REKAP OWNER ESTIMATE PEKERJAAN ELEKTRIKAL & ELEKTRONIKA

PROYEK : PEMBANGUNAN APARTEMEN GRAND ZAM ZAM TOWER ( BLOK F )


LOKASI : MARGONDA DEPOK
PEKERJAAN : ELEKTRIKAL / INSTALASI & UPAH
TANGGAL : 15 OKTOBER 2016
Pemasangan Instalasi Dan Armatur

JUMLAH ( Rp )
NO URAIAN
MATERIAL UPAH
1 UNIT 1,457,256,831 361,098,868
Jumlah
2 KORIDOR 528,867,932 187,555,725
Jumlah
3 KOMERSIAL DAN PUBLIC AREA
- Basement 3 50,915,712 12,995,501
- Basement 2 64,956,694 16,077,668
- Basement 1 69,704,773 15,301,048
Jumlah
4 LANTAI DASAR -
- Komersial 18,162,379 3,986,864
- Public area 68,349,981 25,762,714
Jumlah
5 LANTAI ATAP 6,128,271 15,177,540
Jumlah
6 UTILITAS - -
- Peralatan utama listrik 14,352,059 119,260,264
- Elektronika - -
Jumlah
7 SHAFT - -

8 PERIJINAN DAN TESTING COMMISSIONING -


- Penyambungan daya listrik PLN -
- Perijinan Depnaker - -
- Tes Peralatan Elektrikal 5,656,987 1,241,778
- Tes Peralatan Elektronika - -
Jumlah
9 RUANG BERSAMA 2,655,220 582,853
Jumlah
JUMLAH 2,287,006,839 759,040,822
JUMLAH ( Rp )
TOTAL
1,818,355,700
1,818,355,700
716,423,657
716,423,657

63,911,213
81,034,361
85,005,820
229,951,395
-
22,149,243
94,112,695
116,261,938
21,305,811
21,305,811
-
133,612,323
-
133,612,323
-

-
-
-
6,898,765
-
6,898,765
3,238,073
3,238,073
3,046,047,660.81
OWNER ESTIMATE PEKERJAAN ELEKTRIKAL TIPIKAL 967 UNIT

PROYEK : PEMBANGUNAN APARTEMEN GRAND ZAM ZAM TOWER ( BLOK F )


LOKASI : MARGONDA DEPOK
PEKERJAAN : ELEKTRIKAL / INSTALASI & UPAH
TANGGAL : 15 OKTOBER 2016

HARGA SAT HARGA SAT


NO URAIAN PEKERJAAN SAT QTY Material Upah

( Rp ) ( Rp )
I. UNIT :
A PEKERJAAN LISTRIK
Lampu PLC 25 W(Fitting E27) bh 4 27,758 6,093
Lampu DL 25 W bh 1 69,345 15,222
Saklar tunggal bh 1 8,859 1,945
Saklar ganda bh 2 14,666 3,219
Stop kontak 200 Wat bh 6 13,288 2,917
Stop kontak AC 1000 Wat bh 1 25,789 5,661
Instalasi lampu NYM 3 X 2.5 mm titik 5 67,278 14,768
Instalasi stop kontak NYM 3 X 2.5 mm titik 7 116,986 25,680
Panel kamar unit 1 - 42,620
Instalasi Exhaust Fan NYM 3 X 2.5 mm titik 1 27,610 6,061

SUB TOTAL PEKERJAAN LISTRIK


TOTAL 1 UNIT
TOTAL 967 UNIT
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

( Rp ) ( Rp ) ( Rp )

111,031 24,373 135,403


69,345 15,222 84,567
8,859 1,945 10,803
29,333 6,439 35,771
79,730 17,502 97,231
25,789 5,661 31,450
336,390 73,842 410,232
818,901 179,759 998,660
- 42,620 42,620
27,610 6,061 33,671
- - -
1,506,987 373,422 1,880,409
1,506,987 373,422 1,880,409
1,457,256,831 361,098,868 1,818,355,700
OWNER ESTIMATE PEKERJAAN ELEKTRIKAL BASEMENT - 3

PROYEK : PEMBANGUNAN APARTEMEN GRAND ZAM ZAM TOWER ( BLOK F )


LOKASI : MARGONDA DEPOK
PEKERJAAN : ELEKTRIKAL / INSTALASI & UPAH
TANGGAL : 15 OKTOBER 2016

HARGA SAT HARGA SAT


NO URAIAN PEKERJAAN SAT QTY Material Upah

A.5 BASEMENT - 3 ( Rp ) ( Rp )
I. LOBBY LIFT
A PEKERJAAN LISTRIK

TL 1 x 35 Wat bh 7 121,173 26,599


TL 1 X 35 W Emergency bh - - -
Instalasi lampu NYM 3 X 2.5 mm titik 7 77,331 16,975
Saklar ganda bh 2 16,858 3,700
Instalasi Saklar Lampu titik - - -
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL LOBBY LIFT - -
- -
II. GUDANG - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Wat bh 4 121,173 26,599
Saklar ganda bh 2 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 4 77,331 16,975
- -
SUB TOTAL PEKERJAAN LISTRIK - -
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah

- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL GUDANG - -
- -
III. PANEL - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Wat bh 2 121,173 26,599
Instalasi lampu NYM 3 X 2.5 mm titik 3 77,331 16,975
Saklar tunggal bh 2 10,183 2,235
PANEL LP - B3 titik 2 - 909,441
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL PANEL - -
- -
IV. RUANG POMPA ( RAW WATER ) - -
A PEKERJAAN LISTRIK - -
- -
TL 1 X 35 W bh 4 121,173 26,599
TL 1 X 35 W Emergency bh 2 663,112 145,561
saklar tunggal bh - - -
Saklar ganda bh 1 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 6 77,331 16,975
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL RUANG POMPA - -
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah

- -
V. PARKIR - -
A PEKERJAAN LISTRIK - -
- -
TL 1 X 35 W bh 134 121,173 26,599
TL 1 X 35 W Emergency bh 22 663,112 145,561
TL 1 X 20 W bh 8 76,539 16,801
TL 1 X 20 W Emergency bh - - -
Lampu exit 7 Wat bh 4 510,091 111,971
Saklar tunggal bh 1 10,183 2,235
Saklar ganda bh 1 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 160 77,331 16,975

SUB TOTAL PEKERJAAN LISTRIK


TOTAL PARKIR
TOTAL BASEMENT 3
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

( Rp ) ( Rp ) ( Rp )

848,209 186,192 1,034,401


- - -
541,317 118,826 660,143
33,716 7,401 41,117
- - -

1,423,241 312,419 1,735,660

- - -
- - -
1,423,241 312,419 1,735,660

484,691 106,396 591,086


33,716 7,401 41,117
309,324 67,900 377,224
- - -
827,730 181,697 1,009,427
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

- - -
- - -
827,730 181,697 1,009,427

242,345 53,198 295,543


231,993 50,925 282,918
20,365 4,470 24,836
- 1,818,881 1,818,881
- - -
494,704 1,927,475 2,422,178

- - -
- - -
494,704 1,927,475 2,422,178

484,691 106,396 591,086


1,326,224 291,122 1,617,346
- - -
16,858 3,700 20,558
463,986 101,851 565,837
- - -
2,291,759 503,069 2,794,828

- - -
- - -
2,291,759 503,069 2,794,828
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

- - -

16,237,137 3,564,250 19,801,386


14,588,465 3,202,346 17,790,810
612,312 134,410 746,722
- - -
2,040,362 447,884 2,488,246
10,183 2,235 12,418
16,858 3,700 20,558
12,372,962 2,716,016 15,088,978

45,878,278 10,070,842 55,949,120


45,878,278 10,070,842 55,949,120
50,915,712 12,995,501 63,911,213
OWNER ESTIMATE PEKERJAAN ELEKTRIKAL BASEMENT - 2

PROYEK : PEMBANGUNAN APARTEMEN GRAND ZAM ZAM TOWER ( BLOK F )


LOKASI : MARGONDA DEPOK
PEKERJAAN : ELEKTRIKAL
TANGGAL : 15 OKTOBER 2016

HARGA SAT HARGA SAT


NO URAIAN PEKERJAAN SAT QTY Material Upah

A.5 BASEMENT - 2 ( Rp ) ( Rp )

I. LOBBY LIFT
A PEKERJAAN LISTRIK

TL 1 x 35 Wat bh 5 121,173 26,599


TL 1 X 35 W Emergency bh - - -
Saklar tunggal bh 2 10,183 2,235
Saklar ganda bh 1 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 5 77,331 16,975
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL LOBBY LIFT - -
- -
II. GUDANG, TANGGA - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Wat bh 7 121,173 26,599
TL 1 x 35 Wat Emergency bh 2 663,112 145,561
TL 1 x 20 Wat Emergency bh 5 618,478 135,764
Lampu exit 7 Wat bh 4 510,091 111,971
BL 1 x 15 Wat bh 6 79,707 17,497
Saklar tunggal bh 1 10,183 2,235
Instalasi lampu NYM 3 X 2.5 mm titik 24 77,331 16,975
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL GUDANG, TANGGA - -
- -
III. PANEL - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Wat bh 2 121,173 26,599
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah

Instalasi lampu NYM 3 X 2.5 mm titik 2 77,331 16,975


Saklar tunggal bh 2 10,183 2,235
Stop kontak 200 Wat bh 2 15,274 3,353
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah

LP - B2 bh 2 - 909,441
Instalasi stop kontak NYM 3 X 2.5 mm titik 2 134,467 29,517
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL PANEL - -
- -
IV. RUANG KONTROL - -
A PEKERJAAN LISTRIK - -
- -
TL 1 X 35 W bh 4 121,173 26,599
Saklar ganda bh 1 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 4 77,331 16,975
Stop kontak 200 Wat titik 10 15,274 3,353
Instalasi Saklar Lampu titik - - -
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL RUANG KONTROL - -
- -
V. R. FCC - -
A PEKERJAAN LISTRIK - -
- -
TL 1 X 35 W bh 3 121,173 26,599
Saklar tunggal bh 1 10,183 2,235
Instalasi lampu NYM 3 X 2.5 mm titik 4 77,331 16,975
Saklar ganda bh 1 16,858 3,700
Stop kontak 200 Wat bh 5 15,274 3,353
Instalasi Saklar Lampu titik - - -
Panel kontrol kebakaran bh 1 #VALUE! -
- -
SUB TOTAL PEKERJAAN LISTRIK - -
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah

- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL R. FCC - -
- -
VI. R. GENSET - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Wat bh 14 121,173 26,599
TL 1 x 35 Wat Emergency bh 7 663,112 145,561
Saklar ganda bh 2 16,858 3,700
Stop kontak 200 Wat bh 2 15,274 3,353
Instalasi lampu NYM 3 X 2.5 mm titik 21 77,331 16,975
Instalasi Saklar Lampu titik - - -
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL R. GENSET - -
- -
VII. PARKIR - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Wat bh 153 121,173 26,599
TL 1 x 35 Wat Emergency bh 18 663,112 145,561
Instalasi lampu NYM 3 X 2.5 mm titik 171 77,331 16,975
Saklar ganda bh 1 16,858 3,700
Stop kontak 200 Wat bh 5 15,274 3,353

SUB TOTAL PEKERJAAN LISTRIK


TOTAL PARKIR
TOTAL BASEMENT 2
AAN ELEKTRIKAL BASEMENT - 2

HARGA TOTAL HARGA TOTAL HARGA TOTAL


Material Upah

( Rp ) ( Rp ) ( Rp )

605,863 132,994 738,858


- - -
20,365 4,470 24,836
16,858 3,700 20,558
386,655 84,876 471,531
- - -
1,029,741 226,041 1,255,782

- - -
- - -
1,029,741 226,041 1,255,782

848,209 186,192 1,034,401


1,326,224 291,122 1,617,346
3,092,392 678,818 3,771,210
2,040,362 447,884 2,488,246
478,242 104,980 583,222
10,183 2,235 12,418
1,855,944 407,402 2,263,347
- - -
9,651,555 2,118,634 11,770,189

- - -

- - -
9,651,555 2,118,634 11,770,189

242,345 53,198 295,543


HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

154,662 33,950 188,612


20,365 4,470 24,836
30,548 6,706 37,253
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

- 1,818,881 1,818,881
268,933 59,034 327,967
- - -
716,853 1,976,239 2,693,093

- - -
- - -
716,853 1,976,239 2,693,093

484,691 106,396 591,086


16,858 3,700 20,558
309,324 67,900 377,224
152,739 33,528 186,267
- - -
-
963,611 211,524 1,175,136

- - -
- - -
963,611 211,524 1,175,136

363,518 79,797 443,315


10,183 2,235 12,418
309,324 67,900 377,224
16,858 3,700 20,558
76,369 16,764 93,133
- - -
- - -
- - -
776,252 170,397 946,648
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

- - -
- - -
776,252 170,397 946,648

1,696,417 372,384 2,068,802


4,641,784 1,018,928 5,660,712
33,716 7,401 41,117
30,548 6,706 37,253
1,623,951 356,477 1,980,428
- - -
- - -
8,026,416 1,761,896 9,788,312

- - -

- - -
8,026,416 1,761,896 9,788,312

18,539,417 4,069,628 22,609,046


11,936,016 2,620,101 14,556,118
13,223,603 2,902,742 16,126,345
16,858 3,700 20,558
76,369 16,764 93,133
- -
43,792,264 9,612,936 53,405,200
43,792,264 9,612,936 53,405,200
64,956,694 16,077,668 81,034,361
OWNER ESTIMATE PEKERJAAN ELEKTRIKAL BASEMENT - 1

PROYEK : PEMBANGUNAN APARTEMEN GRAND ZAM ZAM TOWER ( BLOK F )


LOKASI : MARGONDA DEPOK
PEKERJAAN : ELEKTRIKAL
TANGGAL : 15 OKTOBER 2016

HARGA SAT HARGA SAT


NO URAIAN PEKERJAAN SAT QTY Material Upah

( Rp ) ( Rp )

A.5 BASEMENT - 1
I. LOBBY LIFT
A PEKERJAAN LISTRIK
TL 1 x 35 Watt bh 5 121,173 26,599
TL 1 x 35 Watt Emergency bh 1 663,112 145,561
Instalasi lampu NYM 3 X 2.5 mm2 tambahkan u/ semua kabel titik 6 77,331 16,975
Saklar ganda bh 2 16,858 3,700
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL LOBBY LIFT - -
- -
II. RUANG NOC - -
A PEKERJAAN LISTRIK - -
TL 1 x 35 Watt bh 2 121,173 26,599
Saklar ganda bh 1 16,858 3,700
Saklar tunggal bh - - -
Instalasi lampu NYM 3 X 2.5 mm titik 2 77,331 16,975
Stop kontak 200 Wat bh 5 15,274 3,353
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL RUANG NOC - -
- -
III. PANEL - -
A PEKERJAAN LISTRIK - -
TL 1 x 35 Watt bh 2 121,173 26,599
Instalasi lampu NYM 3 X 2.5 mm titik 2 77,331 16,975
Stop kontak 200 Wat bh 2 15,274 3,353
Saklar tunggal bh 2 10,183 2,235
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah

( Rp ) ( Rp )
Instalasi stop kontak NYM 3 X 2.5 mm titik 2 134,467 29,517
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL PANEL - -
- -
IV. RUANG POMPA - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Watt bh 15 121,173 26,599
TL 1 x 35 Watt Emergency bh 3 663,112 145,561
Instalasi lampu NYM 3 X 2.5 mm titik 18 77,331 16,975
Saklar ganda bh 2 16,858 3,700
Instalasi Saklar Lampu titik - - -
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL RUANG POMPA - -
- -
V. R. GUDANG / TANGGA - -
A PEKERJAAN LISTRK - -
- -
TL 1 x 35 Wat bh 2 121,173 26,599
TL 1 x 35 Wat Emergency bh 5 663,112 145,561
TL 1 X 20 Wat bh 8 76,539 16,801
TL 1 x 20 Wat Emergency bh - - -
lampu exit 7 Wat bh 4 510,091 111,971
Instalasi lampu NYM 3 X 2.5 mm titik 19 77,331 16,975
Saklar ganda bh 1 16,858 3,700
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL GUDANG - -
- -
VI. R. PUTR - -
A PEKERJAAN LISTRK - -
- -
TL 1 x 35 Wat bh 11 121,173 26,599
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah

( Rp ) ( Rp )
TL 1 x 35 Wat Emergency bh 4 663,112 145,561
Saklar ganda bh 2 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 17 77,331 16,975
Stop kontak 200 Wat bh 4 15,274 3,353
Instalasi Saklar Lampu titik - - -
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL PUTR - -
- -
VII. R. GENSET - -
A PEKERJAAN LISTRK - -
TL 1 x 35 Wat bh - - -
TL 1 x 35 Wat Emergency bh - - -
Saklar ganda bh - - -
Instalasi lampu NYM 3 X 2.5 mm bh - - -
Stop kontak 200 Wat bh - - -
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL GENSET - -
- -
VIII. PARKIR - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Watt bh 149 121,173 26,599
TL 1 x 35 Watt Emergency bh 25 663,112 145,561
Instalasi lampu NYM 3 X 2.5 mm titik 174 77,331 16,975
Saklar ganda bh 2 16,858 3,700
Stop kontak 200 Wat bh 5 15,274 3,353
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL PARKIR - -
- -
IX. TPS SEMENTARA - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Wat bh 1 121,173 26,599
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah

( Rp ) ( Rp )
Saklar tunggal bh 1 10,183 2,235
Instalasi lampu NYM 3 X 2.5 mm titik 1 77,331 16,975

SUB TOTAL PEKERJAAN LISTRIK


TOTAL TPS SEMENTARA
TOTAL BASEMENT 1
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

( Rp ) ( Rp ) ( Rp )

605,863 132,994 738,858


663,112 145,561 808,673
463,986 101,851 565,837
33,716 7,401 41,117

1,766,677 387,807 2,154,484

- - -
- - -
- - -
1,766,677 387,807 2,154,484

242,345 53,198 295,543


16,858 3,700 20,558
- - -
154,662 33,950 188,612
76,369 16,764 93,133
- - -
490,235 107,612 597,847

- - -
- - -
490,235 107,612 597,847

242,345 53,198 295,543


154,662 33,950 188,612
30,548 6,706 37,253
20,365 4,470 24,836
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

( Rp ) ( Rp ) ( Rp )
268,933 59,034 327,967
- - -
716,853 157,358 874,211

- - -
- - -
716,853 157,358 874,211

1,817,590 398,983 2,216,573


1,989,336 436,684 2,426,020
1,391,958 305,552 1,697,510
33,716 7,401 41,117
- - -
- - -
5,232,600 1,148,619 6,381,219

- - -
- - -
5,232,600 1,148,619 6,381,219

242,345 53,198 295,543


3,315,560 727,806 4,043,366
612,312 134,410 746,722
- - -
2,040,362 447,884 2,488,246
1,469,289 322,527 1,791,816
16,858 3,700 20,558

7,696,727 1,689,525 9,386,252

- - -
- - -
7,696,727 1,689,525 9,386,252

1,332,899 292,588 1,625,487


HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

( Rp ) ( Rp ) ( Rp )
2,652,448 582,245 3,234,693
33,716 7,401 41,117
1,314,627 288,577 1,603,204
61,095 13,411 74,507
- - -
-
5,394,786 1,184,221 6,579,007

- - -
- - -
5,394,786 1,184,221 6,579,007

- - -
- - -
- - -
- - -
- - -

- - -

- - -
- - -
- - -

18,054,727 3,963,233 22,017,960


16,577,801 3,639,029 20,216,830
13,455,596 2,953,667 16,409,264
33,716 7,401 41,117
76,369 16,764 93,133
- - -
48,198,209 10,580,095 58,778,303

- - -
- - -
48,198,209 10,580,095 58,778,303

121,173 26,599 147,772


HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

( Rp ) ( Rp ) ( Rp )
10,183 2,235 12,418
77,331 16,975 94,306
- - -
208,686 45,809 254,495
208,686 45,809 254,495
69,704,773 15,301,048 85,005,820
OWNER ESTIMATE PEKERJAAN ELEKTRIKAL DASAR

PROYEK : PEMBANGUNAN APARTEMEN GRAND ZAM ZAM TOWER ( BLOK F )


