Project Date of check

Section /area checked Check after rectification


Result of inspection Approved Rectification of Defects
Defects Identified
(Consultant)
Item OK Not

OK Not OK Not OK Not OK Not OK Not


1
Foundation acceptance Surface Preparation
2
Setting & Level
Form work / Shuttering
3 (a) Position
(b) Securing
Reinforcement work
4 (a) Position
(b) Securing
5 Embedded Items / Pipes
(a) Depth of conduit
(b) Adherence to the conduit layout
(c) Safe keeping of conduit
6 Method of concrete ( Bucket / Pump )
7 Final Clearing
8 Stop board arrangement
9 Ready Mix
10 No of Vibratos available

Comments:

Requested by: Final Approval:


Concrete Type: ………………………………….......................... Approved by:
Signature (BO): Signature Consultant : Signature Consultant :
Estimated Qty: ……………………………………….................... Designation:
………………………………..
Designation: