PROJECT : LINDE AG - NEW PITCH GASIFICATION PLANT (TEMPORARY SITE FACILITIES)

2019 2020
MAY JUNE JULY AUGUST SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE JULY AUGUST
DUR START FINISH
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
52
A) MOBILISATION 10-May-19 30-Jun-19
DAYS
PERSONNELS 52 10-May-19 30-Jun-19
MATERIALS 52 10-May-19 30-Jun-19
TOOLS, EQUIPMENT, AND SMALL MACHINERIES 52 10-May-19 30-Jun-19
HEAVY MACHINERIES 52 10-May-19 30-Jun-19
183
B) SITE PREPARATION (INCL. UP-ROOTING & LEVELLING) 1-Jun-19 30-Nov-19
DAYS
WEST PLOT AREA (W/ FENCING) 91 1-Jun-19 30-Aug-19
EAST PLOT AREA (W/ FENCING) 91 1-Jun-19 30-Aug-19
LAYDOWN EAST AREA (W/ FENCING, DRAINAGE, GRAVELING) 123 1-Jun-19 30-Sep-19
LAYDOWN 2A+2B AREA (W/ FENCING, DRAINAGE, GRAVELING) 92 1-Aug-19 30-Oct-19
LAYDOWN BANYAN AREA (W/ FENCING, DRAINAGE, GRAVELING) 91 1-Sep-19 30-Nov-19
76 (P1) 1/6/2019 (P1) 30/8/2019 (P1)
C) TEMPORARY SITE FACILITIES (W/ FREE OF A & B PUNCH POINT)
62 (P2) 1/5/2020 (P2) 1/7/2020 (P2)
OFFICE COMPANY WEST & EAST PLOT - PHASE 1 76 1-Jun-19 15-Aug-19
OFFICE FUTURE MAIN CONTRACTOR - PHASE 1 76 1-Jun-19 15-Aug-19
TSF WEST PLOT + TSF EAST PLOT (FENCING, SHELTERS, SANITARY) - PHASE 1 91 1-Jun-19 30-Aug-19
WAREHOUSE (EAST SIDE LAYDOWN) - PHASE 1 91 1-Jun-19 30-Aug-19
OFFICE COMPANY - PHASE 2 62 1-May-20 1-Jul-20
OFFICE FUTURE MAIN CONTRACTOR - PHASE 2 62 1-May-20 1-Jul-20
RESTING SHELTER LAYDOWN EAST PLOT - PHASE 2 62 1-May-20 1-Jul-20
30 (P1) 1/1/2020 (P1) 30/1/2020 (P1)
D) DEMOBILISATION
30 (P2) 1/7/2020 (P2) 30/7/2020 (P2)
PHASE 1 30 1-Jan-20 30-Jan-20
PHASE 2 30 1-Jul-20 30-Jul-20
**SUNDAYS AND PUBLIC HOLIDAYS ARE NOT YET CONSIDERED 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
**P1 & P2 MEANS PHASE 1 OR PHASE 1
Attachment 1 to Instructions to Tenderer Project No. 2910BX58
Project Name Singapore
TENDERER'S CONSTRUCTION Manpower dedicated to the Project (incl. SUBCONTRACTOR
Inquiry No. Personnel)
001 2MI0230

Planned manpower in month... Total


Qualification / profession
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Man-Months

A. Direct Labour

1.) Civil Works


a General Foreman / Foreman - Civil 1 1 1 1 1 1 1 1 1 0 0 0 1 1 1 12
b General Workers 15 40 40 40 25 25 25 25 25 0 0 0 25 25 25 335
c Carpenter 0
d Mason 0
e Rebarman 0
0
Sub-Total 16 41 41 41 26 26 26 26 26 0 0 0 26 26 26 0 0 0 0 0 0 347

2.) Mechanical Works


a General Foreman / Foreman - Mechanical & Millwright 0
b Leadman - Mechanical & Millwright 0
c Boilermaker 0
d Millwright 0

Sub-Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3.) Steel Structure Works
a General Foreman / Foreman - Steel Structure 0
b Leadman - Steel Structure 0
c Ironworker / Structural Worker / Erector 0
d Welder 0 6 6 6 0 0 0 0 0 0 0 0 6 6 0 30

Sub-Total 0 6 6 6 0 0 0 0 0 0 0 0 6 6 0 0 0 0 0 0 0 30
4.) Piping Works
a General Foreman / Foreman - Piping / Piping Pre-Fabrication 0
b General Foreman / Foreman - Welding 0
c Leadman - Piping / Piping Pre-Fabrication / Welding 0 1 1 1 0 0 0 0 0 0 0 0 1 1 1 6
d Pipefitter / Pre-Fabricator 0
e Plumber 0 10 10 10 0 0 0 0 0 0 0 0 10 10 0 50
f Welder (Stainless Steel) 0
g Welder (Carbon Steel) 0
h Welder (Aluminium) 0
i Overall Welder (Pipe / Tig) (SS+CS+Alu) 0

Sub-Total 0 11 11 11 0 0 0 0 0 0 0 0 11 11 1 0 0 0 0 0 0 56
5.) Electrical & Instrument Works
a General Foreman / Foreman/ Leadman - Electrical / Instrument 0 1 1 1 0 0 0 0 0 0 0 0 1 1 1 6
b Industrial Electrician / wireman 0 10 10 10 0 0 0 0 0 0 0 0 10 10 10 60
c Cable Splicer LV/MV 0
d Electrician for tests and switching activity 0
e Heat tracing fitter/splicer/tester for SL and MI cable 0
f Instrument Technician 0
g Instrument Fitter 0
h Loop Tester 0
i Welder 0
j Helper 0

Sub-Total 0 11 11 11 0 0 0 0 0 0 0 0 11 11 11 0 0 0 0 0 0 66
6.) Painting & Insulation Works
a General Foreman / Foreman - Painting 0
b General Foreman / Foreman - Insulation 0
c Leadman - Painting / Insulation 0
d Painter 0
e Sandblaster 0
f Wrapper / Insulator 0
g Tinsmith 0

Sub-Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7.) Common works
a General Foreman / Foreman - Scaffolding 1 1 1 1 1 1 1 1 1 0 0 0 1 1 0 11
b General Foreman / Foreman - Rigging 0
c General Foreman / Foreman - Pre-Commissioning 0
d Leadman - Scaffolding / Rigging 0
e Rigger 0
f Scaffolder 0 10 10 10 5 5 5 5 5 0 0 0 10 10 0 75
g Heavy Equipment Operator 0
h Helper / Laborer 0
i Punchlist / Pre-Commissioning Crew 0

Sub-Total 1 11 11 11 6 6 6 6 6 0 0 0 11 11 0 0 0 0 0 0 0 86

A. Total Direct Labour 17 80 80 80 32 32 32 32 32 0 0 0 65 65 38 0 0 0 0 0 0 585

B. Indirect Labour

1.) Project Management


a Project Manager / Site Manager 1 1 1 1 1 1 1 1 1 0 0 0 1 1 1 12
b Construction Manager / Production Manager 0
0
Sub-Total 1 1 1 1 1 1 1 1 1 0 0 0 1 1 1 0 0 0 0 0 0 12
2.) Supervision
a Superintendent / Supervisor (Civil) 0
b Superintendent / Supervisor (Steel Structure) 0
Superintendent / Supervisor
c
(Mechanical / Piping / Welding / Material) 0
d Superintendent / Supervisor (Electrical / Instrument) 0
e Superintendent / Supervisor (Rigging / Scaffolding) 0
f Superintendent / Supervisor (Painting / Insulation) 0
g Superintendent / Supervisor (Pre-Commissioning) 0
0
Sub-Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Non-Manual Indirect Labour 0
Appellation of qualifications can be adjusted according to Tenderer's internal appellation. Page 2 of 21
Further qualifications can be added.
Attachment 1 to Instructions to Tenderer Project No. 2910BX58
Project Name Singapore
TENDERER'S CONSTRUCTION Manpower dedicated to the Project (incl. SUBCONTRACTOR
Inquiry No. Personnel)
001 2MI0230

Planned manpower in month... Total


Qualification / profession
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Man-Months
3.) Field Engineering 0
a Engineering Manager 0
b Supervising Engineer 0
c Engineer - Civil 1 1 1 1 1 1 1 1 1 0 0 0 1 1 1 12
d Engineer - Material 0
e Engineer - Steel Structure 0
f Engineer - Architect 0
g Engineer - Mechanical / Piping 0
h Engineer - Electrical / Instrument 0
i Engineer - Test Package 0
j Sr. / Jr. Draftsman 0
0
Sub-Total 1 1 1 1 1 1 1 1 1 0 0 0 1 1 1 0 0 0 0 0 0 12

4.) Quality Control


a QC Manager 0
b QC Supervisor 1 1 1 1 1 1 1 1 1 0 0 0 1 1 1 12
c QC Inspector - Civil / Steel Structure 0
d QC Inspector - Mechanical 0
e QC Inspector - Piping / Welding 0
f QC Inspector - Coating / Insulation 0
g QC Inspector - Electrical / Instrument 0
h QC Document Controller 0
i QC Clerk / News Operator 0
j PWHT (Post welding heat treatment) Technician 0
0
Sub-Total 1 1 1 1 1 1 1 1 1 0 0 0 1 1 1 0 0 0 0 0 0 12
5.) Project Control
a Planning Coordinator 0
b Planning Enginner or Supervisor 0
c Cost Control Engineer 0
0
Sub-Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6.) HSE & Loss Prevention
a Safety Manager 0
b Safety Superintendent / Supervisor 1 1 1 1 1 1 1 1 1 0 0 0 1 1 1 12
c Safety Officer 0
d Safety Assistant 0
0
Sub-Total 1 1 1 1 1 1 1 1 1 0 0 0 1 1 1 0 0 0 0 0 0 12
7.) Administration
a Contract Coordinator / Administrator 1 1 1 1 1 1 1 1 1 0 0 0 1 1 1 12
b Contract Assistant 0
c Personnel / Administration Supervisor 0
d Personnel / Liaison Officer 0
e Personnel Clerk / Assistant 0
f Camp Administrator 0
g Doctor 0
h Nurse / Paramedic 0
i Ambulance Driver 0
j Accountant 0
k Account Officer 0
l Account Assistant 0
m Secretary 0
n Security Guard 0
o Computer Operator 0
p Others 0
0
Sub-Total 1 1 1 1 1 1 1 1 1 0 0 0 1 1 1 0 0 0 0 0 0 12
8.) Material / Warehousing
a Material / Warehouse Supervisor 0
b Foreman Warehouse / Material 0
c Purchaser 1 1 1 1 1 1 1 1 1 0 0 0 1 1 1
d Material Expediter 0
e Material Custom Coordinator 0
f I/R Clerk / Assistant 0
g Warehouse Helper / Rigger / Yardman / Toolkeeper 0
0
Sub-Total 1 1 1 1 1 1 1 1 1 0 0 0 1 1 1 0 0 0 0 0 0 12

9.) Survey Crew


a Surveyor 0 4 4 4 2 2 2 1 1 0 0 0 1 1 1 23
b Rodman / Chainman / Assistant 0 4 4 4 2 2 2 1 1 0 0 0 1 1 1 23
0
Sub-Total 0 8 8 8 4 4 4 2 2 0 0 0 2 2 2 0 0 0 0 0 0 46

10.) Equipment Services


a Equipment Coordinator / Supervisor 0
b Foreman Equipment 0
c Crane Operator 0 2 2 2 0 0 0 0 2 0 0 0 2 2 2 14
d Truck Driver 2 2 2 2 2 2 1 0 1 0 0 0 2 2 2 20
e Bulldozer Operator 0 4 4 4 4 4 2 0 0 0 0 0 0 0 0 22
f Excavator Operator 0 2 2 2 2 2 2 0 0 0 0 0 1 1 0 14
g Dump Truck Driver 0 4 4 4 4 4 4 0 0 0 0 0 0 0 0 24
h Road Roller Operator 0 2 2 2 2 2 2 0 0 0 0 0 0 0 0 12
i ESD (Electron-stream drilling) Assistant 0
0
Sub-Total 2 16 16 16 14 14 11 0 3 0 0 0 5 5 4 0 0 0 0 0 0 106

B. Total Indirect Labour 8 30 30 30 24 24 21 8 11 0 0 0 13 13 12 0 0 0 0 0 0 224

A. Total Direct Labour 17 80 80 80 32 32 32 32 32 0 0 0 65 65 38 0 0 0 0 0 0 585


B. Total Indirect Labour 8 30 30 30 24 24 21 8 11 0 0 0 13 13 12 0 0 0 0 0 0 224
C. OVERALL MANPOWER 25 110 110 110 56 56 53 40 43 0 0 0 78 78 50 0 0 0 0 0 0 809

Appellation of qualifications can be adjusted according to Tenderer's internal appellation. Page 3 of 21


Further qualifications can be added.
Attachment 2 to Instructions to Tenderer Project No. 2910BX58
Project Name <project name>
TENDERER'S EQUIPMENT dedicated to the Project (incl. SUBCONTRACTOR equipment) Inquiry No. 001 2MI0230

