8.4.2. Proposed Power Supply Plan Broad Land Use Specific Land Use Site Area Gross Floor Area Phase 1 Phase 2 Phase 3
The power supply for developments at Aerocity
Ha m2 MVA at 150/70kV SS MVA at 150/70kV SS MVA at 150/70kV SS
is proposed to tap off the power from the
proposed/planned power plant at IDRMYU or at AEROSPACE PARK
Cirebon. This is subject to agreement from the Aerospace Node 2213,722,898 121 31 76
authorities/power providers. Maintenance Repair
and Overhaul 1322,106,893 50 17 32
In the PT PLN Business Supply Plan for 2013- LOGISTIC HUB
2022, to strengthen the system supply in
Jakarta, construction has been planned for a Logistic & Distribution 4298,583,143 48 28 30
CREATIVE TECHNOLOGY CENTER
EHV transmission line 500kV from power plant
Bio-Life Science 1794,304,936 - 88 176
IDRMYU and from Cirebon. The planned power
plant capacity may need review to supply for Advance Manufacturing 1482,360,196
Aerocity phase 2 (2025-2034) and phase 3 University Campus 1843,667,430 - - 107
BUSINESS PARK
(2035-2045) both of which are very substantial
Financial Center & ICT
(Data Center) 2289,699,672 38 58 261
Mixed Use (inc.
residential) 44512,397,258 87 87 87
RESIDENTIAL TOWNSHIP
Individual Housing 602,418,899 - 59 -
Individual & High-Class
Housing 2005,553,619 - - 205
COMMUNITY FACILITIES
Public Community
Facilities 34473,479 2 2 5
GREEN & BLUE PUBLIC AREA
Green & Blue Area 589
ENERGY CENTER
Energy Center (Power
Plant) 126631,172 3 5 12
INFRASTRUCTURE (Roads, Utility, Public Transportation) 4 7 16
TOTAL 3,481 55,848,755 330 489 1,295
Cumulative total - 818 2,114
Typical Typical
Range of Range of
Typical Range of sizes of sizes of
8.4.2. Proposed Power Supply Plan Estimated No of sizes of Voltage Estimated No of tranformers Voltage Estimated No of tranformers Voltage Estimated No of
Voltage Level MVA substations tranformers (MVA) Level MVA substations (MVA) Level MVA substations (MVA) Level MVA substations
The proposed power installations for
1 no 2x15 1 nos 2x20, 2 nos 2x15,
the Aerocity are shown in the table.
1 nos 2x20, 4 no 2x30, 4 nos 2x20,
The proposed sub-stations are a 500/150kV
Substation which are expanded at each 3 no 2x25, 2 nos 2x35 2 nos 2x25,
phase to meet the demand. 2 no 2x30 1 no 2x40 2 no 2x30,
The proposed 500/150kV sub-station will 1 nos 2x35, 2 no 2x45 3nos 2x35,
distribute with 150kV feeders to 10 nos of 2 no 2x45 1 no 2x50 6 nos 2x40,
150/70kV substations. From these 150/70 kV
substations in turn will feed 70 kV to 61 nos of 70/20kV 1 no 2x55 70/20kV 1 no 2x60 70/20kV 2 nos 2x45, 70/20kV
70/20kV substations in each of the parcels of 1 no 2x60 1 no 2x70 5 nos 2x50,
development. From these 70/20kV substations
1 no 2x75 1 no 2x55
they will be further stepped down to 20/0.4kV at
individual building developments. All substations 1 no 2x60,
should have 1 spare lot for future expansion. 2 no 2x65
2 no 2x75
1 no 2x80,
1 no 2x85,
388 12 575 14 1524 35 1 no 2x95 2487 61
1 nos
2x120, 1
2x95 nos 2x140,
2x180,
150/70kV 150/70kV 2x240 150/70kV 1 no 2x220 150/70kV
1 nos 2x240
1 no 2x250,
3
8.4. POWER SUPPLY