REKAPITULASI TOTAL

RENCANA ANGGARAN BIAYA ( RAB )

Unit Kerja : Dinas Perdagangan Dan Perindustrian


Pekerjaan : Revitalisasi Pasar Rakyat Batu Parigi
Lokasi : Kecamatan Tobadak Kab. Mamuju Tengah
Tahun Anggaran : 2017

NO. URAIAN PEKERJAAN JUMLAH HARGA

I BIAYA PEKERJAAN PERENCANAAN Rp 50,000,000.00

II BIAYA PEKERJAAN PENGAWASAN Rp 147,518,000.00

III BIAYA PENGELOLAAN ADMINISTRASI Rp 150,850,000.00

IV BIAYA PEKERJAAN KONSTRUKSI FISIK Rp 5,651,632,000.00

JUMLAH BIAYA TOTAL Rp 6,000,000,000.00

TERBILANG : ENAM MILYAR RUPIAH


JADWAL WAKTU PELAKSANAAN

Unit Kerja : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


Pekerjaan : PEMBANGUNAN BUNDARAN BENTENG
Lokasi : KEC. TOPOYO KAB. MAMUJU TENGAH
Tahun Anggaran : 2018

Jadwal Pelaksanaan Tahun 2018-2019


NO. URAIAN PEKERJAAN Bobot Bulan Ke …….. Keterangan
(%) 1 2 3 4 5 6 7 8 9

I PEKERJAAN PERSIAPAN #DIV/0! #DIV/0! 100%

II PEKERJAAN STRUKTUR Err:509 Err:509 Err:509 Err:509 Err:509 270 HARI

III PEKERJAAN ARSITEKTUR Err:509 Err:509 Err:509 Err:509 Err:509 KALENDER

IV PEKERJAAN MEKANIKAL ELEKTRIKAL Err:509 Err:509

V PEKERJAAN PLUMBING Err:509 Err:509

VI PEKERJAAN AIR MANCUR #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

VII PEKERJAAN KUNINGAN DAN TEMBAGA #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0%

A Bobot Rencana #DIV/0! #DIV/0! Err:509 Err:509 #DIV/0! #DIV/0! #DIV/0! Err:509 #DIV/0! #DIV/0!
B Bobot Rencana Komulatif 0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
REKAPITULASI

BILL OF QUANTITY (BOQ)


Unit Kerja : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Pekerjaan : PEMBANGUNAN BUNDARAN BENTENG
Lokasi : KEC. TOBADAK KAB. MAMUJU TENGAH
Sumber Dana : APBD
Tahun Anggaran : 2019

NO. URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN Rp -

II PEKERJAAN AIR MANCUR Rp -

III PEKERJAAN KUNINGAN DAN TEMBAGA Rp -

Jumlah Rp -

PPN 10 % Rp -

Total Biaya Rp -

…………………, ………………………….

Dibuat Oleh :
PT. ..........................................

Nama Direktur/Direktris
Jabatan
RENCANA ANGGAR
Unit Kerja : DINAS PERDAGANGAN DAN PERINDUSTRIAN
Pekerjaan : REVITALISASI PASAR RAKYAT BATU PARIGI
Lokasi : KECAMATAN TOBADAK KAB. MAMUJU TENGAH
Tahun Anggaran : 2017

NO.

I.
1
2
3
4

II.
II. A
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14

B
1
2
3
4

C
1
2
3
4
Ju
D
1
2
3

E
1
2
3
4

F
1
2
3
4
5
6
7
8
9
10
11
12

G
1
2
3
4
5
6
7
8
9
10
11

JUMLAH
II. B
A
1
-
-
-
-
-
2
-
-
-
3
-
-
4
-
5
-
-
-
-
-
6
-
7
-
-
-

B
1
-
-
-
-
-
2
-
-
-
3
-
-
4
-
5
-
-
-
-
-
6
-
7
-
-
-

C
1
-
-
-
-
-
2
-
-
-
3
-
-
4
-
5
-
-
-
-
-
6
-
7
-
-
-
II. C
1
-
-
-
-
-
-
2
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH BI
II. D

JU
II. E
1
-
-
-
-
2
-
-
-
-
3
-
-
-
4
-
-
-
-
JUMLAH BI

III
III. A
1
-
-
-
-
-
-

III. B
1
-
-
-
-
-
2
-
-
-
-
-

III. C
1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2
-

III. D
1
-
-
-
-
-
2
-
-
-
-
-
-
-
-
-
3
-
-
-
-
-
-
-
-
III. E
1
2
3
4
5
-
-
-
6
-
-
-
7
-
-
-
8
-
-
9
10
11
-
-
12
-
-
13
-
-
14
-
-

III. F
1
-
-
-
-
2
-
-
-
3
-
-
-
4
5
6
7
-
-
-
8
-
-
-
-
JUMLAH BIAYA PE
III. F
1
-

2
-

JUMLAH
III. G
1
2
3
4
5
6
7
8
9
10
11
12

IV
IV. A
1
a.
-
-
-
-
-
-
-
-
b.
-
-
-
-
c.
-
-
-
-
2
a.
-
-
-
-
b.
-
-
-

IV. B
1
a
b
c
d
2
a
b
c
d

IV. C
1
2
3

V
1
-
-
-
-
-
-
-
-
-
-
-
2
-
-
-
-
3
-
-
-
-
4
-
-

VI
1
2
3
4
5
TOTAL B
RENCANA ANGGARAN
Unit Kerja : DINAS PERDAGANGAN DAN PERINDUSTRIAN
Pekerjaan : REVITALISASI PASAR RAKYAT BATU PARIGI
Lokasi : KECAMATAN TOBADAK KAB. MAMUJU TENGAH
Tahun Anggaran : 2017

URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN
Pengukuran dan pemasangan bouwplank
Pemasangan Papan Nama Proyek
Sewa direksi keet / kantor sementara & gudang alat dan bahan
Peralatan dan pembersihan lapangan

PEKERJAAN STRUKTUR
PEKERJAAN TANAH DAN STRUKTUR BAWAH
PONDASI POER LANTAI
Galian Pondasi Poer (Pondasi 1) 25 Titik
Urugan Kembali Hasil Galian
Urugan Pasir Bawah Pondasi Poer
Galian Pondasi Poer ( Pondasi 2) 7 Titik
Urugan Kembali Hasil Galian
Urugan Pasir Bawah Pondasi Poer
Galian Pondasi Poer (Pondasi 3) 21 Titik
Urugan Kembali Hasil Galian
Urugan Pasir Bawah Pondasi Poer
Galian Pondasi Poer (Pondasi 4) 1 Titik
Urugan Kembali Hasil Galian
Urugan Pasir Bawah Pondasi Poer
Urugan Pasir Bawah Lantai Rabat
Urugan Tanah Bawah Lantai Rabat

LANTAI BETON K-175


Lantai Beton Pondasi 1 (25 Titik)
Lantai Beton Pondasi 2 (7 Titik)
Lantai Betom Pondasi 3 (21 Titik)
Lantai Beton 4 (1 Titik)

BETON K-225 PONDASI POER


Beton Poer Pondasi 1 (25 Titik)
Beton Poer Pondasi 2 (7 Titik)
Beton Poer Pondasi 3 (21 Titik)
Beton Poer Pondasi 4 (1 Titik)
Jumlah
SLOOF
Sloof 1 Total Panjang 172 M
Sloof 2 Total Panjang 227.2 M
Sloof 3 Total Panjang 1063 M

BETON K-300 KOLOM


Beton Kolom K1
Beton Kolom K2
Beton Kolom K3
Beton Kolom K4

PEMBESIAN
Pembesian Poer Pondasi 1 (25 Titik)
Pembesian Poer Pondasi 2 (7 Titik)
Pembesian Poer Pondasi 3 (21 Titik)
Pembesian Poer Pondasi 4 (1 Titik)
Pembesian Kolom Pondasi 1 (25 Titik)
Pembesian Kolom Pondasi 2 (7 Titik)
Pembesian Kolom Pondasi 3 (21 Titik)
Pembesian Kolom Pondasi 4 (1 Titik)
Pembesian Sloof 1
Pembesian Sloof 2
Pembesian Sloof 3
Tutup Parit

PEKERJAAN BEKISTING
Bekisting Poer Pondasi 1 (25 Titik)
Bekisting Poer Pondasi 2 (7 Titik)
Bekisting Poer Pondasi 3 (21 Titik)
Bekisting Poer Pondasi 4 (1 Titik)
Bekisting Kolom Pondasi 1 (25 Titik)
Bekisting Kolom Pondasi 2 (7 Titik)
Bekisting Kolom Pondasi 3 (21 Titik)
Bekisting Kolom Pondasi 4 (1 Titik)
Bekisting Sloof 1 Total Panjang 172 m
Bekisting Sloof 2 Total Panjang 227.2 m
Bekisting Sloof 3 Total Panjang 1063 m

JUMLAH BIAY
PEKERJAAN STRUKTUR TENGAH
PEKERJAAN BETON
Kolom K-300
Tipe Kolom (K1) Jumlah 34 Titik
Tipe Kolom (K2) Jumlah 10 Titik
Tipe Kolom (K3) Jumlah 11 Titik
Tipe Kolom (KP) Jumlah 54 Titik
Dinding Cold Storage K-175
Ringbalk L-225
Ring balok 1 total panjang 280 m
Ring balok 2 total panjang 261 m
Balok letiu total panjang 207 m
Plat Beton K-300
Plat beton lantai 2 (ruang pengelola dan balkon)
Dak beton main gate depan
Plat Beton Tanggan K-300
Plat lantai tangga
Plat Beton Meja Los K-175
Los Model A
Los Model 2
Los Model 3
Los Model 4
Los Model 5
Kolom Beton Meja Los K-175
Los
Bak Kontrol dan Bak Penampungan K-175
Dinding beton grease trap
Dinding beton groundtank
Dinding beton septocktank

PEKERJAAN PEMBESIAN
Kolom Struktur
Tipe Kolom (K1)
Tipe Kolom (K2)
Tipe Kolom (K3)
Tipe Kolom (K4)
Tipe Kolom (KP)
Ring Balok
Ring Balok 1 Total Panjang 280 m
Ring Balok 2 Total Panjang 261
Balok Letiu Total Panjang 207 m
Plat Beton
Plat Beton Lantai2 (Ruang Pengelola dan Balkon)
Dak Beton Main Gate Depan
Tangga
Plat Lantai Tangga
Plat Meja Beton Los
Los Model 1
Los Model 2
Los Model 3
Los Model 4
Los Model 5
Kolom Beton Meja Los
Los
Bak Kontrol dan Bak Penampungan
Dinding Beton Grease Trap
Dinding Beton Groundtank
Dinding Beton Septiktank

PEKERJAAN BEKISTING
Kolom Struktur
Tipe Kolom (K1) Jumlah (34 Titik)
Tipe Kolom (K2) Jumlah (10 Titik)
Tipe Kolom (K3) Jumlah (11 Titik)
Tipe Kolom (KP) Jumlah (54 Titik)
Dinding Cold Trorage
Ring Balok
Ring Balok 1 Total Panjang 280 m
Ring Balok 2 Total Panjang 261 m
Balok Letiu Total Panjang 207 m
Plat Beton
Plat Beton Lantai 2 (Ruang Pengelola dan Balkon
Dak Beton Main Gate Depan
Tangga
Plat Lantai Tangga
Plat Meja Beton Los
Los Model A
Los Model 2
Los Model 3
Los Model 4
Los Model 5
Kolom Beton Meja Los
Los Model
Bak Kontrol dan Bak Penampungan
Dinding Beton Grease Trap
Dinding Beton Groundtank
Dinding Beton Septiktank
JU
PEKERJAAN STRUKTUR BAJA KONVENSIONAL
Struktur Utama
Struktur Utama K1
Kuda Kuda Baja
Konsol Teristisan
Balok 1
Ring Balok 3
Gording Kanal C
Accesoris Struktur Pendukung
Rip 1 (Plat Buhul)Jumlah 224 Buah
Rip 2 (Plat Buhul)Jumlah 32 Buah
Rip 3 (Plat Buhul)Jumlah 16 Buah
Rip4 (Plat Buhul)Jumlah 320 Buah
Rip 5 (Plat Buhul)Jumlah 16 Buah
Rip 6 (Plat Buhul)Jumlah 64 Buah
Rip 7 (Plat Buhul)Jumlah 16 Buah
Rip 8 (Plat Buhul)Jumlah 224 Buah
Rip 9 (Plat Buhul)Jumlah 224 Buah
Rip 10 (Plat Buhul)Jumlah 224 Buah
Endplate 1
Endplate 2
Endplate 3
Endplate 4
Angkur Baut
Baut 19
Baut 16
Trackstank
Kait Angin
Dudukan Gording
JUMLAH BIAYA
PEKERJAAN STRUKTUR BAJA RINGAN
Kuda Kuda 1
Kuda Kuda 2
Kuda Kuda 3
JUMLA
PEKERJAAN STRUKTUR BAJA KONVENSIONAL
Penutup Atap
Atap Utama
Atap Sky Light
Atap Tertisan Keliling
Atap Main Gate
Bubungan
Nok Atap Utama
Nok Atap Main Gate
Nok Atap Jurai Teristisan
Bubungan Rabat
Talang
Rabgka Talang Atap Utama
Plat Talang Atap Utama
Roof Drain
Listplank
Listplank Atap Terisisan GRC Lebar 20 cm
Listtplank Teristisan GRC Lebar 15 cm
Listplank Atap Main Gate GRC Lebar 20 cm
Listplank Main Gate GRC Lebar 15 cm
JUMLAH BIAYA

