HARGA SATUAN BAHAN DAN ALAT

Desa Simpang Bayat


Kecamatan Bayung Lencir
Kabupaten Musi Banyuasin

HARGA DASAR HARGA DASAR


PEMBULATAN
No. URAIAN SATUAN
Rp UPAH ANGKUT HARGA

A BAHAN / MATERIAL
1 Semen Portland (PC) Zak 65,000 65,000
2 Batu Pecah M3 480,000 550,000
3 Batu Koral M3 450,000 500,000
3 Pasir Pasang M3 180,000 180,000
4 Pasir Urug M3 180,000 180,000
5 Papan (2/25/400) Keping 54,000 54,000
6 Papan (2/20/400) Keping 44,000 44,000
7 Papan (3/10/400) Keping 33,000 33,000
8 Kayu (6/10/400) Batang 65,000 65,000
9 Kayu (7/13/400) Batang 98,000 98,000
10 Kayu (7/10/400) Batang 76,000 76,000
11 Kayu (10/10/400) Batang 108,000 108,000
12 Kayu (8/10/400) Batang 87,000 87,000
13 Kayu (5/7/400) Batang 38,000 38,000
14 Kayu (5/5/400) Batang 27,000 27,000
15 Kayu (2/3/400) Batang 8,000 8,000
16 Kayu Bulat Batang 7,000 8,000
17 Paku Kg 20,000 20,000
18 Paku Seng Kg 45,000 45,000
19 Besi dia 10 Batang 75,000 75,000
20 Besi dia 8 Batang 54,000 54,000
21 Besi dia 6 Batang 30,000 30,000
22 Kawat Beton Kg 25,000 25,000
23 batu bata Buah 650 650
24 Seng Gelombang 5 kaki Keping 45,000 47,000
25 Seng Gelombang 6 kaki Keping 50,000 50,000
26 Seng Gelombang 7 kaki Keping 58,000 58,000
27 Genteng Metal Keping 35,000 35,000
28 Genteng Kodok Keping 1,750 2,000
29 Bubungan Seng Polos Meter 35,000 35,000
30 Bubungan Metal Buah 30,000 30,000
31 Bubungan Genteng Kodok Buah 7,000 8,000
32 Kloset Jongkok Buah 145,000 150,000
33 Pipa PVC 3'' Batang 150,000 150,000
34 Elbow PVC 3'' Buah 25,000 25,000
35 Grendel Pintu Buah 12,000 12,000
36 Engsel Pintu Kotak 25,000 25,000
37 Engsel Jendela Kotak 15,000 15,000
38 Grendel Jendela Buah 15,000 15,000
39 Kait Angin Buah 12,000 12,000
40 Kusen Pintu 1 Daun Unit 300,000 300,000
41 Kusen Jendela 1 Daun Unit 200,000 200,000
42 Daun Pintu Unit 400,000 400,000
43 Daun Jendela Unit 200,000 200,000

C UPAH
1 Pekerja HOK 50,000 50,000
2 Tukang HOK 100,000 100,000
Kabupaten Musi Banyuasin Jenis Prasarana Peningkatan Kualitas
Kecamatan Bayung Lencir TAKE OF SHEET Lokasi : Dusun
Desa Simpang Bayat Volume 6x4

PEMBANGUNAN RUMAH SEMI PERMANEN


PANJANG 6 METER LEBAR 4 METER
1 UNIT

1 PEKERJAAN BONGKARAN
1.1 PEKERJAAN BONGKARAN RUMAH Bongkaran rumah
Panjang = 9 M
Lebar = 6 M
Volume = 9 X 6 = 54.0 M3

Untuk Upah Bongkaran Dihitung Dengan Perkiraan


Upah 8.000 Pekerja = 8.000 x 1.00 = 8.00 HOK
2.000 Tukang = 2.000 x 1.00 = 2.00 HOK

2 PEKERJAAN TANAH GALIAN TANAH


2.1 PEKERJAAN GALIAN TANAH pondasi Menerus
Panjang = 20 M (Total Panjang)
Lebar = 0.2 M
Tinggi = 0.3 M
Volume = 20 X 0.2 X 0.3 = 1.2 M3

1 m3 Analisa Pekerjaan Galian Tanah ( SNI.II.1 ; 2016 )


Upah 0.750 Pekerja = 0.750 x 1.20 = 0.90 HOK
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA : 06
Nomor KTP : 1606090801770003
Nama Penerima Bantuan : Arianto
Alamat : Dusun II
Desa/Kelurahan : Simpang Bayat
Kecamatan : Bayung Lencir
Kabupaten/Kota : Musi Banyuasin
Jenis Kegiatan : PK

SUMBER DANA
HARGA TOTAL SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) HARGA (Rp) BSPS Memakai Bahan
Dana Tunai Bangunan Lama
I PEKERJAAN PERSIAPAN
1 Bongkar Rumah Lama ls
II PEKERJAAN PONDASI
1 Galian Tanah Pondasi 1.20 M³
2 Urugan Pasir 1.50 M³
-Pasir 1 M³ 180,000 180,000 180,000
3 Pasangan Pondasi Bata 1.2 M³
-Semen @ 50 kg 2.00 Zak 65,000 130,000 130,000
-Pasir Beton 0.2 M³ 180,000 36,000 36,000
-Batu Bata 760 Bh 650 494,000 494,000
4 Urugan kembali 0.50 M³
III PEKERJAAN SLOOF
1 Pekerjaan bekisting M³
2 Cor Beton Sloof, Ukuran 12/12 0.288 M³
-Besi beton Φ 8mm SNI 7 Btg 54,000 378,000 378,000
-Besi beton Φ 6 mm SNI 5 Btg 30,000 150,000 150,000
-Kawat Ikat 0.5 Kg 25,000 12,500 12,500
-Semen @ 40 kg / 50 kg 2 Zak 65,000 130,000 130,000
-Pasir Beton 0.2 M³ 180,000 36,000 36,000
-Batu Pecah 0.3 M³ 550,000 165,000 165,000
IV PEKERJAAN KOLOM
1 Pekerjaan bekisting M²
2 Cor Beton Kolom, Ukuran 12/12 0.22464 M³
-Besi beton Φ8mm SNI 12 Btg 54,000 648,000 648,000
-Besi beton Φ 6 mm SNI 8 Btg 30,000 240,000 240,000
-Kawat Ikat 0.5 Kg 25,000 12,500 12,500
-Semen @ 40 kg / 50 kg 2 Zak 65,000 130,000 130,000
-Pasir Beton 0.3 M³ 180,000 54,000 54,000
-Batu pecah 0.5 M³ 550,000 275,000 275,000
V PEKERJAAN DINDING
1 Tembok M²
-Pasir Pasang 2 M³ 180,000 360,000 360,000
-Semen @ 50 kg 15 Zak 65,000 975,000 975,000
-Batu Bata 3660 Bh 650 2,379,000 2,379,000
2 Pekerjaan Plester
-Pasir Pasang 2 M³ 180,000 360,000 360,000
-Semen @ 50 kg 14 Zak 65,000 910,000 910,000
3 Papan
-Papan, Ukuran 2/25/400
-Kayu, Ukuran 8/10/400 Kolom
-Kayu, Ukuran 8/10/400 Balok Btg
-Paku
VI PEKERJAAN PINTU DAN JENDELA
-Kayu 7/13 9 Btg 98,000 882,000 882,000
-Papan 2/25 6 Kpg 54,000 324,000 324,000
-Kusen Pintu, Ukuran 80 x 220 Unit
-Kusen Jendela, Ukuran 60 x 130 Unit
-Daun Pintu Kayu, Ukuran 70 x 190 Unit
-Daun Jendela Kayu Atau Kaca, Ukuran 50 x 120 Unit
-Grendel Pintu Set
-Grendel Jendela Set
-Engsel Pintu Set
-Engsel Jendela Set
VII RING BALOK
1 Pekerjaan bekisting M²
2 Pekerjaan Cor Beton
-Besi beton Φ 8 mm SNI 7 Btg 54,000 378,000 378,000
-Besi beton Φ 6 mm SNI 5 Btg 30,000 150,000 150,000
-Semen @ 40 kg / 50 kg 2 Zak 65,000 130,000 130,000
-Pasir beton 0.2 M³ 180,000 36,000 36,000
-Batu pecah 0.3 M³ 550,000 165,000 165,000
VIII PEKERJAAN STRUKTUR ATAP
-Kayu rangka kuda-kuda, Ukuran 6/10 4 Btg 65,000 260,000 260,000
-Kayu gapit, Ukuran 5/5 Btg
-Papan, Ukuran 3/10 6 Kpg 33,000 198,000 198,000
-Kayu Kasau, Ukuran 5/7 8 Btg 38,000 304,000 304,000
-Paku 1.95 Kg 20,000 39,000 39,000
IX PEKERJAAN PENUTUP ATAP
1 Penutup Atap
-Seng gelombang (0,2 cm x 80 cm x 180 cm), 7 kk 25 Lbr 58,000 1,450,000 1,450,000
-Genteng Bh
-Bahan penutup atap lainnya yang diijinkan Lbr
-Paku Seng 1.00 Kg 45,000 45,000 45,000
2 Bubungan Atap Bh
-Seng M
-Genteng Bh
-Bahan penutup atap lainnya yang diijinkan Lbr
3 Listplang papan, Ukuran……. M³
X PEKERJAAN LANTAI
1 Lantai Rabat Campuran minimal 1:4, T= 2,5 cm 78 M²
-Semen @ 50 kg 3 Zak 65,000 195,000 195,000
-Batu pecah 0.4 M³ 550,000 220,000 220,000
-Pasir pasang 0.3 M³ 180,000 54,000 54,000
2 Lantai Papan M²
-Papan, Ukuran……….. Lbr
-Kayu, Ukuran……….. Btg
XI MCK
-Septic Tank Unit
-Closet Jongkok 1 Unit 150,000 150,000 150,000
-Pipa Air Bersih, Ukuran…… Btg
-Pipa Air Kotor, Ukuran 3'' 1 Btg 150,000 150,000 150,000
-Elbow 3'' 1 Bh 25,000 25,000 25,000
-Kran Bh
-Pintu Kamar Mandi Set
XII LAIN-LAIN/INSTALASI LISTRIK
Lampu bh
Instalasi Kabel m
Stop Kontak & saklar bh
XIII UPAH KERJA
Tukang 35 Oh 100,000 3,500,000 2,500,000 1,000,000
Pembantu Tukang 30 Oh 50,000 1,500,000 1,500,000

JUMLAH 18,210,000 15,000,000 3,210,000


18,210,000 15,000,000
0

Simpang Bayat , 28 September 2018


Difasilitasi, Diajukan Oleh,
Tenaga Fasilitator Lapangan Ketua KPB Penerima Bantuan

( Elgani, S.Sos) ( Budiman ) ( Arianto )

Disahkan oleh,
Tim Teknis Diverifikasi Oleh,
Kabupaten/Kota Koordinator Fasilitator

( Nosa Yantania, ST ) ( Arohim Abdullah H, ST )


NIP. 19671118 200117 1 003
RUMAH 4 X 6

Tukang Pekerja SEMEN PASIR PS. URG BATA B. PECAH PAPAN KY 13/7 KY 6/10 KY 5/7 KY 5/5 pp 3/10 PAKU PAKU S

1.80 1
1.20 3.60
1.78 2.00
0.34 0.2
840 760

8.67
6.55
0.75
3.81 2
0.30 0.2
0.51 0.3

7
7.06
0.25
1.58 2
0.13 0.3
0.21 1.47 3.97 0.5

10.00 32.00
2.80 2
14.80 15
1rb 7000 3660

42.144 0
5.00 0
5.00 0
1.62 0

5
6.05 1.17 0.23
6.05
3.81 2
0.50 0.2
0.51 0.3

12.15 8.43 5.62 4


3.50 8
10.50
18.00
9.62 1.95

4.48 8.58
1kodi 44.44

4.28 4

6.00

19.00 9.00 6.00 3

3.80 0.3

35.75 60.00 26.00 3.20 1.00 4420.00 1.10 0.00 5.00 4.00 8.00 0.00 1.95 4.00
Tukang Pekerja SEMEN PASIR PS. URG BATA B. PECAH PAPAN KY 13/7 KY 6/10 KY 5/7 KY 5/5 PAKU PAKU S
2,600,000 -Semen @ 40 kg / 50 kg 40.00 65000 2600000
900,000 -Pasir 5 180000 900000
825,000 -Batu Pecah 1.5 550000 825000
3,660 -Batu Bata 3660 650 2379000 12500000
1,404,000 -Besi beton Φ 8mm SNI 26 54000 1404000 2500000
mber 2018 540,000 -Besi beton Φ 6 mm SNI 18 30000 540000 15,000,000
0 -Paku 1.95 20000 39000
1,450,000 -Seng gelombang (0,2 cm x 80 cm x 180 cm), 7 25 58000 1450000
25,000 -Kawat Ikat 1 25000 25000
-Paku Seng 1 45000 45000
882,000 -Kayu 7/13 9 98000 882000
-Papan 2/25 6 54000 324000
-Kayu rangka kuda-kuda, Ukuran 6/10 4 65000 260000
-Kayu gording/kasau, Ukuran 5/7 8 38000 304000
-Papan, Ukuran 3/10 6 33000 198000
150000 -Closet Jongkok 1 150000 150000
150000 -Pipa Air Kotor, Ukuran 3'' 1 150000 150000
25000 -Elbow 3'' 1 25000 25000
KAWAT

0.5

0.5
1.00
KAWAT
DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB)

Nomor BNBA : 06
Nama Penerima Bantuan : Arianto
Nomor KTP : 1606090801770003
Alamat : Dusun II
Desa/Kelurahan : Simpang Bayat
Kecamatan : Bayung Lencir
Kabupaten/Kota : Musi Banyuasin
Nomor Rekening Penerima Bantuan :
Nama Toko/Penyedia Bahan Bangunan : Toko Panca Logam Jaya

A.   Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I dan II )

Jumlah Harga per Unit Jumlah Harga


No Jenis Bahan Bangunan
( unit ) ( Rp ) ( Rp )
1 Semen @ 40 kg / 50 kg 40 Zak 65,000 2,600,000
2 Pasir 5 M3 180,000 900,000
3 Batu Pecah 1.5 M3 550,000 825,000
4 Batu Bata 3660 Bh 650 2,379,000
5 Besi beton Φ 8mm SNI 26 Batang 54,000 1,404,000
6 Besi beton Φ 6 mm SNI 18 Batang 30,000 540,000
7 Paku 1.95 Kg 20,000 39,000
8 Seng gelombang (0,2 cm x 80 cm x 180 cm), 7 k 25 Kg 58,000 1,450,000
9 Kawat Ikat 1 Batang 25,000 25,000
10 Paku Seng 1 Batang 45,000 45,000
11 Kayu 7/13 9 Batang 98,000 882,000
12 Papan 2/25 6 Keping 54,000 324,000
13 Kayu rangka kuda-kuda, Ukuran 6/10 4 Batang 65,000 260,000
14 Kayu gording/kasau, Ukuran 5/7 8 Batang 38,000 304,000
15 Papan, Ukuran 3/10 6 Keping 33,000 198,000
16 Closet Jongkok 1 Bh 150,000 150,000
17 Pipa Air Kotor, Ukuran 3'' 1 Bh 150,000 150,000
18 Elbow 3'' 1 Bh 25,000 25,000
TOTAL HARGA PEMBELIAN 12,500,000

Terbilang Dua Belas Juta Lima Ratus Ribu Rupiah

Disanggupi oleh:
Nama Toko/Penyedia Bahan Bangunan : Panca Logam Jaya
Alamat Toko/Penyedia Bahan Bangunan : Jl. Palembang Jambi Rt. 11 Rw. 01 Kel. Bayung Lencir Kec. Bayung Lencir Kab. Muba
Nomor Rekening Bank Toko/Penyedia BB : 00008-01-50-077893-1

Toko/Penyedia Bahan Bangunan

Andi Wawan
B.   Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I dan II)

No Uraian Jumlah Harga (Rp)


1 Upah Kerja PKRS 2,500,000
TOTAL TARIK TUNAI (B)
Dua Juta Lima Ratus Ribu Rupiah

C.   Total dana yang ditarik ( A + B )

Dana yang ditarik (Rp) 15,000,000


Terbilang Lima Belas Juta Rupiah

Simpang Bayat, 10 November 2018

Ketua KPB

BUDIMAN ARIANTO

Disahkan oleh : Diverifikasi Oleh : Difasilitasi oleh :


Tim Teknis Kab / Kota Koordinator Fasilitator Tenaga Fasilitator Lapangan
Kabupaten/Kota

NOSA YANTANIA, ST AROHIM ABDULLAH HENDRI,ST ELGANI, S.Sos


NIP. 19671118 200112 1 003
-Semen @ 40 kg / 50 kg 40 65000 2600000 23 65000 1495000
-Pasir 5 180000 900000 5 180000 900000
-Batu Pecah 1.5 550000 825000 1.5 550000 825000
-Batu Bata 3660 650 2379000 5200 650 3380000
-Besi beton Φ 8mm SNI 26 54000 1404000 19 54000 1026000
-Besi beton Φ 6 mm SNI 18 30000 540000 14 30000 420000
-Paku 1.95 20000 39000 5.55 20000 111000
-Seng gelombang (0,2 cm x 80 cm x 180 cm), 7 kk 25 58000 1450000 1 25000 25000
-Kawat Ikat 1 25000 25000 9 98000 882000
-Paku Seng 1 45000 45000 17 65000 1105000
-Kayu 7/13 9 98000 882000
-Papan 2/25 6 54000 324000
-Kayu rangka kuda-kuda, Ukuran 6/10 4 65000 260000
-Kayu gording/kasau, Ukuran 5/7 8 38000 304000
-Papan, Ukuran 3/10 6 33000 198000
-Closet Jongkok 1 150000 150000
-Pipa Air Kotor, Ukuran 3'' 1 150000 150000 1 150000 150000
-Elbow 3'' 1 25000 25000 1 150000 150000
12500000

10469000

25000000

yung Lencir Kab. Muba


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB)

Nomor BNBA : 06
Nama Penerima Bantuan : Arianto
Nomor KTP : 1606090801770003
Alamat : Dusun II
Desa/Kelurahan : Simpang Bayat
Kecamatan : Bayung Lencir
Kabupaten/Kota : Musi Banyuasin
Nomor Rekening Penerima Bantuan :
Nama Toko/Penyedia Bahan Bangunan : Toko Panca Logam Jaya

A.   Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I )

Jumlah Harga per Unit Jumlah Harga


No Jenis Bahan Bangunan
( unit ) ( Rp ) ( Rp )
1 Semen @ 40 kg / 50 kg 15 Zak 65,000 975,000
2 Pasir 1 M3 180,000 180,000
3 Batu Pecah 1.5 M3 550,000 825,000
4 Batu Bata 1660 Bh 650 1,079,000
5 Besi beton Φ 8mm SNI 26 Batang 54,000 1,404,000
6 Besi beton Φ 6 mm SNI 18 Batang 30,000 540,000
7 Paku 0.8 Kg 20,000 16,000
8 Seng gelombang (0,2 cm x 80 cm x 180 cm), 7 k Kg 58,000 -
9 Kawat Ikat 1 Batang 25,000 25,000
10 Paku Seng Batang 45,000 -
11 Kayu 7/13 9 Batang 98,000 882,000
12 Papan 2/25 6 Keping 54,000 324,000
13 Kayu rangka kuda-kuda, Ukuran 6/10 Batang 65,000 -
14 Kayu gording/kasau, Ukuran 5/7 Batang 38,000 -
15 Papan, Ukuran 3/10 Keping 33,000 -
16 Closet Jongkok Bh 150,000 -
17 Pipa Air Kotor, Ukuran 3'' Bh 150,000 -
18 Elbow 3'' Bh 25,000 -
TOTAL HARGA PEMBELIAN 6,250,000

Terbilang Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh:
Nama Toko/Penyedia Bahan Bangunan : Panca Logam Jaya
Alamat Toko/Penyedia Bahan Bangunan : Jl. Palembang Jambi Rt. 11 Rw. 01 Kel. Bayung Lencir Kec. Bayung Lencir Kab. Muba
Nomor Rekening Bank Toko/Penyedia BB : 00008-01-50-077893-1

Toko/Penyedia Bahan Bangunan

Andi Wawan
B.   Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I )

No Uraian Jumlah Harga (Rp)


1 Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B)
Satu Juta Dua Ratus Lima Puluh Ribu Rupiah

C.   Total dana yang ditarik ( A + B )

Dana yang ditarik (Rp) 7,500,000


Terbilang Tujuh Juta Lima Ratus Ribu Rupiah

Simpang Bayat, 10 November 2018

Ketua KPB

BUDIMAN ARIANTO

Disahkan oleh : Diverifikasi Oleh : Difasilitasi oleh :


Tim Teknis Kab / Kota Koordinator Fasilitator Tenaga Fasilitator Lapangan
Kabupaten/Kota

NOSA YANTANIA, ST AROHIM ABDULLAH HENDRI,ST ELGANI, S.Sos


NIP. 19671118 200112 1 003
2000

-Semen @ 40 kg / 50 kg 40 65000 2600000 23 65000 1495000


-Pasir 5 180000 900000 5 180000 900000
-Batu Pecah 1.5 550000 825000 1.5 550000 825000
-Batu Bata 3660 650 2379000 5200 650 3380000
-Besi beton Φ 8mm SNI 26 54000 1404000 19 54000 1026000
-Besi beton Φ 6 mm SNI 18 30000 540000 14 30000 420000
-Paku 1.95 20000 39000 5.55 20000 111000
-Seng gelombang (0,2 cm x 80 cm x 180 cm), 7 kk 25 58000 1450000 1 25000 25000
-Kawat Ikat 1 25000 25000 9 98000 882000
-Paku Seng 1 45000 45000 17 65000 1105000
-Kayu 7/13 9 98000 882000
-Papan 2/25 6 54000 324000
-Kayu rangka kuda-kuda, Ukuran 6/10 4 65000 260000
-Kayu gording/kasau, Ukuran 5/7 8 38000 304000
-Papan, Ukuran 3/10 6 33000 198000
-Closet Jongkok 1 150000 150000
-Pipa Air Kotor, Ukuran 3'' 1 150000 150000 1 150000 150000
-Elbow 3'' 1 25000 25000 1 150000 150000
12500000

10469000

25000000

yung Lencir Kab. Muba


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB)

Nomor BNBA : 06
Nama Penerima Bantuan : Arianto
Nomor KTP : 1606090801770003
Alamat : Dusun II
Desa/Kelurahan : Simpang Bayat
Kecamatan : Bayung Lencir
Kabupaten/Kota : Musi Banyuasin
Nomor Rekening Penerima Bantuan :
Nama Toko/Penyedia Bahan Bangunan : Toko Panca Logam Jaya

A.   Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap II )

Jumlah Harga per Unit Jumlah Harga


No Jenis Bahan Bangunan
( unit ) ( Rp ) ( Rp )
1 Semen @ 40 kg / 50 kg 25 Zak 65,000 1,625,000
2 Pasir 4 M3 180,000 720,000
3 Batu Pecah M3 550,000 -
4 Batu Bata 2000 Bh 650 1,300,000
5 Besi beton Φ 8mm SNI Batang 54,000 -
6 Besi beton Φ 6 mm SNI Batang 30,000 -
7 Paku 1.15 Kg 20,000 23,000
8 Seng gelombang (0,2 cm x 80 cm x 180 cm), 7 k 25 Kg 58,000 1,450,000
9 Kawat Ikat Batang 25,000 -
10 Paku Seng 1 Batang 45,000 45,000
11 Kayu 7/13 Batang 98,000 -
12 Papan 2/25 Keping 54,000 -
13 Kayu rangka kuda-kuda, Ukuran 6/10 4 Batang 65,000 260,000
14 Kayu gording/kasau, Ukuran 5/7 8 Batang 38,000 304,000
15 Papan, Ukuran 3/10 6 Keping 33,000 198,000
16 Closet Jongkok 1 Bh 150,000 150,000
17 Pipa Air Kotor, Ukuran 3'' 1 Bh 150,000 150,000
18 Elbow 3'' 1 Bh 25,000 25,000
TOTAL HARGA PEMBELIAN 6,250,000

Terbilang Dua Belas Juta Lima Ratus Ribu Rupiah

Disanggupi oleh:
Nama Toko/Penyedia Bahan Bangunan : Panca Logam Jaya
Alamat Toko/Penyedia Bahan Bangunan : Jl. Palembang Jambi Rt. 11 Rw. 01 Kel. Bayung Lencir Kec. Bayung Lencir Kab. Muba
Nomor Rekening Bank Toko/Penyedia BB : 00008-01-50-077893-1

Toko/Penyedia Bahan Bangunan

Andi Wawan
B.   Jumlah dana yang ditarik tunai untuk upah kerja (Tahap II )

No Uraian Jumlah Harga (Rp)


1 Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B)
Dua Juta Lima Ratus Ribu Rupiah

C.   Total dana yang ditarik ( A + B )

Dana yang ditarik (Rp) 7,500,000


Terbilang Lima Belas Juta Rupiah

Simpang Bayat, 10 November 2018

Ketua KPB

BUDIMAN ARIANTO

Disahkan oleh : Diverifikasi Oleh : Difasilitasi oleh :


Tim Teknis Kab / Kota Koordinator Fasilitator Tenaga Fasilitator Lapangan
Kabupaten/Kota

NOSA YANTANIA, ST AROHIM ABDULLAH HENDRI,ST ELGANI, S.Sos


NIP. 19671118 200112 1 003
2000

-Semen @ 40 kg / 50 kg 40 65000 2600000 23 65000 15 1495000


-Pasir 5 180000 900000 5 180000 1 900000
-Batu Pecah 1.5 550000 825000 1.5 550000 1.5 825000
-Batu Bata 3660 650 2379000 5200 650 1660 3380000
-Besi beton Φ 8mm SNI 26 54000 1404000 19 54000 26 1026000
-Besi beton Φ 6 mm SNI 18 30000 540000 14 30000 18 420000
-Paku 1.95 20000 39000 5.55 20000 0.8 111000
-Seng gelombang (0,2 cm x 80 cm x 180 cm), 7 kk 25 58000 1450000 1 25000 25000
-Kawat Ikat 1 25000 25000 9 98000 1 882000
-Paku Seng 1 45000 45000 17 65000 1105000
-Kayu 7/13 9 98000 882000 9
-Papan 2/25 6 54000 324000 6
-Kayu rangka kuda-kuda, Ukuran 6/10 4 65000 260000
-Kayu gording/kasau, Ukuran 5/7 8 38000 304000
-Papan, Ukuran 3/10 6 33000 198000
-Closet Jongkok 1 150000 150000
-Pipa Air Kotor, Ukuran 3'' 1 150000 150000 1 150000 150000
-Elbow 3'' 1 25000 25000 1 150000 150000
12500000

10469000

25000000

yung Lencir Kab. Muba


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB)

Nomor BNBA :
Nama Penerima Bantuan : Arianto
Nomor KTP : 1606090801770003
Alamat : Dusun II
Desa/Kelurahan : Simpang Bayat
Kecamatan : Bayung Lencir
Kabupaten/Kota : Musi Banyuasin
Nomor Rekening Penerima Bantuan :
Nama Toko/Penyedia Bahan Bangunan : Toko Panca Logam Jaya

A.   Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I )

Jumlah Harga per Unit Jumlah Harga


No Jenis Bahan Bangunan
( unit ) ( Rp ) ( Rp )
1 Semen 11 Zak 65,000 715,000
2 Pasir 3 M3 180,000 540,000
3 Batu pecah 2 M3 550,000 1,100,000
4 Batu Bata 2000 Bh 650 1,300,000
5 Besi 6 15 Batang 54,000 810,000
6 Besi 8 15 Batang 30,000 450,000
7 Paku 4.2 Kg 20,000 84,000
10 Kawat Ikat 3 Kg 25,000 75,000
12 Kayu 7/13 12 Batang 98,000 1,176,000
13 Papan 2/25 Batang 54,000 -
17 Kloset Jongkok Bh 150,000 -
18 Pipa Air Kotor, Ukuran 3'' Bh 150,000 -
19 Elbow 3'' Bh 25,000 -
TOTAL HARGA PEMBELIAN 6,250,000

Terbilang Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh:
Nama Toko/Penyedia Bahan Bangunan : Panca Logam Jaya
Alamat Toko/Penyedia Bahan Bangunan : Jl. Palembang Jambi Rt. 11 Rw. 01 Kel. Bayung Lencir Kec. Bayung Lencir Kab. Muba
Nomor Rekening Bank Toko/Penyedia BB : 00008-01-50-077893-1

Toko/Penyedia Bahan Bangunan

Andi Wawan
B.   Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I )

No Uraian Jumlah Harga (Rp)


1 Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B)
Satu Juta Dua Ratus Lima Puluh Ribu Rupiah

C.   Total dana yang ditarik ( A + B )

Dana yang ditarik (Rp) 7,500,000


Terbilang Tujuh Juta Lima Ratus Ribu Rupiah

Ketua KPB

BUDIMAN ARIANTO

Disahkan oleh : Diverifikasi Oleh : Difasilitasi oleh :


Tim Teknis Kab / Kota Koordinator Fasilitator Tenaga Fasilitator Lapangan
Kabupaten/Kota

NOSA YANTANIA, ST AROHIM ABDULLAH HENDRI,ST ELGANI, S.Sos


NIP. 19671118 200112 1 003
-Semen @ 40 kg / 50 kg 47 65000 3055000 23 65000 1495000
-Pasir 7 180000 1260000 5 180000 900000
-Batu Pecah 2 550000 1100000 1.5 550000 825000
-Batu Bata 5500 650 3575000 5200 650 3380000
-Besi beton Φ 8mm SNI 15 54000 810000 19 54000 1026000
-Besi beton Φ 6 mm SNI 15 30000 450000 14 30000 420000
-Paku 6.7 20000 134000 5.55 20000 111000
-Kawat Ikat 3 25000 75000 1 25000 25000
-Kayu 7/13 12 98000 1176000 9 98000 882000
-Papan 2/25 10 54000 540000 17 65000 1105000
-Closet Jongkok 1 150000 150000 1 150000 150000
-Pipa Air Kotor, Ukuran 3'' 1 150000 150000 1 150000 150000
-Elbow 3'' 1 25000 25000 1 25000 25000

10494000

12500000

yung Lencir Kab. Muba


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB)

Nomor BNBA :
Nama Penerima Bantuan : Arianto
Nomor KTP : 1606090801770003
Alamat : Dusun II
Desa/Kelurahan : Simpang Bayat
Kecamatan : Bayung Lencir
Kabupaten/Kota : Musi Banyuasin
Nomor Rekening Penerima Bantuan :
Nama Toko/Penyedia Bahan Bangunan : Toko Panca Logam Jaya

A.   Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap II )

Jumlah Harga per Unit Jumlah Harga


No Jenis Bahan Bangunan
( unit ) ( Rp ) ( Rp )
1 Semen 36 Zak 65,000 2,340,000
2 Pasir 4 M3 180,000 720,000
3 Batu pecah M3 550,000 -
4 Batu Bata 3500 Bh 650 2,275,000
5 Besi 6 Batang 54,000 -
6 Besi 8 Batang 30,000 -
7 Paku 2.5 Kg 20,000 50,000
10 Kawat Ikat Kg 25,000 -
12 Kayu 7/13 Batang 98,000 -
13 Papan 2/25 10 Batang 54,000 540,000
17 Kloset Jongkok 1 Bh 150,000 150,000
18 Pipa Air Kotor, Ukuran 3'' 1 Bh 150,000 150,000
19 Elbow 3'' 1 Bh 25,000 25,000
TOTAL HARGA PEMBELIAN 6,250,000

Terbilang Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh:
Nama Toko/Penyedia Bahan Bangunan : Panca Logam Jaya
Alamat Toko/Penyedia Bahan Bangunan : Jl. Palembang Jambi Rt. 11 Rw. 01 Kel. Bayung Lencir Kec. Bayung Lencir Kab. Muba
Nomor Rekening Bank Toko/Penyedia BB : 00008-01-50-077893-1

