VALOR REFERENCIAL

RESUMEN GENERAL DE INVERSION EN ACTIVOS FIJOS


PROYECTO : ESTUDIO DE DISTANCIAS MINIMAS DE SEGURIDAD
REGION : PUNO
PROVINCIA : PUNO, SAN ROMAN, SAN ANTONIO DE PUTINA, SANDIA
DISTRITO : PUNO, JULIACA, CHUCUITO, PICHACANI, LARAQUERI, MUÑANI, CAPACHICA, HUATA y SANDIA

ITEM DESCRIPCION DMS DMS


PUNO JULIACA

A SUMINISTRO DE MATERIALES 666,257.91 606,084.75

B MONTAJE ELECTROMECANICO 227,540.30 245,200.52

C TRANSPORTE (% SUMINISTROS) 7.00% 46,638.05 42,425.93

D COSTO DIRECTO ( C.D. ) 940,436.26 893,711.20

E GASTOS GENERALES (% C.D.) 79,858.87 79,765.42

F UTILIDADES (% C.D.) 5.00% 47,021.81 44,685.56

G SUB-TOTAL SIN I.G.V. 1,067,316.94 1,018,162.18

H I.G.V. 19.00% 202,790.22 193,450.81

COSTO TOTAL S/. 1,270,107.16 1,211,612.99


VALOR REFERENCIAL
ERAL DE INVERSION EN ACTIVOS FIJOS

FECHA: MAYO DEL 2017

DMS TOTAL
CHUCUITO, PICHACANI, LARAQUERI, MUÑANI, CAPACHICA, HUATA
SOLESy( SANDIA
S /. )

1,692,668.40 2,965,011.06

810,119.21 1,282,860.03

118,486.79 207,550.77

2,621,274.40 4,455,421.86

188,503.11 348,127.40

131,063.72 222,771.09

2,940,841.23 5,026,320.35

558,759.83 955,000.86

3,499,601.06 5,981,321.21
No
1.0
1.01
1.02
1.03
1.05
1.06
1.07
1.08
1.09
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20
Err:509
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
Err:509

2.00
2.01
2.02

3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09
3.10
3.11
3.12
3.13

4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10

6.0

70 6.01
50 6.02
35 6.03

7.0
12/400/180/360 7.01
13/400/180/380 7.02
ESPECIFICACIÓN
ARMADOS
ARMADO PS1-3, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400)
ARMADO PS1-3, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/300), POSTE EXISTENTE
ARMADO PR3-3, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400)
ARMADO SEC-3, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400)
ARMADO PSVE-3(MFG), (SUMINISTRADO POR JUEGO PARA POSTE DE 13/400)
ARMADO PSEC-3(MFG), (SUMINISTRADO POR JUEGO PARA POSTE DE 13/400)
ARMADO PR3-3(MFG), (SUMINISTRADO POR JUEGO PARA POSTE DE 13/400)
ARMADO PSH-3, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400)
ARMADO PRH-3, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400)
ARMADO DS-0, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400)
ARMADO DS-2, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400)
ARMADO DS-3, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400)
ARMADO BAY-1, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400)
PERNO MAQUINADO DE A°G° DE 16 mm ø x 254 mm LONG., PROVISTO DE TUERCA, CONTRATUERCA Y ARANDELA
PERNO MAQUINADO DE A°G° DE 16 mm ø x 457 mm LONG., PROVISTO DE TUERCA, CONTRATUERCA Y ARANDELA
AISLADOR TIPO PIN, CLASE ANSI 56-3
AISLADOR TIPO PIN, CLASE ANSI 56-4
ESPIGA VERTICE PUNTA DE POSTE DE 50.8mm x 609mm CABEZA PB 35mm
ESPIGA DE CRUCETA DE F°G° FORJADO DE 28.6mm x 381mm CABEZA PB 35mm
ESPIGA DE CRUCETA DE F°G° FORJADO DE 28.6mm x 432mm CABEZA PB 35mm
GRAPA DE ANCLAJE TIPO PISTOLA CON 3 PERNOS Y ARANDELAS
ALAMBRE DE AMARRE DE ALUMINIO RECOCIDO DE 16 mm²
PERNO OJO DE A°G° DE 16 mm ø x 305 mm LONG., 152 mm MAQUINADO, PROVISTO DE TUERCA Y CONTRATUERCA
TUERCA-OJO PARA PERNO DE 16 mm ø
ARANDELA CUADRADA CURVA DE A° G°, 57 x 57 x 5 mm, AGUJERO DE 18 mm ø
GRAPA DE ANGULO ACERO/ALUMINIO
AISLADOR DE TIPO SUSPENSIÓN, POLIMERICO ANSI RPP-25
GRILLETE DE F°G° DE ANCLAJE
VARILLA DE ARMAR PREFORMADA SIMPLE DE 35mm2
VARILLA DE ARMAR PREFORMADA SIMPLE DE 50mm2
CINTA PLANA DE ARMAR
CONECTOR DE AL-AL DE 25/120mm2, 02 PERNOS
ESPACIADOR PARA ESPIGAS DE CABEZA DE POSTE
DESCARGADOR BALLONETA DE F°G° DE 50x50x5mm x 2000mm DE LONG.

EQUIPOS DE MANIOBRA
SECCIONADOR FUSIBLE UNIPOLAR TIPO EXPULSION (CUT-OUT) DE 27/38 KV, 100A, 170KV-BIL.
PARARRAYOS TIPO AUTOVALVULA DE OXIDO METALICO, 21 kV, 10 KA,170 KV-BIL

RETENIDAS
CABLE DE ACERO GRADO SIEMENS MARTIN, DE 10 mm ø - 7 HILOS
VARILLA DE ANCLAJE DE A° G° DE 19 mm ø x 2,40 m, PROVISTO DE OJAL GUARDACABO EN UN EXTREMO Y TUERCA
RIEL DE ANCLAJE DE 5 m, PROVISTO DE OJAL DE 25 mm ø
GRAPA PARALELA DE ACERO DE 152 mm DE LONGITUD, PROVISTA DE TRES PERNOS
ABRAZADERA DE FºGº DE 195 mm ø x 50 mm, E=6,4 mm, CON 3 PERNOS DE AºGº DE 16 mm ø x 102 mm LONG, TUERCA Y ARANDELA
OJAL GUARDACABOS DE FºGº PARA CABLE DE 10 mm ø
ALAMBRE DE AºGº N° 12; PARA ENTORCHADO
ARANDELA CUADRADA PLANA DE A° G° DE 102x102x10 mm, AGUJERO DE 21 mm ø
BLOQUE DE CONCRETO DE 0,40 x 0,40 x 0,15 m
AISLADOR TIPO SUSPENSIÓN POLIMERICO RPP-25
CANALETA GUARDACABLE DE F.G. DE E=4.5 mm. X2100 mm DE LONG
TEMPLADOR DE F.G. DE 19mm øx300mm. LONG.
GRILLETE REFERIR ANTERIOR
BRAZO CONTRAPUNTA DE F°G° DE DIAM=51mm X 1500mm DE LONG.CON ABRAZADERA DE DIAM=245mm
PUESTA A TIERRA
PLANCHA DOBLADA TIPO J DE COBRE PARA TOMA A TIERRA DE ESPIGAS Y/ O PERNOS
PLANCHA DE BRONCE DE 150x400x6.35mm, CON AGUJERO DE 19mm DE DIAM, PROTECCION ANTIRROBO
CONDUCTOR DESNUDO COOPERWELD DE 25 mm2, PARA PUESTA A TIERRA
VARILLA PARA PUESTA A TIERRA DE COBRE DE 15.875mm DE DIAM, x 2.40m DE LONG, ROSCADO EN LA PUNTA
CONECTOR DE COBRE TIPO ANDERSON, PARA VARILLA DE 16 mm ø Y CONDUCTOR DE 25mm2
CONECTOR DE COBRE TIPO PERNO PARTIDO PARA CONDUCTOR 25 mm²
TUERCA INOXIDABLE PARA VARILLA DE 15.875mm DE DIAM
CAJA DE REGISTRO DE CONCRETO PARA PUESTA A TIERRA 0,40x0,40x0,3m
CEMENTO CONDUCTIVO
TIERRA NEGRA

CONDUCTORES
ALEACIÓN DE ALUMINIO
CONDUCTOR DE ALEACION DE ALUMINIO DE 70 mm2
CONDUCTOR DE ALEACION DE ALUMINIO DE 50 mm2
CONDUCTOR DE ALEACION DE ALUMINIO DE 35 mm2

POSTES
POSTE DE CONCRETO ARMADO DE 12/400/180/360 (INCLUYE PERILLA)
POSTE DE CONCRETO ARMADO DE 13/400/180/380 (INCLUYE PERILLA)

DESMONTAJE DE REDES PRIMARIAS


12/400/180/360
13/400/180/380
12/400/180/360
13/400/180/380

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

DESMONTAJE Y REUBICACION DE REDES SECUNDARIAS


12/300/180/360
13/400/180/380
12/300/180/360
13/400/180/380
Err:509
Err:509
Err:509
1 2 3 4 5 6 7
SE Juliaca SE Azángaro SE Ayaviri SE Putina SE Huancané SE Antauta SE Moho

82 99 9 13 21 54 29
0 0 34 0 0 0 0
18 12 3 7 3 11 6
2 0 0 1 2 2 2
4 35 3 0 0 0 0
0 0 0 0 0 0 0
1 1 0 0 0 0 0
7 2 0 1 0 3 0
0 0 0 0 0 0 0
13 15 1 0 4 4 7
1 2 0 0 0 0 1
9 1 1 0 1 2 1
24 25 3 8 4 25 16
290 290 98 56 56 216 126
0 0 0 0 0 0 0
272 244 0 0 73 0 57
91 210 145 49 0 210 60
121 120 46 20 24 83 47
193 188 0 0 49 0 30
49 146 99 29 0 127 40
162 114 30 48 18 126 60
915 1142.5 362.5 122.5 182.5 525 292.5
93 96 27 27 9 81 36
117 92 15 35 15 73 42
320 386 134 68 56 276 138
9 30 6 0 0 6 6
249 226 54 65 24 204 101
312 243 54 76 30 246 130
0 0 0 0 0 0 0
0 0 0 0 0 0 0
162 114 30 48 18 126 60
252 152 38 48 44 146 96
0 0 0 0 0 0 0
0 0 0 0 0 0 0

6 0 0 3 6 6 6
6 0 0 3 6 6 6

1170 1026 270 255 90 1080 525


78 65 18 17 6 72 35
0 0 0 0 0 0 0
312 294 72 68 24 288 140
78 65 18 17 6 72 35
78 133 18 17 6 72 35
312 396 72 68 24 288 140
78 65 18 17 6 72 35
78 65 18 17 6 72 35
0 0 0 0 0 0 0
78 65 18 17 6 72 35
78 82 18 17 6 72 35
0 0 0 0 0 0 0
0 17 0 0 0 0 0

325 371 118 57 59 235 127


3 0 0 1 2 2 2
2142 2608 290 358 409 1451 800
3 0 0 1 2 2 2
3 0 0 1 2 2 2
189 197 63 35 37 141 80
3 0 0 1 2 2 2
3 0 0 1 2 2 2
3 0 0 1 2 2 2
4.2 0 0 1.4 2.8 2.8 2.8

