Anda di halaman 1dari 65

DPK Konvensional

Project Upgrade Core Banking System Bank Nagari

Test Result

Total Test Case


79

Total Eksekusi
0
Total Pass
0
Total Failed
0
Total Not Run
79
Total Blocked
0

Test Case Objective:

Test Case Pre-execution Steps:

Post Execution Clean-up Steps:

Test Case Dependencies:


Release Name/Number

Total Pass
0%
Total Failed

#N/A Total Not Run

Total Blocked
#N/A

100 %

0%

Test Case Objective:

Case Pre-execution Steps:

Execution Clean-up Steps:

st Case Dependencies:
ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK Konvensional
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

Nasabah Perorangan - Tabungan IDR

1
2
3
4
5
6 Nasabah Non Perorangan - Tabungan IDR

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK Konvensional
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

Nasabah Non Perorangan - Tabungan IDR

7
8
9
10

11

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK Konvensional
PROJECT NAME Nasabah Non Perorangan - Tabungan IDR PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

12
13
14
15

16

Document Ver. 1.0 For Internal Use Only


Nasabah Non Perorangan - Tabungan IDR
ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK Konvensional
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

17
18
19
20

21

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK Konvensional
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

Blokir & Lepas Blokir Tabungan

22

23
24

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK KonvensionalBlokir & Lepas Blokir Tabungan
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

25
Cetak Buku Tabungan Transaksi Tunda,
Inquery, Cetak Rekening Koran Tabungan

26

27
Penutupan Rekening Tabungan
28

29

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK Konvensional
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario # Penutupan Rekening Tabungan

30
Pembukaan Rekening Tabungan Massal
31

32
Pemeliharaan Rekening Tabungan
33

34

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK Konvensional
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

Nasabah Non Perorangan - Giro IDR

35
36

37

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK Konvensional
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

38
39
40

41

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK Konvensional
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

Nasabah Perorangan - Giro IDR

42
43

44

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK Konvensional
PROJECT NAME Nasabah Perorangan - Giro IDR PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

45
46
47

48

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK Konvensional
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

Blokir & Lepas Blokir Giro

49

50

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK Konvensional
PROJECT NAME Blokir & Lepas Blokir Giro PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

51

52
Penutupan Rekening Giro

53

54

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK Konvensional
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

Nasabah - Deposito

55

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK KonvensionalNasabah - Deposito
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

56

57

58
59

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK Konvensional
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

Nasabah - Deposito Bunga Nego

60

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS Nasabah - Deposito Bunga Nego


1
UAT untuk Modul DPK Konvensional
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

61

62
63

64

65

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK Konvensional
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

Blokir & Lepas Blokir Deposito

66

67

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK KonvensionalBlokir & Lepas Blokir Deposito
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

68

69

70

71

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK Konvensional
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

Pencairan Deposito

72
Penutupan Rekening Deposito

73

74

75

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Test Case and Execution Report

PROJECT AND TESTING DETAILS


1
UAT untuk Modul DPK Konvensional
PROJECT NAME PROJECT CODE
Upgrade Core Banking System Bank Nagari
MODULE / UNIT TESTED TESTED BY
DPK Konvensional
TEST EXECUTION DETAILS
2
This section provides the details of the Test Case Execution.
# Requirement / Test Data (Input) Test Prerequisites
Test Case
CR Number/ Description
ID
Scenario #

76 Stock Bilyet Deposito

77
Perubahan Status Rekening Doorman

78

79
Prepared By Date & Time

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Pembukaan CIF Perorangan Berhasil, dengan tampil no. CIF

Pembukaan rekening tabungan Berhasil, dengan tampil no.


SIKOCI Rekening yang di pilih sesuai
pemilihan rekening sebelumnya
Approval pembukaan rekening tab Data berhasil di simpan
Pencatatan Buku Tabungan Berhasil
Register buku tabungan Berhasil
Cetak header buku tabungan Sesuai format buku tab
Pembukaan CIF Perorangan Berhasil, dengan tampil no. CIF

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Pembukaan rekening tabungan Berhasil, dengan tampil no.


