Anda di halaman 1dari 12

¤ Item

0 01
0 01.01
0 01.02
0 01.03
0 01.04
0 01.05
0 01.06
0 02
0 02.01
0 02.02
0 02.03
0 02.04
0 02.05
0 02.06
0 02.07
0 02.08
0 02.09
0 02.10
0 02.11
0 02.12
0 02.13
0 02.14
0 02.15
0 02.16
0 02.17
0 02.18
0 02.19
0 02.20
0 03
0 03.01
0 03.02
0 03.03
0 03.04
0 03.05
0 03.06
0 03.07
0 03.08
0 03.09
0 03.10
0 03.11
0 04
0 04.01
0 04.02
0 04.03
0 04.04
0 04.05
0 04.06
0 04.07
0 04.08
0 04.09
0 04.10
0 04.11
0 04.12
0 04.13
0 04.14
0 04.15
0 04.16
0 04.17
0 04.18
0 04.19
0 04.20
0 05
0 05.01
0 05.02
0 05.03
0 05.04
0 05.05
0 05.06
0 05.07
0 05.08
0 05.09
0 05.10
0 05.11
0 05.12
0 05.13
0 05.14
0 06
0 06.01
0 06.02
0 06.03
0 06.04
0 06.05
0 06.06
0 06.07
0 06.08
0 06.09
0 06.10
0 06.11
0 06.12
0 07
0 07.01
0 07.02
0 07.03
0 07.04
0 07.05
0 07.06
0 07.07
0 07.08
0 07.09
0 07.10
0 07.11
0 07.12
0 07.13
0 07.14
0 07.15
0 08
0 08.01
0 08.02
0 08.03
0 08.04
0 08.05
0 08.06
0 08.07
0 08.08
0 09
0 09.01
0 09.02
0 09.03
0 09.04
0 09.05
0 09.06
0 09.07
0 09.08
0 09.09
0 09.10
0 10
0 10.01
0 10.02
0 10.03
0 10.04
0 10.05
0 10.06
0 10.07
0 10.08
0 10.09
0 10.10
0 10.11
0 10.12
0 10.13
0 10.14
0 10.15
0 11
0 11.01
0 11.02
0 11.03
0 11.04
0 11.05
0 11.06
0 11.07
0 11.08
0 11.09
0 11.10
0 11.11
0 11.12
0 11.13
0 11.14
0 12
0 12.01
0 12.02
0 12.03
0 12.04
0 12.05
0 12.06
0 12.07
0 12.08
0 12.09
0 12.10
0 13
0 13.01
0 13.02
0 14
0 14.01
Descripción
TRABAJOS PRELIMINARES
CARTEL DE OBRA DE 2.40x3.60M
MOVILIZACION Y DESMOV. DE EQUIPO LIV. Y HERRAMIENTAS
DEMOLICION DE CAPTACION EXISTENTE
DEMOLICION DE RESERVORIO EXISTENTE
ELIMINACION DE MATERIAL DEMOLIDO
ALMACEN
CONSTRUCCION DE CAPTACION (01 UND)
LIMPIEZA MANUAL DE TERRENO
TRAZO Y REPLANTEO
EXCAVACION MANUAL
ELIMINACION MATERIAL EXCEDENTE
CONCRETO F'C=175 KG/CM2. - MUROS Y LOSAS
CONCRETO F'C=140 KG/CM2 - DADOS
PIEDRA ASENTADA CON MORTERO 1:5
CONCRETO F'C=100 KG/CM2 PARA RELLENO
ENCOFRADO Y DESENCOFRADO DE MUROS Y LOSA
ACERO F'y= 4200 KG/CM2
TARRAJEO CON IMPERMEAB. DE INTER. (MORTERO 1:2)
TARRAJEO EN EXTERIORES (MORTERO 1:5)
PINTURA ESMALTE EN EXTERIORES (DOS MANOS)
FILTRO DE ARENA
FILTRO DE GRAVA
SUM. Y COLOC. TUB. DE REBOSE Y LIMPIA Ø 4" + ACCES.-VENTIL. 1"
SUM. Y COLOC. TUB.+ ACCESORIOS-SALIDA CAPTACION
SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60M
SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40M
CERCO PERIMETRICO DE ALAMBRE DE PUAS
LINEA DE CONDUCCION
TRAZO, NIVELACION Y REPLANTEO
CORTE MATERIAL TIERRA EN ZANJAS
REFINE Y NIVELACION DE FONDO DE ZANJAS A=0.60M
CAMA DE APOYO E=0.10, A=0.60M PARA TUBERIA
RELLENO CON MAT. PROPIO ZARANDEADO E=0.30, A=0.60M
RELLENO COMP. CON MATERIAL PROPIO EN ZANJAS
ELIMINACION MATERIAL EXCEDENTE
SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, Ø 1"
SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, Ø 3/4"
PRUEBA HIDRAULICA Y DESINFECCION TUBERIA PVC
SUM. Y COLOC. ACCESORIOS RED CONDUCCION
RESERVORIO RECTANGULAR DE 10 M3
LIMPIEZA MANUAL DE TERRENO
TRAZO Y REPLANTEO
EXCAVACION MANUAL
NIVELACION Y COMPACTACION DE SUBRASANTE
ELIMINACION MANUAL DE MATERIAL EXCEDENTE
BASE GRANULAR DE E=0.20M.
SOLADO E=4" MEZCLA C:H - 1:12
ENCOFRADO Y DESENCOFRADO DE MUROS Y LOSA SUPERIOR
CONCRETO FC=175 KG/CM2 EN CIMIENTOS, MUROS Y LOSAS
ACERO F'y= 4200 KG/CM2
TARRAJEO EN EXTERIORES (MORTERO 1:5)
TARRAJEO CON IMPERMEABILIZANTE DE MUROS - INTERIORES
PENDIENTE DE LOSA DE FONDO (MORTERO 1:2)
PINTURA ESMALTE EN EXTERIORES (DOS MANOS)
SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60M
SUMINISTRO Y COLOCACION DE HIPOCLORADOR
ACCESORIOS TUBERIA DE VENTILACIÓN Ø 4"
WATER STOP DE P.V.C. DE 6". PROVISION Y COLOCADO
SELLO ELASTICO DE POLIURETANO
CERCO PERIMETRICO DE ALAMBRE DE PUAS
CASETA DE VALVULAS DEL RESERVORIO (01 UND)
TRAZO Y REPLANTEO
EXCAVACION MANUAL
ELIMINACION MATERIAL EXCEDENTE
REFINE, NIVELACION Y COMPACTACION
ENCOFRADO Y DESENCOFRADO CASETA
CONCRETO F'C=175 KG/CM2
ACERO F'y= 4200 KG/CM2 - CAJA DE VALVULAS
TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5)
PINTURA ESMALTE EN EXTERIORES (DOS MANOS)
SUM. Y COLOC. TAPA METALICA DE 0.80 x 0.80M
SUM. Y COLOC. VALVULA Ø 3/4"+ACCESORIOS - INGRESO
SUM. Y COLOC. VALVULA Ø 1"+ACCESORIOS - SALIDA
SUM. Y COLOC. TUB. DE LIMPIEZA Y REBOSE Ø 4" + ACCES.
GRAVA PARA CAJAS, Ø MAX.1"
RED DE DISTRIBUCIÓN
TRAZO, NIVELACION Y REPLANTEO
CORTE MATERIAL SEMIROCOSO EN ZANJAS
REFINE Y NIVELACION DE FONDO DE ZANJAS A=0.50M
CAMA DE APOYO E=0.10, A=0.50M PARA TUBERIA
RELLENO CON MAT. PROPIO ZARANDEADO E=0.30, A=0.50M
RELLENO COMP. CON MATERIAL PROPIO EN ZANJAS
ELIMINACION MATERIAL EXCEDENTE
SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, Ø 1"
SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, Ø 3/4"
SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, Ø 1/2"
PRUEBA HIDRAULICA Y DESINFECCION TUBERIA PVC
SUM. Y COLOC. ACCESORIOS RED DISTRIBUCION
CAMARAS ROMPE PRESION TIPO 7 (3 UND.)
