Result of inspection Approved Rectification of Defects Defects Identified (Consultant) Item OK Not
OK Not OK Not OK Not OK Not OK Not
1 Foundation acceptance Surface Preparation 2 Setting & Level Form work / Shuttering 3 (a) Position (b) Securing Reinforcement work 4 (a) Position (b) Securing 5 Embedded Items / Pipes (a) Depth of conduit (b) Adherence to the conduit layout (c) Safe keeping of conduit 6 Method of concrete ( Bucket / Pump ) 7 Final Clearing 8 Stop board arrangement 9 Ready Mix 10 No of Vibratos available