LOKASI : MARGONDA DEPOK
PEKERJAAN : ELEKTRIKAL
TANGGAL : 15 OKTOBER 2016

HARGA SAT HARGA SAT


NO URAIAN PEKERJAAN SAT QTY Material Upah

( Rp ) ( Rp )
A.5 DASAR
I. LOBBY / R. TUNGGU
A PEKERJAAN LISTRIK

Down Light PL 25 W bh 46 79,707 17,497


Down Light PL 25 W Emergency bh 11 618,478 135,764
TL 1 x 35 Wat bh 2 121,173 26,599
Saklar ganda bh 2 16,858 3,700
Stop kontak 200 Wat bh 2 15,274 3,353
- -
Instalasi lampu NYM 3 X 2.5 mm titik 57 77,331 16,975
Instalasi stop kontak NYM 3 X 2.5 mm titik 2 134,467 29,517
KWH meter digital bh 6 133,901 29,393
Panel komersial bh 6 - 1,793,177
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL LOBBY / R. TUNGGU - -
- -
II. PANEL - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Wat bh 2 121,173 26,599
Instalasi lampu NYM 3 X 2.5 mm titik 2 77,331 16,975
Saklar tunggal bh 2 10,183 2,235
Stop kontak 200 Wat bh 2 15,274 3,353
Instalasi stop kontak NYM 3 X 2.5 mm titik 2 134,467 29,517
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah

B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL PANEL - -
- -
III. R. BUILDING MANAGEMENT - -
A PEKERJAAN LISTRIK - -
TL 1 X 35 W bh 5 121,173 26,599
Stop kontak 200 Wat bh 2 15,274 3,353
Saklar ganda bh 1 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 5 77,331 16,975
Instalasi stop kontak NYM 3 X 2.5 mm titik 2 134,467 29,517
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL R. BUILDING MANAGEMENT - -
- -
IV. MUSHOLLA - -
A PEKERJAAN LISTRIK - -
- -
TL 1 X 35 Wat m 10 121,173 26,599
TL 1 x 35 Wat Emergency bh 1 663,112 145,561
Saklar ganda bh 2 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 11 77,331 16,975
Stop kontak 200 Wat bh 1 15,274 3,353
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL MUSHOLLA - -
- -
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah

V. TANGGA - -
A PEKERJAAN LISTRIK - -
- -
TL 1 X 20 Wat Emergency bh 8 618,478 135,764
TL 1 x 35 Wat Emergency bh 4 663,112 145,561
Lampu Exit 7 Wat bh 4 510,091 111,971
Instalasi lampu NYM 3 X 2.5 mm titik 16 77,331 16,975
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL TANGGA - -
- -
VI. TOILET - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Wat bh 9 121,173 26,599
Saklar tunggal bh 2 10,183 2,235
Saklar ganda bh 2 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 13 77,331 16,975
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL TOILET - -
- -
VII. R. TUNGGU DRIVER - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Wat bh 3 121,173 26,599
Saklar ganda bh 1 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 4 77,331 16,975
Stop kontak 200 Wat bh 1 15,274 3,353
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIKA - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL R. TUNGGU DRIVER - -
- -
VIII. R. TPS SEMENTARA - -
A PEKERJAAN LISTRIK - -
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah

TL 1 x 35 Wat bh 1 121,173 26,599


Saklar tunggal bh 1 10,183 2,235
Instalasi lampu NYM 3 X 2.5 mm titik 1 77,331 16,975
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIKA - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL R. TPS SEMENTARA - -
- -
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah

IX. R. KARYAWAN / PANTRI / TOILET - -


A PEKERJAAN LISTRIK - -
TL 1 x 35 Wat bh 10 121,173 26,599
Down Light PL 25 W bh 1 79,707 17,497
Saklar ganda bh 1 16,858 3,700
Saklar tunggal bh - - -
Stop kontak 200 Wat bh 3 15,274 3,353
Instalasi lampu NYM 3 X 2.5 mm titik 11 77,331 16,975
Instalasi stop kontak NYM 3 X 2.5 mm titik 3 134,467 29,517
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIKA - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL R. KARYAWAN/PANTRI/TOILET - -
- -
X. PARKIRAN - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Wat bh 106 121,173 26,599
TL 1 x 35 Wat Emergency bh 13 663,112 145,561
Instalasi lampu NYM 3 X 2.5 mm titik 119 77,331 16,975
Stop kontak 200 Wat bh 5 15,274 3,353
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIKA - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL PARKIRAN - -
- -
XI. KABEL TRAY - -
A PEKERJAAN TRAY ARUS KUAT - -
- -
SUB TOTAL PEKERJAAN LISTRIK - -
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah

- -
B PEKERJAAN TRAY ARUS LEMAH - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL KABEL TRAY - -
XI. KOMERSIAL - -
A PEKERJAAN LISTRIK - -
- -
Down Light PL 25 W bh 40 79,707 17,497
Down Light PL 25 W Emergency bh 13 618,478 135,764
Stop kontak 200 Wat bh 12 15,274 3,353
Saklar ganda bh 6 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 53 77,331 16,975
Instalasi stop kontak NYM 3 X 2.5 mm titik 12 134,467 29,517
KWH Meter 1P, 16 A, unit digital unit 7 133,901 29,393
- -
SUB TOTAL PEKERJAAN LISTRIK