TRAZO Y REPLANTEO
EXCAVACION MANUAL
AFIRMADO DE 0.10 M
CONCRETO F'C=175 KG/CM2
CONCRETO F'C=140 KG/CM2 - DADOS
ENCOFRADO Y DESENCOFRADO
ACERO F'y= 4200 KG/CM2
TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES
TARRAJEO EN EXTERIORES (MORTERO 1:5)
PINTURA ESMALTE EN EXTERIORES (DOS MANOS)
SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60M
SUM. Y COLOC. VALVULA Ø 3/4"+ACCESORIOS - INGRESO
SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, Ø 3/4" - CRP T7
PIEDRA ASENTADA CON MORTERO 1:5
CERCO PERIMETRICO DE ALAMBRE DE PUAS - CRPT7
CONEXIONES DOMICILIARIAS (35 und.)
TRAZO Y REPLANTEO
EXCAVACION MANUAL
REFINE Y NIVELACION DE FONDO DE ZANJAS A=0.40M
RELLENO CON MAT. PROPIO ZARANDEADO E=0.30, A=0.40M
RELLENO COMP. CON MATERIAL PROPIO EN ZANJAS
SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, Ø 1/2"
SUM. Y COLOCACION DE LAVATORIO Y ACCESORIOS Ø 1/2"
SUM. Y COLOC. CAJA, VALV. DE CONTROL Y ACCES. Ø1/2"
VALVULAS DE CONTROL (02 UND.)
TRAZO Y REPLANTEO
EXCAVACION MANUAL DE TERRENO
CONCRETO F'C=175 KG/CM2
ENCOFRADO Y DESENCOFRADO DE CAJA
ACERO F'y= 4200 KG/CM2 - VALV. CONTROL
TARRAJEO EN INTERIORES Y EXTERIORES (MORTERO 1:5)
PINTURA ESMALTE EN EXTERIORES (DOS MANOS)
SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40M
SUM. Y COLOC. VALVULA COMPUERTA Ø 3/4"+ACCESORIOS
SUM. Y COLOC. VALVULA COMPUERTA Ø 1"+ACCESORIOS
VALVULAS DE PURGA Y AIRE
TRAZO Y REPLANTEO
EXCAVACION MANUAL DE TERRENO
CONCRETO F'C=175 KG/CM2
CONCRETO F'C=140 KG/CM2
ENCOFRADO Y DESENCOFRADO DE CAJA
ACERO F'y= 4200 KG/CM2 - VALV. PURGA Y AIRE
TARRAJEO EN INTERIORES Y EXTERIORES (MORTERO 1:5)
PINTURA ESMALTE EN EXTERIORES (DOS MANOS)
SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60M
SUM. Y COLOC. VALVULA COMPUERTA Ø 1/2"+ ACCESORIOS (V. PURGA)
SUM. Y COLOC. VALVULA COMPUERTA Ø 3/4"+ ACCESORIOS (V. PURGA)
SUM. Y COLOC. VALVULA COMPUERTA Ø 1"+ ACCESORIOS (V. PURGA)
SUM. Y COLOC. VALVULA COMPUERTA Ø 1"+ACCES. (V. AIRE)
SUM. Y COLOC. VALVULA COMPUERTA Ø 1"+ ACCESORIOS (V. AIRE)
SUM. Y COLOC. VALVULA COMPUERTA Ø 3/4"+ ACCESORIOS (V. AIRE)
PASES AEREOS RED CONDUCCION
TRAZO Y REPLANTEO
EXCAVACION MANUAL
REFINE Y NIVELACION DE SUBRASANTE
RELLENO CON MAT. PROPIO COMPACTADO
ELIMINACION MATERIAL EXCEDENTE
SOLADO E=4" MEZCLA C:H - 1:12
CONCRETO F'C=140 KG/CM2 +30% P.M
CONCRETO F'C=175 KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO F'y= 4200 KG/CM2
TARRAJEO EXTERIOR (MORTERO 1:5)
CABLES Y ACCESORIOS
SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, Ø 1"
PINTURA ESMALTE EN EXTERIORES (DOS MANOS)
CONSTRUCCIÓN DE LETRINAS TRANSPORTABLES (35 UND.)
