meter
8 Pipa HDPE 100 PN-12.5 90mm (3") SNI 101,823.75 Meter
9 Pipa HDPE 100 PN-12.5 110mm (4") SNI 151,935.00 Meter
10 Pipa HDPE 100 PN-12.5 160mm (6") SNI 319,068.75 Meter
11 Pipa HDPE 100 PN-12.5 200mm (8") SNI 509,040.00 Meter
12 Pipa HDPE 100 PN-12.5 250mm (10") SNI 796,031.25 Meter
13 Pipa HDPE 100 PN-12.5 315mm (12") SNI 1,263,438.75 Meter
14 Pipa HDPE 100 PN-12.5 355mm (14") SNI 1,602,562.50 Meter
15 Pipa HDPE 100 PN-12.5 400mm (16") SNI 2,031,776.25 Meter
16 Pipa HDPE 100 PN-12.5 450mm (18") SNI 2,573,130.00 Meter
17 Pipa HDPE 100 PN-12.5 500mm (20") SNI 3,172,417.50 Meter
18 Pipa HDPE 100 PN-10 20mm (1/2") SNI 6,562.50 Meter
19 Pipa HDPE 100 PN-10 25mm (3/4") SNI 8,347.50 Meter
20 Pipa HDPE 100 PN-10 32mm (1") SNI 12,442.50 Meter
21 Pipa HDPE 100 PN-10 40mm (1 1/4") SNI 19,635.00 Meter
22 Pipa HDPE 100 PN-10 50mm (1 1/2") SNI 26,197.50 Meter
23 Pipa HDPE 100 PN-10 63mm (2") SNI 41,763.75 Meter
24 Pipa HDPE 100 PN-10 75mm (2 1/2") SNI 58,905.00 Meter
25 Pipa HDPE 100 PN-10 90mm (3") SNI 84,577.50 Meter
26 Pipa HDPE 100 PN-10 110mm (4") SNI 125,632.50 Meter
27 Pipa HDPE 100 PN-10 160mm (6") SNI 262,211.25 Meter
28 Pipa HDPE 100 PN-10 200mm (8") SNI 419,028.75 Meter
29 Pipa HDPE 100 PN-10 250mm (10") SNI 651,131.25 Meter
30 Pipa HDPE 100 PN-10 315mm (12") SNI 1,035,588.75 Meter
31 Pipa HDPE 100 PN-10 355mm (14") SNI 1,318,537.50 Meter
32 Pipa HDPE 100 PN-10 400mm (16") SNI 1,665,116.25 Meter
33 Pipa HDPE 100 PN-10 450mm (18") SNI 2,109,292.50 Meter
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4
34 Pipa HDPE 100 PN-10 500mm (20") SNI 2,598,356.25 Meter
35 Pipa HDPE 100 PN-10 630.mm (24") SNI 4,125,030.00 Meter
36 Pipa HDPE 100 PN-10 710.mm (25") SNI 6,265,087.50 Meter
37 Pipa HDPE 100 PN-10 800.mm (26") SNI 7,940,625.00 Meter
38 Pipa HDPE 100 PN-8 40mm (1 1/4") SNI 15,750.00 Meter
39 Pipa HDPE 100 PN-8 50mm (1 1/2") SNI 29,315.00 Meter
40 Pipa HDPE 100 PN-8 63mm (2") SNI 46,596.00 Meter
41 Pipa HDPE 100 PN-8 75mm (2 1/2") SNI 65,351.00 Meter
42 Pipa HDPE 100 PN-8 90mm (3") SNI 93,681.50 Meter
43 Pipa HDPE 100 PN-8 110mm (4") SNI 139,843.00 Meter
44 Pipa HDPE 100 PN-8 160mm (6") SNI 293,700.00 Meter
45 Pipa HDPE 100 PN-8 200mm (8") SNI 468,952.00 Meter
46 Pipa HDPE 100 PN-8 250mm (10") SNI 733,359.00 Meter
47 Pipa HDPE 100 PN-8 315mm (12") SNI 1,163,959.50 Meter
48 Pipa HDPE 100 PN-8 355mm (14") SNI 1,476,348.50 Meter
49 Pipa HDPE 100 PN-8 400mm (16") SNI 1,871,182.50 Meter
50 Pipa HDPE 100 PN-8 450mm (18") SNI 2,154,960.00 Meter
51 Pipa HDPE 100 PN-8 500mm (20") SNI 2,656,850.00 Meter
52 Pipa HDPE 100 PN-8 630.mm (24") SNI 3,359,291.25 Meter
53 Pipa HDPE 100 PN-8 710.mm (25") SNI 5,106,937.50 Meter
54 Pipa HDPE 100 PN-8 800.mm (26") SNI 6,479,340.00 Meter

U PIPA BLOCK STEEL


1 Pipa Block Steel dia 4" Setara PRALON 850,500.00 Meter

V PIPA HEADER
1 Pipa Header GI Medium SII dia 16" 10,290,000.00 Batang

W LISTRIK / ACSESORIES
1 Lampu TL 1 x 20 W Lengkap Kotak @Rp. 54,450.00 / Set
2 Lampu TL 1 x 40 W Lengkap Kotak @Rp. 60,500.00 / Set
3 Lampu TL 2 x 20 W Lengkap Kotak @Rp. 163,350.00 / Set
4 Lampu TL 2 x 40 W Lengkap Kotak @Rp. 183,920.00 / Set
5 Lampu TL Bambu 1 x 20 W Lengkap @Rp. 108,900.00 / Set
6 Lampu TL Bambu 1 x 40 W Lengkap @Rp. 123,420.00 / Set
7 Lampu XL 5 W + Fitting @Rp. 25,410.00 / Set
8 Lampu XL 8 W + Fitting @Rp. 27,230.00 / Set
9 Lampu XL 10 W + Fitting @Rp. 29,040.00 / Set
10 Lampu XL 14 W + Fitting @Rp. 33,280.00 / Set
11 Lampu XL 18 W + Fitting @Rp. 33,880.00 / Set
12 Lampu XL 24 W + Fitting @Rp. 38,720.00 / Set
13 Lampu Downlight 5 W lengkap @Rp. 54,450.00 / Set
14 Lampu Pijar 5 w + Fitting @Rp. 8,250.00 / Set
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4
15 Lampu Pijar 10 w + Fitting @Rp. 8,800.00 / Set
16 Lampu Pijar 15 w + Fitting @Rp. 9,350.00 / Set
17 Lampu Pijar 20 w + Fitting @Rp. 9,900.00 / Set
18 Lampu Pijar 25 w + Fitting @Rp. 10,450.00 / Set
19 Lampu Pijar 40 w + Fitting @Rp. 11,550.00 / Set
20 Stop Kontak tanam @Rp. 10,290.00 / Bh
21 Saklar tunggal @Rp. 14,520.00 / Bh
22 Saklar ganda @Rp. 15,730.00 / Bh
23 Saklar Triple @Rp. 18,150.00 / Bh
24 Zekring box 1 grup @Rp. 26,620.00 / Unit
25 Zekring box 2 grup @Rp. 31,350.00 / Unit
26 Zekring box 3 grup @Rp. 38,500.00 / Unit
27 Zekring box 4 grup @Rp. 46,200.00 / Unit
28 MCB 2 Ampere @Rp. 35,200.00 / Unit
29 MCB 4 Ampere @Rp. 42,900.00 / Unit
30 MCB 6 Ampere @Rp. 67,760.00 / Unit
31 MCB 8 Ampere @Rp. 99,220.00 / Unit
32 Kabel Listrik NYA Ø 1,5 mm @Rp. 1,120.00 / M'
33 Kabel Listrik NYA Ø 2,5 mm @Rp. 1,930.00 / M'
34 Kabel Listrik NYA Ø 4 mm @Rp. 8,250.00 / M'
35 Kabel Listrik NYM 2 Ø 1,5 mm @Rp. 4,020.00 / M'
36 Kabel Listrik NYM 2 Ø 2,5 mm @Rp. 9,900.00 / M'
37 Kabel Listrik NYM 2 Ø 4 mm @Rp. 15,970.00 / M'
38 Instalasi Listrik titik api / Lampu nyala @Rp. 101,750.00 / Ttk

X JALAN
1 Paving Blok @Rp. 105,000.00 / M2
2 Kanstin 10.20.40 @Rp. 24,000.00 / Bh

Y READYMIX
1 Readymix Beton B 0, Mutu Slump 12±2 cm @Rp. / M3
2 Readymix Beton K 125, Mutu Slump 12±2 cm @Rp. / M3
3 Readymix Beton K 175, Mutu Slump 12±2 cm @Rp. / M3
4 Readymix Beton K 225, Mutu Slump 12±2 cm @Rp. / M3
5 Readymix Beton K 250, Mutu Slump 12±2 cm @Rp. / M3
6 Readymix Beton K 275, Mutu Slump 12±2 cm @Rp. / M3
7 Readymix Beton K 300, Mutu Slump 12±2 cm @Rp. / M3
8 Readymix Beton K 300, Mutu Slump 12±2 cm @Rp. / M3
9 Readymix Beton K 350, Mutu Slump 12±2 cm @Rp. / M3
10 Readymix Beton K 375, Mutu Slump 12±2 cm @Rp. / M3
11 Readymix Beton K 400, Mutu Slump 12±2 cm @Rp. / M3
12 Readymix Beton K 450, Mutu Slump 12±2 cm @Rp. / M3
13 Readymix Beton K 500, Mutu Slump 12±2 cm @Rp. / M3
NO. URAIAN HARGA BAHAN HARGA SATUAN

1 2 3 4

Depok, Juni 2016

Diketahui Oleh : Dibuat oleh : TIM TEKNIS


Kepala Dinas Tata Ruang dan Permukiman 1. H. Dadan Rustandi, ST, M.Si (………….)
Kota Depok
2. Suwandi, ST (………….)

3. Sriyanto, ST, MT. (………….)

4. Fitra Pratomo Aditya Putra, ST (………….)


Dra. Kania Parwanti, M.Si
Pembina Utama Muda 5. Elisabeth Indriani, ST (………….)
NIP. 1968
6. Arizal Dani Widyatmoko, ST (………….)

7. Heri Pursugiarto, ST (………….)

8. Arina Tri Ariani, ST (………….)

9. Puja Sutrisna, ST (………….)

10. Djamaludin A. Rachman, A.Md (………….)

11. M. Ibnu Fajri, A.Md (………….)

12. Ade Endah Susanti, SE (………….)

13. Sahuri (………….)


NO ANALISA URAIAN

Pekerjaan Persiapan
1 Anl. 6.1. 1 m' Pagar Sementara dari kayu tinggi 2 meter Rp.
2 Anl. 6.2. 1 m' Pagar sementara dari seng gelombang tinggi 2 meter Rp.
3 Anl. 6.3 1 m' Pagar sementara dari kawat duri tinggi 1,8 meter Rp.
4 Anl. 6.4 1 m' Pengukuran dan Pemasangan bouplank Rp.
5 Anl. 6.5 1 m2 Pembuatan Kantor Sementara dengan Lantai Plesteran Rp.
6 Anl. 6.6. 1 m² Pembuatan gudang semen dan alat - alat Rp.
7 Anl. 6.7 1m² Pembuatan rumah jaga / kontruksi kayu Rp.
8 Anl. 6.8 1 m² Membersihkan Lapangan dan peralatan Rp.
9 Anl. 6.9 1 m² Pembuatan bedeng buruh Rp.
10 Anl. 6.10. 1 m² Pembuatan bak adukan ukuran ( 40 x 50 x 20 ) cm Rp.
11 Anl. 6.11. 1 m² Pembuatan Stegger dari bambu, ukuran ( 40 x 50 x 20 ) cm Rp.
12 Anl. 6.12 1 m² Pembuatan jalan sementara Rp.
13 Anl. 6.13 1 m³ Bongkaran beton betulang Rp.
14 Anl. 6.14 1 m³ Bongkaran dinding tembok bata merah Rp.
15 Anl. 6.15 1 m´ Pasangan pagar kawat jaring galvanis, tinggi 1.00 m Rp.
16 Anl. 6.16 1 m' Pasang pagar beton pracetak (5 x 50 x 213) cm Rp.

Pekerjaan Tanah
17 Anl. 6.1. 1 m³ Galian tanah biasa sedalam 1 meter Rp.
18 Anl. 6.2. 1 m³ Galian tanah biasa sedalam 2 meter Rp.
19 Anl. 6.3. 1 m³ Galian tanah biasa sedalam 3 meter Rp.
20 Anl. 6.4. 1 m³ Galian tanah keras sedalam 1 meter Rp.
21 Anl. 6.5. 1 m³ Galian tanah cadas sedalam 1 meter Rp.
22 Anl. 6.6. 1 m³ Galian tanah lumpur sedalam 1 meter Rp.
23 Anl. 6.7. 1 m² Pekerjaan stripping setinggi 1 meter Rp.
24 Anl. 6.8. 1 m³ Pembuangan tanah sejauh 150 meter Rp.
25 Anl. 6.9. 1 m³ Urugan kembali Rp.
26 Anl. 6.10. 1 m³ Pemadatan tanah Rp.
27 Anl. 6.11. 1 m³ Urugan pasir Rp.
28 Anl. 6.12. 1 m³ Lapisan pudel campuran 1 Kp : 3 Ps : 7 TL Rp.
29 Anl. 6.13. 1 m³ Lapisan pudel campuran 1 Kp : 5 TL Rp.
30 Anl. 6.14. 1 m³ Pembuatan jalan sementara, tebal 25 cm Rp.

Pekerjaan Pondasi
NO ANALISA URAIAN

33 Anl. 6.1. 1 M³ Pasangan pondasi batu kali, 1 Pc : 1 Ps Rp.


34 Anl. 6.2. 1 M³ Pasang pondasi batu kali 1 Pc : 2 Ps Rp.
35 Anl. 6.3. 1 M³ Pasang pondasi batu kali, 1 Pc : 2,5 Ps Rp.
36 Anl. 6.4. 1 M³ Pasang pondasi batu kali, 1 Pc : 3 Ps Rp.
37 Anl. 6.5. 1 M³ Pasang pondasi batu kali, 1 Pc : 4 Ps. Rp.
38 Anl. 6.6. 1 M³ Pasang pondasi batu kali, 1 Pc : 5 Ps Rp.
39 Anl. 6.7. 1 M³ Pasang pondasi batu kali, 1 Pc : 6 Ps Rp.
40 Anl. 6.8. 1 M³ Pasang pondasi batu kali, Pc : 8 Ps Rp.
41 Anl. 6.9. 1 M³ Pasang pondasi batu kosong Rp.
42 Anl. 6.10. 1 M³ Pasang pondasi siklop 40 % batu kali Rp.
43 Anl. 6.11. 1 M³ Pasang pondasi sumuran diameter 100 Cm Rp.
44 Anl. 6.12. 1 M³ Pembuatan tiang pancang (40 x 40) Cm, beton bertulang Rp.
45 Anl. 6.13. 1 M³ Pembuatan tiang pancang (35 x 35) Cm, beton bertulang Rp.

Pekerjaan Dinding
51 Anl. 6.1 1 M² Pasangan bata merah tebal 1 bata, 1 Pc : 1 Ps Rp.
52 Anl. 6.2 1m² Pasangan bata merah tebal 1 bata, 1Pc : 2 Ps Rp.
53 Anl. 6.3 1 m² Pasangan bata merah tebal 1 bata, 1Pc : 3 Ps Rp.
54 Anl. 6.4 1 m² Pasangan bata merah tebal 1 bata, 1Pc : 4 Ps Rp.
55 Anl. 6.5 1 m² Pasangan bata merah tebal 1 bata, 1Pc : 5 Ps Rp.
56 Anl. 6.6 1 m² Pasangan bata merah tebal 1 bata, 1Pc : 6 Ps Rp.
57 Anl. 6.7 1 m² Pasangan bata merah tebal 1 bata, 1Pc : 10 Ps Rp.
58 Anl. 6.8 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 1 Ps Rp.
59 Anl. 6.9 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 2 Ps Rp.
60 Anl. 6.10 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 3 Ps Rp.
61 Anl. 6.11 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 4 Ps Rp.
62 Anl. 6.12 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 5 Ps Rp.
63 Anl. 6.13 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 6 Ps Rp.
64 Anl. 6.14 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 8 Ps Rp.
65 Anl. 6.15 1 m² Pasangan dinding holowblock (HB.20) Rp.
66 Anl. 6.16 1 m² Pasangan dinding holowblock (HB.15) Rp.
67 Anl. 6.17 1 m² Pasangan dinding holowblock (HB.10) Rp.
68 Anl. 6.18 1 m² Pasangan dinding conblock (CB.20) Rp.
69 Anl. 6.19 1 m² Pasangan dinding Conblock (CB.15) Rp.
70 Anl. 6.20 1 m² Pasangan dinding Conblock (CB.10) Rp.
71 Anl. 6.21 1 m² Pasang dinding lantai Rp.
72 Anl. 6.22 1 m² Pasang dinding roster / terawang Rp.
73 Anl. 6.23 1 m² Pasang bata berongga ukuran ( 5 x 10 x 20 ) cm Rp.
74 Anl. 6.24 1 m² Pasang dinding anyaman bambu, rangka kayu Rp.
NO ANALISA URAIAN
Pekerjaan Plesteran
78 Anl. 6.1 1 M² Plesteran 1 Pc : 1 Ps, tebal 15 mm Rp.
79 Anl. 6.2 1 M² Plesteran 1 Pc : 2 Ps, tebal 15 mm Rp.
80 Anl. 6.3 1 M² Plesteran 1 Pc : 3 Ps, tebal 15 mm Rp.
81 Anl. 6.4 1 M² Plesteran 1 Pc : 4 Ps, tebal 15 mm Rp.
82 Anl. 6.5 1 M² Plesteran 1 Pc : 5 Ps, tebal 15 mm Rp.
83 Anl. 6.6 1 M² Plesteran 1 Pc : 6 Ps, tebal 15 mm Rp.
84 Anl. 6.7 1 M² Plesteran 1 Pc : 8 Ps, tebal 15 mm Rp.
85 Anl. 6.8 1 M² Plesteran 1 Pc : 2 Ps, tebal 20 mm Rp.
86 Anl. 6.9 1 M² Plesteran 1 Pc : 3 Ps, tebal 20 mm Rp.
87 Anl. 6.10 1 M² Plesteran 1 Pc : 4 Ps, tebal 20 mm Rp.
88 Anl. 6.11 1 M² Plesteran 1 Pc : 5 Ps, tebal 20 mm Rp.
89 Anl. 6.12 1 M² Plesteran 1 Pc : 6 Ps, tebal 20 mm Rp.
90 Anl. 6.13 1 M² Plesteran 1 Pc : 2 Ps, tebal 25 mm Rp.
91 Anl. 6.14 1 M² Plesteran 1 Pc : 3 Ps, tebal 25 mm Rp.
92 Anl. 6.15 1 M² Plesteran 1 Pc : 4 Ps, tebal 25 mm Rp.
93 Anl. 6.16 1 M² Plesteran 1 Pc : 5 Ps, tebal 25 mm Rp.
94 Anl. 6.17 1 M² Plesteran 1 Pc : 2 Ps, tebal 30 mm Rp.
95 Anl. 6.18 1 M² Plesteran 1 Pc : 3 Ps, tebal 30 mm Rp.
96 Anl. 6.19 1 M² Plesteran 1 Pc : 4 Ps, tebal 30 mm Rp.
97 Anl. 6.20 1 M² Plesteran 1 Pc : 4 Ps, tebal 30 mm Rp.
98 Anl. 6.21 1 M² Berapen 1 Pc : 3 Ps, tebal 30 mm Rp.
99 Anl. 6.22 1 M² Berapen 1 Pc : 5 Ps, tebal 30 mm Rp.
100 Anl. 6.23 1 M² Plesteran Beton 1 Pc : 2 Ps, tebal 15 mm Rp.
101 Anl. 6.24 1 M² Plesteran Beton 1 Pc : 3 Ps, tebal 15 mm Rp.
102 Anl. 6.25 1 M² Plesteran Skoning 1 Pc : 2 Ps Rp.
103 Anl. 6.26 1 M² Plesteran Granito, 1 Pc warna : 2 Granito, tebal 10 mm Rp.
104 Anl. 6.27 1 M² Plesteran Teraso, 1 Pc warna : 2 Batu Teraso, tebal 10 mm Rp.
105 Anl. 6.28 1 M² Plesteran Ciprat, 1 Pc : 2 Ps, tebal 10 mm Rp.
106 Anl. 6.29 1 M² Plesteran Siar adukan, 1 Pc : 2 Ps Rp.
107 Anl. 6.30 1 M² Plesteran waterfroof bata cote 3 lapis Rp.

Pekerjaan Kayu
114 Anl 6.1 1 M³ Pasang kusen pintu dan jendela kayu jati : Rp.
115 Anl 6.2 1 M³ Pasang kusen pintu dan jendela kayu damar laut : Rp.
116 Anl 6.3 1 M³ Pasang kusen pintu dan jendela kayu meranti : Rp.
117 Anl 6.4 1 M³ Pasang kusen pintu dan jendela kayu damar laut : Rp.
118 Anl 6.5 1 M² Pasang pintu klamp kayu meranti batu Rp.
119 Anl 6.6 1 M³ Pasang pintu klamp kayu jati Rp.
120 Anl 6.7 1 M² Pasang pintu panel kayu jati : Rp.
NO ANALISA URAIAN
121 Anl 6.8 1 M² Pasang pintu panel kayu meranti batu Rp.
122 Anl 6.9 1 M² Pasang pintu dan jendela kaca panel kayu jati : Rp.
123 Anl 6.10 1 M² Pasang pintu dan jendela kaca panel kayu meranti batu : Rp.
124 Anl 6.11 1 M² Pasang pintu dan jendela kaca panel kayu meranti : Rp.
125 Anl 6.12 1 M² Pasang pintu dan jendela jalusi kayu jati : Rp.
126 Anl 6.13 1 M² Pasang pintu dan jendela jalusi kayu meranti batu : Rp.
127 Anl 6.14 1 M² Pasang pintu plywood rangka, rangka kayu jati : Rp.
128 Anl 6.15 1 M² Pasang pintu plywood rangka, rangka kayu meranti batu : Rp.
129 Anl 6.16 1 M² Pasang jalusi mati kusen kayu jati : Rp.
130 Anl 6.17 1 M² Pasang jalusi mati kusen kayu damar laut : Rp.
131 Anl 6.18 1 M² Pasang pintu plywood rangka, rangka kayu meranti : Rp.
132 Anl 6.19 1 M² Pasang pintu teakwood rangka, rangka kayu jati : Rp.
133 Anl 6.20 1 M² Pasang pintu teakwood rangka, rangka kayu meranti batu : Rp.
134 Anl 6.21 1 M² Pasang pintu plywood & formika, rangka kayu jati : Rp.
135 Anl 6.22 1 M² Pasang pintu plywood & formika, rangka kayu meranti batu : Rp.
136 Anl 6.23 1 M² Pasang pintu plywood & formika, rangka kayu jati : Rp.
137 Anl 6.24 1 M² Pasang pintu plywood & formika, rangka kayu damar laut (divermiRp.
138 Anl 6.25 1 M³ Pasang konstruksi kuda-kuda kayu damar laut : Rp.
139 Anl 6.26 1 M³ Pasang konstruksi kuda-kuda kayu meranti : Rp.
140 Anl 6.27 1 M² Pasang kaso + reng genteng kodok kayu meranti : Rp.
141 Anl 6.28 1 M² Pasang kaso + reng genteng kodok kayu damar laut : Rp.
142 Anl 6.29 1 M² Pasang kaso + reng genteng monier kayu jati : Rp.
143 Anl 6.30 1 M² Pasang kaso + reng genteng monier kayu damar laut : Rp.
144 Anl 6.31 1 M² Pasang kaso + reng genteng beton kayu damar laut : Rp.
145 Anl 6.32 1 M² Pasang kaso + reng atap sirap kayu damar laut : Rp.
146 Anl 6.33 1 M² Pasang kaso + reng atap sirap kayu meranti : Rp.
147 Anl 6.34 1 M² Pasang rangka langit-langit (1.00 x 1.00) m, kayu jati : Rp.
148 Anl 6.35 1 M² Pasang rangka langit-langit (1.00 x 1.00) m, damar laut : Rp.
149 Anl 6.36 1 M² Pasang rangka langit-langit (1.00 x 1.00) m, Kayu meranti : Rp.
150 Anl 6.37 1 M² Pasang rangka langit-langit (30 x 30) cm, kayu jati : Rp.
151 Anl 6.38 1 M² Pasang rangka langit-langit (30 x 30) cm, kayu damar laut : Rp.
152 Anl 6.39 1 M² Pasang rangka langit-langit (30 x 30) cm, kayu meranti : Rp.
153 Anl 6.40 1 M´ Pasang lisplang ukuran (3 x 20) cm, kayu meranti : Rp.
154 Anl 6.41 1 M´ Pasang lisplang ukuran (3 x 20) cm, kayu meranti batu : Rp.
155 Anl 6.42 1 M´ Pasang lisplang ukuran (3 x 30) cm, kayu jati : Rp.
156 Anl 6.43 1 M´ Pasang lisplang ukuran (3 x 30) cm, kayu meranti batu : Rp.
157 Anl 6.44 1 M´ Pasang lisplang ukuran 2 x (3 x 20) cm, kayu meranti batu : Rp.
158 Anl 6.45 1 M´ Pasang lisplang ukuran 2 x (2 x 20) cm, kayu meranti batu : Rp.
159 Anl 6.46 1 M´ Pasang lisplang ukuran 2 x (2 x 20) cm, kayu meranti : Rp.
160 Anl 6.47 1 M´ Pasang rangka dinding pemisah, kayu damar laut : Rp.
NO ANALISA URAIAN
161 Anl 6.48 1 M´ Pasang rangka dinding pemisah, kayu meranti : Rp.
162 Anl 6.49 1 M² Pasang dinding pemisah teakwood rangka, rangka kayu damar lautRp.
163 Anl 6.50 1 M² Pasang dinding pemisah double plywood, rangka kayu damar laut Rp.
164 Anl 6.51 1 M² Pasang dinding lambrizering dari papan meranti : Rp.
165 Anl 6.52 1 M² Pasang plywood tebal 4 mm, untuk dinding : Rp.
166 Anl 6.53 1 M' Pasang list plafond kayu profil : Rp.

Pekerjaan Beton
174 Anl 6.1 1 M³ Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr Rp.
175 Anl 6.2 1 M³ Membuat beton tumbuk, 1 Pc : 3 Ps : 6 Kr Rp.
176 Anl 6.3 1 M³ Membuat beton tumbuk, 1 Pc : 4 Ps : 6 Kr Rp.
177 Anl 6.4 1 M³ Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr, Tebal 5 Cm Rp.
178 Anl 6.5 1 M³ Membuat beton 1 Pc : 2 Ps : 3 Kr Rp.
179 Anl 6.6 1 M³ Membuat beton 1 Pc : 2 Ps : 4 Kr Rp.
180 Anl 6.7 1 M³ Membuat beton 1 Pc : 2 Ps : 2,5 Kr Rp.
181 Anl 6.8 1 M³ Membuat beton 1 Pc : 1,5 Ps : 3 Kr Rp.
182 Anl 6.9 1 M³ Membuat beton 1 Pc : 1,5 Ps : 2,5 Kr Rp.
183 Anl 6.10 1 M³ Membuat beton 1 Pc : 1 Ps : 2 Kr Rp.
184 Anl 6.11 1 M³ Membuat tiang pancang prestressed beton Rp.
185 Anl 6.12 1 M³ Membuat beton dengan puzzdith - 100 XR Rp.
186 Anl 6.13 1 M³ Membuat beton 1 Pc : 2 Ps : 3 Kr Rp.
187 Anl 6.14 1 M³ Membuat beton 1 Pc : 2 Ps : 4 Kr Rp.
188 Anl 6.15 1 M³ Membuat beton 1 Pc : 1,5 Ps : 3 Kr Rp.
189 Anl 6.16 1 M³ Membuat beton 1 Pc : 1,5 Ps : 2,5 Kr Rp.
190 Anl 6.17 1 M³ Membuat beton 1 Pc : 1 Ps : 1 Kr Rp.
191 Anl 6.18 1 M³ Membuat beton kedap air dengan strorox - 100 Rp.
192 Anl 6.19 1 M' Memasang PVC Waterstop lebar 150 mm Rp.
193 Anl 6.20 1 M' Memasang PVC Waterstop lebar 200 mm Rp.
194 Anl 6.21 1 M' Memasang PVC Waterstop lebar 230 mm Rp.
195 Anl 6.22 1 M' Memasang PVC Waterstop lebar 250 mm Rp.
196 Anl 6.23 1 M' Memasang PVC Waterstop lebar 300 mm Rp.
197 Anl 6.24 1 Kg Pembesian dengan Besi polos Rp.
198 Anl 6.25 1 M² Kabel Presstressed polos / strands Rp.
199 Anl 6.26 1 M² Pasang bekisting untuk pondasi Rp.
200 Anl 6.27 1 M² Pasang bekisting untuk sloof Rp.
201 Anl 6.28 1 M² Pasang bekisting untuk kolom Rp.
202 Anl 6.29 1 M² Pasang bekisting untuk balok Rp.
203 Anl 6.30 1 M² Pasang bekisting untuk lantai Rp.
204 Anl 6.31 1 M² Pasang bekisting untuk dinding Rp.
205 Anl 6.32 1 M² Pasang bekisting untuk tangga Rp.
NO ANALISA URAIAN
206 Anl 6.33 1 M³ Pasang beton dengan mutu K 225 Rp.
207 Anl 6.34 1 M³ Pasang beton dengan mutu K 275 Rp.
208 Anl 6.35 1 M² Pasang jembatan cor Rp.
209 Anl 6.36 1 M³ Membuat pondasi beton bertulang (150 kg besi + bekisting) Rp.
210 Anl 6.37 1 M³ Membuat sloof beton bertulang (200 kg besi + bekisting) Rp.
211 Anl 6.38 1 M³ Membuat kolom beton bertulang (300 kg besi + bekisting) Rp.
212 Anl 6.39 1 M³ Membuat balok beton bertulang (200 kg besi + bekisting) Rp.
213 Anl 6.40 1 M³ Membuat balok beton bertulang (150 kg besi + bekisting) Rp.
214 Anl 6.41 1 M³ Membuat dinding beton bertulang (150 kg besi + bekisting) Rp.
215 Anl 6.42 1 M³ Membuat tangga beton bertulang (150 kg besi + bekisting) Rp.
216 Anl 6.43 1 M' Membuat kolom penguat beton bertulang (11 x 11) cm Rp.
217 Anl 6.44 1 M' Membuat ring balok beton bertulang (10 x 15) cm Rp.

Pekerjaan Penutup Atap


220 Anl 6.1 1 M² Pasang atap genteng palentong kecil Rp.
221 Anl 6.2 1 M² Pasang atap genteng kodok / glazzur Rp.
222 Anl 6.3 1 M² Pasang atap genteng palentong super / besar Rp.
223 Anl 6.4 1 M² Pasang genteng bubung palentong Rp.
224 Anl 6.5 1 M' Pasang bubung genteng kodok glazzuur Rp.
225 Anl 6.6 1 M' Pasang bubung genteng palentong besar Rp.
226 Anl 6.7 1 M² Pasang roof light fiberglass ( 180 x 90 ) cm Rp.
227 Anl 6.8 1 M² Pasang atap asbes gelombang ( 2,70 x 0,92 m ) x 5 mm Rp.
228 Anl 6.9 1 M² Pasang atap asbes gelombang ( 2,40 x 0,92 m ) x 5 mm Rp.
229 Anl 6.10 1 M² Pasang atap asbes gelombang ( 2,10 x 0,92 m ) x 5 mm Rp.
230 Anl 6.11 1 M² Pasang atap asbes gelombang ( 1,80 x 0,92 m ) x 5 mm Rp.
231 Anl 6.12 1 M² Pasang atap asbes gelombang ( 2,40 x 1,05 m ) x 4 mm Rp.
232 Anl 6.13 1 M² Pasang atap asbes gelombang ( 2,10 x 1,05 m ) x 4 mm Rp.
233 Anl 6.14 1 M² Pasang atap asbes gelombang ( 1,80 x 1,05 m ) x 4 mm Rp.
234 Anl 6.15 1 M² Pasang atap asbes gelombang ( 2,10 x 1,05 m ) x 4 mm Rp.
235 Anl 6.16 1 M² Pasang atap asbes gelombang ( 1,5 x 1,05 m ) x 4 mm Rp.
236 Anl 6.17 1 M² Pasang atap asbes gelombang ( 3,00 x 1,08 m ) x 6 mm Rp.
237 Anl 6.18 1 M² Pasang atap asbes gelombang ( 2,70 x 1,08 m ) x 6 mm Rp.
238 Anl 6.19 1 M² Pasang atap asbes gelombang ( 2,4 x 1,08 m ) x 6 mm Rp.
239 Anl 6.20 1 M² Pasang atap asbes gelombang ( 2,1 x 1,08 m ) x 6 mm Rp.
240 Anl 6.21 1 M² Pasang atap asbes gelombang ( 1,80 x 1,08 m ) x 6 mm Rp.
241 Anl 6.22 1 M' Pasang bubung stel gelombang 0,92 m Rp.
242 Anl 6.23 1 M' Pasang nok stel gelombang 1,05 m Rp.
243 Anl 6.24 1 M' Pasang nok stel gelombang 1,08 m Rp.
244 Anl 6.25 1 M' Pasang nok paten 1,05 m Rp.
245 Anl 6.26 1 M' Pasang nok paten 1,05 m Rp.
NO ANALISA URAIAN
246 Anl 6.27 1 M' Pasang nok paten 1,08 m Rp.
247 Anl 6.28 1 M' Pasang nok stel rata 0,92 m Rp.
248 Anl 6.29 1 M' Pasang nok stel rata 1,05 m Rp.
249 Anl 6.30 1 M² Pasang atap genteng beton Rp.
250 Anl 6.31 1 M² Pasang atap genteng aspal Rp.
251 Anl 6.32 1 M² Pasang atap genteng metal / multi roof Rp.
252 Anl 6.33 1 M² Pasang atap sirap Rp.
253 Anl 6.34 1 M' Pasang nok genteng beton Rp.
254 Anl 6.35 1 M' Pasang nok genteng aspal Rp.
255 Anl 6.36 1 M' Pasang nok genteng metal Rp.
256 Anl 6.37 1 M' Pasang nok sirap Rp.
257 Anl 6.38 1 M' Pasang atap seng gelombang Rp.
258 Anl 6.39 1 M' Pasang atap nok seng Rp.
259 Anl 6.40 1 M' Pasang atap aluminium Rp.
260 Anl 6.41 1 M' Pasang nok aluminium Rp.
261 Anl 6.42 1 M' Pasang aluminium foil / sisalation Rp.

Pekerjaan Penutup Lantai


262 Anl 6.1 1 M² Pasang lantai ubin granito ukuran 40 x 40 cm Rp.
263 Anl 6.2 1 M² Pasang lantai ubin granito ukuran 30 x 30 cm Rp.
264 Anl 6.3 1 M² Pasang lantai ubin teralux marmer ukuran 60 x 60 cm Rp.
265 Anl 6.4 1 M² Pasang lantai ubin teralux marmer ukuran 40 x 40 cm Rp.
266 Anl 6.5 1 M² Pasang lantai ubin teralux marmer ukuran 30 x 30 cm Rp.
267 Anl 6.6 1 M' Pasang plint ubin granito ukuran 10 x 40 cm Rp.
268 Anl 6.7 1 M' Pasang plint ubin granito ukuran 10 x 30 cm Rp.
269 Anl 6.8 1 M' Pasang plint ubin teralux marmer ukuran 10 x 60 cm Rp.
270 Anl 6.9 1 M' Pasang plint ubin teralux marmer ukuran 10 x 40 cm Rp.
271 Anl 6.10 1 M' Pasang plint ubin teralux marmer ukuran 10 x 30 cm Rp.
272 Anl 6.11 1 M² Pasang lantai keramik artistik 10 x 20 cm Rp.
273 Anl 6.12 1 M² Pasang lantai keramik artistik 10 x 10 cm Rp.
274 Anl 6.13 1 M² Pasang lantai keramik artistik ukuran 5 x 20 cm Rp.
275 Anl 6.14 1 M' Pasang plint keramik artistik ukuran 10 x 20 cm Rp.
276 Anl 6.15 1 M' Pasang plint keramik artistik ukuran 10 x 10 cm Rp.
277 Anl 6.16 1 M' Pasang plint keramik ukuran 10 x 20 cm Rp.
278 Anl 6.17 1 M' Pasang plint keramik ukuran 10 x 30 cm Rp.
279 Anl 6.18 1 M' Pasang plint keramik ukuran 10 x 40 cm Rp.
280 Anl 6.19 1 M' Pasang plint vinyil tanpa adukan Rp.
281 Anl 6.20 1 M² Pasang lantai keramik 10 x 20 cm Rp.
282 Anl 6.21 1 M² Pasang lantai keramik 15 x 15 cm Rp.
NO ANALISA URAIAN
283 Anl 6.22 1 M² Pasang lantai keramik 20 x 20 cm Rp.
284 Anl 6.23 1 M² Pasang lantai keramik 20 x 25 cm Rp.
285 Anl 6.24 1 M² Pasang lantai keramik 25 x 25 cm Rp.
286 Anl 6.25 1 M² Pasang lantai keramik 30 x 30 cm Rp.
287 Anl 6.26 1 M² Pasang lantai keramik 30 x 30 cm anti slip Rp.
288 Anl 6.27 1 M² Pasang lantai keramik 40 x 40 cm Rp.
289 Anl 6.28 1 M² Pasang lantai mosaik 30 x 30 cm, ex lokal Rp.
290 Anl 6.29 1 M² Pasang lantai marmer Rp.
291 Anl 6.30 1 M² Pasang lantai karpet 100% wool Rp.
292 Anl 6.31 1 M² Pasang lantai karpet 80% wool, 20% nylon Rp.
293 Anl 6.32 1 M² Pasang lantai karpet Rp.
294 Anl 6.33 1 M² Pasang lantai parquet jati Rp.
295 Anl 6.34 1 M² Pasang dinding porselin 11 x 11 cm, putih Rp.
296 Anl 6.35 1 M² Pasang dinding porselin 11 x 11 cm, warna Rp.
297 Anl 6.36 1 M² Pasang dinding porselin 15 x 15 cm, putih Rp.
298 Anl 6.37 1 M² Pasang dinding porselin 15 x 15 cm, warna Rp.
299 Anl 6.38 1 M² Pasang dinding keramik artistik 10 x 20 cm Rp.
300 Anl 6.39 1 M² Pasang dinding keramik artistik 5 x 20 cm Rp.
301 Anl 6.40 1 M² Pasang dinding keramik 10 x 20 cm Rp.
302 Anl 6.41 1 M² Pasang dinding keramik 15 x 15 cm Rp.
303 Anl 6.42 1 M² Pasang dinding keramik 20 x 20 cm Rp.
304 Anl 6.43 1 M² Pasang dinding keramik 20 x 25 cm Rp.
305 Anl 6.44 1 M² Pasang dinding marmer Rp.
306 Anl 6.45 1 M² Pasang dinding bata pelapis 7 x 3 x 20 cm Rp.
307 Anl 6.46 1 M² Pasang dinding batu poros Rp.
308 Anl 6.47 1 M² Pasang dinding batu tempel hitam Rp.
309 Anl 6.48 1 M² Pasang lantai vinyl karet 30 x 30 cm KL I Rp.
310 Anl 6.49 1 M² Pasang lantai vinyl karet 30 x 30 cm KL II Rp.
311 Anl 6.50 1 M² Pasang lantai vinyl asbes 30 x 30 cm Rp.
312 Anl 6.51 1 M² Pasang lantai vinyl motif kembang 30 x 30 cm Rp.
313 Anl 6.52 1 M² Pasang wall corvering lebar 50 cm Rp.
314 Anl 6.53 1 M² Plint kayu Jati 2 x 10 cm Rp.
315 Anl 6.54 1 M² Plint kayu Meranti batu 2 x 10 cm Rp.

Pekerjaan Penutup Kunci dan Kaca


Anl 6.1 1 buah pasang kunci tanam antik Rp.
Anl 6.2 1 buah pasang kunci tanam biasa Rp.
Anl 6.3 1 buah pasang kunci tanam kamar mandi Rp.
Anl 6.4 1 buah pasang kunci silinder Rp.
Anl 6.5 1 buah pasang engsel pintu Rp.
NO ANALISA URAIAN
Anl 6.6 1 buah pasang engsel jendela kupu-kupu Rp.
Anl 6.7 1 buah pasang engsel angin Rp.
Anl 6.8 1 buah pasang spring knip Rp.
Anl 6.9 1 buah pasang kait angin Rp.
Anl 6.10 1 buah pasang door closer Rp.
Anl 6.11 1 buah pasang kunci selot Rp.
Anl 6.12 1 buah pasang pegangan pintu / door holder Rp.
Anl 6.13 1 buah pasang door stop Rp.
Anl 6.14 1 buah pasang rel pintu dorong Rp.
Anl 6.15 1 buah pasang kunci lemari Rp.
Anl 6.16 1 M² pasang kaca, tebal 3 mm Rp.
Anl 6.17 1 M² pasang kaca, tebal 5 mm Rp.
Anl 6.18 1 M² pasang kaca, tebal 8 mm Rp.
Anl 6.19 1 M² pasang kaca buram, tebal 5 mm Rp.
Anl 6.20 1 M² pasang kaca cermin, tebal 5 mm Rp.
Anl 6.21 1 M² pasang kaca cermin, tebal 8 mm Rp.
Anl 6.22 1 M² pasang kaca "wireglass" , tebal 5 mm Rp.
Anl 6.23 1 M² pasang kaca patri, tebal 5 mm Rp.
Anl 6.24 1 M² pasang kaca Reyben, tebal 5 mm Rp.

Pekerjaan Pengecatan
Anl 6.1 1M² Mengikis/ mengerok permukaan cat tembok lama Rp.
Anl 6.2 1M² Mencuci bidang permukaan tembok yang pernah di cat Rp.
Anl 6.3 1M² Mengerok karat cat lama permukaan baja dengan cara manual Rp.
Anl 6.4 1M² Menyabun permukaan tembok lama Rp.
Anl 6.5 1M² Mendempul dan menggosok kayu Rp.
Anl 6.6 1M² Pengecatan bidang kayu lama Rp.
Anl 6.7 1M² Pengecatan bidang kayu baru 1 lps plamir, 1 lps cat dasar, 2 lps c Rp.
Anl 6.8 1M² Pengecatan bidang kayu baru 1 lps plamir, 1 lps cat dasar, 3lps c Rp.
Anl 6.9 1M² Peleburan kayu dengan politur Rp.
Anl 6.10 1M² Peleburan kayu dengan residu Rp.
Anl 6.11 1M² Peleburan bidang kayu dan vernis Rp.
Anl 6.12 1M² Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapi Rp.
Anl 6.13 1M² Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup ) Rp.
Anl 6.14 1M² Pemasangan wall paper Rp.
Anl 6.15 1M² Pengecatan permukaan baja dengan meni besi Rp.
Anl 6.16 1M² Pengecatan permukaan baja dengan meni besi dan perancah Rp.
Anl 6.17 1M² Pengecatan permukaan baja lapis seng (galbani) secara manual Rp.
Anl 6.18 1M² Pengecatan permukaan baja lapis seng (galbani) secara manual Rp.
NO ANALISA URAIAN
Anl 6.19 1M² Pengecatan permukaan baja lapis seng (galbani) secara semprot Rp.

Pekerjaan Sanitasi
Anl 6.1 Memasang 1 buah kloset duduk/monoblok Rp.
Anl 6.2 Memasang 1 buah kloset jongkok porselen Rp.
Anl 6.3 Memasang 1 buah kloset jongkok teraso Rp.
Anl 6.4 Memasang 1 buah urinoir Rp.
Anl 6.5 Memasang 1 buah wastafel Rp.
Anl 6.6 Memasang 1 buah bak mandi teraso volume 0,30 m³ Rp.
Anl 6.7 Memasang 1 buah bak mandi fibreglass volume 0,30 m³ Rp.
Anl 6.8 Memasang 1 buah bak mandi batu bata volume 0,30 m³ Rp.
Anl 6.9 Memasang 1 buah badkip porselin Rp.
Anl 6.10 Memasang 1 buah bak mandi beton volume 1 m³ air Rp.
Anl 6.11 Memasang 1 buah bak fibreglass volume 1 m³ air Rp.
Anl 6.12 Memasang 1 m' pipa beton, diameter 30 cm - 100 cm Rp.
Anl 6.13 Memasang 1 buah bak kontrol pasangan batu bata ukuran (30 x 30) cmRp.
Anl 6.14 Memasang 1 buah bak kontrol pasangan batu bata ukuran (45 x 45) cmRp.
Anl 6.15 Memasang 1 buah bak kontrol pasangan batu bata ukuran (60 x 60) cmRp.
Anl 6.16 Memasang 1 m' pipa galvanis diameter ½" Rp.
Anl 6.17 Memasang 1 m' pipa galvanis diameter 3/4" Rp.
Anl 6.18 Memasang 1 m' pipa galvanis diameter 1" Rp.
Anl 6.19 Memasang 1 m' pipa galvanis diameter 1 ½" Rp.
Anl 6.20 Memasang 1 m' pipa galvanis diameter 2" Rp.
Anl 6.21 Memasang 1 m' pipa galvanis diameter 2,5" Rp.
Anl 6.22 Memasang 1 m' pipa PVC tipe AW diameter ½" Rp.
Anl 6.23 Memasang 1 m' pipa PVC tipe AW diameter ¾" Rp.
Anl 6.24 Memasang 1 m' pipa PVC tipe AW diameter 1" Rp.
Anl 6.25 Memasang 1 m' pipa PVC tipe AW diameter 1 ½" Rp.
Anl 6.26 Memasang 1 m' pipa PVC tipe AW diameter 2" Rp.
Anl 6.27 Memasang 1 m' pipa PVC tipe AW diameter 2 ½" Rp.
Anl 6.28 Memasang 1 m' pipa PVC tipe AW diameter 3" Rp.
Anl 6.29 Memasang 1 m' pipa PVC tipe AW diameter 4" Rp.
Anl 6.30 Memasang 1 bh bak cuci piring stainles steel Rp.
Anl 6.31 Memasang 1 bh bak cuci piring teraso Rp.
Anl 6.32 Memasang 1 bh kran diameter ¾" atau ½" Rp.
Anl 6.33 Memasang 1 bh Floor drain Rp.

Pekerjaan Besi dan Aluminium


Anl 6.1 1 Kg Pasang rangka atap baja Rp.
Anl 6.2 1 M² Pasang pintu besi baja Rp.
NO ANALISA URAIAN
Anl 6.3 1 M² Pasang jendela besi Rp.
Anl 6.4 1 M² Pasang pintu gulung besi Rp.
Anl 6.5 1 M² Pasang pintu lipat Rp.
Anl 6.6 1 M² Pasang pintu Sunscreen alluminium Rp.
Anl 6.7 1 M² Pasang Rolling door Rp.
Anl 6.8 1 M² Pasang pintu alluminium Rp.
Anl 6.9 1 M² Pasang Venetions blinds Rp.
Anl 6.10 1 M² Pasang Vertikals blinds Rp.
Anl 6.11 1 M² Pasang terali besi Rp.
Anl 6.12 1 M² Pasang kawat harmonika Rp.
Anl 6.13 1 M² Pasang kawat nyamuk Rp.
Anl 6.14 1 M² Pasang kawat kassa Rp.
Anl 6.15 1 M² Pasang kawat burung Rp.
Anl 6.16 1 M² Pasang jendela nako dan tralis Rp.
Anl 6.17 1 M' Pasang talang datar, seng bjls 35 Rp.
Anl 6.18 1 M' Pasang talang miring, seng bjls 35 Rp.
Anl 6.19 1 M' Pasang talang ½ lingkaran D-10 cm, seng bjls 35 Rp.
Anl 6.20 1 M' Pasang talang ½ lingkaran D-10 cm, seng bjls 30 Rp.

Pekerjaan Langit - Langit


Anl 6.1 1 M² langit - langit asbes ( 1,00 x 1,00 ) m tebal 6 mm Rp.
Anl 6.2 1 M² langit - langit asbes ( 1,00 x 1,00 ) m tebal 5 mm Rp.
Anl 6.3 1 M² langit - langit asbes ( 1,00 x 1,00 ) m tebal 4 mm Rp.
Anl 6.4 1 M² langit - langit asbes ( 1,00 x 1,00 ) m tebal 3,5 mm Rp.
Anl 6.5 1 M² Langit - langit akustik ( 30 x 30 ) cm Rp.
Anl 6.6 1 M² Langit - langit akustik ( 30 x 60 ) cm Rp.
Anl 6.7 1 M² Langit - langit akustik ( 60 x 120 ) cm Rp.
Anl 6.8 1 M² Langit - langit plywood ( 30 x 60 ) cm, tebal 4 mm Rp.
Anl 6.9 1 M² Langit - langit plywood ( 30 x 60 ) cm, tebal 6 mm Rp.
Anl 6.10 1 M² Langit - langit plywood ( 60 x 120 ) cm, tebal 4 mm Rp.
Anl 6.11 1 M² Langit - langit plywood ( 60 x 120 ) cm, tebal 6 mm Rp.
Anl 6.12 1 M² Langit - langit teakwood ( 30 x 60 ) cm, tebal 4 mm Rp.
Anl 6.13 1 M² Langit - langit teakwood ( 60 x 120 ) cm, tebal 4 mm Rp.
Anl 6.14 1 M² Langit - langit lat kayu jati Rp.
Anl 6.15 1 M² Langit - langit lat papan rider Rp.
Anl 6.16 1 M² Langit - langit soft board Rp.
Anl 6.17 1 M² Langit - langit akustik 60 x 120 cm + rangka alluminium Rp.
Anl 6.18 1 M' List Langit - langit Kayu profil 3" Rp.
Anl 6.19 1 M² Langit - langit asbes (1,00 x 1,00) m, rangka kayu meranti Rp.
NO ANALISA URAIAN
Anl 6.20 1 M² Langit - langit plywood 4 mm + rangka kayu meranti Rp.
Anl 6.21 1 M² Langit - langit akustik ( 30 x 60 ) cm + rangka kayu meranti Rp.
Anl 6.22 1 M² Langit - langit akustik ( 30 x 30 ) cm + rangka kayu borneo Rp.
Anl 6.23 1 M² Langit - langit gypsum board, tebal 9 mm Rp.
Anl 6.24 1 M² Langit - langit gypsum board, tebal 6 mm Rp.
Anl 6.25 1 M² Langit - langit gypsum board, tebal 12 mm Rp.

Pekerjaan Jalan Paving


Anl 6.1 1 M2 Pekerjaan Paving Block natural tb 8cm Rp.
Anl 6.2 1 BH Pekerjaan Kanstin 10.20.40 Rp.
HARGA

265,938.69
364,839.69
96,901.04
67,489.47
1,623,706.21
722,378.98
1,109,494.81
17,050.00
1,078,248.29
45,952.50
449,273.00
163,457.80
707,652.00
530,750.00
128,000.40
584,202.30

77,825.00
95,535.00
113,531.00
103,576.00
157,080.00
125,235.00
5,665.00
58,349.50
26,092.00
56,650.00
375,650.00
368,553.24
167,054.80
149,602.20
HARGA

1,277,289.20
1,104,973.10
1,277,289.20
1,063,375.50
1,009,536.00
972,193.20
945,948.30
909,955.20
585,063.60
2,595,324.60
903,755.60
1,020,877.29
800,786.67

370,317.20
342,749.00
328,644.80
314,395.40
284,950.60
314,111.60
137,359.75
177,753.40
166,153.90
159,197.50
155,362.90
152,960.50
151,917.70
149,215.00
160,703.40
145,022.90
328,840.60
302,676.52
218,703.62
174,458.87
172,282.00
195,123.50
532,603.50
82,162.42
HARGA

84,176.40
76,665.60
73,527.30
71,293.20
70,151.40
69,184.50
68,201.10
87,327.90
83,275.50
95,343.60
93,921.30
92,532.00
90,226.40
90,717.00
87,872.40
85,631.70
111,683.00
105,459.20
101,789.60
97,427.00
44,206.80
43,399.40
77,609.40
74,830.80
17,804.60
81,192.32
81,941.20
55,404.80
38,167.80
376,351.80

32,512,150.00
15,277,900.00
11,865,700.00
15,640,900.00
562,914.00
1,146,199.82
1,426,435.82
HARGA
884,400.00
1,404,980.94
837,897.50
687,747.50
2,277,752.58
1,269,400.00
952,101.73
634,535.00
1,939,043.04
985,050.00
550,451.00
1,042,444.73
724,878.00
1,163,466.73
845,900.00
1,249,354.73
846,004.50
13,702,920.00
8,711,670.00
96,690.00
151,140.00
396,165.00
171,710.00
171,710.00
1,730,619.00
981,931.50
379,610.00
187,220.00
132,770.00
791,615.00
358,737.50
236,225.00
84,777.00
114,950.00
336,279.72
158,053.50
212,671.25
121,357.50
84,463.50
365,805.00
HARGA
247,293.75
436,617.50
402,887.10
404,444.70
37,303.20
19,763.70

890,772.30
854,266.60
831,537.30
53,358.36
896,953.20
1,075,800.00
1,168,233.00
1,086,921.00
1,221,066.00
1,332,606.00
1,317,195.00
1,168,497.00
1,341,318.00
1,280,499.00
1,382,535.00
1,448,997.00
1,712,403.00
1,426,029.00
9,625.00
10,356.50
59,356.00
59,499.00
68,453.00
13,268.06
15,185.50
125,140.68
133,413.27
128,369.28
134,544.90
154,752.78
378,966.23
311,817.34
HARGA
1,229,321.50
1,248,918.00
99,995.05
4,033,260.43
5,037,239.66
8,398,722.56
6,463,104.34
6,003,541.35
5,735,912.36
6,038,531.75
88,261.75
114,123.27

72,963.00
86,713.00
77,308.00
143,380.60
144,535.60
148,011.60
56,148.40
81,605.15
76,584.20
79,554.20
86,321.95
62,438.20
61,888.20
62,372.20
57,125.20
74,032.20
48,963.20
92,361.94
90,935.35
92,314.75
92,361.94
81,670.60
89,989.90
94,243.05
78,542.20
70,807.00
HARGA
86,660.20
78,493.80
66,555.50
108,592.00
192,781.60
111,113.86
125,433.00
154,248.60
112,689.50
99,158.40
144,903.00
74,771.40
64,654.70
140,821.56
90,518.12
112,475.00

425,164.52
415,514.77
401,475.03
461,119.45
506,340.56
250,473.96
209,227.81
229,705.96
186,706.96
166,700.38
248,859.60
203,374.60
252,159.60
36,336.96
36,717.56
31,941.36
40,386.50
40,933.86
57,808.30
218,609.60
219,819.60
HARGA
262,059.60
221,359.60
220,171.60
274,257.28
274,257.28
284,059.60
340,738.20
460,145.88
167,310.00
169,851.00
173,662.50
590,271.00
273,838.40
176,603.90
267,920.40
279,800.40
347,670.40
254,170.40
220,620.40
223,370.40
217,870.40
223,370.40
498,722.84
304,463.50
279,228.40
267,470.50
182,916.25
174,164.65
163,832.90
178,540.45
195,390.25
95,048.97
56,163.25

330,099.00
168,157.00
127,726.50
105,184.75
40,180.25
HARGA
39,891.50
60,225.00
33,525.25
44,569.25
199,182.50
61,336.00
202,768.50
57,623.50
270,512.00
52,802.75
123,967.25
161,048.25
316,287.40
161,178.60
219,975.25
338,938.60
207,330.75
244,202.75
146,528.25

15,873.00
15,773.45
15,773.45
15,773.45
17,307.18
35,898.50
53,064.00
58,767.50
48,251.68
12,144.00
48,884.00
37,202.00
29,309.50
84,245.70
12,320.00
66,562.05
51,678.00
241,241.00
HARGA
199,430.00

2,821,275.60
604,791.00
932,338.00
977,715.20
1,007,316.20
545,908.00
508,519.00
1,187,890.00
4,385,975.00
3,900,345.20
1,372,008.00
276,927.20
725,406.00
725,406.00
1,100,497.20
47,556.85
56,712.70
72,705.60
101,872.10
118,956.20
136,665.10
55,735.90
25,284.60
35,821.50
46,136.75
58,438.05
57,986.50
79,233.00
113,469.40
571,444.50
436,947.50
46,420.00
32,835.00

28,422.90
1,062,446.00
HARGA
640,312.75
1,206,953.00
1,196,470.00
125,532.00
807,653.00
704,193.60
245,697.38
259,007.38
571,802.00
63,833.00
50,416.30
52,120.20
50,656.10
313,143.60
198,602.25
254,278.75
207,105.25
210,089.00

34,559.80
31,062.90
27,566.00
24,904.00
132,781.00
130,730.60
134,502.50
43,115.82
53,395.98
43,972.50
54,681.00
74,035.50
76,180.50
746,697.12
357,839.90
96,510.15
241,209.65
35,619.10
149,858.50
HARGA
185,161.68
270,733.10
285,406.00
56,528.78
44,496.76
67,555.18

224,240.50
36,152.86
ANALISA BIAYA KONSTRUKSI
PEKERJAAN PERSIAPAN

PA 6.1. 1 m' Pagar Sementara dari kayu tinggi 2 meter

6.1.1. Bahan
- Kayu Laut/Dolken Ø 8-10/400 cm 1.250 Btg x Rp 15,540 = Rp 19,425.00
- Semen Portland 5.000 Kg x Rp 1,500 = Rp 7,500.00
- Pasir Beton 0.005 M3 x Rp 273,000 = Rp 1,365.00
- Koral Beton 0.009 M3 x Rp 170,900 = Rp 1,538.10
- Kayu 5/7 0.072 M3 x Rp 2,005,477 = Rp 144,394.34
- Paku Biasa 2" - 5" 0.060 Kg x Rp 15,000 = Rp 900.00
- Residu/colter 0.400 Lt x Rp 3,600 = Rp 1,440.00
Jumlah (1) = Rp 176,562.44

6.1.2. Tenaga
- Tukang kayu 0.200 Oh x Rp 120,000 = Rp 24,000.00
- Pekerja 0.400 Oh x Rp 90,000 = Rp 36,000.00
- Kepala tukang 0.020 Oh x Rp 130,000 = Rp 2,600.00
- Mandor 0.020 Oh x Rp 130,000 = Rp 2,600.00
Jumlah (2) = Rp 65,200.00

Jumlah (1) + (2) = Rp 241,762.44


Keuntungan+Over head 10% = Rp 24,176.24
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 265,938.69

PA 6.2. 1 m' Pagar sementara dari seng gelombang tinggi 2 meter

6.2.1. Bahan
- Kayu Laut/Dolken Ø 8-10/400 cm 1.250 Btg x Rp 15,540 = Rp 19,425.00
- Semen Portland 2.500 Kg x Rp 1,500 = Rp 3,750.00
- Seng Gelombang 1.200 Lbr x Rp 68,000 = Rp 81,600.00
- Pasir beton 0.005 M3 x Rp 273,000 = Rp 1,365.00
- Koral beton 0.009 M3 x Rp 170,900 = Rp 1,538.10
- Kayu 5/7 0.072 M3 x Rp 2,005,477 = Rp 144,394.34
- Paku biasa 2" - 5" 0.060 Kg x Rp 15,000 = Rp 900.00
- Meni besi 0.450 Kg x Rp 30,000 = Rp 13,500.00
Jumlah (1) = Rp 266,472.44

6.2.2. Tenaga
- Tukang kayu 0.200 Oh x Rp 120,000 = Rp 24,000.00
- Pekerja 0.400 Oh x Rp 90,000 = Rp 36,000.00
- Kepala tukang 0.020 Oh x Rp 130,000 = Rp 2,600.00
- Mandor 0.020 Oh x Rp 130,000 = Rp 2,600.00
Jumlah (2) = Rp 65,200.00

Jumlah (1) + (2) = Rp 331,672.44


Keuntungan+Over head 10% = Rp 33,167.24
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 364,839.69

PA 6.3 1 m' Pagar sementara dari kawat duri tinggi 1,8 meter

6.3.1. Bahan
- Kayu Laut/Dolken Ø 8-10/400 cm 1.000 Btg x Rp 15,540 = Rp 15,540.00
- Semen Portland 2.000 Kg x Rp 1,500 = Rp 3,000.00
- Kawat duri 1.625 Kg x Rp 4,030 = Rp 6,548.75
- Pasir beton 0.005 M3 x Rp 273,000 = Rp 1,365.00
- Koral beton 0.009 M3 x Rp 170,900 = Rp 1,538.10
- Paku biasa 2" - 5" 0.060 Kg x Rp 15,000 = Rp 900.00
Jumlah (1) = Rp 28,891.85

6.3.2. Tenaga
- Tukang kayu 0.300 Oh x Rp 120,000 = Rp 36,000.00
- Pekerja 0.200 Oh x Rp 90,000 = Rp 18,000.00
- Kepala tukang 0.020 Oh x Rp 130,000 = Rp 2,600.00
- Mandor 0.020 Oh x Rp 130,000 = Rp 2,600.00
Jumlah (2) = Rp 59,200.00

Jumlah (1) + (2) = Rp 88,091.85


Keuntungan+Over head 10% = Rp 8,809.19
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 96,901.04

PA 6.4 1 m' Pengukuran dan Pemasangan bouplank

6.4.1. Bahan
- Kayu 5/7 0.012 M3 x Rp 2,005,477 = Rp 24,065.72
- Paku biasa 2" - 5" 0.020 Kg x Rp 15,000 = Rp 300.00
- Kayu papan 3/20 0.007 M3 x Rp 2,005,477 = Rp 14,038.34
Jumlah (1) = Rp 38,404.06

6.4.2. Tenaga
- Tukang kayu 0.100 Oh x Rp 120,000 = Rp 12,000.00
- Pekerja 0.100 Oh x Rp 90,000 = Rp 9,000.00
- Kepala tukang 0.010 Oh x Rp 130,000 = Rp 1,300.00
- Mandor 0.005 Oh x Rp 130,000 = Rp 650.00
Jumlah (2) = Rp 22,950.00

Jumlah (1) + (2) = Rp 61,354.06


Keuntungan+Over head 10% = Rp 6,135.41
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 67,489.47

PA 6.5 1 m2 Pembuatan Kantor Sementara dengan Lantai Plesteran

6.5.1. Bahan
- Kayu Laut/Dolken Ø 8-10/400 cm 1.250 Btg x Rp 15,540 = Rp 19,425.00
- Kayu 0.180 M3 x Rp 2,005,477 = Rp 360,985.85
- Batu Belah/Kali 15 - 20 cm 0.850 Kg x Rp 239,000 = Rp 203,150.00
- Paku biasa 0.080 Kg x Rp 15,000 = Rp 1,200.00
- Besi Strip 1.100 Kg x Rp 11,880 = Rp 13,068.00
- Semen Portland 35.000 Kg x Rp 1,500 = Rp 52,500.00
- Pasir pasang 0.150 M3 x Rp 273,000 = Rp 40,950.00
- Pasir beton 0.100 M3 x Rp 273,000 = Rp 27,300.00
- Koral beton 0.150 M3 x Rp 270,000 = Rp 40,500.00
- Bata merah 30.000 Bh x Rp 1,000 = Rp 30,000.00
- Seng plat 0.250 Lbr x Rp 103,950 = Rp 25,987.50
- Jendela nako 0.200 Bh x Rp 261,360 = Rp 52,272.00
- Kaca polos 0.080 M2 x Rp 83,000 = Rp 6,640.00
- Kunci tanam 0.150 Bh x Rp 90,020 = Rp 13,503.00
- Plywood 4 mm 0.060 Lbr x Rp 51,920 = Rp 3,115.20
Jumlah (1) = Rp 890,596.55
6.5.2. Tenaga
- Tukang kayu 2.000 Oh x Rp 120,000 = Rp 240,000.00
- Tukang batu 1.000 Oh x Rp 120,000 = Rp 120,000.00
- Pekerja 2.000 Oh x Rp 90,000 = Rp 180,000.00
- Kepala tukang 0.300 Oh x Rp 130,000 = Rp 39,000.00
- Mandor 0.050 Oh x Rp 130,000 = Rp 6,500.00
Jumlah (2) = Rp 585,500.00

Jumlah (1) + (2) = Rp 1,476,096.55


Keuntungan+Over head 10% = Rp 147,609.66
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,623,706.21

PA 6.6. 1 m² Pembuatan gudang semen dan alat - alat

6.6.1. Bahan
- Kayu Laut/Dolken Ø 8-10/400 cm 1.700 Btg x Rp 15,540 = Rp 26,418.00
- Kayu 0.210 M3 x Rp 2,005,477 = Rp 421,150.16
- Paku biasa 0.300 Kg x Rp 15,000 = Rp 4,500.00
- Semen Portland 10.500 Kg x Rp 1,500 = Rp 15,750.00
- Pasir beton 0.030 M3 x Rp 273,000 = Rp 8,190.00
- Koral beton 0.050 M3 x Rp 270,000 = Rp 13,500.00
- Seng gelombang bjls 20 - 7" 1.500 Lbr x Rp 68,000 = Rp 102,000.00
Jumlah (1) = Rp 591,508.16

6.2.2. Tenaga
- Tukang kayu 0.200 Oh x Rp 120,000 = Rp 24,000.00
- Pekerja 0.400 Oh x Rp 90,000 = Rp 36,000.00
- Kepala tukang 0.020 Oh x Rp 130,000 = Rp 2,600.00
- Mandor 0.020 Oh x Rp 130,000 = Rp 2,600.00
Jumlah (2) = Rp 65,200.00

Jumlah (1) + (2) = Rp 656,708.16


Keuntungan+Over head 10% = Rp 65,670.82
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 722,378.98

PA 6.7 1m² Pembuatan rumah jaga / kontruksi kayu

6.7.1 Bahan
- Kayu Laut/Dolken Ø 8-10/400 cm 3.000 Btg x Rp 15,540 = Rp 46,620.00
- Kayu 0.276 M³ x Rp 2,005,477 = Rp 553,511.64
- Paku biasa 0.700 Kg x Rp 15,000 = Rp 10,500.00
- Seng gelombang bjls 20 - 7" 1.500 Lbr x Rp 68,000 = Rp 102,000.00
Jumlah (1) = Rp 712,631.64

6.7.2 Tenaga
- Tukang kayu 1.500 Oh x Rp 120,000 = Rp 180,000.00
- Pekerja 1.000 Oh x Rp 90,000 = Rp 90,000.00
- Kepala Tukang 0.150 Oh x Rp 130,000 = Rp 19,500.00
- Mandor 0.050 Oh x Rp 130,000 = Rp 6,500.00
Jumlah (2) = Rp 296,000.00

Jumlah (1) + (2) = Rp 1,008,631.64


Keuntungan+Over head 10% = Rp 100,863.16
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,109,494.81

PA 6.8 1 m² Membersihkan lapangan dan perataan

6.8.1 Tenaga
- Pekerja 0.100 Oh
x Rp 90,000 = Rp 9,000.00
- Mandor 0.050 Oh
x Rp 130,000 = Rp 6,500.00
Jumlah = Rp 15,500.00
Keuntungan+Over head 10% = Rp 1,550.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 17,050.00

PA 6.9 1 m² Pembuatan bedeng buruh

6.9.1 Bahan
- Kayu Laut/Dolken Ø 8-10/400 cm 1.250 Btg x Rp 15,540 = Rp 19,425.00
- Kayu 0.186 M³ x Rp 2,005,477 = Rp 373,018.71
- Paku biasa 0.300 Kg x Rp 15,000 = Rp 4,500.00
- Semen portland 18.000 Kg x Rp 1,500 = Rp 27,000.00
- Pasir beton 0.030 M³ x Rp 273,000 = Rp 8,190.00
- Koral beton 0.050 M³ x Rp 270,000 = Rp 13,500.00
- Seng gelombang bjls 20 - 7" 1.500 Lbr x Rp 68,000 = Rp 102,000.00
- Plywood 4mm 1.350 Lbr x Rp 51,920 = Rp 70,092.00
Jumlah (1) = Rp 617,725.71

6.9.2 Tenaga
- Tukang kayu 2.000 Oh x Rp 120,000 = Rp 240,000.00
- Pekerja 1.000 Oh x Rp 90,000 = Rp 90,000.00
- Kepala tukang 0.200 Oh x Rp 130,000 = Rp 26,000.00
- Mandor 0.050 Oh x Rp 130,000 = Rp 6,500.00
Jumlah (2) = Rp 362,500.00

Jumlah (1) + (2) = Rp 980,225.71


Keuntungan+Over head 10% = Rp 98,022.57
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,078,248.29

PA 6.10. 1 m² Pembuatan bak adukan ukuran ( 40 x 50 x 20 ) cm

6.10.1. Bahan
- Waterfroof 0.036 M3 x Rp 80,000 = Rp 2,880.00
- Paku biasa 0.080 Kg x Rp 15,000 = Rp 1,200.00
- Kaso 5/7 1.000 Btg x Rp 1,500 = Rp 1,500.00
Jumlah (1) = Rp 5,580.00

6.10.2 Tenaga
- Tukang kayu 0.300 Oh x Rp 120,000 = Rp 36,000.00
- Mandor 0.002 Oh x Rp 130,000 = Rp 195.00
Jumlah (2) = Rp 36,195.00

Jumlah (1) + (2) = Rp 41,775.00


Keuntungan+Over head 10% = Rp 4,177.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 45,952.50

PA 6.11. 1 m² Pembuatan Stegger dari bambu, ukuran ( 40 x 50 x 20 ) cm


6.11.1 Bahan
- Bambu ø 6 - 8 / 600 cm 1.250 Btg x Rp 36,000 = Rp 45,000.00
- Tali ijuk 0.186 Kg x Rp 5,000 = Rp 930.00
Jumlah (1) = Rp 45,930.00

6.11.2 Tenaga
- Tukang kayu 2.000 Oh x Rp 120,000 = Rp 240,000.00
- Kepala tukang 0.200 Oh x Rp 130,000 = Rp 26,000.00
- Pekerja 1.000 Oh x Rp 90,000 = Rp 90,000.00
- Mandor 0.050 Oh x Rp 130,000 = Rp 6,500.00
Jumlah (2) = Rp 362,500.00

Jumlah (1) + (2) = Rp 408,430.00


Keuntungan+Over head 10% = Rp 40,843.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 449,273.00

PA 6.12 1 m² Pembuatan jalan sementara

6. 12.1 Bahan
- Batu belah 15/20 0.150 M³ x Rp 239,000 = Rp 35,850.00
- Batu pecah 5/7 0.090 M³ x Rp 150,200 = Rp 13,518.00
- Pasir pasang 0.010 M³ x Rp 273,000 = Rp 2,730.00
Jumlah (1) = Rp 52,098.00

6.12.2 Tenaga
- Pekerja 1.000 Oh x Rp 90,000 = Rp 90,000.00
- Mandor 0.050 Oh x Rp 130,000 = Rp 6,500.00
Jumlah (2) = Rp 96,500.00

Jumlah (1) + (2) = Rp 148,598.00


Keuntungan+Over head 10% = Rp 14,859.80
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 163,457.80

PA 6.13 1 m³ Bongkaran beton betulang

6.13.1 Tenaga
- Pekerja 6.667 Oh x Rp 90,000 = Rp 600,030.00
- Mandor 0.333 Oh x Rp 130,000 = Rp 43,290.00
Jumlah = Rp 643,320.00
Keuntungan+Over head 10% = Rp 64,332.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 707,652.00

PA 6.14 1 m³ Bongkaran dinding tembok bata merah

6.14.1 Tenaga
- Pekerja 5.000 Oh x Rp 90,000 = Rp 450,000.00
- Mandor 0.250 Oh x Rp 130,000 = Rp 32,500.00
Jumlah = Rp 482,500.00
Keuntungan+Over head 10% = Rp 48,250.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 530,750.00

PA 1 m² Bongkaran Atap

6.14.1 Tenaga
- Pekerja 0.070 Oh
x Rp 90,000 = Rp 6,300.00
- Tukang 0.020 Oh
x Rp 120,000 = Rp 2,400.00
- Mandor 0.005 Oh
x Rp 130,000 = Rp 650.00
Jumlah = Rp 9,350.00
Keuntungan+Over head 10% = Rp 935.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 10,285.00

PA 1 m² Bongkaran genteng

6.14.1 Tenaga
- Pekerja 0.020 Oh
x Rp 90,000 = Rp 1,800.00
- Mandor 0.010 Oh
x Rp 130,000 = Rp 1,300.00
Jumlah = Rp 3,100.00
Keuntungan+Over head 10% = Rp 310.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 3,410.00

PA 6.15 1 m´ Pasangan pagar kawat jaring galvanis, tinggi 1.00 m

6.15.1 Bahan
- Kawat jaring galvanis/BRC 0.434 Lbr x Rp 246,000 = Rp 106,764.00
Jumlah (1) = Rp 106,764.00

6.15.2. Tenaga
- Pekerja 0.042 Oh x Rp 90,000 = Rp 3,780.00
- Kepala tukang 0.004 Oh x Rp 130,000 = Rp 520.00
- Tukang 0.042 Oh x Rp 120,000 = Rp 5,040.00
- Mandor 0.002 Oh x Rp 130,000 = Rp 260.00
Jumlah (2) = Rp 9,600.00

Jumlah = Rp 116,364.00
Keuntungan+Over head 10% = Rp 11,636.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 128,000.40

PA 6.16 1 m' Pasang pagar beton pracetak (5 x 50 x 213) cm

6.16.1. Bahan
- Panel beton pracetak 0.986 Lbr x Rp 261,000 = Rp 257,346.00
- Kolom beton pracetak 0.525 Btg x Rp 261,000 = Rp 137,025.00
- Pasir beton 0.074 M³ x Rp 273,000 = Rp 20,202.00
- Koral 2/3 0.146 M³ x Rp 270,000 = Rp 39,420.00
- Batu Bata biasa 5x10x20 cm 45.000 Kg x Rp 1,500 = Rp 67,500.00
Jumlah (1) = Rp 521,493.00

6.16.2. Tenaga
- Pekerja 0.042 Oh x Rp 90,000 = Rp 3,780.00
- Kepala tukang 0.004 Oh x Rp 130,000 = Rp 520.00
- Tukang 0.042 Oh x Rp 120,000 = Rp 5,040.00
- Mandor 0.002 Oh x Rp 130,000 = Rp 260.00
Jumlah (2) = Rp 9,600.00

Jumlah = Rp 531,093.00
Keuntungan+Over head 10% = Rp 53,109.30
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 584,202.30
ANALISA BIAYA KONSTRUKSI
PEKERJAAN TANAH

PT 6.1. 1 m³ Galian tanah biasa sedalam 1 meter

6.1.1. Tenaga
- Pekerja 0.750 Oh x Rp. 90,000 = Rp. 67,500.00
- Mandor 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
Jumlah (1) = Rp. 70,750.00
Keuntungan+Over head 10% = Rp 7,075.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 77,825.00

PT 6.2. 1 m³ Galian tanah biasa sedalam 2 meter

6.2.1. Tenaga
- Pekerja 0.900 Oh x Rp. 90,000 = Rp. 81,000.00
- Mandor 0.0450 Oh x Rp. 130,000 = Rp. 5,850.00
Jumlah (1) = Rp. 86,850.00
Keuntungan+Over head 10% = Rp 8,685.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 95,535.00

PT 6.3. 1 m³ Galian tanah biasa sedalam 3 meter

6.3.1. Tenaga
- Pekerja 1.050 Oh x Rp. 90,000 = Rp. 94,500.00
- Mandor 0.0670 Oh x Rp. 130,000 = Rp. 8,710.00
Jumlah (1) = Rp. 103,210.00
Keuntungan+Over head 10% = Rp 10,321.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 113,531.00

PT 6.4. 1 m³ Galian tanah keras sedalam 1 meter

6.4. Tenaga
- Pekerja 1.000 Oh x Rp. 90,000 = Rp. 90,000.00
- Mandor 0.032 Oh x Rp. 130,000 = Rp. 4,160.00
Jumlah (1) = Rp. 94,160.00
Keuntungan+Over head 10% = Rp 9,416.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 103,576.00

PT 6.5. 1 m³ Galian tanah cadas sedalam 1 meter

6.5.1. Tenaga
- Pekerja 1.500 Oh x Rp. 90,000 = Rp. 135,000.00
- Mandor 0.060 Oh x Rp. 130,000 = Rp. 7,800.00
Jumlah (1) = Rp. 142,800.00
Keuntungan+Over head 10% = Rp 14,280.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 157,080.00

PT 6.6. 1 m³ Galian tanah lumpur sedalam 1 meter

6.6.1. Tenaga
- Pekerja 1.200 Oh x Rp. 90,000 = Rp. 108,000.00
- Mandor 0.045 Oh x Rp. 130,000 = Rp. 5,850.00
Jumlah (1) = Rp. 113,850.00
Keuntungan+Over head 10% = Rp 11,385.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 125,235.00

PT 6.7. 1 m² Pekerjaan stripping setinggi 1 meter

6.7.1. Tenaga
- Pekerja 0.050 Oh x Rp. 90,000 = Rp. 4,500.00
- Mandor 0.005 Oh x Rp. 130,000 = Rp. 650.00
Jumlah (1) = Rp. 5,150.00
Keuntungan+Over head 10% = Rp 515.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 5,665.00

PT 6.8. 1 m³ Pembuangan tanah sejauh 150 meter

6.8.1. Tenaga
- Pekerja 0.515 Oh x Rp. 90,000 = Rp. 46,350.00
- Mandor 0.0515 Oh x Rp. 130,000 Rp. 6,695.00
Jumlah (1) = Rp. 53,045.00
Keuntungan+Over head 10% = Rp 5,304.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 58,349.50

PT 6.9. 1 m³ Urugan kembali

6.9.1. Tenaga
- Pekerja 0.252 Oh x Rp. 90,000 = Rp. 22,680.00
- Mandor 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
Jumlah (1) = Rp. 23,720.00
Keuntungan+Over head 10% = Rp 2,372.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 26,092.00

PT 6.10. 1 m³ Pemadatan tanah

6.10.1. Tenaga
- Pekerja 0.500 Oh x Rp. 90,000 = Rp. 45,000.00
- Mandor 0.050 Oh x Rp. 130,000 = Rp. 6,500.00
Jumlah (1) = Rp. 51,500.00
Keuntungan+Over head 10% = Rp 5,150.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 56,650.00

PT 6.11. 1 m³ Urugan pasir

6.11.1. Bahan
- Pasir urug 1.200 M³ x Rp. 261,000 = Rp. 313,200.00
Jumlah (1) = Rp. 313,200.00

6.11.2. Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp. 27,000.00
- Mandor 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
Jumlah (2) = Rp. 28,300.00

Jumlah (1) + (2) = Rp. 341,500.00


Keuntungan+Over head 10% = Rp 34,150.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 375,650.00

PT 6.12. 1 m³ Lapisan pudel campuran 1 Kp : 3 Ps : 7 TL

6.12.1. Bahan
- Pasir urug 0.400 M³ x Rp. 261,000 = Rp. 104,400.00
- Kapur padam 0.135 M³ x Rp. 1,840 = Rp. 248.40
- Tanah liat 0.948 M³ x Rp. 100,000 = Rp. 94,800.00
Jumlah (1) = Rp. 199,448.40

6.12.2. Tenaga
- Pekerja 0.800 Oh x Rp. 90,000 = Rp. 72,000.00
- Tukang 0.400 Oh x Rp. 120,000 = Rp. 48,000.00
- Kepala Tukang 0.040 Oh x Rp. 130,000 = Rp. 5,200.00
- Mandor 0.080 Oh x Rp. 130,000 = Rp. 10,400.00
Jumlah (2) = Rp. 135,600.00

Jumlah (1) + (2) = Rp. 335,048.40


Keuntungan+Over head 10% = Rp 33,504.84
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 368,553.24

PT 6.13. 1 m³ Lapisan pudel campuran 1 Kp : 5 TL

6.13.1. Bahan
- Kapur padam 0.200 M³ x Rp. 1,840 = Rp. 368.00
- Tanah liat 1.000 M³ x Rp. 100,000 = Rp. 100,000.00
Jumlah (1) = Rp. 100,368.00

6.13.2. Tenaga
- Pekerja 0.500 Oh x Rp. 90,000 = Rp. 45,000.00
- Mandor 0.050 Oh x Rp. 130,000 = Rp. 6,500.00
Jumlah (2) = Rp. 51,500.00

Jumlah (1) + (2) = Rp. 151,868.00


Keuntungan+Over head 10% = Rp 15,186.80
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 167,054.80

PT 6.14. 1 m³ Pembuatan jalan sementara, tebal 25 cm

6.14.1. Bahan
- Batu belah 10/15 0.275 M³ x Rp. 239,000 = Rp. 65,725.00
- Batu koral 5/7 0.030 M³ x Rp. 170,900 = Rp. 5,127.00
- Pasir pasang 0.050 M³ x Rp. 273,000 = Rp. 13,650.00
Jumlah (1) = Rp. 84,502.00

6.14.2. Tenaga

- Pekerja 0.500 Oh x Rp. 90,000 = Rp. 45,000.00


- Mandor 0.050 Oh x Rp. 130,000 = Rp. 6,500.00
Jumlah (2) = Rp. 51,500.00

Jumlah (1) + (2) = Rp. 136,002.00


Keuntungan+Over head 10% = Rp 13,600.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 149,602.20
ANALISA BIAYA KONSTRUKSI
PEKERJAAN PONDASI

PP 6.1. 1 M³ Pasangan pondasi batu kali, 1 Pc : 1 Ps

6.1.1. Bahan :
- Batu belah 15/20 1.100 M³ x Rp. 239,000.00 = Rp. 262,900.00
- Semen porland 392.000 Kg x Rp. 1,500.00 = Rp. 588,000.00
- Pasir pasang 0.314 M³ x Rp. 273,000.00 = Rp. 85,722.00
Jumlah (1) = Rp. 936,622.00

6.1.2. Tenaga
- Pekerja 1.500 Oh x Rp. 90,000.00 = Rp. 135,000.00
- Tukang batu 0.600 Oh x Rp. 120,000.00 = Rp. 72,000.00
- Kepala tukang 0.060 Oh x Rp. 130,000.00 = Rp. 7,800.00
- Mandor 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
Jumlah (2) = Rp. 224,550.00

Jumlah (1) + (2) = Rp. 1,161,172.00


Keuntungan+Over head 10% = Rp 116,117.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,277,289.20

PP 6.2. 1 M³ Pasang pondasi batu kali 1 Pc : 2 Ps

6.2.1. Bahan
- Batu belah 15/20 cm 1.100 M³ x Rp. 239,000.00 = Rp. 262,900.00
- Semen porland 267.000 Kg x Rp. 1,500.00 = Rp. 400,500.00
- Pasir Pasang 0.427 M³ x Rp. 273,000.00 = Rp. 116,571.00
Jumlah (1) = Rp. 779,971.00

6.2.2. Tenaga
- Pekerja 1.500 Oh x Rp. 90,000.00 = Rp. 135,000.00
- Tukang batu 0.600 Oh x Rp. 120,000.00 = Rp. 72,000.00
- Kepala tukang 0.060 Oh x Rp. 130,000.00 = Rp. 7,800.00
- Mandor 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
Jumlah (2) = Rp. 224,550.00

Jumlah (1) +(2) = Rp. 1,004,521.00


Keuntungan+Over head 10% = Rp 100,452.10
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,104,973.10

PP 6.3. 1 M³ Pasang pondasi batu kali, 1 Pc : 2,5 Ps

6.3.1. Bahan
- Batu belah 15/20 cm 1.100 M³ x Rp. 239,000.00 = Rp. 262,900.00
- Semen porland 392.000 Kg x Rp. 1,500.00 = Rp. 588,000.00
- Pasir Pasang 0.314 M³ x Rp. 273,000.00 = Rp. 85,722.00
Jumlah (1) = Rp. 936,622.00

6.3.2. Tenaga
- Pekerja 1.500 Oh x Rp. 90,000.00 = Rp. 135,000.00
- Tukang batu 0.600 Oh x Rp. 120,000.00 = Rp. 72,000.00
- Kepala tukang 0.060 Oh x Rp. 130,000.00 = Rp. 7,800.00
- Mandor 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
Jumlah (2) = Rp. 224,550.00
Jumlah (1) +(2) = Rp. 1,161,172.00
Keuntungan+Over head 10% = Rp 116,117.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,277,289.20

PP 6.4. 1 M³ Pasang pondasi batu kali, 1 Pc : 3 Ps

6.4.1. Bahan
- Batu belah 15/20 cm 1.200 M³ x Rp. 239,000.00 = Rp. 286,800.00
- Semen porland 202.000 Kg x Rp. 1,500.00 = Rp. 303,000.00
- Pasir Pasang 0.485 M³ x Rp. 273,000.00 = Rp. 132,405.00
Jumlah (1) = Rp. 722,205.00

6.4.2. Tenaga
- Pekerja 1.500 Oh x Rp. 90,000.00 = Rp. 135,000.00
- Tukang batu 0.750 Oh x Rp. 120,000.00 = Rp. 90,000.00
- Kepala tukang 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
- Mandor 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
Jumlah (2) = Rp. 244,500.00

Jumlah (1) +(2) = Rp. 966,705.00


Keuntungan+Over head 10% = Rp 96,670.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,063,375.50

PP 6.5. 1 M³ Pasang pondasi batu kali, 1 Pc : 4 Ps.

