demand factor
Land-use VA /m2
8.4. POWER SUPPLY Industrial Park 100
Proposed 500kV SS at Kertajati logistics and warehouse 20
Kertajati Aerocity to serve Aerocity Creative tech centre Bioscience
8.4.1. Projected Power Demand and Manufacturing 100
Demand Factor Used for Power Projection. The Residential 40
Table lists down the demand factor used for
Residential high class 60
different land uses/zoning in the proposed
development. Campus University 30
Business Park 60
Based on the demand factor and proposed Institution and Community 30
GFA of the site, the power demand at the
500kV/150kV Substation level is 280 MVA, Energy Centre 50
700 MVA and 1800 MVA at Phase 1, 2 and 3 Roads 10
respectively. The power demand at 150/70KV
level are 330 MA, 818 MVA and 2114 MVA
respectively. (Please refer to Projected Power
Demand Table). Demand factors
PLN Power Supply Plan 2013-2022

8.4.2. Proposed Power Supply Plan Broad Land Use Specific Land Use Site Area Gross Floor Area Phase 1 Phase 2 Phase 3
The power supply for developments at Aerocity
Ha m2 MVA at 150/70kV SS MVA at 150/70kV SS MVA at 150/70kV SS
is proposed to tap off the power from the
proposed/planned power plant at IDRMYU or at AEROSPACE PARK
Cirebon. This is subject to agreement from the Aerospace Node 2213,722,898 121 31 76
authorities/power providers. Maintenance Repair
and Overhaul 1322,106,893 50 17 32
In the PT PLN Business Supply Plan for 2013- LOGISTIC HUB
2022, to strengthen the system supply in
Jakarta, construction has been planned for a Logistic & Distribution 4298,583,143 48 28 30
CREATIVE TECHNOLOGY CENTER
EHV transmission line 500kV from power plant
Bio-Life Science 1794,304,936 - 88 176
IDRMYU and from Cirebon. The planned power
plant capacity may need review to supply for Advance Manufacturing 1482,360,196
Aerocity phase 2 (2025-2034) and phase 3 University Campus 1843,667,430 - - 107
BUSINESS PARK
(2035-2045) both of which are very substantial
Financial Center & ICT
(Data Center) 2289,699,672 38 58 261
Mixed Use (inc.
residential) 44512,397,258 87 87 87
RESIDENTIAL TOWNSHIP
Individual Housing 602,418,899 - 59 -
Individual & High-Class
Housing 2005,553,619 - - 205
COMMUNITY FACILITIES
Public Community
Facilities 34473,479 2 2 5
GREEN & BLUE PUBLIC AREA
Green & Blue Area 589
ENERGY CENTER
Energy Center (Power
Plant) 126631,172 3 5 12
INFRASTRUCTURE (Roads, Utility, Public Transportation) 4 7 16
TOTAL 3,481 55,848,755 330 489 1,295
Cumulative total - 818 2,114

Proposed Power Demand 2


8.4. POWER SUPPLY Phase 1 Phase 2 Phase 3 Total

Typical Typical
Range of Range of
Typical Range of sizes of sizes of
8.4.2. Proposed Power Supply Plan Estimated No of sizes of Voltage Estimated No of tranformers Voltage Estimated No of tranformers Voltage Estimated No of
Voltage Level MVA substations tranformers (MVA) Level MVA substations (MVA) Level MVA substations (MVA) Level MVA substations
The proposed power installations for
1 no 2x15 1 nos 2x20, 2 nos 2x15,
the Aerocity are shown in the table.
1 nos 2x20, 4 no 2x30, 4 nos 2x20,
The proposed sub-stations are a 500/150kV
Substation which are expanded at each 3 no 2x25, 2 nos 2x35 2 nos 2x25,
phase to meet the demand. 2 no 2x30 1 no 2x40 2 no 2x30,

The proposed 500/150kV sub-station will 1 nos 2x35, 2 no 2x45 3nos 2x35,
distribute with 150kV feeders to 10 nos of 2 no 2x45 1 no 2x50 6 nos 2x40,
150/70kV substations. From these 150/70 kV
substations in turn will feed 70 kV to 61 nos of 70/20kV 1 no 2x55 70/20kV 1 no 2x60 70/20kV 2 nos 2x45, 70/20kV
70/20kV substations in each of the parcels of 1 no 2x60 1 no 2x70 5 nos 2x50,
development. From these 70/20kV substations
1 no 2x75 1 no 2x55
they will be further stepped down to 20/0.4kV at
individual building developments. All substations 1 no 2x60,
should have 1 spare lot for future expansion. 2 no 2x65
2 no 2x75

1 no 2x80,

1 no 2x85,
388 12 575 14 1524 35 1 no 2x95 2487 61
1 nos
2x120, 1
2x95 nos 2x140,
2x180,
150/70kV 150/70kV 2x240 150/70kV 1 no 2x220 150/70kV
1 nos 2x240

1 no 2x250,

330 2 2x110, 2x240 489 2 1296 6 1 no 2x280 2114 10

tap off from tap off from


500/150k tap off from 500/150k substation 500/150k substation 500/150k
substation at power at Power
power station or 1 station or station or 1
280 1 no 2x300 416 1 2x420 1101 1 no 4x540 1797 3

Proposed Power Supply

3
8.4. POWER SUPPLY

8.4.4. Power Supply 2x85 2x250 2x55


Phase 1 2x35
2x75 2x40
The figure shows the colour coded phasing of 2x45 2x30
the location of substations and indicative 2x40 2x50 2x45 2x30
routing. 2x65
2x240 2x55
2x25
The land footprint indicated for the substations 2x20 2x160 2x35
are subject to PLN agreement. 2x60 2x40
2x20
70kV cable Phase 1 2x20 2x50 2x45 2x60 2x240+2x95+2x120
This phasing route should follow according 2x45
2x50
to the road construction phasing. 70kV cable Phase 2
2x25
It is proposed that all the 500kV , 150kV cable 70kV cable Phase 32x35 2x50 2x30 2x15
and 70kV cable shall be laid underground. 2x402x110 2x35
150kV cable Phase 1 2x280 2x20
The cable shall be laid along dedicated utility 150kV cable Phase 2 2x50 2x30 2x45
corridor at the road side table. 2x30
150kV cable Phase 3 2x75 2x30 2x70 2x40 2x35 2x25
. 70/20kV Sub Station Phase 1, 1 ha 2x180
2x20 2x25
2x30 2x40
2x25
70/20kV Sub Station Phase 2, 1 ha 2x30
2x45 2x15
70/20kV Sub Station Phase 3, 1 ha
2x220
2x80 2x65 2x50
150/70kV Sub Station Phase 1, 2.25 ha 2x95 2x35
2x40 2x240
150/70kV Sub Station Phase 2, 2.25 ha 2x140 2x75
150/70kV Sub Station Phase 3, 2.25 ha 2x60 4x540
500/150kV Sub Station Phase 1, 6 ha 2x20 2x420
2x15 2x300
500/150kV Sub Station Phase 2, 6 ha
500/150kV Sub Station Phase 3, 6 ha

Proposed Power Supply