0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A

29.00 12.00 0.00 3.00 0.00 16.00 12.00


0.00 0.00 2.00 0.00 0.00 0.00 0.00

81.00 141.00 16.00 11.00 22.00 37.00 13.00


9.00 18.00 2.00 1.00 2.00 2.00 1.00
81.00 141.00 16.00 11.00 22.00 37.00 13.00
9.00 18.00 2.00 1.00 2.00 2.00 1.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

90.00 141.00 18.00 14.00 23.00 39.00 12.00


0.00 18.00 0.00 1.00 1.00 0.00 2.00
90.00 141.00 18.00 14.00 23.00 39.00 12.00
0.00 18.00 0.00 1.00 1.00 0.00 2.00
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Cimentacion Tipo I
Poste de Concreto Madera
H (m) 8 12 13 8 12 13
h (m) 1.4 1.8 1.9 1.4 1.8 1.9
hs (m) 0 0 0 0 0 0
d (mm) 120 140 160 120 120 160
d (mm) 240 320 340 240 300 340
Dh 0.80 0.80 0.80 0.80 0.80 0.80
De 219 293 314 219 273 314

Vexc 0.704 0.905 0.955 0.704 0.905 0.955


Vciment. 0.646 0.772 0.796 0.646 0.789 0.796
8 9 10 11 12
SE Puno SE Desaguadero SE Ilave SE Yunguyo SE Juli

20 26 54 28 19
0 0 0 0 0
1 3 6 7 2
0 0 0 1 1
0 0 30 16 0
0 0 0 0 0
0 0 2 2 0
10 0 0 0 0
1 0 0 0 0
4 0 9 6 1
1 0 2 3 0
0 1 2 3 0
13 9 12 6 7
74 76 144 82 56
0 0 0 0 0
72 82 283 166 60
28 2 0 0 0
24 29 60 35 21
58 55 223 131 39
18 0 0 0 0
24 24 72 54 12
250 210 722.5 430 150
15 15 57 27 6
14 15 47 51 10
86 88 210 82 56
0 0 9 0 0
35 31 110 75 16
40 32 101 92 20
0 0 0 0 0
0 0 0 0 0
24 24 72 54 12
36 30 98 90 20
0 0 0 0 0
0 0 0 0 0

0 0 0 3 3
0 0 0 3 3

165 105 375 267 60


11 7 24 17 4
0 0 0 0 0
44 28 106 76 16
11 7 24 17 4
11 7 44 33 4
44 28 136 100 16
11 7 24 17 4
11 7 24 17 4
0 0 0 0 0
11 7 24 17 4
11 7 29 21 4
0 0 0 0 0
0 0 5 4 0

94 74 210 107 51
0 0 0 1 1
558 460 1510 833 343
0 0 0 1 1
0 0 0 1 1
57 43 107 55 31
0 0 0 1 1
0 0 0 1 1
0 0 0 1 1
0 0 0 1.4 1.4

0.00 0.00 2.39 0.00 0.00


0.00 0.00 0.00 4.23 0.00
#N/A #N/A #N/A #N/A #N/A

8.00 2.00 0.00 2.00 2.00


0.00 0.00 0.00 1.00 0.00

45.00 24.00 66.00 13.00 12.00


1.00 0.00 33.00 18.00 1.00
45.00 24.00 66.00 13.00 12.00
1.00 0.00 33.00 18.00 1.00
#N/A #N/A #N/A #N/A #N/A
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509

46.00 24.00 68.00 13.00 20.00


0.00 0.00 33.00 18.00 0.00
46.00 24.00 68.00 13.00 20.00
0.00 0.00 33.00 18.00 0.00
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509

Cimentacion Tipo II
Poste de Concreto
8 12 13
1.1 1.5 1.3
0.1 0.1 0.1
120 140 160
240 320 340
0.86 0.80 0.80
224 298 322

0.888 1.024 0.896


0.841 0.912 0.784
1
0

0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0.00
0.00
#N/A

29.00
0.00

81.00
9.00
81.00
9.00
#N/A
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

90.00
0.00
90.00
0.00
Err:509
Err:509
Err:509
140 54

127 17 138 144


149 35 184 184
16 2 18 18
25 1 26 26
24 1 25 25
85 0 9 1 95 95
47 2 49 49
54 0 54 54
21 0 9 26 30
0 66 33 99 99
0 35 19 54 54
0 21 1 22 22
548 58 140 54 790
Página 54 de 300
V

PROYECTO
REGION
PROVINCIA
DISTRITO

Item Descripc

Err:509 OBRAS PRELIMINARES


Err:509 CARTEL PARA OBRA
Err:509 REPLANTEO TOPOGRÁFICO, UBICACIÓN E INGENIERIA DE

Err:509 INSTALACION DE POSTES DE CONCRETO DE RED PRIMAR


Err:509 TRANSPORTE POSTE DE CONCRETO DE ALMACEN A PUN
Err:509 TipEXCAVACIÓN EN TERRENO NORMAL
Err:509 TipEXCAVACIÓN EN TERRENO ROCOSO
Err:509 =HIZAJE, IDENTIFICACION Y SEÑALIZACION DE POSTE DE CO
Err:509 =HIZAJE, IDENTIFICACION Y SEÑALIZACION DE POSTE DE CO
Err:509 TipRELLENO Y CIMENTACION DE POSTE DE CONCRETO

Err:509 INSTALACION DE RETENIDAS RED PRIMARIA


Err:509 TipEXCAVACIÓN EN TERRENO NORMAL
Err:509 TipEXCAVACIÓN EN TERRENO ROCOSO
Err:509 RI INSTALACIÓN DE RETENIDA TIPO RI-A
Err:509 RRINSTALACIÓN DE RETENIDA TIPO RI-A
Err:509 Er Err:509
Err:509 Er Err:509
Err:509 RelRELLENO Y COMPACTACIÓN PARA INSTALACION DE BLOQ

Err:502 MONTAJE DE ARMADOS RED PRIMARIA


Err:502 PSARMADO TIPO
Err:502 PSARMADO TIPO
Err:502 ###
ARMADO TIPO
Err:502 ###
ARMADO TIPO
Err:502 P3ARMADO TIPO
Err:502 DSARMADO TIPO
Err:502 DSARMADO TIPO
Err:502 DSARMADO TIPO

Err:509 MONTAJE DE CONDUCTORES DE ALEACION DE ALUMINIO


Err:509 TENDIDO Y PUESTA EN FLECHA CONDUCTOR ALEACIÓN D
Err:509 TENDIDO Y PUESTA EN FLECHA CONDUCTOR ALEACIÓN D
Err:509 TENDIDO Y PUESTA EN FLECHA CONDUCTOR ALEACIÓN D
Página 55 de 300
V

PROYECTO
REGION
PROVINCIA
DISTRITO

Item Descripc

Err:509 MONTAJE DE CONDUCTO NA2XSY2-S DE RED PRIMARIA


Err:509 TENDIDO Y PUESTA EN FLECHA CONDUCTOR NA2XSY2-S
Err:509 TENDIDO Y PUESTA EN FLECHA CONDUCTOR NA2XSY2-S

Err:509 MONTAJE DE CONDUCTOR AUTOPORTANTE PARA RED SE


Err:509 Er Err:509

#N/A INSTALACION DE PUESTA A TIERRA DE RED PRIMARIA


#N/A TipEXCAVACIÓN PARA PUESTA A TIERRA EN TERRENO NORM
#N/A TipEXCAVACIÓN PARA PUESTA A TIERRA EN TERRENO ROCO
#N/A PAINSTALACION DE PUESTA A TIERRA TIPO PAT-2 EN POSTES
#N/A ArmRELLENO Y COMPACTACIÓN DE PUESTA A TIERRA

Err:509 MONTAJE DE ARMADOS DE RED SECUNDARIA


Err:509 ARMADO TIPO E1, CON CAJA DE DERIVACION PARA ACOM
Err:509 ARMADO TIPO E3, CON CAJA DE DERIVACION PARA ACOM
Err:509 INSTALACION DE PASTORAL SIMPLE DE ACERO GALVANIZ

Err:509 DESMONTAJE DE REDES PRIMARIAS


Err:509 12/400/180/360
Err:509 13/400/180/380
Err:509 12/400/180/360
Err:509 13/400/180/380
Err:509 0
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Err:509 DESMONTAJE Y REUBICACION DE REDES SECUNDARIAS


Err:509 12/300/180/360
Err:509 12/300/180/360
Err:509 13/400/180/380
Err:509 Err:509

Err:509 PRUEBAS Y PUESTA EN SERVICIO


Err:509 PRUEBAS Y PUESTA EN SERVICIO DE REDES PRIMARIAS
Página 56 de 300
V

PROYECTO
REGION
PROVINCIA
DISTRITO

Item Descripc

EXPEDIENTES TECNICOS FINAL CONFORME A OBRA (1 OR


Err:509
LA PRESENTACION DIGITALIZADA DE TEXTOS Y PLANOS E

TOTAL MONTAJE ELECTROMECÁNICO

(*) El Contratista coordinará con la empresa concesionaria para definir los


VALOR REFERENCIAL Página 57 de 300

0
MONTAJE ELECTROMECANICO

#REF!
#REF!
#REF!
#REF!

Descripción

PRELIMINARES
L PARA OBRA
NTEO TOPOGRÁFICO, UBICACIÓN E INGENIERIA DE DETALLE DE REDES PRIMARIAS
Err:509
ACION DE POSTES DE CONCRETO DE RED PRIMARIA
PORTE POSTE DE CONCRETO DE ALMACEN A PUNTO DE IZAJE
ACIÓN EN TERRENO NORMAL
ACIÓN EN TERRENO ROCOSO
DENTIFICACION Y SEÑALIZACION DE POSTE DE CONCRETO ARMADO DE 12/400/180/360
DENTIFICACION Y SEÑALIZACION DE POSTE DE CONCRETO ARMADO DE 13/400/180/380
NO Y CIMENTACION DE POSTE DE CONCRETO
Err:509
ACION DE RETENIDAS RED PRIMARIA
ACIÓN EN TERRENO NORMAL
ACIÓN EN TERRENO ROCOSO
ACIÓN DE RETENIDA TIPO RI-A
ACIÓN DE RETENIDA TIPO RI-A

NO Y COMPACTACIÓN PARA INSTALACION DE BLOQUE DE ANCLAJE


Err:509
JE DE ARMADOS RED PRIMARIA
PS1-3
PSH-3
Err:509
Err:509
P3A2-3
DS-0
DS-2
DS-3
Err:502
JE DE CONDUCTORES DE ALEACION DE ALUMINIO DE RED PRIMARIA
O Y PUESTA EN FLECHA CONDUCTOR ALEACIÓN DE Al DE 120 mm2, POR FASE
O Y PUESTA EN FLECHA CONDUCTOR ALEACIÓN DE Al DE 35 mm2, POR FASE
O Y PUESTA EN FLECHA CONDUCTOR ALEACIÓN DE Al DE 25 mm2, POR FASE
Err:509
VALOR REFERENCIAL Página 58 de 300

0
MONTAJE ELECTROMECANICO

#REF!
#REF!
#REF!
#REF!

Descripción

JE DE CONDUCTO NA2XSY2-S DE RED PRIMARIA


O Y PUESTA EN FLECHA CONDUCTOR NA2XSY2-S 3x35 mm2
O Y PUESTA EN FLECHA CONDUCTOR NA2XSY2-S 3x25 mm3
Err:509
JE DE CONDUCTOR AUTOPORTANTE PARA RED SECUNDARIA

Err:509
ACION DE PUESTA A TIERRA DE RED PRIMARIA
ACIÓN PARA PUESTA A TIERRA EN TERRENO NORMAL
ACIÓN PARA PUESTA A TIERRA EN TERRENO ROCOSO
ACION DE PUESTA A TIERRA TIPO PAT-2 EN POSTES DE CONCRET0, INCLUYE CAJA DE REGISTRO
NO Y COMPACTACIÓN DE PUESTA A TIERRA
#N/A
JE DE ARMADOS DE RED SECUNDARIA
O TIPO E1, CON CAJA DE DERIVACION PARA ACOMETIDA
O TIPO E3, CON CAJA DE DERIVACION PARA ACOMETIDA
ACION DE PASTORAL SIMPLE DE ACERO GALVANIZADO (INCLUYE LUMINARIA Y LAMPARA)
Err:509
NTAJE DE REDES PRIMARIAS

Err:509
NTAJE Y REUBICACION DE REDES SECUNDARIAS

Err:509
AS Y PUESTA EN SERVICIO
AS Y PUESTA EN SERVICIO DE REDES PRIMARIAS
VALOR REFERENCIAL Página 59 de 300

0
MONTAJE ELECTROMECANICO

#REF!
#REF!
#REF!
#REF!

Descripción

ENTES TECNICOS FINAL CONFORME A OBRA (1 ORIGINAL + 3 COPIAS), DE REDES PRIMARIAS, INCLUYE
SENTACION DIGITALIZADA DE TEXTOS Y PLANOS EN CD.
Err:509

MONTAJE ELECTROMECÁNICO

ordinará con la empresa concesionaria para definir los detalles para la identificación y señalización de los postes.
RENCIAL Página 60 de 300

OMECANICO

FECHA: MAYO DEL 2017

Metrado Precio S/.


Unid.
Cant. Unitario Total

u 1.00 804.58 804.58


Loc. Err:509 188.28 Err:509
Err:509

u Err:509 66.54 Err:509


m3 Err:509 31.97 Err:509
m3 Err:509 118.49 Err:509
u Err:509 62.63 Err:509
u Err:509 70.58 Err:509
m3 Err:509 152.42 Err:509
Err:509

m3 Err:509 31.97 Err:509


m3 Err:509 118.49 Err:509
u Err:502 47.18 Err:502
u Err:502 50.72 Err:502
u Err:509 50.72 Err:509
u Err:509 47.18 Err:509
m3 Err:509 41.79 Err:509
Err:509

U Err:502 84.96 Err:502


U Err:502 51.63 Err:502
U Err:509 69.54 Err:509
U Err:509 60.67 Err:509
U Err:502 101.33 Err:502
U Err:502 51.63 Err:502
U Err:502 59.44 Err:502
U Err:502 48.04 Err:502
Err:502

km Err:509 1,107.71 Err:509


km #N/A 875.48 #N/A
km Err:509 819.19 Err:509
Err:509
RENCIAL Página 61 de 300

OMECANICO

FECHA: MAYO DEL 2017

Metrado Precio S/.


Unid.
Cant. Unitario Total

km Err:509 1,046.24 Err:509


km Err:509 1,046.24 Err:509
Err:509

km Err:509 759.59 Err:509


Err:509

m3 #N/A 31.97 #N/A


m3 #N/A 118.49 #N/A
u #N/A 29.82 #N/A
m3 #N/A 42.12 #N/A
#N/A

u Err:509 14.94 Err:509


u Err:509 15.29 Err:509
u Err:509 33.01 Err:509
Err:509

u Err:509 100.59 Err:509


u Err:509 26.37 Err:509
km Err:509 367.56 Err:509
km Err:509 367.56 Err:509
u #N/A 21.61 #N/A
jgo Err:509 25.96 Err:509
u Err:509 265.75 Err:509
u Err:509 29.75 Err:509
u Err:509 29.75 Err:509
Err:509

u Err:509 76.23 Err:509


km Err:509 367.56 Err:509
u Err:509 16.35 Err:509
u Err:509 29.08 Err:509
Err:509

Loc. Err:509 58.59 Err:509


RENCIAL Página 62 de 300

OMECANICO

FECHA: MAYO DEL 2017

Metrado Precio S/.


Unid.
Cant. Unitario Total

Loc. Err:509 105.00 Err:509


Err:509

Err:509
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Cartel de obra


UNIDAD : Cartel de obra
RENDIMIENTO : 1 cartel/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 67.00% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Madera tornillo cepillado p2 70.00
Clavos c/c de 3" kg 2.00
Triplay Lupuna 4' x8' x9 mm pl 4.00
Pintura esmalte sintético gln 0.50
Cemento Portland tipo I en bolsa de 42,5 kg. bls 1.00
Hormigón m3 0.36

MANO DE OBRA
Capataz 0.10 h-h 0.80
Operario 1.00 h-h 8.00
Oficial 1.00 h-h 8.00
Peón 2.00 h-h 16.00

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.10 h-m 0.80
Herramientas % mano de obra % 5.00

TOTAL

Replanteo topografico, ubicación de estructuras e Ingen


PARTIDA :
Primarias
UNIDAD : Localidad
RENDIMIENTO : 3 Localidad/día
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 86.45% CALIFICADA
DESCRIPCION Und. Cantidad

MATERIALES
Material varios (Estaca,wincha metálica de 50 m., yeso, cordel,
%MO 5.00
pintura, etc., útilies y equipos de gabinete)

MANO DE OBRA
Ingeniero Especialista en Redes Primarias 0.33 h-h 0.88
Dibujante en Autocad 0.33 h-h 0.88
Topógrafo 1.00 h-h 2.67
Oficial 1.00 h-h 2.67
Peón 1.00 h-h 2.67

EQUIPOS Y HERRAMIENTAS
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

Camioneta Rural 4x4 de 135 HP 0.25 h-m 0.67


Teodolito 1.00 h-m 2.67
Herramientas % mano de obra % 5.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Excavacion en terreno normal


UNIDAD : m3
RENDIMIENTO : 7.5 m3/día
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 11.84% CALIFICADA
DESCRIPCION Und. Cantidad

MATERIALES
Material varios (Yeso,estacas,cordel,etc) % 5.00

MANO DE OBRA
Capataz 0.1 h-h 0.11
Peón 2 h-h 2.13

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.15 h-m 0.16
Herramientas % mano de obra % 5.00

TOTAL

PARTIDA : Excavacion en terreno rocoso


UNIDAD : m³
RENDIMIENTO : 9 m³/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 53.08% CALIFICADA
DESCRIPCION Und. Cantidad

MATERIALES
Material varios (Yeso,estacas,cordel,etc) % 5.00

MANO DE OBRA
Capataz 0.1 h-h 0.09
Operario 1.0 h-h 0.89
Peón 2.0 h-h 1.78

EQUIPOS Y HERRAMIENTAS
Compresor Neumático, perforador y barrenos ( incluye Explosivos,
1.000 h-m 0.89
fulminantes y mechas)
Camión plataforma 4X2, 122 HP, 8 TN. 0.150 h-m 0.13
Herramientas % mano de obra % 5.00

TOTAL

PARTIDA : Relleno y cimentación de poste de concreto armado


UNIDAD : m3
RENDIMIENTO : 9 m3/dia
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 67.01% CALIFICADA


DESCRIPCION Und. Cantidad

MATERIALES
Piedra Chancada de 1/2" m³ 0.35
Arena gruesa m³ 0.51
Cemento Portland tipo I en bolsa de 42,5 kg. bls 4.00
Agua m³ 0.20

MANO DE OBRA
Capataz 0.10 h-h 0.09
Operario 1.00 h-h 0.89
Oficial 1.00 h-h 0.89
Peón 2.00 h-h 1.78

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.15 h-m 0.13
Herramientas % mano de obra % 5.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Relleno y compactación para instalación bloque de ancl


UNIDAD : m3
RENDIMIENTO : 9 m3/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 50.77% CALIFICADA
DESCRIPCION Und. Cantidad

MATERIALES
Piedra Grande de Cantera m³ 0.20
Agua m3 0.20

MANO DE OBRA
Capataz 0.10 h-h 0.09
Oficial 1.00 h-h 0.89
Peón 2.00 h-h 1.78

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.15 h-m 0.13
Herramientas % mano de obra % 5.00

TOTAL

PARTIDA : Relleno y compactación para puesta a tierra


UNIDAD : m3
RENDIMIENTO : 7.5 m3/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 50.94% CALIFICADA
DESCRIPCION Und. Cantidad

MATERIALES
Agua m3 0.20

MANO DE OBRA
Capataz 0.10 h-h 0.11
Oficial 1.00 h-h 1.07
Peón 2.00 h-h 2.13

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.15 h-m 0.16
Herramientas % mano de obra % 5.00

TOTAL

PARTIDA : Transporte de poste de concreto de almacen a punto de


UNIDAD : Un.
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

RENDIMIENTO : 20 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 16.20% CALIFICADA
DESCRIPCION Und. Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.08
Oficial 1.00 h-h 0.40
Peón 12.00 h-h 4.80

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.75 h-m 0.30
Herramientas % mano de obra % 5.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Izado de poste de CAC 13 m / 3000 N. Incluye numerac


UNIDAD : Un.
RENDIMIENTO : 16 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 42.15% CALIFICADA
DESCRIPCION Und. Cantidad

MATERIALES
Material varios (estribo,soga,pintura, brochas, etc) % MO 5.00

MANO DE OBRA
Capataz 0.50 h-h 0.25
Operario 1.00 h-h 0.50
Oficial 1.00 h-h 0.50
Peón 7.00 h-h 3.50

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.25 h-m 0.13
Pluma de Izaje 1 h-m 0.50
Teodolito 1.00 h-m 0.50
Herramientas % mano de obra % 5.00

TOTAL

PARTIDA : Izado de poste de CAC 13 m / 4000 N. Incluye numerac


UNIDAD : Un.
RENDIMIENTO : 14 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 42.20% CALIFICADA
DESCRIPCION Und. Cantidad

MATERIALES
Material varios (estribo,soga,pintura, brochas, etc) % MO 5.00

MANO DE OBRA
Capataz 0.50 h-h 0.29
Operario 1.00 h-h 0.57
Oficial 1.00 h-h 0.57
Peón 7.00 h-h 4.00

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.25 h-m 0.14
Pluma de Izaje 1 h-m 0.57
Teodolito 1.00 h-m 0.57
Herramientas % mano de obra % 5.00
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Instalacion de retenida tipo RI - A y RB - A


UNIDAD : Un.
RENDIMIENTO : 12 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 67.23% CALIFICADA
DESCRIPCION Und. Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % M.O. 5.00

MANO DE OBRA
Capataz 0.10 h-h 0.07
Operario 1.00 h-h 0.67
Oficial 1.00 h-h 0.67
Peón 2.00 h-h 1.33

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.250 h-m 0.17
Tirfor 3 ton. 1.00 h-m 0.67
Escalera 1.00 h-m 0.67
Caja de herramientas 2.00 h-m 1.33
Herramientas % mano de obra % 5.00

TOTAL

PARTIDA : Instalacion de retenida tipo RV - A y RB - A


UNIDAD : Un.
RENDIMIENTO : 11 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 67.09% CALIFICADA
DESCRIPCION Und. Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.10 h-h 0.07
Operario 1.00 h-h 0.73
Oficial 1.00 h-h 0.73
Peón 2.00 h-h 1.45

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.250 h-m 0.18
Tirfor 3 ton. 1.00 h-m 0.73
Escalera 1.00 h-m 0.73
Caja de herramientas 2.00 h-m 1.45
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

