RENCANA ANGGARAN BIAYA (RAB)

PROYEK : Rumah Type 30/60


LOKASI : Islamic Grand Village Kalisuren

NO URAIAN PEKERJAAN SPESIFIKASI BAHAN VOL

I PEKERJAAN PERSIAPAN
1 PEMBERSIHAN LAHAN 60.0
2 PS.BOUPLSNK & SETTING 40.0

II PEKERJAAN TANAH
1 GALIAN PONDASI BANGUNAN 11.0
2 URUGAN TANAH KEMBALI 4.1

III PEKERJAAN PONDASI


1 PONDASI PLAT BETON BESI 10 MM -
2 PONDASI BATU KALI 6.9
3 SLOOF 15/20 0.9
4 SLOOF 15/15 0.4

IV PEK. KOLOM LANTAI BETON


1 KOLOM PRAKTIS 1.0
2 PLAT LANTAI -
3 BALOK LANTAI -
4 KOLOM K1 -
5 RING BALK 1.1

V PEKERJAAN BETONN ATAP


1 DAK ATAP 0.3
2 BALOK DAN ATAP -
3 WATERPROOFING 2.5

VI PEK. BATA & PLESTERAN


1 PAS. BATA RINGAN 130.9
2 PLESTER + ACIAN 261.7

VII PEK. LANTAI


1 KERAMIK 40X40 23.0
2 PLINT LANTAI -
3 KERAMIK 30X30 4.0
4 LANTAI KM/WC 25X20 2.1
5 DINDING KM/WC 25X20 9.6

VIII KUSEN PINTU & JENDELA


1 KUSEN PINTU & JENDELA KAYU MERANTI KW2 35.8
2 DAUN JENDELA + KACA 5.0
3 DAUN PINTU PANEL 1.0
4 DAUN PINTU TEAKWOOD 3.0
5 PINTU KM/WC 1.0
6 VENTILASI UDARA 7.0
7 KUNCI PINTU 4.0
8 KUNCI JENDELA 5.0
9 ENGSEL PINTU PASANG 4.0
10 ENGSEL JENDELA 5.0
11 HAK. ANGIN 5.0

IX PEKERJAAN PLAFOND
1 PLAFOND GYPSUM 32.2
2 LIST PLAFOND GYPSUM -

X PEKERJAAN INSTALASI AIR


A INS. AIR BERSIH
1 PIPA PVC 1/2" 17.0
2 PIPA PVC 3/4" -
B INS. AIR KOTOR
1 PIPA PVC 3" -
2 PIPA PVC 4" 17.0

XI KM/WC & PERALATAN SANITAIR


1 CLOSET JONGKOK 1.0
2 FLOR DRAIN 1.0
3 KRAN LEHER ANGSA 1.0
4 KITCHEN ZINK 1.0
5 SHOWER -
6 KRAN AIR 3.0
7 BAK AIR 1.0
8 ZET WASHER -

XII INSTALASI LISTRIK


1 BOX MCB 1.0
2 INS. TITIK LAMPU DOWNLIGHT 7.0
3 INS. STOP KONTAK 5.0
4 INS. STOP KONTAK AC -
5 INS. TELP -

XIII PEK. PENGECATAN


1 CAT DINDING 261.7
2 CAT PLAFOND + LIST 32.2
3 CAT KUSEN PINTU & JENDELA -
4 CAT DAUN PINTU 4.0
5 CAT LISTPLANK 16.0

XIV PEK. RANGKA ATAP


1 ATAP BAJA RINGAN 42.6
2 PAS ATAP GENTENG 42.6
3 NOK GENTENG 6.0
4 LISTPLANK GRC 16.0

XV PEK. LAIN - LAIN


1 SEPTICTANK + BAK KONTROL 1.0
2 CARPORT 12.0
3 TOREN -
4 SUMUR BOR + POMPA -
5 MEJA DAPUR 1.0

TOTAL
TOTAL PER M2
RAB)

HARGA
L/N SUB TOTAL
SATUAN

M2 5,000.00 300,000.00
M1 35,000.00 1,400,000.00
1,700,000.00

M3 60,000.00 660,000.00
M3 25,000.00 102,500.00
762,500.00

M3 2,000,000.00 -
M3 700,000.00 4,830,000.00
M3 2,000,000.00 1,800,000.00
M3 2,000,000.00 800,000.00
7,430,000.00

M3 2,000,000.00 2,000,000.00
M3 2,000,000.00 -
M3 2,000,000.00 -
M4 2,000,000.00 -
M3 2,000,000.00 2,200,000.00
4,200,000.00

M3 2,000,000.00 600,000.00
M3 2,000,000.00 -
M2 20,000.00 50,000.00
650,000.00

M2 75,000.00 9,817,500.00
M2 30,000.00 7,851,000.00
17,668,500.00

M2 115,000.00 2,645,000.00
M' 45,000.00 -
M2 100,000.00 400,000.00
M2 110,000.00 231,000.00
M2 115,000.00 1,104,000.00
4,380,000.00

M1 60,000.00 2,148,000.00
BH 150,000.00 750,000.00
BH 500,000.00 500,000.00
BH 300,000.00 900,000.00
PS 200,000.00 200,000.00
BH 75,000.00 525,000.00
BH 150,000.00 600,000.00
BH 50,000.00 250,000.00
BH 45,000.00 180,000.00
BH 45,000.00 225,000.00
BH 45,000.00 225,000.00
6,503,000.00

M2 50,000.00 1,610,000.00
M1 25,000.00 -
1,610,000.00

M1 20,000.00 340,000.00
M1 20,000.00 -

M1 150,000.00 -
M1 48,000.00 816,000.00
1,156,000.00

BH 230,000.00 230,000.00
BH 45,000.00 45,000.00
BH 20,000.00 20,000.00
BH 450,000.00 450,000.00
BH 650,000.00 -
BH 75,000.00 225,000.00
BH 750,000.00 750,000.00
BH 250,000.00 -
1,720,000.00

UNIT 250,000.00 250,000.00


TTK 150,000.00 1,050,000.00
TTK 150,000.00 750,000.00
TTK 150,000.00 -
TTK 150,000.00 -
2,050,000.00

M2 13,000.00 3,402,100.00
M2 20,000.00 644,000.00
M1 150,000.00 -
BH 75,000.00 300,000.00
M1 5,000.00 80,000.00
4,426,100.00

M2 100,000.00 4,260,000.00
M2 38,000.00 1,618,800.00
M1 36,000.00 216,000.00
M1 26,000.00 416,000.00
6,510,800.00

UN 1,500,000.00 1,500,000.00
M2 450,000.00 5,400,000.00
LS 1,100,000.00 -
LS 7,500,000.00 -
LS 500,000.00 500,000.00
7,400,000.00
68,166,900.00
30.00 2,272,230.00