Anda di halaman 1dari 6

REKAPITULASI HPS

PROGRAM : PENGEMBANGAN PERUMAHAN


KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA RUMAH SEHAT SEDERHANA
PENYUSUNAN DED PERENCANAAN PEMBANGUNAN JALAN LINGKUNGAN
PEKERJAAN :
SEHAT KOMUNAL PAKET 1
TAHUN ANGGARAN : 2018
SUMBER DANA : APBD
LOKASI : KABUPATEN POHUWATO

R E KAPI T U LAS I

I. BIAYA LANGSUNG PERSONIL Rp. 32,750,000.00


II BIAYA LANGSUNG NON PERSONIL Rp. 12,705,000.00

Jumlah Rp. 45,455,000.00


PPn 10 % Rp. 4,545,500.00
Total Rp. 50,000,500.00
Di Bulatkan Rp. 50,000,000.00

Terbilang : Lima Puluh Juta Rupiah

Marisa, 14 Februari 2018


Ditetapkan Oleh
KPA

ARFAN LASENA, ST
Direktur
BIAYA LANGSUNG PERSONIL
PROGRAM : PENGEMBANGAN PERUMAHAN
KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA RUMAH SEHAT SEDERHANA
PENYUSUNAN DED PERENCANAAN PEMBANGUNAN JALAN LINGKUNGAN SEHAT KOMUNAL
PEKERJAAN :
PAKET 1
TAHUN ANGGARAN : 2018
SUMBER DANA : APBD
LOKASI : KABUPATEN POHUWATO

TAHUN STRATA JUMLAH OB SATUAN BIAYA JUMLAH BIAYA


NO KEAHLIAN/JABATAN BOK
KERJA PEND. Org. Bln ( Rp.) (Rp)
1 2 3 4 5 6 7 8 (7x8)
I. STAFF PROFESIONAL
A. Tenaga Ahli :
1 Team Leader (Ahli Sipil) 4 Thn S-1 1.00 1.00 1.00 8,000,000.00 Rp. 8,000,000.00
5 Ahli Geodesi 3 Thn S-1 1.00 0.00 0.00 - Rp. -
Jumlah Biaya Tenaga Ahli Rp. 8,000,000.00
II. STAFF SUB-PROFESIONAL
A. Tenaga Teknis :
1 Surveyor 3 Thn SMK 2.00 1.00 2.00 3,750,000.00 Rp. 7,500,000.00
2 Estimator 3 Thn SMK 1.00 1.00 1.00 3,750,000.00 Rp. 3,750,000.00
3 Auto Cad Spesialist 3 Thn D3 2.00 1.00 2.00 5,000,000.00 Rp. 10,000,000.00
Jumlah Biaya Tenaga Teknis Rp. 21,250,000.00
B. Tenaga Pendukung :
1 Office Manager/Administrator 3 Thn SMA/SMK 1.00 1.00 1.00 1,500,000.00 Rp. 1,500,000.00
2 Driver 3 Thn - 1.00 1.00 1.00 1,000,000.00 Rp. 1,000,000.00
3 Office Boy 3 Thn - 1.00 1.00 1.00 1,000,000.00 Rp. 1,000,000.00
Jumlah Biaya Tenaga Pendukung Rp. 3,500,000.00
TOTAL JUMLAH BIAYA LANGSUNG PERSONIL Rp. 32,750,000.00
BIAYA LANGSUNG NON PERSONIL
PROGRAM : PENGEMBANGAN PERUMAHAN
KEGIATAN PEMBANGUNAN SARANA DAN PRASARANA RUMAH SEHAT SEDERHANA
PENYUSUNAN DED PERENCANAAN PEMBANGUNAN JALAN LINGKUNGAN SEHAT
PEKERJAAN :
KOMUNAL PAKET 1
T.A : 2018
SUMBER DANA : APBD
LOKASI : KABUPATEN POHUWATO

JLH
SATUAN BIAYA JUMLAH BIAYA
NO JENIS KEGIATAN SAT VOL BLN ( Rp. ) (Rp)
1 2 3 4 5 6 (4x5x6)
1. Biaya Kantor :
a. Peralatan / Perlengkapan kantor Ls 1.00 Ls Rp. 1,950,000.00 Rp. 1,950,000.00
b. Sewa Alat Ukur Unit 1.00 1.00 Rp. 1,000,000.00 Rp. 1,000,000.00
c. Sewa Komputer Unit 1.00 1.00 Rp. 690,000.00 Rp. 690,000.00
d. Sewa Printer Unit 1.00 1.00 Rp. 450,000.00 Rp. 450,000.00
e. Alat tulis & bahan habis terpakai Ls 1.00 Ls Rp. 450,000.00 Rp. 450,000.00

Jumlah Biaya Kantor Rp. 4,540,000.00


2. Biaya Transport.& Komunikasi
a. Sewa Kendaraan Roda 4 Unit 1.00 1.00 Rp. 6,000,000.00 Rp. 6,000,000.00
b. Sewa Kendaraan Roda 2 Unit 2.00 1.00 Rp. 420,000.00 Rp. 840,000.00
c. Biaya Komunikasi Lot 1.00 Lot Rp. 325,000.00 Rp. 325,000.00
Jumlah Biaya Transportasi & Komunikasi Rp. 7,165,000.00
3. Biaya Pembuatan Laporan dan Lain-lain :
a. Laporan Perencanaan
- Laporan Pendahuluan Buku 2.00 Ls Rp. 125,000.00 Rp. 250,000.00
- Laporan Antara Buku 2.00 Ls Rp. 125,000.00 Rp. 250,000.00
- Laporan Akhir Buku 2.00 Ls Rp. 125,000.00 Rp. 250,000.00

b. EE/Gambar/Spektek Buku 2.00 Ls Rp. 125,000.00 Rp. 250,000.00

Rp. 1,000,000.00
TOTAL JUMLAH BIAYA LANGSUNG NON PERSONIL Rp. 12,705,000.00
BILLING RATE
HARGA PERHITUNGAN SENDIRI ( HPS )

A. BIAYA LANGSUNG PERSONIL TENAGA AHLI PROFESIONAL


PROVINSI GORONTALO - TAHUN 2010
RUPIAH RUPIAH RUPIAH
KELOMPOK AHLI YEARS YEARS YEARS
PER-BULAN PER-BULAN PER-BULAN
EXP. EXP. EXP.
KLASIFIKASI GOLONGAN S-1 S-2 S-3
AHLI I-A 1 -
PERTAMA I-B 2 -
I-C 3 12,593,250
I-D 4 14,040,750
AHLI MUDA II-A 5 15,343,500 1 15,922,500
II-B 6 16,791,000 2 17,659,500
II-C 7 18,238,500 3 19,541,250
II-D 8 19,686,000 4 21,278,250
AHLI MADYA III-A 9 7,543,883 5 9,591,360 1 15,580,339
III-B 10 7,984,778 6 10,063,979 2 16,095,019
III-C 11 8,451,442 7 10,559,888 3 16,626,700
III-D 12 8,945,378 8 11,080,232 4 17,175,944
AHLI UTAMA IV-A 13 9,468,183 9 11,626,217 5 17,743,333
IV-B 14 10,021,542 10 12,199,106 6 18,329,464
IV-C 15 10,607,243 11 12,800,224 7 18,934,958
IV-D 16 11,227,173 12 13,430,962 8 19,560,453
AHLI KEPALA V-A 17 11,883,335 13 14,092,781 9 20,206,611
V-B 18 12,577,846 14 14,787,210 10 20,874,114
V-C 19 13,312,947 15 15,515,859 11 21,563,667
V-D 20 14,091,010 16 16,280,412 12 22,275,999
AHLI PEMBINA VI-A 21 14,914,547 17 17,082,638 13 23,011,862
KELAPA VI-B 22 15,786,214 18 17,924,395 14 23,772,034
VI-C 23 16,708,825 19 18,807,630 15 24,557,316
VI-D 24 17,685,357 20 19,734,387 16 25,368,540
VI-E 25 18,718,962 21 20,706,810 17 26,206,562
BILLING RATE
HARGA PERHITUNGAN SENDIRI ( HPS )