6.5.1. Bahan
- Batu belah 15/20 cm 1.200 M³ x Rp. 239,000.00 = Rp. 286,800.00
- Semen porland 163.000 Kg x Rp. 1,500.00 = Rp. 244,500.00
- Pasir Pasang 0.520 M³ x Rp. 273,000.00 = Rp. 141,960.00
Jumlah (1) = Rp. 673,260.00

6.5.2. Tenaga
- Pekerja 1.500 Oh x Rp. 90,000.00 = Rp. 135,000.00
- Tukang batu 0.750 Oh x Rp. 120,000.00 = Rp. 90,000.00
- Kepala tukang 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
- Mandor 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
Jumlah (2) = Rp. 244,500.00

Jumlah (1) +(2) = Rp. 917,760.00


Keuntungan+Over head 10% = Rp 91,776.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,009,536.00

PP 6.6. 1 M³ Pasang pondasi batu kali, 1 Pc : 5 Ps

6.6.1. Bahan
- Batu belah 15/20 cm 1.200 M³ x Rp. 239,000.00 = Rp. 286,800.00
- Semen porland 136.000 Kg x Rp. 1,500.00 = Rp. 204,000.00
- Pasir Pasang 0.544 M³ x Rp. 273,000.00 = Rp. 148,512.00
Jumlah (1) = Rp. 639,312.00

6.6.2. Tenaga
- Pekerja 1.500 Oh x Rp. 90,000.00 = Rp. 135,000.00
- Tukang batu 0.750 Oh x Rp. 120,000.00 = Rp. 90,000.00
- Kepala tukang 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
- Mandor 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
Jumlah (2) 244,500.00

Jumlah (1) +(2) 883,812.00


Keuntungan+Over head 10% = Rp 88,381.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 972,193.20

PP 6.7. 1 M³ Pasang pondasi batu kali, 1 Pc : 6 Ps

6.7.1. Bahan
- Batu belah 15/20 cm 1.200 M³ x Rp. 239,000.00 = Rp. 286,800.00
- Semen porland 117.000 Kg x Rp. 1,500.00 = Rp. 175,500.00
- Pasir Pasang 0.561 M³ x Rp. 273,000.00 = Rp. 153,153.00
Jumlah (1) = Rp. 615,453.00
6.7.2. Tenaga
- Pekerja 1.500 Oh x Rp. 90,000.00 = Rp. 135,000.00
- Tukang batu 0.750 Oh x Rp. 120,000.00 = Rp. 90,000.00
- Kepala tukang 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
- Mandor 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
Jumlah (2) = Rp. 244,500.00

Jumlah (1) +(2) 859,953.00


Keuntungan+Over head 10% = Rp 85,995.30
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 945,948.30

PP 6.8. 1 M³ Pasang pondasi batu kali, Pc : 8 Ps

6.8.1. Bahan
- Batu belah 15/20 cm 1.200 M³ x Rp. 239,000.00 = Rp. 286,800.00
- Semen porland 91.000 Kg x Rp. 1,500.00 = Rp. 136,500.00
- Pasir Pasang 0.584 M³ x Rp. 273,000.00 = Rp. 159,432.00
Jumlah (1) = Rp. 582,732.00

6.8.2. Tenaga
- Pekerja 1.500 Oh x Rp. 90,000.00 = Rp. 135,000.00
- Tukang batu 0.750 Oh x Rp. 120,000.00 = Rp. 90,000.00
- Kepala tukang 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
- Mandor 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
Jumlah (2) = Rp. 244,500.00

Jumlah (1) +(2) = Rp. 827,232.00


Keuntungan+Over head 10% = Rp 82,723.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 909,955.20

PP 6.9. 1 M³ Pasang pondasi batu kosong

6.9.1. Bahan
- Batu belah 10/15 cm 1.200 M³ x Rp. 239,000.00 = Rp. 286,800.00
- Pasir pasang 0.432 M³ x Rp. 273,000.00 = Rp. 117,936.00
Jumlah (1) = Rp. 404,736.00
6.9.2. Tenaga
- Pekerja 0.780 Oh x Rp. 90,000.00 = Rp. 70,200.00
- Tukang batu 0.390 Oh x Rp. 120,000.00 = Rp. 46,800.00
- Kepala tukang 0.039 Oh x Rp. 130,000.00 = Rp. 5,070.00
- Mandor 0.039 Oh x Rp. 130,000.00 = Rp. 5,070.00
Jumlah (2) = Rp. 127,140.00

Jumlah (1) +(2) = Rp. 531,876.00


Keuntungan+Over head 10% = Rp 53,187.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 585,063.60

PP 6.10. 1 M³ Pasang pondasi siklop 40 % batu kali

6.10.1.Bahan
- Besi beton 126.000 Kg x Rp. 11,000.00 = Rp. 1,386,000.00
- Semen portland 194.000 Kg x Rp. 1,500.00 = Rp. 291,000.00
- Pasir beton 0.312 Kg x Rp. 273,000.00 = Rp. 85,176.00
- Koral beton 0.468 M³ x Rp. 270,000.00 = Rp. 126,360.00
- Kawat beton 1.800 Kg x Rp. 16,500.00 = Rp. 29,700.00
- Batu belah 0.480 M³ x Rp. 239,000.00 = Rp. 114,720.00
Jumlah (1) = Rp. 1,918,236.00

6.10.2.Tenaga
- Pekerja 3.400 Oh x Rp. 90,000.00 = Rp. 306,000.00
- Tukang batu 0.850 Oh x Rp. 120,000.00 = Rp. 102,000.00
- Kepala tukang 0.085 Oh x Rp. 130,000.00 = Rp. 11,050.00
- Mandor 0.170 Oh x Rp. 130,000.00 = Rp. 22,100.00
Jumlah (2) = Rp. 441,150.00

Jumlah (1) +(2) = Rp. 2,359,386.00


Keuntungan+Over head 10% = Rp 235,938.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 2,595,324.60

PP 6.11. 1 M³ Pasang pondasi sumuran diameter 100 Cm

6.11.1. Bahan
- Batu belah 15/20 cm 0.450 M³ x Rp. 239,000.00 = Rp. 107,550.00
- Semen portland 194.000 Kg x Rp. 1,500.00 = Rp. 291,000.00
- Pasir Pasang 0.312 M³ x Rp. 273,000.00 = Rp. 85,176.00
- Kerikil 0.468 M³ x Rp. 270,000.00 = Rp. 126,360.00
Jumlah (1) = Rp. 483,726.00

6.11.2. Tenaga
- Pekerja 2.400 Oh x Rp. 90,000.00 = Rp. 216,000.00
- Tukang batu 0.800 Oh x Rp. 120,000.00 = Rp. 96,000.00
- Kepala tukang 0.080 Oh x Rp. 130,000.00 = Rp. 10,400.00
- Mandor 0.119 Oh x Rp. 130,000.00 = Rp. 15,470.00
Jumlah (2) = Rp. 337,870.00

Jumlah (1) +(2) = Rp. 821,596.00


Keuntungan+Over head 10% = Rp 82,159.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 903,755.60

PP 6.12. 1 M³ Pembuatan tiang pancang (40 x 40) Cm, beton bertulang

6.12.1.Bahan
- Pasir urug darat 0.019 M³ x Rp. 261,000.00 = Rp. 4,959.00
- Pasir beton 0.094 M³ x Rp. 273,000.00 = Rp. 25,662.00
- Koral beton 0.150 M³ x Rp. 270,000.00 = Rp. 40,500.00
- Semen porland 60.500 Kg x Rp. 1,500.00 = Rp. 90,750.00
- Besi beton 45.000 Kg x Rp. 11,000.00 = Rp. 495,000.00
- Kawat beton 0.900 Kg x Rp. 16,500.00 = Rp. 14,850.00
- Kayu kaso 5/7 0.032 M³ x Rp. 2,005,476.96 = Rp. 64,175.26
- Paku 0.120 Kg x Rp. 15,000.00 = Rp. 1,800.00
- Minyak bekisting 0.090 Lt x Rp. 3,600.00 = Rp. 324.00
- Plamur tembok 0.240 Kg x Rp. 18,500.00 = Rp. 4,440.00
Jumlah (1) = Rp. 742,460.26
6.12.2.Tenaga
- Pekerja 1.000 Oh x Rp. 90,000.00 = Rp. 90,000.00
- Tukang batu 0.670 Oh x Rp. 120,000.00 = Rp. 80,400.00
- Kepala tukang 0.067 Oh x Rp. 130,000.00 = Rp. 8,710.00
- Mandor 0.050 Oh x Rp. 130,000.00 = Rp. 6,500.00
Jumlah (2) = Rp. 185,610.00

Jumlah (1) +(2) = Rp. 928,070.26


Keuntungan+Over head 10% = Rp 92,807.03
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,020,877.29

PP 6.13. 1 M³ Pembuatan tiang pancang (35 x 35) Cm, beton bertulang

6.13.1.Bahan
- Pasir urug darat 0.016 M³ x Rp. 261,000.00 = Rp. 4,176.00
- Pasir beton 0.080 M³ x Rp. 273,000.00 = Rp. 21,840.00
- Koral beton 0.125 M³ x Rp. 270,000.00 = Rp. 33,750.00
- Semen porland 49.000 Kg x Rp. 1,500.00 = Rp. 73,500.00
- Besi beton 34.500 Kg x Rp. 11,000.00 = Rp. 379,500.00
- Kawat beton 0.700 Kg x Rp. 16,500.00 = Rp. 11,550.00
- Kayu kaso 5/7 0.027 M³ x Rp. 2,005,476.96 = Rp. 54,147.88
- Paku 0.120 Kg x Rp. 15,000.00 = Rp. 1,800.00
- Minyak bekisting 0.090 Lt x Rp. 3,600.00 = Rp. 324.00
- Plamur tembok 0.200 Kg x Rp. 18,500.00 = Rp. 3,700.00
Jumlah (1) = Rp. 584,287.88

6.13.2.Tenaga
- Pekerja 0.800 Oh x Rp. 90,000.00 = Rp. 72,000.00
- Tukang batu 0.500 Oh x Rp. 120,000.00 = Rp. 60,000.00
- Kepala tukang 0.050 Oh x Rp. 130,000.00 = Rp. 6,500.00
- Mandor 0.040 Oh x Rp. 130,000.00 = Rp. 5,200.00
Jumlah (2) = Rp. 143,700.00

Jumlah (1) +(2) = Rp. 727,987.88


Keuntungan+Over head 10% = Rp 72,798.79
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 800,786.67
ANALISA BIAYA KONSTRUKSI
PEKERJAAN DINDING

PD 6.1. 1 M² Pasangan bata merah tebal 1 bata, 1 Pc : 1 Ps

6.1.1. Bahan
- Bata merah 5 x 11 x 22 cm 140.000 Bh x Rp. 1,000 = Rp 140,000.00
- Semen portland 64.030 Kg x Rp. 1,500 = Rp 96,045.00
- Pasir pasang 0.059 M³ x Rp. 273,000 = Rp 16,107.00
Jumlah (1) = Rp 252,152.00

6.1.2 Tenaga
- Pekerja 0.600 Oh x Rp. 90,000 = Rp 54,000.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp 2,600.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp 3,900.00
Jumlah (2) = Rp 84,500.00

Jumlah (1) + (2) = Rp 336,652.00


Keuntungan+Over head 10% = Rp 33,665.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 370,317.20

PD 6.2 1m² Pasangan bata merah tebal 1 bata, 1Pc : 2 Ps

6.2.1 Bahan
- Bata merah 5 x 11 x 22 cm 140.000 Bh x Rp. 1,000 = Rp 140,000.00
- Semen portland 43.500 Kg x Rp. 1,500 = Rp 65,250.00
- Pasir pasang 0.080 M³ x Rp. 273,000 = Rp 21,840.00
Jumlah (1) = Rp 227,090.00

6.2.2 Tenaga
- Pekerja 0.600 Oh x Rp. 90,000 = Rp 54,000.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp 2,600.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp 3,900.00
Jumlah (2) = Rp 84,500.00

Jumlah (1) + (2) = Rp 311,590.00


Keuntungan+Over head 10% = Rp 31,159.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 342,749.00

PD 6.3 1 m² Pasangan bata merah tebal 1 bata, 1Pc : 3 Ps

6.3.1 Bahan
- Bata merah 5 x 11 x 22 cm 140.000 Bh x Rp. 1,000 = Rp 140,000.00
- Semen portland 32.950 Kg x Rp. 1,500 = Rp 49,425.00
- Pasir pasang 0.091 M³ x Rp. 273,000 = Rp 24,843.00
Jumlah (1) = Rp 214,268.00

6.3.2 Tenaga
- Pekerja 0.600 Oh x Rp. 90,000 = Rp 54,000.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp 2,600.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp 3,900.00
Jumlah (2) = Rp 84,500.00
Jumlah (1) + (2) = Rp 298,768.00
Keuntungan+Over head 10% = Rp 29,876.80
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 328,644.80

PD 6.4 1 m² Pasangan bata merah tebal 1 bata, 1Pc : 4 Ps

6.4.1 Bahan
- Bata merah 5 x 11 x 22 cm 140.000 Bh x Rp. 1,000 = Rp 140,000.00
- Semen portland 26.550 Kg x Rp. 1,500 = Rp 39,825.00
- Pasir pasang 0.093 M³ x Rp. 273,000 = Rp 25,389.00
Jumlah (1) = Rp 205,214.00

6.4.2 Tenaga
- Pekerja 0.600 Oh x Rp. 90,000 = Rp 54,000.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp 2,600.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp 54,000.00
Jumlah (2) = Rp 80,600.00

Jumlah (1) + (2) = Rp 285,814.00


Keuntungan+Over head 10% = Rp 28,581.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 314,395.40

PD 6.5 1 m² Pasangan bata merah tebal 1 bata, 1Pc : 5 Ps

6.5.1 Bahan
- Bata merah 5 x 11 x 22 cm 140.000 Bh x Rp. 1,000 = Rp 140,000.00
- Semen portland 22.200 Kg x Rp. 1,500 = Rp 33,300.00
- Pasir pasang 0.102 M³ x Rp. 273,000 = Rp 27,846.00
Jumlah (1) = Rp 201,146.00

6.5.2 Tenaga
- Pekerja 0.600 Oh x Rp. 90,000 = Rp 54,000.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp 0.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp 0.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp 3,900.00
Jumlah (2) = Rp 57,900.00

Jumlah (1) + (2) = Rp 259,046.00


Keuntungan+Over head 10% = Rp 25,904.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 284,950.60

PD 6.6 1 m² Pasangan bata merah tebal 1 bata, 1Pc : 6 Ps

6.6.1 Bahan
- Bata merah 5 x 11 x 22 cm 140.000 Bh x Rp. 1,000 = Rp 140,000.00
- Semen portland 18.500 Kg x Rp. 1,500 = Rp 27,750.00
- Pasir pasang 0.122 M³ x Rp. 273,000 = Rp 33,306.00
Jumlah (1) = Rp 201,056.00

6.6.2 Tenaga
- Pekerja 0.600 Oh x Rp. 90,000 = Rp 54,000.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp 2,600.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp 3,900.00
Jumlah (2) = Rp 84,500.00

Jumlah (1) + (2) = Rp 285,556.00


Keuntungan+Over head 10% = Rp 28,555.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 314,111.60

PD 6.7 1 m² Pasangan bata merah tebal 1 bata, 1Pc : 10 Ps

6.7.1 Bahan
- Bata merah 5 x 11 x 22 cm 140.000 Bh x Rp. 1,000 = Rp 140,000.00
- Semen portland 10.080 Kg x Rp. 1,500 = Rp 15,120.00
- Pasir pasang 0.0925 M³ x Rp. 273,000 = Rp 25,252.50
Jumlah (1) = Rp 40,372.50

6.7.2 Tenaga
- Pekerja 0.600 Oh x Rp. 90,000 = Rp 54,000.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp 2,600.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp 3,900.00
Jumlah (2) = Rp 84,500.00

Jumlah (1) + (2) = Rp 124,872.50


Keuntungan+Over head 10% = Rp 12,487.25
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 137,359.75

PD 6.8 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 1 Ps

6.8.1 Bahan
- Bata merah 5 x 11 x 22 cm 70.000 Bh x Rp. 1,000 = Rp 70,000.00
- Semen portland 27.800 Kg x Rp. 1,500 = Rp 41,700.00
- Pasir pasang 0.028 M³ x Rp. 273,000 = Rp 7,644.00
Jumlah (1) = Rp 119,344.00

6.8.2 Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp 27,000.00
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp 1,300.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp 1,950.00
Jumlah (2) = Rp 42,250.00

Jumlah (1) + (2) = Rp 161,594.00


Keuntungan+Over head 10% = Rp 16,159.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 177,753.40

PD 6.9 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 2 Ps

6.9.1 Bahan
- Bata merah 5 x 11 x 22 cm 70.000 Bh x Rp. 1,000 = Rp 70,000.00
- Semen portland 18.950 Kg x Rp. 1,500 = Rp 28,425.00
- Pasir pasang 0.038 M³ x Rp. 273,000 = Rp 10,374.00
Jumlah (1) = Rp 108,799.00

6.9.2 Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp 27,000.00
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp 1,300.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp 1,950.00
Jumlah (2) = Rp 42,250.00

Jumlah (1) + (2) = Rp 151,049.00


Keuntungan+Over head 10% = Rp 15,104.90
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 166,153.90

PD 6.10 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 3 Ps

6.10.1 Bahan
- Bata merah 5 x 11 x 22 cm 70.000 Bh x Rp. 1,000 = Rp 70,000.00
- Semen portland 14.370 Kg x Rp. 1,500 = Rp 21,555.00
- Pasir pasang 0.040 M³ x Rp. 273,000 = Rp 10,920.00
Jumlah (1) = Rp 102,475.00

6.10.2 Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp 27,000.00
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp 1,300.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp 1,950.00
Jumlah (2) = Rp 42,250.00

Jumlah (1) + (2) = Rp 144,725.00


Keuntungan+Over head 10% = Rp 14,472.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 159,197.50

PD 6.11 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 4 Ps

6.11.1 Bahan
- Bata merah 5 x 11 x 22 cm 70.000 Bh x Rp. 1,000 = Rp 70,000.00
- Semen portland 11.500 Kg x Rp. 1,500 = Rp 17,250.00
- Pasir pasang 0.043 M³ x Rp. 273,000 = Rp 11,739.00
Jumlah (1) = Rp 98,989.00

6.11.2 Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp 27,000.00
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp 1,300.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp 1,950.00
Jumlah (2) = Rp 42,250.00

Jumlah (1) + (2) = Rp 141,239.00


Keuntungan+Over head 10% = Rp 14,123.90
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 155,362.90

PD 6.12 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 5 Ps

6.12.1 Bahan
- Bata merah 5 x 11 x 22 cm 70.000 Bh x Rp. 1,000 = Rp 70,000.00
- Semen portland 9.680 Kg x Rp. 1,500 = Rp 14,520.00
- Pasir pasang 0.045 M³ x Rp. 273,000 = Rp 12,285.00
Jumlah (1) = Rp 96,805.00
6.12.2 Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp 27,000.00
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp 1,300.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp 1,950.00
Jumlah (2) = Rp 42,250.00

Jumlah (1) + (2) = Rp 139,055.00


Keuntungan+Over head 10% = Rp 13,905.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 152,960.50

PD 6.13 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 6 Ps

6.13.1 Bahan
- Bata merah 5 x 11 x 22 cm 70.000 Bh x Rp. 1,000 = Rp 70,000.00
- Semen portland 8.320 Kg x Rp. 1,500 = Rp 12,480.00
- Pasir pasang 0.049 M³ x Rp. 273,000 = Rp 13,377.00
Jumlah (1) = Rp 95,857.00

6.13.2 Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp 27,000.00
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp 1,300.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp 1,950.00
Jumlah (2) = Rp 42,250.00

Jumlah (1) + (2) = Rp 138,107.00


Keuntungan+Over head 10% = Rp 13,810.70
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 151,917.70

PD 6.14 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 8 Ps

6.14.1 Bahan
- Bata merah 5 x 11 x 22 cm 70.000 Bh x Rp. 1,000 = Rp 70,000.00
- Semen portland 6.500 Kg x Rp. 1,500 = Rp 9,750.00
- Pasir pasang 0.050 M³ x Rp. 273,000 = Rp 13,650.00
Jumlah (1) = Rp 93,400.00

6.14.2 Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp 27,000.00
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp 1,300.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp 1,950.00
Jumlah (2) = Rp 42,250.00

Jumlah (1) + (2) = Rp 135,650.00


Keuntungan+Over head 10% = Rp 13,565.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 149,215.00

PD 6.15 1 m² Pasangan dinding holowblock (HB.20)

6.15.1 Bahan
- Hollow block (HB.20) 12.500 Bh x Rp. 3,000 = Rp 37,500.00
- Semen portland 13.500 Kg x Rp. 1,500 = Rp 20,250.00
- Pasir pasang 0.048 M³ x Rp. 273,000 = Rp 13,104.00
- Besi beton polos 1.950 M³ x Rp. 11,000 = Rp 21,450.00
Jumlah (1) = Rp 92,304.00

6.15.2 Tenaga
- Pekerja 0.350 Oh x Rp. 90,000 = Rp 31,500.00
- Tukang batu 0.150 Oh x Rp. 120,000 = Rp 18,000.00
- Kepala tukang 0.015 Oh x Rp. 130,000 = Rp 1,950.00
- Mandor 0.018 Oh x Rp. 130,000 = Rp 2,340.00
Jumlah (2) = Rp 53,790.00

Jumlah (1) + (2) = Rp 146,094.00


Keuntungan+Over head 10% = Rp 14,609.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 160,703.40

PD 6.16 1 m² Pasangan dinding holowblock (HB.15)

6.16.1 Bahan
- Hollow block (HB.15) 12.500 Bh x Rp. 3,000 = Rp 37,500.00
- Semen portland 10.450 Kg x Rp. 1,500 = Rp 15,675.00
- Pasir pasang 0.038 M³ x Rp. 273,000 = Rp 10,374.00
- Besi beton polos 1.950 M³ x Rp. 11,000 = Rp 21,450.00
Jumlah (1) = Rp 84,999.00

6.16.2 Tenaga
- Pekerja 0.320 Oh x Rp. 90,000 = Rp 28,800.00
- Tukang batu 0.120 Oh x Rp. 120,000 = Rp 14,400.00
- Kepala tukang 0.012 Oh x Rp. 130,000 = Rp 1,560.00
- Mandor 0.016 Oh x Rp. 130,000 = Rp 2,080.00
Jumlah (2) = Rp 46,840.00

Jumlah (1) + (2) = Rp 131,839.00


Keuntungan+Over head 10% = Rp 13,183.90
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 145,022.90

PD 6.17 1 m² Pasangan dinding holowblock (HB.10)

6.17.1 Bahan
- Hollow block (HB.10) 12.500 Bh x Rp. 17,330 = Rp 216,625.00
- Semen portland 7.500 Kg x Rp. 1,500 = Rp 11,250.00
- Pasir pasang 0.027 M³ x Rp. 273,000 = Rp 7,371.00
- Besi beton polos 1.950 M³ x Rp. 11,000 = Rp 21,450.00
Jumlah (1) = Rp 256,696.00

6.17.2 Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp 27,000.00
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp 1,300.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp 1,950.00
Jumlah (2) = Rp 42,250.00

Jumlah (1) + (2) = Rp 298,946.00


Keuntungan+Over head 10% = Rp 29,894.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 328,840.60
PD 6.18 1 m² Pasangan dinding conblock (CB.20)

6.18.1 Bahan
- Concrete block (CB 20) 12.500 Bh x Rp. 11,000 = Rp 137,500.00
- Semen portland 14.050 Kg x Rp. 1,500 = Rp 21,075.00
- Pasir beton 0.004 M³ x Rp. 273,000 = Rp 1,092.00
- Pasir pasang 0.042 M³ x Rp. 273,000 = Rp 11,466.00
- Besi beton polos 3.870 Bh x Rp. 11,000 = Rp 42,570.00
- Paku biasa 2" - 5" 0.006 Kg x Rp. 15,000 = Rp 90.00
- Kayu sembarang 0.001 M³ x Rp. 2,005,477 = Rp 2,005.48
- Kawat beton 0.030 M³ x Rp. 16,500 = Rp 495.00
- Koral beton 0.005 M³ x Rp. 270,000 = Rp 1,350.00
Jumlah (1) = Rp 217,643.48

6.18.2 Tenaga
- Pekerja 0.370 Oh x Rp. 90,000 = Rp 33,300.00
- Tukang batu 0.157 Oh x Rp. 120,000 = Rp 18,840.00
- Tukang besi 0.007 Oh x Rp. 120,000 = Rp 840.00
- Kepala tukang 0.0164 Oh x Rp. 130,000 = Rp 2,132.00
- Mandor 0.0185 Oh x Rp. 130,000 = Rp 2,405.00
Jumlah (2) = Rp 57,517.00

Jumlah (1) + (2) = Rp 275,160.48


Keuntungan+Over head 10% = Rp 27,516.05
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 302,676.52

PD 6.19 1 m² Pasangan dinding Conblock (CB.15)

6.19.1 Bahan
- Concrete block (CB 15) 12.500 Bh x Rp. 7,000 = Rp 87,500.00
- Semen portland 10.460 Kg x Rp. 1,500 = Rp 15,690.00
- Pasir beton 0.003 M³ x Rp. 273,000 = Rp 819.00
- Pasir pasang 0.032 M³ x Rp. 273,000 = Rp 8,736.00
- Besi beton polos ø 8 mm 2.870 Bh x Rp. 11,000 = Rp 31,570.00
- Paku biasa 2" - 5" 0.004 Kg x Rp. 15,000 = Rp 60.00
- Kayu sembarang 0.001 M³ x Rp. 2,005,477 = Rp 2,005.48
- Kawat beton 0.020 M³ x Rp. 16,500 = Rp 330.00
- Koral beton 0.004 M³ x Rp. 270,000 = Rp 1,080.00
Jumlah (1) = Rp 147,790.48

6.19.2 Tenaga
- Pekerja 0.340 Oh x Rp. 90,000 = Rp 30,600.00
- Tukang batu 0.130 Oh x Rp. 120,000 = Rp 15,600.00
- Tukang besi 0.007 Oh x Rp. 120,000 = Rp 840.00
- Kepala tukang 0.0137 Oh x Rp. 130,000 = Rp 1,781.00
- Mandor 0.017 Oh x Rp. 130,000 = Rp 2,210.00
Jumlah (2) = Rp 51,031.00

Jumlah (1) + (2) = Rp 198,821.48


Keuntungan+Over head 10% = Rp 19,882.15
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 218,703.62

PD 6.20 1 m² Pasangan dinding Conblock (CB.10)


6.20.1 Bahan
- Concrete block (CB 10) 12.500 Bh x Rp. 5,000 = Rp 62,500.00
- Semen portland 7.200 Kg x Rp. 1,500 = Rp 10,800.00
- Pasir beton 0.002 M³ x Rp. 273,000 = Rp 546.00
- Pasir pasang 0.021 M³ x Rp. 273,000 = Rp 5,733.00
- Besi beton polos 2.540 Bh x Rp. 11,000 = Rp 27,940.00
- Paku biasa 2" - 5" 0.003 Kg x Rp. 15,000 = Rp 45.00
- Kayu sembarang 0.001 M³ x Rp. 2,005,477 = Rp 2,005.48
- Kawat beton 0.015 M³ x Rp. 16,500 = Rp 247.50
- Koral beton 0.003 M³ x Rp. 270,000 = Rp 810.00
Jumlah (1) = Rp 110,626.98

6.20.2 Tenaga
- Pekerja 0.340 Oh x Rp. 90,000 = Rp 30,600.00
- Tukang batu 0.107 Oh x Rp. 120,000 = Rp 12,840.00
- Tukang besi 0.007 Oh x Rp. 120,000 = Rp 840.00
- Kepala tukang 0.0114 Oh x Rp. 130,000 = Rp 1,482.00
- Mandor 0.017 Oh x Rp. 130,000 = Rp 2,210.00
Jumlah (2) = Rp 47,972.00

Jumlah (1) + (2) = Rp 158,598.98


Keuntungan+Over head 10% = Rp 15,859.90
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 174,458.87

PD 6.21 1 m² Pasang dinding lantai

6.21.1 Bahan
- Bondbeam 40 x 20 x 20 cm 2.500 Bh x Rp. 21,000 = Rp 52,500.00
- Semen portland 5.100 Kg x Rp. 1,500 = Rp 7,650.00
- Pasir beton 0.080 M³ x Rp. 273,000 = Rp 21,840.00
- Besi beton polos 1.500 Kg x Rp. 11,000 = Rp 16,500.00
- Koral beton 0.150 M³ x Rp. 270,000 = Rp 40,500.00
Jumlah (1) = Rp 138,990.00

6.21.2 Tenaga
- Pekerja 0.100 Oh x Rp. 90,000 = Rp 9,000.00
- Tukang batu 0.030 Oh x Rp. 120,000 = Rp 3,600.00
- Tukang besi 0.030 Oh x Rp. 120,000 = Rp 3,600.00
- Kepala tukang 0.006 Oh x Rp. 130,000 = Rp 780.00
- Mandor 0.005 Oh x Rp. 130,000 = Rp 650.00
Jumlah (2) = Rp 17,630.00

Jumlah (1) + (2) = Rp 156,620.00


Keuntungan+Over head 10% = Rp 15,662.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 172,282.00

PD 6.22 1 m² Pasang dinding roster / terawang

6.22.1 Bahan
- Roster/terawang 36.000 Bh x Rp. 3,030 = Rp 109,080.00
- Semen portland 11.000 Kg x Rp. 1,500 = Rp 16,500.00
- Pasir pasang 0.035 M³ x Rp. 273,000 = Rp 9,555.00
Jumlah (1) = Rp 135,135.00

6.22.2 Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp 27,000.00
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp 1,300.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp 1,950.00
Jumlah (2) = Rp 42,250.00

Jumlah (1) + (2) = Rp 177,385.00


Keuntungan+Over head 10% = Rp 17,738.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 195,123.50

PD 6.23 1 m² Pasang bata berongga ukuran ( 5 x 10 x 20 ) cm

6.23.1 Bahan
- Batu berongga 80.000 Bh x Rp. 3,030 = Rp 242,400.00
- Semen portland 23.650 Kg x Rp. 1,500 = Rp 35,475.00
- Pasir pasang 0.570 M³ x Rp. 273,000 = Rp 155,610.00
Jumlah (1) = Rp 433,485.00

6.23.2 Tenaga
- Pekerja 0.320 Oh x Rp. 90,000 = Rp 28,800.00
- Tukang batu 0.150 Oh x Rp. 120,000 = Rp 18,000.00
- Kepala tukang 0.015 Oh x Rp. 130,000 = Rp 1,950.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp 1,950.00
Jumlah (2) = Rp 50,700.00

Jumlah (1) + (2) = Rp 484,185.00


Keuntungan+Over head 10% = Rp 48,418.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 532,603.50

PD 6.24 1 m² Pasang dinding anyaman bambu, rangka kayu

6.24.1 Bahan
- Bilik bambu 1.500 M² x Rp. 16,340 = Rp 24,510.00
- Kayu 5/7 0.014 M³ x Rp. 2,005,477 = Rp 28,076.68
- Paku 0.012 Kg x Rp. 15,000 = Rp 180.00
- List kayu 2/4 0.003 M³ x Rp. 2,005,477 = Rp 6,016.43
Jumlah (1) = Rp 58,783.11

6.24.2 Tenaga
- Pekerja 0.100 Oh x Rp. 90,000 = Rp 9,000.00
- Tukang batu 0.050 Oh x Rp. 120,000 = Rp 6,000.00
- Kepala tukang 0.005 Oh x Rp. 130,000 = Rp 650.00
- Mandor 0.002 Oh x Rp. 130,000 = Rp 260.00
Jumlah (2) = Rp 15,910.00

Jumlah (1) + (2) = Rp 74,693.11


Keuntungan+Over head 10% = Rp 7,469.31
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 82,162.42

PD 6.25 1 m² Pasang dinding bata ringan tebal 7,5 cm dengan mortar siap pakai

6.25.1 Bahan
- Bata ringan tebal 7,5 cm 8.400 M³ x Rp. 6,486 = Rp 54,486.49
- Mortar siap pakai 0.473 Kg x Rp. 1,695 = Rp 801.74

Jumlah (1) = Rp 55,288.22


6.25.2 Tenaga
- Pekerja 0.670 Oh x Rp. 90,000 = Rp 60,300.00
- Tukang batu 0.130 Oh x Rp. 120,000 = Rp 15,600.00
- Kepala tukang 0.013 Oh x Rp. 130,000 = Rp 1,690.00
- Mandor 0.013 Oh x Rp. 130,000 = Rp 1,690.00
Jumlah (2) = Rp 79,280.00

Jumlah (1) + (2) = Rp 134,568.22


Keuntungan+Over head 10% = Rp 13,456.82
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 148,025.04

PD 6.26 1 m² Pasang dinding bata ringan tebal 10 cm dengan mortar siap pakai

6.26.1 Bahan
- Bata ringan tebal 10 cm 8.400 M³ x Rp. 8,675 = Rp 72,867.47
- Mortar siap pakai 0.063 Kg x Rp. 1,695 = Rp 106.79

Jumlah (1) = Rp 72,974.25

6.26.2 Tenaga
- Pekerja 0.670 Oh x Rp. 90,000 = Rp 60,300.00
- Tukang batu 0.130 Oh x Rp. 120,000 = Rp 15,600.00
- Kepala tukang 0.013 Oh x Rp. 130,000 = Rp 1,690.00
- Mandor 0.013 Oh x Rp. 130,000 = Rp 1,690.00
Jumlah (2) = Rp 79,280.00

Jumlah (1) + (2) = Rp 152,254.25


Keuntungan+Over head 10% = Rp 15,225.43
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 167,479.68
ANALISA BIAYA KONSTRUKSI
PEKERJAAN PLESTERAN

PPL 6.1. 1 M² Plesteran 1 Pc : 1 Ps, tebal 15 mm

6.1.1. Bahan
- Semen portland 15.504 Kg x Rp. 1,500 = Rp. 23,256.00
- Pasir pasang 0.016 M³ x Rp. 273,000 = Rp. 4,368.00
Jumlah (1) = Rp. 27,624.00
6.1.2. Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp. 27,000.00
- Tukang batu 0.150 Oh x Rp. 120,000 = Rp. 18,000.00
- Kepala tukang 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
Jumlah (2) = Rp. 48,900.00

Jumlah (1) + (2) = Rp. 76,524.00


Keuntungan+Over head 10% = Rp 7,652.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 84,176.40

PPL 6.2. 1 M² Plesteran 1 Pc : 2 Ps, tebal 15 mm

6.2.1. Bahan
- Semen portland 10.224 Kg x Rp. 1,500 = Rp. 15,336.00
- Pasir pasang 0.020 M³ x Rp. 273,000 = Rp. 5,460.00
Jumlah (1) = Rp. 20,796.00
6.2.2. Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp. 27,000.00
- Tukang batu 0.150 Oh x Rp. 120,000 = Rp. 18,000.00
- Kepala tukang 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
Jumlah (2) = Rp. 48,900.00

Jumlah (1) + (2) = Rp. 69,696.00


Keuntungan+Over head 10% = Rp 6,969.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 76,665.60

PPL 6.3. 1 M² Plesteran 1 Pc : 3 Ps, tebal 15 mm

6.3.1. Bahan
- Semen portland 7.776 Kg x Rp. 1,500 = Rp. 11,664.00
- Pasir pasang 0.023 M³ x Rp. 273,000 = Rp. 6,279.00
Jumlah (1) = Rp. 17,943.00
6.3.2. Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp. 27,000.00
- Tukang batu 0.150 Oh x Rp. 120,000 = Rp. 18,000.00
- Kepala tukang 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
Jumlah (2) = Rp. 48,900.00

Jumlah (1) + (2) = Rp. 66,843.00


Keuntungan+Over head 10% = Rp 6,684.30
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 73,527.30
PPL 6.4. 1 M² Plesteran 1 Pc : 4 Ps, tebal 15 mm

6.4.1. Bahan
- Semen portland 6.240 Kg x Rp. 1,500 = Rp. 9,360.00
- Pasir pasang 0.024 M³ x Rp. 273,000 = Rp. 6,552.00
Jumlah (1) = Rp. 15,912.00
6.4.2. Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp. 27,000.00
- Tukang batu 0.150 Oh x Rp. 120,000 = Rp. 18,000.00
- Kepala tukang 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
Jumlah (2) = Rp. 48,900.00

Jumlah (1) + (2) = Rp. 64,812.00


Keuntungan+Over head 10% = Rp 6,481.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 71,293.20

PPL 6.5. 1 M² Plesteran 1 Pc : 5 Ps, tebal 15 mm

6.5.1. Bahan
- Semen portland 5.184 Kg x Rp. 1,500 = Rp. 7,776.00
- Pasir pasang 0.026 M³ x Rp. 273,000 = Rp. 7,098.00
Jumlah (1) = Rp. 14,874.00
6.5.2. Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp. 27,000.00
- Tukang batu 0.150 Oh x Rp. 120,000 = Rp. 18,000.00
- Kepala tukang 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
Jumlah (2) = Rp. 48,900.00

Jumlah (1) + (2) = Rp. 63,774.00


Keuntungan+Over head 10% = Rp 6,377.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 70,151.40

PPL 6.6. 1 M² Plesteran 1 Pc : 6 Ps, tebal 15 mm

6.6.1. Bahan
- Semen portland 4.416 Kg x Rp. 1,500 = Rp. 6,624.00
- Pasir pasang 0.027 M³ x Rp. 273,000 = Rp. 7,371.00
Jumlah (1) = Rp. 13,995.00
6.6.2. Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp. 27,000.00
- Tukang batu 0.150 Oh x Rp. 120,000 = Rp. 18,000.00
- Kepala tukang 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
Jumlah (2) = Rp. 48,900.00

Jumlah (1) + (2) = Rp. 62,895.00


Keuntungan+Over head 10% = Rp 6,289.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 69,184.50

PPL 6.7. 1 M² Plesteran 1 Pc : 8 Ps, tebal 15 mm

6.7.1. Bahan
- Semen portland 3.456 Kg x Rp. 1,500 = Rp. 5,184.00
- Pasir pasang 0.029 M³ x Rp. 273,000 = Rp. 7,917.00
Jumlah (1) = Rp. 13,101.00
6.7.2. Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp. 27,000.00
- Tukang batu 0.150 Oh x Rp. 120,000 = Rp. 18,000.00
- Kepala tukang 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
Jumlah (2) = Rp. 48,900.00

Jumlah (1) + (2) = Rp. 62,001.00


Keuntungan+Over head 10% = Rp 6,200.10
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 68,201.10

PPL 6.8. 1 M² Plesteran 1 Pc : 2 Ps, tebal 20 mm

6.8.1. Bahan
- Semen Portland 14.280 Kg x Rp. 1,500 = Rp. 21,420.00
- Pasir pasang 0.023 M³ x Rp. 273,000 = Rp. 6,279.00
Jumlah (1) = Rp. 27,699.00

6.8.2. Tenaga
- Pekerja 0.260 Oh x Rp. 90,000 = Rp. 23,400.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
Jumlah (2) = Rp. 51,690.00

Jumlah (1) + (2) = Rp. 79,389.00


Keuntungan+Over head 10% = Rp 7,938.90
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 87,327.90

PPL 6.9. 1 M² Plesteran 1 Pc : 3 Ps, tebal 20 mm

6.9.1. Bahan
- Semen Portland 10.368 Kg x Rp. 1,500 = Rp. 15,552.00
- Pasir pasang 0.031 M³ x Rp. 273,000 = Rp. 8,463.00
Jumlah (1) = Rp. 24,015.00
6.9.2. Tenaga
- Pekerja 0.260 Oh x Rp. 90,000 = Rp. 23,400.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
Jumlah (2) = Rp. 51,690.00

Jumlah (1) + (2) = Rp. 75,705.00


Keuntungan+Over head 10% = Rp 7,570.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 83,275.50

PPL 6.10. 1 M² Plesteran 1 Pc : 4 Ps, tebal 20 mm

6.10.1. Bahan
- Semen Portland 8.320 Kg x Rp. 1,500 = Rp. 12,480.00
- Pasir pasang 0.032 M³ x Rp. 273,000 = Rp. 8,736.00
Jumlah (1) = Rp. 21,216.00
6.10.2. Tenaga
- Pekerja 0.400 Oh x Rp. 90,000 = Rp. 36,000.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.022 Oh x Rp. 130,000 = Rp. 2,860.00
Jumlah (2) = Rp. 65,460.00

Jumlah (1) + (2) = Rp. 86,676.00


Keuntungan+Over head 10% = Rp 8,667.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 95,343.60

PPL 6.11. 1 M² Plesteran 1 Pc : 5 Ps, tebal 20 mm

6.11.1. Bahan
- Semen Portland 6.912 Kg x Rp. 1,500 = Rp. 10,368.00
- Pasir pasang 0.035 M³ x Rp. 273,000 = Rp. 9,555.00
Jumlah (1) = Rp. 19,923.00
6.11.2. Tenaga
- Pekerja 0.400 Oh x Rp. 90,000 = Rp. 36,000.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.022 Oh x Rp. 130,000 = Rp. 2,860.00
Jumlah (2) = Rp. 65,460.00

Jumlah (1) + (2) = Rp. 85,383.00


Keuntungan+Over head 10% = Rp 8,538.30
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 93,921.30

PPL 6.12. 1 M² Plesteran 1 Pc : 6 Ps, tebal 20 mm

6.12.1. Bahan
- Semen Portland 5.888 Kg x Rp. 1,500 = Rp. 8,832.00
- Pasir pasang 0.036 M³ x Rp. 273,000 = Rp. 9,828.00
Jumlah (1) = Rp. 18,660.00

6.12.2. Tenaga
- Pekerja 0.400 Oh x Rp. 90,000 = Rp. 36,000.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.022 Oh x Rp. 130,000 = Rp. 2,860.00
Jumlah (2) = Rp. 65,460.00

Jumlah (1) + (2) = Rp. 84,120.00


Keuntungan+Over head 10% = Rp 8,412.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 92,532.00

PPL 6.13. 1 M² Plesteran 1 Pc : 2 Ps, tebal 25 mm

6.13.1. Bahan
- Semen Portland 15.500 Kg x Rp. 1,500 = Rp. 23,250.00
- Pasir pasang 0.013 M³ x Rp. 273,000 = Rp. 3,549.00
Jumlah (1) = Rp. 26,799.00
6.13.2. Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp. 27,000.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.013 Oh x Rp. 130,000 = Rp. 1,625.00
Jumlah (2) = Rp. 55,225.00

Jumlah (1) + (2) = Rp. 82,024.00


Keuntungan+Over head 10% = Rp 8,202.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 90,226.40

PPL 6.14. 1 M² Plesteran 1 Pc : 3 Ps, tebal 25 mm

6.14.1. Bahan
- Semen Portland 11.750 Kg x Rp. 1,500 = Rp. 17,625.00
- Pasir pasang 0.035 M³ x Rp. 273,000 = Rp. 9,555.00
Jumlah (1) = Rp. 27,180.00
6.14.2. Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp. 27,000.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
Jumlah (2) = Rp. 55,290.00

Jumlah (1) + (2) = Rp. 82,470.00


Keuntungan+Over head 10% = Rp 8,247.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 90,717.00

PPL 6.15. 1 M² Plesteran 1 Pc : 4 Ps, tebal 25 mm

6.15.1. Bahan
- Semen Portland 9.480 Kg x Rp. 1,500 = Rp. 14,220.00
- Pasir pasang 0.038 M³ x Rp. 273,000 = Rp. 10,374.00
Jumlah (1) = Rp. 24,594.00
6.15.2. Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp. 27,000.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
Jumlah (2) = Rp. 55,290.00

Jumlah (1) + (2) = Rp. 79,884.00


Keuntungan+Over head 10% = Rp 7,988.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 87,872.40

PPL 6.16. 1 M² Plesteran 1 Pc : 5 Ps, tebal 25 mm

6.16.1. Bahan
- Semen Portland 7.940 Kg x Rp. 1,500 = Rp. 11,910.00
- Pasir pasang 0.039 M³ x Rp. 273,000 = Rp. 10,647.00
Jumlah (1) = Rp. 22,557.00
6.16.2. Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp. 27,000.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
Jumlah (2) = Rp. 55,290.00

Jumlah (1) + (2) = Rp. 77,847.00


Keuntungan+Over head 10% = Rp 7,784.70
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 85,631.70

PPL 6.17. 1 M² Plesteran 1 Pc : 2 Ps, tebal 30 mm

6.17.1. Bahan
- Semen Portland 18.650 Kg x Rp. 1,500 = Rp. 27,975.00
- Pasir pasang 0.035 M³ x Rp. 273,000 = Rp. 9,555.00
Jumlah (1) = Rp. 37,530.00
6.17.2. Tenaga
- Pekerja 0.320 Oh x Rp. 90,000 = Rp. 28,800.00
- Tukang batu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
Jumlah (2) = Rp. 64,000.00

Jumlah (1) + (2) = Rp. 101,530.00


Keuntungan+Over head 10% = Rp 10,153.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 111,683.00

PPL 6.18. 1 M² Plesteran 1 Pc : 3 Ps, tebal 30 mm

6.18.1. Bahan
- Semen Portland 14.150 Kg x Rp. 1,500 = Rp. 21,225.00
- Pasir pasang 0.039 M³ x Rp. 273,000 = Rp. 10,647.00
Jumlah (1) = Rp. 31,872.00
6.18.2. Tenaga
- Pekerja 0.320 Oh x Rp. 90,000 = Rp. 28,800.00
- Tukang batu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
Jumlah (2) = Rp. 64,000.00

Jumlah (1) + (2) = Rp. 95,872.00


Keuntungan+Over head 10% = Rp 9,587.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 105,459.20

PPL 6.19. 1 M² Plesteran 1 Pc : 4 Ps, tebal 30 mm

6.19.1. Bahan
- Semen Portland 11.380 Kg x Rp. 1,500 = Rp. 17,070.00
- Pasir pasang 0.042 M³ x Rp. 273,000 = Rp. 11,466.00
Jumlah (1) = Rp. 28,536.00
6.19.2. Tenaga
- Pekerja 0.320 Oh x Rp. 90,000 = Rp. 28,800.00
- Tukang batu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
Jumlah (2) = Rp. 64,000.00

Jumlah (1) + (2) = Rp. 92,536.00


Keuntungan+Over head 10% = Rp 9,253.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 101,789.60

PPL 6.20. 1 M² Plesteran 1 Pc : 4 Ps, tebal 30 mm

6.20.1. Bahan
- Semen Portland 8.190 Kg x Rp. 1,500 = Rp. 12,285.00
- Pasir pasang 0.045 M³ x Rp. 273,000 = Rp. 12,285.00
Jumlah (1) = Rp. 24,570.00
6.20.2. Tenaga
- Pekerja 0.320 Oh x Rp. 90,000 = Rp. 28,800.00
- Tukang batu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
Jumlah (2) = Rp. 64,000.00

Jumlah (1) + (2) = Rp. 88,570.00


Keuntungan+Over head 10% = Rp 8,857.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 97,427.00

PPL 6.21. 1 M² Berapen 1 Pc : 3 Ps, tebal 30 mm

6.21.1. Bahan
- Semen Portland 7.070 Kg x Rp. 1,500 = Rp. 10,605.00
- Pasir pasang 0.021 M³ x Rp. 273,000 = Rp. 5,733.00
Jumlah (1) = Rp. 16,338.00
6.21.2. Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang batu 0.070 Oh x Rp. 120,000 = Rp. 8,400.00
- Kepala tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
Jumlah (2) = Rp. 23,850.00

Jumlah (1) + (2) = Rp. 40,188.00


Keuntungan+Over head 10% = Rp 4,018.80
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 44,206.80

PPL 6.22. 1 M² Berapen 1 Pc : 5 Ps, tebal 30 mm

6.22.1. Bahan
- Semen Portland 5.184 Kg x Rp. 1,500 = Rp. 7,776.00
- Pasir pasang 0.026 M³ x Rp. 273,000 = Rp. 7,098.00
Jumlah (1) = Rp. 14,874.00
6.22.2. Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang batu 0.075 Oh x Rp. 120,000 = Rp. 9,000.00
- Kepala tukang 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
- Mandor 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
Jumlah (2) = Rp. 24,580.00

Jumlah (1) + (2) = Rp. 39,454.00


Keuntungan+Over head 10% = Rp 3,945.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 43,399.40
PPL 6.23. 1 M² Plesteran Beton 1 Pc : 2 Ps, tebal 15 mm

6.23.1. Bahan
- Semen Portland 9.300 Kg x Rp. 1,500 = Rp. 13,950.00
- Pasir pasang 0.018 M³ x Rp. 273,000 = Rp. 4,914.00
Jumlah (1) = Rp. 18,864.00
6.23.2. Tenaga
- Pekerja 0.260 Oh x Rp. 90,000 = Rp. 23,400.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
Jumlah (2) = Rp. 51,690.00

Jumlah (1) + (2) = Rp. 70,554.00


\ Keuntungan+Over head 10% = Rp 7,055.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 77,609.40

PPL 6.24. 1 M² Plesteran Beton 1 Pc : 3 Ps, tebal 15 mm

6.24.1. Bahan
- Semen Portland 7.070 Kg x Rp. 1,500 = Rp. 10,605.00
- Pasir pasang 0.021 M³ x Rp. 273,000 = Rp. 5,733.00
Jumlah (1) = Rp. 16,338.00
6.24.2. Tenaga
- Pekerja 0.260 Oh x Rp. 90,000 = Rp. 23,400.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
Jumlah (2) = Rp. 51,690.00

Jumlah (1) + (2) = Rp. 68,028.00


Keuntungan+Over head 10% = Rp 6,802.80
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 74,830.80

PPL 6.25. 1 M² Plesteran Skoning 1 Pc : 2 Ps

6.25.1. Bahan
- Semen Portland 0.500 Kg x Rp. 1,500 = Rp. 750.00
- Pasir pasang 0.002 M³ x Rp. 273,000 = Rp. 546.00
Jumlah (1) = Rp. 1,296.00
6.25.2. Tenaga
- Pekerja 0.057 Oh x Rp. 90,000 = Rp. 5,130.00
- Tukang batu 0.038 Oh x Rp. 120,000 = Rp. 4,560.00
- Kepala tukang 0.038 Oh x Rp. 130,000 = Rp. 4,940.00
- Mandor 0.002 Oh x Rp. 130,000 = Rp. 260.00
Jumlah (2) = Rp. 14,890.00

Jumlah (1) + (2) = Rp. 16,186.00


Keuntungan+Over head 10% = Rp 1,618.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 17,804.60

PPL 6.26. 1 M² Plesteran Granito, 1 Pc warna : 2 Granito, tebal 10 mm

6.26.1. Bahan
- PC warna 0.144 Kg x Rp. 2,300 = Rp. 331.20
- Batu granito 15.000 Kg x Rp. 0 = Rp. 0.00
Jumlah (1) = Rp. 331.20
6.26.2. Tenaga
- Pekerja 0.450 Oh x Rp. 90,000 = Rp. 40,500.00
- Tukang batu 0.225 Oh x Rp. 120,000 = Rp. 27,000.00
- Kepala tukang 0.023 Oh x Rp. 130,000 = Rp. 2,990.00
- Mandor 0.023 Oh x Rp. 130,000 = Rp. 2,990.00
Jumlah (2) = Rp. 73,480.00

Jumlah (1) + (2) = Rp. 73,811.20


Keuntungan+Over head 10% = Rp 7,381.12
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 81,192.32

PPL 6.27. 1 M² Plesteran Teraso, 1 Pc warna : 2 Batu Teraso, tebal 10 mm

6.27.1. Bahan
- PC warna 0.440 Kg x Rp. 2,300 = Rp. 1,012.00
- Batu teraso 11.500 Kg x Rp. 0 = Rp. 0.00
Jumlah (1) = Rp. 1,012.00
6.27.2. Tenaga
- Pekerja 0.450 Oh x Rp. 90,000 = Rp. 40,500.00
- Tukang batu 0.225 Oh x Rp. 120,000 = Rp. 27,000.00
- Kepala tukang 0.023 Oh x Rp. 130,000 = Rp. 2,990.00
- Mandor 0.023 Oh x Rp. 130,000 = Rp. 2,990.00
Jumlah (2) = Rp. 73,480.00

Jumlah (1) + (2) = Rp. 74,492.00


Keuntungan+Over head 10% = Rp 7,449.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 81,941.20

PPL 6.28. 1 M² Plesteran Ciprat, 1 Pc : 2 Ps, tebal 10 mm

6.28.1. Bahan
- Semen portland 4.320 Kg x Rp. 1,500 = Rp. 6,480.00
- Pasir pasang 0.006 M³ x Rp. 273,000 = Rp. 1,638.00
Jumlah (1) = Rp. 8,118.00
6.28.2. Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp. 27,000.00
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
Jumlah (2) = Rp. 42,250.00

Jumlah (1) + (2) = Rp. 50,368.00


Keuntungan+Over head 10% = Rp 5,036.80
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 55,404.80

PPL 6.29. 1 M² Plesteran Siar adukan, 1 Pc : 2 Ps

6.29.1. Bahan
- Semen portland 4.320 Kg x Rp. 1,500 = Rp. 6,480.00
- Pasir pasang 0.016 M³ x Rp. 273,000 = Rp. 4,368.00
Jumlah (1) = Rp. 10,848.00
6.29.2. Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang batu 0.070 Oh x Rp. 120,000 = Rp. 8,400.00
- Kepala tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
Jumlah (2) = Rp. 23,850.00

Jumlah (1) + (2) = Rp. 34,698.00


Keuntungan+Over head 10% = Rp 3,469.80
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 38,167.80

PPL 6.30. 1 M² Plesteran waterfroof bata cote 3 lapis

6.30.1. Bahan
- Semen portland 0.500 Kg x Rp. 1,500 = Rp. 750.00
- Kosen Pintu / Jendela Alumi 2.900 Kg x Rp. 98,000 = Rp. 284,200.00
- Pasir pasang 0.006 M³ x Rp. 273,000 = Rp. 1,638.00
Jumlah (1) = Rp. 286,588.00
6.30.2. Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp. 27,000.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
Jumlah (2) = Rp. 55,550.00

Jumlah (1) + (2) = Rp. 342,138.00


Keuntungan+Over head 10% = Rp 34,213.80
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 376,351.80

PPL 6.30. 1 M² Pemasangan acian

6.30.1. Bahan
- Semen portland 3.250 Kg x Rp. 1,500 = Rp. 4,875.00

Jumlah (1) = Rp. 4,875.00


6.30.2. Tenaga
- Pekerja 0.200 Oh x Rp. 90,000 = Rp. 18,000.00
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
Jumlah (2) = Rp. 32,600.00

Jumlah (1) + (2) = Rp. 37,475.00


Keuntungan+Over head 10% = Rp 3,747.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 41,222.50
ANALISA BIAYA KONSTRUKSI
PEKERJAAN KAYU

PK 6.1. 1 M³ Pasang kusen pintu dan jendela kayu jati :

6.1.1. Bahan
- Kayu jati, balok 1.100 M³ x Rp. 23,925,000.00 = Rp. 26,317,500.00
Jumlah (1) = Rp. 26,317,500.00

6.1.2. Tenaga
- Pekerja 6.000 Oh x Rp. 90,000.00 = Rp. 540,000.00
- Tukang kayu 20.000 Oh x Rp. 120,000.00 = Rp. 2,400,000.00
- Kepala tukang 2.000 Oh x Rp. 130,000.00 = Rp. 260,000.00
- Mandor 0.300 Oh x Rp. 130,000.00 = Rp. 39,000.00
Jumlah (2) = Rp. 3,239,000.00

Jumlah (1) + (2) = Rp. 29,556,500.00


Keuntungan+Over head 10% = Rp 2,955,650.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 32,512,150.00

PK 6.2. 1 M³ Pasang kusen pintu dan jendela kayu damar laut :

6.2.1. Bahan
- Kayu meranti, balok 1.200 M³ x Rp. 9,075,000.00 = Rp. 10,890,000.00
Jumlah (1) = Rp. 10,890,000.00

6.2.2. Tenaga
- Pekerja 6.000 Oh x Rp. 90,000.00 = Rp. 540,000.00
- Tukang kayu 18.000 Oh x Rp. 120,000.00 = Rp. 2,160,000.00
- Kepala tukang 2.000 Oh x Rp. 130,000.00 = Rp. 260,000.00
- Mandor 0.300 Oh x Rp. 130,000.00 = Rp. 39,000.00
Jumlah (2) = Rp. 2,999,000.00

Jumlah (1) + (2) = Rp. 13,889,000.00


Keuntungan+Over head 10% = Rp 1,388,900.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 15,277,900.00

PK 6.3. 1 M³ Pasang kusen pintu dan jendela kayu meranti :

6.3.1. Bahan
- Kayu kapur, balok 1.200 M³ x Rp. 6,490,000.00 = Rp. 7,788,000.00
Jumlah (1) = Rp. 7,788,000.00

6.3.2. Tenaga
- Pekerja 6.000 Oh x Rp. 90,000.00 = Rp. 540,000.00
- Tukang kayu 18.000 Oh x Rp. 120,000.00 = Rp. 2,160,000.00
- Kepala tukang 2.000 Oh x Rp. 130,000.00 = Rp. 260,000.00
- Mandor 0.300 Oh x Rp. 130,000.00 = Rp. 39,000.00
Jumlah (2) = Rp. 2,999,000.00

Jumlah (1) +(2) = Rp. 10,787,000.00


Keuntungan+Over head 10% = Rp 1,078,700.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 11,865,700.00
PK 6.4. 1 M³ Pasang kusen pintu dan jendela kayu damar laut :

6.4.1. Bahan
- Kayu damar laut, balok 1.200 M³ x Rp. 9,350,000.00 = Rp. 11,220,000.00
Jumlah (1) = Rp. 11,220,000.00

6.4.2. Tenaga

- Pekerja 6.000 Oh x Rp. 90,000.00 = Rp. 540,000.00


- Tukang kayu 18.000 Oh x Rp. 120,000.00 = Rp. 2,160,000.00
- Kepala tukang 2.000 Oh x Rp. 130,000.00 = Rp. 260,000.00
- Mandor 0.300 Oh x Rp. 130,000.00 = Rp. 39,000.00
Jumlah (2) = Rp. 2,999,000.00

Jumlah (1) +(2) = Rp. 14,219,000.00


Keuntungan+Over head 10% = Rp 1,421,900.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 15,640,900.00

PK 6.5. 1 M² Pasang pintu klamp kayu meranti batu

6.5.1. Bahan
- Kayu meranti batu, papan 0.036 M³ x Rp. 9,375,000.00 = Rp. 337,500.00
- Paku biasa 2" - 5" 0.050 Kg x Rp. 15,000.00 = Rp. 750.00
Jumlah (1) = Rp. 338,250.00
6.5.2. Tenaga
- Pekerja 0.350 Oh x Rp. 90,000.00 = Rp. 31,500.00
- Tukang kayu 1.050 Oh x Rp. 120,000.00 = Rp. 126,000.00
- Kepala tukang 0.105 Oh x Rp. 130,000.00 = Rp. 13,650.00
- Mandor 0.018 Oh x Rp. 130,000.00 = Rp. 2,340.00
Jumlah (2) = Rp. 173,490.00

Jumlah (1) +(2) = Rp. 511,740.00


Keuntungan+Over head 10% = Rp 51,174.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 562,914.00

PK 6.6. 1 M³ Pasang pintu klamp kayu jati

6.6.1. Bahan
- Kayu jati, papan 0.036 M³ x Rp. 24,104,440.00 = Rp. 867,759.84
- Paku biasa 2" - 5" 0.050 Kg x Rp. 15,000.00 = Rp. 750.00
Jumlah (1) = Rp. 868,509.84
6.6.2. Tenaga
- Pekerja 0.350 Oh x Rp. 90,000.00 = Rp. 31,500.00
- Tukang kayu 1.050 Oh x Rp. 120,000.00 = Rp. 126,000.00
- Kepala tukang 0.105 Oh x Rp. 130,000.00 = Rp. 13,650.00
- Mandor 0.018 Oh x Rp. 130,000.00 = Rp. 2,340.00
Jumlah (2) = Rp. 173,490.00

Jumlah (1) +(2) = Rp. 1,041,999.84


Keuntungan+Over head 10% = Rp 104,199.98
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,146,199.82

PK 6.7. 1 M² Pasang pintu panel kayu jati :

6.7.1. Bahan
- Kayu jati, papan 0.036 M³ x Rp. 24,104,440.00 = Rp. 867,759.84
Jumlah (1) 867,759.84
6.7.2. Tenaga
- Pekerja 1.000 Oh x Rp. 90,000.00 = Rp. 90,000.00
- Tukang kayu 2.500 Oh x Rp. 120,000.00 = Rp. 300,000.00
- Kepala tukang 0.250 Oh x Rp. 130,000.00 = Rp. 32,500.00
- Mandor 0.050 Oh x Rp. 130,000.00 = Rp. 6,500.00
Jumlah (2) = Rp. 429,000.00

Jumlah (1) +(2) = Rp. 1,296,759.84


Keuntungan+Over head 10% = Rp 129,675.98
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,426,435.82

PK 6.8. 1 M² Pasang pintu panel kayu meranti batu

6.8.1. Bahan
- Kayu meranti batu, papan 0.040 M³ x Rp. 9,375,000.00 = Rp. 375,000.00
Jumlah (1) = Rp. 375,000.00
6.8.2. Tenaga
- Pekerja 1.000 Oh x Rp. 90,000.00 = Rp. 90,000.00
- Tukang kayu 2.500 Oh x Rp. 120,000.00 = Rp. 300,000.00
- Kepala tukang 0.250 Oh x Rp. 130,000.00 = Rp. 32,500.00
- Mandor 0.050 Oh x Rp. 130,000.00 = Rp. 6,500.00
Jumlah (2) = Rp. 429,000.00

Jumlah (1) +(2) = Rp. 804,000.00


Keuntungan+Over head 10% = Rp 80,400.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 884,400.00

PK 6.9. 1 M² Pasang pintu dan jendela kaca panel kayu jati :

6.9.1. Bahan
- Kayu jati, papan 0.035 M³ x Rp. 24,104,440.00 = Rp. 843,655.40
- Kaca polos 5 mm 0.800 M2 x Rp. 113,000.00 = Rp. 90,400.00
Jumlah (1) = Rp. 934,055.40
6.9.2. Tenaga
- Pekerja 0.800 Oh x Rp. 90,000.00 = Rp. 72,000.00
- Tukang kayu 2.000 Oh x Rp. 120,000.00 = Rp. 240,000.00
- Kepala tukang 0.200 Oh x Rp. 130,000.00 = Rp. 26,000.00
- Mandor 0.040 Oh x Rp. 130,000.00 = Rp. 5,200.00
Jumlah (2) = Rp. 343,200.00

Jumlah (1) +(2) = Rp. 1,277,255.40


Keuntungan+Over head 10% = Rp 127,725.54
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,404,980.94

PK 6.10. 1 M² Pasang pintu dan jendela kaca panel kayu meranti batu :

6.10.1. Bahan
- Kayu meranti batu, papan 0.035 M³ x Rp. 9,375,000.00 = Rp. 328,125.00
- Kaca polos 5 mm 0.800 M³ x Rp. 113,000.00 = Rp. 90,400.00
Jumlah (1) = Rp. 418,525.00
6.10.2. Tenaga
- Pekerja 0.800 Oh x Rp. 90,000.00 = Rp. 72,000.00
- Tukang kayu 2.000 Oh x Rp. 120,000.00 = Rp. 240,000.00
- Kepala tukang 0.200 Oh x Rp. 130,000.00 = Rp. 26,000.00
- Mandor 0.040 Oh x Rp. 130,000.00 = Rp. 5,200.00
Jumlah (2) = Rp. 343,200.00

Jumlah (1) +(2) = Rp. 761,725.00


Keuntungan+Over head 10% = Rp 76,172.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 837,897.50

PK 6.11. 1 M² Pasang pintu dan jendela kaca panel kayu meranti :

6.11.1. Bahan
- Kayu meranti, papan 0.035 M³ x Rp. 5,475,000.00 = Rp. 191,625.00
- Kaca polos 5 mm 0.800 M³ x Rp. 113,000.00 = Rp. 90,400.00
Jumlah (1) = Rp. 282,025.00
6.11.2. Tenaga
- Pekerja 0.800 Oh x Rp. 90,000.00 = Rp. 72,000.00
- Tukang kayu 2.000 Oh x Rp. 120,000.00 = Rp. 240,000.00
- Kepala tukang 0.200 Oh x Rp. 130,000.00 = Rp. 26,000.00
- Mandor 0.040 Oh x Rp. 130,000.00 = Rp. 5,200.00
Jumlah (2) = Rp. 343,200.00

Jumlah (1) +(2) = Rp. 625,225.00


Keuntungan+Over head 10% = Rp 62,522.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 687,747.50

PK 6.12. 1 M² Pasang pintu dan jendela jalusi kayu jati :

6.12.1. Bahan
- Kayu jati, papan 0.064 M³ x Rp. 24,104,440.00 = Rp. 1,542,684.16
Jumlah (1) = Rp. 1,542,684.16
6.12.2. Tenaga
- Pekerja 1.000 Oh x Rp. 90,000.00 = Rp. 90,000.00
- Tukang kayu 3.000 Oh x Rp. 120,000.00 = Rp. 360,000.00
- Kepala tukang 0.300 Oh x Rp. 130,000.00 = Rp. 39,000.00
- Mandor 0.300 Oh x Rp. 130,000.00 = Rp. 39,000.00
Jumlah (2) = Rp. 528,000.00

Jumlah (1) +(2) = Rp. 2,070,684.16


Keuntungan+Over head 10% = Rp 207,068.42
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 2,277,752.58

PK 6.13. 1 M² Pasang pintu dan jendela jalusi kayu meranti batu :

6.13.1. Bahan
- Kayu meranti batu, papan 0.064 M³ x Rp. 9,375,000.00 = Rp. 600,000.00
Jumlah (1) = Rp. 600,000.00
6.13.2. Tenaga
- Pekerja 1.000 Oh x Rp. 90,000.00 = Rp. 90,000.00
- Tukang kayu 3.000 Oh x Rp. 120,000.00 = Rp. 360,000.00
- Kepala tukang 0.300 Oh x Rp. 130,000.00 = Rp. 39,000.00
- Mandor 0.500 Oh x Rp. 130,000.00 = Rp. 65,000.00
Jumlah (2) = Rp. 554,000.00

Jumlah (1) +(2) = Rp. 1,154,000.00


Keuntungan+Over head 10% = Rp 115,400.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,269,400.00

PK 6.14. 1 M² Pasang pintu plywood rangka, rangka kayu jati :

6.14.1. Bahan
- Kayu jati, papan 0.0196 M³ x Rp. 24,104,440.00 = Rp. 472,447.02
- Paku biasa ½" - 1" 0.030 Kg x Rp. 15,000.00 = Rp. 450.00
- Lem kayu 0.300 Lt x Rp. 56,100.00 = Rp. 16,830.00
- Playwood 4' x 3' x 4 mm 1.000 Lbr x Rp. 51,920.00 = Rp. 51,920.00
Jumlah (1) = Rp. 541,647.02

6.14.2. Tenaga
- Pekerja 0.600 Oh x Rp. 90,000.00 = Rp. 54,000.00
- Tukang kayu 2.000 Oh x Rp. 120,000.00 = Rp. 240,000.00
- Kepala tukang 0.200 Oh x Rp. 130,000.00 = Rp. 26,000.00
- Mandor 0.030 Oh x Rp. 130,000.00 = Rp. 3,900.00
Jumlah (2) = Rp. 323,900.00

Jumlah (1) +(2) = Rp. 865,547.02


Keuntungan+Over head 10% = Rp 86,554.70
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 952,101.73

PK 6.15. 1 M² Pasang pintu plywood rangka, rangka kayu meranti batu :

6.15.1. Bahan
- Kayu meranti batu, papan 0.0196 M³ x Rp. 9,375,000.00 = Rp. 183,750.00
- Paku biasa ½" - 1" 0.030 Kg x Rp. 15,000.00 = Rp. 450.00
- Lem kayu 0.300 Lt x Rp. 56,100.00 = Rp. 16,830.00
- Playwood 4' x 3' x 4 mm 1.000 Lbr x Rp. 51,920.00 = Rp. 51,920.00
Jumlah (1) = Rp. 252,950.00
6.15.2. Tenaga
- Pekerja 0.600 Oh x Rp. 90,000.00 = Rp. 54,000.00
- Tukang kayu 2.000 Oh x Rp. 120,000.00 = Rp. 240,000.00
- Kepala tukang 0.200 Oh x Rp. 130,000.00 = Rp. 26,000.00
- Mandor 0.030 Oh x Rp. 130,000.00 = Rp. 3,900.00
Jumlah (2) = Rp. 323,900.00

Jumlah (1) +(2) = Rp. 576,850.00


Keuntungan+Over head 10% = Rp 57,685.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 634,535.00

PK 6.16. 1 M² Pasang jalusi mati kusen kayu jati :

6.16.1. Bahan
- Kayu jati, papan 0.060 M³ x Rp. 24,104,440.00 = Rp. 1,446,266.40
- Paku biasa ½" - 1" 0.150 Kg x Rp. 15,000.00 = Rp. 2,250.00
Jumlah (1) = Rp. 1,448,516.40
6.16.2. Tenaga
- Pekerja 0.500 Oh x Rp. 90,000.00 = Rp. 45,000.00
- Tukang kayu 2.000 Oh x Rp. 120,000.00 = Rp. 240,000.00
- Kepala tukang 0.200 Oh x Rp. 130,000.00 = Rp. 26,000.00
- Mandor 0.025 Oh x Rp. 130,000.00 = Rp. 3,250.00
Jumlah (2) = Rp. 314,250.00

Jumlah (1) +(2) = Rp. 1,762,766.40


Keuntungan+Over head 10% = Rp 176,276.64
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,939,043.04

PK 6.17. 1 M² Pasang jalusi mati kusen kayu damar laut :

6.17.1. Bahan
- Kayu damar laut, papan 0.060 M³ x Rp. 9,650,000.00 = Rp. 579,000.00
- Paku biasa ½" - 1" 0.150 Kg x Rp. 15,000.00 = Rp. 2,250.00
Jumlah (1) = Rp. 581,250.00
6.17.2. Tenaga
- Pekerja 0.500 Oh x Rp. 90,000.00 = Rp. 45,000.00
- Tukang kayu 2.000 Oh x Rp. 120,000.00 = Rp. 240,000.00
- Kepala tukang 0.200 Oh x Rp. 130,000.00 = Rp. 26,000.00
- Mandor 0.025 Oh x Rp. 130,000.00 = Rp. 3,250.00
Jumlah (2) = Rp. 314,250.00

Jumlah (1) +(2) = Rp. 895,500.00


Keuntungan+Over head 10% = Rp 89,550.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 985,050.00

PK 6.18. 1 M² Pasang pintu plywood rangka, rangka kayu meranti :

6.18.1. Bahan
- Kayu meranti, papan 0.0196 M³ x Rp. 5,475,000.00 = Rp. 107,310.00
- Paku biasa ½" - 1" 0.030 Kg x Rp. 15,000.00 = Rp. 450.00
- Lem kayu 0.300 Lt x Rp. 56,100.00 = Rp. 16,830.00
- Playwood 4' x 3' x 4 mm 1.000 Lbr x Rp. 51,920.00 = Rp. 51,920.00
Jumlah (1) = Rp. 176,510.00
6.18.2. Tenaga
- Pekerja 0.600 Oh x Rp. 90,000.00 = Rp. 54,000.00
- Tukang kayu 2.000 Oh x Rp. 120,000.00 = Rp. 240,000.00
- Kepala tukang 0.200 Oh x Rp. 130,000.00 = Rp. 26,000.00
- Mandor 0.030 Oh x Rp. 130,000.00 = Rp. 3,900.00
Jumlah (2) = Rp. 323,900.00

Jumlah (1) +(2) = Rp. 500,410.00


Keuntungan+Over head 10% = Rp 50,041.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 550,451.00

PK 6.19. 1 M² Pasang pintu teakwood rangka, rangka kayu jati :

6.19.1. Bahan
- Kayu jati, papan 0.0196 M³ x Rp. 24,104,440.00 = Rp. 472,447.02
- Paku biasa ½" - 1" 0.300 Kg x Rp. 15,000.00 = Rp. 4,500.00
- Lem kayu 0.300 Lt x Rp. 56,100.00 = Rp. 16,830.00
- Teakwood 4' x 8' x 4 mm 1.000 Lbr x Rp. 130,000.00 = Rp. 130,000.00
Jumlah (1) = Rp. 623,777.02
6.19.2. Tenaga
- Pekerja 0.600 Oh x Rp. 90,000.00 = Rp. 54,000.00
- Tukang kayu 2.000 Oh x Rp. 120,000.00 = Rp. 240,000.00
- Kepala tukang 0.200 Oh x Rp. 130,000.00 = Rp. 26,000.00
- Mandor 0.030 Oh x Rp. 130,000.00 = Rp. 3,900.00
Jumlah (2) = Rp. 323,900.00

Jumlah (1) +(2) = Rp. 947,677.02


Keuntungan+Over head 10% = Rp 94,767.70
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,042,444.73

PK 6.20. 1 M² Pasang pintu teakwood rangka, rangka kayu meranti batu :

6.20.1. Bahan
- Kayu meranti batu, papan 0.0196 M³ x Rp. 9,375,000.00 = Rp. 183,750.00
- Paku biasa ½" - 1" 0.300 Kg x Rp. 15,000.00 = Rp. 4,500.00
- Lem kayu 0.300 Lt x Rp. 56,100.00 = Rp. 16,830.00
- Teakwood 4' x 8' x 4 mm 1.000 Lbr x Rp. 130,000.00 = Rp. 130,000.00
Jumlah (1) = Rp. 335,080.00
6.20.2. Tenaga
- Pekerja 0.600 Oh x Rp. 90,000.00 = Rp. 54,000.00
- Tukang kayu 2.000 Oh x Rp. 120,000.00 = Rp. 240,000.00
- Kepala tukang 0.200 Oh x Rp. 130,000.00 = Rp. 26,000.00
- Mandor 0.030 Oh x Rp. 130,000.00 = Rp. 3,900.00
Jumlah (2) = Rp. 323,900.00

Jumlah (1) +(2) = Rp. 658,980.00


Keuntungan+Over head 10% = Rp 65,898.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 724,878.00

PK 6.21. 1 M² Pasang pintu plywood & formika, rangka kayu jati :

6.21.1. Bahan
- Kayu jati, papan 0.0196 M³ x Rp. 24,104,440.00 = Rp. 472,447.02
- Paku biasa ½" - 1" 0.300 Kg x Rp. 15,000.00 = Rp. 4,500.00
- Lem kayu 0.800 Lt x Rp. 56,100.00 = Rp. 44,880.00
- Plywood 4' x 8' x 4 mm 1.000 Lbr x Rp. 51,920.00 = Rp. 51,920.00
- Formica 4' x 8' 1.000 Lbr x Rp. 74,250.00 = Rp. 74,250.00
Jumlah (1) = Rp. 647,997.02
6.21.2. Tenaga
- Pekerja 0.800 Oh x Rp. 90,000.00 = Rp. 72,000.00
- Tukang kayu 2.500 Oh x Rp. 120,000.00 = Rp. 300,000.00
- Kepala tukang 0.250 Oh x Rp. 130,000.00 = Rp. 32,500.00
- Mandor 0.040 Oh x Rp. 130,000.00 = Rp. 5,200.00
Jumlah (2) = Rp. 409,700.00

Jumlah (1) +(2) = Rp. 1,057,697.02


Keuntungan+Over head 10% = Rp 105,769.70
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,163,466.73

PK 6.22. 1 M² Pasang pintu plywood & formika, rangka kayu meranti batu :

6.22.1. Bahan
- Kayu meranti batu, papan 0.0196 M³ x Rp. 9,375,000.00 = Rp. 183,750.00
- Paku biasa ½" - 1" 0.300 Kg x Rp. 15,000.00 = Rp. 4,500.00
- Lem kayu 0.800 Lt x Rp. 56,100.00 = Rp. 44,880.00
- Plywood 4' x 8' x 4 mm 1.000 Lbr x Rp. 51,920.00 = Rp. 51,920.00
- Formica 4' x 8' 1.000 Lbr x Rp. 74,250.00 = Rp. 74,250.00
Jumlah (1) = Rp. 359,300.00

6.22.2. Tenaga
- Pekerja 0.800 Oh x Rp. 90,000.00 = Rp. 72,000.00
- Tukang kayu 2.500 Oh x Rp. 120,000.00 = Rp. 300,000.00
- Kepala tukang 0.250 Oh x Rp. 130,000.00 = Rp. 32,500.00
- Mandor 0.040 Oh x Rp. 130,000.00 = Rp. 5,200.00
Jumlah (2) = Rp. 409,700.00

Jumlah (1) +(2) = Rp. 769,000.00


Keuntungan+Over head 10% = Rp 76,900.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 845,900.00

PK 6.23. 1 M² Pasang pintu plywood & formika, rangka kayu jati :

6.23.1. Bahan
- Kayu jati, papan 0.0196 M³ x Rp. 24,104,440.00 = Rp. 472,447.02
- Paku biasa ½" - 1" 0.300 Kg x Rp. 15,000.00 = Rp. 4,500.00
- Lem kayu 0.800 Lt x Rp. 56,100.00 = Rp. 44,880.00
- Teakwood 4' x 8' x 4 mm 1.000 Lbr x Rp. 130,000.00 = Rp. 130,000.00
- Formica 4' x 8' 1.000 Lbr x Rp. 74,250.00 = Rp. 74,250.00
Jumlah (1) = Rp. 726,077.02

6.23.2. Tenaga
- Pekerja 0.800 Oh x Rp. 90,000.00 = Rp. 72,000.00
- Tukang kayu 2.500 Oh x Rp. 120,000.00 = Rp. 300,000.00
- Kepala tukang 0.250 Oh x Rp. 130,000.00 = Rp. 32,500.00
- Mandor 0.040 Oh x Rp. 130,000.00 = Rp. 5,200.00
Jumlah (2) = Rp. 409,700.00

Jumlah (1) +(2) = Rp. 1,135,777.02


Keuntungan+Over head 10% = Rp 113,577.70
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,249,354.73

PK 6.24. 1 M² Pasang pintu plywood & formika, rangka kayu damar laut (divermis) :

6.24.1. Bahan
- Kayu meranti batu, papan 0.0196 M³ x Rp. 9,375,000.00 = Rp. 183,750.00
- Paku biasa ½" - 1" 0.300 Kg x Rp. 15,000.00 = Rp. 4,500.00
- Lem kayu 0.800 Lt x Rp. 56,100.00 = Rp. 44,880.00
- Teakwood 4' x 8' x 4 mm 0.500 Lbr x Rp. 130,000.00 = Rp. 65,000.00
- Vernis 0.500 Lt x Rp. 48,280.00 = Rp. 24,140.00
- Formica 4' x 8' 0.500 Lbr x Rp. 74,250.00 = Rp. 37,125.00
Jumlah (1) = Rp. 359,395.00

6.24.2. Tenaga
- Pekerja 0.800 Oh x Rp. 90,000.00 = Rp. 72,000.00
- Tukang kayu 2.500 Oh x Rp. 120,000.00 = Rp. 300,000.00
- Kepala tukang 0.250 Oh x Rp. 130,000.00 = Rp. 32,500.00
- Mandor 0.040 Oh x Rp. 130,000.00 = Rp. 5,200.00
Jumlah (2) = Rp. 409,700.00

Jumlah (1) +(2) = Rp. 769,095.00


Keuntungan+Over head 10% = Rp 76,909.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 846,004.50

PK 6.25. 1 M³ Pasang konstruksi kuda-kuda kayu damar laut :

6.25.1. Bahan
- Kayu damar laut, balok 1.1000 M³ x Rp. 9,350,000.00 = Rp. 10,285,000.00
- Besi strip 15.000 Kg x Rp. 11,880.00 = Rp. 178,200.00
- Paku biasa 2" - 5" 0.800 Kg x Rp. 15,000.00 = Rp. 12,000.00
Jumlah (1) = Rp. 10,475,200.00

6.25.2. Tenaga
- Pekerja 4.000 Oh x Rp. 90,000.00 = Rp. 360,000.00
- Tukang kayu 12.000 Oh x Rp. 120,000.00 = Rp. 1,440,000.00
- Kepala tukang 1.200 Oh x Rp. 130,000.00 = Rp. 156,000.00
- Mandor 0.200 Oh x Rp. 130,000.00 = Rp. 26,000.00
Jumlah (2) = Rp. 1,982,000.00

Jumlah (1) +(2) = Rp. 12,457,200.00


Keuntungan+Over head 10% = Rp 1,245,720.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 13,702,920.00

PK 6.26. 1 M³ Pasang konstruksi kuda-kuda kayu meranti :

6.26.1. Bahan
- Kayu meranti, balok 1.1000 M³ x Rp. 5,225,000.00 = Rp. 5,747,500.00
- Besi strip 15.000 Kg x Rp. 11,880.00 = Rp. 178,200.00
- Paku biasa 2" - 5" 0.800 Kg x Rp. 15,000.00 = Rp. 12,000.00
Jumlah (1) = Rp. 5,937,700.00

6.26.2. Tenaga
- Pekerja 4.000 Oh x Rp. 90,000.00 = Rp. 360,000.00
- Tukang kayu 12.000 Oh x Rp. 120,000.00 = Rp. 1,440,000.00
- Kepala tukang 1.200 Oh x Rp. 130,000.00 = Rp. 156,000.00
- Mandor 0.200 Oh x Rp. 130,000.00 = Rp. 26,000.00
Jumlah (2) = Rp. 1,982,000.00

Jumlah (1) +(2) = Rp. 7,919,700.00


Keuntungan+Over head 10% = Rp 791,970.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 8,711,670.00

PK 6.27. 1 M² Pasang kaso + reng genteng kodok kayu meranti :

6.27.1. Bahan
- Kayu meranti, balok 0.012 M³ x Rp. 5,225,000.00 = Rp. 62,700.00
- Paku biasa 2" - 5" 0.150 Kg x Rp. 15,000.00 = Rp. 2,250.00
Jumlah (1) = Rp. 64,950.00
6.27.2. Tenaga
- Pekerja 0.100 Oh x Rp. 90,000.00 = Rp. 9,000.00
- Tukang kayu 0.100 Oh x Rp. 120,000.00 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000.00 = Rp. 1,300.00
- Mandor 0.005 Oh x Rp. 130,000.00 = Rp. 650.00
Jumlah (2) = Rp. 22,950.00

Jumlah (1) +(2) = Rp. 87,900.00


Keuntungan+Over head 10% = Rp 8,790.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 96,690.00

PK 6.28. 1 M² Pasang kaso + reng genteng kodok kayu damar laut :

6.28.1. Bahan
- Kayu damar laut, balok 0.012 M³ x Rp. 9,350,000.00 = Rp. 112,200.00
- Paku biasa 2" - 5" 0.150 Kg x Rp. 15,000.00 = Rp. 2,250.00
Jumlah (1) = Rp. 114,450.00

6.28.2. Tenaga
- Pekerja 0.100 Oh x Rp. 90,000.00 = Rp. 9,000.00
- Tukang kayu 0.100 Oh x Rp. 120,000.00 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000.00 = Rp. 1,300.00
- Mandor 0.005 Oh x Rp. 130,000.00 = Rp. 650.00
Jumlah (2) = Rp. 22,950.00

Jumlah (1) +(2) = Rp. 137,400.00


Keuntungan+Over head 10% = Rp 13,740.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 151,140.00

PK 6.29. 1 M² Pasang kaso + reng genteng monier kayu jati :

6.29.1. Bahan
- Kayu jati, balok 0.014 M³ x Rp. 23,925,000.00 = Rp. 334,950.00
- Paku biasa 2" - 5" 0.150 Kg x Rp. 15,000.00 = Rp. 2,250.00
Jumlah (1) = Rp. 337,200.00

6.29.2. Tenaga
- Pekerja 0.100 Oh x Rp. 90,000.00 = Rp. 9,000.00
- Tukang kayu 0.100 Oh x Rp. 120,000.00 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000.00 = Rp. 1,300.00
- Mandor 0.005 Oh x Rp. 130,000.00 = Rp. 650.00
Jumlah (2) = Rp. 22,950.00

Jumlah (1) +(2) = Rp. 360,150.00


Keuntungan+Over head 10% = Rp 36,015.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 396,165.00

PK 6.30. 1 M² Pasang kaso + reng genteng monier kayu damar laut :

6.30.1. Bahan
- Kayu damar laut, balok 0.014 M³ x Rp. 9,350,000.00 = Rp. 130,900.00
- Paku biasa 2" - 5" 0.150 Kg x Rp. 15,000.00 = Rp. 2,250.00
Jumlah (1) = Rp. 133,150.00

6.30.2. Tenaga
- Pekerja 0.100 Oh x Rp. 90,000.00 = Rp. 9,000.00
- Tukang kayu 0.100 Oh x Rp. 120,000.00 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000.00 = Rp. 1,300.00
- Mandor 0.005 Oh x Rp. 130,000.00 = Rp. 650.00
Jumlah (2) = Rp. 22,950.00

Jumlah (1) +(2) = Rp. 156,100.00


Keuntungan+Over head 10% = Rp 15,610.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 171,710.00

PK 6.31. 1 M² Pasang kaso + reng genteng beton kayu damar laut :

6.31.1. Bahan
- Kayu damar laut, balok 0.014 M³ x Rp. 9,350,000.00 = Rp. 130,900.00
- Paku biasa 2" - 5" 0.150 Kg x Rp. 15,000.00 = Rp. 2,250.00
Jumlah (1) = Rp. 133,150.00
6.31.2. Tenaga
- Pekerja 0.100 Oh x Rp. 90,000.00 = Rp. 9,000.00
- Tukang kayu 0.100 Oh x Rp. 120,000.00 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000.00 = Rp. 1,300.00
- Mandor 0.005 Oh x Rp. 130,000.00 = Rp. 650.00
Jumlah (2) = Rp. 22,950.00

Jumlah (1) +(2) = Rp. 156,100.00


Keuntungan+Over head 10% = Rp 15,610.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 171,710.00

PK 6.32. 1 M² Pasang kaso + reng atap sirap kayu damar laut :

6.32.1. Bahan
- Kayu damar laut, balok 0.165 M³ x Rp. 9,350,000.00 = Rp. 1,542,750.00
- Paku biasa 2" - 5" 0.200 Kg x Rp. 15,000.00 = Rp. 3,000.00
Jumlah (1) = Rp. 1,545,750.00

6.32.2. Tenaga
- Pekerja 0.120 Oh x Rp. 90,000.00 = Rp. 10,800.00
- Tukang kayu 0.120 Oh x Rp. 120,000.00 = Rp. 14,400.00
- Kepala tukang 0.012 Oh x Rp. 130,000.00 = Rp. 1,560.00
- Mandor 0.006 Oh x Rp. 130,000.00 = Rp. 780.00
Jumlah (2) = Rp. 27,540.00

Jumlah (1) +(2) = Rp. 1,573,290.00


Keuntungan+Over head 10% = Rp 157,329.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,730,619.00

PK 6.33. 1 M² Pasang kaso + reng atap sirap kayu meranti :

6.33.1. Bahan
- Kayu meranti, balok 0.165 M³ x Rp. 5,225,000.00 = Rp. 862,125.00
- Paku biasa 2" - 5" 0.200 Kg x Rp. 15,000.00 = Rp. 3,000.00
Jumlah (1) = Rp. 865,125.00
6.33.2. Tenaga
- Pekerja 0.120 Oh x Rp. 90,000.00 = Rp. 10,800.00
- Tukang kayu 0.120 Oh x Rp. 120,000.00 = Rp. 14,400.00
- Kepala tukang 0.012 Oh x Rp. 130,000.00 = Rp. 1,560.00
- Mandor 0.006 Oh x Rp. 130,000.00 = Rp. 780.00
Jumlah (2) = Rp. 27,540.00

Jumlah (1) +(2) = Rp. 892,665.00


Keuntungan+Over head 10% = Rp 89,266.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 981,931.50

PK 6.34. 1 M² Pasang rangka langit-langit (1.00 x 1.00) m, kayu jati :

6.34.1. Bahan
- Kayu jati, balok 0.012 M³ x Rp. 23,925,000.00 = Rp. 287,100.00
- Paku biasa 2" - 5" 0.100 Kg x Rp. 15,000.00 = Rp. 1,500.00
Jumlah (1) = Rp. 288,600.00
6.34.2. Tenaga
- Pekerja 0.150 Oh x Rp. 90,000.00 = Rp. 13,500.00
- Tukang kayu 0.250 Oh x Rp. 120,000.00 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000.00 = Rp. 3,250.00
- Mandor 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
Jumlah (2) = Rp. 56,500.00

Jumlah (1) +(2) = Rp. 345,100.00


Keuntungan+Over head 10% = Rp 34,510.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 379,610.00

PK 6.35. A 1 M² Pasang rangka langit-langit (1.00 x 1.00) m, damar laut :

