SUMMARY OF COST
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal

BILL NO. :First Running Bill


S.No DESCRIPTION OF WORKS Amount ( Nrs ) Remarks
Up to date First Running Bill
1 Civil Works 12,796,270.70 12,796,270.70
2 Aditional Works 624,385.00 624,385.00
Total Amount (Including VAT - 13% ) NRS :- 13,420,655.70 13,420,655.70

Prepared by Checked by Approved by


Page 2 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
ABSTRACT OF COST
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
S.no Particulars Unit Quantity Rate Amount Remarks
A CIVIL WORKS
1.00 SITE CLEARENCE & LAYOUT WORK
1.10 Clearing the site for the construction such as
removing off grass, shrubs, debrises etc. and
disposing off the waste materials to a suitable
place as per instruction including layout of the
building and construction of reference pillars
and bench mark etc. all complete. The works Job 1.00 20,000.00 20,000.00
also include clearance of site/premise after
completion of the building & other related
structures.

2.00 EARTHWORK
Earthwork in excavation in foundation,
trenches and pits etc in all kinds of soil
including dressing of sides, ramming of
bottom, watering, soring, dewatering (if
Cum. 648.77 450.00 291,945.60
required) all lead and lifts required and
removing off surplus excavated earth to a
suitable place as per design, drawing,
specification and instructions.
3.00 FILLING WORKS
3.10 Backfilling to structures, foundations pits, side
drains, etc. from excavated materials including
compaction, all complete as per drawing and Cum. 467.90 300.00 140,368.80
instruction of the Engineer.
4.00 SOLING WORKS
4.10 Supplying and laying boulders soling-150mm
in foundation in perfect line and level including
Cum. 44.94 4,500.00 202,216.50
blinding the joints with sand as per design,
drawing, specification and instructions
4.20 Flat brick soling in floor in perfect line and
level including blinding the joints with sand as
Sqm. 9.83 900.00 8,845.20
per design, drawing, specification and
instructions
6.00 BRICK WORK

Prepared by Checked by Approved by


Page 3 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
ABSTRACT OF COST
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
S.no Particulars Unit Quantity Rate Amount Remarks
6.10 Brick work in (1:6) cement sand mortar below
plinth level - 23cm thick wall with approved
quality chimney made bricks in perfect line and
level including the cost of single or miulti stage
Cum. 42.30 19,000.00 803,605.00
scaffolding, soaking bricks, curing, racking
joints, provision of recesses, opening, toothing
etc. all complete as per design, drawing,
specification and instructions.
7.00 P.C.C. FOR R.C.C.WORK
Plain cement concrete in M20 (1:1.5:3) for
R.C.C. works for columns,beams, slabs, lintels,
stairs and shear wall etc. with OPC cement in
perfect line and level as per design, drawing, Cum. 284.30 20,000.00 5,686,020.00
specification and instructions.

8.00 FORM WORK


Centering, shuttering of form works with steel
or plywood for all kind of RCC works for
foundations, columns, beams, slabs, lintels,
stairs and shear wall etc. including nails,
propping, scaffolding, staging, supporting and
bracing in proper line and level and also Sqm. 838.03 1,000.00 838,031.00
including removal of form works all complete
as per design, drawing, specification and
instructions.

9.00 STEEL REINFORCEMENT


Steel reinforcement bars of all sizes (diameters)
including straightening, cleaning, cutting,
bending, placing and binding with 20 SWG
Annealed binding wires all complete as per M.Ton. 40.04 120,000.00 4,805,238.60
design, drawing, specification and instructions.

Total Amount 12,796,270.70

Prepared by Checked by Approved by


Page 4 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
ABSTRACT OF COST
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
S.no Particulars Unit Quantity Rate Amount Remarks
Additional Works
1.00 Dumping of Excess soil by using backhoe
Tip 70.00 2,500.00 175,000.00
loader and Dump Truck 4 km.Far.
2.00 100mm thick plain cement concrete in (1:3:6)
in foundation and floor with 43 grade cement in
perfect line and level as per design, drawing, Cum. 29.96 15,000.00 449,385.00
specification and instructions.

Total Amount 624,385.00

Prepared by Checked by Approved by


Page 5 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
MEASUREMENT DETAIL
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE: Dolkha, Nepal
BILL NO : First Running Bill
Item
Description No Length Breadth Height Quantity Unit Remarks
No.
A CIVIL WORKS
1.00 SITE CLEARENCE & LAYOUT WORK
1.10 Clearing the site for the construction such as
removing off grass, shrubs, debrises etc. and
disposing off the waste materials to a suitable place
as per instruction including layout of the building and
construction of reference pillars and bench mark etc. 1.000 Job
all complete. The works also include clearance of
site/premise after completion of the building & other
related structures.

2.00 EARTHWORK
Earthwork in excavation in foundation, trenches and
pits etc in all kinds of soil including dressing of sides,
ramming of bottom, watering, soring, dewatering (if
required) all lead and lifts required and removing off
surplus excavated earth to a suitable place as per
design, drawing, specification and instructions.
CF1 & F1 1.000 10.750 2.400 1.650 42.570 Cum.
CF2 & F2 2.000 10.850 2.700 1.650 96.673
CF3 & F2 1.000 10.850 2.900 1.650 51.917
Mat 1 & F1 1.000 12.222 4.470 2.200 120.193
Mat 2 1.000 9.610 9.700 1.650 153.808
Mat 3 & F3 1.000 11.570 9.000 1.650 171.814
Foundation wall
Grid 4 , 6 & 7 3.000 2.450 0.600 0.600 2.646
3.000 2.300 0.600 0.600 2.484
3.000 2.200 0.600 0.600 2.376
3.000 1.770 0.600 0.600 1.911
Grid F & G 2.000 1.600 0.600 0.600 1.152
2.000 1.700 0.600 0.600 1.224
Total :- 648.768 Cum.
3.00 FILLING WORKS
3.10 Backfilling to structures, foundations pits, side
drains, etc. from excavated materials including
compaction, all complete as per drawing and
instruction of the Engineer.
CF1 & F1 1.000 10.750 2.400 1.650 42.570 Cum.
CF2 & F2 2.000 10.850 2.700 1.650 96.673
CF3 & F2 1.000 10.850 2.900 1.650 51.917