Herramientas % mano de obra % 5.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Armado TSV-3 y L1-7-216-1 Soporte de Retencion verti


UNIDAD : Un.
RENDIMIENTO : 13.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 68.45% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.12
Operario 1.00 h-h 0.62
Oficial 1.00 h-h 0.62
Peón 2.00 h-h 1.23

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.31
Caja de herramientas 2.00 h-m 1.23
Escalera 1.00 h-m 0.62

TOTAL

PARTIDA : Arm. PSVE-3 (MFG) Soporte de Suspensión Vertical 0º


UNIDAD : Un.
RENDIMIENTO : 9.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 68.38% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.18
Operario 1.00 h-h 0.89
Oficial 1.00 h-h 0.89
Peón 2.00 h-h 1.78

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.44
Caja de herramientas 2.00 h-m 1.78
Escalera 1.00 h-m 0.89

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Arm. PA1VE-3 (MFG) Soporte de angulo vertical 10º - 3


UNIDAD : Un.
RENDIMIENTO : 8.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 68.35% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.20
Operario 1.00 h-h 1.00
Oficial 1.00 h-h 1.00
Peón 2.00 h-h 2.00

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.50
Caja de herramientas 2.00 h-m 2.00
Escalera 1.00 h-m 1.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Arm. PR3-3 (MFG) Soporte de Retención Vertical, trifás


UNIDAD : Un.
RENDIMIENTO : 7.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 68.28% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.23
Operario 1.00 h-h 1.14
Oficial 1.00 h-h 1.14
Peón 2.00 h-h 2.29

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.57
Caja de herramientas 2.00 h-m 2.29
Escalera 1.00 h-m 1.14

TOTAL

PARTIDA : Arm. TSV-3 (MFG) y LI-7-216-1 Soporte de Retención V


UNIDAD : Un.
RENDIMIENTO : 7.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 68.28% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.23
Operario 1.00 h-h 1.14
Oficial 1.00 h-h 1.14
Peón 2.00 h-h 2.29

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.57
Caja de herramientas 2.00 h-m 2.29
Escalera 1.00 h-m 1.14

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Armado PSEC-3P (MFG) Soporte de Seccionamiento 3


UNIDAD : Un.
RENDIMIENTO : 8.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 59.02% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.20
Operario 1.00 h-h 1.00
Oficial 1.00 h-h 1.00
Peón 3.00 h-h 3.00

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.50
Caja de herramientas 2.00 h-m 2.00
Escalera 1.00 h-m 1.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Armado PSUB Soporte de Seccionamiento 3ø con salid


UNIDAD : Un.
RENDIMIENTO : 7.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 58.97% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.23
Operario 1.00 h-h 1.14
Oficial 1.00 h-h 1.14
Peón 3.00 h-h 3.43

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.57
Caja de herramientas 2.00 h-m 2.29
Escalera 1.00 h-m 1.14

TOTAL

PARTIDA : Arm. PSVE-2A (MFG) Soporte de Suspensión trifásica


UNIDAD : Un.
RENDIMIENTO : 13.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 68.45% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.12
Operario 1.00 h-h 0.62
Oficial 1.00 h-h 0.62
Peón 2.00 h-h 1.23

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.31
Caja de herramientas 2.00 h-m 1.78
Escalera 1.00 h-m 0.89

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Armado PS1-3 (0°-5°) Soporte de alineamiento Trifásico


UNIDAD : Un.
RENDIMIENTO : 15.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 68.25% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.11
Operario 1.00 h-h 0.53
Oficial 1.00 h-h 0.53
Peón 2.00 h-h 1.07

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.27
Caja de herramientas 2.00 h-m 1.07
Escalera 1.00 h-m 0.53

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Arm. DS-3 (CCAV) Soporte de derivacion no tensada, t


UNIDAD : Un.
RENDIMIENTO : 11.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 68.57% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.15
Operario 1.00 h-h 0.73
Oficial 1.00 h-h 0.73
Peón 2.00 h-h 1.45

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.36
Caja de herramientas 2.00 h-m 1.45
Escalera 1.00 h-m 0.73

TOTAL

PARTIDA : Arm. PSVE-3 (MCAV) Soporte de Suspensión Vertical (


UNIDAD : Un.
RENDIMIENTO : 13.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 68.45% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.12
Operario 1.00 h-h 0.62
Oficial 1.00 h-h 0.62
Peón 2.00 h-h 1.23

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.31
Caja de herramientas 2.00 h-m 1.78
Escalera 1.00 h-m 0.89

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Armado LI-7-219-0 Soporte de Seccionamiento en cruce


UNIDAD : Un.
RENDIMIENTO : 8.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 59.02% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.20
Operario 1.00 h-h 1.00
Oficial 1.00 h-h 1.00
Peón 3.00 h-h 3.00

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.50
Caja de herramientas 2.00 h-m 2.00
Escalera 1.00 h-m 1.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Armado PA3-3 (60°-90°) Soporte de angulo Trifásico sin


UNIDAD : Un.
RENDIMIENTO : 15.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 68.25% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.11
Operario 1.00 h-h 0.53
Oficial 1.00 h-h 0.53
Peón 2.00 h-h 1.07

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.27
Caja de herramientas 2.00 h-m 1.07
Escalera 1.00 h-m 0.53

TOTAL

PARTIDA : Armado PA3-4 (60°-90°) Soporte de angulo Trifásico sin


UNIDAD : Un.
RENDIMIENTO : 13.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 68.45% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.12
Operario 1.00 h-h 0.62
Oficial 1.00 h-h 0.62
Peón 2.00 h-h 1.23

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.31
Caja de herramientas 2.00 h-m 1.23
Escalera 1.00 h-m 0.62

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Arm. PSVE-1A (MCAV) Soporte de Suspensión trifásica


UNIDAD : Un.
RENDIMIENTO : 16.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 68.35% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.10
Operario 1.00 h-h 0.50
Oficial 1.00 h-h 0.50
Peón 2.00 h-h 1.00

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.25
Caja de herramientas 2.00 h-m 1.00
Escalera 1.00 h-m 0.50

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Armado PS1-3 (0°-5°) Soporte de alineamiento Trifásico


UNIDAD : Un.
RENDIMIENTO : 12.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 68.44% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.13
Operario 1.00 h-h 0.67
Oficial 1.00 h-h 0.67
Peón 2.00 h-h 1.33

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.33
Caja de herramientas 2.00 h-m 1.33
Escalera 1.00 h-m 0.67

TOTAL

PARTIDA : Arm. TSVE-1A (MCAV) Soporte de Retencion Vertical t


UNIDAD : Un.
RENDIMIENTO : 16.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 68.35% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.10
Operario 1.00 h-h 0.50
Oficial 1.00 h-h 0.50
Peón 2.00 h-h 1.00

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.25
Caja de herramientas 2.00 h-m 1.00
Escalera 1.00 h-m 0.50

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Arm. PSEC-1A (MCAV) Soporte de Retencion Vertical t


UNIDAD : Un.
RENDIMIENTO : 13.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 68.45% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.12
Operario 1.00 h-h 0.62
Oficial 1.00 h-h 0.62
Peón 2.00 h-h 1.23

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.31
Caja de herramientas 2.00 h-m 1.23
Escalera 1.00 h-m 0.62

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Arm. PSEC-1A (MCAV) Soporte de Retencion Vertical t


UNIDAD : Un.
RENDIMIENTO : 12.00 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 68.44% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.13
Operario 1.00 h-h 0.67
Oficial 1.00 h-h 0.67
Peón 2.00 h-h 1.33

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.33
Caja de herramientas 2.00 h-m 1.33
Escalera 1.00 h-m 0.67

TOTAL

PARTIDA : Armado STB - MCAV (ALI) S.E. 3ø, Biposte (NO incluye
UNIDAD : Un.
RENDIMIENTO : 3 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 75.78% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.25 h-h 0.67
Operario 1.00 h-h 2.67
Oficial 2.00 h-h 5.33
Peón 2.00 h-h 5.33

EQUIPOS Y HERRAMIENTAS
Grúa hidráulica c/camión 5 ton. 1.00 h-m 2.67
Caja de herramientas 3.00 h-m 8.00
Escalera 1.00 h-m 2.67

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Armado STB - MCAV (FIN) S.E. 3ø, Biposte (NO incluye
UNIDAD : Un.
RENDIMIENTO : 2.8 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 75.76% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.25 h-h 0.71
Operario 1.00 h-h 2.86
Oficial 2.00 h-h 5.71
Peón 2.00 h-h 5.71

EQUIPOS Y HERRAMIENTAS
Grúa hidráulica c/camión 5 ton. 1.00 h-m 2.86
Caja de herramientas 3.00 h-m 8.57
Escalera 1.00 h-m 2.86

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Tendido y puesta en flecha conductor AAAC 120 mm2 /


UNIDAD : km
RENDIMIENTO : 3.3 km/día
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 90.92% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Soga de manila kg 0.50
Soga de nylon kg 0.50
Materiales varios %MO 5.00

MANO DE OBRA
Capataz 1.00 h-h 2.42
Operario 4.00 h-h 9.70
Oficial 3.00 h-h 7.27
Peón 12.00 h-h 29.09
Topógrafo 1.00 h-h 2.42

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.75 h-m 1.82
Tirfor 3 ton. 3.00 h-m 7.27
Poleas 20.00 h-m 48.48
Escalera 3.00 h-m 7.27
Caja de herramientas 2.00 h-m 4.85
Equipo de Estación Total y accesorios 1.00 h-m 2.42
Equipo de comunicación 4.00 h-m 9.70
Cable Guía 0.50 h-m 1.21
Winche de 3 Ton. 1.00 h-m 2.42
Freno hidráulico 3 Ton. 1.00 h-m 2.42
Caballete Alzabobina 1.00 h-m 2.42

TOTAL

PARTIDA : Tendido y puesta en flecha conductor AAAC 95 mm2 /


UNIDAD : km
RENDIMIENTO : 3.5 km/día
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 90.90% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Soga de manila kg 0.50
Soga de nylon kg 0.50
Materiales varios %MO 5.00
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

MANO DE OBRA
Capataz 1.00 h-h 2.29
Operario 4.00 h-h 9.14
Oficial 3.00 h-h 6.86
Peón 12.00 h-h 27.43
Topógrafo 1.00 h-h 2.29

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.75 h-m 1.71
Tirfor 3 ton. 3.00 h-m 6.86
Poleas 20.00 h-m 45.71
Escalera 3.00 h-m 6.86
Caja de herramientas 2.00 h-m 4.57
Equipo de Estación Total y accesorios 1.00 h-m 2.29
Equipo de comunicación 4.00 h-m 9.14
Cable Guía 0.50 h-m 1.14
Winche de 3 Ton. 1.00 h-m 2.29
Freno hidráulico 3 Ton. 1.00 h-m 2.29
Caballete Alzabobina 1.00 h-m 2.29

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Tendido y puesta en flecha conductor AAAC 70 mm2 /


UNIDAD : km
RENDIMIENTO : 3.7 km./día
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 90.92% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Soga de manila kg. 0.50
Soga de nylon kg. 0.50
Materiales varios % 5.00

MANO DE OBRA
Capataz 1.00 h-h 2.16
Operario 4.00 h-h 8.65
Oficial 3.00 h-h 6.49
Peón 12.00 h-h 25.95
Topógrafo 1.00 h-h 2.16

