JUMLAH ( Rp )
NO URAIAN
MATERIAL UPAH
1 UNIT 1,457,256,831 361,098,868
Jumlah
2 KORIDOR 528,867,932 187,555,725
Jumlah
3 KOMERSIAL DAN PUBLIC AREA
- Basement 3 50,915,712 12,995,501
- Basement 2 64,956,694 16,077,668
- Basement 1 69,704,773 15,301,048
Jumlah
4 LANTAI DASAR -
- Komersial 18,162,379 3,986,864
- Public area 68,349,981 25,762,714
Jumlah
5 LANTAI ATAP 6,128,271 15,177,540
Jumlah
6 UTILITAS - -
- Peralatan utama listrik 14,352,059 119,260,264
- Elektronika - -
Jumlah
7 SHAFT - -
63,911,213
81,034,361
85,005,820
229,951,395
-
22,149,243
94,112,695
116,261,938
21,305,811
21,305,811
-
133,612,323
-
133,612,323
-
-
-
-
6,898,765
-
6,898,765
3,238,073
3,238,073
3,046,047,660.81
OWNER ESTIMATE PEKERJAAN ELEKTRIKAL TIPIKAL 967 UNIT
( Rp ) ( Rp )
I. UNIT :
A PEKERJAAN LISTRIK
Lampu PLC 25 W(Fitting E27) bh 4 27,758 6,093
Lampu DL 25 W bh 1 69,345 15,222
Saklar tunggal bh 1 8,859 1,945
Saklar ganda bh 2 14,666 3,219
Stop kontak 200 Wat bh 6 13,288 2,917
Stop kontak AC 1000 Wat bh 1 25,789 5,661
Instalasi lampu NYM 3 X 2.5 mm titik 5 67,278 14,768
Instalasi stop kontak NYM 3 X 2.5 mm titik 7 116,986 25,680
Panel kamar unit 1 - 42,620
Instalasi Exhaust Fan NYM 3 X 2.5 mm titik 1 27,610 6,061
( Rp ) ( Rp ) ( Rp )
A.5 BASEMENT - 3 ( Rp ) ( Rp )
I. LOBBY LIFT
A PEKERJAAN LISTRIK
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL GUDANG - -
- -
III. PANEL - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Wat bh 2 121,173 26,599
Instalasi lampu NYM 3 X 2.5 mm titik 3 77,331 16,975
Saklar tunggal bh 2 10,183 2,235
PANEL LP - B3 titik 2 - 909,441
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL PANEL - -
- -
IV. RUANG POMPA ( RAW WATER ) - -
A PEKERJAAN LISTRIK - -
- -
TL 1 X 35 W bh 4 121,173 26,599
TL 1 X 35 W Emergency bh 2 663,112 145,561
saklar tunggal bh - - -
Saklar ganda bh 1 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 6 77,331 16,975
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL RUANG POMPA - -
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah
- -
V. PARKIR - -
A PEKERJAAN LISTRIK - -
- -
TL 1 X 35 W bh 134 121,173 26,599
TL 1 X 35 W Emergency bh 22 663,112 145,561
TL 1 X 20 W bh 8 76,539 16,801
TL 1 X 20 W Emergency bh - - -
Lampu exit 7 Wat bh 4 510,091 111,971
Saklar tunggal bh 1 10,183 2,235
Saklar ganda bh 1 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 160 77,331 16,975
( Rp ) ( Rp ) ( Rp )
- - -
- - -
1,423,241 312,419 1,735,660
- - -
- - -
827,730 181,697 1,009,427
- - -
- - -
494,704 1,927,475 2,422,178
- - -
- - -
2,291,759 503,069 2,794,828
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah
- - -
A.5 BASEMENT - 2 ( Rp ) ( Rp )
I. LOBBY LIFT
A PEKERJAAN LISTRIK
LP - B2 bh 2 - 909,441
Instalasi stop kontak NYM 3 X 2.5 mm titik 2 134,467 29,517
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL PANEL - -
- -
IV. RUANG KONTROL - -
A PEKERJAAN LISTRIK - -
- -
TL 1 X 35 W bh 4 121,173 26,599
