- Contractor ensure that all work are in full compliance with the requirement of Saudi Aramco Construction Safety Manual (CSM) and
with the provision of Saudi Aramco certification applicable.
Changing Conditions and Emergency Procedures: Stop Work, Switch off all equipments, Supervisors must direct all personnel to the
nearest Emergency Exit and Assembly point.
Written by: MOHD. NAUSHAD Subcontractor Name (if applicable): GLOBAL SUHAIMI COMPANY
Page 2 of 8
JOB SAFETY ANALYSIS
Page 5 of 8
JOB SAFETY ANALYSIS
or alter a tool.
Tools must always be in good
condition ,and tools shall be
properly stored when not in use
Trigger lock must be disabled.
Minimum requirements shall
be Hardhat, safety
glasses/face shield, steel
shoe and gloves and dust
mask or cartridge type.
8. PPE’s Minimum requirements Additional PPE may use All
depending on the work to
be performed and the area
work is being performed.
Safety glasses to be worn
at all times on site
House keeping shall be done on
Slip, trip and fall regular intervals Safety Supervisor
9 House Keeping Site Supervisor or
Good house keeping preventing Foreman
the work area/site hazards free.
Page 6 of 8
JOB SAFETY ANALYSIS
Page 7 of 8
JOB SAFETY ANALYSIS
PTW Receiver
Closing of Work Failure to close the work permit Work permit shall be in
12 Site Supervisor or
permit which is a violation for GI 2.100 compliance with GI 2.100.
Foreman
Page 8 of 8