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.75 h-m 1.62
Tirfor 3 ton. 3.00 h-m 6.49
Poleas 20.00 h-m 43.24
Escalera 3.00 h-m 6.49
Caja de herramientas 2.00 h-m 4.32
Equipo de Estación Total y accesorios 1.00 h-m 2.16
Equipo de comunicación 4.00 h-m 8.65
Cable Guía 0.50 h-m 1.08
Winche de 3 Ton. 1.00 h-m 2.16
Freno hidráulico 3 Ton. 1.00 h-m 2.16
Caballete Alzabobina 1.00 h-m 2.16

TOTAL

PARTIDA : Tendido y puesta en flecha conductor AAAC 50 mm2 /


UNIDAD : Km.
RENDIMIENTO : 4 km./día
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 90.91% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Soga de manila kg 0.50
Soga de nylon kg. 0.50
Materiales varios % 5.00
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

MANO DE OBRA
Capataz 1.00 h-h 2.00
Operario 4.00 h-h 8.00
Oficial 3.00 h-h 6.00
Peón 12.00 h-h 24.00
Topógrafo 1.00 h-h 2.00

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.75 h-m 1.50
Tirfor 3 ton. 3.00 h-m 6.00
Poleas 20.00 h-m 40.00
Escalera 3.00 h-m 6.00
Caja de herramientas 2.00 h-m 4.00
Equipo de Estación Total y accesorios 1.00 h-m 2.00
Equipo de comunicación 4.00 h-m 8.00
Cable Guía 0.50 h-m 1.00
Winche de 3 Ton. 1.00 h-m 2.00
Freno hidráulico 3 Ton. 1.00 h-m 2.00
Caballete Alzabobina 1.00 h-m 2.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Tendido y puesta en flecha conductor AAAC 35 mm2 /


UNIDAD : Km.
RENDIMIENTO : 4.2 km./día
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 90.93% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Soga de manila kg. 0.50
Soga de nylon kg. 0.50
Materiales varios % 5.00

MANO DE OBRA
Capataz 1.00 h-h 1.90
Operario 4.00 h-h 7.62
Oficial 3.00 h-h 5.71
Peón 12.00 h-h 22.86
Topógrafo 1.00 h-h 1.90

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.75 h-m 1.43
Tirfor 3 ton. 3.00 h-m 5.71
Poleas 20.00 h-m 38.10
Escalera 3.00 h-m 5.71
Caja de herramientas 2.00 h-m 3.81
Equipo de Estación Total y accesorios 1.00 h-m 1.90
Equipo de comunicación 4.00 h-m 7.62
Cable Guía 0.50 h-m 0.95
Winche de 3 Ton. 1.00 h-m 1.90
Freno hidráulico 3 Ton. 1.00 h-m 1.90
Caballete Alzabobina 1.00 h-m 1.90

TOTAL

PARTIDA : Tendido y puesta en flecha conductor AAAC 25 mm2 /


UNIDAD : Km.
RENDIMIENTO : 4.5 km./día
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 90.90% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Soga de manila kg. 0.50
Soga de nylon kg. 0.50
Materiales varios % 5.00
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

MANO DE OBRA
Capataz 1.00 h-h 1.78
Operario 4.00 h-h 7.11
Oficial 3.00 h-h 5.33
Peón 12.00 h-h 21.33
Topógrafo 1.00 h-h 1.78

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.75 h-m 1.33
Tirfor 3 ton. 3.00 h-m 5.33
Poleas 20.00 h-m 35.56
Escalera 3.00 h-m 5.33
Caja de herramientas 2.00 h-m 3.56
Equipo de Estación Total y accesorios 1.00 h-m 1.78
Equipo de comunicación 4.00 h-m 7.11
Cable Guía 0.50 h-m 0.89
Winche de 3 Ton. 1.00 h-m 1.78
Freno hidráulico 3 Ton. 1.00 h-m 1.78
Caballete Alzabobina 1.00 h-m 1.78

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Tendido y puesta en flecha conductor NA2XSY2-S 3x35


UNIDAD : km
RENDIMIENTO : 3.5 km/día
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 90.90% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Soga de manila kg 0.50
Soga de nylon kg 0.50
Materiales varios %MO 5.00

MANO DE OBRA
Capataz 1.00 h-h 2.29
Operario 4.00 h-h 9.14
Oficial 3.00 h-h 6.86
Peón 12.00 h-h 27.43
Topógrafo 1.00 h-h 2.29

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.75 h-m 1.71
Tirfor 3 ton. 3.00 h-m 6.86
Poleas 20.00 h-m 45.71
Escalera 3.00 h-m 6.86
Caja de herramientas 2.00 h-m 4.57
Equipo de Estación Total y accesorios 1.00 h-m 2.29
Equipo de comunicación 4.00 h-m 9.14
Cable Guía 0.50 h-m 1.14
Winche de 3 Ton. 1.00 h-m 2.29
Freno hidráulico 3 Ton. 1.00 h-m 2.29
Caballete Alzabobina 1.00 h-m 2.29

TOTAL

PARTIDA : Instalación de conductor subterraneo


Err:509 y Err:509
UNIDAD : km
RENDIMIENTO : 3 km/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 67.11% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Soga de manila kg 0.50
Soga de nylon kg 0.50
Materiales varios % 5.00
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

MANO DE OBRA
Capataz 1.00 h-h 2.67
Operario 2.00 h-h 5.33
Oficial 2.00 h-h 5.33
Peón 5.00 h-h 13.33

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.25 h-m 0.67
Escalera 2.00 h-m 5.33
Equipo de comunicación 4.00 h-m 10.67
Caja de herramientas 4.00 h-m 10.67
Herramientas % mano de obra % 5.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Tendido y Puesta en Flecha de Conductor Autoportante


Err:509
UNIDAD : km
RENDIMIENTO : 1 km/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 67.11% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Soga de manila kg 0.50
Soga de nylon kg 0.50
Materiales varios % 5.00

MANO DE OBRA
Capataz 1.00 h-h 8.00
Operario 2.00 h-h 16.00
Oficial 2.00 h-h 16.00
Peón 5.00 h-h 40.00

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.25 h-m 2.00
Tirfor 3 ton. 2.00 h-m 16.00
Escalera 2.00 h-m 16.00
Equipo de comunicación 4.00 h-m 32.00
Caja de herramientas 4.00 h-m 32.00
Herramientas % mano de obra % 5.00

TOTAL

PARTIDA : Tendido y Puesta en Flecha de Conductor Autoportante


Err:509
UNIDAD : km
RENDIMIENTO : 1.15 km/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 67.11% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Soga de manila kg 0.50
Soga de nylon kg 0.50
Materiales varios % 5.00

MANO DE OBRA
Capataz 1.00 h-h 6.96
Operario 2.00 h-h 13.91
Oficial 2.00 h-h 13.91
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

Peón 5.00 h-h 34.78

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.25 h-m 1.74
Tirfor 3 ton. 2.00 h-m 13.91
Escalera 2.00 h-m 13.91
Equipo de comunicación 4.00 h-m 27.83
Caja de herramientas 4.00 h-m 27.83
Herramientas % mano de obra % 5.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Tendido y Puesta en Flecha de Conductor Autoportante


Err:509
UNIDAD : km
RENDIMIENTO : 1.3 km/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 67.10% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Soga de manila kg 0.50
Soga de nylon kg 0.50
Materiales varios % 5.00

MANO DE OBRA
Capataz 1.00 h-h 6.15
Operario 2.00 h-h 12.31
Oficial 2.00 h-h 12.31
Peón 5.00 h-h 30.77

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.25 h-m 1.54
Tirfor 3 ton. 2.00 h-m 12.31
Escalera 2.00 h-m 12.31
Equipo de comunicación 4.00 h-m 24.62
Caja de herramientas 4.00 h-m 24.62
Herramientas % mano de obra % 5.00

TOTAL

PARTIDA : Tendido y Puesta en Flecha de Conductor Autoportante


Err:509
UNIDAD : km
RENDIMIENTO : 1.5 km/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 67.10% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Soga de manila kg 0.50
Soga de nylon kg 0.50
Materiales varios % 5.00

MANO DE OBRA
Capataz 1.00 h-h 5.33
Operario 2.00 h-h 10.67
Oficial 2.00 h-h 10.67
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

Peón 5.00 h-h 26.67

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.25 h-m 1.33
Tirfor 3 ton. 2.00 h-m 10.67
Escalera 2.00 h-m 10.67
Equipo de comunicación 4.00 h-m 21.33
Caja de herramientas 4.00 h-m 21.33
Herramientas % mano de obra % 5.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Armado PAT-1 (con UN electrodo) para puesta a tierra


Instalación en Poste de Concreto Armado Centrifugado
UNIDAD : Un.
RENDIMIENTO : 24 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 81.31% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.07
Operario 1.00 h-h 0.33
Oficial 1.00 h-h 0.33
Peón 1.00 h-h 0.33

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.250 h-m 0.08
Caja de herramientas 2.00 h-m 0.67
Escalera 1.00 h-m 0.33
Herramientas % mano de obra % 5.00

TOTAL

PARTIDA : Armado PAT-2 (con DOS electrodos) para puesta a tierr


Instalación en Poste de Concreto Armado Centrifugado
UNIDAD : Un.
RENDIMIENTO : 17 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 81.12% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.09
Operario 1.00 h-h 0.47
Oficial 1.00 h-h 0.47
Peón 1.00 h-h 0.47

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.250 h-m 0.12
Caja de herramientas 2.00 h-m 0.94
Escalera 1.00 h-m 0.47
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

Herramientas % mano de obra % 5.00

TOTAL

PARTIDA : Armado TIPO E1 Alineamiento y Angulo - Cond. Autoportante


con caja de derivación para acometida
UNIDAD : Und.
RENDIMIENTO : 35 Un/dia
68.58% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.05
Operario 1.00 h-h 0.23
Oficial 1.00 h-h 0.23
Peón 2.00 h-h 0.46

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.20 h-m 0.05
Caja de herramientas 2.00 h-m 0.46
Escalera 1.00 h-m 0.23
Herramientas % mano de obra % 5.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Armado TIPO E2 Anclaje y Cambio de Sección - Cond. Autopo


Con Caja de Derivación para Acometida.
UNIDAD : Un.
RENDIMIENTO : 30 Un/dia
68.56% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.05
Operario 1.00 h-h 0.27
Oficial 1.00 h-h 0.27
Peón 2.00 h-h 0.53

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.20 h-m 0.05
Caja de herramientas 2.00 h-m 0.53
Escalera 1.00 h-m 0.27
Herramientas % mano de obra % 5.00

TOTAL

PARTIDA : Armado TIPO E3 Extremo de Linea con Conductor Autoportan


con Caja de Derivación para Acometida.
UNIDAD : Un.
RENDIMIENTO : 33 Un/dia
68.46% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.05
Operario 1.00 h-h 0.24
Oficial 1.00 h-h 0.24
Peón 2.00 h-h 0.48

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.20 h-m 0.05
Caja de herramientas 2.00 h-m 0.48
Escalera 1.00 h-m 0.24
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

Herramientas % mano de obra % 5.00

TOTAL

PARTIDA : Instalación de Pastoral Simple de A°G° (Incluye luminar


UNIDAD : Un.
RENDIMIENTO : 12 Un/dia
53.72% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.13
Oficial 1.00 h-h 0.67
Peón 2.00 h-h 1.33

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.20 h-m 0.13
Caja de herramientas 1.00 h-m 0.67
Escalera 1.00 h-m 0.67
Herramientas % mano de obra % 5.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Instalación de Pastoral Doble de A°G° (Incluye luminaria


