Project title:

Consultant Design Responsibility Matrix

Specialist Subcontractors
Fire Strategy Consultant
Reference:

Planning Supervisor

Approved Inspector
Civil/Structural Eng
Quantity Surveyor

Public Health Eng


Date:

Client Supervisor

Mechanical Eng

Main Contractor
Electrical Eng

Fire Services
1 = PRIMARY RESPONSIBILITY

Client's PM

Acoustics
2 = SUPPORTING ROLE

Architect
Client
DRAFT
Appointment of Consultants 1 2
Brief Information 1 2 2 2 2 2 2 2
Instruct changes to brief 1 2 2 2 2 2 2 2 2 2
Design team co-ordination 2 1 2 2 2 2 2 2 2
Co-ordination of services (confirm exact meaning) 2 2 2 1 1 1 2
Site ownership and boundaries 1 2 2 2
Land and/or building survey 1 2 2 2
Services survey 1 2 2 2 2 2 2
Adjoining premises/deptartments 1 2 2 2 2 2 2 2 2
Air and/or water condition 2 1 1
Planning Application 2 2 2 1 2 2 2 2
Building Regs Compliance Certificate 2 2 2 2 2 2 2 2 1
Fire Certificate Application 1 2 2 2 2 2 2 2
Water retaining tanking DPC's and DPM's (roof) 2 1 2 2 2 2
Building envelope design 2 1 2 2 2 2 2
Internal walls,partitions,ceilings 2 1 2 2 2 2 2
Internal finishes 2 1 2 2 2
Building structure elements 2 2 1 2 2 2 2
Paint performance spec to primary steel 2 1 2 2
Galv perf spec to external steel 2 1 2 2
Subcontractor design criteria for concealed steelwork
connections 1 2
Architectural metalwork 2 1 2 2 2 2 2
Roof drainage 2 2 2 2 1
Int drainage 2 2 2 2 1
Int sanitary installation 2 2 2 1
Sanitary fittings 2 1 2
Rainwater system 2 2 1
Main water supply 2 2 2 1
Cold water distribution 2 2 2 1
Hot water supply/distribution 2 2 2 1
Structural fire protection performance spec for
intumescent paint 2 2 1 2
Fire stopping 2 1 2 2 2 2 2
Fire fighting installations and strategy 2 2 2 2 2 1
Fire alarm/detection 2 2 2 1 2
Electrical power and lighting 2 2 2 1 2
Communications systems 2 2 2 1 2
Security services
Lightning protection (earthing & bonding) 2 2 2 2 1
Heating installation/fuel supply 2 2 2 1 2 2
Builders work holes >150 mm x 150sq 2 2 1 2 2 2 2 2
Builders work holes <150 x 150 2 2 1 2 2 2 2 2 2
Mechanical engineering 2 2 2 1 2 2 2
Air conditioning systems 2 2 2 1 2 2 2
Main gas supply/distribution 2 2 2 1 2
Lifts, conveyors and hoists 2 1 2 2 2
Refrigeration plant/installations 2 2 2 1
External Envelope Cleaning & Maintenance 2 2 1 2 2 2
Laboratory Equipment 1 2 2 2 2 2 2 2
Specialist Equipment schedule 1 2 2 2 2 2 2 2 2 2 2
Lab furniture 2 2 1 2 2 2 2
Services sound control and acoustics 2 2 2 1 2 2 2 2 2 2
Fixed furniture & fittings (not loose) 2 1
Signage 2 1 2 2
Cost planning and control 1 2 2 2 2 2 2
Building contract preliminaries 2 2 1 2 2 2 2 2
Maintenance manuals 2 1 2 2
Site inspection client 1
Site Inspection Novated Team 2 2 2 2 2 1

page 1 of 4 l/projects/2523/01.02/design responsibilities matrix


Pre Tender Health and Safety plan 2 2 2 2 2 2 1
Construction Health and Safety Plan 1 2 2
Health and Safety file (inc O&M Manuals) 2 2 2 2 1 2 2

SCHEDULE OF SPECIALIST CONTRACTOR DESIGN RESPONSIBILITIES

The following list represents the design that will be completed by the main contractor's specialists. The design intent submitted by the client's consultant
team and the novated consultant team will be completed post contract award by the specialist contractors. Shop drawings will be required for approval. The
novated consultant team will check the specialist contractor's information for approval in accordance with the contract design intent information prior to
submission to the Supervisor for Acceptance. This list does not incorporate all the contractor design responsibility but shows the areas of responsibility
handed over by the novated design team to specialists.

1. Pile foundations
2. Concrete mixes
3. Waterproof additives
4. Concealed steelwork connections
5. Fire protection to primary steel
6. Corrosion protection to primary steel
7. Architectural metalwork
8. External envelope, including:
- curtain walling
- roof plantroom cladding
- glazed screens
- louvres
- roof finishes
- associated doors, windows, hatches and hoppers
- perforated metal screen
9. Lifts and hoists
10. Commissioning management
11. Builders’ work
12. Fire stopping and protection
13. Walkways and safety latchways
14. Window cleaning and maintenance equipment
15. Dry lining, shaft walls, plaster and screeds
16. Suspended ceilings and plasterboard ceilings and soffits
17. Internal metal and stone panels
18. Raised floors
19. Sundry metalwork
20. Glass balustrading
21. Roller shutters and sliding doors
22. Metal doors
23. Joinery
24. Internal partitions glazed
25. Blockwork and internal walls
26. Reception desks
27. All Mechanical, Electrical and Public Health Services as items 28-51
28. Selection and design of equipment, components, systems and software to meet the specified performance parameters
29. Preparation of coordinated installation details as specified and spatial coordination of the works indicated thereon with the works of other Trade contractors
30. Coordination of technical requirements and details at interfaces with Trade Contractors
31. Design of support systems and any proprietary products supplied by the Trade Contractor
32. Design calculations to demonstrate the expansion and contraction of the pipework
33. Detailing of all shop drawings for approval, based on the design issue layouts and schematics provided by the consultant
34. Confirmation of pump duties based on final installation drawings and equipment details
35. Confirmation of fan duties based on final installation drawings and sizing and positioning of refrigerant pipework
36. Sizing and positioning of refrigerant pipework
37. Sizing of all cable containment provided as part of the Trade Contract works, where sizes are not indicated on the contract drawings
38. Sizing of all power cables between distribution boards/MCCs and equipment based on final equipment details
39. Detailing of all shop drawings for approval based on design intent for all inernal and external below ground services
40. Size of all final circuits from distribution boards in relation to grouping and containment routes
41. Detailed coordination between building services, building structure and fabric
42. Secondary steelwork support structures and bracketry, fixing systems, lifting beams, maintenance access and access safety systems, including structural calculatio
43. Design of syphonic rainwater systems based on site installation and submission of calculations
44. Check the cable sizing for all sub mains using selected equipment actual loads
45. Acoustic performance and attenuation of plant and equipment based on final installation drawings and equipment details
46. Develop the design intent details using selected system/equipment vendor details for lighting control, network metering, EPG
47. Carry out electrical protection grading inclusive of protection grading charts
48. Provision of builders work drawings
49. Develop the design intent for specialist equipment supplies and earthing once vendor has been selected
50. Develop a switchgear interlocking scheme with switchgear vendor
51. Sprinkler system design and certification

page 2 of 4 l/projects/2523/01.02/design responsibilities matrix


page 3 of 4 l/projects/2523/01.02/design responsibilities matrix
ons

page 4 of 4 l/projects/2523/01.02/design responsibilities matrix

Anda mungkin juga menyukai