PEKERJAAN ARSITEKTUR
PEKERJAAN DINDING
Pekerjaan Dinding Bata
Dinding Bata Bangunan Utama 1 : 5
Dinding Bata Meja Los 1 : 5
Dinding Bata Parit 1 : 5
Dinding Bata Tangga dan Balkon 1: 5
Dinding Bata Trasram 1 : 3
Dinding Roster 1: 5

PEKERJAAN PELAPIS DINDING


Plaster dan Acian
Dinding Bata Bangunan Utama 1 : 5
Dinding Bata Parit 1 : 5
Dinding Bata Tangga dan Balkon 1: 5
Kolam Teras Termasuk Skoneng 1 : 5
Pekerjaan Acian
Pekerjaan Keramik Dinding
Keramik Dinding Toilet 20 x 20 cm
Keramik Dinding Meja Los 20 x 20 cm
Keramik Dinding Sekat Antar Los 20 x 20 cm
Keramik Dinding Ruang Wudhu 20 x 20 cm
Plint Keramik 20 x 20 cm

PEKERJAAN PELAPIS LANTAI


Keramik
Keramik Selasr Pasar 40 x 40 cm
Keramik Asen pada Selasar Pasar 40 x 40 cm
Keramik Los Termasuk Meja 40 x 40 cm
Keramik Selasar Depan 40 x 40 cm
Keramik Tangga 40 x 40 cm
Keramik Ruang Pengelola 40 x 40 cm
Keramik Balkon 40 x 40 cm
Keramik Ruang R. ATM 40 x 40 cm
Keramik Ruang Klinik 40 x 40 cm
Keramik Ruang Ibu Menyusui 40 x 40 cm
Keramik Ruang Musholla 40 x 40 cm
Keramik Toilet 40 x 40 cm
Keramik Ruang Cold Storage 40 x 40 cm
Keramik Kios 40 x 40 cm
Tali Air
Pembuatan Tali Air Selasar Samping dan Belakang

PEKERJAAN PENGECATAN
Pengecetan Area Luar
Pengecatan Dinding Bangunan Utama
Pengecatan Kolom Selasar
Pengecatan Listplank Atap Teritisan GRC Lebar 20 cm
Pengecatan Listplank Atap Main Gate GRC Lebar
Pengecatan Dinding Roster
Pengecetan Area Dalam
Pengecatan Dinding Bagian Dalam Pasr
Pengecatan Dinding Bagian Dalam Kios
Pengecatan Dinding Bagian Dalam Ruang Pengelola
Pengecatan Dinding Bagian Dalam Ruang ATM
Pengecatan Dinding Bagian Dalam Ruang Musholla
Pengecatan Dinding Bagian Dalam Ruang Klinik
Pengecatan Dinding Bagian Dalam Ruang Ibu Menyusui
Pengecatan Dinding Bagian Dalam Ruang Toilet
Pengecatan Dinding Bagian Dalam Cold Storage
Pengecatan Bidang Besi
Pengecatan Boven Kawat Harmonika
Pengecatan Besi Teralis Atas kios
Pengecatan Teralis Besi Pengaman Pipa Air Hujan
Pengecatan Besi Pengaman Sudut Meja los
Pengecatan Besi Klem Pipa Air Hujan
Pengecatan Grill Los
Pengecatan Besi Siku Support Kabel Tray
Pengecatan Besi Longdrat Support Kabel Tray
PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan dan Belakang
Folding Door Harmonika untuk pintu samping kiri dan kanan
Rolling Door Kios Lebar 3 m Jumlah 28 Unit
Rolling Door Kios Lebar 2.5 m Jumlah 8 Unit
Pintu Jendela 1 Aluminium (PJ1) Jumlah 1 Unit
Kuseng Aluminium Natural 3"
Pasangan Kaca Bening 5 mm
Daun Pintu Aluminium + Kaca Bening 5 mm
Pintu Jendela 2 (PJ2) Jumlah 3 Unit
Kuseng Aluminium Natural 3"
Pasangan Kaca Bening 5 mm
Daun Pintu Aluminium + Kaca Bening 5 mm
Pintu 1 (P1) Jumlah 1 Unit
Kuseng Aluminium Natural 3"
Pasangan Kaca Bening 5 mm
Daun Pintu Aluminium + Kaca Bening 5 mm
Jendela 1 (J1) Jumlah 2 Unit
Kuseng Aluminium Natural 3"
Pasangan Kaca Bening 5 mm
Boven 1 (BV1) Jumlah 48 Unit
Boven 2 (BV2) Jumlah 2 Unit
Boven 3 (BV3) Jumlah 6 Unit
Kuseng Aluminium Natural 3"
Pasangan Kaca Bening 5 mm
Boven 4 (BV4) Jumlah 6 Unit
Kuseng Aluminium Natural 3"
Pasangan Kaca Bening 5 mm
Pintu Toilet (PT1) Jumlah 7 Unit
Kuseng Aluminium Natural 3"
Daun Pintu Aluminium Sudah Termasuk Grill Pintu
Pintu Besi (PB1) Jumlah 1 Unit
Kuseng Besi Hollow 50 x 50
Daun Pintu Plat Tebal 2 mm dengan Rangka Besi Hollow 30 x 30 cm

PEKERJAAN KUNCI, ENGSEL DAN AKSESORIS KUSEN


Pintu Jendela 1 (PJ1) Jumlah 1 Unit
Kunci Slot Tanam Merk Solid Atau Setara
Engsel Kupu
Handle Pintu Merk Solid Atau Setara
Door Closer
Pintu 1 (P1) Jumlah 1 Unit
Kunci Slot Tanam Merk Solid Atau Setara
Engsel Kupu
Handle Pintu Merk Solid Atau Setara
Pintu 1 (P1) Jumlah 1 Unit
Kunci Slot Tanam Merk Solid Atau Setara
Engsel Kupu
Handle Pintu Merk Solid Atau Setara
Jendela 1 ( J1) Jumlah 2 Unit
Boven 3 (BV3) Jumlah 6 Unit
Boven 4 (BV4) Jumlah 6 Unit
Pintu Toilet (PT1) Jumlah 7 Unit
Kunci Slot Tanam Merk Solid Atau Setara
Engsel Kupu
Handle Pintu Merk Solid Atau Setara
Pintu Besi (PB1) Jumlah 1 Unit
Engsel Bubut 12 mm
Handle Besi Beton Diameter 16 mm
Daun Pintu Plat Besi2 mm dengan Rangka Besi Hollow 30 x 30
Grendel Besi
JUMLAH BIAYA PEKERJ
PEKERJAAN PLAFOND DAN LANGIT LANGIT
Plafond Gypsum Rangka Hollow 40 x 40 cm
Plafond Selasar Depan

Plafond Ruang Pengelola

Plafond Ruang ATM

Plafond Ruang Klinik

Plafond Ruang Ibu Menyusui

Plafond Ruang Musholla

Plafong Kios

Plafond Calsiboard 6 mm Rangka Hollow 40 x 40 cm


Plafond Toiled

Plafond Ruang Cold Storage

JUMLAH BIAY
PEKERJAAN LAIN LAIN
Plat Nama Pasar (signage) Tampak Depan
Logo Pasar Signage
Teralis Pengaman Pipa Air Hujan Jumlah 16 Unit
Pembuatan dan Pemasangan Railling Balkon
Teralis di Atas Plafond Kios
Papan Nama Kios
Besi Pengaman Sudut Meja Los
Support Gantung Untuk Pipa Air Hujan
Klem Menempel Dinding untuk Pipa Air Hujan
Pipa Display Los
Pembuatan dan Pengadaan box filter Grease Trap
Gril Besi Los

PEKERJAAN ME
PEKERJAAN PANEL DISTRIBUSI
Pekerjaan Panel
Pekerjaan Main Panel Distribusi
Box Panel Plat 1,5 mm fin. Cat warna abu-abu kulit jeruk (uk. 60x80 cm)
COS 160 A, 3 Phasa
MCCB 60A, 10KA, 3 Phasa
MCCB 80A, 10KA, 3 Phasa
MCCB 40A, 3 Phasa
MCCB 25A, 3 Phasa
MCCB 16A, 3 Phasa
MCB 10A, 6KA, 1 Phasa
Pekerjaan Main Panel; Distribusi (SDP1) untuk kios
Box Panel Plat 1,5 mm fin. Cat warna abu-abu kulit jeruk (uk. 40x60 cm)
MCCB 60A, 10KA, 3 Phasa
MCB 10A, 5KA, 1 Phasa
MCB 10A, 10KA, 1 Phasa
Pekerjaan Main Panel Distribusi (SDP2) untuk kios
Box Panel Plat 1,5 mm fin. Cat warna abu-abu kulit jeruk (uk. 40x60 cm)
MCCB 80A, 10KA, 3 Phasa
MCB 10A, 5KA, 1 Phasa
MCB 2A, 10KA, 1 Phasa (posisi di meja los)
Pekerjaan Kabel Trovoor + Arde & Kabel Tray
Pekerjaan Kbel Trovoor
Pekerjaan Kabel Trovoor NYY 4 x 50 mm2
Pekerjaan Kabel Trovoor NYY 4 x 25 mm2
Pekerjaan Kabel Trovoor NYY 4 x 16 mm2
Pekerjaan Kabel Trovoor NYY 4 x 4 mm2
Pekerjaan Kabel Tray
Pekerjaan Pengadaan + Pasang Kabel Tray
Pekerjaan Pengadaan Pipa Galvanis Sambungan dari Kabel Tray ke Instalasi
Pekerjaan Grounding
Pekerjaan Grounding, Nilai Maksimal = 1 ohm
J
PEKERJAAN INSTALASI
Instalasi Penarikan Kabel Lampu dan Stop Kontak
Pengadaan + Penarikan Instalasi Penerangan Down
Pengadaan + Penarikan Instalasi Stop Kontak Normal (1 gang)
Pengadaan + Penarikan Instalasi Saklar
Instalasi Power AC (Kapasitas 1,5 s/d 2 PK)
Pekerjaan Armature
Pengadaan + Pasang Armature Lampu Downlight
Pengadaan + Pasang Armature Lampu TL 1
Pengadaan + Pasang Armature Lampu Emergency
Pengadaan + Pasang Stop Kontak 1 gang
Pengadaan + Pasang Saklar Tunggal

PEKERJAAN TELEPON
Instalasi Incoming
Armature socket telephone, inbow
Pekerjaan PABX

PEKERJAAN PLUMBING
Pekerjaan Plumbing Air Bersih
Pengadaan + Pemasangan Pipa Air Bersih Supply Kran ke Lavatory
Pengadaan + Pemasangan Pipa Air Bersih Supply dari Pompa ke Pipa Vertical
Pengadaan + Pemasangan Pipa Air Bersih Supply dari Pipa 1" horizontal
Pengadaan + Pemasangan Pipa Air Bersih Supply ke kran selasar
Pengadaan + Pemasangan Kran Dinding 1/2"
Pengadaan + Pemasangan washtafel
Pengadaan + Pemasangan urinoir
Pengadaan + Pemasangan Stop Kran Galvanis 1" pada Pipa Turun menuju Los
Pengadaan + Pemasangan Stop Kran PVC 1" Posisi pada Pompa In dan Out
Pengadaan + Pemasangan Stop Kran PVC 1" Posisi pada Pipa Supply Vertical
Pengadaan + Pemasangan Pompa Air 3pk
Pekerjaan Plumbing Air Kotor
Pengadaan + Pemasangan Pipa Air Kotor dari Parit Los ke Grease Trap
Pengadaan + Pemasangan Pipa Air Kotor dari Grease Trap ke IPAL gedung
Pengadaan + Pemasangan Pipa Air Kotor Toilet dan Wudhu ke Parit
Pengadaan + Pemasangan fFloor Drain
Pekerjaan Plumbing Air Kotoran
Pengadaan + Pemasangan Pipa Air Kotoran dari Closet ke Septictank
Pengadaan + Pemasangan Pipa Udara pad Septictank
Pengadaan + Pemasangan Pipa Peresapan Pada Septicktank
Pengadaan + Pemasangan Closet Jongkok
Pekerjaan Plumbing Air Hujan
Pengadaan dan Pemasangan Pipa
Bak Kontrol Parit 40 x 40

PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
Pengadaan dan Pemasangan Hydrant Box
Nozzle 2,5"
Fire House 2,5" x 30 m
Hose Rack 2,5"
TOTAL BIAYA
A ANGGARAN BIAYA

VOL SAT. KODE HARGA SATUAN (Rp)

