Daftar Isi :

1. Norma Harga
2. Norma Kegiatan
3. Norma Volume Pekerjaan
4. Norma Rotasi Pekerjaan
5. Rasio Biaya LC/Tanam baru - Bibitan
6. Rasio Biaya LC/Tanam baru - TBM
7. Norma Jarak Angkut
8. Norma kebutuhan HK
9. Norma Agrochemical
10. Norma Material
11. Norma Turunan Material
12. Norma Alat Berat (HM)
13. Norma Alat Angkut
14. Norma Pupuk Nursery (Gambut)
15. Norma Pupuk Nursery (Mineral)
16. Norma Pupuk TBM (Gambut)
17. Norma Pupuk TBM (Mineral)
18. Norma Kebutuhan Tenaga Kerja
Contract
LAND CLEARING
BLOCKING Mtr/Ha 43.8667 43.8667 43.8667 50.6400
RUMPUK % 95.0000 70.0000 40.0000 100.0000
BAJAK % 95.0000 70.0000 40.0000 100.0000
GARU % 95.0000 70.0000 40.0000 100.0000
COMPACTING % - - - 100.0000
JALAN 45.8667 62.7533 73.4467 52.6400
ACCESS ROAD (di dalam) Mtr/Ha 2.0000 2.5000 3.0000 2.0000 Acces Road diluar kebun Jalan di luar izin lokasi beban Capex
MAIN ROAD Mtr/Ha 10.2333 11.2567 11.7683 10.2800
COLLECTION ROAD Mtr/Ha 33.6333 36.9967 38.6783 40.3600
CONTOUR ROAD Mtr/Ha - 12.0000 20.0000 -
GAMBANGAN Mtr/Ha 0.1000 0.3000 0.5000 0.7500
JEMBATAN
JEMBATAN KAYU/LOG Unit/Ha 0.0500 0.0667 0.1000 0.0400
JEMBATAN BETON Unit/Ha 0.0100 0.0100 0.0167 0.0100
GORONG-GORONG Unit/Ha 0.0333 0.0500 0.0667 0.0400
PARIT
PARIT MAIN Mtr/Ha 2.0000 3.0000 5.0000 10.2800
PARIT COLLECTION Mtr/Ha 8.0000 10.0000 10.0000 40.3600 6.097561 0.203252
PARIT FIELD Mtr/Ha 10.0000 15.0000 20.0000 330.0000 328.94737
PARIT ALAM Mtr/Ha 1.0000 1.0000 1.0000 1.0000
TERESAN, TPK KUDA & PLANTING POCKET
TERESAN % 5.0000 30.0000 60.0000 -
PLANTING POCKET % - 15.0000 30.0000 -
TAPAK KUDA % 0.5000 1.0000 2.0000 -
BUMBUNAN % 2.0000 1.0000 1.0000 5.0000
BENTENG RORAK % - 1.0000 2.0000 -
BENDUNGAN Unit/Ha - - - 0.1200
PINTU AIR Unit/Ha 0.0002 0.0002 0.0002 0.0012
PRASARANA LAIN
TANGGA-TANGGA PANEN Mtr/Ha 0.5000 1.0000 1.5000 -
TITI PANEN KAYU Unit/Ha 0.1700 0.2000 0.2000 2.2000 Rasio 3 PP
TITI PANEN BETON Unit/Ha 0.1700 0.2000 0.2000 0.9200 Rasio 3 PP
TPH PANEN Unit/Ha 1.4245 1.5670 1.6382 1.7316 Rasio 3 PP
KANDANG BURUNG HANTU Unit/Ha 0.0333 0.0333 0.0333 0.0400
PENANAMAN KACANGAN
KACANGAN MB Stek/Ha 1.0000 1.0000 1.0000 1.0000
KACANGAN SELAIN MB Kg/Ha 9.5000 9.5000 9.5000 9.5000
PENANAMAN KELAPA SAWIT
BIBIT SAWIT Pkk/Ha 143.0000 143.0000 143.0000 150.0000
LUAS Ha/Ha 1.0000 1.0000 1.0000 1.0000
SURVEY DAN PATOK
PATOK BATAS BLOK Unit/Ha 0.1333 0.1333 0.1333 0.1600
NORMA KUANTITAS 2. VOLUME PENGERJAAN
Aktivitas Sat Mineral
Thn 0 Thn 1

PEMBIBITAN
PERSIAPAN AREAL
PENETAPAN AREAL (SURVEY AWAL) % 100.0000
IMAS TUMBANG % 100.0000
RUMPUK % 100.0000
PEMBUATAN TAPAK BIBITAN % 100.0000
PEMBUATAN JALAN BIBITAN % 100.0000
PEMBUATAN JEMBATAN BIBITAN % 100.0000
PEMBUATAN PARIT BIBITAN % 100.0000
PEMBUATAN WADUK % 100.0000
PEMBUATAN INSTALASI AIR % 100.0000
PEMBUATAN BANGUNAN % 100.0000
PEMBUATAN BEDENGAN DAN NAUNGAN % 100.0000
KUMPUL TOPSOIL (PN DAN MN) % 100.0000
PRE- NURSERY
KECAMBAH % 100.0000
MENGISI TANAH - PN % 100.0000
MENGATUR BABY BAG - PN % 100.0000
SELEKSI KECAMBAH - PN % 100.0000
PENANAMAN KECAMBAH - PN % 100.0000
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - PN % 100.0000
PENYIRAMAN MANUAL - PN % 100.0000
PENYIRAMAN MEKANIS - PN % 100.0000
RAWAT PARIT BEDENGAN - PN % 100.0000
PEMELIHARAAN INSTALASI AIR - PN % 100.0000
PEMUPUKAN PRE NURSERY % 100.0000
PENGENDALIAN GULMA DI POLIBAG - PN % 100.0000
PENGENDALIAN GULMA DI LUAR POLIBAG - PN % 100.0000
PENGENDALIAN HAMA PENYAKIT TANAMAN - PN % 100.0000
SENSUS - PN % 100.0000
SELEKSI - PN % 100.0000
MAIN NURSERY
MENGISI TANAH - MN % 100.0000
PENAMBAHAN TANAH - MN % 30.0000
SPACING & SUSUN POLIBAG - MN % 100.0000
LANGSIR POLIBAG - MN % 100.0000
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - MN % 100.0000
MENCABUT & ANGKUT KE MN % 100.0000
MEMBUAT LUBANG TANAM (BOR) - MN % 100.0000
TANAM BIBIT - MN % 100.0000
PENYIRAMAN MANUAL - MN % 100.0000
PENYIRAMAN MEKANIS - MN % 100.0000
RAWAT PARIT - MN % 100.0000
PEMELIHARAAN INSTALASI AIR - MN % 100.0000
PEMUPUKAN - MN % 100.0000
PENGENDALIAN GULMA DI POLIBAG - MN % 100.0000
PENGENDALIAN GULMA DI LUAR POLIBAG - MN % 100.0000
PENGENDALIAN HAMA PENYAKIT TANAMAN - MN % 100.0000
SENSUS - MN % 100.0000
SELEKSI - MN % 100.0000
MENEGAKKAN POLIBAG DAN BIBIT - MN % 30.0000
PENGGANTIAN POLIBAG - MN % 30.0000

TANAMAN BELUM MENGHASILKAN


LAND CLEARING
SURVEY AREAL % 100.0000
BLOCKING % 100.0000
IMAS TUMBANG % 100.0000
RUMPUK % 100.0000
PADATKAN RUMPUKAN % 100.0000
BENAM RUMPUKAN % 100.0000
RENCEK % 100.0000
CUCI TUNGGUL % 100.0000
LALANG SHEET & SPORADIS % 100.0000
WIPING % 100.0000
BAJAK % 100.0000
GARU % 100.0000
COMPACTING % 100.0000
PEMBUATAN INFRASTUKTUR JALAN DAN JEMBATAN
PEMBUATAN ACCESS ROAD % 100.0000
PEMBUATAN MAIN ROAD % 100.0000
PEMBUATAN COLLECTION ROAD % 100.0000
PEMBUATAN CONTOUR ROAD % 100.0000
PENIMBUNAN ACCESS ROAD % 3.6000 -
PENIMBUNAN MAIN ROAD % 7.6000 -
PENIMBUNAN COLLECTION ROAD % 3.6000 -
PEMBUATAN GAMBANGAN % 100.0000
PEMBUATAN JEMBATAN KAYU % 100.0000
PEMBUATAN JEMBATAN BETON % 100.0000
PEMBUATAN GORONG-GORONG % 100.0000
PEMBUATAN PARIT, TERESAN, TPK KUDA DAN PLANTING POCKET
PEMBUATAN PARIT MAIN % 100.0000
PEMBUATAN PARIT COLLECTION % 100.0000
PEMBUATAN PARIT FIELD % 100.0000
PENCUCIAN PARIT ALAM % 100.0000
PEMBUATAN TERESAN % 100.0000
PEMBUATAN PLANTING POCKET % 100.0000
PEMBUATAN TAPAK KUDA % 100.0000
PEMBUATAN BUMBUNAN % 100.0000
PEMBUATAN BENTENG RORAK % 100.0000
PEMBUATAN BENDUNGAN % 100.0000
PEMBUATAN TANGGUL SUNGAI % 100.0000
PEMBUATAN PINTU AIR % 100.0000
PEMBUATAN BOUNDRIES % 100.0000
PENANAMAN KACANGAN
SEMPROT LALANG % 100.0000
SEMPROT ANAK KAYU & PAKIS % 100.0000
PENANAMAN KACANGAN MB % 100.0000
PENANAMAN KACANGAN SELAIN MB %
PEMUPUKAN KACANGAN % 100.0000
PENYIANGAN GULMA/DANGIR KACANGAN % 100.0000
PENANAMAN KELAPA SAWIT
MEMANCANG % 100.0000
LUBANG TANAM MANUAL % 100.0000
LUBANG TANAM MEKANIS % 100.0000
PENGUNTILAN PUPUK % 100.0000
PEMUPUKAN LOBANG TANAM % 100.0000
APLIKASI PENGENDALIAN HAMA % 100.0000
BIBIT % 100.0000
TRANSPORT & ECERAN BIBIT % 100.0000
PENANAMAN BIBIT % 100.0000
MERUMPUT
PENGENDALIAN PIRINGAN / PASAR RINTIS MANUAL % 100.000
PENGENDALIAN PIRINGAN / PASAR RINTIS CHEMIST % -
PENGENDALIAN GAWANGAN CHEMIST % -
PENGENDALIAN GAWANGAN MANUAL % 100.000
PENGENDALIAN ALANG-ALANG
SEMPROT SHEET % 5.000
SEMPROT SPORADIS % 5.000
WIPING LALANG % 100.000
PEMUPUKAN TANAMAN
PENGUNTILAN PUPUK ANORGANIK % 100.000
PENABURAN PUPUK ANORGANIK % 100.000
PEMUPUKAN KOMPOS % -
PEMUPUKAN EFB %
PEMUPUKAN DECANTER SOLID % 100.000
PEMUPUKAN LIMBAH CAIR PABRIK KELAPA SAWIT % -
PENGENDALIAN HAMA DAN PENYAKIT
SENSUS HAMA DAN PENYAKIT % 100.000
PENGEDALIAN ULAT API/KANTONG % 5.000
PENGENDALIAN TIRATABHA % 2.000
PENGENDALIAN TIKUS CHEMIST % 10.000
PENGENDALIAN TIKUS BIOLOGIS %
PENGENDALIAN RAYAP % 0.500
PENGENDALIAN ORYCTES % 2.000
PENGENDALIAN GANODERMA % 0.500
PENGENDALIAN HAMA LAINNYA % 10.000
PATROLI DAN PADAMKAN API % 100.000
KASTRASI DAN SANITASI
KASTRASI & SANITASI % -
SENSUS DAN THINING OUT
SENSUS POKOK % 100.000
MENJARANGKAN POKOK (THINNING OUT) % -
SENSUS PRODUKSI % -
TIMBANG BERAT JANJANG RATA-RATA % -
SISIP DAN KONSOLIDASI
PENYISIPAN %
KONSOLIDASI % 1.000
PEMELIHARAAN PARIT / TERESAN / TAPAK KUDA
PENCUCIAN PARIT MAIN % -
PENCUCIAN PARIT COLLECTION % -
PENCUCIAN PARIT FIELD MANUAL % -
PENCUCIAN PARIT ALAM % -
SEMPROT PINGGIR PARIT % -
PEMELIHARAAN/REHAB TERESAN % -
PEMELIHARAAN PLANTING POCKET % -
PEMELIHARAAN/REHAB TAPAK KUDA % -
PEMELIHARAAN/REHAB BUMBUNAN % -
PEMELIHARAAN/REHAB BENTENG RORAK % -
PEMELIHARAAN/REHAB BENDUNGAN % -
PEMELIHARAAN TANGGULAN SUNGAI %
PEMELIHARAAN/REHAB PINTU AIR % -
PEMELIHARAAN JALAN / JEMBATAN, TITI PANEN
PEMELIHARAAN ACCESS ROAD MANUAL % 100.000
PENIMBUNAN ACCESS ROAD % 30.0000
PENGERASAN ACCESS ROAD MEKANIS (SIRTU) % 50.000
GRADING ACCESS ROAD % 100.000
PEMELIHARAAN MAIN ROAD MANUAL % 100.000
PENIMBUNAN MAIN ROAD % 30.0000
PENGERASAN MAIN ROAD MEKANIS (SIRTU) % 25.000
GRADING MAIN ROAD % 100.000
PEMELIHARAAN COLLECTION ROAD MANUAL % 100.000
PENIMBUNAN COLLECTION ROAD % 30.0000
PENGERASAN COLLECTION ROAD MEKANIS (SIRTU) % 25.000
GRADING COLLECTION ROAD % 100.000
PEMELIHARAAN JEMBATAN KAYU % 100.000
PEMELIHARAAN JEMBATAN BETON % 100.000
PEMELIHARAN GORONG-GORONG % 100.000
PEMBUATAN/REHAB TANGGA PANEN % -
TITI PANEN KAYU % 100.000
TITI PANEN BETON % 100.000
PEMBUATAN/REHAB TPH PANEN % -
REMPES POKOK/TUNAS PASAR % -
SURVEY DAN PATOK
PEMELIHARAAN PATOK BATAS BLOK % 100.000
SURVEY AREAL STATEMENT % -
SURVEY TANAH DAN TOPOGRAFI % -
Mineral Gambut
Thn 0 dan 1 Thn 2 Thn 3 Thn 0 Thn 1 Thn 0 dan Thn 2 Thn 3

100.0000 100 100 101


100.0000 100 100 102
100.0000 100 100 103
100.0000 100 100 104
100.0000 100 100 105
100.0000 100 100 106
100.0000 100 100 107
100.0000 100 100 108
100.0000 100 100 109
100.0000 100 100 110
100.0000 100 100 111
100.0000 100 100 112

100.0000 100 100 201


100.0000 100 100 202
100.0000 100 100 203
100.0000 100 100 204
100.0000 100 100 205
100.0000 100 100 206
100.0000 100 100 207
100.0000 100 100 208
100.0000 100 100 209
100.0000 100 100 210
100.0000 100 100 211
100.0000 100 100 212
100.0000 100 100 213
100.0000 100 100 214
100.0000 100 100 215
100.0000 100 100 216

100.0000 100 100 301


100.0000 30 100 302
100.0000 100 100 303
100.0000 100 100 304
100.0000 100 100 305
100.0000 100 100 306
100.0000 100 100 307
100.0000 100 100 308
100.0000 100 100 309
100.0000 100 100 310
100.0000 100 100 311
100.0000 100 100 312
100.0000 100 100 313
100.0000 100 100 314
100.0000 100 100 315
100.0000 100 100 316
100.000 100 100 317
100.000 100 100 318
30.000 30 30 319
10.000 30 10 320
100 401
100.000 100 100 402
100.000 100 100 403
100.000 100 100 404
100.000 405
100.000 30 406
100.000 100 100 407
100.000 100 100 408
25.000 100 25 409
- 100 0 410
- 100 0 411
- 100 0 412
- 100 0 413

100.000 100 100 501


100.000 100 100 502
100.000 100 100 503
100.000 100 100 504
3.600 50 10 505
7.600 25 10 506
3.600 25 10 507
100.000 100 100 508
100.000 100 100 509
100 510
100 511

100.000 100 100 601


100.000 100 100 602
100.000 100 100 603
100.000 100 100 604
100.000 100 100 605
100.000 100 100 606
100.000 100 100 607
100.000 100 100 608
100.000 100 100 609
100.000 100 100 610
100.000 100 100 611
100.000 100 100 612
100.000 613

30.000 100 30 701


30.000 100 30 702
100.000 100 100 703
- 100 100 704
100.000 100 100 705
100.000 100 100 706

100.000 100 100 801


80.000 100 70 802
20.000 100 30 803
100.000 100 100 804
100.000 100 100 805
100.000 100 100 806
100.000 100 100 807
100.000 100 100 808
100.000 100 100 809

100.000 100.000 100 100 100 100 100 901


- 100.000 100 0 0 100 100 902
25.000 25.000 25 0 25 25 25 903
100.000 100.000 100 100 100 100 100 904

1001
30.0 20.0 10.0 5.0 30.0 20.0 10.0 1002
10.0 20.0 30.0 100.0 10.0 20.0 30.0 1003

100.000 100.000 100 100 100 100 100 1101


100.000 100.000 100 100 100 100 100 1102
- - 0 0 0 0 0 1103
- 100 100 100 100 1104
100.000 100.000 100 100 100 100 100 1105
- - 0 0 0 0 0 1106

100.000 100.000 100 100 100 100 100 1201


5.000 5.000 5 5 5 5 5 1202
- - 2 2 0 0 2 1203
15.0 100.0 100.0 10.0 20.0 100.0 100.0 1204
100 100 100 100 1205
- - 0 10 10 10 10 1206
0.500 0.500 0.5 0.5 0.5 0.5 0.5 0.5 1207
- - 0 1 0 0 0 1208
5.000 5.000 5 10 5 5 5 1209
50.000 50.000 50 50 50 50 50 50 1210

- 100.000 100 0 0 100 100 1301

100.000 100.000 100 100 100 100 100 1401


- - 0 0 0 0 0 1402
- - 100 0 0 0 100 1403
- - 100 0 0 0 100 1404

1.000 0.5 2.5 2 1.3333333 0.6666667 1501


1.300 1.000 0.5 2.5 2 1.3333333 0.6666667 1502

- 10.000 50 0 0 10 50 1601
- 10.000 33 0 0 10 33 1602
- - 33 0 0 0 33 1603
100.000 100.000 100 0 100 100 100 1604
- - 20 0 0 20 20 1605
- - 10 0 0 0 0 1606
- - 0 0 0 0 0 1607
- - 0 0 0 0 0 1608
- - 0 0 0 5 5 1609
- 5.000 5 0 0 0 0 1610
- - 0 0 0 5 5 1611
0 0 5 5 1612
- - 0 0 0 0 0 1613
100.000 100.000 100 100 100 100 100 1701
- 0 0 1702
50.000 50.000 0 0 0 12.5 12.5 1703
100.000 100.000 100 100 100 100 100 1704
100.000 100.000 100 100 100 100 100 1705
20.000 0 0 1706
- 50.000 50 0 0 12.5 12.5 1707
100.000 100.000 100 100 100 100 100 1708
100.000 100.000 100 100 100 100 100 1709
20.000 0 1710
- 30.000 30 0 0 12.5 12.5 1711
100.000 100.000 100 100 100 100 100 1712
100.000 100.000 100 100 100 100 100 1713
- - 0 100 0 0 0 1714
- - 100 100 0 0 100 1715
- - 100 0 0 0 0 1716
- 25.000 25 100 0 25 25 1717
- - 100 100 0 0 100 1718
- - 100 0 0 0 100 1719
- - 25 0 0 0 0 1720

100.000 - 100 100 100 0 100 1801


- - 0 0 0 0 0 1802
100.000 - 0 0 100 0 0 1803
214.286

120000
1000
NORMA KUANTITAS 3. ROTASI PENGERJAAN
Mineral
Aktivitas Sat
Thn 0 Thn 1 Thn 0 dan 1 Thn 2

PEMBIBITAN
PERSIAPAN AREAL
PENETAPAN AREAL (SURVEY AWAL) Rot/Thn 1.0 1.0
IMAS TUMBANG Rot/Thn 1.0 1.0
RUMPUK Rot/Thn 1.0 1.0
PEMBUATAN TAPAK BIBITAN Rot/Thn 1.0 1.0
PEMBUATAN JALAN BIBITAN Rot/Thn 1.0 1.0
PEMBUATAN JEMBATAN BIBITAN Rot/Thn 1.0 1.0
PEMBUATAN PARIT BIBITAN Rot/Thn 1.0 1.0
PEMBUATAN WADUK Rot/Thn 1.0 1.0
PEMBUATAN INSTALASI AIR Rot/Thn 1.0 1.0
PEMBUATAN BANGUNAN Rot/Thn 1.0 1.0
PEMBUATAN BEDENGAN DAN NAUNGAN Rot/Thn 1.0 1.0
KUMPUL TOPSOIL (PN DAN MN) Rot/Thn 1.0 1.0
PRE- NURSERY
KECAMBAH Rot/Thn 1.0 1.0
MENGISI TANAH - PN Rot/Thn 1.0 1.0
MENGATUR BABY BAG - PN Rot/Thn 1.0 1.0
SELEKSI KECAMBAH - PN Rot/Thn 1.0 1.0
PENANAMAN KECAMBAH - PN Rot/Thn 1.0 1.0
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - PN Rot/Thn 1.0 1.0
PENYIRAMAN MANUAL - PN Rot/Thn 3.0 60.0
PENYIRAMAN MEKANIS - PN Rot/Thn 3.0 60.0
RAWAT PARIT BEDENGAN - PN Rot/Thn 3.0 3.0
PEMELIHARAAN INSTALASI AIR - PN Rot/Thn 3.0 3.0
PEMUPUKAN PRE NURSERY Rot/Thn 1.0 1.0
PENGENDALIAN GULMA DI POLIBAG - PN Rot/Thn 3.0 2.0
PENGENDALIAN GULMA DI LUAR POLIBAG - PN Rot/Thn 3.0 2.0
PENGENDALIAN HAMA PENYAKIT TANAMAN - PN Rot/Thn 3.0 9.0
SENSUS - PN Rot/Thn 2.0 2.0
SELEKSI - PN Rot/Thn 2.0 2.0
MAIN NURSERY
MENGISI TANAH - MN Rot/Thn 1.0 1.0
PENAMBAHAN TANAH - MN Rot/Thn 1.0 1.0
SPACING & SUSUN POLIBAG - MN Rot/Thn 1.0 1.0
LANGSIR POLIBAG - MN Rot/Thn 1.0 1.0
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - MN Rot/Thn 1.0 1.0
MENCABUT & ANGKUT KE MN Rot/Thn 1.0 1.0
MEMBUAT LUBANG TANAM (BOR) - MN Rot/Thn 1.0 1.0
TANAM BIBIT - MN Rot/Thn 1.0 1.0
PENYIRAMAN MANUAL - MN Rot/Thn 9.0 210.0
PENYIRAMAN MEKANIS - MN Rot/Thn 9.0 210.0
RAWAT PARIT - MN Rot/Thn 9.0 9.0
PEMELIHARAAN INSTALASI AIR - MN Rot/Thn 9.0 9.0
PEMUPUKAN - MN Rot/Thn 1.0 1.0
PENGENDALIAN GULMA DI POLIBAG - MN Rot/Thn 9.0 12.0
PENGENDALIAN GULMA DI LUAR POLIBAG - MN Rot/Thn 9.0 12.0
PENGENDALIAN HAMA PENYAKIT TANAMAN - MN Rot/Thn 9.0 30.0
SENSUS - MN Rot/Thn 3.0 3.0
SELEKSI - MN Rot/Thn 3.0 3.0
MENEGAKKAN POLIBAG DAN BIBIT - MN Rot/Thn 1.0 1.0
PENGGANTIAN POLIBAG - MN Rot/Thn 1.0 1.0

TANAMAN BELUM MENGHASILKAN


LAND CLEARING
SURVEY AREAL Rot/Thn 1.0 1.0
BLOCKING Rot/Thn 1.0 1.0
IMAS TUMBANG Rot/Thn 1.0 1.0
RUMPUK Rot/Thn 1.0 1.0
PADATKAN RUMPUKAN Rot/Thn 1.0 1.0
BENAM RUMPUKAN Rot/Thn 1.0 1.0
RENCEK Rot/Thn 1.0 1.0
CUCI TUNGGUL Rot/Thn 1.0 1.0
LALANG SHEET & SPORADIS Rot/Thn 3.0 1.0
WIPING Rot/Thn 3.0 1.0
BAJAK Rot/Thn 1.0 -
GARU Rot/Thn 1.0 -
COMPACTING Rot/Thn 1.0 -
PEMBUATAN INFRASTUKTUR JALAN DAN JEMBATAN
PEMBUATAN ACCESS ROAD Rot/Thn 1.0 1.0
PEMBUATAN MAIN ROAD Rot/Thn 1.0 1.0
PEMBUATAN COLLECTION ROAD Rot/Thn 1.0 1.0
PEMBUATAN CONTOUR ROAD Rot/Thn 1.0 1.0
PENIMBUNAN ACCESS ROAD Rot/Thn 1.0 - 1.0 -
PENIMBUNAN MAIN ROAD Rot/Thn 1.0 - 1.0 -
PENIMBUNAN COLLECTION ROAD Rot/Thn 1.0 - 1.0 -
PEMBUATAN GAMBANGAN Rot/Thn 1.0
PEMBUATAN JEMBATAN KAYU Rot/Thn 1.0 1.0
PEMBUATAN JEMBATAN BETON Rot/Thn 1.0
PEMBUATAN GORONG-GORONG Rot/Thn 1.0
PEMBUATAN PARIT, TERESAN, TPK KUDA DAN PLANTING POCKET
PEMBUATAN PARIT MAIN Rot/Thn 1.0 1.0
PEMBUATAN PARIT COLLECTION Rot/Thn 1.0 1.0
PEMBUATAN PARIT FIELD Rot/Thn 1.0 1.0
PENCUCIAN PARIT ALAM Rot/Thn 1.0 1.0
PEMBUATAN TERESAN Rot/Thn 1.0 1.0
PEMBUATAN PLANTING POCKET Rot/Thn 1.0 1.0
PEMBUATAN TAPAK KUDA Rot/Thn 1.0 1.0
PEMBUATAN BUMBUNAN Rot/Thn 1.0 1.0
PEMBUATAN BENTENG RORAK Rot/Thn 1.0 1.0
PEMBUATAN BENDUNGAN Rot/Thn 1.0 1.0
PEMBUATAN TANGGUL SUNGAI Rot/Thn 1.0 1.0
PEMBUATAN PINTU AIR Rot/Thn 1.0 1.0
PEMBUATAN BOUNDRIES Rot/Thn 1.0 1.0
PENANAMAN KACANGAN
SEMPROT LALANG Rot/Thn 2.0 1.0
SEMPROT ANAK KAYU & PAKIS Rot/Thn 2.0 1.0
PENANAMAN KACANGAN MB Rot/Thn 1.0 1.0
PENANAMAN KACANGAN SELAIN MB Rot/Thn 1.0 1.0
PEMUPUKAN KACANGAN Rot/Thn 1.0 1.0
PENYIANGAN GULMA/DANGIR KACANGAN Rot/Thn 4.5 4.5
PENANAMAN KELAPA SAWIT
MEMANCANG Rot/Thn 1.0 1.0
LUBANG TANAM MANUAL Rot/Thn 1.0 1.0
LUBANG TANAM MEKANIS Rot/Thn 1.0 1.0
PENGUNTILAN PUPUK Rot/Thn 1.0 1.0
PEMUPUKAN LOBANG TANAM Rot/Thn 1.0 1.0
APLIKASI PENGENDALIAN HAMA Rot/Thn 1.0 1.0
BIBIT Rot/Thn 1.0 1.0
TRANSPORT & ECERAN BIBIT Rot/Thn 1.0 1.0
PENANAMAN BIBIT Rot/Thn 1.0 1.0
MERUMPUT
PENGENDALIAN PIRINGAN / PASAR RINTIS MANUAL Rot/Thn 3.0 3.0 4.0
PENGENDALIAN PIRINGAN / PASAR RINTIS CHEMIST Rot/Thn - - 2.0
PENGENDALIAN GAWANGAN CHEMIST Rot/Thn - 1.0 1.0
PENGENDALIAN GAWANGAN MANUAL Rot/Thn 2.0 2.0 3.0
PENGENDALIAN ALANG-ALANG
SEMPROT SHEET Rot/Thn 3.0 1.0 1.0
SEMPROT SPORADIS Rot/Thn 3.0 1.0 1.0
WIPING LALANG Rot/Thn 4.0 6.0 6.0
PEMUPUKAN TANAMAN
PENGUNTILAN PUPUK ANORGANIK Rot/Thn 1.0 1.0 1.0
PENABURAN PUPUK ANORGANIK Rot/Thn 1.0 1.0 1.0
PEMUPUKAN KOMPOS Rot/Thn 1.0 1.0 1.0
PEMUPUKAN EFB Rot/Thn 1.0 1.0 1.0
PEMUPUKAN DECANTER SOLID Rot/Thn 1.0 1.0 1.0
PEMUPUKAN LIMBAH CAIR PABRIK KELAPA SAWIT Rot/Thn 1.0 1.0 1.0
PENGENDALIAN HAMA DAN PENYAKIT
SENSUS HAMA DAN PENYAKIT Rot/Thn 6.0 12.0 12.0
PENGEDALIAN ULAT API/KANTONG Rot/Thn 1.0 2.0 2.0
PENGENDALIAN TIRATABHA Rot/Thn 2.0 - -
PENGENDALIAN TIKUS CHEMIST Rot/Thn 1.0 2.0 2.0
PENGENDALIAN TIKUS BIOLOGIS Rot/Thn 1.0 2.0 2.0
PENGENDALIAN RAYAP Rot/Thn 2.0 - -
PENGENDALIAN ORYCTES Rot/Thn 2.0 2.0 2.0
PENGENDALIAN GANODERMA Rot/Thn 1.0 - -
PENGENDALIAN HAMA LAINNYA Rot/Thn 12.0 4.0 3.0
PATROLI DAN PADAMKAN API Rot/Thn 12.0 12.0 12.0
KASTRASI DAN SANITASI
KASTRASI & SANITASI Rot/Thn - - 2.0
SENSUS DAN THINING OUT
SENSUS POKOK Rot/Thn 2.0 2.0 2.0
MENJARANGKAN POKOK (THINNING OUT) Rot/Thn - - -
SENSUS PRODUKSI Rot/Thn - - -
TIMBANG BJR Rot/Thn - - -
SISIP DAN KONSOLIDASI
PENYISIPAN Rot/Thn 1.0 1.0 1.0
KONSOLIDASI Rot/Thn 1.0 1.0 1.0
PEMELIHARAAN PARIT / TERESAN / TAPAK KUDA
PENCUCIAN PARIT MAIN Rot/Thn - - 1.0
PENCUCIAN PARIT COLLECTION Rot/Thn - - 1.0
PENCUCIAN PARIT FIELD MANUAL Rot/Thn - - 1.0
PENCUCIAN PARIT ALAM Rot/Thn - - 1.0
SEMPROT PINGGIR PARIT Rot/Thn - - 1.0
PEMELIHARAAN/REHAB TERESAN Rot/Thn - - -
PEMELIHARAAN PLANTING POCKET Rot/Thn - - -
PEMELIHARAAN/REHAB TAPAK KUDA Rot/Thn - - -
PEMELIHARAAN/REHAB BUMBUNAN Rot/Thn - - -
PEMELIHARAAN/REHAB BENTENG RORAK Rot/Thn - - 1.0
PEMELIHARAAN/REHAB BENDUNGAN Rot/Thn - - -
PEMELIHARAAN TANGGULAN SUNGAI Rot/Thn
PEMELIHARAAN/REHAB PINTU AIR Rot/Thn - - -
PEMELIHARAAN JALAN / JEMBATAN, TITI PANEN
PEMELIHARAAN ACCESS ROAD MANUAL Rot/Thn 2.0 6.0 12.0
PENIMBUNAN ACCESS ROAD Rot/Thn - 1.0 -
PENGERASAN ACCESS ROAD MEKANIS (SIRTU) Rot/Thn 1.0 1.0 1.0
GRADING ACCESS ROAD Rot/Thn 2.0 1.0 2.0
PEMELIHARAAN MAIN ROAD MANUAL Rot/Thn 2.0 6.0 12.0
PENIMBUNAN MAIN ROAD Rot/Thn - 1.0 1.0
PENGERASAN MAIN ROAD MEKANIS (SIRTU) Rot/Thn 1.0 - 1.0
GRADING MAIN ROAD Rot/Thn 2.0 1.0 2.0
PEMELIHARAAN COLLECTION ROAD MANUAL Rot/Thn 2.0 6.0 12.0
PENIMBUNAN COLLECTION ROAD Rot/Thn - 1.0 1.0
PENGERASAN COLLECTION ROAD MEKANIS (SIRTU) Rot/Thn 1.0 - 1.0
GRADING COLLECTION ROAD Rot/Thn 2.0 1.0 2.0
PEMELIHARAAN JEMBATAN KAYU Rot/Thn 1.0 1.0 1.0
PEMELIHARAAN JEMBATAN BETON Rot/Thn 1.0
PEMELIHARAN GORONG-GORONG Rot/Thn 1.0
PEMBUATAN/REHAB TANGGA PANEN Rot/Thn - - -
TITI PANEN KAYU Rot/Thn 1.0 - 1.0
TITI PANEN BETON Rot/Thn 1.0 - -
PEMBUATAN/REHAB TPH PANEN Rot/Thn - - -
REMPES POKOK/TUNAS PASAR Rot/Thn - - -
SURVEY DAN PATOK
PEMELIHARAAN PATOK BATAS BLOK Rot/Thn 1.0 - -
SURVEY TOPOGRAFI Rot/Thn - - -
SURVEY BATAS BLOK Rot/Thn - 1.0 -
Gambut Keterangan
Thn 3 Thn 0 dan 1 Thn 2 Thn 3

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0
60.0 Setiap hari selama 3 bulan
60.0 Setiap hari selama 3 bulan
3.0
3.0
1.0
2.0
2.0
9.0
2.0
2.0

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
210.0 Setiap hari selama 7 bulan
210.0 Setiap hari selama 7 bulan
9.0
9.0
1.0
12.0
12.0
30.0
3.0
3.0
1.0
1.0

1.0 401
1.0 402
1.0 403
1.0 404
1.0 405
1.0 406
1.0 407
1.0 408
1.0 409
1.0 410
- 411
- 412
- 413

1.0 501
1.0 502
1.0 503
1.0 504
- 1.0 505
- 1.0 506
- 1.0 507
1.0 508
1.0 509
510
511

1.0 601
1.0 602
1.0 603
1.0 604
1.0 605
1.0 606
1.0 607
1.0 608
1.0 609
1.0 610
1.0 611
1.0 612
1.0 613

1.0 701
1.0 702
1.0 703
1.0 704
1.0 705
4.5 6 rotasi 3 bln 706

1.0 801
1.0 802
1.0 803
1.0 804
1.0 805
1.0 806
1.0 807
1.0 808
1.0 809

2.0 3.0 4.0 3.0 3 rot (3 rotasi 901


2.0 - 2.0 3.0 902
1.0 1.0 1.0 1.0 903
2.0 2.0 3.0 2.0 904

1.0 1.0 1.0 1.0 1001


1.0 1.0 1.0 1.0 1002
6.0 6.0 6.0 6.0 1003

1.0 1.0 1.0 1.0 1101


1.0 1.0 1.0 1.0 1102
1.0 1.0 1.0 1.0 1103
1.0 1.0 1.0 1.0 1104
1.0 1.0 1.0 1.0 1105
1.0 1.0 1.0 1.0 1106

12.0 12.0 12.0 12.0 Setiap Bulan 1201


2.0 2.0 2.0 2.0 1202
2.0 - - 2.0 1203
2.0 2.0 2.0 2.0 1204
2.0 2.0 2.0 2.0 1205
- - - - 1206
1.0 2.0 2.0 1.0 1207
- - - - 1208
2.0 4.0 3.0 2.0 1209
12.0 12.0 12.0 12.0 Setiap bulan 1210

2.0 - 2.0 2.0 1301

2.0 2.0 2.0 2.0 1401


- - - - 1402
1.0 - - 1.0 1403
1.0 - - 1.0 1404

1.0 1.0 1.0 1.0 1501


1.0 1.0 1.0 1.0 1502

1.0 - 1.0 1.0 1601


1.0 - 1.0 1.0 1602
1.0 - 1.0 1.0 1603
1.0 - 1.0 1.0 1604
1.0 - 1.0 - 1605
1.0 - - - 1606
- - - - 1607
- - - - 1608
- - 1.0 1.0 1609
1.0 - - - 1610
- - 1.0 1.0 1611
1.0 1.0 1612
- - - - 1613

12.0 6.0 12.0 12.0 Setiap bulan 1701


- 1.0 1.0 - 1702
- - 1.0 1.0 1703
2.0 1.0 2.0 2.0 1704
12.0 6.0 12.0 12.0 Setiap bulan 1705
- 1.0 1.0 - 1706
1.0 - 1.0 1.0 1707
2.0 1.0 2.0 2.0 1708
12.0 6.0 12.0 12.0 Setiap bulan 1709
- 1.0 1.0 1.0 1710
1.0 - 1.0 1.0 1711
2.0 1.0 2.0 2.0 1712
1.0 1.0 1.0 1.0 1713
1.0 1.0 1714
1.0 1.0 1715
1.0 - - 1.0 1716
1.0 - 1.0 1.0 1717
1.0 - - 1.0 1718
1.0 - - 1.0 1719
1.0 - - - 1720

1.0 - - 1.0 1801


- - - - 1802
1.0 1.0 - 1.0 1803
100 PERSIAPAN AREAL
101 PENETAPAN AREAL (SURVEY AWAL)
101 Fisik LUAS SURVEY AWAL BIBITAN Ha 100
101 Labour PHL HK/Ha 1.000 1.250 1.500 2.000 -
101 Veh Running DUMP TRUK KM -
101 Veh Running TRAKTOR HM -
101 Veh Running TRAILLER HM -
101 Supervision ALOKASI SUPERVISI

102 IMAS TUMBANG -


102 Fisik LUAS IMAS TUMBANG Ha 100
102 Fisik LUAS IMAS TUMBANG SENDIRI Ha
102 Labour PHL HK/Ha 15.000 16.000 17.000 18.000 -
102 Material CAT MINYAK Klg/Ha 0.167 0.167 0.167 0.167 -
102 Tools PARANG BABAT Pcs/Ha 0.051 0.055 0.058 0.061 -
102 Tools BATU ASAH Pcs/Ha 0.051 0.055 0.058 0.061 -
102 Contract KONTRAK IMAS TUMBANG
102 Supervision ALOKASI SUPERVISI

103 RUMPUK -
103 Fisik LUAS RUMPUK Ha 100
103 Fisik LUAS RUMPUK SENDIRI Ha
103 Labour PHL HK/Ha 1.000 1.000 1.000 1.500 -
103 Veh Running BULDOZER HM/Ha 8 6.5 5 -
103 Veh Running EXCAVATOR HM/Ha 14 12.5 10 -
103 Contract KONTRAK RUMPUK
103 Supervision ALOKASI SUPERVISI

104 PEMBUATAN TAPAK BIBITAN -


104 Fisik LUAS TAPAK BIBITAN Ha 100
104 Fisik LUAS TAPAK BIBITAN SENDIRI Ha
104 Labour PHL HK/Ha 6.000 7.000 8.000 8.000 -
104 Veh Running BULDOZER HM/Ha 30.000 50.000 60.000 -
104 Veh Running EXCAVATOR HM/Ha 30.000 -
104 Contract KONTRAK TAPAK BIBITAN
104 Supervision ALOKASI SUPERVISI

105 PEMBUATAN JALAN BIBITAN -


105 Fisik PANJANG JLN BIBITAN Mtr 100
105 Fisik PANJANG JLN BIBITAN SENDIRI Mtr
105 Veh Running BULDOZER HM/Mtr 0.029 0.029 0.029 -
105 Veh Running EXCAVATOR HM/Mtr 0.040 -
105 Contract KONTRAK JALAN BIBITAN
100 PERSIAPAN AREAL
105 Supervision ALOKASI SUPERVISI

106 PEMBUATAN JEMBATAN BIBITAN -


106 Fisik UNIT JEMBATAN Unit 100
106 Fisik UNIT JEMBATAN SENDIRI Unit
106 Veh Running BULDOZER HM/Unit 10.000 10.000 10.000 -
106 Veh Running EXCAVATOR HM/Unit 10.000 -
106 Contract KONTRAK JEMBATAN BIBITAN
106 Supervision ALOKASI SUPERVISI

107 PEMBUATAN PARIT BIBITAN -


107 Fisik PANJANG PARIT Mtr 100
107 Fisik PANJANG PARIT SENDIRI Mtr
107 Veh Running EXCAVATOR HM/Mtr 0.020 0.020 0.020 0.020 -
107 Contract KONTRAK PARIT BIBITAN
107 Supervision ALOKASI SUPERVISI

108 PEMBUATAN WADUK -


108 Fisik UNIT WADUK Unit 100
108 Fisik UNIT WADUK SENDIRI Unit
108 Labour PHL HK/Unit 20.000 20.000 20.000 20.000 -
108 Veh Running EXCAVATOR HM/Unit 200.000 200.000 200.000 200.000 -
108 Contract KONTRAK BUAT WADUK BIBITAN
108 Supervision ALOKASI SUPERVISI

109 PEMBUATAN INSTALASI AIR -


109 Fisik LUAS INSTALASI AIR Ha 100
109 Fisik LUAS INSTALASI AIR SENDIRI Ha
109 Labour PHL HK/Ha 50.000 50.000 50.000 50.000 -
109 Material PERALATAN INSTALASI AIR Ha/Ha 1.000 1.000 1.000 1.000 -
109 Contract KONTRAK INSTALASI AIR
109 Supervision ALOKASI SUPERVISI

110 PEMBUATAN BANGUNAN -


STANDARD INPUT KAPASITAS ANGKUT
Tenaga Kerja dan Alat Mineral Gambut Mineral Gambut
NORMA KUANTITAS 1. STANDARD INPUT PEMBUATAN
PT
Aktivitas UoM
A B C D

LAND CLEARING
BLOCKING Mtr/Ha 70.0 60.0 56.0 56.0
RUMPUK % 0.1 0.2 0.3 0.4
PADATKAN RUMPUKAN % - - - -
BENAM RUMPUKAN % - - - -
BAJAK % - - - -
GARU % - - - -
COMPACTING % - - - -
PEMBUATAN INFRASTRUKTUR JALAN DAN JEMBATAN
PEMBUATAN ACCESS ROAD Mtr/Ha 5 4 12 8.6
PEMBUATAN MAIN ROAD Mtr/Ha 17 15 13 13
PEMBUATAN COLLECTION ROAD Mtr/Ha 53 45 43 43
PEMBUATAN CONTOUR ROAD Mtr/Ha 40 40 39 39
PENIMBUNAN ACCESS ROAD Mtr/Ha - - - -
PENIMBUNAN MAIN ROAD Mtr/Ha - - - -
PENIMBUNAN COLLECTION ROAD Mtr/Ha - - - -
PEMBUATAN GAMBANGAN Mtr/Ha 1.0 1.0 1.0 1.0
PEMBUATAN JEMBATAN KAYU Unit/Ha 0.10 0.10 0.10 0.10
PEMBUATAN JEMBATAN BETON Unit/Ha - - - -
PEMBUATAN GORONG-GORONG Unit/Ha 0.07 0.07 0.07 0.07

PEMBUATAN PARIT, TERESAN, TPK KUDA DAN PLANTING POCKET


PEMBUATAN PARIT MAIN Mtr/Ha - - 5.00 5.00
PEMBUATAN PARIT COLLECTION Mtr/Ha 6.00 5.00 10.00 10.00
PEMBUATAN PARIT FIELD Mtr/Ha 25.00 15.00 20.00 20.00
PENCUCIAN PARIT ALAM Mtr/Ha 2.00 2.00 2.00 1.00
PEMBUATAN TERESAN % 0.90 0.80 0.70 0.60
PEMBUATAN PLANTING POCKET % - - - -
PEMBUATAN TAPAK KUDA % 0.01 0.01 0.01 0.00
PEMBUATAN BUMBUNAN % - - 0.00 0.00
PEMBUATAN BENTENG RORAK % 0.15 0.15 0.15 0.15
PEMBUATAN BENDUNGAN Unit/Ha - - - -
PEMBUATAN TANGGUL SUNGAI Mtr/Ha - - - -
PEMBUATAN PINTU AIR Unit/Ha - - - -
PEMBUATAN BOUNDRIES Mtr/Ha - - 4.00 -