B. BIAYA LANGSUNG PERSONIL STAFF SUB-PROFESIONAL


PROVINSI GORONTALO TAHUN 2004

HARGA SATUAN INDEKS JUMLAH HARGA


NO. PERSONIL (GORONTALO)
( RUPIAH ) ( RUPIAH )
1 2 3 4 3x4

Sub - Profesional (D1/D2/D3) :


1. Autocad Specialist 6,700,000.00 0.965 6,465,500.00
2. System/Software Engineer 8,100,000.00 0.965 7,816,500.00
3. Hardware Engineer 6,700,000.00 0.965 6,465,500.00

Teknisi (SMK/D1/D2) :
1. Technician 6,700,000.00 0.965 6,465,500.00
2. Supervisor/Inspector 6,700,000.00 0.965 6,465,500.00
3. Surveyor/Estimator 6,200,000.00 0.965 5,983,000.00

Tenaga Pendukung :
1. Office Manager 7,350,000.00 0.965 7,092,750.00
2. Billingual Secretary 7,250,000.00 0.965 6,996,250.00
3. Secretary 4,500,000.00 0.965 4,342,500.00
4. Drafter 3,350,000.00 0.965 3,232,750.00
5. Office Administration 6,700,000.00 0.965 6,465,500.00
6. Computer Operator 3,950,000.00 0.965 3,811,750.00
7. Massenger 2,300,000.00 0.965 2,219,500.00
8. Office Boy 1,700,000.00 0.965 1,640,500.00
9. Driver 2,500,000.00 0.965 2,412,500.00
10 Guard 2,050,000.00 0.965 1,978,250.00

INDEKS : Indeks Harga Satuan untuk Provinsi Gorontalo = 0,965


BILLING RATE
HARGA PERHITUNGAN SENDIRI ( HPS )

C. BIAYA LANGSUNG NON PERSONIL


PROVINSI GORONTALO - TAHUN 2010

HARGA SATUAN
NO. JENIS PENGELUARAN SATUAN
MAXIMUM ( Rp.)
1 2 3 4

A. Biaya Kantor :
1. Peralatan/Perlengkapan kantor M2/Bulan 619,380.00
2. Sewa Komputer Unit/Bulan 1,147,000.00
3 Sewa Alat Ukur Unit/Bulan 860,250.00
4 Sewa Printer Unit/Bulan 917,600.00
5 Alat tulis dan Bahan habis terpakai Ls 2,500,000.00
B. Biaya Transportasi & Komunikasi :
1. Sewa kendaraan roda 4 Unit/Bulan 9,520,100.00
2. Sewa kendaraan roda 2 Unit/Bulan 1,605,800.00
3. Telepon, Telex, Facimile Bulan 378,510.00
4. Surat menyurat Bulan 573,500.00
C. Biaya Pelaporan :
1. Laporan Pendahuluan Buku 160,580.00
2. Laporan Antara Buku 206,460.00
3. Laporan Bulanan Buku 206,460.00
4. Laporan Akhir Buku 321,160.00
5. Ringkasan Eksekutif Buku 143,375.00
D. Biaya Lain-lain :
1. Dokumentasi Ls 1,500,000.00
2. Biaya Rapat/pertemuan Ls 2,000,000.00
3. Konsumsi Ls 1,500,000.00

INDEKS : Indeks Harga Satuan untuk Provinsi Gorontalo = 1.147

Anda mungkin juga menyukai