Anda di halaman 1dari 1

Fig. 2.

2
MAJOR IRRIGATION PROJECTS
TAKEN UP AND COMPLETED DURING PRE PLAN & PLAN PERIODS
UP TO END OF IXTH PLAN (CUMULATIVE)

450

400 390
369
TAKEN UP 348 350
350 337
COMPLETED 305
295
300

250 227 228

194 198
200 183 183 189
168
151
136 138
150 130
118 110 115
99
100 79
74 74

50

0
Pre Plan I Plan II Plan III Plan AP IV Plan V Plan AP VI Plan VII Plan AP VIII Plan IX Plan
(1966-69) (1978-80) (1990-92)
PLAN PERIOD

Anda mungkin juga menyukai