i
FIGURE LIST
Figure 1. Flow Chart of Deterministic Method ........................................ Error! Bookmark not defined.
Figure 2. Flow Chart of Probabilistic Method .......................................... Error! Bookmark not defined.
Figure 9. Distribution for Probabilistic Method ....................................... Error! Bookmark not defined.
Figure 10. Monte Carlo Simulation .......................................................... Error! Bookmark not defined.
Figure 11. Result of Monte Carlo Simulation ........................................... Error! Bookmark not defined.
ii
TABLE LIST
1
CHAPTER I INTRODUCTION
2
CHAPTER II DISCUSSION
In X field, There are three existing wells ( TM-1, TM-2, TM-3), and from the best case well IN-2, IN-4
were added. The gathering station located in the middle of 5 wells near TM-1 with the red dot in
Figure 1.
GS
Because flow from TM-3 to gathering station pass through TM-1, TM-1 and TM-3 can be made into
one source. Choke is use for every source from each well to maintain the flowrate and wellhead
pressure. The flow from each source gather in joint J before entering three phase separator. Output
gas from separator are delivered to the market that has distance 30 km or 98425.2 ft. Because far
distance to the market, Compressor is needed to raise the pressure and help deliver the produced
gas, while the condensate and produced water went into treatment facility.
3
4
CHAPTER III CLOSING
5
1.1 Conclusion
3.3 Reference
Ariadji, Tutuka. Perencanaan Pengembangan Lapangan Migas. 2016. Bandung:
Penerbit ITB