SIMPEDA Rekening yang di pilih sesuai
pemilihan rekening sebelumnya
Approval pembukaan rekening tab Data berhasil di simpan
Register buku tabungan Berhasil
Cetak header buku tabungan Sesuai format buku tab
Setoran tunai awal rekening tabungan Diatas minimal berhasil, dibawah
Diatas minimal setoran dan setoran minimal ditolak
dibawah minimal

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Pembukaan rekening tabungan Berhasil, dengan tampil no.


KHUSUS Rekening yang di pilih sesuai
pemilihan rekening sebelumnya
Approval pembukaan rekening tab Data berhasil di simpan
Register buku tabungan Berhasil
Cetak header buku tabungan Sesuai format buku tab
Setoran tunai awal rekening tabungan Diatas minimal berhasil, dibawah
Diatas minimal setoran dan setoran minimal ditolak
dibawah minimal

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Pembukaan rekening tabungan Berhasil, dengan tampil no.


SIKOCI USD Rekening yang di pilih sesuai
pemilihan rekening sebelumnya
Approval pembukaan rekening tab Data berhasil di simpan
Register buku tabungan Berhasil
Cetak header buku tabungan Sesuai format buku tab
Setoran tunai awal rekening tabungan Diatas minimal berhasil, dibawah
Diatas minimal setoran dan setoran minimal ditolak
dibawah minimal

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Blokir rekening tabungan SIKOCI Data berhasil di simpan


Jenis blokir : blokir rekening
Tanggal : ………………….. s.d
……………….

Blokir rekening tabungan SIMPEDA Data berhasil di simpan


Jenis blokir : blokir saldo seluruh
Tanggal : ………………….. s.d
……………….

Lepas Blokir rekening SIMPEDA Data berhasil di simpan

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Lepas Blokir rekening SIKOCI Data berhasil di simpan


Cetak buku tabungan transaksi tunda Berhasil di print
rekening tabungan SIKOCI

Cetak buku tabungan transaksi tunda Berhasil di print


rekening tabungan SIMPEDA

Penutupan rekening Tabungan Rekening berhasil ditutup


SIKOCI
Penutupan rekening Tabungan Rekening berhasil ditutup
SIMPEDA

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Penutupan rekening Tabungan Rekening berhasil ditutup


TABUNGANKU
Pembukaan rekening Tabungan Data berhasil di simpan
massal TABUNGANKU
Pembukaan rekening Tabungan Data berhasil di simpan
massal SIKOCI
Pemeliharaan rekening tabungan Data berhasil di simpan
SIKOCI
Pemeliharaan rekening tabungan Data berhasil di simpan
TABUNGANKU

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Pembukaan rekening Data berhasil di simpan


GIRO PEMERINTAH
No Nsb :
……………………………………………
.
Jasa giro ditransfer ke rekenig :
………………………..

Approval pembukaan rekening giro Data berhasil di simpan


Pendaftaran speciment rekening ( 2 Data berhasil di simpan
speciment )

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Setoran tunai awal rekening giro Rp Data berhasil di simpan


……………………………
Pembelian cheque 50 lembar Data berhasil di simpan
Pengembalian cheque Data berhasil di simpan
Cetak rekening koran Data berhasil di simpan
Cetak informasi Rekening giro

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Pembukaan rekening Data berhasil di simpan


GIRO SWASTA PERORANGAN
No Nsb :
……………………………………………
.
Jasa giro ditransfer ke rekenig :
………………………..

Approval pembukaan rekening giro Data berhasil di simpan


Pendaftaran speciment rekening ( 2 Transaksi berhasil
speciment )

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Setoran tunai awal rekening giro Rp Data berhasil di simpan


……………………………
Pembelian cheque 50 lembar Data berhasil di simpan
Pengembalian cheque Data berhasil di simpan
Cetak rekening koran Berhasil di cetak
Cetak informasi Rekening giro

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Blokir rekening Data berhasil di simpan


GIRO PEMERINTAH
Jenis blokir : blokir rekening
Tanggal : ………………….. s.d
……………….

Blokir rekening Data berhasil di simpan


GIRO SWASTA PERUSAHAAN
Jenis blokir : blokir saldo seluruh
Tanggal : ………………….. s.d
……………….

