Contoh Standar Input Anggaran TBM 0 - 3
Contoh Standar Input Anggaran TBM 0 - 3
1. Norma Harga
2. Norma Kegiatan
3. Norma Volume Pekerjaan
4. Norma Rotasi Pekerjaan
5. Rasio Biaya LC/Tanam baru - Bibitan
6. Rasio Biaya LC/Tanam baru - TBM
7. Norma Jarak Angkut
8. Norma kebutuhan HK
9. Norma Agrochemical
10. Norma Material
11. Norma Turunan Material
12. Norma Alat Berat (HM)
13. Norma Alat Angkut
14. Norma Pupuk Nursery (Gambut)
15. Norma Pupuk Nursery (Mineral)
16. Norma Pupuk TBM (Gambut)
17. Norma Pupuk TBM (Mineral)
18. Norma Kebutuhan Tenaga Kerja
Contract
LAND CLEARING
BLOCKING Mtr/Ha 43.8667 43.8667 43.8667 50.6400
RUMPUK % 95.0000 70.0000 40.0000 100.0000
BAJAK % 95.0000 70.0000 40.0000 100.0000
GARU % 95.0000 70.0000 40.0000 100.0000
COMPACTING % - - - 100.0000
JALAN 45.8667 62.7533 73.4467 52.6400
ACCESS ROAD (di dalam) Mtr/Ha 2.0000 2.5000 3.0000 2.0000 Acces Road diluar kebun Jalan di luar izin lokasi beban Capex
MAIN ROAD Mtr/Ha 10.2333 11.2567 11.7683 10.2800
COLLECTION ROAD Mtr/Ha 33.6333 36.9967 38.6783 40.3600
CONTOUR ROAD Mtr/Ha - 12.0000 20.0000 -
GAMBANGAN Mtr/Ha 0.1000 0.3000 0.5000 0.7500
JEMBATAN
JEMBATAN KAYU/LOG Unit/Ha 0.0500 0.0667 0.1000 0.0400
JEMBATAN BETON Unit/Ha 0.0100 0.0100 0.0167 0.0100
GORONG-GORONG Unit/Ha 0.0333 0.0500 0.0667 0.0400
PARIT
PARIT MAIN Mtr/Ha 2.0000 3.0000 5.0000 10.2800
PARIT COLLECTION Mtr/Ha 8.0000 10.0000 10.0000 40.3600 6.097561 0.203252
PARIT FIELD Mtr/Ha 10.0000 15.0000 20.0000 330.0000 328.94737
PARIT ALAM Mtr/Ha 1.0000 1.0000 1.0000 1.0000
TERESAN, TPK KUDA & PLANTING POCKET
TERESAN % 5.0000 30.0000 60.0000 -
PLANTING POCKET % - 15.0000 30.0000 -
TAPAK KUDA % 0.5000 1.0000 2.0000 -
BUMBUNAN % 2.0000 1.0000 1.0000 5.0000
BENTENG RORAK % - 1.0000 2.0000 -
BENDUNGAN Unit/Ha - - - 0.1200
PINTU AIR Unit/Ha 0.0002 0.0002 0.0002 0.0012
PRASARANA LAIN
TANGGA-TANGGA PANEN Mtr/Ha 0.5000 1.0000 1.5000 -
TITI PANEN KAYU Unit/Ha 0.1700 0.2000 0.2000 2.2000 Rasio 3 PP
TITI PANEN BETON Unit/Ha 0.1700 0.2000 0.2000 0.9200 Rasio 3 PP
TPH PANEN Unit/Ha 1.4245 1.5670 1.6382 1.7316 Rasio 3 PP
KANDANG BURUNG HANTU Unit/Ha 0.0333 0.0333 0.0333 0.0400
PENANAMAN KACANGAN
KACANGAN MB Stek/Ha 1.0000 1.0000 1.0000 1.0000
KACANGAN SELAIN MB Kg/Ha 9.5000 9.5000 9.5000 9.5000
PENANAMAN KELAPA SAWIT
BIBIT SAWIT Pkk/Ha 143.0000 143.0000 143.0000 150.0000
LUAS Ha/Ha 1.0000 1.0000 1.0000 1.0000
SURVEY DAN PATOK
PATOK BATAS BLOK Unit/Ha 0.1333 0.1333 0.1333 0.1600
NORMA KUANTITAS 2. VOLUME PENGERJAAN
Aktivitas Sat Mineral
Thn 0 Thn 1
PEMBIBITAN
PERSIAPAN AREAL
PENETAPAN AREAL (SURVEY AWAL) % 100.0000
IMAS TUMBANG % 100.0000
RUMPUK % 100.0000
PEMBUATAN TAPAK BIBITAN % 100.0000
PEMBUATAN JALAN BIBITAN % 100.0000
PEMBUATAN JEMBATAN BIBITAN % 100.0000
PEMBUATAN PARIT BIBITAN % 100.0000
PEMBUATAN WADUK % 100.0000
PEMBUATAN INSTALASI AIR % 100.0000
PEMBUATAN BANGUNAN % 100.0000
PEMBUATAN BEDENGAN DAN NAUNGAN % 100.0000
KUMPUL TOPSOIL (PN DAN MN) % 100.0000
PRE- NURSERY
KECAMBAH % 100.0000
MENGISI TANAH - PN % 100.0000
MENGATUR BABY BAG - PN % 100.0000
SELEKSI KECAMBAH - PN % 100.0000
PENANAMAN KECAMBAH - PN % 100.0000
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - PN % 100.0000
PENYIRAMAN MANUAL - PN % 100.0000
PENYIRAMAN MEKANIS - PN % 100.0000
RAWAT PARIT BEDENGAN - PN % 100.0000
PEMELIHARAAN INSTALASI AIR - PN % 100.0000
PEMUPUKAN PRE NURSERY % 100.0000
PENGENDALIAN GULMA DI POLIBAG - PN % 100.0000
PENGENDALIAN GULMA DI LUAR POLIBAG - PN % 100.0000
PENGENDALIAN HAMA PENYAKIT TANAMAN - PN % 100.0000
SENSUS - PN % 100.0000
SELEKSI - PN % 100.0000
MAIN NURSERY
MENGISI TANAH - MN % 100.0000
PENAMBAHAN TANAH - MN % 30.0000
SPACING & SUSUN POLIBAG - MN % 100.0000
LANGSIR POLIBAG - MN % 100.0000
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - MN % 100.0000
MENCABUT & ANGKUT KE MN % 100.0000
MEMBUAT LUBANG TANAM (BOR) - MN % 100.0000
TANAM BIBIT - MN % 100.0000
PENYIRAMAN MANUAL - MN % 100.0000
PENYIRAMAN MEKANIS - MN % 100.0000
RAWAT PARIT - MN % 100.0000
PEMELIHARAAN INSTALASI AIR - MN % 100.0000
PEMUPUKAN - MN % 100.0000
PENGENDALIAN GULMA DI POLIBAG - MN % 100.0000
PENGENDALIAN GULMA DI LUAR POLIBAG - MN % 100.0000
PENGENDALIAN HAMA PENYAKIT TANAMAN - MN % 100.0000
SENSUS - MN % 100.0000
SELEKSI - MN % 100.0000
MENEGAKKAN POLIBAG DAN BIBIT - MN % 30.0000
PENGGANTIAN POLIBAG - MN % 30.0000
1001
30.0 20.0 10.0 5.0 30.0 20.0 10.0 1002
10.0 20.0 30.0 100.0 10.0 20.0 30.0 1003
- 10.000 50 0 0 10 50 1601
- 10.000 33 0 0 10 33 1602
- - 33 0 0 0 33 1603
100.000 100.000 100 0 100 100 100 1604
- - 20 0 0 20 20 1605
- - 10 0 0 0 0 1606
- - 0 0 0 0 0 1607
- - 0 0 0 0 0 1608
- - 0 0 0 5 5 1609
- 5.000 5 0 0 0 0 1610
- - 0 0 0 5 5 1611
0 0 5 5 1612
- - 0 0 0 0 0 1613
100.000 100.000 100 100 100 100 100 1701
- 0 0 1702
50.000 50.000 0 0 0 12.5 12.5 1703
100.000 100.000 100 100 100 100 100 1704
100.000 100.000 100 100 100 100 100 1705
20.000 0 0 1706
- 50.000 50 0 0 12.5 12.5 1707
100.000 100.000 100 100 100 100 100 1708
100.000 100.000 100 100 100 100 100 1709
20.000 0 1710
- 30.000 30 0 0 12.5 12.5 1711
100.000 100.000 100 100 100 100 100 1712
100.000 100.000 100 100 100 100 100 1713
- - 0 100 0 0 0 1714
- - 100 100 0 0 100 1715
- - 100 0 0 0 0 1716
- 25.000 25 100 0 25 25 1717
- - 100 100 0 0 100 1718
- - 100 0 0 0 100 1719
- - 25 0 0 0 0 1720
120000
1000
NORMA KUANTITAS 3. ROTASI PENGERJAAN
Mineral
Aktivitas Sat
Thn 0 Thn 1 Thn 0 dan 1 Thn 2
PEMBIBITAN
PERSIAPAN AREAL
PENETAPAN AREAL (SURVEY AWAL) Rot/Thn 1.0 1.0
IMAS TUMBANG Rot/Thn 1.0 1.0
RUMPUK Rot/Thn 1.0 1.0
PEMBUATAN TAPAK BIBITAN Rot/Thn 1.0 1.0
PEMBUATAN JALAN BIBITAN Rot/Thn 1.0 1.0
PEMBUATAN JEMBATAN BIBITAN Rot/Thn 1.0 1.0
PEMBUATAN PARIT BIBITAN Rot/Thn 1.0 1.0
PEMBUATAN WADUK Rot/Thn 1.0 1.0
PEMBUATAN INSTALASI AIR Rot/Thn 1.0 1.0
PEMBUATAN BANGUNAN Rot/Thn 1.0 1.0
PEMBUATAN BEDENGAN DAN NAUNGAN Rot/Thn 1.0 1.0
KUMPUL TOPSOIL (PN DAN MN) Rot/Thn 1.0 1.0
PRE- NURSERY
KECAMBAH Rot/Thn 1.0 1.0
MENGISI TANAH - PN Rot/Thn 1.0 1.0
MENGATUR BABY BAG - PN Rot/Thn 1.0 1.0
SELEKSI KECAMBAH - PN Rot/Thn 1.0 1.0
PENANAMAN KECAMBAH - PN Rot/Thn 1.0 1.0
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - PN Rot/Thn 1.0 1.0
PENYIRAMAN MANUAL - PN Rot/Thn 3.0 60.0
PENYIRAMAN MEKANIS - PN Rot/Thn 3.0 60.0
RAWAT PARIT BEDENGAN - PN Rot/Thn 3.0 3.0
PEMELIHARAAN INSTALASI AIR - PN Rot/Thn 3.0 3.0
PEMUPUKAN PRE NURSERY Rot/Thn 1.0 1.0
PENGENDALIAN GULMA DI POLIBAG - PN Rot/Thn 3.0 2.0
PENGENDALIAN GULMA DI LUAR POLIBAG - PN Rot/Thn 3.0 2.0
PENGENDALIAN HAMA PENYAKIT TANAMAN - PN Rot/Thn 3.0 9.0
SENSUS - PN Rot/Thn 2.0 2.0
SELEKSI - PN Rot/Thn 2.0 2.0
MAIN NURSERY
MENGISI TANAH - MN Rot/Thn 1.0 1.0
PENAMBAHAN TANAH - MN Rot/Thn 1.0 1.0
SPACING & SUSUN POLIBAG - MN Rot/Thn 1.0 1.0
LANGSIR POLIBAG - MN Rot/Thn 1.0 1.0
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - MN Rot/Thn 1.0 1.0
MENCABUT & ANGKUT KE MN Rot/Thn 1.0 1.0
MEMBUAT LUBANG TANAM (BOR) - MN Rot/Thn 1.0 1.0
TANAM BIBIT - MN Rot/Thn 1.0 1.0
PENYIRAMAN MANUAL - MN Rot/Thn 9.0 210.0
PENYIRAMAN MEKANIS - MN Rot/Thn 9.0 210.0
RAWAT PARIT - MN Rot/Thn 9.0 9.0
PEMELIHARAAN INSTALASI AIR - MN Rot/Thn 9.0 9.0
PEMUPUKAN - MN Rot/Thn 1.0 1.0
PENGENDALIAN GULMA DI POLIBAG - MN Rot/Thn 9.0 12.0
PENGENDALIAN GULMA DI LUAR POLIBAG - MN Rot/Thn 9.0 12.0
PENGENDALIAN HAMA PENYAKIT TANAMAN - MN Rot/Thn 9.0 30.0
SENSUS - MN Rot/Thn 3.0 3.0
SELEKSI - MN Rot/Thn 3.0 3.0
MENEGAKKAN POLIBAG DAN BIBIT - MN Rot/Thn 1.0 1.0
PENGGANTIAN POLIBAG - MN Rot/Thn 1.0 1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
60.0 Setiap hari selama 3 bulan
60.0 Setiap hari selama 3 bulan
3.0
3.0
1.0
2.0
2.0
9.0
2.0
2.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
210.0 Setiap hari selama 7 bulan
210.0 Setiap hari selama 7 bulan
9.0
9.0
1.0
12.0
12.0
30.0
3.0
3.0
1.0
1.0
1.0 401
1.0 402
1.0 403
1.0 404
1.0 405
1.0 406
1.0 407
1.0 408
1.0 409
1.0 410
- 411
- 412
- 413
1.0 501
1.0 502
1.0 503
1.0 504
- 1.0 505
- 1.0 506
- 1.0 507
1.0 508
1.0 509
510
511
1.0 601
1.0 602
1.0 603
1.0 604
1.0 605
1.0 606
1.0 607
1.0 608
1.0 609
1.0 610
1.0 611
1.0 612
1.0 613
1.0 701
1.0 702
1.0 703
1.0 704
1.0 705
4.5 6 rotasi 3 bln 706
1.0 801
1.0 802
1.0 803
1.0 804
1.0 805
1.0 806
1.0 807
1.0 808
1.0 809
103 RUMPUK -
103 Fisik LUAS RUMPUK Ha 100
103 Fisik LUAS RUMPUK SENDIRI Ha
103 Labour PHL HK/Ha 1.000 1.000 1.000 1.500 -
103 Veh Running BULDOZER HM/Ha 8 6.5 5 -
103 Veh Running EXCAVATOR HM/Ha 14 12.5 10 -
103 Contract KONTRAK RUMPUK
103 Supervision ALOKASI SUPERVISI
LAND CLEARING
BLOCKING Mtr/Ha 70.0 60.0 56.0 56.0
RUMPUK % 0.1 0.2 0.3 0.4
PADATKAN RUMPUKAN % - - - -
BENAM RUMPUKAN % - - - -
BAJAK % - - - -
GARU % - - - -
COMPACTING % - - - -
PEMBUATAN INFRASTRUKTUR JALAN DAN JEMBATAN
PEMBUATAN ACCESS ROAD Mtr/Ha 5 4 12 8.6
PEMBUATAN MAIN ROAD Mtr/Ha 17 15 13 13
PEMBUATAN COLLECTION ROAD Mtr/Ha 53 45 43 43
PEMBUATAN CONTOUR ROAD Mtr/Ha 40 40 39 39
PENIMBUNAN ACCESS ROAD Mtr/Ha - - - -
PENIMBUNAN MAIN ROAD Mtr/Ha - - - -
PENIMBUNAN COLLECTION ROAD Mtr/Ha - - - -
PEMBUATAN GAMBANGAN Mtr/Ha 1.0 1.0 1.0 1.0
PEMBUATAN JEMBATAN KAYU Unit/Ha 0.10 0.10 0.10 0.10
PEMBUATAN JEMBATAN BETON Unit/Ha - - - -
PEMBUATAN GORONG-GORONG Unit/Ha 0.07 0.07 0.07 0.07
PRASARANA LAIN
PEMBUATAN/REHAB TANGGA PANEN Mtr/Ha - - - -
TITI PANEN KAYU Unit/Ha - - 0.3 0.3
TITI PANEN BETON Unit/Ha - - - -
PEMBUATAN/REHAB TEMPAT PELETAKAN HASIL PANUnit/Ha - - - -
REMPES POKOK/TUNAS PASAR Unit/Ha - - - -
KANDANG BURUNG HANTU Unit/Ha
STANDARD NORMA TENAGA KERJA
PT
Aktivitas UoM
A B C D
LAND CLEARING
SURVEY AREAL HK/Ha 0.5 0.5 0.5 0.5
BLOCKING HK/Mtr 0.0031 0.0031 0.003 0.003
IMAS TUMBANG HK/Ha 0.3 0.3 0.3 0.3
RUMPUK HK/Ha 1.0 1.0 1.0 1.0
PADATKAN RUMPUKAN HK/Ha - - - -
BENAM RUMPUKAN HK/Ha - - - -
RENCEK HK/Ha 1.0 1.0 1.0 1.0
CUCI TUNGGUL HK/Ha 1.0 1.0 1.0 1.0
LALANG SHEET & SPORADIS HK/Ha 4.0 4.0 4.0 4.0
WIPING HK/Ha 0.3 0.3 0.3 0.3
BAJAK HK/Ha - - - -
GARU HK/Ha - - - -
COMPACTING HK/Ha - - - -
Subtotal Land Clearing
PEMBUATAN INFRASTRUKTUR JALAN DAN JEMBATAN - - - -
PEMBUATAN ACCESS ROAD HK/Mtr 0.008 0.008 0.008 0.008
PEMBUATAN MAIN ROAD HK/Mtr 0.004 0.004 0.004 0.004
PEMBUATAN COLLECTION ROAD HK/Mtr 0.002 0.002 0.002 0.002
PEMBUATAN CONTOUR ROAD HK/Mtr 0.002 0.002 0.002 0.002
PENIMBUNAN ACCESS ROAD HK/Mtr - - - -
PENIMBUNAN MAIN ROAD HK/Mtr - - - -
PENIMBUNAN COLLECTION ROAD HK/Mtr - - - -
PEMBUATAN GAMBANGAN HK/Mtr 0.020 0.020 0.020 0.020
PEMBUATAN JEMBATAN KAYU HK/Unit 0.500 0.500 0.500 0.500
PEMBUATAN JEMBATAN BETON HK/Unit - - - -
PEMBUATAN GORONG-GORONG HK/Unit 0.3 0.3 0.330 0.330
Subtotal Pembuatan Infrastruktur Jalan dan Jembatan
PEMBUATAN PARIT, TERESAN, TPK KUDA DAN PLANTING POCKET - - - -
PEMBUATAN PARIT MAIN HK/Mtr 0.005 0.005 0.005 0.005
PEMBUATAN PARIT COLLECTION HK/Mtr 0.003 0.003 0.003 0.003
PEMBUATAN PARIT FIELD HK/Mtr 0.003 0.003 0.003 0.003
PENCUCIAN PARIT ALAM HK/Mtr 0.005 0.005 0.005 0.005
PEMBUATAN TERESAN HK/Mtr 0.001 0.001 0.001 0.001
PEMBUATAN PLANTING POCKET HK/Unit - - - -
PEMBUATAN TAPAK KUDA HK/Unit 0.500 0.500 0.500 0.500
PEMBUATAN BUMBUNAN HK/Unit 0.500 0.500 0.500 0.500
PEMBUATAN BENTENG RORAK HK/Unit 0.143 0.143 0.143 0.143
PEMBUATAN BENDUNGAN HK/Unit - - - -
PEMBUATAN TANGGUL SUNGAI HK/Mtr - - - -
PEMBUATAN PINTU AIR HK/Unit - - - -
PEMBUATAN BOUNDRIES HK/Mtr - - 0.010 -
Subtotal Pembuatan Parit, Teresan, Tpk Kuda dan Planting Pocket
PENANAMAN KACANGAN - - - -
SEMPROT LALANG HK/Ha 1.5 1.5 1.5 1.5
SEMPROT ANAK KAYU & PAKIS HK/Ha 1.0 1.0 1.0 1.0
PENANAMAN KACANGAN MB HK/Ha 5.0 5.0 5.0 5.0
PENANAMAN KACANGAN SELAIN MB HK/Ha 2.5 2.5 2.5 2.5
PEMUPUKAN KACANGAN HK/Ha 2.5 2.5 2.5 2.5
PENYIANGAN GULMA/DANGIR KACANGAN HK/Ha 1.0 1.0 1.0 1.0
Subtotal Penanaman Kacangan
PENANAMAN KELAPA SAWIT - - - -
MEMANCANG HK/Ha 3.000 3.000 3.000 3.000
LUBANG TANAM MANUAL HK/Lbg 0.035 0.035 0.035 0.035
LUBANG TANAM MEKANIS HK/Lbg - - - -
PENGUNTILAN PUPUK HK/Kg 0.005 0.005 0.005 0.005
PEMUPUKAN LOBANG TANAM HK/Lbg 0.003 0.003 0.003 0.003
APLIKASI PENGENDALIAN HAMA HK/Ha 0.700 0.700 0.700 0.700
BIBIT - - - -
TRANSPORT & ECERAN BIBIT HK/Bbt 0.031 0.031 0.025 0.025
PENANAMAN BIBIT HK/Lbg 0.035 0.035 0.035 0.035
Subtotal Penanaman Kelapa Sawit
MERUMPUT
PENGENDALIAN PIRINGAN / PASAR RINTIS MANUAL HK/Ha 3.0 3.0 3.0 3.0
PENGENDALIAN PIRINGAN / PASAR RINTIS CHEMIST HK/Ha 0.50 0.5 0.5 0.5
PENGENDALIAN GAWANGAN CHEMIST HK/Ha 1.0 1.0 1.0 1.0
PENGENDALIAN GAWANGAN MANUAL HK/Ha 2.0 2.0 2.0 2.0
Subtotal Merumput
PENGENDALIAN ALANG-ALANG
SEMPROT SHEET HK/Ha - - - -
SEMPROT SPORADIS HK/Ha 1.0 1.0 1.0 1.0
WIPING LALANG HK/Ha 0.3 0.3 0.3 0.3
Subtotal Pengendalian Alang-alang
PEMUPUKAN TANAMAN
PENGUNTILAN PUPUK ANORGANIK HK/Kg 0.001 0.001 0.001 0.001
PENABURAN PUPUK ANORGANIK HK/Kg 0.003 0.003 0.003 0.003
PEMUPUKAN KOMPOS HK/Ton - - - -
PEMUPUKAN EFB HK/Ton - - 0.800 0.800
PEMUPUKAN DECANTER SOLID HK/Ton - - - -
PEMUPUKAN LIMBAH CAIR PABRIK KELAPA SAWIT HK/Ha - - - -
HK/Ha - - - -
HK/Ha - - - -
Subtotal Pemupukan Tanaman
PENGENDALIAN HAMA DAN PENYAKIT
SENSUS HAMA DAN PENYAKIT HK/Ha 0.2 0.2 0.2 0.2
PENGEDALIAN ULAT API/KANTONG HK/Ha - - 0.3 0.3
PENGENDALIAN TIRATABHA HK/Ha - - - -
PENGENDALIAN TIKUS CHEMIST HK/Ha 0.8 0.8 0.8 0.8
PENGENDALIAN TIKUS BIOLOGIS HK/Ha - - - -
HK/Unit - - - -
HK/Unit - - - -
PENGENDALIAN RAYAP HK/TP - - - -
PENGENDALIAN ORYCTES HK/Ha - - - -
HK/Ha - - - -
PENGENDALIAN GANODERMA HK/Ha - - - -
HK/Pkk - - - -
HK/Pkk - - - -
PENGENDALIAN HAMA LAINNYA HK/Ha 2.0 2.0 2.0 2.0
HK/Mtr 0.0 0.0 0.0 0.0
HK/Ha 1.5 1.5 1.5 1.5
PATROLI DAN PADAMKAN API HK/Ha 0.2 0.2 0.2 0.2
Subtotal Pengendalian Hama dan Penyakit
KASTRASI DAN SANITASI
KASTRASI & SANITASI HK/Ha 2.5 2.5 2.5 2.5
Subtotal Kastrasi dan Sanitasi
SENSUS DAN THINING OUT
SENSUS POKOK HK/Ha 0.2 0.2 0.2 0.2
MENJARANGKAN POKOK (THINNING OUT) HK/Ha - - - -
HK/Pkk - - - -
HK/Pkk - - - -
SENSUS PRODUKSI HK/Ha - - - -
HK/Ha - - - -
TIMBANG BERAT JANJANG RATA-RATA HK/Ha - - - -
Subtotal Sensus dan Thining Out
SISIP DAN KONSOLIDASI
PENYISIPAN HK/Pkk 0.1 0.1 0.1 0.1
KONSOLIDASI HK/Pkk 0.1 0.1 0.1 0.1
Subtotal sisip dan Konsolidasi
PEMELIHARAAN PARIT / TERESAN / TAPAK KUDA
PENCUCIAN PARIT MAIN - - - -
PENCUCIAN PARIT COLLECTION - - - -
PENCUCIAN PARIT FIELD MANUAL HK/Mtr - - 0.0200 0.0200
PENCUCIAN PARIT ALAM - - - -
SEMPROT PINGGIR PARIT HK/Mtr - - - -
PEMELIHARAAN/REHAB TERESAN HK/Mtr 0.020 0.020 0.020 0.020
PEMELIHARAAN PLANTING POCKET HK/Unit - - - 0.020
PEMELIHARAAN/REHAB TAPAK KUDA HK/Unit - - - -
PEMELIHARAAN/REHAB BUMBUNAN HK/Unit - - - -
PEMELIHARAAN/REHAB BENTENG RORAK HK/Unit - - - -
PEMELIHARAAN/REHAB BENDUNGAN HK/Unit - - - -
PEMELIHARAAN TANGGUL SUNGAI HK/Ha - - - -
PEMELIHARAAN/REHAB PINTU AIR HK/Unit - - - -
Subtotal Pemeliharaan Parit/ Teresan/ Tapak Kuda - - - -
PEMELIHARAAN JALAN / JEMBATAN, TITI PANEN - - - -
PEMELIHARAAN ACCESS ROAD MANUAL HK/Mtr 0.002 0.002 0.002 0.002
PENIMBUNAN ACCESS ROAD HK/Mtr 0.001 0.001 0.001 0.001
PENGERASAN ACCESS ROAD MEKANIS (SIRTU) HK/Mtr 0.001 0.001 0.001 0.001
GRADING ACCESS ROAD - - - -
PEMELIHARAAN MAIN ROAD MANUAL HK/Mtr 0.002 0.002 0.002 0.002
PENIMBUNAN MAIN ROAD HK/Mtr 0.001 0.001 0.001 0.001
PENGERASAN MAIN ROAD MEKANIS (SIRTU) HK/Mtr 0.001 0.001 0.001 0.001
GRADING MAIN ROAD - - - -
PEMELIHARAAN COLLECTION ROAD MANUAL HK/Mtr 0.002 0.002 0.002 0.002
PENIMBUNAN COLLECTION ROAD HK/Mtr 0.001 0.001 0.001 0.001
PENGERASAN COLLECTION ROAD MEKANIS - (SIRTU HK/Mtr 0.001 0.001 0.001 0.001
GRADING COLLECTION ROAD - - - -
PEMELIHARAAN JEMBATAN KAYU HK/Unit 1.000 1.000 1.000 1.000
PEMELIHARAAN JEMBATAN BETON HK/Unit - - - -
PEMELIHARAN GORONG-GORONG HK/Unit - - - -
PEMBUATAN/REHAB TANGGA PANEN HK/Mtr - - - -
TITI PANEN KAYU HK/Unit - - - -
TITI PANEN BETON HK/Unit - - - -
PEMBUATAN/REHAB TEMPAT PELETAKAN HASIL PAN HK/Unit - - - -
REMPES POKOK/TUNAS PASAR HK/Mtr - - - -
Subtotal Jalan / Jembatan, Titi Panen - - - -
SURVEY DAN PATOK - - - -
PEMELIHARAAN PATOK BATAS BLOK HK/Unit 0.1 0.1 0.1 0.1
SURVEY AREAL STATEMENT HK/Ha 0.1 0.1 0.1 0.1
SURVEY TANAH DAN TOPOGRAFI HK/Ha 0.1 0.1 0.1 0.1
Subtotal Survey dan Patok 0 0 0 0
LAND CLEARING
RUMPUK BULDOZER HM/Ha 7.000 7.000 7.000
EXCAVATOR HM/Ha 12.500 12.500 12.500
PADATKAN RUMPUKAN EXCAVATOR HM/Ha - - -
BENAM RUMPUKAN EXCAVATOR HM/Ha - - -
RENCEK CHAIN SAW HM/Ha 7.500 7.500 7.500
CUCI TUNGGUL CHAIN SAW HM/Ha 7.500 7.500 7.500
BAJAK TRAKTOR HM - - -
GARU TRAKTOR HM - - -
COMPACTING EXCAVATOR HM - - -
Subtotal Land Clearing - - -
PEMBUATAN INFRASTRUKTUR JALAN DAN JEMBATAN - -
PEMBUATAN ACCESS ROAD BULDOZER HM/Mtr 0.083 0.083 0.083
EXCAVATOR HM/Mtr - - -
PEMBUATAN MAIN ROAD BULDOZER HM/Mtr 0.040 0.040 0.050
EXCAVATOR HM/Mtr - - -
PEMBUATAN COLLECTION ROAD BULDOZER HM/Mtr 0.025 0.025 0.025
EXCAVATOR HM/Mtr - - -
PEMBUATAN CONTOUR ROAD BULDOZER HM/Mtr 0.020 0.020 0.020
PENIMBUNAN ACCESS ROAD EXCAVATOR HM/M3 0.033 0.033 0.033
LOADER BACKH HM/M3 0.050 0.050 0.050
ROAD GRADER HM/Mtr 0.010 0.010 0.010
COMPACTOR HM/Mtr 0.010 0.010 0.010
BULDOZER HM/Mtr 0.010 0.010 0.010
PENIMBUNAN MAIN ROAD EXCAVATOR HM/M3 - - -
LOADER BACKH HM/M3 - - -
ROAD GRADER HM/Mtr - - -
COMPACTOR HM/Mtr - - -
BULDOZER HM/Mtr - - -
PENIMBUNAN COLLECTION ROAD EXCAVATOR HM/M3 - - -
LOADER BACKH HM/M3 - - -
ROAD GRADER HM/Mtr - - -
COMPACTOR HM/Mtr - - -
BULDOZER HM/Mtr - - -
PEMBUATAN GAMBANGAN EXCAVATOR HM/Mtr 0.050 0.050 0.050
LOADER BACKH HM/Mtr - - -
PEMBUATAN JEMBATAN KAYU EXCAVATOR HM/Unit 10.000 10.000 10.000
PEMBUATAN JEMBATAN BETON - - -
PEMBUATAN GORONG-GORONG EXCAVATOR HM/Unit 3.000 3.000 5.000
LOADER BACKH HM/Unit 5.000 5.000 5.000
Subtotal Pembuatan Infrastruktur Jalan dan Jembatan - - -
PEMBUATAN PARIT, TERESAN, TPK KUDA DAN PLANTING POCKET - - -
PEMBUATAN PARIT MAIN EXCAVATOR HM/Mtr 0.050 0.050 0.050
PEMBUATAN PARIT COLLECTION EXCAVATOR HM/Mtr 0.033 0.033 0.033
PEMBUATAN PARIT FIELD EXCAVATOR HM/Mtr 0.025 0.025 0.025
PENCUCIAN PARIT ALAM EXCAVATOR HM/Mtr 0.050 0.050 0.050
PEMBUATAN TERESAN BULDOZER HM/Mtr 0.014 0.014 0.017
PEMBUATAN PLANTING POCKET EXCAVATOR HM/Unit - - -
PEMBUATAN TANGGUL SUNGAI EXCAVATOR HM/Mtr - - -
LOADER BACKH HM/Mtr - - -
PEMBUATAN PINTU AIR EXCAVATOR HM/Unit - - -
LOADER BACKH HM/Unit - - -
PEMBUATAN BOUNDRIES EXCAVATOR HM/Mtr 0.100 - 0.100
LOADER BACKH HM/Mtr - - -
Subtotal Pembuatan Parit, Teresan, Tpk Kuda dan Planting Pocket - - -
PENANAMAN KELAPA SAWIT - - -
LUBANG TANAM MEKANIS EXCAVATOR HM/Lbg - - -
TRAKTOR HM/Lbg - - -
Subtotal Penanaman Kelapa Sawit - - -
PEMELIHARAAN PARIT / TERESAN / TAPAK KUDA - - -
PENCUCIAN PARIT MAIN EXCAVATOR HM/Mtr - - 0.020
PENCUCIAN PARIT COLLECTION EXCAVATOR HM/Mtr - - 0.017
PENCUCIAN PARIT FIELD MANUAL - - -
PENCUCIAN PARIT ALAM EXCAVATOR HM/Mtr - - 0.025
PEMELIHARAAN TANGGUL SUNGAI EXCAVATOR HM/Mtr - - -
LOADER BACKH HM/Mtr - - -
PEMELIHARAAN/REHAB PINTU AIR EXCAVATOR HM/Unit - - -
LOADER BACKH HM/Unit - - -
Subtotal Pemeliharaan Parit/ Teresan/ Tapak Kuda - - -
PEMELIHARAAN JALAN / JEMBATAN, TITI PANEN - - -
PENIMBUNAN ACCESS ROAD EXCAVATOR HM/M3 - - -
LOADER BACKH HM/M3 - - -
ROAD GRADER HM/Mtr - - -
COMPACTOR HM/Mtr - - -
BULDOZER HM/Mtr - - -
PENGERASAN ACCESS ROAD MEKANIS (SIRTU) EXCAVATOR HM/M3 0.033 0.033 0.050
LOADER BACKH HM/M3 0.050 0.050 0.100
ROAD GRADER HM/Mtr 0.010 0.010 0.013
COMPACTOR HM/Mtr 0.010 0.010 0.013
BULDOZER HM/Mtr - - -
GRADING ACCESS ROAD ROAD GRADER HM/Mtr 0.007 0.007 0.007
COMPACTOR HM/Mtr 0.007 0.007 0.007
PENIMBUNAN MAIN ROAD EXCAVATOR HM/M3 - - -
LOADER BACKH HM/M3 - - -
ROAD GRADER HM/Mtr - - -
COMPACTOR HM/Mtr - - -
BULDOZER HM/Mtr - - -
PENGERASAN MAIN ROAD MEKANIS (SIRTU) EXCAVATOR HM/M3 0.033 0.033 0.033
LOADER BACKH HM/M3 0.100 0.100 0.100
ROAD GRADER HM/Mtr 0.010 0.010 0.010
COMPACTOR HM/Mtr 0.010 0.010 0.010
BULDOZER HM/Mtr - - -
GRADING MAIN ROAD ROAD GRADER HM/Mtr 0.007 0.007 0.007
COMPACTOR HM/Mtr 0.007 0.007 0.007
PENIMBUNAN COLLECTION ROAD EXCAVATOR HM/M3 - - -
LOADER BACKH HM/M3 - - -
ROAD GRADER HM/Mtr - - -
COMPACTOR HM/Mtr - - -
BULDOZER HM/Mtr - - -
PENGERASAN COLLECTION ROAD MEKANIS - (SIRTU EXCAVATOR HM/M3 0.050 0.050 0.050
LOADER BACKH HM/M3 0.050 0.100 0.100
ROAD GRADER HM/Mtr 0.010 0.008 0.008
COMPACTOR HM/Mtr 0.010 0.008 0.008
BULDOZER HM/Mtr - - -
GRADING COLLECTION ROAD ROAD GRADER HM/Mtr 0.007 0.007 0.007
COMPACTOR HM/Mtr 0.007 0.007 0.007
Subtotal Jalan / Jembatan, Titi Panen
REVISI
PT
E F G H I J
21 21 4 5 5 6
13 15 10 10 10 10
43 45 34 40 40 34
39 40 - - - 12
- - 4 5 5 6
- - 10 10 10 10
- - 34 40 40 34
1.0 1.0 1.0 1.0 1.0 1.0
0.10 0.10 0.08 0.08 0.08 0.10
- - - - - -
0.07 0.07 0.07 - - 0.03
- - - - - -
0.3 0.3 0.8 0.9 0.9 0.8
- - - - - -
- - - - - -
- - - - - -
0
PT
E F G H I J
- - - -
0.008 0.008 0.008 0.008 0.008 0.008
0.004 0.004 0.004 0.004 0.004 0.004
0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 - - - 0.002
- - 0.002 0.002 0.002 0.002
- - 0.002 0.002 0.002 0.002
- - 0.002 0.002 0.002 0.002
0.020 0.020 0.020 0.020 0.020 0.014
0.500 0.500 0.500 0.500 0.500 0.500
- - - - - -
0.330 0.330 0.330 - - 0.330
- - - -
0.005 0.005 0.005 0.005 0.005 0.005
0.003 0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003 0.003
0.005 0.005 0.005 0.005 0.005 0.005
0.001 0.001 - - - 0.001
- - - - - -
0.500 0.500 - - - 0.500
0.500 0.500 0.040 0.040 0.040 0.040
0.143 0.143 - - - -
- - - 0.500 0.500 0.500
- - - 0.007 0.007 0.007
- - - 10.000 10.000 10.000
- - - 0.010 0.010 -
- - - -
1.5 1.5 1.5 1.5 1.5 1.5
1.0 1.0 1.0 1.0 1.0 1.0
5.0 5.0 5.0 5.0 5.0 5.0
2.5 2.5 2.5 2.5 2.5 2.5
2.5 2.5 2.5 2.5 2.5 2.5
1.0 1.0 1.0 1.0 1.0 1.0
-
- - - - -
3.000 3.000 3.000 3.000 3.000 -
0.035 0.035 0.035 - - 0.035
- - - - - -
0.005 0.005 0.005 0.005 0.005 0.005
0.003 0.003 0.003 0.003 0.003 0.003
0.700 0.700 0.700 0.700 0.700 0.700
- - - - - -
0.031 0.031 0.031 0.031 0.031 0.031
0.035 0.035 0.035 0.035 0.035 0.035
0
0
3.0 3.0 3.0 3.0 3.0 3.0
0.5 0.5 0.5 0.5 0.5 0.5
1.0 1.0 1.0 1.0 1.0 1.0
2.0 2.0 2.0 2.0 2.0 2.0
-
-
- - - - - -
1.0 1.0 1.0 1.0 1.0 1.0
0.3 0.3 0.3 0.3 0.3 0.3
-
-
0.001 0.001 0.001 0.001 0.001 0.001
0.003 0.003 0.003 0.004 0.004 0.003
- - - - - -
- - 0.800 - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
-
-
0.2 0.2 0.2 0.2 0.2 0.2
0.3 0.3 0.3 0.3 0.3 0.3
- - - - - -
0.8 0.8 0.8 0.8 0.8 0.8
- - - 0.0 - -
- - - 0.5 - -
- - - 0.3 - -
- - 0.1 0.1 0.1 0.1
- - 0.1 0.1 0.1 0.1
- - 0.2 0.2 0.2 0.2
- - 0.1 0.1 0.1 0.1
- - 0.2 0.2 0.2 0.2
- - 0.7 0.7 0.7 0.7
2.0 2.0 2.0 2.0 2.0 2.0
0.0 0.0 0.0 0.0 0.0 0.0
1.5 1.5 1.5 1.5 1.5 1.5
0.2 0.2 0.2 0.2 0.2 0.2
-
-
2.5 2.5 2.5 3.0 - 2.5
- -
- -
0.2 0.2 0.2 0.2 0.2 0.2
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- -
- -
0.1 0.1 0.1 0.1 0.1 0.1
0.1 0.1 0.1 0.1 0.1 0.1
- -
- -
- - - - - -
- - - - - -
0.0200 0.0200 0.0200 0.0200 0.0200 0.0200
- - - - - -
- - - - - -
0.020 - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001
- - - - - -
0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001
- - - - - -
0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001
- - - - - -
1.000 1.000 1.000 1.000 1.000 1.000
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1 0.1 0.1 0.1 0.1 0.1
0.1 0.1 0.1 0.1 0.1 0.1
0.1 0.1 0.1 0.1 0.1 0.1
0 0 0 0
PT
D E F G H I J
PT
A B C D E F G H I J
50.0 45.0 44.0 44.0 44.0 44.0 44.0 50.0 50.0 44.0
0.1 0.2 0.3 0.4 0.3 0.0 1.0 1.0 0.0 1.0
- - - - - - 0.7 0.7 0.0 0.7
- - - - - - 0.3 0.3 0.0 0.3
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
5 4 12 8.6 21 21 4 5 5 6
17 15 12 12 12 12 10 10 10 10
43 40 38 39 39 39 34 40 40 34
45 41 38 41 37 37 - - - 12
4 5 5 6
10 10 10 10
34 40 40 34
0.5 0.5 0.8 0.5 0.8 0.8 0.4 - - 0.8
0.10 0.10 0.10 0.10 0.10 0.10 0.08 0.08 0.08 0.08
- - - -
0.07 0.07 0.07 0.07 0.07 0.07 0.07 - 0.03
- - - - - - - - -
- - 0.4 0.3 0.4 0.4 0.7 0.9 0.9 0.7
- - - - - - 0.92 -
- - - - - - -
- - - - - - - - -
0
PT
A B C D E F G H I J
0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
0.0031 0.0031 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
26.4 26.4 26.4 26.4 26.4 26.4 26.4 26.4 26.4 26.4
1.0 1.0 1.0 1.0 1.0 1.0 1.0 2.0 2.0 1.5
- - - - - - 0.002 0.002 0.002 0.002
- - - - - - 0.004 0.004 0.004 0.004
1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
8.0 8.0 8.0 8.0 8.0 8.0 9.0 9.0 9.0 9.0
0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
- - - - - - - -
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
0.004 0.004 0.004 0.004 0.004 0.004 0.003 0.004 0.004 0.004
0.002 0.002 0.002 0.003 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 - - - 0.002
- 0.002 0.002 0.002 0.002
- 0.002 0.002 0.002 0.002
- 0.002 0.002 0.002 0.002
0.014 0.014 0.014 0.008 0.014 0.014 0.014 0.014 0.014 0.014
0.500 0.500 0.500 1.000 0.500 0.500 0.500 0.500 0.500 0.500
- - - - - - - -
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.001 0.001 0.001 0.002 0.001 0.001 - - - 0.002
- - - - - - - -
0.333 0.333 0.500 0.500 0.500 0.500 - - - 0.033
0.200 0.200 0.667 0.667 0.667 0.667 0.033 0.033 0.033 0.033
0.200 0.200 0.333 0.333 0.333 0.333 - - -
- - - - - - - 0.500 0.500 0.500
- - - - - 0.007 0.007 0.007
- - - - 10.000 10.000 10.000
0.010 - - - - 0.010 0.010 -
- - - - - - - -
2.5 2.5 3.5 3.5 3.5 3.5 3.0 4.0 4.0 4.0
2.5 2.5 3.0 3.0 3.0 3.0 2.0 3.0 3.0 3.0
3.0 3.0 5.0 5.0 5.0 5.0 3.0 3.5 3.5 3.5
2.5 2.5 2.0 2.0 2.0 2.0 3.0 3.0 3.0 3.0
1.5 1.5 1.5 1.5 1.5 1.5 1.0 2.0 2.0 2.0
4.7 4.7 5.0 5.0 5.0 5.0 4.0 5.0 5.0 5.0
-
- - - - - - - - -
3.000 3.000 3.000 3.000 3.000 3.000 2.700 2.400 2.400 2.400
0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.042 0.042 0.042
- - - - 0.001 0.001 0.001 0.001
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700
- - - - - - - - - -
0.017 0.017 0.017 0.017 0.017 0.017 0.014 0.021 0.021 0.021
0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.039 0.039 0.039
0
0
2.5 2.5 3.5 3.5 3.5 3.5 2.5 2.5 2.5 2.5
0.80 0.8 0.8 0.8 0.8 0.8 0.4 0.4 0.4 0.4
2.0 2.0 2.0 2.0 2.0 2.0 1.5 1.5 1.5 1.5
4.0 4.0 4.0 4.0 4.0 4.0 3.0 3.0 3.0 3.0
-
-
- - 5.0 5.0 5.0 5.0 4.0 5.0 5.0 5.0
2.5 2.5 3.0 3.0 3.0 3.0 2.0 3.0 3.0 3.0
0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
-
-
0.001 0.001 0.002 0.002 0.002 0.002 0.001 0.001 0.001 0.001
0.004 0.004 0.003 0.005 0.003 0.003 0.003 0.004 0.004 0.004
- - - - - - -
- - 3.000 3.000 - 0.400 -
- - - - - - 1.000 1.000 1.000
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
-
-
0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
- - 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
- - - - - - 0.0
- - - - - - 0.5
- - - - - - 0.3
- - - - - - 0.1 0.1 0.1 0.1
- - 0.1 0.1 0.1 0.1
- - 0.2 0.2 0.2 0.2
- - - - - - 0.1 0.1 0.1 0.1
- - - - - - 0.2 0.2 0.2 0.2
- - - - - - 0.7 0.7 0.7 0.7
16.7 16.7 16.7 16.7 16.7 16.7 16.7 16.7 16.7 16.7
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
-
-
- 3.0 3.0 3.0 3.0 2.5 2.5 2.5 2.5
- -
- -
0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- -
- -
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.2 0.2 0.2
- -
- -
- - - - - - - - - -
- - - - - - - - - -
- - 0.0500 0.0500 0.0500 0.0500 0.0200 0.0200 0.0200 0.0200
- - - - - - - - - -
- - 0.003 0.003 0.003 0.003 0.0005 0.0006 0.0006 0.0006
0.010 0.010 0.010 - - - - -
- -
- - 0.143 0.143 0.143 0.143 -
- - 0.200 0.200 0.200 0.200 -
- - 0.050 0.050 0.050 0.050
- - - - - - 0.2000 0.200 0.200 0.200
- - - - - -
- - - - - - 25.0 25.0 25.0 25.0
- - - - - - - - - -
- - - - - - - - - -
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
- - - - - - - - - -
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
- - - - - - - - - -
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
- - - - - - - - - -
1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000
0.020 0.020 0.020 0.020 0.020 0.020 - - - -
0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
0.333 0.333 0.333 0.333 0.333 0.333 0.333 0.333 0.333 0.333
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
- - - - - - - - - -
- - - - - - - - - -
0.5 0.5 0.1 0.1 0.1 0.1 0.5 0.1 0.1 0.1
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0 0 0 0 0
PT
A B C D E F G H I J
PT
A B C D E F G H
5 4 12 8.6 21 21 4 5
17 15 13 13 13 15 10 10
53 45 43 43 43 45 34 40
40 40 39 39 39 40 - -
4 5
10 10
34 40
1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
0.10 0.10 0.10 0.10 0.10 0.10 0.08 0.08
PT
A B C D E F G H
50.6 43.9
1.0 0.97
0.0 0.7
0.0 0.3
5 6
10 10
40 34
- 12
5 6
10 10
40 34
1.0 1.0
0.08 0.10
- 0.03
10.28 10.23
40.36 33.63
330.00 330.00
2.00 1.00
- 0.03
0.0001
0.05 0.05
0
0.12 0.01
2.50 0.01
0.0012 0.0012
0.90 0.75
I J
0.5 0.5
0.003 0.003
0.3 26.4
2.0 1.5
0.0 0.0
0.004 0.004
1.0 1.0
1.0 1.0
4.0 4.0
0.3 0.3
0.008 0.008
0.004 0.004
0.002 0.002
- 0.002
0.002 0.002
0.002 0.002
0.002 0.002
0.020 0.014
0.500 0.500
- 0.330
0.005 0.005
0.003 0.003
0.003 0.003
0.005 0.005
- 0.001
- -
- 0.500
0.040 0.040
0.500 0.500
0.007 0.007
10.000 10.000
0.010 -
1.5 1.5
1.0 1.0
5.0 5.0
2.5 2.5
2.5 2.5
1.0 1.0
3.000
0.035
0.005 0.005
0.003 0.003
0.700 0.700
0.031 0.031
0.035 0.035
3.0 3.0
0.5 0.5
1.0 1.0
2.0 2.0
1.0 1.0
0.3 0.3
0.001 0.001
0.004 0.003
0.2 0.2
0.3 0.3
0.8 0.8
0.1 0.1
0.1 0.1
0.2 0.2
0.1 0.1
0.2 0.2
0.7 0.7
2.0 2.0
0.0 0.0
1.5 1.5
0.2 0.2
2.5
0.2 0.2
0.1 0.1
0.1 0.1
0.0200 0.0200
0.002 0.002
0.001 0.001
0.001 0.001
0.002 0.002
0.001 0.001
0.001 0.001
0.002 0.002
0.001 0.001
0.001 0.001
1.000 1.000
0.1 0.1
0.1 0.1
0.1 0.1
I J
7.000
12.500 12.500
4.000 4.000
7.000 7.000
7.500
7.500
-
-
-
-
-
0.083
0.008 0.008
0.050
0.050 0.050
0.025
0.030 0.030
0.020
0.033 0.033
0.050 0.050
0.010 0.010
0.010 0.010
0.010 0.010
0.030 0.033
0.060 0.060
0.010 0.010
0.010 0.010
0.010 0.010
0.033 0.033
0.050 0.050
0.010 0.010
0.010 0.010
0.010 0.010
0.020 0.020
0.030 0.030
12.000 12.000
-
4.000 4.000
5.000 5.000
-
-
0.060 0.060
0.033 0.030
0.025 0.025
0.060 0.060
0.020
-
-
-
5.000 5.000
10.000 10.000
0.100 0.100
-
-
-
0.011
-
-
-
0.017
0.011
-
0.017
0.004
0.003
5.000
10.000
-
-
0.033 0.033
0.050 0.050
0.010 0.010
0.010 0.010
0.010 0.010
0.033 0.033
0.050 0.050
0.010 0.010
0.010 0.010
-
0.007 0.007
0.007 0.007
0.033 0.033
0.050 0.050
0.010 0.010
0.010 0.010
0.010 0.010
0.033 0.033
0.100 0.100
0.010 0.010
0.010 0.010
-
0.007 0.007
0.007 0.007
0.033 0.033
0.050 0.050
0.010 0.010
0.010 0.010
0.010 0.010
0.033 0.033
0.050 0.050
0.010 0.010
0.010 0.010
-
0.007 0.007
0.007 0.007
PENENTUAN JARAK ANGKUT
PEMBIBITAN
PERSIAPAN AREAL
PENETAPAN AREAL (SURVEY AWAL) HK/Ha 1.0000 1.2500
IMAS TUMBANG HK/Ha 15.000 16.0000
RUMPUK HK/Ha 1.0000 1.0000
PEMBUATAN TAPAK BIBITAN HK/Ha 6.0000 7.0000
PEMBUATAN JALAN BIBITAN
PEMBUATAN JEMBATAN BIBITAN
PEMBUATAN PARIT BIBITAN
PEMBUATAN WADUK HK/Unit 20.0000 20.0000
PEMBUATAN INSTALASI AIR HK/Ha 50.0000 50.0000
PEMBUATAN BANGUNAN
PEMBUATAN BEDENGAN DAN NAUNGAN HK/Unit 4.0000 4.0000
KUMPUL TOPSOIL (PN DAN MN)
PRE- NURSERY
KECAMBAH
MENGISI TANAH - PN HK/Bag 0.0025 0.0025
MENGATUR BABY BAG - PN HK/Bag 0.0010 0.0010
SELEKSI KECAMBAH - PN HK/Kcb 0.0002 0.0002
PENANAMAN KECAMBAH - PN HK/Kcb 0.0010 0.0010
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - PN HK/Unit 0.1000 0.1000
PENYIRAMAN MANUAL - PN HK/Bbt 0.0000 0.0000
PENYIRAMAN MEKANIS - PN HK/Bbt 0.0000 0.0000
RAWAT PARIT BEDENGAN - PN HK/Mtr 0.0100 0.0100
PEMELIHARAAN INSTALASI AIR - PN HK/Ha 0.2000 0.2000
PEMUPUKAN PRE NURSERY HK/Kg 0.0667 0.0667
PENGENDALIAN GULMA DI POLIBAG - PN HK/Bbt 0.0002 0.0002
PENGENDALIAN GULMA DI LUAR POLIBAG - PN HK/Bbt 0.0002 0.0002
PENGENDALIAN HAMA PENYAKIT TANAMAN - PN HK/Bbt 0.0000 0.0000
SENSUS - PN HK/Bbt 0.0001 0.0001
SELEKSI - PN HK/Bbt 0.0002 0.0002
MAIN NURSERY
MENGISI TANAH - MN HK/Bag 0.0050 0.0050
PENAMBAHAN TANAH - MN HK/Bag 0.0020 0.0020
SPACING & SUSUN POLIBAG - MN HK/Bag 0.0014 0.0014
LANGSIR POLIBAG - MN HK/Bag 0.0050 0.0050
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - MN HK/Unit 0.1000 0.1000
MENCABUT & ANGKUT KE MN HK/Bag 0.0020 0.0020
MEMBUAT LUBANG TANAM (BOR) - MN HK/Bag 0.0025 0.0025
TANAM BIBIT - MN HK/Bag 0.0050 0.0050