Saklar ganda bh 1 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 4 77,331 16,975
Stop kontak 200 Wat titik 10 15,274 3,353
Instalasi Saklar Lampu titik - - -
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL RUANG KONTROL - -
- -
V. R. FCC - -
A PEKERJAAN LISTRIK - -
- -
TL 1 X 35 W bh 3 121,173 26,599
Saklar tunggal bh 1 10,183 2,235
Instalasi lampu NYM 3 X 2.5 mm titik 4 77,331 16,975
Saklar ganda bh 1 16,858 3,700
Stop kontak 200 Wat bh 5 15,274 3,353
Instalasi Saklar Lampu titik - - -
Panel kontrol kebakaran bh 1 #VALUE! -
- -
SUB TOTAL PEKERJAAN LISTRIK - -
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL R. FCC - -
- -
VI. R. GENSET - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Wat bh 14 121,173 26,599
TL 1 x 35 Wat Emergency bh 7 663,112 145,561
Saklar ganda bh 2 16,858 3,700
Stop kontak 200 Wat bh 2 15,274 3,353
Instalasi lampu NYM 3 X 2.5 mm titik 21 77,331 16,975
Instalasi Saklar Lampu titik - - -
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL R. GENSET - -
- -
VII. PARKIR - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Wat bh 153 121,173 26,599
TL 1 x 35 Wat Emergency bh 18 663,112 145,561
Instalasi lampu NYM 3 X 2.5 mm titik 171 77,331 16,975
Saklar ganda bh 1 16,858 3,700
Stop kontak 200 Wat bh 5 15,274 3,353
( Rp ) ( Rp ) ( Rp )
- - -
- - -
1,029,741 226,041 1,255,782
- - -
- - -
9,651,555 2,118,634 11,770,189
- 1,818,881 1,818,881
268,933 59,034 327,967
- - -
716,853 1,976,239 2,693,093
- - -
- - -
716,853 1,976,239 2,693,093
- - -
- - -
963,611 211,524 1,175,136
- - -
- - -
776,252 170,397 946,648
- - -
- - -
8,026,416 1,761,896 9,788,312
( Rp ) ( Rp )
A.5 BASEMENT - 1
I. LOBBY LIFT
A PEKERJAAN LISTRIK
TL 1 x 35 Watt bh 5 121,173 26,599
TL 1 x 35 Watt Emergency bh 1 663,112 145,561
Instalasi lampu NYM 3 X 2.5 mm2 tambahkan u/ semua kabel titik 6 77,331 16,975
Saklar ganda bh 2 16,858 3,700
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL LOBBY LIFT - -
- -
II. RUANG NOC - -
A PEKERJAAN LISTRIK - -
TL 1 x 35 Watt bh 2 121,173 26,599
Saklar ganda bh 1 16,858 3,700
Saklar tunggal bh - - -
Instalasi lampu NYM 3 X 2.5 mm titik 2 77,331 16,975
Stop kontak 200 Wat bh 5 15,274 3,353
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL RUANG NOC - -
- -
III. PANEL - -
A PEKERJAAN LISTRIK - -
TL 1 x 35 Watt bh 2 121,173 26,599
Instalasi lampu NYM 3 X 2.5 mm titik 2 77,331 16,975
Stop kontak 200 Wat bh 2 15,274 3,353
Saklar tunggal bh 2 10,183 2,235
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah
( Rp ) ( Rp )
Instalasi stop kontak NYM 3 X 2.5 mm titik 2 134,467 29,517
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL PANEL - -
- -
IV. RUANG POMPA - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Watt bh 15 121,173 26,599
TL 1 x 35 Watt Emergency bh 3 663,112 145,561
Instalasi lampu NYM 3 X 2.5 mm titik 18 77,331 16,975
Saklar ganda bh 2 16,858 3,700
Instalasi Saklar Lampu titik - - -
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL RUANG POMPA - -