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Lepas Blokir rekening no Data berhasil di simpan


GIRO PEMERINTAH

Lepas Blokir rekening no Data berhasil di simpan


GIRO SWASTA PERUSAHAAN

Penutupan rekening Rekening berhasil di tutup


GIRO PEMERINTAH

Penutupan rekening Rekening berhasil di tutup


GIRO SWASTA PEMERINTAH

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Pembukaan rekening Data berhasil di simpan


DEPOSITO 1 BULAN
IDR
No Nsb : …………………….
Jenis perpanjangan : ARO
Nominal : ……………………………….
Rekening sumber :
………………………..
Rekening pencairan :
………………………..

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Approval pembukaan rekening Approval berhasil


deposito
Penempatan Dana via Data berhasil di simpan
transfer( pemindahbukuan )
dari rekening ………………………..
Rp …………………………

Pambayaran Bunga dibayar ditransfer Data berhasil di simpan


ke ………………………..
Pencetakan bilyet deposito Berhasil cetk bilyet

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Pembukaan rekening Data berhasil di simpan


DEPOSITO 1 BULAN
IDR
no nsb : ………………………..
Jenis perpanjangan : ARO
Bunga nego :
Rekening sumber IDR:
………………………..
Rekening pencairan IDR:
………………………..
Bunga ditransfer ke
………………………..

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Approval pembukaan rekening Approval berhasil


deposito
Penempatan Dana via Transaksi berhasil
transfer( pemindahbukuan )
dari rekening ………………………..
Rp …………………………

Pencetakan bilyet deposito Cetak bilyet berhasil


Rekening penerima bagi hasil Data berhasil di simpan
deposito
Perubahan nisbah bagi hasil deposito Data berhasil diubah

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Blokir rekening Data berhasil di simpan


DEPOSITO 1 BULAN
Jenis blokir : blokir rekening
Tanggal : ………………….. s.d
……………….

Blokir rekening Data berhasil di simpan


DEPOSITO 3 BULAN
Jenis blokir : blokir saldo seluruh
Tanggal : ………………….. s.d
……………….

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Blokir rekening Data berhasil di simpan


DEPOSITO 6 BULAN
Jenis blokir : blokir rekening
Tanggal : ………………….. s.d
……………….

Lepas Blokir rekening no Data berhasil di simpan


DEPOSITO 1 BULAN
Lepas Blokir rekening no Data berhasil di simpan
DEPOSITO 3 BULAN
Lepas Blokir rekening no Data berhasil di simpan
DEPOSITO 6 BULAN

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Pencairan Rekening berhasil di cairkan


DEPOSITO 1 BULAN
sebelum waktunya
No Rekening ……………………

Penutupan rekening Rekening berhasil ditutup


DEPOSITO 1 BULAN
Penutupan rekening Rekening berhasil ditutup
DEPOSITO 3 BULAN
Penutupan rekening Rekening berhasil ditutup
DEPOSITO 6 BULAN

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Template Ver. 1.0

ECT CODE PRODUCT / PROJECT RELEASE VERSION


v1.2.10p0-RELEASE
Testing Technique FROM DATE TO DATE
Manual

Procedure / Steps Expected Result Severity Test Test Date Cycle 1


Ressource

Actual Result

Pencatatan Stock Bilyet Deposito Data berhasil disimpan


Pembatalan Stock Bilyet Deposito Stock bilyet deposito berhasil
dibatalkan
Perubahan Status Rekening Doorman Data berhasil disimpan
Tabungan
Perubahan Status Rekening Doorman Data berhasil disimpan
Giro
& Time Approved By

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Not Run
Not Run
Not Run
Not Run
Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Not Run
Not Run
Not Run

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Not Run
Not Run
Not Run

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Not Run
Not Run
Not Run

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Not Run

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)
Not Run

Not Run

Not Run

Not Run

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Not Run

Not Run

Not Run

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Not Run

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Not Run
Not Run

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Not Run

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Not Run
Not Run

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Not Run

Not Run

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Not Run

Not Run

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Not Run

Not Run

Not Run

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Not Run

Not Run

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)

Not Run

Not Run

Not Run

Not Run

Document Ver. 1.0 For Internal Use Only


ElectraCard Services Pvt. Ltd. Template Ver. 1.0

Cycle 1 Cycle n

Test Test
Status Defect Actual Status Defect
( P-Pass, Number Result ( P-Pass, Number
F-Fail) F-Fail)
Not Run

Not Run

Not Run

Not Run

Document Ver. 1.0 For Internal Use Only

Anda mungkin juga menyukai