B PEKERJAAN ELEKTRONIK
- -
SUB TOTAL PEKERJAAN ELEKTRONIK
TOTAL KOMERSIAL

TOTAL PUBLIC AREA

TOTAL LANTAI DASAR


HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

( Rp ) ( Rp ) ( Rp )

3,666,520 804,846 4,471,365


6,803,262 1,493,399 8,296,661
242,345 53,198 295,543
33,716 7,401 41,117
30,548 6,706 37,253
- - -
4,407,868 967,581 5,375,448
268,933 59,034 327,967
803,405 176,357 979,763
- 10,759,060 10,759,060
- - -
16,256,597 14,327,581 30,584,178

- - -
- - -
16,256,597 14,327,581 30,584,178

242,345 53,198 295,543


154,662 33,950 188,612
20,365 4,470 24,836
30,548 6,706 37,253
268,933 59,034 327,967
- - -
716,853 157,358 874,211
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

- - -
- - -
716,853 157,358 874,211

605,863 132,994 738,858


30,548 6,706 37,253
16,858 3,700 20,558
386,655 84,876 471,531
268,933 59,034 327,967
- - -
1,308,857 287,310 1,596,167

- - -
- - -
1,308,857 287,310 1,596,167

1,211,727 265,989 1,477,715


663,112 145,561 808,673
33,716 7,401 41,117
850,641 186,726 1,037,367
15,274 3,353 18,627
- - -
2,774,469 609,030 3,383,499

- - -
- - -
2,774,469 609,030 3,383,499
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

4,947,827 1,086,108 6,033,936


2,652,448 582,245 3,234,693
2,040,362 447,884 2,488,246
1,237,296 271,602 1,508,898
- - -
10,877,934 2,387,839 13,265,773

-
- - -
10,877,934 2,387,839 13,265,773

1,090,554 239,390 1,329,944


20,365 4,470 24,836
33,716 7,401 41,117
1,005,303 220,676 1,225,979
- - -
2,149,938 471,938 2,621,876
-

-
- - -
2,149,938 471,938 2,621,876

363,518 79,797 443,315


16,858 3,700 20,558
309,324 67,900 377,224
15,274 3,353 18,627
- - -
704,974 154,750 859,724

- - -
- - -
704,974 154,750 859,724
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

121,173 26,599 147,772


10,183 2,235 12,418
77,331 16,975 94,306

208,686 45,809 254,495

-
- - -
208,686 45,809 254,495
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

1,211,727 265,989 1,477,715


79,707 17,497 97,204
16,858 3,700 20,558
- - -
45,822 10,058 55,880
850,641 186,726 1,037,367
403,400 88,551 491,951
- - -
2,608,154 572,522 3,180,675

-
- - -
2,608,154 572,522 3,180,675

12,844,302 2,819,481 15,663,783


8,620,456 1,892,295 10,512,752
9,202,391 2,020,037 11,222,428
76,369 16,764 93,133
- - -
30,743,519 6,748,577 37,492,096

- - -
- - -
30,743,519 6,748,577 37,492,096

- - -
- - -
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

- - -
- - -
- - -

3,188,278 699,866 3,888,144


8,040,219 1,764,926 9,805,145
183,286 40,234 223,520
101,147 22,203 123,350
4,098,544 899,680 4,998,224
1,613,599 354,205 1,967,804
937,306 205,750 1,143,056
- - -
18,162,379 3,986,864 22,149,243

- - -
- - -
18,162,379 3,986,864 22,149,243

68,349,981 25,762,714 94,112,695

86,512,360 29,749,578 116,261,938


OWNER ESTIMATE PEKERJAAN ELEKTRIKAL KORRIDOR TIPIKAL 29 LANTAI

PROYEK : PEMBANGUNAN APARTEMEN GRAND ZAM ZAM TOWER ( BLOK F )


LOKASI : MARGONDA DEPOK
PEKERJAAN : ELEKTRIKAL
TANGGAL : 15 OKTOBER 2016

HARGA SAT HARGA SAT


NO URAIAN PEKERJAAN SAT QTY Material Upah

A.5 LANTAI - 1 ( Satu ) ( Rp ) ( Rp )

I. KORIDOR DAN BALKON


A PEKERJAAN LISTRIK

Down Light PL 25 W bh 14 79,707 17,497


Down Light PL 25 W Emergency bh 6 618,478 135,764
TL 1 x 35 Wat bh 1 121,173 26,599
Stop kontak 200 Wat bh 4 15,274 3,353
Instalasi stop kontak titik 4 148,552 32,609
Instalasi lampu NYM 3 X 2.5 mm titik 21 77,331 16,975
Saklar ganda bh 1 16,858 3,700
Saklar tunggal bh 1 10,183 2,235
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL KORIDOR DAN BALKON - -
- -
II. LOBBY, TANGGA DAN GUDANG - -
A PEKERJAAN LISTRIK - -
- -
Down Light PL 25 Wat bh 9 79,707 17,497
Down Light PL 25 Wat Emergency bh 1 618,478 135,764
TL 1 x 35 Wat bh 1 121,173 26,599
TL 1 x 35 Wat Emergency bh 1 663,112 145,561
TL 1 x 20 Wat Emergency bh 4 618,478 135,764
Lampu exit 7 Wat bh 2 510,091 111,971
Saklar ganda bh 1 16,858 3,700
Stop kontak 200 Wat bh 4 15,274 3,353
Instalasi lampu NYM 3 X 2.5 mm titik 18 77,331 16,975
Instalasi stop kontak titik 4 148,552 32,609
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah

B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL LOBBY, TANGGA DAN GUDANG - -
- -
III. RUANG PANEL - -
A PEKERJAAN LISTRIK - -
- -
TL 1 X 35 W bh 1 121,173 26,599
Stop kontak 200 Wat bh 1 15,274 3,353
Instalasi lampu NYM 3 X 2.5 mm titik 1 77,331 16,975
SakLar tunggal bh 1 10,183 2,235
Instalasi stop kontak NYM 3 X 2.5 mm titik 1 134,467 29,517
- -
PANEL - -
SDP - LT.1 unit 1 - 1,664,988
LP-P.KOR - LT .1 unit 1 - 799,245
KWH Meter 1P, 16 A, unit analog unit 33 89,267 19,595

SUB TOTAL PEKERJAAN LISTRIK

B PEKERJAAN ELEKTRONIK

SUB TOTAL PEKERJAAN ELEKTRONIK


TOTAL R. PANEL
TOTAL KORIDOR 1 LANTAI
TOTAL KORIDOR 29 LANTAI
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

( Rp ) ( Rp ) ( Rp )

1,115,897 244,953 1,360,850


3,710,870 814,581 4,525,452
121,173 26,599 147,772
61,095 13,411 74,507
594,210 130,436 724,646
1,623,951 356,477 1,980,428
16,858 3,700 20,558
10,183 2,235 12,418

7,254,237 1,592,394 8,846,631

- - -
- - -
7,254,237 1,592,394 8,846,631

717,363 157,470 874,832


618,478 135,764 754,242
121,173 26,599 147,772
663,112 145,561 808,673
2,473,914 543,054 3,016,968
1,020,181 223,942 1,244,123
16,858 3,700 20,558
61,095 13,411 74,507
1,391,958 305,552 1,697,510
594,210 130,436 724,646
- - -
7,678,342 1,685,490 9,363,831
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

- - -
- - -
7,678,342 1,685,490 9,363,831

121,173 26,599 147,772


15,274 3,353 18,627
77,331 16,975 94,306
10,183 2,235 12,418
134,467 29,517 163,984

- 1,664,988 1,664,988
- 799,245 799,245
2,945,819 646,643 3,592,463

3,304,246 3,189,556 6,493,802

- - -
- - -
3,304,246 3,189,556 6,493,802
18,236,825 6,467,439 24,704,264
528,867,932 187,555,725 716,423,657
OWNER ESTIMATE PEKERJAAN ELEKTRIKAL LANTAI ATAP

PROYEK : PEMBANGUNAN APARTEMEN GRAND ZAM ZAM TOWER ( BLOK F )


LOKASI : MARGONDA DEPOK
PEKERJAAN : ELEKTRIKAL
TANGGAL : 15 OKTOBER 2016

HARGA SAT HARGA SAT


NO URAIAN PEKERJAAN SAT QTY Material Upah

( Rp ) ( Rp )
A.5 LANTAI ATAP
A PEKERJAAN LISTRIK
Lampu TL 1 X 35 wat bh 3 121,173 26,599
Lampu TL 1 x 20 wat Emergency bh 3 618,478 135,764
Lampu TL 1 x 35 Wat Emergency bh 3 663,112 145,561
Lampu BL 1 X 15 wat Emergency bh 1 621,646 136,459
Instalasi lampu NYM 3 X 2.5 mm titik 10 77,331 16,975
Saklar ganda bh 1 16,858 3,700
Saklar tunggal bh 1 10,183 2,235
Panel P-LIFT.S unit 1 - 1,258,082
Panel P-LIFT.P unit 1 - 1,258,082
Panel P-PF.1 unit 1 - 1,078,447
Panel P-PF.2 unit 1 - 1,078,447
Panel P-GD unit 1 - 960,515
Panel P-BP unit 2 - 2,667,525
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL R. MESIN - -
- -
II. RUANG PANEL - -
A PEKERJAAN LISTRIK - -
Lampu TL 1 X 35 wat bh 1 121,173 26,599
Stop Kontak 1 x 200 wat bh 2 15,274 3,353
Instalasi lampu NYM 3 X 2.5 mm titik 1 77,331 16,975
Instalasi stop kontak NYM 3 X 2.5 mm titik 2 134,467 29,517
- -
SDP - LT.ATAP unit 1 - 2,180,611
LP - LT.ATAP unit 1 - 683,077

SUB TOTAL PEKERJAAN LISTRIK


TOTAL R. PANEL
TOTAL LANTAI ATAP
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

( Rp ) ( Rp ) ( Rp )