- -
V. R. GUDANG / TANGGA - -
A PEKERJAAN LISTRK - -
- -
TL 1 x 35 Wat bh 2 121,173 26,599
TL 1 x 35 Wat Emergency bh 5 663,112 145,561
TL 1 X 20 Wat bh 8 76,539 16,801
TL 1 x 20 Wat Emergency bh - - -
lampu exit 7 Wat bh 4 510,091 111,971
Instalasi lampu NYM 3 X 2.5 mm titik 19 77,331 16,975
Saklar ganda bh 1 16,858 3,700
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL GUDANG - -
- -
VI. R. PUTR - -
A PEKERJAAN LISTRK - -
- -
TL 1 x 35 Wat bh 11 121,173 26,599
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah
( Rp ) ( Rp )
TL 1 x 35 Wat Emergency bh 4 663,112 145,561
Saklar ganda bh 2 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 17 77,331 16,975
Stop kontak 200 Wat bh 4 15,274 3,353
Instalasi Saklar Lampu titik - - -
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL PUTR - -
- -
VII. R. GENSET - -
A PEKERJAAN LISTRK - -
TL 1 x 35 Wat bh - - -
TL 1 x 35 Wat Emergency bh - - -
Saklar ganda bh - - -
Instalasi lampu NYM 3 X 2.5 mm bh - - -
Stop kontak 200 Wat bh - - -
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL GENSET - -
- -
VIII. PARKIR - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Watt bh 149 121,173 26,599
TL 1 x 35 Watt Emergency bh 25 663,112 145,561
Instalasi lampu NYM 3 X 2.5 mm titik 174 77,331 16,975
Saklar ganda bh 2 16,858 3,700
Stop kontak 200 Wat bh 5 15,274 3,353
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL PARKIR - -
- -
IX. TPS SEMENTARA - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Wat bh 1 121,173 26,599
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah
( Rp ) ( Rp )
Saklar tunggal bh 1 10,183 2,235
Instalasi lampu NYM 3 X 2.5 mm titik 1 77,331 16,975
( Rp ) ( Rp ) ( Rp )
- - -
- - -
- - -
1,766,677 387,807 2,154,484
- - -
- - -
490,235 107,612 597,847
( Rp ) ( Rp ) ( Rp )
268,933 59,034 327,967
- - -
716,853 157,358 874,211
- - -
- - -
716,853 157,358 874,211
- - -
- - -
5,232,600 1,148,619 6,381,219
- - -
- - -
7,696,727 1,689,525 9,386,252
( Rp ) ( Rp ) ( Rp )
2,652,448 582,245 3,234,693
33,716 7,401 41,117
1,314,627 288,577 1,603,204
61,095 13,411 74,507
- - -
-
5,394,786 1,184,221 6,579,007
- - -
- - -
5,394,786 1,184,221 6,579,007
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
48,198,209 10,580,095 58,778,303
( Rp ) ( Rp ) ( Rp )
10,183 2,235 12,418
77,331 16,975 94,306
- - -
208,686 45,809 254,495
208,686 45,809 254,495
69,704,773 15,301,048 85,005,820
OWNER ESTIMATE PEKERJAAN ELEKTRIKAL DASAR
( Rp ) ( Rp )
A.5 DASAR
I. LOBBY / R. TUNGGU
A PEKERJAAN LISTRIK
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL PANEL - -
- -
III. R. BUILDING MANAGEMENT - -
A PEKERJAAN LISTRIK - -
TL 1 X 35 W bh 5 121,173 26,599
Stop kontak 200 Wat bh 2 15,274 3,353
Saklar ganda bh 1 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 5 77,331 16,975
Instalasi stop kontak NYM 3 X 2.5 mm titik 2 134,467 29,517
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL R. BUILDING MANAGEMENT - -