PENYIRAMAN MANUAL - MN HK/Bbt 0.0003 0.0003
PENYIRAMAN MEKANIS - MN HK/Bbt 0.0000 0.0000
RAWAT PARIT - MN HK/Bbt 0.0000 0.0000
PEMELIHARAAN INSTALASI AIR - MN HK/Ha 0.2000 0.2000
PEMUPUKAN - MN HK/Kg 0.0080 0.0080
PENGENDALIAN GULMA DI POLIBAG - MN HK/Bbt 0.0003 0.0003
PENGENDALIAN GULMA DI LUAR POLIBAG - MN HK/Ha 0.0003 0.0003
PENGENDALIAN HAMA PENYAKIT TANAMAN - MN HK/Bbt 0.0002 0.0002
SENSUS - MN HK/Bbt 0.0001 0.0001
SELEKSI - MN HK/Bbt 0.0001 0.0001
MENEGAKKAN POLIBAG DAN BIBIT - MN HK/Bbt 0.0001 0.0001
PENGGANTIAN POLIBAG - MN HK/Bag 0.0001 0.0001
1.5000 2.0000
17.0000 18.0000
1.0000 1.5000
8.0000 8.0000
20.0000 20.0000
50.0000 50.0000
4.0000 4.0000
0.0025 0.0025
0.0010 0.0010
0.0002 0.0002
0.0010 0.0010
0.1000 0.1000
0.0000 0.0000
0.0000 0.0000
0.0100 0.0100
0.2000 0.2000
0.0667 0.0667
0.0002 0.0002
0.0002 0.0002
0.0000 0.0000
0.0001 0.0001
0.0002 0.0002
0.0050 0.0050
0.0020 0.0020
0.0014 0.0014
0.0050 0.0050
0.1000 0.1000
0.0020 0.0020
0.0025 0.0025
0.0050 0.0050
0.0003 0.0003
0.0000 0.0000
0.0000 0.0000
0.2000 0.2000
0.0080 0.0080
0.0003 0.0003
0.0003 0.0003
0.0002 0.0002
0.0001 0.0001
0.0001 0.0001
0.0001 0.0001
0.0001 0.0001
1.5000 2.0000
0.0061 0.0046
17.0000 18.0000
1.0000 1.5000
1.0000 1.0000
1.0000 1.0000
8.0000 9.0000
0.3333 0.3333
0.3333
0.2000
0.2000
0.0083 0.0083
0.0040 0.0040
0.0022 0.0022
0.0017 -
0.0020 0.0020
0.0020 0.0020
0.0020 0.0020
0.0143 0.0143
0.5000 0.5000
1.0000 1.0000
0.2500 0.2500
0.0050 0.0050
0.0033 0.0033
0.0025 0.0025
0.0050 0.0050
0.0014
0.0067
0.3333
0.2000 0.2000
0.2000
0.5000
10.0000 10.0000
3.5000 3.5000
2.5000 2.5000
3.0000 3.0000
2.5000 2.5000
1.5000 1.5000
4.6667 4.6667
2.0000 2.0000
0.0350 0.0350
0.0011 0.0011
0.0050 0.0050
0.0034 0.0034
0.0167 0.0167
0.0350 0.0350
2.5000 2.5000
0.4000 0.4000
2.0000 2.0000
2.0000 2.0000
5.0000 5.0000
2.5000 2.5000
0.2000 0.2000
0.0010 0.0010
0.0040 0.0040
0.6667 0.6667
2.2222 2.2222
0.4000 0.4000
1.0000 1.0000
0.1667 0.1000
0.0100 0.0100
0.2500 0.2500
0.2000 0.2000
1.0000 1.0000
0.7500 0.7500
0.1429 0.1429
0.1000 0.1000
0.2000 0.2000
0.1000 0.1000
0.2000 0.2000
0.6667 0.6667
16.6667 16.6667
0.0013 0.0013
1.5000 1.5000
0.0667 0.0667
2.5000 2.5000
0.1667 0.1000
0.1667 0.1000
0.0500 0.0500
0.2500 0.2500
0.1250 0.1250
0.1000 0.1000
0.0333 0.0333
0.1000 0.1000
0.1667 0.1667
0.0200 0.0200
0.0005 0.0005
0.0100
0.1000 0.1000
0.1000 0.1000
0.0667 0.0667
0.0500 0.0500
0.2000 0.2000
25.0000 25.0000
0.0020 0.0017
0.0020 0.0020
0.0010 0.0010
0.0020 0.0017
0.0020 0.0020
0.0010 0.0010
0.0013 0.0013
0.0020 0.0020
0.0010 0.0010
1.0000 1.0000
1.0000 1.0000
2.0000 2.0000
0.0200
0.1000 0.1000
0.1000 0.1000
0.3333 0.3333
0.0022 0.0022
0.0500 0.0500
0.0333 0.0400
0.0333 0.0400
Keterangan
4 HK mampu mangcover 1 perlengkapan bedengan besar dan naungan panjang 25 m (16 HK mengcover bedengan panjang 100 mtr)
1 HK dapat mengcover 1 alat, dimana output alat = 12,5 mtr/HM = 125 mtr/Hari
1 HK dapat mengcover 1 alat, dimana output alat = 30 mtr/HM = 300 mtr/Hari
1 HK dapat mengcover 1 alat, dimana output alat = 50 mtr/HM = 500 mtr/Hari
1 HK dapat mengcover 1 alat, dimana output alat = 60 mtr/HM = 600 mtr/Hari
1 HK dapat mengcover 500 meter
1 HK dapat mengcover 500 meter
1 HK dapat mengcover 500 meter
1 HK dapat mengcover 1 alat, dimana output alat = 70 mtr/hari
1 HK dapat mengcover 2 unit jembatan
1 HK dapat mengcover 1 unit jembatan
1 HK dapat mengcover 4 unit jembatan
3 HK dapat mengcover 1 Ha
2 HK dapat mengcover 1 Ha
3 HK dapat mengcover 1 Ha
2 HK dapat mengcover 1 Ha
1 HK dapat mangcover 1 Ha (setara dengan 300 kg)
4 HK dapat mangcover 1 Ha
2 HK dapat mangcover 1 Ha
5 HK dapat mangcover 1 Ha (5 HK untuk 145 Lubang)
1 HK dapat mengcover 1 alat (1 alat = 900 lubang)
1 HK dapat mangcover 200 Kg
1 HK dapat memupuk 2-2,5 Ha
2 HK dapat mengcover 1 Ha
1 HK dapat mangcover 3 Ha (1 HK untuk 3 Ha)
1,5 HK dapat mangcover 1 Ha
2 HK dapat mangcover 1 Ha
4 HK dapat mangcover 1 Ha
2 HK dapat mangcover 1 Ha
1 HK dapat mengcover 5 Ha
1 HK dapat mengcover 10 Ha
1 HK dapat mengcover 100 Ha
1 HK dapat merehab dan memasang 4 unit kandang
1 HK dapat mengcover 5 ha
1 HK dapat mengcover 1 Ha
(I = 5 Ha; II = 7,5; III : 7,5; IV : 7,5; Rata2 = 0,75000 HK/Ha)
1 HK mengcover 7 TP
Sensus, 1 HK mengcover 10 Ha
Semprot, 1 HK mengcover 5 Ha
Sensus, 1 HK mengcover 10 Ha
Racun, 1 HK mengcover 5 pokok
Bongkar
Hama lain, 1 HK mengcover 8 Pkk (8/143 = 0,06)
Tanam Subulata, 1 HK mengcover 800 meter
Polinasi Buatan, 1 HK mengcover 1 Ha
1 HK mengcover 15 Ha
1 HK dapat 0,5 Ha
1 HK dapat mengcover 10 Ha
1 HK dapat mengcover 10 Ha
Racun
Bongkar
Rehab tanda, 1 HK mengcover 4 Ha
Sensus, 1 HK mengcover 10 Ha
1 HK mengcover 30 Ha
1 HK menyisip 15 pokok
1 HK menyisip 10 pokok
1 HK mengcover 50 m)
1 HK menyemprot 2000 Mtr pinggir parit ( lebar 2,5 kiri kanan parit)
1 HK dapat mengcover 100 meter
1 HK dapat mengcover 10 unit
1 HK dapat mengcover 10 unit
1 HK dapat mengcover 15 unit
1 HK dapat mengcover 20 unit
1 HK dapat mengcover 5 unit
25 HK untuk menjaga 1 pintu air selama sebulan (waktu efektif untuk menjaga pada musim hujan = 6 bulan)
1 HK mengcover 1 unit
1 HK mengcover 1 unit
2 HK mengcover 1 unit
1 HK dapat mengcover 50 meter
1 HK dapat mengcover 10 unit
1 HK dapat mengcover 10 unit
1 HK dapat mengcover 3 unit
1 HK dapat mengcover 450 meter
PEMBIBITAN
PERSIAPAN AREAL
PENETAPAN AREAL (SURVEY AWAL)
IMAS TUMBANG
RUMPUK
PEMBUATAN TAPAK BIBITAN
PEMBUATAN JALAN BIBITAN
PEMBUATAN JEMBATAN BIBITAN
PEMBUATAN PARIT BIBITAN
PEMBUATAN WADUK
PEMBUATAN INSTALASI AIR
PEMBUATAN BANGUNAN
PEMBUATAN BEDENGAN DAN NAUNGAN
KUMPUL TOPSOIL (PN DAN MN)
PRE- NURSERY
KECAMBAH
MENGISI TANAH - PN
MENGATUR BABY BAG - PN
SELEKSI KECAMBAH - PN
PENANAMAN KECAMBAH - PN TIRAM Ltr/Kcb
CARBOFURAN Kg/Kcb
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - PN
PENYIRAMAN MANUAL - PN
PENYIRAMAN MEKANIS - PN
RAWAT PARIT BEDENGAN - PN
PEMELIHARAAN INSTALASI AIR - PN
PEMUPUKAN PRE NURSERY
PENGENDALIAN GULMA DI POLIBAG - PN
PENGENDALIAN GULMA DI LUAR POLIBAG - PN GLIFOSAT Ltr/Ha
PENGENDALIAN HAMA PENYAKIT TANAMAN - PN CARBOFURAN Kg/Bbt
FIPRONIL Ltr/Bbt
MANKOZEB Kg/Bbt
SENSUS - PN
SELEKSI - PN
MAIN NURSERY
MENGISI TANAH - MN
PENAMBAHAN TANAH - MN
SPACING & SUSUN POLIBAG - MN
LANGSIR POLIBAG - MN
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - MN
MENCABUT & ANGKUT KE MN