PRASARANA LAIN
PEMBUATAN/REHAB TANGGA PANEN Mtr/Ha - - - -
TITI PANEN KAYU Unit/Ha - - 0.3 0.3
TITI PANEN BETON Unit/Ha - - - -
PEMBUATAN/REHAB TEMPAT PELETAKAN HASIL PANUnit/Ha - - - -
REMPES POKOK/TUNAS PASAR Unit/Ha - - - -
KANDANG BURUNG HANTU Unit/Ha
STANDARD NORMA TENAGA KERJA

PT
Aktivitas UoM
A B C D

LAND CLEARING
SURVEY AREAL HK/Ha 0.5 0.5 0.5 0.5
BLOCKING HK/Mtr 0.0031 0.0031 0.003 0.003
IMAS TUMBANG HK/Ha 0.3 0.3 0.3 0.3
RUMPUK HK/Ha 1.0 1.0 1.0 1.0
PADATKAN RUMPUKAN HK/Ha - - - -
BENAM RUMPUKAN HK/Ha - - - -
RENCEK HK/Ha 1.0 1.0 1.0 1.0
CUCI TUNGGUL HK/Ha 1.0 1.0 1.0 1.0
LALANG SHEET & SPORADIS HK/Ha 4.0 4.0 4.0 4.0
WIPING HK/Ha 0.3 0.3 0.3 0.3
BAJAK HK/Ha - - - -
GARU HK/Ha - - - -
COMPACTING HK/Ha - - - -
Subtotal Land Clearing
PEMBUATAN INFRASTRUKTUR JALAN DAN JEMBATAN - - - -
PEMBUATAN ACCESS ROAD HK/Mtr 0.008 0.008 0.008 0.008
PEMBUATAN MAIN ROAD HK/Mtr 0.004 0.004 0.004 0.004
PEMBUATAN COLLECTION ROAD HK/Mtr 0.002 0.002 0.002 0.002
PEMBUATAN CONTOUR ROAD HK/Mtr 0.002 0.002 0.002 0.002
PENIMBUNAN ACCESS ROAD HK/Mtr - - - -
PENIMBUNAN MAIN ROAD HK/Mtr - - - -
PENIMBUNAN COLLECTION ROAD HK/Mtr - - - -
PEMBUATAN GAMBANGAN HK/Mtr 0.020 0.020 0.020 0.020
PEMBUATAN JEMBATAN KAYU HK/Unit 0.500 0.500 0.500 0.500
PEMBUATAN JEMBATAN BETON HK/Unit - - - -
PEMBUATAN GORONG-GORONG HK/Unit 0.3 0.3 0.330 0.330
Subtotal Pembuatan Infrastruktur Jalan dan Jembatan
PEMBUATAN PARIT, TERESAN, TPK KUDA DAN PLANTING POCKET - - - -
PEMBUATAN PARIT MAIN HK/Mtr 0.005 0.005 0.005 0.005
PEMBUATAN PARIT COLLECTION HK/Mtr 0.003 0.003 0.003 0.003
PEMBUATAN PARIT FIELD HK/Mtr 0.003 0.003 0.003 0.003
PENCUCIAN PARIT ALAM HK/Mtr 0.005 0.005 0.005 0.005
PEMBUATAN TERESAN HK/Mtr 0.001 0.001 0.001 0.001
PEMBUATAN PLANTING POCKET HK/Unit - - - -
PEMBUATAN TAPAK KUDA HK/Unit 0.500 0.500 0.500 0.500
PEMBUATAN BUMBUNAN HK/Unit 0.500 0.500 0.500 0.500
PEMBUATAN BENTENG RORAK HK/Unit 0.143 0.143 0.143 0.143
PEMBUATAN BENDUNGAN HK/Unit - - - -
PEMBUATAN TANGGUL SUNGAI HK/Mtr - - - -
PEMBUATAN PINTU AIR HK/Unit - - - -
PEMBUATAN BOUNDRIES HK/Mtr - - 0.010 -
Subtotal Pembuatan Parit, Teresan, Tpk Kuda dan Planting Pocket
PENANAMAN KACANGAN - - - -
SEMPROT LALANG HK/Ha 1.5 1.5 1.5 1.5
SEMPROT ANAK KAYU & PAKIS HK/Ha 1.0 1.0 1.0 1.0
PENANAMAN KACANGAN MB HK/Ha 5.0 5.0 5.0 5.0
PENANAMAN KACANGAN SELAIN MB HK/Ha 2.5 2.5 2.5 2.5
PEMUPUKAN KACANGAN HK/Ha 2.5 2.5 2.5 2.5
PENYIANGAN GULMA/DANGIR KACANGAN HK/Ha 1.0 1.0 1.0 1.0
Subtotal Penanaman Kacangan
PENANAMAN KELAPA SAWIT - - - -
MEMANCANG HK/Ha 3.000 3.000 3.000 3.000
LUBANG TANAM MANUAL HK/Lbg 0.035 0.035 0.035 0.035
LUBANG TANAM MEKANIS HK/Lbg - - - -
PENGUNTILAN PUPUK HK/Kg 0.005 0.005 0.005 0.005
PEMUPUKAN LOBANG TANAM HK/Lbg 0.003 0.003 0.003 0.003
APLIKASI PENGENDALIAN HAMA HK/Ha 0.700 0.700 0.700 0.700
BIBIT - - - -
TRANSPORT & ECERAN BIBIT HK/Bbt 0.031 0.031 0.025 0.025
PENANAMAN BIBIT HK/Lbg 0.035 0.035 0.035 0.035
Subtotal Penanaman Kelapa Sawit
MERUMPUT
PENGENDALIAN PIRINGAN / PASAR RINTIS MANUAL HK/Ha 3.0 3.0 3.0 3.0
PENGENDALIAN PIRINGAN / PASAR RINTIS CHEMIST HK/Ha 0.50 0.5 0.5 0.5
PENGENDALIAN GAWANGAN CHEMIST HK/Ha 1.0 1.0 1.0 1.0
PENGENDALIAN GAWANGAN MANUAL HK/Ha 2.0 2.0 2.0 2.0
Subtotal Merumput
PENGENDALIAN ALANG-ALANG
SEMPROT SHEET HK/Ha - - - -
SEMPROT SPORADIS HK/Ha 1.0 1.0 1.0 1.0
WIPING LALANG HK/Ha 0.3 0.3 0.3 0.3
Subtotal Pengendalian Alang-alang
PEMUPUKAN TANAMAN
PENGUNTILAN PUPUK ANORGANIK HK/Kg 0.001 0.001 0.001 0.001
PENABURAN PUPUK ANORGANIK HK/Kg 0.003 0.003 0.003 0.003
PEMUPUKAN KOMPOS HK/Ton - - - -
PEMUPUKAN EFB HK/Ton - - 0.800 0.800
PEMUPUKAN DECANTER SOLID HK/Ton - - - -
PEMUPUKAN LIMBAH CAIR PABRIK KELAPA SAWIT HK/Ha - - - -
HK/Ha - - - -
HK/Ha - - - -
Subtotal Pemupukan Tanaman
PENGENDALIAN HAMA DAN PENYAKIT
SENSUS HAMA DAN PENYAKIT HK/Ha 0.2 0.2 0.2 0.2
PENGEDALIAN ULAT API/KANTONG HK/Ha - - 0.3 0.3
PENGENDALIAN TIRATABHA HK/Ha - - - -
PENGENDALIAN TIKUS CHEMIST HK/Ha 0.8 0.8 0.8 0.8
PENGENDALIAN TIKUS BIOLOGIS HK/Ha - - - -
HK/Unit - - - -
HK/Unit - - - -
PENGENDALIAN RAYAP HK/TP - - - -
PENGENDALIAN ORYCTES HK/Ha - - - -
HK/Ha - - - -
PENGENDALIAN GANODERMA HK/Ha - - - -
HK/Pkk - - - -
HK/Pkk - - - -
PENGENDALIAN HAMA LAINNYA HK/Ha 2.0 2.0 2.0 2.0
HK/Mtr 0.0 0.0 0.0 0.0
HK/Ha 1.5 1.5 1.5 1.5
PATROLI DAN PADAMKAN API HK/Ha 0.2 0.2 0.2 0.2
Subtotal Pengendalian Hama dan Penyakit
KASTRASI DAN SANITASI
KASTRASI & SANITASI HK/Ha 2.5 2.5 2.5 2.5
Subtotal Kastrasi dan Sanitasi
SENSUS DAN THINING OUT
SENSUS POKOK HK/Ha 0.2 0.2 0.2 0.2
MENJARANGKAN POKOK (THINNING OUT) HK/Ha - - - -
HK/Pkk - - - -
HK/Pkk - - - -
SENSUS PRODUKSI HK/Ha - - - -
HK/Ha - - - -
TIMBANG BERAT JANJANG RATA-RATA HK/Ha - - - -
Subtotal Sensus dan Thining Out
SISIP DAN KONSOLIDASI
PENYISIPAN HK/Pkk 0.1 0.1 0.1 0.1
KONSOLIDASI HK/Pkk 0.1 0.1 0.1 0.1
Subtotal sisip dan Konsolidasi
PEMELIHARAAN PARIT / TERESAN / TAPAK KUDA
PENCUCIAN PARIT MAIN - - - -
PENCUCIAN PARIT COLLECTION - - - -
PENCUCIAN PARIT FIELD MANUAL HK/Mtr - - 0.0200 0.0200
PENCUCIAN PARIT ALAM - - - -
SEMPROT PINGGIR PARIT HK/Mtr - - - -
PEMELIHARAAN/REHAB TERESAN HK/Mtr 0.020 0.020 0.020 0.020
PEMELIHARAAN PLANTING POCKET HK/Unit - - - 0.020
PEMELIHARAAN/REHAB TAPAK KUDA HK/Unit - - - -
PEMELIHARAAN/REHAB BUMBUNAN HK/Unit - - - -
PEMELIHARAAN/REHAB BENTENG RORAK HK/Unit - - - -
PEMELIHARAAN/REHAB BENDUNGAN HK/Unit - - - -
PEMELIHARAAN TANGGUL SUNGAI HK/Ha - - - -
PEMELIHARAAN/REHAB PINTU AIR HK/Unit - - - -
Subtotal Pemeliharaan Parit/ Teresan/ Tapak Kuda - - - -
PEMELIHARAAN JALAN / JEMBATAN, TITI PANEN - - - -
PEMELIHARAAN ACCESS ROAD MANUAL HK/Mtr 0.002 0.002 0.002 0.002
PENIMBUNAN ACCESS ROAD HK/Mtr 0.001 0.001 0.001 0.001
PENGERASAN ACCESS ROAD MEKANIS (SIRTU) HK/Mtr 0.001 0.001 0.001 0.001
GRADING ACCESS ROAD - - - -
PEMELIHARAAN MAIN ROAD MANUAL HK/Mtr 0.002 0.002 0.002 0.002
PENIMBUNAN MAIN ROAD HK/Mtr 0.001 0.001 0.001 0.001
PENGERASAN MAIN ROAD MEKANIS (SIRTU) HK/Mtr 0.001 0.001 0.001 0.001
GRADING MAIN ROAD - - - -
PEMELIHARAAN COLLECTION ROAD MANUAL HK/Mtr 0.002 0.002 0.002 0.002
PENIMBUNAN COLLECTION ROAD HK/Mtr 0.001 0.001 0.001 0.001
PENGERASAN COLLECTION ROAD MEKANIS - (SIRTU HK/Mtr 0.001 0.001 0.001 0.001
GRADING COLLECTION ROAD - - - -
PEMELIHARAAN JEMBATAN KAYU HK/Unit 1.000 1.000 1.000 1.000
PEMELIHARAAN JEMBATAN BETON HK/Unit - - - -
PEMELIHARAN GORONG-GORONG HK/Unit - - - -
PEMBUATAN/REHAB TANGGA PANEN HK/Mtr - - - -
TITI PANEN KAYU HK/Unit - - - -
TITI PANEN BETON HK/Unit - - - -
PEMBUATAN/REHAB TEMPAT PELETAKAN HASIL PAN HK/Unit - - - -
REMPES POKOK/TUNAS PASAR HK/Mtr - - - -
Subtotal Jalan / Jembatan, Titi Panen - - - -
SURVEY DAN PATOK - - - -
PEMELIHARAAN PATOK BATAS BLOK HK/Unit 0.1 0.1 0.1 0.1
SURVEY AREAL STATEMENT HK/Ha 0.1 0.1 0.1 0.1
SURVEY TANAH DAN TOPOGRAFI HK/Ha 0.1 0.1 0.1 0.1
Subtotal Survey dan Patok 0 0 0 0

Jenis Pekerjaan Jenis Alat


UoM
Berat A B C

LAND CLEARING
RUMPUK BULDOZER HM/Ha 7.000 7.000 7.000
EXCAVATOR HM/Ha 12.500 12.500 12.500
PADATKAN RUMPUKAN EXCAVATOR HM/Ha - - -
BENAM RUMPUKAN EXCAVATOR HM/Ha - - -
RENCEK CHAIN SAW HM/Ha 7.500 7.500 7.500
CUCI TUNGGUL CHAIN SAW HM/Ha 7.500 7.500 7.500
BAJAK TRAKTOR HM - - -
GARU TRAKTOR HM - - -
COMPACTING EXCAVATOR HM - - -
Subtotal Land Clearing - - -
PEMBUATAN INFRASTRUKTUR JALAN DAN JEMBATAN - -
PEMBUATAN ACCESS ROAD BULDOZER HM/Mtr 0.083 0.083 0.083
EXCAVATOR HM/Mtr - - -
PEMBUATAN MAIN ROAD BULDOZER HM/Mtr 0.040 0.040 0.050
EXCAVATOR HM/Mtr - - -
PEMBUATAN COLLECTION ROAD BULDOZER HM/Mtr 0.025 0.025 0.025
EXCAVATOR HM/Mtr - - -
PEMBUATAN CONTOUR ROAD BULDOZER HM/Mtr 0.020 0.020 0.020
PENIMBUNAN ACCESS ROAD EXCAVATOR HM/M3 0.033 0.033 0.033
LOADER BACKH HM/M3 0.050 0.050 0.050
ROAD GRADER HM/Mtr 0.010 0.010 0.010
COMPACTOR HM/Mtr 0.010 0.010 0.010
BULDOZER HM/Mtr 0.010 0.010 0.010
PENIMBUNAN MAIN ROAD EXCAVATOR HM/M3 - - -
LOADER BACKH HM/M3 - - -
ROAD GRADER HM/Mtr - - -
COMPACTOR HM/Mtr - - -
BULDOZER HM/Mtr - - -
PENIMBUNAN COLLECTION ROAD EXCAVATOR HM/M3 - - -
LOADER BACKH HM/M3 - - -
ROAD GRADER HM/Mtr - - -
COMPACTOR HM/Mtr - - -
BULDOZER HM/Mtr - - -
PEMBUATAN GAMBANGAN EXCAVATOR HM/Mtr 0.050 0.050 0.050
LOADER BACKH HM/Mtr - - -
PEMBUATAN JEMBATAN KAYU EXCAVATOR HM/Unit 10.000 10.000 10.000
PEMBUATAN JEMBATAN BETON - - -
PEMBUATAN GORONG-GORONG EXCAVATOR HM/Unit 3.000 3.000 5.000
LOADER BACKH HM/Unit 5.000 5.000 5.000
Subtotal Pembuatan Infrastruktur Jalan dan Jembatan - - -
PEMBUATAN PARIT, TERESAN, TPK KUDA DAN PLANTING POCKET - - -
PEMBUATAN PARIT MAIN EXCAVATOR HM/Mtr 0.050 0.050 0.050
PEMBUATAN PARIT COLLECTION EXCAVATOR HM/Mtr 0.033 0.033 0.033
PEMBUATAN PARIT FIELD EXCAVATOR HM/Mtr 0.025 0.025 0.025
PENCUCIAN PARIT ALAM EXCAVATOR HM/Mtr 0.050 0.050 0.050
PEMBUATAN TERESAN BULDOZER HM/Mtr 0.014 0.014 0.017
PEMBUATAN PLANTING POCKET EXCAVATOR HM/Unit - - -
PEMBUATAN TANGGUL SUNGAI EXCAVATOR HM/Mtr - - -
LOADER BACKH HM/Mtr - - -
PEMBUATAN PINTU AIR EXCAVATOR HM/Unit - - -
LOADER BACKH HM/Unit - - -
PEMBUATAN BOUNDRIES EXCAVATOR HM/Mtr 0.100 - 0.100
LOADER BACKH HM/Mtr - - -
Subtotal Pembuatan Parit, Teresan, Tpk Kuda dan Planting Pocket - - -
PENANAMAN KELAPA SAWIT - - -
LUBANG TANAM MEKANIS EXCAVATOR HM/Lbg - - -
TRAKTOR HM/Lbg - - -
Subtotal Penanaman Kelapa Sawit - - -
PEMELIHARAAN PARIT / TERESAN / TAPAK KUDA - - -
PENCUCIAN PARIT MAIN EXCAVATOR HM/Mtr - - 0.020
PENCUCIAN PARIT COLLECTION EXCAVATOR HM/Mtr - - 0.017
PENCUCIAN PARIT FIELD MANUAL - - -
PENCUCIAN PARIT ALAM EXCAVATOR HM/Mtr - - 0.025
PEMELIHARAAN TANGGUL SUNGAI EXCAVATOR HM/Mtr - - -
LOADER BACKH HM/Mtr - - -
PEMELIHARAAN/REHAB PINTU AIR EXCAVATOR HM/Unit - - -
LOADER BACKH HM/Unit - - -
Subtotal Pemeliharaan Parit/ Teresan/ Tapak Kuda - - -
PEMELIHARAAN JALAN / JEMBATAN, TITI PANEN - - -
PENIMBUNAN ACCESS ROAD EXCAVATOR HM/M3 - - -
LOADER BACKH HM/M3 - - -
ROAD GRADER HM/Mtr - - -
COMPACTOR HM/Mtr - - -
BULDOZER HM/Mtr - - -
PENGERASAN ACCESS ROAD MEKANIS (SIRTU) EXCAVATOR HM/M3 0.033 0.033 0.050
LOADER BACKH HM/M3 0.050 0.050 0.100
ROAD GRADER HM/Mtr 0.010 0.010 0.013
COMPACTOR HM/Mtr 0.010 0.010 0.013
BULDOZER HM/Mtr - - -
GRADING ACCESS ROAD ROAD GRADER HM/Mtr 0.007 0.007 0.007
COMPACTOR HM/Mtr 0.007 0.007 0.007
PENIMBUNAN MAIN ROAD EXCAVATOR HM/M3 - - -
LOADER BACKH HM/M3 - - -
ROAD GRADER HM/Mtr - - -
COMPACTOR HM/Mtr - - -
BULDOZER HM/Mtr - - -
PENGERASAN MAIN ROAD MEKANIS (SIRTU) EXCAVATOR HM/M3 0.033 0.033 0.033
LOADER BACKH HM/M3 0.100 0.100 0.100
ROAD GRADER HM/Mtr 0.010 0.010 0.010
COMPACTOR HM/Mtr 0.010 0.010 0.010
BULDOZER HM/Mtr - - -
GRADING MAIN ROAD ROAD GRADER HM/Mtr 0.007 0.007 0.007
COMPACTOR HM/Mtr 0.007 0.007 0.007
PENIMBUNAN COLLECTION ROAD EXCAVATOR HM/M3 - - -
LOADER BACKH HM/M3 - - -
ROAD GRADER HM/Mtr - - -
COMPACTOR HM/Mtr - - -
BULDOZER HM/Mtr - - -
PENGERASAN COLLECTION ROAD MEKANIS - (SIRTU EXCAVATOR HM/M3 0.050 0.050 0.050
LOADER BACKH HM/M3 0.050 0.100 0.100
ROAD GRADER HM/Mtr 0.010 0.008 0.008
COMPACTOR HM/Mtr 0.010 0.008 0.008
BULDOZER HM/Mtr - - -
GRADING COLLECTION ROAD ROAD GRADER HM/Mtr 0.007 0.007 0.007
COMPACTOR HM/Mtr 0.007 0.007 0.007
Subtotal Jalan / Jembatan, Titi Panen
REVISI

PT
E F G H I J

56.0 60.0 43.9 50.6 50.6 43.9


0.3 0.2 1.0 1.0 1.0 0.97
- - 0.7 0.7 0.0 0.7
- - 0.3 0.3 0.0 0.3
- - - - - -
- - - - - -
- - - - - -

21 21 4 5 5 6
13 15 10 10 10 10
43 45 34 40 40 34
39 40 - - - 12
- - 4 5 5 6
- - 10 10 10 10
- - 34 40 40 34
1.0 1.0 1.0 1.0 1.0 1.0
0.10 0.10 0.08 0.08 0.08 0.10
- - - - - -
0.07 0.07 0.07 - - 0.03

5.00 5.00 10.23 10.28 10.28 10.23


10.00 10.00 33.63 40.36 40.36 33.63
20.00 20.00 330.00 330.00 330.00 330.00
2.00 2.00 2.00 2.00 2.00 1.00
0.70 0.80 - - - 0.03
- - - - - -
0.01 0.01 0.01 - - 0.00
0.00 0.01 0.02 0.05 0.05 0.05
0.15 0.15 - - - 0.15
- - 0.01 0.12 0.12 0.01
- - 0.01 2.50 2.50 0.01
- - 0.00 0.00 0.00 0.00
- - 4.55 1.10 - -

- - - - - -
0.3 0.3 0.8 0.9 0.9 0.8
- - - - - -
- - - - - -
- - - - - -
0
PT
E F G H I J

0.5 0.5 0.5 0.5 0.5 0.5


0.003 0.003 0.003 0.003 0.003 0.003
0.3 0.3 0.3 0.3 0.3 26.4
1.0 1.0 1.0 2.0 2.0 1.5
- - 0.0 0.0 0.0 0.0
- - 0.004 0.004 0.004 0.004
1.0 1.0 1.0 1.0 1.0 1.0
1.0 1.0 1.0 1.0 1.0 1.0
4.0 4.0 4.0 4.0 4.0 4.0
0.3 0.3 0.3 0.3 0.3 0.3
- - - - - -
- - - - - -
- - - - - -

- - - -
0.008 0.008 0.008 0.008 0.008 0.008
0.004 0.004 0.004 0.004 0.004 0.004
0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 - - - 0.002
- - 0.002 0.002 0.002 0.002
- - 0.002 0.002 0.002 0.002
- - 0.002 0.002 0.002 0.002
0.020 0.020 0.020 0.020 0.020 0.014
0.500 0.500 0.500 0.500 0.500 0.500
- - - - - -
0.330 0.330 0.330 - - 0.330

- - - -
0.005 0.005 0.005 0.005 0.005 0.005
0.003 0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003 0.003
0.005 0.005 0.005 0.005 0.005 0.005
0.001 0.001 - - - 0.001
- - - - - -
0.500 0.500 - - - 0.500
0.500 0.500 0.040 0.040 0.040 0.040
0.143 0.143 - - - -
- - - 0.500 0.500 0.500
- - - 0.007 0.007 0.007
- - - 10.000 10.000 10.000
- - - 0.010 0.010 -

- - - -
1.5 1.5 1.5 1.5 1.5 1.5
1.0 1.0 1.0 1.0 1.0 1.0
5.0 5.0 5.0 5.0 5.0 5.0
2.5 2.5 2.5 2.5 2.5 2.5
2.5 2.5 2.5 2.5 2.5 2.5
1.0 1.0 1.0 1.0 1.0 1.0
-
- - - - -
3.000 3.000 3.000 3.000 3.000 -
0.035 0.035 0.035 - - 0.035
- - - - - -
0.005 0.005 0.005 0.005 0.005 0.005
0.003 0.003 0.003 0.003 0.003 0.003
0.700 0.700 0.700 0.700 0.700 0.700
- - - - - -
0.031 0.031 0.031 0.031 0.031 0.031
0.035 0.035 0.035 0.035 0.035 0.035
0
0
3.0 3.0 3.0 3.0 3.0 3.0
0.5 0.5 0.5 0.5 0.5 0.5
1.0 1.0 1.0 1.0 1.0 1.0
2.0 2.0 2.0 2.0 2.0 2.0
-
-
- - - - - -
1.0 1.0 1.0 1.0 1.0 1.0
0.3 0.3 0.3 0.3 0.3 0.3
-
-
0.001 0.001 0.001 0.001 0.001 0.001
0.003 0.003 0.003 0.004 0.004 0.003
- - - - - -
- - 0.800 - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
-
-
0.2 0.2 0.2 0.2 0.2 0.2
0.3 0.3 0.3 0.3 0.3 0.3
- - - - - -
0.8 0.8 0.8 0.8 0.8 0.8
- - - 0.0 - -
- - - 0.5 - -
- - - 0.3 - -
- - 0.1 0.1 0.1 0.1
- - 0.1 0.1 0.1 0.1
- - 0.2 0.2 0.2 0.2
- - 0.1 0.1 0.1 0.1
- - 0.2 0.2 0.2 0.2
- - 0.7 0.7 0.7 0.7
2.0 2.0 2.0 2.0 2.0 2.0
0.0 0.0 0.0 0.0 0.0 0.0
1.5 1.5 1.5 1.5 1.5 1.5
0.2 0.2 0.2 0.2 0.2 0.2
-
-
2.5 2.5 2.5 3.0 - 2.5
- -
- -
0.2 0.2 0.2 0.2 0.2 0.2
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- -
- -
0.1 0.1 0.1 0.1 0.1 0.1
0.1 0.1 0.1 0.1 0.1 0.1
- -
- -
- - - - - -
- - - - - -
0.0200 0.0200 0.0200 0.0200 0.0200 0.0200
- - - - - -
- - - - - -
0.020 - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001
- - - - - -
0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001
- - - - - -
0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001
- - - - - -
1.000 1.000 1.000 1.000 1.000 1.000
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1 0.1 0.1 0.1 0.1 0.1
0.1 0.1 0.1 0.1 0.1 0.1
0.1 0.1 0.1 0.1 0.1 0.1
0 0 0 0

PT
D E F G H I J

7.000 7.000 7.000 - - - 7.000


12.500 12.500 12.500 12.500 12.500 12.500 12.500
- - - 4.000 4.000 4.000 4.000
- - - 7.000 7.000 7.000 7.000
7.500 7.500 7.500 - - - 7.500
7.500 7.500 7.500 - - - 7.500
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -
- - - - -
0.083 0.083 0.083 - - - 0.083
- - - 0.008 0.008 0.008 0.008
0.050 0.050 0.050 - - - 0.050
- - - 0.050 0.050 0.050 0.050
0.025 0.025 0.025 - - - 0.025
- - - 0.030 0.030 0.030 0.030
0.020 0.020 0.020 - - - 0.020
0.033 0.033 0.033 0.033 0.033 0.033 0.033
0.050 0.050 0.050 0.050 0.050 0.050 0.050
0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.010 0.010 0.010 0.010 0.010 0.010 0.010
- - - 0.030 0.030 0.030 0.033
- - - 0.060 0.060 0.060 0.060
- - - 0.010 0.010 0.010 0.010
- - - 0.010 0.010 0.010 0.010
- - - 0.010 0.010 0.010 0.010
- - - 0.033 0.033 0.033 0.033
- - - 0.050 0.050 0.050 0.050
- - - 0.010 0.010 0.010 0.010
- - - 0.010 0.010 0.010 0.010
- - - 0.010 0.010 0.010 0.010
0.050 0.050 0.050 0.020 0.020 0.020 0.020
- - - 0.030 0.030 0.030 0.030
10.000 10.000 10.000 12.000 12.000 12.000 12.000
- - - - - - -
5.000 5.000 5.000 4.000 4.000 4.000 4.000
5.000 5.000 5.000 5.000 5.000 5.000 5.000
- - - - -
- - - - -
0.050 0.050 0.050 0.060 0.060 0.060 0.060
0.033 0.033 0.033 0.033 0.033 0.033 0.030
0.025 0.025 0.025 0.025 0.025 0.025 0.025
0.050 0.050 0.050 0.060 0.060 0.060 0.060
0.020 0.017 0.017 - - - 0.020
- - - - - - -
- - - - - - -
- - - - - - -
- - - 5.000 5.000 5.000 5.000
- - - 10.000 10.000 10.000 10.000
- - - 0.100 0.100 0.100 0.100
- - - - - - -
- - - - -
- - - - -
- - - 0.011 0.011 - 0.011
- - - - - - -
- - - - -
- - - - -
0.020 0.020 - 0.020 0.017 - 0.017
0.017 0.017 - 0.010 0.011 - 0.011
- - - - - - -
0.025 0.025 - 0.020 0.017 - 0.017
- - - - 0.004 - 0.004
- - - - 0.003 - 0.003
- - - 5.000 5.000 - 5.000
- - - 10.000 10.000 - 10.000
- - - - -
- - - - -
- - - 0.033 0.033 0.033 0.033
- - - 0.050 0.050 0.050 0.050
- - - 0.010 0.010 0.010 0.010
- - - 0.010 0.010 0.010 0.010
- - - 0.010 0.010 0.010 0.010
0.050 0.050 0.033 0.033 0.033 0.033 0.033
0.100 0.100 0.050 0.050 0.050 0.050 0.050
0.013 0.013 0.010 0.010 0.010 0.010 0.010
0.013 0.013 0.010 0.010 0.010 0.010 0.010
- - - - - - -
0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.007 0.007 0.007 0.007 0.007 0.007 0.007
- - - 0.033 0.033 0.033 0.033
- - - 0.050 0.050 0.050 0.050
- - - 0.010 0.010 0.010 0.010
- - - 0.010 0.010 0.010 0.010
- - - 0.010 0.010 0.010 0.010
0.033 0.033 0.033 0.033 0.033 0.033 0.033
0.100 0.100 0.100 0.100 0.100 0.100 0.100
0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.010 0.010 0.010 0.010 0.010 0.010 0.010
- - - - - - -
0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.007 0.007 0.007 0.007 0.007 0.007 0.007
- - - 0.033 0.033 0.033 0.033
- - - 0.050 0.050 0.050 0.050
- - - 0.010 0.010 0.010 0.010
- - - 0.010 0.010 0.010 0.010
- - - 0.010 0.010 0.010 0.010
0.050 0.050 0.050 0.033 0.033 0.033 0.033
0.100 0.100 0.100 0.050 0.050 0.050 0.050
0.008 0.008 0.008 0.010 0.010 0.010 0.010
0.008 0.008 0.008 0.010 0.010 0.010 0.010
- - - - - - -
0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.007 0.007 0.007 0.007 0.007 0.007 0.007
USULAN

PT
A B C D E F G H I J

50.0 45.0 44.0 44.0 44.0 44.0 44.0 50.0 50.0 44.0
0.1 0.2 0.3 0.4 0.3 0.0 1.0 1.0 0.0 1.0
- - - - - - 0.7 0.7 0.0 0.7
- - - - - - 0.3 0.3 0.0 0.3
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -

5 4 12 8.6 21 21 4 5 5 6
17 15 12 12 12 12 10 10 10 10
43 40 38 39 39 39 34 40 40 34
45 41 38 41 37 37 - - - 12
4 5 5 6
10 10 10 10
34 40 40 34
0.5 0.5 0.8 0.5 0.8 0.8 0.4 - - 0.8
0.10 0.10 0.10 0.10 0.10 0.10 0.08 0.08 0.08 0.08
- - - -
0.07 0.07 0.07 0.07 0.07 0.07 0.07 - 0.03

3.00 - 5.00 5.00 5.00 5.00 10.23 10.28 10.28 10.23


6.00 5.00 10.00 10.00 10.00 10.00 33.63 40.36 40.36 33.63
25.00 15.00 20.00 20.00 20.00 20.00 330.00 330.00 330.00 330.00
- - 2.00 1.00 2.00 2.00 1.00 - - 1.00
0.90 0.80 0.70 0.60 0.70 0.01 - - - 0.05
- - - - - - - - - -
- - 0.02 0.01 0.02 0.00 0.01 - - 0.01
- - 0.01 0.01 0.01 0.00 0.02 0.05 0.00 0.05
0.02 0.02 0.01 0.01 0.01 0.00 - - - -
- - - - - - 0.01 0.12 0.12 -
- - - - - - 0.01 2.50 2.50 -
- - - - - - - 0.00 0.00 -
- - 4.00 - - - 7.50 7.43 7.43 -

- - - - - - - - -
- - 0.4 0.3 0.4 0.4 0.7 0.9 0.9 0.7
- - - - - - 0.92 -
- - - - - - -
- - - - - - - - -
0
PT
A B C D E F G H I J

0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
0.0031 0.0031 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
26.4 26.4 26.4 26.4 26.4 26.4 26.4 26.4 26.4 26.4
1.0 1.0 1.0 1.0 1.0 1.0 1.0 2.0 2.0 1.5
- - - - - - 0.002 0.002 0.002 0.002
- - - - - - 0.004 0.004 0.004 0.004
1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
8.0 8.0 8.0 8.0 8.0 8.0 9.0 9.0 9.0 9.0
0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3

- - - - - - - 0.4 0.4 0.4

- - - - - - - -
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
0.004 0.004 0.004 0.004 0.004 0.004 0.003 0.004 0.004 0.004
0.002 0.002 0.002 0.003 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 - - - 0.002
- 0.002 0.002 0.002 0.002
- 0.002 0.002 0.002 0.002
- 0.002 0.002 0.002 0.002
0.014 0.014 0.014 0.008 0.014 0.014 0.014 0.014 0.014 0.014
0.500 0.500 0.500 1.000 0.500 0.500 0.500 0.500 0.500 0.500

0.3 0.3 0.500 0.500 0.500 0.500 0.250 - 0.250

- - - - - - - -
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.001 0.001 0.001 0.002 0.001 0.001 - - - 0.002
- - - - - - - -
0.333 0.333 0.500 0.500 0.500 0.500 - - - 0.033
0.200 0.200 0.667 0.667 0.667 0.667 0.033 0.033 0.033 0.033
0.200 0.200 0.333 0.333 0.333 0.333 - - -
- - - - - - - 0.500 0.500 0.500
- - - - - 0.007 0.007 0.007
- - - - 10.000 10.000 10.000
0.010 - - - - 0.010 0.010 -

- - - - - - - -
2.5 2.5 3.5 3.5 3.5 3.5 3.0 4.0 4.0 4.0
2.5 2.5 3.0 3.0 3.0 3.0 2.0 3.0 3.0 3.0
3.0 3.0 5.0 5.0 5.0 5.0 3.0 3.5 3.5 3.5
2.5 2.5 2.0 2.0 2.0 2.0 3.0 3.0 3.0 3.0
1.5 1.5 1.5 1.5 1.5 1.5 1.0 2.0 2.0 2.0
4.7 4.7 5.0 5.0 5.0 5.0 4.0 5.0 5.0 5.0
-
- - - - - - - - -
3.000 3.000 3.000 3.000 3.000 3.000 2.700 2.400 2.400 2.400
0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.042 0.042 0.042
- - - - 0.001 0.001 0.001 0.001
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700
- - - - - - - - - -
0.017 0.017 0.017 0.017 0.017 0.017 0.014 0.021 0.021 0.021
0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.039 0.039 0.039
0
0
2.5 2.5 3.5 3.5 3.5 3.5 2.5 2.5 2.5 2.5
0.80 0.8 0.8 0.8 0.8 0.8 0.4 0.4 0.4 0.4
2.0 2.0 2.0 2.0 2.0 2.0 1.5 1.5 1.5 1.5
4.0 4.0 4.0 4.0 4.0 4.0 3.0 3.0 3.0 3.0
-
-
- - 5.0 5.0 5.0 5.0 4.0 5.0 5.0 5.0
2.5 2.5 3.0 3.0 3.0 3.0 2.0 3.0 3.0 3.0
0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
-
-
0.001 0.001 0.002 0.002 0.002 0.002 0.001 0.001 0.001 0.001
0.004 0.004 0.003 0.005 0.003 0.003 0.003 0.004 0.004 0.004
- - - - - - -
- - 3.000 3.000 - 0.400 -
- - - - - - 1.000 1.000 1.000
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
-
-
0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
- - 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3

0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
- - - - - - 0.0
- - - - - - 0.5
- - - - - - 0.3
- - - - - - 0.1 0.1 0.1 0.1
- - 0.1 0.1 0.1 0.1
- - 0.2 0.2 0.2 0.2
- - - - - - 0.1 0.1 0.1 0.1
- - - - - - 0.2 0.2 0.2 0.2
- - - - - - 0.7 0.7 0.7 0.7
16.7 16.7 16.7 16.7 16.7 16.7 16.7 16.7 16.7 16.7
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
-
-
- 3.0 3.0 3.0 3.0 2.5 2.5 2.5 2.5
- -
- -
0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- -
- -
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.2 0.2 0.2
- -
- -
- - - - - - - - - -
- - - - - - - - - -
- - 0.0500 0.0500 0.0500 0.0500 0.0200 0.0200 0.0200 0.0200
- - - - - - - - - -
- - 0.003 0.003 0.003 0.003 0.0005 0.0006 0.0006 0.0006
0.010 0.010 0.010 - - - - -
- -
- - 0.143 0.143 0.143 0.143 -
- - 0.200 0.200 0.200 0.200 -
- - 0.050 0.050 0.050 0.050
- - - - - - 0.2000 0.200 0.200 0.200
- - - - - -
- - - - - - 25.0 25.0 25.0 25.0
- - - - - - - - - -
- - - - - - - - - -
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
- - - - - - - - - -
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
- - - - - - - - - -
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
- - - - - - - - - -
1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000
0.020 0.020 0.020 0.020 0.020 0.020 - - - -
0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
0.333 0.333 0.333 0.333 0.333 0.333 0.333 0.333 0.333 0.333
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
- - - - - - - - - -
- - - - - - - - - -
0.5 0.5 0.1 0.1 0.1 0.1 0.5 0.1 0.1 0.1
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0 0 0 0 0

PT
A B C D E F G H I J

7.000 7.000 7.000 7.000 7.000 7.000 7.000


12.500 12.500 12.500 12.500 12.500 12.500 12.500 12.500 12.500 12.500
- - - - 4.000 4.000 4.000 4.000
- - - - 7.000 7.000 7.000 7.000
7.500 7.500 7.500 7.500 7.500 7.500 - - 7.500
7.500 7.500 7.500 7.500 7.500 7.500 - - 7.500
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - -
0.083 0.083 0.083 0.083 0.083 0.083 - - 0.083
- - - - - 0.008 0.008 0.008 0.008
0.040 0.040 0.050 0.050 0.050 0.050 - - 0.050
- - - - - 0.050 0.050 0.050 0.050
0.025 0.025 0.025 0.025 0.025 0.025 - - 0.025
- - - - - 0.030 0.030 0.030 0.030
0.020 0.020 0.020 0.020 0.020 0.020 - - 0.020
0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
- - - - - 0.030 0.030 0.030 0.033
- - - - - 0.060 0.060 0.060 0.060
- - - - - 0.010 0.010 0.010 0.010
- - - - - 0.010 0.010 0.010 0.010
- - - - - 0.010 0.010 0.010 0.010
- - - - - 0.033 0.033 0.033 0.033
- - - - - 0.050 0.050 0.050 0.050
- - - - - 0.010 0.010 0.010 0.010
- - - - - 0.010 0.010 0.010 0.010
- - - - - 0.010 0.010 0.010 0.010
0.050 0.050 0.050 0.050 0.050 0.050 0.020 0.020 0.020 0.020
- - - - - 0.030 0.030 0.030 0.030
10.000 10.000 10.000 10.000 10.000 10.000 12.000 12.000 12.000 12.000
- - - - - - - -
3.000 3.000 5.000 5.000 5.000 5.000 4.000 4.000 4.000 4.000
5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000
- - - - - - - -
- - - - - - - -
0.050 0.050 0.050 0.050 0.050 0.050 0.060 0.060 0.060 0.060
0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.030
0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025
0.050 0.050 0.050 0.050 0.050 0.050 0.060 0.060 0.060 0.060
0.014 0.014 0.017 0.020 0.017 0.017 - 0.020
- - - - - - -
- -
- -
- - - - 5.000 5.000 5.000 5.000
- - - - 10.000 10.000 10.000 10.000
0.100 - 0.100 - - 0.100 0.100 0.100 0.100
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - 0.011 0.011 0.011
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - 0.020 0.020 0.020 0.020 0.017 0.017
- - 0.017 0.017 0.017 0.010 0.011 0.011
- - - - - - - -
- - 0.025 0.025 0.025 0.020 0.017 0.017
- - - - - - 0.004 0.004
- - - - - - 0.003 0.003
- - - - - 5.000 5.000 5.000
- - - - - 10.000 10.000 10.000
- - - - - - - -
- - - - - - - -
0.033 0.033 0.033 0.033
0.050 0.050 0.050 0.050
0.010 0.010 0.010 0.010
0.010 0.010 0.010 0.010
0.010 0.010 0.010 0.010
0.033 0.033 0.050 0.050 0.050 0.033 0.033 0.033 0.033 0.033
0.050 0.050 0.100 0.100 0.100 0.050 0.050 0.050 0.050 0.050
0.010 0.010 0.013 0.013 0.013 0.010 0.010 0.010 0.010 0.010
0.010 0.010 0.013 0.013 0.013 0.010 0.010 0.010 0.010 0.010
- - - - - - - - -
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
- - - - - 0.033 0.033 0.033 0.033
- - - - - 0.050 0.050 0.050 0.050
- - - - - 0.010 0.010 0.010 0.010
- - - - - 0.010 0.010 0.010 0.010
- - - - - 0.010 0.010 0.010 0.010
0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
- - - - - - - -
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
- - - - - 0.033 0.033 0.033 0.033
- - - - - 0.050 0.050 0.050 0.050
- - - - - 0.010 0.010 0.010 0.010
- - - - - 0.010 0.010 0.010 0.010
- - - - - 0.010 0.010 0.010 0.010
0.050 0.050 0.050 0.050 0.050 0.050 0.033 0.033 0.033 0.033
0.050 0.100 0.100 0.100 0.100 0.100 0.050 0.050 0.050 0.050
0.010 0.008 0.008 0.008 0.008 0.008 0.010 0.010 0.010 0.010
0.010 0.008 0.008 0.008 0.008 0.008 0.010 0.010 0.010 0.010
- - - - - - - -
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
REVISI

PT
A B C D E F G H

70.0 60.0 56.0 56.0 56.0 60.0 43.9 50.6


100 0.10 0.20 0.30 0.4 0.3 0.2 1.0 1.0
0.7 0.7
0.3 0.3

5 4 12 8.6 21 21 4 5
17 15 13 13 13 15 10 10
53 45 43 43 43 45 34 40
40 40 39 39 39 40 - -
4 5
10 10
34 40
1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
0.10 0.10 0.10 0.10 0.10 0.10 0.08 0.08

0.07 0.07 0.07 0.07 0.07 0.07 0.07

5.00 5.00 5.00 5.00 10.23 10.28


6.00 5.00 10.00 10.00 10.00 10.00 33.63 40.36
25.00 15.00 20.00 20.00 20.00 20.00 330.00 330.00
2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00
0.90 0.80 0.70 0.60 0.70 0.80 - -

0.010 0.010 0.006 0.004 0.006 0.010 0.010


0.003 0.002 0.003 0.005 0.02 0.05
0 0 0 0 0 0
0.01 0.12
0.01 2.50
0.0019 0.0012
4.00 4.55 1.10

0.25 0.25 0.25 0.25 0.75 0.90


PT
A B C D E F G H

0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5


0.0031 0.0031 0.003 0.003 0.003 0.003 0.003 0.003
0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
1.0 1.0 1.0 1.0 1.0 1.0 1.0 2.0
- - - - - - 0.0 0.0
- - - - - - 0.004 0.004
1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3

0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008


0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 - -
- 0.002 0.002
- 0.002 0.002
- 0.002 0.002
0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020
0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500

0.33 0.33 0.330 0.330 0.330 0.330 0.330

0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005


0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.001 0.001 0.001 0.001 0.001 0.001 - -
- - - - - -
0.500 0.500 0.500 0.500 0.500 0.500 - -
0.500 0.500 0.500 0.500 0.500 0.500 0.040 0.040
0.143 0.143 0.143 0.143 0.143 0.143
- - - - - 0.500
- - - - - 0.007
- - - - 10.000
0.010 - - - - 0.010

1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5


1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5
2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5
1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
-

3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000


0.035 0.035 0.035 0.035 0.035 0.035 0.035
- - - -
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700
- - - - - -
0.031 0.031 0.025 0.025 0.031 0.031 0.031 0.031
0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035
0

3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0


0.50 0.5 0.5 0.5 0.5 0.5 0.5 0.5
1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0

1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0


0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001


0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.004

- - 0.800 0.800 - 0.800

0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2


- - 0.3 0.3 0.3 0.3 0.3 0.3

0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8


0.0
0.5
0.3
0.1 0.1
0.1 0.1
0.2 0.2
0.1 0.1
0.2 0.2
0.7 0.7
2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2

2.5 2.5 2.5 2.5 2.5 2.5 2.5 3.0

0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2

0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1


0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1

0.0200 0.0200 0.0200 0.0200 0.0200 0.0200

0.020 0.020 0.020 0.020 0.020


0.020

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002


0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002


0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000

0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1


0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1

PT
A B C D E F G H

7.000 7.000 7.000 7.000 7.000 7.000


12.500 12.500 12.500 12.500 12.500 12.500 12.500 12.500
- - - - 4.000 4.000
- - - - 7.000 7.000
7.500 7.500 7.500 7.500 7.500 7.500 - -
7.500 7.500 7.500 7.500 7.500 7.500 - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - -
0.083 0.083 0.083 0.083 0.083 0.083 - -
- - - - - 0.008 0.008
0.040 0.040 0.050 0.050 0.050 0.050 - -
- - - - - 0.050 0.050
0.025 0.025 0.025 0.025 0.025 0.025 - -
- - - - - 0.030 0.030
0.020 0.020 0.020 0.020 0.020 0.020 - -
0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
- - - - - 0.030 0.030
- - - - - 0.060 0.060
- - - - - 0.010 0.010
- - - - - 0.010 0.010
- - - - - 0.010 0.010
- - - - - 0.033 0.033
- - - - - 0.050 0.050
- - - - - 0.010 0.010
- - - - - 0.010 0.010
- - - - - 0.010 0.010
0.050 0.050 0.050 0.050 0.050 0.050 0.020 0.020
- - - - - 0.030 0.030
10.000 10.000 10.000 10.000 10.000 10.000 12.000 12.000
- - - - - - -
3.000 3.000 5.000 5.000 5.000 5.000 4.000 4.000
5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000
- - - - - - -
- - - - - - -
0.050 0.050 0.050 0.050 0.050 0.050 0.060 0.060
0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025
0.050 0.050 0.050 0.050 0.050 0.050 0.060 0.060
0.014 0.014 0.017 0.020 0.017 0.017 -
- - - - - -
-
-
- - - - 5.000 5.000
- - - - 10.000 10.000
0.100 - 0.100 - - 0.100 0.100
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - 0.011 0.011
- - - - - - -
- - - - - - -
- - - - - - -
- - 0.020 0.020 0.020 0.020 0.017
- - 0.017 0.017 0.017 0.010 0.011
- - - - - - -
- - 0.025 0.025 0.025 0.020 0.017
- - - - - - 0.004
- - - - - - 0.003
- - - - - 5.000 5.000
- - - - - 10.000 10.000
- - - - - - -
- - - - - - -
0.033 0.033
0.050 0.050
0.010 0.010
0.010 0.010
0.010 0.010
0.033 0.033 0.050 0.050 0.050 0.033 0.033 0.033
0.050 0.050 0.100 0.100 0.100 0.050 0.050 0.050
0.010 0.010 0.013 0.013 0.013 0.010 0.010 0.010
0.010 0.010 0.013 0.013 0.013 0.010 0.010 0.010
- - - - - - - -
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
- - - - - 0.033 0.033
- - - - - 0.050 0.050
- - - - - 0.010 0.010
- - - - - 0.010 0.010
- - - - - 0.010 0.010
0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
- - - - - - -
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
- - - - - 0.033 0.033
- - - - - 0.050 0.050
- - - - - 0.010 0.010
- - - - - 0.010 0.010
- - - - - 0.010 0.010
0.050 0.050 0.050 0.050 0.050 0.050 0.033 0.033
0.050 0.100 0.100 0.100 0.100 0.100 0.050 0.050
0.010 0.008 0.008 0.008 0.008 0.008 0.010 0.010
0.010 0.008 0.008 0.008 0.008 0.008 0.010 0.010
- - - - - - -
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
I J

50.6 43.9
1.0 0.97
0.0 0.7
0.0 0.3

5 6
10 10
40 34
- 12
5 6
10 10
40 34
1.0 1.0
0.08 0.10

- 0.03

10.28 10.23
40.36 33.63
330.00 330.00
2.00 1.00
- 0.03

0.0001
0.05 0.05
0
0.12 0.01
2.50 0.01
0.0012 0.0012

0.90 0.75
I J

0.5 0.5
0.003 0.003
0.3 26.4
2.0 1.5
0.0 0.0
0.004 0.004
1.0 1.0
1.0 1.0
4.0 4.0
0.3 0.3

0.008 0.008
0.004 0.004
0.002 0.002
- 0.002
0.002 0.002
0.002 0.002
0.002 0.002
0.020 0.014
0.500 0.500

- 0.330

0.005 0.005
0.003 0.003
0.003 0.003
0.005 0.005
- 0.001
- -
- 0.500
0.040 0.040

0.500 0.500
0.007 0.007
10.000 10.000
0.010 -

1.5 1.5
1.0 1.0
5.0 5.0
2.5 2.5
2.5 2.5
1.0 1.0

3.000
0.035

0.005 0.005
0.003 0.003
0.700 0.700

0.031 0.031
0.035 0.035

3.0 3.0
0.5 0.5
1.0 1.0
2.0 2.0

1.0 1.0
0.3 0.3

0.001 0.001
0.004 0.003

0.2 0.2
0.3 0.3

0.8 0.8
0.1 0.1
0.1 0.1
0.2 0.2
0.1 0.1
0.2 0.2
0.7 0.7
2.0 2.0
0.0 0.0
1.5 1.5
0.2 0.2

2.5

0.2 0.2

0.1 0.1
0.1 0.1

0.0200 0.0200

0.002 0.002
0.001 0.001
0.001 0.001

0.002 0.002
0.001 0.001
0.001 0.001
0.002 0.002
0.001 0.001
0.001 0.001

1.000 1.000

0.1 0.1
0.1 0.1
0.1 0.1

I J

7.000
12.500 12.500
4.000 4.000
7.000 7.000
7.500
7.500
-
-
-
-
-
0.083
0.008 0.008
0.050
0.050 0.050
0.025
0.030 0.030
0.020
0.033 0.033
0.050 0.050
0.010 0.010
0.010 0.010
0.010 0.010
0.030 0.033
0.060 0.060
0.010 0.010
0.010 0.010
0.010 0.010
0.033 0.033
0.050 0.050
0.010 0.010
0.010 0.010
0.010 0.010
0.020 0.020
0.030 0.030
12.000 12.000
-
4.000 4.000
5.000 5.000
-
-
0.060 0.060
0.033 0.030
0.025 0.025
0.060 0.060
0.020
-
-
-
5.000 5.000
10.000 10.000
0.100 0.100
-
-
-
0.011
-
-
-
0.017
0.011
-
0.017
0.004
0.003
5.000
10.000
-
-
0.033 0.033
0.050 0.050
0.010 0.010
0.010 0.010
0.010 0.010
0.033 0.033
0.050 0.050
0.010 0.010
0.010 0.010
-
0.007 0.007
0.007 0.007
0.033 0.033
0.050 0.050
0.010 0.010
0.010 0.010
0.010 0.010
0.033 0.033
0.100 0.100
0.010 0.010
0.010 0.010
-
0.007 0.007
0.007 0.007
0.033 0.033
0.050 0.050
0.010 0.010
0.010 0.010
0.010 0.010
0.033 0.033
0.050 0.050
0.010 0.010
0.010 0.010
-
0.007 0.007
0.007 0.007
PENENTUAN JARAK ANGKUT

Jenis Angkutan Sat KM

Abu Janjang Ton 0


Bibit MN Bibit 10
Dec Solid Ton 0
EFB Ton 0
Gorong Unit 3
Jb Beton Unit 0
Kayu Gambang Batang 3
Kayu Pancang Batang 3
Orang Orang 7
Patok Patok 3
Pupuk Kg 3
Sirtu M3 5
Tanah M3 10
TP Beton Unit 3
TP Kayu M3 3
NORMA KEBUTUHAN HK KERJA

Aktivitas Sat Datar Bergelombang

PEMBIBITAN
PERSIAPAN AREAL
PENETAPAN AREAL (SURVEY AWAL) HK/Ha 1.0000 1.2500
IMAS TUMBANG HK/Ha 15.000 16.0000
RUMPUK HK/Ha 1.0000 1.0000
PEMBUATAN TAPAK BIBITAN HK/Ha 6.0000 7.0000
PEMBUATAN JALAN BIBITAN
PEMBUATAN JEMBATAN BIBITAN
PEMBUATAN PARIT BIBITAN
PEMBUATAN WADUK HK/Unit 20.0000 20.0000
PEMBUATAN INSTALASI AIR HK/Ha 50.0000 50.0000
PEMBUATAN BANGUNAN
PEMBUATAN BEDENGAN DAN NAUNGAN HK/Unit 4.0000 4.0000
KUMPUL TOPSOIL (PN DAN MN)
PRE- NURSERY
KECAMBAH
MENGISI TANAH - PN HK/Bag 0.0025 0.0025
MENGATUR BABY BAG - PN HK/Bag 0.0010 0.0010
SELEKSI KECAMBAH - PN HK/Kcb 0.0002 0.0002
PENANAMAN KECAMBAH - PN HK/Kcb 0.0010 0.0010
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - PN HK/Unit 0.1000 0.1000
PENYIRAMAN MANUAL - PN HK/Bbt 0.0000 0.0000
PENYIRAMAN MEKANIS - PN HK/Bbt 0.0000 0.0000
RAWAT PARIT BEDENGAN - PN HK/Mtr 0.0100 0.0100
PEMELIHARAAN INSTALASI AIR - PN HK/Ha 0.2000 0.2000
PEMUPUKAN PRE NURSERY HK/Kg 0.0667 0.0667
PENGENDALIAN GULMA DI POLIBAG - PN HK/Bbt 0.0002 0.0002
PENGENDALIAN GULMA DI LUAR POLIBAG - PN HK/Bbt 0.0002 0.0002
PENGENDALIAN HAMA PENYAKIT TANAMAN - PN HK/Bbt 0.0000 0.0000
SENSUS - PN HK/Bbt 0.0001 0.0001
SELEKSI - PN HK/Bbt 0.0002 0.0002
MAIN NURSERY
MENGISI TANAH - MN HK/Bag 0.0050 0.0050
PENAMBAHAN TANAH - MN HK/Bag 0.0020 0.0020
SPACING & SUSUN POLIBAG - MN HK/Bag 0.0014 0.0014
LANGSIR POLIBAG - MN HK/Bag 0.0050 0.0050
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - MN HK/Unit 0.1000 0.1000
MENCABUT & ANGKUT KE MN HK/Bag 0.0020 0.0020
MEMBUAT LUBANG TANAM (BOR) - MN HK/Bag 0.0025 0.0025
TANAM BIBIT - MN HK/Bag 0.0050 0.0050
PENYIRAMAN MANUAL - MN HK/Bbt 0.0003 0.0003
PENYIRAMAN MEKANIS - MN HK/Bbt 0.0000 0.0000
RAWAT PARIT - MN HK/Bbt 0.0000 0.0000
PEMELIHARAAN INSTALASI AIR - MN HK/Ha 0.2000 0.2000
PEMUPUKAN - MN HK/Kg 0.0080 0.0080
PENGENDALIAN GULMA DI POLIBAG - MN HK/Bbt 0.0003 0.0003
PENGENDALIAN GULMA DI LUAR POLIBAG - MN HK/Ha 0.0003 0.0003
PENGENDALIAN HAMA PENYAKIT TANAMAN - MN HK/Bbt 0.0002 0.0002
SENSUS - MN HK/Bbt 0.0001 0.0001
SELEKSI - MN HK/Bbt 0.0001 0.0001
MENEGAKKAN POLIBAG DAN BIBIT - MN HK/Bbt 0.0001 0.0001
PENGGANTIAN POLIBAG - MN HK/Bag 0.0001 0.0001

TANAMAN BELUM MENGHASILKAN


LAND CLEARING
SURVEY AREAL HK/Ha 1.0000 1.2500
BLOCKING HK/Mtr 0.0046 0.0053
IMAS TUMBANG HK/Ha 15.000 16.0000
RUMPUK HK/Ha 1.0000 1.0000
RENCEK HK/Ha 1.0000 1.0000
CUCI TUNGGUL HK/Ha 1.0000 1.0000
LALANG SHEET & SPORADIS HK/Ha 8.0000 8.0000
WIPING HK/Ha 0.3333 0.3333
BAJAK HK/Ha 0.3333 0.3333
GARU HK/Ha 0.2000 0.2000
COMPACTING HK/Ha
PEMBUATAN INFRASTUKTUR JALAN DAN JEMBATAN
PEMBUATAN ACCESS ROAD HK/Mtr 0.0080 0.0082
PEMBUATAN MAIN ROAD HK/Mtr 0.0033 0.0036
PEMBUATAN COLLECTION ROAD HK/Mtr 0.0020 0.0021
PEMBUATAN CONTOUR ROAD HK/Mtr 0.0017 0.0017
PENIMBUNAN ACCESS ROAD HK/Mtr 0.0020 0.0020
PENIMBUNAN MAIN ROAD HK/Mtr 0.0020 0.0020
PENIMBUNAN COLLECTION ROAD HK/Mtr 0.0020 0.0020
PEMBUATAN GAMBANGAN HK/Mtr 0.0143 0.0143
PEMBUATAN JEMBATAN KAYU HK/Unit 0.5000 0.5000
PEMBUATAN JEMBATAN BETON HK/Unit 1.0000 1.0000
PEMBUATAN GORONG-GORONG HK/Unit 0.2500 0.2500
PEMBUATAN PARIT, TERESAN, TPK KUDA DAN PLANTING POCKET
PEMBUATAN PARIT MAIN HK/Mtr 0.0050 0.0050
PEMBUATAN PARIT COLLECTION HK/Mtr 0.0033 0.0033
PEMBUATAN PARIT FIELD HK/Mtr 0.0025 0.0025
PECUCIAN PARIT ALAM HK/Mtr 0.0050 0.0050
PEMBUATAN TERESAN HK/Mtr 0.0014 0.0014
PEMBUATAN PLANTING POCKET HK/Unit 0.0067 0.0067
PEMBUATAN TAPAK KUDA HK/Unit 0.3333 0.3333
PEMBUATAN BUMBUNAN HK/Unit 0.2000 0.2000
PEMBUATAN BENTENG RORAK HK/Unit 0.2000 0.2000
PEMBUATAN BENDUNGAN HK/Unit
PEMBUATAN PINTU AIR HK/Unit 10.0000 10.0000
PENANAMAN KACANGAN
SEMPROT LALANG HK/Ha 3.0000 3.2500
SEMPROT ANAK KAYU & PAKIS HK/Ha 2.0000 2.2500
PENANAMAN KACANGAN MB HK/Ha 3.0000 3.0000
PENANAMAN KACANGAN SELAIN MB HK/Ha 2.0000 2.2500
PEMUPUKAN KACANGAN HK/Ha 1.0000 1.2500
PENYIANGAN GULMA/DANGIR KACANGAN HK/Ha 4.6667 4.6667
PENANAMAN KELAPA SAWIT
MEMANCANG HK/Ha 2.0000 2.0000
LUBANG TANAM MANUAL HK/Lbg 0.0350 0.0350
LUBANG TANAM MEKANIS HK/Lbg 0.0011 0.0011
PENGUNTILAN PUPUK HK/Kg 0.0050 0.0050
PEMUPUKAN LOBANG TANAM HK/Lbg 0.0028 0.0031
APLIKASI RACUN TIKUS
BIBIT
TRANSPORT & ECERAN BIBIT HK/Bbt 0.0140 0.0154
PENANAMAN BIBIT HK/Lbg 0.0350 0.0350
MERUMPUT
GARUK PIRINGAN & TARIK GOLORAN HK/Ha 2.5000 2.5000
SEMPROT PIRINGAN/PSR PIKUL/TPH HK/Ha 0.3333 0.3636
SEMPROT GAWANGAN HK/Ha 1.5000 1.7500
DONGKEL ANAK KAYU HK/Ha 2.0000 2.0000
PENGENDALIAN ALANG-ALANG
SEMPROT SHEET HK/Ha 4.0000 5.0000
SEMPROT SPORADIS HK/Ha 2.0000 2.2500
WIPING LALANG HK/Ha 0.2000 0.2000
PEMUPUKAN TANAMAN
PENGUNTILAN PUPUK ANORGANIK HK/Kg 0.0010 0.0010
PEMUPUKAN PUPUK ANORGANIK HK/Kg 0.0033 0.0036
PEMUPUKAN ABU JANJANG HK/Ton 0.6667 0.6667
PEMUPUKAN ABU JANJANG HK/Ton 2.2222 2.2222
PEMUPUKAN EFB HK/Ton 0.4000 0.4000
PEMUPUKAN DECANTER SOLID HK/Ton 1.0000 1.0000
PENGENDALIAN HAMA DAN PENYAKIT
SENSUS HAMA DAN PENYAKIT HK/Ha 0.1000 0.1250
SENSUS KANDANG BURUNG HANTU HK/Ha 0.0100 0.0100
REHAB KANDANG BURUNG HANTU HK/Unit 0.2500 0.2500
PENGEDALIAN ULAT API/KANTONG HK/Ha 0.2000 0.2000
PENGENDALIAN TIRATABHA HK/Ha 1.0000 1.0000
PENGENDALIAN TIKUS HK/Ha 0.7500 0.7500
PENGENDALIAN RAYAP HK/TP 0.1429 0.1429
PENGENDALIAN ORYCTES HK/Ha 0.1000 0.1000
PENGENDALIAN ORYCTES HK/Ha 0.2000 0.2000
PENGENDALIAN GANODERMA HK/Ha 0.1000 0.1000
PENGENDALIAN GANODERMA HK/Pkk 0.2000 0.2000
PENGENDALIAN GANODERMA HK/Pkk 0.6667 0.6667
PENGENDALIAN HAMA LAINNYA HK/Ha 16.6667 16.6667
PENGENDALIAN HAMA LAINNYA HK/Mtr 0.0013 0.0013
PENGENDALIAN HAMA LAINNYA HK/Ha 1.0000 1.2500
PATROLI DAN PADAMKAN API HK/Ha 0.0667 0.0667
KASTRASI DAN SANITASI
KASTRASI & SANITASI HK/Ha 2.0000 2.2500
SENSUS DAN THINING OUT
SENSUS POKOK HK/Ha 0.1000 0.1250
MENJARANGKAN POKOK (THINNING OUT) HK/Ha 0.1000 0.1250
MENJARANGKAN POKOK (THINNING OUT) HK/Pkk 0.0500 0.0500
MENJARANGKAN POKOK (THINNING OUT) HK/Pkk 0.2500 0.2500
SENSUS PRODUKSI HK/Ha 0.1250 0.1250
SENSUS PRODUKSI HK/Ha 0.1000 0.1000
TIMBANG BJR HK/Ha 0.0333 0.0333
SISIP DAN KONSOLIDASI
PENYISIPAN HK/Pkk 0.0667 0.0833
KONSOLIDASI HK/Pkk 0.1000 0.1250
PEMELIHARAAN PARIT / TERESAN / TAPAK KUDA
PENCUCIAN PARIT FIELD HK/Mtr 0.0200 0.0200
SEMPROT PINGGIR PARIT HK/Mtr 0.0005 0.0005
PEMELIHARAAN/REHAB TERESAN HK/Mtr 0.0100 0.0100
PEMELIHARAAN PLANTING POCKET HK/Unit 0.1000 0.1000
PEMELIHARAAN/REHAB TAPAK KUDA HK/Unit 0.1000 0.1000
PEMELIHARAAN/REHAB BUMBUNAN HK/Unit 0.0667 0.0667
PEMELIHARAAN/REHAB BENTENG RORAK HK/Unit 0.0500 0.0500
PEMELIHARAAN/REHAB BENDUNGAN HK/Unit 0.2000 0.2000
PEMELIHARAAN/REHAB PINTU AIR HK/Unit 25.0000 25.0000
PEMELIHARAAN JALAN / JEMBATAN, TITI PANEN
PEMELIHARAAN ACCESS ROAD MANUAL HK/Mtr 0.0017 0.0018
PENIMBUNAN ACCESS ROAD HK/Mtr 0.0020 0.0020
PENGERASAN ACCESS ROAD MEKANIS (SIRTU) HK/Mtr 0.0010 0.0010
GRADING ACCESS ROAD
PEMELIHARAAN MAIN ROAD MANUAL HK/Mtr 0.0017 0.0018
PENIMBUNAN MAIN ROAD HK/Mtr 0.0020 0.0020
PENGERASAN MAIN ROAD MEKANIS (SIRTU) HK/Mtr 0.0010 0.0010
GRADING MAIN ROAD
PEMELIHARAAN COLLECTION ROAD MANUAL HK/Mtr 0.0010 0.0011
PENIMBUNAN COLLECTION ROAD HK/Mtr 0.0020 0.0020
PENGERASAN COLLECTION ROAD MEKANIS (SIRTU) HK/Mtr 0.0010 0.0010
GRADING COLLECTION ROAD
PEMELIHARAAN JEMBATAN KAYU HK/Unit 1.0000 1.0000
PEMELIHARAAN JEMBATAN BETON HK/Unit 1.0000 1.0000
PEMELIHARAN GORONG-GORONG HK/Unit 2.0000 2.0000
PEMBUATAN/REHAB TANGGA PANEN HK/Mtr 0.0200 0.0200
TITI PANEN KAYU HK/Unit 0.1000 0.1000
TITI PANEN BETON HK/Unit 0.1000 0.1000
PEMBUATAN/REHAB TPH PANEN HK/Unit 0.3333 0.3333
REMPES POKOK/TUNAS PASAR HK/Mtr 0.0022 0.0022
SURVEY DAN PATOK
PEMELIHARAAN PATOK BATAS BLOK HK/Unit 0.0500 0.0500
SURVEY TOPOGRAFI HK/Ha 0.0333 0.0333
SURVEY BATAS BLOK HK/Ha 0.0333 0.0333
Berbukit Gambut

1.5000 2.0000
17.0000 18.0000
1.0000 1.5000
8.0000 8.0000

20.0000 20.0000
50.0000 50.0000

4.0000 4.0000

0.0025 0.0025
0.0010 0.0010
0.0002 0.0002
0.0010 0.0010
0.1000 0.1000
0.0000 0.0000
0.0000 0.0000
0.0100 0.0100
0.2000 0.2000
0.0667 0.0667
0.0002 0.0002
0.0002 0.0002
0.0000 0.0000
0.0001 0.0001
0.0002 0.0002

0.0050 0.0050
0.0020 0.0020
0.0014 0.0014
0.0050 0.0050
0.1000 0.1000
0.0020 0.0020
0.0025 0.0025
0.0050 0.0050
0.0003 0.0003
0.0000 0.0000
0.0000 0.0000
0.2000 0.2000
0.0080 0.0080
0.0003 0.0003
0.0003 0.0003
0.0002 0.0002
0.0001 0.0001
0.0001 0.0001
0.0001 0.0001
0.0001 0.0001