6.35.1. Bahan
- Kayu damar laut, balok 0.012 M³ x Rp. 9,350,000.00 = Rp. 112,200.00
- Paku biasa 2" - 5" 0.100 Kg x Rp. 15,000.00 = Rp. 1,500.00
Jumlah (1) = Rp. 113,700.00
6.35.2. Tenaga
- Pekerja 0.150 Oh x Rp. 90,000.00 = Rp. 13,500.00
- Tukang kayu 0.250 Oh x Rp. 120,000.00 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000.00 = Rp. 3,250.00
- Mandor 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
Jumlah (2) = Rp. 56,500.00

Jumlah (1) +(2) = Rp. 170,200.00


Keuntungan+Over head 10% = Rp 17,020.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 187,220.00

PK 6.36. B 1 M² Pasang rangka langit-langit (1.00 x 1.00) m, Kayu meranti :

6.36.1. Bahan
- Kayu meranti, balok 0.012 M³ x Rp. 5,225,000.00 = Rp. 62,700.00
- Paku biasa 2" - 5" 0.100 Kg x Rp. 15,000.00 = Rp. 1,500.00
Jumlah (1) = Rp. 64,200.00
6.36.2. Tenaga
- Pekerja 0.150 Oh x Rp. 90,000.00 = Rp. 13,500.00
- Tukang kayu 0.250 Oh x Rp. 120,000.00 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000.00 = Rp. 3,250.00
- Mandor 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
Jumlah (2) = Rp. 56,500.00

Jumlah (1) +(2) = Rp. 120,700.00


Keuntungan+Over head 10% = Rp 12,070.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 132,770.00

PK 6.37. 1 M² Pasang rangka langit-langit (30 x 30) cm, kayu jati :

6.37.1. Bahan
- Kayu jati, balok 0.027 M³ x Rp. 23,925,000.00 = Rp. 645,975.00
- Paku biasa 2" - 5" 0.200 Kg x Rp. 15,000.00 = Rp. 3,000.00
Jumlah (1) = Rp. 648,975.00
6.37.2. Tenaga
- Pekerja 0.250 Oh x Rp. 90,000.00 = Rp. 22,500.00
- Tukang kayu 0.350 Oh x Rp. 120,000.00 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000.00 = Rp. 4,550.00
- Mandor 0.0125 Oh x Rp. 130,000.00 = Rp. 1,625.00
Jumlah (2) = Rp. 70,675.00

Jumlah (1) +(2) = Rp. 719,650.00


Keuntungan+Over head 10% = Rp 71,965.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 791,615.00

PK 6.38. 1 M² Pasang rangka langit-langit (30 x 30) cm, kayu damar laut :

6.38.1. Bahan
- Kayu damar laut, balok 0.027 M³ x Rp. 9,350,000.00 = Rp. 252,450.00
- Paku biasa 2" - 5" 0.200 Kg x Rp. 15,000.00 = Rp. 3,000.00
Jumlah (1) = Rp. 255,450.00
6.38.2. Tenaga
- Pekerja 0.250 Oh x Rp. 90,000.00 = Rp. 22,500.00
- Tukang kayu 0.350 Oh x Rp. 120,000.00 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000.00 = Rp. 4,550.00
- Mandor 0.0125 Oh x Rp. 130,000.00 = Rp. 1,625.00
Jumlah (2) = Rp. 70,675.00

Jumlah (1) +(2) = Rp. 326,125.00


Keuntungan+Over head 10% = Rp 32,612.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 358,737.50

PK 6.39. 1 M² Pasang rangka langit-langit (30 x 30) cm, kayu meranti :

6.39.1. Bahan
- Kayu meranti, balok 0.027 M³ x Rp. 5,225,000.00 = Rp. 141,075.00
- Paku biasa 2" - 5" 0.200 Kg x Rp. 15,000.00 = Rp. 3,000.00
Jumlah (1) = Rp. 144,075.00
6.39.2. Tenaga
- Pekerja 0.250 Oh x Rp. 90,000.00 = Rp. 22,500.00
- Tukang kayu 0.350 Oh x Rp. 120,000.00 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000.00 = Rp. 4,550.00
- Mandor 0.0125 Oh x Rp. 130,000.00 = Rp. 1,625.00
Jumlah (2) = Rp. 70,675.00

Jumlah (1) +(2) = Rp. 214,750.00


Keuntungan+Over head 10% = Rp 21,475.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 236,225.00

PK 6.40. 1 M´ Pasang lisplang ukuran (3 x 20) cm, kayu meranti :

6.40.1. Bahan
- Kayu meranti, papan 0.0072 M³ x Rp. 5,475,000.00 = Rp. 39,420.00
- Paku biasa 2" - 5" 0.050 Kg x Rp. 15,000.00 = Rp. 750.00
Jumlah (1) = Rp. 40,170.00
6.40.2. Tenaga
- Pekerja 0.100 Oh x Rp. 90,000.00 = Rp. 9,000.00
- Tukang kayu 0.200 Oh x Rp. 120,000.00 = Rp. 24,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000.00 = Rp. 3,250.00
- Mandor 0.005 Oh x Rp. 130,000.00 = Rp. 650.00
Jumlah (2) = Rp. 36,900.00
Jumlah (1) +(2) = Rp. 77,070.00
Keuntungan+Over head 10% = Rp 7,707.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 84,777.00

PK 6.41. 1 M´ Pasang lisplang ukuran (3 x 20) cm, kayu meranti batu :

6.41.1. Bahan
- Meranti batu, papan 0.0072 M³ x Rp. 9,375,000.00 = Rp. 67,500.00
- Paku biasa 2" - 5" 0.050 Kg x Rp. 15,000.00 = Rp. 750.00
Jumlah (1) = Rp. 68,250.00
6.41.2. Tenaga
- Pekerja 0.100 Oh x Rp. 90,000.00 = Rp. 9,000.00
- Tukang kayu 0.200 Oh x Rp. 120,000.00 = Rp. 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000.00 = Rp. 2,600.00
- Mandor 0.005 Oh x Rp. 130,000.00 = Rp. 650.00
Jumlah (2) = Rp. 36,250.00

Jumlah (1) +(2) = Rp. 104,500.00


Keuntungan+Over head 10% = Rp 10,450.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 114,950.00

PK 6.42. 1 M´ Pasang lisplang ukuran (3 x 30) cm, kayu jati :

6.42.1. Bahan
- Kayu jati, papan 0.0110 M³ x Rp. 24,104,440.00 = Rp. 265,148.84
- Paku biasa 2" - 5" 0.050 Kg x Rp. 15,000.00 = Rp. 750.00
Jumlah (1) = Rp. 265,898.84
6.42.2. Tenaga
- Pekerja 0.110 Oh x Rp. 90,000.00 = Rp. 9,900.00
- Tukang kayu 0.220 Oh x Rp. 120,000.00 = Rp. 26,400.00
- Kepala tukang 0.022 Oh x Rp. 130,000.00 = Rp. 2,860.00
- Mandor 0.005 Oh x Rp. 130,000.00 = Rp. 650.00
Jumlah (2) = Rp. 39,810.00

Jumlah (1) +(2) = Rp. 305,708.84


Keuntungan+Over head 10% = Rp 30,570.88
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 336,279.72

PK 6.43. 1 M´ Pasang lisplang ukuran (3 x 30) cm, kayu meranti batu :

6.43.1. Bahan
- Meranti batu, papan 0.011 M³ x Rp. 9,375,000.00 = Rp. 103,125.00
- Paku biasa 2" - 5" 0.050 Kg x Rp. 15,000.00 = Rp. 750.00
Jumlah (1) = Rp. 103,875.00

6.43.2. Tenaga
- Pekerja 0.110 Oh x Rp. 90,000.00 = Rp. 9,900.00
- Tukang kayu 0.220 Oh x Rp. 120,000.00 = Rp. 26,400.00
- Kepala tukang 0.022 Oh x Rp. 130,000.00 = Rp. 2,860.00
- Mandor 0.005 Oh x Rp. 130,000.00 = Rp. 650.00
Jumlah (2) = Rp. 39,810.00
Jumlah (1) +(2) = Rp. 143,685.00
Keuntungan+Over head 10% = Rp 14,368.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 158,053.50

PK 6.44. 1 M´ Pasang lisplang ukuran 2 x (3 x 20) cm, kayu meranti batu :

6.44.1. Bahan
- Meranti batu, papan 0.0145 M³ x Rp. 9,375,000.00 = Rp. 135,937.50
- Paku biasa 2" - 5" 0.060 Kg x Rp. 15,000.00 = Rp. 900.00
Jumlah (1) = Rp. 136,837.50
6.44.2. Tenaga
- Pekerja 0.150 Oh x Rp. 90,000.00 = Rp. 13,500.00
- Tukang kayu 0.250 Oh x Rp. 120,000.00 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000.00 = Rp. 3,250.00
- Mandor 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
Jumlah (2) = Rp. 56,500.00

Jumlah (1) +(2) = Rp. 193,337.50


Keuntungan+Over head 10% = Rp 19,333.75
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 212,671.25

PK 6.45. 1 M´ Pasang lisplang ukuran 2 x (2 x 20) cm, kayu meranti batu :

6.45.1. Bahan
- Meranti batu, papan 0.0086 M³ x Rp. 9,375,000.00 = Rp. 80,625.00
- Paku biasa 2" - 5" 0.060 Kg x Rp. 15,000.00 = Rp. 900.00
Jumlah (1) = Rp. 81,525.00
6.45.2. Tenaga
- Pekerja 0.100 Oh x Rp. 90,000.00 = Rp. 9,000.00
- Tukang kayu 0.100 Oh x Rp. 120,000.00 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000.00 = Rp. 1,300.00
- Mandor 0.050 Oh x Rp. 130,000.00 = Rp. 6,500.00
Jumlah (2) = Rp. 28,800.00

Jumlah (1) +(2) = Rp. 110,325.00


Keuntungan+Over head 10% = Rp 11,032.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 121,357.50

PK 6.46. 1 M´ Pasang lisplang ukuran 2 x (2 x 20) cm, kayu meranti :

6.46.1. Bahan
- Kayu meranti,papan 0.0086 M³ x Rp. 5,475,000.00 = Rp. 47,085.00
- Paku biasa 2" - 5" 0.060 Kg x Rp. 15,000.00 = Rp. 900.00
Jumlah (1) = Rp. 47,985.00

6.46.2. Tenaga
- Pekerja 0.100 Oh x Rp. 90,000.00 = Rp. 9,000.00
- Tukang kayu 0.100 Oh x Rp. 120,000.00 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000.00 = Rp. 1,300.00
- Mandor 0.050 Oh x Rp. 130,000.00 = Rp. 6,500.00
Jumlah (2) = Rp. 28,800.00

Jumlah (1) +(2) = Rp. 76,785.00


Keuntungan+Over head 10% = Rp 7,678.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 84,463.50
PK 6.47. 1 M´ Pasang rangka dinding pemisah, kayu damar laut :

6.47.1. Bahan
- Kayu damar laut, balok 0.0195 M³ x Rp. 9,350,000.00 = Rp. 182,325.00
- Meranti batu, papan 0.007 M³ x Rp. 9,375,000.00 = Rp. 65,625.00
- Paku biasa 2" - 5" 0.100 Kg x Rp. 15,000.00 = Rp. 1,500.00
Jumlah (1) = Rp. 249,450.00
6.47.2. Tenaga
- Pekerja 0.150 Oh x Rp. 90,000.00 = Rp. 13,500.00
- Tukang kayu 0.450 Oh x Rp. 120,000.00 = Rp. 54,000.00
- Kepala tukang 0.045 Oh x Rp. 130,000.00 = Rp. 5,850.00
- Mandor 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
Jumlah (2) = Rp. 83,100.00

Jumlah (1) +(2) = Rp. 332,550.00


Keuntungan+Over head 10% = Rp 33,255.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 365,805.00

PK 6.48. 1 M´ Pasang rangka dinding pemisah, kayu meranti :

6.48.1. Bahan
- Kayu meranti, balok 0.0195 M³ x Rp. 5,225,000.00 = Rp. 101,887.50
- Kayu meranti, papan 0.007 M³ x Rp. 5,475,000.00 = Rp. 38,325.00
- Paku biasa 2" - 5" 0.100 Kg x Rp. 15,000.00 = Rp. 1,500.00
Jumlah (1) = Rp. 141,712.50
6.48.2. Tenaga
- Pekerja 0.150 Oh x Rp. 90,000.00 = Rp. 13,500.00
- Tukang kayu 0.450 Oh x Rp. 120,000.00 = Rp. 54,000.00
- Kepala tukang 0.045 Oh x Rp. 130,000.00 = Rp. 5,850.00
- Mandor 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
Jumlah (2) = Rp. 83,100.00

Jumlah (1) +(2) = Rp. 224,812.50


Keuntungan+Over head 10% = Rp 22,481.25
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 247,293.75

PK 6.49. 1 M² Pasang dinding pemisah teakwood rangka, rangka kayu damar laut :

6.49.1. Bahan
- Kayu damar laut, balok 0.0195 M³ x Rp. 9,350,000.00 = Rp. 182,325.00
- Teakwood 4' x 8' 1.000 M³ x Rp. 130,000.00 = Rp. 130,000.00
- Paku biasa 2" - 5" 0.100 Kg x Rp. 15,000.00 = Rp. 1,500.00
Jumlah (1) = Rp. 313,825.00
6.49.2. Tenaga
- Pekerja 0.150 Oh x Rp. 90,000.00 = Rp. 13,500.00
- Tukang kayu 0.450 Oh x Rp. 120,000.00 = Rp. 54,000.00
- Kepala tukang 0.045 Oh x Rp. 130,000.00 = Rp. 5,850.00
- Mandor 0.075 Oh x Rp. 130,000.00 = Rp. 9,750.00
Jumlah (2) = Rp. 83,100.00

Jumlah (1) +(2) = Rp. 396,925.00


Keuntungan+Over head 10% = Rp 39,692.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 436,617.50
PK 6.50. 1 M² Pasang dinding pemisah double plywood, rangka kayu damar laut :

6.50.1. Bahan
- Kayu damar laut, balok 0.0195 M³ x Rp. 9,350,000.00 = Rp. 182,325.00
- Paku biasa 2" - 5" 0.100 Kg x Rp. 15,000.00 = Rp. 1,500.00
- Lem kayu 0.560 Lt x Rp. 56,100.00 = Rp. 31,416.00
- Plywood 4' x 8' x 4 mm 1.000 Lbr x Rp. 51,920.00 = Rp. 51,920.00
Jumlah (1) = Rp. 267,161.00
6.50.2. Tenaga
- Pekerja 0.200 Oh x Rp. 90,000.00 = Rp. 18,000.00
- Tukang kayu 0.600 Oh x Rp. 120,000.00 = Rp. 72,000.00
- Kepala tukang 0.060 Oh x Rp. 130,000.00 = Rp. 7,800.00
- Mandor 0.010 Oh x Rp. 130,000.00 = Rp. 1,300.00
Jumlah (2) = Rp. 99,100.00

Jumlah (1) +(2) = Rp. 366,261.00


Keuntungan+Over head 10% = Rp 36,626.10
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 402,887.10

PK 6.51. 1 M² Pasang dinding lambrizering dari papan meranti :

6.51.1. Bahan
- Kayu meranti, papan 0.0120 M³ x Rp. 5,475,000.00 = Rp. 65,700.00
- Paku biasa 2" - 5" 0.100 Kg x Rp. 15,000.00 = Rp. 1,500.00
- Paku skrup 3,5" 0.150 Lbr x Rp. 21,180.00 = Rp. 3,177.00
Jumlah (1) = Rp. 70,377.00
6.51.2. Tenaga
- Pekerja 0.600 Oh x Rp. 90,000.00 = Rp. 54,000.00
- Tukang kayu 1.800 Oh x Rp. 120,000.00 = Rp. 216,000.00
- Kepala tukang 0.180 Oh x Rp. 130,000.00 = Rp. 23,400.00
- Mandor 0.030 Oh x Rp. 130,000.00 = Rp. 3,900.00
Jumlah (2) = Rp. 297,300.00

Jumlah (1) +(2) = Rp. 367,677.00


Keuntungan+Over head 10% = Rp 36,767.70
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 404,444.70

PK 6.52. 1 M² Pasang plywood tebal 4 mm, untuk dinding :

6.52.1. Bahan

- Plywood 4' x 8' x 4 mm 0.4000 Lbr x Rp. 51,920.00 = Rp. 20,768.00


- Paku biasa 2" - 5" 0.050 Kg x Rp. 15,000.00 = Rp. 750.00
Jumlah (1) = Rp. 21,518.00
6.52.2. Tenaga

- Pekerja 0.025 Oh x Rp. 90,000.00 = Rp. 2,250.00


- Tukang kayu 0.075 Oh x Rp. 120,000.00 = Rp. 9,000.00
- Kepala tukang 0.0075 Oh x Rp. 130,000.00 = Rp. 975.00
- Mandor 0.0013 Oh x Rp. 130,000.00 = Rp. 169.00
Jumlah (2) = Rp. 12,394.00

Jumlah (1) +(2) = Rp. 33,912.00


Keuntungan+Over head 10% = Rp 3,391.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 37,303.20
PK 6.53. 1 M' Pasang list plafond kayu profil :

6.53.1. Bahan

- Kayu profil 2" 1.050 M' x Rp. 12,540.00 = Rp. 13,167.00


Jumlah (1) = Rp. 13,167.00
6.53.2. Tenaga

- Pekerja 0.021 Oh x Rp. 90,000.00 = Rp. 1,890.00


- Tukang kayu 0.021 Oh x Rp. 120,000.00 = Rp. 2,520.00
- Kepala tukang 0.002 Oh x Rp. 130,000.00 = Rp. 260.00
- Mandor 0.001 Oh x Rp. 130,000.00 = Rp. 130.00
Jumlah (2) = Rp. 4,800.00

Jumlah (1) +(2) = Rp. 17,967.00


Keuntungan+Over head 10% = Rp 1,796.70
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 19,763.70
ANALISA BIAYA KONSTRUKSI
PEKERJAAN BETON

PB 6.1. 1 M³ Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr

6.1.1 Bahan
- Semen portland 218.000 Kg x Rp. 1,500 = Rp. 327,000.00
- Pasir beton 0.520 M³ x Rp. 273,000 = Rp. 141,960.00
- Koral beton 5/7 0.870 M³ x Rp. 170,900 = Rp. 148,683.00
Jumlah (1) = Rp. 617,643.00

6.1.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.080 Oh x Rp. 130,000 = Rp. 10,400.00
Jumlah (2) = Rp. 192,150.00

Jumlah (1) + (2) = Rp. 809,793.00


Keuntungan+Over head 10% = Rp 80,979.30
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 890,772.30

PB 6.2. 1 M³ Membuat beton tumbuk, 1 Pc : 3 Ps : 6 Kr

6.2.1 Bahan
- Semen portland 197.000 Kg x Rp. 1,500 = Rp. 295,500.00
- Pasir beton 0.470 M³ x Rp. 273,000 = Rp. 128,310.00
- Koral beton 5/7 0.940 M³ x Rp. 170,900 = Rp. 160,646.00
Jumlah (1) = Rp. 584,456.00

6.2.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.080 Oh x Rp. 130,000 = Rp. 10,400.00
Jumlah (2) = Rp. 192,150.00

Jumlah (1) + (2) = Rp. 776,606.00


Keuntungan+Over head 10% = Rp 77,660.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 854,266.60

PB 6.3. 1 M³ Membuat beton tumbuk, 1 Pc : 4 Ps : 6 Kr

6.3.1 Bahan
- Semen portland 173.000 Kg x Rp. 1,500 = Rp. 259,500.00
- Pasir beton 0.570 M³ x Rp. 273,000 = Rp. 155,610.00
- Koral beton 5/7 0.870 M³ x Rp. 170,900 = Rp. 148,683.00
Jumlah (1) = Rp. 563,793.00

6.3.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.080 Oh x Rp. 130,000 = Rp. 10,400.00
Jumlah (2) = Rp. 192,150.00
Jumlah (1) + (2) = Rp. 755,943.00
Keuntungan+Over head 10% = Rp 75,594.30
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 831,537.30

PB 6.4. 1 M³ Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr, Tebal 5 Cm

6.4.1 Bahan
- Semen portland 10.000 Kg x Rp. 1,500 = Rp. 15,000.00
- Pasir beton 0.026 M³ x Rp. 273,000 = Rp. 7,098.00
- Koral beton 5/7 0.044 M³ x Rp. 170,900 = Rp. 7,519.60
Jumlah (1) = Rp. 29,617.60

6.4.2. Tenaga
- Pekerja 0.165 Oh x Rp. 90,000 = Rp. 14,850.00
- Tukang batu 0.025 Oh x Rp. 120,000 = Rp. 3,000.00
- Kepala tukang 0.002 Oh x Rp. 130,000 = Rp. 260.00
- Mandor 0.006 Oh x Rp. 130,000 = Rp. 780.00
Jumlah (2) = Rp. 18,890.00

Jumlah (1) + (2) = Rp. 48,507.60


Keuntungan+Over head 10% = Rp 4,850.76
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 53,358.36

PB 6.5. 1 M³ Membuat beton 1 Pc : 2 Ps : 3 Kr

6.5.1. Bahan
- Semen portland 232.000 Kg x Rp. 1,500 = Rp. 348,000.00
- Pasir beton 0.520 M³ x Rp. 273,000 = Rp. 141,960.00
- Koral beton 5/7 0.780 M³ x Rp. 170,900 = Rp. 133,302.00
Jumlah (1) = Rp. 623,262.00
6.5.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.080 Oh x Rp. 130,000 = Rp. 10,400.00
Jumlah (2) = Rp. 192,150.00

Jumlah (1) + (2) = Rp. 815,412.00


Keuntungan+Over head 10% = Rp 81,541.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 896,953.20

PB 6.6. 1 M³ Membuat beton 1 Pc : 2 Ps : 4 Kr

6.6.1. Bahan
- Semen portland 280.000 Kg x Rp. 1,500 = Rp. 420,000.00
- Pasir beton 0.450 M³ x Rp. 273,000 = Rp. 122,850.00
- Koral beton 3/5 0.900 M³ x Rp. 270,000 = Rp. 243,000.00
Jumlah (1) = Rp. 785,850.00
6.6.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.080 Oh x Rp. 130,000 = Rp. 10,400.00
Jumlah (2) = Rp. 192,150.00

Jumlah (1) + (2) = Rp. 978,000.00


Keuntungan+Over head 10% = Rp 97,800.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,075,800.00

PB 6.7. 1 M³ Membuat beton 1 Pc : 2 Ps : 2,5 Kr

6.7.1. Bahan
- Semen portland 352.000 Kg x Rp. 1,500 = Rp. 528,000.00
- Pasir beton 0.560 M³ x Rp. 273,000 = Rp. 152,880.00
- Koral beton 3/5 0.700 M³ x Rp. 270,000 = Rp. 189,000.00
Jumlah (1) = Rp. 869,880.00
6.7.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.080 Oh x Rp. 130,000 = Rp. 10,400.00
Jumlah (2) = Rp. 192,150.00

Jumlah (1) + (2) = Rp. 1,062,030.00


Keuntungan+Over head 10% = Rp 106,203.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,168,233.00

PB 6.8. 1 M³ Membuat beton 1 Pc : 1,5 Ps : 3 Kr

6.8.1. Bahan
- Semen portland 357.000 Kg x Rp. 1,500 = Rp. 535,500.00
- Pasir beton 0.420 M³ x Rp. 273,000 = Rp. 114,660.00
- Koral beton 3/5 0.540 M³ x Rp. 270,000 = Rp. 145,800.00
Jumlah (1) = Rp. 795,960.00
6.8.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.080 Oh x Rp. 130,000 = Rp. 10,400.00
Jumlah (2) = Rp. 192,150.00

Jumlah (1) + (2) = Rp. 988,110.00


Keuntungan+Over head 10% = Rp 98,811.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,086,921.00

PB 6.9. 1 M³ Membuat beton 1 Pc : 1,5 Ps : 2,5 Kr

6.9.1. Bahan
- Semen portland 386.000 Kg x Rp. 1,500 = Rp. 579,000.00
- Pasir beton 0.470 M³ x Rp. 273,000 = Rp. 128,310.00
- Koral beton 3/5 0.780 M³ x Rp. 270,000 = Rp. 210,600.00
Jumlah (1) = Rp. 917,910.00
6.9.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.080 Oh x Rp. 130,000 = Rp. 10,400.00
Jumlah (2) = Rp. 192,150.00

Jumlah (1) + (2) = Rp. 1,110,060.00


Keuntungan+Over head 10% = Rp 111,006.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,221,066.00
PB 6.10. 1 M³ Membuat beton 1 Pc : 1 Ps : 2 Kr

6.10.1. Bahan
- Semen portland 479.000 Kg x Rp. 1,500 = Rp. 718,500.00
- Pasir beton 0.370 M³ x Rp. 273,000 = Rp. 101,010.00
- Koral beton 3/5 0.740 M³ x Rp. 270,000 = Rp. 199,800.00
Jumlah (1) = Rp. 1,019,310.00

6.10.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.080 Oh x Rp. 130,000 = Rp. 10,400.00
Jumlah (2) = Rp. 192,150.00

Jumlah (1) + (2) = Rp. 1,211,460.00


Keuntungan+Over head 10% = Rp 121,146.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,332,606.00

PB 6.11. 1 M³ Membuat tiang pancang prestressed beton

6.11.1. Bahan
- Semen portland 440.000 Kg x Rp. 1,500 = Rp. 660,000.00
- Pasir beton 0.500 M³ x Rp. 273,000 = Rp. 136,500.00
- Koral beton/batu pecah 2/3 0.800 M³ x Rp. 261,000 = Rp. 208,800.00
- Rapidrant 2.460 Gln x Rp. 0 = Rp. 0.00
Jumlah (1) = Rp. 1,005,300.00
6.11.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.080 Oh x Rp. 130,000 = Rp. 10,400.00
Jumlah (2) = Rp. 192,150.00

Jumlah (1) + (2) = Rp. 1,197,450.00


Keuntungan+Over head 10% = Rp 119,745.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,317,195.00

PB 6.12. 1 M³ Membuat beton dengan puzzdith - 100 XR

6.12.1. Bahan
- Semen portland 336.000 Kg x Rp. 1,500 = Rp. 504,000.00
- Pasir beton 0.540 M³ x Rp. 273,000 = Rp. 147,420.00
- Koral beton 0.810 M³ x Rp. 270,000 = Rp. 218,700.00
- Puzzdith - 100 XR 1.000 Ltr x Rp. 0 = Rp. 0.00
Jumlah (1) = Rp. 870,120.00
6.12.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.080 Oh x Rp. 130,000 = Rp. 10,400.00
Jumlah (2) = Rp. 192,150.00

Jumlah (1) + (2) = Rp. 1,062,270.00


Keuntungan+Over head 10% = Rp 106,227.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,168,497.00

PB 6.13. 1 M³ Membuat beton 1 Pc : 2 Ps : 3 Kr

6.13.1. Bahan
- Semen portland 336.000 Kg x Rp. 1,500 = Rp. 504,000.00
- Pasir beton 0.540 M³ x Rp. 273,000 = Rp. 147,420.00
- Koral beton/batu pecah 2/3 0.810 M³ x Rp. 261,000 = Rp. 211,410.00
Jumlah (1) = Rp. 862,830.00
6.13.2. Tenaga
- Pekerja 2.000 Oh x Rp. 90,000 = Rp. 180,000.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 1.000 Oh x Rp. 130,000 = Rp. 130,000.00
Jumlah (2) = Rp. 356,550.00

Jumlah (1) + (2) = Rp. 1,219,380.00


Keuntungan+Over head 10% = Rp 121,938.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,341,318.00

PB 6.14. 1 M³ Membuat beton 1 Pc : 2 Ps : 4 Kr

6.14.1. Bahan
- Semen portland 291.000 Kg x Rp. 1,500 = Rp. 436,500.00
- Pasir beton 0.470 M³ x Rp. 273,000 = Rp. 128,310.00
- Koral beton/batu pecah 2/3 0.930 M³ x Rp. 261,000 = Rp. 242,730.00
Jumlah (1) = Rp. 807,540.00
6.14.2. Tenaga
- Pekerja 2.000 Oh x Rp. 90,000 = Rp. 180,000.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 1.000 Oh x Rp. 130,000 = Rp. 130,000.00
Jumlah (2) = Rp. 356,550.00

Jumlah (1) + (2) = Rp. 1,164,090.00


Keuntungan+Over head 10% = Rp 116,409.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,280,499.00

PB 6.15. 1 M³ Membuat beton 1 Pc : 1,5 Ps : 3 Kr

6.15.1. Bahan
- Semen portland 367.000 Kg x Rp. 1,500 = Rp. 550,500.00
- Pasir beton 0.440 M³ x Rp. 273,000 = Rp. 120,120.00
- Koral beton 2/3 0.880 M³ x Rp. 261,000 = Rp. 229,680.00
Jumlah (1) = Rp. 900,300.00

6.15.2. Tenaga

- Pekerja 2.000 Oh x Rp. 90,000 = Rp. 180,000.00


- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 1.000 Oh x Rp. 130,000 = Rp. 130,000.00
Jumlah (2) = Rp. 356,550.00

Jumlah (1) + (2) = Rp. 1,256,850.00


Keuntungan+Over head 10% = Rp 125,685.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,382,535.00

PB 6.16. 1 M³ Membuat beton 1 Pc : 1,5 Ps : 2,5 Kr

6.16.1. Bahan
- Semen portland 400.000 Kg x Rp. 1,500 = Rp. 600,000.00
- Pasir beton 0.480 M³ x Rp. 273,000 = Rp. 131,040.00
- Koral beton 2/3 0.880 M³ x Rp. 261,000 = Rp. 229,680.00
Jumlah (1) = Rp. 960,720.00
6.16.2. Tenaga
- Pekerja 2.000 Oh x Rp. 90,000 = Rp. 180,000.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 1.000 Oh x Rp. 130,000 = Rp. 130,000.00
Jumlah (2) = Rp. 356,550.00

Jumlah (1) + (2) = Rp. 1,317,270.00


Keuntungan+Over head 10% = Rp 131,727.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,448,997.00

PB 6.17. 1 M³ Membuat beton 1 Pc : 1 Ps : 1 Kr

6.17.1. Bahan
- Semen portland 615.000 Kg x Rp. 1,500 = Rp. 922,500.00
- Pasir beton 0.520 M³ x Rp. 273,000 = Rp. 141,960.00
- Koral beton 2/3 0.520 M³ x Rp. 261,000 = Rp. 135,720.00
Jumlah (1) = Rp. 1,200,180.00
6.17.2. Tenaga
- Pekerja 2.000 Oh x Rp. 90,000 = Rp. 180,000.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 1.000 Oh x Rp. 130,000 = Rp. 130,000.00
Jumlah (2) = Rp. 356,550.00

Jumlah (1) + (2) = Rp. 1,556,730.00


Keuntungan+Over head 10% = Rp 155,673.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,712,403.00

PB 6.18. 1 M³ Membuat beton kedap air dengan strorox - 100

6.18.1. Bahan
- Semen portland 400.000 Kg x Rp. 1,500 = Rp. 600,000.00
- Pasir beton 0.480 M³ x Rp. 273,000 = Rp. 131,040.00
- Koral beton 2/3 0.800 M³ x Rp. 261,000 = Rp. 208,800.00
- Strorox - 100 1.200 M³ x Rp. = Rp. 0.00
Jumlah (1) = Rp. 939,840.00

6.18.2. Tenaga
- Pekerja 2.000 Oh x Rp. 90,000 = Rp. 180,000.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 1.000 Oh x Rp. 130,000 = Rp. 130,000.00
Jumlah (2) = Rp. 356,550.00
Jumlah (1) + (2) = Rp. 1,296,390.00
Keuntungan+Over head 10% = Rp 129,639.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,426,029.00

PB 6.19. 1 M' Memasang PVC Waterstop lebar 150 mm

6.19.1. Bahan
- Waterstop lebar 150 mm 1.050 M' x Rp. 0 = Rp. 0.00
Jumlah (1) = Rp. 0.00

6.19.2. Tenaga
- Pekerja 0.050 Oh x Rp. 90,000 = Rp. 4,500.00
- Tukang batu 0.030 Oh x Rp. 120,000 = Rp. 3,600.00
- Kepala tukang 0.003 Oh x Rp. 130,000 = Rp. 390.00
- Mandor 0.002 Oh x Rp. 130,000 = Rp. 260.00
Jumlah (2) = Rp. 8,750.00

Jumlah (1) + (2) = Rp. 8,750.00


Keuntungan+Over head 10% = Rp 875.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 9,625.00

PB 6.20. 1 M' Memasang PVC Waterstop lebar 200 mm

6.20.1. Bahan
- Waterstop lebar 200 mm 1.050 M' x Rp. 0 = Rp. 0.00
Jumlah (1) = Rp. 0.00

6.20.2. Tenaga
- Pekerja 0.050 Oh x Rp. 90,000 = Rp. 4,500.00
- Tukang batu 0.035 Oh x Rp. 120,000 = Rp. 4,200.00
- Kepala tukang 0.0035 Oh x Rp. 130,000 = Rp. 455.00
- Mandor 0.002 Oh x Rp. 130,000 = Rp. 260.00
Jumlah (2) = Rp. 9,415.00

Jumlah (1) + (2) = Rp. 9,415.00


Keuntungan+Over head 10% = Rp 941.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 10,356.50

PB 6.21. 1 M' Memasang PVC Waterstop lebar 230 mm

6.21.1. Bahan
- Waterstop lebar 230 mm 1.050 M' x Rp. 0 = Rp. 0.00
Jumlah (1) = Rp. 0.00

6.21.2. Tenaga
- Pekerja 0.550 Oh x Rp. 90,000 = Rp. 49,500.00
- Tukang batu 0.035 Oh x Rp. 120,000 = Rp. 4,200.00
- Mandor 0.002 Oh x Rp. 130,000 = Rp. 260.00
Jumlah (2) = Rp. 53,960.00

Jumlah (1) + (2) = Rp. 53,960.00


Keuntungan+Over head 10% = Rp 5,396.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 59,356.00

PB 6.22. 1 M' Memasang PVC Waterstop lebar 250 mm

6.22.1. Bahan
- Waterstop lebar 250 mm 1.050 M' x Rp. 0 = Rp. 0.00
Jumlah (1) = Rp. 0.00

6.22.2. Tenaga
- Pekerja 0.550 Oh x Rp. 90,000 = Rp. 49,500.00
- Tukang batu 0.035 Oh x Rp. 120,000 = Rp. 4,200.00
- Mandor 0.003 Oh x Rp. 130,000 = Rp. 390.00
Jumlah (2) = Rp. 54,090.00

Jumlah (1) + (2) = Rp. 54,090.00


Keuntungan+Over head 10% = Rp 5,409.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 59,499.00

PB 6.23. 1 M' Memasang PVC Waterstop lebar 300 mm

6.23.1. Bahan
- Waterstop lebar 300 mm 1.050 M' x Rp. 0 = Rp. 0.00
Jumlah (1) = Rp. 0.00

6.23.2. Tenaga
- Pekerja 0.300 Oh x Rp. 90,000 = Rp. 27,000.00
- Tukang batu 0.260 Oh x Rp. 120,000 = Rp. 31,200.00
- Kepala tukang 0.026 Oh x Rp. 130,000 = Rp. 3,380.00
- Mandor 0.005 Oh x Rp. 130,000 = Rp. 650.00
Jumlah (2) = Rp. 62,230.00

Jumlah (1) + (2) = Rp. 62,230.00


Keuntungan+Over head 10% = Rp 6,223.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 68,453.00

PB 6.24 1 Kg Pembesian dengan Besi polos

6.24.1 Bahan
Besi beton polos 1.025 Kg x Rp. 11,000 = Rp. 11,275.00
Kawat beton 0.00375 Kg x Rp. 16,500 = Rp. 61.88
Jumlah (1) = Rp. 11,336.88

6.24.2 Tenaga
Pekerja 0.00175 Oh x Rp. 90,000 = Rp. 157.50
Tukang besi 0.00175 Oh x Rp. 120,000 = Rp. 210.00
Kepala tukang 0.00175 Oh x Rp. 130,000 = Rp. 227.50
Mandor 0.001 Oh x Rp. 130,000 = Rp. 130.00
Jumlah (2) = Rp. 725.00

Jumlah (1) + (2) = Rp. 12,061.88


Keuntungan+Over head 10% = Rp 1,206.19
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 13,268.06
PB 6.25 1 M² Kabel Presstressed polos / strands

6.25.1 Bahan
Besi Presstressed polos 1.050 Kg x Rp. 11,000 = Rp. 11,550.00
Kawat beton 0.010 Kg x Rp. 16,500 = Rp. 165.00
Jumlah (1) = Rp. 11,715.00

6.25.2 Tenaga
Pekerja 0.005 Oh x Rp. 90,000 = Rp. 450.00
Tukang besi 0.005 Oh x Rp. 120,000 = Rp. 600.00
Kepala tukang 0.005 Oh x Rp. 130,000 = Rp. 650.00
Mandor 0.003 Oh x Rp. 130,000 = Rp. 390.00
Jumlah (2) = Rp. 2,090.00

Jumlah (1) + (2) = Rp. 13,805.00


Keuntungan+Over head 10% = Rp 1,380.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 15,185.50

PB 6.26 1 M² Pasang bekisting untuk pondasi

6.26.1 Bahan
Kayu sembarang 0.0300 M³ x Rp. 2,005,477 = Rp. 60,164.31
Paku biasa 2" - 5" 0.2250 Kg x Rp. 15,000 = Rp. 3,375.00
Minyak bekisting 0.987 Ltr x Rp. 3,600 = Rp. 3,552.44
Jumlah (1) = Rp. 67,091.75

6.26.2 Tenaga
Pekerja 0.2250 Oh x Rp. 90,000 = Rp. 20,250.00
Tukang besi 0.1950 Oh x Rp. 120,000 = Rp. 23,400.00
Kepala tukang 0.0195 Oh x Rp. 130,000 = Rp. 2,535.00
Mandor 0.0038 Oh x Rp. 130,000 = Rp. 487.50
Jumlah (2) = Rp. 46,672.50

Jumlah (1) + (2) = Rp. 113,764.25


Keuntungan+Over head 10% = Rp 11,376.43
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 125,140.68

PB 6.27. 1 M² Pasang bekisting untuk sloof

6.27.1. Bahan
- Kayu sembarang 0.0338 M³ x Rp. 2,005,477 = Rp. 67,684.85
- Paku biasa 2' - 5" 0.2250 Kg x Rp. 15,000 = Rp. 3,375.00
- Minyak bekisting 0.987 Lt x Rp. 3,600 = Rp. 3,552.44
Jumlah (1) = Rp. 74,612.29

6.27.2. Tenaga
- Pekerja 0.2250 Oh x Rp. 90,000 = Rp. 20,250.00
- Tukang batu 0.1950 Oh x Rp. 120,000 = Rp. 23,400.00
- Kepala tukang 0.0195 Oh x Rp. 130,000 = Rp. 2,535.00
- Mandor 0.0038 Oh x Rp. 130,000 = Rp. 487.50
Jumlah (2) = Rp. 46,672.50

Jumlah (1) + (2) = Rp. 121,284.79


Keuntungan+Over head 10% = Rp 12,128.48
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 133,413.27

PB 6.28. 1 M² Pasang bekisting untuk kolom

6.28.1. Bahan
- Kayu sembarang 0.0150 M³ x Rp. 2,005,477 = Rp. 30,082.15
- Paku biasa 2' - 5" 0.1500 Kg x Rp. 15,000 = Rp. 2,250.00
- Minyak bekisting 0.9868 Lt x Rp. 3,600 = Rp. 3,552.44
- Balok kayu sembarang 0.0056 M³ x Rp. 4,390,400 = Rp. 24,696.00
- Plywood tebal 9 mm 0.1313 Lbr x Rp. 134,000 = Rp. 17,587.50
- Kayu dolken/Laut Ø 3"-4"/4 m 0.7500 Btg x Rp. 15,540 = Rp. 11,655.00
Jumlah (1) = Rp. 89,823.10

6.28.2. Tenaga
- Pekerja 0.1125 Oh x Rp. 90,000 = Rp. 10,125.00
- Tukang batu 0.1238 Oh x Rp. 120,000 = Rp. 14,850.00
- Kepala tukang 0.0124 Oh x Rp. 130,000 = Rp. 1,608.75
- Mandor 0.0023 Oh x Rp. 130,000 = Rp. 292.50
Jumlah (2) = Rp. 26,876.25

Jumlah (1) + (2) = Rp. 116,699.35


Keuntungan+Over head 10% = Rp 11,669.93
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 128,369.28

PB 6.29. 1 M² Pasang bekisting untuk balok

6.29.1. Bahan
- Kayu sembarang 0.0150 M³ x Rp. 2,005,477 = Rp. 30,082.15
- Paku biasa 2' - 5" 0.1500 Kg x Rp. 15,000 = Rp. 2,250.00
- Minyak bekisting 0.9868 Lt x Rp. 3,600 = Rp. 3,552.44
- Balok kayu sembarang 0.0068 M³ x Rp. 4,390,400 = Rp. 29,635.20
- Plywood tebal 9 mm 0.1313 Lbr x Rp. 134,000 = Rp. 17,587.50
- Kayu dolken/Laut Ø 3"-4"/4 m 0.7500 Btg x Rp. 15,540 = Rp. 11,655.00
Jumlah (1) = Rp. 94,762.30

6.29.2. Tenaga
- Pekerja 0.1200 Oh x Rp. 90,000 = Rp. 10,800.00
- Tukang batu 0.1238 Oh x Rp. 120,000 = Rp. 14,850.00
- Kepala tukang 0.0124 Oh x Rp. 130,000 = Rp. 1,608.75
- Mandor 0.0023 Oh x Rp. 130,000 = Rp. 292.50
Jumlah (2) = Rp. 27,551.25

Jumlah (1) + (2) = Rp. 122,313.55


Keuntungan+Over head 10% = Rp 12,231.35
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 134,544.90

PB 6.30. 1 M² Pasang bekisting untuk lantai

6.30.1. Bahan
- Kayu sembarang 0.0150 M³ x Rp. 2,005,477 = Rp. 30,082.15
- Paku biasa 2' - 5" 0.1500 Kg x Rp. 15,000 = Rp. 2,250.00
- Minyak bekisting 0.9868 Lt x Rp. 3,600 = Rp. 3,552.44
- Balok kayu sembarang 0.0056 M³ x Rp. 4,390,400 = Rp. 24,696.00
- Plywood tebal 9 mm 0.1313 Lbr x Rp. 134,000 = Rp. 17,587.50
- Kayu dolken/Laut Ø 3"-4"/4 m 2.2500 Btg x Rp. 15,540 = Rp. 34,965.00
Jumlah (1) = Rp. 113,133.10

6.30.2. Tenaga
- Pekerja 0.1200 Oh x Rp. 90,000 = Rp. 10,800.00
- Tukang batu 0.1238 Oh x Rp. 120,000 = Rp. 14,850.00
- Kepala tukang 0.0124 Oh x Rp. 130,000 = Rp. 1,608.75
- Mandor 0.0023 Oh x Rp. 130,000 = Rp. 292.50
Jumlah (2) = Rp. 27,551.25

Jumlah (1) + (2) = Rp. 140,684.35


Keuntungan+Over head 10% = Rp 14,068.43
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 154,752.78

PB 6.31. 1 M² Pasang bekisting untuk dinding

6.31.1. Bahan
- Kayu sembarang 0.0300 M³ x Rp. 2,005,477 = Rp. 60,164.31
- Paku biasa 2' - 5" 0.4000 Kg x Rp. 15,000 = Rp. 6,000.00
- Minyak bekisting 0.9868 Lt x Rp. 3,600 = Rp. 3,552.44
- Balok kayu sembarang 0.0200 M³ x Rp. 4,390,400 = Rp. 87,808.00
- Plywood tebal 9 mm 0.3500 Lbr x Rp. 134,000 = Rp. 46,900.00
- Kayu dolken/Laut Ø 3"-4"/4 m 3.0000 Btg x Rp. 15,540 = Rp. 46,620.00
- Formtie/penjaga jarak bekisting/spacer 4.0000 Btg x Rp. 5,000 = Rp. 20,000.00
Jumlah (1) = Rp. 271,044.75

6.31.2. Tenaga
- Pekerja 0.3200 Oh x Rp. 90,000 = Rp. 28,800.00
- Tukang batu 0.3300 Oh x Rp. 120,000 = Rp. 39,600.00
- Kepala tukang 0.0330 Oh x Rp. 130,000 = Rp. 4,290.00
- Mandor 0.0060 Oh x Rp. 130,000 = Rp. 780.00
Jumlah (2) = Rp. 73,470.00

Jumlah (1) + (2) = Rp. 344,514.75


Keuntungan+Over head 10% = Rp 34,451.48
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 378,966.23

PB 6.32. 1 M² Pasang bekisting untuk tangga

6.32.1. Bahan
- Kayu sembarang 0.0300 M³ x Rp. 2,005,477 = Rp. 60,164.31
- Paku biasa 2' - 5" 0.4000 Kg x Rp. 15,000 = Rp. 6,000.00
- Minyak bekisting 0.0000 Lt x Rp. 3,600 = Rp. 0.00
- Balok kayu sembarang 0.0150 M³ x Rp. 4,390,400 = Rp. 65,856.00
- Plywood tebal 9 mm 0.3500 Lbr x Rp. 134,000 = Rp. 46,900.00
- Kayu dolken/Laut Ø 3"-4"/4 m 2.0000 Btg x Rp. 15,540 = Rp. 31,080.00
Jumlah (1) = Rp. 210,000.31

6.32.2. Tenaga
- Pekerja 0.3200 Oh x Rp. 90,000 = Rp. 28,800.00
- Tukang batu 0.3300 Oh x Rp. 120,000 = Rp. 39,600.00
- Kepala tukang 0.0330 Oh x Rp. 130,000 = Rp. 4,290.00
- Mandor 0.0060 Oh x Rp. 130,000 = Rp. 780.00
Jumlah (2) = Rp. 73,470.00

Jumlah (1) + (2) = Rp. 283,470.31


Keuntungan+Over head 10% = Rp 28,347.03
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 311,817.34

PB 6.33. 1 M³ Pasang beton dengan mutu K 225

6.33.1. Bahan
- Semen portland 388.000 Kg x Rp. 1,500 = Rp. 582,000.00
- Pasir beton 0.605 M³ x Rp. 273,000 = Rp. 165,165.00
- Batu pecah 0.650 M³ x Rp. 296,000 = Rp. 192,400.00
Jumlah (1) = Rp. 939,565.00

6.33.2. Tenaga
- Pekerja 1.500 Oh x Rp. 90,000 = Rp. 135,000.00
- Tukang batu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.075 Oh x Rp. 130,000 = Rp. 9,750.00
Jumlah (2) = Rp. 178,000.00

Jumlah (1) + (2) = Rp. 1,117,565.00


Keuntungan+Over head 10% = Rp 111,756.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,229,321.50

PB 6.34. 1 M³ Pasang beton dengan mutu K 275

6.34.1. Bahan
- Semen portland 400.000 Kg x Rp. 1,500 = Rp. 600,000.00
- Pasir beton 0.420 M³ x Rp. 273,000 = Rp. 114,660.00
- Koral beton 0.820 M³ x Rp. 296,000 = Rp. 242,720.00
Jumlah (1) = Rp. 957,380.00

6.34.2. Tenaga
- Pekerja 1.500 Oh x Rp. 90,000 = Rp. 135,000.00
- Tukang batu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.075 Oh x Rp. 130,000 = Rp. 9,750.00
Jumlah (2) = Rp. 178,000.00

Jumlah (1) + (2) = Rp. 1,135,380.00


Keuntungan+Over head 10% = Rp 113,538.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,248,918.00

PB 6.35. 1 M² Pasang jembatan cor

6.35.1. Bahan
- Kayu sembarang 0.0264 M³ x Rp. 2,005,477 = Rp. 52,944.59
- Paku biasa 2" - 5 " 0.600 Kg x Rp. 15,000 = Rp. 9,000.00
- Kayu dolken/Laut Ø 3"-4"/4 m 0.500 Btg x Rp. 15,540 = Rp. 7,770.00
Jumlah (1) = Rp. 69,714.59

6.35.2. Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang batu 0.050 Oh x Rp. 120,000 = Rp. 6,000.00
- Kepala tukang 0.005 Oh x Rp. 130,000 = Rp. 650.00
- Mandor 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
Jumlah (2) = Rp. 21,190.00

Jumlah (1) + (2) = Rp. 90,904.59


Keuntungan+Over head 10% = Rp 9,090.46
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 99,995.05

PB 6.36. 1 M³ Membuat pondasi beton bertulang (150 kg besi + bekisting)

6.36.1. Bahan
- Kayu sembarang 0.2000 M³ x Rp. 2,005,477 = Rp. 401,095.39
- Paku biasa 2" - 5 " 1.500 Kg x Rp. 15,000 = Rp. 22,500.00
- Minyak bekisting 0.400 Lt x Rp. 3,600 = Rp. 1,440.00
- Besi beton polos 150.000 Kg x Rp. 11,000 = Rp. 1,650,000.00
- Kawat beton 2.250 Kg x Rp. 16,500 = Rp. 37,125.00
- Semen portland 323.000 Kg x Rp. 1,500 = Rp. 484,500.00
- Pasir beton 0.520 M³ x Rp. 273,000 = Rp. 141,960.00
- Koral beton 0.780 M³ x Rp. 296,000 = Rp. 230,880.00
Jumlah (1) = Rp. 2,969,500.39

6.36.2. Tenaga
- Pekerja 3.900 Oh x Rp. 90,000 = Rp. 351,000.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Tukang kayu 1.040 Oh x Rp. 120,000 = Rp. 124,800.00
- Tukang besi 1.050 Oh x Rp. 120,000 = Rp. 126,000.00
- Kepala tukang 0.245 Oh x Rp. 130,000 = Rp. 31,850.00
- Mandor 0.165 Oh x Rp. 130,000 = Rp. 21,450.00
Jumlah (2) = Rp. 697,100.00

Jumlah (1) + (2) = Rp. 3,666,600.39


Keuntungan+Over head 10% = Rp 366,660.04
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 4,033,260.43

PB 6.37. 1 M³ Membuat sloof beton bertulang (200 kg besi + bekisting)

6.37.1. Bahan
- Kayu sembarang 0.2700 M³ x Rp. 2,005,477 = Rp. 541,478.78
- Paku biasa 2" - 5 " 2.000 Kg x Rp. 15,000 = Rp. 30,000.00
- Minyak bekisting 0.600 Lt x Rp. 3,600 = Rp. 2,160.00
- Besi beton polos 200.000 Kg x Rp. 11,000 = Rp. 2,200,000.00
- Kawat beton 3.000 Kg x Rp. 16,500 = Rp. 49,500.00
- Semen portland 323.000 Kg x Rp. 1,500 = Rp. 484,500.00
- Pasir beton 0.520 M³ x Rp. 273,000 = Rp. 141,960.00
- Koral beton 0.780 M³ x Rp. 296,000 = Rp. 230,880.00
Jumlah (1) = Rp. 3,680,478.78

6.37.2. Tenaga
- Pekerja 4.850 Oh x Rp. 90,000 = Rp. 436,500.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Tukang kayu 1.560 Oh x Rp. 120,000 = Rp. 187,200.00
- Tukang besi 1.400 Oh x Rp. 120,000 = Rp. 168,000.00
- Kepala tukang 0.331 Oh x Rp. 130,000 = Rp. 43,030.00
- Mandor 0.170 Oh x Rp. 130,000 = Rp. 22,100.00
Jumlah (2) = Rp. 898,830.00

Jumlah (1) + (2) = Rp. 4,579,308.78


Keuntungan+Over head 10% = Rp 457,930.88
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 5,037,239.66

PB 6.38. 1 M³ Membuat kolom beton bertulang (300 kg besi + bekisting)

6.38.1. Bahan
- Kayu sembarang 0.4000 M³ x Rp. 2,005,477 = Rp. 802,190.78
- Paku biasa 2" - 5 " 4.000 Kg x Rp. 15,000 = Rp. 60,000.00
- Minyak bekisting 2.000 Lt x Rp. 3,600 = Rp. 7,200.00
- Besi beton polos 300.000 Kg x Rp. 11,000 = Rp. 3,300,000.00
- Kawat beton 4.500 Kg x Rp. 16,500 = Rp. 74,250.00
- Semen portland 323.000 Kg x Rp. 1,500 = Rp. 484,500.00
- Pasir beton 0.520 M³ x Rp. 273,000 = Rp. 141,960.00
- Koral beton 0.780 M³ x Rp. 296,000 = Rp. 230,880.00
- Kayu sembarang balok 0.150 M³ x Rp. 2,005,477 = Rp. 300,821.54
- Plywood 9 mm 3.500 Lbr x Rp. 134,000 = Rp. 469,000.00
- Kayu dolken/Laut Ø 3"-4"/4 m 20.000 Btg x Rp. 15,540 = Rp. 310,800.00
Jumlah (1) = Rp. 6,181,602.33

6.38.2. Tenaga
- Pekerja 7.300 Oh x Rp. 90,000 = Rp. 657,000.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Tukang kayu 3.300 Oh x Rp. 120,000 = Rp. 396,000.00
- Tukang besi 2.100 Oh x Rp. 120,000 = Rp. 252,000.00
- Kepala tukang 0.570 Oh x Rp. 130,000 = Rp. 74,100.00
- Mandor 0.250 Oh x Rp. 130,000 = Rp. 32,500.00
Jumlah (2) = Rp. 1,453,600.00

Jumlah (1) + (2) = Rp. 7,635,202.33


Keuntungan+Over head 10% = Rp 763,520.23
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 8,398,722.56

PB 6.39. 1 M³ Membuat balok beton bertulang (200 kg besi + bekisting)

6.39.1. Bahan
- Kayu sembarang 0.3200 M³ x Rp. 2,005,477 = Rp. 641,752.63
- Paku biasa 2" - 5 " 3.200 Kg x Rp. 15,000 = Rp. 48,000.00
- Minyak bekisting 1.600 Lt x Rp. 3,600 = Rp. 5,760.00
- Besi beton polos 200.000 Kg x Rp. 11,000 = Rp. 2,200,000.00
- Kawat beton 3.000 Kg x Rp. 16,500 = Rp. 49,500.00
- Semen portland 323.000 Kg x Rp. 1,500 = Rp. 484,500.00
- Pasir beton 0.520 M³ x Rp. 273,000 = Rp. 141,960.00
- Koral beton 0.780 M³ x Rp. 296,000 = Rp. 230,880.00
- Kayu sembarang balok 0.140 M³ x Rp. 2,005,477 = Rp. 280,766.77
- Plywood 9 mm 2.800 Lbr x Rp. 134,000 = Rp. 375,200.00
- Kayu dolken/Laut Ø 3"-4"/4 m 16.000 Btg x Rp. 15,540 = Rp. 248,640.00
Jumlah (1) = Rp. 4,706,959.40

6.39.2. Tenaga
- Pekerja 5.960 Oh x Rp. 90,000 = Rp. 536,400.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Tukang kayu 2.800 Oh x Rp. 120,000 = Rp. 336,000.00
- Tukang besi 1.400 Oh x Rp. 120,000 = Rp. 168,000.00
- Kepala tukang 0.455 Oh x Rp. 130,000 = Rp. 59,150.00
- Mandor 0.208 Oh x Rp. 130,000 = Rp. 27,040.00
Jumlah (2) = Rp. 1,168,590.00

Jumlah (1) + (2) = Rp. 5,875,549.40


Keuntungan+Over head 10% = Rp 587,554.94
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 6,463,104.34

PB 6.40. 1 M³ Membuat balok beton bertulang (150 kg besi + bekisting)

6.40.1. Bahan
- Kayu sembarang 0.320 M³ x Rp. 2,005,477 = Rp. 641,752.63
- Paku biasa 2" - 5 " 3.200 Kg x Rp. 15,000 = Rp. 48,000.00
- Minyak bekisting 1.600 Lt x Rp. 3,600 = Rp. 5,760.00
- Besi beton polos 150.000 Kg x Rp. 11,000 = Rp. 1,650,000.00
- Kawat beton 2.250 Kg x Rp. 16,500 = Rp. 37,125.00
- Semen portland 323.000 Kg x Rp. 1,500 = Rp. 484,500.00
- Pasir beton 0.520 M³ x Rp. 273,000 = Rp. 141,960.00
- Koral beton 0.780 M³ x Rp. 296,000 = Rp. 230,880.00
- Kayu sembarang balok 0.120 M³ x Rp. 2,005,477 = Rp. 240,657.24
- Plywood 9 mm 2.800 Lbr x Rp. 134,000 = Rp. 375,200.00
- Kayu dolken/Laut Ø 3"-4"/4 m 32.000 Btg x Rp. 15,540 = Rp. 497,280.00
Jumlah (1) = Rp. 4,353,114.86
6.40.2. Tenaga
- Pekerja 5.800 Oh x Rp. 90,000 = Rp. 522,000.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Tukang kayu 2.800 Oh x Rp. 120,000 = Rp. 336,000.00
- Tukang besi 1.050 Oh x Rp. 120,000 = Rp. 126,000.00
- Kepala tukang 0.420 Oh x Rp. 130,000 = Rp. 54,600.00
- Mandor 0.185 Oh x Rp. 130,000 = Rp. 24,050.00
Jumlah (2) = Rp. 1,104,650.00

Jumlah (1) + (2) = Rp. 5,457,764.86


Keuntungan+Over head 10% = Rp 545,776.49
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 6,003,541.35

PB 6.41. 1 M³ Membuat dinding beton bertulang (150 kg besi + bekisting)

6.41.1. Bahan
- Kayu sembarang 0.240 M³ x Rp. 2,005,477 = Rp. 481,314.47
- Paku biasa 2" - 5 " 3.200 Kg x Rp. 15,000 = Rp. 48,000.00
- Minyak bekisting 1.600 Lt x Rp. 3,600 = Rp. 5,760.00
- Besi beton polos 150.000 Kg x Rp. 11,000 = Rp. 1,650,000.00
- Kawat beton 2.250 Kg x Rp. 16,500 = Rp. 37,125.00
- Semen portland 323.000 Kg x Rp. 1,500 = Rp. 484,500.00
- Pasir beton 0.520 M³ x Rp. 273,000 = Rp. 141,960.00
- Koral beton 0.780 M³ x Rp. 296,000 = Rp. 230,880.00
- Kayu sembarang balok 0.160 M³ x Rp. 2,005,477 = Rp. 320,876.31
- Plywood 9 mm 2.800 Lbr x Rp. 134,000 = Rp. 375,200.00
- Kayu dolken/Laut Ø 3"-4"/4 m 24.000 Btg x Rp. 15,540 = Rp. 372,960.00
Jumlah (1) = Rp. 4,148,575.78

6.41.2. Tenaga
- Pekerja 5.600 Oh x Rp. 90,000 = Rp. 504,000.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Tukang kayu 2.640 Oh x Rp. 120,000 = Rp. 316,800.00
- Tukang besi 1.050 Oh x Rp. 120,000 = Rp. 126,000.00
- Kepala tukang 0.400 Oh x Rp. 130,000 = Rp. 52,000.00
- Mandor 0.193 Oh x Rp. 130,000 = Rp. 25,090.00
Jumlah (2) = Rp. 1,065,890.00

Jumlah (1) + (2) = Rp. 5,214,465.78


Keuntungan+Over head 10% = Rp 521,446.58
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 5,735,912.36

PB 6.42. 1 M³ Membuat tangga beton bertulang (150 kg besi + bekisting)

6.42.1. Bahan
- Kayu sembarang 0.250 M³ x Rp. 2,005,477 = Rp. 501,369.24
- Paku biasa 2" - 5 " 3.000 Kg x Rp. 15,000 = Rp. 45,000.00
- Minyak bekisting 1.200 Lt x Rp. 3,600 = Rp. 4,320.00
- Besi beton polos 200.000 Kg x Rp. 11,000 = Rp. 2,200,000.00
- Kawat beton 3.000 Kg x Rp. 16,500 = Rp. 49,500.00
- Semen portland 323.000 Kg x Rp. 1,500 = Rp. 484,500.00
- Pasir beton 0.520 M³ x Rp. 273,000 = Rp. 141,960.00
- Koral beton 0.780 M³ x Rp. 296,000 = Rp. 230,880.00
- Kayu sembarang balok 0.105 M³ x Rp. 2,005,477 = Rp. 210,575.08
- Plywood 9 mm 2.500 Lbr x Rp. 134,000 = Rp. 335,000.00
- Kayu dolken/Laut Ø 3"-4"/4 m 14.000 Btg x Rp. 15,540 = Rp. 217,560.00
Jumlah (1) = Rp. 4,420,664.32

6.42.2. Tenaga
- Pekerja 5.600 Oh x Rp. 90,000 = Rp. 504,000.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Tukang kayu 2.300 Oh x Rp. 120,000 = Rp. 276,000.00
- Tukang besi 1.400 Oh x Rp. 120,000 = Rp. 168,000.00
- Kepala tukang 0.405 Oh x Rp. 130,000 = Rp. 52,650.00
- Mandor 0.202 Oh x Rp. 130,000 = Rp. 26,260.00
Jumlah (2) = Rp. 1,068,910.00

Jumlah (1) + (2) = Rp. 5,489,574.32


Keuntungan+Over head 10% = Rp 548,957.43
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 6,038,531.75

PB 6.43. 1 M' Membuat kolom penguat beton bertulang (11 x 11) cm

6.43.1. Bahan
- Kayu sembarang 0.002 M³ x Rp. 2,005,477 = Rp. 4,010.95
- Paku biasa 2" - 5 " 0.010 Kg x Rp. 15,000 = Rp. 150.00
- Besi beton polos 3.000 Kg x Rp. 11,000 = Rp. 33,000.00
- Kawat beton 0.450 Kg x Rp. 16,500 = Rp. 7,425.00
- Semen portland 4.000 Kg x Rp. 1,500 = Rp. 6,000.00
- Pasir beton 0.006 M³ x Rp. 273,000 = Rp. 1,638.00
- Koral beton 0.009 M³ x Rp. 296,000 = Rp. 2,664.00
Jumlah (1) = Rp. 54,887.95

6.43.2. Tenaga
- Pekerja 0.180 Oh x Rp. 90,000 = Rp. 16,200.00
- Tukang batu 0.020 Oh x Rp. 120,000 = Rp. 2,400.00
- Tukang kayu 0.020 Oh x Rp. 120,000 = Rp. 2,400.00
- Tukang besi 0.020 Oh x Rp. 120,000 = Rp. 2,400.00
- Kepala tukang 0.006 Oh x Rp. 130,000 = Rp. 780.00
- Mandor 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
Jumlah (2) = Rp. 25,350.00

Jumlah (1) + (2) = Rp. 80,237.95


Keuntungan+Over head 10% = Rp 8,023.80
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 88,261.75

PB 6.44. 1 M' Membuat ring balok beton bertulang (10 x 15) cm

6.44.1. Bahan
- Kayu sembarang 0.003 M³ x Rp. 2,005,477 = Rp. 6,016.43
- Paku biasa 2" - 5 " 0.020 Kg x Rp. 15,000 = Rp. 300.00
- Besi beton polos 3.600 Kg x Rp. 11,000 = Rp. 39,600.00
- Kawat beton 0.050 Kg x Rp. 16,500 = Rp. 825.00
- Semen portland 5.500 Kg x Rp. 1,500 = Rp. 8,250.00
- Pasir beton 0.009 M³ x Rp. 273,000 = Rp. 2,457.00
- Koral beton 0.015 M³ x Rp. 296,000 = Rp. 4,440.00
Jumlah (1) = Rp. 61,888.43

6.44.2. Tenaga
- Pekerja 0.297 Oh x Rp. 90,000 = Rp. 26,730.00
- Tukang batu 0.033 Oh x Rp. 120,000 = Rp. 3,960.00
- Tukang kayu 0.033 Oh x Rp. 120,000 = Rp. 3,960.00
- Tukang besi 0.033 Oh x Rp. 120,000 = Rp. 3,960.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
Jumlah (2) = Rp. 41,860.00

Jumlah (1) + (2) = Rp. 103,748.43


Keuntungan+Over head 10% = Rp 10,374.84
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 114,123.27

PB 6.45. Membuat 1 m3 beton mutu f'c = 7,4 Mpa

6.45.1. Bahan
- Semen portland 247.000 Kg x Rp. 1,500 = Rp. 370,500.00
- Pasir beton 869.000 Kg x Rp. 195 = Rp. 169,455.00
- Kerikil (maks 30 mm) 999.000 Kg x Rp. 219 = Rp. 219,040.00

Jumlah (1) = Rp. 758,995.00

6.45.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.275 Oh x Rp. 120,000 = Rp. 33,000.00
- Kepala tukang 0.028 Oh x Rp. 130,000 = Rp. 3,640.00
- Mandor 0.083 Oh x Rp. 130,000 = Rp. 10,790.00
Jumlah (2) = Rp. 195,930.00

Jumlah (1) + (2) = Rp. 954,925.00


Keuntungan+Over head 10% = Rp 95,492.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,050,417.50

PB 6.46 Membuat 1 m3 beton mutu f'c = 9,8 Mpa

6.46.1. Bahan
- Semen portland 276.000 Kg x Rp. 1,500 = Rp. 414,000.00
- Pasir beton 828.000 Kg x Rp. 195 = Rp. 161,460.00
- Kerikil (maks 30 mm) 1012.000 Kg x Rp. 219 = Rp. 221,890.37

Jumlah (1) = Rp. 797,350.37

6.46.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.275 Oh x Rp. 120,000 = Rp. 33,000.00
- Kepala tukang 0.028 Oh x Rp. 130,000 = Rp. 3,640.00
- Mandor 0.083 Oh x Rp. 130,000 = Rp. 10,790.00
Jumlah (2) = Rp. 195,930.00

Jumlah (1) + (2) = Rp. 993,280.37


Keuntungan+Over head 10% = Rp 99,328.04
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,092,608.41

PB 6.47. Membuat 1 m3 beton mutu f'c = 12,2 Mpa

6.47.1. Bahan
- Semen portland 299.000 Kg x Rp. 1,500 = Rp. 448,500.00
- Pasir beton 799.000 Kg x Rp. 195 = Rp. 155,805.00
- Kerikil (maks 30 mm) 1017.000 Kg x Rp. 219 = Rp. 222,986.67

Jumlah (1) = Rp. 827,291.67

6.47.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.275 Oh x Rp. 120,000 = Rp. 33,000.00
- Kepala tukang 0.028 Oh x Rp. 130,000 = Rp. 3,640.00
- Mandor 0.083 Oh x Rp. 130,000 = Rp. 10,790.00
Jumlah (2) = Rp. 195,930.00

Jumlah (1) + (2) = Rp. 1,023,221.67


Keuntungan+Over head 10% = Rp 102,322.17
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,125,543.83

PB 6.48. Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa slump (3-6) cm, w/c=0,87

6.48.1. Bahan
- Semen portland 230.000 Kg x Rp. 1,500 = Rp. 345,000.00
- Pasir beton 893.000 Kg x Rp. 195 = Rp. 174,135.00
- Kerikil (maks 30 mm) 1027.000 Kg x Rp. 219 = Rp. 225,179.26

Jumlah (1) = Rp. 744,314.26


6.48.2. Tenaga
- Pekerja 1.200 Oh x Rp. 90,000 = Rp. 108,000.00
- Tukang batu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.060 Oh x Rp. 130,000 = Rp. 7,800.00
Jumlah (2) = Rp. 142,400.00

Jumlah (1) + (2) = Rp. 886,714.26


Keuntungan+Over head 10% = Rp 88,671.43
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 975,385.69

PB 6.49. Membuat 1 m3 lantai kerja beton mutu f'c = 14,5 Mpa slump (120±20) mm

6.49.1. Bahan
- Semen portland 326.000 Kg x Rp. 1,500 = Rp. 489,000.00
- Pasir beton 760.000 Kg x Rp. 195 = Rp. 148,200.00
- Kerikil (maks 30 mm) 1029.000 Kg x Rp. 219 = Rp. 225,617.78

Jumlah (1) = Rp. 862,817.78

6.49.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.275 Oh x Rp. 120,000 = Rp. 33,000.00
- Kepala tukang 0.028 Oh x Rp. 130,000 = Rp. 3,640.00
- Mandor 0.083 Oh x Rp. 130,000 = Rp. 10,790.00
Jumlah (2) = Rp. 195,930.00

Jumlah (1) + (2) = Rp. 1,058,747.78


Keuntungan+Over head 10% = Rp 105,874.78
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,164,622.56

PB 6.50. Membuat 1 m3 beton mutu f'c = 16,9 Mpa

6.50.1. Bahan
- Semen portland 352.000 Kg x Rp. 1,500 = Rp. 528,000.00
- Pasir beton 731.000 Kg x Rp. 195 = Rp. 142,545.00
- Kerikil (maks 30 mm) 1031.000 Kg x Rp. 219 = Rp. 226,056.30

Jumlah (1) = Rp. 896,601.30

6.50.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.275 Oh x Rp. 120,000 = Rp. 33,000.00
- Kepala tukang 0.028 Oh x Rp. 130,000 = Rp. 3,640.00
- Mandor 0.083 Oh x Rp. 130,000 = Rp. 10,790.00
Jumlah (2) = Rp. 195,930.00

Jumlah (1) + (2) = Rp. 1,092,531.30


Keuntungan+Over head 10% = Rp 109,253.13
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,201,784.43

PB 6.51. Membuat 1 m3 beton mutu f'c = 19,3 Mpa

6.51.1. Bahan
- Semen portland 371.000 Kg x Rp. 1,500 = Rp. 556,500.00
- Pasir beton 698.000 Kg x Rp. 195 = Rp. 136,110.00
- Kerikil (maks 30 mm) 1047.000 Kg x Rp. 219 = Rp. 229,564.44
Jumlah (1) = Rp. 922,174.44

6.51.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.275 Oh x Rp. 120,000 = Rp. 33,000.00
- Kepala tukang 0.028 Oh x Rp. 130,000 = Rp. 3,640.00
- Mandor 0.083 Oh x Rp. 130,000 = Rp. 10,790.00
Jumlah (2) = Rp. 195,930.00

Jumlah (1) + (2) = Rp. 1,118,104.44


Keuntungan+Over head 10% = Rp 111,810.44
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,229,914.89

PB 6.52. Membuat 1 m3 beton mutu f'c = 21,7 Mpa

6.52.1. Bahan
- Semen portland 384.000 Kg x Rp. 1,500 = Rp. 576,000.00
- Pasir beton 692.000 Kg x Rp. 195 = Rp. 134,940.00
- Kerikil (maks 30 mm) 1039.000 Kg x Rp. 219 = Rp. 227,810.37

Jumlah (1) = Rp. 938,750.37

6.52.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.275 Oh x Rp. 120,000 = Rp. 33,000.00
- Kepala tukang 0.028 Oh x Rp. 130,000 = Rp. 3,640.00
- Mandor 0.083 Oh x Rp. 130,000 = Rp. 10,790.00
Jumlah (2) = Rp. 195,930.00

Jumlah (1) + (2) = Rp. 1,134,680.37


Keuntungan+Over head 10% = Rp 113,468.04
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,248,148.41

PB 6.53. Membuat 1 m3 beton mutu f'c = 24,0 Mpa

6.53.1. Bahan
- Semen portland 406.000 Kg x Rp. 1,500 = Rp. 609,000.00
- Pasir beton 684.000 Kg x Rp. 195 = Rp. 133,380.00
- Kerikil (maks 30 mm) 1026.000 Kg x Rp. 219 = Rp. 224,960.00

Jumlah (1) = Rp. 967,340.00

6.53.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.275 Oh x Rp. 120,000 = Rp. 33,000.00
- Kepala tukang 0.028 Oh x Rp. 130,000 = Rp. 3,640.00
- Mandor 0.083 Oh x Rp. 130,000 = Rp. 10,790.00
Jumlah (2) = Rp. 195,930.00

Jumlah (1) + (2) = Rp. 1,163,270.00


Keuntungan+Over head 10% = Rp 116,327.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,279,597.00

PB 6.54. Membuat 1 m3 beton mutu f'c = 26,4 Mpa

6.54.1. Bahan
- Semen portland 413.000 Kg x Rp. 1,500 = Rp. 619,500.00
- Pasir beton 681.000 Kg x Rp. 195 = Rp. 132,795.00
- Kerikil (maks 30 mm) 1021.000 Kg x Rp. 219 = Rp. 223,863.70

Jumlah (1) = Rp. 976,158.70

6.54.2. Tenaga
- Pekerja 1.650 Oh x Rp. 90,000 = Rp. 148,500.00
- Tukang batu 0.275 Oh x Rp. 120,000 = Rp. 33,000.00
- Kepala tukang 0.028 Oh x Rp. 130,000 = Rp. 3,640.00
- Mandor 0.083 Oh x Rp. 130,000 = Rp. 10,790.00
Jumlah (2) = Rp. 195,930.00

Jumlah (1) + (2) = Rp. 1,172,088.70


Keuntungan+Over head 10% = Rp 117,208.87
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,289,297.57

PB 6.55. Membuat 1 m3 beton mutu f'c = 28,8 Mpa

6.55.1. Bahan
- Semen portland 439.000 Kg x Rp. 1,500 = Rp. 658,500.00
- Pasir beton 670.000 Kg x Rp. 195 = Rp. 130,650.00
- Kerikil (maks 30 mm) 1006.000 Kg x Rp. 219 = Rp. 220,574.81

Jumlah (1) = Rp. 1,009,724.81

6.55.2. Tenaga
- Pekerja 2.100 Oh x Rp. 90,000 = Rp. 189,000.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.105 Oh x Rp. 130,000 = Rp. 13,650.00
Jumlah (2) = Rp. 249,200.00

Jumlah (1) + (2) = Rp. 1,258,924.81


Keuntungan+Over head 10% = Rp 125,892.48
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,384,817.30

PB 6.56. Membuat 1 m3 beton mutu f'c = 31,2 Mpa slump (120±20) mm

6.56.1. Bahan
- Semen portland 448.000 Kg x Rp. 1,500 = Rp. 672,000.00
- Pasir beton 667.000 Kg x Rp. 195 = Rp. 130,065.00
- Kerikil (maks 30 mm) 1000.000 Kg x Rp. 219 = Rp. 219,259.26

Jumlah (1) = Rp. 1,021,324.26

6.56.2. Tenaga
- Pekerja 2.100 Oh x Rp. 90,000 = Rp. 189,000.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.105 Oh x Rp. 130,000 = Rp. 13,650.00
Jumlah (2) = Rp. 249,200.00

Jumlah (1) + (2) = Rp. 1,270,524.26


Keuntungan+Over head 10% = Rp 127,052.43
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,397,576.69

PB 6.57. Pemasangfan 10 kg jaring kawat baja (wiremesh)

6.57.1. Bahan
- Jaring kawat baja di las 10.200 Kg x Rp. 11,000 = Rp. 112,200.00
- Kawat beton 0.050 Kg x Rp. 16,500 = Rp. 825.00

Jumlah (1) = Rp. 113,025.00

6.57.2. Tenaga
- Pekerja 0.025 Oh x Rp. 90,000 = Rp. 2,250.00
- Tukang besi 0.025 Oh x Rp. 120,000 = Rp. 3,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.001 Oh x Rp. 130,000 = Rp. 130.00
Jumlah (2) = Rp. 8,630.00

Jumlah (1) + (2) = Rp. 121,655.00


Keuntungan+Over head 10% = Rp 12,165.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 133,820.50
ANALISA BIAYA KONSTRUKSI
PEKERJAAN PENUTUP ATAP

PPA 6.1 1 M² Pasang atap genteng palentong kecil

6.1.1 Bahan
- Genteng Palentong 25.000 Buah x Rp. 1,670 = Rp. 41,750.00
Jumlah (1) = Rp. 41,750.00
6.1.2 Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang Kayu 0.075 Oh x Rp. 120,000 = Rp. 9,000.00
- Kepala Tukang 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
- Mandor 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
Jumlah (2) = Rp. 24,580.00

Jumlah (1) + (2) = Rp. 66,330.00


Keuntungan+Over head 10% = Rp 6,633.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 72,963.00

PPA 6.2 1 M² Pasang atap genteng kodok / glazzur

6.2.1 Bahan
- Genteng Kodok 25.000 Buah x Rp. 2,170 = Rp. 54,250.00
Jumlah (1) = Rp. 54,250.00
6.2.2 Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang Kayu 0.075 Oh x Rp. 120,000 = Rp. 9,000.00
- Kepala Tukang 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
- Mandor 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
Jumlah (2) = Rp. 24,580.00

Jumlah (1) + (2) = Rp. 78,830.00


Keuntungan+Over head 10% = Rp 7,883.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 86,713.00

PPA 6.3 1 M² Pasang atap genteng palentong super / besar

6.3.1 Bahan
- Genteng Palentong super 12.000 Buah x Rp. 3,980 = Rp. 47,760.00
Jumlah (1) = Rp. 47,760.00
6.3.2 Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang Kayu 0.060 Oh x Rp. 120,000 = Rp. 7,200.00
- Kepala Tukang 0.006 Oh x Rp. 130,000 = Rp. 780.00
- Mandor 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
Jumlah (2) = Rp. 22,520.00

Jumlah (1) + (2) = Rp. 70,280.00


Keuntungan+Over head 10% = Rp 7,028.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 77,308.00

PPA 6.4 1 M² Pasang genteng bubung palentong

6.4.1 Bahan
- Bubung geneteng palentong 5.000 Buah x Rp. 9,350 = Rp. 46,750.00
- Semen portland 8.000 Kg x Rp. 1,500 = Rp. 12,000.00
- Pasir Pasang 0.032 M³ x Rp. 273,000 = Rp. 8,736.00
Jumlah (1) = Rp. 67,486.00
6.4.2 Tenaga
- Pekerja 0.400 Oh x Rp. 90,000 = Rp. 36,000.00
- Tukang Kayu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala Tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.002 Oh x Rp. 130,000 = Rp. 260.00
Jumlah (2) = Rp. 62,860.00

Jumlah (1) + (2) = Rp. 130,346.00


Keuntungan+Over head 10% = Rp 13,034.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 143,380.60

PPA 6.5 1 M' Pasang bubung genteng kodok glazzuur

6.5.1 Bahan
- Bubung genteng kodok 5.000 Buah x Rp. 9,560 = Rp. 47,800.00
- Semen portland 8.000 Kg x Rp. 1,500 = Rp. 12,000.00
- Pasir Pasang 0.032 M³ x Rp. 273,000 = Rp. 8,736.00
Jumlah (1) = Rp. 68,536.00
6.5.2 Tenaga
- Pekerja 0.400 Oh x Rp. 90,000 = Rp. 36,000.00
- Tukang Kayu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala Tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.002 Oh x Rp. 130,000 = Rp. 260.00
Jumlah (2) = Rp. 62,860.00

Jumlah (1) + (2) = Rp. 131,396.00


Keuntungan+Over head 10% = Rp 13,139.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 144,535.60

PPA 6.6 1 M' Pasang bubung genteng palentong besar

6.6.1 Bahan
- Bubung genteng palentong super 4.000 Buah x Rp. 12,740 = Rp. 50,960.00
- Semen portland 8.000 Kg x Rp. 1,500 = Rp. 12,000.00
- Pasir Pasang 0.032 M³ x Rp. 273,000 = Rp. 8,736.00
Jumlah (1) = Rp. 71,696.00
6.6.2 Tenaga
- Pekerja 0.400 Oh x Rp. 90,000 = Rp. 36,000.00
- Tukang Kayu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala Tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.002 Oh x Rp. 130,000 = Rp. 260.00
Jumlah (2) = Rp. 62,860.00

Jumlah (1) + (2) = Rp. 134,556.00


Keuntungan+Over head 10% = Rp 13,455.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 148,011.60

PPA 6.7 1 M² Pasang roof light fiberglass ( 180 x 90 ) cm

6.7.1 Bahan
- Roof light fibreglass 0.600 Lbr x Rp. 46,390 = Rp. 27,834.00
- Paku biasa ½ " - 1" 0.050 Kg x Rp. 15,000 = Rp. 750.00
Jumlah (1) = Rp. 28,584.00
6.7.2 Tenaga
- Pekerja 0.140 Oh x Rp. 90,000 = Rp. 12,600.00
- Tukang Kayu 0.067 Oh x Rp. 120,000 = Rp. 8,040.00
- Kepala Tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.007 Oh x Rp. 130,000 = Rp. 910.00
Jumlah (2) = Rp. 22,460.00

Jumlah (1) + (2) = Rp. 51,044.00


Keuntungan+Over head 10% = Rp 5,104.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 56,148.40

PPA 6.8 1 M² Pasang atap asbes gelombang ( 2,70 x 0,92 m ) x 5 mm

6.8.1 Bahan
- Atap asbes gelombang 0.450 Lbr x Rp. 106,810 = Rp. 48,064.50
- Paku seng 0.120 Kg x Rp. 20,350 = Rp. 2,442.00
Jumlah (1) = Rp. 50,506.50
6.8.2 Tenaga
- Pekerja 0.140 Oh x Rp. 90,000 = Rp. 12,600.00
- Tukang Kayu 0.075 Oh x Rp. 120,000 = Rp. 9,000.00
- Kepala Tukang 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
- Mandor 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
Jumlah (2) = Rp. 23,680.00

Jumlah (1) + (2) = Rp. 74,186.50


Keuntungan+Over head 10% = Rp 7,418.65
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 81,605.15

PPA 6.9 1 M² Pasang atap asbes gelombang ( 2,40 x 0,92 m ) x 5 mm

6.9.1 Bahan
- Atap asbes gelombang 0.500 Lbr x Rp. 87,000 = Rp. 43,500.00
- Paku seng 0.120 Kg x Rp. 20,350 = Rp. 2,442.00
Jumlah (1) = Rp. 45,942.00
6.9.2 Tenaga
- Pekerja 0.140 Oh x Rp. 90,000 = Rp. 12,600.00
- Tukang Kayu 0.075 Oh x Rp. 120,000 = Rp. 9,000.00
- Kepala Tukang 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
- Mandor 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
Jumlah (2) = Rp. 23,680.00

Jumlah (1) + (2) = Rp. 69,622.00


Keuntungan+Over head 10% = Rp 6,962.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 76,584.20

PPA 6.10 1 M² Pasang atap asbes gelombang ( 2,10 x 0,92 m ) x 5 mm

6.10.1 Bahan
- Atap asbes gelombang 0.600 Lbr x Rp. 77,000 = Rp. 46,200.00
- Paku seng 0.120 Kg x Rp. 20,350 = Rp. 2,442.00
Jumlah (1) = Rp. 48,642.00
6.10.2 Tenaga
- Pekerja 0.140 Oh x Rp. 90,000 = Rp. 12,600.00
- Tukang Kayu 0.075 Oh x Rp. 120,000 = Rp. 9,000.00
- Kepala Tukang 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
- Mandor 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
Jumlah (2) = Rp. 23,680.00

Jumlah (1) + (2) = Rp. 72,322.00


Keuntungan+Over head 10% = Rp 7,232.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 79,554.20

PPA 6.11 1 M² Pasang atap asbes gelombang ( 1,80 x 0,92 m ) x 5 mm

6.11.1 Bahan
- Atap asbes gelombang 0.750 Lbr x Rp. 70,950 = Rp. 53,212.50
- Paku seng 0.120 Kg x Rp. 20,350 = Rp. 2,442.00
Jumlah (1) = Rp. 55,654.50
6.11.2 Tenaga
- Pekerja 0.140 Oh x Rp. 90,000 = Rp. 12,600.00
- Tukang Kayu 0.070 Oh x Rp. 120,000 = Rp. 8,400.00
- Kepala Tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.007 Oh x Rp. 130,000 = Rp. 910.00
Jumlah (2) = Rp. 22,820.00

Jumlah (1) + (2) = Rp. 78,474.50


Keuntungan+Over head 10% = Rp 7,847.45
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 86,321.95

PPA 6.12 1 M² Pasang atap asbes gelombang ( 2,40 x 1,05 m ) x 4 mm

6.12.1 Bahan
- Atap asbes gelombang 0.450 Lbr x Rp. 70,000 = Rp. 31,500.00
- Paku seng 0.120 Kg x Rp. 20,350 = Rp. 2,442.00
Jumlah (1) = Rp. 33,942.00
6.12.2 Tenaga
- Pekerja 0.140 Oh x Rp. 90,000 = Rp. 12,600.00
- Tukang Kayu 0.070 Oh x Rp. 120,000 = Rp. 8,400.00
- Kepala Tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.007 Oh x Rp. 130,000 = Rp. 910.00
Jumlah (2) = Rp. 22,820.00

Jumlah (1) + (2) = Rp. 56,762.00


Keuntungan+Over head 10% = Rp 5,676.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 62,438.20

PPA 6.13 1 M² Pasang atap asbes gelombang ( 2,10 x 1,05 m ) x 4 mm

6.13.1 Bahan
- Atap asbes gelombang 0.500 Lbr x Rp. 62,000 = Rp. 31,000.00
- Paku seng 0.120 Kg x Rp. 20,350 = Rp. 2,442.00
Jumlah (1) = Rp. 33,442.00
6.13.2 Tenaga
- Pekerja 0.140 Oh x Rp. 90,000 = Rp. 12,600.00
- Tukang Kayu 0.070 Oh x Rp. 120,000 = Rp. 8,400.00
- Kepala Tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.007 Oh x Rp. 130,000 = Rp. 910.00
Jumlah (2) = Rp. 22,820.00

Jumlah (1) + (2) = Rp. 56,262.00


Keuntungan+Over head 10% = Rp 5,626.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 61,888.20

PPA 6.14 1 M² Pasang atap asbes gelombang ( 1,80 x 1,05 m ) x 4 mm

6.14.1 Bahan
- Atap asbes gelombang 0.600 Lbr x Rp. 53,000 = Rp. 31,800.00
- Paku seng 0.120 Kg x Rp. 20,350 = Rp. 2,442.00
Jumlah (1) = Rp. 34,242.00
6.14.2 Tenaga
- Pekerja 0.140 Oh x Rp. 90,000 = Rp. 12,600.00
- Tukang Kayu 0.067 Oh x Rp. 120,000 = Rp. 8,040.00
- Kepala Tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.007 Oh x Rp. 130,000 = Rp. 910.00
Jumlah (2) = Rp. 22,460.00

Jumlah (1) + (2) = Rp. 56,702.00


Keuntungan+Over head 10% = Rp 5,670.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 62,372.20

PPA 6.15 1 M² Pasang atap asbes gelombang ( 2,10 x 1,05 m ) x 4 mm

6.15.1 Bahan
- Atap asbes gelombang 0.510 Lbr x Rp. 53,000 = Rp. 27,030.00
- Paku seng 0.120 Kg x Rp. 20,350 = Rp. 2,442.00
Jumlah (1) = Rp. 29,472.00
6.15.2 Tenaga
- Pekerja 0.140 Oh x Rp. 90,000 = Rp. 12,600.00
- Tukang Kayu 0.067 Oh x Rp. 120,000 = Rp. 8,040.00
- Kepala Tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.007 Oh x Rp. 130,000 = Rp. 910.00
Jumlah (2) = Rp. 22,460.00

Jumlah (1) + (2) = Rp. 51,932.00


Keuntungan+Over head 10% = Rp 5,193.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 57,125.20