MEMBUAT LUBANG TANAM (BOR) - MN
TANAM BIBIT - MN
PENYIRAMAN MANUAL - MN
PENYIRAMAN MEKANIS - MN
RAWAT PARIT - MN
PEMELIHARAAN INSTALASI AIR - MN
PEMUPUKAN - MN
PENGENDALIAN GULMA DI POLIBAG - MN
PENGENDALIAN GULMA DI LUAR POLIBAG - MN GLIFOSAT Ltr/Bbt
PENGENDALIAN HAMA PENYAKIT TANAMAN - MN FIPRONIL Ltr/Bbt
MANKOZEB Ltr/Bbt
SENSUS - MN
SELEKSI - MN
MENEGAKKAN POLIBAG DAN BIBIT - MN
PENGGANTIAN POLIBAG - MN
TANAMAN BELUM MENGHASILKAN
LAND CLEARING
SURVEY AREAL
BLOCKING
IMAS TUMBANG
RUMPUK
RENCEK
CUCI TUNGGUL
LALANG SHEET & SPORADIS GLIFOSAT Ltr/Ha
WIPING GLIFOSAT Ltr/Ha
BAJAK
GARU
COMPACTING
PEMBUATAN INFRASTUKTUR JALAN DAN JEMBATAN
PEMBUATAN ACCESS ROAD
PEMBUATAN MAIN ROAD
PEMBUATAN COLLECTION ROAD
PEMBUATAN CONTOUR ROAD
PEMBUATAN GAMBANGAN
PEMBUATAN JEMBATAN KAYU
PEMBUATAN JEMBATAN BETON
PEMBUATAN GORONG-GORONG
PEMBUATAN PARIT, TERESAN, TPK KUDA DAN PLANTING POCKET
PEMBUATAN PARIT MAIN
PEMBUATAN PARIT COLLECTION
PEMBUATAN PARIT FIELD
PENCUCIAN PARIT ALAM
PEMBUATAN TERESAN
PEMBUATAN PLANTING POCKET
PEMBUATAN TAPAK KUDA
PEMBUATAN BUMBUNAN
PEMBUATAN BENTENG RORAK
PEMBUATAN BENDUNGAN
PEMBUATAN PINTU AIR
PENANAMAN KACANGAN
SEMPROT LALANG GLIFOSAT Ltr/Ha
SEMPROT ANAK KAYU & PAKIS PARAQUAT Ltr/Ha
METIL METSULFURON Kg/Ha
PANCANG TANAM KACANGAN
PENANAMAN KACANGAN MB
PENANAMAN KACANGAN SELAIN MB
PEMUPUKAN KACANGAN
PENYIANGAN GULMA/DANGIR KACANGAN GLIFOSAT Ltr/Ha
PENANAMAN KELAPA SAWIT
MEMANCANG
LUBANG TANAM MANUAL
LUBANG TANAM MEKANIS
PENGUNTILAN PUPUK
PEMUPUKAN LOBANG TANAM
APLIKASI RACUN TIKUS RACUN TIKUS Kg/Lbg
BIBIT
TRANSPORT & ECERAN BIBIT
PENANAMAN BIBIT
MERUMPUT
GARUK PIRINGAN & TARIK GOLORAN
SEMPROT PIRINGAN/PSR PIKUL/TPH GLIFOSAT Ltr/Ha
FLOROXIPIR Ltr/Ha
PARAQUAT Ltr/Ha
METIL METSULFURON Kg/Ha
SEMPROT GAWANGAN PARAQUAT Ltr/Ha
METIL METSULFURON Kg/Ha
GLIFOSAT Ltr/Ha
DONGKEL ANAK KAYU
PENGENDALIAN ALANG-ALANG
SEMPROT SHEET GLIFOSAT Ltr/Ha
SEMPROT SPORADIS GLIFOSAT Ltr/Ha
WIPING LALANG GLIFOSAT Ltr/Ha
PEMUPUKAN TANAMAN
PENGUNTILAN PUPUK ANORGANIK
PEMUPUKAN PUPUK ANORGANIK
PEMUPUKAN ABU JANJANG
PEMUPUKAN EFB
PEMUPUKAN DECANTER SOLID
PENGENDALIAN HAMA DAN PENYAKIT
SENSUS HAMA DAN PENYAKIT
SENSUS KANDANG BURUNG HANTU
REHAB KANDANG BURUNG HANTU
PENGEDALIAN ULAT API/KANTONG LAMDA SIHALOTRIN Ltr/Ha
EMULGATOR Ltr/Ha
BENSIN Ltr/Ha
SOLAR Ltr/Ha
PENGENDALIAN TIRATABHA FIPRONIL Ltr/Pkk
ALKILARIL POLIGLIKOL ETER Ltr/Pkk
PENGENDALIAN TIKUS RACUN TIKUS Kg/Ha
PENGENDALIAN RAYAP FIPRONIL Ltr/TP
PENGENDALIAN ORYCTES FEROMON Sct/Ha
SIPERMETRIN Ltr/Ha
CARBOFURAN Kg/Ha
PENGENDALIAN GANODERMA GLIFOSAT Ltr/Pkk
PENGENDALIAN HAMA LAINNYA
PATROLI DAN PADAMKAN API
KASTRASI DAN SANITASI
KASTRASI
SANITASI
SENSUS DAN THINING OUT
SENSUS POKOK
MENJARANGKAN POKOK (THINNING OUT) GLIFOSAT Ltr/Pkk
SENSUS PRODUKSI
TIMBANG BJR
SISIP DAN KONSOLIDASI
PENYISIPAN
KONSOLIDASI
PEMELIHARAAN PARIT / TERESAN / TAPAK KUDA
PENCUCIAN PARIT MAIN
PENCUCIAN PARIT COLLECTION
PENCUCIAN PARIT FIELD MANUAL
PENCUCIAN PARIT ALAM
SEMPROT PINGGIR PARIT GLIFOSAT Ltr/Mtr
PEMELIHARAAN/REHAB TERESAN
PEMELIHARAAN PLANTING POCKET
PEMELIHARAAN/REHAB TAPAK KUDA
PEMELIHARAAN/REHAB BUMBUNAN
PEMELIHARAAN/REHAB BENTENG RORAK
PEMELIHARAAN/REHAB BENDUNGAN
PEMELIHARAAN/REHAB PINTU AIR
PEMELIHARAAN JALAN / JEMBATAN, TITI PANEN
PEMELIHARAAN ACCESS ROAD MANUAL
PENIMBUNAN ACCESS ROAD
PENGERASAN ACCESS ROAD MEKANIS (SIRTU)
GRADING ACCESS ROAD
PEMELIHARAAN MAIN ROAD MANUAL
PENIMBUNAN MAIN ROAD
PENGERASAN MAIN ROAD MEKANIS (SIRTU)
GRADING MAIN ROAD
PEMELIHARAAN COLLECTION ROAD MANUAL
PENIMBUNAN COLLECTION ROAD
PENGERASAN COLLECTION ROAD MEKANIS (SIRTU)
GRADING COLLECTION ROAD
PEMELIHARAAN JEMBATAN KAYU
PEMELIHARAAN JEMBATAN BETON
PEMELIHARAN GORONG-GORONG
PEMBUATAN/REHAB TANGGA PANEN
TITI PANEN KAYU
TITI PANEN BETON
PEMBUATAN/REHAB TPH PANEN
REMPES POKOK/TUNAS PASAR
SURVEY DAN PATOK
PEMELIHARAAN PATOK BATAS BLOK
SURVEY TOPOGRAFI
SURVEY BATAS BLOK
Kebutuhan Keterangan
0.0080 2 lubang perlu 1 bait. 1 kg racun tikus = 250 bait (racun yang ukuran kecil)
0.0003 1,5 liter bahan aktif per Ha, setara dengan panjang 5000 meter
37.5
sentrasi 0,25%
NORMA KEBUTUHAN MATRERIAL
PEMBIBITAN
PERSIAPAN AREAL
PENETAPAN AREAL (SURVEY AWAL)
IMAS TUMBANG CAT MINYAK Klg/Ha
RUMPUK
PEMBUATAN TAPAK BIBITAN
PEMBUATAN JALAN BIBITAN
PEMBUATAN JEMBATAN BIBITAN
PEMBUATAN PARIT BIBITAN
PEMBUATAN WADUK
PEMBUATAN INSTALASI AIR PERALATAN INSTALASI AIR SENDIRI Ha/Ha
PEMBUATAN BANGUNAN BANGUNAN BIBITAN Unit/Unit
PEMBUATAN BEDENGAN DAN NAUNGAN BAHAN BEDENGAN & NAUNGAN Unit/Unit
PARANET Roll/Unit
KUMPUL TOPSOIL (PN DAN MN) TANAH TOP SOIL Roll/Unit
PRE- NURSERY
KECAMBAH
MENGISI TANAH - PN BABY BAG Kg/Bag
MENGATUR BABY BAG - PN
SELEKSI KECAMBAH - PN
PENANAMAN KECAMBAH - PN
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - PN BAHAN LABELING PN Unit/Unit
PENYIRAMAN MANUAL - PN SELANG Mtr/Bbt
PENYIRAMAN MEKANIS - PN
RAWAT PARIT BEDENGAN - PN
PEMELIHARAAN INSTALASI AIR - PN BAHAN INSTALASI AIR PN Ha/Ha
PEMUPUKAN PRE NURSERY
PENGENDALIAN GULMA DI POLIBAG - PN
PENGENDALIAN GULMA DI LUAR POLIBAG - PN
PENGENDALIAN HAMA PENYAKIT TANAMAN - PN
SENSUS - PN
SELEKSI - PN
MAIN NURSERY
MENGISI TANAH - MN LARGE BAG Kg/Bag
PENAMBAHAN TANAH - MN
SPACING & SUSUN POLIBAG - MN
LANGSIR POLIBAG - MN
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - MN BAHAN LABELING MN Unit/Unit
MENCABUT & ANGKUT KE MN
MEMBUAT LUBANG TANAM (BOR) - MN
TANAM BIBIT - MN
PENYIRAMAN MANUAL - MN SELANG Mtr/Bbt
PENYIRAMAN MEKANIS - MN
RAWAT PARIT - MN
PEMELIHARAAN INSTALASI AIR - MN BAHAN INSTALASI AIR MN Ha/Ha
PEMUPUKAN - MN
PENGENDALIAN GULMA DI POLIBAG - MN
PENGENDALIAN GULMA DI LUAR POLIBAG - MN
PENGENDALIAN HAMA PENYAKIT TANAMAN - MN
SENSUS - MN
SELEKSI - MN
MENEGAKKAN POLIBAG DAN BIBIT - MN
PENGGANTIAN POLIBAG - MN LARGE BAG Kg/Bag
0.1667
1.0000
1.0000
1.0000
0.3750
0.0067
1.0000
0.00080
1.0000
0.0588
1.0000
0.00833
1.0000
0.0588
0.0038
53.4188
6.7500
5.2500
3.7500
5.0000
1.0000
1.0000
1.0000
1.0000
1.0000
572.0000
6.0000
3.0000
0.5000
1.0000
143.0000
0.0010
1.0000
1.0000
0.0333
0.0167
0.2000
0.0043
0.0213
0.0020
0.1667
0.0333
0.0167
0.1000
0.0010
1.0000
1.0000
12.0000
2.4000
5.2500
1.0500
3.7500
0.5000
1.0000
1.0000
1.0000
0.1000
1.0000
1.0000
Keterangan
5 Kaleng untuk 30 Ha
1 Roll Paranet panjang 100 meter dengan lebar 1,5 meter dapat mengcover 1 unit bedengan besar dengan panjang 100 meter (4 unit bede
1 bibit perlu 1 baby bag, 1 kg babybag terdiri dari 150 baby bag
1 bibit perlu 1 large bag, 1 kg large bag terdiri dari 17 large bag
5 Kaleng untuk 30 Ha
1 lubang perlu 1 plastik until pupuk uk 1 kg (1 kg kantong plastik terdiri dari 1000 lbr)
1 Unit untuk 25 - 30 Ha
1 lubang perlu 1 plastik until pupuk uk 1 kg (1 kg kantong plastik terdiri dari 1000 lbr)
12
2.4
er (4 unit bedengan)
1316.01
30 4440
60
6.000 30
NORMA TURUNAN KEBUTUHAN MATERIAL
PEMBUATAN
PERALATAN INSTALASI AIR
MESIN POMPA Unit/Ha 0.0500
PVC PIPE "AW" - 6" X 4M Btg/Ha 3.5000
PVC TEE 6"X 6" Pc/Ha 0.0500
PVC ELBOW 6" ( 90 DEGREE ) Pc/Ha 0.1500
PVC REDUCING SOCKET 6"X 4" Pc/Ha 0.1500
PVC PIPE "AW" - 4" X 4M Pc/Ha 13.7500
PVC FLANGE 4" Set/Ha 0.3000
PVC FLANGE 6" Set/Ha 0.5000
BUTTERFLY VALVE C/W FLANGES 4" Pc/Ha 0.1000
NON-RETURN VALVE 6" C/W FLANGES Pc/Ha 0.0500
PVC END CAP 4" Pc/Ha 0.1000
BUTTERFLY VALVE C/W FLANGES 6" Pc/Ha 0.0500
PVC FLANGE 8" Pc/Ha 0.4000
PVC ELBOW 6" ( 45 DEGREE ) Pc/Ha 0.1000
GALVANIZE FITTINGS FOR PUMP SUCTION- FLANGE ( 6" - 8" ) Set/Ha 0.0500
GALVANIZE FITTINGS FOR PUMP DISCHARGE- FLANGE ( 5" - 6" ) Set/Ha 0.0500
PVC PIPE "AW" - 8" X 4M Btg/Ha 0.3000
PVC FOOT VALVE 8" - FLANGE TYPE Pc/Ha 0.0500
PVC ELBOW 8"( 90 DEGREE ) Pc/Ha 0.0500
RUBBER GASKET UNTUK FLANGE 4" Pc/Ha 0.3000
RUBBER GASKET UNTUK FLANGE 5" Pc/Ha 0.0500
RUBBER GASKET UNTUK FLANGE 6" Pc/Ha 0.5000
RUBBER GASKET UNTUK FLANGE 8" Pc/Ha 0.4000
BOLT WITH NUT & 2 PCS WASHER ( 3/4" X 3" ) Set/Ha 1.2000
BOLT WITH NUT & 2 PCS WASHER ( 5/8" X 3" ) Set/Ha 3.2000
BOLT WITH NUT & 2 PCS WASHER ( 5/8" X 5" ) Set/Ha 1.2000
BOLT WITH NUT & 2 PCS WASHER ( 5/8" X 6" ) Set/Ha 0.8000
STAINLESS MOSQUITO NETTING FOR SUCTION PIPE ( 200 MESH ) Roll/Ha 0.0500
4" DIAMETERL PRESSURE GAUGE 0-15 BARS & FITTINGS ( OIL ) Set/Ha 0.0500
PVC PIPE "AW" - 2" X 4M Btg/Ha 23.0000
PVC REDUCING TEE 4"X 2" Pc/Ha 4.0000
PVC EQUAL TEE 2" Pc/Ha 4.0000
CAST IRON BALL VALVE 2" - DRAT DALAM Pc/Ha 4.0000
PVC VALVE SOCKET 2"- DRAT LUAR Pc/Ha 8.0000
PVC BALL VALVE 1" - TIADA DRAT Pc/Ha 15.0000
PVC END CAP 2" Pc/Ha 8.0000
PVC PIPE "AW" - 1" X 4M Btg/Ha 2.7500
PVC REDUCING TEE 2" X 1" Pc/Ha 31.0000
HOSE CLIP 25MM - 30MM / 1" (STAINLESS) Pc/Ha 32.5000
KIRICO TUBE ( 100 M / ROLL ) Roll/Ha 30.0000
1" ELBOW 45 DEGREE Pc/Ha 3.0000
1" HOSE CLIP Pc/Ha 3.0000
BAN DALAM SEPEDA MOTOR Roll/Ha 1.0000
SEAL TAPE Roll/Ha 4.0000
SAND PAPER (@ 30 METER) Roll/Ha 0.1000
GLUE UNTUK PIPA PVC - 600G PACKING Pc/Ha 8.0000
GERGAJI BAJA Pc/Ha 0.1000
MATA GERGAJI BAJA (1KOTAK) Pc/Ha 0.6000
GERGAJI KAYU Pc/Ha 0.1000
4" DIAMETER PRESSURE GAUGE 0-2 BARS & FITTINGS( BSP 1/4" ) Set/Ha 0.2000
BANGUNAN BIBITAN
KANTOR BIBITAN Unit/Ha 0.0500
GUDANG BIBITAN Unit/Ha 0.0500
RUMAH BIBITAN Unit/Ha 0.0500
BAHAN BEDENGAN DAN NAUNGAN ( ukuran 2500 x 150 cm)
PAPAN 600 cm x 20 cm x 3 cm M3/Unit 0.3600
KAYU BULAT Æ = 20 cm Pcs/Unit 8.0000
KAYU BULAT Æ = 10 cm Pcs/Unit 15.0000
PAKU Kg/Unit 5.0000
BAHAN KBH
BALOK UKURAN 550 cm x 10 cm x 10 cm M3/Unit 0.0550
PAPAN 600 cm x 20 cm x 3 cm M3/Unit 0.1080
SENG Lbr/Unit 0.5000
PAKU Kg/Unit 0.5000
SEMEN Sak/Unit 0.3333
CAT MINYAK Klg/Unit 2.0000
PEMELIHARAAN
BAHAN REHAB INSTALASI AIR PN
Bahan Rehab Instalasi Air PN Unit/Unit 1.0000
1 mesin untuk 20 Ha
70 btg untuk 20 Ha
1 pc untuk 20 Ha
3 pc untuk 20 Ha
3 pc untuk 20 Ha
275 pc untuk 20 Ha
6 set untuk 20 Ha
10 set untuk 20 Ha
2 pc untuk 20 Ha
1 pc untuk 20 Ha
2 pc untuk 20 Ha
1 pc untuk 20 Ha
8 pc untuk 20 Ha
2 pc untuk 20 Ha
1 set untuk 20 Ha
1 set untuk 20 Ha
6 btg untuk 20 Ha
1 pc untuk 20 Ha
1 pc untuk 20 Ha
6 pc untuk 20 Ha
1 pc untuk 20 Ha
10 pc untuk 20 Ha
8 pc untuk 20 Ha
24 set untuk 20 Ha
64 set untuk 20 Ha
24 set untuk 20 Ha
16 set untuk 20 Ha
1 roll untuk 20 Ha
1 set untuk 20 Ha
460 btg untuk 20 Ha
80 pc untuk 20 Ha
80 pc untuk 20 Ha
80 pc untuk 20 Ha
160 pc untuk 20 Ha
300 pc untuk 20 Ha
160 pc untuk 20 Ha
55 btg untuk 20 Ha
620 pc untuk 20 Ha
650 pc untuk 20 Ha
600 roll untuk 20 Ha
60 pc untuk 20 Ha
60 pc untuk 20 Ha
20 roll untuk 20 Ha
80 roll untuk 20 Ha
2 roll untuk 20 Ha
160 pc untuk 20 Ha
2 pc untuk 20 Ha
12 pc untuk 20 Ha
2 pc untuk 20 Ha
4 set untuk 20 Ha
1 unit untuk 20 Ha
1 unit untuk 20 Ha
1 unit untuk 20 Ha
10 keping papan untuk membuat 1 bedengan kecil
8 pcs kayu bulat untuk membuat 1 bedengan kecil
15 pcs kayu bulat untuk membuat 1 bedengan kecil
5 Kg paku 1 unit
0.0500 0.0500
0.0500 0.0500
0.0667 0.0667
8.0000 6.5000 5.0000
14.0000 12.5000 10.0000
0.0833
0.0083
0.0400
0.0400
0.0222
0.0222
0.0167
0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0125 0.0125
0.0167 0.0167
10.0000 10.0000
3.0000 3.0000
5.0000 5.0000
0.0500 0.0500
0.0333 0.0333
0.0250 0.0250
0.0500 0.0500
0.0143 0.0143
0.0667 0.0667
5.0000 5.0000
10.0000 10.0000
0.0111 0.0111
0.0167 0.0167
0.0111 0.0111
0.0167 0.0167
5.0000 5.0000
10.0000 10.0000
0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0067 0.0067
0.0067 0.0067
0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0067 0.0067
0.0067 0.0067
0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0067 0.0067
0.0067 0.0067
NORMA KEBUTUHAN HM DAN KM ALAT ANGKUT
Total
Aktivitas Sat
Diangkut
Orang Orang 30
Tanah M3 3
Sirtu M3 3
Bibit PN Bibit 700
Bibit MN Bibit 150
Pupuk Kg 2,000
Bibit MB Bibit 700
Kacangan Kg 1,500
Kompos Ton 3
EFB Ton 3
Dec Solid Ton 3
KBH Unit 5
Jb Beton Unit 2
Gorong Unit 5
TP Beton Unit 15
TP Kayu M3 3
Kayu M3 3
Kayu Pancang Batang 100 200
Kayu Gambang Batang 100
Patok Patok 30
Air Liter 5,000
Polybag Kg 2,000
NURSERY OIL PALM MANURING SCHEDULE (PEAT)
Pre-N
Baby bag 10 5
3 0.060
Main-N
Large bag 30 50 40 Saat Transplanting
4 0.300 Cu : Rot 2 kali, 60 gr/kap
5 0.450 Cu : Rot 3 kali, 60 gr/kap
6 0.450
7 15
9 25 0.450 Cu : Rot 3 kali, 60 gr/kap
11 25
13 25
14 - dst 25
Total 40 55 - 115 1.71 40
NURSERY OIL PALM MANURING SCHEDULE
Pre-N
Baby bag 10 5
Main-N
Large bag 30 50
5 20
9 20
13 30
14 - dst
Total 40 55 30 40
IMMATURE OIL PALM MANURING SCHEDULE (PEAT)
Rekomendasi pemupukan pada umur tanaman 27 sampai dengan 36 bulan setelah tanam dilaksanakan jika analisa daun tidak berlaku/tidak ada
IMMATURE OIL PALM MANURING SCHEDUL
ULTISOL
Umur Gram Per Pokok
ROCK NPK (15-15- NPK (12-6-
Tanaman PHOSPHATE
NPK (15-15-6-4)
15) 22-3)
KIESERITE HGFB
0 0.50
1
2 0.50
3
4
5 0.80
6
7
8
9 1.00
10
11
12
13 1.30
14
15
16 1.70
17
18
19
21
22
23
NORMA KEBUTUHAN TENAGA KERJA
Simulasi - Kebun 5,000 Ha