Program K3 1
Program K3 1
I KESELMATAN KERJA
- PEMASANGAN RAMBU - RAMBU DI AREA KERJA HSE PALU, PAKU, GERGAJI MINGGU 3 BULAN MARET
- PEMASANGAN POLICE LINE DI AREA GALIAN HSE PALU, PAKU, GERGAJI MINGGU 3 BULAN MARET
- PEMASANGAN LABEL DI TEMPAT KERJA HSE PALU, PAKU, GERGAJI MINGGU 3 BULAN MARET
- PEMASANGAN LABEL LOTO (INSTALASI LISTRIK) HSE SAFETY SHOES, SAFETY GLOVES KONDISIONAL SETIAP PEMASANGAN INSTALASI BARU
- MELAPORKAN SEMUA KONDISI BERBAHAYA HSE/ PM/ SM ATK SETIAP HARI KETIKA ADA KEJADIAN
- MELAKSANAKAN INSPEKSI PERALATAN KERJA HSE/ PM/ SM ATK, SAFETY SHOES SETIAP HARI
- MELAKSANAKAN INSPEKSI APD HSE/ PM/ SM ATK, SAFETY SHOES SETIAP HARI
- MELAKUKAN SAFETY PATROL HSE/ SM SAFETY SHOES, HEADLAMP, SENTER SETIAP HARI
- ERECTION RANGKA ATAP BAJA HSE/ PM/ SM MOBILE CRANE/ HOIST/ CHAINBLOCK APRIL MINGGU KE 3
- KESELAMATAN LALU LINTAS HSE LIGHT SIGN MINGGU 3 BULAN MARET PENGECORAN KOLOM
II KESEHATAN KERJA
- MELAKUKAN PEMBUANGAN SAMPAH BERKALA HSE SETIAP MINGGU SEWA MOBIL SAMPAH
DISIAPKAN OLEH DIPERIKSA OLEH DISETUJUI OLEH MESJID JAMI' BINTARO JAYA
S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M
WAKTU PELAKSANAAN
JUNI JULI AGUSTUS
MINGGU KE 2 MINGGU KE 3 MINGGU KE 4 MINGGU KE 1 MINGGU KE 2 MINGGU KE 3 MINGGU KE 4 MINGGU KE 1
S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M
AGUSTUS SEPTEMBER OKTOBER
MINGGU KE 2 MINGGU KE 3 MINGGU KE 4 MINGGU KE 1 MINGGU KE 2 MINGGU KE 3 MINGGU KE 4 MINGGU KE 1 MINGGU KE 2
S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M
DISIAPKAN OLEH DISETUJUI OLEH MESJID JAMI BINTARO JAYA
PERUSAHAAN : NAMA : NAMA :
NAMA : JABATAN : JABATAN :
TANGGAL : TANGGAL : TANGGAL :
TANDA TANGAN : TANDA TANGAN : TANDA TANGAN :
: