240-PI-T-002
COPPER CONCENTRATE NOTES:
MULTI-STREAM ANALYZER
1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001.
FROM COPPER
CONCENTRATE SAMPLER
240-SA-001
4"-CO-240-101-P6
1432 240-PI-T-001
AIC
0051
AIT
0051
AE
0051
240-AZ-003
TO COPPER CONCENTRATE
THICKENER TANK
240-TK-001
4"-CO-240-102-P6
1433 240-PI-T-001
QUALITY CONTROL
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN NAME SIGN AND STAMP
SCALE : PROJECT
REFERENCES REVISIONS REVISIONS NOTICE SHEET SIZE
DWG. NO. TITLE NO. DESCRIPTION BY CHECK APPROVED DATE NO. DESCRIPTION BY CHECK APPROVED DATE
A1 TOROMOCHO PROJECT
THIS IS A COMPUTER GENERATED DRAWING. ALL
000-PI-T-001 PIPING LEGEND P&ID A ISSUED FOR INTERNAL REVIEW (B.E. 240-PI-T-002) YK YC 06/27/08 CHANGES HERE TO SHALL BE PERFORMED USING
AREA
CADD ONLY. DRAWN BY: MKM/CAC DATE : 07/20/09 240-COPPER CONCENTRATE & THICKENING C-560 REVISION
000-PI-T-002 INSTRUMENTATION LEGEND P&ID B ISSUED FOR CLIENT APPROVAL YK YC 09/03/08 THIS DRAWING IS THE PROPERTY OF AND EMBODIES
PROPRIETARY INFORMATION BELONGING TO AKER TITLE CAD NO.
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY CHECKED BY: VVD DATE : 10/09/09
240-FS-T-001 COPPER CONCENTRATE HANDLING AREA FLOW SHEET C ISSUED FOR DESIGN (B.E. 240-PI-T-002) YK YC YC LN 09/24/08 UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
D RE-ISSUED FOR DESIGN MKM VVD TT JHL/RC 08/06/09 TT/JHL DATE : 10/09/09 COPPER CONCENTRATE 560-240-PI-T-002
WRITTEN PERMISSION. APPROVED BY:
E
E ISSUED FOR DELETION (EQUIP. HAS BEEN DELETED) CAC VVD TT JHL 10/09/09
AUTHORIZED BY: RC DATE : 10/12/09 SAMPLE ANALYZER
DWG. NO.
P & ID
MCP APPROVED: DATE : MINERA CHINALCO PERU S.A. 240-PI-T-002