Toko/Penyedia Bahan Bangunan

Andi Wawan
B.   Jumlah dana yang ditarik tunai untuk upah kerja (Tahap II )

No Uraian Jumlah Harga (Rp)


1 Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B)
Satu Juta Dua Ratus Lima Puluh Ribu Rupiah

C.   Total dana yang ditarik ( A + B )

Dana yang ditarik (Rp) 7,500,000


Terbilang Tujuh Juta Lima Ratus Ribu Rupiah

Ketua KPB

BUDIMAN ARIANTO

Disahkan oleh : Diverifikasi Oleh : Difasilitasi oleh :


Tim Teknis Kab / Kota Koordinator Fasilitator Tenaga Fasilitator Lapangan
Kabupaten/Kota

NOSA YANTANIA, ST AROHIM ABDULLAH HENDRI,ST ELGANI, S.Sos


NIP. 19671118 200112 1 003
-Semen @ 40 kg / 50 kg 47 65000 3055000 23 65000 47 11 36 1495000
-Pasir 7 180000 1260000 5 180000 7 3 4 900000
-Batu Pecah 2 550000 1100000 1.5 550000 2 2 0 825000
-Batu Bata 5500 650 3575000 5200 650 5500 2000 3500 3380000
-Besi beton Φ 8mm SNI 15 54000 810000 19 54000 15 15 0 1026000
-Besi beton Φ 6 mm SNI 15 30000 450000 14 30000 15 15 0 420000
-Paku 6.7 20000 134000 5.55 20000 6.7 4.2 2.5 111000
-Kawat Ikat 3 25000 75000 1 25000 3 3 0 25000
-Kayu 7/13 12 98000 1176000 9 98000 12 12 0 882000
-Papan 2/25 10 54000 540000 17 65000 10 10 1105000
-Closet Jongkok 1 150000 150000 1 150000 1 1 150000
-Pipa Air Kotor, Ukuran 3'' 1 150000 150000 1 150000 1 1 150000
-Elbow 3'' 1 25000 25000 1 25000 1 1 25000

10494000

12500000

yung Lencir Kab. Muba


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB)

Nomor BNBA :
Nama Penerima Bantuan : Arnila
Nomor KTP : 1606095202850007
Alamat : Dusun II
Desa/Kelurahan : Simpang Bayat
Kecamatan : Bayung Lencir
Kabupaten/Kota : Musi Banyuasin
Nomor Rekening Penerima Bantuan :
Nama Toko/Penyedia Bahan Bangunan : Toko Panca Logam Jaya

A.   Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I )

Jumlah Harga per Unit Jumlah Harga


No Jenis Bahan Bangunan
( unit ) ( Rp ) ( Rp )
1 Semen 12 Zak 65,000 780,000
2 Pasir 3 M3 180,000 540,000
3 Batu pecah 1.5 M3 550,000 825,000
4 Batu Bata 2600 Bh 650 1,690,000
5 Besi 6 14 Batang 30,000 420,000
6 Besi 8 19 Batang 54,000 1,026,000
7 Paku 3.1 Kg 20,000 62,000
8 Seng gelombang (0,2 cm x 80 cm x 180 cm), 7 k Lbr 58,000 -
9 Seng Bubungan m' 35,000 -
10 Kawat Ikat 1 Kg 25,000 25,000
11 Paku Seng Kg 45,000 -
12 Kayu 7/13 9 Batang 98,000 882,000
13 Kayu rangka kuda-kuda, Ukuran 6/10 Batang 65,000 -
14 Kayu gording/kasau, Ukuran 5/7 Batang 38,000 -
15 Papan, Ukuran 3/10 Keping 33,000 -
16 Kayu Ukuran 5/5 Batang 27,000 -
17 Kloset Jongkok Bh 150,000 -
18 Pipa Air Kotor, Ukuran 3'' Bh 150,000 -
19 Elbow 3'' Bh 25,000 -
TOTAL HARGA PEMBELIAN 6,250,000

Terbilang Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh:
Nama Toko/Penyedia Bahan Bangunan : Panca Logam Jaya
Alamat Toko/Penyedia Bahan Bangunan : Jl. Palembang Jambi Rt. 11 Rw. 01 Kel. Bayung Lencir Kec. Bayung Lencir Kab. Muba
Nomor Rekening Bank Toko/Penyedia BB : 00008-01-50-077893-1

Toko/Penyedia Bahan Bangunan

Andi Wawan
B.   Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I)

No Uraian Jumlah Harga (Rp)


1 Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B)
Satu Juta Dua Ratus Lima Puluh Ribu Rupiah

C.   Total dana yang ditarik ( A + B )

Dana yang ditarik (Rp) 7,500,000


Terbilang Tujuh Juta Lima Ratus Ribu Rupiah

Ketua KPB

BUDIMAN ARNILA

Disahkan oleh : Diverifikasi Oleh : Difasilitasi oleh :


Tim Teknis Kab / Kota Koordinator Fasilitator Tenaga Fasilitator Lapangan
Kabupaten/Kota