PPA 6.16 1 M² Pasang atap asbes gelombang ( 1,5 x 1,05 m ) x 4 mm

6.16.1 Bahan
- Atap asbes gelombang 0.800 Lbr x Rp. 53,000 = Rp. 42,400.00
- Paku seng 0.120 Kg x Rp. 20,350 = Rp. 2,442.00
Jumlah (1) = Rp. 44,842.00
6.16.2 Tenaga
- Pekerja 0.140 Oh x Rp. 90,000 = Rp. 12,600.00
- Tukang Kayu 0.067 Oh x Rp. 120,000 = Rp. 8,040.00
- Kepala Tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.007 Oh x Rp. 130,000 = Rp. 910.00
Jumlah (2) = Rp. 22,460.00

Jumlah (1) + (2) = Rp. 67,302.00


Keuntungan+Over head 10% = Rp 6,730.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 74,032.20

PPA 6.17 1 M² Pasang atap asbes gelombang ( 3,00 x 1,08 m ) x 6 mm

6.17.1 Bahan
- Atap asbes gelombang 0.370 Lbr x Rp. 53,000 = Rp. 19,610.00
- Paku seng 0.120 Kg x Rp. 20,350 = Rp. 2,442.00
Jumlah (1) = Rp. 22,052.00
6.17.2 Tenaga
- Pekerja 0.140 Oh x Rp. 90,000 = Rp. 12,600.00
- Tukang Kayu 0.067 Oh x Rp. 120,000 = Rp. 8,040.00
- Kepala Tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.007 Oh x Rp. 130,000 = Rp. 910.00
Jumlah (2) = Rp. 22,460.00

Jumlah (1) + (2) = Rp. 44,512.00


Keuntungan+Over head 10% = Rp 4,451.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 48,963.20

PPA 6.18 1 M² Pasang atap asbes gelombang ( 2,70 x 1,08 m ) x 6 mm

6.18.1 Bahan
- Atap asbes gelombang 0.380 Lbr x Rp. 155,430 = Rp. 59,063.40
- Paku seng 0.120 Kg x Rp. 20,350 = Rp. 2,442.00
Jumlah (1) = Rp. 61,505.40
6.18.2 Tenaga
- Pekerja 0.140 Oh x Rp. 90,000 = Rp. 12,600.00
- Tukang Kayu 0.067 Oh x Rp. 120,000 = Rp. 8,040.00
- Kepala Tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.007 Oh x Rp. 130,000 = Rp. 910.00
Jumlah (2) = Rp. 22,460.00

Jumlah (1) + (2) = Rp. 83,965.40


Keuntungan+Over head 10% = Rp 8,396.54
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 92,361.94

PPA 6.19 1 M² Pasang atap asbes gelombang ( 2,4 x 1,08 m ) x 6 mm

6.19.1 Bahan
- Atap asbes gelombang 0.450 Lbr x Rp. 128,370 = Rp. 57,766.50
- Paku seng 0.120 Kg x Rp. 20,350 = Rp. 2,442.00
Jumlah (1) = Rp. 60,208.50
6.19.2 Tenaga
- Pekerja 0.140 Oh x Rp. 90,000 = Rp. 12,600.00
- Tukang Kayu 0.067 Oh x Rp. 120,000 = Rp. 8,040.00
- Kepala Tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.007 Oh x Rp. 130,000 = Rp. 910.00
Jumlah (2) = Rp. 22,460.00

Jumlah (1) + (2) = Rp. 82,668.50


Keuntungan+Over head 10% = Rp 8,266.85
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 90,935.35

PPA 6.20 1 M² Pasang atap asbes gelombang ( 2,1 x 1,08 m ) x 6 mm

6.20.1 Bahan
- Atap asbes gelombang 0.490 Lbr x Rp. 120,450 = Rp. 59,020.50
- Paku seng 0.120 Kg x Rp. 20,350 = Rp. 2,442.00
Jumlah (1) = Rp. 61,462.50
6.16.2 Tenaga
- Pekerja 0.140 Oh x Rp. 90,000 = Rp. 12,600.00
- Tukang Kayu 0.067 Oh x Rp. 120,000 = Rp. 8,040.00
- Kepala Tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.007 Oh x Rp. 130,000 = Rp. 910.00
Jumlah (2) = Rp. 22,460.00

Jumlah (1) + (2) = Rp. 83,922.50


Keuntungan+Over head 10% = Rp 8,392.25
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 92,314.75

PPA 6.21 1 M² Pasang atap asbes gelombang ( 1,80 x 1,08 m ) x 6 mm

6.21.1 Bahan
- Atap asbes gelombang 0.570 Lbr x Rp. 103,620 = Rp. 59,063.40
- Paku seng 0.120 Kg x Rp. 20,350 = Rp. 2,442.00
Jumlah (1) = Rp. 61,505.40
6.21.2 Tenaga
- Pekerja 0.140 Oh x Rp. 90,000 = Rp. 12,600.00
- Tukang Kayu 0.067 Oh x Rp. 120,000 = Rp. 8,040.00
- Kepala Tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.007 Oh x Rp. 130,000 = Rp. 910.00
Jumlah (2) = Rp. 22,460.00

Jumlah (1) + (2) = Rp. 83,965.40


Keuntungan+Over head 10% = Rp 8,396.54
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 92,361.94

PPA 6.22 1 M' Pasang bubung stel gelombang 0,92 m

6.22.1 Bahan
- Bubung stel gelombang 2.400 Lbr x Rp. 19,590 = Rp. 47,016.00
- Paku seng 6.000 Bh x Rp. 410 = Rp. 2,460.00
Jumlah (1) = Rp. 49,476.00
6.22.2 Tenaga
- Pekerja 0.084 Oh x Rp. 90,000 = Rp. 7,560.00
- Tukang Kayu 0.125 Oh x Rp. 120,000 = Rp. 15,000.00
- Kepala Tukang 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
- Mandor 0.004 Oh x Rp. 130,000 = Rp. 520.00
Jumlah (2) = Rp. 24,770.00

Jumlah (1) + (2) = Rp. 74,246.00


Keuntungan+Over head 10% = Rp 7,424.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 81,670.60

PPA 6.23 1 M' Pasang nok stel gelombang 1,05 m

6.23.1 Bahan
- Bubung stel gelombang 2.100 Lbr x Rp. 25,990 = Rp. 54,579.00
- Paku seng 6.000 Bh x Rp. 410 = Rp. 2,460.00
Jumlah (1) = Rp. 57,039.00

6.23.2 Tenaga
- Pekerja 0.084 Oh x Rp. 90,000 = Rp. 7,560.00
- Tukang Kayu 0.125 Oh x Rp. 120,000 = Rp. 15,000.00
- Kepala Tukang 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
- Mandor 0.004 Oh x Rp. 130,000 = Rp. 520.00
Jumlah (2) = Rp. 24,770.00

Jumlah (1) + (2) = Rp. 81,809.00


Keuntungan+Over head 10% = Rp 8,180.90
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 89,989.90

PPA 6.24 1 M' Pasang nok stel gelombang 1,08 m

6.24.1 Bahan
- Bubung stel gelombang 2.050 Lbr x Rp. 28,510 = Rp. 58,445.50
- Paku seng 6.000 Bh x Rp. 410 = Rp. 2,460.00
Jumlah (1) = Rp. 60,905.50
6.24.2 Tenaga
- Pekerja 0.084 Oh x Rp. 90,000 = Rp. 7,560.00
- Tukang Kayu 0.125 Oh x Rp. 120,000 = Rp. 15,000.00
- Kepala Tukang 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
- Mandor 0.004 Oh x Rp. 130,000 = Rp. 520.00
Jumlah (2) = Rp. 24,770.00

Jumlah (1) + (2) = Rp. 85,675.50


Keuntungan+Over head 10% = Rp 8,567.55
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 94,243.05

PPA 6.25 1 M' Pasang nok paten 1,05 m

6.25.1 Bahan
- Nok paten 5 mm 1.200 Lbr x Rp. 36,810 = Rp. 44,172.00
- Paku seng 6.000 Bh x Rp. 410 = Rp. 2,460.00
Jumlah (1) = Rp. 46,632.00
6.25.2 Tenaga
- Pekerja 0.084 Oh x Rp. 90,000 = Rp. 7,560.00
- Tukang Kayu 0.125 Oh x Rp. 120,000 = Rp. 15,000.00
- Kepala Tukang 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
- Mandor 0.004 Oh x Rp. 130,000 = Rp. 520.00
Jumlah (2) = Rp. 24,770.00

Jumlah (1) + (2) = Rp. 71,402.00


Keuntungan+Over head 10% = Rp 7,140.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 78,542.20

PPA 6.26 1 M' Pasang nok paten 1,05 m

6.26.1 Bahan
- Nok paten 4 mm 1.200 Lbr x Rp. 30,950 = Rp. 37,140.00
- Paku seng 6.000 Bh x Rp. 410 = Rp. 2,460.00
Jumlah (1) = Rp. 39,600.00
6.26.2 Tenaga
- Pekerja 0.084 Oh x Rp. 90,000 = Rp. 7,560.00
- Tukang Kayu 0.125 Oh x Rp. 120,000 = Rp. 15,000.00
- Kepala Tukang 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
- Mandor 0.004 Oh x Rp. 130,000 = Rp. 520.00
Jumlah (2) = Rp. 24,770.00

Jumlah (1) + (2) = Rp. 64,370.00


Keuntungan+Over head 10% = Rp 6,437.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 70,807.00

PPA 6.27 1 M' Pasang nok paten 1,08 m

6.27.1 Bahan
- Nok paten 6 mm 1.200 Lbr x Rp. 42,960 = Rp. 51,552.00
- Paku seng 6.000 Bh x Rp. 410 = Rp. 2,460.00
Jumlah (1) = Rp. 54,012.00
6.27.2 Tenaga
- Pekerja 0.084 Oh x Rp. 90,000 = Rp. 7,560.00
- Tukang Kayu 0.125 Oh x Rp. 120,000 = Rp. 15,000.00
- Kepala Tukang 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
- Mandor 0.004 Oh x Rp. 130,000 = Rp. 520.00
Jumlah (2) = Rp. 24,770.00

Jumlah (1) + (2) = Rp. 78,782.00


Keuntungan+Over head 10% = Rp 7,878.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 86,660.20

PPA 6.28 1 M' Pasang nok stel rata 0,92 m

6.28.1 Bahan
- Nok stel rata 5 mm 1.100 Lbr x Rp. 36,080 = Rp. 39,688.00
- Paku seng 6.000 Bh x Rp. 410 = Rp. 2,460.00
Jumlah (1) = Rp. 42,148.00
6.28.2 Tenaga
- Pekerja 0.100 Oh x Rp. 90,000 = Rp. 9,000.00
- Tukang Kayu 0.150 Oh x Rp. 120,000 = Rp. 18,000.00
- Kepala Tukang 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
- Mandor 0.004 Oh x Rp. 130,000 = Rp. 520.00
Jumlah (2) = Rp. 29,210.00
Jumlah (1) + (2) = Rp. 71,358.00
Keuntungan+Over head 10% = Rp 7,135.80
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 78,493.80

PPA 6.29 1 M' Pasang nok stel rata 1,05 m

6.29.1 Bahan
- Nok stel rata 4 mm 1.100 Lbr x Rp. 30,250 = Rp. 33,275.00
- Paku seng 6.000 Bh x Rp. 410 = Rp. 2,460.00
Jumlah (1) = Rp. 35,735.00
6.29.2 Tenaga
- Pekerja 0.084 Oh x Rp. 90,000 = Rp. 7,560.00
- Tukang Kayu 0.125 Oh x Rp. 120,000 = Rp. 15,000.00
- Kepala Tukang 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
- Mandor 0.004 Oh x Rp. 130,000 = Rp. 520.00
Jumlah (2) = Rp. 24,770.00

Jumlah (1) + (2) = Rp. 60,505.00


Keuntungan+Over head 10% = Rp 6,050.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 66,555.50
PPA 6.30 1 M² Pasang atap genteng beton

6.30.1 Bahan
- Atap genteng beton 11.000 Bh x Rp. 5,970 = Rp. 65,670.00
- Paku biasa 2" - 5" 0.030 Kg x Rp. 15,000 = Rp. 450.00
Jumlah (1) = Rp. 66,120.00
6.30.2 Tenaga
- Pekerja 0.200 Oh x Rp. 90,000 = Rp. 18,000.00
- Tukang Kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala Tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
Jumlah (2) = Rp. 32,600.00

Jumlah (1) + (2) = Rp. 98,720.00


Keuntungan+Over head 10% = Rp 9,872.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 108,592.00

PPA 6.31 1 M² Pasang atap genteng aspal

6.31.1 Bahan
- Nok genteng aspal 6.900 Lbr x Rp. 11,320 = Rp. 78,108.00
- Plywood 4" x 8" x 6 mm 0.350 Lbr x Rp. 77,880 = Rp. 27,258.00
- Paku biasa ½" - 1" 0.030 Kg x Rp. 15,000 = Rp. 450.00
- Plastic aerator 0.500 Bh x Rp. 27,500 = Rp. 13,750.00
Jumlah (1) = Rp. 119,566.00
6.31.2 Tenaga
- Pekerja 0.200 Oh x Rp. 90,000 = Rp. 18,000.00
- Tukang Kayu 0.300 Oh x Rp. 120,000 = Rp. 36,000.00
- Kepala Tukang 0.003 Oh x Rp. 130,000 = Rp. 390.00
- Mandor 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
Jumlah (2) = Rp. 55,690.00

Jumlah (1) + (2) = Rp. 175,256.00


Keuntungan+Over head 10% = Rp 17,525.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 192,781.60

PPA 6.32 1 M² Pasang atap genteng metal / multi roof

6.32.1 Bahan
- Atap genteng metal 1.020 Bh x Rp. 64,130 = Rp. 65,412.60
- Paku biasa 2" - 5" 0.200 Kg x Rp. 15,000 = Rp. 3,000.00
Jumlah (1) = Rp. 68,412.60
6.32.2 Tenaga
- Pekerja 0.200 Oh x Rp. 90,000 = Rp. 18,000.00
- Tukang Kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala Tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
Jumlah (2) = Rp. 32,600.00

Jumlah (1) + (2) = Rp. 101,012.60


Keuntungan+Over head 10% = Rp 10,101.26
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 111,113.86
PPA 6.33 1 M² Pasang atap sirap

6.33.1 Bahan
- Atap sirap 60.000 Bh x Rp. 1,030 = Rp. 61,800.00
- Paku biasa ½" - 1" 0.200 Kg x Rp. 15,000 = Rp. 3,000.00
Jumlah (1) = Rp. 64,800.00
6.33.2 Tenaga
- Pekerja 0.166 Oh x Rp. 90,000 = Rp. 14,940.00
- Tukang Kayu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala Tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
Jumlah (2) = Rp. 49,230.00

Jumlah (1) + (2) = Rp. 114,030.00


Keuntungan+Over head 10% = Rp 11,403.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 125,433.00

PPA 6.34 1 M' Pasang nok genteng beton

6.34.1 Bahan
- Nok atap genteng beton 3.500 Bh x Rp. 13,440 = Rp. 47,040.00
- Paku biasa 2" x 5" 0.050 Kg x Rp. 15,000 = Rp. 750.00
- Semen PC 10.800 Kg x Rp. 1,500 = Rp. 16,200.00
- Pasir pasang 0.032 M³ x Rp. 273,000 = Rp. 8,736.00
- Semen warna 1.000 Kg x Rp. 2,300 = Rp. 2,300.00
Jumlah (1) = Rp. 75,026.00
6.34.2 Tenaga
- Pekerja 0.400 Oh x Rp. 90,000 = Rp. 36,000.00
- Tukang Kayu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala Tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
Jumlah (2) = Rp. 65,200.00

Jumlah (1) + (2) = Rp. 140,226.00


Keuntungan+Over head 10% = Rp 14,022.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 154,248.60

PPA 6.35 1 M' Pasang nok genteng aspal

6.35.1 Bahan
- Nok genteng aspal 2.000 Bh x Rp. 11,320 = Rp. 22,640.00
- Paku biasa ½" - 1" 0.050 Kg x Rp. 15,000 = Rp. 750.00
- Kayu papan 0.0035 M³ x Rp. 9,650,000 = Rp. 33,775.00
Jumlah (1) = Rp. 57,165.00
6.35.2 Tenaga
- Pekerja 0.125 Oh x Rp. 90,000 = Rp. 11,250.00
- Tukang Kayu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala Tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.006 Oh x Rp. 130,000 = Rp. 780.00
Jumlah (2) = Rp. 45,280.00

Jumlah (1) + (2) = Rp. 102,445.00


Keuntungan+Over head 10% = Rp 10,244.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 112,689.50
PPA 6.36 1 M' Pasang nok genteng metal

6.36.1 Bahan
- Nok genteng decra bond 1.100 Bh x Rp. 41,140 = Rp. 45,254.00
- Paku biasa ½" - 1" 0.050 Kg x Rp. 15,000 = Rp. 750.00
Jumlah (1) = Rp. 46,004.00
6.36.2 Tenaga
- Pekerja 0.250 Oh x Rp. 90,000 = Rp. 22,500.00
- Tukang Kayu 0.150 Oh x Rp. 120,000 = Rp. 18,000.00
- Kepala Tukang 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
- Mandor 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
Jumlah (2) = Rp. 44,140.00

Jumlah (1) + (2) = Rp. 90,144.00


Keuntungan+Over head 10% = Rp 9,014.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 99,158.40

PPA 6.37 1 M' Pasang nok sirap

6.37.1 Bahan
- Seng plat 3" x 6" BJLS 35 0.400 Lbr x Rp. 115,500 = Rp. 46,200.00
- Paku biasa ½" - 1" 0.060 Kg x Rp. 15,000 = Rp. 900.00
- Paku biasa 2" - 5" 0.050 Kg x Rp. 15,000 = Rp. 750.00
- Kayu papan tbl. 3 cm 0.004 M³ x Rp. 9,650,000 = Rp. 38,600.00
Jumlah (1) = Rp. 86,450.00
6.37.2 Tenaga
- Pekerja 0.125 Oh x Rp. 90,000 = Rp. 11,250.00
- Tukang Kayu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala Tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.006 Oh x Rp. 130,000 = Rp. 780.00
Jumlah (2) = Rp. 45,280.00

Jumlah (1) + (2) = Rp. 131,730.00


Keuntungan+Over head 10% = Rp 13,173.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 144,903.00

PPA 6.38 1 M' Pasang atap seng gelombang

6.38.1 Bahan
- Seng gelombang 3" x 6" BJLS 30 0.700 Lbr x Rp. 68,000 = Rp. 47,600.00
- Paku seng 0.040 Kg x Rp. 20,350 = Rp. 814.00
Jumlah (1) = Rp. 48,414.00
6.38.2 Tenaga
- Pekerja 0.120 Oh x Rp. 90,000 = Rp. 10,800.00
- Tukang Kayu 0.060 Oh x Rp. 120,000 = Rp. 7,200.00
- Kepala Tukang 0.006 Oh x Rp. 130,000 = Rp. 780.00
- Mandor 0.006 Oh x Rp. 130,000 = Rp. 780.00
Jumlah (2) = Rp. 19,560.00

Jumlah (1) + (2) = Rp. 67,974.00


Keuntungan+Over head 10% = Rp 6,797.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 74,771.40
PPA 6.39 1 M' Pasang atap nok seng

6.39.1 Bahan
- Seng plat 3" x 6" BJLS 35 0.300 Bh x Rp. 115,500 = Rp. 34,650.00
- Paku seng 0.020 Kg x Rp. 20,350 = Rp. 407.00
Jumlah (1) = Rp. 35,057.00
6.39.2 Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang Kayu 0.070 Oh x Rp. 120,000 = Rp. 8,400.00
- Kepala Tukang 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
- Mandor 0.006 Oh x Rp. 130,000 = Rp. 780.00
Jumlah (2) = Rp. 23,720.00

Jumlah (1) + (2) = Rp. 58,777.00


Keuntungan+Over head 10% = Rp 5,877.70
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 64,654.70

PPA 6.40 1 M' Pasang atap aluminium

6.40.1 Bahan
- Atap aluminium gelombang 0,55 1.050 Bh x Rp. 98,180 = Rp. 103,089.00
- Paku hak panjang 15 cm 0.020 Kg x Rp. 30,530 = Rp. 610.60
Jumlah (1) = Rp. 103,699.60
6.40.2 Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang Kayu 0.075 Oh x Rp. 120,000 = Rp. 9,000.00
- Kepala Tukang 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
- Mandor 0.006 Oh x Rp. 130,000 = Rp. 780.00
Jumlah (2) = Rp. 24,320.00

Jumlah (1) + (2) = Rp. 128,019.60


Keuntungan+Over head 10% = Rp 12,801.96
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 140,821.56

PPA 6.41 1 M' Pasang nok aluminium

6.41.1 Bahan
- Nok standard 40 cm 18 SWG 22 1.200 Bh x Rp. 47,890 = Rp. 57,468.00
- Paku hak panjang 15 cm 0.040 Kg x Rp. 30,530 = Rp. 1,221.20
Jumlah (1) = Rp. 58,689.20
6.41.2 Tenaga
- Pekerja 0.100 Oh x Rp. 90,000 = Rp. 9,000.00
- Tukang Kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala Tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
Jumlah (2) = Rp. 23,600.00

Jumlah (1) + (2) = Rp. 82,289.20


Keuntungan+Over head 10% = Rp 8,228.92
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 90,518.12

PPA 6.42 1 M' Pasang aluminium foil / sisalation

6.42.1 Bahan
- Sisalation / Aluminium foil 1.050 M² x Rp. 77,200 = Rp. 81,060.00
Jumlah (1) = Rp. 81,060.00
6.42.2 Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang Kayu 0.050 Oh x Rp. 120,000 = Rp. 6,000.00
- Kepala Tukang 0.005 Oh x Rp. 130,000 = Rp. 650.00
- Mandor 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
Jumlah (2) = Rp. 21,190.00

Jumlah (1) + (2) = Rp. 102,250.00


Keuntungan+Over head 10% = Rp 10,225.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 112,475.00

PPA 6.43 1 M² Pasang atap bitumen bergelombang 3 mm w=106

6.32.1 Bahan
- Bitumen Bergelombang 3 mm H.38 (On3.225806 lembar x Rp. 38,500 = Rp. 124,193.55
- Screw 16.15 buah x Rp. 1,100 = Rp. 17,765.00
Jumlah (1) = Rp. 141,958.55
6.32.2 Tenaga
- Pekerja 0.100 Oh x Rp. 90,000 = Rp. 9,000.00
- Tukang Kayu 0.050 Oh x Rp. 120,000 = Rp. 6,000.00
- Kepala Tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
Jumlah (2) = Rp. 17,600.00

Jumlah (1) + (2) = Rp. 159,558.55


Keuntungan+Over head 10% = Rp 15,955.85
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 175,514.40

PPA 6.44 1 M' Pasang atap nok bitumen

6.39.1 Bahan
- Nok 1.282051 lembar x Rp. 88,000 = Rp. 112,820.51
- Screw 10.25641 buah x Rp. 1,100 = Rp. 11,282.05
Jumlah (1) = Rp. 124,102.56
6.39.2 Tenaga
- Pekerja 0.100 Oh x Rp. 90,000 = Rp. 9,000.00
- Tukang Kayu 0.050 Oh x Rp. 120,000 = Rp. 6,000.00
- Kepala Tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
Jumlah (2) = Rp. 17,600.00

Jumlah (1) + (2) = Rp. 141,702.56


Keuntungan+Over head 10% = Rp 14,170.26
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 155,872.82
ANALISA BIAYA KONSTRUKSI
PEKERJAAN PENUTUP LANTAI

PPL 6.1 1 M² Pasang lantai ubin granito ukuran 40 x 40 cm


6.1.1 Bahan
- Ubin granito 40 x 40 cm 6.930 Bh x Rp. 46,590 = Rp. 322,868.70
- Semen portland 9.800 Kg x Rp. 1,500 = Rp. 14,700.00
- Pasir pasang 0.0215 M³ x Rp. 273,000 = Rp. 5,869.50
- Semen warna 1.300 Kg x Rp. 2,300 = Rp. 2,990.00
Jumlah (1) = Rp. 346,428.20
6.1.2 Tenaga
- Pekerja 0.250 Oh x Rp. 90,000 = Rp. 22,500.00
- Tukang batu 0.120 Oh x Rp. 120,000 = Rp. 14,400.00
- Kepala tukang 0.012 Oh x Rp. 130,000 = Rp. 1,560.00
- Mandor 0.0125 Oh x Rp. 130,000 = Rp. 1,625.00
Jumlah (2) = Rp. 40,085.00

Jumlah (1) + (2) = Rp. 386,513.20


Keuntungan+Over head 10% = Rp 38,651.32
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 425,164.52

PPL 6.2 1 M² Pasang lantai ubin granito ukuran 30 x 30 cm

6.2.1 Bahan
- Ubin granito 30 x 30 cm 11.870 Bh x Rp. 26,260 = Rp. 311,706.20
- Semen portland 10.000 Kg x Rp. 1,500 = Rp. 15,000.00
- Pasir pasang 0.0215 M³ x Rp. 273,000 = Rp. 5,869.50
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 336,025.70
6.2.2 Tenaga
- Pekerja 0.260 Oh x Rp. 90,000 = Rp. 23,400.00
- Tukang batu 0.125 Oh x Rp. 120,000 = Rp. 15,000.00
- Kepala tukang 0.0125 Oh x Rp. 130,000 = Rp. 1,625.00
- Mandor 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
Jumlah (2) = Rp. 41,715.00

Jumlah (1) + (2) = Rp. 377,740.70


Keuntungan+Over head 10% = Rp 37,774.07
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 415,514.77

PPL 6.3 1 M² Pasang lantai ubin teralux marmer ukuran 60 x 60 cm

6.3.1 Bahan
- Ubin marmer 60 x 60 cm 2.780 Bh x Rp. 109,510 = Rp. 304,437.80
- Semen portland 8.190 Kg x Rp. 1,500 = Rp. 12,285.00
- Pasir pasang 0.0215 M³ x Rp. 273,000 = Rp. 5,869.50
- Semen warna 1.000 Kg x Rp. 2,300 = Rp. 2,300.00
Jumlah (1) = Rp. 324,892.30
6.3.2 Tenaga
- Pekerja 0.250 Oh x Rp. 90,000 = Rp. 22,500.00
- Tukang batu 0.120 Oh x Rp. 120,000 = Rp. 14,400.00
- Kepala tukang 0.012 Oh x Rp. 130,000 = Rp. 1,560.00
- Mandor 0.0125 Oh x Rp. 130,000 = Rp. 1,625.00
Jumlah (2) = Rp. 40,085.00
Jumlah (1) + (2) = Rp. 364,977.30
Keuntungan+Over head 10% = Rp 36,497.73
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 401,475.03

PPL 6.4 1 M² Pasang lantai ubin teralux marmer ukuran 40 x 40 cm

6.4.1 Bahan
- ubin marmer 40 x 40 cm 6.250 Bh x Rp. 48,400 = Rp. 302,500.00
- Semen portland 8.800 Kg x Rp. 1,500 = Rp. 13,200.00
- Pasir pasang 0.0215 M³ x Rp. 273,000 = Rp. 5,869.50
- Semen warna 1.300 Kg x Rp. 2,300 = Rp. 2,990.00
Jumlah (1) = Rp. 324,559.50
6.4.2 Tenaga
- Pekerja 0.672 Oh x Rp. 90,000 = Rp. 60,480.00
- Tukang batu 0.224 Oh x Rp. 120,000 = Rp. 26,880.00
- Kepala tukang 0.022 Oh x Rp. 130,000 = Rp. 2,860.00
- Mandor 0.034 Oh x Rp. 130,000 = Rp. 4,420.00
Jumlah (2) = Rp. 94,640.00

Jumlah (1) + (2) = Rp. 419,199.50


Keuntungan+Over head 10% = Rp 41,919.95
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 461,119.45

PPL 6.5 1 M² Pasang lantai ubin teralux marmer ukuran 30 x 30 cm

6.5.1 Bahan
- Ubin marmer 30 x 30 cm 11.870 Bh x Rp. 27,230 = Rp. 323,220.10
- Semen portland 10.000 Kg x Rp. 1,500 = Rp. 15,000.00
- Pasir pasang 0.0215 M³ x Rp. 273,000 = Rp. 5,869.50
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 347,539.60
6.5.2 Tenaga
- Pekerja 0.700 Oh x Rp. 90,000 = Rp. 63,000.00
- Tukang batu 0.340 Oh x Rp. 120,000 = Rp. 40,800.00
- Kepala tukang 0.034 Oh x Rp. 130,000 = Rp. 4,420.00
- Mandor 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
Jumlah (2) = Rp. 112,770.00

Jumlah (1) + (2) = Rp. 460,309.60


Keuntungan+Over head 10% = Rp 46,030.96
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 506,340.56

PPL 6.6 1 M' Pasang plint ubin granito ukuran 10 x 40 cm

6.6.1 Bahan
- Plint ubin granito 10 x 40 cm 2.650 Bh x Rp. 62,800 = Rp. 166,420.00
- Semen portland 1.200 Kg x Rp. 1,500 = Rp. 1,800.00
- Pasir pasang 0.0032 M³ x Rp. 273,000 = Rp. 873.60
- Semen warna 0.100 Kg x Rp. 2,300 = Rp. 230.00
Jumlah (1) = Rp. 169,323.60
6.6.2 Tenaga
- Pekerja 0.600 Oh x Rp. 90,000 = Rp. 54,000.00
- Tukang batu 0.030 Oh x Rp. 120,000 = Rp. 3,600.00
- Kepala tukang 0.003 Oh x Rp. 130,000 = Rp. 390.00
- Mandor 0.003 Oh x Rp. 130,000 = Rp. 390.00
Jumlah (2) = Rp. 58,380.00
Jumlah (1) + (2) = Rp. 227,703.60
Keuntungan+Over head 10% = Rp 22,770.36
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 250,473.96

PPL 6.7 1 M' Pasang plint ubin granito ukuran 10 x 30 cm

6.7.1 Bahan
- Plint ubin granito 10 x 30 cm 3.330 Bh x Rp. 27,950 = Rp. 93,073.50
- Semen portland 1.650 Kg x Rp. 1,500 = Rp. 2,475.00
- Pasir pasang 0.0032 M³ x Rp. 273,000 = Rp. 873.60
- Semen warna 0.100 Kg x Rp. 2,300 = Rp. 230.00
Jumlah (1) = Rp. 96,652.10
6.7.2 Tenaga
- Pekerja 0.900 Oh x Rp. 90,000 = Rp. 81,000.00
- Tukang batu 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.0045 Oh x Rp. 130,000 = Rp. 585.00
Jumlah (2) = Rp. 93,555.00

Jumlah (1) + (2) = Rp. 190,207.10


Keuntungan+Over head 10% = Rp 19,020.71
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 209,227.81

PPL 6.8 1 M' Pasang plint ubin teralux marmer ukuran 10 x 60 cm

6.8.1 Bahan
- Plint ubin marmer 10 x 60 cm 1.700 Bh x Rp. 65,700 = Rp. 111,690.00
- Semen portland 1.650 Kg x Rp. 1,500 = Rp. 2,475.00
- Pasir pasang 0.0032 M³ x Rp. 273,000 = Rp. 873.60
- Semen warna 0.100 Kg x Rp. 2,300 = Rp. 230.00
Jumlah (1) = Rp. 115,268.60

6.8.2 Tenaga
- Pekerja 0.900 Oh x Rp. 90,000 = Rp. 81,000.00
- Tukang batu 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.0045 Oh x Rp. 130,000 = Rp. 585.00
Jumlah (2) = Rp. 93,555.00

Jumlah (1) + (2) = Rp. 208,823.60


Keuntungan+Over head 10% = Rp 20,882.36
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 229,705.96

PPL 6.9 1 M' Pasang plint ubin teralux marmer ukuran 10 x 40 cm

6.9.1 Bahan
- Plint ubin marmer 10 x 40 cm 2.500 Bh x Rp. 29,040 = Rp. 72,600.00
- Semen portland 1.650 Kg x Rp. 1,500 = Rp. 2,475.00
- Pasir pasang 0.0032 M³ x Rp. 273,000 = Rp. 873.60
- Semen warna 0.100 Kg x Rp. 2,300 = Rp. 230.00

Jumlah (1) = Rp. 76,178.60


6.9.2 Tenaga
- Pekerja 0.900 Oh x Rp. 90,000 = Rp. 81,000.00
- Tukang batu 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.0045 Oh x Rp. 130,000 = Rp. 585.00
Jumlah (2) = Rp. 93,555.00

Jumlah (1) + (2) = Rp. 169,733.60


Keuntungan+Over head 10% = Rp 16,973.36
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 186,706.96

PPL 6.10 1 M' Pasang plint ubin teralux marmer ukuran 10 x 30 cm

6.10.1 Bahan
- Plint ubin marmer 10 x 30 cm 3.330 Bh x Rp. 16,340 = Rp. 54,412.20
- Semen portland 1.650 Kg x Rp. 1,500 = Rp. 2,475.00
- Pasir pasang 0.0032 M³ x Rp. 273,000 = Rp. 873.60
- Semen warna 0.100 Kg x Rp. 2,300 = Rp. 230.00
Jumlah (1) = Rp. 57,990.80

6.10.2 Tenaga
- Pekerja 0.900 Oh x Rp. 90,000 = Rp. 81,000.00
- Tukang batu 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.0045 Oh x Rp. 130,000 = Rp. 585.00
Jumlah (2) = Rp. 93,555.00

Jumlah (1) + (2) = Rp. 151,545.80


Keuntungan+Over head 10% = Rp 15,154.58
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 166,700.38

PPL 6.11 1 M² Pasang lantai keramik artistik 10 x 20 cm

6.11.1 Bahan
- Keramik artistik 10 x 20 cm 50.000 Bh x Rp. 1,760 = Rp. 88,000.00
- Semen portland 11.380 Kg x Rp. 1,500 = Rp. 17,070.00
- Pasir pasang 0.042 M³ x Rp. 273,000 = Rp. 11,466.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 119,986.00

6.11.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 106,250.00

Jumlah (1) + (2) = Rp. 226,236.00


Keuntungan+Over head 10% = Rp 22,623.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 248,859.60

PPL 6.12 1 M² Pasang lantai keramik artistik 10 x 10 cm

6.12.1 Bahan
- Keramik artistik 10 x 10 cm 50.000 Bh x Rp. 910 = Rp. 45,500.00
- Semen portland 11.380 Kg x Rp. 1,500 = Rp. 17,070.00
- Pasir pasang 0.042 M³ x Rp. 273,000 = Rp. 11,466.00
- Semen warna 2.000 Kg x Rp. 2,300 = Rp. 4,600.00
Jumlah (1) = Rp. 78,636.00

6.12.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 106,250.00

Jumlah (1) + (2) = Rp. 184,886.00


Keuntungan+Over head 10% = Rp 18,488.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 203,374.60

PPL 6.13 1 M² Pasang lantai keramik artistik ukuran 5 x 20 cm

6.13.1 Bahan
- Keramik artistik 5 x 20 cm 100.000 Bh x Rp. 910 = Rp. 91,000.00
- Semen portland 11.380 Kg x Rp. 1,500 = Rp. 17,070.00
- Pasir pasang 0.042 M³ x Rp. 273,000 = Rp. 11,466.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 122,986.00
6.13.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 106,250.00

Jumlah (1) + (2) = Rp. 229,236.00


Keuntungan+Over head 10% = Rp 22,923.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 252,159.60

PPL 6.14 1 M' Pasang plint keramik artistik ukuran 10 x 20 cm

6.14.1 Bahan
- keramik artistik 10 x 20 cm 5.000 Bh x Rp. 1,760 = Rp. 8,800.00
- Semen portland 1.650 Kg x Rp. 1,500 = Rp. 2,475.00
- Pasir pasang 0.0032 M³ x Rp. 273,000 = Rp. 873.60
- Semen warna 0.100 Kg x Rp. 2,300 = Rp. 230.00
Jumlah (1) = Rp. 12,378.60
6.14.2 Tenaga
- Pekerja 0.090 Oh x Rp. 90,000 = Rp. 8,100.00
- Tukang batu 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.0045 Oh x Rp. 130,000 = Rp. 585.00
Jumlah (2) = Rp. 20,655.00

Jumlah (1) + (2) = Rp. 33,033.60


Keuntungan+Over head 10% = Rp 3,303.36
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 36,336.96
PPL 6.15 1 M' Pasang plint keramik artistik ukuran 10 x 10 cm

6.15.1 Bahan
- keramik artistik 10 x 10 cm 10.000 Bh x Rp. 910 = Rp. 9,100.00
- Semen portland 1.650 Kg x Rp. 1,500 = Rp. 2,475.00
- Pasir pasang 0.0032 M³ x Rp. 273,000 = Rp. 873.60
- Semen warna 0.120 Kg x Rp. 2,300 = Rp. 276.00
Jumlah (1) = Rp. 12,724.60

6.15.2 Tenaga
- Pekerja 0.090 Oh x Rp. 90,000 = Rp. 8,100.00
- Tukang batu 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.0045 Oh x Rp. 130,000 = Rp. 585.00
Jumlah (2) = Rp. 20,655.00

Jumlah (1) + (2) = Rp. 33,379.60


Keuntungan+Over head 10% = Rp 3,337.96
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 36,717.56

PPL 6.16. 1 M' Pasang plint keramik ukuran 10 x 20 cm

6.16.1 Bahan
- Keramik 10 x 20 cm 5.000 Bh x Rp. 1,210 = Rp. 6,050.00
- Semen portland 0.850 Kg x Rp. 1,500 = Rp. 1,275.00
- Pasir pasang 0.0032 M³ x Rp. 273,000 = Rp. 873.60
- Semen warna 0.080 Kg x Rp. 2,300 = Rp. 184.00
Jumlah (1) = Rp. 8,382.60
6.16.2 Tenaga
- Pekerja 0.090 Oh x Rp. 90,000 = Rp. 8,100.00
- Tukang batu 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.0045 Oh x Rp. 130,000 = Rp. 585.00
Jumlah (2) = Rp. 20,655.00

Jumlah (1) + (2) = Rp. 29,037.60


Keuntungan+Over head 10% = Rp 2,903.76
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 31,941.36

PPL 6.17. 1 M' Pasang plint keramik ukuran 10 x 30 cm

6.17.1 Bahan
- Keramik 10 x 30 cm 3.340 Bh x Rp. 4,110 = Rp. 13,727.40
- Semen portland 0.850 Kg x Rp. 1,500 = Rp. 1,275.00
- Pasir pasang 0.0032 M³ x Rp. 273,000 = Rp. 873.60
- Semen warna 0.080 Kg x Rp. 2,300 = Rp. 184.00
Jumlah (1) = Rp. 16,060.00

6.17.2 Tenaga
- Pekerja 0.090 Oh x Rp. 90,000 = Rp. 8,100.00
- Tukang batu 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.0045 Oh x Rp. 130,000 = Rp. 585.00
Jumlah (2) = Rp. 20,655.00
Jumlah (1) + (2) = Rp. 36,715.00
Keuntungan+Over head 10% = Rp 3,671.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 40,386.50

PPL 6.18. 1 M' Pasang plint keramik ukuran 10 x 40 cm

6.18.1 Bahan
- Keramik 10 x 40 cm 2.500 Bh x Rp. 5,690 = Rp. 14,225.00
- Semen portland 0.850 Kg x Rp. 1,500 = Rp. 1,275.00
- Pasir pasang 0.0032 M³ x Rp. 273,000 = Rp. 873.60
- Semen warna 0.080 Kg x Rp. 2,300 = Rp. 184.00
Jumlah (1) = Rp. 16,557.60

6.18.2 Tenaga
- Pekerja 0.090 Oh x Rp. 90,000 = Rp. 8,100.00
- Tukang batu 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.0045 Oh x Rp. 130,000 = Rp. 585.00
Jumlah (2) = Rp. 20,655.00

Jumlah (1) + (2) = Rp. 37,212.60


Keuntungan+Over head 10% = Rp 3,721.26
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 40,933.86

PPL 6,19. 1 M' Pasang plint vinyil tanpa adukan

6.19.1 Bahan
- Vinyl 30 x 30 cm 3.500 Bh x Rp. 8,230 = Rp. 28,805.00
- Lem vinyl 0.080 Kg x Rp. 67,350 = Rp. 5,388.00
Jumlah (1) = Rp. 34,193.00
6.19.2 Tenaga
- Pekerja 0.080 Oh x Rp. 90,000 = Rp. 7,200.00
- Tukang batu 0.080 Oh x Rp. 120,000 = Rp. 9,600.00
- Kepala tukang 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
- Mandor 0.004 Oh x Rp. 130,000 = Rp. 520.00
Jumlah (2) = Rp. 18,360.00

Jumlah (1) + (2) = Rp. 52,553.00


Keuntungan+Over head 10% = Rp 5,255.30
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 57,808.30

PPL 6.20 1 M² Pasang lantai keramik 10 x 20 cm

6.20.1 Bahan
- Ubin keramik 10 x 20 cm 50.000 Bh x Rp. 1,210 = Rp. 60,500.00
- Semen portland 11.380 Kg x Rp. 1,500 = Rp. 17,070.00
- Pasir pasang 0.042 M³ x Rp. 273,000 = Rp. 11,466.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 92,486.00
6.20.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 106,250.00
Jumlah (1) + (2) = Rp. 198,736.00
Keuntungan+Over head 10% = Rp 19,873.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 218,609.60

PPL 6.21 1 M² Pasang lantai keramik 15 x 15 cm

6.21.1 Bahan
- Ubin keramik 15 x 15 cm 44.000 Bh x Rp. 1,400 = Rp. 61,600.00
- Semen portland 11.380 Kg x Rp. 1,500 = Rp. 17,070.00
- Pasir pasang 0.042 M³ x Rp. 273,000 = Rp. 11,466.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 93,586.00
6.21.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 106,250.00

Jumlah (1) + (2) = Rp. 199,836.00


Keuntungan+Over head 10% = Rp 19,983.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 219,819.60

PPL 6.22 1 M² Pasang lantai keramik 20 x 20 cm

6.22.1 Bahan
- Ubin keramik 20 x 20 cm 25.000 Bh x Rp. 4,000 = Rp. 100,000.00
- Semen portland 11.380 Kg x Rp. 1,500 = Rp. 17,070.00
- Pasir pasang 0.042 M³ x Rp. 273,000 = Rp. 11,466.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 131,986.00

6.22.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 106,250.00

Jumlah (1) + (2) = Rp. 238,236.00


Keuntungan+Over head 10% = Rp 23,823.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 262,059.60

PPL 6.23 1 M² Pasang lantai keramik 20 x 25 cm

6.23.1 Bahan
- Ubin keramik 20 x 25 cm 20.000 Bh x Rp. 3,150 = Rp. 63,000.00
- Semen portland 11.380 Kg x Rp. 1,500 = Rp. 17,070.00
- Pasir pasang 0.042 M³ x Rp. 273,000 = Rp. 11,466.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 94,986.00

6.23.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 106,250.00

Jumlah (1) + (2) = Rp. 201,236.00


Keuntungan+Over head 10% = Rp 20,123.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 221,359.60

PPL 6.24 1 M² Pasang lantai keramik 25 x 25 cm

6.24.1 Bahan
- Ubin keramik 25 x 25 cm 16.000 Bh x Rp. 3,870 = Rp. 61,920.00
- Semen portland 11.380 Kg x Rp. 1,500 = Rp. 17,070.00
- Pasir pasang 0.042 M³ x Rp. 273,000 = Rp. 11,466.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 93,906.00

6.24.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 106,250.00

Jumlah (1) + (2) = Rp. 200,156.00


Keuntungan+Over head 10% = Rp 20,015.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 220,171.60

PPL 6.25 1 M² Pasang lantai keramik 30 x 30 cm

6.25.1 Bahan
- Ubin keramik 30 x 30 cm 11.120 Bh x Rp. 9,990 = Rp. 111,088.80
- Semen portland 11.380 Kg x Rp. 1,500 = Rp. 17,070.00
- Pasir pasang 0.042 M³ x Rp. 273,000 = Rp. 11,466.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 143,074.80
6.25.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 106,250.00

Jumlah (1) + (2) = Rp. 249,324.80


Keuntungan+Over head 10% = Rp 24,932.48
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 274,257.28

PPL 6.26 1 M² Pasang lantai keramik 30 x 30 cm anti slip

6.26.1 Bahan
- Ubin keramik 30 x 30 cm anti slip 11.120 Bh x Rp. 9,990 = Rp. 111,088.80
- Semen portland 11.380 Kg x Rp. 1,500 = Rp. 17,070.00
- Pasir pasang 0.042 M³ x Rp. 273,000 = Rp. 11,466.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 143,074.80
6.26.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 106,250.00

Jumlah (1) + (2) = Rp. 249,324.80


Keuntungan+Over head 10% = Rp 24,932.48
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 274,257.28

PPL 6.27 1 M² Pasang lantai keramik 40 x 40 cm

6.27.1 Bahan
- Ubin keramik 40 x 40 cm 6.250 Bh x Rp. 19,200 = Rp. 120,000.00
- Semen portland 11.380 Kg x Rp. 1,500 = Rp. 17,070.00
- Pasir pasang 0.042 M³ x Rp. 273,000 = Rp. 11,466.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 151,986.00
6.27.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 106,250.00

Jumlah (1) + (2) = Rp. 258,236.00


Keuntungan+Over head 10% = Rp 25,823.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 284,059.60

PPL 6.27 1 M² Pasang lantai keramik 60 x 60 cm

6.27.1 Bahan
- Ubin keramik 60 x 60 cm 6.250 Bh x Rp. 23,040 = Rp. 144,000.00
- Semen portland 11.380 Kg x Rp. 1,500 = Rp. 17,070.00
- Pasir pasang 0.042 M³ x Rp. 273,000 = Rp. 11,466.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 175,986.00
6.27.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 106,250.00

Jumlah (1) + (2) = Rp. 282,236.00


Keuntungan+Over head 10% = Rp 28,223.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 310,459.60

PPL 6.28 1 M² Pasang lantai mosaik 30 x 30 cm, ex lokal

6.28.1 Bahan
- Mosaik 30 x 30 cm 12.000 Bh x Rp. 13,920 = Rp. 167,040.00
- Semen portland 14.150 Kg x Rp. 1,500 = Rp. 21,225.00
- Pasir pasang 0.039 M³ x Rp. 273,000 = Rp. 10,647.00
- Semen warna 2.000 Kg x Rp. 2,300 = Rp. 4,600.00
Jumlah (1) = Rp. 203,512.00
6.28.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 106,250.00

Jumlah (1) + (2) = Rp. 309,762.00


Keuntungan+Over head 10% = Rp 30,976.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 340,738.20

PPL 6.29 1 M² Pasang lantai marmer

6.29.1 Bahan
- Marmer 1.052 Bh x Rp. 261,970 = Rp. 275,592.44
- Semen portland 14.150 Kg x Rp. 1,500 = Rp. 21,225.00
- Pasir pasang 0.039 M³ x Rp. 273,000 = Rp. 10,647.00
- Semen warna 2.000 Kg x Rp. 2,300 = Rp. 4,600.00
Jumlah (1) = Rp. 312,064.44
6.29.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 106,250.00

Jumlah (1) + (2) = Rp. 418,314.44


Keuntungan+Over head 10% = Rp 41,831.44
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 460,145.88

PPL 6.30 1 M² Pasang lantai karpet 100% wool

6.30.1 Bahan
- Karpet wool 1.050 M² x Rp. 85,250 = Rp. 89,512.50
- Lem vinyl 0.350 Kg x Rp. 67,350 = Rp. 23,572.50
Jumlah (1) = Rp. 113,085.00
6.30.2 Tenaga
- Pekerja 0.170 Oh x Rp. 90,000 = Rp. 15,300.00
- Tukang 0.170 Oh x Rp. 120,000 = Rp. 20,400.00
- Kepala tukang 0.017 Oh x Rp. 130,000 = Rp. 2,210.00
- Mandor 0.0085 Oh x Rp. 130,000 = Rp. 1,105.00
Jumlah (2) = Rp. 39,015.00

Jumlah (1) + (2) = Rp. 152,100.00


Keuntungan+Over head 10% = Rp 15,210.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 167,310.00

PPL 6.31 1 M² Pasang lantai karpet 80% wool, 20% nylon


6.31.1 Bahan
- Karpet wool + nylon 1.050 M² x Rp. 87,450 = Rp. 91,822.50
- Lem vinyl 0.350 Kg x Rp. 67,350 = Rp. 23,572.50
Jumlah (1) = Rp. 115,395.00

6.31.2 Tenaga
- Pekerja 0.170 Oh x Rp. 90,000 = Rp. 15,300.00
- Tukang 0.170 Oh x Rp. 120,000 = Rp. 20,400.00
- Kepala tukang 0.017 Oh x Rp. 130,000 = Rp. 2,210.00
- Mandor 0.0085 Oh x Rp. 130,000 = Rp. 1,105.00
Jumlah (2) = Rp. 39,015.00

Jumlah (1) + (2) = Rp. 154,410.00


Keuntungan+Over head 10% = Rp 15,441.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 169,851.00

PPL 6.32 1 M² Pasang lantai karpet

6.32.1 Bahan
- Carpet 1.050 M² x Rp. 90,750 = Rp. 95,287.50
- Lem vinyl 0.350 Kg x Rp. 67,350 = Rp. 23,572.50
Jumlah (1) = Rp. 118,860.00
6.32.2 Tenaga
- Pekerja 0.170 Oh x Rp. 90,000 = Rp. 15,300.00
- Tukang 0.170 Oh x Rp. 120,000 = Rp. 20,400.00
- Kepala tukang 0.017 Oh x Rp. 130,000 = Rp. 2,210.00
- Mandor 0.0085 Oh x Rp. 130,000 = Rp. 1,105.00
Jumlah (2) = Rp. 39,015.00

Jumlah (1) + (2) = Rp. 157,875.00


Keuntungan+Over head 10% = Rp 15,787.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 173,662.50

PPL 6.33 1 M² Pasang lantai parquet jati

6.33.1 Bahan
- Perquet jati 1.050 M² x Rp. 368,500 = Rp. 386,925.00
- Lem vinyl 0.600 Kg x Rp. 67,350 = Rp. 40,410.00
Jumlah (1) = Rp. 427,335.00
6.33.2 Tenaga
- Pekerja 0.650 Oh x Rp. 90,000 = Rp. 58,500.00
- Tukang 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.0325 Oh x Rp. 130,000 = Rp. 4,225.00
Jumlah (2) = Rp. 109,275.00

Jumlah (1) + (2) = Rp. 536,610.00


Keuntungan+Over head 10% = Rp 53,661.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 590,271.00

PPL 6.34 1 M² Pasang dinding porselin 11 x 11 cm, putih

6.34.1 Bahan
- Porselin 11 x 11 cm 83.000 Bh x Rp. 1,210 = Rp. 100,430.00
- Semen portland 9.300 Kg x Rp. 1,500 = Rp. 13,950.00
- Pasir pasang 0.018 M³ x Rp. 273,000 = Rp. 4,914.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 122,744.00

6.34.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.500 Oh x Rp. 120,000 = Rp. 60,000.00
- Kepala tukang 0.050 Oh x Rp. 130,000 = Rp. 6,500.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 126,200.00

Jumlah (1) + (2) = Rp. 248,944.00


Keuntungan+Over head 10% = Rp 24,894.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 273,838.40

PPL 6.35 1 M² Pasang dinding porselin 11 x 11 cm, warna

6.35.1 Bahan
- Porselin 11 x 11 cm warna 83.000 Bh x Rp. 145 = Rp. 12,035.00
- Semen portland 9.300 Kg x Rp. 1,500 = Rp. 13,950.00
- Pasir pasang 0.018 M³ x Rp. 273,000 = Rp. 4,914.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 34,349.00

6.35.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.500 Oh x Rp. 120,000 = Rp. 60,000.00
- Kepala tukang 0.050 Oh x Rp. 130,000 = Rp. 6,500.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 126,200.00

Jumlah (1) + (2) = Rp. 160,549.00


Keuntungan+Over head 10% = Rp 16,054.90
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 176,603.90

PPL 6.36 1 M² Pasang dinding porselin 15 x 15 cm, putih

6.36.1 Bahan
- Porselin 15 x 15 cm putih 45.000 Bh x Rp. 2,300 = Rp. 103,500.00
- Semen portland 9.300 Kg x Rp. 1,500 = Rp. 13,950.00
- Pasir pasang 0.018 M³ x Rp. 273,000 = Rp. 4,914.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 125,814.00
6.36.2 Tenaga
- Pekerja 0.600 Oh x Rp. 90,000 = Rp. 54,000.00
- Tukang batu 0.450 Oh x Rp. 120,000 = Rp. 54,000.00
- Kepala tukang 0.045 Oh x Rp. 130,000 = Rp. 5,850.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 117,750.00

Jumlah (1) + (2) = Rp. 243,564.00


Keuntungan+Over head 10% = Rp 24,356.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 267,920.40

PPL 6.37 1 M² Pasang dinding porselin 15 x 15 cm, warna


6.37.1 Bahan
- Porselin 15 x 15 cm warna 45.000 Bh x Rp. 2,540 = Rp. 114,300.00
- Semen portland 9.300 Kg x Rp. 1,500 = Rp. 13,950.00
- Pasir pasang 0.018 M³ x Rp. 273,000 = Rp. 4,914.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 136,614.00
6.37.2 Tenaga
- Pekerja 0.600 Oh x Rp. 90,000 = Rp. 54,000.00
- Tukang batu 0.450 Oh x Rp. 120,000 = Rp. 54,000.00
- Kepala tukang 0.045 Oh x Rp. 130,000 = Rp. 5,850.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 117,750.00

Jumlah (1) + (2) = Rp. 254,364.00


Keuntungan+Over head 10% = Rp 25,436.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 279,800.40

PPL 6.38 1 M² Pasang dinding keramik artistik 10 x 20 cm

6.38.1 Bahan
- Keramik artistik 10 x 20 cm 100.000 Bh x Rp. 1,760 = Rp. 176,000.00
- Semen portland 9.300 Kg x Rp. 1,500 = Rp. 13,950.00
- Pasir pasang 0.018 M³ x Rp. 273,000 = Rp. 4,914.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 198,314.00

6.38.2 Tenaga
- Pekerja 0.600 Oh x Rp. 90,000 = Rp. 54,000.00
- Tukang batu 0.450 Oh x Rp. 120,000 = Rp. 54,000.00
- Kepala tukang 0.045 Oh x Rp. 130,000 = Rp. 5,850.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 117,750.00

Jumlah (1) + (2) = Rp. 316,064.00


Keuntungan+Over head 10% = Rp 31,606.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 347,670.40

PPL 6.39 1 M² Pasang dinding keramik artistik 5 x 20 cm

6.39.1 Bahan
- Keramik artistik 5 x 20 cm 100.000 Bh x Rp. 910 = Rp. 91,000.00
- Semen portland 9.300 Kg x Rp. 1,500 = Rp. 13,950.00
- Pasir pasang 0.018 M³ x Rp. 273,000 = Rp. 4,914.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 113,314.00
6.39.2 Tenaga
- Pekerja 0.600 Oh x Rp. 90,000 = Rp. 54,000.00
- Tukang batu 0.450 Oh x Rp. 120,000 = Rp. 54,000.00
- Kepala tukang 0.045 Oh x Rp. 130,000 = Rp. 5,850.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 117,750.00

Jumlah (1) + (2) = Rp. 231,064.00


Keuntungan+Over head 10% = Rp 23,106.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 254,170.40
PPL 6.40 1 M² Pasang dinding keramik 10 x 20 cm

6.40.1 Bahan
- Keramik 10 x 20 cm 50.000 Bh x Rp. 1,210 = Rp. 60,500.00
- Semen portland 9.300 Kg x Rp. 1,500 = Rp. 13,950.00
- Pasir pasang 0.018 M³ x Rp. 273,000 = Rp. 4,914.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 82,814.00
6.40.2 Tenaga
- Pekerja 0.600 Oh x Rp. 90,000 = Rp. 54,000.00
- Tukang batu 0.450 Oh x Rp. 120,000 = Rp. 54,000.00
- Kepala tukang 0.045 Oh x Rp. 130,000 = Rp. 5,850.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 117,750.00

Jumlah (1) + (2) = Rp. 200,564.00


Keuntungan+Over head 10% = Rp 20,056.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 220,620.40

PPL 6.41 1 M² Pasang dinding keramik 15 x 15 cm

6.41.1 Bahan
- Keramik 15 x 15 cm 45.000 Bh x Rp. 1,400 = Rp. 63,000.00
- Semen portland 9.300 Kg x Rp. 1,500 = Rp. 13,950.00
- Pasir pasang 0.018 M³ x Rp. 273,000 = Rp. 4,914.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 85,314.00
6.41.2 Tenaga
- Pekerja 0.600 Oh x Rp. 90,000 = Rp. 54,000.00
- Tukang batu 0.450 Oh x Rp. 120,000 = Rp. 54,000.00
- Kepala tukang 0.045 Oh x Rp. 130,000 = Rp. 5,850.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 117,750.00

Jumlah (1) + (2) = Rp. 203,064.00


Keuntungan+Over head 10% = Rp 20,306.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 223,370.40

PPL 6.42 1 M² Pasang dinding keramik 20 x 20 cm

6.42.1 Bahan
- Keramik 20 x 20 cm 25.000 Bh x Rp. 4,000 = Rp. 100,000.00
- Semen portland 9.300 Kg x Rp. 1,500 = Rp. 13,950.00
- Pasir pasang 0.018 M³ x Rp. 273,000 = Rp. 4,914.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 122,314.00
6.42.2 Tenaga
- Pekerja 0.600 Oh x Rp. 90,000 = Rp. 54,000.00
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.045 Oh x Rp. 130,000 = Rp. 5,850.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 75,750.00

Jumlah (1) + (2) = Rp. 198,064.00


Keuntungan+Over head 10% = Rp 19,806.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 217,870.40

PPL 6.43 1 M² Pasang dinding keramik 20 x 25 cm

6.43.1 Bahan
- Keramik 20 x 25 cm 20.000 Bh x Rp. 3,150 = Rp. 63,000.00
- Semen portland 9.300 Kg x Rp. 1,500 = Rp. 13,950.00
- Pasir pasang 0.018 M³ x Rp. 273,000 = Rp. 4,914.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 85,314.00
6.43.2 Tenaga
- Pekerja 0.600 Oh x Rp. 90,000 = Rp. 54,000.00
- Tukang batu 0.450 Oh x Rp. 120,000 = Rp. 54,000.00
- Kepala tukang 0.0450 Oh x Rp. 130,000 = Rp. 5,850.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 117,750.00

Jumlah (1) + (2) = Rp. 203,064.00


Keuntungan+Over head 10% = Rp 20,306.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 223,370.40

PPL 6.44 1 M² Pasang dinding marmer

6.44.1 Bahan
- Marmer 1.020 M² x Rp. 261,970 = Rp. 267,209.40
- Paku pancing 2.000 Bh x Rp. 720 = Rp. 1,440.00
- Semen portland 12.440 Kg x Rp. 1,500 = Rp. 18,660.00
- Pasir pasang 0.025 M³ x Rp. 273,000 = Rp. 6,825.00
- Semen warna 1.500 Kg x Rp. 2,300 = Rp. 3,450.00
Jumlah (1) = Rp. 297,584.40
6.44.2 Tenaga
- Pekerja 0.720 Oh x Rp. 90,000 = Rp. 64,800.00
- Tukang batu 0.650 Oh x Rp. 120,000 = Rp. 78,000.00
- Kepala tukang 0.065 Oh x Rp. 130,000 = Rp. 8,450.00
- Mandor 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
Jumlah (2) = Rp. 155,800.00

Jumlah (1) + (2) = Rp. 453,384.40


Keuntungan+Over head 10% = Rp 45,338.44
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 498,722.84

PPL 6.45 1 M² Pasang dinding bata pelapis 7 x 3 x 20 cm

6.45.1 Bahan
- Bata pelapis dinding 60.000 Bh x Rp. 2,040 = Rp. 122,400.00
- Semen portland 12.440 Kg x Rp. 1,500 = Rp. 18,660.00
- Pasir pasang 0.025 M³ x Rp. 273,000 = Rp. 6,825.00
Jumlah (1) = Rp. 147,885.00
6.45.2 Tenaga
- Pekerja 0.650 Oh x Rp. 90,000 = Rp. 58,500.00
- Tukang batu 0.500 Oh x Rp. 120,000 = Rp. 60,000.00
- Kepala tukang 0.050 Oh x Rp. 130,000 = Rp. 6,500.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 128,900.00

Jumlah (1) + (2) = Rp. 276,785.00


Keuntungan+Over head 10% = Rp 27,678.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 304,463.50

PPL 6.46 1 M² Pasang dinding batu poros

6.46.1 Bahan
- Batu poros 1.050 M² x Rp. 114,680 = Rp. 120,414.00
- Semen portland 11.750 Kg x Rp. 1,500 = Rp. 17,625.00
- Pasir pasang 0.035 M³ x Rp. 273,000 = Rp. 9,555.00
Jumlah (1) = Rp. 147,594.00
6.46.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 106,250.00

Jumlah (1) + (2) = Rp. 253,844.00


Keuntungan+Over head 10% = Rp 25,384.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 279,228.40

PPL 6.47 1 M² Pasang dinding batu tempel hitam

6.47.1 Bahan
- Batu tempel hitam 1.050 M² x Rp. 104,500 = Rp. 109,725.00
- Semen portland 11.750 Kg x Rp. 1,500 = Rp. 17,625.00
- Pasir pasang 0.035 M³ x Rp. 273,000 = Rp. 9,555.00
Jumlah (1) = Rp. 136,905.00
6.47.2 Tenaga
- Pekerja 0.620 Oh x Rp. 90,000 = Rp. 55,800.00
- Tukang batu 0.350 Oh x Rp. 120,000 = Rp. 42,000.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
Jumlah (2) = Rp. 106,250.00

Jumlah (1) + (2) = Rp. 243,155.00


Keuntungan+Over head 10% = Rp 24,315.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 267,470.50

PPL 6.48 1 M² Pasang lantai vinyl karet 30 x 30 cm KL I

6.48.1 Bahan
- Vinyl karet 11.050 Bh x Rp. 9,800 = Rp. 108,290.00
- Lem vinyl 0.350 Kg x Rp. 67,350 = Rp. 23,572.50
Jumlah (1) = Rp. 131,862.50
6.48.2 Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang batu 0.150 Oh x Rp. 120,000 = Rp. 18,000.00
- Kepala tukang 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
- Mandor 0.0075 Oh x Rp. 130,000 = Rp. 975.00
Jumlah (2) = Rp. 34,425.00
Jumlah (1) + (2) = Rp. 166,287.50
Keuntungan+Over head 10% = Rp 16,628.75
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 182,916.25

PPL 6.49 1 M² Pasang lantai vinyl karet 30 x 30 cm KL II

6.49.1 Bahan
- Vinyl karet 11.050 Bh x Rp. 9,080 = Rp. 100,334.00
- Lem vinyl 0.350 Kg x Rp. 67,350 = Rp. 23,572.50
Jumlah (1) = Rp. 123,906.50
6.49.2 Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang batu 0.150 Oh x Rp. 120,000 = Rp. 18,000.00
- Kepala tukang 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
- Mandor 0.0075 Oh x Rp. 130,000 = Rp. 975.00
Jumlah (2) = Rp. 34,425.00

Jumlah (1) + (2) = Rp. 158,331.50


Keuntungan+Over head 10% = Rp 15,833.15
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 174,164.65

PPL 6.50 1 M² Pasang lantai vinyl asbes 30 x 30 cm

6.50.1 Bahan
- Vinyl asbes 30 x 30 cm 11.050 Bh x Rp. 8,230 = Rp. 90,941.50
- Lem vinyl 0.350 Kg x Rp. 67,350 = Rp. 23,572.50
Jumlah (1) = Rp. 114,514.00
6.50.2 Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang batu 0.150 Oh x Rp. 120,000 = Rp. 18,000.00
- Kepala tukang 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
- Mandor 0.0075 Oh x Rp. 130,000 = Rp. 975.00
Jumlah (2) = Rp. 34,425.00

Jumlah (1) + (2) = Rp. 148,939.00


Keuntungan+Over head 10% = Rp 14,893.90
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 163,832.90

PPL 6.51 1 M² Pasang lantai vinyl motif kembang 30 x 30 cm

6.51.1 Bahan
- Vinyl motif kembang 11.050 Bh x Rp. 9,440 = Rp. 104,312.00
- Lem vinyl 0.350 Kg x Rp. 67,350 = Rp. 23,572.50
Jumlah (1) = Rp. 127,884.50
6.51.2 Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang batu 0.150 Oh x Rp. 120,000 = Rp. 18,000.00
- Kepala tukang 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
- Mandor 0.0075 Oh x Rp. 130,000 = Rp. 975.00
Jumlah (2) = Rp. 34,425.00

Jumlah (1) + (2) = Rp. 162,309.50


Keuntungan+Over head 10% = Rp 16,230.95
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 178,540.45
PPL 6.52 1 M² Pasang wall corvering lebar 50 cm

6.52.1 Bahan
- Corvering L.50 cm 1.100 M² x Rp. 63,250 = Rp. 69,575.00
- Lem 0.250 Kg x Rp. 67,350 = Rp. 16,837.50
Jumlah (1) = Rp. 86,412.50
6.52.2 Tenaga
- Pekerja 0.750 Oh x Rp. 90,000 = Rp. 67,500.00
- Tukang batu 0.170 Oh x Rp. 120,000 = Rp. 20,400.00
- Kepala tukang 0.017 Oh x Rp. 130,000 = Rp. 2,210.00
- Mandor 0.0085 Oh x Rp. 130,000 = Rp. 1,105.00
Jumlah (2) = Rp. 91,215.00

Jumlah (1) + (2) = Rp. 177,627.50


Keuntungan+Over head 10% = Rp 17,762.75
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 195,390.25

PPL 6.53 1 M² Plint kayu Jati 2 x 10 cm

6.53.1 Bahan
- Kayu jati papan 0.0024 M³ x Rp. 24,104,440 = Rp. 57,850.66
- Paku skrup 3,5" 0.050 Kg x Rp. 20,350 = Rp. 1,017.50
Jumlah (1) = Rp. 58,868.16
6.53.2 Tenaga
- Pekerja 0.120 Oh x Rp. 90,000 = Rp. 10,800.00
- Tukang kayu 0.120 Oh x Rp. 120,000 = Rp. 14,400.00
- Kepala tukang 0.012 Oh x Rp. 130,000 = Rp. 1,560.00
- Mandor 0.006 Oh x Rp. 130,000 = Rp. 780.00
Jumlah (2) = Rp. 27,540.00

Jumlah (1) + (2) = Rp. 86,408.16


Keuntungan+Over head 10% = Rp 8,640.82
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 95,048.97
PPL 6.54 1 M² Plint kayu Meranti batu 2 x 10 cm

6.54.1 Bahan
- Kayu meranti batu, papan 0.0024 M³ x Rp. 9,375,000 = Rp. 22,500.00
- Paku skrup 3,5" 0.050 Kg x Rp. 20,350 = Rp. 1,017.50
Jumlah (1) = Rp. 23,517.50
6.54.2 Tenaga
- Pekerja 0.120 Oh x Rp. 90,000 = Rp. 10,800.00
- Tukang kayu 0.120 Oh x Rp. 120,000 = Rp. 14,400.00
- Kepala tukang 0.012 Oh x Rp. 130,000 = Rp. 1,560.00
- Mandor 0.006 Oh x Rp. 130,000 = Rp. 780.00
Jumlah (2) = Rp. 27,540.00

Jumlah (1) + (2) = Rp. 51,057.50


Keuntungan+Over head 10% = Rp 5,105.75
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 56,163.25

6.55 1 M² Pasang lantai ubin granito ukuran 60 x 60 cm

6.1.1 Bahan
- Ubin granito 40 x 40 cm 3.4000 Bh x Rp. 59,294 = Rp. 201,600.00
- Semen portland 9.3000 Kg x Rp. 1,500 = Rp. 13,950.00
- Pasir pasang 0.0215 M³ x Rp. 273,000 = Rp. 5,869.50
- Semen warna 0.8500 Kg x Rp. 11,000 = Rp. 9,350.00
Jumlah (1) = Rp. 230,769.50
6.1.2 Tenaga
- Pekerja 0.2400 Oh x Rp. 90,000 = Rp. 21,600.00
- Tukang batu 0.1250 Oh x Rp. 120,000 = Rp. 15,000.00
- Kepala tukang 0.0125 Oh x Rp. 130,000 = Rp. 1,625.00
- Mandor 0.0130 Oh x Rp. 130,000 = Rp. 1,690.00
Jumlah (2) = Rp. 39,915.00

Jumlah (1) + (2) = Rp. 270,684.50


Keuntungan+Over head 10% = Rp 27,068.45
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 297,752.95

6.56 1 M² Pasang ACP + Rangka Hollow

6.1.1 Bahan
- Besi Hollow 4/4 8.5000 Bh x Rp. 31,500 = Rp. 267,750.00
- Skrup khusus 25.0000 Bh x Rp. 410 = Rp. 10,250.00
- Alumunium Composite panel 1.0000 M³ x Rp. 335,000 = Rp. 335,000.00
- Silent 6.0000 M¹ x Rp. 10,000 = Rp. 60,000.00
Jumlah (1) = Rp. 673,000.00
6.1.2 Tenaga
- Pekerja 0.2400 Oh x Rp. 90,000 = Rp. 21,600.00
- Tukang Partisi 0.2500 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.0870 Oh x Rp. 130,000 = Rp. 11,310.00
- Mandor 0.0130 Oh x Rp. 130,000 = Rp. 1,690.00
Jumlah (2) = Rp. 64,600.00
Jumlah (1) + (2) = Rp. 737,600.00
Keuntungan+Over head 10% = Rp 73,760.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 811,360.00
ANALISA BIAYA KONSTRUKSI
PEKERJAAN KUNCI DAN KACA

PKK 6.1 1 buah pasang kunci tanam antik


6.1.1 Bahan
- Kunci tanam antik 1.000 Bh x Rp. 214,500 = Rp. 214,500.00
Jumlah (1) = Rp. 214,500.00
6.1.2 Tenaga
- Pekerja 0.060 Oh x Rp. 90,000 = Rp. 5,400.00
- Tukang Kayu 0.600 Oh x Rp. 120,000 = Rp. 72,000.00
- Kepala Tukang 0.060 Oh x Rp. 130,000 = Rp. 7,800.00
- Mandor 0.003 Oh x Rp. 130,000 = Rp. 390.00
Jumlah (2) = Rp. 85,590.00

Jumlah (1) + (2) = Rp. 300,090.00


Keuntungan+Over head 10% = Rp 30,009.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 330,099.00

PKK 6.2 1 buah pasang kunci tanam biasa


6.2.1 Bahan
- Kunci tanam biasa 1.000 Bh x Rp. 90,020 = Rp. 90,020.00
Jumlah (1) = Rp. 90,020.00
6.1.2 Tenaga
- Pekerja 0.010 Oh x Rp. 90,000 = Rp. 900.00
- Tukang Kayu 0.500 Oh x Rp. 120,000 = Rp. 60,000.00
- Kepala Tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.005 Oh x Rp. 130,000 = Rp. 650.00
Jumlah (2) = Rp. 62,850.00

Jumlah (1) + (2) = Rp. 152,870.00


Keuntungan+Over head 10% = Rp 15,287.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 168,157.00

PKK 6.3 1 buah pasang kunci tanam kamar mandi


6.3.1 Bahan
- Kunci tanam kamar mandi 1.000 Bh x Rp. 54,690 = Rp. 54,690.00
Jumlah (1) = Rp. 54,690.00
6.3.2 Tenaga
- Pekerja 0.005 Oh x Rp. 90,000 = Rp. 450.00
- Tukang Kayu 0.500 Oh x Rp. 120,000 = Rp. 60,000.00
- Kepala Tukang 0.005 Oh x Rp. 130,000 = Rp. 650.00
- Mandor 0.0025 Oh x Rp. 130,000 = Rp. 325.00
Jumlah (2) = Rp. 61,425.00

Jumlah (1) + (2) = Rp. 116,115.00


Keuntungan+Over head 10% = Rp 11,611.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 127,726.50

PKK 6.4 1 buah pasang kunci silinder


6.4.1 Bahan
- Kunci silinder 1.000 Bh x Rp. 34,490 = Rp. 34,490.00
Jumlah (1) = Rp. 34,490.00
6.4.2 Tenaga
- Pekerja 0.005 Oh x Rp. 90,000 = Rp. 450.00
- Tukang Kayu 0.500 Oh x Rp. 120,000 = Rp. 60,000.00
- Kepala Tukang 0.005 Oh x Rp. 130,000 = Rp. 650.00
- Mandor 0.00025 Oh x Rp. 130,000 = Rp. 32.50
Jumlah (2) = Rp. 61,132.50

Jumlah (1) + (2) = Rp. 95,622.50


Keuntungan+Over head 10% = Rp 9,562.25
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 105,184.75

PKK 6.5 1 buah pasang engsel pintu


6.5.1 Bahan
- engsel pintu 1.000 Bh x Rp. 15,130 = Rp. 15,130.00
Jumlah (1) = Rp. 15,130.00
6.5.2 Tenaga
- Pekerja 0.015 Oh x Rp. 90,000 = Rp. 1,350.00
- Tukang Kayu 0.150 Oh x Rp. 120,000 = Rp. 18,000.00
- Kepala Tukang 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
- Mandor 0.00075 Oh x Rp. 130,000 = Rp. 97.50
Jumlah (2) = Rp. 21,397.50

Jumlah (1) + (2) = Rp. 36,527.50


Keuntungan+Over head 10% = Rp 3,652.75
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 40,180.25

PKK 6.6 1 buah pasang engsel jendela kupu-kupu


6.6.1 Bahan
- Engsel jendela 1.000 Bh x Rp. 22,000 = Rp. 22,000.00
Jumlah (1) = Rp. 22,000.00
6.6.2 Tenaga
- Pekerja 0.010 Oh x Rp. 90,000 = Rp. 900.00
- Tukang Kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala Tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.0005 Oh x Rp. 130,000 = Rp. 65.00
Jumlah (2) = Rp. 14,265.00

Jumlah (1) + (2) = Rp. 36,265.00


Keuntungan+Over head 10% = Rp 3,626.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 39,891.50

PKK 6.7 1 buah pasang engsel angin

6.7.1 Bahan
- Engsel angin 1.000 Bh x Rp. 25,050 = Rp. 25,050.00
Jumlah (1) = Rp. 25,050.00
6.7.2 Tenaga
- Pekerja 0.020 Oh x Rp. 90,000 = Rp. 1,800.00
- Tukang Kayu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala Tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
Jumlah (2) = Rp. 29,700.00

Jumlah (1) + (2) = Rp. 54,750.00


Keuntungan+Over head 10% = Rp 5,475.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 60,225.00

PKK 6.8 1 buah pasang spring knip

6.8.1 Bahan
- Spring knip 1.000 Bh x Rp. 9,080 = Rp. 9,080.00
Jumlah (1) = Rp. 9,080.00
6.8.2 Tenaga
- Pekerja 0.015 Oh x Rp. 90,000 = Rp. 1,350.00
- Tukang Kayu 0.150 Oh x Rp. 120,000 = Rp. 18,000.00
- Kepala Tukang 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
- Mandor 0.00075 Oh x Rp. 130,000 = Rp. 97.50
Jumlah (2) = Rp. 21,397.50

Jumlah (1) + (2) = Rp. 30,477.50


Keuntungan+Over head 10% = Rp 3,047.75
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 33,525.25

PKK 6.9 1 buah pasang kait angin


6.9.1 Bahan
- Kait angin 1.000 Bh x Rp. 19,120 = Rp. 19,120.00
Jumlah (1) = Rp. 19,120.00
6.9.2 Tenaga
- Pekerja 0.015 Oh x Rp. 90,000 = Rp. 1,350.00
- Tukang Kayu 0.150 Oh x Rp. 120,000 = Rp. 18,000.00
- Kepala Tukang 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
- Mandor 0.00075 Oh x Rp. 130,000 = Rp. 97.50
Jumlah (2) = Rp. 21,397.50

Jumlah (1) + (2) = Rp. 40,517.50


Keuntungan+Over head 10% = Rp 4,051.75
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 44,569.25

PKK 6.10 1 buah pasang door closer


6.10.1 Bahan
- Door closer 1.000 Bh x Rp. 109,750 = Rp. 109,750.00
Jumlah (1) = Rp. 109,750.00
6.10.2 Tenaga
- Pekerja 0.050 Oh x Rp. 90,000 = Rp. 4,500.00
- Tukang Kayu 0.500 Oh x Rp. 120,000 = Rp. 60,000.00
- Kepala Tukang 0.050 Oh x Rp. 130,000 = Rp. 6,500.00
- Mandor 0.0025 Oh x Rp. 130,000 = Rp. 325.00
Jumlah (2) = Rp. 71,325.00

Jumlah (1) + (2) = Rp. 181,075.00


Keuntungan+Over head 10% = Rp 18,107.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 199,182.50

PKK 6.11 1 buah pasang kunci selot


6.11.1 Bahan
- Kunci selot 1.000 Bh x Rp. 27,230 = Rp. 27,230.00
Jumlah (1) = Rp. 27,230.00
6.11.2 Tenaga
- Pekerja 0.020 Oh x Rp. 90,000 = Rp. 1,800.00
- Tukang Kayu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala Tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.001 Oh x Rp. 130,000 = Rp. 130.00
Jumlah (2) = Rp. 28,530.00

Jumlah (1) + (2) = Rp. 55,760.00


Keuntungan+Over head 10% = Rp 5,576.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 61,336.00

PKK 6.12 1 buah pasang pegangan pintu / door holder


6.12.1 Bahan
- Pegangan pintu / door holder 1.000 Bh x Rp. 113,010 = Rp. 113,010.00
Jumlah (1) = Rp. 113,010.00
6.12.2 Tenaga
- Pekerja 0.050 Oh x Rp. 90,000 = Rp. 4,500.00
- Tukang Kayu 0.500 Oh x Rp. 120,000 = Rp. 60,000.00
- Kepala Tukang 0.050 Oh x Rp. 130,000 = Rp. 6,500.00
- Mandor 0.0025 Oh x Rp. 130,000 = Rp. 325.00
Jumlah (2) = Rp. 71,325.00

Jumlah (1) + (2) = Rp. 184,335.00


Keuntungan+Over head 10% = Rp 18,433.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 202,768.50

PKK 6.13 1 buah pasang door stop

6.13.1 Bahan
- Door stop 1.000 Bh x Rp. 38,120 = Rp. 38,120.00
Jumlah (1) = Rp. 38,120.00
6.13.2 Tenaga
- Pekerja 0.010 Oh x Rp. 90,000 = Rp. 900.00
- Tukang Kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala Tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.0005 Oh x Rp. 130,000 = Rp. 65.00
Jumlah (2) = Rp. 14,265.00

Jumlah (1) + (2) = Rp. 52,385.00


Keuntungan+Over head 10% = Rp 5,238.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 57,623.50

PKK 6.14 1 buah pasang rel pintu dorong


6.14.1 Bahan
- Rel pintu dorong 1.000 Bh x Rp. 160,330 = Rp. 160,330.00
Jumlah (1) = Rp. 160,330.00
6.14.2 Tenaga
- Pekerja 0.060 Oh x Rp. 90,000 = Rp. 5,400.00
- Tukang Kayu 0.600 Oh x Rp. 120,000 = Rp. 72,000.00
- Kepala Tukang 0.060 Oh x Rp. 130,000 = Rp. 7,800.00
- Mandor 0.003 Oh x Rp. 130,000 = Rp. 390.00
Jumlah (2) = Rp. 85,590.00

Jumlah (1) + (2) = Rp. 245,920.00


Keuntungan+Over head 10% = Rp 24,592.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 270,512.00
PKK 6.15 1 buah pasang kunci lemari

6.15.1 Bahan
- Kunci lemari 1.000 Bh x Rp. 12,340 = Rp. 12,340.00
Jumlah (1) = Rp. 12,340.00
6.15.2 Tenaga
- Pekerja 0.025 Oh x Rp. 90,000 = Rp. 2,250.00
- Tukang Kayu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala Tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.00125 Oh x Rp. 130,000 = Rp. 162.50
Jumlah (2) = Rp. 35,662.50

Jumlah (1) + (2) = Rp. 48,002.50


Keuntungan+Over head 10% = Rp 4,800.25
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 52,802.75

PKK 6.16 1 M² pasang kaca, tebal 3 mm


6.16.1 Bahan
- Kaca 1.100 M² x Rp. 83,000 = Rp. 91,300.00
Jumlah (1) = Rp. 91,300.00
6.16.2 Tenaga
- Pekerja 0.015 Oh x Rp. 90,000 = Rp. 1,350.00
- Tukang Kayu 0.150 Oh x Rp. 120,000 = Rp. 18,000.00
- Kepala Tukang 0.015 Oh x Rp. 130,000 = Rp. 1,950.00
- Mandor 0.00075 Oh x Rp. 130,000 = Rp. 97.50
Jumlah (2) = Rp. 21,397.50

Jumlah (1) + (2) = Rp. 112,697.50


Keuntungan+Over head 10% = Rp 11,269.75
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 123,967.25

PKK 6.17 1 M² pasang kaca, tebal 5 mm


6.17.1 Bahan
- Kaca 1.100 M² x Rp. 113,000 = Rp. 124,300.00
Jumlah (1) = Rp. 124,300.00
6.17.2 Tenaga
- Pekerja 0.0155 Oh x Rp. 90,000 = Rp. 1,395.00
- Tukang Kayu 0.1550 Oh x Rp. 120,000 = Rp. 18,600.00
- Kepala Tukang 0.0155 Oh x Rp. 130,000 = Rp. 2,015.00
- Mandor 0.00075 Oh x Rp. 130,000 = Rp. 97.50
Jumlah (2) = Rp. 22,107.50

Jumlah (1) + (2) = Rp. 146,407.50


Keuntungan+Over head 10% = Rp 14,640.75
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 161,048.25

PKK 6.18 1 M² pasang kaca, tebal 8 mm


6.18.1 Bahan
- Kaca polos 1.100 M² x Rp. 240,000 = Rp. 264,000.00
Jumlah (1) = Rp. 264,000.00
6.18.2 Tenaga
- Pekerja 0.0165 Oh x Rp. 90,000 = Rp. 1,485.00
- Tukang Kayu 0.165 Oh x Rp. 120,000 = Rp. 19,800.00
- Kepala Tukang 0.0165 Oh x Rp. 130,000 = Rp. 2,145.00
- Mandor 0.0008 Oh x Rp. 130,000 = Rp. 104.00
Jumlah (2) = Rp. 23,534.00

Jumlah (1) + (2) = Rp. 287,534.00


Keuntungan+Over head 10% = Rp 28,753.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 316,287.40

PKK 6.19 1 M² pasang kaca buram, tebal 5 mm

6.19.1 Bahan
- Kaca buram 1.100 M² x Rp. 111,320 = Rp. 122,452.00
- Sealent 0.050 Kg x Rp. 39,330 = Rp. 1,966.50
Jumlah (1) = Rp. 124,418.50
6.19.2 Tenaga
- Pekerja 0.0155 Oh x Rp. 90,000 = Rp. 1,395.00
- Tukang Kayu 0.1550 Oh x Rp. 120,000 = Rp. 18,600.00
- Kepala Tukang 0.0155 Oh x Rp. 130,000 = Rp. 2,015.00
- Mandor 0.00075 Oh x Rp. 130,000 = Rp. 97.50
Jumlah (2) = Rp. 22,107.50

Jumlah (1) + (2) = Rp. 146,526.00


Keuntungan+Over head 10% = Rp 14,652.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 161,178.60

PKK 6.20 1 M² pasang kaca cermin, tebal 5 mm

6.20.1 Bahan
- Kaca cermin 1.100 M² x Rp. 161,700 = Rp. 177,870.00
Jumlah (1) = Rp. 177,870.00
6.20.2 Tenaga
- Pekerja 0.0155 Oh x Rp. 90,000 = Rp. 1,395.00
- Tukang Kayu 0.1550 Oh x Rp. 120,000 = Rp. 18,600.00
- Kepala Tukang 0.0155 Oh x Rp. 130,000 = Rp. 2,015.00
- Mandor 0.00075 Oh x Rp. 130,000 = Rp. 97.50
Jumlah (2) = Rp. 22,107.50

Jumlah (1) + (2) = Rp. 199,977.50


Keuntungan+Over head 10% = Rp 19,997.75
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 219,975.25

PKK 6.21 1 M² pasang kaca cermin, tebal 8 mm

6.21.1 Bahan
- Kaca cermin 1.100 M² x Rp. 258,720 = Rp. 284,592.00
Jumlah (1) = Rp. 284,592.00
6.21.2 Tenaga
- Pekerja 0.0165 Oh x Rp. 90,000 = Rp. 1,485.00
- Tukang Kayu 0.165 Oh x Rp. 120,000 = Rp. 19,800.00
- Kepala Tukang 0.0165 Oh x Rp. 130,000 = Rp. 2,145.00
- Mandor 0.0008 Oh x Rp. 130,000 = Rp. 104.00
Jumlah (2) = Rp. 23,534.00

Jumlah (1) + (2) = Rp. 308,126.00


Keuntungan+Over head 10% = Rp 30,812.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 338,938.60
PKK 6.22 1 M² pasang kaca "wireglass" , tebal 5 mm

6.22.1 Bahan
- Kaca wireglass 1.100 M² x Rp. 151,250 = Rp. 166,375.00
Jumlah (1) = Rp. 166,375.00
6.22.2 Tenaga
- Pekerja 0.0155 Oh x Rp. 90,000 = Rp. 1,395.00
- Tukang Kayu 0.1550 Oh x Rp. 120,000 = Rp. 18,600.00
- Kepala Tukang 0.0155 Oh x Rp. 130,000 = Rp. 2,015.00
- Mandor 0.00075 Oh x Rp. 130,000 = Rp. 97.50
Jumlah (2) = Rp. 22,107.50

Jumlah (1) + (2) = Rp. 188,482.50


Keuntungan+Over head 10% = Rp 18,848.25
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 207,330.75

PKK 6.23 1 M² pasang kaca patri, tebal 5 mm


6.23.1 Bahan
- Kaca patri 1.100 M² x Rp. 169,400 = Rp. 186,340.00
Jumlah (1) = Rp. 186,340.00
6.23.2 Tenaga
- Pekerja 0.0250 Oh x Rp. 90,000 = Rp. 2,250.00
- Tukang Kayu 0.2500 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala Tukang 0.0250 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.00125 Oh x Rp. 130,000 = Rp. 162.50
Jumlah (2) = Rp. 35,662.50

Jumlah (1) + (2) = Rp. 222,002.50


Keuntungan+Over head 10% = Rp 22,200.25
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 244,202.75

PKK 6.24. 1 M² pasang kaca Reyben, tebal 5 mm

6.24.1 Bahan
- Kaca reyben 1.100 M² x Rp. 101,000 = Rp. 111,100.00
Jumlah (1) = Rp. 111,100.00
6.24.2 Tenaga
- Pekerja 0.0155 Oh x Rp. 90,000 = Rp. 1,395.00
- Tukang Kayu 0.1550 Oh x Rp. 120,000 = Rp. 18,600.00
- Kepala Tukang 0.0155 Oh x Rp. 130,000 = Rp. 2,015.00
- Mandor 0.00075 Oh x Rp. 130,000 = Rp. 97.50
Jumlah (2) = Rp. 22,107.50