363,518 79,797 443,315


1,855,435 407,291 2,262,726
1,989,336 436,684 2,426,020
621,646 136,459 758,105
773,310 169,751 943,061
16,858 3,700 20,558
10,183 2,235 12,418
- 1,258,082 1,258,082
- 1,258,082 1,258,082
- 1,078,447 1,078,447
- 1,078,447 1,078,447
- 960,515 960,515
- 5,335,049 5,335,049
5,630,286 12,204,538 17,834,825

- - -
- - -
5,630,286 12,204,538 17,834,825

121,173 26,599 147,772


30,548 6,706 37,253
77,331 16,975 94,306
268,933 59,034 327,967

- 2,180,611 2,180,611
- 683,077 683,077
- - -
497,985 2,973,002 3,470,987
497,985 2,973,002 3,470,987
6,128,271 15,177,540 21,305,811
OWNER ESTIMATE PEKERJAAN ELEKTRIKAL UTILITAS

PROYEK : PEMBANGUNAN APARTEMEN GRAND ZAM ZAM TOWER ( BLOK F )


LOKASI : MARGONDA DEPOK
PEKERJAAN : ELEKTRIKAL
TANGGAL : 15 OKTOBER 2016

HARGA SAT HARGA SAT


NO URAIAN PEKERJAAN SAT QTY Material Upah

I. PEKERJAAN LISTRIK ( Rp ) ( Rp )
A PEKERJAAN PANEL TEGANGAN RENDAH
PUTR Lot 1 - 52,828,326
Kapasitor Bank kapasitas 1000 KVAR berikut Regulator Lot 1 - 30,873,697
PANEL PP Air bersih unit 3 - 5,131,895
PANEL PP Pemadam kebakaran unit 1 - 11,354,666
PANEL PP Pompa Recycle unit 1 - 5,657,440
- -
SUB TOTAL PEKERJAAN PANEL - -
- -
A INSTALASI PENANGKAL PETIR & PENTANAHAN PENGAMAN - -
- -
- -
SUB TOTAL INSTALASI PENANGKAL PETIR & PENTANAHAN PENGAMAN - -
- -
C R. REFUGE - -
PEKERJAAN LISTRIK - -
- -
TL 1 X 35 W bh 35 121,173 26,599
TL 1 X 35 W Emergency bh 10 663,112 145,561
Instalasi lampu NYM 3 X 2.5 mm titik 45 77,331 16,975

SUB TOTAL PEKERJAAN R. REFUGE

PEKERJAAN ELEKTRONIK

SUB TOTAL PEKERJAAN ELEKTRONIK


SUB TOTAL R. REFUGE
TOTAL PEKERJAAN ELEKTRIKAL
TOTAL PEKERJAAN UTILITAS
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

( Rp ) ( Rp ) ( Rp )

- 52,828,326 52,828,326
- 30,873,697 30,873,697
- 15,395,684 15,395,684
- 11,354,666 11,354,666
- 5,657,440 5,657,440

- 116,109,812 116,109,812

- - -
- - -

4,241,043 930,961 5,172,004


6,631,120 1,455,612 8,086,732
3,479,896 763,880 4,243,775

14,352,059 3,150,452 17,502,511

14,352,059 3,150,452 17,502,511


14,352,059 119,260,264 133,612,323
14,352,059 119,260,264 133,612,323
OWNER ESTIMATE PEKERJAAN ELEKTRIKAL RUANG BERSAMA

PROYEK : PEMBANGUNAN APARTEMEN GRAND ZAM ZAM TOWER ( BLOK F )


LOKASI : MARGONDA DEPOK
PEKERJAAN : ELEKTRIKAL
TANGGAL : 15 OKTOBER 2016

HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material

I. R. BERSAMA ( Rp )
A PEKERJAAN LISTRIK

SPOT LIGHT 60 W bh 6 382,525


Saklar ke lampu NYM 3 x 2.5 m 95 3,790

SUB TOTAL PEKERJAAN RUANG BERSAMA


TOTAL RUANG BERSAMA
HARGA SAT HARGA TOTAL HARGA TOTAL HARGA TOTAL
Upah Material Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

83,969 2,295,153 503,814 2,798,967


832 360,067 79,039 439,106
- - -
- - -
G BERSAMA 2,655,220 582,853 3,238,073
MA 2,655,220 582,853 3,238,073
OWNER ESTIMATE PEKERJAAN ELEKTRIKAL PERIJINAN DAN TESTING COMMISSIONING

PROYEK : PEMBANGUNAN APARTEMEN GRAND ZAM ZAM TOWER ( BLOK F )


LOKASI : MARGONDA DEPOK
PEKERJAAN : ELEKTRIKAL
TANGGAL : 15 OKTOBER 2016

HARGA SAT HARGA SAT


NO URAIAN PEKERJAAN SAT QTY Material Upah

II. TESTING & COMMISSIONING


A PERALATAN ELEKTRIKAL
Genset Lot 1 - -
Sistim kelistrikan Lot 1 5,656,987 1,241,778

SUB TOTAL PEKERJAAN ELEKTRIKAL


TOTAL TESCOM
TOTAL IJIN DAN TESCOM
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah

- - -
5,656,987 1,241,778 6,898,765
- - -
5,656,987 1,241,778 6,898,765
5,656,987 1,241,778 6,898,765
5,656,987 1,241,778 6,898,765