1.5000 2.0000
0.0061 0.0046
17.0000 18.0000
1.0000 1.5000
1.0000 1.0000
1.0000 1.0000
8.0000 9.0000
0.3333 0.3333
0.3333
0.2000
0.2000

0.0083 0.0083
0.0040 0.0040
0.0022 0.0022
0.0017 -
0.0020 0.0020
0.0020 0.0020
0.0020 0.0020
0.0143 0.0143
0.5000 0.5000
1.0000 1.0000
0.2500 0.2500

0.0050 0.0050
0.0033 0.0033
0.0025 0.0025
0.0050 0.0050
0.0014
0.0067
0.3333
0.2000 0.2000
0.2000
0.5000
10.0000 10.0000

3.5000 3.5000
2.5000 2.5000
3.0000 3.0000
2.5000 2.5000
1.5000 1.5000
4.6667 4.6667

2.0000 2.0000
0.0350 0.0350
0.0011 0.0011
0.0050 0.0050
0.0034 0.0034

0.0167 0.0167
0.0350 0.0350

2.5000 2.5000
0.4000 0.4000
2.0000 2.0000
2.0000 2.0000

5.0000 5.0000
2.5000 2.5000
0.2000 0.2000

0.0010 0.0010
0.0040 0.0040
0.6667 0.6667
2.2222 2.2222
0.4000 0.4000
1.0000 1.0000

0.1667 0.1000
0.0100 0.0100
0.2500 0.2500
0.2000 0.2000
1.0000 1.0000
0.7500 0.7500
0.1429 0.1429
0.1000 0.1000
0.2000 0.2000
0.1000 0.1000
0.2000 0.2000
0.6667 0.6667
16.6667 16.6667
0.0013 0.0013
1.5000 1.5000
0.0667 0.0667

2.5000 2.5000

0.1667 0.1000
0.1667 0.1000
0.0500 0.0500
0.2500 0.2500
0.1250 0.1250
0.1000 0.1000
0.0333 0.0333

0.1000 0.1000
0.1667 0.1667

0.0200 0.0200
0.0005 0.0005
0.0100
0.1000 0.1000
0.1000 0.1000
0.0667 0.0667
0.0500 0.0500
0.2000 0.2000
25.0000 25.0000

0.0020 0.0017
0.0020 0.0020
0.0010 0.0010

0.0020 0.0017
0.0020 0.0020
0.0010 0.0010

0.0013 0.0013
0.0020 0.0020
0.0010 0.0010

1.0000 1.0000
1.0000 1.0000
2.0000 2.0000
0.0200
0.1000 0.1000
0.1000 0.1000
0.3333 0.3333
0.0022 0.0022

0.0500 0.0500
0.0333 0.0400
0.0333 0.0400
Keterangan

1 orang dapat mengcover 1 Ha


15 orang dapat mengcover 1 Ha
1 orang dapat mengcover 1 Ha (1 pengawas alat berat)
50 HM/Ha, 1 hari 7 HM = 50/7

200 HM/unit waduk. 1 hari = 10 HM ( 30 m x 60 m)


Pemasangan instalasi air 50 HK mengcover 1 Ha (40.000.000/20 Ha/31.000)

4 HK mampu mangcover 1 perlengkapan bedengan besar dan naungan panjang 25 m (16 HK mengcover bedengan panjang 100 mtr)

1 HK mampu mengisi 400 bag


1 HK mampu menyusun 1000 bag
1 HK mampu menyeleksi 5000 kecambah
1 HK mampu menanam 1000 kecambah
1 HK mampu mangcover dan memasang 10 label
1 HK mampu menyiram 20 bedengan kecil (1 bed kecil = 2500 bbt) dalam 1 hari
1 HK mampu menyiram 20 bedengan kecil (1 bed kecil = 2500 bbt) dalam 1 hari
1 HK dapat mengcover 5 jalur bedengan besar panjang 100 meter. Panjang parit = panjang bedengan
1 HK dapat mengcover 5 Ha luas areal bibitan
1 HK dapat memupuk 15 Kg
1 HK dapat mengcover 2 bedengan kecil, 2 bedengan = 5000 bibit
1 HK dapat mengcover 2 bedengan kecil, 2 bedengan = 5000 bibit
1 HK dapat mengcover 20 bedengan, 1 bedengan = 2500 bibit
1 HK dapat mengcover 4 bedengan
1 HK dapat mengcover 2 bedengan

1 HK dapat mengcover 200 bibit


1 HK dapat mengcover 500 bibit
1 HK dapat mengcover 700 bibit
1 HK dapat mengcover 200 bibit
1 HK dapat mengcover 10 label
1 HK dapat mengcover 500 bibit
1 HK dapat mengcover 400 bibit
1 HK dapat mengcover 200 bibit
1 HK dapat mengcover 4000 bbt
1 HK dapat mengcover 10 plot (1 plot = 1 Ha) = 12000 bibit
1 HK dapat mengcover 3 plot (3 Ha), panjang parit per plot = 600 m
4 HK dapat mengcover 20 Ha
1 HK dapat memupuk 125 Kg
4 HK dapat mengcover 1 ha ( 1 ha = 12000)
4 HK dapat mengcover 1 ha ( 1 ha = 12000)
1 HK dapat mengcover 4500 bibit
1 HK dapat mengcover 12000 bibit
1 HK dapat mengcover 12000 bibit
1 HK dapat mengcover 12000 bibit
1 HK dapat mengcover 12000 bibit

1 orang dapat mengcover 1 Ha


6 HK dapat mengcover 30 Ha (43,867 Mtr/Ha)
15 orang dapat mengcover 1 Ha
1 orang dapat mengcover 1 Ha (1 pengawas alat berat)
Pembantu operator chainsaw
Pembantu operator chainsaw
8 HK dapat mengcover 1 Ha sheet per rotasi
1 HK dapat mengcover 3 Ha
1 HK dapat mengcover 1 alat, dimana output alat = 3Ha/hari
1 HK dapat mengcover 1 alat, dimana output alat = 5Ha/hari
1 HK dapat mengawasi 1 alat, dimana output alat = 5 Ha/hari

1 HK dapat mengcover 1 alat, dimana output alat = 12,5 mtr/HM = 125 mtr/Hari
1 HK dapat mengcover 1 alat, dimana output alat = 30 mtr/HM = 300 mtr/Hari
1 HK dapat mengcover 1 alat, dimana output alat = 50 mtr/HM = 500 mtr/Hari
1 HK dapat mengcover 1 alat, dimana output alat = 60 mtr/HM = 600 mtr/Hari
1 HK dapat mengcover 500 meter
1 HK dapat mengcover 500 meter
1 HK dapat mengcover 500 meter
1 HK dapat mengcover 1 alat, dimana output alat = 70 mtr/hari
1 HK dapat mengcover 2 unit jembatan
1 HK dapat mengcover 1 unit jembatan
1 HK dapat mengcover 4 unit jembatan

1 HK dapat mengcover 1 alat, dimana output alat = 200 mtr/hari


1 HK dapat mengcover 1 alat, dimana output alat = 300 mtr/hari
1 HK dapat mengcover 1 alat, dimana output alat = 400 mtr/hari
1 HK dapat mengcover 1 alat, dimana output alat = 200 mtr/hari
1 HK dapat mengcover 1 alat, dimana output alat = 700 mtr/hari
1 HK dapat mengcover 1 alat, dimana output alat = 150 unit/hari
1 HK dapat mangcover 3 unit
1 HK dapat mangcover 5 unit
1 HK dapat mangcover 5 unit
1 HK dapat mangcover 2 unit
10 HK dapat mangcover 1 unit

3 HK dapat mengcover 1 Ha
2 HK dapat mengcover 1 Ha
3 HK dapat mengcover 1 Ha
2 HK dapat mengcover 1 Ha
1 HK dapat mangcover 1 Ha (setara dengan 300 kg)
4 HK dapat mangcover 1 Ha

2 HK dapat mangcover 1 Ha
5 HK dapat mangcover 1 Ha (5 HK untuk 145 Lubang)
1 HK dapat mengcover 1 alat (1 alat = 900 lubang)
1 HK dapat mangcover 200 Kg
1 HK dapat memupuk 2-2,5 Ha

2 HK dapat mengecer 1 Ha (2 HK untuk 145 Bibit)


5 HK dapat mangcover 1 Ha (5 HK untuk 145 Lubang)

2 HK dapat mengcover 1 Ha
1 HK dapat mangcover 3 Ha (1 HK untuk 3 Ha)
1,5 HK dapat mangcover 1 Ha
2 HK dapat mangcover 1 Ha

4 HK dapat mangcover 1 Ha
2 HK dapat mangcover 1 Ha
1 HK dapat mengcover 5 Ha

1 HK dapat mangcover 1000 Kg


1 HK dapat mangcover 300 Kg
1 HK dapat mangcover 1500 Kg until
1 HK dapat mangcover 450 Kg tabur
1 HK dapat mangcover 2,500 Kg
1 HK dapat mangcover 1000 Kg

1 HK dapat mengcover 10 Ha
1 HK dapat mengcover 100 Ha
1 HK dapat merehab dan memasang 4 unit kandang
1 HK dapat mengcover 5 ha
1 HK dapat mengcover 1 Ha
(I = 5 Ha; II = 7,5; III : 7,5; IV : 7,5; Rata2 = 0,75000 HK/Ha)
1 HK mengcover 7 TP
Sensus, 1 HK mengcover 10 Ha
Semprot, 1 HK mengcover 5 Ha
Sensus, 1 HK mengcover 10 Ha
Racun, 1 HK mengcover 5 pokok
Bongkar
Hama lain, 1 HK mengcover 8 Pkk (8/143 = 0,06)
Tanam Subulata, 1 HK mengcover 800 meter
Polinasi Buatan, 1 HK mengcover 1 Ha
1 HK mengcover 15 Ha

1 HK dapat 0,5 Ha

1 HK dapat mengcover 10 Ha
1 HK dapat mengcover 10 Ha
Racun
Bongkar
Rehab tanda, 1 HK mengcover 4 Ha
Sensus, 1 HK mengcover 10 Ha
1 HK mengcover 30 Ha

1 HK menyisip 15 pokok
1 HK menyisip 10 pokok

1 HK mengcover 50 m)
1 HK menyemprot 2000 Mtr pinggir parit ( lebar 2,5 kiri kanan parit)
1 HK dapat mengcover 100 meter
1 HK dapat mengcover 10 unit
1 HK dapat mengcover 10 unit
1 HK dapat mengcover 15 unit
1 HK dapat mengcover 20 unit
1 HK dapat mengcover 5 unit
25 HK untuk menjaga 1 pintu air selama sebulan (waktu efektif untuk menjaga pada musim hujan = 6 bulan)

1 HK dapat mengcover 600 meter


1 HK dapat mengcover 500 meter
1 HK dapat mengcover 1000 meter

1 HK dapat mengcover 600 meter


1 HK dapat mengcover 500 meter
1 HK dapat mengcover 1000 meter

1 HK dapat mengcover 1000 meter


1 HK dapat mengcover 500 meter
1 HK dapat mengcover 1000 meter

1 HK mengcover 1 unit
1 HK mengcover 1 unit
2 HK mengcover 1 unit
1 HK dapat mengcover 50 meter
1 HK dapat mengcover 10 unit
1 HK dapat mengcover 10 unit
1 HK dapat mengcover 3 unit
1 HK dapat mengcover 450 meter

1 orang mengcover 20 patok (5 blok)


1 HK mengcover 30 Ha
1 HK mengcover 30 Ha
n panjang 100 mtr)
48
0.0559440559
NORMA KEBUTUHAN AGROCHEMICAL

Aktivitas Bahan Sat

PEMBIBITAN
PERSIAPAN AREAL
PENETAPAN AREAL (SURVEY AWAL)
IMAS TUMBANG
RUMPUK
PEMBUATAN TAPAK BIBITAN
PEMBUATAN JALAN BIBITAN
PEMBUATAN JEMBATAN BIBITAN
PEMBUATAN PARIT BIBITAN
PEMBUATAN WADUK
PEMBUATAN INSTALASI AIR
PEMBUATAN BANGUNAN
PEMBUATAN BEDENGAN DAN NAUNGAN
KUMPUL TOPSOIL (PN DAN MN)
PRE- NURSERY
KECAMBAH
MENGISI TANAH - PN
MENGATUR BABY BAG - PN
SELEKSI KECAMBAH - PN
PENANAMAN KECAMBAH - PN TIRAM Ltr/Kcb
CARBOFURAN Kg/Kcb
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - PN
PENYIRAMAN MANUAL - PN
PENYIRAMAN MEKANIS - PN
RAWAT PARIT BEDENGAN - PN
PEMELIHARAAN INSTALASI AIR - PN
PEMUPUKAN PRE NURSERY
PENGENDALIAN GULMA DI POLIBAG - PN
PENGENDALIAN GULMA DI LUAR POLIBAG - PN GLIFOSAT Ltr/Ha
PENGENDALIAN HAMA PENYAKIT TANAMAN - PN CARBOFURAN Kg/Bbt
FIPRONIL Ltr/Bbt
MANKOZEB Kg/Bbt
SENSUS - PN
SELEKSI - PN
MAIN NURSERY
MENGISI TANAH - MN
PENAMBAHAN TANAH - MN
SPACING & SUSUN POLIBAG - MN
LANGSIR POLIBAG - MN
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - MN
MENCABUT & ANGKUT KE MN
MEMBUAT LUBANG TANAM (BOR) - MN
TANAM BIBIT - MN
PENYIRAMAN MANUAL - MN
PENYIRAMAN MEKANIS - MN
RAWAT PARIT - MN
PEMELIHARAAN INSTALASI AIR - MN
PEMUPUKAN - MN
PENGENDALIAN GULMA DI POLIBAG - MN
PENGENDALIAN GULMA DI LUAR POLIBAG - MN GLIFOSAT Ltr/Bbt
PENGENDALIAN HAMA PENYAKIT TANAMAN - MN FIPRONIL Ltr/Bbt
MANKOZEB Ltr/Bbt
SENSUS - MN
SELEKSI - MN
MENEGAKKAN POLIBAG DAN BIBIT - MN
PENGGANTIAN POLIBAG - MN
TANAMAN BELUM MENGHASILKAN
LAND CLEARING
SURVEY AREAL
BLOCKING
IMAS TUMBANG
RUMPUK
RENCEK
CUCI TUNGGUL
LALANG SHEET & SPORADIS GLIFOSAT Ltr/Ha
WIPING GLIFOSAT Ltr/Ha
BAJAK
GARU
COMPACTING
PEMBUATAN INFRASTUKTUR JALAN DAN JEMBATAN
PEMBUATAN ACCESS ROAD
PEMBUATAN MAIN ROAD
PEMBUATAN COLLECTION ROAD
PEMBUATAN CONTOUR ROAD
PEMBUATAN GAMBANGAN
PEMBUATAN JEMBATAN KAYU
PEMBUATAN JEMBATAN BETON
PEMBUATAN GORONG-GORONG
PEMBUATAN PARIT, TERESAN, TPK KUDA DAN PLANTING POCKET
PEMBUATAN PARIT MAIN
PEMBUATAN PARIT COLLECTION
PEMBUATAN PARIT FIELD
PENCUCIAN PARIT ALAM
PEMBUATAN TERESAN
PEMBUATAN PLANTING POCKET
PEMBUATAN TAPAK KUDA
PEMBUATAN BUMBUNAN
PEMBUATAN BENTENG RORAK
PEMBUATAN BENDUNGAN
PEMBUATAN PINTU AIR
PENANAMAN KACANGAN
SEMPROT LALANG GLIFOSAT Ltr/Ha
SEMPROT ANAK KAYU & PAKIS PARAQUAT Ltr/Ha
METIL METSULFURON Kg/Ha
PANCANG TANAM KACANGAN
PENANAMAN KACANGAN MB
PENANAMAN KACANGAN SELAIN MB
PEMUPUKAN KACANGAN
PENYIANGAN GULMA/DANGIR KACANGAN GLIFOSAT Ltr/Ha
PENANAMAN KELAPA SAWIT
MEMANCANG
LUBANG TANAM MANUAL
LUBANG TANAM MEKANIS
PENGUNTILAN PUPUK
PEMUPUKAN LOBANG TANAM
APLIKASI RACUN TIKUS RACUN TIKUS Kg/Lbg
BIBIT
TRANSPORT & ECERAN BIBIT
PENANAMAN BIBIT
MERUMPUT
GARUK PIRINGAN & TARIK GOLORAN
SEMPROT PIRINGAN/PSR PIKUL/TPH GLIFOSAT Ltr/Ha
FLOROXIPIR Ltr/Ha
PARAQUAT Ltr/Ha
METIL METSULFURON Kg/Ha
SEMPROT GAWANGAN PARAQUAT Ltr/Ha
METIL METSULFURON Kg/Ha
GLIFOSAT Ltr/Ha
DONGKEL ANAK KAYU
PENGENDALIAN ALANG-ALANG
SEMPROT SHEET GLIFOSAT Ltr/Ha
SEMPROT SPORADIS GLIFOSAT Ltr/Ha
WIPING LALANG GLIFOSAT Ltr/Ha
PEMUPUKAN TANAMAN
PENGUNTILAN PUPUK ANORGANIK
PEMUPUKAN PUPUK ANORGANIK
PEMUPUKAN ABU JANJANG
PEMUPUKAN EFB
PEMUPUKAN DECANTER SOLID
PENGENDALIAN HAMA DAN PENYAKIT
SENSUS HAMA DAN PENYAKIT
SENSUS KANDANG BURUNG HANTU
REHAB KANDANG BURUNG HANTU
PENGEDALIAN ULAT API/KANTONG LAMDA SIHALOTRIN Ltr/Ha
EMULGATOR Ltr/Ha
BENSIN Ltr/Ha
SOLAR Ltr/Ha
PENGENDALIAN TIRATABHA FIPRONIL Ltr/Pkk
ALKILARIL POLIGLIKOL ETER Ltr/Pkk
PENGENDALIAN TIKUS RACUN TIKUS Kg/Ha
PENGENDALIAN RAYAP FIPRONIL Ltr/TP
PENGENDALIAN ORYCTES FEROMON Sct/Ha
SIPERMETRIN Ltr/Ha
CARBOFURAN Kg/Ha
PENGENDALIAN GANODERMA GLIFOSAT Ltr/Pkk
PENGENDALIAN HAMA LAINNYA
PATROLI DAN PADAMKAN API
KASTRASI DAN SANITASI
KASTRASI
SANITASI
SENSUS DAN THINING OUT
SENSUS POKOK
MENJARANGKAN POKOK (THINNING OUT) GLIFOSAT Ltr/Pkk
SENSUS PRODUKSI
TIMBANG BJR
SISIP DAN KONSOLIDASI
PENYISIPAN
KONSOLIDASI
PEMELIHARAAN PARIT / TERESAN / TAPAK KUDA
PENCUCIAN PARIT MAIN
PENCUCIAN PARIT COLLECTION
PENCUCIAN PARIT FIELD MANUAL
PENCUCIAN PARIT ALAM
SEMPROT PINGGIR PARIT GLIFOSAT Ltr/Mtr
PEMELIHARAAN/REHAB TERESAN
PEMELIHARAAN PLANTING POCKET
PEMELIHARAAN/REHAB TAPAK KUDA
PEMELIHARAAN/REHAB BUMBUNAN
PEMELIHARAAN/REHAB BENTENG RORAK
PEMELIHARAAN/REHAB BENDUNGAN
PEMELIHARAAN/REHAB PINTU AIR
PEMELIHARAAN JALAN / JEMBATAN, TITI PANEN
PEMELIHARAAN ACCESS ROAD MANUAL
PENIMBUNAN ACCESS ROAD
PENGERASAN ACCESS ROAD MEKANIS (SIRTU)
GRADING ACCESS ROAD
PEMELIHARAAN MAIN ROAD MANUAL
PENIMBUNAN MAIN ROAD
PENGERASAN MAIN ROAD MEKANIS (SIRTU)
GRADING MAIN ROAD
PEMELIHARAAN COLLECTION ROAD MANUAL
PENIMBUNAN COLLECTION ROAD
PENGERASAN COLLECTION ROAD MEKANIS (SIRTU)
GRADING COLLECTION ROAD
PEMELIHARAAN JEMBATAN KAYU
PEMELIHARAAN JEMBATAN BETON
PEMELIHARAN GORONG-GORONG
PEMBUATAN/REHAB TANGGA PANEN
TITI PANEN KAYU
TITI PANEN BETON
PEMBUATAN/REHAB TPH PANEN
REMPES POKOK/TUNAS PASAR
SURVEY DAN PATOK
PEMELIHARAAN PATOK BATAS BLOK
SURVEY TOPOGRAFI
SURVEY BATAS BLOK
Kebutuhan Keterangan

0.0000 20 liter larutan bahan mengcover 100.000 kecambah, konsentrasi 2%


0.0050 5 gram per bag

0.0000 200 cc/Ha, 200 cc untuk 12.000 bbt


0.0050 5 gram per bag
0.0000 1 liter larutan bahan mengcover 500 bibit, konsentrasi 1%
0.0000 1 liter larutan bahan mengcover 500 bibit, konsentrasi 2%

0.0001 1 liter larutan bahan dapat mengcover Ha, konsentrasi 1%


0.0002 1 liter air untuk 50 bibit, konsentrasi 1%
0.0004 1 liter air untuk 50 bibit, konsentrasi 2%
6.0000 6 liter bahan aktif per Ha
0.1000 100 cc bahan aktif per Ha

1.5000 1,5 liter bahan aktif per Ha


2.0000 2 liter bahan aktif per Ha
0.1000 100 gram bahan aktif per Ha

1.0000 1 liter bahan aktif per Ha

0.0080 2 lubang perlu 1 bait. 1 kg racun tikus = 250 bait (racun yang ukuran kecil)

0.5000 500 cc bahan aktif per Ha


0.1250 125 cc bahan aktif per Ha
0.5000 500 cc bahan aktif per Ha
0.0250 25 gram bahan aktif per Ha
1.0000 1000 cc bahan aktif per Ha
0.0500 50 gram bahan aktif per Ha
1.0000 1000 cc bahan aktif per Ha
6.0000 5 liter bahan aktif per Ha
2.0000 2 liter bahan aktif per Ha
0.1000 100 cc bahan aktif per Ha

0.2000 200 cc bahan aktif per Ha


0.1000 100 cc bahan aktif per Ha
3.0000 3 liter bensin per Ha
3.2000 3,2 liter bensin per Ha
0.0015 1,5 cc bahan aktif per pokok
0.0075 7,5 cc bahan perekat per pokok
1.0010 1 pokok terserang dicampaign 4 tahap, total umpan = 175%, 1 kg umpan tikus terdiri dari 250 bait
4.0000 4 liter per Titik Point (terserang) (2+2 liter pokok terserang, 16 liter pokok sekeliling), konsentrasi 0,25%
0.5000 1 pcs Feromon mengcover 2 Ha
0.2000 200 cc bahan aktif per Ha
0.7150 5 gram bahan aktif per pokok
0.0800 80 cc bahan aktif per pokok

0.0800 80 cc bahan aktif per pokok

0.0003 1,5 liter bahan aktif per Ha, setara dengan panjang 5000 meter
37.5
sentrasi 0,25%
NORMA KEBUTUHAN MATRERIAL

Aktivitas Bahan Sat

PEMBIBITAN
PERSIAPAN AREAL
PENETAPAN AREAL (SURVEY AWAL)
IMAS TUMBANG CAT MINYAK Klg/Ha
RUMPUK
PEMBUATAN TAPAK BIBITAN
PEMBUATAN JALAN BIBITAN
PEMBUATAN JEMBATAN BIBITAN
PEMBUATAN PARIT BIBITAN
PEMBUATAN WADUK
PEMBUATAN INSTALASI AIR PERALATAN INSTALASI AIR SENDIRI Ha/Ha
PEMBUATAN BANGUNAN BANGUNAN BIBITAN Unit/Unit
PEMBUATAN BEDENGAN DAN NAUNGAN BAHAN BEDENGAN & NAUNGAN Unit/Unit
PARANET Roll/Unit
KUMPUL TOPSOIL (PN DAN MN) TANAH TOP SOIL Roll/Unit
PRE- NURSERY
KECAMBAH
MENGISI TANAH - PN BABY BAG Kg/Bag
MENGATUR BABY BAG - PN
SELEKSI KECAMBAH - PN
PENANAMAN KECAMBAH - PN
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - PN BAHAN LABELING PN Unit/Unit
PENYIRAMAN MANUAL - PN SELANG Mtr/Bbt
PENYIRAMAN MEKANIS - PN
RAWAT PARIT BEDENGAN - PN
PEMELIHARAAN INSTALASI AIR - PN BAHAN INSTALASI AIR PN Ha/Ha
PEMUPUKAN PRE NURSERY
PENGENDALIAN GULMA DI POLIBAG - PN
PENGENDALIAN GULMA DI LUAR POLIBAG - PN
PENGENDALIAN HAMA PENYAKIT TANAMAN - PN
SENSUS - PN
SELEKSI - PN
MAIN NURSERY
MENGISI TANAH - MN LARGE BAG Kg/Bag
PENAMBAHAN TANAH - MN
SPACING & SUSUN POLIBAG - MN
LANGSIR POLIBAG - MN
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - MN BAHAN LABELING MN Unit/Unit
MENCABUT & ANGKUT KE MN
MEMBUAT LUBANG TANAM (BOR) - MN
TANAM BIBIT - MN
PENYIRAMAN MANUAL - MN SELANG Mtr/Bbt
PENYIRAMAN MEKANIS - MN
RAWAT PARIT - MN
PEMELIHARAAN INSTALASI AIR - MN BAHAN INSTALASI AIR MN Ha/Ha
PEMUPUKAN - MN
PENGENDALIAN GULMA DI POLIBAG - MN
PENGENDALIAN GULMA DI LUAR POLIBAG - MN
PENGENDALIAN HAMA PENYAKIT TANAMAN - MN
SENSUS - MN
SELEKSI - MN
MENEGAKKAN POLIBAG DAN BIBIT - MN
PENGGANTIAN POLIBAG - MN LARGE BAG Kg/Bag

TANAMAN BELUM MENGHASILKAN


LAND CLEARING
SURVEY AREAL
BLOCKING CAT MINYAK Klg/Mtr
IMAS TUMBANG
RUMPUK KAYU PANCANG RUMPUK Pcs/Ha
RENCEK
CUCI TUNGGUL
LALANG SHEET & SPORADIS
WIPING
BAJAK
GARU
COMPACTING
PEMBUATAN INFRASTUKTUR JALAN DAN JEMBATAN
PEMBUATAN ACCESS ROAD
PEMBUATAN MAIN ROAD
PEMBUATAN COLLECTION ROAD
PEMBUATAN CONTOUR ROAD
PENIMBUNAN ACCESS ROAD TANAH M3/Mtr
PENIMBUNAN MAIN ROAD TANAH M3/Mtr
PENIMBUNAN COLLECTION ROAD TANAH M3/Mtr
PEMBUATAN GAMBANGAN KAYU GAMBANGAN Pcs/Mtr
PEMBUATAN JEMBATAN KAYU BAHAN JEMBATAN LOG - BUAT BARU Unit/Unit
PEMBUATAN JEMBATAN BETON BAHAN JEMBATAN BETON - BUAT BARU Unit/Unit
PEMBUATAN GORONG-GORONG BAHAN GORONG-GORONG - BUAT BARU Unit/Unit
PEMBUATAN PARIT, TERESAN, TPK KUDA DAN PLANTING POCKET
PEMBUATAN PARIT MAIN
PEMBUATAN PARIT COLLECTION
PEMBUATAN PARIT FIELD
PENCUCIAN PARIT ALAM
PEMBUATAN TERESAN
PEMBUATAN PLANTING POCKET
PEMBUATAN TAPAK KUDA
PEMBUATAN BUMBUNAN
PEMBUATAN BENTENG RORAK
PEMBUATAN BENDUNGAN BAHAN BENDUNGAN - BUAT BARU Unit/Unit
PEMBUATAN PINTU AIR BAHAN PINTU AIR - BUAT BARU Unit/Unit
PENANAMAN KACANGAN
SEMPROT LALANG
SEMPROT ANAK KAYU & PAKIS
PANCANG TANAM KACANGAN
PENANAMAN KACANGAN MB KACANGAN MB Stek/Ha
PENANAMAN KACANGAN SELAIN MB KACANGAN CM Kg/Ha
KACANGAN PJ Kg/Ha
KACANGAN CC Kg/Ha
RHIZOBIUM Sct/Ha
PEMUPUKAN KACANGAN
PENYIANGAN GULMA/DANGIR KACANGAN
PENANAMAN KELAPA SAWIT
MEMANCANG KAYU PANCANG TANAM Pcs/Ha
LUBANG TANAM MANUAL
LUBANG TANAM MEKANIS
PENGUNTILAN PUPUK
PEMUPUKAN LOBANG TANAM PLASTIK Kg/Lbg
APLIKASI RACUN TIKUS
BIBIT
TRANSPORT & ECERAN BIBIT
PENANAMAN BIBIT
MERUMPUT
GARUK PIRINGAN & TARIK GOLORAN
SEMPROT PIRINGAN/PSR PIKUL/TPH
SEMPROT GAWANGAN
DONGKEL ANAK KAYU
PENGENDALIAN ALANG-ALANG
SEMPROT SHEET
SEMPROT SPORADIS
WIPING LALANG
PEMUPUKAN TANAMAN
PENGUNTILAN PUPUK ANORGANIK
PEMUPUKAN PUPUK ANORGANIK
PEMUPUKAN ABU JANJANG
PEMUPUKAN EFB
PEMUPUKAN DECANTER SOLID
PENGENDALIAN HAMA DAN PENYAKIT
SENSUS HAMA DAN PENYAKIT
SENSUS KANDANG BURUNG HANTU
REHAB KANDANG BURUNG HANTU BAHAN KBH Unit/Unit
PENGEDALIAN ULAT API/KANTONG SPARTS BLOWER Pcs/Ha
PENGENDALIAN TIRATABHA
PENGENDALIAN TIKUS
PENGENDALIAN RAYAP
PENGENDALIAN ORYCTES
PENGENDALIAN GANODERMA CAT MINYAK Klg/Pkk
BOR TANGAN Pcs/Pkk
PENGENDALIAN HAMA LAINNYA BUNGA T. SUBULATA Bbt/Mtr
POLLEN Kg/Ha
TALK Kg/Ha
PATROLI DAN PADAMKAN API BAHAN MENARA API Unit/Ha
KASTRASI DAN SANITASI
KASTRASI
SANITASI
SENSUS DAN THINING OUT
SENSUS POKOK CAT MINYAK Klg/Ha
MENJARANGKAN POKOK (THINNING OUT) CAT MINYAK Klg/Pkk
BOR TANGAN Pcs/Pkk
SENSUS PRODUKSI CAT MINYAK Klg/Ha
TIMBANG BJR
SISIP DAN KONSOLIDASI
PENYISIPAN PLASTIK Kg/Lbg
KONSOLIDASI
PEMELIHARAAN PARIT / TERESAN / TAPAK KUDA
PENCUCIAN PARIT MAIN
PENCUCIAN PARIT COLLECTION
PENCUCIAN PARIT FIELD MANUAL
PENCUCIAN PARIT ALAM
SEMPROT PINGGIR PARIT
PEMELIHARAAN/REHAB TERESAN
PEMELIHARAAN PLANTING POCKET
PEMELIHARAAN/REHAB TAPAK KUDA
PEMELIHARAAN/REHAB BUMBUNAN
PEMELIHARAAN/REHAB BENTENG RORAK
PEMELIHARAAN/REHAB BENDUNGAN BAHAN BENDUNGAN - REHAB Unit/Unit
PEMELIHARAAN/REHAB PINTU AIR BAHAN PINTU AIR - REHAB Unit/Unit
PEMELIHARAAN JALAN / JEMBATAN, TITI PANEN
PEMELIHARAAN ACCESS ROAD MANUAL
PENIMBUNAN ACCESS ROAD TANAH M3/Mtr
PENGERASAN ACCESS ROAD MEKANIS (SIRTU) SIRTU M3/Mtr
GRADING ACCESS ROAD
PEMELIHARAAN MAIN ROAD MANUAL
PENIMBUNAN MAIN ROAD TANAH M3/Mtr
PENGERASAN MAIN ROAD MEKANIS (SIRTU) SIRTU M3/Mtr
GRADING MAIN ROAD
PEMELIHARAAN COLLECTION ROAD MANUAL
PENIMBUNAN COLLECTION ROAD TANAH M3/Mtr
PENGERASAN COLLECTION ROAD MEKANIS (SIRTU) SIRTU M3/Mtr
GRADING COLLECTION ROAD
PEMELIHARAAN JEMBATAN KAYU BAHAN REHAB JEMBATAN KAYU Unit/Unit
PEMELIHARAAN JEMBATAN BETON BAHAN REHAB JEMBATAN BETON Unit/Unit
PEMELIHARAN GORONG-GORONG BAHAN REHAB GORONG-GORONG Unit/Unit
PEMBUATAN/REHAB TANGGA PANEN
TITI PANEN KAYU TITI PANEN KAYU M3/Unit
TITI PANEN BETON TITI PANEN BETON Unit/unit
PEMBUATAN/REHAB TPH PANEN
REMPES POKOK/TUNAS PASAR
SURVEY DAN PATOK
PEMELIHARAAN PATOK BATAS BLOK BAHAN PATOK BATAS BLOK Unit/Unit
SURVEY TOPOGRAFI
SURVEY BATAS BLOK
Kebutuhan

0.1667

1.0000
1.0000
1.0000
0.3750

0.0067

1.0000
0.00080

1.0000

0.0588

1.0000

0.00833

1.0000
0.0588

0.0038

53.4188

6.7500
5.2500
3.7500
5.0000
1.0000
1.0000
1.0000

1.0000
1.0000

572.0000
6.0000
3.0000
0.5000
1.0000

143.0000

0.0010
1.0000
1.0000

0.0333
0.0167
0.2000
0.0043
0.0213
0.0020

0.1667
0.0333
0.0167
0.1000

0.0010

1.0000
1.0000

12.0000
2.4000

5.2500
1.0500

3.7500
0.5000

1.0000
1.0000
1.0000

0.1000
1.0000

1.0000
Keterangan

5 Kaleng untuk 30 Ha

1 Roll Paranet panjang 100 meter dengan lebar 1,5 meter dapat mengcover 1 unit bedengan besar dengan panjang 100 meter (4 unit bede

1 bibit perlu 1 baby bag, 1 kg babybag terdiri dari 150 baby bag

1 label untuk 1 bedengan kecil yang menampung 2500 bibit


200 meter mengcover 250.000 bibit

1 bibit perlu 1 large bag, 1 kg large bag terdiri dari 17 large bag

1 label untuk 1 plot yang menampung 12.000 bibit


1 bibit perlu 1 large bag, 1 kg large bag terdiri dari 17 large bag

5 Kaleng untuk 30 Ha

Pancang setiap 50 meter

Panjang jalan digambang 1 meter perlu 5 kayu, dengan diameter kayu 20 cm

4 stek untuk 1 pokok

1 pancang untuk 1 pokok

1 lubang perlu 1 plastik until pupuk uk 1 kg (1 kg kantong plastik terdiri dari 1000 lbr)
1 Unit untuk 25 - 30 Ha

1 kaleng cat untuk 30 pkk


1 bor untuk 60 pkk
4 bibit per 20 meter
Kg/Ha
Kg/Ha
2 menara per 1000 Ha

5 kaleng cat untuk 30 Ha


1 kaleng cat untuk 30 pkk
1 bor untuk 60 pkk
3 kaleng cat untuk 30 Ha

1 lubang perlu 1 plastik until pupuk uk 1 kg (1 kg kantong plastik terdiri dari 1000 lbr)
12
2.4
er (4 unit bedengan)
1316.01
30 4440
60

6.000 30
NORMA TURUNAN KEBUTUHAN MATERIAL

Aktivitas Sat Kebutuhan

PEMBUATAN
PERALATAN INSTALASI AIR
MESIN POMPA Unit/Ha 0.0500
PVC PIPE "AW" - 6" X 4M Btg/Ha 3.5000
PVC TEE 6"X 6" Pc/Ha 0.0500
PVC ELBOW 6" ( 90 DEGREE ) Pc/Ha 0.1500
PVC REDUCING SOCKET 6"X 4" Pc/Ha 0.1500
PVC PIPE "AW" - 4" X 4M Pc/Ha 13.7500
PVC FLANGE 4" Set/Ha 0.3000
PVC FLANGE 6" Set/Ha 0.5000
BUTTERFLY VALVE C/W FLANGES 4" Pc/Ha 0.1000
NON-RETURN VALVE 6" C/W FLANGES Pc/Ha 0.0500
PVC END CAP 4" Pc/Ha 0.1000
BUTTERFLY VALVE C/W FLANGES 6" Pc/Ha 0.0500
PVC FLANGE 8" Pc/Ha 0.4000
PVC ELBOW 6" ( 45 DEGREE ) Pc/Ha 0.1000
GALVANIZE FITTINGS FOR PUMP SUCTION- FLANGE ( 6" - 8" ) Set/Ha 0.0500
GALVANIZE FITTINGS FOR PUMP DISCHARGE- FLANGE ( 5" - 6" ) Set/Ha 0.0500
PVC PIPE "AW" - 8" X 4M Btg/Ha 0.3000
PVC FOOT VALVE 8" - FLANGE TYPE Pc/Ha 0.0500
PVC ELBOW 8"( 90 DEGREE ) Pc/Ha 0.0500
RUBBER GASKET UNTUK FLANGE 4" Pc/Ha 0.3000
RUBBER GASKET UNTUK FLANGE 5" Pc/Ha 0.0500
RUBBER GASKET UNTUK FLANGE 6" Pc/Ha 0.5000
RUBBER GASKET UNTUK FLANGE 8" Pc/Ha 0.4000
BOLT WITH NUT & 2 PCS WASHER ( 3/4" X 3" ) Set/Ha 1.2000
BOLT WITH NUT & 2 PCS WASHER ( 5/8" X 3" ) Set/Ha 3.2000
BOLT WITH NUT & 2 PCS WASHER ( 5/8" X 5" ) Set/Ha 1.2000
BOLT WITH NUT & 2 PCS WASHER ( 5/8" X 6" ) Set/Ha 0.8000
STAINLESS MOSQUITO NETTING FOR SUCTION PIPE ( 200 MESH ) Roll/Ha 0.0500
4" DIAMETERL PRESSURE GAUGE 0-15 BARS & FITTINGS ( OIL ) Set/Ha 0.0500
PVC PIPE "AW" - 2" X 4M Btg/Ha 23.0000
PVC REDUCING TEE 4"X 2" Pc/Ha 4.0000
PVC EQUAL TEE 2" Pc/Ha 4.0000
CAST IRON BALL VALVE 2" - DRAT DALAM Pc/Ha 4.0000
PVC VALVE SOCKET 2"- DRAT LUAR Pc/Ha 8.0000
PVC BALL VALVE 1" - TIADA DRAT Pc/Ha 15.0000
PVC END CAP 2" Pc/Ha 8.0000
PVC PIPE "AW" - 1" X 4M Btg/Ha 2.7500
PVC REDUCING TEE 2" X 1" Pc/Ha 31.0000
HOSE CLIP 25MM - 30MM / 1" (STAINLESS) Pc/Ha 32.5000
KIRICO TUBE ( 100 M / ROLL ) Roll/Ha 30.0000
1" ELBOW 45 DEGREE Pc/Ha 3.0000
1" HOSE CLIP Pc/Ha 3.0000
BAN DALAM SEPEDA MOTOR Roll/Ha 1.0000
SEAL TAPE Roll/Ha 4.0000
SAND PAPER (@ 30 METER) Roll/Ha 0.1000
GLUE UNTUK PIPA PVC - 600G PACKING Pc/Ha 8.0000
GERGAJI BAJA Pc/Ha 0.1000
MATA GERGAJI BAJA (1KOTAK) Pc/Ha 0.6000
GERGAJI KAYU Pc/Ha 0.1000
4" DIAMETER PRESSURE GAUGE 0-2 BARS & FITTINGS( BSP 1/4" ) Set/Ha 0.2000

BANGUNAN BIBITAN
KANTOR BIBITAN Unit/Ha 0.0500
GUDANG BIBITAN Unit/Ha 0.0500
RUMAH BIBITAN Unit/Ha 0.0500
BAHAN BEDENGAN DAN NAUNGAN ( ukuran 2500 x 150 cm)
PAPAN 600 cm x 20 cm x 3 cm M3/Unit 0.3600
KAYU BULAT Æ = 20 cm Pcs/Unit 8.0000
KAYU BULAT Æ = 10 cm Pcs/Unit 15.0000
PAKU Kg/Unit 5.0000

BAHAN LABELING PN (ukuran 20 x 15 x 30)


PAPAN 600 cm x 20 cm x 3 cm M3/Unit 0.0012
KAYU BULAT Æ = 20 cm Pcs/Unit 0.1000
CAT MINYAK Klg/Unit 0.5000
PAKU Kg/Unit 0.0500

BAHAN LABELING PN (ukuran 30 x 20 x 50)


PAPAN 600 cm x 20 cm x 3 cm M3/Unit 0.0018
KAYU BULAT Æ = 20 cm Pcs/Unit 0.1250
CAT MINYAK Klg/Unit 0.5000
PAKU Kg/Unit 0.0500

BAHAN KBH
BALOK UKURAN 550 cm x 10 cm x 10 cm M3/Unit 0.0550
PAPAN 600 cm x 20 cm x 3 cm M3/Unit 0.1080
SENG Lbr/Unit 0.5000
PAKU Kg/Unit 0.5000
SEMEN Sak/Unit 0.3333
CAT MINYAK Klg/Unit 2.0000

BAHAN PATOK BATAS BLOK


BALOK UKURAN 150 cm x 10 cm x 10 cm M3/Unit 0.0183
CAT MINYAK Klg/Unit 0.2000

PEMELIHARAAN
BAHAN REHAB INSTALASI AIR PN
Bahan Rehab Instalasi Air PN Unit/Unit 1.0000

BAHAN REHAB INSTALASI AIR PN


Bahan Rehab Instalasi Air MN Unit/Unit 1.0000

BAHAN REHAB JEMBATAN KAYU


Bahan Rehab Jembatan Kayu Unit/Unit 1.0000

BAHAN REHAB JEMBATAN BETON


Bahan Rehab Jembatan Beton Unit/Unit 1.0000

BAHAN REHAB GORONG-GORONG


Bahan Rehab Gorong-gorong Unit/Unit 1.0000
Keterangan

1 mesin untuk 20 Ha
70 btg untuk 20 Ha
1 pc untuk 20 Ha
3 pc untuk 20 Ha
3 pc untuk 20 Ha
275 pc untuk 20 Ha
6 set untuk 20 Ha
10 set untuk 20 Ha
2 pc untuk 20 Ha
1 pc untuk 20 Ha
2 pc untuk 20 Ha
1 pc untuk 20 Ha
8 pc untuk 20 Ha
2 pc untuk 20 Ha
1 set untuk 20 Ha
1 set untuk 20 Ha
6 btg untuk 20 Ha
1 pc untuk 20 Ha
1 pc untuk 20 Ha
6 pc untuk 20 Ha
1 pc untuk 20 Ha
10 pc untuk 20 Ha
8 pc untuk 20 Ha
24 set untuk 20 Ha
64 set untuk 20 Ha
24 set untuk 20 Ha
16 set untuk 20 Ha
1 roll untuk 20 Ha
1 set untuk 20 Ha
460 btg untuk 20 Ha
80 pc untuk 20 Ha
80 pc untuk 20 Ha
80 pc untuk 20 Ha
160 pc untuk 20 Ha
300 pc untuk 20 Ha
160 pc untuk 20 Ha
55 btg untuk 20 Ha
620 pc untuk 20 Ha
650 pc untuk 20 Ha
600 roll untuk 20 Ha
60 pc untuk 20 Ha
60 pc untuk 20 Ha
20 roll untuk 20 Ha
80 roll untuk 20 Ha
2 roll untuk 20 Ha
160 pc untuk 20 Ha
2 pc untuk 20 Ha
12 pc untuk 20 Ha
2 pc untuk 20 Ha
4 set untuk 20 Ha

1 unit untuk 20 Ha
1 unit untuk 20 Ha
1 unit untuk 20 Ha
10 keping papan untuk membuat 1 bedengan kecil
8 pcs kayu bulat untuk membuat 1 bedengan kecil
15 pcs kayu bulat untuk membuat 1 bedengan kecil
5 Kg paku 1 unit

Papan 1 keping untuk 30 label


1 pcs kay bulat panjang 4 meter bisa untuk 10 label
1 kaleng bisa untuk 3 label
0,5 kg paku bisa untuk 10 label

Papan 1 keping untuk 20 label


1 pcs kay bulat panjang 4 meter bisa untuk 8 label
1 kaleng bisa untuk 2 label
0,5 kg paku bisa untuk 10 label

Balok kayu 1 pcs 1 unit KBH


Papan 3 keping untuk 1 unit KBH
1 lembar seng untuk 2 unit KBH
0,5 kg paku bisa untuk 1 unit KBH
1 Sak cemen untuk 3 unit KBH
2 Klg cat untuk 1 unit KBH