Jumlah (1) + (2) = Rp. 133,207.50


Keuntungan+Over head 10% = Rp 13,320.75
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 146,528.25
ANALISA BIAYA KONTRUKSI
PEKERJAAN PENGECATAN

PC 6.1 1M² Mengikis/ mengerok permukaan cat tembok lama


6.1.1 Bahan
- Soda api 0.050 Kg x Rp. 12,100 = Rp. 605.00
Jumlah (1) = Rp. 605.00
6.1.2 Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Mandor 0.0025 Oh x Rp. 130,000 = Rp. 325.00
Jumlah (2) = Rp. 13,825.00

Jumlah (1) + (2) = Rp. 14,430.00


Keuntungan+Over head 10% = Rp 1,443.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 15,873.00

PC 6.2. 1M² Mencuci bidang permukaan tembok yang pernah di cat


6.2.1 Bahan
- Sabun 0.050 Kg x Rp. 10,290 = Rp. 514.50
Jumlah (1) = Rp. 514.50
6.2.2 Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Mandor 0.0025 Oh x Rp. 130,000 = Rp. 325.00
Jumlah (2) = Rp. 13,825.00

Jumlah (1) + (2) = Rp. 14,339.50


Keuntungan+Over head 10% = Rp 1,433.95
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 15,773.45

PC 6.3. 1M² Mengerok karat cat lama permukaan baja dengan cara manual
6.3 .1 Bahan
- Sabun 0.050 Kg x Rp. 10,290 = Rp. 514.50
Jumlah (1) = Rp. 514.50
6.3.2 Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Mandor 0.0025 Oh x Rp. 130,000 = Rp. 325.00
Jumlah (2) = Rp. 13,825.00

Jumlah (1) + (2) = Rp. 14,339.50


Keuntungan+Over head 10% = Rp 1,433.95
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 15,773.45

PC 6.4 1M² Menyabun permukaan tembok lama


6.4 .1 Bahan
- Sabun 0.050 Kg x Rp. 10,290 = Rp. 514.50
Jumlah (1) = Rp. 514.50
6.4.2 Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Mandor 0.0025 Oh x Rp. 130,000 = Rp. 325.00
Jumlah (2) = Rp. 13,825.00

Jumlah (1) + (2) = Rp. 14,339.50


Keuntungan+Over head 10% = Rp 1,433.95
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 15,773.45

PC 6.5 1M² Mendempul dan menggosok kayu

6.5 .1 Bahan
- Dempul jadi 0.080 Kg x Rp. 11,860 = Rp. 948.80
- Minyak cat 0.020 Kg x Rp. 18,000 = Rp. 360.00
- Amplas 0.100 Lbr x Rp. 5,000 = Rp. 500.00
Jumlah (1) = Rp. 1,808.80
6.5.2 Tenaga
- Pekerja 0.040 Oh x Rp. 90,000 = Rp. 3,600.00
- Tukang cat 0.040 Oh x Rp. 120,000 = Rp. 4,800.00
- Kepala tukang 0.040 Oh x Rp. 130,000 = Rp. 5,200.00
- Mandor 0.0025 Oh x Rp. 130,000 = Rp. 325.00
Jumlah (2) = Rp. 13,925.00

Jumlah (1) + (2) = Rp. 15,733.80


Keuntungan+Over head 10% = Rp 1,573.38
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 17,307.18

PC 6.6 1M² Pengecatan bidang kayu lama

6.6.1 Bahan
- Plamir 0.150 Kg x Rp. 18,500 = Rp. 2,775.00
- Minyak Cat 0.170 Kg x Rp. 18,000 = Rp. 3,060.00
- Cat Minyak 0.170 Kg x Rp. 60,000 = Rp. 10,200.00
Jumlah (1) = Rp. 16,035.00
6.6.2 Tenaga
- Pekerja 0.070 Oh x Rp. 90,000 = Rp. 6,300.00
- Tukang cat 0.075 Oh x Rp. 120,000 = Rp. 9,000.00
- Kepala tukang 0.0075 Oh x Rp. 130,000 = Rp. 975.00
- Mandor 0.0025 Oh x Rp. 130,000 = Rp. 325.00
Jumlah (2) = Rp. 16,600.00

Jumlah (1) + (2) = Rp. 32,635.00


Keuntungan+Over head 10% = Rp 3,263.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 35,898.50

PC 6.7 1M² Pengecatan bidang kayu baru 1 lps plamir, 1 lps cat dasar, 2 lps cat minyak
6.7.1 Bahan
- Cat menie kayu 0.200 Kg x Rp. 30,000 = Rp. 6,000.00
- Plamir 0.150 Kg x Rp. 18,500 = Rp. 2,775.00
- Cat dasar 0.170 Kg x Rp. 31,000 = Rp. 5,270.00
- Cat Minyak 0.260 Kg x Rp. 60,000 = Rp. 15,600.00
Jumlah (1) = Rp. 29,645.00
6.7.2 Tenaga
- Pekerja 0.070 Oh x Rp. 90,000 = Rp. 6,300.00
- Tukang cat 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.0090 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.0025 Oh x Rp. 130,000 = Rp. 325.00
Jumlah (2) = Rp. 18,595.00

Jumlah (1) + (2) = Rp. 48,240.00


Keuntungan+Over head 10% = Rp 4,824.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 53,064.00
PC 6.8 1M² Pengecatan bidang kayu baru 1 lps plamir, 1 lps cat dasar, 3lps cat minyak
6.8.1 Bahan
- Cat menie kayu 0.200 Kg x Rp. 30,000 = Rp. 6,000.00
- Plamir 0.150 Kg x Rp. 18,500 = Rp. 2,775.00
- Minyak Cat 0.170 Kg x Rp. 18,000 = Rp. 3,060.00
- Cat Minyak 0.350 Kg x Rp. 60,000 = Rp. 21,000.00
Jumlah (1) = Rp. 32,835.00
6.8.2 Tenaga
- Pekerja 0.070 Oh x Rp. 90,000 = Rp. 6,300.00
- Tukang cat 0.105 Oh x Rp. 120,000 = Rp. 12,600.00
- Kepala tukang 0.0105 Oh x Rp. 130,000 = Rp. 1,365.00
- Mandor 0.0025 Oh x Rp. 130,000 = Rp. 325.00
Jumlah (2) = Rp. 20,590.00

Jumlah (1) + (2) = Rp. 53,425.00


Keuntungan+Over head 10% = Rp 5,342.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 58,767.50

PC 6.9 1M² Peleburan kayu dengan politur


6.9.1 Bahan
- Minyak politur 0.150 Kg x Rp. 18,000 = Rp. 2,700.00
- Politur Jadi / vernis 0.372 Kg x Rp. 48,280 = Rp. 17,960.16
- Amplas 2.000 Kg x Rp. 5,000 = Rp. 10,000.00
Jumlah (1) = Rp. 30,660.16
6.9.2 Tenaga
- Pekerja 0.040 Oh x Rp. 90,000 = Rp. 3,600.00
- Tukang cat 0.060 Oh x Rp. 120,000 = Rp. 7,200.00
- Kepala tukang 0.0160 Oh x Rp. 130,000 = Rp. 2,080.00
- Mandor 0.0025 Oh x Rp. 130,000 = Rp. 325.00
Jumlah (2) = Rp. 13,205.00

Jumlah (1) + (2) = Rp. 43,865.16


Keuntungan+Over head 10% = Rp 4,386.52
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 48,251.68

PC 6.10 1M² Peleburan kayu dengan residu


6.10.1 Bahan
- Residu 0.350 Kg x Rp. 3,600 = Rp. 1,260.00
Jumlah (1) = Rp. 1,260.00
6.10.2 Tenaga
- Pekerja 0.100 Oh x Rp. 90,000 = Rp. 9,000.00
- Mandor 0.006 Oh x Rp. 130,000 = Rp. 780.00
Jumlah (2) = Rp. 9,780.00

Jumlah (1) + (2) = Rp. 11,040.00


Keuntungan+Over head 10% = Rp 1,104.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 12,144.00

PC 6.11 1M² Peleburan bidang kayu dan vernis

6.11.1 Bahan
- Vernis 0.150 Ltr x Rp. 48,280 = Rp. 7,242.00
- Dempul 0.050 Kg x Rp. 11,860 = Rp. 593.00
- Ampelas 0.100 Lbr x Rp. 5,000 = Rp. 500.00
- Kuas 0.010 bh x Rp. 10,000 = Rp. 100.00
Jumlah (1) = Rp. 8,435.00
6.11.2 Tenaga
- Pekerja 0.160 Oh x Rp. 90,000 = Rp. 14,400.00
- Tukang cat 0.160 Oh x Rp. 120,000 = Rp. 19,200.00
- Kepala tukang 0.016 Oh x Rp. 130,000 = Rp. 2,080.00
- Mandor 0.0025 Oh x Rp. 130,000 = Rp. 325.00
Jumlah (2) = Rp. 36,005.00

Jumlah (1) + (2) = Rp. 44,440.00


Keuntungan+Over head 10% = Rp 4,444.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 48,884.00

PC 6.12 1M² Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )

6.12.1 Bahan
- Plamir 0.120 Kg x Rp. 18,500 = Rp. 2,220.00
- Cat dasar 0.120 Kg x Rp. 31,000 = Rp. 3,720.00
- Cat tembok 2 x 0.260 Kg x Rp. 31,000 = Rp. 8,060.00
Jumlah (1) = Rp. 14,000.00
6.12.2 Tenaga
- Pekerja 0.040 Oh x Rp. 90,000 = Rp. 3,600.00
- Tukang cat 0.120 Oh x Rp. 120,000 = Rp. 14,400.00
- Kepala tukang 0.0120 Oh x Rp. 130,000 = Rp. 1,560.00
- Mandor 0.002 Oh x Rp. 130,000 = Rp. 260.00
Jumlah (2) = Rp. 19,820.00

Jumlah (1) + (2) = Rp. 33,820.00


Keuntungan+Over head 10% = Rp 3,382.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 37,202.00

PC 6.13 1M² Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup )

6.13.1 Bahan
- Cat dasar 0.120 Kg x Rp. 31,000 = Rp. 3,720.00
- Cat tembok 2 x 0.260 Kg x Rp. 31,000 = Rp. 8,060.00
Jumlah (1) = Rp. 11,780.00
6.13.2 Tenaga
- Pekerja 0.030 Oh x Rp. 90,000 = Rp. 2,700.00
- Tukang cat 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.0090 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.0015 Oh x Rp. 130,000 = Rp. 195.00
Jumlah (2) = Rp. 14,865.00

Jumlah (1) + (2) = Rp. 26,645.00


Keuntungan+Over head 10% = Rp 2,664.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 29,309.50

PC 6.14 1M² Pemasangan wall paper

6.14.1 Bahan
- wall paper 1.200 M³ x Rp. 30,610 = Rp. 36,732.00
- Perekat lem karet 0.200 Kg x Rp. 67,350 = Rp. 13,470.00
Jumlah (1) = Rp. 50,202.00
6.14.2 Tenaga
- Pekerja 0.020 Oh x Rp. 90,000 = Rp. 1,800.00
- Tukang cat 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala tukang 0.002 Oh x Rp. 130,000 = Rp. 260.00
- Mandor 0.0025 Oh x Rp. 130,000 = Rp. 325.00
Jumlah (2) = Rp. 26,385.00

Jumlah (1) + (2) = Rp. 76,587.00


Keuntungan+Over head 10% = Rp 7,658.70
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 84,245.70

PC 6.15 1M² Pengecatan permukaan baja dengan meni besi

6.15.1 Bahan
- Meni besi 0.100 Kg x Rp. 30,000 = Rp. 3,000.00
- Kuas 0.010 Bh x Rp. 10,000 = Rp. 100.00
Jumlah (1) = Rp. 3,100.00
6.15.2 Tenaga
- Pekerja 0.020 Oh x Rp. 90,000 = Rp. 1,800.00
- Tukang cat 0.020 Oh x Rp. 120,000 = Rp. 2,400.00
- Kepala tukang 0.02 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.01 Oh x Rp. 130,000 = Rp. 1,300.00
Jumlah (2) = Rp. 8,100.00

Jumlah (1) + (2) = Rp. 11,200.00


Keuntungan+Over head 10% = Rp 1,120.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 12,320.00

PC 6.16. 1M² Pengecatan permukaan baja dengan meni besi dan perancah

6.16.1 Bahan
- Meni besi 0.100 Kg x Rp. 30,000 = Rp. 3,000.00
- Kuas 0.010 Bh x Rp. 10,000 = Rp. 100.00
- Peranca kayu 0.002 M³ x Rp. 2,005,477 = Rp. 4,010.95
Jumlah (1) = Rp. 7,110.95
6.16.2 Tenaga
- Pekerja 0.250 Oh x Rp. 90,000 = Rp. 22,500.00
- Tukang cat 0.225 Oh x Rp. 120,000 = Rp. 27,000.00
- Kepala tukang 0.0225 Oh x Rp. 130,000 = Rp. 2,925.00
- Mandor 0.0075 Oh x Rp. 130,000 = Rp. 975.00
Jumlah (2) = Rp. 53,400.00

Jumlah (1) + (2) = Rp. 60,510.95


Keuntungan+Over head 10% = Rp 6,051.10
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 66,562.05

PC 6.17. 1M² Pengecatan permukaan baja lapis seng (galbani) secara manual
sistem 1 lapis cat konvensional dengan tebal 200 um.

6.17.1 Bahan
- Cat Minyak besi 0.300 Kg x Rp. 60,000 = Rp. 18,000.00
Jumlah (1) = Rp. 18,000.00
6.17.2 Tenaga
- Pekerja 0.060 Oh x Rp. 90,000 = Rp. 5,400.00
- Tukang cat 0.060 Oh x Rp. 120,000 = Rp. 7,200.00
- Kepala tukang 0.1200 Oh x Rp. 130,000 = Rp. 15,600.00
- Mandor 0.006 Oh x Rp. 130,000 = Rp. 780.00
Jumlah (2) = Rp. 28,980.00

Jumlah (1) + (2) = Rp. 46,980.00


Keuntungan+Over head 10% = Rp 4,698.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 51,678.00

PC 6.18. 1M² Pengecatan permukaan baja lapis seng (galbani) secara manual
sistem 3 lapis cat konvensional dengan tebal 200 um.

6.18.1 Bahan
- Cat dasar 0.110 Kg x Rp. 31,000 = Rp. 3,410.00
- Cat menie besi 0.170 Kg x Rp. 30,000 = Rp. 5,100.00
- Cat minyak besi 0.080 Kg x Rp. 60,000 = Rp. 4,800.00
Jumlah (1) = Rp. 13,310.00
6.18.2 Tenaga
- Pekerja 0.500 Oh x Rp. 90,000 = Rp. 45,000.00
- Tukang cat 0.800 Oh x Rp. 120,000 = Rp. 96,000.00
- Kepala tukang 0.300 Oh x Rp. 130,000 = Rp. 39,000.00
- Mandor 0.200 Oh x Rp. 130,000 = Rp. 26,000.00
Jumlah (2) = Rp. 206,000.00

Jumlah (1) + (2) = Rp. 219,310.00


Keuntungan+Over head 10% = Rp 21,931.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 241,241.00

PC 6.19. 1M² Pengecatan permukaan baja lapis seng (galbani) secara semprot
(airless spray) dengan sistem 1 lapis cat konvensional dengan tebal 200 um.

6.19.1 Bahan
- Cat dasar 0.300 Kg x Rp. 31,000 = Rp. 9,300.00
Jumlah (1) = Rp. 9,300.00
6.19.2 Tenaga
- Pekerja 0.400 Oh x Rp. 90,000 = Rp. 36,000.00
- Tukang cat 0.700 Oh x Rp. 120,000 = Rp. 84,000.00
- Kepala tukang 0.200 Oh x Rp. 130,000 = Rp. 26,000.00
- Mandor 0.200 Oh x Rp. 130,000 = Rp. 26,000.00
Jumlah (2) = Rp. 172,000.00

Jumlah (1) + (2) = Rp. 181,300.00


Keuntungan+Over head 10% = Rp 18,130.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 199,430.00
ANALISA BIAYA KONSTRUKSI
PEKERJAAN SANITASI

PS 6.1. Memasang 1 buah kloset duduk/monoblok

6.1.1. Bahan
- Klosed duduk/monoblok 1.000 Bh x Rp. 1,931,600 = Rp. 1,931,600.00
- Perlengkapan 6% harga klosed x Rp. 1,931,600 = Rp. 115,896.00
Jumlah (1) = Rp. 2,047,496.00
6.1.2. Tenaga
- Pekerja 3.300 Oh x Rp. 90,000 = Rp. 297,000.00
- Tukang batu 1.500 Oh x Rp. 120,000 = Rp. 180,000.00
- Kepala tukang 0.150 Oh x Rp. 130,000 = Rp. 19,500.00
- Mandor 0.160 Oh x Rp. 130,000 = Rp. 20,800.00
Jumlah (2) = Rp. 517,300.00

Jumlah (1) + (2) = Rp. 2,564,796.00


Keuntungan+Over head 10% = Rp 256,479.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 2,821,275.60

PS 6.2. Memasang 1 buah kloset jongkok porselen

6.2.1. Bahan
- Klosed jongkok porselin 1.000 Bh x Rp. 225,280 = Rp. 225,280.00
- Semen portland 6.000 Kg x Rp. 1,500 = Rp. 9,000.00
- Pasir pasang 0.010 M³ x Rp. 273,000 = Rp. 2,730.00
Jumlah (1) = Rp. 237,010.00
6.2.2. Tenaga
- Pekerja 1.100 Oh x Rp. 90,000 = Rp. 99,000.00
- Tukang batu 1.500 Oh x Rp. 120,000 = Rp. 180,000.00
- Kepala tukang 0.150 Oh x Rp. 130,000 = Rp. 19,500.00
- Mandor 0.110 Oh x Rp. 130,000 = Rp. 14,300.00
Jumlah (2) = Rp. 312,800.00

Jumlah (1) + (2) = Rp. 549,810.00


Keuntungan+Over head 10% = Rp 54,981.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 604,791.00

PS 6.3. Memasang 1 buah kloset jongkok teraso

6.3.1. Bahan
- Klosed jongkok teraso 1.000 Bh x Rp. 526,350 = Rp. 526,350.00
- Bata merah 5x10x20 cm 7.000 Bh x Rp. 1,000 = Rp. 7,000.00
- Semen portland 6.000 Kg x Rp. 1,500 = Rp. 9,000.00
- Pasir pasang 0.010 M³ x Rp. 273,000 = Rp. 2,730.00
Jumlah (1) = Rp. 545,080.00
6.3.2. Tenaga
- Pekerja 1.000 Oh x Rp. 90,000 = Rp. 90,000.00
- Tukang batu 1.500 Oh x Rp. 120,000 = Rp. 180,000.00
- Kepala tukang 0.150 Oh x Rp. 130,000 = Rp. 19,500.00
- Mandor 0.100 Oh x Rp. 130,000 = Rp. 13,000.00
Jumlah (2) = Rp. 302,500.00

Jumlah (1) + (2) = Rp. 847,580.00


Keuntungan+Over head 10% = Rp 84,758.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 932,338.00
PS 6.4 Memasang 1 buah urinoir

6.4.1. Bahan
- Urinoir 1.000 Bh x Rp. 557,480 = Rp. 557,480.00
- Perlengkapan 15% harga urinoir x Rp. 557,480 = Rp. 83,622.00
- Semen portland 6.000 Kg x Rp. 1,500 = Rp. 9,000.00
- Pasir pasang 0.010 M³ x Rp. 273,000 = Rp. 2,730.00
Jumlah (1) = Rp. 652,832.00
6.4.2. Tenaga
- Pekerja 1.000 Oh x Rp. 90,000 = Rp. 90,000.00
- Tukang batu 1.000 Oh x Rp. 120,000 = Rp. 120,000.00
- Kepala tukang 0.100 Oh x Rp. 130,000 = Rp. 13,000.00
- Mandor 0.100 Oh x Rp. 130,000 = Rp. 13,000.00
Jumlah (2) = Rp. 236,000.00

Jumlah (1) + (2) = Rp. 888,832.00


Keuntungan+Over head 10% = Rp 88,883.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 977,715.20

PS 6.5 Memasang 1 buah wastafel

6.5.1. Bahan
- Wastafel 1.000 Bh x Rp. 526,350 = Rp. 526,350.00
- Perlengkapan 12% harga wastafel x Rp. 526,350 = Rp. 63,162.00
- Semen portland 6.000 Kg x Rp. 1,500 = Rp. 9,000.00
- Pasir pasang 0.010 M³ x Rp. 273,000 = Rp. 2,730.00
Jumlah (1) = Rp. 601,242.00
6.5.2. Tenaga
- Pekerja 1.200 Oh x Rp. 90,000 = Rp. 108,000.00
- Tukang batu 1.450 Oh x Rp. 120,000 = Rp. 174,000.00
- Kepala tukang 0.150 Oh x Rp. 130,000 = Rp. 19,500.00
- Mandor 0.100 Oh x Rp. 130,000 = Rp. 13,000.00
Jumlah (2) = Rp. 314,500.00

Jumlah (1) + (2) = Rp. 915,742.00


Keuntungan+Over head 10% = Rp 91,574.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,007,316.20

PS 6.6. Memasang 1 buah bak mandi teraso volume 0,30 m³

6.6.1. Bahan
- Bak teraso 1.000 Bh x Rp. 181,500 = Rp. 181,500.00
- Semen portland 6.000 Kg x Rp. 1,500 = Rp. 9,000.00
- Pasir pasang 0.010 M³ x Rp. 273,000 = Rp. 2,730.00
Jumlah (1) = Rp. 193,230.00
6.6.2. Tenaga
- Pekerja 2.100 Oh x Rp. 90,000 = Rp. 189,000.00
- Tukang batu 0.750 Oh x Rp. 120,000 = Rp. 90,000.00
- Kepala tukang 0.075 Oh x Rp. 130,000 = Rp. 9,750.00
- Mandor 0.110 Oh x Rp. 130,000 = Rp. 14,300.00
Jumlah (2) = Rp. 303,050.00

Jumlah (1) + (2) = Rp. 496,280.00


Keuntungan+Over head 10% = Rp 49,628.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 545,908.00

PS 6.7. Memasang 1 buah bak mandi fibreglass volume 0,30 m³

6.7.1. Bahan
- Bak fibreglass 1.000 Bh x Rp. 181,500 = Rp. 181,500.00
- Perlengkapan 18% Harga bak x Rp. 181,500 = Rp. 32,670.00
Jumlah (1) = Rp. 214,170.00
6.7.2. Tenaga
- Pembantu tukang 1.800 Oh x Rp. 90,000 = Rp. 162,000.00
- Tukang batu 0.540 Oh x Rp. 120,000 = Rp. 64,800.00
- Kepala tukang 0.054 Oh x Rp. 130,000 = Rp. 7,020.00
- Mandor 0.110 Oh x Rp. 130,000 = Rp. 14,300.00
Jumlah (2) = Rp. 248,120.00

Jumlah (1) + (2) = Rp. 462,290.00


Keuntungan+Over head 10% = Rp 46,229.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 508,519.00

0.35129

PS 6.8. Memasang 1 buah bak mandi batu bata volume 0,30 m³

6.8.1. Bahan
- Batu bata 44.000 M³ x Rp. 1,000 = Rp. 44,000.00
- Semen portland 120.000 Kg x Rp. 1,500 = Rp. 180,000.00
- Pasir pasang 0.300 M³ x Rp. 273,000 = Rp. 81,900.00
- Porselin (11x11) cm 360.000 Bh x Rp. 145 = Rp. 52,200.00
- Semen putih 6.000 Kg x Rp. 2,300 = Rp. 13,800.00
Jumlah (1) = Rp. 371,900.00
6.8.2. Tenaga
- Pekerja 3.000 Oh x Rp. 90,000 = Rp. 270,000.00
- Tukang batu 3.000 Oh x Rp. 120,000 = Rp. 360,000.00
- Kepala tukang 0.300 Oh x Rp. 130,000 = Rp. 39,000.00
- Mandor 0.300 Oh x Rp. 130,000 = Rp. 39,000.00
Jumlah (2) = Rp. 708,000.00

Jumlah (1) + (2) = Rp. 1,079,900.00


Keuntungan+Over head 10% = Rp 107,990.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,187,890.00

PS 6.9. Memasang 1 buah badkip porselin

6.9.1. Bahan
- Badkip 1.000 Bh x Rp. 3,025,000 = Rp. 3,025,000.00
- Perlengkapan 20% Harga badkip x Rp. 3,025,000 = Rp. 605,000.00
Jumlah (1) = Rp. 3,630,000.00
6.9.2. Tenaga
- Pekerja 2.500 Oh x Rp. 90,000 = Rp. 225,000.00
- Tukang batu 0.750 Oh x Rp. 120,000 = Rp. 90,000.00
- Kepala tukang 0.075 Oh x Rp. 130,000 = Rp. 9,750.00
- Mandor 0.250 Oh x Rp. 130,000 = Rp. 32,500.00
Jumlah (2) = Rp. 357,250.00

Jumlah (1) + (2) = Rp. 3,987,250.00


Keuntungan+Over head 10% = Rp 398,725.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 4,385,975.00

PS 6.10. Memasang 1 buah bak mandi beton volume 1 m³ air

6.10.1.Bahan
- Beton 1 : 1 ½ : 2½ 0.900 M³ x Rp. 0 = Rp. 0.00
- Besi beton 180.000 Kg x Rp. 11,000 = Rp. 1,980,000.00
- Kayu cetakan 0.096 M³ x Rp. 2,005,477 = Rp. 192,525.79
- Ubin porselin 420.000 M² x Rp. 145 = Rp. 60,900.00
- Perlengkapan 10% Hrg total bahan x Rp. 2,233,426 = Rp. 223,342.58
Jumlah (1) = Rp. 2,456,768.37

6.10.2.Tenaga
- Pekerja 3.500 Oh x Rp. 90,000 = Rp. 315,000.00
- Tukang batu 4.500 Oh x Rp. 120,000 = Rp. 540,000.00
- Kepala tukang 0.900 Oh x Rp. 130,000 = Rp. 117,000.00
- Mandor 0.900 Oh x Rp. 130,000 = Rp. 117,000.00
Jumlah (2) = Rp. 1,089,000.00

Jumlah (1) + (2) = Rp. 3,545,768.37


Keuntungan+Over head 10% = Rp 354,576.84
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 3,900,345.20

PS 6.11. Memasang 1 buah bak fibreglass volume 1 m³ air

6.11.1.Bahan
- Bak fibreglass 1.000 Bh x Rp. 181,500 = Rp. 181,500.00
- Perlengkapan 12% Harga bak x Rp. 181,500 = Rp. 21,780.00
Jumlah (1) = Rp. 203,280.00
6.11.2.Tenaga
- Pekerja 3.000 Oh x Rp. 90,000 = Rp. 270,000.00
- Tukang batu 4.500 Oh x Rp. 120,000 = Rp. 540,000.00
- Kepala tukang 0.900 Oh x Rp. 130,000 = Rp. 117,000.00
- Mandor 0.900 Oh x Rp. 130,000 = Rp. 117,000.00
Jumlah (2) = Rp. 1,044,000.00

Jumlah (1) + (2) = Rp. 1,247,280.00


Keuntungan+Over head 10% = Rp 124,728.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,372,008.00

PS 6.12. Memasang 1 m' pipa beton, diameter 30 cm - 100 cm

6.12.1.Bahan
- Pipa beton 1.100 Bh x Rp. 77,000 = Rp. 84,700.00
- Batu bata 55.000 Bh x Rp. 1,000 = Rp. 55,000.00
- Semen portland 10.300 Kg x Rp. 1,500 = Rp. 15,450.00
- Pasir pasang 0.061 M³ x Rp. 273,000 = Rp. 16,653.00
- Pasir urug 0.069 M³ x Rp. 261,000 = Rp. 18,009.00
Jumlah (1) = Rp. 189,812.00
6.12.2.Tenaga
- Pekerja 0.380 Oh x Rp. 90,000 = Rp. 34,200.00
- Tukang batu 0.190 Oh x Rp. 120,000 = Rp. 22,800.00
- Kepala tukang 0.019 Oh x Rp. 130,000 = Rp. 2,470.00
- Mandor 0.019 Oh x Rp. 130,000 = Rp. 2,470.00
Jumlah (2) = Rp. 61,940.00

Jumlah (1) + (2) = Rp. 251,752.00


Keuntungan+Over head 10% = Rp 25,175.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 276,927.20

PS 6.13. Memasang 1 buah bak kontrol pasangan batu bata ukuran (30 x 30) cm
tinggi 35 cm

6.13.1.Bahan
- Batu bata 145.000 Bh x Rp. 1,000 = Rp. 145,000.00
- Semen portland 44.000 Kg x Rp. 1,500 = Rp. 66,000.00
- Pasir pasang 0.070 M³ x Rp. 273,000 = Rp. 19,110.00
- Batu kerikil 0.070 M³ x Rp. 270,000 = Rp. 18,900.00
- Besi beton 1.600 Kg x Rp. 11,000 = Rp. 17,600.00
- Pasir beton 0.060 M³ x Rp. 273,000 = Rp. 16,380.00
Jumlah (1) = Rp. 282,990.00
6.13.2.Tenaga
- Pekerja 3.200 Oh x Rp. 90,000 = Rp. 288,000.00
- Tukang batu 1.015 Oh x Rp. 120,000 = Rp. 121,800.00
- Kepala tukang 0.0015 Oh x Rp. 130,000 = Rp. 195.00
- Mandor 0.016 Oh x Rp. 130,000 = Rp. 2,080.00
Jumlah (2) = Rp. 412,075.00

Jumlah (1) + (2) = Rp. 695,065.00


Keuntungan+Over head 10% = Rp 69,506.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 764,571.50

PS 6.14. Memasang 1 buah bak kontrol pasangan batu bata ukuran (45 x 45) cm
tinggi 50 cm

6.14.1.Bahan
- Batu bata 250.000 Bh x Rp. 1,000 = Rp. 250,000.00
- Semen portland 77.000 Kg x Rp. 1,500 = Rp. 115,500.00
- Pasir pasang 0.130 M³ x Rp. 273,000 = Rp. 35,490.00
- Batu kerikil 0.020 M³ x Rp. 270,000 = Rp. 5,400.00
- Besi beton 2.600 Kg x Rp. 11,000 = Rp. 28,600.00
- Pasir beton 0.090 M³ x Rp. 273,000 = Rp. 24,570.00
Jumlah (1) = Rp. 459,560.00
6.14.2.Tenaga
- Pekerja 1.420 Oh x Rp. 90,000 = Rp. 127,800.00
- Tukang batu 0.473 Oh x Rp. 120,000 = Rp. 56,760.00
- Kepala tukang 0.047 Oh x Rp. 130,000 = Rp. 6,110.00
- Mandor 0.071 Oh x Rp. 130,000 = Rp. 9,230.00
Jumlah (2) = Rp. 199,900.00

Jumlah (1) + (2) = Rp. 659,460.00


Keuntungan+Over head 10% = Rp 65,946.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 725,406.00

PS 6.15. Memasang 1 buah bak kontrol pasangan batu bata ukuran (60 x 60) cm
tinggi 65 cm

6.15.1.Bahan
- Batu bata 371.000 Bh x Rp. 1,000 = Rp. 371,000.00
- Semen portland 114.000 Kg x Rp. 1,500 = Rp. 171,000.00
- Pasir pasang 0.184 M³ x Rp. 273,000 = Rp. 50,232.00
- Batu koral 0.033 M³ x Rp. 270,000 = Rp. 8,910.00
- Besi beton 4.850 Kg x Rp. 11,000 = Rp. 53,350.00
- Pasir beton 0.120 M³ x Rp. 273,000 = Rp. 32,760.00
Jumlah (1) = Rp. 687,252.00
6.15.2.Tenaga
- Pekerja 2.160 Oh x Rp. 90,000 = Rp. 194,400.00
- Tukang batu 0.720 Oh x Rp. 120,000 = Rp. 86,400.00
- Kepala tukang 0.072 Oh x Rp. 130,000 = Rp. 9,360.00
- Mandor 0.108 Oh x Rp. 130,000 = Rp. 14,040.00
- Tukang gali 0.100 Oh x Rp. 90,000 = Rp. 9,000.00
Jumlah (2) = Rp. 313,200.00

Jumlah (1) + (2) = Rp. 1,000,452.00


Keuntungan+Over head 10% = Rp 100,045.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,100,497.20

PS 6.16. Memasang 1 m' pipa galvanis diameter ½"

6.16.1.Bahan
- Pipa galvanis 1.200 M´ x Rp. 14,770 = Rp. 17,724.00
- Perlengkapan 35% harga pipa x Rp. 14,770 = Rp. 5,169.50
Jumlah (1) = Rp. 22,893.50

6.16.2.Tenaga
- Pekerja 0.054 Oh x Rp. 90,000 = Rp. 4,860.00
- Tukang batu 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.027 Oh x Rp. 130,000 = Rp. 3,510.00
Jumlah (2) = Rp. 20,340.00

Jumlah (1) + (2) = Rp. 43,233.50


Keuntungan+Over head 10% = Rp 4,323.35
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 47,556.85

PS 6.17. Memasang 1 m' pipa galvanis diameter 3/4"

6.17.1.Bahan
- Pipa galvanis 1.200 M´ x Rp. 20,140 = Rp. 24,168.00
- Perlengkapan 35% harga pipa x Rp. 20,140 = Rp. 7,049.00
Jumlah (1) = Rp. 31,217.00
6.17.2.Tenaga
- Pekerja 0.054 Oh x Rp. 90,000 = Rp. 4,860.00
- Tukang batu 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.027 Oh x Rp. 130,000 = Rp. 3,510.00
Jumlah (2) = Rp. 20,340.00

Jumlah (1) + (2) = Rp. 51,557.00


Keuntungan+Over head 10% = Rp 5,155.70
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 56,712.70

PS 6.18. Memasang 1 m' pipa galvanis diameter 1"


6.18.1.Bahan
- Pipa galvanis 1.200 M´ x Rp. 29,520 = Rp. 35,424.00
- Perlengkapan 35% harga pipa x Rp. 29,520 = Rp. 10,332.00
Jumlah (1) = Rp. 45,756.00
6.18.2.Tenaga
- Pekerja 0.054 Oh x Rp. 90,000 = Rp. 4,860.00
- Tukang batu 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.027 Oh x Rp. 130,000 = Rp. 3,510.00
Jumlah (2) = Rp. 20,340.00

Jumlah (1) + (2) = Rp. 66,096.00


Keuntungan+Over head 10% = Rp 6,609.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 72,705.60

PS 6.19. Memasang 1 m' pipa galvanis diameter 1 ½"

6.19.1.Bahan
- Pipa galvanis 1.200 M´ x Rp. 37,580 = Rp. 45,096.00
- Perlengkapan 35% harga pipa x Rp. 37,580 = Rp. 13,153.00
Jumlah (1) = Rp. 58,249.00
6.19.2.Tenaga
- Pekerja 0.108 Oh x Rp. 90,000 = Rp. 9,720.00
- Tukang batu 0.180 Oh x Rp. 120,000 = Rp. 21,600.00
- Kepala tukang 0.018 Oh x Rp. 130,000 = Rp. 2,340.00
- Mandor 0.0054 Oh x Rp. 130,000 = Rp. 702.00
Jumlah (2) = Rp. 34,362.00

Jumlah (1) + (2) = Rp. 92,611.00


Keuntungan+Over head 10% = Rp 9,261.10
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 101,872.10

PS 6.20. Memasang 1 m' pipa galvanis diameter 2"

6.20.1.Bahan
- Pipa galvanis 1.200 M´ x Rp. 47,600 = Rp. 57,120.00
- Perlengkapan 35% harga pipa x Rp. 47,600 = Rp. 16,660.00
Jumlah (1) = Rp. 73,780.00
6.20.2.Tenaga
- Pekerja 0.108 Oh x Rp. 90,000 = Rp. 9,720.00
- Tukang batu 0.180 Oh x Rp. 120,000 = Rp. 21,600.00
- Kepala tukang 0.018 Oh x Rp. 130,000 = Rp. 2,340.00
- Mandor 0.0054 Oh x Rp. 130,000 = Rp. 702.00
Jumlah (2) = Rp. 34,362.00

Jumlah (1) + (2) = Rp. 108,142.00


Keuntungan+Over head 10% = Rp 10,814.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 118,956.20

PS 6.21. Memasang 1 m' pipa galvanis diameter 2,5"

6.21.1.Bahan
- Pipa galvanis 1.200 M´ x Rp. 52,440 = Rp. 62,928.00
- Perlengkapan 35% harga pipa x Rp. 52,440 = Rp. 18,354.00
Jumlah (1) = Rp. 81,282.00
6.21.2.Tenaga
- Pekerja 0.135 Oh x Rp. 90,000 = Rp. 12,150.00
- Tukang batu 0.225 Oh x Rp. 120,000 = Rp. 27,000.00
- Kepala tukang 0.0225 Oh x Rp. 130,000 = Rp. 2,925.00
- Mandor 0.0068 Oh x Rp. 130,000 = Rp. 884.00
Jumlah (2) = Rp. 42,959.00

Jumlah (1) + (2) = Rp. 124,241.00


Keuntungan+Over head 10% = Rp 12,424.10
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 136,665.10

PS 6.22. Memasang 1 m' pipa PVC tipe AW diameter ½"

6.22.1.Bahan
- Pipa PVC 1.200 M´ x Rp. 25,300 = Rp. 30,360.00
- Perlengkapan 35% harga pipa x Rp. 25,300 = Rp. 8,855.00
Jumlah (1) = Rp. 39,215.00
6.22.2.Tenaga
- Pekerja 0.036 Oh x Rp. 90,000 = Rp. 3,240.00
- Tukang batu 0.060 Oh x Rp. 120,000 = Rp. 7,200.00
- Kepala tukang 0.006 Oh x Rp. 130,000 = Rp. 780.00
- Mandor 0.0018 Oh x Rp. 130,000 = Rp. 234.00
Jumlah (2) = Rp. 11,454.00

Jumlah (1) + (2) = Rp. 50,669.00


Keuntungan+Over head 10% = Rp 5,066.90
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 55,735.90

PS 6.23. Memasang 1 m' pipa PVC tipe AW diameter ¾"

6.23.1.Bahan
- Pipa PVC 1.200 M´ x Rp. 7,440 = Rp. 8,928.00
- Perlengkapan 35% harga pipa x Rp. 7,440 = Rp. 2,604.00
Jumlah (1) = Rp. 11,532.00
6.23.2.Tenaga
- Pekerja 0.036 Oh x Rp. 90,000 = Rp. 3,240.00
- Tukang batu 0.060 Oh x Rp. 120,000 = Rp. 7,200.00
- Kepala tukang 0.006 Oh x Rp. 130,000 = Rp. 780.00
- Mandor 0.0018 Oh x Rp. 130,000 = Rp. 234.00
Jumlah (2) = Rp. 11,454.00

Jumlah (1) + (2) = Rp. 22,986.00


Keuntungan+Over head 10% = Rp 2,298.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 25,284.60

PS 6.24. Memasang 1 m' pipa PVC tipe AW diameter 1"

6.24.1.Bahan
- Pipa PVC 1.200 M´ x Rp. 13,620 = Rp. 16,344.00
- Perlengkapan 35% harga pipa x Rp. 13,620 = Rp. 4,767.00
Jumlah (1) = Rp. 21,111.00
6.24.2.Tenaga
- Pekerja 0.036 Oh x Rp. 90,000 = Rp. 3,240.00
- Tukang batu 0.060 Oh x Rp. 120,000 = Rp. 7,200.00
- Kepala tukang 0.006 Oh x Rp. 130,000 = Rp. 780.00
- Mandor 0.0018 Oh x Rp. 130,000 = Rp. 234.00
Jumlah (2) = Rp. 11,454.00

Jumlah (1) + (2) = Rp. 32,565.00


Keuntungan+Over head 10% = Rp 3,256.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 35,821.50

PS 6.25. Memasang 1 m' pipa PVC tipe AW diameter 1 ½"

6.25.1.Bahan
- Pipa PVC 1.200 M´ x Rp. 19,670 = Rp. 23,604.00
- Perlengkapan 35% harga pipa x Rp. 19,670 = Rp. 6,884.50
Jumlah (1) = Rp. 30,488.50
6.25.2.Tenaga
- Pekerja 0.036 Oh x Rp. 90,000 = Rp. 3,240.00
- Tukang batu 0.060 Oh x Rp. 120,000 = Rp. 7,200.00
- Kepala tukang 0.006 Oh x Rp. 130,000 = Rp. 780.00
- Mandor 0.0018 Oh x Rp. 130,000 = Rp. 234.00
Jumlah (2) = Rp. 11,454.00

Jumlah (1) + (2) = Rp. 41,942.50


Keuntungan+Over head 10% = Rp 4,194.25
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 46,136.75

PS 6.26. Memasang 1 m' pipa PVC tipe AW diameter 2"

6.26.1.Bahan
- Pipa PVC 1.200 M´ x Rp. 23,190 = Rp. 27,828.00
- Perlengkapan 35% harga pipa x Rp. 23,190 = Rp. 8,116.50
Jumlah (1) = Rp. 35,944.50
6.26.2.Tenaga
- Pekerja 0.054 Oh x Rp. 90,000 = Rp. 4,860.00
- Tukang batu 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.0027 Oh x Rp. 130,000 = Rp. 351.00
Jumlah (2) = Rp. 17,181.00

Jumlah (1) + (2) = Rp. 53,125.50


Keuntungan+Over head 10% = Rp 5,312.55
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 58,438.05

PS 6.27. Memasang 1 m' pipa PVC tipe AW diameter 2 ½"

6.27.1.Bahan
- Pipa PVC 1.200 M´ x Rp. 26,620 = Rp. 31,944.00
- Perlengkapan 35% harga pipa x Rp. 26,620 = Rp. 9,317.00
Jumlah (1) = Rp. 41,261.00
6.27.2.Tenaga
- Pekerja 0.036 Oh x Rp. 90,000 = Rp. 3,240.00
- Tukang batu 0.060 Oh x Rp. 120,000 = Rp. 7,200.00
- Kepala tukang 0.006 Oh x Rp. 130,000 = Rp. 780.00
- Mandor 0.0018 Oh x Rp. 130,000 = Rp. 234.00
Jumlah (2) = Rp. 11,454.00

Jumlah (1) + (2) = Rp. 52,715.00


Keuntungan+Over head 10% = Rp 5,271.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 57,986.50

PS 6.28. Memasang 1 m' pipa PVC tipe AW diameter 3"

6.28.1.Bahan
- Pipa PVC 1.200 M´ x Rp. 29,840 = Rp. 35,808.00
- Perlengkapan 35% harga pipa x Rp. 29,840 = Rp. 10,444.00
Jumlah (1) = Rp. 46,252.00
6.28.2.Tenaga
- Pekerja 0.081 Oh x Rp. 90,000 = Rp. 7,290.00
- Tukang batu 0.135 Oh x Rp. 120,000 = Rp. 16,200.00
- Kepala tukang 0.0135 Oh x Rp. 130,000 = Rp. 1,755.00
- Mandor 0.0041 Oh x Rp. 130,000 = Rp. 533.00
Jumlah (2) = Rp. 25,778.00

Jumlah (1) + (2) = Rp. 72,030.00


Keuntungan+Over head 10% = Rp 7,203.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 79,233.00

PS 6.29. Memasang 1 m' pipa PVC tipe AW diameter 4"

6.29.1.Bahan
- Pipa PVC 1.200 M´ x Rp. 49,920 = Rp. 59,904.00
- Perlengkapan 35% harga pipa x Rp. 49,920 = Rp. 17,472.00
Jumlah (1) = Rp. 77,376.00
6.29.2.Tenaga
- Pekerja 0.081 Oh x Rp. 90,000 = Rp. 7,290.00
- Tukang batu 0.135 Oh x Rp. 120,000 = Rp. 16,200.00
- Kepala tukang 0.0135 Oh x Rp. 130,000 = Rp. 1,755.00
- Mandor 0.0041 Oh x Rp. 130,000 = Rp. 533.00
Jumlah (2) = Rp. 25,778.00

Jumlah (1) + (2) = Rp. 103,154.00


Keuntungan+Over head 10% = Rp 10,315.40
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 113,469.40

PS 6.30. Memasang 1 bh bak cuci piring stainles steel

6.30.1.Bahan
- Bak cuci stainless steel 1.000 Bh x Rp. 466,700 = Rp. 466,700.00
- Water drain asesories 1.000 Set x Rp. 10,000 = Rp. 10,000.00
Jumlah (1) = Rp. 476,700.00
6.30.2.Tenaga
- Pekerja 0.030 Oh x Rp. 90,000 = Rp. 2,700.00
- Tukang batu 0.300 Oh x Rp. 120,000 = Rp. 36,000.00
- Kepala tukang 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
- Mandor 0.0015 Oh x Rp. 130,000 = Rp. 195.00
Jumlah (2) = Rp. 42,795.00

Jumlah (1) + (2) = Rp. 519,495.00


Keuntungan+Over head 10% = Rp 51,949.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 571,444.50

PS 6.31. Memasang 1 bh bak cuci piring teraso


6.31.1.Bahan
- Bak cuci teraso 1.000 Bh x Rp. 272,250 = Rp. 272,250.00
- Water drain + asesories 1.000 Bh x Rp. 10,000 = Rp. 10,000.00
- Semen portland 20.000 Kg x Rp. 1,500 = Rp. 30,000.00
- Pasir 0.050 M³ x Rp. 273,000 = Rp. 13,650.00
Jumlah (1) = Rp. 325,900.00
6.31.2.Tenaga
- Pekerja 0.050 Oh x Rp. 90,000 = Rp. 4,500.00
- Tukang batu 0.500 Oh x Rp. 120,000 = Rp. 60,000.00
- Kepala tukang 0.050 Oh x Rp. 130,000 = Rp. 6,500.00
- Mandor 0.0025 Oh x Rp. 130,000 = Rp. 325.00
Jumlah (2) = Rp. 71,325.00

Jumlah (1) + (2) = Rp. 397,225.00


Keuntungan+Over head 10% = Rp 39,722.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 436,947.50

PS 6.32. Memasang 1 bh kran diameter ¾" atau ½"

6.32.1.Bahan
- Kran air 1.000 Bh x Rp. 27,350 = Rp. 27,350.00
- Seal tape 0.025 Bh x Rp. 0 = Rp. 0.00
Jumlah (1) = Rp. 27,350.00

6.32.2.Tenaga
- Pekerja 0.010 Oh x Rp. 90,000 = Rp. 900.00
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.005 Oh x Rp. 130,000 = Rp. 650.00
Jumlah (2) 14,850.00

Jumlah (1) + (2) = Rp. 42,200.00


Keuntungan+Over head 10% = Rp 4,220.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 46,420.00

PS 6.33. Memasang 1 bh Floor drain

6.33.1.Bahan
- Floor drain 1.000 Bh x Rp. 15,000 = Rp. 15,000.00
Jumlah (1) = Rp. 15,000.00

6.33.2.Tenaga
- Pekerja 0.010 Oh x Rp. 90,000 = Rp. 900.00
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.005 Oh x Rp. 130,000 = Rp. 650.00
Jumlah (2) 14,850.00

Jumlah (1) + (2) = Rp. 29,850.00


Keuntungan+Over head 10% = Rp 2,985.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 32,835.00
ANALISA BIAYA KONSTRUKSI
PEKERJAAN BESI DAN ALUMINIUM

PBA 6.1 1 Kg Pasang rangka atap baja

6.1.1 Bahan
- Besi profil WF 1.100 Kg x Rp. 15,000 = Rp. 16,500.00
- Meni besi 0.080 Kg x Rp. 30,000 = Rp. 2,400.00
Jumlah (1) = Rp. 18,900.00
6.1.2. Tenaga
- Tukang besi 0.006 Oh x Rp. 120,000 = Rp. 720.00
- Pekerja 0.060 Oh x Rp. 90,000 = Rp. 5,400.00
- Kepala tukang 0.006 Oh x Rp. 130,000 = Rp. 780.00
- Mandor 0.0003 Oh x Rp. 130,000 = Rp. 39.00
Jumlah (2) = Rp. 6,939.00

Jumlah (1) + (2) = Rp. 25,839.00


Keuntungan+Over head 10% = Rp 2,583.90
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 28,422.90

PBA 6.2 1 M² Pasang pintu besi baja

6.2.1 Bahan
- Pintu besi baja 1.000 M² x Rp. 816,750 = Rp. 816,750.00
Jumlah (1) = Rp. 816,750.00
6.2.2. Tenaga
- Tukang besi konstruksi 0.650 Oh x Rp. 120,000 = Rp. 78,000.00
- Pekerja 0.650 Oh x Rp. 90,000 = Rp. 58,500.00
- Kepala tukang 0.065 Oh x Rp. 130,000 = Rp. 8,450.00
- Mandor 0.032 Oh x Rp. 130,000 = Rp. 4,160.00
Jumlah (2) = Rp. 149,110.00

Jumlah (1) + (2) = Rp. 965,860.00


Keuntungan+Over head 10% = Rp 96,586.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,062,446.00

PBA 6.3 1 M² Pasang jendela besi


6.3.1 Bahan
- Jendela besi 1.000 M² x Rp. 347,270 = Rp. 347,270.00
Jumlah (1) = Rp. 347,270.00
6.3.2. Tenaga
- Tukang besi konstruksi 1.050 Oh x Rp. 120,000 = Rp. 126,000.00
- Pekerja 1.050 Oh x Rp. 90,000 = Rp. 94,500.00
- Kepala tukang 0.105 Oh x Rp. 130,000 = Rp. 13,650.00
- Mandor 0.00525 Oh x Rp. 130,000 = Rp. 682.50
Jumlah (2) = Rp. 234,832.50

Jumlah (1) + (2) = Rp. 582,102.50


Keuntungan+Over head 10% = Rp 58,210.25
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 640,312.75

PBA 6.4 1 M² Pasang pintu gulung besi


6.4.1 Bahan
- Pintu gulung besi 1.000 M² x Rp. 828,850 = Rp. 828,850.00
Jumlah (1) = Rp. 828,850.00
6.4.2. Tenaga
- Tukang besi konstruksi 1.200 Oh x Rp. 120,000 = Rp. 144,000.00
- Pekerja 1.200 Oh x Rp. 90,000 = Rp. 108,000.00
- Kepala tukang 0.120 Oh x Rp. 130,000 = Rp. 15,600.00
- Mandor 0.006 Oh x Rp. 130,000 = Rp. 780.00
Jumlah (2) = Rp. 268,380.00

Jumlah (1) + (2) = Rp. 1,097,230.00


Keuntungan+Over head 10% = Rp 109,723.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,206,953.00

PBA 6.5 1 M² Pasang pintu lipat

6.5.1 Bahan
- Pintu lipat 1.000 M² x Rp. 837,320 = Rp. 837,320.00
Jumlah (1) = Rp. 837,320.00
6.5.2. Tenaga
- Tukang besi konstruksi 1.200 Oh x Rp. 120,000 = Rp. 144,000.00
- Pekerja 1.000 Oh x Rp. 90,000 = Rp. 90,000.00
- Kepala tukang 0.120 Oh x Rp. 130,000 = Rp. 15,600.00
- Mandor 0.006 Oh x Rp. 130,000 = Rp. 780.00
Jumlah (2) = Rp. 250,380.00

Jumlah (1) + (2) = Rp. 1,087,700.00


Keuntungan+Over head 10% = Rp 108,770.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 1,196,470.00

PBA 6.6 1 M² Pasang pintu Sunscreen alluminium

6.6.1 Bahan
- Sunscreen alluminium 1.000 M² x Rp. 0 = Rp. 0.00
Jumlah (1) = Rp. 0.00
6.6.2. Tenaga
- Tukang besi konstruksi 0.800 Oh x Rp. 120,000 = Rp. 96,000.00
- Pekerja 0.080 Oh x Rp. 90,000 = Rp. 7,200.00
- Kepala tukang 0.080 Oh x Rp. 130,000 = Rp. 10,400.00
- Mandor 0.004 Oh x Rp. 130,000 = Rp. 520.00
Jumlah (2) = Rp. 114,120.00

Jumlah (1) + (2) = Rp. 114,120.00


Keuntungan+Over head 10% = Rp 11,412.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 125,532.00

PBA 6.7 1 M² Pasang Rolling door

6.7.1 Bahan
- Roll door 1.000 M² x Rp. 465,850 = Rp. 465,850.00
Jumlah (1) = Rp. 465,850.00
6.7.2. Tenaga
- Tukang besi konstruksi 1.200 Oh x Rp. 120,000 = Rp. 144,000.00
- Pekerja 1.200 Oh x Rp. 90,000 = Rp. 108,000.00
- Kepala tukang 0.120 Oh x Rp. 130,000 = Rp. 15,600.00
- Mandor 0.006 Oh x Rp. 130,000 = Rp. 780.00
Jumlah (2) = Rp. 268,380.00
Jumlah (1) + (2) = Rp. 734,230.00
Keuntungan+Over head 10% = Rp 73,423.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 807,653.00

PBA 6.8 1 M² Pasang pintu alluminium

6.8.1 Bahan
- Pintu alluminium 1.000 M² x Rp. 405,350 = Rp. 405,350.00
Jumlah (1) = Rp. 405,350.00

6.8.2. Tenaga
- Tukang besi konstruksi 1.050 Oh x Rp. 120,000 = Rp. 126,000.00
- Pekerja 1.050 Oh x Rp. 90,000 = Rp. 94,500.00
- Kepala tukang 0.105 Oh x Rp. 130,000 = Rp. 13,650.00
- Mandor 0.0052 Oh x Rp. 130,000 = Rp. 676.00
Jumlah (2) = Rp. 234,826.00

Jumlah (1) + (2) = Rp. 640,176.00


Keuntungan+Over head 10% = Rp 64,017.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 704,193.60

PBA 6.9 1 M² Pasang Venetions blinds

6.9.1 Bahan
- Venetions blinds 1.000 M² x Rp. 163,350 = Rp. 163,350.00
Jumlah (1) = Rp. 163,350.00

6.9.2. Tenaga
- Tukang kayu 0.350 Oh x Rp. 61,775 = Rp. 21,621.25
- Pekerja 0.350 Oh x Rp. 90,000 = Rp. 31,500.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.018 Oh x Rp. 130,000 = Rp. 2,340.00
Jumlah (2) = Rp. 60,011.25

Jumlah (1) + (2) = Rp. 223,361.25


Keuntungan+Over head 10% = Rp 22,336.13
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 245,697.38

PBA 6.10 1 M² Pasang Vertikals blinds

6.10.1 Bahan
- Vertikals blinds 1.000 M² x Rp. 175,450 = Rp. 175,450.00
Jumlah (1) = Rp. 175,450.00

6.10.2. Tenaga
- Tukang kayu 0.350 Oh x Rp. 61,775 = Rp. 21,621.25
- Pekerja 0.350 Oh x Rp. 90,000 = Rp. 31,500.00
- Kepala tukang 0.035 Oh x Rp. 130,000 = Rp. 4,550.00
- Mandor 0.018 Oh x Rp. 130,000 = Rp. 2,340.00
Jumlah (2) = Rp. 60,011.25

Jumlah (1) + (2) = Rp. 235,461.25


Keuntungan+Over head 10% = Rp 23,546.13
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 259,007.38
PBA 6.11 1 M² Pasang terali besi

6.11.1 Bahan
- Besi strip 2 x 3 11.500 M' x Rp. 11,880 = Rp. 136,620.00
Jumlah (1) = Rp. 136,620.00
6.11.2. Tenaga
- Tukang las 1.670 Oh x Rp. 120,000 = Rp. 200,400.00
- Pekerja 1.670 Oh x Rp. 90,000 = Rp. 150,300.00
- Kepala tukang 0.167 Oh x Rp. 130,000 = Rp. 21,710.00
- Mandor 0.083 Oh x Rp. 130,000 = Rp. 10,790.00
Jumlah (2) = Rp. 383,200.00

Jumlah (1) + (2) = Rp. 519,820.00


Keuntungan+Over head 10% = Rp 51,982.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 571,802.00

PBA 6.12 1 M² Pasang kawat harmonika

6.12.1 Bahan
- Kawat harmonika 1.100 M² x Rp. 23,600 = Rp. 25,960.00
- Paku biasa ½" - 1" 0.020 Kg x Rp. 15,000 = Rp. 300.00
- Kayu meranti 0.0018 M³ x Rp. 5,225,000 = Rp. 9,405.00
Jumlah (1) = Rp. 35,665.00
6.12.2. Tenaga
- Pekerja 0.100 Oh x Rp. 90,000 = Rp. 9,000.00
- Tukang kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.0005 Oh x Rp. 130,000 = Rp. 65.00
Jumlah (2) = Rp. 22,365.00

Jumlah (1) + (2) = Rp. 58,030.00


Keuntungan+Over head 10% = Rp 5,803.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 63,833.00

PBA 6.13 1 M² Pasang kawat nyamuk

6.13.1 Bahan
- Kawat nyamuk 1.100 M² x Rp. 11,980 = Rp. 13,178.00
- Paku biasa ½" - 1" 0.020 Kg x Rp. 15,000 = Rp. 300.00
- Kayu meranti 0.0018 M³ x Rp. 5,225,000 = Rp. 9,405.00
Jumlah (1) = Rp. 22,883.00
6.13.2. Tenaga
- Pekerja 0.100 Oh x Rp. 90,000 = Rp. 9,000.00
- Tukang kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.005 Oh x Rp. 130,000 = Rp. 650.00
Jumlah (2) = Rp. 22,950.00

Jumlah (1) + (2) = Rp. 45,833.00


Keuntungan+Over head 10% = Rp 4,583.30
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 50,416.30

PBA 6.14 1 M² Pasang kawat kassa


6.14.1 Bahan
- Kawat kassa 1.100 M² x Rp. 13,920 = Rp. 15,312.00
- Paku biasa ½" - 1" 0.020 Kg x Rp. 15,000 = Rp. 300.00
- Kayu meranti 0.0018 M³ x Rp. 5,225,000 = Rp. 9,405.00
Jumlah (1) = Rp. 25,017.00

6.14.2. Tenaga
- Pekerja 0.100 Oh x Rp. 90,000 = Rp. 9,000.00
- Tukang kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.0005 Oh x Rp. 130,000 = Rp. 65.00
Jumlah (2) = Rp. 22,365.00

Jumlah (1) + (2) = Rp. 47,382.00


Keuntungan+Over head 10% = Rp 4,738.20
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 52,120.20

PBA 6.15 1 M² Pasang kawat burung

6.15.1 Bahan
- Kawat burung 1.100 M² x Rp. 12,710 = Rp. 13,981.00
- Paku biasa ½" - 1" 0.020 Kg x Rp. 15,000 = Rp. 300.00
- Kayu meranti 0.0018 M³ x Rp. 5,225,000 = Rp. 9,405.00
Jumlah (1) = Rp. 23,686.00

6.15.2. Tenaga
- Pekerja 0.100 Oh x Rp. 90,000 = Rp. 9,000.00
- Tukang kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.0005 Oh x Rp. 130,000 = Rp. 65.00
Jumlah (2) = Rp. 22,365.00

Jumlah (1) + (2) = Rp. 46,051.00


Keuntungan+Over head 10% = Rp 4,605.10
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 50,656.10

PBA 6.16 1 M² Pasang jendela nako dan tralis

6.16.1 Bahan
- Jendela nako 1.100 M² x Rp. 201,660 = Rp. 221,826.00
- Paku biasa ½" - 1" atau skrup 0.020 Kg x Rp. 15,000 = Rp. 300.00
- Besi strip # 12 mm 1.500 M² x Rp. 11,880 = Rp. 17,820.00
Jumlah (1) = Rp. 239,946.00

6.16.2. Tenaga
- Pekerja 0.200 Oh x Rp. 90,000 = Rp. 18,000.00
- Tukang kayu 0.200 Oh x Rp. 120,000 = Rp. 24,000.00
- Kepala tukang 0.020 Oh x Rp. 130,000 = Rp. 2,600.00
- Mandor 0.001 Oh x Rp. 130,000 = Rp. 130.00
Jumlah (2) = Rp. 44,730.00

Jumlah (1) + (2) = Rp. 284,676.00


Keuntungan+Over head 10% = Rp 28,467.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 313,143.60
PBA 6.17 1 M' Pasang talang datar, seng bjls 35

6.17.1 Bahan
- Seng plat 3' x 6' bjls 35 0.500 Lbr x Rp. 115,500 = Rp. 57,750.00
- Paku biasa ½" - 1" atau skrup 0.015 Kg x Rp. 15,000 = Rp. 225.00
- Kayu meranti 0.0096 M³ x Rp. 5,225,000 = Rp. 50,160.00
- Flincote / meni besi 0.250 Kg x Rp. 30,000 = Rp. 7,500.00
Jumlah (1) = Rp. 115,635.00
6.17.2. Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang kayu 0.400 Oh x Rp. 120,000 = Rp. 48,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.00125 Oh x Rp. 130,000 = Rp. 162.50
Jumlah (2) = Rp. 64,912.50

Jumlah (1) + (2) = Rp. 180,547.50


Keuntungan+Over head 10% = Rp 18,054.75
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 198,602.25

PBA 6.18 1 M' Pasang talang miring, seng bjls 35

6.18.1 Bahan
- Seng plat 3' x 6' bjls 35 0.500 Lbr x Rp. 115,500 = Rp. 57,750.00
- Paku biasa ½" - 1" atau skrup 0.015 Kg x Rp. 15,000 = Rp. 225.00
- Kayu meranti 0.019 M³ x Rp. 5,225,000 = Rp. 99,275.00
- Flincote / meni besi 0.300 Kg x Rp. 30,000 = Rp. 9,000.00
Jumlah (1) = Rp. 166,250.00
6.18.2. Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang kayu 0.400 Oh x Rp. 120,000 = Rp. 48,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.00125 Oh x Rp. 130,000 = Rp. 162.50
Jumlah (2) = Rp. 64,912.50

Jumlah (1) + (2) = Rp. 231,162.50


Keuntungan+Over head 10% = Rp 23,116.25
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 254,278.75

PBA 6.19 1 M' Pasang talang ½ lingkaran D-10 cm, seng bjls 35

6.19.1 Bahan
- Seng plat 3' x 6' bjls 35 0.300 Lbr x Rp. 115,500 = Rp. 34,650.00
- Paku biasa ½" - 1" atau skrup 0.100 Kg x Rp. 15,000 = Rp. 1,500.00
- Kayu meranti 0.019 M³ x Rp. 5,225,000 = Rp. 99,275.00
- Besi strip 0.500 Kg x Rp. 11,880 = Rp. 5,940.00
Jumlah (1) = Rp. 141,365.00
6.19.2. Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang kayu 0.250 Oh x Rp. 120,000 = Rp. 30,000.00
- Kepala tukang 0.025 Oh x Rp. 130,000 = Rp. 3,250.00
- Mandor 0.00125 Oh x Rp. 130,000 = Rp. 162.50
Jumlah (2) = Rp. 46,912.50

Jumlah (1) + (2) = Rp. 188,277.50


Keuntungan+Over head 10% = Rp 18,827.75
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 207,105.25
PBA 6.20 1 M' Pasang talang ½ lingkaran D-10 cm, seng bjls 30

6.20.1 Bahan
- Seng plat 3' x 6' bjls 30 0.300 Lbr x Rp. 103,950 = Rp. 31,185.00
- Paku biasa ½" - 1" atau skrup 0.010 Kg x Rp. 15,000 = Rp. 150.00
- Kayu meranti 0.019 M³ x Rp. 5,225,000 = Rp. 99,275.00
- Besi strip 0.500 Kg x Rp. 11,880 = Rp. 5,940.00
Jumlah (1) = Rp. 136,550.00
6.20.2. Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang kayu 0.300 Oh x Rp. 120,000 = Rp. 36,000.00
- Kepala tukang 0.030 Oh x Rp. 130,000 = Rp. 3,900.00
- Mandor 0.008 Oh x Rp. 130,000 = Rp. 1,040.00
Jumlah (2) = Rp. 54,440.00

Jumlah (1) + (2) = Rp. 190,990.00


Keuntungan+Over head 10% = Rp 19,099.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 210,089.00

PBA 6.21 1 M2 Pasang atap pelana rangka atap baja canai dingin profil C-75

6.21.1 Bahan
- Baja ringan canai dingin C-75 3.065 Kg x Rp. 10,309 = Rp. 31,597.94

Jumlah (1) = Rp. 31,597.94


6.21.2. Tenaga
- Pekerja 0.489 Oh x Rp. 90,000 = Rp. 44,040.00
- Tukang kayu 0.489 Oh x Rp. 120,000 = Rp. 58,720.00
- Kepala tukang 0.073 Oh x Rp. 130,000 = Rp. 9,490.00
- Mandor 0.037 Oh x Rp. 130,000 = Rp. 4,810.00
Jumlah (2) = Rp. 117,060.00

Jumlah (1) + (2) = Rp. 148,657.94


Keuntungan+Over head 10% = Rp 14,865.79
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 163,523.73

PBA 6.22 1 M2 Pasang atap jurai rangka atap baja canai dingin profil C-75

6.22.1 Bahan
- Baja ringan canai dingin C-75 4.0500 Kg x Rp. 10,309 = Rp. 41,752.58

Jumlah (1) = Rp. 41,752.58


6.22.2. Tenaga
- Pekerja 0.5069 Oh x Rp. 90,000 = Rp. 45,624.00
- Tukang kayu 0.5069 Oh x Rp. 120,000 = Rp. 60,832.00
- Kepala tukang 0.0760 Oh x Rp. 130,000 = Rp. 9,880.00
- Mandor 0.0380 Oh x Rp. 130,000 = Rp. 4,940.00
Jumlah (2) = Rp. 121,276.00

Jumlah (1) + (2) = Rp. 163,028.58


Keuntungan+Over head 10% = Rp 16,302.86
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 179,331.44
ANALISA BIAYA KONSTRUKSI
PEKERJAAN LANGIT - LANGIT

PLL 6.1 1 M² langit - langit asbes ( 1,00 x 1,00 ) m tebal 6 mm

6.1.1 Bahan
- Pelat asbes tebal 6 mm 1.100 Lbr x Rp. 17,330 = Rp. 19,063.00
- Paku 0.010 Kg x Rp. 15,000 = Rp. 150.00
Jumlah (1) = Rp. 19,213.00
6.1.2 Tenaga
- Pekerja 0.030 Oh x Rp. 90,000 = Rp. 2,700.00
- Tukang kayu 0.070 Oh x Rp. 120,000 = Rp. 8,400.00
- Kepala tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.0015 Oh x Rp. 130,000 = Rp. 195.00
Jumlah (2) = Rp. 12,205.00

Jumlah (1) + (2) = Rp. 31,418.00


Keuntungan+Over head 10% = Rp 3,141.80
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 34,559.80

PLL 6.2 1 M² langit - langit asbes ( 1,00 x 1,00 ) m tebal 5 mm

6.2.1 Bahan
- Pelat asbes tebal 5 mm 1.100 Lbr x Rp. 14,440 = Rp. 15,884.00
- Paku 0.010 Kg x Rp. 15,000 = Rp. 150.00
Jumlah (1) = Rp. 16,034.00
6.2.2 Tenaga
- Pekerja 0.030 Oh x Rp. 90,000 = Rp. 2,700.00
- Tukang kayu 0.070 Oh x Rp. 120,000 = Rp. 8,400.00
- Kepala tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.0015 Oh x Rp. 130,000 = Rp. 195.00
Jumlah (2) = Rp. 12,205.00

Jumlah (1) + (2) = Rp. 28,239.00


Keuntungan+Over head 10% = Rp 2,823.90
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 31,062.90

PLL 6.3 1 M² langit - langit asbes ( 1,00 x 1,00 ) m tebal 4 mm

6.3.1 Bahan
- Pelat asbes tebal 4 mm 1.100 Lbr x Rp. 11,550 = Rp. 12,705.00
- Paku 0.010 Kg x Rp. 15,000 = Rp. 150.00
Jumlah (1) = Rp. 12,855.00
6.3.2 Tenaga
- Pekerja 0.030 Oh x Rp. 90,000 = Rp. 2,700.00
- Tukang kayu 0.070 Oh x Rp. 120,000 = Rp. 8,400.00
- Kepala tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.0015 Oh x Rp. 130,000 = Rp. 195.00
Jumlah (2) = Rp. 12,205.00

Jumlah (1) + (2) = Rp. 25,060.00


Keuntungan+Over head 10% = Rp 2,506.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 27,566.00
PLL 6.4 1 M² langit - langit asbes ( 1,00 x 1,00 ) m tebal 3,5 mm
6.4.1 Bahan
- Pelat asbes tebal 3,5 mm 1.100 Lbr x Rp. 9,350 = Rp. 10,285.00
- Paku 0.010 Kg x Rp. 15,000 = Rp. 150.00
Jumlah (1) = Rp. 10,435.00

6.4.2 Tenaga
- Pekerja 0.030 Oh x Rp. 90,000 = Rp. 2,700.00
- Tukang kayu 0.070 Oh x Rp. 120,000 = Rp. 8,400.00
- Kepala tukang 0.007 Oh x Rp. 130,000 = Rp. 910.00
- Mandor 0.0015 Oh x Rp. 130,000 = Rp. 195.00
Jumlah (2) = Rp. 12,205.00

Jumlah (1) + (2) = Rp. 22,640.00


Keuntungan+Over head 10% = Rp 2,264.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 24,904.00

PLL 6.5 1 M² Langit - langit akustik ( 30 x 30 ) cm

6.5.1 Bahan
- Akustik ukuran 30 x 30 cm 11.500 Lbr x Rp. 8,540 = Rp. 98,210.00
- Paku 0.050 Kg x Rp. 15,000 = Rp. 750.00
Jumlah (1) = Rp. 98,960.00
6.5.2 Tenaga
- Pekerja 0.060 Oh x Rp. 90,000 = Rp. 5,400.00
- Tukang kayu 0.120 Oh x Rp. 120,000 = Rp. 14,400.00
- Kepala tukang 0.012 Oh x Rp. 130,000 = Rp. 1,560.00
- Mandor 0.003 Oh x Rp. 130,000 = Rp. 390.00
Jumlah (2) = Rp. 21,750.00

Jumlah (1) + (2) = Rp. 120,710.00


Keuntungan+Over head 10% = Rp 12,071.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 132,781.00

PLL 6.6 1 M² Langit - langit akustik ( 30 x 60 ) cm

6.6.1 Bahan
- Akustik ukuran 30 x 60 cm 5.800 Lbr x Rp. 17,070 = Rp. 99,006.00
- Paku 0.050 Kg x Rp. 15,000 = Rp. 750.00
Jumlah (1) = Rp. 99,756.00
6.6.2 Tenaga
- Pekerja 0.060 Oh x Rp. 90,000 = Rp. 5,400.00
- Tukang kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.003 Oh x Rp. 130,000 = Rp. 390.00
Jumlah (2) = Rp. 19,090.00

Jumlah (1) + (2) = Rp. 118,846.00


Keuntungan+Over head 10% = Rp 11,884.60
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 130,730.60
PLL 6.7 1 M² Langit - langit akustik ( 60 x 120 ) cm

6.7.1 Bahan
- Akustik arm strong ukuran 60 x 120 cm 1.500 Lbr x Rp. 68,290 = Rp. 102,435.00
- Paku 0.050 Kg x Rp. 15,000 = Rp. 750.00
Jumlah (1) = Rp. 103,185.00
6.7.2 Tenaga
- Pekerja 0.060 Oh x Rp. 90,000 = Rp. 5,400.00
- Tukang kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.003 Oh x Rp. 130,000 = Rp. 390.00
Jumlah (2) = Rp. 19,090.00

Jumlah (1) + (2) = Rp. 122,275.00


Keuntungan+Over head 10% = Rp 12,227.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 134,502.50

PLL 6.8 1 M² Langit - langit plywood ( 30 x 60 ) cm, tebal 4 mm

6.8.1 Bahan
- Plywood 4' x 8' x 4 mm 0.360 Lbr x Rp. 51,920 = Rp. 18,691.20
- Paku 0.030 Kg x Rp. 15,000 = Rp. 450.00
Jumlah (1) = Rp. 19,141.20
6.8.2 Tenaga
- Pekerja 0.070 Oh x Rp. 90,000 = Rp. 6,300.00
- Tukang kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.0035 Oh x Rp. 130,000 = Rp. 455.00
Jumlah (2) = Rp. 20,055.00

Jumlah (1) + (2) = Rp. 39,196.20


Keuntungan+Over head 10% = Rp 3,919.62
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 43,115.82

PLL 6.9 1 M² Langit - langit plywood ( 30 x 60 ) cm, tebal 6 mm


6.9.1 Bahan
- Plywood 4' x 8' x 6 mm 0.360 Lbr x Rp. 77,880 = Rp. 28,036.80
- Paku 0.030 Kg x Rp. 15,000 = Rp. 450.00
Jumlah (1) = Rp. 28,486.80
6.9.2 Tenaga
- Pekerja 0.070 Oh x Rp. 90,000 = Rp. 6,300.00
- Tukang kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.0035 Oh x Rp. 130,000 = Rp. 455.00
Jumlah (2) = Rp. 20,055.00

Jumlah (1) + (2) = Rp. 48,541.80


Keuntungan+Over head 10% = Rp 4,854.18
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 53,395.98

PLL 6.10 1 M² Langit - langit plywood ( 60 x 120 ) cm, tebal 4 mm


6.10.1 Bahan
- Plywood 4' x 8' x 4 mm 0.375 Lbr x Rp. 51,920 = Rp. 19,470.00
- Paku 0.030 Kg x Rp. 15,000 = Rp. 450.00
Jumlah (1) = Rp. 19,920.00
6.10.2 Tenaga
- Pekerja 0.070 Oh x Rp. 90,000 = Rp. 6,300.00
- Tukang kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.0035 Oh x Rp. 130,000 = Rp. 455.00
Jumlah (2) = Rp. 20,055.00

Jumlah (1) + (2) = Rp. 39,975.00


Keuntungan+Over head 10% = Rp 3,997.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 43,972.50

PLL 6.11 1 M² Langit - langit plywood ( 60 x 120 ) cm, tebal 6 mm


6.11.1 Bahan
- Plywood 4' x 8' x 6 mm 0.375 Lbr x Rp. 77,880 = Rp. 29,205.00
- Paku 0.030 Kg x Rp. 15,000 = Rp. 450.00
Jumlah (1) = Rp. 29,655.00
6.11.2 Tenaga
- Pekerja 0.070 Oh x Rp. 90,000 = Rp. 6,300.00
- Tukang kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.0035 Oh x Rp. 130,000 = Rp. 455.00
Jumlah (2) = Rp. 20,055.00

Jumlah (1) + (2) = Rp. 49,710.00


Keuntungan+Over head 10% = Rp 4,971.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 54,681.00

PLL 6.12 1 M² Langit - langit teakwood ( 30 x 60 ) cm, tebal 4 mm

6.12.1 Bahan
- Teakwood 4' x 8' x 4 mm 0.360 Lbr x Rp. 130,000 = Rp. 46,800.00
- Paku 0.030 Kg x Rp. 15,000 = Rp. 450.00
Jumlah (1) = Rp. 47,250.00
6.12.2 Tenaga
- Pekerja 0.070 Oh x Rp. 90,000 = Rp. 6,300.00
- Tukang kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.0035 Oh x Rp. 130,000 = Rp. 455.00
Jumlah (2) = Rp. 20,055.00

Jumlah (1) + (2) = Rp. 67,305.00


Keuntungan+Over head 10% = Rp 6,730.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 74,035.50

PLL 6.13 1 M² Langit - langit teakwood ( 60 x 120 ) cm, tebal 4 mm

6.13.1 Bahan
- Teakwood 4' x 8' x 4 mm 0.375 Lbr x Rp. 130,000 = Rp. 48,750.00
- Paku 0.030 Kg x Rp. 15,000 = Rp. 450.00
Jumlah (1) = Rp. 49,200.00
6.13.2 Tenaga
- Pekerja 0.070 Oh x Rp. 90,000 = Rp. 6,300.00
- Tukang kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.0035 Oh x Rp. 130,000 = Rp. 455.00
Jumlah (2) = Rp. 20,055.00

Jumlah (1) + (2) = Rp. 69,255.00


Keuntungan+Over head 10% = Rp 6,925.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 76,180.50

PLL 6.14 1 M² Langit - langit lat kayu jati


6.14.1 Bahan
- Kayu jati, papan 0.024 M³ x Rp. 24,104,440 = Rp. 578,506.56
- Paku 0.010 Kg x Rp. 15,000 = Rp. 150.00
- Paku sekrup 0.050 Kg x Rp. 21,180 = Rp. 1,059.00
Jumlah (1) = Rp. 579,715.56
6.14.2 Tenaga
- Pekerja 0.200 Oh x Rp. 90,000 = Rp. 18,000.00
- Tukang kayu 0.600 Oh x Rp. 120,000 = Rp. 72,000.00
- Kepala tukang 0.060 Oh x Rp. 130,000 = Rp. 7,800.00
- Mandor 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
Jumlah (2) = Rp. 99,100.00

Jumlah (1) + (2) = Rp. 678,815.56


Keuntungan+Over head 10% = Rp 67,881.56
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 746,697.12

PLL 6.15 1 M² Langit - langit lat papan rider


6.15.1 Bahan
- Papan rider 1.000 Lbr x Rp. 225,000 = Rp. 225,000.00
- Paku 0.010 Kg x Rp. 15,000 = Rp. 150.00
- Paku sekrup 0.050 Kg x Rp. 21,180 = Rp. 1,059.00
Jumlah (1) = Rp. 226,209.00
6.15.2 Tenaga
- Pekerja 0.200 Oh x Rp. 90,000 = Rp. 18,000.00
- Tukang kayu 0.600 Oh x Rp. 120,000 = Rp. 72,000.00
- Kepala tukang 0.060 Oh x Rp. 130,000 = Rp. 7,800.00
- Mandor 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
Jumlah (2) = Rp. 99,100.00

Jumlah (1) + (2) = Rp. 325,309.00


Keuntungan+Over head 10% = Rp 32,530.90
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 357,839.90

PLL 6.16 1 M² Langit - langit soft board


6.16.1 Bahan
- Soft board 4' x 8' x 4 mm 0.350 Lbr x Rp. 55,990 = Rp. 19,596.50
- Paku biasa 0.030 Kg x Rp. 15,000 = Rp. 450.00
Jumlah (1) = Rp. 20,046.50
6.16.2 Tenaga
- Pekerja 0.600 Oh x Rp. 90,000 = Rp. 54,000.00
- Tukang kayu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 130,000 = Rp. 1,300.00
- Mandor 0.003 Oh x Rp. 130,000 = Rp. 390.00
Jumlah (2) = Rp. 67,690.00

Jumlah (1) + (2) = Rp. 87,736.50


Keuntungan+Over head 10% = Rp 8,773.65
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 96,510.15

PLL 6.17 1 M² Langit - langit akustik 60 x 120 cm + rangka alluminium

6.17.1 Bahan
- Profil alluminium "T" 3.600 M' x Rp. 8,470 = Rp. 30,492.00
- Kawat seng polos 0.150 Kg x Rp. 22,530 = Rp. 3,379.50
- Ramset/dina bolt 1.000 Bh x Rp. 2,000 = Rp. 2,000.00
- Akustik arm strong 60 x 120 cm 1.500 Lbr x Rp. 68,290 = Rp. 102,435.00
Jumlah (1) = Rp. 138,306.50
6.17.2 Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang kayu 0.500 Oh x Rp. 120,000 = Rp. 60,000.00
- Kepala tukang 0.050 Oh x Rp. 130,000 = Rp. 6,500.00
- Mandor 0.0075 Oh x Rp. 130,000 = Rp. 975.00
Jumlah (2) = Rp. 80,975.00

Jumlah (1) + (2) = Rp. 219,281.50


Keuntungan+Over head 10% = Rp 21,928.15
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 241,209.65

PLL 6.18 1 M' List Langit - langit Kayu profil 3"


6.18.1 Bahan
- List kayu profil 1.100 M' x Rp. 18,810 = Rp. 20,691.00
- Paku 0.010 Kg x Rp. 15,000 = Rp. 150.00
Jumlah (1) = Rp. 20,841.00
6.18.2 Tenaga
- Pekerja 0.050 Oh x Rp. 90,000 = Rp. 4,500.00
- Tukang kayu 0.050 Oh x Rp. 120,000 = Rp. 6,000.00
- Kepala tukang 0.005 Oh x Rp. 130,000 = Rp. 650.00
- Mandor 0.003 Oh x Rp. 130,000 = Rp. 390.00
Jumlah (2) = Rp. 11,540.00

Jumlah (1) + (2) = Rp. 32,381.00


Keuntungan+Over head 10% = Rp 3,238.10
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 35,619.10

PLL 6.19 1 M² Langit - langit asbes (1,00 x 1,00) m, rangka kayu meranti

6.19.1 Bahan
- Kayu meranti 0.012 M³ x Rp. 5,225,000 = Rp. 62,700.00
- Paku 0.060 Kg x Rp. 15,000 = Rp. 900.00
- Asbes 1,00 x 1,00 m 1.100 Lbr x Rp. 11,550 = Rp. 12,705.00
Jumlah (1) = Rp. 76,305.00
6.19.2 Tenaga
- Pekerja 0.180 Oh x Rp. 90,000 = Rp. 16,200.00
- Tukang kayu 0.320 Oh x Rp. 120,000 = Rp. 38,400.00
- Kepala tukang 0.032 Oh x Rp. 130,000 = Rp. 4,160.00
- Mandor 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
Jumlah (2) = Rp. 59,930.00

Jumlah (1) + (2) = Rp. 136,235.00


Keuntungan+Over head 10% = Rp 13,623.50
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 149,858.50

PLL 6.20 1 M² Langit - langit plywood 4 mm + rangka kayu meranti

6.20.1 Bahan
- Kayu meranti 0.013 M³ x Rp. 5,225,000 = Rp. 67,925.00
- Paku biasa 2" - 5" 0.060 Kg x Rp. 15,000 = Rp. 900.00
- Plywood 4' x 8' x 4 mm 0.390 Lbr x Rp. 51,920 = Rp. 20,248.80
Jumlah (1) = Rp. 89,073.80
6.20.2 Tenaga
- Pekerja 0.270 Oh x Rp. 90,000 = Rp. 24,300.00
- Tukang kayu 0.400 Oh x Rp. 120,000 = Rp. 48,000.00
- Kepala tukang 0.040 Oh x Rp. 130,000 = Rp. 5,200.00
- Mandor 0.0135 Oh x Rp. 130,000 = Rp. 1,755.00
Jumlah (2) = Rp. 79,255.00

Jumlah (1) + (2) = Rp. 168,328.80


Keuntungan+Over head 10% = Rp 16,832.88
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 185,161.68

PLL 6.21 1 M² Langit - langit akustik ( 30 x 60 ) cm + rangka kayu meranti

6.21.1 Bahan
- Kayu meranti 0.013 M³ x Rp. 5,225,000 = Rp. 67,925.00
- Paku 0.060 Kg x Rp. 15,000 = Rp. 900.00
- Akustik 30 x 60 cm 5.800 Lbr x Rp. 17,070 = Rp. 99,006.00
Jumlah (1) = Rp. 167,831.00
6.21.2 Tenaga
- Pekerja 0.260 Oh x Rp. 90,000 = Rp. 23,400.00
- Tukang kayu 0.400 Oh x Rp. 120,000 = Rp. 48,000.00
- Kepala tukang 0.040 Oh x Rp. 130,000 = Rp. 5,200.00
- Mandor 0.013 Oh x Rp. 130,000 = Rp. 1,690.00
Jumlah (2) = Rp. 78,290.00

Jumlah (1) + (2) = Rp. 246,121.00


Keuntungan+Over head 10% = Rp 24,612.10
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 270,733.10

PLL 6.22 1 M² Langit - langit akustik ( 30 x 30 ) cm + rangka kayu borneo

6.22.1 Bahan
- Kayu meranti 0.013 M³ x Rp. 5,225,000 = Rp. 67,925.00
- Paku 0.060 Kg x Rp. 15,000 = Rp. 900.00
- Akustik 30 x 30 cm 11.500 Lbr x Rp. 8,540 = Rp. 98,210.00
Jumlah (1) = Rp. 167,035.00
6.22.2 Tenaga
- Pekerja 0.310 Oh x Rp. 90,000 = Rp. 27,900.00
- Tukang kayu 0.470 Oh x Rp. 120,000 = Rp. 56,400.00
- Kepala tukang 0.047 Oh x Rp. 130,000 = Rp. 6,110.00
- Mandor 0.0155 Oh x Rp. 130,000 = Rp. 2,015.00
Jumlah (2) = Rp. 92,425.00

Jumlah (1) + (2) = Rp. 259,460.00


Keuntungan+Over head 10% = Rp 25,946.00
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 285,406.00

PLL 6.23 1 M² Langit - langit gypsum board, tebal 9 mm

6.23.1 Bahan
- Gypsum board (120 x 240 x 9) mm 0.364 Lbr x Rp. 90,000 = Rp. 32,760.00
- Paku sekrup 0.110 Kg x Rp. 21,180 = Rp. 2,329.80
Jumlah (1) = Rp. 35,089.80

6.23.2 Tenaga
- Pekerja 0.100 Oh x Rp. 90,000 = Rp. 9,000.00
- Tukang kayu 0.050 Oh x Rp. 120,000 = Rp. 6,000.00
- Kepala tukang 0.005 Oh x Rp. 130,000 = Rp. 650.00
- Mandor 0.005 Oh x Rp. 130,000 = Rp. 650.00
Jumlah (2) = Rp. 16,300.00

Jumlah (1) + (2) = Rp. 51,389.80


Keuntungan+Over head 10% = Rp 5,138.98
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 56,528.78

PLL 6.24 1 M² Langit - langit gypsum board, tebal 6 mm

6.24.1 Bahan
- Gypsum board (120 x 240 x 6) mm 0.364 Lbr x Rp. 59,950 = Rp. 21,821.80
- Paku sekrup 0.110 Kg x Rp. 21,180 = Rp. 2,329.80
Jumlah (1) = Rp. 24,151.60

6.24.2 Tenaga
- Pekerja 0.100 Oh x Rp. 90,000 = Rp. 9,000.00
- Tukang kayu 0.050 Oh x Rp. 120,000 = Rp. 6,000.00
- Kepala tukang 0.005 Oh x Rp. 130,000 = Rp. 650.00
- Mandor 0.005 Oh x Rp. 130,000 = Rp. 650.00
Jumlah (2) = Rp. 16,300.00

Jumlah (1) + (2) = Rp. 40,451.60


Keuntungan+Over head 10% = Rp 4,045.16
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 44,496.76

PLL 6.25 1 M² Langit - langit gypsum board, tebal 12 mm

6.25.1 Bahan
- Gypsum board (120 x 240 x 12) mm 0.364 Lbr x Rp. 93,500 = Rp. 34,034.00
- Paku sekrup 0.110 Kg x Rp. 21,180 = Rp. 2,329.80
Jumlah (1) = Rp. 36,363.80

6.25.2 Tenaga
- Pekerja 0.150 Oh x Rp. 90,000 = Rp. 13,500.00
- Tukang kayu 0.080 Oh x Rp. 120,000 = Rp. 9,600.00
- Kepala tukang 0.0075 Oh x Rp. 130,000 = Rp. 975.00
- Mandor 0.0075 Oh x Rp. 130,000 = Rp. 975.00
Jumlah (2) = Rp. 25,050.00

Jumlah (1) + (2) = Rp. 61,413.80


Keuntungan+Over head 10% = Rp 6,141.38
Total = Jumlah+(Keuntungan+Over head 10%) = Rp 67,555.18
ANALISA BIAYA KONSTRUKSI
PEKERJAAN JALAN PAVING

1 1 M2 Pekerjaan Paving Block natural tb 8cm


Bahan 1.000 M2 Paving Block t=8 cm Natural 105,000.00 105,000.00
0.050 M2 Pasir Urug 261,000.00 13,050.00
1.000 lot Peralatan Bantu 11,805.00 11,805.00
Jumlah I 129,855.00

Tenaga 0.250 Oh Pekerja 90,000.00 22,500.00


0.500 Oh Tukang Setengah Terampil 90,000.00 45,000.00
0.025 Oh Kepala tukang 130,000.00 3,250.00
0.025 Oh Mandor 130,000.00 3,250.00
Jumlah II 74,000.00
Jumlah I + II 203,855.00
Keuntungan 10% 20,385.50
Total 224,240.50

2 1 M2 Pekerjaan Paving Block warna tb 8cm


Bahan 1.000 M2 Paving Block t=8 cm Warna 157,500.00 157,500.00
0.050 M2 Pasir Urug 261,000.00 13,050.00
1.000 lot Peralatan Bantu 17,055.00 17,055.00
Jumlah I 187,605.00

Tenaga 0.250 Oh Pekerja 90,000.00 22,500.00


0.500 Oh Tukang Setengah Terampil 90,000.00 45,000.00
0.025 Oh Kepala tukang 130,000.00 3,250.00
0.025 Oh Mandor 130,000.00 3,250.00
Jumlah II 74,000.00
Jumlah I + II 261,605.00
Keuntungan 10% 26,160.50
Total 287,765.50

3 1 BH Pekerjaan Kanstin 10.20.40


1.000 bh Cansteen 24,000.00 24,000.00
0.040 m2 Adukan 1 : 5 70,151.40 2,806.06
0.030 set Alat bantu 26,806.06 804.18
Jumlah I 27,610.24

0.036 Oh Pekerja 90,000.00 3,240.00


0.012 Oh Tukang Setengah Terampil 90,000.00 1,080.00
0.006 Oh Kepala tukang 130,000.00 780.00
0.001 Oh Mandor 130,000.00 156.00
Jumlah II 5,256.00
Jumlah I + II 32,866.24
Keuntungan 10% 3,286.62
Total 36,152.86
ANALISA BIAYA KONSTRUKSI
PEKERJAAN AIR BERSIH

HARGA JUMLAH HARGA


SAT.
KODE U RAIAN INDEX SAT SATUAN SAT. PEKERJAAN
PEK
Rp. Rp.
1 2 3 4 5 6 7
PEKERJAAN PEMASANGAN PIPA PVC Ø 25
P001 M' Harga per 1M' ….. Rp. 38,431.09
MM PADA TANAH BIASA
Peletakan dan Penyambungan Pipa PVC Ø 25 mm 1.0000 m¹ 4,020.00 4,020.00
Galian tanah biasa 0.1300 m³ 70,750.00 9,197.50
Urugan tanah kembali dipadatkan 0.0800 m³ 75,220.00 6,017.60
Urugan pasir 0.0500 m³ 261,000.00 13,050.00
Buangan sisa galian 0.0500 m³ 53,045.00 2,652.25
Jumlah 34,937.35
Keuntungan 10% 3,493.74
Total 38,431.09

PEKERJAAN PEMASANGAN PIPA PVC Ø 40


P002 M' Harga per 1M' ….. Rp. 48,504.17
MM PADA TANAH BIASA
Peletakan dan Penyambungan Pipa PVC Ø 40 mm 1.0000 m¹ 6,410.00 6,410.00
Galian tanah biasa 0.1600 m³ 70,750.00 11,320.00
Urugan tanah kembali dipadatkan 0.1000 m³ 75,220.00 7,522.00
Urugan pasir 0.0600 m³ 261,000.00 15,660.00
Buangan sisa galian 0.0600 m³ 53,045.00 3,182.70
Jumlah 44,094.70
Keuntungan 10% 4,409.47
Total 48,504.17

PEKERJAAN PEMASANGAN PIPA PVC Ø 50


P003 M' Harga per 1M' ….. Rp. 59,665.27
MM PADA TANAH BIASA
Peletakan dan Penyambungan Pipa PVC Ø 50 mm 1.0000 m¹ 8,020.00 8,020.00
Galian tanah biasa 0.2200 m³ 70,750.00 15,565.00
Urugan tanah kembali dipadatkan 0.1500 m³ 75,220.00 11,283.00
Urugan pasir 0.0600 m³ 261,000.00 15,660.00
Buangan sisa galian 0.0700 m³ 53,045.00 3,713.15
Jumlah 54,241.15
Keuntungan 10% 5,424.12
Total 59,665.27

PEKERJAAN PEMASANGAN PIPA PVC Ø 75


P004 M' Harga per 1M' ….. Rp. 79,153.36
MM PADA TANAH BIASA
Peletakan dan Penyambungan Pipa PVC Ø 75 mm 1.0000 m¹ 11,980.00 11,980.00
Galian tanah biasa 0.2800 m³ 70,750.00 19,810.00
Urugan tanah kembali dipadatkan 0.2000 m³ 75,220.00 15,044.00
Urugan pasir 0.0800 m³ 261,000.00 20,880.00
Buangan sisa galian 0.0800 m³ 53,045.00 4,243.60
Jumlah 71,957.60
Keuntungan 10% 7,195.76
Total 79,153.36

PEKERJAAN PEMASANGAN PIPA PVC Ø 100


P005 M' Harga per 1M' ….. Rp. 95,537.53
MM PADAdan
Peletakan TANAH BIASA Pipa PVC Ø 100
Penyambungan
1.0000 m¹ 15,950.00 15,950.00
mm
Galian tanah biasa 0.3400 m³ 70,750.00 24,055.00
Urugan tanah kembali dipadatkan 0.2400 m³ 75,220.00 18,052.80
Urugan pasir 0.0900 m³ 261,000.00 23,490.00
Buangan sisa galian 0.1000 m³ 53,045.00 5,304.50
Jumlah 86,852.30
Keuntungan 10% 8,685.23
Total 95,537.53

PEKERJAAN PEMASANGAN PIPA PVC Ø 150


P006 M' Harga per 1M' ….. Rp. 126,559.13
MM PADAdan
Peletakan TANAH BIASA Pipa PVC Ø 150
Penyambungan
1.0000 m¹ 23,540.00 23,540.00
mm
Galian tanah biasa 0.4500 m³ 70,750.00 31,837.50
Urugan tanah kembali dipadatkan 0.3200 m³ 75,220.00 24,070.40
Urugan pasir 0.1100 m³ 261,000.00 28,710.00
Buangan sisa galian 0.1300 m³ 53,045.00 6,895.85
Jumlah 115,053.75
Keuntungan 10% 11,505.38
Total 126,559.13

PEKERJAAN PEMASANGAN PIPA PVC Ø 200


P007 M' Harga per 1M' ….. Rp. 152,093.04
MM PADAdan
Peletakan TANAH BIASA Pipa PVC Ø 200
Penyambungan
1.0000 m¹ 31,980.00 31,980.00
mm
Galian tanah biasa 0.5200 m³ 70,750.00 36,790.00
Urugan tanah kembali dipadatkan 0.3600 m³ 75,220.00 27,079.20
Urugan pasir 0.1300 m³ 261,000.00 33,930.00
Buangan sisa galian 0.1600 m³ 53,045.00 8,487.20
Jumlah 138,266.40
Keuntungan 10% 13,826.64
Total 152,093.04

PEKERJAAN PEMASANGAN PIPA PVC Ø 250


P008 M' Harga per 1M' ….. Rp. 179,769.37
MM PADAdan
Peletakan TANAH BIASA Pipa PVC Ø 250
Penyambungan
1.0000 m¹ 39,670.00 39,670.00
mm
Galian tanah biasa 0.6100 m³ 70,750.00 43,157.50
Urugan tanah kembali dipadatkan 0.4100 m³ 75,220.00 30,840.20
Urugan pasir 0.1500 m³ 261,000.00 39,150.00
Buangan sisa galian 0.2000 m³ 53,045.00 10,609.00
Jumlah 163,426.70
Keuntungan 10% 16,342.67
Total 179,769.37

PEKERJAAN PEMASANGAN PIPA PVC Ø 300


P009 M' Harga per 1M' ….. Rp. 218,372.94
MM PADAdan
Peletakan TANAH BIASA Pipa PVC Ø 300
Penyambungan
1.0000 m¹ 48,360.00 48,360.00
mm
Galian tanah biasa 0.7300 m³ 70,750.00 51,647.50
Urugan tanah kembali dipadatkan 0.4600 m³ 75,220.00 34,601.20
Urugan pasir 0.1900 m³ 261,000.00 49,590.00
Buangan sisa galian 0.2700 m³ 53,045.00 14,322.15
Jumlah 198,520.85
Keuntungan 10% 19,852.09
Total 218,372.94

PEKERJAAN PEMASANGAN PIPA PVC Ø 400


P010 M' Harga per 1M' ….. Rp. 287,703.24
MM PADAdan
Peletakan TANAH BIASA Pipa PVC Ø 400
Penyambungan
1.0000 m¹ 76,980.00 76,980.00
mm
Galian tanah biasa 0.9000 m³ 70,750.00 63,675.00
Urugan tanah kembali dipadatkan 0.5400 m³ 75,220.00 40,618.80
Urugan pasir 0.2344 m³ 261,000.00 61,178.40
Buangan sisa galian 0.3600 m³ 53,045.00 19,096.20
Jumlah 261,548.40
Keuntungan 10% 26,154.84
Total 287,703.24

PEKERJAAN PEMASANGAN PIPA PVC Ø 500


P011 M' Harga per 1M' ….. Rp. 376,049.76
MM PADAdan
Peletakan TANAH BIASA Pipa PVC Ø 500
Penyambungan
1.0000 m¹ 105,300.00 105,300.00
mm
Galian tanah biasa 1.1520 m³ 70,750.00 81,504.00
Urugan tanah kembali dipadatkan 0.6336 m³ 75,220.00 47,659.39
Urugan pasir 0.3061 m³ 261,000.00 79,901.50
Buangan sisa galian 0.5184 m³ 53,045.00 27,498.53
Jumlah 341,863.42
Keuntungan 10% 34,186.34
Total 376,049.76

PEKERJAAN PEMASANGAN PIPA PVC Ø 600


P012 M' Harga per 1M' ….. Rp. 486,464.89
MM PADAdan
Peletakan TANAH BIASA Pipa PVC Ø 600
Penyambungan
1.0000 m¹ 157,950.00 157,950.00
mm
Galian tanah biasa 1.3940 m³ 70,750.00 98,625.50
Urugan tanah kembali dipadatkan 0.7216 m³ 75,220.00 54,278.75
Urugan pasir 0.3667 m³ 261,000.00 95,719.10
Buangan sisa galian 0.6724 m³ 53,045.00 35,667.46
Jumlah 442,240.81
Keuntungan 10% 44,224.08
Total 486,464.89

PEKERJAAN PEMASANGAN PIPA PVC Ø 25


P013 M' Harga per 1M' ….. Rp. 41,778.72
MM PADA TANAH KERAS
Peletakan dan Penyambungan Pipa PVC Ø 25 mm 1.0000 m¹ 4,020.00 4,020.00
Galian tanah Keras 0.1300 m³ 94,160.00 12,240.80
Urugan tanah kembali dipadatkan 0.0800 m³ 75,220.00 6,017.60
Urugan pasir 0.0500 m³ 261,000.00 13,050.00
Buangan sisa galian 0.0500 m³ 53,045.00 2,652.25
Jumlah 37,980.65
Keuntungan 10% 3,798.07
Total 41,778.72
PEKERJAAN PEMASANGAN PIPA PVC Ø 40
P014 M' Harga per 1M' ….. Rp. 52,624.33
MM PADA TANAH KERAS
Peletakan dan Penyambungan Pipa PVC Ø 40 mm 1.0000 m¹ 6,410.00 6,410.00
Galian tanah Keras 0.1600 m³ 94,160.00 15,065.60
Urugan tanah kembali dipadatkan 0.1000 m³ 75,220.00 7,522.00
Urugan pasir 0.0600 m³ 261,000.00 15,660.00
Buangan sisa galian 0.0600 m³ 53,045.00 3,182.70
Jumlah 47,840.30
Keuntungan 10% 4,784.03
Total 52,624.33

PEKERJAAN PEMASANGAN PIPA PVC Ø 50


P015 M' Harga per 1M' ….. Rp. 65,330.49
MM PADA TANAH KERAS
Peletakan dan Penyambungan Pipa PVC Ø 50 mm 1.0000 m¹ 8,020.00 8,020.00
Galian tanah Keras 0.2200 m³ 94,160.00 20,715.20
Urugan tanah kembali dipadatkan 0.1500 m³ 75,220.00 11,283.00
Urugan pasir 0.0600 m³ 261,000.00 15,660.00
Buangan sisa galian 0.0700 m³ 53,045.00 3,713.15
Jumlah 59,391.35
Keuntungan 10% 5,939.14
Total 65,330.49

PEKERJAAN PEMASANGAN PIPA PVC Ø 75


P016 M' Harga per 1M' ….. Rp. 86,363.64
MM PADA TANAH KERAS
Peletakan dan Penyambungan Pipa PVC Ø 75 mm 1.0000 m¹ 11,980.00 11,980.00
Galian tanah Keras 0.2800 m³ 94,160.00 26,364.80
Urugan tanah kembali dipadatkan 0.2000 m³ 75,220.00 15,044.00
Urugan pasir 0.0800 m³ 261,000.00 20,880.00
Buangan sisa galian 0.0800 m³ 53,045.00 4,243.60
Jumlah 78,512.40
Keuntungan 10% 7,851.24
Total 86,363.64

PEKERJAAN PEMASANGAN PIPA PVC Ø 100


P017 M' Harga per 1M' ….. Rp. 104,292.87
MM PADAdan
Peletakan TANAH KERAS Pipa PVC Ø 100
Penyambungan
1.0000 m¹ 15,950.00 15,950.00
mm
Galian tanah Keras 0.3400 m³ 94,160.00 32,014.40
Urugan tanah kembali dipadatkan 0.2400 m³ 75,220.00 18,052.80
Urugan pasir 0.0900 m³ 261,000.00 23,490.00
Buangan sisa galian 0.1000 m³ 53,045.00 5,304.50
Jumlah 94,811.70
Keuntungan 10% 9,481.17
Total 104,292.87

PEKERJAAN PEMASANGAN PIPA PVC Ø 150


P018 M' Harga per 1M' ….. Rp. 138,147.08
MM PADAdan
Peletakan TANAH KERAS Pipa PVC Ø 150
Penyambungan
1.0000 m¹ 23,540.00 23,540.00
mm
Galian tanah Keras 0.4500 m³ 94,160.00 42,372.00
Urugan tanah kembali dipadatkan 0.3200 m³ 75,220.00 24,070.40
Urugan pasir 0.1100 m³ 261,000.00 28,710.00
Buangan sisa galian 0.1300 m³ 53,045.00 6,895.85
Jumlah 125,588.25
Keuntungan 10% 12,558.83
Total 138,147.08

PEKERJAAN PEMASANGAN PIPA PVC Ø 200


P019 M' Harga per 1M' ….. Rp. 165,483.56
MM PADAdan
Peletakan TANAH KERAS Pipa PVC Ø 200
Penyambungan
1.0000 m¹ 31,980.00 31,980.00
mm
Galian tanah Keras 0.5200 m³ 94,160.00 48,963.20
Urugan tanah kembali dipadatkan 0.3600 m³ 75,220.00 27,079.20
Urugan pasir 0.1300 m³ 261,000.00 33,930.00
Buangan sisa galian 0.1600 m³ 53,045.00 8,487.20
Jumlah 150,439.60
Keuntungan 10% 15,043.96
Total 165,483.56

PEKERJAAN PEMASANGAN PIPA PVC Ø 250


P020 M' Harga per 1M' ….. Rp. 195,477.48
MM PADAdan
Peletakan TANAH KERAS Pipa PVC Ø 250
Penyambungan
1.0000 m¹ 39,670.00 39,670.00
mm
Galian tanah Keras 0.6100 m³ 94,160.00 57,437.60
Urugan tanah kembali dipadatkan 0.4100 m³ 75,220.00 30,840.20
Urugan pasir 0.1500 m³ 261,000.00 39,150.00
Buangan sisa galian 0.2000 m³ 53,045.00 10,609.00
Jumlah 177,706.80
Keuntungan 10% 17,770.68
Total 195,477.48

PEKERJAAN PEMASANGAN PIPA PVC Ø 300


P021 M' Harga per 1M' ….. Rp. 237,171.17
MM PADAdan
Peletakan TANAH KERAS Pipa PVC Ø 300
Penyambungan
1.0000 m¹ 48,360.00 48,360.00
mm
Galian tanah Keras 0.7300 m³ 94,160.00 68,736.80
Urugan tanah kembali dipadatkan 0.4600 m³ 75,220.00 34,601.20
Urugan pasir 0.1900 m³ 261,000.00 49,590.00
Buangan sisa galian 0.2700 m³ 53,045.00 14,322.15
Jumlah 215,610.15
Keuntungan 10% 21,561.02
Total 237,171.17

PEKERJAAN PEMASANGAN PIPA PVC Ø 400


P022 M' Harga per 1M' ….. Rp. 310,879.14
MM PADAdan
Peletakan TANAH KERAS Pipa PVC Ø 400
Penyambungan
1.0000 m¹ 76,980.00 76,980.00
mm
Galian tanah Keras 0.9000 m³ 94,160.00 84,744.00
Urugan tanah kembali dipadatkan 0.5400 m³ 75,220.00 40,618.80
Urugan pasir 0.2344 m³ 261,000.00 61,178.40
Buangan sisa galian 0.3600 m³ 53,045.00 19,096.20
Jumlah 282,617.40
Keuntungan 10% 28,261.74
Total 310,879.14

PEKERJAAN PEMASANGAN PIPA PVC Ø 500


P023 M' Harga per 1M' ….. Rp. 405,714.91
MM PADA TANAH KERAS
Peletakan dan Penyambungan Pipa PVC Ø 500
1.0000 m¹ 105,300.00 105,300.00
mm
Galian tanah Keras 1.1520 m³ 94,160.00 108,472.32
Urugan tanah kembali dipadatkan 0.6336 m³ 75,220.00 47,659.39
Urugan pasir 0.3061 m³ 261,000.00 79,901.50
Buangan sisa galian 0.5184 m³ 53,045.00 27,498.53
Jumlah 368,831.74
Keuntungan 10% 36,883.17
Total 405,714.91

PEKERJAAN PEMASANGAN PIPA PVC Ø 600


P024 M' Harga per 1M' ….. Rp. 522,361.78
MM PADAdan
Peletakan TANAH KERAS Pipa PVC Ø 600
Penyambungan
1.0000 m¹ 157,950.00 157,950.00
mm
Galian tanah Keras 1.3940 m³ 94,160.00 131,259.04
Urugan tanah kembali dipadatkan 0.7216 m³ 75,220.00 54,278.75
Urugan pasir 0.3667 m³ 261,000.00 95,719.10
Buangan sisa galian 0.6724 m³ 53,045.00 35,667.46
Jumlah 474,874.35
Keuntungan 10% 47,487.43
Total 522,361.78

PEKERJAAN PEMASANGAN PIPA PVC Ø 25


P025 M' Harga per 1M' ….. Rp. 48,734.24
MM PADA TANAH BERBATU
Peletakan dan Penyambungan Pipa PVC Ø 25 mm 1.0000 m¹ 4,020.00 4,020.00
Galian tanah Berbatu 0.1300 m³ 142,800.00 18,564.00
Urugan tanah kembali dipadatkan 0.0800 m³ 75,220.00 6,017.60
Urugan pasir 0.0500 m³ 261,000.00 13,050.00
Buangan sisa galian 0.0500 m³ 53,045.00 2,652.25
Jumlah 44,303.85
Keuntungan 10% 4,430.39
Total 48,734.24

PEKERJAAN PEMASANGAN PIPA PVC Ø 40


P026 M' Harga per 1M' ….. Rp. 61,184.97
MM PADA TANAH BERBATU
Peletakan dan Penyambungan Pipa PVC Ø 40 mm 1.0000 m¹ 6,410.00 6,410.00
Galian tanah Berbatu 0.1600 m³ 142,800.00 22,848.00
Urugan tanah kembali dipadatkan 0.1000 m³ 75,220.00 7,522.00
Urugan pasir 0.0600 m³ 261,000.00 15,660.00
Buangan sisa galian 0.0600 m³ 53,045.00 3,182.70
Jumlah 55,622.70
Keuntungan 10% 5,562.27
Total 61,184.97

PEKERJAAN PEMASANGAN PIPA PVC Ø 50


P027 M' Harga per 1M' ….. Rp. 77,101.37
MM PADA TANAH BERBATU
Peletakan dan Penyambungan Pipa PVC Ø 50 mm 1.0000 m¹ 8,020.00 8,020.00
Galian tanah Berbatu 0.2200 m³ 142,800.00 31,416.00
Urugan tanah kembali dipadatkan 0.1500 m³ 75,220.00 11,283.00
Urugan pasir 0.0600 m³ 261,000.00 15,660.00
Buangan sisa galian 0.0700 m³ 53,045.00 3,713.15
Jumlah 70,092.15
Keuntungan 10% 7,009.22
Total 77,101.37

PEKERJAAN PEMASANGAN PIPA PVC Ø 75


P028 M' Harga per 1M' ….. Rp. 101,344.76
MM PADA TANAH BERBATU
Peletakan dan Penyambungan Pipa PVC Ø 75 mm 1.0000 m¹ 11,980.00 11,980.00
Galian tanah Berbatu 0.2800 m³ 142,800.00 39,984.00
Urugan tanah kembali dipadatkan 0.2000 m³ 75,220.00 15,044.00
Urugan pasir 0.0800 m³ 261,000.00 20,880.00
Buangan sisa galian 0.0800 m³ 53,045.00 4,243.60
Jumlah 92,131.60
Keuntungan 10% 9,213.16
Total 101,344.76

PEKERJAAN PEMASANGAN PIPA PVC Ø 100


P029 M' Harga per 1M' ….. Rp. 122,484.23
MM PADAdan
Peletakan TANAH BERBATUPipa PVC Ø 100
Penyambungan
1.0000 m¹ 15,950.00 15,950.00
mm
Galian tanah Berbatu 0.3400 m³ 142,800.00 48,552.00
Urugan tanah kembali dipadatkan 0.2400 m³ 75,220.00 18,052.80
Urugan pasir 0.0900 m³ 261,000.00 23,490.00
Buangan sisa galian 0.1000 m³ 53,045.00 5,304.50
Jumlah 111,349.30
Keuntungan 10% 11,134.93
Total 122,484.23

PEKERJAAN PEMASANGAN PIPA PVC Ø 150


P030 M' Harga per 1M' ….. Rp. 162,223.88
MM PADAdan
Peletakan TANAH BERBATUPipa PVC Ø 150
Penyambungan
1.0000 m¹ 23,540.00 23,540.00
mm
Galian tanah Berbatu 0.4500 m³ 142,800.00 64,260.00
Urugan tanah kembali dipadatkan 0.3200 m³ 75,220.00 24,070.40
Urugan pasir 0.1100 m³ 261,000.00 28,710.00
Buangan sisa galian 0.1300 m³ 53,045.00 6,895.85
Jumlah 147,476.25
Keuntungan 10% 14,747.63
Total 162,223.88

PEKERJAAN PEMASANGAN PIPA PVC Ø 200


P031 M' Harga per 1M' ….. Rp. 193,305.64
MM PADAdan
Peletakan TANAH BERBATUPipa PVC Ø 200
Penyambungan
1.0000 m¹ 31,980.00 31,980.00
mm
Galian tanah Berbatu 0.5200 m³ 142,800.00 74,256.00
Urugan tanah kembali dipadatkan 0.3600 m³ 75,220.00 27,079.20
Urugan pasir 0.1300 m³ 261,000.00 33,930.00
Buangan sisa galian 0.1600 m³ 53,045.00 8,487.20
Jumlah 175,732.40
Keuntungan 10% 17,573.24
Total 193,305.64

PEKERJAAN PEMASANGAN PIPA PVC Ø 250


P032 M' Harga per 1M' ….. Rp. 228,114.92
MM PADAdan
Peletakan TANAH BERBATUPipa PVC Ø 250
Penyambungan
1.0000 m¹ 39,670.00 39,670.00
mm
Galian tanah Berbatu 0.6100 m³ 142,800.00 87,108.00
Urugan tanah kembali dipadatkan 0.4100 m³ 75,220.00 30,840.20
Urugan pasir 0.1500 m³ 261,000.00 39,150.00
Buangan sisa galian 0.2000 m³ 53,045.00 10,609.00
Jumlah 207,377.20
Keuntungan 10% 20,737.72
Total 228,114.92

PEKERJAAN PEMASANGAN PIPA PVC Ø 300


P033 M' Harga per 1M' ….. Rp. 276,229.09
MM PADAdan
Peletakan TANAH BERBATUPipa PVC Ø 300
Penyambungan
1.0000 m¹ 48,360.00 48,360.00
mm
Galian tanah Berbatu 0.7300 m³ 142,800.00 104,244.00
Urugan tanah kembali dipadatkan 0.4600 m³ 75,220.00 34,601.20
Urugan pasir 0.1900 m³ 261,000.00 49,590.00
Buangan sisa galian 0.2700 m³ 53,045.00 14,322.15
Jumlah 251,117.35
Keuntungan 10% 25,111.74
Total 276,229.09

PEKERJAAN PEMASANGAN PIPA PVC Ø 400


P034 M' Harga per 1M' ….. Rp. 359,032.74
MM PADAdan
Peletakan TANAH BERBATUPipa PVC Ø 400
Penyambungan
1.0000 m¹ 76,980.00 76,980.00
mm
Galian tanah Berbatu 0.9000 m³ 142,800.00 128,520.00
Urugan tanah kembali dipadatkan 0.5400 m³ 75,220.00 40,618.80
Urugan pasir 0.2344 m³ 261,000.00 61,178.40
Buangan sisa galian 0.3600 m³ 53,045.00 19,096.20
Jumlah 326,393.40
Keuntungan 10% 32,639.34
Total 359,032.74

PEKERJAAN PEMASANGAN PIPA PVC Ø 500


P035 M' Harga per 1M' ….. Rp. 467,351.52
MM PADAdan
Peletakan TANAH BERBATUPipa PVC Ø 500
Penyambungan
1.0000 m¹ 105,300.00 105,300.00
mm
Galian tanah Berbatu 1.1520 m³ 142,800.00 164,505.60
Urugan tanah kembali dipadatkan 0.6336 m³ 75,220.00 47,659.39
Urugan pasir 0.3061 m³ 261,000.00 79,901.50
Buangan sisa galian 0.5184 m³ 53,045.00 27,498.53
Jumlah 424,865.02
Keuntungan 10% 42,486.50
Total 467,351.52

PEKERJAAN PEMASANGAN PIPA PVC Ø 600


P036 M' Harga per 1M' ….. Rp. 596,946.36
MM PADAdan
Peletakan TANAH BERBATUPipa PVC Ø 600
Penyambungan
1.0000 m¹ 157,950.00 157,950.00
mm
Galian tanah Berbatu 1.3940 m³ 142,800.00 199,063.20
Urugan tanah kembali dipadatkan 0.7216 m³ 75,220.00 54,278.75
Urugan pasir 0.3667 m³ 261,000.00 95,719.10
Buangan sisa galian 0.6724 m³ 53,045.00 35,667.46
Jumlah 542,678.51
Keuntungan 10% 54,267.85
Total 596,946.36
PEKERJAAN PEMASANGAN PIPA PVC Ø 25
P037 M' Harga per 1M' ….. Rp. 48,734.24
MM PADA TANAH CADAS
Peletakan dan Penyambungan Pipa PVC Ø 25 mm 1.0000 m¹ 4,020.00 4,020.00
Galian tanah Cadas 0.1300 m³ 142,800.00 18,564.00
Urugan tanah kembali dipadatkan 0.0800 m³ 75,220.00 6,017.60
Urugan pasir 0.0500 m³ 261,000.00 13,050.00
Buangan sisa galian 0.0500 m³ 53,045.00 2,652.25
Jumlah 44,303.85
Keuntungan 10% 4,430.39
Total 48,734.24

PEKERJAAN PEMASANGAN PIPA PVC Ø 40


P038 M' Harga per 1M' ….. Rp. 61,184.97
MM PADA TANAH CADAS
Peletakan dan Penyambungan Pipa PVC Ø 40 mm 1.0000 m¹ 6,410.00 6,410.00
Galian tanah Cadas 0.1600 m³ 142,800.00 22,848.00
Urugan tanah kembali dipadatkan 0.1000 m³ 75,220.00 7,522.00
Urugan pasir 0.0600 m³ 261,000.00 15,660.00
Buangan sisa galian 0.0600 m³ 53,045.00 3,182.70
Jumlah 55,622.70
Keuntungan 10% 5,562.27
Total 61,184.97

PEKERJAAN PEMASANGAN PIPA PVC Ø 50


P039 M' Harga per 1M' ….. Rp. 77,101.37
MM PADA TANAH CADAS
Peletakan dan Penyambungan Pipa PVC Ø 50 mm 1.0000 m¹ 8,020.00 8,020.00
Galian tanah Cadas 0.2200 m³ 142,800.00 31,416.00
Urugan tanah kembali dipadatkan 0.1500 m³ 75,220.00 11,283.00
Urugan pasir 0.0600 m³ 261,000.00 15,660.00
Buangan sisa galian 0.0700 m³ 53,045.00 3,713.15
Jumlah 70,092.15
Keuntungan 10% 7,009.22
Total 77,101.37

PEKERJAAN PEMASANGAN PIPA PVC Ø 75


P040 M' Harga per 1M' ….. Rp. 101,344.76
MM PADA TANAH CADAS
Peletakan dan Penyambungan Pipa PVC Ø 75 mm 1.0000 m¹ 11,980.00 11,980.00
Galian tanah Cadas 0.2800 m³ 142,800.00 39,984.00
Urugan tanah kembali dipadatkan 0.2000 m³ 75,220.00 15,044.00
Urugan pasir 0.0800 m³ 261,000.00 20,880.00
Buangan sisa galian 0.0800 m³ 53,045.00 4,243.60
Jumlah 92,131.60
Keuntungan 10% 9,213.16
Total 101,344.76

PEKERJAAN PEMASANGAN PIPA PVC Ø 100


P041 M' Harga per 1M' ….. Rp. 122,484.23
MM PADAdan
Peletakan TANAH CADAS Pipa PVC Ø 100
Penyambungan
1.0000 m¹ 15,950.00 15,950.00
mm
Galian tanah Cadas 0.3400 m³ 142,800.00 48,552.00
Urugan tanah kembali dipadatkan 0.2400 m³ 75,220.00 18,052.80
Urugan pasir 0.0900 m³ 261,000.00 23,490.00
Buangan sisa galian 0.1000 m³ 53,045.00 5,304.50
Jumlah 111,349.30
Keuntungan 10% 11,134.93
Total 122,484.23

PEKERJAAN PEMASANGAN PIPA PVC Ø 150


P042 M' Harga per 1M' ….. Rp. 162,223.88
MM PADAdan
Peletakan TANAH CADAS Pipa PVC Ø 150
Penyambungan
1.0000 m¹ 23,540.00 23,540.00
mm
Galian tanah Cadas 0.4500 m³ 142,800.00 64,260.00
Urugan tanah kembali dipadatkan 0.3200 m³ 75,220.00 24,070.40
Urugan pasir 0.1100 m³ 261,000.00 28,710.00
Buangan sisa galian 0.1300 m³ 53,045.00 6,895.85
Jumlah 147,476.25
Keuntungan 10% 14,747.63
Total 162,223.88

PEKERJAAN PEMASANGAN PIPA PVC Ø 200


P044 M' Harga per 1M' ….. Rp. 193,305.64
MM PADAdan
Peletakan TANAH CADAS Pipa PVC Ø 200
Penyambungan
1.0000 m¹ 31,980.00 31,980.00
mm
Galian tanah Cadas 0.5200 m³ 142,800.00 74,256.00
Urugan tanah kembali dipadatkan 0.3600 m³ 75,220.00 27,079.20
Urugan pasir 0.1300 m³ 261,000.00 33,930.00
Buangan sisa galian 0.1600 m³ 53,045.00 8,487.20
Jumlah 175,732.40
Keuntungan 10% 17,573.24
Total 193,305.64

PEKERJAAN PEMASANGAN PIPA PVC Ø 250


P045 M' Harga per 1M' ….. Rp. 228,114.92
MM PADAdan
Peletakan TANAH CADAS Pipa PVC Ø 250
Penyambungan
1.0000 m¹ 39,670.00 39,670.00
mm
Galian tanah Cadas 0.6100 m³ 142,800.00 87,108.00
Urugan tanah kembali dipadatkan 0.4100 m³ 75,220.00 30,840.20
Urugan pasir 0.1500 m³ 261,000.00 39,150.00
Buangan sisa galian 0.2000 m³ 53,045.00 10,609.00
Jumlah 207,377.20
Keuntungan 10% 20,737.72
Total 228,114.92

PEKERJAAN PEMASANGAN PIPA PVC Ø 300


P046 M' Harga per 1M' ….. Rp. 276,229.09
MM PADAdan
Peletakan TANAH CADAS Pipa PVC Ø 300
Penyambungan
1.0000 m¹ 48,360.00 48,360.00
mm
Galian tanah Cadas 0.7300 m³ 142,800.00 104,244.00
Urugan tanah kembali dipadatkan 0.4600 m³ 75,220.00 34,601.20
Urugan pasir 0.1900 m³ 261,000.00 49,590.00
Buangan sisa galian 0.2700 m³ 53,045.00 14,322.15
Jumlah 251,117.35
Keuntungan 10% 25,111.74
Total 276,229.09

PEKERJAAN PEMASANGAN PIPA PVC Ø 400


P047 M' Harga per 1M' ….. Rp. 359,032.74
MM PADA TANAH CADAS
Peletakan dan Penyambungan Pipa PVC Ø 400
1.0000 m¹ 76,980.00 76,980.00
mm
Galian tanah Cadas 0.9000 m³ 142,800.00 128,520.00
Urugan tanah kembali dipadatkan 0.5400 m³ 75,220.00 40,618.80
Urugan pasir 0.2344 m³ 261,000.00 61,178.40
Buangan sisa galian 0.3600 m³ 53,045.00 19,096.20
Jumlah 326,393.40
Keuntungan 10% 32,639.34
Total 359,032.74

PEKERJAAN PEMASANGAN PIPA PVC Ø 500


P048 M' Harga per 1M' ….. Rp. 467,351.52
MM PADAdan
Peletakan TANAH CADAS Pipa PVC Ø 500
Penyambungan
1.0000 m¹ 105,300.00 105,300.00
mm
Galian tanah Cadas 1.1520 m³ 142,800.00 164,505.60
Urugan tanah kembali dipadatkan 0.6336 m³ 75,220.00 47,659.39
Urugan pasir 0.3061 m³ 261,000.00 79,901.50
Buangan sisa galian 0.5184 m³ 53,045.00 27,498.53
Jumlah 424,865.02
Keuntungan 10% 42,486.50
Total 467,351.52

PEKERJAAN PEMASANGAN PIPA PVC Ø 600


P049 M' Harga per 1M' ….. Rp. 596,946.36
MM PADAdan
Peletakan TANAH CADAS Pipa PVC Ø 600
Penyambungan
1.0000 m¹ 157,950.00 157,950.00
mm
Galian tanah Cadas 1.3940 m³ 142,800.00 199,063.20
Urugan tanah kembali dipadatkan 0.7216 m³ 75,220.00 54,278.75
Urugan pasir 0.3667 m³ 261,000.00 95,719.10
Buangan sisa galian 0.6724 m³ 53,045.00 35,667.46
Jumlah 542,678.51
Keuntungan 10% 54,267.85
Total 596,946.36

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P050 M' Harga per 1M' ….. Rp. 86,417.27
Ø 50 MM PADA TANAH BIASA
Peletakan Pipa Steel / GI Ø 50 mm 1.0000 m¹ 21,850.00 21,850.00
Pengelasan Pipa Steel / GI Ø 50 mm 1.0000 m¹ 10,490.00 10,490.00
Galian tanah biasa 0.2200 m³ 70,750.00 15,565.00
Urugan tanah kembali dipadatkan 0.1500 m³ 75,220.00 11,283.00
Urugan pasir 0.0600 m³ 261,000.00 15,660.00
Buangan sisa galian 0.0700 m³ 53,045.00 3,713.15
Jumlah 78,561.15
Keuntungan 10% 7,856.12
Total 86,417.27

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P051 M' Harga per 1M' ….. Rp. 112,736.36
Ø 75 MM PADA TANAH BIASA
Peletakan Pipa Steel / GI Ø 75 mm 1.0000 m¹ 26,770.00 26,770.00
Pengelasan Pipa Steel / GI Ø 75 mm 1.0000 m¹ 15,740.00 15,740.00
Galian tanah biasa 0.2800 m³ 70,750.00 19,810.00
Urugan tanah kembali dipadatkan 0.2000 m³ 75,220.00 15,044.00
Urugan pasir 0.0800 m³ 261,000.00 20,880.00
Buangan sisa galian 0.0800 m³ 53,045.00 4,243.60
Jumlah 102,487.60
Keuntungan 10% 10,248.76
Total 112,736.36

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P052 M' Harga per 1M' ….. Rp. 151,076.53
Ø 100 MM PADA TANAH BIASA
Peletakan Pipa Steel / GI Ø 100 mm 1.0000 m¹ 45,450.00 45,450.00
Pengelasan Pipa Steel / GI Ø 100 mm 1.0000 m¹ 20,990.00 20,990.00
Galian tanah biasa 0.3400 m³ 70,750.00 24,055.00
Urugan tanah kembali dipadatkan 0.2400 m³ 75,220.00 18,052.80
Urugan pasir 0.0900 m³ 261,000.00 23,490.00
Buangan sisa galian 0.1000 m³ 53,045.00 5,304.50
Jumlah 137,342.30
Keuntungan 10% 13,734.23
Total 151,076.53

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P053 M' Harga per 1M' ….. Rp. 199,698.13
Ø 150 MM PADA TANAH BIASA
Peletakan Pipa Steel / GI Ø 150 mm 1.0000 m¹ 58,550.00 58,550.00
Pengelasan Pipa Steel / GI Ø 150 mm 1.0000 m¹ 31,480.00 31,480.00
Galian tanah biasa 0.4500 m³ 70,750.00 31,837.50
Urugan tanah kembali dipadatkan 0.3200 m³ 75,220.00 24,070.40
Urugan pasir 0.1100 m³ 261,000.00 28,710.00
Buangan sisa galian 0.1300 m³ 53,045.00 6,895.85
Jumlah 181,543.75
Keuntungan 10% 18,154.38
Total 199,698.13

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P054 M' Harga per 1M' ….. Rp. 244,515.04
Ø 200 MM PADA TANAH BIASA
Peletakan Pipa Steel / GI Ø 200 mm 1.0000 m¹ 74,030.00 74,030.00
Pengelasan Pipa Steel / GI Ø 200 mm 1.0000 m¹ 41,970.00 41,970.00
Galian tanah biasa 0.5200 m³ 70,750.00 36,790.00
Urugan tanah kembali dipadatkan 0.3600 m³ 75,220.00 27,079.20
Urugan pasir 0.1300 m³ 261,000.00 33,930.00
Buangan sisa galian 0.1600 m³ 53,045.00 8,487.20
Jumlah 222,286.40
Keuntungan 10% 22,228.64
Total 244,515.04

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P055 M' Harga per 1M' ….. Rp. 283,983.37
Ø 250 MM PADA TANAH BIASA
Peletakan Pipa Steel / GI Ø 250 mm 1.0000 m¹ 81,950.00 81,950.00
Pengelasan Pipa Steel / GI Ø 250 mm 1.0000 m¹ 52,460.00 52,460.00
Galian tanah biasa 0.6100 m³ 70,750.00 43,157.50
Urugan tanah kembali dipadatkan 0.4100 m³ 75,220.00 30,840.20
Urugan pasir 0.1500 m³ 261,000.00 39,150.00
Buangan sisa galian 0.2000 m³ 53,045.00 10,609.00
Jumlah 258,166.70
Keuntungan 10% 25,816.67
Total 283,983.37

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P056 M' Harga per 1M' ….. Rp. 333,674.94
Ø 300 MM PADA TANAH BIASA
Peletakan Pipa Steel / GI Ø 300 mm 1.0000 m¹ 90,220.00 90,220.00
Pengelasan Pipa Steel / GI Ø 300 mm 1.0000 m¹ 62,960.00 62,960.00
Galian tanah biasa 0.7300 m³ 70,750.00 51,647.50
Urugan tanah kembali dipadatkan 0.4600 m³ 75,220.00 34,601.20
Urugan pasir 0.1900 m³ 261,000.00 49,590.00
Buangan sisa galian 0.2700 m³ 53,045.00 14,322.15
Jumlah 303,340.85
Keuntungan 10% 30,334.09
Total 333,674.94

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P057 M' Harga per 1M' ….. Rp. 414,049.24
Ø 400 MM PADA TANAH BIASA
Peletakan Pipa Steel / GI Ø 400 mm 1.0000 m¹ 107,900.00 107,900.00
Pengelasan Pipa Steel / GI Ø 400 mm 1.0000 m¹ 83,940.00 83,940.00
Galian tanah biasa 0.9000 m³ 70,750.00 63,675.00
Urugan tanah kembali dipadatkan 0.5400 m³ 75,220.00 40,618.80
Urugan pasir 0.2344 m³ 261,000.00 61,178.40
Buangan sisa galian 0.3600 m³ 53,045.00 19,096.20
Jumlah 376,408.40
Keuntungan 10% 37,640.84
Total 414,049.24

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P058 M' Harga per 1M' ….. Rp. 531,193.76
Ø 500 MM PADA TANAH BIASA
Peletakan Pipa Steel / GI Ø 500 mm 1.0000 m¹ 141,410.00 141,410.00
Pengelasan Pipa Steel / GI Ø 500 mm 1.0000 m¹ 104,930.00 104,930.00
Galian tanah biasa 1.1520 m³ 70,750.00 81,504.00
Urugan tanah kembali dipadatkan 0.6336 m³ 75,220.00 47,659.39
Urugan pasir 0.3061 m³ 261,000.00 79,901.50
Buangan sisa galian 0.5184 m³ 53,045.00 27,498.53
Jumlah 482,903.42
Keuntungan 10% 48,290.34
Total 531,193.76

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P059 M' Harga per 1M' ….. Rp. 636,460.89
Ø 600 MM PADA TANAH BIASA
Peletakan Pipa Steel / GI Ø 600 mm 1.0000 m¹ 168,400.00 168,400.00
Pengelasan Pipa Steel / GI Ø 600 mm 1.0000 m¹ 125,910.00 125,910.00
Galian tanah biasa 1.3940 m³ 70,750.00 98,625.50
Urugan tanah kembali dipadatkan 0.7216 m³ 75,220.00 54,278.75
Urugan pasir 0.3667 m³ 261,000.00 95,719.10
Buangan sisa galian 0.6724 m³ 53,045.00 35,667.46
Jumlah 578,600.81
Keuntungan 10% 57,860.08
Total 636,460.89
PEKERJAAN PEMASANGAN PIPA STEEL / GI
P060 M' Harga per 1M' ….. Rp. 92,082.49
Ø 50 MM PADA TANAH KERAS
Peletakan Pipa Steel / GI Ø 50 mm 1.0000 m¹ 21,850.00 21,850.00
Pengelasan Pipa Steel / GI Ø 50 mm 1.0000 m¹ 10,490.00 10,490.00
Galian tanah Keras 0.2200 m³ 94,160.00 20,715.20
Urugan tanah kembali dipadatkan 0.1500 m³ 75,220.00 11,283.00
Urugan pasir 0.0600 m³ 261,000.00 15,660.00
Buangan sisa galian 0.0700 m³ 53,045.00 3,713.15
Jumlah 83,711.35
Keuntungan 10% 8,371.14
Total 92,082.49

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P061 M' Harga per 1M' ….. Rp. 119,946.64
Ø 75 MM PADA TANAH KERAS
Peletakan Pipa Steel / GI Ø 75 mm 1.0000 m¹ 26,770.00 26,770.00
Pengelasan Pipa Steel / GI Ø 75 mm 1.0000 m¹ 15,740.00 15,740.00
Galian tanah Keras 0.2800 m³ 94,160.00 26,364.80
Urugan tanah kembali dipadatkan 0.2000 m³ 75,220.00 15,044.00
Urugan pasir 0.0800 m³ 261,000.00 20,880.00
Buangan sisa galian 0.0800 m³ 53,045.00 4,243.60
Jumlah 109,042.40
Keuntungan 10% 10,904.24
Total 119,946.64

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P062 M' Harga per 1M' ….. Rp. 159,831.87
Ø 100 MM PADA TANAH KERAS
Peletakan Pipa Steel / GI Ø 100 mm 1.0000 m¹ 45,450.00 45,450.00
Pengelasan Pipa Steel / GI Ø 100 mm 1.0000 m¹ 20,990.00 20,990.00
Galian tanah Keras 0.3400 m³ 94,160.00 32,014.40
Urugan tanah kembali dipadatkan 0.2400 m³ 75,220.00 18,052.80
Urugan pasir 0.0900 m³ 261,000.00 23,490.00
Buangan sisa galian 0.1000 m³ 53,045.00 5,304.50
Jumlah 145,301.70
Keuntungan 10% 14,530.17
Total 159,831.87

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P063 M' Harga per 1M' ….. Rp. 211,286.08
Ø 150 MM PADA TANAH KERAS
Peletakan Pipa Steel / GI Ø 150 mm 1.0000 m¹ 58,550.00 58,550.00
Pengelasan Pipa Steel / GI Ø 150 mm 1.0000 m¹ 31,480.00 31,480.00
Galian tanah Keras 0.4500 m³ 94,160.00 42,372.00
Urugan tanah kembali dipadatkan 0.3200 m³ 75,220.00 24,070.40
Urugan pasir 0.1100 m³ 261,000.00 28,710.00
Buangan sisa galian 0.1300 m³ 53,045.00 6,895.85
Jumlah 192,078.25
Keuntungan 10% 19,207.83
Total 211,286.08

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P064 M' Harga per 1M' ….. Rp. 257,905.56
Ø 200 MM PADA TANAH KERAS
Peletakan Pipa Steel / GI Ø 200 mm 1.0000 m¹ 74,030.00 74,030.00
Pengelasan Pipa Steel / GI Ø 200 mm 1.0000 m¹ 41,970.00 41,970.00
Galian tanah Keras 0.5200 m³ 94,160.00 48,963.20
Urugan tanah kembali dipadatkan 0.3600 m³ 75,220.00 27,079.20
Urugan pasir 0.1300 m³ 261,000.00 33,930.00
Buangan sisa galian 0.1600 m³ 53,045.00 8,487.20
Jumlah 234,459.60
Keuntungan 10% 23,445.96
Total 257,905.56

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P065 M' Harga per 1M' ….. Rp. 299,691.48
Ø 250 MM PADA TANAH KERAS
Peletakan Pipa Steel / GI Ø 250 mm 1.0000 m¹ 81,950.00 81,950.00
Pengelasan Pipa Steel / GI Ø 250 mm 1.0000 m¹ 52,460.00 52,460.00
Galian tanah Keras 0.6100 m³ 94,160.00 57,437.60
Urugan tanah kembali dipadatkan 0.4100 m³ 75,220.00 30,840.20
Urugan pasir 0.1500 m³ 261,000.00 39,150.00
Buangan sisa galian 0.2000 m³ 53,045.00 10,609.00
Jumlah 272,446.80
Keuntungan 10% 27,244.68
Total 299,691.48

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P066 M' Harga per 1M' ….. Rp. 352,473.17
Ø 300 MM PADA TANAH KERAS
Peletakan Pipa Steel / GI Ø 300 mm 1.0000 m¹ 90,220.00 90,220.00
Pengelasan Pipa Steel / GI Ø 300 mm 1.0000 m¹ 62,960.00 62,960.00
Galian tanah Keras 0.7300 m³ 94,160.00 68,736.80
Urugan tanah kembali dipadatkan 0.4600 m³ 75,220.00 34,601.20
Urugan pasir 0.1900 m³ 261,000.00 49,590.00
Buangan sisa galian 0.2700 m³ 53,045.00 14,322.15
Jumlah 320,430.15
Keuntungan 10% 32,043.02
Total 352,473.17

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P067 M' Harga per 1M' ….. Rp. 437,225.14
Ø 400 MM PADA TANAH KERAS
Peletakan Pipa Steel / GI Ø 400 mm 1.0000 m¹ 107,900.00 107,900.00
Pengelasan Pipa Steel / GI Ø 400 mm 1.0000 m¹ 83,940.00 83,940.00
Galian tanah Keras 0.9000 m³ 94,160.00 84,744.00
Urugan tanah kembali dipadatkan 0.5400 m³ 75,220.00 40,618.80
Urugan pasir 0.2344 m³ 261,000.00 61,178.40
Buangan sisa galian 0.3600 m³ 53,045.00 19,096.20
Jumlah 397,477.40
Keuntungan 10% 39,747.74
Total 437,225.14

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P068 M' Harga per 1M' ….. Rp. 560,858.91
Ø 500 MM PADA TANAH KERAS
Peletakan Pipa Steel / GI Ø 500 mm 1.0000 m¹ 141,410.00 141,410.00
Pengelasan Pipa Steel / GI Ø 500 mm 1.0000 m¹ 104,930.00 104,930.00
Galian tanah Keras 1.1520 m³ 94,160.00 108,472.32
Urugan tanah kembali dipadatkan 0.6336 m³ 75,220.00 47,659.39
Urugan pasir 0.3061 m³ 261,000.00 79,901.50
Buangan sisa galian 0.5184 m³ 53,045.00 27,498.53
Jumlah 509,871.74
Keuntungan 10% 50,987.17
Total 560,858.91

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P069 M' Harga per 1M' ….. Rp. 672,357.78
Ø 600 MM PADA TANAH KERAS
Peletakan Pipa Steel / GI Ø 600 mm 1.0000 m¹ 168,400.00 168,400.00
Pengelasan Pipa Steel / GI Ø 600 mm 1.0000 m¹ 125,910.00 125,910.00
Galian tanah Keras 1.3940 m³ 94,160.00 131,259.04
Urugan tanah kembali dipadatkan 0.7216 m³ 75,220.00 54,278.75
Urugan pasir 0.3667 m³ 261,000.00 95,719.10
Buangan sisa galian 0.6724 m³ 53,045.00 35,667.46
Jumlah 611,234.35
Keuntungan 10% 61,123.43
Total 672,357.78

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P070 M' Harga per 1M' ….. Rp. 103,853.37
Ø 50 MM PADA TANAH BERBATU
Peletakan Pipa Steel / GI Ø 50 mm 1.0000 m¹ 21,850.00 21,850.00
Pengelasan Pipa Steel / GI Ø 50 mm 1.0000 m¹ 10,490.00 10,490.00
Galian tanah Berbatu 0.2200 m³ 142,800.00 31,416.00
Urugan tanah kembali dipadatkan 0.1500 m³ 75,220.00 11,283.00
Urugan pasir 0.0600 m³ 261,000.00 15,660.00
Buangan sisa galian 0.0700 m³ 53,045.00 3,713.15
Jumlah 94,412.15
Keuntungan 10% 9,441.22
Total 103,853.37

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P071 M' Harga per 1M' ….. Rp. 134,927.76
Ø 75 MM PADA TANAH BERBATU
Peletakan Pipa Steel / GI Ø 75 mm 1.0000 m¹ 26,770.00 26,770.00
Pengelasan Pipa Steel / GI Ø 75 mm 1.0000 m¹ 15,740.00 15,740.00
Galian tanah Berbatu 0.2800 m³ 142,800.00 39,984.00
Urugan tanah kembali dipadatkan 0.2000 m³ 75,220.00 15,044.00
Urugan pasir 0.0800 m³ 261,000.00 20,880.00
Buangan sisa galian 0.0800 m³ 53,045.00 4,243.60
Jumlah 122,661.60
Keuntungan 10% 12,266.16
Total 134,927.76

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P072 M' Harga per 1M' ….. Rp. 178,023.23
Ø 100 MM PADA TANAH BERBATU
Peletakan Pipa Steel / GI Ø 100 mm 1.0000 m¹ 45,450.00 45,450.00
Pengelasan Pipa Steel / GI Ø 100 mm 1.0000 m¹ 20,990.00 20,990.00
Galian tanah Berbatu 0.3400 m³ 142,800.00 48,552.00
Urugan tanah kembali dipadatkan 0.2400 m³ 75,220.00 18,052.80
Urugan pasir 0.0900 m³ 261,000.00 23,490.00
Buangan sisa galian 0.1000 m³ 53,045.00 5,304.50
Jumlah 161,839.30
Keuntungan 10% 16,183.93
Total 178,023.23

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P073 M' Harga per 1M' ….. Rp. 235,362.88
Ø 150 MM PADA TANAH BERBATU
Peletakan Pipa Steel / GI Ø 150 mm 1.0000 m¹ 58,550.00 58,550.00
Pengelasan Pipa Steel / GI Ø 150 mm 1.0000 m¹ 31,480.00 31,480.00
Galian tanah Berbatu 0.4500 m³ 142,800.00 64,260.00
Urugan tanah kembali dipadatkan 0.3200 m³ 75,220.00 24,070.40
Urugan pasir 0.1100 m³ 261,000.00 28,710.00
Buangan sisa galian 0.1300 m³ 53,045.00 6,895.85
Jumlah 213,966.25
Keuntungan 10% 21,396.63
Total 235,362.88

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P074 M' Harga per 1M' ….. Rp. 285,727.64
Ø 200 MM PADA TANAH BERBATU
Peletakan Pipa Steel / GI Ø 200 mm 1.0000 m¹ 74,030.00 74,030.00
Pengelasan Pipa Steel / GI Ø 200 mm 1.0000 m¹ 41,970.00 41,970.00
Galian tanah Berbatu 0.5200 m³ 142,800.00 74,256.00
Urugan tanah kembali dipadatkan 0.3600 m³ 75,220.00 27,079.20
Urugan pasir 0.1300 m³ 261,000.00 33,930.00
Buangan sisa galian 0.1600 m³ 53,045.00 8,487.20
Jumlah 259,752.40
Keuntungan 10% 25,975.24
Total 285,727.64

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P075 M' Harga per 1M' ….. Rp. 332,328.92
Ø 250 MM PADA TANAH BERBATU
Peletakan Pipa Steel / GI Ø 250 mm 1.0000 m¹ 81,950.00 81,950.00
Pengelasan Pipa Steel / GI Ø 250 mm 1.0000 m¹ 52,460.00 52,460.00
Galian tanah Berbatu 0.6100 m³ 142,800.00 87,108.00
Urugan tanah kembali dipadatkan 0.4100 m³ 75,220.00 30,840.20
Urugan pasir 0.1500 m³ 261,000.00 39,150.00
Buangan sisa galian 0.2000 m³ 53,045.00 10,609.00
Jumlah 302,117.20
Keuntungan 10% 30,211.72
Total 332,328.92

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P076 M' Harga per 1M' ….. Rp. 391,531.09
Ø 300 MM PADA TANAH BERBATU
Peletakan Pipa Steel / GI Ø 300 mm 1.0000 m¹ 90,220.00 90,220.00
Pengelasan Pipa Steel / GI Ø 300 mm 1.0000 m¹ 62,960.00 62,960.00
Galian tanah Berbatu 0.7300 m³ 142,800.00 104,244.00
Urugan tanah kembali dipadatkan 0.4600 m³ 75,220.00 34,601.20
Urugan pasir 0.1900 m³ 261,000.00 49,590.00
Buangan sisa galian 0.2700 m³ 53,045.00 14,322.15
Jumlah 355,937.35
Keuntungan 10% 35,593.74
Total 391,531.09

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P077 M' Harga per 1M' ….. Rp. 485,378.74
Ø 400 MM PADA TANAH BERBATU
Peletakan Pipa Steel / GI Ø 400 mm 1.0000 m¹ 107,900.00 107,900.00
Pengelasan Pipa Steel / GI Ø 400 mm 1.0000 m¹ 83,940.00 83,940.00
Galian tanah Berbatu 0.9000 m³ 142,800.00 128,520.00
Urugan tanah kembali dipadatkan 0.5400 m³ 75,220.00 40,618.80
Urugan pasir 0.2344 m³ 261,000.00 61,178.40
Buangan sisa galian 0.3600 m³ 53,045.00 19,096.20
Jumlah 441,253.40
Keuntungan 10% 44,125.34
Total 485,378.74

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P078 M' Harga per 1M' ….. Rp. 622,495.52
Ø 500 MM PADA TANAH BERBATU
Peletakan Pipa Steel / GI Ø 500 mm 1.0000 m¹ 141,410.00 141,410.00
Pengelasan Pipa Steel / GI Ø 500 mm 1.0000 m¹ 104,930.00 104,930.00
Galian tanah Berbatu 1.1520 m³ 142,800.00 164,505.60
Urugan tanah kembali dipadatkan 0.6336 m³ 75,220.00 47,659.39
Urugan pasir 0.3061 m³ 261,000.00 79,901.50
Buangan sisa galian 0.5184 m³ 53,045.00 27,498.53
Jumlah 565,905.02
Keuntungan 10% 56,590.50
Total 622,495.52

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P079 M' Harga per 1M' ….. Rp. 746,942.36
Ø 600 MM PADA TANAH BERBATU
Peletakan Pipa Steel / GI Ø 600 mm 1.0000 m¹ 168,400.00 168,400.00
Pengelasan Pipa Steel / GI Ø 600 mm 1.0000 m¹ 125,910.00 125,910.00
Galian tanah Berbatu 1.3940 m³ 142,800.00 199,063.20
Urugan tanah kembali dipadatkan 0.7216 m³ 75,220.00 54,278.75
Urugan pasir 0.3667 m³ 261,000.00 95,719.10
Buangan sisa galian 0.6724 m³ 53,045.00 35,667.46
Jumlah 679,038.51
Keuntungan 10% 67,903.85
Total 746,942.36

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P080 M' Harga per 1M' ….. Rp. 103,853.37
Ø 50 MM PADA TANAH CADAS
Peletakan Pipa Steel / GI Ø 50 mm 1.0000 m¹ 21,850.00 21,850.00
Pengelasan Pipa Steel / GI Ø 50 mm 1.0000 m¹ 10,490.00 10,490.00
Galian tanah Cadas 0.2200 m³ 142,800.00 31,416.00
Urugan tanah kembali dipadatkan 0.1500 m³ 75,220.00 11,283.00
Urugan pasir 0.0600 m³ 261,000.00 15,660.00
Buangan sisa galian 0.0700 m³ 53,045.00 3,713.15
Jumlah 94,412.15
Keuntungan 10% 9,441.22
Total 103,853.37

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P081 M' Harga per 1M' ….. Rp. 134,927.76
Ø 75 MM PADA TANAH CADAS
Peletakan Pipa Steel / GI Ø 75 mm 1.0000 m¹ 26,770.00 26,770.00
Pengelasan Pipa Steel / GI Ø 75 mm 1.0000 m¹ 15,740.00 15,740.00
Galian tanah Cadas 0.2800 m³ 142,800.00 39,984.00
Urugan tanah kembali dipadatkan 0.2000 m³ 75,220.00 15,044.00
Urugan pasir 0.0800 m³ 261,000.00 20,880.00
Buangan sisa galian 0.0800 m³ 53,045.00 4,243.60
Jumlah 122,661.60
Keuntungan 10% 12,266.16
Total 134,927.76

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P082 M' Harga per 1M' ….. Rp. 178,023.23
Ø 100 MM PADA TANAH CADAS
Peletakan Pipa Steel / GI Ø 100 mm 1.0000 m¹ 45,450.00 45,450.00
Pengelasan Pipa Steel / GI Ø 100 mm 1.0000 m¹ 20,990.00 20,990.00
Galian tanah Cadas 0.3400 m³ 142,800.00 48,552.00
Urugan tanah kembali dipadatkan 0.2400 m³ 75,220.00 18,052.80
Urugan pasir 0.0900 m³ 261,000.00 23,490.00
Buangan sisa galian 0.1000 m³ 53,045.00 5,304.50
Jumlah 161,839.30
Keuntungan 10% 16,183.93
Total 178,023.23

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P083 M' Harga per 1M' ….. Rp. 235,362.88
Ø 150 MM PADA TANAH CADAS
Peletakan Pipa Steel / GI Ø 150 mm 1.0000 m¹ 58,550.00 58,550.00
Pengelasan Pipa Steel / GI Ø 150 mm 1.0000 m¹ 31,480.00 31,480.00
Galian tanah Cadas 0.4500 m³ 142,800.00 64,260.00
Urugan tanah kembali dipadatkan 0.3200 m³ 75,220.00 24,070.40
Urugan pasir 0.1100 m³ 261,000.00 28,710.00
Buangan sisa galian 0.1300 m³ 53,045.00 6,895.85
Jumlah 213,966.25
Keuntungan 10% 21,396.63
Total 235,362.88

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P084 M' Harga per 1M' ….. Rp. 285,727.64
Ø 200 MM PADA TANAH CADAS
Peletakan Pipa Steel / GI Ø 200 mm 1.0000 m¹ 74,030.00 74,030.00
Pengelasan Pipa Steel / GI Ø 200 mm 1.0000 m¹ 41,970.00 41,970.00
Galian tanah Cadas 0.5200 m³ 142,800.00 74,256.00
Urugan tanah kembali dipadatkan 0.3600 m³ 75,220.00 27,079.20
Urugan pasir 0.1300 m³ 261,000.00 33,930.00
Buangan sisa galian 0.1600 m³ 53,045.00 8,487.20
Jumlah 259,752.40
Keuntungan 10% 25,975.24
Total 285,727.64
PEKERJAAN PEMASANGAN PIPA STEEL / GI
P085 M' Harga per 1M' ….. Rp. 332,328.92
Ø 250 MM PADA TANAH CADAS
Peletakan Pipa Steel / GI Ø 250 mm 1.0000 m¹ 81,950.00 81,950.00
Pengelasan Pipa Steel / GI Ø 250 mm 1.0000 m¹ 52,460.00 52,460.00
Galian tanah Cadas 0.6100 m³ 142,800.00 87,108.00
Urugan tanah kembali dipadatkan 0.4100 m³ 75,220.00 30,840.20
Urugan pasir 0.1500 m³ 261,000.00 39,150.00
Buangan sisa galian 0.2000 m³ 53,045.00 10,609.00
Jumlah 302,117.20
Keuntungan 10% 30,211.72
Total 332,328.92

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P086 M' Harga per 1M' ….. Rp. 391,531.09
Ø 300 MM PADA TANAH CADAS
Peletakan Pipa Steel / GI Ø 300 mm 1.0000 m¹ 90,220.00 90,220.00
Pengelasan Pipa Steel / GI Ø 300 mm 1.0000 m¹ 62,960.00 62,960.00
Galian tanah Cadas 0.7300 m³ 142,800.00 104,244.00
Urugan tanah kembali dipadatkan 0.4600 m³ 75,220.00 34,601.20
Urugan pasir 0.1900 m³ 261,000.00 49,590.00
Buangan sisa galian 0.2700 m³ 53,045.00 14,322.15
Jumlah 355,937.35
Keuntungan 10% 35,593.74
Total 391,531.09

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P087 M' Harga per 1M' ….. Rp. 485,378.74
Ø 400 MM PADA TANAH CADAS
Peletakan Pipa Steel / GI Ø 400 mm 1.0000 m¹ 107,900.00 107,900.00
Pengelasan Pipa Steel / GI Ø 400 mm 1.0000 m¹ 83,940.00 83,940.00
Galian tanah Cadas 0.9000 m³ 142,800.00 128,520.00
Urugan tanah kembali dipadatkan 0.5400 m³ 75,220.00 40,618.80
Urugan pasir 0.2344 m³ 261,000.00 61,178.40
Buangan sisa galian 0.3600 m³ 53,045.00 19,096.20
Jumlah 441,253.40
Keuntungan 10% 44,125.34
Total 485,378.74

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P088 M' Harga per 1M' ….. Rp. 622,495.52
Ø 500 MM PADA TANAH CADAS
Peletakan Pipa Steel / GI Ø 500 mm 1.0000 m¹ 141,410.00 141,410.00
Pengelasan Pipa Steel / GI Ø 500 mm 1.0000 m¹ 104,930.00 104,930.00
Galian tanah Cadas 1.1520 m³ 142,800.00 164,505.60
Urugan tanah kembali dipadatkan 0.6336 m³ 75,220.00 47,659.39
Urugan pasir 0.3061 m³ 261,000.00 79,901.50
Buangan sisa galian 0.5184 m³ 53,045.00 27,498.53
Jumlah 565,905.02
Keuntungan 10% 56,590.50
Total 622,495.52

PEKERJAAN PEMASANGAN PIPA STEEL / GI


P089 M' Harga per 1M' ….. Rp. 746,942.36
Ø 600 MM PADA TANAH CADAS
Peletakan Pipa Steel / GI Ø 600 mm 1.0000 m¹ 168,400.00 168,400.00
Pengelasan Pipa Steel / GI Ø 600 mm 1.0000 m¹ 125,910.00 125,910.00
Galian tanah Cadas 1.3940 m³ 142,800.00 199,063.20
Urugan tanah kembali dipadatkan 0.7216 m³ 75,220.00 54,278.75
Urugan pasir 0.3667 m³ 261,000.00 95,719.10
Buangan sisa galian 0.6724 m³ 53,045.00 35,667.46
Jumlah 679,038.51
Keuntungan 10% 67,903.85
Total 746,942.36

PEKERJAAN PEMASANGAN PIPA HDPE Ø 50


P090 M' Harga per 1M' ….. Rp. 71,215.27
MM PADAdan
Peletakan TANAH BIASA Pipa HDPE Ø 50
Penyambungan
1.0000 m¹ 18,520.00 18,520.00
mm
Galian tanah biasa 0.2200 m³ 70,750.00 15,565.00
Urugan tanah kembali dipadatkan 0.1500 m³ 75,220.00 11,283.00
Urugan pasir 0.0600 m³ 261,000.00 15,660.00
Buangan sisa galian 0.0700 m³ 53,045.00 3,713.15
Jumlah 64,741.15
Keuntungan 10% 6,474.12
Total 71,215.27

PEKERJAAN PEMASANGAN PIPA HDPE Ø 75


P091 M' Harga per 1M' ….. Rp. 94,553.36
MM PADAdan
Peletakan TANAH BIASA Pipa HDPE Ø 75
Penyambungan
1.0000 m¹ 25,980.00 25,980.00
mm
Galian tanah biasa 0.2800 m³ 70,750.00 19,810.00
Urugan tanah kembali dipadatkan 0.2000 m³ 75,220.00 15,044.00
Urugan pasir 0.0800 m³ 261,000.00 20,880.00
Buangan sisa galian 0.0800 m³ 53,045.00 4,243.60
Jumlah 85,957.60
Keuntungan 10% 8,595.76
Total 94,553.36

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P092 M' Harga per 1M' ….. Rp. 126,337.53
100 MM PADA
Peletakan TANAH BIASA
dan Penyambungan Pipa HDPE Ø 100
1.0000 m¹ 43,950.00 43,950.00
mm
Galian tanah biasa 0.3400 m³ 70,750.00 24,055.00
Urugan tanah kembali dipadatkan 0.2400 m³ 75,220.00 18,052.80
Urugan pasir 0.0900 m³ 261,000.00 23,490.00
Buangan sisa galian 0.1000 m³ 53,045.00 5,304.50
Jumlah 114,852.30
Keuntungan 10% 11,485.23
Total 126,337.53

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P093 M' Harga per 1M' ….. Rp. 176,609.13
150 MM PADA
Peletakan TANAH BIASA
dan Penyambungan Pipa HDPE Ø 150
1.0000 m¹ 69,040.00 69,040.00
mm
Galian tanah biasa 0.4500 m³ 70,750.00 31,837.50
Urugan tanah kembali dipadatkan 0.3200 m³ 75,220.00 24,070.40
Urugan pasir 0.1100 m³ 261,000.00 28,710.00
Buangan sisa galian 0.1300 m³ 53,045.00 6,895.85
Jumlah 160,553.75
Keuntungan 10% 16,055.38
Total 176,609.13

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P094 M' Harga per 1M' ….. Rp. 209,843.04
200 MM PADA
Peletakan TANAH BIASA
dan Penyambungan Pipa HDPE Ø 200
1.0000 m¹ 84,480.00 84,480.00
mm
Galian tanah biasa 0.5200 m³ 70,750.00 36,790.00
Urugan tanah kembali dipadatkan 0.3600 m³ 75,220.00 27,079.20
Urugan pasir 0.1300 m³ 261,000.00 33,930.00
Buangan sisa galian 0.1600 m³ 53,045.00 8,487.20
Jumlah 190,766.40
Keuntungan 10% 19,076.64
Total 209,843.04

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P095 M' Harga per 1M' ….. Rp. 241,369.37
250 MM PADA
Peletakan TANAH BIASA
dan Penyambungan Pipa HDPE Ø 250
1.0000 m¹ 95,670.00 95,670.00
mm
Galian tanah biasa 0.6100 m³ 70,750.00 43,157.50
Urugan tanah kembali dipadatkan 0.4100 m³ 75,220.00 30,840.20
Urugan pasir 0.1500 m³ 261,000.00 39,150.00
Buangan sisa galian 0.2000 m³ 53,045.00 10,609.00
Jumlah 219,426.70
Keuntungan 10% 21,942.67
Total 241,369.37

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P096 M' Harga per 1M' ….. Rp. 303,072.94
300 MM PADA
Peletakan TANAH BIASA
dan Penyambungan Pipa HDPE Ø 300
1.0000 m¹ 125,360.00 125,360.00
mm
Galian tanah biasa 0.7300 m³ 70,750.00 51,647.50
Urugan tanah kembali dipadatkan 0.4600 m³ 75,220.00 34,601.20
Urugan pasir 0.1900 m³ 261,000.00 49,590.00
Buangan sisa galian 0.2700 m³ 53,045.00 14,322.15
Jumlah 275,520.85
Keuntungan 10% 27,552.09
Total 303,072.94

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P097 M' Harga per 1M' ….. Rp. 383,953.24
400 MM PADA
Peletakan TANAH BIASA
dan Penyambungan Pipa HDPE Ø 400
1.0000 m¹ 164,480.00 164,480.00
mm
Galian tanah biasa 0.9000 m³ 70,750.00 63,675.00
Urugan tanah kembali dipadatkan 0.5400 m³ 75,220.00 40,618.80
Urugan pasir 0.2344 m³ 261,000.00 61,178.40
Buangan sisa galian 0.3600 m³ 53,045.00 19,096.20
Jumlah 349,048.40
Keuntungan 10% 34,904.84
Total 383,953.24

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P098 M' Harga per 1M' ….. Rp. 485,774.76
500 MM PADA
Peletakan TANAH BIASA
dan Penyambungan Pipa HDPE Ø 500
1.0000 m¹ 205,050.00 205,050.00
mm
Galian tanah biasa 1.1520 m³ 70,750.00 81,504.00
Urugan tanah kembali dipadatkan 0.6336 m³ 75,220.00 47,659.39
Urugan pasir 0.3061 m³ 261,000.00 79,901.50
Buangan sisa galian 0.5184 m³ 53,045.00 27,498.53
Jumlah 441,613.42
Keuntungan 10% 44,161.34
Total 485,774.76

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P099 M' Harga per 1M' ….. Rp. 613,514.89
600 MM PADA
Peletakan TANAH BIASA
dan Penyambungan Pipa HDPE Ø 600
1.0000 m¹ 273,450.00 273,450.00
mm
Galian tanah biasa 1.3940 m³ 70,750.00 98,625.50
Urugan tanah kembali dipadatkan 0.7216 m³ 75,220.00 54,278.75
Urugan pasir 0.3667 m³ 261,000.00 95,719.10
Buangan sisa galian 0.6724 m³ 53,045.00 35,667.46
Jumlah 557,740.81
Keuntungan 10% 55,774.08
Total 613,514.89

PEKERJAAN PEMASANGAN PIPA HDPE Ø 50


P100 M' Harga per 1M' ….. Rp. 76,880.49
MM PADAdan
Peletakan TANAH KERAS Pipa HDPE Ø 50
Penyambungan
1.0000 m¹ 18,520.00 18,520.00
mm
Galian tanah Keras 0.2200 m³ 94,160.00 20,715.20
Urugan tanah kembali dipadatkan 0.1500 m³ 75,220.00 11,283.00
Urugan pasir 0.0600 m³ 261,000.00 15,660.00
Buangan sisa galian 0.0700 m³ 53,045.00 3,713.15
Jumlah 69,891.35
Keuntungan 10% 6,989.14
Total 76,880.49

PEKERJAAN PEMASANGAN PIPA HDPE Ø 75


P101 M' Harga per 1M' ….. Rp. 101,763.64
MM PADAdan
Peletakan TANAH KERAS Pipa HDPE Ø 75
Penyambungan
1.0000 m¹ 25,980.00 25,980.00
mm
Galian tanah Keras 0.2800 m³ 94,160.00 26,364.80
Urugan tanah kembali dipadatkan 0.2000 m³ 75,220.00 15,044.00
Urugan pasir 0.0800 m³ 261,000.00 20,880.00
Buangan sisa galian 0.0800 m³ 53,045.00 4,243.60
Jumlah 92,512.40
Keuntungan 10% 9,251.24
Total 101,763.64

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P102 M' Harga per 1M' ….. Rp. 135,092.87
100 MM PADA
Peletakan TANAH KERAS
dan Penyambungan Pipa HDPE Ø 100
1.0000 m¹ 43,950.00 43,950.00
mm
Galian tanah Keras 0.3400 m³ 94,160.00 32,014.40
Urugan tanah kembali dipadatkan 0.2400 m³ 75,220.00 18,052.80
Urugan pasir 0.0900 m³ 261,000.00 23,490.00
Buangan sisa galian 0.1000 m³ 53,045.00 5,304.50
Jumlah 122,811.70
Keuntungan 10% 12,281.17
Total 135,092.87
PEKERJAAN PEMASANGAN PIPA HDPE Ø
P103 M' Harga per 1M' ….. Rp. 188,197.08
150 MM PADA
Peletakan TANAH KERAS
dan Penyambungan Pipa HDPE Ø 150
1.0000 m¹ 69,040.00 69,040.00
mm
Galian tanah Keras 0.4500 m³ 94,160.00 42,372.00
Urugan tanah kembali dipadatkan 0.3200 m³ 75,220.00 24,070.40
Urugan pasir 0.1100 m³ 261,000.00 28,710.00
Buangan sisa galian 0.1300 m³ 53,045.00 6,895.85
Jumlah 171,088.25
Keuntungan 10% 17,108.83
Total 188,197.08

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P104 M' Harga per 1M' ….. Rp. 223,233.56
200 MM PADA
Peletakan TANAH KERAS
dan Penyambungan Pipa HDPE Ø 200
1.0000 m¹ 84,480.00 84,480.00
mm
Galian tanah Keras 0.5200 m³ 94,160.00 48,963.20
Urugan tanah kembali dipadatkan 0.3600 m³ 75,220.00 27,079.20
Urugan pasir 0.1300 m³ 261,000.00 33,930.00
Buangan sisa galian 0.1600 m³ 53,045.00 8,487.20
Jumlah 202,939.60
Keuntungan 10% 20,293.96
Total 223,233.56

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P105 M' Harga per 1M' ….. Rp. 257,077.48
250 MM PADA
Peletakan TANAH KERAS
dan Penyambungan Pipa HDPE Ø 250
1.0000 m¹ 95,670.00 95,670.00
mm
Galian tanah Keras 0.6100 m³ 94,160.00 57,437.60
Urugan tanah kembali dipadatkan 0.4100 m³ 75,220.00 30,840.20
Urugan pasir 0.1500 m³ 261,000.00 39,150.00
Buangan sisa galian 0.2000 m³ 53,045.00 10,609.00
Jumlah 233,706.80
Keuntungan 10% 23,370.68
Total 257,077.48

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P106 M' Harga per 1M' ….. Rp. 321,871.17
300 MM PADA
Peletakan TANAH KERAS
dan Penyambungan Pipa HDPE Ø 300
1.0000 m¹ 125,360.00 125,360.00
mm
Galian tanah Keras 0.7300 m³ 94,160.00 68,736.80
Urugan tanah kembali dipadatkan 0.4600 m³ 75,220.00 34,601.20
Urugan pasir 0.1900 m³ 261,000.00 49,590.00
Buangan sisa galian 0.2700 m³ 53,045.00 14,322.15
Jumlah 292,610.15
Keuntungan 10% 29,261.02
Total 321,871.17

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P107 M' Harga per 1M' ….. Rp. 407,129.14
400 MM PADA
Peletakan TANAH KERAS
dan Penyambungan Pipa HDPE Ø 400
1.0000 m¹ 164,480.00 164,480.00
mm
Galian tanah Keras 0.9000 m³ 94,160.00 84,744.00
Urugan tanah kembali dipadatkan 0.5400 m³ 75,220.00 40,618.80
Urugan pasir 0.2344 m³ 261,000.00 61,178.40
Buangan sisa galian 0.3600 m³ 53,045.00 19,096.20
Jumlah 370,117.40
Keuntungan 10% 37,011.74
Total 407,129.14

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P108 M' Harga per 1M' ….. Rp. 515,439.91
500 MM PADA
Peletakan TANAH KERAS
dan Penyambungan Pipa HDPE Ø 500
1.0000 m¹ 205,050.00 205,050.00
mm
Galian tanah Keras 1.1520 m³ 94,160.00 108,472.32
Urugan tanah kembali dipadatkan 0.6336 m³ 75,220.00 47,659.39
Urugan pasir 0.3061 m³ 261,000.00 79,901.50
Buangan sisa galian 0.5184 m³ 53,045.00 27,498.53
Jumlah 468,581.74
Keuntungan 10% 46,858.17
Total 515,439.91

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P109 M' Harga per 1M' ….. Rp. 649,411.78
600 MM PADA
Peletakan TANAH KERAS
dan Penyambungan Pipa HDPE Ø 600
1.0000 m¹ 273,450.00 273,450.00
mm
Galian tanah Keras 1.3940 m³ 94,160.00 131,259.04
Urugan tanah kembali dipadatkan 0.7216 m³ 75,220.00 54,278.75
Urugan pasir 0.3667 m³ 261,000.00 95,719.10
Buangan sisa galian 0.6724 m³ 53,045.00 35,667.46
Jumlah 590,374.35
Keuntungan 10% 59,037.43
Total 649,411.78

PEKERJAAN PEMASANGAN PIPA HDPE Ø 50


P110 M' Harga per 1M' ….. Rp. 88,651.37
MM PADAdan
Peletakan TANAH BERBATUPipa HDPE Ø 50
Penyambungan
1.0000 m¹ 18,520.00 18,520.00
mm
Galian tanah Berbatu 0.2200 m³ 142,800.00 31,416.00
Urugan tanah kembali dipadatkan 0.1500 m³ 75,220.00 11,283.00
Urugan pasir 0.0600 m³ 261,000.00 15,660.00
Buangan sisa galian 0.0700 m³ 53,045.00 3,713.15
Jumlah 80,592.15
Keuntungan 10% 8,059.22
Total 88,651.37

PEKERJAAN PEMASANGAN PIPA HDPE Ø 75


P111 M' Harga per 1M' ….. Rp. 116,744.76
MM PADAdan
Peletakan TANAH BERBATUPipa HDPE Ø 75
Penyambungan
1.0000 m¹ 25,980.00 25,980.00
mm
Galian tanah Berbatu 0.2800 m³ 142,800.00 39,984.00
Urugan tanah kembali dipadatkan 0.2000 m³ 75,220.00 15,044.00
Urugan pasir 0.0800 m³ 261,000.00 20,880.00
Buangan sisa galian 0.0800 m³ 53,045.00 4,243.60
Jumlah 106,131.60
Keuntungan 10% 10,613.16
Total 116,744.76

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P112 M' Harga per 1M' ….. Rp. 153,284.23
100 MM PADA TANAH BERBATU
Peletakan dan Penyambungan Pipa HDPE Ø 100
1.0000 m¹ 43,950.00 43,950.00
mm
Galian tanah Berbatu 0.3400 m³ 142,800.00 48,552.00
Urugan tanah kembali dipadatkan 0.2400 m³ 75,220.00 18,052.80
Urugan pasir 0.0900 m³ 261,000.00 23,490.00
Buangan sisa galian 0.1000 m³ 53,045.00 5,304.50
Jumlah 139,349.30
Keuntungan 10% 13,934.93
Total 153,284.23

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P113 M' Harga per 1M' ….. Rp. 212,273.88
150 MM PADA
Peletakan TANAH BERBATU
dan Penyambungan Pipa HDPE Ø 150
1.0000 m¹ 69,040.00 69,040.00
mm
Galian tanah Berbatu 0.4500 m³ 142,800.00 64,260.00
Urugan tanah kembali dipadatkan 0.3200 m³ 75,220.00 24,070.40
Urugan pasir 0.1100 m³ 261,000.00 28,710.00
Buangan sisa galian 0.1300 m³ 53,045.00 6,895.85
Jumlah 192,976.25
Keuntungan 10% 19,297.63
Total 212,273.88

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P114 M' Harga per 1M' ….. Rp. 251,055.64
200 MM PADA
Peletakan TANAH BERBATU
dan Penyambungan Pipa HDPE Ø 200
1.0000 m¹ 84,480.00 84,480.00
mm
Galian tanah Berbatu 0.5200 m³ 142,800.00 74,256.00
Urugan tanah kembali dipadatkan 0.3600 m³ 75,220.00 27,079.20
Urugan pasir 0.1300 m³ 261,000.00 33,930.00
Buangan sisa galian 0.1600 m³ 53,045.00 8,487.20
Jumlah 228,232.40
Keuntungan 10% 22,823.24
Total 251,055.64

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P115 M' Harga per 1M' ….. Rp. 289,714.92
250 MM PADA
Peletakan TANAH BERBATU
dan Penyambungan Pipa HDPE Ø 250
1.0000 m¹ 95,670.00 95,670.00
mm
Galian tanah Berbatu 0.6100 m³ 142,800.00 87,108.00
Urugan tanah kembali dipadatkan 0.4100 m³ 75,220.00 30,840.20
Urugan pasir 0.1500 m³ 261,000.00 39,150.00
Buangan sisa galian 0.2000 m³ 53,045.00 10,609.00
Jumlah 263,377.20
Keuntungan 10% 26,337.72
Total 289,714.92

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P116 M' Harga per 1M' ….. Rp. 360,929.09
300 MM PADA
Peletakan TANAH BERBATU
dan Penyambungan Pipa HDPE Ø 300
1.0000 m¹ 125,360.00 125,360.00
mm
Galian tanah Berbatu 0.7300 m³ 142,800.00 104,244.00
Urugan tanah kembali dipadatkan 0.4600 m³ 75,220.00 34,601.20
Urugan pasir 0.1900 m³ 261,000.00 49,590.00
Buangan sisa galian 0.2700 m³ 53,045.00 14,322.15
Jumlah 328,117.35
Keuntungan 10% 32,811.74
Total 360,929.09

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P117 M' Harga per 1M' ….. Rp. 455,282.74
400 MM PADA
Peletakan TANAH BERBATU
dan Penyambungan Pipa HDPE Ø 400
1.0000 m¹ 164,480.00 164,480.00
mm
Galian tanah Berbatu 0.9000 m³ 142,800.00 128,520.00
Urugan tanah kembali dipadatkan 0.5400 m³ 75,220.00 40,618.80
Urugan pasir 0.2344 m³ 261,000.00 61,178.40
Buangan sisa galian 0.3600 m³ 53,045.00 19,096.20
Jumlah 413,893.40
Keuntungan 10% 41,389.34
Total 455,282.74

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P118 M' Harga per 1M' ….. Rp. 577,076.52
500 MM PADA
Peletakan TANAH BERBATU
dan Penyambungan Pipa HDPE Ø 500
1.0000 m¹ 205,050.00 205,050.00
mm
Galian tanah Berbatu 1.1520 m³ 142,800.00 164,505.60
Urugan tanah kembali dipadatkan 0.6336 m³ 75,220.00 47,659.39
Urugan pasir 0.3061 m³ 261,000.00 79,901.50
Buangan sisa galian 0.5184 m³ 53,045.00 27,498.53
Jumlah 524,615.02
Keuntungan 10% 52,461.50
Total 577,076.52

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P119 M' Harga per 1M' ….. Rp. 723,996.36
600 MM PADA
Peletakan TANAH BERBATU
dan Penyambungan Pipa HDPE Ø 600
1.0000 m¹ 273,450.00 273,450.00
mm
Galian tanah Berbatu 1.3940 m³ 142,800.00 199,063.20
Urugan tanah kembali dipadatkan 0.7216 m³ 75,220.00 54,278.75
Urugan pasir 0.3667 m³ 261,000.00 95,719.10
Buangan sisa galian 0.6724 m³ 53,045.00 35,667.46
Jumlah 658,178.51
Keuntungan 10% 65,817.85
Total 723,996.36

PEKERJAAN PEMASANGAN PIPA HDPE Ø 50


P120 M' Harga per 1M' ….. Rp. 88,651.37
MM PADAdan
Peletakan TANAH CADAS Pipa HDPE Ø 50
Penyambungan
1.0000 m¹ 18,520.00 18,520.00
mm
Galian tanah Cadas 0.2200 m³ 142,800.00 31,416.00
Urugan tanah kembali dipadatkan 0.1500 m³ 75,220.00 11,283.00
Urugan pasir 0.0600 m³ 261,000.00 15,660.00
Buangan sisa galian 0.0700 m³ 53,045.00 3,713.15
Jumlah 80,592.15
Keuntungan 10% 8,059.22
Total 88,651.37

PEKERJAAN PEMASANGAN PIPA HDPE Ø 75


P121 M' Harga per 1M' ….. Rp. 116,744.76
MM PADAdan
Peletakan TANAH CADAS Pipa HDPE Ø 75
Penyambungan
1.0000 m¹ 25,980.00 25,980.00
mm
Galian tanah Cadas 0.2800 m³ 142,800.00 39,984.00
Urugan tanah kembali dipadatkan 0.2000 m³ 75,220.00 15,044.00
Urugan pasir 0.0800 m³ 261,000.00 20,880.00
Buangan sisa galian 0.0800 m³ 53,045.00 4,243.60
Jumlah 106,131.60
Keuntungan 10% 10,613.16
Total 116,744.76