UNIDAD : Un.
RENDIMIENTO : 10 Un/dia
53.70% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.16
Oficial 1.00 h-h 0.80
Peón 2.00 h-h 1.60

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.20 h-m 0.16
Caja de herramientas 2.00 h-m 1.60
Escalera 1.00 h-m 0.80
Herramientas % mano de obra % 5.00

TOTAL

PARTIDA : Prueba y puesta en servicio


UNIDAD : Localidades
RENDIMIENTO : 15 Localidades/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 80.69% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (Estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 1.00 h-h 0.53
Operario 2.00 h-h 1.07
Oficial 1.00 h-h 0.53
Peón 2.00 h-h 1.07

EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 0.25 h-m 0.13
Motosierra 1.00 h-m 0.53
Teodolito 1.00 h-m 0.53
Medidor de aislamiento eléctrico 1.00 h-m 0.53
Medidor de resistencia de puesta a tierra 1.00 h-m 0.53
Termometro de línea 1.00 h-m 0.53
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

Caja de herramientas 2.00 h-m 1.07


Herramientas % mano de obra % 5.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Desmontaje de Poste para Media Tensión incluye resan


UNIDAD : Un.
RENDIMIENTO : 8 Un/dia

DESCRIPCION Unidad Cantidad

MANO DE OBRA
Capataz 0.50 h-h 0.50
Oficial 1.00 h-h 1.00
Peón 7.00 h-h 7.00

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4x2, 122 HP, 8 TN. 0.25 h-m 0.25
Pluma de Izaje 1.00 h-m 1.00
Herramientas % mano de obra % 5.00

TOTAL

PARTIDA : Desmontaje de Cruceta de Madera


UNIDAD : Un.
RENDIMIENTO : 25 Un/dia

DESCRIPCION Unidad Cantidad

MANO DE OBRA
Capataz 0.20 h-h 0.06
Oficial 1.00 h-h 0.32
Peón 2.00 h-h 0.64

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4x2, 122 HP, 8 TN. 0.50 h-m 0.16
Escalera 1.00 h-m 0.32
Herramientas % mano de obra % 5.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Desmontaje de Aislador Pin y Accesorios


UNIDAD : Un.
RENDIMIENTO : 30 Un/dia

DESCRIPCION Unidad Cantidad

MANO DE OBRA
Capataz 0.20 h-h 0.05
Oficial 1.00 h-h 0.27
Peón 2.00 h-h 0.53

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4x2, 122 HP, 8 TN. 0.50 h-m 0.13
Caja de herramientas 1.00 h-m 0.27
Herramientas % mano de obra % 5.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Desmontaje de Aislador de Suspensión y Accesorios


UNIDAD : Un.
RENDIMIENTO : 25 Un/dia

DESCRIPCION Unidad Cantidad

MANO DE OBRA
Capataz 0.10 h-h 0.03
Oficial 1.00 h-h 0.32
Peón 2.00 h-h 0.64

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4x2, 122 HP, 8 TN. 0.50 h-m 0.16
Caja de herramientas 1.00 h-m 0.32
Herramientas % mano de obra % 5.00

TOTAL

PARTIDA : Desmontaje de Subestación Áerea Monoposte (Incluye


UNIDAD : Un.
RENDIMIENTO : 6 Un/dia

DESCRIPCION Unidad Cantidad

MANO DE OBRA
Capataz 0.20 h-h 0.27
Operario 1.00 h-h 1.33
Oficial 1.00 h-h 1.33
Peón 5.00 h-h 6.67

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4x2, 122 HP, 8 TN. 0.25 h-m 0.33
Pluma de Izaje 1.00 h-m 1.33
Caja de herramientas 2.00 h-m 2.67
Herramientas % mano de obra % 5.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Desmontaje de Subestación Áerea Biposte (Incluye tran


UNIDAD : Un.
RENDIMIENTO : 3 Un/dia

DESCRIPCION Unidad Cantidad

MANO DE OBRA
Capataz 0.20 h-h 0.53
Operario 1.00 h-h 2.67
Oficial 1.00 h-h 2.67
Peón 5.00 h-h 13.33

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4x2, 122 HP, 8 TN. 0.25 h-m 0.67
Pluma de Izaje 1.00 h-m 2.67
Caja de herramientas 2.00 h-m 5.33
Herramientas % mano de obra % 5.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Desmontaje Seccionador Fusible tipo Cut Out


UNIDAD : Un.
RENDIMIENTO : 20 Un/dia

DESCRIPCION Unidad Cantidad

MANO DE OBRA
Capataz 0.20 h-h 0.08
Operario 1.00 h-h 0.40
Oficial 1.00 h-h 0.40
Peón 2.00 h-h 0.80

EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 0.50 h-m 0.20
Caja de herramientas 1.00 h-m 0.40
Herramientas % mano de obra % 5.00

TOTAL

PARTIDA : Desmontaje de Parrarayos


UNIDAD : Un.
RENDIMIENTO : 20 Un/dia

DESCRIPCION Unidad Cantidad

MANO DE OBRA
Capataz 0.20 h-h 0.08
Operario 1.00 h-h 0.40
Oficial 1.00 h-h 0.40
Peón 2.00 h-h 0.80

EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 0.50 h-m 0.20
Caja de herramientas 1.00 h-m 0.40
Herramientas % mano de obra % 5.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Desmontaje de Postes de Concreto para Redes Secundarias


UNIDAD : Und.
RENDIMIENTO : 11 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 42.65% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (estrobo,soga,etc) % MO 5.00

MANO DE OBRA
Capataz 0.25 h-h 0.18
Operario 1.00 h-h 0.73
Oficial 1.00 h-h 0.73
Peón 6.00 h-h 4.36

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.25 h-m 0.18
Pluma de Izaje 1 h-m 0.73
Herramientas % mano de obra % 5.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Desmontaje de Portalíneas y Aisladores


UNIDAD : Und
RENDIMIENTO : 40 Un/dia
PARTICIPACIÓN DE LA M. O. EN LOS COSTOS 68.35% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.04
Operario 1.00 h-h 0.20
Oficial 1.00 h-h 0.20
Peón 2.00 h-h 0.40

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.10
Caja de herramientas 2.00 h-m 0.40
Escalera 1.00 h-m 0.20

TOTAL

PARTIDA : Desmontaje de Conductor Unifilar


UNIDAD : km
RENDIMIENTO : 3.0 km/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 57.76% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Soga de manila kg 0.50
Soga de nylon kg 0.50
Materiales varios % 5.00

MANO DE OBRA
Capataz 1.00 h-h 2.67
Operario 1.00 h-h 2.67
Oficial 2.00 h-h 5.33
Peón 6.00 h-h 16.00

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.25 h-m 0.67
Tirfor 3 ton. 2.00 h-m 5.33
Escalera 2.00 h-m 5.33
Equipo de comunicación 3.00 h-m 8.00
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

Caja de herramientas 3.00 h-m 8.00


Herramientas % mano de obra % 5.00

TOTAL

PARTIDA : Desmontaje de Pastoral de AºGº y Luminarias con Lámp


UNIDAD : Und
RENDIMIENTO : 25 Un/dia
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 55.43% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.06
Operario 1.00 h-h 0.32
Peón 2.00 h-h 0.64

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.20 h-m 0.06
Caja de herramientas 2.00 h-m 0.64
Escalera 1.00 h-m 0.32
Herramientas % mano de obra % 5.00

TOTAL
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

PARTIDA : Desmontaje de Retenida


UNIDAD : und
RENDIMIENTO : 10 und/día
PARTICIPACION DE LA MANO DE OBRA EN LOS COSTOS 67.00% CALIFICADA
DESCRIPCION Und. Cantidad

MATERIALES
Material varios (estrobo,soga,etc) %MO 5.00

MANO DE OBRA
Capataz 0.10 h-h 0.08
Operario 1.00 h-h 0.80
Oficial 1.00 h-h 0.80
Peón 2.00 h-h 1.60

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.100 h-m 0.08
Tirfor 3 ton. 1.00 h-m 0.80
Escalera 1.00 h-m 0.80
Herramientas % mano de obra %MO 5.00

TOTAL

PARTIDA : Desmontaje y reubicación de Acometida Domiciliaria


(No incluye medidor de energía activa)
UNIDAD : Un.
RENDIMIENTO : 18 Un/dia
68.17% CALIFICADA
DESCRIPCION Unidad Cantidad

MATERIALES
Material varios (estrobo,soga,etc) % 5.00

MANO DE OBRA
Capataz 0.20 h-h 0.09
Operario 1.00 h-h 0.44
Oficial 1.00 h-h 0.44
Peón 2.00 h-h 0.89

EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.20 h-m 0.09
Caja de herramientas 2.00 h-m 0.89
Escalera 2.00 h-m 0.89
Herramientas % mano de obra % 5.00
ANALISIS DE COSTOS UNITARIOS
REDES PRIMARIAS Y REDES SECUNDARIAS

TOTAL
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Cartel de obra

33.00% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

3.50 245.00 044


2.94 5.88 002
40.00 160.00 044
31.33 15.67 054
20.00 20.00 021
28.00 10.08 038
Sub-total 456.63

13.00 10.40 047


10.00 80.00 047
9.00 72.00 047
5.00 80.00 047
Sub-total 242.40

116.79 93.43 049


242.40 12.12 048
Sub-total 105.55
S/. 804.58

Replanteo topografico, ubicación de estructuras e Ingeniería de Detalle de Redes


Primarias

13.55% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. INEI

98.52 4.93 039

Sub-total 4.93

17.00 14.96 047


10.00 8.80 047
14.00 37.38 047
9.00 24.03 047
5.00 13.35 047
Sub-total 98.52
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

79.40 53.20 049


10.00 26.70 049
98.52 4.93 048
Sub-total 84.83
S/. 188.28
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Excavacion en terreno normal

88.16% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

12.08 0.60 039


Sub-total 0.6

13.00 1.43 047


5.00 10.65 047
Sub-total 12.08

116.79 18.69 049


12.08 0.60 048
Sub-total 19.29
S/. 31.97

Excavacion en terreno rocoso

46.92% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

18.97 0.95 039


Sub-total 0.95

13.00 1.17 047


10.00 8.90 047
5.00 8.90 047
Sub-total 18.97

92.63 82.44 049

116.79 15.18 049


18.97 0.95 048
Sub-total 98.57
S/. 118.49

Relleno y cimentación de poste de concreto armado


LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

32.99% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

40.00 14.00
28.00 14.28
20.00 80.00
3.15 0.63
Sub-total 108.91

13.00 1.17 047


10.00 8.90
9.00 8.01 047
5.00 8.90 047
Sub-total 26.98

116.79 15.18 049


26.98 1.35 048
Sub-total 16.53
S/. 152.42
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Relleno y compactación para instalación bloque de anclaje

49.23% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

35.00 7.00
3.15 0.63
Sub-total 7.63

13.00 1.17 047


9.00 8.01 047
5.00 8.90 047
Sub-total 18.08

116.79 15.18 049


18.08 0.90 048
Sub-total 16.08
S/. 41.79

Relleno y compactación para puesta a tierra

49.06% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

3.15 0.63
Sub-total 0.63

13.00 1.43 047


9.00 9.63 047
5.00 10.65 047
Sub-total 21.71

116.79 18.69 049


21.71 1.09 048
Sub-total 19.78
S/. 42.12

Transporte de poste de concreto de almacen a punto de izaje


LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

83.80% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

28.64 1.43 039


Sub-total 1.43

13.00 1.04 047


9.00 3.60 047
5.00 24.00 047
Sub-total 28.64

116.79 35.04 049


28.64 1.43 048
Sub-total 36.47
S/. 66.54
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Izado de poste de CAC 13 m / 3000 N. Incluye numeración