Unit Rate per


Description Specification day, fully
Month ... Total
Type Capacity Own Rented maintenanced 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Equip.-Months
0
Cars / Service
Service Bus 0
Service Car 0
Service Pick-Up 0
Service Van 0
0
Cranes / Lifting
Forklift 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 17
Mobile Crane 0 2 2 2 0 0 0 0 2 0 0 0 2 2 2 14
Pillar Crane 0
Service Crane 0
0
Earth Works
Bulldozer 0 4 4 4 4 4 2 0 0 0 0 0 0 0 0 22
Excavator 0 2 2 2 2 2 2 0 0 0 0 0 1 1 0 14
Mini Loader 0
Motor Grader 0
Road Roller 0 2 2 2 2 2 2 0 0 0 0 0 0 0 0 12
Wheel Loader 0
0
Trucks
Ambulance 0
Concrete Mixer 0
Concrete Pump 0
Dump Truck 0 4 4 4 4 4 4 0 0 0 0 0 0 0 0 24
Fire Engine 0
Fuel Tanker 0
Lube Truck 0
Tractor 0
Tractor Trailer 0
Trailer 0
Truck 2 2 2 2 2 2 1 0 1 0 0 0 2 2 2 20
Tugger 0
Water Tanker 0
0
Equipments & Machines
Air Compressor 0 4 4 4 4 4 4 2 2 2 2 2 2 2 2 40
Cable Pulling Machine 0
Concrete Cutter 0 2 2 2 2 2 2 0 0 0 0 0 0 0 0 12
Concrete Mixer 1 4 4 4 4 4 4 0 0 0 0 0 0 0 0 25
Concrete Trowel 1 6 6 6 6 6 6 0 0 0 0 0 0 0 0 37
Concrete Vibrator 1 6 6 6 6 6 6 0 0 0 0 0 0 0 0 37
Cut / Bevel Machine 0
Electric Air Blower/Exhaust 0
Garnet Recycle Pump 0
Generator Set 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 30
Hydratight Equipment 0
Hydro Test Pump 0
Impact Wrench 0
Jetting Pump 0
Line-Up Clamp 0
Manlift 0
Paint Spray Set 0
Plate Compactor 0 3 3 3 3 3 3 2 2 2 2 2 2 2 2 34
Portable Heating Equipment for work during
winter times, e.g. "Heat Kings"
Radios 0
Rebar Cutter/Bender 0 4 4 4 4 4 4 2 2 2 2 2 2 2 2 40
Reach stacker (for container handling)
Roller Compactor 0
Sandblasting Machine 0
System Formwork in square meters 0
Torque Wrench 0
Water Pump 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 28
Welding Machine 1 4 4 4 4 4 4 2 2 2 2 2 2 2 2 41
Well Point System 0
0
Formwork
Systems formwork in square meters 1 1
0
Scaffolding
Scaffolding in cubic meters 1 1
"Cherry Picker"
Scissor Lifts
0
Site Facilities
Office Container in meters 1 1
Shelter in square meters 1 1

Appellation of equipment can be adjusted according to Tenderer's internal appellation.


Further equipment can be added. Page4 of 21
Attachment 3 to Instructions to Tenderer Project No. 2910BX58
Project Name Singapore
TENDERER'S overall manpower availability in Singapore (incl. SUBCONTRACTOR Personnel) Inquiry No. 001 2MI02

January February March April May June July August September October November December
2019
at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total
Available Manpower Civil 9,876
Available Manpower Mechanical
Available Manpower E&I
Total Available Manpower 0 0 0 0 0 0 0 0 0 0 0 0 9,876 0 0 0 0 0 0 0 0 0 0 0

Current Workload Projects


Current Workload Maintenance
Total Current Workload 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Anticipated Workload

January February March April May June July August September October November December
2020
at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total
Available Manpower Civil
Available Manpower Mechanical
Available Manpower E&I
Total Available Manpower 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Current Workload Projects


Current Workload Maintenance
Total Current Workload 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Anticipated Workload

January February March April May June July August September October November December
2021
at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total
Available Manpower Civil
Available Manpower Mechanical
Available Manpower E&I
Total Available Manpower 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Current Workload Projects


Current Workload Maintenance
Total Current Workload 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Anticipated Workload

January February March April May June July August September October November December
2022
at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total at Site total
Available Manpower Civil
Available Manpower Mechanical
Available Manpower E&I
Total Available Manpower 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Current Workload Projects


Current Workload Maintenance
Total Current Workload 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Anticipated Workload

(1) Appellation of qualification can be adjusted acc. to Tenderer's internal appellation.


(2) Further qualification can be added.
(3) "at Site" = personnel on Job Site Page 5 of 21
(4) "total" = total personnel available in the country of Site
Attachment 4 to Instructions to Tenderer Project No. 2910BX58
Project Name Singapore
Manpower Qualification dedicated to the Project Inquiry No. 001 2MI0230

Qualification / profession Own Personnel Subcontracting / temporary Personnel (on valid VISA)
(number of employees) (number of employees)
available in total Singapore outside of total Singapore outside of
Singapore Singapore

Direct Labour

Civil Works
1 General Foreman / Foreman - Civil
2 Leadman - Civil
3 Carpenter
4 Mason
5 Rebarman
Sub-Total 0 0 0 0 0 0

Mechanical Works
1 General Foreman / Foreman - Mechanical & Millwright
2 Leadman - Mechanical & Millwright
3 Boilermaker
4 Millwright
Sub-Total 0 0 0 0 0 0

Steel Structure Works


1 General Foreman / Foreman - Steel Structure
2 Leadman - Steel Structure
3 Ironworker / Structural Worker / Erector
4 Welder
Sub-Total 0 0 0 0 0 0

Piping Works
1 General Foreman / Foreman - Piping /
Piping Pre-Fabrication
2 General Foreman / Foreman - Welding
3 Leadman - Piping / Piping Pre-Fabrication / Welding
4 Pipefitter / Pre-Fabricator
5 Plumber
6a Welder (Stainless Steel)
6b Welder (Carbon Steel)
6c Welder (Aluminium)
7 Overall Welder (Pipe / Tig) (SS+CS+Alu)
Sub-Total 0 0 0 0 0 0

Electrical & Instrument Works


1 General Foreman / Foreman - Electrical / Instrument
2 Leadman - Electrical / Instrument
3 Industrial Electrician
4 Cable Splicer
5 Instrument Technician
6 Instrument Fitter
Sub-Total 0 0 0 0 0 0

Painting & Insulation Works


1 General Foreman / Foreman - Painting
2 General Foreman / Foreman - Insulation
3 Leadman - Painting / Insulation
4 Painter
5 Sandblaster
6 Wrapper / Insulator
7 Tinsmith
Sub-Total 0 0 0 0 0 0

Common works
1 General Foreman / Foreman - Scaffolding
2 General Foreman / Foreman - Rigging
3 General Foreman / Foreman - Pre-Commissioning
4 Leadman - Scaffolding / Rigging
5 Rigger
6 Scaffolder
7 Heavy Equipment Operator
8 Helper / Laborer
9 Punchlist / Pre-Commissioning Crew
Sub-Total 0 0 0 0 0 0

Total Direct Labour 0 0 0 0 0 0

Indirect Labour

Project Management
1 Project Manager / Site Manager
2 Construction Manager / Production Manager
Sub-Total 0 0 0 0 0 0

Supervision
1 Superintendent / Supervisor (Civil)
2 Superintendent / Supervisor (Steel Structure)
3 Superintendent / Supervisor
(Mechanical / Piping / Welding / Material)
4 Superintendent / Supervisor (Electrical / Instrument)
5 Superintendent / Supervisor (Rigging / Scaffolding)
6 Superintendent / Supervisor (Painting / Insulation)
7 Superintendent / Supervisor (Pre-Commissioning)
Sub-Total 0 0 0 0 0 0

Non-Manual Indirect Labour

Field Engineering
1 Engineering Manager
2 Supervising Engineer
3 Engineer - Civil
4 Engineer - Material
5 Engineer - Steel Structure
6 Engineer - Architect
Appellation of qualification can be adjusted according to Tenderer's internal appellation. Page 6 of 21
Further qualifications can be added.
Attachment 4 to Instructions to Tenderer Project No. 2910BX58
Project Name Singapore
Manpower Qualification dedicated to the Project Inquiry No. 001 2MI0230

Qualification / profession Own Personnel Subcontracting / temporary Personnel (on valid VISA)
(number of employees) (number of employees)
available in total Singapore outside of total Singapore outside of
Singapore Singapore
7 Engineer - Mechanical / Piping
8 Engineer - Electrical / Instrument
9 Engineer - Test Package
10 Sr. / Jr. Draftsman
11 Document Controller
12 Printer / Helper
Sub-Total 0 0 0 0 0 0

Quality Control
1 QC Manager
2 QC Supervisor
3 QC Inspector - Civil / Steel Structure
4 QC Inspector - Mechanical
5 QC Inspector - Piping / Welding
6 QC Inspector - Coating / Insulation
7 QC Inspector - Electrical / Instrument
8 QC Document Controller
9 QC Clerk / News Operator
10 QC Assistant
11 PWHT (Post welding heat treatment) Technician
Sub-Total 0 0 0 0 0 0

Project Control
1 Planning Coordinator
2 Planning Supervisor
3 Planning Engineer
4 Cost Control Engineer
5 Material Control Engineer
6 Quantity Surveyor / Tracker
Sub-Total 0 0 0 0 0 0

HSE & Loss Prevention


1 Safety Manager
2 Safety Superintendent / Supervisor
3 Safety Officer
4 Safety Assistant
Sub-Total 0 0 0 0 0 0

Administration
1 Contract Coordinator / Administrator
2 Contract Assistant
3 Personnel / Administration Supervisor
4 Personnel / Liaison Officer
5 Personnel Clerk / Assistant
6 Camp Administrator
7 Doctor
8 Nurse / Paramedic
9 Ambulance Driver
10 Accountant
11 Account Officer
12 Account Assistant
13 Secretary
14 Security Guard
15 Computer Operator
16 Others
Sub-Total 0 0 0 0 0 0