TRAZO Y REPLANTEO PRELIMINAR
EXCAVACION MANUAL DE HOYO
FORMACION DE TERRAPLEN COMPACTADO A MANO
ROLLISO DE EUCALIPTO Ø 6" ( BROCAL)
CASETA DE MADERA Y PLANCHA DE FIBROCEMENTO
PUERTA DE MADERA CON PLANCHA DE FIBROCEMENTO
CONCRETO F'C=175 KG/CM2. - LOSAS
ACERO F'y= 4200 KG/CM2
SUM. Y COLOC. TUBERIA Y ACCESORIOS DE VENTILACIÓN Ø 4"
PINTURA ESMALTE EN CARPINTERIA DE MADERA
FLETE
FLETE TERRESTRE
FLETE RURAL
VARIOS
LIMPIEZA GENERAL Y ENTREGA DE OBRA
Und. Metrado Precio (S/.) Parcial (S/.)
3,097.09
GLB 1.00 474.69 474.69
GLB 1.00 422.40 422.40
GLB 1.00 500.00 500.00
GLB 1.00 800.00 800.00
GLB 1.00 500.00 500.00
und 1.00 400.00 400.00
8,271.11
m2 11.88 0.73 8.67
m2 11.88 1.20 14.26
m3 23.76 21.77 517.26
m3 29.70 14.51 430.95
m3 6.22 305.95 1,903.01
m3 0.05 277.71 13.89
m2 4.00 32.76 131.04
m3 1.28 233.28 298.60
m2 37.04 44.30 1,640.87
kg 199.45 4.16 829.71
m2 8.25 26.20 216.15
m2 20.16 20.25 408.24
m2 20.16 7.76 156.44
m3 1.25 93.67 117.09
m3 0.80 93.67 74.94
und 1.00 332.75 332.75
und 1.00 571.26 571.26
und 2.00 99.17 198.34
und 1.00 89.17 89.17
m 24.20 13.16 318.47
8,995.86
m 326.60 0.52 169.83
m3 117.78 24.88 2,930.37
m 326.60 1.45 473.57
m 326.60 3.24 1,058.18
m 326.60 1.90 620.54
m 326.60 2.90 947.14
m3 45.07 14.51 653.97
m 335.09 3.91 1,310.20
m 94.85 3.45 327.23
m 326.60 0.62 202.49
GLB 1.00 302.34 302.34
14,927.87
m2 12.25 0.73 8.94
m2 12.25 1.20 14.70
m3 15.63 24.88 388.87
m2 7.93 2.39 18.95
m3 19.54 14.51 283.53
m2 0.72 12.34 8.88
m2 7.93 29.36 232.82
m2 51.95 52.86 2,746.08
m3 18.15 311.95 5,661.89
kg 542.02 4.16 2,254.80
m2 36.69 20.25 742.97
m2 25.65 26.20 672.03
m2 7.43 32.27 239.77
m2 36.69 7.76 284.71
und 1.00 99.17 99.17
und 1.00 38.36 38.36
und 2.00 122.14 244.28
m 11.60 26.12 302.99
m 10.80 11.76 127.01
m 16.00 34.82 557.12
2,283.25
m2 1.24 1.20 1.49
m3 0.25 24.88 6.22
m3 0.31 14.51 4.50
m2 1.24 2.39 2.96
m2 10.04 41.94 421.08
m3 0.58 311.95 180.93
kg 38.70 4.16 160.99
m2 10.04 20.25 203.31
m2 7.35 7.76 57.04
und 1.00 105.93 105.93
und 1.00 109.98 109.98
und 1.00 165.13 165.13
und 1.00 833.73 833.73
m3 0.37 80.96 29.96