57.85% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

30.25 1.51 039


Sub-total 1.51

13.00 3.25 047


10.00 5.00 047
9.00 4.50 047
5.00 17.50 047
Sub-total 30.25

116.79 15.18 049


18.36 9.18 049
10.00 5.00 049
30.25 1.51 048
Sub-total 30.87
S/. 62.63

Izado de poste de CAC 13 m / 4000 N. Incluye numeración

57.80% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

34.60 1.73 039


Sub-total 1.73

13.00 3.77 047


10.00 5.70 047
9.00 5.13 047
5.00 20.00 047
Sub-total 34.60

116.79 16.35 049


18.36 10.47 049
10.00 5.70 049
34.60 1.73 048
Sub-total 34.25
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

S/. 70.58
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Instalacion de retenida tipo RI - A y RB - A

32.77% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

20.29 1.01 039


Sub-total 1.01

13.00 0.91 047


10.00 6.70 047
9.00 6.03 047
5.00 6.65 047
Sub-total 20.29

116.79 19.85 049


3.00 2.01 049
1.50 1.01 037
1.50 2.00 037
20.29 1.01 048
Sub-total 25.88
S/. 47.18

Instalacion de retenida tipo RV - A y RB - A

32.91% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

22.03 1.10 039


Sub-total 1.10

13.00 0.91 047


10.00 7.30 047
9.00 6.57 047
5.00 7.25 047
Sub-total 22.03

116.79 21.02 049


3.00 2.19 049
1.50 1.10 037
1.50 2.18 037
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

22.03 1.10 048


Sub-total 27.59
S/. 50.72
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Armado TSV-3 y L1-7-216-1 Soporte de Retencion vertical o anclaje

31.55% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

19.49 0.97 039


Sub-total 0.97

13.00 1.56 047


10.00 6.20 047
9.00 5.58 047
5.00 6.15 047
Sub-total 19.49

116.79 36.20 049


1.50 1.85 048
1.50 0.93 048
Sub-total 38.98
S/. 59.44

Arm. PSVE-3 (MFG) Soporte de Suspensión Vertical 0º - 10º, trifásica

31.62% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

28.15 1.41 039


Sub-total 1.41

13.00 2.34 047


10.00 8.90 047
9.00 8.01 047
5.00 8.90 047
Sub-total 28.15

116.79 51.39 049


1.50 2.67 048
1.50 1.34 048
Sub-total 55.40
S/. 84.96
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Arm. PA1VE-3 (MFG) Soporte de angulo vertical 10º - 30º trifásica

31.65% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

31.60 1.58 039


Sub-total 1.58

13.00 2.60 047


10.00 10.00 047
9.00 9.00 047
5.00 10.00 047
Sub-total 31.60

116.79 58.40 049


1.50 3.00 048
1.50 1.50 048
Sub-total 62.90
S/. 96.08
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Arm. PR3-3 (MFG) Soporte de Retención Vertical, trifásica

31.72% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

36.10 1.81 039


Sub-total 1.81

13.00 2.99 047


10.00 11.40 047
9.00 10.26 047
5.00 11.45 047
Sub-total 36.10

116.79 66.57 049


1.50 3.44 048
1.50 1.71 048
Sub-total 71.72
S/. 109.63

Arm. TSV-3 (MFG) y LI-7-216-1 Soporte de Retención Vertical, trifásica

31.72% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

36.10 1.81 039


Sub-total 1.81

13.00 2.99 047


10.00 11.40 047
9.00 10.26 047
5.00 11.45 047
Sub-total 36.10

116.79 66.57 049


1.50 3.44 048
1.50 1.71 048
Sub-total 71.72
S/. 109.63
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Armado PSEC-3P (MFG) Soporte de Seccionamiento 3ø

40.98% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

36.60 1.83 039


Sub-total 1.83

13.00 2.60 047


10.00 10.00 047
9.00 9.00 047
5.00 15.00 047
Sub-total 36.60

116.79 58.40 049


1.50 3.00 048
1.50 1.50 048
Sub-total 62.90
S/. 101.33
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Armado PSUB Soporte de Seccionamiento 3ø con salida subterranea

41.03% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

41.80 2.09 039


Sub-total 2.09

13.00 2.99 047


10.00 11.40 047
9.00 10.26 047
5.00 17.15 047
Sub-total 41.80

116.79 66.57 049


1.50 3.44 048
1.50 1.71 048
Sub-total 71.72
S/. 115.61

Arm. PSVE-2A (MFG) Soporte de Suspensión trifásica autoportante

31.55% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

19.49 0.97 039


Sub-total 0.97

13.00 1.56 047


10.00 6.20 047
9.00 5.58 047
5.00 6.15 047
Sub-total 19.49

116.79 36.20 049


1.50 2.67 048
1.50 1.34 048
Sub-total 40.21
S/. 60.67
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Armado PS1-3 (0°-5°) Soporte de alineamiento Trifásico sin neutro

31.75% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

16.85 0.84 039


Sub-total 0.84

13.00 1.43 047


10.00 5.30 047
9.00 4.77 047
5.00 5.35 047
Sub-total 16.85

116.79 31.53 049


1.50 1.61 048
1.50 0.80 048
Sub-total 33.94
S/. 51.63
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Arm. DS-3 (CCAV) Soporte de derivacion no tensada, trifásico

31.43% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

23.07 1.15 039


Sub-total 1.15

13.00 1.95 047


10.00 7.30 047
9.00 6.57 047
5.00 7.25 047
Sub-total 23.07

116.79 42.04 049


1.50 2.18 048
1.50 1.10 048
Sub-total 45.32
S/. 69.54

Arm. PSVE-3 (MCAV) Soporte de Suspensión Vertical (0°-10°) trifásica

31.55% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

19.49 0.97 039


Sub-total 0.97

13.00 1.56 047


10.00 6.20 047
9.00 5.58 047
5.00 6.15 047
Sub-total 19.49

116.79 36.20 049


1.50 2.67 048
1.50 1.34 048
Sub-total 40.21
S/. 60.67
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Armado LI-7-219-0 Soporte de Seccionamiento en cruceta

40.98% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

36.60 1.83 039


Sub-total 1.83

13.00 2.60 047


10.00 10.00 047
9.00 9.00 047
5.00 15.00 047
Sub-total 36.60

116.79 58.40 049


1.50 3.00 048
1.50 1.50 048
Sub-total 62.90
S/. 101.33
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Armado PA3-3 (60°-90°) Soporte de angulo Trifásico sin neutro

31.75% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

16.85 0.84 039


Sub-total 0.84

13.00 1.43 047


10.00 5.30 047
9.00 4.77 047
5.00 5.35 047
Sub-total 16.85

116.79 31.53 049


1.50 1.61 048
1.50 0.80 048
Sub-total 33.94
S/. 51.63

Armado PA3-4 (60°-90°) Soporte de angulo Trifásico sin neutro

31.55% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

19.49 0.97 039


Sub-total 0.97

13.00 1.56 047


10.00 6.20 047
9.00 5.58 047
5.00 6.15 047
Sub-total 19.49

116.79 36.20 049


1.50 1.85 048
1.50 0.93 048
Sub-total 38.98
S/. 59.44
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Arm. PSVE-1A (MCAV) Soporte de Suspensión trifásica autoportante

31.65% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

15.80 0.79 039


Sub-total 0.79

13.00 1.30 047


10.00 5.00 047
9.00 4.50 047
5.00 5.00 047
Sub-total 15.80

116.79 29.20 049


1.50 1.50 048
1.50 0.75 048
Sub-total 31.45
S/. 48.04
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Armado PS1-3 (0°-5°) Soporte de alineamiento Trifásico sin neutro

31.56% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

21.07 1.05 039


Sub-total 1.05

13.00 1.69 047


10.00 6.70 047
9.00 6.03 047
5.00 6.65 047
Sub-total 21.07

116.79 38.54 049


1.50 2.00 048
1.50 1.01 048
Sub-total 41.55
S/. 63.67

Arm. TSVE-1A (MCAV) Soporte de Retencion Vertical trifásica autoportante

31.65% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

15.80 0.79 039


Sub-total 0.79

13.00 1.30 047


10.00 5.00 047
9.00 4.50 047
5.00 5.00 047
Sub-total 15.80

116.79 29.20 049


1.50 1.50 048
1.50 0.75 048
Sub-total 31.45
S/. 48.04
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Arm. PSEC-1A (MCAV) Soporte de Retencion Vertical trifásica

31.55% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

19.49 0.97 039


Sub-total 0.97

13.00 1.56 047


10.00 6.20 047
9.00 5.58 047
5.00 6.15 047
Sub-total 19.49

116.79 36.20 049


1.50 1.85 048
1.50 0.93 048
Sub-total 38.98
S/. 59.44
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Arm. PSEC-1A (MCAV) Soporte de Retencion Vertical trifásica

31.56% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

21.07 1.05 039


Sub-total 1.05

13.00 1.69 047


10.00 6.70 047
9.00 6.03 047
5.00 6.65 047
Sub-total 21.07

116.79 38.54 049


1.50 2.00 048
1.50 1.01 048
Sub-total 41.55
S/. 63.67

Armado STB - MCAV (ALI) S.E. 3ø, Biposte (NO incluye p.a.t.)

24.22% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

110.03 5.50 039


Sub-total 5.50

13.00 8.71 047


10.00 26.70 047
9.00 47.97 047
5.00 26.65 047
Sub-total 110.03

258.60 690.46 049


1.50 12.00 048
1.50 4.01 048
Sub-total 706.47
S/. 822.00
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Armado STB - MCAV (FIN) S.E. 3ø, Biposte (NO incluye p.a.t.)