Material / Warehousing
1 Material / Warehouse Supervisor
2 Foreman Warehouse
3 Foreman Material
4 Material Custom Coordinator
5 Purchaser
6 Material Expediter
7 I/R Clerk / Assistant
8 Warehouseman
9 Toolkeeper
10 Yardman
11 Warehouse Helper / Rigger
Sub-Total 0 0 0 0 0 0

Survey Crew
1 Surveyor
2 Rodman / Chainman / Assistant
Sub-Total 0 0 0 0 0 0

Equipment Services
1 Equipment Coordinator / Supervisor
2 Foreman Equipment
3 Crane Operator
4 HE Driver / Bus Driver
5 Auto Electrician, Painter, Body Mechanic /
Heavy Equipment & Bench Mechanic /
Lubeman / Tireman / Permit Rcvr
6 Machinist
7 Fuel Injection Calibrator, AC (Arc Welding) Technician
8 Equipment Tender
9 ESD (Electron-stream drilling) Assistant
Sub-Total 0 0 0 0 0 0

Total Indirect Labour 0 0 0 0 0 0

Total Direct Labour 0 0 0 0 0 0


Total Indirect Labour 0 0 0 0 0 0
OVERALL MANPOWER 0 0 0 0 0 0

Appellation of qualification can be adjusted according to Tenderer's internal appellation. Page 7 of 21


Further qualifications can be added.
Attachment 6 to Instructions to Tenderer Project No. 2910 BX58
Project Name: Singapore
Manpower Recruitment dedicated to the Project *) Inquiry No.: 001 2MI0230

Not currently employed with Bidder


Nationality currently employed with Bidder
and expected to be recruited from COUNTRY
thereof
holding
Qualification / profession Country A Country B Country C Country D Total Country A Country B Country C Country D Total
required
certificates
1 Superintendent / Supervisor 0 0
2 General Foreman / Foreman 0 0
3 Work leader (PTW Owner) 0 0
4 Welder 0 0
5 Fire Watcher 0 0
6 Skilled Worker 0 0
7 Semi-Skilled Worker 0 0
8 Helper 0 0

Estimated recruitment duration up to


full availability at SITE (in weeks)
incl. all inductions & certications

*) Please insert further columns covering the nationalities / countries being considered by Bidder

Appellation of qualification can be adjusted according to Bidder's internal appellation. Page 8 of 21


Further qualifications can be added.
Area Requirements Project No.
Project Name
Bidder's Own Temporary Inquiry No.
Site Facilities

Quantity Description Dimension Area


(m x m) (m²)
Office container x 0
Container for supervisors x 0
Container for direct personnel x 0
Sanitary container x 0
Workshop for carbon steel material x 0
Workshop for stainless steel material x 0
Workshop for aluminium x 0
Other workshops x 0
Warehouse, storage x 0
Prefabrication area x 0
Storage area x 0
Sandblasting area x 0
NDE area x 0
Parking area x 0
Storage for machines x 0
Others (please specify) x 0

Total area requirements in m²

Remark
A site accommodation plan can be drawn with completed formsheet only.

Issue : 2.0
Intellectual property rights reserved acc. ISO 16016 Date: 29.03.2010
2910 BX58
Singapore
001 2MI0230

∑ Areas
(m²)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Issue : 2.0
Intellectual property rights reserved acc. ISO 16016 Date: 29.03.2010
Project No.
Power Requirements Project Name
Inquiry No.

1.0 Office-, Staff-, Sanitary Container

Pos Equipment Voltage Qty Single Total


3-phase AC 400 V consumption consumption
1-phase AC 230 V V kW kW
1.1 Office Container
1.2 Staff Container
1.3 Sanitary Container
1.4 Lighting
1.5 Heating,
Heating, Air
Air
Conditioning
1.6 Others

400 V - total
230 V - total

2.0 Prefabrication

Pos Equipment Voltage Qty Power kW Simul- Total


3-phase AC 400 V average taneity consumpt.
1-phase AC 230 V V per factor (approx)
equipm. total % kW
2.1 Lifting devices
2.2 Welding machines
2.3 Portable power tools
2.4 Annealing equipment
2.5 Shop equipment
2.6 Air compressors
2.7 Blast cleaning shop
2.8 Heating / air condition
2.9 Container
(office, sanitary etc.)
2.10 Warehouse
2.11 Lighting
2.12 Others

400 V - total
230 V - total

Issue: 2.0
Intellectual property rights reserved acc. ISO 16016 Date: 29.03.2010
3.0 Plant Area