135,994.58
m 4,678.65 0.52 2,432.90
m3 1,403.60 43.55 61,126.78
m 4,678.65 1.16 5,427.23
m 4,678.65 3.16 14,784.53
m 4,678.65 1.90 8,889.44
m 4,678.65 2.49 11,649.84
m3 608.22 14.51 8,825.27
m 1,322.01 3.91 5,169.06
m 1,364.28 3.45 4,706.77
m 1,992.36 3.29 6,554.86
m 4,678.65 0.62 2,900.76
glb 1.00 3,527.14 3,527.14
6,398.25
m2 6.27 1.20 7.52
m3 5.03 24.88 125.15
m2 4.95 8.53 42.22
m3 3.13 311.95 976.40
m3 0.09 277.71 24.99
m2 35.76 41.32 1,477.60
kg 145.68 4.16 606.03
m2 10.44 24.03 250.87
m2 30.24 20.25 612.36
m2 22.17 8.78 194.65
und 6.00 99.17 595.02
und 1.00 109.98 109.98
und 1.00 25.94 25.94
m2 6.00 32.76 196.56
m 48.00 24.02 1,152.96
62,978.99
m2 70.00 1.20 84.00
m3 56.00 24.88 1,393.28
m 175.00 0.73 127.75
m 175.00 1.50 262.50
m 175.00 2.49 435.75
m 175.00 3.29 575.75
und 35.00 150.00 5,250.00
und 228.00 240.57 54,849.96
2,095.88
m2 1.62 1.20 1.94
m3 0.97 24.88 24.13
m3 0.48 308.64 148.15
m2 5.76 44.30 255.17
kg 2.78 4.16 11.56
m2 43.95 20.25 889.99
m2 24.60 8.78 215.99
und 2.00 89.17 178.34
und 2.00 63.23 126.46
und 5.00 48.83 244.15
5,660.83
m2 7.78 1.20 9.34
m3 7.13 24.88 177.39
m3 3.77 308.64 1,163.57
m3 0.26 277.71 72.20
m2 39.00 41.32 1,611.48
kg 211.81 4.16 881.13
m2 35.16 20.25 711.99
m2 19.68 7.76 152.72
und 4.00 99.17 396.68
und 2.00 48.63 97.26
und 1.00 54.03 54.03
und 1.00 49.43 49.43
und 3.00 60.05 180.15
und 1.00 49.43 49.43
und 1.00 54.03 54.03
36,817.69
m2 136.65 1.20 163.98
m3 68.28 24.88 1,698.81
m2 27.06 2.39 64.67
m3 20.52 20.11 412.66
m3 67.42 14.51 978.26
m2 33.31 29.36 977.98
m3 29.12 233.18 6,790.20
m3 24.18 308.64 7,462.92
m2 22.40 41.32 925.57
kg 506.50 4.16 2,107.04
m2 16.80 20.25 340.20
GLB 1.00 14,152.62 14,152.62
m 103.34 3.91 404.06
m2 43.65 7.76 338.72
42,933.22
m2 169.40 1.20 203.28
m3 51.03 29.04 1,481.91
m3 50.47 14.01 707.08
und 308.00 20.02 6,166.16
und 35.00 688.25 24,088.75
und 35.00 181.47 6,351.45
m3 3.18 333.06 1,059.13
kg 215.99 4.16 898.52
und 35.00 27.61 966.35
m2 185.77 5.44 1,010.59
9,387.72
glb 1.00 3,813.56 3,813.56
dia 8.00 696.77 5,574.16
1,000.00
GLB 1.00 1,000.00 1,000.00