A.

MAIN HOUSE

1 LINE & GRADE


1.01 Survey, Clearing & Grubbing
1.02 Layout & Staking
1.03 Batter Board Installation
1.04 Benchmarking
2 EARTHWORKS
2.01 Cut & fill
2.02 Excavation
3 COLUMN FOOTING
3.01 Excavation, Backfilling & Compaction
3.02 Gravel Bedding & Compaction
3.03 Lean Concreting
3.04 Footing Rebar Matting & Column Rebar Fabrication & Installation
3.05 Footing Formworks Installation
3.06 Soil Treatment
3.07 Footing Concreting
3.08 Removal of Forms
3.09 Curing
3.10 Backfilling & Compaction
4 TIE BEAM (optional)
4.01 Excavation
4.02 Gravel Bedding & Compaction
4.03 Rebars Installation
4.04 Forms Installation
4.05 Concreting & Concrete Setting
4.06 Removal of Forms
4.07 Curing
5 COLUMN (below ground)
5.01 Scaffolds Installation
5.02 Lateral ties adjustment
5.03 Plumbing Roughing-ins
5.04 Column Alignment, Forms & Brace Installation
5.05 Concreting & Concrete Setting
5.06 Removal of Forms & Scaffolds
5.07 Curing
5.08 Backfilling & Compaction
6 G/F BEAM (optional)
6.01 Gravel Bedding & Compaction
6.02 Rebars Installation
6.03 Plumbing Roughing-ins
6.04 Electrical Roughing-ins
6.05 Forms Installation
6.06 Concreting & Concrete Setting
6.07 Removal of Forms
6.08 Curing
6.09 Backfilling & Compaction
7 WALL FOOTING (Zocalo)
7.01 Layout, Excavation, Backfill & Compaction
7.02 Gravel Bedding & Compaction
7.03 Rebars Installation
7.06 Forms Installation
7.07 Concreting & Concrete Setting
7.08 CHB Laying & Plastering
7.09 Removal of Forms
7.10 Backfilling & Compaction
8 G/F SLAB
8.01 Gravel Bedding & Compaction
8.02 Side Forms Installation
8.03 Plumbing roughing-ins
8.04 Rebars Installation
8.05 Electrical Roughing-ins For Power & Feederline
8.06 Soil Treatment
8.07 Concreting & Concrete Setting
8.08 Removal of Forms
8.09 Curing
9 G/F COLUMN
9.01 Scaffolds Installation
9.02 Rebars Installation
9.03 CHB Dowels Installation
9.04 Plumbing Roughing-ins
9.05 Electrical Roughing-ins
9.06 Alignment & Forms & Brace Installation
9.07 Concreting & Concrete Setting
9.08 Removal of Forms & Scaffolds
9.09 Curing
10 SEPTIC TANK
10.01 Layout, Excavation, Compaction & Gravel Bedding
10.02 Rebars Installation
10.03 Bottom Slab Concreting
10.04 CHB Laying & Plastering
10.05 Backfilling & Compaction
11 2/F BEAM, SLAB, STAIRS & CANOPY
11.01 Scaffolds Installation
11.02 Beam Rebars Installation
11.03 Forms Installation
11.04 Steel Deck Installation
11.05 Shoring w/ Backpropping Installation
11.06 Slab Rebars Installation
11.07 Electrical Roughing-ins
11.08 Plumbing Roughing-ins
11.09 Column dowels Installation
11.10 Stair Steel Plate & Dowels Installation
11.11 Concreting & Concrete Setting
11.12 Curing
11.13 Removal of Forms & Shoring
12 G/F WALLS & PARTITIONS
12.01 Layouting
12.02 CHB Laying (verify owner for ACU preparation)
12.03 Plumbing Roughing-ins
12.04 Electrical Roughing-ins
12.05 Lintel Beam Rebars Installation
12.06 Lintel Beam Forms Installation
12.07 Lintel Beam Concreting
12.08 Curing
13 2/F WALLS & PARTITIONS
13.01 Layouting
13.02 CHB Laying (verify owner for ACU preparation)
13.03 Electrical Roughing-ins
13.04 Plumbing Roughing-ins
13.05 Lintel Beam Rebars Installation
13.06 Canopy Rebars Installation
13.07 Lintel & Canopy Formworks & Shoring Installation
13.08 Lintel & Canopy Concreting
13.09 Removal of Forms
13.10 Curing
14 2/F COLUMN
14.01 Rebars Installation
14.02 CHB dowels installation
14.03 Electrical Roughing-ins
14.04 Forms & Shoring Installation
14.05 Concreting & Concrete Setting
14.06 Removal of Forms
14.07 Curing
15 ROOFBEAM
15.01 Scaffolds Installation
15.02 Rebars Installation
15.03 Electrical Roughing-ins
15.04 Plumbing Roughing-ins
15.05 Forms & Shoring Installation
15.06 Baseplate Support / Bolts Installation For Trusses
15.07 Concreting & Concrete Setting
15.08 Removal of Forms
15.09 Curing
16 MAIN ROOF
16.01 Angle Bars & Cor. G.I Painting
16.02 Trusses Fabrication
16.03 Layouting
16.04 Baseplate Installation & Leveling
16.05 Trusses Installation
16.06 Purlins Installation
16.07 Painting
16.08 Fascia Board Installation
16.09 Undersheeting Installation (including Insulation & Cor. G.I. sheets)
16.10 Battens Installation
16.11 Rooftiles Installation
16.12 Concrete patching (ridge roll)
16.13 Ridge roll painting
17 PLASTERING (G/F - 2/F)
17.01 Layouting
17.02 Walls, Partitions, & Canopy Rough Plastering
17.03 Panel Board Box Installation
17.04 Sanitary & Waterline Hanger & Pipe Vent Installation
17.05 Sanitary Hanger Support Installation
17.06 Guestroom T&B & Powder Rm. Sanitary & Waterline Installation
17.07 Door Jamb Fabrication & Installation
17.08 Doors & Windows Opening Plastering
17.09 Walls , Partitions & Canopy Smooth Plastering
17.10 Curing
18 STAIR FRAME
18.01 Stair I-Beam & Baseplate Installation
18.02 Stair I-Beam & Baseplate Painting
18.03 Landing Concrete Topping
19 2/F CEILING & EAVES (EXCLUDING 2/F T&Bs)
19.01 Ceiling Stiffener Installation
19.02 Layouting
19.03 Shadow Moulding Installation
19.04 Framing Installation
19.05 Elect. Wiring Installation (Lightings)
19.06 Board Installation
19.07 Manhole & Manhole Frame Installation
19.08 Louvers Installation
20 2/F SLAB TOPPING
20.01 Slab Concrete Topping (verify owner for floor finish)
21 G/F CEILING WORKS (EXCLUDING T&Bs)
21.01 Layouting
21.02 Shadow Moulding & False Beam (Kitchen & Porch) Installation
21.03 Framing Installation
21.04 Kitchen Cove Ceiling Installation
21.05 Elect. Wiring Installation (Lightings)
21.06 Plumbing Roughing-ins for exhaust pipe
21.07 Board Installation (with manhole location for leak test)
22 CEILING,EAVES & FASCIA PAINTING
22.01 Epoxy Application
22.02 Putty Application, Primer Painting & Sanding
22.03 Painting (2 Final Coats)
23 TILEWORKS FOR 2/F T&Bs
23.01 Layouting
23.02 Depressed Chipping
23.03 Shower Control Valve Installation
23.04 Wall Tiles Installation
23.05 Shadow Moulding Installation
23.06 Ceiling Framing Installation
23.07 Cove Ceiling Installation
23.08 Electrical works
23.09 Ceiling Board Installation
23.10 Waterproofing Application & Floodtesting
23.11 Flooring Tiles Installation
23.12 Floor Drains Installation
23.13 Tile Grouting
24 TILEWORKS FOR GUESTROOM T&B & POWDER ROOM
24.01 Layouting
24.02 Depressed Chipping (Excluding Powder Room)
24.03 Wall Tiles Installation
24.04 Shadow Moulding Installation (Excluding Powder Room)
24.05 Ceiling Framing Installation (Excluding Powder Room)
24.06 Electrical works
24.07 Ceiling Board Installation (Excluding Powder Room)
24.08 Flooring Tiles Installation
24.09 Floor Drains Installation
24.10 Tile Grouting
25 PLUMBING FIXTURES & SHOWER ENCLOSURE
25.01 Lavatory Vanity Installation
25.02 Countertop Installation (Solid Surface)
25.03 Lavatory & Faucet Installation
25.04 Water Closets & Shower Installation
25.05 Guest Room Shower Enclosure Installation
25.06 2/F T&Bs Shower Enclosure Installation
25.07 Garden Faucets Installation
26 INTERIOR WALL PAINTING
26.01 Primer Painting
26.02 Rectification (Optional)
26.03 Masonry Putty Application & Sanding
26.04 Walls Painting (2 Final Coats)
27 BASEBOARD & PANELLING
27.01 Baseboard Installation
27.02 Door & Window Panelling
28 STAIRWAY
28.01 Wooden Planks Installation
28.02 Balluster Installation
28.03 Wooden Handrail Installation
29 DOOR PANELS, LOCKS & KNOBS
29.01 Installation Of Door Panels
29.02 Installation Of Door Locks & Knobs
30 TILEWORKS FOR G/F
30.01 Baseboard Removal (for Tiles Works)
30.02 Layouting
30.03 Floor Tiles Installation
30.04 Baseboard Final Installation
30.05 Brass Nosing Installation
30.06 Tile Grouting
31 EXTERIOR WALL PAINTING
31.01 Scaffolds Installation
31.02 Primer Painting
31.03 Wall Textured Application
31.04 Wall Painting (2 Final Coats)
32 SHERRA WOOD
32.01 Framing Installation
32.02 Sherra Wood Installation
33 LAMINATED FLOORING
33.01 Baseboard Removal (for Laminated Flooring Installation)
33.02 Laminated Flooring Installation
33.03 Baseboard Final Installation
34 GARAGE ROOF
34.01 Layouting, Clearing & Excavation
34.02 Trusses Installation
34.03 Purlins Installation
34.04 Red Lead Paint Retouching
34.05 Fascia Board Installation
34.06 Undersheeting Installation (including Insulation & Cor.G.I. Sheets)
34.07 Ceiling Eaves Frame Installation
34.08 Ceiling Eaves Board Installation
34.09 Battens Installation
34.10 Rooftiles Installation
35 GARAGE & PORCH SLAB
35.01 Lay-out, Clearing & Excavation
35.02 Rebars Installation (Porch)
35.03 Zocalo Concreting & CHB Laying & Plastering for Zocalo Wall
35.04 Backfilling & Compaction
35.05 Siding Forms Installation & Gravel Bedding & Compaction
35.06 Rebars Installation
35.07 Electrical Roughing-ins
35.08 Plumbing Roughing-ins
35.09 Soil Treatment
35.10 Slab Concreting & Concrete Setting
35.11 Removal of Forms
35.12 Curing
36 GARAGE TOPPING & RAMP GROOVING
36.01 Lay-out & Forms Installation for Crushed Stone
36.02 Concrete Slab Topping
36.03 Crushed Stone Installation
36.04 Ramp Grooving
36.05 Septic Tank Cover Fabrication & Installation

37
VARNISHING BASEBOARD, PANELLING, STAIR WOODEN STEPS, H&RAIL, DOOR JAMBS
& DOOR PANELS, SHERRA WOOD
37.01 Wood Preparation (Sanding & Epoxy Application)
37.02 Varnish Application 1St Coat
37.03 Varnish Application Final Coat
38 WINDOWS & SLIDING DOOR
38.01 Windows Installation
38.02 Sliding Door Installation
38.03 Sealant Application (Outside)
38.04 Grills Installation
39 COLUMN/POST (W/ STONE CLADDING) FOR GLASS ROOF
39.01 Layouting & Rebars Installation
39.02 Forms Installation & Concreting
39.03 Tubular Support Installation
39.04 Stone Cladding Design For Post
40 GLASS ROOF & GRILL DOOR
40.01 Framing Installation
40.02 Porch Glass Roof Installation
40.03 Grill Door Installation At Service Area
40.04 Grill Door Painting
41 TILEWORKS FOR PORCH
41.01 Layouting
41.02 Floor Tiles Installation
41.03 Tile Grouting
42 KITCHEN CABINETS, COUNTERTOP, & SPLASHWALL
42.01 Kitchen Cabinets Installation
42.02 Kitchen Countertop Installation (Solid Surface by owner)
42.03 Kitchen Sink & Faucet Installation
42.04 Splashwall Layouting
42.05 Splashwall Tiles Installation
42.06 Tile Grouting
43 WINDOW SEALANT & SCREENS
43.01 Sealant Application (Inside)
43.02 Screen Installation
B. MAID'S & SERVICE AREA
44 MAID'S ROOM COLUMN FOOTING
44.01 Layout & Excavation
44.02 Gravel Bedding & Compaction
44.03 Rebars Installation
44.04 Formworks Installation
44.05 Soil Treatment
44.06 Concreting & Concrete Setting
44.07 Backfilling & Compaction
45 MAID'S ROOM WALL FOOTING
45.01 Layout & Excavation
45.02 Gravel Bedding & Compaction
45.03 Rebars Installation
45.04 Formworks Installation
45.05 Soil Treatment
45.06 Concreting & Concrete Setting
45.07 CHB Laying & Plastering
45.08 Removal of Forms
45.09 Plumbing Works
45.10 Electrical Works
Backfilling & Compaction
46 MAID'S ROOM WALL & COLUMN
46.01 Layouting
46.02 CHB Laying
46.03 Electrical Roughing-ins
46.04 Plumbing Roughing-ins (for fixtures & downspout)
46.05 Lintel Beam Rebars Installation
46.06 Lintel Beam Forms & Shoring Installation
46.07 Lintel Beam Concreting & Concrete Setting
46.08 Removal of Forms
46.09 Column Rebars Installation
46.10 Column Alignment , Forms & Brace Installation
46.11 Column Concreting
46.12 Removal of Forms
46.13 Curing For Column
46.14 CHB Rough Plastering
46.15 Door Jamb Installation
46.16 CHB Smooth Plastering
46.17 T&B PVC Jamb Installation
47 MAID'S ROOM & SERVICE AREA ROOFBEAM
47.01 Scaffolds Installation
47.02 Rebars Installation
47.03 Forms Installation
47.04 Plumbing Roughing-ins
47.05 Concreting
47.06 Removal of forms & scaffolds
47.07 Curing
48 MAID'S ROOM & SERVICE AREA SLAB
48.01 Clearing, Gravel Bedding & Compaction
48.02 Grease Trap & Catch BasinManual Trimming & CHB Laying
48.03 Side Forms Installation
48.04 Rebars Installation
48.05 Electrical Roughing-ins
48.06 Plumbing Roughing-ins
48.07 Soil Treatment
48.08 Concreting
48.09 Removal of Forms
48.10 Grease Trap & Catch Basin Cover Fabrication & Installation
48.11 Curing
49 MAID'S ROOM & SERVICE AREA ROOF
49.01 Layouting
49.02 Trusses Installation
49.03 Purlins Installation
49.04 Painting
49.05 Fascia Board Installation
49.06 Undersheeting Installation (including Insulation & Cor.G.I. Sheets)
49.07 Battens Installation
49.08 Rooftiles Installation
50 MAID'S ROOM & SERVICE AREA CEILING
50.01 Layouting
50.02 Frame Installation
50.03 Electrical Works
50.04 Board Installation
51 TILEWORKS FOR MAID'S ROOM T&B
51.01 Layouting
51.02 Wall Tiles Installation
51.03 Flooring Tiles Installation
51.04 Floor Drains Installation
51.05 Tile Grouting
52 TILEWORKS FOR SERVICE AREA & MAID'S ROOM FLOORING
52.01 Layouting
52.02 Floor Tiles Installation
52.03 Floor Drains Installation for Service Area
52.04 Tile Grouting
53 CATCH BASIN / MANHOLES, AT GARDEN AREA
53.01 Manual trimming
53.02 CHB Laying & Plastering For Catch Basins/Manholes
53.03 Catch Basin Cover Fabrication & Installation
54 WATERLINE LOOPING & FAUCET STAB-OUT
54.01 Waterline Looping & Faucet Stub-out Installation
54.02 Leak & Hydro Testing
C. PERIMETER FENCE & RETAINING WALL
55 PERIMETER FENCE
55.01 Layout & Excavation
55.02 Gravel Bedding & Compaction
55.03 Wall Footing & Col. Footing Rebars Installation
55.04 Wall Footing & Col. Footing Forms Installation
55.05 Soil Treatment
55.06 Wall Footing & Col. Footing Concreting & Concrete Setting
55.07 Wall Footing & Col. Footing Removal of Forms
55.08 Zocalo Wall CHB Laying & Rough Plastering
55.09 Backfilling & Compaction
55.10 Pull Box Installation
55.11 Column Rebars Installation
55.12 Fence Wall CHB Laying
55.13 Column Formworks Installation
55.14 Column Concreting & Concrete Setting
55.15 Removal Of Forms
55.16 Beam & Gutter Rebars Installation
55.17 Beam & Gutter Forms Installation
55.18 Beam & Gutter Concreting & Concrete Setting
55.19 Removal of Forms
55.20 CHB Plastering
55.21 Concrete gutter topping
55.22 Waterproofing Application
55.23 Leak test
56 PERIMETER FENCE PAINTING
56.01 Primer Painting
56.02 Textured Application
Painting (2 Final Coats)
57 RETAINING WALL/RIP RAP (optional)
RIPRAP
57.01 Layout & excavation of riprap footing
57.02 Laying of boulders
57.03 Installation of weepholes
57.04 Grouting of boulders
57.05 Topping
57.06 Curing of concrete grout
57.07 Backfilling & compaction
RETAINING WALL
57.08 Layout & excavation of wall footing
57.09 Rebar Installation
57.10 Forms Installation
57.11 Concreting & Concrete Setting
57.12 Removal of Forms
57.13 Curing of concrete
57.14 Backfilling & compaction
D. TURN-OVER
58 TURN-OVER PREP
58.01 Final Megger Testing, Electric Meter Installation
58.02 Final Hydro Test, Fixtures Test, Water Meter Installation
58.03 Inspection, Punchlisting/Rectifications & Housekeeping
58.04 Ground Soil Leveling & Gravel Bedding
58.05 Sealant Application For Grease Trap & Septic Tank Covers
58.06 Door keys Turn-over
59 TURN-OVER
59.01 Owner Inspection & Acceptance
27 28 29 30 31
DURATION MC DURATION MC DURATION MC DURATION MC DURATION
32 33 34 35
MC DURATION MC DURATION MC DURATION MC DURATION MC
36 37 41 42 43
DURATION MC DURATION MC DURATION MC DURATION MC DURATION

1 8
2 8
1 15
1 7
5 4

1 4
2 4
2 2
4 6
1 15
3 5

16.75 2

1 5
4.75 7
1 3
1 2
1 12
1 15
2 2

3 3
N/A N/A

2.375 4
2 6
1 2
1 10
1 5
1 2
1 5
1 3

1 4
4 8
1 2
1 2
1 2
5 8
1 7
2 5

1 2
2 2
1 2
2 10
1 3
45 46/47 TOTAL AVERAGE
MC DURATION MC DURATION MC DURATION MC DURATION MC

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
1 8
2 8
1 15
1 7
5 4
0 0
0 0
1 4
2 4
2 2
4 6
1 15
3 5
0 0
16.75 2
0 0
1 5
4.75 7
1 3
1 2
1 12
1 15
2 2
0 0
3 3
#VALUE! #VALUE!
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
2.375 4
2 6
1 2
1 10
1 5
1 2
1 5
1 3
0 0
0 0
1 4
4 8
1 2
1 2
1 2
5 8
1 7
2 5
0 0
0 0
1 2
2 2
1 2
2 10
1 3
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

Anda mungkin juga menyukai