NOSA YANTANIA, ST AROHIM ABDULLAH HENDRI,ST ELGANI, S.Sos


NIP. 19671118 200112 1 003
11 -Semen @ 40 kg / 50 kg -Semen @ 40 kg / 50 kg 23 65000 1495000
-Pasir -Pasir 5 180000 900000
-Batu Pecah -Batu Pecah 1.5 550000 825000
2600 -Batu Bata -Batu Bata 5200 650 3380000
-Besi beton Φ 8mm SNI -Besi beton Φ 8mm SNI 19 54000 1026000
-Besi beton Φ 6 mm SNI -Besi beton Φ 6 mm SNI 14 30000 420000
-Paku -Paku 5.55 20000 111000
-Seng gelombang (0,2 cm x 80 cm x 180 cm), 7 kk -Seng gelombang (0,2 cm x 80 cm x 180 cm), 19 58000 1102000
-Sengbubungan -Sengbubungan 7 35000 245000
-Kawat Ikat -Kawat Ikat 1 25000 25000
-Paku Seng -Paku Seng 3 45000 135000
-Kayu 7/13 -Kayu 7/13 9 98000 882000
-Kayu rangka kuda-kuda, Ukuran 6/10 -Kayu rangka kuda-kuda, Ukuran 6/10 17 65000 1105000
-Kayu gording/kasau, Ukuran 5/7 -Kayu gording/kasau, Ukuran 5/7 4 38000 152000
-Papan, Ukuran 3/10 -Papan, Ukuran 3/10 8 33000 264000
-Kayu gapit, Ukuran 5/5 -Kayu gapit, Ukuran 5/5 4 27000 108000
-Closet Jongkok -Closet Jongkok 1 150000 150000
-Pipa Air Kotor, Ukuran 3'' -Pipa Air Kotor, Ukuran 3'' 1 150000 150000
-Elbow 3'' -Elbow 3'' 1 25000 25000

12500000
6250000
-
DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB)

Nomor BNBA :
Nama Penerima Bantuan : Arianto
Nomor KTP : 1606090801770003
Alamat : Dusun II
Desa/Kelurahan : Simpang Bayat
Kecamatan : Bayung Lencir
Kabupaten/Kota : Musi Banyuasin
Nomor Rekening Penerima Bantuan :
Nama Toko/Penyedia Bahan Bangunan : Toko Panca Logam Jaya

A.   Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap II )

Jumlah Harga per Unit Jumlah Harga


No Jenis Bahan Bangunan
( unit ) ( Rp ) ( Rp )
1 Semen 36 Zak 65,000 2,340,000
2 Pasir 4 M3 180,000 720,000
3 Batu pecah M3 550,000 -
4 Batu Bata 3500 Bh 650 2,275,000
5 Besi 6 Batang 54,000 -
6 Besi 8 Batang 30,000 -
7 Paku 2.5 Kg 20,000 50,000
10 Kawat Ikat Kg 25,000 -
12 Kayu 7/13 Batang 98,000 -
13 Papan 2/25 10 Batang 54,000 540,000
17 Kloset Jongkok 1 Bh 150,000 150,000
18 Pipa Air Kotor, Ukuran 3'' 1 Bh 150,000 150,000
19 Elbow 3'' 1 Bh 25,000 25,000
TOTAL HARGA PEMBELIAN 6,250,000

Terbilang Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh:
Nama Toko/Penyedia Bahan Bangunan : Panca Logam Jaya
Alamat Toko/Penyedia Bahan Bangunan : Jl. Palembang Jambi Rt. 11 Rw. 01 Kel. Bayung Lencir Kec. Bayung Lencir Kab. Muba
Nomor Rekening Bank Toko/Penyedia BB : 00008-01-50-077893-1

Toko/Penyedia Bahan Bangunan

Andi Wawan
B.   Jumlah dana yang ditarik tunai untuk upah kerja (Tahap II )

No Uraian Jumlah Harga (Rp)


1 Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B)
Satu Juta Dua Ratus Lima Puluh Ribu Rupiah

C.   Total dana yang ditarik ( A + B )

Dana yang ditarik (Rp) 7,500,000


Terbilang Tujuh Juta Lima Ratus Ribu Rupiah

Simpang Bayat, Oktober 2018

Ketua KPB

BUDIMAN ARIANTO

Disahkan oleh : Diverifikasi Oleh : Difasilitasi oleh :


Tim Teknis Kab / Kota Koordinator Fasilitator Tenaga Fasilitator Lapangan
Kabupaten/Kota

NOSA YANTANIA, ST AROHIM ABDULLAH HENDRI,ST ELGANI, S.Sos


NIP. 19671118 200112 1 003
-Semen @ 40 kg / 50 kg 47 65000 3055000 23 65000 47 11 36 1495000
-Pasir 7 180000 1260000 5 180000 7 3 4 900000
-Batu Pecah 2 550000 1100000 1.5 550000 2 2 0 825000
-Batu Bata 5500 650 3575000 5200 650 5500 2000 3500 3380000
-Besi beton Φ 8mm SNI 15 54000 810000 19 54000 15 15 0 1026000
-Besi beton Φ 6 mm SNI 15 30000 450000 14 30000 15 15 0 420000
-Paku 6.7 20000 134000 5.55 20000 6.7 4.2 2.5 111000
-Kawat Ikat 3 25000 75000 1 25000 3 3 0 25000
-Kayu 7/13 12 98000 1176000 9 98000 12 12 0 882000
-Papan 2/25 10 54000 540000 17 65000 10 10 1105000
-Closet Jongkok 1 150000 150000 1 150000 1 1 150000
-Pipa Air Kotor, Ukuran 3'' 1 150000 150000 1 150000 1 1 150000
-Elbow 3'' 1 25000 25000 1 25000 1 1 25000

10494000