0.00 M'
0.00 Ls
0.00 Bh
0.00 M2
TOTAL BIAYAPEKERJAAN PENDAHULUAN

0.00 M3 A.2.3.1.1 Rp -
0.00 M 3
A.2.3.1.9 Rp -
0.00 M3 A.2.3.1.11 Err:509
0.00 M 3
A.2.3.1.1 Rp -
0.00 M3 A.2.3.1.9 Rp -
0.00 M 3
A.2.3.1.11 Err:509
0.00 M3 A.2.3.1.1 Rp -
0.00 M 3
A.2.3.1.9 Rp -
0.00 M3 A.2.3.1.11 Err:509
0.00 M 3
A.2.3.1.1 Rp -
0.00 M3 A.2.3.1.9 Rp -
0.00 M 3
A.2.3.1.11 Err:509
0.00 M3
0.00 M3
Jumlah Biaya Pekerjaan Pondasi Poer

0.00 M3 A.4.1.1.3 Err:509


0.00 M 3
A.4.1.1.3 Err:509
0.00 M3 A.4.1.1.3 Err:509
0.00 M 3
A.4.1.1.3 Err:509
Jumlah Biaya Pekerjaan Beton K-175

0.00 M3 A.4.1.1.5 Err:509


0.00 M3 A.4.1.1.5 Err:509
0.00 M3 A.4.1.1.5 Err:509
0.00 M3 A.4.1.1.5 Err:509
Jumlah Biaya Pekerjaan Beton K-225 Pondasi Poer

0.00 M3
0.00 M3
0.00 M3
Jumlah Biaya Pekerjaan Sloof

0.00 M3
0.00 M3
0.00 M3
0.00 M3
Jumlah Biaya Pekerjaan Beton K-300 Kolom

0.00 Kg A.4.1.1.17 Err:509


0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509
Jumlah Biaya Pekerjaan Pembesian

0.00 M2 A.4.1.1.20 Err:509


0.00 M2 A.4.1.1.20 Err:509
0.00 M2 A.4.1.1.20 Err:509
0.00 M2 A.4.1.1.20 Err:509
0.00 M2 A.4.1.1.20 Err:509
0.00 M2 A.4.1.1.20 Err:509
0.00 M2 A.4.1.1.20 Err:509
0.00 M2 A.4.1.1.20 Err:509
0.00 M2 A.4.1.1.20 Err:509
0.00 M2 A.4.1.1.20 Err:509
0.00 M2 A.4.1.1.20 Err:509
Jumlah Biaya Pekerjaan Bekisting
JUMLAH BIAYA PEKERJAAN TANAH DAN STRUKTUR BAWAH
0.00 M3
0.00 M3
0.00 M3
0.00 M3
0.00 M3

0.00 M3
0.00 M3
0.00 M3

0.00 M3
0.00 M3

0.00 M3

0.00 M3
0.00 M3
0.00 M3
0.00 M3
0.00 M3

0.00 M3

0.00 M3
0.00 M3
0.00 M3
Jumlah Biaya Pekerjaan Beton

0.00 Kg A.4.1.1.17 Err:509


0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509

0.00 Kg A.4.1.1.17 Err:509


0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509

0.00 Kg A.4.1.1.17 Err:509


0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509

0.00 Kg A.4.1.1.17 Err:509


0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509

0.00 Kg A.4.1.1.17 Err:509

0.00 Kg A.4.1.1.17 Err:509


0.00 Kg A.4.1.1.17 Err:509
0.00 Kg A.4.1.1.17 Err:509
Jumlah Biaya Pekerjaan Pembesian

0.00 M2 A.4.1.1.22 Err:509


0.00 M2 A.4.1.1.22 Err:509
0.00 M2 A.4.1.1.22 Err:509
0.00 M2 A.4.1.1.22 Err:509
0.00 M2 A.4.1.1.22 Err:509

0.00 M2 A.4.1.1.23 Err:509


0.00 M2 A.4.1.1.23 Err:509
0.00 M2 A.4.1.1.23 Err:509

0.00 M2 A.4.1.1.24 Err:509


0.00 M2 A.4.1.1.24 Err:509

0.00 M2

0.00 M2 A.4.1.1.24 Err:509


0.00 M2 A.4.1.1.24 Err:509
0.00 M2 A.4.1.1.24 Err:509
0.00 M2 A.4.1.1.24 Err:509
0.00 M2 A.4.1.1.24 Err:509

0.00 M2 A.4.1.1.24 Err:509

0.00 M2 A.4.1.1.25 Err:509


0.00 M2 A.4.1.1.25 Err:509
0.00 M2 A.4.1.1.25 Err:509
Jumlah Biaya Pekerjaan Bekisting
JUMLAH BIAYA PEKERJAAN STRUKTUR TENGAH

\
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -

0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Bh A.4.2.1.2 Rp -
0.00 Bh A.4.2.1.2 Rp -
0.00 Bh A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
0.00 Kg A.4.2.1.2 Rp -
JUMLAH BIAYA PEKERJAAN STRUKTUR BAJA KONVENSIONAL

0.00 M2
0.00 M2
0.00 M2
JUMLAH BIAYA PEKERJAAN STRUKTUR BAJA RINGAN

0.00 M2 A.4.2.1.2 Rp -
0.00 M2 A.4.2.1.2 Rp -
0.00 M2 A.4.2.1.2 Rp -
0.00 M2 A.4.2.1.2 Rp -

0.00 M' A.4.2.1.2 Rp -


0.00 M' A.4.2.1.2 Rp -
0.00 M' A.4.2.1.2 Rp -
0.00 M3 A.4.2.1.2 Rp -

0.00 Kg A.4.2.1.2 Rp -
0.00 M2 A.4.2.1.2 Rp -
0.00 Unit A.4.2.1.2 Rp -

0.00 M' A.4.2.1.2 Rp -


0.00 M' A.4.2.1.2 Rp -
0.00 M' A.4.2.1.2 Rp -
0.00 M' A.4.2.1.2 Rp -
JUMLAH BIAYA PEKERJAAN STRUKTUR BAJA KONVENSIONAL
TOTAL BIAYA PEKERJAAN STRUKTUR

0.00 M2 A. 4.4.1.10 Err:509


0.00 M2 A. 4.4.1.10 Err:509
0.00 M2 A. 4.4.1.10 Err:509
0.00 M2 A. 4.4.1.10 Err:509
0.00 M2 A. 4.4.1.8 Err:509
0.00 M' A. 4.4.1.10 Err:509
JUMLAH BIAYA PEKERJAAN DINDING

0.00 M2 A.4.4.2.5 Err:509


0.00 M2 A.4.4.2.5 Err:509
0.00 M2 A.4.4.2.5 Err:509
0.00 M2 A.4.4.2.5 Err:509
0.00 M2 A.4.4.2.27 Err:509

0.00 M2 A.4.4.3.54 Err:509


0.00 M2 A.4.4.3.54 Err:509
0.00 M 2
A.4.4.3.54 Err:509
0.00 M2 A.4.4.3.54 Err:509
0.00 M'
JUMLAH BIAYA PEKERJAAN PELAPIS DINDING

0.00 M2 A.4.4.3.35 Err:509


0.00 M2 A.4.4.3.35 Err:509
0.00 M2 A.4.4.3.35 Err:509
0.00 M2 A.4.4.3.35 Err:509
0.00 M2 A.4.4.3.35 Err:509
0.00 M2 A.4.4.3.35 Err:509
0.00 M2 A.4.4.3.35 Err:509
0.00 M2 A.4.4.3.35 Err:509
0.00 M2 A.4.4.3.35 Err:509
0.00 M2 A.4.4.3.35 Err:509
0.00 M2 A.4.4.3.35 Err:509
0.00 M2 A.4.4.3.35 Err:509
0.00 M2 A.4.4.3.35 Err:509
0.00 M2 A.4.4.3.35 Err:509

0.00 M2
JUMLAH BIAYA PEKERJAAN PELAPIS LANTAI

0.00 M2 A.4.7.1.10 Err:509


0.00 M2 A.4.7.1.10 Err:509
0.00 M2 A.4.7.1.10 Err:509
0.00 M2 A.4.7.1.10 Err:509
0.00 M2 A.4.7.1.10 Err:509

0.00 M2 A.4.7.1.10 Err:509


0.00 M2 A.4.7.1.10 Err:509
0.00 M2 A.4.7.1.10 Err:509
0.00 M2 A.4.7.1.10 Err:509
0.00 M2 A.4.7.1.10 Err:509
0.00 M2 A.4.7.1.10 Err:509
0.00 M2 A.4.7.1.10 Err:509
0.00 M2 A.4.7.1.10 Err:509
0.00 M2 A.4.7.1.10 Err:509

0.00 M2 A.4.7.1.19 Err:509


0.00 M 2
A.4.7.1.19 Err:509
0.00 M2 A.4.7.1.19 Err:509
0.00 M 2
A.4.7.1.19 Err:509
0.00 Bh A.4.7.1.19 Err:509
0.00 M2 A.4.7.1.19 Err:509
0.00 unit A.4.7.1.19 Err:509
0.00 unit A.4.7.1.19 Err:509
JUMLAH BIAYA PEKERJAAN PENGECATAN
0.00 M2
0.00 M2
0.00 M2
0.00 M2

0.00 M2
0.00 M2
0.00 M2

0.00 M2
0.00 M2
0.00 M2

0.00 M2
0.00 M2
0.00 M2

0.00 M2
0.00 M2
0.00 M2
0.00 M2

0.00 M2
0.00 M2

0.00 M2
0.00 M2

0.00 M2
0.00 M2

0.00 M2
0.00 M2
JUMLAH BIAYA PEKERJAAN KUSEN

0.00 Unit
0.00 Unit
0.00 Unit
0.00 Unit
0.00 Unit
0.00 Unit
0.00 Unit

0.00 Unit
0.00 Unit
0.00 Unit
0.00 Unit
0.00 Unit
0.00 Unit

0.00 Unit
0.00 Unit
0.00 Unit

0.00 Unit
0.00 Unit
0.00 M2
0.00 Unit
H BIAYA PEKERJAAN KUNCI, ENGSEL DAN AKSESORIS KUSEN

0.00 M2 Err:509 Err:509


0.00 M3 Err:509 Err:509
0.00 M4 Err:509 Err:509
0.00 M5 Err:509 Err:509
0.00 M6 Err:509 Err:509
0.00 M7 Err:509 Err:509
0.00 M8 Err:509 Err:509
0.00 M9 Err:509 Err:509
0.00 M10 Err:509 Err:509
0.00 M11 Err:509 Err:509
0.00 M12 Err:509 Err:509
0.00 M13 Err:509 Err:509
0.00 M14 Err:509 Err:509
0.00 M15 Err:509 Err:509

0.00 M2 Err:509 Err:509


0.00 M3 Err:509 Err:509
0.00 M4 Err:509 Err:509
0.00 M5 Err:509 Err:509
JUMLAH BIAYA PEKERJAAN PLAFOND DAN LANGIT LANGIT
0.00 Cm
0.00 M1
0.00 Kg
0.00 M1
0.00 M2
0.00 M1
0.00 Kg
0.00 Kg
0.00 Kg
0.00 M1
0.00 Unit
0.00 M2
JUMLAH BIAYA PEKERJAAN LAIN-LAIN
TOTAL BIAYA PEKERJAAN ARSITEKTUR

0.00 Set
0.00 Unit
0.00 Unit
0.00 Unit
0.00 Unit
0.00 Unit
0.00 Unit
0.00 Unit

0.00 Set
0.00 Unit
0.00 Unit
0.00 Unit

0.00 Set
0.00 Unit
0.00 Unit
0.00 Unit

0.00 M1
0.00 M1
0.00 M1
0.00 M1

0.00 M1
0.00 M1

0.00 Ls
JUMLAH BIAYA PEKERJAAN PANEL DISTRIBUSI

0.00 Titik
0.00 Titik
0.00 Titik
0.00 Titik

0.00 Titik
0.00 Titik
0.00 Titik
0.00 Titik
0.00 Titik
JUMLAH BIAYA PEKERJAAN INSTALASI

0.00 Ls
0.00 Titik
0.00 Ls
JUMLAH BIAYA PEKERJAAN TELEPON
TOTAL BIAYA PEKERJAAN ME

0.00 M1
0.00 M1
0.00 M1
0.00 M1
0.00 Unit
0.00 Set
0.00 Set
0.00 Set
0.00 Set
0.00 Set
0.00 Unit

0.00 M1
0.00 M1
0.00 M1
0.00 Set

0.00 M1
0.00 M1
0.00 M1
0.00 Unit

0.00 M1
0.00 Unit
TOTAL BIAYA PEKERJAAN PLUMBING

0.00 Unit
0.00 Unit
0.00 Unit
0.00 Unit
0.00 Unit
TOTAL BIAYA PEKERJAAN SISTEM PEMADAM KEBAKARAN
JUMLAH HARGA
(Rp)

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Err:509
Rp -
Rp -
Err:509
Rp -
Rp -
Err:509
Rp -
Rp -
Err:509
Rp -
Rp -
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -

Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -

Rp -
Rp -
Rp -

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509

Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

Err:509
Err:509

Rp -

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509

Err:509
Err:509
Err:509
Err:509
Err:509

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Rp -
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Rp -
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -

Rp -
Rp -

Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:509

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -

Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
RENCANA ANGGARAN BIAY
Unit Kerja : Dinas Perdagangan Dan Perindustrian

Pekerjaan : Revitalisasi Pasar Rakyat Batu Parigi

Lokasi : Kecamatan Tobadak Kab. Mamuju Tengah

Tahun Anggaran : 2017

PEKERJAAN PERSIAPAN

NO. URAIAN PEKERJAAN VOL

1 Pengukuran dan pemasangan bouwplank 147.00

2 Pemasangan Papan Nama Proyek 1.00

3 Sewa direksi keet / kantor sementara & gudang alat dan bahan 18.00

4 Pembersihan lapangan 1.00

5 Mobilisasi & Demobilisasi 1.00

TOTA
ARAN BIAYA

JUMLAH HARGA
SAT. KODE HARGA SATUAN (Rp)
(Rp)

M' A. 2.2.1.4 Err:509 Err:509

Ls - Rp 350,000.00 Rp 350,000.00

M2 A. 2.2.1.7 Err:509 Err:509

Ls - Rp 5,000,000.00 Rp 5,000,000.00

Ls Rp 5,415,000.00 Rp 5,415,000.00

TOTAL BIAYAPEKERJAAN PENDAHULUAN Err:509


RENCANA ANGGARA
Unit Kerja : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Pekerjaan : PERENCANAAN BUNDARAN TOBADAK
Lokasi : KEC. TOPOYO KAB. MAMUJU TENGAH
Tahun Anggaran : 2018

NO. URAIAN PEKERJAAN VOL

1. PEKERJAAN PLAZA TAMAN


1.1 PEKERJAAN STRUKTUR
I PEKERJAAN TANAH DAN PONDASI
1 Urugan Tanah 187.11
2 Urugan Sirtu Bawa Lantai 228.50
3 Lantai Kerja 157.34
4 Pas. Pondasi Batu Gunung 23.63
5 Pas. Pondasi Rollag 77.52
II PEKERJAAN DRAINASE
1 Pekerjaan Bekisting 170.00
2 Pekerjaan Pembesian 1509.60
3 Pekerjaan Beton 33.15

1.2 PEKERJAAN ARSITEKTUR

I PEKERJAAN PELAPIS LANTAI


1 Keramik
- Keramik 1 (Homogeneus 60x60 rock tile warna abu-abu) 122.14
- Keramik 2 (Homogeneus 60x60 rock tile warna Cream) 413.23
NO. URAIAN PEKERJAAN VOL

- Keramik Dipabel 25 x 30 61.80

2 Batu Alam
- Batu Alam Andesit 750.05
- Koral Sika Putih KS 1 139.76
- Koral Sika Warna KS 2 59.00
- Rubbert Floor 679.22

3 Paving Block
- Paving Block Tebal 8 cm 898.68
- Kanstain 15 x 37 cm 1,007.60

II PEKERJAAN HURUF
1 Huruf
- Pekerjaan Huruf Kab Mamuju Tengah 42.00
NO. URAIAN PEKERJAAN VOL

1.3 PEKERJAAN POHON DAN ASESORIS TAMAN

I PEKERJAAN POHON
1 Pohon Falm 30.00
2 Pohon Ketapang 301.00

II ASESORIS TAMAN
1 Bangku Taman 6.00
2 Pot Tanam Pohon 6.00

J
NA ANGGARAN BIAYA
UANG

SAT. SPESIFIKASI HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

M3 Err:509 Err:509
M3 Err:509 Err:509
M3 Err:509 Err:509
M3 Err:509 Err:509
M2 Err:509 Err:509

M2 Rp 187,996.60 Rp 31,959,422.00
Kg Rp 33,956.18 Rp 51,260,241.78
M3 Rp 1,133,853.81 Rp 37,587,253.79
Jumlah Biaya Pekerjaan Struktur Err:509

M2 Err:509 Err:509
M2 Err:509 Err:509
SAT. SPESIFIKASI HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

M2 Rp 139,931.00 Rp 8,647,735.80

M2 Rp 410,140.50 Rp 307,625,102.76
M2 Err:509 Err:509
M2 Err:509 Err:509
M2 Rp 800,000.00 Rp 543,379,200.00

M2 Rp 201,916.00 Rp 181,457,870.88
M1 Rp 170,572.60 Rp 171,868,951.76

M2 Rp 2,790,000.00 Rp 117,180,000.00

JUMLAH BIAYA PEKERJAAN ARSITEKTUR Err:509


SAT. SPESIFIKASI HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

Btg Rp 46,502.50 Rp 1,395,075.00


Btg Rp 46,502.50 Rp 13,997,252.50

BH Rp 10,000,000.00 Rp 60,000,000.00
BH Rp 500,000.00 Rp 3,000,000.00

JUMLAH BIAYA POHON DAN ASESORIS TAMAN Rp 78,392,327.50


JUMLAH BIAYA PEKERJAAN PLAZA TAMAN Err:509
REAL COST Err:509
PPN 10 % Err:509
TOTAL Err:509
Dibulatkan Err:509

Makassar, Agustus 2018

CV. SENTRADESAIN KONSULTAN

ZAPARMAN, ST
Direktur
DAFTAR KUANTITAS DAN HARGA

Unit Kerja : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


Pekerjaan : PEMBANGUNAN BUNDARAN BENTENG
Lokasi : KEC. TOPOYO KAB. MAMUJU TENGAH
Tahun Anggaran : 2018

NO. URAIAN PEKERJAAN VOL SAT. HARGA SATUAN (Rp)

PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank 131.88 M' Err:509
2 Pemasangan Papan Nama Proyek 1.00 Ls Rp 250,000.00
Sewa direksi keet / kantor sementara & gudang
3 36.00 M2 Err:509
alat dan bahan
4 Pembersihan lapangan 1.00 Ls Rp 4,000,000.00
5 Mobilisasi & Demobilisasi 1.00 Ls Rp 5,000,000.00
JUMLAH BIAYA PEKERJAAN PERSIAPAN
1. PEKERJAAN PLAZA TUGU DAN AIR MANCUR
II. PEKERJAAN STRUKTUR
I PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi 52.30 M3 Rp -
2 Urugan Tanah Kembali 15.69 M3 Rp -
3 Urugan Tanah Bawah Lantai Rabat 874.24 M3 Err:509
4 Urugan Sirtu Bawa Lantai Beton 663.36 Err:509
5 Urugan Pasir Bawah Lantai Rabat 306.41 M3 Err:509
6 Pas. Pondasi Batu Gunung 140.82 M3 Err:509

II PEKERJAAN BETON
1 Pekerjaan Lantai Beton 63.23 M3 Err:509
2 Beton Bertulang K -275 172.42 M3 Err:509
3 Pembesian 14,972.74 Kg Err:509
4 Bekisting 2 kali pakai 537.49 M 2
Err:509
JUMLAH BIAYA PEKERJAAN STRUKTUR
III. PEKERJAAN ARSITEKTUR
I PEKERJAAN PELAPIS LANTAI
1 Keramik
Keramik 1 (Homogeneus 60x60 rock tile warna
- 679.71 M2 Err:509
abu-abu)
Keramik 2 (Homogeneus 60x60 rock tile warna
- 101.66 M2 Err:509
Cream)

2 Batu Alam
- Batu Kali Belah 175.15 M2 Err:509
- Batu Palimanan 99.98 M2 Err:509
- Pekerjaan Rubber Floor - M 2
Rp 800,000.00
NO. URAIAN PEKERJAAN VOL SAT. HARGA SATUAN (Rp)

3 Water Prooping
- Water Prooping Lantai 40.34 M2 Rp 145,000.00

II PEKERJAAN ALMINIUM COMPOSIT PANEL


- Rangka Utama ACP 32.15 M2 Rp -
- Alminium Composit Panel (ACP) 32.15 M2 Err:509

II PEKERJAAN HURUF
- Pekerjaan Huruf Alminium Composit Panel 19.99 M2 Rp 2,700,000.00

JUMLAH BIAYA PEKERJAAN ARSITEKTUR


NO. URAIAN PEKERJAAN VOL SAT. HARGA SATUAN (Rp)

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


I PEKERJAAN INSTALASI
A Instalasi Penarikan Kabel Lampu dan Stop Kontak
1 Pengadaan + Penarikan Instalasi Penerangan 55.00 Titik Err:509
2 Pengadaan + Penarikan Instalasi Stok Kontak - Titik
3 Pengadaan + Penarikan Instalasi Saklar 55.00 Titik Err:509
B
1 Pengadaan + Pasang Armature Lampu 55.00 Titik Err:509
2 Pengadaan + Pasang Stop Kontak 1 gang - Titik
3 Pengadaan + Pasang Saklar Tunggal 55.00 Titik Err:509

JUMLAH BIAYA PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


V. PEKERJAAN PLAMBING
1 Pengadaan + Pemasangan Pipa Air Bersih 3/4 " 88.00 M1 Rp 27,000.00
2 Pengadaan + Pemasangan Pipa Air Bekas 4 " 104.00 M1 Rp 135,000.00

JUMLAH BIAYA PEKERJAAN PLAMBING


VI. PEKERJAAN AIR MANCUR
1 Air Mancur Tuguh 1.00 LS Rp 1,180,000,000.00

JUMLAH BIAYA PEKERJAAN AIR MANCUR


VII. PEKERJAAN KUNINGAN DAN TEMBAGA
1 Pekerjaan Plat Temba Tugu 1.00 LS Rp 3,855,000,000.00

JUMLAH BIAYA PEKERJAAN KUNINGAN DAN TEMBAGA

REAL COST
PPN 10 %
TOTAL
DIBULATKAN
NTITAS DAN HARGA

ATAAN RUANG
NG
AH

JUMLAH HARGA (Rp)

Err:509
Rp 250,000.00

Err:509

Rp 4,000,000.00
Rp 5,000,000.00
Err:509

Rp -
Rp -
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509

Err:509

Err:509
Err:509
Rp -
JUMLAH HARGA (Rp)

Rp 5,849,300.00

Rp -
Err:509

Rp 53,973,000.00

Err:509
JUMLAH HARGA (Rp)

Err:509
Rp -
Err:509

Err:509
Rp -
Err:509

Err:509

Rp 2,376,000.00
Rp 14,040,000.00

Rp 16,416,000.00

Rp 1,180,000,000.00

Rp 1,180,000,000.00

Rp 3,855,000,000.00

Rp 3,855,000,000.00

Err:509
Err:509
Err:509
Err:509
ESTIMATE ENGIN
Unit Kerja : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Pekerjaan : PERENCANAAN BUNDARAN TOBADAK
Lokasi : KEC. TOPOYO KAB. MAMUJU TENGAH
Tahun Anggaran : 2018

NO. URAIAN PEKERJAAN VOL

PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank 131.88
2 Pemasangan Papan Nama Proyek 1.00
3 Sewa direksi keet / kantor sementara & gudang alat dan bahan 36.00
4 Pembersihan lapangan 1.00
5 Mobilisasi & Demobilisasi 1.00

1. PEKERJAAN PLAZA TUGU DAN AIR MANCUR


1.1 PEKERJAAN STRUKTUR
I PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi 52.30
2 Urugan Tanah Kebali 15.69
3 Urugan Tanah Bawah Lantai Rabat 874.24
4 Urugan Sirtu Bawa Lantai Beton 663.36
5 Urugan Pasir Bawah Lantai Rabat 306.41
6 Pas. Pondasi Batu Gunung 140.82

II PEKERJAAN BETON

1 Pekerjaan Lantai Beton 63.23


2 Beton Bertulang K -275 172.42
NO. URAIAN PEKERJAAN VOL

3 Pembesian 14,972.74
4 Bekisting 2 kali pakai 537.49

1.2 PEKERJAAN ARSITEKTUR

I PEKERJAAN PELAPIS LANTAI


1 Keramik
- Keramik 1 (Homogeneus 60x60 rock tile warna abu-abu) 679.71
- Keramik 2 (Homogeneus 60x60 rock tile warna Cream) 101.66

2 Batu Alam
- Batu Kali Belah 175.15
- Batu Palimanan 99.98
- Pekerjaan Rubber Floor -

3 Water Prooping
- Water Prooping Lantai 40.34

II PEKERJAAN ALMINIUM COMPOSIT PANEL


- Rangka Utama ACP 32.15
- Alminium Composit Panel (ACP) 32.15

II PEKERJAAN HURUF
- Pekerjaan Huruf Alminium Composit Panel 19.99
NO. URAIAN PEKERJAAN VOL

1.3 PEKERJAAN ME

I PEKERJAAN INSTALASI
A Instalasi Penarikan Kabel Lampu dan Stop Kontak
1 Pengadaan + Penarikan Instalasi Penerangan 55.00
2 Pengadaan + Penarikan Instalasi Stok Kontak -
3 Pengadaan + Penarikan Instalasi Saklar 55.00
B
1 Pengadaan + Pasang Armature Lampu 55.00
2 Pengadaan + Pasang Stop Kontak 1 gang -
3 Pengadaan + Pasang Saklar Tunggal 55.00