Balok kayu 1 pcs 3 unit patok


1 Klg cat untuk 5 patok
NORMA KEBUTUHAN HM ALAT BERAT

Aktivitas Alat Sat Datar Bergelombang


PEMBIBITAN
PERSIAPAN AREAL
PENETAPAN AREAL (SURVEY AWAL)
IMAS TUMBANG
RUMPUK BULDOZER HM/Ha
EXCAVATOR HM/Ha
PEMBUATAN TAPAK BIBITAN BULDOZER HM/Ha 30.0000 50.0000
EXCAVATOR HM/Ha
PEMBUATAN JALAN BIBITAN BULDOZER HM/Mtr 0.0286 0.0286
EXCAVATOR HM/Mtr
PEMBUATAN JEMBATAN BIBITAN BULDOZER HM/Unit 10.0000 10.0000
EXCAVATOR HM/Unit
PEMBUATAN PARIT BIBITAN EXCAVATOR HM/Mtr 0.0200 0.0200
PEMBUATAN WADUK EXCAVATOR HM/Unit 200.0000 200.0000
PEMBUATAN INSTALASI AIR
PEMBUATAN BANGUNAN
PEMBUATAN BEDENGAN DAN NAUNGAN
KUMPUL TOPSOIL (PN DAN MN) BULDOZER HM/M3 0.0500 0.0500
EXCAVATOR HM/M3 0.0500 0.0500
LOADER BACKHOE HM/M3 0.0667 0.0667
PRE- NURSERY
KECAMBAH
MENGISI TANAH - PN
MENGATUR BABY BAG - PN
SELEKSI KECAMBAH - PN
PENANAMAN KECAMBAH - PN
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - PN
PENYIRAMAN MANUAL - PN
PENYIRAMAN MEKANIS - PN
RAWAT PARIT BEDENGAN - PN
PEMELIHARAAN INSTALASI AIR - PN
PEMUPUKAN PRE NURSERY
PENGENDALIAN GULMA DI POLIBAG - PN
PENGENDALIAN GULMA DI LUAR POLIBAG - PN
PENGENDALIAN HAMA PENYAKIT TANAMAN - PN
SENSUS - PN
SELEKSI - PN
MAIN NURSERY
MENGISI TANAH - MN
PENAMBAHAN TANAH - MN
SPACING & SUSUN POLIBAG - MN
LANGSIR POLIBAG - MN
PEMBUATAN PAPAN NAMA BIBITAN (LABELLING) - MN
MENCABUT & ANGKUT KE MN
MEMBUAT LUBANG TANAM (BOR) - MN
TANAM BIBIT - MN
PENYIRAMAN MANUAL - MN
PENYIRAMAN MEKANIS - MN
RAWAT PARIT - MN
PEMELIHARAAN INSTALASI AIR - MN
PEMUPUKAN - MN
PENGENDALIAN GULMA DI POLIBAG - MN
PENGENDALIAN GULMA DI LUAR POLIBAG - MN
PENGENDALIAN HAMA PENYAKIT TANAMAN - MN
SENSUS - MN
SELEKSI - MN
MENEGAKKAN POLIBAG DAN BIBIT - MN
PENGGANTIAN POLIBAG - MN

TANAMAN BELUM MENGHASILKAN


LAND CLEARING
SURVEY AREAL
BLOCKING
IMAS TUMBANG
RUMPUK BULDOZER HM/Ha
RUMPUK EXCAVATOR HM/Ha
RENCEK
CUCI TUNGGUL
LALANG SHEET & SPORADIS
WIPING
BAJAK
GARU
COMPACTING
PEMBUATAN INFRASTUKTUR JALAN DAN JEMBATAN
PEMBUATAN ACCESS ROAD BULDOZER HM/Mtr 0.0800 0.0820
EXCAVATOR HM/Mtr
PEMBUATAN MAIN ROAD BULDOZER HM/Mtr 0.0333 0.0357
EXCAVATOR HM/Mtr
PEMBUATAN COLLECTION ROAD BULDOZER HM/Mtr 0.0200 0.0208
EXCAVATOR HM/Mtr
PEMBUATAN CONTOUR ROAD BULDOZER HM/Mtr 0.0167 0.0167
PENIMBUNAN ACCESS ROAD EXCAVATOR HM/M3 0.0333 0.0333
LOADER BACK HOE HM/M3 0.0500 0.0500
ROAD GRADER HM/Mtr 0.0100 0.0100
COMPACTOR HM/Mtr 0.0100 0.0100
BULDOZER HM/Mtr 0.0100 0.0100
PENIMBUNAN MAIN ROAD EXCAVATOR HM/M3 0.0333 0.0333
LOADER BACK HOE HM/M3 0.0500 0.0500
ROAD GRADER HM/Mtr 0.0100 0.0100
COMPACTOR HM/Mtr 0.0100 0.0100
BULDOZER HM/Mtr 0.0100 0.0100
PENIMBUNAN COLLECTION ROAD EXCAVATOR HM/M3 0.0333 0.0333
LOADER BACK HOE HM/M3 0.0500 0.0500
ROAD GRADER HM/Mtr 0.0100 0.0100
COMPACTOR HM/Mtr 0.0100 0.0100
BULDOZER HM/Mtr 0.0100 0.0100
PEMBUATAN GAMBANGAN EXCAVATOR HM/Mtr 0.0125 0.0125
LOADER BACKHOE HM/Mtr 0.0167 0.0167
PEMBUATAN JEMBATAN KAYU EXCAVATOR HM/Unit 10.0000 10.0000
PEMBUATAN JEMBATAN BETON
PEMBUATAN GORONG-GORONG EXCAVATOR HM/Unit 3.0000 3.0000
LOADER BACK HOE HM/Unit 5.0000 5.0000
PEMBUATAN PARIT, TERESAN, TPK KUDA DAN PLANTING POCKET
PEMBUATAN PARIT MAIN EXCAVATOR HM/Mtr 0.0500 0.0500
PEMBUATAN PARIT COLLECTION EXCAVATOR HM/Mtr 0.0333 0.0333
PEMBUATAN PARIT FIELD EXCAVATOR HM/Mtr 0.0250 0.0250
PENCUCIAN PARIT ALAM EXCAVATOR HM/Mtr 0.0500 0.0500
PEMBUATAN TERESAN BULDOZER HM/Mtr 0.0143 0.0143
PEMBUATAN PLANTING POCKET EXCAVATOR HM/Unit 0.0667 0.0667
PEMBUATAN TAPAK KUDA
PEMBUATAN BUMBUNAN
PEMBUATAN BENTENG RORAK
PEMBUATAN BENDUNGAN
PEMBUATAN PINTU AIR EXCAVATOR HM/Unit 5.0000 5.0000
LOADER BACKHOE HM/Unit 10.0000 10.0000
PENANAMAN KACANGAN
SEMPROT LALANG
SEMPROT ANAK KAYU & PAKIS
PANCANG TANAM KACANGAN
PENANAMAN KACANGAN MB
PENANAMAN KACANGAN SELAIN MB
PEMUPUKAN KACANGAN
PENYIANGAN GULMA/DANGIR KACANGAN
PENANAMAN KELAPA SAWIT
MEMANCANG
LUBANG TANAM MANUAL
LUBANG TANAM MEKANIS EXCAVATOR HM/Lbg 0.0111 0.0111
PENGUNTILAN PUPUK
PEMUPUKAN LOBANG TANAM
APLIKASI RACUN TIKUS
BIBIT
TRANSPORT & ECERAN BIBIT
PENANAMAN BIBIT
MERUMPUT
GARUK PIRINGAN & TARIK GOLORAN
SEMPROT PIRINGAN/PSR PIKUL/TPH
SEMPROT GAWANGAN
DONGKEL ANAK KAYU
PENGENDALIAN ALANG-ALANG
SEMPROT SHEET
SEMPROT SPORADIS
WIPING LALANG
PEMUPUKAN TANAMAN
PENGUNTILAN PUPUK ANORGANIK
PEMUPUKAN PUPUK ANORGANIK
PEMUPUKAN ABU JANJANG
PEMUPUKAN EFB
PEMUPUKAN DECANTER SOLID
PENGENDALIAN HAMA DAN PENYAKIT
SENSUS HAMA DAN PENYAKIT
SENSUS KANDANG BURUNG HANTU
REHAB KANDANG BURUNG HANTU
PENGEDALIAN ULAT API/KANTONG
PENGENDALIAN TIRATABHA
PENGENDALIAN TIKUS
PENGENDALIAN RAYAP
PENGENDALIAN ORYCTES
PENGENDALIAN GANODERMA
PENGENDALIAN HAMA LAINNYA
PATROLI DAN PADAMKAN API
KASTRASI DAN SANITASI
KASTRASI
SANITASI
SENSUS DAN THINING OUT
SENSUS POKOK
MENJARANGKAN POKOK (THINNING OUT)
SENSUS PRODUKSI
TIMBANG BJR
SISIP DAN KONSOLIDASI
PENYISIPAN
KONSOLIDASI
PEMELIHARAAN PARIT / TERESAN / TAPAK KUDA
PENCUCIAN PARIT MAIN EXCAVATOR HM/Mtr 0.0167 0.0167
PENCUCIAN PARIT COLLECTION EXCAVATOR HM/Mtr 0.0111 0.0111
PENCUCIAN PARIT FIELD MANUAL
PENCUCIAN PARIT ALAM EXCAVATOR HM/Mtr 0.0167 0.0167
SEMPROT PINGGIR PARIT
PEMELIHARAAN/REHAB TERESAN
PEMELIHARAAN PLANTING POCKET
PEMELIHARAAN/REHAB TAPAK KUDA
PEMELIHARAAN/REHAB BUMBUNAN
PEMELIHARAAN/REHAB BENTENG RORAK
PEMELIHARAAN/REHAB BENDUNGAN
PEMELIHARAAN/REHAB PINTU AIR EXCAVATOR HM/Unit 5.0000 5.0000
LOADER BACKHOE HM/Unit 10.0000 10.0000
PEMELIHARAAN JALAN / JEMBATAN, TITI PANEN
PEMELIHARAAN ACCESS ROAD MANUAL
PENIMBUNAN ACCESS ROAD EXCAVATOR HM/M3 0.0333 0.0333
LOADER BACK HOE HM/M3 0.0500 0.0500
ROAD GRADER HM/Mtr 0.0100 0.0100
COMPACTOR HM/Mtr 0.0100 0.0100
BULDOZER HM/Mtr 0.0100 0.0100
PENGERASAN ACCESS ROAD MEKANIS (SIRTU) EXCAVATOR HM/M3 0.0333 0.0333
LOADER BACK HOE HM/M3 0.0500 0.0500
ROAD GRADER HM/Mtr 0.0100 0.0100
COMPACTOR HM/Mtr 0.0100 0.0100
BULDOZER HM/Mtr 0.0100 0.0100
GRADING ACCESS ROAD ROAD GRADER HM/Mtr 0.0067 0.0067
COMPACTOR HM/Mtr 0.0067 0.0067
PEMELIHARAAN MAIN ROAD MANUAL
PENIMBUNAN MAIN ROAD EXCAVATOR HM/M3 0.0333 0.0333
LOADER BACK HOE HM/M3 0.0500 0.0500
ROAD GRADER HM/Mtr 0.0100 0.0100
COMPACTOR HM/Mtr 0.0100 0.0100
BULDOZER HM/Mtr 0.0100 0.0100
PENGERASAN MAIN ROAD MEKANIS (SIRTU) EXCAVATOR HM/M3 0.0333 0.0333
LOADER BACK HOE HM/M3 0.0500 0.0500
ROAD GRADER HM/Mtr 0.0100 0.0100
COMPACTOR HM/Mtr 0.0100 0.0100
BULDOZER HM/Mtr 0.0100 0.0100
GRADING MAIN ROAD ROAD GRADER HM/Mtr 0.0067 0.0067
COMPACTOR HM/Mtr 0.0067 0.0067
PEMELIHARAAN COLLECTION ROAD MANUAL
PENIMBUNAN COLLECTION ROAD EXCAVATOR HM/M3 0.0333 0.0333
LOADER BACK HOE HM/M3 0.0500 0.0500
ROAD GRADER HM/Mtr 0.0100 0.0100
COMPACTOR HM/Mtr 0.0100 0.0100
BULDOZER HM/Mtr 0.0100 0.0100
PENGERASAN COLLECTION ROAD MEKANIS (SIRTU) EXCAVATOR HM/M3 0.0333 0.0333
LOADER BACK HOE HM/M3 0.0500 0.0500
ROAD GRADER HM/Mtr 0.0100 0.0100
COMPACTOR HM/Mtr 0.0100 0.0100
BULDOZER HM/Mtr 0.0100 0.0100
GRADING COLLECTION ROAD ROAD GRADER HM/Mtr 0.0067 0.0067
COMPACTOR HM/Mtr 0.0067 0.0067
PEMELIHARAAN JEMBATAN KAYU
PEMELIHARAAN JEMBATAN BETON
PEMELIHARAN GORONG-GORONG
PEMBUATAN/REHAB TANGGA PANEN
TITI PANEN KAYU
TITI PANEN BETON
PEMBUATAN/REHAB TPH PANEN
REMPES POKOK/TUNAS PASAR
SURVEY DAN PATOK
PEMELIHARAAN PATOK BATAS BLOK
SURVEY TOPOGRAFI
SURVEY BATAS BLOK
Berbukit Gambut Primer Sekunder Tersier

8.0000 6.5000 5.0000


14.0000 12.5000 10.0000
60.0000
30.0000
0.0286
0.0400
10.0000
10.0000
0.0200 0.0200
200.0000 200.0000

0.0500 0.0500
0.0500 0.0500
0.0667 0.0667
8.0000 6.5000 5.0000
14.0000 12.5000 10.0000

0.0833
0.0083
0.0400
0.0400
0.0222
0.0222
0.0167
0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0125 0.0125
0.0167 0.0167
10.0000 10.0000

3.0000 3.0000
5.0000 5.0000

0.0500 0.0500
0.0333 0.0333
0.0250 0.0250
0.0500 0.0500
0.0143 0.0143
0.0667 0.0667

5.0000 5.0000
10.0000 10.0000

0.0111 0.0111
0.0167 0.0167
0.0111 0.0111

0.0167 0.0167

5.0000 5.0000
10.0000 10.0000

0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0067 0.0067
0.0067 0.0067

0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0067 0.0067
0.0067 0.0067

0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0333 0.0333
0.0500 0.0500
0.0100 0.0100
0.0100 0.0100
0.0100 0.0100
0.0067 0.0067
0.0067 0.0067
NORMA KEBUTUHAN HM DAN KM ALAT ANGKUT

Total
Aktivitas Sat
Diangkut

Orang Orang 30
Tanah M3 3
Sirtu M3 3
Bibit PN Bibit 700
Bibit MN Bibit 150
Pupuk Kg 2,000
Bibit MB Bibit 700
Kacangan Kg 1,500
Kompos Ton 3
EFB Ton 3
Dec Solid Ton 3
KBH Unit 5
Jb Beton Unit 2
Gorong Unit 5
TP Beton Unit 15
TP Kayu M3 3
Kayu M3 3
Kayu Pancang Batang 100 200
Kayu Gambang Batang 100
Patok Patok 30
Air Liter 5,000
Polybag Kg 2,000
NURSERY OIL PALM MANURING SCHEDULE (PEAT)

UMUR JENIS DAN DOSIS PUPUK (Gr/Bag_Pk)


BIBIT NPK Keterangan
RP CRF ZA CuSO4 Dolomite
(Bulan) 15:15:6:4

Pre-N
Baby bag 10 5
3 0.060

Main-N
Large bag 30 50 40 Saat Transplanting
4 0.300 Cu : Rot 2 kali, 60 gr/kap
5 0.450 Cu : Rot 3 kali, 60 gr/kap
6 0.450
7 15
9 25 0.450 Cu : Rot 3 kali, 60 gr/kap
11 25
13 25
14 - dst 25
Total 40 55 - 115 1.71 40
NURSERY OIL PALM MANURING SCHEDULE

UMUR JENIS DAN DOSIS PUPUK (Gr/Bag_Pk)


BIBIT NPK Keterangan
RP CRF ZA
(Bulan) 12:12:17:2

Pre-N
Baby bag 10 5

Main-N
Large bag 30 50
5 20
9 20
13 30
14 - dst
Total 40 55 30 40
IMMATURE OIL PALM MANURING SCHEDULE (PEAT)

JENIS DAN DOSIS PUPUK (GR/PKK)


Umur
Tanaman Comp. Peat Kay Plus
(Bulan) 7:4:34+B RP CuSO4 ZnSO4 FeSO4 HGFB Dolomit CRF TOTAL
12:12:17:2+TE
+Cu+Zn

Lubang Tanam 250 300 550


1 100 15 115
2 50 50
3 -
4 -
5 200 100 300
6 -
7 -
8 400 50 150 600
9 -
10 150 150
12 500 500
Subtotal 1,100 - 250 100 15 50 50 400 300 2,265
14 100 15 200 315
15 1,000 100 1,100
16 -
17 1,000 1,000
18 250 250
19 1,000 1,000
20 -
21 1,000 1,000
23 1,000 300 1,300
24 100 100
Subtotal 5,000 - - 100 15 100 100 - 6,065
26 1,000 1,000
27 100 15 350 465
28 1,000 100 1,100
30 1,000 350 1,350
32 1,500 1,500
34 1,500 350 1,850
36 100 100
Subtotal 6,000 - - 100 15 100 100 - 7,365
Total 12,100 - 250 300 45 250 250 2,200 300 15,695

Rekomendasi pemupukan pada umur tanaman 27 sampai dengan 36 bulan setelah tanam dilaksanakan jika analisa daun tidak berlaku/tidak ada
IMMATURE OIL PALM MANURING SCHEDUL

ULTISOL
Umur Gram Per Pokok
ROCK NPK (15-15- NPK (12-6-
Tanaman PHOSPHATE
NPK (15-15-6-4)
15) 22-3)
KIESERITE HGFB

0 0.50

1
2 0.50
3
4
5 0.80
6
7
8
9 1.00
10
11
12

13 1.30
14
15
16 1.70
17
18
19
21
22
23
NORMA KEBUTUHAN TENAGA KERJA
Simulasi - Kebun 5,000 Ha

Kebutuhan Karyawan per Golongan Rasio Karyawan per Golongan


POSISI URAIAN JABATAN
Total Staf SKU-B SKU-H PHL Total Staf SKU-B SKU-H PHL
Staf Kebun Area Controller Operation 0.5 0.5 0.0001 0.0001 - - -
Estate Controller Operation 1 1 0.0002 0.0002 - - -
Asisten Kepala 1 1 0.0002 0.0002 - - -
Asisten Afdeling (Field Ast) 5 5 0.0010 0.0010 - - -
Asisten Bibitan (Field Ast) 1 1 0.0002 0.0002 - - -
Estate Controller Finnance 1 1 0.0002 0.0002 - - -
Kasie 1 1 0.0002 0.0002 - - -
Humas 1 1 0.0002 0.0002 - - -
Surveyor 1 1 0.0002 0.0002 - - -
Staf GIS 0.5 0.5 0.0001 0.0001 - - -
13 13 0 0 0 0.0026 0.0026 - - -
Supervisi Afdeling Mandor I 5 5 0.0010 - 0.0010 - -
Kerani Afdeling 5 5 0.0010 - 0.0010 - -
Mandor Panen 15 15 0.0030 - 0.0030 - -
Mandor Tunas 5 5 0.0010 - - 0.0010 -
Mandor Pupuk 5 5 0.0010 - - 0.0010 -
Mandor Semprot 1 1 0.0002 - - 0.0002 -
Mantri Hama & Penyakit 5 5 0.0010 - - 0.0010 -
Mandor Pemeliharaan 10 10 0.0020 - - 0.0020 -
Mandor Parit/Jalan 5 5 0.0010 - - 0.0010 -
Kerani Buah 15 15 0.0030 - - 0.0030 -
Kerani Keliling 5 5 0.0010 - - 0.0010 -
Mandor Bibitan 5 5 0.0010 - - 0.0010 -
81 0 25 56 0 0.0162 - 0.0050 0.0112 -
Kantor Kerani Pembukuan 1 1 0.0002 - 0.0002 - -
Kasir 1 1 0.0002 - 0.0002 - -
Admin Tanaman 1 1 0.0002 - 0.0002 - -
Kepala Gudang 1 1 0.0002 - 0.0002 - -
Kepala Poliklinik 1 1 0.0002 - 0.0002 - -
Mantri Tanaman/Sensus 1 1 0.0002 - 0.0002 - -
Mantri Buah 1 1 0.0002 - - 0.0002 -
Personalia/Pembelian 1 1 0.0002 - 0.0002 - -
Operator Komputer 2 2 0.0004 - - 0.0004 -
Operator Radio/SSB 1 1 0.0002 - - 0.0002 -
Kerani Gudang 1 1 0.0002 - - 0.0002 -
Pembantu Gudang 2 2 0.0004 - - - 0.0004
Opas Kantor 1 1 0.0002 - - - 0.0002
Kepala Mess 1 1 0.0002 - - 0.0002 -
Pembantu Mess 3 3 0.0006 - - - 0.0006
Tukang Kebun 2 2 0.0004 - - - 0.0004
Mantri Kesehatan 1 1 0.0002 - 0.0002 - -
Bidan 1 1 0.0002 - - 0.0002 -
Kepala Sekolah SD 1 1 0.0002 - 0.0002 - -
Guru SD 6 6 0.0012 - - 0.0012 -
Kepala Keamanan 1 1 0.0002 - 0.0002 - -
Anggota/Satuan Keamanan 18 18 0.0036 - - 0.0036 -
Penjaga Bayi 10 10 0.0020 - - - 0.0020
59 0 10 31 18 0.0118 - 0.0020 0.0062 0.0036
Bengkel Kepala Bengkel 1 1 0.0002 - 0.0002 - -
Mandor Traksi 1 1 0.0002 - 0.0002 - -
Kerani Traksi 1 1 0.0002 - 0.0002 - -
Mekanik 3 3 0.0006 - 0.0006 - -
Pembantu Mekanik 3 3 0.0006 - - 0.0006 -
Tukang Las/Tambal Ban 1 1 0.0002 - - 0.0002 -
Tool Man 1 1 0.0002 - - 0.0002 -
Tukang Kayu/Bangunan 2 2 0.0004 - - 0.0004 -
Operator Mesin Listrik/Air 7 7 0.0014 - - 0.0014 -
20 0 6 14 0 0.0040 - 0.0012 0.0028 -
Total 173 13 41 101 18 0.0346 0.0026 0.0082 0.0202 0.0036