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P122 M' Harga per 1M' ….. Rp. 153,284.23
100 MM PADA
Peletakan TANAH CADAS
dan Penyambungan Pipa HDPE Ø 100
1.0000 m¹ 43,950.00 43,950.00
mm
Galian tanah Cadas 0.3400 m³ 142,800.00 48,552.00
Urugan tanah kembali dipadatkan 0.2400 m³ 75,220.00 18,052.80
Urugan pasir 0.0900 m³ 261,000.00 23,490.00
Buangan sisa galian 0.1000 m³ 53,045.00 5,304.50
Jumlah 139,349.30
Keuntungan 10% 13,934.93
Total 153,284.23

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P123 M' Harga per 1M' ….. Rp. 212,273.88
150 MM PADA
Peletakan TANAH CADAS
dan Penyambungan Pipa HDPE Ø 150
1.0000 m¹ 69,040.00 69,040.00
mm
Galian tanah Cadas 0.4500 m³ 142,800.00 64,260.00
Urugan tanah kembali dipadatkan 0.3200 m³ 75,220.00 24,070.40
Urugan pasir 0.1100 m³ 261,000.00 28,710.00
Buangan sisa galian 0.1300 m³ 53,045.00 6,895.85
Jumlah 192,976.25
Keuntungan 10% 19,297.63
Total 212,273.88

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P124 M' Harga per 1M' ….. Rp. 251,055.64
200 MM PADA
Peletakan TANAH CADAS
dan Penyambungan Pipa HDPE Ø 200
1.0000 m¹ 84,480.00 84,480.00
mm
Galian tanah Cadas 0.5200 m³ 142,800.00 74,256.00
Urugan tanah kembali dipadatkan 0.3600 m³ 75,220.00 27,079.20
Urugan pasir 0.1300 m³ 261,000.00 33,930.00
Buangan sisa galian 0.1600 m³ 53,045.00 8,487.20
Jumlah 228,232.40
Keuntungan 10% 22,823.24
Total 251,055.64

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P125 M' Harga per 1M' ….. Rp. 289,714.92
250 MM PADA
Peletakan TANAH CADAS
dan Penyambungan Pipa HDPE Ø 250
1.0000 m¹ 95,670.00 95,670.00
mm
Galian tanah Cadas 0.6100 m³ 142,800.00 87,108.00
Urugan tanah kembali dipadatkan 0.4100 m³ 75,220.00 30,840.20
Urugan pasir 0.1500 m³ 261,000.00 39,150.00
Buangan sisa galian 0.2000 m³ 53,045.00 10,609.00
Jumlah 263,377.20
Keuntungan 10% 26,337.72
Total 289,714.92
PEKERJAAN PEMASANGAN PIPA HDPE Ø
P126 M' Harga per 1M' ….. Rp. 360,929.09
300 MM PADA
Peletakan TANAH CADAS
dan Penyambungan Pipa HDPE Ø 300
1.0000 m¹ 125,360.00 125,360.00
mm
Galian tanah Cadas 0.7300 m³ 142,800.00 104,244.00
Urugan tanah kembali dipadatkan 0.4600 m³ 75,220.00 34,601.20
Urugan pasir 0.1900 m³ 261,000.00 49,590.00
Buangan sisa galian 0.2700 m³ 53,045.00 14,322.15
Jumlah 328,117.35
Keuntungan 10% 32,811.74
Total 360,929.09

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P127 M' Harga per 1M' ….. Rp. 455,282.74
400 MM PADA
Peletakan TANAH CADAS
dan Penyambungan Pipa HDPE Ø 400
1.0000 m¹ 164,480.00 164,480.00
mm
Galian tanah Cadas 0.9000 m³ 142,800.00 128,520.00
Urugan tanah kembali dipadatkan 0.5400 m³ 75,220.00 40,618.80
Urugan pasir 0.2344 m³ 261,000.00 61,178.40
Buangan sisa galian 0.3600 m³ 53,045.00 19,096.20
Jumlah 413,893.40
Keuntungan 10% 41,389.34
Total 455,282.74

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P128 M' Harga per 1M' ….. Rp. 577,076.52
500 MM PADA
Peletakan TANAH CADAS
dan Penyambungan Pipa HDPE Ø 500
1.0000 m¹ 205,050.00 205,050.00
mm
Galian tanah Cadas 1.1520 m³ 142,800.00 164,505.60
Urugan tanah kembali dipadatkan 0.6336 m³ 75,220.00 47,659.39
Urugan pasir 0.3061 m³ 261,000.00 79,901.50
Buangan sisa galian 0.5184 m³ 53,045.00 27,498.53
Jumlah 524,615.02
Keuntungan 10% 52,461.50
Total 577,076.52

PEKERJAAN PEMASANGAN PIPA HDPE Ø


P129 M' Harga per 1M' ….. Rp. 723,996.36
600 MM PADA
Peletakan TANAH CADAS
dan Penyambungan Pipa HDPE Ø 600
1.0000 m¹ 273,450.00 273,450.00
mm
Galian tanah Cadas 1.3940 m³ 142,800.00 199,063.20
Urugan tanah kembali dipadatkan 0.7216 m³ 75,220.00 54,278.75
Urugan pasir 0.3667 m³ 261,000.00 95,719.10
Buangan sisa galian 0.6724 m³ 53,045.00 35,667.46
Jumlah 658,178.51
Keuntungan 10% 65,817.85
Total 723,996.36

P190 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 191,351.85
HORIZONTAL DRILLING PADA JALAN BINA
MARGA U/ STEEL Ø 50 MM
Sewa Alat bantu 0.5500 jam 85,000.00 46,750.00
Mandor 0.1800 Org 130,000.00 23,400.00
Kepala Tukang Pipa 0.1800 Org 130,000.00 23,400.00
Pekerja Setengah Terampil 0.5000 Org 90,000.00 45,000.00
Pembuangan Tanah 0.0060 m³ 53,045.00 318.27
Peletakan Pipa Steel / GI Ø 50 mm 1.0000 m¹ 21,850.00 21,850.00
Pengelasan Pipa Steel / GI Ø 50 mm 1.0000 m¹ 10,490.00 10,490.00
Galian Tanah Keras 0.0180 m³ 94,160.00 1,694.88
Urugan Tanah dipadatkan 0.0140 m³ 75,220.00 1,053.08
Jumlah 173,956.23
Keuntungan 10% 17,395.62
Total 191,351.85

P191 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 164,379.85
HORIZONTAL DRILLING DILINGKUNGAN
PERUMAHAN U/ STEEL Ø 50 MM
Sewa Alat bantu 0.4500 jam 85,000.00 38,250.00
Mandor 0.1530 Org 130,000.00 19,890.00
Kepala Tukang Pipa 0.1530 Org 130,000.00 19,890.00
Pekerja Setengah Terampil 0.4000 Org 90,000.00 36,000.00
Pembuangan Tanah 0.0060 m³ 53,045.00 318.27
Peletakan Pipa Steel / GI Ø 50 mm 1.0000 m¹ 21,850.00 21,850.00
Pengelasan Pipa Steel / GI Ø 50 mm 1.0000 m¹ 10,490.00 10,490.00
Galian Tanah Keras 0.0180 m³ 94,160.00 1,694.88
Urugan Tanah dipadatkan 0.0140 m³ 75,220.00 1,053.08
Jumlah 149,436.23
Keuntungan 10% 14,943.62
Total 164,379.85

P192 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 242,352.64
HORIZONTAL DRILLING PADA JALAN BINA
MARGA U/ STEEL Ø 75 MM
Sewa Alat bantu 0.7500 jam 85,000.00 63,750.00
Mandor 0.1800 Org 130,000.00 23,400.00
Kepala Tukang Pipa 0.1800 Org 130,000.00 23,400.00
Pekerja Setengah Terampil 0.7000 Org 90,000.00 63,000.00
Pembuangan Tanah 0.0090 m³ 53,045.00 477.41
Peletakan Pipa Steel / GI Ø 75 mm 1.0000 m¹ 26,770.00 26,770.00
Pengelasan Pipa Steel / GI Ø 75 mm 1.0000 m¹ 15,740.00 15,740.00
Galian Tanah Keras 0.0250 m³ 94,160.00 2,354.00
Urugan Tanah dipadatkan 0.0190 m³ 75,220.00 1,429.18
Jumlah 220,320.59
Keuntungan 10% 22,032.06
Total 242,352.64

P193 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 222,035.64
HORIZONTAL DRILLING DILINGKUNGAN
PERUMAHAN U/ STEEL Ø 75 MM
Sewa Alat bantu 0.7000 jam 85,000.00 59,500.00
Mandor 0.1530 Org 130,000.00 19,890.00
Kepala Tukang Pipa 0.1530 Org 130,000.00 19,890.00
Pekerja Setengah Terampil 0.6200 Org 90,000.00 55,800.00
Pembuangan Tanah 0.0090 m³ 53,045.00 477.41
Peletakan Pipa Steel / GI Ø 75 mm 1.0000 m¹ 26,770.00 26,770.00
Pengelasan Pipa Steel / GI Ø 75 mm 1.0000 m¹ 15,740.00 15,740.00
Galian Tanah Keras 0.0250 m³ 94,160.00 2,354.00
Urugan Tanah dipadatkan 0.0190 m³ 75,220.00 1,429.18
Jumlah 201,850.59
Keuntungan 10% 20,185.06
Total 222,035.64

P194 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 321,872.40
HORIZONTAL DRILLING PADA JALAN BINA
MARGA U/ STEEL Ø 100 MM
Sewa Alat bantu 1.0000 jam 85,000.00 85,000.00
Mandor 0.2100 Org 130,000.00 27,300.00
Kepala Tukang Pipa 0.2100 Org 130,000.00 27,300.00
Pekerja Setengah Terampil 0.9000 Org 90,000.00 81,000.00
Pembuangan Tanah 0.0110 m³ 53,045.00 583.50
Peletakan Pipa Steel / GI Ø 100 mm 1.0000 m¹ 45,450.00 45,450.00
Pengelasan Pipa Steel / GI Ø 100 mm 1.0000 m¹ 20,990.00 20,990.00
Galian Tanah Keras 0.0330 m³ 94,160.00 3,107.28
Urugan Tanah dipadatkan 0.0250 m³ 75,220.00 1,880.50
Jumlah 292,611.28
Keuntungan 10% 29,261.13
Total 321,872.40

P195 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 303,381.40
HORIZONTAL DRILLING DILINGKUNGAN
PERUMAHAN U/ STEEL Ø 100 MM
Sewa Alat bantu 0.9500 jam 85,000.00 80,750.00
Mandor 0.1790 Org 130,000.00 23,270.00
Kepala Tukang Pipa 0.1790 Org 130,000.00 23,270.00
Pekerja Setengah Terampil 0.8500 Org 90,000.00 76,500.00
Pembuangan Tanah 0.0110 m³ 53,045.00 583.50
Peletakan Pipa Steel / GI Ø 100 mm 1.0000 m¹ 45,450.00 45,450.00
Pengelasan Pipa Steel / GI Ø 100 mm 1.0000 m¹ 20,990.00 20,990.00
Galian Tanah Keras 0.0330 m³ 94,160.00 3,107.28
Urugan Tanah dipadatkan 0.0250 m³ 75,220.00 1,880.50
Jumlah 275,801.28
Keuntungan 10% 27,580.13
Total 303,381.40

P196 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 478,717.94
HORIZONTAL DRILLING PADA JALAN BINA
MARGA U/ STEEL Ø 150 MM
Sewa Alat bantu 1.3300 jam 85,000.00 113,050.00
Mandor 0.3150 Org 130,000.00 40,950.00
Kepala Tukang Pipa 0.3150 Org 130,000.00 40,950.00
Pekerja Setengah Terampil 1.5750 Org 90,000.00 141,750.00
Pembuangan Tanah 0.0170 m³ 53,045.00 901.77
Peletakan Pipa Steel / GI Ø 150 mm 1.0000 m¹ 58,550.00 58,550.00
Pengelasan Pipa Steel / GI Ø 150 mm 1.0000 m¹ 31,480.00 31,480.00
Galian Tanah Keras 0.0500 m³ 94,160.00 4,708.00
Urugan Tanah dipadatkan 0.0380 m³ 75,220.00 2,858.36
Jumlah 435,198.13
Keuntungan 10% 43,519.81
Total 478,717.94

P197 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 423,305.44
HORIZONTAL DRILLING DILINGKUNGAN
PERUMAHAN U/ STEEL Ø 150 MM
Sewa Alat bantu 1.1310 jam 85,000.00 96,135.00
Mandor 0.2680 Org 130,000.00 34,840.00
Kepala Tukang Pipa 0.2680 Org 130,000.00 34,840.00
Pekerja Setengah Terampil 1.3390 Org 90,000.00 120,510.00
Pembuangan Tanah 0.0170 m³ 53,045.00 901.77
Peletakan Pipa Steel / GI Ø 150 mm 1.0000 m¹ 58,550.00 58,550.00
Pengelasan Pipa Steel / GI Ø 150 mm 1.0000 m¹ 31,480.00 31,480.00
Galian Tanah Keras 0.0500 m³ 94,160.00 4,708.00
Urugan Tanah dipadatkan 0.0380 m³ 75,220.00 2,858.36
Jumlah 384,823.13
Keuntungan 10% 38,482.31
Total 423,305.44

P198 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 598,938.73
HORIZONTAL DRILLING PADA JALAN BINA
MARGA U/ STEEL Ø 200 MM
Sewa Alat bantu 1.4000 jam 85,000.00 119,000.00
Mandor 0.4200 Org 130,000.00 54,600.00
Kepala Tukang Pipa 0.4200 Org 130,000.00 54,600.00
Pekerja Setengah Terampil 2.1000 Org 90,000.00 189,000.00
Pembuangan Tanah 0.0230 m³ 53,045.00 1,220.04
Peletakan Pipa Steel / GI Ø 200 mm 1.0000 m¹ 74,030.00 74,030.00
Pengelasan Pipa Steel / GI Ø 200 mm 1.0000 m¹ 41,970.00 41,970.00
Galian Tanah Keras 0.0670 m³ 94,160.00 6,308.72
Urugan Tanah dipadatkan 0.0500 m³ 75,220.00 3,761.00
Jumlah 544,489.76
Keuntungan 10% 54,448.98
Total 598,938.73

P199 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 530,100.73
HORIZONTAL DRILLING DILINGKUNGAN
PERUMAHAN U/ STEEL Ø 200 MM
Sewa Alat bantu 1.1900 jam 85,000.00 101,150.00
Mandor 0.3570 Org 130,000.00 46,410.00
Kepala Tukang Pipa 0.3570 Org 130,000.00 46,410.00
Pekerja Setengah Terampil 1.7850 Org 90,000.00 160,650.00
Pembuangan Tanah 0.0230 m³ 53,045.00 1,220.04
Peletakan Pipa Steel / GI Ø 200 mm 1.0000 m¹ 74,030.00 74,030.00
Pengelasan Pipa Steel / GI Ø 200 mm 1.0000 m¹ 41,970.00 41,970.00
Galian Tanah Keras 0.0670 m³ 94,160.00 6,308.72
Urugan Tanah dipadatkan 0.0500 m³ 75,220.00 3,761.00
Jumlah 481,909.76
Keuntungan 10% 48,190.98
Total 530,100.73

P200 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 710,764.34
HORIZONTAL DRILLING PADA JALAN BINA
MARGA U/ STEEL Ø 250 MM
Sewa Alat bantu 1.4700 jam 85,000.00 124,950.00
Mandor 0.5250 Org 130,000.00 68,250.00
Kepala Tukang Pipa 0.5250 Org 130,000.00 68,250.00
Pekerja Setengah Terampil 2.6250 Org 90,000.00 236,250.00
Pembuangan Tanah 0.0280 m³ 53,045.00 1,485.26
Peletakan Pipa Steel / GI Ø 250 mm 1.0000 m¹ 81,950.00 81,950.00
Pengelasan Pipa Steel / GI Ø 250 mm 1.0000 m¹ 52,460.00 52,460.00
Galian Tanah Keras 0.0830 m³ 94,160.00 7,815.28
Urugan Tanah dipadatkan 0.0630 m³ 75,220.00 4,738.86
Jumlah 646,149.40
Keuntungan 10% 64,614.94
Total 710,764.34

P201 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 628,979.34
HORIZONTAL DRILLING DILINGKUNGAN
PERUMAHAN U/ STEEL Ø 250 MM
Sewa Alat bantu 1.2500 jam 85,000.00 106,250.00
Mandor 0.4470 Org 130,000.00 58,110.00
Kepala Tukang Pipa 0.4470 Org 130,000.00 58,110.00
Pekerja Setengah Terampil 2.2320 Org 90,000.00 200,880.00
Pembuangan Tanah 0.0280 m³ 53,045.00 1,485.26
Peletakan Pipa Steel / GI Ø 250 mm 1.0000 m¹ 81,950.00 81,950.00
Pengelasan Pipa Steel / GI Ø 250 mm 1.0000 m¹ 52,460.00 52,460.00
Galian Tanah Keras 0.0830 m³ 94,160.00 7,815.28
Urugan Tanah dipadatkan 0.0630 m³ 75,220.00 4,738.86
Jumlah 571,799.40
Keuntungan 10% 57,179.94
Total 628,979.34

P202 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 823,065.13
HORIZONTAL DRILLING PADA JALAN BINA
MARGA U/ STEEL Ø 300 MM
Sewa Alat bantu 1.5400 jam 85,000.00 130,900.00
Mandor 0.6300 Org 130,000.00 81,900.00
Kepala Tukang Pipa 0.6300 Org 130,000.00 81,900.00
Pekerja Setengah Terampil 3.1500 Org 90,000.00 283,500.00
Pembuangan Tanah 0.0340 m³ 53,045.00 1,803.53
Peletakan Pipa Steel / GI Ø 300 mm 1.0000 m¹ 90,220.00 90,220.00
Pengelasan Pipa Steel / GI Ø 300 mm 1.0000 m¹ 62,960.00 62,960.00
Galian Tanah Keras 0.1000 m³ 94,160.00 9,416.00
Urugan Tanah dipadatkan 0.0750 m³ 75,220.00 5,641.50
Jumlah 748,241.03
Keuntungan 10% 74,824.10
Total 823,065.13

P203 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 727,854.63
HORIZONTAL DRILLING DILINGKUNGAN
PERUMAHAN U/ STEEL Ø 300 MM
Sewa Alat bantu 1.3090 jam 85,000.00 111,265.00
Mandor 0.5360 Org 130,000.00 69,680.00
Kepala Tukang Pipa 0.5360 Org 130,000.00 69,680.00
Pekerja Setengah Terampil 2.6780 Org 90,000.00 241,020.00
Pembuangan Tanah 0.0340 m³ 53,045.00 1,803.53
Peletakan Pipa Steel / GI Ø 300 mm 1.0000 m¹ 90,220.00 90,220.00
Pengelasan Pipa Steel / GI Ø 300 mm 1.0000 m¹ 62,960.00 62,960.00
Galian Tanah Keras 0.1000 m³ 94,160.00 9,416.00
Urugan Tanah dipadatkan 0.0750 m³ 75,220.00 5,641.50
Jumlah 661,686.03
Keuntungan 10% 66,168.60
Total 727,854.63

P204 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 1,048,819.54
HORIZONTAL DRILLING PADA JALAN BINA
MARGA U/ STEEL Ø 400 MM
Sewa Alat bantu 1.6800 jam 85,000.00 142,800.00
Mandor 0.8400 Org 130,000.00 109,200.00
Kepala Tukang Pipa 0.8400 Org 130,000.00 109,200.00
Pekerja Setengah Terampil 4.2000 Org 90,000.00 378,000.00
Pembuangan Tanah 0.0450 m³ 53,045.00 2,387.03
Peletakan Pipa Steel / GI Ø 400 mm 1.0000 m¹ 107,900.00 107,900.00
Pengelasan Pipa Steel / GI Ø 400 mm 1.0000 m¹ 83,940.00 83,940.00
Galian Tanah Keras 0.1330 m³ 94,160.00 12,523.28
Urugan Tanah dipadatkan 0.1000 m³ 75,220.00 7,522.00
Jumlah 953,472.31
Keuntungan 10% 95,347.23
Total 1,048,819.54

P205 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 926,851.54
HORIZONTAL DRILLING DILINGKUNGAN
PERUMAHAN U/ STEEL Ø 400 MM
Sewa Alat bantu 1.4280 jam 85,000.00 121,380.00
Mandor 0.7140 Org 130,000.00 92,820.00
Kepala Tukang Pipa 0.7140 Org 130,000.00 92,820.00
Pekerja Setengah Terampil 3.5700 Org 90,000.00 321,300.00
Pembuangan Tanah 0.0450 m³ 53,045.00 2,387.03
Peletakan Pipa Steel / GI Ø 400 mm 1.0000 m¹ 107,900.00 107,900.00
Pengelasan Pipa Steel / GI Ø 400 mm 1.0000 m¹ 83,940.00 83,940.00
Galian Tanah Keras 0.1330 m³ 94,160.00 12,523.28
Urugan Tanah dipadatkan 0.1000 m³ 75,220.00 7,522.00
Jumlah 842,592.31
Keuntungan 10% 84,259.23
Total 926,851.54

P206 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 1,737,156.67
HORIZONTAL DRILLING PADA JALAN BINA
MARGA U/ STEEL Ø 500 MM
Sewa Alat bantu 2.9400 jam 85,000.00 249,900.00
Mandor 1.4700 Org 130,000.00 191,100.00
Kepala Tukang Pipa 1.4700 Org 130,000.00 191,100.00
Pekerja Setengah Terampil 7.3500 Org 90,000.00 661,500.00
Pembuangan Tanah 0.0790 m³ 53,045.00 4,190.56
Peletakan Pipa Steel / GI Ø 500 mm 1.0000 m¹ 141,410.00 141,410.00
Pengelasan Pipa Steel / GI Ø 500 mm 1.0000 m¹ 104,930.00 104,930.00
Galian Tanah Keras 0.2330 m³ 94,160.00 21,939.28
Urugan Tanah dipadatkan 0.1750 m³ 75,220.00 13,163.50
Jumlah 1,579,233.34
Keuntungan 10% 157,923.33
Total 1,737,156.67

P207 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 1,523,905.17
HORIZONTAL DRILLING DILINGKUNGAN
PERUMAHAN U/ STEEL Ø 500 MM
Sewa Alat bantu 2.4990 jam 85,000.00 212,415.00
Mandor 1.2500 Org 130,000.00 162,500.00
Kepala Tukang Pipa 1.2500 Org 130,000.00 162,500.00
Pekerja Setengah Terampil 6.2480 Org 90,000.00 562,320.00
Pembuangan Tanah 0.0790 m³ 53,045.00 4,190.56
Peletakan Pipa Steel / GI Ø 500 mm 1.0000 m¹ 141,410.00 141,410.00
Pengelasan Pipa Steel / GI Ø 500 mm 1.0000 m¹ 104,930.00 104,930.00
Galian Tanah Keras 0.2330 m³ 94,160.00 21,939.28
Urugan Tanah dipadatkan 0.1750 m³ 75,220.00 13,163.50
Jumlah 1,385,368.34
Keuntungan 10% 138,536.83
Total 1,523,905.17

P208 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 2,889,802.14
HORIZONTAL DRILLING PADA JALAN BINA
MARGA U/ STEEL Ø 600 MM
Sewa Alat bantu 5.1450 jam 85,000.00 437,325.00
Mandor 2.5730 Org 130,000.00 334,490.00
Kepala Tukang Pipa 2.5730 Org 130,000.00 334,490.00
Pekerja Setengah Terampil 12.8630 Org 90,000.00 1,157,670.00
Pembuangan Tanah 0.1390 m³ 53,045.00 7,373.26
Peletakan Pipa Steel / GI Ø 600 mm 1.0000 m¹ 168,400.00 168,400.00
Pengelasan Pipa Steel / GI Ø 600 mm 1.0000 m¹ 125,910.00 125,910.00
Galian Tanah Keras 0.4080 m³ 94,160.00 38,417.28
Urugan Tanah dipadatkan 0.3060 m³ 75,220.00 23,017.32
Jumlah 2,627,092.86
Keuntungan 10% 262,709.29
Total 2,889,802.14

P209 M' PEMASANGAN PIPA DENGAN CARA BORING Harga per 1M' ….. Rp. 2,516,247.64
HORIZONTAL DRILLING DILINGKUNGAN
PERUMAHAN U/ STEEL Ø 600 MM
Sewa Alat bantu 4.3740 jam 85,000.00 371,790.00
Mandor 2.1870 Org 130,000.00 284,310.00
Kepala Tukang Pipa 2.1870 Org 130,000.00 284,310.00
Pekerja Setengah Terampil 10.9330 Org 90,000.00 983,970.00
Pembuangan Tanah 0.1390 m³ 53,045.00 7,373.26
Peletakan Pipa Steel / GI Ø 600 mm 1.0000 m¹ 168,400.00 168,400.00
Pengelasan Pipa Steel / GI Ø 600 mm 1.0000 m¹ 125,910.00 125,910.00
Galian Tanah Keras 0.4080 m³ 94,160.00 38,417.28
Urugan Tanah dipadatkan 0.3060 m³ 75,220.00 23,017.32
Jumlah 2,287,497.86
Keuntungan 10% 228,749.79
Total 2,516,247.64

PEMASANGAN PIPA DENGAN CARA BORING


P210 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 164,599.85
MARGA
Sewa Alat U/ PVC Ø 50 MM
bantu 0.5500 jam 85,000.00 46,750.00
Mandor 0.1800 Org 130,000.00 23,400.00
Kepala Tukang Pipa 0.1800 Org 130,000.00 23,400.00
Pekerja Setengah Terampil 0.5000 Org 90,000.00 45,000.00
Pembuangan Tanah 0.0060 m³ 53,045.00 318.27
Peletakan dan Penyambungan Pipa PVC Ø 50 mm 1.0000 m³ 8,020.00 8,020.00
Galian Tanah Keras 0.0180 m³ 94,160.00 1,694.88
Urugan Tanah dipadatkan 0.0140 m³ 75,220.00 1,053.08
Jumlah 149,636.23
Keuntungan 10% 14,963.62
Total 164,599.85

PEMASANGAN PIPA DENGAN CARA BORING


P211 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 137,627.85
PERUMAHAN
Sewa Alat bantu U/ PVC Ø 50 MM 0.4500 jam 85,000.00 38,250.00
Mandor 0.1530 Org 130,000.00 19,890.00
Kepala Tukang Pipa 0.1530 Org 130,000.00 19,890.00
Pekerja Setengah Terampil 0.4000 Org 90,000.00 36,000.00
Pembuangan Tanah 0.0060 m³ 53,045.00 318.27
Peletakan dan Penyambungan Pipa PVC Ø 50 mm 1.0000 m³ 8,020.00 8,020.00
Galian Tanah Keras 0.0180 m³ 94,160.00 1,694.88
Urugan Tanah dipadatkan 0.0140 m³ 75,220.00 1,053.08
Jumlah 125,116.23
Keuntungan 10% 12,511.62
Total 137,627.85

PEMASANGAN PIPA DENGAN CARA BORING


P212 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 208,769.64
MARGA U/ PVC Ø 75 MM
Sewa Alat bantu 0.7500 jam 85,000.00 63,750.00
Mandor 0.1800 Org 130,000.00 23,400.00
Kepala Tukang Pipa 0.1800 Org 130,000.00 23,400.00
Pekerja Setengah Terampil 0.7000 Org 90,000.00 63,000.00
Pembuangan Tanah 0.0090 m³ 53,045.00 477.41
Peletakan dan Penyambungan Pipa PVC dia. 75
1.0000 m³ 11,980.00 11,980.00
mm
Galian Tanah Keras 0.0250 m³ 94,160.00 2,354.00
Urugan Tanah dipadatkan 0.0190 m³ 75,220.00 1,429.18
Jumlah 189,790.59
Keuntungan 10% 18,979.06
Total 208,769.64

PEMASANGAN PIPA DENGAN CARA BORING


P213 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 188,452.64
PERUMAHAN
Sewa Alat bantu U/ PVC Ø 75 MM 0.7000 jam 85,000.00 59,500.00
Mandor 0.1530 Org 130,000.00 19,890.00
Kepala Tukang Pipa 0.1530 Org 130,000.00 19,890.00
Pekerja Setengah Terampil 0.6200 Org 90,000.00 55,800.00
Pembuangan Tanah 0.0090 m³ 53,045.00 477.41
Peletakan dan Penyambungan Pipa PVC dia. 75
1.0000 m³ 11,980.00 11,980.00
mm
Galian Tanah Keras 0.0250 m³ 94,160.00 2,354.00
Urugan Tanah dipadatkan 0.0190 m³ 75,220.00 1,429.18
Jumlah 171,320.59
Keuntungan 10% 17,132.06
Total 188,452.64

PEMASANGAN PIPA DENGAN CARA BORING


P214 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 266,333.40
MARGA
Sewa Alat U/ PVC Ø 100 MM
bantu 1.0000 jam 85,000.00 85,000.00
Mandor 0.2100 Org 130,000.00 27,300.00
Kepala Tukang Pipa 0.2100 Org 130,000.00 27,300.00
Pekerja Setengah Terampil 0.9000 Org 90,000.00 81,000.00
Pembuangan Tanah 0.0110 m³ 53,045.00 583.50
Peletakan dan Penyambungan Pipa PVC dia. 100
1.0000 m³ 15,950.00 15,950.00
mm
Galian Tanah Keras 0.0330 m³ 94,160.00 3,107.28
Urugan Tanah dipadatkan 0.0250 m³ 75,220.00 1,880.50
Jumlah 242,121.28
Keuntungan 10% 24,212.13
Total 266,333.40

PEMASANGAN PIPA DENGAN CARA BORING


P215 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 247,842.40
PERUMAHAN
Sewa Alat bantu U/ PVC Ø 100 MM 0.9500 jam 85,000.00 80,750.00
Mandor 0.1790 Org 130,000.00 23,270.00
Kepala Tukang Pipa 0.1790 Org 130,000.00 23,270.00
Pekerja Setengah Terampil 0.8500 Org 90,000.00 76,500.00
Pembuangan Tanah 0.0110 m³ 53,045.00 583.50
Peletakan dan Penyambungan Pipa PVC dia. 100
1.0000 m³ 15,950.00 15,950.00
mm
Galian Tanah Keras 0.0330 m³ 94,160.00 3,107.28
Urugan Tanah dipadatkan 0.0250 m³ 75,220.00 1,880.50
Jumlah 225,311.28
Keuntungan 10% 22,531.13
Total 247,842.40

PEMASANGAN PIPA DENGAN CARA BORING


P216 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 405,578.94
MARGA
Sewa Alat U/ PVC Ø 150 MM
bantu 1.3300 jam 85,000.00 113,050.00
Mandor 0.3150 Org 130,000.00 40,950.00
Kepala Tukang Pipa 0.3150 Org 130,000.00 40,950.00
Pekerja Setengah Terampil 1.5750 Org 90,000.00 141,750.00
Pembuangan Tanah 0.0170 m³ 53,045.00 901.77
Peletakan dan Penyambungan Pipa PVC dia. 150
1.0000 m³ 23,540.00 23,540.00
mm
Galian Tanah Keras 0.0500 m³ 94,160.00 4,708.00
Urugan Tanah dipadatkan 0.0380 m³ 75,220.00 2,858.36
Jumlah 368,708.13
Keuntungan 10% 36,870.81
Total 405,578.94

PEMASANGAN PIPA DENGAN CARA BORING


P217 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 350,166.44
PERUMAHAN
Sewa Alat bantu U/ PVC Ø 150 MM 1.1310 jam 85,000.00 96,135.00
Mandor 0.2680 Org 130,000.00 34,840.00
Kepala Tukang Pipa 0.2680 Org 130,000.00 34,840.00
Pekerja Setengah Terampil 1.3390 Org 90,000.00 120,510.00
Pembuangan Tanah 0.0170 m³ 53,045.00 901.77
Peletakan dan Penyambungan Pipa PVC dia. 150
1.0000 m³ 23,540.00 23,540.00
mm
Galian Tanah Keras 0.0500 m³ 94,160.00 4,708.00
Urugan Tanah dipadatkan 0.0380 m³ 75,220.00 2,858.36
Jumlah 318,333.13
Keuntungan 10% 31,833.31
Total 350,166.44

PEMASANGAN PIPA DENGAN CARA BORING


P218 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 506,516.73
MARGA
Sewa Alat U/ PVC Ø 200 MM
bantu 1.4000 jam 85,000.00 119,000.00
Mandor 0.4200 Org 130,000.00 54,600.00
Kepala Tukang Pipa 0.4200 Org 130,000.00 54,600.00
Pekerja Setengah Terampil 2.1000 Org 90,000.00 189,000.00
Pembuangan Tanah 0.0230 m³ 53,045.00 1,220.04
Peletakan dan Penyambungan Pipa PVC dia. 200
1.0000 m³ 31,980.00 31,980.00
mm
Galian Tanah Keras 0.0670 m³ 94,160.00 6,308.72
Urugan Tanah dipadatkan 0.0500 m³ 75,220.00 3,761.00
Jumlah 460,469.76
Keuntungan 10% 46,046.98
Total 506,516.73

PEMASANGAN PIPA DENGAN CARA BORING


P219 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 437,678.73
PERUMAHAN
Sewa Alat bantu U/ PVC Ø 200 MM 1.1900 jam 85,000.00 101,150.00
Mandor 0.3570 Org 130,000.00 46,410.00
Kepala Tukang Pipa 0.3570 Org 130,000.00 46,410.00
Pekerja Setengah Terampil 1.7850 Org 90,000.00 160,650.00
Pembuangan Tanah 0.0230 m³ 53,045.00 1,220.04
Peletakan dan Penyambungan Pipa PVC dia. 200
1.0000 m³ 31,980.00 31,980.00
mm
Galian Tanah Keras 0.0670 m³ 94,160.00 6,308.72
Urugan Tanah dipadatkan 0.0500 m³ 75,220.00 3,761.00
Jumlah 397,889.76
Keuntungan 10% 39,788.98
Total 437,678.73

PEMASANGAN PIPA DENGAN CARA BORING


P220 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 606,550.34
MARGA
Sewa Alat U/ PVC Ø 250 MM
bantu 1.4700 jam 85,000.00 124,950.00
Mandor 0.5250 Org 130,000.00 68,250.00
Kepala Tukang Pipa 0.5250 Org 130,000.00 68,250.00
Pekerja Setengah Terampil 2.6250 Org 90,000.00 236,250.00
Pembuangan Tanah 0.0280 m³ 53,045.00 1,485.26
Peletakan dan Penyambungan Pipa PVC dia. 250
1.0000 m³ 39,670.00 39,670.00
mm
Galian Tanah Keras 0.0830 m³ 94,160.00 7,815.28
Urugan Tanah dipadatkan 0.0630 m³ 75,220.00 4,738.86
Jumlah 551,409.40
Keuntungan 10% 55,140.94
Total 606,550.34

PEMASANGAN PIPA DENGAN CARA BORING


P222 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 524,765.34
PERUMAHAN
Sewa Alat bantu U/ PVC Ø 250 MM 1.2500 jam 85,000.00 106,250.00
Mandor 0.4470 Org 130,000.00 58,110.00
Kepala Tukang Pipa 0.4470 Org 130,000.00 58,110.00
Pekerja Setengah Terampil 2.2320 Org 90,000.00 200,880.00
Pembuangan Tanah 0.0280 m³ 53,045.00 1,485.26
Peletakan dan Penyambungan Pipa PVC dia. 250
1.0000 m³ 39,670.00 39,670.00
mm
Galian Tanah Keras 0.0830 m³ 94,160.00 7,815.28
Urugan Tanah dipadatkan 0.0630 m³ 75,220.00 4,738.86
Jumlah 477,059.40
Keuntungan 10% 47,705.94
Total 524,765.34

PEMASANGAN PIPA DENGAN CARA BORING


P223 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 707,763.13
MARGA
Sewa Alat U/ PVC Ø 300 MM
bantu 1.5400 jam 85,000.00 130,900.00
Mandor 0.6300 Org 130,000.00 81,900.00
Kepala Tukang Pipa 0.6300 Org 130,000.00 81,900.00
Pekerja Setengah Terampil 3.1500 Org 90,000.00 283,500.00
Pembuangan Tanah 0.0340 m³ 53,045.00 1,803.53
Peletakan dan Penyambungan Pipa PVC dia. 300
1.0000 m³ 48,360.00 48,360.00
mm
Galian Tanah Keras 0.1000 m³ 94,160.00 9,416.00
Urugan Tanah dipadatkan 0.0750 m³ 75,220.00 5,641.50
Jumlah 643,421.03
Keuntungan 10% 64,342.10
Total 707,763.13

PEMASANGAN PIPA DENGAN CARA BORING


P224 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 612,552.63
PERUMAHAN
Sewa Alat bantu U/ PVC Ø 300 MM 1.3090 jam 85,000.00 111,265.00
Mandor 0.5360 Org 130,000.00 69,680.00
Kepala Tukang Pipa 0.5360 Org 130,000.00 69,680.00
Pekerja Setengah Terampil 2.6780 Org 90,000.00 241,020.00
Pembuangan Tanah 0.0340 m³ 53,045.00 1,803.53
Peletakan dan Penyambungan Pipa PVC dia. 300
1.0000 m³ 48,360.00 48,360.00
mm
Galian Tanah Keras 0.1000 m³ 94,160.00 9,416.00
Urugan Tanah dipadatkan 0.0750 m³ 75,220.00 5,641.50
Jumlah 556,866.03
Keuntungan 10% 55,686.60
Total 612,552.63

PEMASANGAN PIPA DENGAN CARA BORING


P225 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 922,473.54
MARGA
Sewa Alat U/ PVC Ø 400 MM
bantu 1.6800 jam 85,000.00 142,800.00
Mandor 0.8400 Org 130,000.00 109,200.00
Kepala Tukang Pipa 0.8400 Org 130,000.00 109,200.00
Pekerja Setengah Terampil 4.2000 Org 90,000.00 378,000.00
Pembuangan Tanah 0.0450 m³ 53,045.00 2,387.03
Peletakan dan Penyambungan Pipa PVC dia. 400
1.0000 m¹ 76,980.00 76,980.00
mm
Galian Tanah Keras 0.1330 m³ 94,160.00 12,523.28
Urugan Tanah dipadatkan 0.1000 m³ 75,220.00 7,522.00
Jumlah 838,612.31
Keuntungan 10% 83,861.23
Total 922,473.54

PEMASANGAN PIPA DENGAN CARA BORING


P226 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 800,505.54
PERUMAHAN
Sewa Alat bantu U/ PVC Ø 400 MM 1.4280 jam 85,000.00 121,380.00
Mandor 0.7140 Org 130,000.00 92,820.00
Kepala Tukang Pipa 0.7140 Org 130,000.00 92,820.00
Pekerja Setengah Terampil 3.5700 Org 90,000.00 321,300.00
Pembuangan Tanah 0.0450 m³ 53,045.00 2,387.03
Peletakan dan Penyambungan Pipa PVC dia. 400
1.0000 m¹ 76,980.00 76,980.00
mm
Galian Tanah Keras 0.1330 m³ 94,160.00 12,523.28
Urugan Tanah dipadatkan 0.1000 m³ 75,220.00 7,522.00
Jumlah 727,732.31
Keuntungan 10% 72,773.23
Total 800,505.54

PEMASANGAN PIPA DENGAN CARA BORING


P227 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 1,582,012.67
MARGA
Sewa Alat U/ PVC Ø 500 MM
bantu 2.9400 jam 85,000.00 249,900.00
Mandor 1.4700 Org 130,000.00 191,100.00
Kepala Tukang Pipa 1.4700 Org 130,000.00 191,100.00
Pekerja Setengah Terampil 7.3500 Org 90,000.00 661,500.00
Pembuangan Tanah 0.0790 m³ 53,045.00 4,190.56
Peletakan dan Penyambungan Pipa PVC dia. 500
1.0000 m¹ 105,300.00 105,300.00
mm
Galian Tanah Keras 0.2330 m³ 94,160.00 21,939.28
Urugan Tanah dipadatkan 0.1750 m³ 75,220.00 13,163.50
Jumlah 1,438,193.34
Keuntungan 10% 143,819.33
Total 1,582,012.67

PEMASANGAN PIPA DENGAN CARA BORING


P228 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 1,368,761.17
PERUMAHAN
Sewa Alat bantu U/ PVC Ø 500 MM 2.4990 jam 85,000.00 212,415.00
Mandor 1.2500 Org 130,000.00 162,500.00
Kepala Tukang Pipa 1.2500 Org 130,000.00 162,500.00
Pekerja Setengah Terampil 6.2480 Org 90,000.00 562,320.00
Pembuangan Tanah 0.0790 m³ 53,045.00 4,190.56
Peletakan dan Penyambungan Pipa PVC dia. 500
1.0000 m¹ 105,300.00 105,300.00
mm
Galian Tanah Keras 0.2330 m³ 94,160.00 21,939.28
Urugan Tanah dipadatkan 0.1750 m³ 75,220.00 13,163.50
Jumlah 1,244,328.34
Keuntungan 10% 124,432.83
Total 1,368,761.17

PEMASANGAN PIPA DENGAN CARA BORING


P229 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 2,739,806.14
MARGA
Sewa Alat U/ PVC Ø 600 MM
bantu 5.1450 jam 85,000.00 437,325.00
Mandor 2.5730 Org 130,000.00 334,490.00
Kepala Tukang Pipa 2.5730 Org 130,000.00 334,490.00
Pekerja Setengah Terampil 12.8630 Org 90,000.00 1,157,670.00
Pembuangan Tanah 0.1390 m³ 53,045.00 7,373.26
Peletakan dan Penyambungan Pipa PVC dia. 600
1.0000 m¹ 157,950.00 157,950.00
mm
Galian Tanah Keras 0.4080 m³ 94,160.00 38,417.28
Urugan Tanah dipadatkan 0.3060 m³ 75,220.00 23,017.32
Jumlah 2,490,732.86
Keuntungan 10% 249,073.29
Total 2,739,806.14

PEMASANGAN PIPA DENGAN CARA BORING


P230 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 2,366,251.64
PERUMAHAN
Sewa Alat bantu U/ PVC Ø 600 MM 4.3740 jam 85,000.00 371,790.00
Mandor 2.1870 Org 130,000.00 284,310.00
Kepala Tukang Pipa 2.1870 Org 130,000.00 284,310.00
Pekerja Setengah Terampil 10.9330 Org 90,000.00 983,970.00
Pembuangan Tanah 0.1390 m³ 53,045.00 7,373.26
Peletakan dan Penyambungan Pipa PVC dia. 600
1.0000 m¹ 157,950.00 157,950.00
mm
Galian Tanah Keras 0.4080 m³ 94,160.00 38,417.28
Urugan Tanah dipadatkan 0.3060 m³ 75,220.00 23,017.32
Jumlah 2,151,137.86
Keuntungan 10% 215,113.79
Total 2,366,251.64

PEMASANGAN PIPA DENGAN CARA BORING


P231 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 176,149.85
MARGA
Sewa Alat U/ HDPE Ø 50 MM
bantu 0.5500 jam 85,000.00 46,750.00
Mandor 0.1800 Org 130,000.00 23,400.00
Kepala Tukang Pipa 0.1800 Org 130,000.00 23,400.00
Pekerja Setengah Terampil 0.5000 Org 90,000.00 45,000.00
Pembuangan Tanah 0.0060 m³ 53,045.00 318.27
Peletakan dan Penyambungan Pipa HDPE Ø 50
1.0000 m³ 18,520.00 18,520.00
mm
Galian Tanah Keras 0.0180 m³ 94,160.00 1,694.88
Urugan Tanah dipadatkan 0.0140 m³ 75,220.00 1,053.08
Jumlah 160,136.23
Keuntungan 10% 16,013.62
Total 176,149.85

PEMASANGAN PIPA DENGAN CARA BORING


P232 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 149,177.85
PERUMAHAN
Sewa Alat bantu U/ HDPE Ø 50 MM 0.4500 jam 85,000.00 38,250.00
Mandor 0.1530 Org 130,000.00 19,890.00
Kepala Tukang Pipa 0.1530 Org 130,000.00 19,890.00
Pekerja Setengah Terampil 0.4000 Org 90,000.00 36,000.00
Pembuangan Tanah 0.0060 m³ 53,045.00 318.27
Peletakan dan Penyambungan Pipa HDPE Ø 50
1.0000 m³ 18,520.00 18,520.00
mm
Galian Tanah Keras 0.0180 m³ 94,160.00 1,694.88
Urugan Tanah dipadatkan 0.0140 m³ 75,220.00 1,053.08
Jumlah 135,616.23
Keuntungan 10% 13,561.62
Total 149,177.85

PEMASANGAN PIPA DENGAN CARA BORING


P233 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 224,169.64
MARGA
Sewa Alat U/ HDPE Ø 75 MM
bantu 0.7500 jam 85,000.00 63,750.00
Mandor 0.1800 Org 130,000.00 23,400.00
Kepala Tukang Pipa 0.1800 Org 130,000.00 23,400.00
Pekerja Setengah Terampil 0.7000 Org 90,000.00 63,000.00
Pembuangan Tanah 0.0090 m³ 53,045.00 477.41
Peletakan dan Penyambungan Pipa HDPE dia. 75
1.0000 m³ 25,980.00 25,980.00
mm
Galian Tanah Keras 0.0250 m³ 94,160.00 2,354.00
Urugan Tanah dipadatkan 0.0190 m³ 75,220.00 1,429.18
Jumlah 203,790.59
Keuntungan 10% 20,379.06
Total 224,169.64

PEMASANGAN PIPA DENGAN CARA BORING


P234 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 203,852.64
PERUMAHAN
Sewa Alat bantu U/ HDPE Ø 75 MM 0.7000 jam 85,000.00 59,500.00
Mandor 0.1530 Org 130,000.00 19,890.00
Kepala Tukang Pipa 0.1530 Org 130,000.00 19,890.00
Pekerja Setengah Terampil 0.6200 Org 90,000.00 55,800.00
Pembuangan Tanah 0.0090 m³ 53,045.00 477.41
Peletakan dan Penyambungan Pipa HDPE dia. 75
1.0000 m³ 25,980.00 25,980.00
mm
Galian Tanah Keras 0.0250 m³ 94,160.00 2,354.00
Urugan Tanah dipadatkan 0.0190 m³ 75,220.00 1,429.18
Jumlah 185,320.59
Keuntungan 10% 18,532.06
Total 203,852.64

PEMASANGAN PIPA DENGAN CARA BORING


P235 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 297,133.40
MARGA
Sewa Alat U/ HDPE Ø 100 MM
bantu 1.0000 jam 85,000.00 85,000.00
Mandor 0.2100 Org 130,000.00 27,300.00
Kepala Tukang Pipa 0.2100 Org 130,000.00 27,300.00
Pekerja Setengah Terampil 0.9000 Org 90,000.00 81,000.00
Pembuangan Tanah 0.0110 m³ 53,045.00 583.50
Peletakan dan Penyambungan Pipa HDPEdia. 100
1.0000 m³ 43,950.00 43,950.00
mm
Galian Tanah Keras 0.0330 m³ 94,160.00 3,107.28
Urugan Tanah dipadatkan 0.0250 m³ 75,220.00 1,880.50
Jumlah 270,121.28
Keuntungan 10% 27,012.13
Total 297,133.40

PEMASANGAN PIPA DENGAN CARA BORING


P236 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 278,642.40
PERUMAHAN
Sewa Alat bantu U/ HDPE Ø 100 MM 0.9500 jam 85,000.00 80,750.00
Mandor 0.1790 Org 130,000.00 23,270.00
Kepala Tukang Pipa 0.1790 Org 130,000.00 23,270.00
Pekerja Setengah Terampil 0.8500 Org 90,000.00 76,500.00
Pembuangan Tanah 0.0110 m³ 53,045.00 583.50
Peletakan dan Penyambungan Pipa HDPE dia. 100
1.0000 m³ 43,950.00 43,950.00
mm
Galian Tanah Keras 0.0330 m³ 94,160.00 3,107.28
Urugan Tanah dipadatkan 0.0250 m³ 75,220.00 1,880.50
Jumlah 253,311.28
Keuntungan 10% 25,331.13
Total 278,642.40

PEMASANGAN PIPA DENGAN CARA BORING


P237 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 405,578.94
MARGA
Sewa Alat U/ HDPE Ø 150 MM
bantu 1.3300 jam 85,000.00 113,050.00
Mandor 0.3150 Org 130,000.00 40,950.00
Kepala Tukang Pipa 0.3150 Org 130,000.00 40,950.00
Pekerja Setengah Terampil 1.5750 Org 90,000.00 141,750.00
Pembuangan Tanah 0.0170 m³ 53,045.00 901.77
Peletakan dan Penyambungan Pipa HDPE dia. 150
1.0000 m³ 23,540.00 23,540.00
mm
Galian Tanah Keras 0.0500 m³ 94,160.00 4,708.00
Urugan Tanah dipadatkan 0.0380 m³ 75,220.00 2,858.36
Jumlah 368,708.13
Keuntungan 10% 36,870.81
Total 405,578.94

PEMASANGAN PIPA DENGAN CARA BORING


P238 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 350,166.44
PERUMAHAN
Sewa Alat bantu U/ HDPE Ø 150 MM 1.1310 jam 85,000.00 96,135.00
Mandor 0.2680 Org 130,000.00 34,840.00
Kepala Tukang Pipa 0.2680 Org 130,000.00 34,840.00
Pekerja Setengah Terampil 1.3390 Org 90,000.00 120,510.00
Pembuangan Tanah 0.0170 m³ 53,045.00 901.77
Peletakan dan Penyambungan Pipa HDPE dia. 150
1.0000 m³ 23,540.00 23,540.00
mm
Galian Tanah Keras 0.0500 m³ 94,160.00 4,708.00
Urugan Tanah dipadatkan 0.0380 m³ 75,220.00 2,858.36
Jumlah 318,333.13
Keuntungan 10% 31,833.31
Total 350,166.44

PEMASANGAN PIPA DENGAN CARA BORING


P239 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 564,266.73
MARGA
Sewa Alat U/ HDPE Ø 200 MM
bantu 1.4000 jam 85,000.00 119,000.00
Mandor 0.4200 Org 130,000.00 54,600.00
Kepala Tukang Pipa 0.4200 Org 130,000.00 54,600.00
Pekerja Setengah Terampil 2.1000 Org 90,000.00 189,000.00
Pembuangan Tanah 0.0230 m³ 53,045.00 1,220.04
Peletakan dan Penyambungan Pipa HDPE dia. 200
1.0000 m³ 84,480.00 84,480.00
mm
Galian Tanah Keras 0.0670 m³ 94,160.00 6,308.72
Urugan Tanah dipadatkan 0.0500 m³ 75,220.00 3,761.00
Jumlah 512,969.76
Keuntungan 10% 51,296.98
Total 564,266.73

PEMASANGAN PIPA DENGAN CARA BORING


P240 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 495,428.73
PERUMAHAN
Sewa Alat bantu U/ HDPE Ø 200 MM 1.1900 jam 85,000.00 101,150.00
Mandor 0.3570 Org 130,000.00 46,410.00
Kepala Tukang Pipa 0.3570 Org 130,000.00 46,410.00
Pekerja Setengah Terampil 1.7850 Org 90,000.00 160,650.00
Pembuangan Tanah 0.0230 m³ 53,045.00 1,220.04
Peletakan dan Penyambungan Pipa HDPE dia. 200
1.0000 m³ 84,480.00 84,480.00
mm
Galian Tanah Keras 0.0670 m³ 94,160.00 6,308.72
Urugan Tanah dipadatkan 0.0500 m³ 75,220.00 3,761.00
Jumlah 450,389.76
Keuntungan 10% 45,038.98
Total 495,428.73

PEMASANGAN PIPA DENGAN CARA BORING


P241 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 668,150.34
MARGA
Sewa Alat U/ HDPE Ø 250 MM
bantu 1.4700 jam 85,000.00 124,950.00
Mandor 0.5250 Org 130,000.00 68,250.00
Kepala Tukang Pipa 0.5250 Org 130,000.00 68,250.00
Pekerja Setengah Terampil 2.6250 Org 90,000.00 236,250.00
Pembuangan Tanah 0.0280 m³ 53,045.00 1,485.26
Peletakan dan Penyambungan Pipa HDPE dia. 250
1.0000 m³ 95,670.00 95,670.00
mm
Galian Tanah Keras 0.0830 m³ 94,160.00 7,815.28
Urugan Tanah dipadatkan 0.0630 m³ 75,220.00 4,738.86
Jumlah 607,409.40
Keuntungan 10% 60,740.94
Total 668,150.34

PEMASANGAN PIPA DENGAN CARA BORING


P242 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 586,365.34
PERUMAHAN
Sewa Alat bantu U/ HDPE Ø 250 MM 1.2500 jam 85,000.00 106,250.00
Mandor 0.4470 Org 130,000.00 58,110.00
Kepala Tukang Pipa 0.4470 Org 130,000.00 58,110.00
Pekerja Setengah Terampil 2.2320 Org 90,000.00 200,880.00
Pembuangan Tanah 0.0280 m³ 53,045.00 1,485.26
Peletakan dan Penyambungan Pipa HDPE dia. 250
1.0000 m³ 95,670.00 95,670.00
mm
Galian Tanah Keras 0.0830 m³ 94,160.00 7,815.28
Urugan Tanah dipadatkan 0.0630 m³ 75,220.00 4,738.86
Jumlah 533,059.40
Keuntungan 10% 53,305.94
Total 586,365.34

PEMASANGAN PIPA DENGAN CARA BORING


P243 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 792,463.13
MARGA
Sewa Alat U/ HDPE Ø 300 MM
bantu 1.5400 jam 85,000.00 130,900.00
Mandor 0.6300 Org 130,000.00 81,900.00
Kepala Tukang Pipa 0.6300 Org 130,000.00 81,900.00
Pekerja Setengah Terampil 3.1500 Org 90,000.00 283,500.00
Pembuangan Tanah 0.0340 m³ 53,045.00 1,803.53
Peletakan dan Penyambungan Pipa HDPE dia. 300
1.0000 m³ 125,360.00 125,360.00
mm
Galian Tanah Keras 0.1000 m³ 94,160.00 9,416.00
Urugan Tanah dipadatkan 0.0750 m³ 75,220.00 5,641.50
Jumlah 720,421.03
Keuntungan 10% 72,042.10
Total 792,463.13

PEMASANGAN PIPA DENGAN CARA BORING


P244 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 697,252.63
PERUMAHAN
Sewa Alat bantu U/ HDPE Ø 300 MM 1.3090 jam 85,000.00 111,265.00
Mandor 0.5360 Org 130,000.00 69,680.00
Kepala Tukang Pipa 0.5360 Org 130,000.00 69,680.00
Pekerja Setengah Terampil 2.6780 Org 90,000.00 241,020.00
Pembuangan Tanah 0.0340 m³ 53,045.00 1,803.53
Peletakan dan Penyambungan Pipa HDPE dia. 300
1.0000 m³ 125,360.00 125,360.00
mm
Galian Tanah Keras 0.1000 m³ 94,160.00 9,416.00
Urugan Tanah dipadatkan 0.0750 m³ 75,220.00 5,641.50
Jumlah 633,866.03
Keuntungan 10% 63,386.60
Total 697,252.63
PEMASANGAN PIPA DENGAN CARA BORING
P245 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 1,018,723.54
MARGA
Sewa Alat U/ HDPE Ø 400 MM
bantu 1.6800 jam 85,000.00 142,800.00
Mandor 0.8400 Org 130,000.00 109,200.00
Kepala Tukang Pipa 0.8400 Org 130,000.00 109,200.00
Pekerja Setengah Terampil 4.2000 Org 90,000.00 378,000.00
Pembuangan Tanah 0.0450 m³ 53,045.00 2,387.03
Peletakan dan Penyambungan Pipa HDPE dia. 400
1.0000 m¹ 164,480.00 164,480.00
mm
Galian Tanah Keras 0.1330 m³ 94,160.00 12,523.28
Urugan Tanah dipadatkan 0.1000 m³ 75,220.00 7,522.00
Jumlah 926,112.31
Keuntungan 10% 92,611.23
Total 1,018,723.54

PEMASANGAN PIPA DENGAN CARA BORING


P246 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 896,755.54
PERUMAHAN
Sewa Alat bantu U/ HDPE Ø 400 MM 1.4280 jam 85,000.00 121,380.00
Mandor 0.7140 Org 130,000.00 92,820.00
Kepala Tukang Pipa 0.7140 Org 130,000.00 92,820.00
Pekerja Setengah Terampil 3.5700 Org 90,000.00 321,300.00
Pembuangan Tanah 0.0450 m³ 53,045.00 2,387.03
Peletakan dan Penyambungan Pipa HDPE dia. 400
1.0000 m¹ 164,480.00 164,480.00
mm
Galian Tanah Keras 0.1330 m³ 94,160.00 12,523.28
Urugan Tanah dipadatkan 0.1000 m³ 75,220.00 7,522.00
Jumlah 815,232.31
Keuntungan 10% 81,523.23
Total 896,755.54

PEMASANGAN PIPA DENGAN CARA BORING


P247 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 1,691,737.67
MARGA
Sewa Alat U/ HDPE Ø 500 MM
bantu 2.9400 jam 85,000.00 249,900.00
Mandor 1.4700 Org 130,000.00 191,100.00
Kepala Tukang Pipa 1.4700 Org 130,000.00 191,100.00
Pekerja Setengah Terampil 7.3500 Org 90,000.00 661,500.00
Pembuangan Tanah 0.0790 m³ 53,045.00 4,190.56
Peletakan dan Penyambungan Pipa HDPE dia. 500
1.0000 m¹ 205,050.00 205,050.00
mm
Galian Tanah Keras 0.2330 m³ 94,160.00 21,939.28
Urugan Tanah dipadatkan 0.1750 m³ 75,220.00 13,163.50
Jumlah 1,537,943.34
Keuntungan 10% 153,794.33
Total 1,691,737.67

PEMASANGAN PIPA DENGAN CARA BORING


P248 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 1,478,486.17
PERUMAHAN
Sewa Alat bantu U/ HDPE Ø 500 MM 2.4990 jam 85,000.00 212,415.00
Mandor 1.2500 Org 130,000.00 162,500.00
Kepala Tukang Pipa 1.2500 Org 130,000.00 162,500.00
Pekerja Setengah Terampil 6.2480 Org 90,000.00 562,320.00
Pembuangan Tanah 0.0790 m³ 53,045.00 4,190.56
Peletakan dan Penyambungan Pipa HDPE dia. 500
1.0000 m¹ 205,050.00 205,050.00
mm
Galian Tanah Keras 0.2330 m³ 94,160.00 21,939.28
Urugan Tanah dipadatkan 0.1750 m³ 75,220.00 13,163.50
Jumlah 1,344,078.34
Keuntungan 10% 134,407.83
Total 1,478,486.17

PEMASANGAN PIPA DENGAN CARA BORING


P249 M' HORIZONTAL DRILLING PADA JALAN BINA Harga per 1M' ….. Rp. 2,866,856.14
MARGA
Sewa Alat U/ HDPE Ø 600 MM
bantu 5.1450 jam 85,000.00 437,325.00
Mandor 2.5730 Org 130,000.00 334,490.00
Kepala Tukang Pipa 2.5730 Org 130,000.00 334,490.00
Pekerja Setengah Terampil 12.8630 Org 90,000.00 1,157,670.00
Pembuangan Tanah 0.1390 m³ 53,045.00 7,373.26
Peletakan dan Penyambungan Pipa HDPE dia. 600
1.0000 m¹ 273,450.00 273,450.00
mm
Galian Tanah Keras 0.4080 m³ 94,160.00 38,417.28
Urugan Tanah dipadatkan 0.3060 m³ 75,220.00 23,017.32
Jumlah 2,606,232.86
Keuntungan 10% 260,623.29
Total 2,866,856.14

PEMASANGAN PIPA DENGAN CARA BORING


P250 M' HORIZONTAL DRILLING DILINGKUNGAN Harga per 1M' ….. Rp. 2,493,301.64
PERUMAHAN
Sewa Alat bantu U/ HDPE Ø 600 MM 4.3740 jam 85,000.00 371,790.00
Mandor 2.1870 Org 130,000.00 284,310.00
Kepala Tukang Pipa 2.1870 Org 130,000.00 284,310.00
Pekerja Setengah Terampil 10.9330 Org 90,000.00 983,970.00
Pembuangan Tanah 0.1390 m³ 53,045.00 7,373.26
Peletakan dan Penyambungan Pipa HDPE dia. 600
1.0000 m¹ 273,450.00 273,450.00
mm
Galian Tanah Keras 0.4080 m³ 94,160.00 38,417.28
Urugan Tanah dipadatkan 0.3060 m³ 75,220.00 23,017.32
Jumlah 2,266,637.86
Keuntungan 10% 226,663.79
Total 2,493,301.64

P251 CM PEKERJAAN PENGELASAN Harga per 1 CM' …. Rp. 4,010.00


Kawat las listrik 0.0400 kg 38,800.00 1,552.00
Bahan bakar solar 0.0300 lt 7,100.00 213.00
Pelumas (olie SAE 20-40) 0.0040 lt 56,400.00 225.60
Pekerja Terampil 0.0040 org 100,000.00 400.00
Tukang Las terlatih 0.0020 org 120,000.00 240.00
Pembantu Tukang Las 0.0020 org 70,000.00 140.00
Kepala tukang besi profil 0.0020 org 130,000.00 260.00
Mandor 0.0010 org 130,000.00 130.00
Alat bantu ( Mesin Las Listrik, Gurinda, Sikat baja dll) 0.0100 set 85,000.00 850.00
Jumlah 4,010.60
Dibulatkan 4,010.00
P252 M' PENGELASAN PIPA STEEL Ø 50 MM Harga per 1M' ….. Rp. 10,490.00
Las Pipa Steel dia. 50 mm 2.617 cm 4,010.00 10,492.83
Jumlah 10,492.83
Dibulatkan 10,490.00

P253 M' PENGELASAN PIPA STEEL Ø 75 MM Harga per 1M' ….. Rp. 15,740.00
Las Pipa Steel dia. 75 mm 3.925 cm 4,010.00 15,739.25
Jumlah 15,739.25
Dibulatkan 15,740.00

P254 M' PENGELASAN PIPA STEEL Ø 100 MM Harga per 1M' ….. Rp. 20,990.00
Las Pipa Steel dia. 100 mm 5.233 cm 4,010.00 20,985.67
Jumlah 20,985.67
Dibulatkan 20,990.00

P255 M' PENGELASAN PIPA STEEL Ø 150 MM Harga per 1M' ….. Rp. 31,480.00
Las Pipa Steel dia. 150 mm 7.850 cm 4,010.00 31,478.50
Jumlah 31,478.50
Dibulatkan 31,480.00

P256 M' PENGELASAN PIPA STEEL Ø 200 MM Harga per 1M' ….. Rp. 41,970.00
Las Pipa Steel dia. 200 mm 10.467 cm 4,010.00 41,971.33
Jumlah 41,971.33
Dibulatkan 41,970.00

P257 M' PENGELASAN PIPA STEEL Ø 250 MM Harga per 1M' ….. Rp. 52,460.00
Las Pipa Steel dia. 250 mm 13.083 cm 4,010.00 52,464.17
Jumlah 52,464.17
Dibulatkan 52,460.00

P258 M' PENGELASAN PIPA STEEL Ø 300 MM Harga per 1M' ….. Rp. 62,960.00
Las Pipa Steel dia. 300 mm 15.700 cm 4,010.00 62,957.00
Jumlah 62,957.00
Dibulatkan 62,960.00

P259 M' PENGELASAN PIPA STEEL Ø 400 MM Harga per 1M' ….. Rp. 83,940.00
Las Pipa Steel dia. 400 mm 20.933 cm 4,010.00 83,942.67
Jumlah 83,942.67
Dibulatkan 83,940.00

P260 M' PENGELASAN PIPA STEEL Ø 500 MM Harga per 1M' ….. Rp. 104,930.00
Las Pipa Steel dia. 500 mm 26.167 cm 4,010.00 104,928.33
Jumlah 104,928.33
Dibulatkan 104,930.00

P261 M' PENGELASAN PIPA STEEL Ø 600 MM Harga per 1M' ….. Rp. 125,910.00
Las Pipa Steel dia. 600 mm 31.400 cm 4,010.00 125,914.00
Jumlah 125,914.00
Dibulatkan 125,910.00

P262 M' PELETAKAN PIPA STEEL Ø 50 mm Harga per 1M' ….. Rp. 21,850.00
Mandor 0.0035 Org 130,000.00 455.00
Tukang pipa Terampil 0.0640 Org 120,000.00 7,680.00
Kepala Tukang Pipa 0.0350 Org 130,000.00 4,550.00
Pekerja Setengah Terampil 0.0640 Org 90,000.00 5,760.00
Alat bantu 0.0400 Set 85,000.00 3,400.00
Jumlah 21,845.00
Dibulatkan 21,850.00

P263 M' PELETAKAN PIPA STEEL Ø 75 mm Harga per 1M' ….. Rp. 26,770.00
Mandor 0.0050 Org 130,000.00 650.00
Tukang pipa Terampil 0.1077 Org 120,000.00 12,924.00
Kepala Tukang Pipa 0.0500 Org 130,000.00 6,500.00
Pekerja Setengah Terampil 0.0177 Org 90,000.00 1,593.00
Alat bantu 0.0600 Set 85,000.00 5,100.00
Jumlah 26,767.00
Dibulatkan 26,770.00

P264 M' PELETAKAN PIPA STEEL Ø 100 mm Harga per 1M' ….. Rp. 45,450.00
Mandor 0.0050 Org 130,000.00 650.00
Tukang pipa Terampil 0.1500 Org 120,000.00 18,000.00
Kepala Tukang Pipa 0.0500 Org 130,000.00 6,500.00
Pekerja Setengah Terampil 0.1500 Org 90,000.00 13,500.00
Alat bantu 0.0800 Set 85,000.00 6,800.00
Jumlah 45,450.00
Dibulatkan 45,450.00

P265 M' PELETAKAN PIPA STEEL Ø 150 mm Harga per 1M' ….. Rp. 58,550.00
Mandor 0.0060 Org 130,000.00 780.00
Tukang pipa Terampil 0.1875 Org 120,000.00 22,500.00
Kepala Tukang Pipa 0.0630 Org 130,000.00 8,190.00
Pekerja Setengah Terampil 0.1875 Org 90,000.00 16,875.00
Alat bantu 0.1200 Set 85,000.00 10,200.00
Jumlah 58,545.00
Dibulatkan 58,550.00

P266 M' PELETAKAN PIPA STEEL Ø 200 mm Harga per 1M' ….. Rp. 74,030.00
Mandor 0.0080 Org 130,000.00 1,040.00
Tukang pipa Terampil 0.2345 Org 120,000.00 28,140.00
Kepala Tukang Pipa 0.0780 Org 130,000.00 10,140.00
Pekerja Setengah Terampil 0.2345 Org 90,000.00 21,105.00
Alat bantu 0.1600 Set 85,000.00 13,600.00
Jumlah 74,025.00
Dibulatkan 74,030.00

P267 M' PELETAKAN PIPA STEEL Ø 250 mm Harga per 1M' ….. Rp. 81,950.00
Mandor 0.0084 Org 130,000.00 1,092.00
Tukang pipa Terampil 0.2521 Org 120,000.00 30,252.00
Kepala Tukang Pipa 0.0840 Org 130,000.00 10,920.00
Pekerja Setengah Terampil 0.2521 Org 90,000.00 22,689.00
Alat bantu 0.2000 Set 85,000.00 17,000.00
Jumlah 81,953.00
Dibulatkan 81,950.00

P268 M' PELETAKAN PIPA STEEL Ø 300 mm Harga per 1M' ….. Rp. 90,220.00
Mandor 0.0090 Org 130,000.00 1,170.00
Tukang pipa Terampil 0.2710 Org 120,000.00 32,520.00
Kepala Tukang Pipa 0.0903 Org 130,000.00 11,739.00
Pekerja Setengah Terampil 0.2710 Org 90,000.00 24,390.00
Alat bantu 0.2400 Set 85,000.00 20,400.00
Jumlah 90,219.00
Dibulatkan 90,220.00

P269 M' PELETAKAN PIPA STEEL Ø 400 mm Harga per 1M' ….. Rp. 107,900.00
Mandor 0.0104 Org 130,000.00 1,352.00
Tukang pipa Terampil 0.3132 Org 120,000.00 37,584.00
Kepala Tukang Pipa 0.1044 Org 130,000.00 13,572.00
Pekerja Setengah Terampil 0.3132 Org 90,000.00 28,188.00
Alat bantu 0.3200 Set 85,000.00 27,200.00
Jumlah 107,896.00
Dibulatkan 107,900.00

P270 M' PELETAKAN PIPA STEEL Ø 500 mm Harga per 1M' ….. Rp. 141,410.00
Mandor 0.1210 Org 130,000.00 15,730.00
Tukang pipa Terampil 0.3619 Org 120,000.00 43,428.00
Kepala Tukang Pipa 0.1206 Org 130,000.00 15,678.00
Pekerja Setengah Terampil 0.3619 Org 90,000.00 32,571.00
Alat bantu 0.4000 Set 85,000.00 34,000.00
Jumlah 141,407.00
Dibulatkan 141,410.00

P271 M' PELETAKAN PIPA STEEL Ø 600 mm Harga per 1M' ….. Rp. 168,400.00
Mandor 0.0243 Org 130,000.00 3,159.00
Tukang pipa Terampil 0.4878 Org 120,000.00 58,536.00
Kepala Tukang Pipa 0.2439 Org 130,000.00 31,707.00
Pekerja Setengah Terampil 0.4878 Org 90,000.00 43,902.00
Alat bantu 0.3658 Set 85,000.00 31,093.00
Jumlah 168,397.00
Dibulatkan 168,400.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P272 M' Harga per 1M' ….. Rp. 4,020.00
PVC Ø 25 mm
Mandor 0.0025 Org 130,000.00 325.00
Tukang pipa Terampil 0.0116 Org 120,000.00 1,392.00
Pekerja Setengah Terampil 0.0225 Org 90,000.00 2,025.00
Alat bantu 0.0033 Set 85,000.00 280.50
Jumlah 4,022.50
Dibulatkan 4,020.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P273 M' Harga per 1M' ….. Rp. 6,410.00
PVC Ø 40 mm
Mandor 0.0040 Org 130,000.00 520.00
Tukang pipa Terampil 0.0184 Org 120,000.00 2,208.00
Pekerja Setengah Terampil 0.0360 Org 90,000.00 3,240.00
Alat bantu 0.0052 Set 85,000.00 445.40
Jumlah 6,413.40
Dibulatkan 6,410.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P274 M' Harga per 1M' ….. Rp. 8,020.00
PVC Ø 50 mm
Mandor 0.0050 Org 130,000.00 650.00
Tukang pipa Terampil 0.0230 Org 120,000.00 2,760.00
Pekerja Setengah Terampil 0.0450 Org 90,000.00 4,050.00
Alat bantu 0.0066 Set 85,000.00 556.75
Jumlah 8,016.75
Dibulatkan 8,020.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P275 M' Harga per 1M' ….. Rp. 11,980.00
PVC Ø 75 mm
Mandor 0.0080 Org 130,000.00 1,040.00
Tukang pipa Terampil 0.0340 Org 120,000.00 4,080.00
Pekerja Setengah Terampil 0.0670 Org 90,000.00 6,030.00
Alat bantu 0.0098 Set 85,000.00 833.44
Jumlah 11,983.44
Dibulatkan 11,980.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P276 M' Harga per 1M' ….. Rp. 15,950.00
PVC Ø 100 mm
Mandor 0.0110 Org 130,000.00 1,430.00
Tukang pipa Terampil 0.0450 Org 120,000.00 5,400.00
Pekerja Setengah Terampil 0.0890 Org 90,000.00 8,010.00
Alat bantu 0.0131 Set 85,000.00 1,110.10
Jumlah 15,950.10
Dibulatkan 15,950.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P277 M' Harga per 1M' ….. Rp. 23,540.00
PVC Ø 150 mm
Mandor 0.0130 Org 130,000.00 1,690.00
Tukang pipa Terampil 0.0680 Org 120,000.00 8,160.00
Pekerja Setengah Terampil 0.1340 Org 90,000.00 12,060.00
Alat bantu 0.0192 Set 85,000.00 1,628.60
Jumlah 23,538.60
Dibulatkan 23,540.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P278 M' Harga per 1M' ….. Rp. 31,980.00
PVC Ø 200 mm
Mandor 0.0210 Org 130,000.00 2,730.00
Tukang pipa Terampil 0.0910 Org 120,000.00 10,920.00
Pekerja Setengah Terampil 0.1790 Org 90,000.00 16,110.00
Alat bantu 0.0262 Set 85,000.00 2,223.60
Jumlah 31,983.60
Dibulatkan 31,980.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P279 M' Harga per 1M' ….. Rp. 39,670.00
PVC Ø 250 mm
Mandor 0.0300 Org 130,000.00 3,900.00
Tukang pipa Terampil 0.1100 Org 120,000.00 13,200.00
Pekerja Setengah Terampil 0.2200 Org 90,000.00 19,800.00
Alat bantu 0.0326 Set 85,000.00 2,766.75
Jumlah 39,666.75
Dibulatkan 39,670.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P280 M' Harga per 1M' ….. Rp. 48,360.00
PVC Ø 300 mm
Mandor 0.0300 Org 130,000.00 3,900.00
Tukang pipa Terampil 0.1400 Org 120,000.00 16,800.00
Pekerja Setengah Terampil 0.2700 Org 90,000.00 24,300.00
Alat bantu 0.0396 Set 85,000.00 3,361.75
Jumlah 48,361.75
Dibulatkan 48,360.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P281 M' Harga per 1M' ….. Rp. 76,980.00
PVC Ø 400 mm
Mandor 0.0380 Org 130,000.00 4,940.00
Tukang pipa Terampil 0.2280 Org 120,000.00 27,360.00
Pekerja Setengah Terampil 0.4350 Org 90,000.00 39,150.00
Alat bantu 0.0650 Set 85,000.00 5,525.00
Jumlah 76,975.00
Dibulatkan 76,980.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P282 M' Harga per 1M' ….. Rp. 105,300.00
PVC Ø 500 mm
Mandor 0.0450 Org 130,000.00 5,850.00
Tukang pipa Terampil 0.3150 Org 120,000.00 37,800.00
Pekerja Setengah Terampil 0.6000 Org 90,000.00 54,000.00
Alat bantu 0.0900 Set 85,000.00 7,650.00
Jumlah 105,300.00
Dibulatkan 105,300.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P283 M' Harga per 1M' ….. Rp. 157,950.00
PVC Ø 600 mm
Mandor 0.0675 Org 130,000.00 8,775.00
Tukang pipa Terampil 0.4725 Org 120,000.00 56,700.00
Pekerja Setengah Terampil 0.9000 Org 90,000.00 81,000.00
Alat bantu 0.1350 Set 85,000.00 11,475.00
Jumlah 157,950.00
Dibulatkan 157,950.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P284 M' Harga per 1M' ….. Rp. 18,520.00
HDPE Ø 50 mm
Mandor 0.0050 Org 130,000.00 650.00
Tukang pipa Terampil 0.0230 Org 120,000.00 2,760.00
Pekerja Setengah Terampil 0.0450 Org 90,000.00 4,050.00
Welding HDPE 0.0600 Jam 125,000.00 7,500.00
Genset Kap. 7000 - 12000 Watt 0.0600 Jam 50,000.00 3,000.00
Alat bantu 0.0066 Set 85,000.00 556.75
Jumlah 18,516.75
Dibulatkan 18,520.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P285 M' Harga per 1M' ….. Rp. 25,980.00
HDPE Ø 75 mm
Mandor 0.0080 Org 130,000.00 1,040.00
Tukang pipa Terampil 0.0340 Org 120,000.00 4,080.00
Pekerja Setengah Terampil 0.0670 Org 90,000.00 6,030.00
Welding HDPE 0.0800 Jam 125,000.00 10,000.00
Genset Kap. 7000 - 12000 Watt 0.0800 Jam 50,000.00 4,000.00
Alat bantu 0.0098 Set 85,000.00 833.44
Jumlah 25,983.44
Dibulatkan 25,980.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P286 M' Harga per 1M' ….. Rp. 43,950.00
HDPE Ø 100 mm
Mandor 0.0110 Org 130,000.00 1,430.00
Tukang pipa Terampil 0.0450 Org 120,000.00 5,400.00
Pekerja Setengah Terampil 0.0890 Org 90,000.00 8,010.00
Welding HDPE 0.1600 Jam 125,000.00 20,000.00
Genset Kap. 7000 - 12000 Watt 0.1600 Jam 50,000.00 8,000.00
Alat bantu 0.0131 Set 85,000.00 1,110.10
Jumlah 43,950.10
Dibulatkan 43,950.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P287 M' Harga per 1M' ….. Rp. 69,040.00
HDPE Ø 150 mm
Mandor 0.0130 Org 130,000.00 1,690.00
Tukang pipa Terampil 0.0680 Org 120,000.00 8,160.00
Pekerja Setengah Terampil 0.1340 Org 90,000.00 12,060.00
Welding HDPE 0.2600 Jam 125,000.00 32,500.00
Genset Kap. 7000 - 12000 Watt 0.2600 Jam 50,000.00 13,000.00
Alat bantu 0.0192 Set 85,000.00 1,628.60
Jumlah 69,038.60
Dibulatkan 69,040.00
PELETAKAN DAN PENYAMBUNGAN PIPA
P288 M' Harga per 1M' ….. Rp. 84,480.00
HDPE Ø 200 mm
Mandor 0.0210 Org 130,000.00 2,730.00
Tukang pipa Terampil 0.0910 Org 120,000.00 10,920.00
Pekerja Setengah Terampil 0.1790 Org 90,000.00 16,110.00
Welding HDPE 0.3000 Jam 125,000.00 37,500.00
Genset Kap. 7000 - 12000 Watt 0.3000 Jam 50,000.00 15,000.00
Alat bantu 0.0262 Set 85,000.00 2,223.60
Jumlah 84,483.60
Dibulatkan 84,480.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P289 M' Harga per 1M' ….. Rp. 95,670.00
HDPE Ø 250 mm
Mandor 0.0300 Org 130,000.00 3,900.00
Tukang pipa Terampil 0.1100 Org 120,000.00 13,200.00
Pekerja Setengah Terampil 0.2200 Org 90,000.00 19,800.00
Welding HDPE 0.3200 Jam 125,000.00 40,000.00
Genset Kap. 7000 - 12000 Watt 0.3200 Jam 50,000.00 16,000.00
Alat bantu 0.0326 Set 85,000.00 2,766.75
Jumlah 95,666.75
Dibulatkan 95,670.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P290 M' Harga per 1M' ….. Rp. 125,360.00
HDPE Ø 300 mm
Mandor 0.0300 Org 130,000.00 3,900.00
Tukang pipa Terampil 0.1400 Org 120,000.00 16,800.00
Pekerja Setengah Terampil 0.2700 Org 90,000.00 24,300.00
Welding HDPE 0.4400 Jam 125,000.00 55,000.00
Genset Kap. 7000 - 12000 Watt 0.4400 Jam 50,000.00 22,000.00
Alat bantu 0.0396 Set 85,000.00 3,361.75
Jumlah 125,361.75
Dibulatkan 125,360.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P291 M' Harga per 1M' ….. Rp. 164,480.00
HDPE Ø 400 mm
Mandor 0.0380 Org 130,000.00 4,940.00
Tukang pipa Terampil 0.2280 Org 120,000.00 27,360.00
Pekerja Setengah Terampil 0.4350 Org 90,000.00 39,150.00
Welding HDPE 0.5000 Jam 125,000.00 62,500.00
Genset Kap. 7000 - 12000 Watt 0.5000 Jam 50,000.00 25,000.00
Alat bantu 0.0650 Set 85,000.00 5,525.00
Jumlah 164,475.00
Dibulatkan 164,480.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P292 M' Harga per 1M' ….. Rp. 205,050.00
HDPE Ø 500 mm
Mandor 0.0450 Org 130,000.00 5,850.00
Tukang pipa Terampil 0.3150 Org 120,000.00 37,800.00
Pekerja Setengah Terampil 0.6000 Org 90,000.00 54,000.00
Welding HDPE 0.5700 Jam 125,000.00 71,250.00
Genset Kap. 7000 - 12000 Watt 0.5700 Jam 50,000.00 28,500.00
Alat bantu 0.0900 Set 85,000.00 7,650.00
Jumlah 205,050.00
Dibulatkan 205,050.00

PELETAKAN DAN PENYAMBUNGAN PIPA


P293 M' Harga per 1M' ….. Rp. 273,450.00
HDPE Ø 600 mm
Mandor 0.0675 Org 130,000.00 8,775.00
Tukang pipa Terampil 0.4725 Org 120,000.00 56,700.00
Pekerja Setengah Terampil 0.9000 Org 90,000.00 81,000.00
Welding HDPE 0.6600 Jam 125,000.00 82,500.00
0.6600 Jam 50,000.00 33,000.00
Alat bantu 0.1350 Set 85,000.00 11,475.00
Jumlah 273,450.00
Dibulatkan 273,450.00

P294 M' PEK PENGETESAN PIPA Ø 25 MM Harga per 1M' ….. Rp. 1,650.00
Pompa Air dan Kompresor 0.0080 J/M 170,800.00 1,366.40
Air Bersih 0.0005 m³ 14,400.00 7.20
Bensin (Premium) 0.0046 ltr 9,000.00 41.40
Operator Kurang Terlatih 0.0002 Org 85,000.00 17.00
Pekerja setengah terampil 0.0006 Org 90,000.00 54.00
Mandor 0.0001 Org 130,000.00 13.00
Alat bantu 0.0018 SET 85,000.00 153.00
Jumlah 1,652.00
Dibulatkan 1,650.00

P295 M' PEK PENGETESAN PIPA Ø 40 MM Harga per 1M' ….. Rp. 1,770.00
Pompa Air dan Kompresor 0.0080 J/M 170,800.00 1,366.40
Air Bersih 0.0014 m³ 14,400.00 20.16
Bensin (Premium) 0.0074 ltr 9,000.00 66.60
Operator Kurang Terlatih 0.0003 Org 85,000.00 25.50
Pekerja setengah terampil 0.0009 Org 90,000.00 81.00
Mandor 0.0001 Org 130,000.00 13.00
Alat bantu 0.0023 SET 85,000.00 195.50
Jumlah 1,768.16
Dibulatkan 1,770.00

P296 M' PEK PENGETESAN PIPA Ø 50 MM Harga per 1M' ….. Rp. 1,880.00
Pompa Air dan Kompresor 0.0080 J/M 170,800.00 1,366.40
Air Bersih 0.0022 m³ 14,400.00 31.68
Bensin (Premium) 0.0092 ltr 9,000.00 82.80
Operator Kurang Terlatih 0.0004 Org 85,000.00 34.00
Pekerja setengah terampil 0.0011 Org 90,000.00 99.00
Mandor 0.0002 Org 130,000.00 26.00
Alat bantu 0.0028 SET 85,000.00 238.00
Jumlah 1,877.88
Dibulatkan 1,880.00
P297 M' PEK PENGETESAN PIPA Ø 75 MM Harga per 1M' ….. Rp. 2,780.00
Pompa Air dan Kompresor 0.0120 J/M 170,800.00 2,049.60
Air Bersih 0.0049 m³ 14,400.00 70.56
Bensin (Premium) 0.0138 ltr 9,000.00 124.20
Operator Kurang Terlatih 0.0006 Org 85,000.00 51.00
Pekerja setengah terampil 0.0017 Org 90,000.00 153.00
Mandor 0.0003 Org 130,000.00 39.00
Alat bantu 0.0035 SET 85,000.00 297.50
Jumlah 2,784.86
Dibulatkan 2,780.00

P298 M' PEK PENGETESAN PIPA Ø 100 MM Harga per 1M' ….. Rp. 3,730.00
Pompa Air dan Kompresor 0.0160 J/M 170,800.00 2,732.80
Air Bersih 0.0086 m³ 14,400.00 123.84
Bensin (Premium) 0.0184 ltr 9,000.00 165.60
Operator Kurang Terlatih 0.0007 Org 85,000.00 59.50
Pekerja setengah terampil 0.0022 Org 90,000.00 198.00
Mandor 0.0004 Org 130,000.00 52.00
Alat bantu 0.0047 SET 85,000.00 399.50
Jumlah 3,731.24
Dibulatkan 3,730.00

P299 M' PEK PENGETESAN PIPA Ø 150 MM Harga per 1M' ….. Rp. 4,090.00
Pompa Air dan Kompresor 0.0160 J/M 170,800.00 2,732.80
Air Bersih 0.0194 m³ 14,400.00 279.36
Bensin (Premium) 0.0276 ltr 9,000.00 248.40
Operator Kurang Terlatih 0.0010 Org 85,000.00 85.00
Pekerja setengah terampil 0.0029 Org 90,000.00 261.00
Mandor 0.0005 Org 130,000.00 65.00
Alat bantu 0.0049 SET 85,000.00 416.50
Jumlah 4,088.06
Dibulatkan 4,090.00

P300 M' PEK PENGETESAN PIPA Ø 200 MM Harga per 1M' ….. Rp. 5,310.00
Pompa Air dan Kompresor 0.0200 J/M 170,800.00 3,416.00
Air Bersih 0.0345 m³ 14,400.00 496.80
Bensin (Premium) 0.0368 ltr 9,000.00 331.20
Operator Kurang Terlatih 0.0013 Org 85,000.00 110.50
Pekerja setengah terampil 0.0037 Org 90,000.00 333.00
Mandor 0.0007 Org 130,000.00 91.00
Alat bantu 0.0063 SET 85,000.00 535.50
Jumlah 5,314.00
Dibulatkan 5,310.00

P301 M' PEK PENGETESAN PIPA Ø 250 MM Harga per 1M' ….. Rp. 6,750.00
Pompa Air dan Kompresor 0.0240 J/M 170,800.00 4,099.20
Air Bersih 0.0540 m³ 14,400.00 777.60
Bensin (Premium) 0.0614 ltr 9,000.00 552.60
Operator Kurang Terlatih 0.0016 Org 85,000.00 136.00
Pekerja setengah terampil 0.0046 Org 90,000.00 414.00
Mandor 0.0008 Org 130,000.00 104.00
Alat bantu 0.0079 SET 85,000.00 671.50
Jumlah 6,754.90
Dibulatkan 6,750.00

P302 M' PEK PENGETESAN PIPA Ø300 MM Harga per 1M' ….. Rp. 9,280.00
Pompa Air dan Kompresor 0.0320 J/M 170,800.00 5,465.60
Air Bersih 0.0777 m³ 14,400.00 1,118.88
Bensin (Premium) 0.0942 ltr 9,000.00 847.80
Operator Kurang Terlatih 0.0016 Org 85,000.00 136.00
Pekerja setengah terampil 0.0046 Org 90,000.00 414.00
Mandor 0.0008 Org 130,000.00 104.00
Alat bantu 0.0140 SET 85,000.00 1,190.00
Jumlah 9,276.28
Dibulatkan 9,280.00

P303 M' PEK PENGETESAN PIPA Ø 400 MM Harga per 1M' ….. Rp. 11,750.00
Pompa Air dan Kompresor 0.0360 J/M 170,800.00 6,148.80
Air Bersih 0.1382 m³ 14,400.00 1,990.08
Bensin (Premium) 0.1256 ltr 9,000.00 1,130.40
Operator Kurang Terlatih 0.0022 Org 85,000.00 187.00
Pekerja setengah terampil 0.0062 Org 90,000.00 558.00
Mandor 0.0011 Org 130,000.00 143.00
Alat bantu 0.0187 SET 85,000.00 1,589.50
Jumlah 11,746.78
Dibulatkan 11,750.00