Prepared by Checked by Approved by


Page 6 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
MEASUREMENT DETAIL
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE: Dolkha, Nepal
BILL NO : First Running Bill
Item
Description No Length Breadth Height Quantity Unit Remarks
No.
Mat 1 & F1 1.000 12.222 4.470 2.200 120.193
Mat 2 1.000 9.610 9.700 1.650 153.808
Mat 3 & F3 1.000 11.570 9.000 1.650 171.814
Foundation wall
Grid 4 , 6 & 7 3.000 2.450 0.600 0.600 2.646
3.000 2.300 0.600 0.600 2.484
3.000 2.200 0.600 0.600 2.376
3.000 1.770 0.600 0.600 1.911
Grid F & G 2.000 1.600 0.600 0.600 1.152
2.000 1.700 0.600 0.600 1.224
Rooms
Block A 1.000 27.150 6.450 0.450 78.802
1.000 15.450 2.500 0.450 17.381
1.000 2.100 2.500 0.450 2.362
Block B 1.000 18.000 9.620 0.450 77.922
Deduction
Soling -44.937
Brick Soling 1.000 9.828 0.050 -0.491
Pcc -29.959
Brick wall -42.295
Pcc for Rcc -224.820
Lift 1.000 4.480 2.070 1.600 -14.837
Total :- 467.896 Cum.

4.00 SOLING WORKS


4.10 Supplying and laying boulders soling-150mm in
foundation in perfect line and level including blinding
the joints with sand as per design, drawing,
specification and instructions
CF1 & F1 1.000 10.350 2.000 0.150 3.105 Cum.
CF2 & F2 2.000 10.450 2.300 0.150 7.210
CF3 & F2 1.000 10.450 2.500 0.150 3.918
F1 1.000 1.800 1.800 0.150 0.486
Mat 1 1.000 9.020 4.070 0.150 5.506
Mat 2 1.000 9.210 9.300 0.150 12.847
F3 2.000 2.400 2.400 0.150 1.728
Mat 3 1.000 8.620 7.840 0.150 10.137

Prepared by Checked by Approved by


Page 7 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
MEASUREMENT DETAIL
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE: Dolkha, Nepal
BILL NO : First Running Bill
Item
Description No Length Breadth Height Quantity Unit Remarks
No.
Total :- 44.937 Cum.

Prepared by Checked by Approved by


Page 8 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
MEASUREMENT DETAIL
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE: Dolkha, Nepal
BILL NO : First Running Bill
Item
Description No Length Breadth Height Quantity Unit Remarks
No.
4.20 Flat brick soling in floor in perfect line and level
including blinding the joints with sand as per design,
drawing, specification and instructions
Foundation wall
Grid 4 , 6 & 7 3.000 2.450 0.300 2.205 Sqm.
3.000 2.300 0.300 2.070
3.000 2.200 0.300 1.980
3.000 1.770 0.300 1.593
Grid F & G 2.000 1.600 0.300 0.960
2.000 1.700 0.300 1.020
Total :- 9.828 Sqm.
6.00 BRICK WORK
6.10 Brick work in (1:6) cement sand mortar below plinth
level - 23cm thick wall with approved quality
chimney made bricks in perfect line and level
including the cost of single or miulti stage
scaffolding, soaking bricks, curing, racking joints,
provision of recesses, opening, toothing etc. all
complete as per design, drawing, specification and
instructions.
For foundation wall
Grid 4 4.000 4.600 0.230 0.700 2.962 Cum.
7.000 1.100 0.230 1.100 1.948
Grid 6 4.000 4.550 0.230 0.700 2.930
1.000 6.300 0.230 1.000 1.449
7.000 1.225 0.230 1.100 2.169
Grid 7 4.000 4.550 0.230 1.000 4.186
1.000 6.300 0.230 1.000 1.449
7.000 1.225 0.230 1.100 2.169
Grid A 1.000 2.060 0.230 0.550 0.26
1.000 0.900 0.230 0.550 0.113
1.000 5.550 0.230 0.550 0.702
Grid B 1.000 2.060 0.230 0.550 0.26
1.000 0.900 0.230 0.550 0.113
1.000 5.550 0.230 0.550 0.702
Grid C 1.000 2.060 0.230 0.550 0.26
1.000 0.900 0.230 0.550 0.113
1.000 5.550 0.230 0.550 0.702

Prepared by Checked by Approved by


Page 9 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
MEASUREMENT DETAIL
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE: Dolkha, Nepal
BILL NO : First Running Bill
Item
Description No Length Breadth Height Quantity Unit Remarks
No.
Grid D 1.000 2.060 0.230 0.550 0.26
1.000 0.900 0.230 0.550 0.113
1.000 5.550 0.230 0.550 0.702
1.000 1.125 0.230 0.550 0.142
1.000 1.125 0.230 0.550 0.142
1.000 1.125 0.230 0.550 0.142
1.000 1.125 0.230 0.550 0.142
Grid F 1.000 5.550 0.230 0.600 0.765
Grid 1 (E-F) 1.000 1.670 0.230 1.900 0.729
1.000 0.405 0.230 1.300 0.121
Grid 1 (F-G) 1.000 1.600 0.230 1.300 0.478
Grid 1a (F-Fb) 1.000 1.600 0.230 1.600 0.588
Grid 2 , 3 & 5 (E-F) 4.000 2.000 0.230 0.600 1.104
Grid 2 ,3 , 5 & 2a (F-G) 6.000 6.300 0.230 0.600 5.216
Grid E (1-2) 1.000 2.580 0.230 1.600 0.949
1.000 3.000 0.230 1.000 0.690
Grid E (2-3) 1.000 5.600 0.230 1.350 1.738
Grid E (3-5) 1.000 5.570 0.230 0.600 0.768
1.000 1.740 0.230 0.300 0.12
Grid F (1-1a) 1.000 2.060 0.230 1.300 0.615
Grid F (1a-2) 1.000 0.300 0.230 0.600 0.041
1.000 2.900 0.230 1.300 0.867
Grid F (2-3) 1.000 5.550 0.230 0.550 0.702
Grid F (3-5) 1.000 5.100 0.230 0.550 0.645
Grid G (1a-2) 1.000 1.950 0.230 0.550 0.246
1.000 1.270 0.230 1.300 0.379
Grid G (2-3 & 3-5) 2.000 5.550 0.230 0.550 1.404
Total :- 42.295 Cum.

Prepared by Checked by Approved by


Page 10 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
MEASUREMENT DETAIL
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE: Dolkha, Nepal
BILL NO : First Running Bill
Item
Description No Length Breadth Height Quantity Unit Remarks
No.
7.00 P.C.C. FOR R.C.C.WORK
Plain cement concrete in M20 (1:1.5:3) for R.C.C.
works for columns,beams, slabs, lintels, stairs and
shear wall etc. with OPC cement in perfect line and
level as per design, drawing, specification and
instructions.

Column Footing
F1
Volume of Straight Portion 2.000 1.800 1.800 0.200 1.296
Volume of sloped portion 2.000 0.402 0.804
F2
Volume of Straight Portion 3.000 2.000 2.000 0.200 2.400
Volume of sloped portion 3.000 0.476 1.428
F3
Volume of Straight Portion 2.000 2.400 2.400 0.300 3.456
Volume of sloped portion 2.000 0.774 1.548
CF1 2.000 8.100 0.637 0.275 2.837 H=.35+.2/2
Foundation Beam 1.000 8.100 0.525 0.900 3.827
CF2 4.000 8.100 0.787 0.275 7.012
Foundation Beam 2.000 8.100 0.525 0.900 7.654
CF3 2.000 8.100 0.887 0.350 5.029 H=.45+.25/2
Foundation Beam 1.000 8.100 0.525 0.900 3.827
Mat 1 1.000 8.820 3.870 0.800 27.306
Mat 2 1.000 9.100 9.000 0.900 73.710
Mat 3 1.000 8.420 7.645 0.900 57.933
Column up to Tie Beam top Level
C1 Circular 4.000 0.126 1.350 0.678
C5 2.000 0.126 1.350 0.340
1.000 0.126 1.950 0.245
C2 8.000 0.450 0.450 0.950 1.539
C3 2.000 0.450 0.450 0.950 0.384
C4 2.000 0.450 0.450 0.950 0.384
C6 1.000 0.450 0.450 0.950 0.192
1.000 0.450 0.450 1.600 0.324
C7 1.000 0.450 0.450 0.950 0.192
1.000 0.450 0.450 1.600 0.324
C8 3.000 0.450 0.450 0.950 0.577

Prepared by Checked by Approved by


Page 11 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
MEASUREMENT DETAIL
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE: Dolkha, Nepal
BILL NO : First Running Bill
Item
Description No Length Breadth Height Quantity Unit Remarks
No.
C9 1.000 0.450 0.450 0.950 0.192
Shear wall Grid G ( 6 to 7 ) 1.000 5.550 0.230 0.650 0.829
Lift shear wall 2.000 5.000 0.230 1.300 2.990
2.000 2.155 0.230 1.300 1.288
Tie Beam
Grid 1,1a,2,2a,3 & 5 4.000 2.143 0.230 0.300 0.591
6.000 6.300 0.230 0.300 2.608
Grid 4 3.000 4.735 0.230 0.300 0.980
1.000 2.093 0.230 0.300 0.144
1.000 2.200 0.230 0.300 0.151
Grid 6 & 7 8.000 4.550 0.230 0.300 2.511
2.000 6.300 0.230 0.300 0.869
Grid A,B,C&D 4.000 2.143 0.230 0.300 0.591
4.000 5.550 0.230 0.300 1.531
Grid E 2.000 5.735 0.230 0.300 0.791
1.000 5.280 0.230 0.300 0.364
Grid F 3.000 5.550 0.230 0.300 1.148
1.000 5.130 0.230 0.300 0.353
Grid Fb 1.000 2.070 0.230 0.300 0.142
Grid G 3.000 5.550 0.230 0.300 1.148
1.000 5.130 0.230 0.300 0.353 224.8
BLOCK A
Column Plinth Beam to Ground Floor Ceiling 12.000 0.450 0.450 3.375 8.201
C1 Circular 4.000 0.126 3.375 1.695
Shear wall Grid G ( 6 to 7 ) 1.000 5.550 0.230 2.900 3.701
First Floor Slab Beams
Grid 4 3.000 4.735 0.300 0.475 2.024
1.000 2.093 0.300 0.475 0.298
1.000 2.200 0.300 0.475 0.313
Grid 6 & 7 8.000 4.550 0.300 0.475 5.187
2.000 6.300 0.300 0.475 1.795
Grid 6b 4.000 4.700 0.300 0.275 1.551
1.000 6.450 0.300 0.275 0.532
Grid A,B,C&D 4.000 2.143 0.300 0.475 1.221
4.000 5.550 0.300 0.475 3.163
Grid Ea 1.000 5.700 0.300 0.275 0.470
Grid F 1.000 5.550 0.300 0.475 0.790

Prepared by Checked by Approved by


Page 12 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
MEASUREMENT DETAIL
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE: Dolkha, Nepal
BILL NO : First Running Bill
Item
Description No Length Breadth Height Quantity Unit Remarks
No.
Grid Fa 1.000 5.700 0.300 0.275 0.470
Grid G 1.000 5.550 0.300 0.475 0.790
First Floor Slab 1.000 27.150 6.450 0.125 21.889
1.000 15.450 2.400 0.125 4.635
1.000 2.100 2.400 0.150 0.756
Total :- 284.301 Cum.
8.00 FORM WORK
Centering, shuttering of form works with steel or
plywood for all kind of RCC works for foundations,
columns, beams, slabs, lintels, stairs and shear wall
etc. including nails, propping, scaffolding, staging,
supporting and bracing in proper line and level and
also including removal of form works all complete as
per design, drawing, specification and instructions.

For PCC work


CF1 & F1 2.000 10.150 0.100 2.030 Sqm.
4.000 1.800 0.100 0.720
CF2 & F2 4.000 10.250 0.100 4.100
2.000 8.200 0.100 1.640
CF3 & F2 2.000 10.250 0.100 2.050
1.000 8.600 0.100 0.860
F1 2.000 1.800 0.100 0.360
2.000 1.800 0.100 0.360
Mat 1 2.000 8.820 0.100 1.764
2.000 3.870 0.100 0.774
Mat 2 2.000 9.100 0.100 1.820
2.000 9.010 0.100 1.802
F3 4.000 2.400 0.100 0.960
4.000 2.400 0.100 0.960
Mat 3 2.000 8.420 0.100 1.684
2.000 7.620 0.100 1.524
For PCC for RCC works
Column Footing
F1 8.000 1.800 0.200 2.880
F2 12.000 2.000 0.200 4.800
F3 8.000 2.400 0.300 5.760
CF1 2.000 8.100 0.200 3.240

Prepared by Checked by Approved by


Page 13 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
MEASUREMENT DETAIL
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE: Dolkha, Nepal
BILL NO : First Running Bill
Item
Description No Length Breadth Height Quantity Unit Remarks
No.
2.000 0.534 1.068
Foundation Beam 2.000 8.100 0.550 8.910
2.000 0.525 0.550 0.577
CF2 4.000 8.100 0.200 6.480
4.000 0.616 2.464

Prepared by Checked by Approved by


Page 14 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
MEASUREMENT DETAIL
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE: Dolkha, Nepal
BILL NO : First Running Bill
Item
Description No Length Breadth Height Quantity Unit Remarks
No.
Foundation Beam 4.000 8.100 0.550 17.820
4.000 0.525 0.550 1.155
CF3 2.000 8.100 0.250 4.050
2.000 0.857 1.714
Foundation Beam 2.000 8.100 0.450 7.290
2.000 0.525 0.450 0.472
Mat 1 2.000 8.820 0.800 14.112
2.000 3.870 0.800 6.192
Mat 2 2.000 9.100 0.900 16.380
2.000 9.000 0.900 16.200
Mat 3 2.000 8.420 0.900 15.156
2.000 7.645 0.900 13.761
Column up to Tie Beam top Level
C1 Circular 4.000 1.256 1.350 6.782
C5 2.000 1.256 1.350 3.391
1.000 1.256 1.950 2.449
C2 32.000 0.450 0.950 13.680
C3 8.000 0.450 0.950 3.420
C4 8.000 0.450 0.950 3.420
C6 4.000 0.450 0.950 1.710
4.000 0.450 1.600 2.880
C7 4.000 0.450 0.950 1.710
4.000 0.450 1.600 2.880
C8 12.000 0.450 0.950 5.130
C9 4.000 0.450 0.950 1.710
Shear wall Grid G ( 6 to 7 ) 2.000 5.550 0.650 7.215
Lift shear wall 4.000 5.000 1.300 26.000
4.000 2.155 1.300 11.206
deduct -78.000 0.230 0.300 -5.382
Tie Beam
Grid 1,1a,2,2a,3 & 5 8.000 2.143 0.300 5.143
12.000 6.300 0.300 22.680
Grid 4 6.000 4.735 0.300 8.523
2.000 2.093 0.300 1.255
2.000 2.200 0.300 1.320
Grid 6 & 7 16.000 4.550 0.300 21.840
4.000 6.300 0.300 7.560

Prepared by Checked by Approved by


Page 15 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
MEASUREMENT DETAIL
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE: Dolkha, Nepal
BILL NO : First Running Bill
Item
Description No Length Breadth Height Quantity Unit Remarks
No.
Grid A,B,C&D 8.000 2.143 0.300 5.143
8.000 5.550 0.300 13.320
Grid E 4.000 5.735 0.300 6.882
2.000 5.280 0.300 3.168
Grid F 6.000 5.550 0.300 9.990
2.000 5.130 0.300 3.078
Grid Fb 2.000 2.070 0.300 1.242
Grid G 6.000 5.550 0.300 9.990
2.000 5.130 0.300 3.078
BLOCK A
Column Plinth Beam to Ground Floor Ceiling 48.000 0.450 3.375 72.900
C1 Circular 4.000 1.256 1.350 6.782
Shear wall Grid G ( 6 to 7 ) 2.000 5.550 2.900 32.190
deduct -47.000 0.300 0.475 -6.698
First Floor Slab Beams
Grid 4 6.000 4.735 0.475 13.494
2.000 2.093 0.475 1.988
2.000 2.200 0.475 2.090
Grid 6 & 7 16.000 4.550 0.475 34.580
4.000 6.300 0.475 11.970
Grid 6b 8.000 4.700 0.275 10.340
2.000 6.450 0.275 3.547
Grid A,B,C&D 8.000 2.143 0.475 8.143
8.000 5.550 0.475 21.090
Grid Ea 2.000 5.700 0.275 3.135
Grid F 2.000 5.550 0.475 5.272
Grid Fa 2.000 5.700 0.275 3.135
Grid G 2.000 5.550 0.475 5.272
First Floor Slab 1.000 27.150 6.450 175.117
1.000 15.450 2.400 37.080
1.000 2.100 2.400 5.040
Slab Sides 2.000 27.150 0.125 6.787
2.000 8.730 0.125 2.182
deduct -1.000 5.550 0.230 -1.277
-12.000 0.450 0.450 -2.430

Total :- 838.031 Sqm.

Prepared by Checked by Approved by


Page 16 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
MEASUREMENT DETAIL
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE: Dolkha, Nepal
BILL NO : First Running Bill
Item
Description No Length Breadth Height Quantity Unit Remarks
No.
9.00 STEEL REINFORCEMENT
Steel reinforcement bars of all sizes (diameters)
including straightening, cleaning, cutting, bending,
placing and binding with 20 SWG Annealed binding 40.044M.Ton.
wires all complete as per design, drawing,
specification and instructions.

Additional Works
1.00 Dumping of Excess soil by using backhoe loader and
Dump Truck 4 km.Far.
Block A 40.000 40.000
Block B 30.000 30.000 Tip.
70.000 Tip.
2.00 100mm thick plain cement concrete in (1:3:6) in
foundation and floor with 43 grade cement in perfect
line and level as per design, drawing, specification
and instructions.
CF1 & F1 1.000 10.350 2.000 0.100 2.070 Sqm.
CF2 & F2 2.000 10.450 2.300 0.100 4.807
CF3 & F2 1.000 10.450 2.500 0.100 2.612
F1 1.000 1.800 1.800 0.100 0.324
Mat 1 1.000 9.020 4.070 0.100 3.671
Mat 2 1.000 9.210 9.300 0.100 8.565
F3 2.000 2.400 2.400 0.100 1.152
Mat 3 1.000 8.620 7.840 0.100 6.758
Total :- 29.959 Sqm.

Prepared by Checked by Approved by


Page 17 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
9 STEEL REINFORCEMENT
Steel reinforcement bars of all sizes (diameters)
including straightening, cleaning, cutting, bending,
placing and binding with 20 SWG Annealed binding
wires all complete as per design, drawing, specification
and instructions.
Foundation net
F 1 - 1 no. 1800x1800
12x2x2
0.075 0.075 12 48.00 1.850 88.800 0.888 78.854 kg.
1.7

150mm bothway

F2 - 3 nos. 2000x2000
13x2x3
0.075 0.075 12 78.00 2.050 159.900 0.888 141.991
1.9

150mm bothway

F3 - 2 no. 2400x2400
16x2x2
0.075 0.075 12 64.00 2.450 156.800 0.888 139.238
2.3

150mm bothway

CF 1 - 1 no.
Foundation net 8100x1800

0.075 0.075 10 12.00 8.150 97.800 0.620 60.636


8

0.075 0.075 10 54.00 1.850 99.900 0.620 61.938


1.7

150mm bothway

Prepared by Checked by Approved by


Page 18 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor

Prepared by Checked by Approved by


Page 19 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
CF 2 - 2 nos.
Foundation net 8100x2100
12x2
0.075 0.075 12 24.00 8.150 195.600 0.888 173.692
8
46x2
0.075 0.075 12 92.00 2.150 197.800 0.888 175.646
2

175mm bothway

CF 3 - 1 no.
Foundation net 8100x2300

0.075 0.075 12 16.00 8.150 130.400 0.888 115.795


8

0.075 0.075 12 54.00 2.350 126.900 0.888 112.687


2.2

150mm bothway

Footing beam
CF 1
bottom main bar

0.7 0.7 20 4.00 9.400 37.600 2.466 92.721


8
top bar
8
0.7 0.7 20 6.00 9.400 56.400 2.466 139.082

top extra bar

4.2 20 6.00 4.200 25.200 2.466 62.143

Prepared by Checked by Approved by


Page 20 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
bottom extra bar

0.6
2.77 20 2.00 3.370 6.740 2.466 16.620

0.6 20 2.00 3.970 7.940 2.466 19.580


3.37
Stirrups
0.48

0.75 0.75 12 64.00 2.660 170.240 0.888 151.173

0.1
0.1
0.48

28+13+34
2L-12@100c/c , 2L-12@150c/c

CF 2
bottom main bar
6x2
0.7 0.7 20 12.00 9.400 112.800 2.466 278.164
8
top bar
8 6x2
0.7 0.7 25 12.00 9.400 112.800 3.853 434.618

top extra bar


5x2
4.2 25 10.00 4.200 42.000 3.853 161.826

Prepared by Checked by Approved by


Page 21 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
bottom extra bar

0.6 2x2
2.77 20 4.00 3.370 13.480 2.466 33.241
2x2
0.6 20 4.00 3.970 15.880 2.466 39.160
3.37
Stirrups
0.48

75x2
0.75 0.75 12 128.00 2.660 340.480 0.888 302.346

0.1
0.1
0.48

28+13+34

0.12

0.75 0.75 12 102.00 1.840 187.680 0.888 166.659

0.05
0.05
0.12

CF 3
bottom main bar

0.7 0.7 20 6.00 9.400 56.400 2.466 139.082


8

Prepared by Checked by Approved by


Page 22 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
top bar
8
0.7 0.7 25 6.00 9.400 56.400 3.853 217.309

top extra bar

4.2 25 5.00 4.200 21.000 3.853 80.913


bottom extra bar

0.6
2.77 20 2.00 3.370 6.740 2.466 16.620

0.6 20 2.00 3.970 7.940 2.466 19.580


3.37
Stirrups
0.48

0.75 0.75 12 64.00 2.660 170.240 0.888 151.173

0.1
0.1
0.48

28+13+34

0.12

0.75 0.75 12 51.00 1.840 93.840 0.888 83.329

0.05
0.05

Prepared by Checked by Approved by


Page 23 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
0.12

MAT 1 8.82x3.87
bottom main bar

0.5 0.5 25 23.00 9.720 223.560 3.853 861.376


8.6

0.5 0.5 25 51.00 4.770 243.270 3.853 937.319


3.67
175mm c/c both way
top bar
8.6
0.5 0.5 25 23.00 9.720 223.560 3.853 861.376

3.67
0.5 0.5 25 51.00 4.770 243.270 3.853 937.319

Face bar
3x2
8.6 25 6.00 8.720 52.320 3.853 201.588

3x2
3.67 25 6.00 3.770 22.620 3.853 87.154

Chair
0.8
0.5 0.5
0.6 25 16.00 3.000 48.000 3.853 184.944
0.6

MAT 2 9.00x9.10
bottom main bar

0.7 0.7 25 45.00 10.400 468.000 3.853 1,803.204


9

Prepared by Checked by Approved by


Page 24 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor

0.7 0.7 25 46.00 10.300 473.800 3.853 1,825.551


8.9

top bar
9
0.7 0.7 25 45.00 10.400 468.000 3.853 1,803.204

8.9
0.7 0.7 25 46.00 10.300 473.800 3.853 1,825.551

200mm c/c both way


Chair
1.1
0.7 0.7
0.6 25 40.00 3.700 148.000 3.853 570.244
0.6

MAT 3 8.42x7.64
bottom main bar

0.7 0.7 25 44.00 9.720 427.680 3.853 1,647.851


8.32

0.7 0.7 25 48.00 8.940 429.120 3.853 1,653.399


7.54

top bar
8.32
0.7 0.7 25 44.00 9.720 427.680 3.853 1,647.851

7.54
0.7 0.7 25 48.00 8.940 429.120 3.853 1,653.399

Chair

Prepared by Checked by Approved by


Page 25 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
1.1
0.7 0.7
0.6 25 22.00 3.700 81.400 3.853 313.634
0.6

Prepared by Checked by Approved by


Page 26 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
Column
Block A
Foundation to First Floor + Lap
C 1 = 4nos.

6x4
5.35 25 24.00 5.950 142.800 3.853 550.208

Lap 25 12.00 1.500 18.000 3.853 69.354


0.6
H=1.4+.45+3.5+1.5

4x4
5.35 20 16.00 5.950 95.200 2.466 234.763

Lap 20 8.00 1.200 9.600 2.466 23.673

0.6
H=1.4+.45+3.5+1.2

C 2 = 8nos.

12x8
5.95 25 96.00 6.550 628.800 3.853 2,422.766

Lap 25 48.00 1.500 72.000 3.853 277.416

0.6
H=1.4+.45+3.5+1.5

Prepared by Checked by Approved by


Page 27 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
C 3 = 2nos.

12x2
5.35 20 24.00 5.950 142.800 2.466 352.144

Lap 20 12.00 1.500 18.000 2.466 44.388

0.6
H=1.4+.45+3.5+1.2
C 4 = 2nos.

12x2
5.35 25 24.00 5.950 142.800 3.853 550.208

Lap 25 12.00 1.500 18.000 3.853 69.354


0.6
H=1.4+.45+3.5+1.5

4x2
5.35 16 8.00 5.950 47.600 1.578 75.112

Lap 16 4.00 1.000 4.000 1.578 6.312


0.6
H=1.4+.45+3.5+1

Prepared by Checked by Approved by


Page 28 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
Stirrups
0.37

54x12
0.37 0.37 8 600.00 1.640 984.000 0.395 388.680

0.08
0.08
0.37

0.23

54x2x2
0.37 0.37 8 200.00 1.360 272.000 0.395 107.440

0.08
0.08
0.23

0.17

54x10x2
0.37 0.37 8 1000.00 1.240 1240.000 0.395 489.800

0.08
0.08
0.17

54x4
340mm 8 200.00 1.200 240.000 0.395 94.800

1.2
8mm @ 100 mm c/c

Prepared by Checked by Approved by


Page 29 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
Shear wall
Grid G ( 6 - 7 )
vertical bar = 12 mm @ 125 mm c/c

45x2
5.35 12 90.00 5.750 517.500 0.888 459.540

Lap 12 44.00 0.720 31.680 0.888 28.131

0.4
H=1.4+.45+3.5+.72
Horizontal bar = 10 mm @ 150 mm c/c

41x2
6.35 10 64.00 6.350 406.400 0.620 251.968

C ' bar 0.15


10 35.00 0.480 16.800 0.620 10.416
0.18

0.15

Block B
Column
up to tie beam top
C 5 = 2nos.

8x2
1.85 25 16.00 2.450 39.200 3.853 151.037

0.6

Prepared by Checked by Approved by


Page 30 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor

4x2
1.85 20 8.00 2.450 19.600 2.466 48.333

0.6
C 5 = no. (Grid 1-E )

2.4 25 8.00 3.000 24.000 3.853 92.472

0.6

2.4 20 4.00 3.000 12.000 2.466 29.592

0.6
Stirrups

19x2+25
340mm 8 63.00 1.2 75.60 0.395 29.862

1.3
8mm @ 100 mm c/c

Prepared by Checked by Approved by


Page 31 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
C 6 = 1 no. ( Grid 1-F )

2.4 20 8.00 3 24.00 2.466 59.184

0.6

2.4 16 4.00 3 12.00 1.578 18.936

0.6
C 6 = 1no. ( Grid 2 - G )

1.85 20 8.00 2.45 19.60 2.466 48.333

0.6

1.85 16 4.00 2.45 9.80 1.578 15.464

0.6

Prepared by Checked by Approved by


Page 32 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
Stirrups
0.37

19+25
0.37 0.37 8 44.00 1.64 72.16 0.395 28.503

0.08
0.08
0.37

0.17

44x2
0.37 0.37 8 88.00 1.24 109.12 0.395 43.102

0.08
0.08
0.17
C 7 = 2no. ( Grid 1-G )

2.4 25 8.00 3 24.00 3.853 92.472

0.6

2.4 20 4.00 3 12.00 2.466 29.592

0.6

Prepared by Checked by Approved by


Page 33 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
C 7 = 1no. (Grid 2-F )

1.85 25 8.00 2.45 19.60 3.853 75.518

0.6

1.85 20 4.00 2.45 9.80 2.466 24.166

0.6

Stirrups
0.37

19+25
0.37 0.37 8 44.00 1.64 72.16 0.395 28.503

0.08
0.08
0.37

0.17

44x2
0.37 0.37 8 88.00 1.24 109.12 0.395 43.102

0.08
0.08

Prepared by Checked by Approved by


Page 34 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
0.17

C 8 = 3nos.

12x3
1.85 25 36.00 2.45 88.20 3.853 339.834

0.6

4x3
1.85 16 12.00 2.45 29.40 1.578 46.393

0.6
Stirrups
0.37

19x3
0.37 0.37 8 57.00 1.64 93.48 0.395 36.924

0.08
0.08
0.37

0.235

19x3x2
0.37 0.37 8 114.00 1.37 156.18 0.395 61.691

0.08

Prepared by Checked by Approved by


Page 35 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
0.08
0.235

Prepared by Checked by Approved by


Page 36 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
C 9 = 1nos.

1.85 25 16.00 2.45 39.20 3.853 151.037

0.6

1.85 16 4.00 2.45 9.80 1.578 15.464

0.6
Stirrups
0.37

0.37 0.37 8 19.00 1.64 31.16 0.395 12.308

0.08
0.08
0.37

0.27

0.37 0.37 8 38.00 1.44 54.72 0.395 21.614

0.08
0.08
0.27

Prepared by Checked by Approved by


Page 37 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor

Prepared by Checked by Approved by


Page 38 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
Lift Shear wall
vertical bar = 12 mm @ 125 mm c/c

118x2
2.4 12 236.00 2.7 637.20 0.888 565.833

0.3

Horizontal bar = 10 mm @ 150 mm c/c

0.6 0.6 16x2


14.64 10 32.00 15.84 506.88 0.620 314.265

Block A
Tie-beam
Grid 4

0.15 0.72 0.15 12 6.00 18.39 110.34 0.888 97.981


17.37

Grid 6&7
6x2
0.15 0.72 0.72 0.15 12 12.00 28.84 346.08 0.888 307.319
27.1

Grid A,B,C,D&F
6x5
0.15 0.15 12 24.00 9.17 220.08 0.888 195.431
8.87
Grid G

0.15 0.15 12 12.00 6.65 79.80 0.888 70.862


6.35

Prepared by Checked by Approved by


Page 39 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor

Prepared by Checked by Approved by


Page 40 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
stirrups
0.17

0.26 0.26 8 739.00 1.02 753.78 0.395 297.743

0.08
0.08
0.17
8mm @ 150mm c/c
116+181+181+300+43

Block B
Tie-beam
Grid 1,2,3&5
6x4
0.15 0.15 12 24.00 9.90 237.60 0.888 210.988
9.6

Grid 1a&2a
6x2
0.15 0.15 12 12.00 7.20 86.40 0.888 76.723
6.9

Grid E,F&G
6x3
0.15 0.72 0.15 12 18.00 18.92 340.56 0.888 302.417
17.9
stirrups
0.17

0.26 0.26 8 660.00 1.02 673.20 0.395 265.914

0.08
0.08
0.17

Prepared by Checked by Approved by


Page 41 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
8mm @ 150mm c/c
260+94+360

Block A
First Floor Slab Beam
Grid 4
Bottom

0.47 0.72 0.47 12 1.00 19.03 19.03 0.888 16.898


17.37

0.64 0.96 0.47 16 2.00 19.44 38.88 1.578 61.352


17.37

Top
0.72
0.47 17.37 0.47 12 1.00 19.03 19.03 0.888 16.898

0.96
0.64 17.37 0.47 16 2.00 19.44 38.88 1.578 61.352

Extra Top
1.82
0.64 16 3.00 2.46 7.38 1.578 11.645

4
0.47 16 3.00 4.47 13.41 1.578 21.160

2x2
3.4 16 4.00 3.40 13.60 1.578 21.460

Extra Bottom

0.64
1.82 16 2.00 2.46 4.92 1.578 7.763

Prepared by Checked by Approved by


Page 42 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
0.47
4 16 2.00 4.47 8.94 1.578 14.107

Prepared by Checked by Approved by


Page 43 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
1x2
3.4 16 2.00 3.40 6.80 1.578 10.730

stirrups
0.25

0.54 0.54 8 145.00 1.74 252.30 0.395 99.658

0.08
0.08
0.25

0.25

0.54 0.54 8 141.00 1.33 187.53 0.395 74.074

Grid 6&7
Bottom
2x2
0.85 1.2 1.2 0.85 20 4.00 31.20 124.80 2.466 307.756
27.1
1x2
0.64 0.96 0.96 0.64 16 2.00 30.30 60.60 1.578 95.626
27.1

Top
1.5 1.5 1x2
1.2 27.1 1.2 25 2.00 32.50 65.00 3.853 250.445

1.2 1.2 2x2


0.85 27.1 0.85 20 4.00 31.20 124.80 2.466 307.756

Prepared by Checked by Approved by


Page 44 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor

Prepared by Checked by Approved by


Page 45 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
Extra Top
1.87 3x2
0.85 20 6.00 2.72 16.32 2.466 40.245

2.37 3x2
0.85 20 6.00 3.22 19.32 2.466 47.643

2x3x2
3.45 20 12.00 3.45 41.40 2.466 102.092

3x2
3.95 20 6.00 3.95 23.70 2.466 58.444

Extra Bottom

0.85 2x2
1.87 20 4.00 2.72 10.88 2.466 26.830

0.64 2x2
2.37 16 4.00 3.01 12.04 1.578 18.999

2x3x2
3.45 16 12.00 3.45 41.40 1.578 65.329

2x2
3.95 16 4.00 3.95 15.80 1.578 24.932

stirrups
0.25

220x2
0.54 0.54 8 432.00 1.74 751.68 0.395 296.913

0.08
0.08
0.25

Prepared by Checked by Approved by


Page 46 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor

Prepared by Checked by Approved by


Page 47 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
0.25

0.54 0.54 8 422.00 1.33 561.26 0.395 221.697

Grid 6b
Bottom

0.3 0.96 0.96 0.3 16 2.00 29.62 59.24 1.578 93.480


27.1

0.3 0.72 0.72 0.3 12 1.00 29.14 29.14 0.888 25.876


27.1

Top
0.96 0.96
0.3 27.1 0.3 16 3.00 29.62 88.86 1.578 140.221

Extra Bottom

4.85 16 1.00 4.85 4.85 1.578 7.653

Extra Top
2.35
0.3 16 2.00 2.65 5.30 1.578 8.363

3.95 16 2.00 3.95 7.90 1.578 12.466

Prepared by Checked by Approved by


Page 48 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
stirrups
0.25

0.35 0.35 8 206.00 1.36 280.16 0.395 110.663

0.08
0.08
0.25

Grid A & B
Bottom
2x1
1.2 1.2 25 2.00 11.27 22.54 3.853 86.846
8.87
2x2
0.85 0.85 20 4.00 10.57 42.28 2.466 104.262
8.87

Top
2x1
1.2 8.87 1.2 25 2.00 11.27 22.54 3.853 86.846

2x2
0.85 8.87 0.85 20 4.00 10.57 42.28 2.466 104.262

Extra Top
4.71 2x3
0.85 20 6.00 5.56 33.36 2.466 82.265

2.15 2x3
0.85 20 6.00 3.00 18.00 2.466 44.388

Extra Bottom

0.85 2x2

Prepared by Checked by Approved by


Page 49 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
4.71 20 4.00 5.56 22.24 2.466 54.843

0.85 2x2
2.15 20 4.00 3.00 12.00 2.466 29.592

stirrups
0.25

65x2
0.54 0.54 8 178.00 1.74 309.72 0.395 122.339

0.08
0.08
0.25

0.25

0.54 0.54 8 176.00 1.33 234.08 0.395 92.461

Grid C & D
Bottom
2x3
0.85 0.85 20 6.00 10.57 63.42 2.466 156.393
8.87

Top
2x2
0.85 8.87 0.85 20 4.00 10.57 42.28 2.466 104.262

Extra Top
4.71 2x3
0.85 20 6.00 5.56 33.36 2.466 82.265

Prepared by Checked by Approved by


Page 50 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
2.15 2x3
0.85 20 6.00 3.00 18.00 2.466 44.388

Prepared by Checked by Approved by


Page 51 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
stirrups
0.25

65x2
0.54 0.54 8 178.00 1.74 309.72 0.395 122.339

0.08
0.08
0.25

0.25

0.54 0.54 8 176.00 1.33 234.08 0.395 92.461

Grid Da
Bottom

0.5 0.5 20 3.00 3.70 11.10 2.466 27.372


2.7

Top

0.5 2.7 0.5 20 3.00 3.70 11.10 2.466 27.372

stirrups
0.25

0.54 0.54 8 20.00 1.74 34.80 0.395 13.746

0.08
0.08
0.25

Prepared by Checked by Approved by


Page 52 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor

Prepared by Checked by Approved by


Page 53 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
0.25

0.54 0.54

Grid F
Bottom

0.85 0.85 20 1.00 8.05 8.05 2.466 19.851


6.35

0.64 0.64 16 2.00 7.63 15.26 1.578 24.080


6.35

Top

0.85 6.35 0.85 16 2.00 8.05 16.10 1.578 25.405

0.85 6.35 0.85 20 1.00 8.05 8.05 2.466 19.851

Extra Top
2.15
0.85 20 2.00 3.00 6.00 2.466 14.796

2.15
0.85 20 2.00 3.00 6.00 2.466 14.796

Extra Bottom

3.75 20 1.00 3.75 3.75 2.466 9.247

Prepared by Checked by Approved by


Page 54 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
stirrups
0.25

0.54 0.54 8 47.00 1.74 81.78 0.395 32.303

0.08
0.08
0.25

0.25

0.54 0.54 8 46.00 1.33 61.18 0.395 24.166

Grid G
Bottom

0.4 0.4 12 1.00 7.15 7.15 0.888 6.349


6.35

0.64 0.64 16 2.00 7.63 15.26 1.578 24.080


6.35

Top

0.64 6.35 0.64 16 2.00 7.63 15.26 1.578 24.080

0.4 6.35 0.4 12 1.00 7.15 7.15 0.888 6.349

Prepared by Checked by Approved by


Page 55 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
stirrups
0.25

0.54 0.54 8 47.00 1.74 81.78 0.395 32.303

0.08
0.08
0.25

Grid Ea
Bottom

0.3 0.3 12 1.00 6.80 6.80 0.888 6.038


6.2

0.3 0.3 16 2.00 6.80 13.60 1.578 21.460


6.2

Top

0.3 6.2 0.3 16 2.00 6.80 13.60 1.578 21.460

0.3 6.2 0.3 12 1.00 6.80 6.80 0.888 6.038

Extra Top
1.9
0.3 16 1.00 2.20 2.20 1.578 3.471

stirrups
0.25

0.35 0.35 8 47.00 1.36 63.92 0.395 25.248

0.08

Prepared by Checked by Approved by


Page 56 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
0.08
0.25

Grid Fa
Bottom

0.3 0.3 12 1.00 6.80 6.80 0.888 6.038


6.2

0.3 0.3 16 2.00 6.80 13.60 1.578 21.460


6.2

Top

0.3 6.2 0.3 16 2.00 6.80 13.60 1.578 21.460

0.3 6.2 0.3 12 1.00 6.80 6.80 0.888 6.038

stirrups
0.25

0.35 0.35 8 47.00 1.36 63.92 0.395 25.248

0.08
0.08
0.25

Block A
First Floor Slab
Main bar Grid (4-7) to (A- Da)

8.7 8 109.00 8.7 948.30 0.395 374.578

Grid ( 6-7) to (Da-Ea)

Prepared by Checked by Approved by


Page 57 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor

6.2 8 11.00 6.2 68.20 0.395 26.939

Prepared by Checked by Approved by


Page 58 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
Grid (6-7) to (Ea-G) Down Slab

6.2 8 49.00 6.2 303.80 0.395 120.001


150mm c/c
Dis. Bar
Grid (4-6)to(A-Da)

17.32 8 15.00 17.32 259.80 0.395 102.621

Grid (6-7)to(A-Ea) Lap 8 15.00 0.48 7.20 0.395 2.844

18.95 8 38.00 18.95 720.10 0.395 284.439


Grid (Ea-G)to (6-7) Down Slab Lap 8 38.00 0.48 18.24 0.395 7.204

8.3 8 38.00 8.3 315.40 0.395 124.583


150mm c/c
Top Bar
Grid (4-6)-(A-D)

3.7 8 96.00 3.7 355.20 0.395 140.304

Grid (4-6)-(D-Da)

3.7 12 13.00 3.7 48.10 0.888 42.712

Grid 6 -(Da-Ea)

1.2 8 11.00 1.2 13.20 0.395 5.214

Grid 6b - (A-Ea)

2.1 8 119.00 2.1 249.90 0.395 98.710

Grid 7 - (A-Ea)

0.9 8 119.00 0.9 107.10 0.395 42.304

Prepared by Checked by Approved by


Page 59 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
Grid (6-7) to (Ea-G) Down Slab

6.2 8 49.00 6.2 303.80 0.395 120.001

Grid (Ea-G)to (6-7) Down Slab

8.3 8 38.00 8.3 315.40 0.395 124.583


150mm c/c

Grid (4-6) to (A-Da)

17.32 8 15.00 17.32 259.80 0.395 102.621

Grid A

1.05 8 38.00 1.05 39.90 0.395 15.760

Grid B

3.3 8 38.00 3.3 125.40 0.395 49.533

Grid C

3.3 8 38.00 3.3 125.40 0.395 49.533

Grid D

3.3 8 38.00 3.3 125.40 0.395 49.533

Grid Ea

1.45 8 38.00 1.45 55.10 0.395 21.764

Top bar binder


Grid 6,6b&7

3.035 8 104.00 3.035 315.64 0.395 124.677

Prepared by Checked by Approved by


Page 60 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor

Prepared by Checked by Approved by


Page 61 of 62

CHHUMA GANESH CONSTRUCTION


BHAKTAPUR
BAR SCHEDULE
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
Total Weigth
S.no Particulars Dai No Length Quantity Unit
Length Factor
Grid A,B,C&D

3.3 8 78.00 3.3 257.40 0.395 101.673

Grid Ea

6.25

Chair 0.2
0.075 0.075
0.1 8 343.00 0.55 188.65 0.395 74.516
0.1

Total :- 40,043.655 kg.


40.044 M.Ton.

Prepared by Checked by Approved by


CHHUMA GANESH CONSTRUCTION
BHAKTAPUR
RATE ANALYSIS
PROJECT: GAURI SHANKAR GENERAL HOSPITAL BUILDING
SITE : Dolkha, Nepal
BILL NO. : First Running Bill
hu leQf kvf{ndf l;d]G6 s+lqm6 ug]{ sfd dfn;fdfg pknAw ug]{
$@ #) dL6/;Dd 9'jfgL ;lxt
& –@ u -lk=;L=;L= !M#M^_
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
;|f]t kl/df Psf k|To]s ;|f]t
tx÷lsl;d b/ k|lt PsfO{ /sd
;fwg 0f O{ ;fwgsf] hDdf
s_ l;kfn' 1 hjfg 1000.00 1000.00
>lds
v_ HofdL 4 hjfg 800.00 3200.00 4200.00
l;d]G6 0.22 d]=6= 22000.00 4840.00
0.653=dL=
$) dL=dL=9'+uf -qm;\8_ /f]8f 3100.00 2015.00
lgdf{0f ;fdu|L
0.243=dL=
@) dL=dL=9'+uf -qm;\8_ /f]8f 3100.00 744.00
v;|f] afn'jf vf]nfsf]0.473=dL= 2900.00 1363.00 8962.00
jf:tljs b//]6 13162.00
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 1974.30
?= ### k}= hDdf b/ /]6 15136.30

Prepared by Checked by Approved by