1.4 PEKERJAAN PLAMBING

1 Pengadaan + Pemasangan Pipa Air Bersih 3/4 " 88.00


2 Pengadaan + Pemasangan Pipa Air Bekas 4 " 104.00

1.5 PEKERJAAN AIR MANCUR

1 Air Mancur Tuguh 1.00


NO. URAIAN PEKERJAAN VOL

1.6 PEKERJAAN PLAT TEMBAGA TUGU

1 Pekerjaan Plat Temba Tugu 1.00

JUML
NO. URAIAN PEKERJAAN VOL

Diperiksa / Disetujui Oleh :


Pejabat Pelaksana Teknis Kegiatan
PPTK

TAKDIR MUSA, ST
Nip : 19761021 200502 1 003
MATE ENGINEER
G

SAT. SPESIFIKASI HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

M' Err:509 Err:509


Ls Rp 300,000.00 Rp 300,000.00
M2 Err:509 Err:509
Ls - Rp 5,000,000.00 Rp 5,000,000.00
Ls - Rp 6,000,000.00 Rp 6,000,000.00

TOTAL BIAYAPEKERJAAN PENDAHULUAN Err:509

M3 Rp - Rp -
M3 Rp - Rp -
M3 Err:509 Err:509
Err:509 Err:509
M3 Err:509 Err:509
M3 Err:509 Err:509

M3 Err:509 Err:509
M3 Rp 1,461,098.00 Rp 251,929,457.38
SAT. SPESIFIKASI HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

Kg Rp 17,453.55 Rp 261,327,457.36
M2 Rp 233,346.50 Rp 125,422,530.35
Jumlah Biaya Pekerjaan Pondasi Poer Err:509

M2 Err:509 Err:509
M2 Err:509 Err:509

M2 Err:509 Err:509
M2 Err:509 Err:509
M2 Rp 800,000.00 Rp -

M2 Rp 150,000.00 Rp 6,050,937.00

M2 Rp - Rp -
M2 Err:509 Err:509

M2 Rp 2,790,000.00 Rp 55,762,335.00

JUMLAH BIAYA PEKERJAAN ARSITEKTUR Err:509


SAT. SPESIFIKASI HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

Titik Err:509 Err:509


Titik Err:509 Err:509
Titik Err:509 Err:509

Titik Err:509 Err:509


Titik Err:509 Err:509
Titik Err:509 Err:509

JUMLAH BIAYA PEKERJAAN INSTALASI LISTRIK Err:509

M1 Rp 27,412.00 Rp 2,412,256.00
M1 Rp 135,080.00 Rp 14,048,320.00

JUMLAH BIAYA PEKERJAAN INSTALASI LISTRIK Rp 16,460,576.00

LS Rp 1,215,000,000.00 Rp 1,215,000,000.00

JUMLAH BIAYA PEKERJAAN AIR MANCUR Rp 1,215,000,000.00


SAT. SPESIFIKASI HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

LS Rp 3,858,750,000.00 Rp 3,858,750,000.00

JUMLAH BIAYA PEKERJAAN KUNINGAN DAN TEMBAGA Rp 3,858,750,000.00


SAT. SPESIFIKASI HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

REAL COST Err:509


PPN 10 % Err:509
TOTAL Err:509
DIBULATKAN Err:509

Makassar, Agustus 2018

Dibuat Oleh
Konsultan Perencana
CV. SENTRADESAIN KONSULTAN

ZAPARMAN, ST
Direktur
DAFTAR KUANTITAS DAN HARGA

Unit Kerja : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


Pekerjaan : LANJUTAN PEMBANGUNAN BUNDARAN BENTENG
Lokasi : KEC. TOPOYO KAB. MAMUJU TENGAH
Tahun Anggaran : 2019

NO. URAIAN PEKERJAAN VOL SAT. HARGA SATUAN (Rp)

I. PEKERJAAN PERSIAPAN
1 Pemasangan Papan Nama Proyek 1.00 Ls Rp 250,000.00
2 Pemasangan Listrik PLN+SLO daya 23000 VA 1.00 Ls Rp 34,500,000.00
3 Penangkal Petir
a. Kabel BC 35 mm2 50.00 mtr Rp 75,000.00
b. Copper Rod 4 m 1.00 bh Rp 1,500,000.00
c. Jarum penagkal petir 1.00 bh Rp 350,000.00

JUMLAH BIAYA PEKERJAAN PERSIAPAN


II. PEKERJAAN AIR MANCUR
A. WATER FEATURE SYSTEM
1 Water Foountain 1 (Running 40 nozzle)
a. Direct Nozzle, RN12/SS bahan stainless asli, 40.00 Unit Rp 1,740,000.00
bukan kuningan berlapiskan chrome, pancuran
lurus dan stabil, merk ber Hologram
b. Double Tooth, RN12/SS, bahan stainless asli 40.00 Unit Rp 216,000.00
c. Ball Valve, RN12 40.00 Unit Rp 472,500.00
d. Selenoid, RN 12 40.00 Unit Rp 1,255,500.00
e. Underwater led light, DMX Controller 24V/12 W 40.00 Unit Rp 6,237,000.00
Stainless Stell IP68, daya 480 kw
f. Fountain pump system submersible, 1,1 KW 2.00 Unit Rp 23,540,625.00
220V±5% 50Hz, type Stainless Steel
submersible pump, daya 2200 kw
g. Fountain Frame Ø3" and accessories, SS 40.00 m Rp 1,852,200.00
Sub Total Water Fountaian 1 (Running 40 Nozzle)

2 Water Fountaian 2 (15 ICE Tower)


a. ICE Tower Nozzle, RN20/SS bahan stainless 5.00 Unit Rp 5,600,000.00
asli, bukan kuningan berlapiskan chrome,
pancuran lurus dan stabil, merk ber Hologram
b. ICE Tower Nozzle, RN12/SS bahan stainless 10.00 Unit Rp 3,000,000.00
asli, bukan kuningan berlapiskan chrome,
pancuran lurus dan stabil, merk ber hologram
c. Double Tooth, RN20/SS, bahan stainless steel 5.00 Unit Rp 303,750.00
d. Double Tooth, RN12/SS, bahan stainless steel 10.00 Unit Rp 216,000.00
e. Ball Valve, RN20 5.00 Unit Rp 837,000.00
f. Ball Valve, RN12 10.00 Unit Rp 472,500.00
g. Underwater Led Light, DMX controller 24V/12W 15.00 Unit Rp 6,237,000.00
Stainless steel IP68, daya 180 KW
NO. URAIAN PEKERJAAN VOL SAT. HARGA SATUAN (Rp)

h. Fountaian pump system submersible 0,75KW 5.00 Unit Rp 13,905,000.00


220V±5% 50HZ, Type Stainless Steel submersible
pump, daya 3750 KW

i. Fountain Frame Ø1" and accessories, SS 15.00 Unit Rp 610,000.00


Sub Total Water Fountaian 2 (15 Ice Tower)

B. Contoller
1 Elektrical Control, Fountaian equipment control 1.00 Unit Rp 285,000,000.00
cabinet, 220/380V ±50Hz, specially designed
and made, daya 100 KW

Sub Total Controller


C. Electrical Works
1 Water Fountaian 1 (14+1 nozzle)
a. Water-proof special pump cable 3x2.5 mm 50.00 M Rp -
b. Water-proof special DMX Lighr wire 4*0.75 mm 1,000.00 M Rp -
c. Water-proof special selenoid wire 2x2.5 mm 1,000.00 M Rp -

2 Water Fountaian 2 (4 Nozzle Rotating)


a. Water-proof special pump cable 3x1.5 mm 125.00 M Rp -
b. Water-proof special DMX Lighr wire 4*0.75 mm 125.00 M Rp -
c. Ground Rood Pipe 1.00 M Rp 541,890.00
d. Grounding Cable 10.00 M Rp 68,580.00
e. Accessories, Water-proof, (kleim, selotip dll) 1.00 ls Rp 9,000,000.00
Sub Total Electrical Works
D. Filter System
a. Sand Filter 1.00 Unit Rp 39,366,000.00
b. Accessories 1.00 ls Rp 12,000,000.00
Sub Total Filter System

JUMLAH BIAYA PEKERJAAN AIR MANCUR


NO. URAIAN PEKERJAAN VOL SAT. HARGA SATUAN (Rp)

III. PEKERJAAN KUNINGAN DAN TEMBAGA


1 Kuningan laser cutting 63.23 m2 Rp -
= 2.81 m * 4.5 m * 5 bh 63.23

2 Kolom kuningan diameter 105 35.95 m2 Rp -


= dia 1.05 m x 0.5 m x 5 bh 8.24
= dia 1.05 m x 1.5 m x 5 bh 24.73
= dia (1.05+0.85)*0.5*0.1*2 * 5 bh 2.98

3 Kolom kuningan dimater 85 33.36 m2 Rp -


= dia 0.85 m x 2.50 m x 5 bh 33.36

4 Pelat dak, tembaga 32.25 m2 Rp -


= 4,3 * 5 * (0,5+0,2+0,2+0,3+0.3) 32.25

5 Kolom bambu kuningan 208.77 m2 Rp -


= dia 1.00 m X 15.12 m 47.48
= dia 0.85 m x 12.00 m x 5 bh 160.14
= 0.25 x 1x 1 0.25
= 0.25 * 0.85*0.85 * 5 bh 0.90

6 Penampang C, tembaga 141.70 m2 Rp -


= C-12.57 m x 0.7 x 5 bh 44.00
= C-11.09 m x 0.7 x 5 bh 38.82
= C-(12.57+11.09)*0.5 *0.47* 2 * 5 bh 55.60
= C-0.7*0.47* 2 * 5 bh 3.29

7 Pipa C-3" , coating warna kuningan 60.00 m' Rp 682,000.00


= 12 x 5 bh 60.00

8 Cincin kuningan diameter 8.81 26.72 m2 Rp -


= dia 8.81 * 0.2 5.53
= dia 8.21 * 0.2 5.16
= dia (8.81+8.21)*0.5 * 0.3 * 2 16.03

9 Cincin kuningan diameter 6.21 20.44 m2 Rp -


= dia 6.21 * 0.2 3.90
= dia 5.61 * 0.2 3.52
= dia (6.21+5.61)*0.5 * 0.3 * 2 13.02

10 Cincin kuningan diameter 4.67 13.72 m2 Rp -


= dia 4.67 * 0.2 2.93
= dia 4.07 * 0.2 2.56
= dia (4.67+4.07)*0.5 * 0.3 * 2 8.23

11 Cincin kuningan diameter 3.82 11.99 m2 Rp -


= dia 3.82 * 0.2 2.40
= dia 3.22 * 0.2 2.02
NO. URAIAN PEKERJAAN VOL SAT. HARGA SATUAN (Rp)

= dia (3.82+3.22)*0.5 * 0.3 * 2 7.57

12 Cincin kuningan diameter 3.55 10.21 m2 Rp -


= dia 3.55 * 0.2 2.23
= dia 2.95 * 0.2 1.85
= dia (3.55+2.95)*0.5 * 0.3 * 2 6.12

JUMLAH BIAYA PEKERJAAN TUGU

REAL COST
PPN 10 %
TOTAL
DIBULATKAN
NTITAS DAN HARGA

ATAAN RUANG
RAN BENTENG
AH

JUMLAH HARGA (Rp)

Rp 250,000.00
Rp 34,500,000.00

Rp 3,750,000.00
Rp 1,500,000.00
Rp 350,000.00

Rp 40,350,000.00

Rp 69,600,000.00

Rp 8,640,000.00
Rp 18,900,000.00
Rp 50,220,000.00
Rp 249,480,000.00

Rp 47,081,250.00

Rp 74,088,000.00
Rp 518,009,250.00

Rp 28,000,000.00

Rp 30,000,000.00

Rp 1,518,750.00
Rp 2,160,000.00
Rp 4,185,000.00
Rp 4,725,000.00
Rp 93,555,000.00
JUMLAH HARGA (Rp)

Rp 69,525,000.00

Rp 9,150,000.00
Rp 242,818,750.00

Rp 285,000,000.00

Rp 285,000,000.00

Rp -
Rp -
Rp -

Rp -
Rp -
Rp 541,890.00
Rp 685,800.00
Rp 9,000,000.00
Rp 10,227,690.00

Rp 39,366,000.00
Rp 12,000,000.00
Rp 51,366,000.00

Rp 1,107,421,690.00
JUMLAH HARGA (Rp)

Rp -

Rp -

Rp -

Rp -

Rp -

Rp -

Rp 40,920,000.00

Rp -

Rp -

Rp -

Rp -
JUMLAH HARGA (Rp)

Rp -

Rp 40,920,000.00

Rp 1,188,691,690.00
Rp 118,869,169.00
Rp 1,307,560,859.00
Rp 1,307,500,000.00
DAFTAR KUANTITAS DAN HARGA

Unit Kerja : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


Pekerjaan : LANJUTAN PEMBANGUNAN BUNDARAN BENTENG
Lokasi : KEC. TOBADAK KAB. MAMUJU TENGAH
Sumber Dana : APBD
Tahun Anggaran : 2019

NO. URAIAN PEKERJAAN VOL SAT.

I. PEKERJAAN PERSIAPAN
1 Pemasangan Papan Nama Proyek 1.00 Ls
2 Pemasangan Listrik PLN+SLO daya 23000 VA 1.00 Ls
3 Penangkal Petir
a. Kabel BC 35 mm2 50.00 mtr
b. Copper Rod 4 m 1.00 bh
c. Jarum penagkal petir 1.00 bh

JUMLAH BIAYA PEKERJAAN P


II. PEKERJAAN AIR MANCUR
A. WATER FEATURE SYSTEM
1 Water Foountain 1 (Running 40 nozzle)
a. Direct Nozzle, DN25/SS bahan stainless asli, bukan 40.00 Unit
kuningan berlapiskan chrome, pancuran lurus dan
stabil, merk ber Hologram

b. Double Tooth, DN25/SS, bahan stainless asli 40.00 Unit


c. Ball Valve, DN25 40.00 Unit
d. Selenoid, DN25 40.00 Unit
e. Underwater led light, DMX Controller 24V/12 W 40.00 Unit
Stainless Stell IP68, daya 480 kw

f. Fountain pump system submersible, 1,1 KW 2.00 Unit


220V±5% 50Hz, type Stainless Steel submersible
pump, daya 2200 kw

g. Fountain Frame Ø3" and accessories, SS 40.00 m


Sub Total Water Fountaian 1 (Running

2 Water Fountaian 2 (15 ICE Tower)


a. 5.00 Unit
ICE Tower Nozzle, DN40/SS bahan stainless asli,
bukan kuningan berlapiskan chrome, pancuran
lurus dan stabil, merk ber Hologram
b. ICE Tower Nozzle, DN25/SS bahan stainless asli, 10.00 Unit
bukan kuningan berlapiskan chrome, pancuran
lurus dan stabil, merk ber hologram

c. Double Tooth, DN40/SS, bahan stainless steel 5.00 Unit


d. Double Tooth, DN25/SS, bahan stainless steel 10.00 Unit
e. Ball Valve, DN40 5.00 Unit
f. Ball Valve, DN25 10.00 Unit
NO. URAIAN PEKERJAAN VOL SAT.

g. Underwater Led Light, DMX controller 24V/12W 15.00 Unit


Stainless steel IP68, daya 180 KW

h. Fountaian pump system submersible 0,75KW 5.00 Unit


220V±5% 50HZ, Type Stainless Steel submersible
pump, daya 3750 KW

i. Fountain Frame Ø1" and accessories, SS 15.00 Unit


Sub Total Water Fountaian 2 (15

B. Contoller
1 Elektrical Control, Fountaian equipment control 1.00 Unit
cabinet, 220/380V ±50Hz, specially designed and
made, daya 100 KW

Sub Total
C. Electrical Works
1 Water Fountaian 1 (14+1 nozzle)
a. Water-proof special pump cable 3x2.5 mm 50.00 M
b. Water-proof special DMX Lighr wire 4*0.75 mm 1,000.00 M
c. Water-proof special selenoid wire 2x2.5 mm 1,000.00 M

2 Water Fountaian 2 (4 Nozzle Rotating)


a. Water-proof special pump cable 3x1.5 mm 125.00 M
b. Water-proof special DMX Lighr wire 4*0.75 mm 125.00 M
c. Ground Rood Pipe 1.00 bh
d. Grounding Cable 10.00 M
e. Accessories, Water-proof, (kleim, selotip dll) 1.00 ls
Sub Total Electr
D. Filter System
a. Sand Filter 1.00 Unit
b. Accessories 1.00 ls
Sub Total Filt
NO. URAIAN PEKERJAAN VOL SAT.

JUMLAH BIAYA PEKERJAAN AIR


III. PEKERJAAN KUNINGAN DAN TEMBAGA
1 Kuningan laser cutting 63.23 m2
2 Kolom kuningan diameter 105 35.95 m2
3 Kolom kuningan dimater 85 33.36 m2
4 Pelat dak, tembaga 32.25 m2
5 Kolom bambu kuningan 208.77 m2
6 Penampang C, tembaga 141.70 m2
7 Pipa C-3" , coating warna kuningan 60.00 m'
8 Cincin kuningan diameter 8.81 26.72 m2
9 Cincin kuningan diameter 6.21 20.44 m2
10 Cincin kuningan diameter 4.67 13.72 m2
11 Cincin kuningan diameter 3.82 11.99 m2
12 Cincin kuningan diameter 3.55 10.21 m2

JUMLAH BIAYA PEKERJ


DAFTAR KUANTITAS DAN HARGA

DAN PENATAAN RUANG


BUNDARAN BENTENG
UJU TENGAH

HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

Rp - Rp -
Rp - Rp -

Rp - Rp -
Rp - Rp -
Rp - Rp -

JUMLAH BIAYA PEKERJAAN PERSIAPAN Rp -

Rp - Rp -

Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -

Rp - Rp -

Rp - Rp -
Sub Total Water Fountaian 1 (Running 40 Nozzle) Rp -

Rp - Rp -

Rp - Rp -

Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

Rp - Rp -

Rp - Rp -

Rp - Rp -
Sub Total Water Fountaian 2 (15 Ice Tower) Rp -

Rp - Rp -

Sub Total Controller Rp -

Rp - Rp -
Rp - Rp -
Rp - Rp -

Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Sub Total Electrical Works Rp -

Rp - Rp -
Rp - Rp -
Sub Total Filter System Rp -
HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

JUMLAH BIAYA PEKERJAAN AIR MANCUR Rp -

Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -

JUMLAH BIAYA PEKERJAAN TUGU Rp -

REAL COST Rp -
PPN 10 % Rp -
TOTAL Rp -
DIBULATKAN Rp -
DAFTAR KUANTITAS DAN HARGA

Unit Kerja : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


Pekerjaan : PEMBANGUNAN BUNDARAN BENTENG
Lokasi : KEC. TOPOYO KAB. MAMUJU TENGAH
Tahun Anggaran : 2018

NO. URAIAN PEKERJAAN VOL SAT. HARGA SATUAN (Rp)

PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank 131.88 M' Err:509
2 Pemasangan Papan Nama Proyek 1.00 Ls Rp 250,000.00
Sewa direksi keet / kantor sementara & gudang
3 36.00 M2 Err:509
alat dan bahan
4 Pembersihan lapangan (MEKANIS) 1.00 Ls Rp 30,000,000.00
5 Mobilisasi & Demobilisasi 1.00 Ls Rp 5,000,000.00
JUMLAH BIAYA PEKERJAAN PERSIAPAN
1. PEKERJAAN PLAZA TUGU DAN AIR MANCUR
II. PEKERJAAN STRUKTUR
I PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi 50.10 M3 Rp -
2 Urugan Tanah Kembali 16.70 M3 Rp -
3 Urugan Tanah Bawah Lantai Rabat 1003.43 M3 Err:509
4 Urugan Sirtu Bawa Lantai Beton 618.46 Err:509
5 Urugan Pasir Bawah Lantai Rabat 333.23 M3 Err:509
6 Pas. Pondasi Batu Gunung 135.86 M3 Err:509

II PEKERJAAN BETON
1 Pekerjaan Lantai Beton 87.21 M3 Err:509
2 Beton Bertulang K -275 197.76 M3 Err:509
3 Pembesian 16,201.95 Kg Err:509
4 Bekisting 2 kali pakai 806.28 M 2
Err:509
JUMLAH BIAYA PEKERJAAN STRUKTUR
III. PEKERJAAN ARSITEKTUR
I PEKERJAAN PELAPIS LANTAI
1 Keramik
Keramik 1 (Homogeneus 60x60 rock tile warna
- 694.98 M2 Err:509
abu-abu)

2 Batu Alam
- Batu Kali Belah 258.66 M2 Err:509
- Batu Palimanan 106.96 M2 Err:509
- Pekerjaan Rubber Floor - M2 Rp 800,000.00

3 Water Prooping
- Water Prooping Lantai 324.68 M2 Rp 145,000.00
NO. URAIAN PEKERJAAN VOL SAT. HARGA SATUAN (Rp)

II PEKERJAAN ALMINIUM COMPOSIT PANEL


- Rangka Utama ACP 149.97 M2 Rp -
- Alminium Composit Panel (ACP) 149.97 M 2
Err:509

II PEKERJAAN HURUF
- Pekerjaan Huruf Alminium Composit Panel 36.06 M2 Rp 2,700,000.00

JUMLAH BIAYA PEKERJAAN ARSITEKTUR


NO. URAIAN PEKERJAAN VOL SAT. HARGA SATUAN (Rp)

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


I PEKERJAAN INSTALASI
A Instalasi Penarikan Kabel Lampu dan Stop Kontak
1 Pengadaan + Penarikan Instalasi Penerangan 15.00 Titik Err:509
2 Pengadaan + Penarikan Instalasi Stok Kontak - Titik
3 Pengadaan + Penarikan Instalasi Saklar 15.00 Titik Err:509
B
1 Pengadaan + Pasang Armature Lampu 15.00 Titik Err:509
2 Pengadaan + Pasang Stop Kontak 1 gang - Titik
3 Pengadaan + Pasang Saklar Tunggal 15.00 Titik Err:509

JUMLAH BIAYA PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


V. PEKERJAAN PLAMBING
1 Pengadaan + Pemasangan Pipa Air Bersih 3/4 " 60.00 M1 Rp 27,000.00
2 Pengadaan + Pemasangan Pipa Air Bekas 4 " 61.00 M1 Rp 135,000.00

JUMLAH BIAYA PEKERJAAN PLAMBING

REAL COST
PPN 10 %
TOTAL
DIBULATKAN
NTITAS DAN HARGA

ATAAN RUANG
NG
AH

JUMLAH HARGA (Rp)

Err:509
Rp 250,000.00

Err:509

Rp 30,000,000.00
Rp 5,000,000.00
Err:509

Rp -
Rp -
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509

Err:509
Err:509
Rp -

Rp 47,078,600.00
JUMLAH HARGA (Rp)

Rp -
Err:509

Rp 97,362,000.00

Err:509
JUMLAH HARGA (Rp)

Err:509
Rp -
Err:509

Err:509
Rp -
Err:509

Err:509

Rp 1,620,000.00
Rp 8,235,000.00

Rp 9,855,000.00

Err:509
Err:509
Err:509
Err:509
DAFTAR KUANTITAS DAN HARGA

Unit Kerja : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


Pekerjaan : PEMBANGUNAN BUNDARAN BENTENG
Lokasi : KEC. TOPOYO KAB. MAMUJU TENGAH
Tahun Anggaran : 2018

NO. URAIAN PEKERJAAN VOL SAT. HARGA SATUAN (Rp)

PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank 131.88 M' Err:509
2 Pemasangan Papan Nama Proyek 1.00 Ls Rp 250,000.00
Sewa direksi keet / kantor sementara & gudang
3 36.00 M2 Err:509
alat dan bahan
4 Pembersihan lapangan (MEKANIS) 1.00 Ls Rp 30,000,000.00
5 Mobilisasi & Demobilisasi 1.00 Ls Rp 5,000,000.00
JUMLAH BIAYA PEKERJAAN PERSIAPAN
1. PEKERJAAN PLAZA TUGU DAN AIR MANCUR
II. PEKERJAAN STRUKTUR
I PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi 50.10 M3 Rp -
2 Urugan Tanah Kembali 16.70 M3 Rp -
3 Urugan Tanah Bawah Lantai Rabat 1003.43 M3 Err:509
4 Urugan Sirtu Bawa Lantai Beton 618.46 Err:509
5 Urugan Pasir Bawah Lantai Rabat 333.23 M3 Err:509
6 Pas. Pondasi Batu Gunung 135.86 M3 Err:509

II PEKERJAAN BETON
1 Pekerjaan Lantai Beton 87.21 M3 Err:509
2 Beton Bertulang K -275 197.76 M3 Err:509
3 Pembesian 16,201.95 Kg Err:509
4 Bekisting 2 kali pakai 806.28 M 2
Err:509
JUMLAH BIAYA PEKERJAAN STRUKTUR
III. PEKERJAAN ARSITEKTUR
I PEKERJAAN PELAPIS LANTAI
1 Keramik
Keramik 1 (Homogeneus 60x60 rock tile warna
- 694.98 M2 Err:509
abu-abu)
Keramik 2 (Homogeneus 60x60 rock tile warna
- - M2 Err:509
Cream)

2 Batu Alam
- Batu Kali Belah 258.66 M2 Err:509
- Batu Palimanan 106.96 M2 Err:509
- Pekerjaan Rubber Floor - M 2
Rp 800,000.00
NO. URAIAN PEKERJAAN VOL SAT. HARGA SATUAN (Rp)

3 Water Prooping
- Water Prooping Lantai 324.68 M2 Rp 145,000.00

II PEKERJAAN ALMINIUM COMPOSIT PANEL


- Rangka Utama ACP 149.97 M2 Rp -
- Alminium Composit Panel (ACP) 149.97 M2 Err:509

II PEKERJAAN HURUF
- Pekerjaan Huruf Alminium Composit Panel 36.06 M2 Rp 2,700,000.00

JUMLAH BIAYA PEKERJAAN ARSITEKTUR


NO. URAIAN PEKERJAAN VOL SAT. HARGA SATUAN (Rp)

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


I PEKERJAAN INSTALASI
A Instalasi Penarikan Kabel Lampu dan Stop Kontak
1 Pengadaan + Penarikan Instalasi Penerangan 15.00 Titik Err:509
2 Pengadaan + Penarikan Instalasi Stok Kontak - Titik
3 Pengadaan + Penarikan Instalasi Saklar 15.00 Titik Err:509
B
1 Pengadaan + Pasang Armature Lampu 15.00 Titik Err:509
2 Pengadaan + Pasang Stop Kontak 1 gang - Titik
3 Pengadaan + Pasang Saklar Tunggal 15.00 Titik Err:509

JUMLAH BIAYA PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


V. PEKERJAAN PLAMBING
1 Pengadaan + Pemasangan Pipa Air Bersih 3/4 " 60.00 M1 Rp 27,000.00
2 Pengadaan + Pemasangan Pipa Air Bekas 4 " 61.00 M1 Rp 135,000.00

JUMLAH BIAYA PEKERJAAN PLAMBING


VI. PEKERJAAN AIR MANCUR
1 Air Mancur Tuguh 1.00 LS Rp 1,180,000,000.00

JUMLAH BIAYA PEKERJAAN AIR MANCUR


VII. PEKERJAAN KUNINGAN DAN TEMBAGA
1 Pekerjaan Plat Temba Tugu 1.00 LS Rp 3,855,000,000.00

JUMLAH BIAYA PEKERJAAN KUNINGAN DAN TEMBAGA

REAL COST
PPN 10 %
TOTAL
DIBULATKAN
NTITAS DAN HARGA

ATAAN RUANG
NG
AH

JUMLAH HARGA (Rp)

Err:509
Rp 250,000.00

Err:509

Rp 30,000,000.00
Rp 5,000,000.00
Err:509

Rp -
Rp -
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509

Err:509

Err:509
Err:509
Rp -
JUMLAH HARGA (Rp)

Rp 47,078,600.00

Rp -
Err:509

Rp 97,362,000.00

Err:509
JUMLAH HARGA (Rp)

Err:509
Rp -
Err:509

Err:509
Rp -
Err:509

Err:509

Rp 1,620,000.00
Rp 8,235,000.00

Rp 9,855,000.00

Rp 1,180,000,000.00

Rp 1,180,000,000.00

Rp 3,855,000,000.00

Rp 3,855,000,000.00

Err:509
Err:509
Err:509
Err:509
RINCIAN PENGGUNAAN UANG MUKA
PEMBANGUNAN BUNDARAN BENTENG

Harga Satuan
No. Uraian Satuan Volume
(Rupiah)

1 Besi Beton kg 12,000.00 13,000.00

2 Semen kg 66,000.00 1,600.00

3 Plat Tembaga

JUMLAH
PPn 10%
TOTAL

Mamuju, 27 September 2018

Dibuat Oleh :
PT. Inter Persada Electro Nusantara

Ir. H. Abdullah Dalie


Direktur
Jumlah Harga
(Rupiah)

156,000,000.00

105,600,000.00

1,116,096,181.82

1,377,696,181.82
137,769,618.18
1,515,465,800.00

Mamuju, 27 September 2018

PT. Inter Persada Electro Nusantara

Ir. H. Abdullah Dalie


DAFTAR ANALISA HARGA SATUAN PEKERJAAN
BERSADARKAN PERATURAN MENTERI PEKERJAAN UMUM
NO. 28/PRT/M/2016

NO. KODE JENIS PEKERJAAN HARGA

A A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN

1 A. 2.2.1.4 Pengukuran dan pemasangan 1 m’ Bouwplank Err:509


2 A. 2.2.1.7 Pembuatan 1 M2 gudang semen dan peralatan Err:509

B A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

1 A.2.3.1.11 Pengurugan 1 M3 dengan pasir urug Err:509


2 A.2.3.1.16 Pengurugan 1 M3 Tanah Urug ( Tanah Timbunan biasa ) Err:509

C A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

1 A.3.2.1.2 Pemasangan 1 M3 pondasi batu belah campuran 1 SP : 4 PP Err:509

D A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

1 Pemasangan 1 M2 lantai Keramik Homogeneus Tile ukuran 60 x 60 cm Err:509

E HARGA SATUAN PEKERJAAN ELEKTRIKAL

1 A.8.4.6.1 Memasang 1 titik lampu Err:509


2 A.8.4.6.2 Memasang 1 titik stop kontak Err:509
3 A.8.4.6.3 Pemasangan 1 bh Saklar Tunggal Err:509
4 A.8.4.6.5 Pemasangan 1 bh Stop Kontak Err:509
5 A.8.4.6.6 Pemasangan 1 bh Lampu TL 2x 36 watt Err:509
14 Ans Lapngan Pemasangan 1 M' Kabel Tray 30 x30 Err:509
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
( 10%
Pengukuran dan pemasangan 1 m’ Bouwplank A. 2.2.1.4
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 - -
Tukang Kayu L.02 OH 0.100 - -
Kepala Tukang L.03 OH 0.010 - -
Mandor L.04 OH 0.005 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kayu balok 5/5 M3 0.005 Err:509 Err:509
Paku 2”-3” Kg 0.020 Err:509 Err:509
Kayu papan 3/20 M3 0.007 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:509


E Overhead & Profit (10 %) ( 10% x D ) Err:509
F Harga Satuan Pekerjaaan (D+E) Err:509

Pembuatan 1 M2 gudang semen dan peralatan A. 2.2.1.7


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 - -
Tukang Kayu L.02 OH 1.500 - -
Kepala Tukang L.03 OH 0.150 - -
Mandor L.04 OH 0.050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Dolken kayu dia. 8-10/400 cm Batang 1.700 Err:509 Err:509
Kayu M3 0.210 Err:509 Err:509
Paku biasa Kg 0.300 Err:509 Err:509
Semen Portland Kg 10.500 Err:509 Err:509
Pasir beton M3 0.030 Err:509 Err:509
Koral beton M3 0.050 Err:509 Err:509
Seng gelombang Lembar 1.500 Err:509 Err:509
Seng plat Lembar 0.250 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:509


E Overhead & Profit (10 %) ( 10% x D ) -
F Harga Satuan Pekerjaaan (D+E) Err:509
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

Penggalian 1 M3 tanah biasa sedalam 1 m'


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.750 -
Mandor L.04 OH 0.025 -
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (10 %) 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pengurugan kembali 1 M3 galian tanah


Pengurugan kembali 1 m3 galian dihitung 1/3 kali dari koefisien pekerjaan galian
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.250 -
Mandor L.04 OH 0.008 -
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (10 %) 10 % x D
F Harga Satuan Pekerjaaan (D+E)
Pengurugan 1 M3 dengan pasir urug
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 -
Mandor L.04 OH 0.010 -
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug M3 1.200 Err:509
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (10 %) 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pengurugan 1 M3 Tanah Urug ( Tanah timbunan pilihan )


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja OH 0.300 -
Mandor OH 0.010 -
JUMLAH TENAGA KERJA
B BAHAN
Tanah timbunan biasa M3 1.200 Err:509
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (10 %) 10 % x D
F Harga Satuan Pekerjaaan (D+E)
Pengurugan 1 M3 Tanah Urug ( Tanah Timbunan biasa )
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja OH 0.300 -
Mandor OH 0.010 -
JUMLAH TENAGA KERJA
B BAHAN
Tanah Timbunan Pilihan M3 1.200 Err:509
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (10 %) 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pengurugan 1 M3 Timbunan Sirtu


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja OH 0.300 -
Mandor OH 0.010 -
JUMLAH TENAGA KERJA
B BAHAN
Timbunan Sirtu M3 1.200 Err:509
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (10 %) 10 % x D
F Harga Satuan Pekerjaaan (D+E)
AH

A.2.3.1.1
Jumlah Harga
(Rp)

-
-
-

-
-
-

A.2.3.1.9
Jumlah Harga
(Rp)

-
-
-

-
-
-
A.2.3.1.11
Jumlah Harga
(Rp)

-
-
-

Err:509
Err:509

Err:509
Err:509
Err:509

A.2.3.1.15
Jumlah Harga
(Rp)

-
-
-

Err:509
Err:509

Err:509
Err:509
Err:509
A.2.3.1.16
Jumlah Harga
(Rp)

-
-
-

Err:509
Err:509

Err:509
Err:509
Err:509

Jumlah Harga
(Rp)

-
-
-

Err:509
Err:509

Err:509
Err:509
Err:509
A.4.1.1 HARGA SATUAN PEKERJAAN BETON

Membuat 1 M3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0.87

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.200
Tukang Batu L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.060
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 230.000
Pasir beton m3 0.638
Batu Pecah 2 - 3 cm m3 0.761
Air ltr 200.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (10 %) 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Membuat 1 M3 beton mutu f' = 21,7 Mpa (K 275), slump (12 ±2) cm, w/c = 0,53

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.650
Tukang Batu L.02 OH 0.275
Kepala Tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 384.000
Pasir beton m3 0.494
Batu Pecah 2 - 3 cm m3 0.764
Air ltr 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (10 %) 10 % x D
F Harga Satuan Pekerjaaan (D+E)
Pembesian 1 kg dengan besi polos atau besi ulir

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.070
Tukang Batu L.02 OH 0.070
Kepala Tukang L.03 OH 0.007
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Besi beton (Polos dan Ulir) Kg 10.500
Kawat beton Kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (10 %) 10 % x D
F Harga Satuan Pekerjaaan (D+E)
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m2 bekisting untuk kolom

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.660
Tukang Batu L.02 OH 0.330
Kepala Tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III ( 2 kali pakai ) M3 0.040
Paku 5 - 10 cm Kg 0.400
Minyak bekisting Liter 0.200
Balok kelas II ( 2 kali pakai ) M3 0.015
Plywood 9 mm ( 2 kali pakai ) Lembar 0.350
Dolken Kayu (8-10) cm , panjang 4 m 3x pakai Batang 2.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit (10 %) 10 % x D
F Harga Satuan Pekerjaaan (D+E)
m, w/c = 0.87 A.4.1.1.4
Harga Satuan Jumlah Harga
(Rp) (Rp)

- -
- -
- -
- -
LAH TENAGA KERJA -

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
LAH HARGA BAHAN Err:509

LAH HARGA ALAT

Err:509
Err:509
Err:509

A.4.1.1.6
Harga Satuan Jumlah Harga
(Rp) (Rp)

- -
- -
- -
- -
LAH TENAGA KERJA -

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
LAH HARGA BAHAN Err:509

LAH HARGA ALAT

Err:509
Err:509
Err:509
A.4.1.1.17
Harga Satuan Jumlah Harga
(Rp) (Rp)

- -
- -
- -
- -
LAH TENAGA KERJA -

- -
Err:509 Err:509
LAH HARGA BAHAN Err:509

LAH HARGA ALAT

Err:509
Err:509
Err:509
Err:509

A.4.1.1.22
Harga Satuan Jumlah Harga
(Rp) (Rp)

- -
- -
- -
- -
LAH TENAGA KERJA -

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
LAH HARGA BAHAN Err:509

LAH HARGA ALAT


Err:509
Err:509
Err:509
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

Pemasangan 1 M2 lantai Keramik Homogeneus Tile ukuran 60 x 60 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang Kayu L.02 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Keramik Uk. 60 x 60 cm m2 1.000
Semen portland Kg 9.800
Pasir pasang M3 0.045
Semen warna Kg 1.300
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (10 %) 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 M2 lantai Batu Alam Palimanan

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang Kramik L.02 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Batu Palimanan m2 1.100
Semen portland Kg 11.750
Pasir pasang M3 0.045
Semen warna Kg 1.300
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (10 %) 10 % x D
F Harga Satuan Pekerjaaan (D+E)
Pemasangan 1 M2 Koral Sika Putih

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang Kramik L.02 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Batu koral sika putih m2 1.100
Semen portland Kg 11.750
Pasir pasang M3 0.045
Semen warna Kg 1.300
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (10 %) 10 % x D
F Harga Satuan Pekerjaaan (D+E)
INDING

A.4.4.3.9
Harga Satuan Jumlah Harga
(Rp) (Rp)

- -
- -
- -
- -
LAH TENAGA KERJA -

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
LAH HARGA BAHAN Err:509

LAH HARGA ALAT

Err:509
Err:509
Err:509

A.4.4.3.57
Harga Satuan Jumlah Harga
(Rp) (Rp)

- -
- -
- -
- -
LAH TENAGA KERJA -

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
LAH HARGA BAHAN Err:509

LAH HARGA ALAT

Err:509
Err:509
Err:509
A.4.4.3.58
Harga Satuan Jumlah Harga
(Rp) (Rp)

- -
- -
- -
- -
LAH TENAGA KERJA -

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
LAH HARGA BAHAN Err:509

LAH HARGA ALAT

Err:509
Err:509
Err:509
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

Pemasangan Plat kuningan 1 m2 Tebal 0.8 MM Ans Lapngan


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.375 - -
Tukang Las Konstruksi L.02 OH 4.375 - -
Kepala Tukang L.03 OH 0.441 - -
Mandor L.04 OH 0.231 - -
Tukang Kerajinan Ls 1.000 -
JUMLAH TENAGA KERJA -
B BAHAN
Hollow 40.40.2 mm m1 7.200 -
Hollow 40.20.2 mm m1 4.400 -
Siku 50.50.4 (baja profil) Kg 6.600 -
Plat kuningan 0.8 mm m2 1.650 -
Kawat las kg 0.500 -
Coating m2 1.200 -
JUMLAH HARGA BAHAN -
C PERALATAN
Alat Bantu Lot 1.0000 -
JUMLAH HARGA ALAT -
###
D Jumlah (A+B+C) -
E Overhead & Profit (15 %) 15 % x D -
F Harga Satuan Pekerjaaan (D+E) -

Pemasangan Plat Tembaga 1 m2 Tebal 0.8 MM Ans Lapngan


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.375 - -
Tukang Las Konstruksi L.02 OH 4.375 - -
Kepala Tukang L.03 OH 0.441 - -
Mandor L.04 OH 0.231 - -
Tukang Kerajinan Ls 1.000 -
JUMLAH TENAGA KERJA -
B BAHAN
Hollow 40.40.2 mm m1 7.200 -
Hollow 40.20.2 mm m1 4.400 -
Siku 50.50.4 (baja profil) Kg 6.600 -
Plat Tembaga 0.8 mm m2 1.650 -
Kawat las kg 0.500 -
Coating m2 1.200 -
JUMLAH HARGA BAHAN -
C PERALATAN
Alat Bantu Lot 1.0000 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) -
E Overhead & Profit (15 %) 15 % x D -
F Harga Satuan Pekerjaaan (D+E) -
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

Pemasangan 1 M3 pondasi batu belah campuran 1 SP : 4 PP A.3.2.1.2


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 - -
Tukang Batu L.02 OH 0.750 - -
Kepala Tukang L.03 OH 0.075 - -
Mandor L.04 OH 0.075 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu belah M3 1.200 Err:509 Err:509
Semen Porlant Kg 163.000 Err:509 Err:509
Pasir pasang M3 0.520 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:509


E Overhead & Profit (10 %) 10 % x D Err:509
F Harga Satuan Pekerjaaan (D+E) Err:509
HARGA SATUAN PEKERJAAN ELEKTRIKAL

Pemasangan 1 M' Kabel NYYHY 3 x 2.5 mm2


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Tukang Listrik L.02 OH 0.033 -
Kepala Tukang L.03 OH 0.033 -
Mandor L.04 OH 0.017 -
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYY 3 x 2.5 mm2 M' 1.100 -
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (15 %) 15 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 M' Kabel NYYHY 3 x 1.5 mm2


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Tukang Listrik L.02 OH 0.033 -
Kepala Tukang L.03 OH 0.033 -
Mandor L.04 OH 0.017 -
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYY 3 x 1.5 mm2 M' 1.100 -
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (15 %) 15 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 M' Kabel NYYHY 4 x 0.75 mm2


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Tukang Listrik L.02 OH 0.033 -
Kepala Tukang L.03 OH 0.033 -
Mandor L.04 OH 0.017 -
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYY 4 x 0.75 mm2 M' 1.100 -
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (15 %) 15 % x D
F Harga Satuan Pekerjaaan (D+E)
Pemasangan 1 M' Kabel NYYHY 2 x 2.5 mm2
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Tukang Listrik L.02 OH 0.033 -
Kepala Tukang L.03 OH 0.033 -
Mandor L.04 OH 0.017 -
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYY 2 x 2.5 mm2 M' 1.100 -
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (15 %) 15 % x D
F Harga Satuan Pekerjaaan (D+E)
Ans Lapngan
Jumlah Harga
(Rp)

-
-
-
-

-
-

-
-
-

Ans Lapngan
Jumlah Harga
(Rp)

-
-
-
-

-
-

-
-
-

Ans Lapngan
Jumlah Harga
(Rp)

-
-
-
-

-
-

-
-
-
Ans Lapngan
Jumlah Harga
(Rp)

-
-
-
-

-
-

-
-
-
DAFTAR HARGA BAHAN / MATERIAL

SPESIFIKASI/
NO MATERIAL SAT.
MERK DAGANG

A BAHAN BESI
1 Besi Hollow 40x40x2 mm m'
2 Besi hollow 30x20x2 mm m'
3 Siku 50.50.4 (baja profil) kg
4 Pelat Tembaga 0,8 mm m2
5 Pelat Kuningan 0,8 mm m2

B ELECTRIKAL
1 Kabel NYYHY 3x2,5 mm m'
2 Kabel NYYHY 3x1,5 mm m'
3 Kabel NYYHY 2x2,5 mm m'
4 Kabel NYYHY 4x0,75 mm m'
5 Kabel BC 35 mm m'
6 Copper Rod 4 m bh
7 Jarum penangkal petir bh
8 Direct Nozzle, DN25/SS bahan stainless asli, bukan kuningan Unit
berlapiskan chrome, pancuran lurus dan stabil, merk ber
Hologram

9 Double Tooth, DN25/SS, bahan stainless asli Unit


10 Double Tooth, DN40/SS, bahan stainless steel Unit
11 Ball Valve, DN25 Unit
12 Ball Valve, DN40 Unit
13 Selenoid, DN25 Unit
14 Underwater led light, DMX Controller 24V/12 W Stainless Unit
Stell IP68, daya 480 kw

15 Fountain pump system submersible, 1,1 KW 220V±5% 50Hz, Unit


type Stainless Steel submersible pump, daya 2200 kw

16 Fountain Frame Ø3" and accessories, SS Unit


17 ICE Tower Nozzle, DN40/SS bahan stainless asli, bukan Unit
kuningan berlapiskan chrome, pancuran lurus dan stabil,
merk ber Hologram

18 ICE Tower Nozzle, DN25/SS bahan stainless asli, bukan Unit


kuningan berlapiskan chrome, pancuran lurus dan stabil,
merk ber hologram

19 Fountaian pump system submersible 0,75KW 220V±5% Unit


50HZ, Type Stainless Steel submersible pump, daya 3750 KW

20 Fountain Frame Ø1" and accessories, SS Unit


21 Elektrical Control, Fountaian equipment control cabinet, Unit
220/380V ±50Hz, specially designed and made, daya 100 KW
SPESIFIKASI/
NO MATERIAL SAT.
MERK DAGANG
R HARGA BAHAN / MATERIAL

HARGA
(Rp)
HARGA
(Rp)
HARGA UPAH KERJA

HARGA
NO URAIAN SAT.
(Rp)

1 Pekerja OH

2 Tukang Batu OH

3 Tukang Kayu OH

4 Tukang Besi OH

5 Tukang Cat OH

6 Kepala Tukang OH

7 Mandor OH
A.3.2.1 HARGA SATUAN PEKERJAAN PENANAMAN POHON

1 Lubang 40 x 40 x 40 cm Tanam Pohon Palm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 - -
Mandor L.04 OH 0.003 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pupuk Kandang Krg 0.080 90,000.00 7,200.00
Furadan Kg 0.001 75,000.00 75.00
Pohon Palm Btg 1.000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 42,275.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 42,275.00


E Overhead & Profit (10 %) 10 % x D 4,227.50
F Harga Satuan Pekerjaaan (D+E) 46,502.50

Pemasangan 1 M3 pondasi batu kosong (anstamping) A.3.2.1.9


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.780 - -
Tukang Batu L.02 OH 0.390 - -
Kepala Tukang L.03 OH 0.039 - -
Mandor L.04 OH 0.039 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu belah M3 1.200 Err:509 Err:509
Pasir urug M3 0.432 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:509


E Overhead & Profit (10 %) 10 % x D Err:509
F Harga Satuan Pekerjaaan (D+E) Err:509

Analisa Teknik Pekerjaan Pondasi


A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

Pemasangan 1 M2 dinding bata merah ( 5 x 11 x 22 ) cm tebal 1/2 batu campuran 1 SP : 3 PP A. 4.4.1.8


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 - -
Tukang Batu L.02 OH 0.100 - -
Kepala Tukang L.03 OH 0.010 - -
Mandor L.04 OH 0.015 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah m3 70.000 Err:509 Err:509
Semen portland kg 14.370 Err:509 Err:509
Pasir pasang m3 0.040 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:509


E Overhead & Profit (10 %) 10 % x D Err:509
F Harga Satuan Pekerjaaan (D+E) Err:509

Pemasangan 1 M2 dinding bata merah ( 5 x 11 x 22 ) cm tebal 1/2 batu campuran 1 SP : 4 PP A. 4.4.1.9


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 - -
Tukang Batu L.02 OH 0.100 - -
Kepala Tukang L.03 OH 0.010 - -
Mandor L.04 OH 0.015 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah m3 70.000 Err:509 Err:509
Semen portland kg 11.500 Err:509 Err:509
Pasir pasang m3 0.043 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:509


E Overhead & Profit (10 %) 10 % x D Err:509
F Harga Satuan Pekerjaaan (D+E) Err:509

Pemasangan 1 M2 dinding bata merah ( 5 x 11 x 22 ) cm tebal 1/2 batu campuran 1 SP : 5 PP A. 4.4.1.10


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -

ANALISA TEKNIK PEKERJAAN PASANGAN DINDING


B BAHAN
Bata Merah m3 70.000 Err:509 Err:509
Semen portland kg 9.680 Err:509 Err:509
Pasir pasang m3 0.045 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:509


E Overhead & Profit (10 %) 10 % x D Err:509
F Harga Satuan Pekerjaaan (D+E) Err:509

ANALISA TEKNIK PEKERJAAN PASANGAN DINDING


A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

Pemasangan 1 M2 plesteran 1 SP : 3 PP tebal 15 mm A.4.4.2.3


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 - -
Tukang Kayu L.02 OH 0.150 - -
Kepala Tukang L.03 OH 0.015 - -
Mandor L.04 OH 0.015 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen portland kg 7.776 Err:509 Err:509
Pasir pasang m3 0.023 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:509


E Overhead & Profit (10 %) 10 % x D Err:509
F Harga Satuan Pekerjaaan (D+E) Err:509

Pemasangan 1 M2 plesteran 1 SP : 5 PP tebal 15 mm A.4.4.2.5


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 - -
Tukang Kayu L.02 OH 0.150 - -
Kepala Tukang L.03 OH 0.015 - -
Mandor L.04 OH 0.015 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen portland kg 5.184 Err:509 Err:509
Pasir pasang m3 0.026 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:509


E Overhead & Profit (10 %) 10 % x D Err:509
F Harga Satuan Pekerjaaan (D+E) Err:509

Pekerjaan 1 M2 acian A.4.4.2.27


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 - -
Tukang Kayu L.02 OH 0.100 - -
Kepala Tukang L.03 OH 0.010 - -
Mandor L.04 OH 0.010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen portland Kg 3.250 Err:509 Err:509

ANALISA TEKNIK PEKERJAAN PELASTERAN


JUMLAH HARGA BAHAN Err:509
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:509


E Overhead & Profit (10 %) 10 % x D Err:509
F Harga Satuan Pekerjaaan (D+E) Err:509

ANALISA TEKNIK PEKERJAAN PELASTERAN


A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Interior A.4.7.1.10
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 - -
Tukang Kayu L.02 OH 0.0630 - -
Kepala Tukang L.03 OH 0.0063 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plamuur Kg 0.1000 Err:509 Err:509
Cat dasar Kg 0.1000 Err:509 Err:509
Cat penutup Kg 0.2600 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:509


E Overhead & Profit (10 %) 10 % x D Err:509
F Harga Satuan Pekerjaaan (D+E) Err:509

Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.10
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 - -
Tukang Kayu L.02 OH 0.0630 - -
Kepala Tukang L.03 OH 0.0063 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plamuur Kg 0.1000 Err:509 Err:509
Cat dasar Kg 0.1000 Err:509 Err:509
Cat penutup Kg 0.2600 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:509


E Overhead & Profit (10 %) 10 % x D Err:509
F Harga Satuan Pekerjaaan (D+E) Err:509

Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir A.4.7.1.19
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 - -
Tukang Kayu L.02 OH 0.0600 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -

ANALISA TEKNIKPEKERJAAN PENGECETAN


B BAHAN
Cat Kg 0.1000 Err:509 Err:509
Kwas Bh 0.1000 Err:509 Err:509
Pengencer Liter 0.2600 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) Err:509
E Overhead & Profit (10 %) 10 % x D Err:509
F Harga Satuan Pekerjaaan (D+E) Err:509

Pengecatan 1 m2 Plafond ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.10
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 - -
Tukang Kayu L.02 OH 0.0630 - -
Kepala Tukang L.03 OH 0.0063 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plamuur Kg 0.1000 Err:509 Err:509
Cat dasar Kg 0.1000 Err:509 Err:509
Cat penutup Kg 0.2600 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:509


E Overhead & Profit (10 %) 10 % x D Err:509
F Harga Satuan Pekerjaaan (D+E) Err:509

ANALISA TEKNIKPEKERJAAN PENGECETAN