P304 M' PEK PENGETESAN PIPA Ø 500 MM Harga per 1M' ….. Rp. 13,180.00
Pompa Air dan Kompresor 0.0380 J/M 170,800.00 6,490.40
Air Bersih 0.1963 m³ 14,400.00 2,826.72
Bensin (Premium) 0.1258 ltr 9,000.00 1,132.20
Operator Kurang Terlatih 0.0024 Org 85,000.00 204.00
Pekerja setengah terampil 0.0072 Org 90,000.00 648.00
Mandor 0.0015 Org 130,000.00 195.00
Alat bantu 0.0198 SET 85,000.00 1,683.00
Jumlah 13,179.32
Dibulatkan 13,180.00

P305 BH PEMASANGAN GATE VALVE Ø 50 MM Harga per 1 BH ….. Rp. 54,530.00


Mandor 0.0071 Org 130,000.00 923.00
Tukang pipa terampil 0.0714 Org 120,000.00 8,568.00
Pekerja Terampil 0.1428 Org 100,000.00 14,280.00
Pekerja Setengah Terampil 0.1428 Org 90,000.00 12,852.00
Alat bantu 0.0714 set 85,000.00 6,069.00
Beton Tumbuk 1:3:5 (A022) 0.0134 m³ 883,700.00 11,841.58
Jumlah 54,533.58
Dibulatkan 54,530.00

P306 BH PEMASANGAN GATE VALVE Ø 75 MM Harga per 1 BH ….. Rp. 80,610.00


Mandor 0.0095 Org 130,000.00 1,235.00
Tukang pipa terampil 0.0952 Org 120,000.00 11,424.00
Pekerja Terampil 0.1904 Org 100,000.00 19,040.00
Pekerja Setengah Terampil 0.1904 Org 90,000.00 17,136.00
Alat bantu 0.0952 set 85,000.00 8,092.00
Beton Tumbuk 1:3:5 (A022) 0.0268 m³ 883,700.00 23,683.16
Jumlah 80,610.16
Dibulatkan 80,610.00

P307 BH PEMASANGAN GATE VALVE Ø 100 MM Harga per 1 BH ….. Rp. 101,030.00
Mandor 0.0119 Org 130,000.00 1,547.00
Tukang pipa terampil 0.1190 Org 120,000.00 14,280.00
Pekerja Terampil 0.2380 Org 100,000.00 23,800.00
Pekerja Setengah Terampil 0.2380 Org 90,000.00 21,420.00
Alat bantu 0.1190 set 85,000.00 10,115.00
Beton Tumbuk 1:3:5 (A022) 0.0338 m³ 883,700.00 29,869.06
Jumlah 101,031.06
Dibulatkan 101,030.00

P308 BH PEMASANGAN GATE VALVE Ø 150 MM Harga per 1 BH ….. Rp. 143,550.00
Mandor 0.0142 Org 130,000.00 1,846.00
Tukang pipa terampil 0.1428 Org 120,000.00 17,136.00
Pekerja Terampil 0.2857 Org 100,000.00 28,570.00
Pekerja Setengah Terampil 0.2857 Org 90,000.00 25,713.00
Alat bantu 0.1428 set 85,000.00 12,138.00
Beton Tumbuk 1:3:5 (A022) 0.0658 m³ 883,700.00 58,147.46
Jumlah 143,550.46
Dibulatkan 143,550.00

P309 BH PEMASANGAN GATE VALVE Ø 200 MM Harga per 1 BH ….. Rp. 184,320.00
Mandor 0.0158 Org 130,000.00 2,054.00
Tukang pipa terampil 0.1587 Org 120,000.00 19,044.00
Pekerja Terampil 0.3174 Org 100,000.00 31,740.00
Pekerja Setengah Terampil 0.3174 Org 90,000.00 28,566.00
Alat bantu 0.1587 set 85,000.00 13,489.50
Beton Tumbuk 1:3:5 (A022) 0.1012 m³ 883,700.00 89,430.44
Jumlah 184,323.94
Dibulatkan 184,320.00
P310 BH PEMASANGAN GATE VALVE Ø250 MM Harga per 1 BH ….. Rp. 268,300.00
Mandor 0.0178 Org 130,000.00 2,314.00
Tukang pipa terampil 0.1785 Org 120,000.00 21,420.00
Pekerja Terampil 0.3571 Org 100,000.00 35,710.00
Pekerja Setengah Terampil 0.3571 Org 90,000.00 32,139.00
Alat bantu 0.1785 set 85,000.00 15,172.50
Beton Tumbuk 1:3:5 (A022) 0.1828 m³ 883,700.00 161,540.36
Jumlah 268,295.86
Dibulatkan 268,300.00

P311 BH PEMASANGAN GATE VALVE Ø 300 MM Harga per 1 BH ….. Rp. 312,780.00
Mandor 0.0200 Org 130,000.00 2,600.00
Tukang pipa terampil 0.2000 Org 120,000.00 24,000.00
Pekerja Terampil 0.4000 Org 100,000.00 40,000.00
Pekerja Setengah Terampil 0.4000 Org 90,000.00 36,000.00
Alat bantu 0.2000 set 85,000.00 17,000.00
Beton Tumbuk 1:3:5 (A022) 0.2186 m³ 883,700.00 193,176.82
Jumlah 312,776.82
Dibulatkan 312,780.00

P312 BH PEMASANGAN GATE VALVE Ø 400 MM Harga per 1 BH ….. Rp. 408,160.00
Mandor 0.0250 Org 130,000.00 3,250.00
Tukang pipa terampil 0.2500 Org 120,000.00 30,000.00
Pekerja Terampil 0.5000 Org 100,000.00 50,000.00
Pekerja Setengah Terampil 0.5000 Org 90,000.00 45,000.00
Alat bantu 0.2500 set 85,000.00 21,250.00
Beton Tumbuk 1:3:5 (A022) 0.2927 m³ 883,700.00 258,658.99
Jumlah 408,158.99
Dibulatkan 408,160.00

P313 BH PEMASANGAN GATE VALVE Ø 500 MM Harga per 1 BH ….. Rp. 546,340.00
Mandor 0.0333 Org 130,000.00 4,329.00
Tukang pipa terampil 0.3333 Org 120,000.00 39,996.00
Pekerja Terampil 0.6666 Org 100,000.00 66,660.00
Pekerja Setengah Terampil 0.6666 Org 90,000.00 59,994.00
Alat bantu 0.3333 set 85,000.00 28,330.50
Beton Tumbuk 1:3:5 (A022) 0.3927 m³ 883,700.00 347,028.99
Jumlah 546,338.49
Dibulatkan 546,340.00

P314 BH PEMASANGAN FLANGE SOCKET Ø 50 MM Harga per 1 BH ….. Rp. 21,350.00


Mandor 0.0036 Org 130,000.00 468.00
Tukang pipa terampil 0.0357 Org 120,000.00 4,284.00
Pekerja Terampil 0.0714 Org 100,000.00 7,140.00
Pekerja Setengah Terampil 0.0714 Org 90,000.00 6,426.00
Alat bantu 0.0357 set 85,000.00 3,034.50
Jumlah 21,352.50
Dibulatkan 21,350.00

P315 BH PEMASANGAN FLANGE SOCKET Ø 75 MM Harga per 1 BH ….. Rp. 28,470.00


Mandor 0.0048 Org 130,000.00 624.00
Tukang pipa terampil 0.0476 Org 120,000.00 5,712.00
Pekerja Terampil 0.0952 Org 100,000.00 9,520.00
Pekerja Setengah Terampil 0.0952 Org 90,000.00 8,568.00
Alat bantu 0.0476 set 85,000.00 4,046.00
Jumlah 28,470.00
Dibulatkan 28,470.00

P316 BH PEMASANGAN FLANGE SOCKET Ø 100 MM Harga per 1 BH ….. Rp. 35,590.00
Mandor 0.0060 Org 130,000.00 780.00
Tukang pipa terampil 0.0595 Org 120,000.00 7,140.00
Pekerja Terampil 0.1190 Org 100,000.00 11,900.00
Pekerja Setengah Terampil 0.1190 Org 90,000.00 10,710.00
Alat bantu 0.0595 set 85,000.00 5,057.50
Jumlah 35,587.50
Dibulatkan 35,590.00

P317 BH PEMASANGAN FLANGE SOCKET Ø 150 MM Harga per 1 BH ….. Rp. 42,710.00
Mandor 0.0071 Org 130,000.00 923.00
Tukang pipa terampil 0.0714 Org 120,000.00 8,568.00
Pekerja Terampil 0.1429 Org 100,000.00 14,290.00
Pekerja Setengah Terampil 0.1429 Org 90,000.00 12,861.00
Alat bantu 0.0714 set 85,000.00 6,069.00
Jumlah 42,711.00
Dibulatkan 42,710.00

P318 BH PEMASANGAN FLANGE SOCKET Ø 200 MM Harga per 1 BH ….. Rp. 47,460.00
Mandor 0.0079 Org 130,000.00 1,027.00
Tukang pipa terampil 0.0794 Org 120,000.00 9,528.00
Pekerja Terampil 0.1587 Org 100,000.00 15,870.00
Pekerja Setengah Terampil 0.1587 Org 90,000.00 14,283.00
Alat bantu 0.0794 set 85,000.00 6,749.00
Jumlah 47,457.00
Dibulatkan 47,460.00

P319 BH PEMASANGAN FLANGE SOCKET Ø 250 MM Harga per 1 BH ….. Rp. 53,400.00
Mandor 0.0089 Org 130,000.00 1,157.00
Tukang pipa terampil 0.0893 Org 120,000.00 10,716.00
Pekerja Terampil 0.1786 Org 100,000.00 17,860.00
Pekerja Setengah Terampil 0.1786 Org 90,000.00 16,074.00
Alat bantu 0.0893 set 85,000.00 7,590.50
Jumlah 53,397.50
Dibulatkan 53,400.00

P320 BH PEMASANGAN FLANGE SOCKET Ø 300 MM Harga per 1 BH ….. Rp. 59,800.00
Mandor 0.0100 Org 130,000.00 1,300.00
Tukang pipa terampil 0.1000 Org 120,000.00 12,000.00
Pekerja Terampil 0.2000 Org 100,000.00 20,000.00
Pekerja Setengah Terampil 0.2000 Org 90,000.00 18,000.00
Alat bantu 0.1000 set 85,000.00 8,500.00
Jumlah 59,800.00
Dibulatkan 59,800.00

P321 BH PEMASANGAN FLANGE SOCKET Ø 400 MM Harga per 1 BH ….. Rp. 74,750.00
Mandor 0.0125 Org 130,000.00 1,625.00
Tukang pipa terampil 0.1250 Org 120,000.00 15,000.00
Pekerja Terampil 0.2500 Org 100,000.00 25,000.00
Pekerja Setengah Terampil 0.2500 Org 90,000.00 22,500.00
Alat bantu 0.1250 set 85,000.00 10,625.00
Jumlah 74,750.00
Dibulatkan 74,750.00

P322 BH PEMASANGAN FLANGE SOCKET Ø 500 MM Harga per 1 BH ….. Rp. 99,670.00
Mandor 0.0167 Org 130,000.00 2,171.00
Tukang pipa terampil 0.1667 Org 120,000.00 20,004.00
Pekerja Terampil 0.3333 Org 100,000.00 33,330.00
Pekerja Setengah Terampil 0.3333 Org 90,000.00 29,997.00
Alat bantu 0.1667 set 85,000.00 14,169.50
Jumlah 99,671.50
Dibulatkan 99,670.00

P323 BH PEMASANGAN STREET POOTH SMALL Harga per 1 BH ….. Rp. 98,630.00
Mandor 0.0071 Org 130,000.00 923.00
Tukang pipa terampil 0.0714 Org 120,000.00 8,568.00
Pekerja Setengah Terampil 0.1428 Org 90,000.00 12,852.00
Pipa PVC AW dia. 100 mm 1.0000 M¹ 57,570.00 57,570.00
Alat bantu 0.0071 set 85,000.00 603.50
Beton Tumbuk 1:3:5 0.0205 m³ 883,700.00 18,115.85
Jumlah 98,632.35
Dibulatkan 98,630.00

P324 BH PEMASANGAN STREET POOTH MEDIUM Harga per 1 BH ….. Rp. 105,880.00
Mandor 0.0071 Org 130,000.00 923.00
Tukang pipa terampil 0.0714 Org 120,000.00 8,568.00
Pekerja Setengah Terampil 0.1428 Org 90,000.00 12,852.00
Pipa PVC AW dia. 100 mm 1.0000 M¹ 57,570.00 57,570.00
Alat bantu 0.0071 set 85,000.00 603.50
Beton Tumbuk 1:3:5 0.0287 m³ 883,700.00 25,362.19
Jumlah 105,878.69
Dibulatkan 105,880.00

P325 BH PEMASANGAN STREET POOTH LARGE Harga per 1 BH ….. Rp. 120,810.00
Mandor 0.0071 Org 130,000.00 923.00
Tukang pipa terampil 0.0714 Org 120,000.00 8,568.00
Pekerja Setengah Terampil 0.1428 Org 90,000.00 12,852.00
Pipa PVC AW dia. 100 mm 1.0000 M¹ 57,570.00 57,570.00
Alat bantu 0.0071 set 85,000.00 603.50
Beton Tumbuk 1:3:5 0.0456 m³ 883,700.00 40,296.72
Jumlah 120,813.22
Dibulatkan 120,810.00

P326 BH PEMASANGAN GIBOULT JOINT Ø 50 MM Harga per 1 BH ….. Rp. 21,340.00


Mandor 0.0035 Org 130,000.00 455.00
Tukang pipa terampil 0.0357 Org 120,000.00 4,284.00
Pekerja Terampil 0.0714 Org 100,000.00 7,140.00
Pekerja Setengah Terampil 0.0714 Org 90,000.00 6,426.00
Alat bantu 0.0357 set 85,000.00 3,034.50
Jumlah 21,339.50
Dibulatkan 21,340.00

P327 BH PEMASANGAN GIBOULT JOINT Ø75 MM Harga per 1 BH ….. Rp. 28,460.00
Mandor 0.0047 Org 130,000.00 611.00
Tukang pipa terampil 0.0476 Org 120,000.00 5,712.00
Pekerja Terampil 0.0952 Org 100,000.00 9,520.00
Pekerja Setengah Terampil 0.0952 Org 90,000.00 8,568.00
Alat bantu 0.0476 set 85,000.00 4,046.00
Jumlah 28,457.00
Dibulatkan 28,460.00

P328 BH PEMASANGAN GIBOULT JOINT Ø 100 MM Harga per 1 BH ….. Rp. 35,570.00
Mandor 0.0059 Org 130,000.00 767.00
Tukang pipa terampil 0.0595 Org 120,000.00 7,140.00
Pekerja Terampil 0.1190 Org 100,000.00 11,900.00
Pekerja Setengah Terampil 0.1190 Org 90,000.00 10,710.00
Alat bantu 0.0595 set 85,000.00 5,057.50
Jumlah 35,574.50
Dibulatkan 35,570.00

P329 BH PEMASANGAN GIBOULT JOINT Ø 150 MM Harga per 1 BH ….. Rp. 42,690.00
Mandor 0.0071 Org 130,000.00 923.00
Tukang pipa terampil 0.0714 Org 120,000.00 8,568.00
Pekerja Terampil 0.1428 Org 100,000.00 14,280.00
Pekerja Setengah Terampil 0.1428 Org 90,000.00 12,852.00
Alat bantu 0.0714 set 85,000.00 6,069.00
Jumlah 42,692.00
Dibulatkan 42,690.00

P330 BH PEMASANGAN GIBOULT JOINT Ø200 MM Harga per 1 BH ….. Rp. 56,930.00
Mandor 0.0095 Org 130,000.00 1,235.00
Tukang pipa terampil 0.0952 Org 120,000.00 11,424.00
Pekerja Terampil 0.1904 Org 100,000.00 19,040.00
Pekerja Setengah Terampil 0.1904 Org 90,000.00 17,136.00
Alat bantu 0.0952 set 85,000.00 8,092.00
Jumlah 56,927.00
Dibulatkan 56,930.00

P331 BH PEMASANGAN GIBOULT JOINT Ø 250 MM Harga per 1 BH ….. Rp. 71,160.00
Mandor 0.0119 Org 130,000.00 1,547.00
Tukang pipa terampil 0.1190 Org 120,000.00 14,280.00
Pekerja Terampil 0.2380 Org 100,000.00 23,800.00
Pekerja Setengah Terampil 0.2380 Org 90,000.00 21,420.00
Alat bantu 0.1190 set 85,000.00 10,115.00
Jumlah 71,162.00
Dibulatkan 71,160.00

P332 BH PEMASANGAN GIBOULT JOINT Ø 300 MM Harga per 1 BH ….. Rp. 85,400.00
Mandor 0.0142 Org 130,000.00 1,846.00
Tukang pipa terampil 0.1428 Org 120,000.00 17,136.00
Pekerja Terampil 0.2857 Org 100,000.00 28,570.00
Pekerja Setengah Terampil 0.2857 Org 90,000.00 25,713.00
Alat bantu 0.1428 set 85,000.00 12,138.00
Jumlah 85,403.00
Dibulatkan 85,400.00

P333 BH PEMASANGAN GIBOULT JOINT Ø 400 MM Harga per 1 BH ….. Rp. 108,710.00
Mandor 0.0181 Org 130,000.00 2,353.00
Tukang pipa terampil 0.1818 Org 120,000.00 21,816.00
Pekerja Terampil 0.3636 Org 100,000.00 36,360.00
Pekerja Setengah Terampil 0.3636 Org 90,000.00 32,724.00
Alat bantu 0.1818 set 85,000.00 15,453.00
Jumlah 108,706.00
Dibulatkan 108,710.00

P334 BH PEMASANGAN CLAMP SADLE Ø 50 MM Harga per 1 BH ….. Rp. 14,220.00


Mandor 0.0023 Org 130,000.00 299.00
Tukang pipa terampil 0.0238 Org 120,000.00 2,856.00
Pekerja Terampil 0.0476 Org 100,000.00 4,760.00
Pekerja Setengah Terampil 0.0476 Org 90,000.00 4,284.00
Alat bantu 0.0238 set 85,000.00 2,023.00
Jumlah 14,222.00
Dibulatkan 14,220.00

P335 BH PEMASANGAN CLAMP SADLE Ø 75 MM Harga per 1 BH ….. Rp. 20,590.00


Mandor 0.0034 Org 130,000.00 442.00
Tukang pipa terampil 0.0344 Org 120,000.00 4,128.00
Pekerja Terampil 0.0689 Org 100,000.00 6,890.00
Pekerja Setengah Terampil 0.0689 Org 90,000.00 6,201.00
Alat bantu 0.0344 set 85,000.00 2,924.00
Jumlah 20,585.00
Dibulatkan 20,590.00

P336 BH PEMASANGAN CLAMP SADLE Ø 100 MM Harga per 1 BH ….. Rp. 28,460.00
Mandor 0.0047 Org 130,000.00 611.00
Tukang pipa terampil 0.0476 Org 120,000.00 5,712.00
Pekerja Terampil 0.0952 Org 100,000.00 9,520.00
Pekerja Setengah Terampil 0.0952 Org 90,000.00 8,568.00
Alat bantu 0.0476 set 85,000.00 4,046.00
Jumlah 28,457.00
Dibulatkan 28,460.00

P337 BH PEMASANGAN CLAMP SADLE Ø 150 MM Harga per 1 BH ….. Rp. 35,570.00
Mandor 0.0059 Org 130,000.00 767.00
Tukang pipa terampil 0.0595 Org 120,000.00 7,140.00
Pekerja Terampil 0.1190 Org 100,000.00 11,900.00
Pekerja Setengah Terampil 0.1190 Org 90,000.00 10,710.00
Alat bantu 0.0595 set 85,000.00 5,057.50
Jumlah 35,574.50
Dibulatkan 35,570.00

P338 BH PEMASANGAN CLAMP SADLE Ø 200 MM Harga per 1 BH ….. Rp. 45,970.00
Mandor 0.0076 Org 130,000.00 988.00
Tukang pipa terampil 0.0769 Org 120,000.00 9,228.00
Pekerja Terampil 0.1538 Org 100,000.00 15,380.00
Pekerja Setengah Terampil 0.1538 Org 90,000.00 13,842.00
Alat bantu 0.0769 set 85,000.00 6,536.50
Jumlah 45,974.50
Dibulatkan 45,970.00

P339 BH PEMASANGAN CLAMP SADLE Ø 250 MM Harga per 1 BH ….. Rp. 50,640.00
Mandor 0.0084 Org 130,000.00 1,092.00
Tukang pipa terampil 0.0847 Org 120,000.00 10,164.00
Pekerja Terampil 0.1694 Org 100,000.00 16,940.00
Pekerja Setengah Terampil 0.1694 Org 90,000.00 15,246.00
Alat bantu 0.0847 set 85,000.00 7,199.50
Jumlah 50,641.50
Dibulatkan 50,640.00

P340 BH PEMASANGAN CLAMP SADLE Ø300 MM Harga per 1 BH ….. Rp. 66,440.00
Mandor 0.0111 Org 130,000.00 1,443.00
Tukang pipa terampil 0.1111 Org 120,000.00 13,332.00
Pekerja Terampil 0.2222 Org 100,000.00 22,220.00
Pekerja Setengah Terampil 0.2222 Org 90,000.00 19,998.00
Alat bantu 0.1111 set 85,000.00 9,443.50
Jumlah 66,436.50
Dibulatkan 66,440.00

P341 BH PEMASANGAN CLAMP SADLE Ø 400 MM Harga per 1 BH ….. Rp. 93,420.00
Mandor 0.0156 Org 130,000.00 2,028.00
Tukang pipa terampil 0.1562 Org 120,000.00 18,744.00
Pekerja Terampil 0.3125 Org 100,000.00 31,250.00
Pekerja Setengah Terampil 0.3125 Org 90,000.00 28,125.00
Alat bantu 0.1562 set 85,000.00 13,277.00
Jumlah 93,424.00
Dibulatkan 93,420.00

P342 BH PEMASANGAN FLANGE LAS Ø 50 MM Harga per 1 BH ….. Rp. 82,870.00


Mandor 0.0033 Org 130,000.00 429.00
Tukang pipa terampil 0.0333 Org 120,000.00 3,996.00
Pekerja Terampil 0.0666 Org 100,000.00 6,660.00
Pekerja Setengah Terampil 0.0666 Org 90,000.00 5,994.00
Alat bantu 0.0333 set 85,000.00 2,830.50
Pengelasan 15.7000 cm 4,010.00 62,957.00
Jumlah 82,866.50
Dibulatkan 82,870.00

P343 BH PEMASANGAN FLANGE LAS Ø 75 MM Harga per 1 BH ….. Rp. 118,360.00


Mandor 0.0040 Org 130,000.00 520.00
Tukang pipa terampil 0.0400 Org 120,000.00 4,800.00
Pekerja Terampil 0.0800 Org 100,000.00 8,000.00
Pekerja Setengah Terampil 0.0800 Org 90,000.00 7,200.00
Alat bantu 0.0400 set 85,000.00 3,400.00
Pengelasan 23.5500 cm 4,010.00 94,435.50
Jumlah 118,355.50
Dibulatkan 118,360.00

P344 BH PEMASANGAN FLANGE LAS Ø 100 MM Harga per 1 BH ….. Rp. 154,370.00
Mandor 0.0047 Org 130,000.00 611.00
Tukang pipa terampil 0.0476 Org 120,000.00 5,712.00
Pekerja Terampil 0.0952 Org 100,000.00 9,520.00
Pekerja Setengah Terampil 0.0952 Org 90,000.00 8,568.00
Alat bantu 0.0476 set 85,000.00 4,046.00
Pengelasan 31.4000 cm 4,010.00 125,914.00
Jumlah 154,371.00
Dibulatkan 154,370.00

P345 BH PEMASANGAN FLANGE LAS Ø 150 MM Harga per 1 BH ….. Rp. 231,560.00
Mandor 0.0071 Org 130,000.00 923.00
Tukang pipa terampil 0.0714 Org 120,000.00 8,568.00
Pekerja Terampil 0.1428 Org 100,000.00 14,280.00
Pekerja Setengah Terampil 0.1428 Org 90,000.00 12,852.00
Alat bantu 0.0714 set 85,000.00 6,069.00
Pengelasan 47.1000 cm 4,010.00 188,871.00
Jumlah 231,563.00
Dibulatkan 231,560.00

P346 BH PEMASANGAN FLANGE LAS Ø 200 MM Harga per 1 BH ….. Rp. 308,760.00
Mandor 0.0095 Org 130,000.00 1,235.00
Tukang pipa terampil 0.0952 Org 120,000.00 11,424.00
Pekerja Terampil 0.1904 Org 100,000.00 19,040.00
Pekerja Setengah Terampil 0.1904 Org 90,000.00 17,136.00
Alat bantu 0.0952 set 85,000.00 8,092.00
Pengelasan 62.8000 cm 4,010.00 251,828.00
Jumlah 308,755.00
Dibulatkan 308,760.00

P347 BH PEMASANGAN FLANGE LAS Ø 250 MM Harga per 1 BH ….. Rp. 406,750.00
Mandor 0.0153 Org 130,000.00 1,989.00
Tukang pipa terampil 0.1538 Org 120,000.00 18,456.00
Pekerja Terampil 0.3076 Org 100,000.00 30,760.00
Pekerja Setengah Terampil 0.3076 Org 90,000.00 27,684.00
Alat bantu 0.1538 set 85,000.00 13,073.00
Pengelasan 78.5000 cm 4,010.00 314,785.00
Jumlah 406,747.00
Dibulatkan 406,750.00

P348 BH PEMASANGAN FLANGE LAS Ø 300 MM Harga per 1 BH ….. Rp. 497,340.00
Mandor 0.0200 Org 130,000.00 2,600.00
Tukang pipa terampil 0.2000 Org 120,000.00 24,000.00
Pekerja Terampil 0.4000 Org 100,000.00 40,000.00
Pekerja Setengah Terampil 0.4000 Org 90,000.00 36,000.00
Alat bantu 0.2000 set 85,000.00 17,000.00
Pengelasan 94.2000 cm 4,010.00 377,742.00
Jumlah 497,342.00
Dibulatkan 497,340.00

P349 BH PEMASANGAN FLANGE LAS Ø 400 MM Harga per 1 BH ….. Rp. 653,160.00
Mandor 0.0250 Org 130,000.00 3,250.00
Tukang pipa terampil 0.2500 Org 120,000.00 30,000.00
Pekerja Terampil 0.5000 Org 100,000.00 50,000.00
Pekerja Setengah Terampil 0.5000 Org 90,000.00 45,000.00
Alat bantu 0.2500 set 85,000.00 21,250.00
Pengelasan 125.6000 cm 4,010.00 503,656.00
Jumlah 653,156.00
Dibulatkan 653,160.00

P350 BH PEMASANGAN FLANGE LAS Ø 500 MM Harga per 1 BH ….. Rp. 828,880.00
Mandor 0.0333 Org 130,000.00 4,329.00
Tukang pipa terampil 0.3333 Org 120,000.00 39,996.00
Pekerja Terampil 0.6666 Org 100,000.00 66,660.00
Pekerja Setengah Terampil 0.6666 Org 90,000.00 59,994.00
Alat bantu 0.3333 set 85,000.00 28,330.50
Pengelasan 157.0000 cm 4,010.00 629,570.00
Jumlah 828,879.50
Dibulatkan 828,880.00

P351 BH PEMASANGAN FLANGE LAS Ø 600 MM Harga per 1 BH ….. Rp. 1,054,480.00
Mandor 0.0500 Org 130,000.00 6,500.00
Tukang pipa terampil 0.5000 Org 120,000.00 60,000.00
Pekerja Terampil 1.0000 Org 100,000.00 100,000.00
Pekerja Setengah Terampil 1.0000 Org 90,000.00 90,000.00
Alat bantu 0.5000 set 85,000.00 42,500.00
Pengelasan 188.4000 cm 4,010.00 755,484.00
Jumlah 1,054,484.00
Dibulatkan 1,054,480.00

P352 BH PAS. ALL FLANGE TEE Ø 50 MM Harga per 1 BH ….. Rp. 53,560.00
Mandor 0.0071 Org 130,000.00 923.00
Tukang pipa terampil 0.0714 Org 120,000.00 8,568.00
Pekerja Terampil 0.1428 Org 100,000.00 14,280.00
Pekerja Setengah Terampil 0.1428 Org 90,000.00 12,852.00
Alat bantu 0.0714 set 85,000.00 6,069.00
Beton Tumbuk 1:3:5 (A022) 0.0123 m³ 883,700.00 10,869.51
Jumlah 53,561.51
Dibulatkan 53,560.00

P353 BH PAS. ALL FLANGE TEE Ø 75 MM Harga per 1 BH ….. Rp. 73,010.00
Mandor 0.0095 Org 130,000.00 1,235.00
Tukang pipa terampil 0.0952 Org 120,000.00 11,424.00
Pekerja Terampil 0.1904 Org 100,000.00 19,040.00
Pekerja Setengah Terampil 0.1904 Org 90,000.00 17,136.00
Alat bantu 0.0952 set 85,000.00 8,092.00
Beton Tumbuk 1:3:5 (A022) 0.0182 m³ 883,700.00 16,083.34
Jumlah 73,010.34
Dibulatkan 73,010.00

P354 BH PAS. ALL FLANGE TEE Ø 100 MM Harga per 1 BH ….. Rp. 109,430.00
Mandor 0.0119 Org 130,000.00 1,547.00
Tukang pipa terampil 0.1190 Org 120,000.00 14,280.00
Pekerja Terampil 0.2380 Org 100,000.00 23,800.00
Pekerja Setengah Terampil 0.2380 Org 90,000.00 21,420.00
Alat bantu 0.1190 set 85,000.00 10,115.00
Beton Tumbuk 1:3:5 (A022) 0.0433 m³ 883,700.00 38,264.21
Jumlah 109,426.21
Dibulatkan 109,430.00

P355 BH PAS. ALL FLANGE TEE Ø 150 MM Harga per 1 BH ….. Rp. 163,430.00
Mandor 0.0142 Org 130,000.00 1,846.00
Tukang pipa terampil 0.1428 Org 120,000.00 17,136.00
Pekerja Terampil 0.2857 Org 100,000.00 28,570.00
Pekerja Setengah Terampil 0.2857 Org 90,000.00 25,713.00
Alat bantu 0.1428 set 85,000.00 12,138.00
Beton Tumbuk 1:3:5 (A022) 0.0883 m³ 883,700.00 78,030.71
Jumlah 163,433.71
Dibulatkan 163,430.00

P356 BH PAS. ALL FLANGE TEE Ø200 MM Harga per 1 BH ….. Rp. 250,510.00
Mandor 0.0158 Org 130,000.00 2,054.00
Tukang pipa terampil 0.1587 Org 120,000.00 19,044.00
Pekerja Terampil 0.3174 Org 100,000.00 31,740.00
Pekerja Setengah Terampil 0.3174 Org 90,000.00 28,566.00
Alat bantu 0.1587 set 85,000.00 13,489.50
Beton Tumbuk 1:3:5 (A022) 0.1761 m³ 883,700.00 155,619.57
Jumlah 250,513.07
Dibulatkan 250,510.00

P357 BH PAS. ALL FLANGE TEE Ø 250 MM Harga per 1 BH ….. Rp. 400,320.00
Mandor 0.0178 Org 130,000.00 2,314.00
Tukang pipa terampil 0.1785 Org 120,000.00 21,420.00
Pekerja Terampil 0.3571 Org 100,000.00 35,710.00
Pekerja Setengah Terampil 0.3571 Org 90,000.00 32,139.00
Alat bantu 0.1785 set 85,000.00 15,172.50
Beton Tumbuk 1:3:5 (A022) 0.3322 m³ 883,700.00 293,565.14
Jumlah 400,320.64
Dibulatkan 400,320.00

P358 BH PAS. ALL FLANGE TEE Ø 300 MM Harga per 1 BH ….. Rp. 622,160.00
Mandor 0.0200 Org 130,000.00 2,600.00
Tukang pipa terampil 0.2000 Org 120,000.00 24,000.00
Pekerja Terampil 0.4000 Org 100,000.00 40,000.00
Pekerja Setengah Terampil 0.4000 Org 90,000.00 36,000.00
Alat bantu 0.2000 set 85,000.00 17,000.00
Beton Tumbuk 1:3:5 (A022) 0.5687 m³ 883,700.00 502,560.19
Jumlah 622,160.19
Dibulatkan 622,160.00

P359 BH PAS. ALL FLANGE TEE Ø400 MM Harga per 1 BH ….. Rp. 843,200.00
Mandor 0.0250 Org 130,000.00 3,250.00
Tukang pipa terampil 0.2500 Org 120,000.00 30,000.00
Pekerja Terampil 0.5000 Org 100,000.00 50,000.00
Pekerja Setengah Terampil 0.5000 Org 90,000.00 45,000.00
Alat bantu 0.2500 set 85,000.00 21,250.00
Beton Tumbuk 1:3:5 (A022) 0.7850 m³ 883,700.00 693,704.50
Jumlah 843,204.50
Dibulatkan 843,200.00

P360 BH PAS. ALL FLANGE TEE Ø500 MM Harga per 1 BH ….. Rp. 1,019,940.00
Mandor 0.0250 Org 130,000.00 3,250.00
Tukang pipa terampil 0.2500 Org 120,000.00 30,000.00
Pekerja Terampil 0.5000 Org 100,000.00 50,000.00
Pekerja Setengah Terampil 0.5000 Org 90,000.00 45,000.00
Alat bantu 0.2500 set 85,000.00 21,250.00
Beton Tumbuk 1:3:5 (A022) 0.9850 m³ 883,700.00 870,444.50
Jumlah 1,019,944.50
Dibulatkan 1,019,940.00

P361 BH PAS. ALL FLENGE BEND Ø 50 MM Harga per 1 BH ….. Rp. 56,840.00
Mandor 0.0076 Org 130,000.00 988.00
Tukang pipa terampil 0.0769 Org 120,000.00 9,228.00
Pekerja Terampil 0.1538 Org 100,000.00 15,380.00
Pekerja Setengah Terampil 0.1538 Org 90,000.00 13,842.00
Alat bantu 0.0769 set 85,000.00 6,536.50
Beton Tumbuk 1:3:5 (A022) 0.0123 m³ 883,700.00 10,869.51
Jumlah 56,844.01
Dibulatkan 56,840.00

P362 BH PAS. ALL FLENGE BEND Ø 75 MM Harga per 1 BH ….. Rp. 75,880.00
Mandor 0.0100 Org 130,000.00 1,300.00
Tukang pipa terampil 0.1000 Org 120,000.00 12,000.00
Pekerja Terampil 0.2000 Org 100,000.00 20,000.00
Pekerja Setengah Terampil 0.2000 Org 90,000.00 18,000.00
Alat bantu 0.1000 set 85,000.00 8,500.00
Beton Tumbuk 1:3:5 (A022) 0.0182 m³ 883,700.00 16,083.34
Jumlah 75,883.34
Dibulatkan 75,880.00
P363 BH PAS. ALL FLENGE BEND Ø 100 MM Harga per 1 BH ….. Rp. 113,010.00
Mandor 0.0125 Org 130,000.00 1,625.00
Tukang pipa terampil 0.1250 Org 120,000.00 15,000.00
Pekerja Terampil 0.2500 Org 100,000.00 25,000.00
Pekerja Setengah Terampil 0.2500 Org 90,000.00 22,500.00
Alat bantu 0.1250 set 85,000.00 10,625.00
Beton Tumbuk 1:3:5 (A022) 0.0433 m³ 883,700.00 38,264.21
Jumlah 113,014.21
Dibulatkan 113,010.00

P364 BH PAS. ALL FLENGE BEND Ø 150 MM Harga per 1 BH ….. Rp. 163,430.00
Mandor 0.0142 Org 130,000.00 1,846.00
Tukang pipa terampil 0.1428 Org 120,000.00 17,136.00
Pekerja Terampil 0.2857 Org 100,000.00 28,570.00
Pekerja Setengah Terampil 0.2857 Org 90,000.00 25,713.00
Alat bantu 0.1428 set 85,000.00 12,138.00
Beton Tumbuk 1:3:5 (A022) 0.0883 m³ 883,700.00 78,030.71
Jumlah 163,433.71
Dibulatkan 163,430.00

P365 BH PAS. ALL FLENGE BEND Ø 200 MM Harga per 1 BH ….. Rp. 255,260.00
Mandor 0.0166 Org 130,000.00 2,158.00
Tukang pipa terampil 0.1666 Org 120,000.00 19,992.00
Pekerja Terampil 0.3333 Org 100,000.00 33,330.00
Pekerja Setengah Terampil 0.3333 Org 90,000.00 29,997.00
Alat bantu 0.1666 set 85,000.00 14,161.00
Beton Tumbuk 1:3:5 (A022) 0.1761 m³ 883,700.00 155,619.57
Jumlah 255,257.57
Dibulatkan 255,260.00

P366 BH PAS. ALL FLENGE BEND Ø 250 MM Harga per 1 BH ….. Rp. 426,440.00
Mandor 0.0222 Org 130,000.00 2,886.00
Tukang pipa terampil 0.2222 Org 120,000.00 26,664.00
Pekerja Terampil 0.4444 Org 100,000.00 44,440.00
Pekerja Setengah Terampil 0.4444 Org 90,000.00 39,996.00
Alat bantu 0.2222 set 85,000.00 18,887.00
Beton Tumbuk 1:3:5 (A022) 0.3322 m³ 883,700.00 293,565.14
Jumlah 426,438.14
Dibulatkan 426,440.00

P367 BH PAS. ALL FLENGE BEND Ø 300 MM Harga per 1 BH ….. Rp. 652,060.00
Mandor 0.0250 Org 130,000.00 3,250.00
Tukang pipa terampil 0.2500 Org 120,000.00 30,000.00
Pekerja Terampil 0.5000 Org 100,000.00 50,000.00
Pekerja Setengah Terampil 0.5000 Org 90,000.00 45,000.00
Alat bantu 0.2500 set 85,000.00 21,250.00
Beton Tumbuk 1:3:5 (A022) 0.5687 m³ 883,700.00 502,560.19
Jumlah 652,060.19
Dibulatkan 652,060.00

P368 BH PAS. ALL FLENGE BEND Ø 400 MM Harga per 1 BH ….. Rp. 861,510.00
Mandor 0.0285 Org 130,000.00 3,705.00
Tukang pipa terampil 0.2857 Org 120,000.00 34,284.00
Pekerja Terampil 0.5714 Org 100,000.00 57,140.00
Pekerja Setengah Terampil 0.5714 Org 90,000.00 51,426.00
Alat bantu 0.2500 set 85,000.00 21,250.00
Beton Tumbuk 1:3:5 (A022) 0.7850 m³ 883,700.00 693,704.50
Jumlah 861,509.50
Dibulatkan 861,510.00

P369 BH PAS. ALL FLENGE BEND Ø 500 MM Harga per 1 BH ….. Rp. 1,038,250.00
Mandor 0.0285 Org 130,000.00 3,705.00
Tukang pipa terampil 0.2857 Org 120,000.00 34,284.00
Pekerja Terampil 0.5714 Org 100,000.00 57,140.00
Pekerja Setengah Terampil 0.5714 Org 90,000.00 51,426.00
Alat bantu 0.2500 set 85,000.00 21,250.00
Beton Tumbuk 1:3:5 (A022) 0.9850 m³ 883,700.00 870,444.50
Jumlah 1,038,249.50
Dibulatkan 1,038,250.00

P370 BH PAS. ALL FLANGE REDUCER Ø 50 MM Harga per 1 BH ….. Rp. 55,140.00
Mandor 0.0074 Org 130,000.00 962.00
Tukang pipa terampil 0.0740 Org 120,000.00 8,880.00
Pekerja Terampil 0.1481 Org 100,000.00 14,810.00
Pekerja Setengah Terampil 0.1481 Org 90,000.00 13,329.00
Alat bantu 0.0740 set 85,000.00 6,290.00
Beton Tumbuk 1:3:5 (A022) 0.0123 m³ 883,700.00 10,869.51
Jumlah 55,140.51
Dibulatkan 55,140.00

P371 BH PAS. ALL FLANGE REDUCER Ø 75 MM Harga per 1 BH ….. Rp. 70,430.00
Mandor 0.0090 Org 130,000.00 1,170.00
Tukang pipa terampil 0.0909 Org 120,000.00 10,908.00
Pekerja Terampil 0.1818 Org 100,000.00 18,180.00
Pekerja Setengah Terampil 0.1818 Org 90,000.00 16,362.00
Alat bantu 0.0909 set 85,000.00 7,726.50
Beton Tumbuk 1:3:5 (A022) 0.0182 m³ 883,700.00 16,083.34
Jumlah 70,429.84
Dibulatkan 70,430.00

P372 BH PAS. ALL FLANGE REDUCER Ø 100 MM Harga per 1 BH ….. Rp. 104,700.00
Mandor 0.0111 Org 130,000.00 1,443.00
Tukang pipa terampil 0.1111 Org 120,000.00 13,332.00
Pekerja Terampil 0.2222 Org 100,000.00 22,220.00
Pekerja Setengah Terampil 0.2222 Org 90,000.00 19,998.00
Alat bantu 0.1111 set 85,000.00 9,443.50
Beton Tumbuk 1:3:5 (A022) 0.0433 m³ 883,700.00 38,264.21
Jumlah 104,700.71
Dibulatkan 104,700.00

P373 BH PAS. ALL FLANGE REDUCER Ø 150 MM Harga per 1 BH ….. Rp. 152,780.00
Mandor 0.0125 Org 130,000.00 1,625.00
Tukang pipa terampil 0.1250 Org 120,000.00 15,000.00
Pekerja Terampil 0.2500 Org 100,000.00 25,000.00
Pekerja Setengah Terampil 0.2500 Org 90,000.00 22,500.00
Alat bantu 0.1250 set 85,000.00 10,625.00
Beton Tumbuk 1:3:5 (A022) 0.0883 m³ 883,700.00 78,030.71
Jumlah 152,780.71
Dibulatkan 152,780.00

P374 BH PAS. ALL FLANGE REDUCER Ø200 MM Harga per 1 BH ….. Rp. 241,020.00
Mandor 0.0142 Org 130,000.00 1,846.00
Tukang pipa terampil 0.1428 Org 120,000.00 17,136.00
Pekerja Terampil 0.2857 Org 100,000.00 28,570.00
Pekerja Setengah Terampil 0.2857 Org 90,000.00 25,713.00
Alat bantu 0.1428 set 85,000.00 12,138.00
Beton Tumbuk 1:3:5 (A022) 0.1761 m³ 883,700.00 155,619.57
Jumlah 241,022.57
Dibulatkan 241,020.00

P375 BH PAS. ALL FLANGE REDUCER Ø 250 MM Harga per 1 BH ….. Rp. 393,200.00
Mandor 0.0166 Org 130,000.00 2,158.00
Tukang pipa terampil 0.1666 Org 120,000.00 19,992.00
Pekerja Terampil 0.3333 Org 100,000.00 33,330.00
Pekerja Setengah Terampil 0.3333 Org 90,000.00 29,997.00
Alat bantu 0.1666 set 85,000.00 14,161.00
Beton Tumbuk 1:3:5 (A022) 0.3322 m³ 883,700.00 293,565.14
Jumlah 393,203.14
Dibulatkan 393,200.00

P376 BH PAS. ALL FLANGE REDUCER Ø 300 MM Harga per 1 BH ….. Rp. 622,160.00
Mandor 0.0200 Org 130,000.00 2,600.00
Tukang pipa terampil 0.2000 Org 120,000.00 24,000.00
Pekerja Terampil 0.4000 Org 100,000.00 40,000.00
Pekerja Setengah Terampil 0.4000 Org 90,000.00 36,000.00
Alat bantu 0.2000 set 85,000.00 17,000.00
Beton Tumbuk 1:3:5 (A022) 0.5687 m³ 883,700.00 502,560.19
Jumlah 622,160.19
Dibulatkan 622,160.00

P377 M' PAS. ALL FLANGE REDUCER Ø 400 MM Harga per 1 BH ….. Rp. 1,019,940.00
Mandor 0.0250 Org 130,000.00 3,250.00
Tukang pipa terampil 0.2500 Org 120,000.00 30,000.00
Pekerja Terampil 0.5000 Org 100,000.00 50,000.00
Pekerja Setengah Terampil 0.5000 Org 90,000.00 45,000.00
Alat bantu 0.2500 set 85,000.00 21,250.00
Beton Tumbuk 1:3:5 (A022) 0.9850 m³ 883,700.00 870,444.50
Jumlah 1,019,944.50
Dibulatkan 1,019,940.00

PEKERJAAN PEMASANGAN THRUST BLOCK TEE PVC


P378 BH Thrust Block Tee Ø 25 mm (Beton Tumbuk ad. 1:3:5 0.0100 m³/bh 883,700.00 8,837.00
P379 BH Thrust Block Tee Ø 40 mm (Beton Tumbuk ad. 1:3:5 0.0100 m³/bh 883,700.00 8,837.00
P380 BH Thrust Block Tee Ø 50 mm (Beton Tumbuk ad. 1:3:5 0.0100 m³/bh 883,700.00 8,837.00
P381 BH Thrust Block Tee Ø 75 mm (Beton Tumbuk ad. 1:3:5 0.0200 m³/bh 883,700.00 17,674.00
P382 BH Thrust Block Tee Ø 100 mm (Beton Tumbuk ad. 1:3:5 0.0400 m³/bh 883,700.00 35,348.00
P383 BH Thrust Block Tee Ø 150 mm (Beton Tumbuk ad. 1:3:5 0.0800 m³/bh 883,700.00 70,696.00
P384 BH Thrust Block Tee Ø 200 mm (Beton Tumbuk ad. 1:3:5 0.1800 m³/bh 883,700.00 159,066.00
P385 BH Thrust Block Tee Ø 250 mm (Beton Tumbuk ad. 1:3:5 0.3300 m³/bh 883,700.00 291,621.00
P386 BH Thrust Block Tee Ø 300 mm (Beton Tumbuk ad. 1:3:5 0.5700 m³/bh 883,700.00 503,709.00

PEKERJAAN PEMASANGAN THRUST BLOCK BEND 90° PVC


P387 BH Thrust Block Bend 90° Ø 25 mm (Beton Tumbuk ad. 1 0.0200 m³/bh 883,700.00 17,674.00
P388 BH Thrust Block Bend 90° Ø 40 mm (Beton Tumbuk ad. 1 0.0200 m³/bh 883,700.00 17,674.00
P389 BH Thrust Block Bend 90° Ø 50 mm (Beton Tumbuk ad. 1 0.0200 m³/bh 883,700.00 17,674.00
P390 BH Thrust Block Bend 90° Ø 75 mm (Beton Tumbuk ad. 1 0.0300 m³/bh 883,700.00 26,511.00
P391 BH Thrust Block Bend 90° Ø 100 mm (Beton Tumbuk ad. 0.0600 m³/bh 883,700.00 53,022.00
P392 BH Thrust Block Bend 90° Ø 150 mm (Beton Tumbuk ad. 0.1300 m³/bh 883,700.00 114,881.00
P393 BH Thrust Block Bend 90° Ø 200 mm (Beton Tumbuk ad. 0.2600 m³/bh 883,700.00 229,762.00
P394 BH Thrust Block Bend 90° Ø 250 mm (Beton Tumbuk ad. 0.4900 m³/bh 883,700.00 433,013.00
P395 BH Thrust Block Bend 90° Ø 300 mm (Beton Tumbuk ad. 0.9300 m³/bh 883,700.00 821,841.00

PEKERJAAN PEMASANGAN THRUST BLOCK BEND 45° PVC


P396 BH Thrust Block Bend 45°, 22,5°, 11.25° Ø 25 mm (Beto 0.0100 m³/bh 883,700.00 8,837.00
P397 BH Thrust Block Bend 45°, 22,5°, 11.25° Ø 40 mm (Beto 0.0100 m³/bh 883,700.00 8,837.00
P398 BH Thrust Block Bend 45°, 22,5°, 11.25° Ø 50 mm (Beto 0.0100 m³/bh 883,700.00 8,837.00
P399 BH Thrust Block Bend 45°, 22,5°, 11.25° Ø 75 mm (Beto 0.0100 m³/bh 883,700.00 8,837.00
P400 BH Thrust Block Bend 45°, 22,5°, 11.25° Ø 100 mm (Bet 0.0300 m³/bh 883,700.00 26,511.00
P401 BH Thrust Block Bend 45°, 22,5°, 11.25° Ø 150 mm (Bet 0.0600 m³/bh 883,700.00 53,022.00
P402 BH Thrust Block Bend 45°, 22,5°, 11.25° Ø 200 mm (Bet 0.1300 m³/bh 883,700.00 114,881.00
P403 BH Thrust Block Bend 45°, 22,5°, 11.25° Ø 250 mm (Bet 0.2400 m³/bh 883,700.00 212,088.00
P404 BH Thrust Block Bend 45°, 22,5°, 11.25° Ø 300 mm (Bet 0.4200 m³/bh 883,700.00 371,154.00

PEKERJAAN PEMASANGAN THRUST BLOCK REDUCER PVC


P405 BH Thrust Block Reducer Ø 25 mm (Beton Tumbuk ad. 1: 0.0100 m³/bh 883,700.00 8,837.00
P406 BH Thrust Block Reducer Ø 40 mm (Beton Tumbuk ad. 1: 0.0100 m³/bh 883,700.00 8,837.00
P407 BH Thrust Block Reducer Ø 50 mm (Beton Tumbuk ad. 1: 0.0100 m³/bh 883,700.00 8,837.00
P408 BH Thrust Block Reducer Ø 75 mm (Beton Tumbuk ad. 1: 0.0200 m³/bh 883,700.00 17,674.00
P409 BH Thrust Block Reducer Ø 100 mm (Beton Tumbuk ad. 1 0.0400 m³/bh 883,700.00 35,348.00
P410 BH Thrust Block Reducer Ø 150 mm (Beton Tumbuk ad. 1 0.0900 m³/bh 883,700.00 79,533.00
P411 BH Thrust Block Reducer Ø 200 mm (Beton Tumbuk ad. 1 0.1800 m³/bh 883,700.00 159,066.00
P412 BH Thrust Block Reducer Ø 250 mm (Beton Tumbuk ad. 1 0.3300 m³/bh 883,700.00 291,621.00
P413 BH Thrust Block Reducer Ø 300 mm (Beton Tumbuk ad. 1 0.5700 m³/bh 883,700.00 503,709.00

PEKERJAAN PEMASANGAN THRUST BLOCK DOP PVC


P414 BH Thrust Block Dop Ø 25 mm (Beton Tumbuk ad. 1:3:5 0.0100 m³/bh 883,700.00 8,837.00
P415 BH Thrust Block Dop Ø 40 mm (Beton Tumbuk ad. 1:3:5 0.0100 m³/bh 883,700.00 8,837.00
P416 BH Thrust Block Dop Ø 50 mm (Beton Tumbuk ad. 1:3:5 0.0100 m³/bh 883,700.00 8,837.00
P417 BH Thrust Block Dop Ø 75 mm (Beton Tumbuk ad. 1:3:5 0.0200 m³/bh 883,700.00 17,674.00
P418 BH Thrust Block Dop Ø 100 mm (Beton Tumbuk ad. 1:3:5 0.0400 m³/bh 883,700.00 35,348.00
P419 BH Thrust Block Dop Ø 150 mm (Beton Tumbuk ad. 1:3:5 0.0900 m³/bh 883,700.00 79,533.00
P420 BH Thrust Block Dop Ø 200 mm (Beton Tumbuk ad. 1:3:5 0.1800 m³/bh 883,700.00 159,066.00
P421 BH Thrust Block Dop Ø 250 mm (Beton Tumbuk ad. 1:3:5 0.3300 m³/bh 883,700.00 291,621.00
P422 BH Thrust Block Dop Ø 300 mm (Beton Tumbuk ad. 1:3:5 0.5700 m³/bh 883,700.00 503,709.00

PELETAKAN DAN PENYAMBUNGAN TEE


P423 M' Harga per 1M' ….. Rp. 38,820.00
HDPE Ø 50 mm
Mandor 0.0050 Org 130,000.00 650.00
Tukang pipa Terampil 0.0230 Org 120,000.00 2,760.00
Pekerja Setengah Terampil 0.0450 Org 90,000.00 4,050.00
Welding HDPE 0.1760 Jam 125,000.00 22,000.00
Genset Kap. 7000 - 12000 Watt 0.1760 Jam 50,000.00 8,800.00
Alat bantu 0.0066 Set 85,000.00 556.75
Jumlah 38,816.75
Dibulatkan 38,820.00

PELETAKAN DAN PENYAMBUNGAN TEE


P424 M' Harga per 1M' ….. Rp. 61,860.00
HDPE Ø 75 mm
Mandor 0.0080 Org 130,000.00 1,040.00
Tukang pipa Terampil 0.0340 Org 120,000.00 4,080.00
Pekerja Setengah Terampil 0.0670 Org 90,000.00 6,030.00
Welding HDPE 0.2850 Jam 125,000.00 35,625.00
Genset Kap. 7000 - 12000 Watt 0.2850 Jam 50,000.00 14,250.00
Alat bantu 0.0098 Set 85,000.00 833.44
Jumlah 61,858.44
Dibulatkan 61,860.00

PELETAKAN DAN PENYAMBUNGAN TEE


P425 M' Harga per 1M' ….. Rp. 85,950.00
HDPE Ø 100 mm
Mandor 0.0110 Org 130,000.00 1,430.00
Tukang pipa Terampil 0.0450 Org 120,000.00 5,400.00
Pekerja Setengah Terampil 0.0890 Org 90,000.00 8,010.00
Welding HDPE 0.4000 Jam 125,000.00 50,000.00
Genset Kap. 7000 - 12000 Watt 0.4000 Jam 50,000.00 20,000.00
Alat bantu 0.0131 Set 85,000.00 1,110.10
Jumlah 85,950.10
Dibulatkan 85,950.00

PELETAKAN DAN PENYAMBUNGAN TEE


P426 M' Harga per 1M' ….. Rp. 160,040.00
HDPE Ø 150 mm
Mandor 0.0130 Org 130,000.00 1,690.00
Tukang pipa Terampil 0.0680 Org 120,000.00 8,160.00
Pekerja Setengah Terampil 0.1340 Org 90,000.00 12,060.00
Welding HDPE 0.7800 Jam 125,000.00 97,500.00
Genset Kap. 7000 - 12000 Watt 0.7800 Jam 50,000.00 39,000.00
Alat bantu 0.0192 Set 85,000.00 1,628.60
Jumlah 160,038.60
Dibulatkan 160,040.00

PELETAKAN DAN PENYAMBUNGAN TEE


P427 M' Harga per 1M' ….. Rp. 189,480.00
HDPE Ø 200 mm
Mandor 0.0210 Org 130,000.00 2,730.00
Tukang pipa Terampil 0.0910 Org 120,000.00 10,920.00
Pekerja Setengah Terampil 0.1790 Org 90,000.00 16,110.00
Welding HDPE 0.9000 Jam 125,000.00 112,500.00
Genset Kap. 7000 - 12000 Watt 0.9000 Jam 50,000.00 45,000.00
Alat bantu 0.0262 Set 85,000.00 2,223.60
Jumlah 189,483.60
Dibulatkan 189,480.00

PELETAKAN DAN PENYAMBUNGAN TEE


P428 M' Harga per 1M' ….. Rp. 207,670.00
HDPE Ø 250 mm
Mandor 0.0300 Org 130,000.00 3,900.00
Tukang pipa Terampil 0.1100 Org 120,000.00 13,200.00
Pekerja Setengah Terampil 0.2200 Org 90,000.00 19,800.00
Welding HDPE 0.9600 Jam 125,000.00 120,000.00
Genset Kap. 7000 - 12000 Watt 0.9600 Jam 50,000.00 48,000.00
Alat bantu 0.0326 Set 85,000.00 2,766.75
Jumlah 207,666.75
Dibulatkan 207,670.00

PELETAKAN DAN PENYAMBUNGAN TEE


P429 M' Harga per 1M' ….. Rp. 279,360.00
HDPE Ø 300 mm
Mandor 0.0300 Org 130,000.00 3,900.00
Tukang pipa Terampil 0.1400 Org 120,000.00 16,800.00
Pekerja Setengah Terampil 0.2700 Org 90,000.00 24,300.00
Welding HDPE 1.3200 Jam 125,000.00 165,000.00
Genset Kap. 7000 - 12000 Watt 1.3200 Jam 50,000.00 66,000.00
Alat bantu 0.0396 Set 85,000.00 3,361.75
Jumlah 279,361.75
Dibulatkan 279,360.00

PELETAKAN DAN PENYAMBUNGAN TEE


P430 M' Harga per 1M' ….. Rp. 339,480.00
HDPE Ø 400 mm
Mandor 0.0380 Org 130,000.00 4,940.00
Tukang pipa Terampil 0.2280 Org 120,000.00 27,360.00
Pekerja Setengah Terampil 0.4350 Org 90,000.00 39,150.00
Welding HDPE 1.5000 Jam 125,000.00 187,500.00
Genset Kap. 7000 - 12000 Watt 1.5000 Jam 50,000.00 75,000.00
Alat bantu 0.0650 Set 85,000.00 5,525.00
Jumlah 339,475.00
Dibulatkan 339,480.00

PELETAKAN DAN PENYAMBUNGAN TEE


P431 M' Harga per 1M' ….. Rp. 404,550.00
HDPE Ø 500 mm
Mandor 0.0450 Org 130,000.00 5,850.00
Tukang pipa Terampil 0.3150 Org 120,000.00 37,800.00
Pekerja Setengah Terampil 0.6000 Org 90,000.00 54,000.00
Welding HDPE 1.7100 Jam 125,000.00 213,750.00
Genset Kap. 7000 - 12000 Watt 1.7100 Jam 50,000.00 85,500.00
Alat bantu 0.0900 Set 85,000.00 7,650.00
Jumlah 404,550.00
Dibulatkan 404,550.00

PELETAKAN DAN PENYAMBUNGAN TEE


P432 M' Harga per 1M' ….. Rp. 504,450.00
HDPE Ø 600 mm
Mandor 0.0675 Org 130,000.00 8,775.00
Tukang pipa Terampil 0.4725 Org 120,000.00 56,700.00
Pekerja Setengah Terampil 0.9000 Org 90,000.00 81,000.00
Welding HDPE 1.9800 Jam 125,000.00 247,500.00
Genset Kap. 7000 - 12000 Watt 1.9800 Jam 50,000.00 99,000.00
Alat bantu 0.1350 Set 85,000.00 11,475.00
Jumlah 504,450.00
Dibulatkan 504,450.00

PELETAKAN DAN PENYAMBUNGAN BEND


P433 M' Harga per 1M' ….. Rp. 31,120.00
HDPE Ø 50 mm
Mandor 0.0050 Org 130,000.00 650.00
Tukang pipa Terampil 0.0230 Org 120,000.00 2,760.00
Pekerja Setengah Terampil 0.0450 Org 90,000.00 4,050.00
Welding HDPE 0.1320 Jam 125,000.00 16,500.00
Genset Kap. 7000 - 12000 Watt 0.1320 Jam 50,000.00 6,600.00
Alat bantu 0.0066 Set 85,000.00 556.75
Jumlah 31,116.75
Dibulatkan 31,120.00

PELETAKAN DAN PENYAMBUNGAN BEND


P434 M' Harga per 1M' ….. Rp. 48,730.00
HDPE Ø 75 mm
Mandor 0.0080 Org 130,000.00 1,040.00
Tukang pipa Terampil 0.0340 Org 120,000.00 4,080.00
Pekerja Setengah Terampil 0.0670 Org 90,000.00 6,030.00
Welding HDPE 0.2100 Jam 125,000.00 26,250.00
Genset Kap. 7000 - 12000 Watt 0.2100 Jam 50,000.00 10,500.00
Alat bantu 0.0098 Set 85,000.00 833.44
Jumlah 48,733.44
Dibulatkan 48,730.00

PELETAKAN DAN PENYAMBUNGAN BEND


P435 M' Harga per 1M' ….. Rp. 71,950.00
HDPE Ø 100 mm
Mandor 0.0110 Org 130,000.00 1,430.00
Tukang pipa Terampil 0.0450 Org 120,000.00 5,400.00
Pekerja Setengah Terampil 0.0890 Org 90,000.00 8,010.00
Welding HDPE 0.3200 Jam 125,000.00 40,000.00
Genset Kap. 7000 - 12000 Watt 0.3200 Jam 50,000.00 16,000.00
Alat bantu 0.0131 Set 85,000.00 1,110.10
Jumlah 71,950.10
Dibulatkan 71,950.00

PELETAKAN DAN PENYAMBUNGAN BEND


P436 M' Harga per 1M' ….. Rp. 114,540.00
HDPE Ø 150 mm
Mandor 0.0130 Org 130,000.00 1,690.00
Tukang pipa Terampil 0.0680 Org 120,000.00 8,160.00
Pekerja Setengah Terampil 0.1340 Org 90,000.00 12,060.00
Welding HDPE 0.5200 Jam 125,000.00 65,000.00
Genset Kap. 7000 - 12000 Watt 0.5200 Jam 50,000.00 26,000.00
Alat bantu 0.0192 Set 85,000.00 1,628.60
Jumlah 114,538.60
Dibulatkan 114,540.00

PELETAKAN DAN PENYAMBUNGAN BEND


P437 M' Harga per 1M' ….. Rp. 136,980.00
HDPE Ø 200 mm
Mandor 0.0210 Org 130,000.00 2,730.00
Tukang pipa Terampil 0.0910 Org 120,000.00 10,920.00
Pekerja Setengah Terampil 0.1790 Org 90,000.00 16,110.00
Welding HDPE 0.6000 Jam 125,000.00 75,000.00
Genset Kap. 7000 - 12000 Watt 0.6000 Jam 50,000.00 30,000.00
Alat bantu 0.0262 Set 85,000.00 2,223.60
Jumlah 136,983.60
Dibulatkan 136,980.00

PELETAKAN DAN PENYAMBUNGAN BEND


P438 M' Harga per 1M' ….. Rp. 151,670.00
HDPE Ø 250 mm
Mandor 0.0300 Org 130,000.00 3,900.00
Tukang pipa Terampil 0.1100 Org 120,000.00 13,200.00
Pekerja Setengah Terampil 0.2200 Org 90,000.00 19,800.00
Welding HDPE 0.6400 Jam 125,000.00 80,000.00
Genset Kap. 7000 - 12000 Watt 0.6400 Jam 50,000.00 32,000.00
Alat bantu 0.0326 Set 85,000.00 2,766.75
Jumlah 151,666.75
Dibulatkan 151,670.00

PELETAKAN DAN PENYAMBUNGAN BEND


P439 M' Harga per 1M' ….. Rp. 202,360.00
HDPE Ø 300 mm
Mandor 0.0300 Org 130,000.00 3,900.00
Tukang pipa Terampil 0.1400 Org 120,000.00 16,800.00
Pekerja Setengah Terampil 0.2700 Org 90,000.00 24,300.00
Welding HDPE 0.8800 Jam 125,000.00 110,000.00
Genset Kap. 7000 - 12000 Watt 0.8800 Jam 50,000.00 44,000.00
Alat bantu 0.0396 Set 85,000.00 3,361.75
Jumlah 202,361.75
Dibulatkan 202,360.00

PELETAKAN DAN PENYAMBUNGAN BEND


P440 M' Harga per 1M' ….. Rp. 251,980.00
HDPE Ø 400 mm
Mandor 0.0380 Org 130,000.00 4,940.00
Tukang pipa Terampil 0.2280 Org 120,000.00 27,360.00
Pekerja Setengah Terampil 0.4350 Org 90,000.00 39,150.00
Welding HDPE 1.0000 Jam 125,000.00 125,000.00
Genset Kap. 7000 - 12000 Watt 1.0000 Jam 50,000.00 50,000.00
Alat bantu 0.0650 Set 85,000.00 5,525.00
Jumlah 251,975.00
Dibulatkan 251,980.00

PELETAKAN DAN PENYAMBUNGAN BEND


P441 M' Harga per 1M' ….. Rp. 304,800.00
HDPE Ø 500 mm
Mandor 0.0450 Org 130,000.00 5,850.00
Tukang pipa Terampil 0.3150 Org 120,000.00 37,800.00
Pekerja Setengah Terampil 0.6000 Org 90,000.00 54,000.00
Welding HDPE 1.1400 Jam 125,000.00 142,500.00
Genset Kap. 7000 - 12000 Watt 1.1400 Jam 50,000.00 57,000.00
Alat bantu 0.0900 Set 85,000.00 7,650.00
Jumlah 304,800.00
Dibulatkan 304,800.00

PELETAKAN DAN PENYAMBUNGAN BEND


P442 M' Harga per 1M' ….. Rp. 388,950.00
HDPE Ø 600 mm
Mandor 0.0675 Org 130,000.00 8,775.00
Tukang pipa Terampil 0.4725 Org 120,000.00 56,700.00
Pekerja Setengah Terampil 0.9000 Org 90,000.00 81,000.00
Welding HDPE 1.3200 Jam 125,000.00 165,000.00
Genset Kap. 7000 - 12000 Watt 1.3200 Jam 50,000.00 66,000.00
Alat bantu 0.1350 Set 85,000.00 11,475.00
Jumlah 388,950.00
Dibulatkan 388,950.00

PELETAKAN DAN PENYAMBUNGAN


P443 M' Harga per 1M' ….. Rp. 26,500.00
REDUCER HDPE Ø 50 mm
Mandor 0.0050 Org 130,000.00 650.00
Tukang pipa Terampil 0.0230 Org 120,000.00 2,760.00
Pekerja Setengah Terampil 0.0450 Org 90,000.00 4,050.00
Welding HDPE 0.1056 Jam 125,000.00 13,200.00
Genset Kap. 7000 - 12000 Watt 0.1056 Jam 50,000.00 5,280.00
Alat bantu 0.0066 Set 85,000.00 556.75
Jumlah 26,496.75
Dibulatkan 26,500.00
PELETAKAN DAN PENYAMBUNGAN
P444 M' Harga per 1M' ….. Rp. 41,910.00
REDUCER HDPE Ø 75 mm
Mandor 0.0080 Org 130,000.00 1,040.00
Tukang pipa Terampil 0.0340 Org 120,000.00 4,080.00
Pekerja Setengah Terampil 0.0670 Org 90,000.00 6,030.00
Welding HDPE 0.1710 Jam 125,000.00 21,375.00
Genset Kap. 7000 - 12000 Watt 0.1710 Jam 50,000.00 8,550.00
Alat bantu 0.0098 Set 85,000.00 833.44
Jumlah 41,908.44
Dibulatkan 41,910.00

PELETAKAN DAN PENYAMBUNGAN


P445 M' Harga per 1M' ….. Rp. 57,950.00
REDUCER HDPE Ø 100 mm
Mandor 0.0110 Org 130,000.00 1,430.00
Tukang pipa Terampil 0.0450 Org 120,000.00 5,400.00
Pekerja Setengah Terampil 0.0890 Org 90,000.00 8,010.00
Welding HDPE 0.2400 Jam 125,000.00 30,000.00
Genset Kap. 7000 - 12000 Watt 0.2400 Jam 50,000.00 12,000.00
Alat bantu 0.0131 Set 85,000.00 1,110.10
Jumlah 57,950.10
Dibulatkan 57,950.00

PELETAKAN DAN PENYAMBUNGAN


P446 M' Harga per 1M' ….. Rp. 91,790.00
REDUCER HDPE Ø 150 mm
Mandor 0.0130 Org 130,000.00 1,690.00
Tukang pipa Terampil 0.0680 Org 120,000.00 8,160.00
Pekerja Setengah Terampil 0.1340 Org 90,000.00 12,060.00
Welding HDPE 0.3900 Jam 125,000.00 48,750.00
Genset Kap. 7000 - 12000 Watt 0.3900 Jam 50,000.00 19,500.00
Alat bantu 0.0192 Set 85,000.00 1,628.60
Jumlah 91,788.60
Dibulatkan 91,790.00

PELETAKAN DAN PENYAMBUNGAN


P447 M' Harga per 1M' ….. Rp. 110,730.00
REDUCER HDPE Ø 200 mm
Mandor 0.0210 Org 130,000.00 2,730.00
Tukang pipa Terampil 0.0910 Org 120,000.00 10,920.00
Pekerja Setengah Terampil 0.1790 Org 90,000.00 16,110.00
Welding HDPE 0.4500 Jam 125,000.00 56,250.00
Genset Kap. 7000 - 12000 Watt 0.4500 Jam 50,000.00 22,500.00
Alat bantu 0.0262 Set 85,000.00 2,223.60
Jumlah 110,733.60
Dibulatkan 110,730.00

PELETAKAN DAN PENYAMBUNGAN


P448 M' Harga per 1M' ….. Rp. 123,670.00
REDUCER HDPE Ø 250 mm
Mandor 0.0300 Org 130,000.00 3,900.00
Tukang pipa Terampil 0.1100 Org 120,000.00 13,200.00
Pekerja Setengah Terampil 0.2200 Org 90,000.00 19,800.00
Welding HDPE 0.4800 Jam 125,000.00 60,000.00
Genset Kap. 7000 - 12000 Watt 0.4800 Jam 50,000.00 24,000.00
Alat bantu 0.0326 Set 85,000.00 2,766.75
Jumlah 123,666.75
Dibulatkan 123,670.00

PELETAKAN DAN PENYAMBUNGAN


P449 M' Harga per 1M' ….. Rp. 163,860.00
REDUCER HDPE Ø 300 mm
Mandor 0.0300 Org 130,000.00 3,900.00
Tukang pipa Terampil 0.1400 Org 120,000.00 16,800.00
Pekerja Setengah Terampil 0.2700 Org 90,000.00 24,300.00
Welding HDPE 0.6600 Jam 125,000.00 82,500.00
Genset Kap. 7000 - 12000 Watt 0.6600 Jam 50,000.00 33,000.00
Alat bantu 0.0396 Set 85,000.00 3,361.75
Jumlah 163,861.75
Dibulatkan 163,860.00

PELETAKAN DAN PENYAMBUNGAN


P450 M' Harga per 1M' ….. Rp. 208,230.00
REDUCER HDPE Ø 400 mm
Mandor 0.0380 Org 130,000.00 4,940.00
Tukang pipa Terampil 0.2280 Org 120,000.00 27,360.00
Pekerja Setengah Terampil 0.4350 Org 90,000.00 39,150.00
Welding HDPE 0.7500 Jam 125,000.00 93,750.00
Genset Kap. 7000 - 12000 Watt 0.7500 Jam 50,000.00 37,500.00
Alat bantu 0.0650 Set 85,000.00 5,525.00
Jumlah 208,225.00
Dibulatkan 208,230.00

PELETAKAN DAN PENYAMBUNGAN


P451 M' Harga per 1M' ….. Rp. 254,930.00
REDUCER HDPE Ø 500 mm
Mandor 0.0450 Org 130,000.00 5,850.00
Tukang pipa Terampil 0.3150 Org 120,000.00 37,800.00
Pekerja Setengah Terampil 0.6000 Org 90,000.00 54,000.00
Welding HDPE 0.8550 Jam 125,000.00 106,875.00
Genset Kap. 7000 - 12000 Watt 0.8550 Jam 50,000.00 42,750.00
Alat bantu 0.0900 Set 85,000.00 7,650.00
Jumlah 254,925.00
Dibulatkan 254,930.00

PELETAKAN DAN PENYAMBUNGAN


P452 M' Harga per 1M' ….. Rp. 331,200.00
REDUCER HDPE Ø 600 mm
Mandor 0.0675 Org 130,000.00 8,775.00
Tukang pipa Terampil 0.4725 Org 120,000.00 56,700.00
Pekerja Setengah Terampil 0.9000 Org 90,000.00 81,000.00
Welding HDPE 0.9900 Jam 125,000.00 123,750.00
Genset Kap. 7000 - 12000 Watt 0.9900 Jam 50,000.00 49,500.00
Alat bantu 0.1350 Set 85,000.00 11,475.00
Jumlah 331,200.00
Dibulatkan 331,200.00

PELETAKAN DAN PENYAMBUNGAN STUBE


P453 M' Harga per 1M' ….. Rp. 23,420.00
END HDPE Ø 50 mm
Mandor 0.0050 Org 130,000.00 650.00
Tukang pipa Terampil 0.0230 Org 120,000.00 2,760.00
Pekerja Setengah Terampil 0.0450 Org 90,000.00 4,050.00
Welding HDPE 0.0880 Jam 125,000.00 11,000.00
Genset Kap. 7000 - 12000 Watt 0.0880 Jam 50,000.00 4,400.00
Alat bantu 0.0066 Set 85,000.00 556.75
Jumlah 23,416.75
Dibulatkan 23,420.00

PELETAKAN DAN PENYAMBUNGAN STUBE


P454 M' Harga per 1M' ….. Rp. 31,930.00
END HDPE Ø 75 mm
Mandor 0.0080 Org 130,000.00 1,040.00
Tukang pipa Terampil 0.0340 Org 120,000.00 4,080.00
Pekerja Setengah Terampil 0.0670 Org 90,000.00 6,030.00
Welding HDPE 0.1140 Jam 125,000.00 14,250.00
Genset Kap. 7000 - 12000 Watt 0.1140 Jam 50,000.00 5,700.00
Alat bantu 0.0098 Set 85,000.00 833.44
Jumlah 31,933.44
Dibulatkan 31,930.00

PELETAKAN DAN PENYAMBUNGAN STUBE


P455 M' Harga per 1M' ….. Rp. 43,950.00
END HDPE Ø 100 mm
Mandor 0.0110 Org 130,000.00 1,430.00
Tukang pipa Terampil 0.0450 Org 120,000.00 5,400.00
Pekerja Setengah Terampil 0.0890 Org 90,000.00 8,010.00
Welding HDPE 0.1600 Jam 125,000.00 20,000.00
Genset Kap. 7000 - 12000 Watt 0.1600 Jam 50,000.00 8,000.00
Alat bantu 0.0131 Set 85,000.00 1,110.10
Jumlah 43,950.10
Dibulatkan 43,950.00

PELETAKAN DAN PENYAMBUNGAN STUBE


P456 M' Harga per 1M' ….. Rp. 69,040.00
END HDPE Ø 150 mm
Mandor 0.0130 Org 130,000.00 1,690.00
Tukang pipa Terampil 0.0680 Org 120,000.00 8,160.00
Pekerja Setengah Terampil 0.1340 Org 90,000.00 12,060.00
Welding HDPE 0.2600 Jam 125,000.00 32,500.00
Genset Kap. 7000 - 12000 Watt 0.2600 Jam 50,000.00 13,000.00
Alat bantu 0.0192 Set 85,000.00 1,628.60
Jumlah 69,038.60
Dibulatkan 69,040.00
PELETAKAN DAN PENYAMBUNGAN STUBE
P457 M' Harga per 1M' ….. Rp. 84,480.00
END HDPE Ø 200 mm
Mandor 0.0210 Org 130,000.00 2,730.00
Tukang pipa Terampil 0.0910 Org 120,000.00 10,920.00
Pekerja Setengah Terampil 0.1790 Org 90,000.00 16,110.00
Welding HDPE 0.3000 Jam 125,000.00 37,500.00
Genset Kap. 7000 - 12000 Watt 0.3000 Jam 50,000.00 15,000.00
Alat bantu 0.0262 Set 85,000.00 2,223.60
Jumlah 84,483.60
Dibulatkan 84,480.00

PELETAKAN DAN PENYAMBUNGAN STUBE


P458 M' Harga per 1M' ….. Rp. 95,670.00
END HDPE Ø 250 mm
Mandor 0.0300 Org 130,000.00 3,900.00
Tukang pipa Terampil 0.1100 Org 120,000.00 13,200.00
Pekerja Setengah Terampil 0.2200 Org 90,000.00 19,800.00
Welding HDPE 0.3200 Jam 125,000.00 40,000.00
Genset Kap. 7000 - 12000 Watt 0.3200 Jam 50,000.00 16,000.00
Alat bantu 0.0326 Set 85,000.00 2,766.75
Jumlah 95,666.75
Dibulatkan 95,670.00

PELETAKAN DAN PENYAMBUNGAN STUBE


P459 M' Harga per 1M' ….. Rp. 125,360.00
END HDPE Ø 300 mm
Mandor 0.0300 Org 130,000.00 3,900.00
Tukang pipa Terampil 0.1400 Org 120,000.00 16,800.00
Pekerja Setengah Terampil 0.2700 Org 90,000.00 24,300.00
Welding HDPE 0.4400 Jam 125,000.00 55,000.00
Genset Kap. 7000 - 12000 Watt 0.4400 Jam 50,000.00 22,000.00
Alat bantu 0.0396 Set 85,000.00 3,361.75
Jumlah 125,361.75
Dibulatkan 125,360.00

PELETAKAN DAN PENYAMBUNGAN STUBE


P460 M' Harga per 1M' ….. Rp. 164,480.00
END HDPE Ø 400 mm
Mandor 0.0380 Org 130,000.00 4,940.00
Tukang pipa Terampil 0.2280 Org 120,000.00 27,360.00
Pekerja Setengah Terampil 0.4350 Org 90,000.00 39,150.00
Welding HDPE 0.5000 Jam 125,000.00 62,500.00
Genset Kap. 7000 - 12000 Watt 0.5000 Jam 50,000.00 25,000.00
Alat bantu 0.0650 Set 85,000.00 5,525.00
Jumlah 164,475.00
Dibulatkan 164,480.00

PELETAKAN DAN PENYAMBUNGAN STUBE


P461 M' Harga per 1M' ….. Rp. 205,050.00
END HDPE Ø 500 mm
Mandor 0.0450 Org 130,000.00 5,850.00
Tukang pipa Terampil 0.3150 Org 120,000.00 37,800.00
Pekerja Setengah Terampil 0.6000 Org 90,000.00 54,000.00
Welding HDPE 0.5700 Jam 125,000.00 71,250.00
Genset Kap. 7000 - 12000 Watt 0.5700 Jam 50,000.00 28,500.00
Alat bantu 0.0900 Set 85,000.00 7,650.00
Jumlah 205,050.00
Dibulatkan 205,050.00

PELETAKAN DAN PENYAMBUNGAN STUBE


P462 M' Harga per 1M' ….. Rp. 273,450.00
END HDPE Ø 600 mm
Mandor 0.0675 Org 130,000.00 8,775.00
Tukang pipa Terampil 0.4725 Org 120,000.00 56,700.00
Pekerja Setengah Terampil 0.9000 Org 90,000.00 81,000.00
Welding HDPE 0.6600 Jam 125,000.00 82,500.00
Genset Kap. 7000 - 12000 Watt 0.6600 Jam 50,000.00 33,000.00
Alat bantu 0.1350 Set 85,000.00 11,475.00
Jumlah 273,450.00
Dibulatkan 273,450.00

P463 UNIT PEMASANGAN SAMBUNGAN RUMAH Harga per Unit ….. Rp. 141,100.00
Pekerja 0.427 h/o 80,000.00 34,160.00
Mandor 0.018 h/o 130,000.00 2,340.00
Tukang Pipa 0.250 h/o 120,000.00 30,000.00
Pekerja setengah terampil 0.215 h/o 90,000.00 19,350.00
Kepala Tukang Pipa 0.040 h/o 130,000.00 5,200.00
Tukang Kayu setengah terampil 0.004 h/o 90,000.00 360.00
Pasir Urug 0.086 m³ 261,000.00 22,446.00
Cement Portland 3.087 kg 1,500.00 4,630.50
Pasir beton 0.019 m3 273,000.00 5,187.00
Batu pecah 2/3 0.026 m3 296,000.00 7,696.00
Papan Klas III 0.004 m3 2,222,300.00 8,889.20
Paku 0.050 kg 16,900.00 845.00
Jumlah 141,103.70
Dibulatkan 141,100.00
Bongkaran Rangka Atap
Genteng
Bata
Beton

Cremona Main frame Memanjang Pipa SCH 40 dia.4" 16.03


Pipa SCH 40 dia.4" 16.03
Pipa SCH 40 dia.3" 11.34
Pipa SCH 40 dia.2,5" 9.12
Plat tbl. 6mm 785.00

Cremona Main frame Melintang Pipa SCH 40 dia.4" 16.03


Pipa SCH 40 dia.3" 11.34
Pipa SCH 40 dia.2,5" 9.12
Plat tbl. 6mm 785.00

Kolom tengah Pipa SCH 40 dia.4" 16.03

Gording CNP 150 x 65 x 2.2mm 5.07


Plat Tbl.6mm 785.00

Trestang Besi polos dia. 12mm 0.89


Baut M12

Ikatan agin Besi polos dia. 12mm 0.89


Plate Tbl.10mm 785.00

Jarum pengeras

Atap Spandek Tbl. 0,4mm

Base plat Plat Tbl. 15mm 785.00


Stiffener Plat Tbl. 10mm 785.00

Angkur bolt

Talang Galvalume Tbl. 3mm


Pipa PVC Ø 6“ Wavin Tipe AW
Elbow PVC Ø 6“ Wavin Tipe AW

Pas.Bata

Pasangan ACP bagian depan bangunan lisplank 22.50


kolom 12.00
8.00
4.00

bagian samping kanan + kiri lisplank 11.20


kolom 12.00

bagian belakang lisplank 22.50


kolom 12.00

Lisplank 25.90
13.00

Plafond atap bagian luar 25.90


13.00
13.937 13.70 190.94
13.937 13.70 190.94
6.07
5.0776 0.20 0.20 0.20

29.7965 2.00 955.28


0.78 6.00 74.66
0.575 19.00 123.89
1.2305 24.00 269.33
0.0368 12.00 2.08
1,425.24 5,700.95 kg

4.94155 4.00 316.85


0.575 7.00 45.64
1.3455 10.00 122.71
0.0368 6.00 1.04
486.25 1,944.98 kg

12.535 2.00 401.87 803.74 kg

16.1 22.00 1,794.61 kg


0.000173 22.00 0.02 0.07 kg

1.5525 22.00 30.40 121.59 kg


358 bh

27.3 4.00 97.19 kg


0.000173 16.00 0.02 0.09 kg

8.00 pcs

29.7965 13.00 387.35 m2

0.046 6.00 3.25 13.00 kg


0.001438 24.00 0.27 1.08 kg 7,728.58 154,571,627.18

102 bh

11.2 m1
61.6 m1
16 bh

49.79 m2

2.2 3.00 148.50


1.5 2.00 36.00
4.2 1.00 33.60
1.5 2.00 12.00 230.10 m2

2.2 3.00 73.92


1.5 2.00 36.00 109.92 m2

2.2 3.00 148.50


1.5 2.00 36.00 184.50 m2

1.15 2.00 59.57


1.15 2.00 29.90 89.47 m2

0.9 2.00 46.62


2.3 2.00 59.80 106.42 m2
0.07
BESI BETON POLOS

No Diameter Berat Besi No Diameter Berat Besi


mm Kg / m1 mm Kg / m1

1 4.0 0.13 11 12 0.89


2 5.0 0.12 12 13 1.04
3 5.5 0.19 13 14 1.21
4 5.7 0.20 14 16 1.58
5 6.0 0.22 15 19 2.23
6 6.5 0.31 16 22 2.98
7 8.0 0.40 17 23 3.26
8 9.0 0.53 18 25 3.85
9 10.0 0.62 19 28 4.83
10 11.0 0.75 20 31 5.93
21 32 6.31

1 PLAT MEJA BETON TEBAL 10 CM TUL DIA 10 DAN


KOE V P
DIMENSI 1 m3 0.60
TUL MELINTANG 5.00
TUL MEMBUJUR 0.60
JARAK 0.150
BEGESTING 2.00 0.60
JUMLAH BTG BERAT/M'
BESI DIA 10.0 1 5.00 bt 0.62
BESI DIA 10.0 1 111.11 bh 0.62

TEKUKAN 0.05
JUMLAH BESI
BEGESTING 1.30
STOOT WERK 1.30

2 KOLOM 15 X 15, TUL 4 O 12 BEGEL O8 JARAK 15 CM


KOE V P
DIMENSI 1 m3 0.15
SENGKANG 2 0.30 m1 0.15
JARAK 0.150
BEGESTING 1.00 0.30 0.15
JUMLAH BTG BERAT/M'
BESI DIA 12 4.00 bt 0.89
BESI DIA 8 296.30 bh 0.40

TEKUKAN 0.05
JUMLAH BESI
BEGESTING 0.30
STOOT WERK 0.25 0.30

3 KOLOM 20 X 20, TUL 4 O 12 BEGEL O8 JARAK 15 CM


KOE V P
DIMENSI 1 m3 0.20
SENGKANG 2 0.40 m1 0.20
JARAK 0.150
BEGESTING 1.00 0.40 0.20
JUMLAH BTG BERAT/M'
BESI DIA 12 4.00 bt 0.89
BESI DIA 8 166.67 bh 0.40

TEKUKAN 0.05
JUMLAH BESI
BEGESTING 0.40
STOOT WERK 0.25 0.40

4 RINGBALK 15 X 20, TUL 4 O 12 BEGEL O 8 JARAK 15 CM


KOE V P
DIMENSI 1 m3 0.15
SENGKANG 2 0.35 m1 0.15
JARAK 0.150
BEGESTING 2.00 0.15
JUMLAH BTG BERAT/M'
BESI DIA 12 4.00 bt 0.89
BESI DIA 8 (SENGKANG) 222.22 bh 0.40

TEKUKAN 0.05
JUMLAH BESI
BEGESTING 0.55
STOOT WERK 0.15
BESI BETON SPIRAL

Berat Besi No. Diameter Berat Besi


Kg / m1 mm Kg / m1

1 10.00 0.62
2 13.00 1.04
3 16.00 1.58
4 19.00 2.23
5 22.00 2.98
6 25.00 3.85
7 29.00 5.19
8 32.00 6.31
9 36.00 7.99

10 JRK 0.15
L T PJG
0.10 16.67 M
Dibulatkan 5 BT
0.10 0.70 M

0.10 1.30
BERAT/M' PJG BERAT
KG 16.67 51.67 KG
KG 0.70 48.22 KG
99.89 KG
4.99 KG
104.88 KG
16.67 21.67 M2
5.00 6.50 M2

L T PJG
0.15 44.44 M
0.15 0.60 M

0.15 0.30 M
BERAT/M' PJG BERAT
KG 44.44 158.22 KG
KG 0.60 71.11 KG
229.33 KG
11.47 KG
240.80 KG
44.44 13.33 M2
44.44 3.33 M2

L T PJG
0.20 25.00 M
0.20 0.80 M

0.20 0.40 M
BERAT/M' PJG BERAT
KG 25.00 89.00 KG
KG 0.80 53.33 KG
142.33 KG
7.12 KG
149.45 KG
25.00 10.00 M2
25.00 2.50 M2

L T PJG
0.20 33.33 M
0.20 0.70 M

0.20 0.55 M
BERAT/M' PJG BERAT
KG 33.33 118.67 KG
KG 0.70 62.22 KG
180.89 KG
9.04 KG
189.93 KG
33.33 18.33 M2
33.33 5.00 M2