TIME SCHEDULE
PROYEK REKONTRUKSI/PENINGKATAN STRUKTUR JALA
SIGLI-BEUREUNE
21 AGUSTUS -09 OK
2017
Pengambilan Data
Opname Talud
5 Water Tank
uji sandcone Libur
Core drill
6 Asphalt Finisher
Libur
Idul
Libur
7 Tandem Roller Adha
8 Peuneumatic Tired Roller 1438 H
9 Motor Grader
10 Asphalt Sprayer
11 concrete Mixer
12 Vibrator Roller
note:
Hari Libur
exavator
exavator long arm
compressor air
Dump Truck
Water Tank
Asphalt Finisher
Tandem Roller
Peuneumatic Tired Roller
Motor Grader
Asphalt Sprayer
concrete Mixer
Vibrator Roller
TIME SCHEDULE PERALATAN
ATAN STRUKTUR JALAN BEUREUNEUN-Bts. ACEH UTARA (MYC 2015-2017)
SIGLI-BEUREUNEUN-BIREUN
21 AGUSTUS -09 OKTOBER 2017
2017
Bulan
September Oktober
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9
Perhitungan Trip Dump Truck
4 4 8 8 8
Pengambilan Data
Core Drill
Core Drill
Core Drill
Core Drill
Core Drill
Libur
Libur
Libur
3 2 2
Rekonstruksi/Peningkatan Struktur Jalan Beureunun-BTS. Aceh Utara (MYC 2015-2017) (WIL. I-2C)
SIGLI-BEUREUNEUN-BIREUN
21 AGUSTUS -09 OKTOBER 2017
2017
Volume
No Uraian Pekerjaan Volume per-hari Orderan/ hari Ket
keseluruhan