Anda di halaman 1dari 1

240-AZ-003

240-PI-T-002
COPPER CONCENTRATE NOTES:
MULTI-STREAM ANALYZER
1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001.

FROM COPPER
CONCENTRATE SAMPLER
240-SA-001
4"-CO-240-101-P6
1432 240-PI-T-001

AIC
0051

AIT
0051
AE
0051

HOLD FOR VENDOR INFORMATION

240-AZ-003

TO COPPER CONCENTRATE
THICKENER TANK
240-TK-001
4"-CO-240-102-P6
1433 240-PI-T-001

DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL

QUALITY CONTROL

DISCIPLINE MANAGER NAME SIGN


DOCUMENT CONTROL

THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN NAME SIGN AND STAMP

SCALE : PROJECT
REFERENCES REVISIONS REVISIONS NOTICE SHEET SIZE

DWG. NO. TITLE NO. DESCRIPTION BY CHECK APPROVED DATE NO. DESCRIPTION BY CHECK APPROVED DATE
A1 TOROMOCHO PROJECT
THIS IS A COMPUTER GENERATED DRAWING. ALL
000-PI-T-001 PIPING LEGEND P&ID A ISSUED FOR INTERNAL REVIEW (B.E. 240-PI-T-002) YK YC 06/27/08 CHANGES HERE TO SHALL BE PERFORMED USING
AREA
CADD ONLY. DRAWN BY: MKM/CAC DATE : 07/20/09 240-COPPER CONCENTRATE & THICKENING C-560 REVISION
000-PI-T-002 INSTRUMENTATION LEGEND P&ID B ISSUED FOR CLIENT APPROVAL YK YC 09/03/08 THIS DRAWING IS THE PROPERTY OF AND EMBODIES
PROPRIETARY INFORMATION BELONGING TO AKER TITLE CAD NO.
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY CHECKED BY: VVD DATE : 10/09/09
240-FS-T-001 COPPER CONCENTRATE HANDLING AREA FLOW SHEET C ISSUED FOR DESIGN (B.E. 240-PI-T-002) YK YC YC LN 09/24/08 UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
D RE-ISSUED FOR DESIGN MKM VVD TT JHL/RC 08/06/09 TT/JHL DATE : 10/09/09 COPPER CONCENTRATE 560-240-PI-T-002
WRITTEN PERMISSION. APPROVED BY:
E
E ISSUED FOR DELETION (EQUIP. HAS BEEN DELETED) CAC VVD TT JHL 10/09/09
AUTHORIZED BY: RC DATE : 10/12/09 SAMPLE ANALYZER
DWG. NO.
P & ID
MCP APPROVED: DATE : MINERA CHINALCO PERU S.A. 240-PI-T-002

Anda mungkin juga menyukai