for
to
Table of Contents
Introduction ....................................................................................................................................................................... 3
Geology.................................................................................................................................................................................. 6
Annexures......................................................................................................................................................................... 18
Page 1 of 18
Chimakurthy Black Galaxy Granite Mine Project
Technical Study Report 2019
List of Tables
Table 2-1 Sy.No 106 - Sub Division................................................................................................................................... 5
List of Figures
Figure 2-1 Google Earth Image of the property ......................................................................................................... 4
Page 2 of 18
Chimakurthy Black Galaxy Granite Mine Project
Technical Study Report 2019
Introduction
Tanka Engineers LLP is a company formed in 2017 aimed at providing ONE STOP solutions
to clients covering high quality engineering, procurement and construction services to
Mining, Material Handling and Process Industries. The team has experience & expertise in
project management, detailed multidiscipline engineering, procurement, logistics
management, and construction services to the mining, mineral processing, infrastructure and
materials handling Industries. The company has tie up with professionals within India and
overseas with a vision of bringing the expertise together as a single package for the end
clients.
Tanka Engineers was contacted by M/s Shree Samarth Minerals for study of Granite Mine
Project at Chimakurthy with an objective of,
Following are the team from Tanka who carried out the technical study.
Property Description
The proposed property of 10.74 acres (4.35 ha) is located at Sy.No: 106, Budawada village,
Chimakurthy Mandal, Prakasham District, Andhra Pradesh.
The Mine Lease was granted for a limited property of 1 ha in Sy.No: 106/1P in the name of
M/s. KL Granites Private Limited vide Director Mines & Geology, Proceeding No: 47796/R3-
1/2011, Dated 29- 12-2011 and the lease was executed vide ADMG Proceeding No:
6041/Q/2007 Dated 11-01-2012 valid for a period up to 25.07.2028.
Page 3 of 18
Chimakurthy Black Galaxy Granite Mine Project
Technical Study Report 2019
The Project has also obtained Consent for Establishment (CFE) ref P-396/PCB/CFE/RED/ZO-
VJA/2016-2233 dated 12.01.2016 for a period up to 7 years and Consent for operation (CFO)
ref P-396/APPCB/ZO-VJA/CFO/W&A/2015-2626 dated 11.03.2016 which needs to be
renewed.
Page 4 of 18
Chimakurthy Black Galaxy Granite Mine Project
Technical Study Report 2019
The proposed property of 10.74 acres (4.35 ha) is sub divided in Sy.No: 106 as below,
Page 5 of 18
Chimakurthy Black Galaxy Granite Mine Project
Technical Study Report 2019
Geology
The Geological formations in the Praksham District is part of Eastern Ghats Belt (EGB) which
extends over 1000 km in length from Brahmani river in orissa to ongole in Andhra Pradesh.
Technical Specification
• Compressive Strength: 2777 Kg/cm2
• Ultimate Tensile Strength: 274 Kg/cm2
• Water Absorption: 0.04%
• Specific Gravity: 2.960 Kg/m3
• Hardness (Moh's Scale): 6.5
Page 6 of 18
Chimakurthy Black Galaxy Granite Mine Project
Technical Study Report 2019
The Resource and Reserve calculation is carried out for 2 scenarios as below,
b) Phase 2 – Considering the complete property area – Sy. No 106 – 4.35 ha.
No allowance is given for the limited extraction carried out by previous owner.
Asset
Mineable Area Resource Reserve
Area in Depth Value in
Sl.No Phase Area in in Volume in Volume in
Sq.mtr in m INR
hectare acres Cu.m Cu.m
Crores
1 Phase 1 1 2.47 9999.98 60.00 599999.00 149999.75 975.00
2 Phase 2 2.87 7.09 28699.96 60.00 1721997.00 430499.25 2798.25
Table 4-1 Resource / Reserve Estimate
Page 7 of 18
Chimakurthy Black Galaxy Granite Mine Project
Technical Study Report 2019
Page 8 of 18
Chimakurthy Black Galaxy Granite Mine Project
Technical Study Report 2019
Quarrying Operation
The property has been mined earlier and as shown in Figure 5-1 water is logged over an area
of 1.5 acre which shall be dewatered before quarrying. The site preparation may require 4-6
weeks including the dewatering before starting the actual quarrying operation.
Once the bench is cut or split loose from the deposit, excavator / loader shall be used to lift
the granite off the bench and transfer it to an inspection area for quality and size
specifications.
Every block that meets the size requirement shall be thoroughly checked for cracks, fissures,
color pattern and other variations quality specifications.
Page 9 of 18
Chimakurthy Black Galaxy Granite Mine Project
Technical Study Report 2019
Machinery requirement
Following are the machinery requirement for the Phase 1 and Phase 2 operation. Phase 1
production is considered as 4647 m3 /annum and Phase 2 production is considered as 10000
m3 /annum
The capital cost estimate for phase 1 and Phase 2 for the above equipment / items will be
525 lakh and 720 lakh respectively.
It is recommended to hire the excavators, Tippers and Compressors for the first 6-8 month
of operations and the equipment deployment may be planned based on cash flow and
investment capacity.
Page 10 of 18
Chimakurthy Black Galaxy Granite Mine Project
Technical Study Report 2019
for 6 month
Sl.No Equipment Specification Remarks
Operation
Page 11 of 18
Chimakurthy Black Galaxy Granite Mine Project
Technical Study Report 2019
Manpower requirement
Following are the manpower requirement for the Phase 1 and Phase 2 operation.
Market Information
Black Galaxy granite is an extremely hard igneous stone. Black Galaxy granite is durable,
weather resistant and beautiful. The Black Galaxy granite has a black background with gold
colored specks in it. The gold specks are due to the presence of ferrous rich Enstatine
(Bronzite). The technical geological name for this granite is Gabbric Anorthosite. The material
takes on a very good polish. The ideal use of this material is in interior applications.
Page 12 of 18
Chimakurthy Black Galaxy Granite Mine Project
Technical Study Report 2019
The photo taken of the cut block at site suggest the granite to be of good quality.
Page 13 of 18
Chimakurthy Black Galaxy Granite Mine Project
Technical Study Report 2019
The black granite from Chimakurthy has good market acceptance and Rs.80000/m 3 is
considered for financial evaluation.
Financial Analysis
The cash flow projection is shown in Table 7-1. M/s Shree Samarth Minerals can target a
profit (pretax) of 12.5 Crores which may be used for the procurement of remaining
equipment / items.
Page 14 of 18
Chimakurthy Black Galaxy Granite Mine Project
Technical Study Report 2019
Page 15 of 18
Chimakurthy Black Galaxy Granite Mine Project
Technical Study Report 2019
Page 16 of 18
Chimakurthy Black Galaxy Granite Mine Project
Technical Study Report 2019
The study team is convinced on the project viability based on the field visits, desktop studies
and experience. The Project is financially robust to take care of any slow starts or
inefficiencies although it should be avoided / taken care. Recommendation to proceed should
be positively considered with following points during operations,
• Borewell within the property to be repaired (if not new bore well) to provide water
for the quarrying operations.
• Skillful workers to be employed with experienced supervisor to control the
recovery.
• Property survey shall be carried out prior to commencement of quarrying.
• Environmental monitoring plan should be put in place and followed.
• Safe working practices to be ensured during quarrying operation.
Page 17 of 18
Chimakurthy Black Galaxy Granite Mine Project
Technical Study Report 2019
Annexures
Page 18 of 18