Pos Equipment Voltage Qty Power kW Simul- Total


3-phase AC 400 V average taneity consumpt.
1-phase AC 230 V V per factor (approx.)
equipm. total % kW
3.1 Lifting devices
3.2 Welding machines
3.3 Portable power tools
3.4 Annealing equipment
3.5 Air compressors
3.6 Blast-cleaning shop
3.7 Heating, air condition
3.8 Container
(office, sanitary etc.)
3.9 Warehouse
3.10 Lighting
3.11 Others

400 V - total
230 V - total

4.0 Distribution Boxes

Pos Distributor Qty Value per unit


3-phase AC kVA
4.1 Main power distributor
4.2 Sub power distributor

Total

Issue: 2.0
Intellectual property rights reserved acc. ISO 16016 Date: 29.03.2010
2910 BX58
Singapore
001 2MI0230

Period of time
(approx.)
from until

Period of time
(approx)

from until

Issue: 2.0
Intellectual property rights reserved acc. ISO 16016 Date: 29.03.2010
Period of Time
(approx.)

from until

Total
kVA

Issue: 2.0
Intellectual property rights reserved acc. ISO 16016 Date: 29.03.2010
Project No. 2910 BX58
Attachment 9 - ESTIMATED MAN- Project Name Singapore
YEAR-ENTITLEMENT (MYE) - Inquiry No. 0012MI0230
CONSTRUCTION MANPOWER
Doc. No. &AA-0230-W-VT-9302.090
Tenderer name: xxxx

2019 2020 2021 2022 2023


MYE MYE MYE MYE MYE
for Work for Work for Work for Work for Work TOTAL
Permits (WP) Permits (WP) Permits (WP) Permits (WP) Permits (WP)

A. Direct Labour 0 0 0 0 0 0
1.) Civil Works 0 0 0 0 0 0
EXAMPLE WORKER 5 1 1 3 0 10
a General Foreman / Foreman - Civil 0
b Leadman - Civil 0
c Carpenter 0
d Mason 0
e Rebarman 0
0
2.) Mechanical Works 0 0 0 0 0 0
a General Foreman / Foreman - Mechanical & Millwright 0
b Leadman - Mechanical & Millwright 0
c Boilermaker 0
d Millwright 0
0
3.) Steel Structure Works 0 0 0 0 0 0
a General Foreman / Foreman - Steel Structure 0
b Leadman - Steel Structure 0
c Structural Worker / Erector 0
0
4.) Piping Works 0 0 0 0 0 0
a General Foreman 0
b Leadman - Piping 0
c Pipefitter 0
d Welder 0
0
5.) Electrical & Instrument Works 0 0 0 0 0 0
a General Foreman / Foreman - Electrical / Instrument 0
b Industrial Electrician / wireman 0
c Cable Splicer LV/MV 0
d Electrician for tests and switching activity 0
e Instrument Technician 0
f Loop Tester 0
g Welder 0

Page 15 of 21
Project No. 2910 BX58
Attachment 9 - ESTIMATED MAN- Project Name Singapore
YEAR-ENTITLEMENT (MYE) - Inquiry No. 0012MI0230
CONSTRUCTION MANPOWER
Doc. No. &AA-0230-W-VT-9302.090
Tenderer name: xxxx

2019 2020 2021 2022 2023


MYE MYE MYE MYE MYE
for Work for Work for Work for Work for Work TOTAL
Permits (WP) Permits (WP) Permits (WP) Permits (WP) Permits (WP)
0
6.) Painting & Insulation Works 0 0 0 0 0 0
a General Foreman / Foreman - Painting / Insulation 0
b Leadman - Painting / Insulation 0
c Painter 0
d Sandblaster 0
e Wrapper / Insulator 0
f Tinsmith 0
0
7.) Common works 0 0 0 0 0 0
a Rigger 0
b Scaffolder 0
c Heavy Equipment Operator 0
d Helper / Laborer 0
0
B. Indirect Labour 0 0 0 0 0 0
1.) Project Management 0 0 0 0 0 0
a Project Manager / Site Manager 0
b Construction Manager / Production Manager 0
0
2.) Supervision 0 0 0 0 0 0
a Superintendent (Civil) 0
b Superintendent (Mechanical & Piping) 0
c Superintendent (Electrical / Instrument) 0
d Supervisor (Civil) 0
e Supervisor (Mechanical & Piping) 0
f Supervisor (Electrical / Instrument) 0
0
3.) Field Engineering 0 0 0 0 0 0
a Engineering Manager 0
b Supervising Engineer 0
c Engineer - Civil 0
d Engineer - Mechanical, Piping 0
e Engineer - Electrical / Instrument 0

Page 16 of 21
Project No. 2910 BX58
Attachment 9 - ESTIMATED MAN- Project Name Singapore
YEAR-ENTITLEMENT (MYE) - Inquiry No. 0012MI0230
CONSTRUCTION MANPOWER
Doc. No. &AA-0230-W-VT-9302.090
Tenderer name: xxxx

2019 2020 2021 2022 2023


MYE MYE MYE MYE MYE
for Work for Work for Work for Work for Work TOTAL
Permits (WP) Permits (WP) Permits (WP) Permits (WP) Permits (WP)
0
4.) Quality Control 0 0 0 0 0 0
a QC Manager 0
b QC Supervisor 0
c QC Inspector 0
a QC Document Controller 0
b QC Clerk / News Operator 0
c PWHT (Post welding heat treatment) Technician 0
0
5.) Project Control 0 0 0 0 0 0
a Planning Coordinator 0
b Planning ost Control Supervisor 0
0
6.) HSE & Loss Prevention 0 0 0 0 0 0
a Safety Manager 0
b Safety Supervisor 0
c Safety Officer 0
d Safety Assistant 0
0
7.) Administration 0 0 0 0 0 0
a Contract Coordinator / Administrator 0
b Assistant 0
c Secretary 0
d Security Guard 0
0
8.) Material / Warehousing 0 0 0 0 0 0
a Material / Warehouse Manager 0
b Foreman Warehouse / Material 0
c Toolkeeper 0
0
9.) Survey Crew 0
a Surveyor 0
0
10.) Equipment Services 0 0 0 0 0 0
a Equipment Supervisor 0

Page 17 of 21
Project No. 2910 BX58
Attachment 9 - ESTIMATED MAN- Project Name Singapore
YEAR-ENTITLEMENT (MYE) - Inquiry No. 0012MI0230
CONSTRUCTION MANPOWER
Doc. No. &AA-0230-W-VT-9302.090
Tenderer name: xxxx

2019 2020 2021 2022 2023


MYE MYE MYE MYE MYE
for Work for Work for Work for Work for Work TOTAL
Permits (WP) Permits (WP) Permits (WP) Permits (WP) Permits (WP)
b Foreman Equipment 0
c Crane Operator 0
d HE Driver / Bus Driver 0
A. Total Direct Labour - MYE 0 0 0 0 0 0
B. Total Indirect Labour - MYE 0 0 0 0 0 0
C. TOTAL - MYE 0 0 0 0 0 0

Page 18 of 21
Linde Gas Singapore (LGS)
Linde Engineering (LE)

Plant/Project Description

New Pitch Gasification Plant


Project No. Client Project No.
2910BX58 ---
Project Code Client Code
Singapore Singapore
Doc. No. Client Doc. No.
&AA-0210-W-VT 9302.110(EN) ---

Attachment 11 - Water Requirements Estimation

If applicable - area for additional information of LE entity (sub-project no./code):


LE Entity Sub-Project No. Project Code
LEI/LEH… NNNN AAAA

IFQ 01 29.06.2018 Verma L, GCITS Kreisel C, GCIC Kuglar S., GCEP


Document
Status Issue Date Prepared Reviewed Approved Remarks

The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are
prohibited. Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of a patent, utility model or design.
Page 19 of 21
Code

Remarks

ress authorization are


ty model or design.
Page 20 of 21
Linde Project No.: 2910BX58 Linde Doc. No.: &AA-0210-W-VT 9302.110(EN)
Code: Singapore Issue:

Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
Year Year 1 Year 2 Year 3 Year 4 Year 5

Water Requirements Estimation Month


Location Description Type of Water 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 Total

Office Company's Site Management Offices Potable Water 0

Office Contractor's Site Management Offices Potable Water 0

Office Owner's Site Management Offices Potable Water 0

Office Worker Potable Water 0


0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Office intermediate sum personnel 0
average daily comsumption [m3 per 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Office person per day] 0
intermediate sum potable water 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Office office 0

CAMP all personnel Potable Water 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0


average daily comsumption [m3 per
CAMP person per day] 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

CAMP Fire water Potable Water 0


intermediate sum potable water 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Camp camp 0
batch plant, pre-cast concrete
Site elements, mortar, cleaning etc. Potable Water 0

steel structure no, equipment erection


no, piping cleaning yes, SC-SP-IN no,
Site pre-commissioning yes etc.) Potable Water 0

Site general cleaning Potable Water 0


Site AG Piping Hydrotest water Potable Water 0
Site UG Piping Hydrotest water Potable Water 0
Site Fire water Potable Water 0
intermediate sum potable water 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Site site 0
Site Demineralized Water DEMIN Water 0
Site Hot Water Hot Potable Water
* total water consumption per month [m3] 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
maximum water consumption per day [m3] 0.00

Remarks
Contractor shall describe, what is included / excluded in the single values!
Contractor will find descriptions of the task in the cell comments!

file:///conversion/tmp/scratch/414331311.xlsx A11 Est Water Req


Page 21 of 21