Anda di halaman 1dari 3

QC Piping Inspector/Mechanical Engineer

Name RAZAMUZAMIL KHAN


Date of Birth 19th June 1980
Nationality Indian
TL.No. 91-9561570237/8106929589
Email muzammil_8@rediffmail.com
Passport Valid up to March 2023

Educational qualifications:

 BE (Bachelor of Engineering- Mechanical) ( 1997 – 2001)


Karnataka University, Dharwad - India
Computer Skills
 AutoCAD, MS-Office (Word, Excel, Power Point)

Additional Certification:
 ASNT-Level II in U.T, R.T, MPT & DPT (Valid up to May 2021)
Approvals

 Saudi Aramco approved Piping Inspector for 03 projects

Career Summary

 Mechanical Engineer with 13years of experience in construction projects in Power


plants, petrochemical, Oil and Gas industry in Middle East and India.

 Experienced in project execution, coordination, progress reports, & supervision of Piping


& Erection, Installation, Fabrication, Welding, and Quality Control.

 Fully conversant with Engineering drawings, Engineering Codes and Standard


specifications. Having well-developed analytical and reporting skills and high level of
computer literacy..

Experience

In Overseas from Oct. 2018

Company. JGC Construction International PTE LTD


Duration. JULY 2018 to OCT 2018
Project. KNPC Clean fuel project (MAA) Kuwait
Position. PIPING / NDE QC Inspector

Duration May2012 to OCT 2016


Employer Daelim Saudi Arabia Co.Ltd
Position QA/QC Piping Inspector
Project SadaraIsocynate / Jubail Export Refinery

Page 1 of 3
Duration January 2010 to March 2012
Employer Aarvi Encon Engg Pvt Ltd, Mumbai, India
Position Mechanical Engineer
Project Proposed Baby care product factory phase-2(M.P)

Duration June 2008 to December 2009


Employer Hyundai Heavy Industries Co.
Position Piping Inspector
Project MARAFIQ 2800 MW Combined cycle power Project

Duration December 2007 to May 2008


Employer JGC Arabia Limited.
Position QA/QC Piping Inspector
Project JCP Project - KSA

Duration October 2006 to December 2007


Employer GAMA Al-Moushegah Arabia Limited, KSA
Position QA/QC Piping Inspector
Project NGL Recovery Plant, Hawiyah.(KSA )

Duration January 2006 to September 2006


Employer LINARCO Ltd (Linde Arabian Contractors), KSA
Position Mechanical Engineer
Project Jubail United Petrochemical Co. (JUPC)

Over all Responsibilities:

 Monitoring and conducting material inspection for piping, as per standards, codes and
Process standard specification.

 Prepare inspection request prior to accept the construction piping welding work, release
fabricated pipe lines, pressure testing and reinstatement of piping system in order to
prepare certification for the completed items.

 Inspection of shop fabrication of piping spools and supports. Visual inspection of weld
joints and plant piping, and preparing Punch List (A & B) after installation.

 Verification of all supporting documents like PQR (for WPS), WQTR (for welder’s
qualification), calibration certificates (for machinery, ovens etc.) and procedure
documents(for NDT) Etc.,

 Preparation of pressure test (hydro, pneumatic, and service) packages and ensure clearing
of punch items prior to Pressure test.

 Verification of gaskets, bolts and nuts as per B.O.M and Witnessing bolt-torquing of
flanged joints.

 Site surveillance to check the construction work and give some comments if necessary
according to standards.

Page 2 of 3
 Installation of temporary spools with temporary gaskets and bolt, nuts. Removal of
temporary spools and reinstate the control valves, Check valves (NRV), Strainers with
permanent gasket and bolt, nuts with correct specification as mentioned in the drawing.

 Monitoring and Inspection of Erection Activities of Piping Spool as per Piping


Arrangement, Piping Layout, Piping & Instrument Diagram and Isometric Drawing.

 Before Fabrication, Erection to check the isometric drawing with correct revision as per
the latest record.
 Monitoring the preservation of Piping Spools and Valves at site (Plant) in a good
Condition placed on Wooden Planks, Covering of ends with Plastic Covered.
 ToCheck Manifold Certificates, Pressure Gauges and Relief Valve during Hydro Test.
 Clearing of Reinstatement Item after Hydro Test.

Indian Assignments :

 October 2004 to September 2005 with Krupa Engineering – India as


Mechanical Engineer.
 January 2003 to August 2004 with GE Godavari Engineers Limited-India as
QA/QC Engineer.

Responsibilities:-

 Supervise of fabrication work which include various type of weld joints


 Site supervision and implementation of job drawing of projects.
 Fabrication and Erection of pipe supports and their alignment, erection of different kinds
of valve.
 Check all the dimension mentioned in drawing and orientation.
 Preparation of bill of material and inspection of fabricated pipe line spools as per
isometric drawing.
 Preparation of the Hydro test as per Line Class Designation issued by Engineering
Department with priority.
 Progress Monitoring and Maintaining Man power, Equipment and material requirement
to meet the project schedule.
 Assign construction works/activities to supervisors/leadmen of Mechanical Works
Group according to its priorities
 Maintain good coordination with production supervisors and managers.
 Coordinate with construction, testing group, in the preparation test requirement of each
test package and facilities close out of any outstanding punch items before and after the
pressure tests.

Page 3 of 3