- -
IV. MUSHOLLA - -
A PEKERJAAN LISTRIK - -
- -
TL 1 X 35 Wat m 10 121,173 26,599
TL 1 x 35 Wat Emergency bh 1 663,112 145,561
Saklar ganda bh 2 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 11 77,331 16,975
Stop kontak 200 Wat bh 1 15,274 3,353
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL MUSHOLLA - -
- -
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah
V. TANGGA - -
A PEKERJAAN LISTRIK - -
- -
TL 1 X 20 Wat Emergency bh 8 618,478 135,764
TL 1 x 35 Wat Emergency bh 4 663,112 145,561
Lampu Exit 7 Wat bh 4 510,091 111,971
Instalasi lampu NYM 3 X 2.5 mm titik 16 77,331 16,975
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL TANGGA - -
- -
VI. TOILET - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Wat bh 9 121,173 26,599
Saklar tunggal bh 2 10,183 2,235
Saklar ganda bh 2 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 13 77,331 16,975
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL TOILET - -
- -
VII. R. TUNGGU DRIVER - -
A PEKERJAAN LISTRIK - -
- -
TL 1 x 35 Wat bh 3 121,173 26,599
Saklar ganda bh 1 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 4 77,331 16,975
Stop kontak 200 Wat bh 1 15,274 3,353
- -
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIKA - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL R. TUNGGU DRIVER - -
- -
VIII. R. TPS SEMENTARA - -
A PEKERJAAN LISTRIK - -
HARGA SAT HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material Upah
- -
B PEKERJAAN TRAY ARUS LEMAH - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL KABEL TRAY - -
XI. KOMERSIAL - -
A PEKERJAAN LISTRIK - -
- -
Down Light PL 25 W bh 40 79,707 17,497
Down Light PL 25 W Emergency bh 13 618,478 135,764
Stop kontak 200 Wat bh 12 15,274 3,353
Saklar ganda bh 6 16,858 3,700
Instalasi lampu NYM 3 X 2.5 mm titik 53 77,331 16,975
Instalasi stop kontak NYM 3 X 2.5 mm titik 12 134,467 29,517
KWH Meter 1P, 16 A, unit digital unit 7 133,901 29,393
- -
SUB TOTAL PEKERJAAN LISTRIK
B PEKERJAAN ELEKTRONIK
- -
SUB TOTAL PEKERJAAN ELEKTRONIK
TOTAL KOMERSIAL
( Rp ) ( Rp ) ( Rp )
- - -
- - -
16,256,597 14,327,581 30,584,178
- - -
- - -
716,853 157,358 874,211
- - -
- - -
1,308,857 287,310 1,596,167
- - -
- - -
2,774,469 609,030 3,383,499
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah
-
- - -
10,877,934 2,387,839 13,265,773
-
- - -
2,149,938 471,938 2,621,876
- - -
- - -
704,974 154,750 859,724
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah
-
- - -
208,686 45,809 254,495
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah
-
- - -
2,608,154 572,522 3,180,675
- - -
- - -
30,743,519 6,748,577 37,492,096
- - -
- - -
HARGA TOTAL HARGA TOTAL HARGA TOTAL
Material Upah
- - -
- - -
- - -
- - -
- - -
18,162,379 3,986,864 22,149,243
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL LOBBY, TANGGA DAN GUDANG - -
- -
III. RUANG PANEL - -
A PEKERJAAN LISTRIK - -
- -
TL 1 X 35 W bh 1 121,173 26,599
Stop kontak 200 Wat bh 1 15,274 3,353
Instalasi lampu NYM 3 X 2.5 mm titik 1 77,331 16,975
SakLar tunggal bh 1 10,183 2,235
Instalasi stop kontak NYM 3 X 2.5 mm titik 1 134,467 29,517
- -
PANEL - -
SDP - LT.1 unit 1 - 1,664,988
LP-P.KOR - LT .1 unit 1 - 799,245
KWH Meter 1P, 16 A, unit analog unit 33 89,267 19,595
B PEKERJAAN ELEKTRONIK
( Rp ) ( Rp ) ( Rp )
- - -
- - -
7,254,237 1,592,394 8,846,631
- - -
- - -
7,678,342 1,685,490 9,363,831
- 1,664,988 1,664,988
- 799,245 799,245
2,945,819 646,643 3,592,463
- - -
- - -
3,304,246 3,189,556 6,493,802
18,236,825 6,467,439 24,704,264
528,867,932 187,555,725 716,423,657
OWNER ESTIMATE PEKERJAAN ELEKTRIKAL LANTAI ATAP
( Rp ) ( Rp )
A.5 LANTAI ATAP
A PEKERJAAN LISTRIK
Lampu TL 1 X 35 wat bh 3 121,173 26,599
Lampu TL 1 x 20 wat Emergency bh 3 618,478 135,764
Lampu TL 1 x 35 Wat Emergency bh 3 663,112 145,561
Lampu BL 1 X 15 wat Emergency bh 1 621,646 136,459
Instalasi lampu NYM 3 X 2.5 mm titik 10 77,331 16,975
Saklar ganda bh 1 16,858 3,700
Saklar tunggal bh 1 10,183 2,235
Panel P-LIFT.S unit 1 - 1,258,082
Panel P-LIFT.P unit 1 - 1,258,082
Panel P-PF.1 unit 1 - 1,078,447
Panel P-PF.2 unit 1 - 1,078,447
Panel P-GD unit 1 - 960,515
Panel P-BP unit 2 - 2,667,525
SUB TOTAL PEKERJAAN LISTRIK - -
- -
B PEKERJAAN ELEKTRONIK - -
- -
SUB TOTAL PEKERJAAN ELEKTRONIK - -
TOTAL R. MESIN - -
- -
II. RUANG PANEL - -
A PEKERJAAN LISTRIK - -
Lampu TL 1 X 35 wat bh 1 121,173 26,599
Stop Kontak 1 x 200 wat bh 2 15,274 3,353
Instalasi lampu NYM 3 X 2.5 mm titik 1 77,331 16,975
Instalasi stop kontak NYM 3 X 2.5 mm titik 2 134,467 29,517
- -
SDP - LT.ATAP unit 1 - 2,180,611
LP - LT.ATAP unit 1 - 683,077
( Rp ) ( Rp ) ( Rp )
- - -
- - -
5,630,286 12,204,538 17,834,825
- 2,180,611 2,180,611
- 683,077 683,077
- - -
497,985 2,973,002 3,470,987
497,985 2,973,002 3,470,987
6,128,271 15,177,540 21,305,811
OWNER ESTIMATE PEKERJAAN ELEKTRIKAL UTILITAS
I. PEKERJAAN LISTRIK ( Rp ) ( Rp )
A PEKERJAAN PANEL TEGANGAN RENDAH
PUTR Lot 1 - 52,828,326
Kapasitor Bank kapasitas 1000 KVAR berikut Regulator Lot 1 - 30,873,697
PANEL PP Air bersih unit 3 - 5,131,895
PANEL PP Pemadam kebakaran unit 1 - 11,354,666
PANEL PP Pompa Recycle unit 1 - 5,657,440
- -
SUB TOTAL PEKERJAAN PANEL - -
- -
A INSTALASI PENANGKAL PETIR & PENTANAHAN PENGAMAN - -
- -
- -
SUB TOTAL INSTALASI PENANGKAL PETIR & PENTANAHAN PENGAMAN - -
- -
C R. REFUGE - -
PEKERJAAN LISTRIK - -
- -
TL 1 X 35 W bh 35 121,173 26,599
TL 1 X 35 W Emergency bh 10 663,112 145,561
Instalasi lampu NYM 3 X 2.5 mm titik 45 77,331 16,975
PEKERJAAN ELEKTRONIK
( Rp ) ( Rp ) ( Rp )
- 52,828,326 52,828,326
- 30,873,697 30,873,697
- 15,395,684 15,395,684
- 11,354,666 11,354,666
- 5,657,440 5,657,440
- 116,109,812 116,109,812
- - -
- - -
HARGA SAT
NO URAIAN PEKERJAAN SAT QTY Material
I. R. BERSAMA ( Rp )
A PEKERJAAN LISTRIK
( Rp ) ( Rp ) ( Rp ) ( Rp )
- - -
5,656,987 1,241,778 6,898,765
- - -
5,656,987 1,241,778 6,898,765
5,656,987 1,241,778 6,898,765
5,656,987 1,241,778 6,898,765