24.24% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

117.77 5.89 039


Sub-total 5.89

13.00 9.23 047


10.00 28.60 047
9.00 51.39 047
5.00 28.55 047
Sub-total 117.77

258.60 739.60 049


1.50 12.86 048
1.50 4.29 048
Sub-total 756.75
S/. 880.41
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Tendido y puesta en flecha conductor AAAC 120 mm2 / fase

9.08% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

15.00 7.50 039


35.00 17.50 039
373.22 18.66 039
Sub-total 43.66

13.00 31.46 047


10.00 97.00 047
9.00 65.43 047
5.00 145.45 047
14.00 33.88 047
Sub-total 373.22

116.79 212.56 049


3.00 21.81 049
2.50 121.20 049
1.50 10.91 037
1.50 7.28 037
35.00 84.70 049
2.50 24.25 037
30.00 36.30 049
30.00 72.60 049
25.00 60.50 049
16.00 38.72 049
Sub-total 690.83
S/. 1107.71

###
Tendido y puesta en flecha conductor AAAC 95 mm2 / fase

9.10% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

15.00 7.50 039


35.00 17.50 039
352.12 17.61 039
Sub-total 42.61
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

13.00 29.77 047


10.00 91.40 047
9.00 61.74 047
5.00 137.15 047
14.00 32.06 047
Sub-total 352.12

116.79 199.71 049


3.00 20.58 049
2.50 114.28 049
1.50 10.29 037
1.50 6.86 037
35.00 80.15 049
2.50 22.85 037
30.00 34.20 049
30.00 68.70 049
25.00 57.25 049
16.00 36.64 049
Sub-total 651.51
S/. 1046.24
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Tendido y puesta en flecha conductor AAAC 70 mm2 / fase

9.08% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

15.00 7.50 039


35.00 17.50 039
332.98 16.65 039
Sub-total 41.65

13.00 28.08 047


10.00 86.50 047
9.00 58.41 047
5.00 129.75 047
14.00 30.24 047
Sub-total 332.98

116.79 189.20 049


3.00 19.47 049
2.50 108.10 049
1.50 9.74 037
1.50 6.48 037
35.00 75.60 049
2.50 21.63 037
30.00 32.40 049
30.00 64.80 049
25.00 54.00 049
16.00 34.56 049
Sub-total 615.98
S/. 990.61

Tendido y puesta en flecha conductor AAAC 50 mm2 / fase

9.09% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

15.00 7.50 039


35.00 17.50 039
308.00 15.40 039
Sub-total 40.40
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

13.00 26.00 047


10.00 80.00 047
9.00 54.00 047
5.00 120.00 047
14.00 28.00 047
Sub-total 308.00

116.79 175.19 049


3.00 18.00 049
2.50 100.00 049
1.50 9.00 037
1.50 6.00 037
35.00 70.00 049
2.50 20.00 037
30.00 30.00 049
30.00 60.00 049
25.00 50.00 049
16.00 32.00 049
Sub-total 570.19
S/. 918.59
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Tendido y puesta en flecha conductor AAAC 35 mm2 / fase

9.07% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

15.00 7.50 039


35.00 17.50 039
293.19 14.66 039
Sub-total 39.66

13.00 24.70 047


10.00 76.20 047
9.00 51.39 047
5.00 114.30 047
14.00 26.60 047
Sub-total 293.19

116.79 167.01 049


3.00 17.13 049
2.50 95.25 049
1.50 8.57 037
1.50 5.72 037
35.00 66.50 049
2.50 19.05 037
30.00 28.50 049
30.00 57.00 049
25.00 47.50 049
16.00 30.40 049
Sub-total 542.63
S/. 875.48

Tendido y puesta en flecha conductor AAAC 25 mm2 / fase

9.10% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

15.00 7.50 039


35.00 17.50 039
273.78 13.69 039
Sub-total 38.69
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

13.00 23.14 047


10.00 71.10 047
9.00 47.97 047
5.00 106.65 047
14.00 24.92 047
Sub-total 273.78

116.79 155.33 049


3.00 15.99 049
2.50 88.90 049
1.50 8.00 037
1.50 5.34 037
35.00 62.30 049
2.50 17.78 037
30.00 26.70 049
30.00 53.40 049
25.00 44.50 049
16.00 28.48 049
Sub-total 506.72
S/. 819.19
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Tendido y puesta en flecha conductor NA2XSY2-S 3x35 mm2 y 3x25 mm2

9.10% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

15.00 7.50 039


35.00 17.50 039
352.12 17.61 039
Sub-total 42.61

13.00 29.77 047


10.00 91.40 047
9.00 61.74 047
5.00 137.15 047
14.00 32.06 047
Sub-total 352.12

116.79 199.71 049


3.00 20.58 049
2.50 114.28 049
1.50 10.29 037
1.50 6.86 037
35.00 80.15 049
2.50 22.85 037
30.00 34.20 049
30.00 68.70 049
25.00 57.25 049
16.00 36.64 049
Sub-total 651.51
S/. 1046.24

32.89% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

15.00 7.50 039


35.00 17.50 039
5.00 0.25 039
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Sub-total 25.25

13.00 34.71 047


10.00 53.30 047
9.00 47.97 047
5.00 66.65 047
Sub-total 202.63

116.79 78.25 049


1.50 8.00 037
2.50 26.68 037
1.50 16.01 037
202.63 10.13 048
Sub-total 139.07
S/. 366.95
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Tendido y Puesta en Flecha de Conductor Autoportante de Aluminio

32.89% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

15.00 7.50 039


35.00 17.50 039
608.00 30.40 039
Sub-total 55.40

13.00 104.00 047


10.00 160.00 047
9.00 144.00 047
5.00 200.00 047
Sub-total 608.00

116.79 233.58 049


3.00 48.00 049
1.50 24.00 037
2.50 80.00 037
1.50 48.00 037
608.00 30.40 048
Sub-total 463.98
S/. 1127.38

Tendido y Puesta en Flecha de Conductor Autoportante de Aluminio

32.89% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

15.00 7.50 039


35.00 17.50 039
528.67 26.43 039
Sub-total 51.43

13.00 90.48 047


10.00 139.10 047
9.00 125.19 047
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

5.00 173.90 047


Sub-total 528.67

116.79 203.21 049


3.00 41.73 049
1.50 20.87 037
2.50 69.58 037
1.50 41.75 037
528.67 26.43 048
Sub-total 403.57
S/. 983.67
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Tendido y Puesta en Flecha de Conductor Autoportante de Aluminio

32.90% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

15.00 7.50 039


35.00 17.50 039
467.69 23.38 039
Sub-total 48.38

13.00 79.95 047


10.00 123.10 047
9.00 110.79 047
5.00 153.85 047
Sub-total 467.69

116.79 179.86 049


3.00 36.93 049
1.50 18.47 037
2.50 61.55 037
1.50 36.93 037
467.69 23.38 048
Sub-total 357.12
S/. 873.19

Tendido y Puesta en Flecha de Conductor Autoportante de Aluminio

32.90% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

15.00 7.50 039


35.00 17.50 039
405.37 20.27 039
Sub-total 45.27

13.00 69.29 047


10.00 106.70 047
9.00 96.03 047
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

5.00 133.35 047


Sub-total 405.37

116.79 155.33 049


3.00 32.01 049
1.50 16.01 037
2.50 53.33 037
1.50 32.00 037
405.37 20.27 048
Sub-total 308.95
S/. 759.59
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Armado PAT-1 (con UN electrodo) para puesta a tierra


Instalación en Poste de Concreto Armado Centrifugado

18.69% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

8.83 0.44 039


Sub-total 0.44

13.00 0.91 047


10.00 3.30 047
9.00 2.97 047
5.00 1.65 047
Sub-total 8.83

116.79 9.34 049


1.50 1.01 037
1.50 0.50 048
8.83 0.44 048
Sub-total 11.29
S/. 20.56

Armado PAT-2 (con DOS electrodos) para puesta a tierra


Instalación en Poste de Concreto Armado Centrifugado

18.88% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

12.45 0.62 039


Sub-total 0.62

13.00 1.17 047


10.00 4.70 047
9.00 4.23 047
5.00 2.35 047
Sub-total 12.45

116.79 14.01 049


1.50 1.41 037
1.50 0.71 048
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

12.45 0.62 048


Sub-total 16.75
S/. 29.82

Armado TIPO E1 Alineamiento y Angulo - Cond. Autoportante

31.42% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

7.32 0.37 039


Sub-total 0.37

13.00 0.65 047


10.00 2.30 047
9.00 2.07 047
5.00 2.30 047
Sub-total 7.32

116.79 5.84 049


1.50 0.69 037
1.50 0.35 048
7.32 0.37 048
Sub-total 7.25
S/. 14.94
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Armado TIPO E2 Anclaje y Cambio de Sección - Cond. Autoport.

31.44% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

8.43 0.42 039


Sub-total 0.42

13.00 0.65 047


10.00 2.70 047
9.00 2.43 047
5.00 2.65 047
Sub-total 8.43

116.79 5.84 049


1.50 0.80 037
1.50 0.41 048
8.43 0.42 048
Sub-total 7.47
S/. 16.32

Armado TIPO E3 Extremo de Linea con Conductor Autoportante

31.54% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

7.61 0.38 039


Sub-total 0.38

13.00 0.65 047


10.00 2.40 047
9.00 2.16 047
5.00 2.40 047
Sub-total 7.61

116.79 5.84 049


1.50 0.72 037
1.50 0.36 048
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

7.61 0.38 048


Sub-total 7.30
S/. 15.29

Instalación de Pastoral Simple de A°G° (Incluye luminaria y lámpara)

46.28% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

14.37 0.72 039


Sub-total 0.72

13.00 1.69 047


9.00 6.03 047
5.00 6.65 047
Sub-total 14.37

116.79 15.18 049


1.50 1.01 037
1.50 1.01 048
14.37 0.72 048
Sub-total 17.92
S/. 33.01
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Instalación de Pastoral Doble de A°G° (Incluye luminaria y lámpara)

46.30% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

17.28 0.86 039


Sub-total 0.86

13.00 2.08 047


9.00 7.20 047
5.00 8.00 047
Sub-total 17.28

116.79 18.69 049


1.50 2.40 037
1.50 1.20 048
17.28 0.86 048
Sub-total 23.15
S/. 41.29

19.31% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

27.71 1.39 039


Sub-total 1.39

13.00 6.89 047


10.00 10.70 047
9.00 4.77 047
5.00 5.35 047
Sub-total 27.71

79.40 10.32 049


5.50 2.92 037
10.00 5.30 037
6.00 3.18 049
6.00 3.18 049
3.00 1.59 049
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

1.50 1.61 037


27.71 1.39 048
Sub-total 29.49
S/. 58.59
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Desmontaje de Poste para Media Tensión incluye resane de terreno

P. Unitario Parcial Indice


S/. S/. (INEI)

13.00 6.50 047


9.00 9.00 047
5.00 35.00 047
Sub-total 50.50

116.79 29.20 049


18.36 18.36 049
50.50 2.53 048
Sub-total 50.09

S/. 100.59

P. Unitario Parcial Indice


S/. S/. (INEI)

13.00 0.78 047


9.00 2.88 047
5.00 3.20 047
Sub-total 6.86

116.79 18.69 049


1.50 0.48 048
6.86 0.34 048
Sub-total 19.51

S/. 26.37
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Desmontaje de Aislador Pin y Accesorios

P. Unitario Parcial Indice


S/. S/. (INEI)

13.00 0.65 047


9.00 2.43 047
5.00 2.65 047
Sub-total 5.73

116.79 15.18 049


1.50 0.41 037
5.73 0.29 048
Sub-total 15.88

S/. 21.61
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Desmontaje de Aislador de Suspensión y Accesorios

P. Unitario Parcial Indice


S/. S/. (INEI)

13.00 0.39 047


9.00 2.88 047
5.00 3.20 047
Sub-total 6.47

116.79 18.69 049


1.50 0.48 037
6.47 0.32 048
Sub-total 19.49

S/. 25.96

Desmontaje de Subestación Áerea Monoposte (Incluye transformador 1f y tablero)

P. Unitario Parcial Indice


S/. S/. (INEI)

13.00 3.51 047


10.00 13.30 047
9.00 11.97 047
5.00 33.35 047
Sub-total 62.13

116.79 38.54 049


18.36 24.42
1.50 4.01 037
62.13 3.11 048
Sub-total 70.08

S/. 132.21
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Desmontaje de Subestación Áerea Biposte (Incluye transformador 3f y tablero)

P. Unitario Parcial Indice


S/. S/. (INEI)

13.00 6.89 047


10.00 26.70 047
9.00 24.03 047
5.00 66.65 047
Sub-total 124.27

116.79 78.25 049


18.36 49.02
1.50 8.00 037
124.27 6.21 048
Sub-total 141.48

S/. 265.75
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Desmontaje Seccionador Fusible tipo Cut Out

P. Unitario Parcial Indice


S/. S/. (INEI)

13.00 1.04 047


10.00 4.00 047
9.00 3.60 047
5.00 4.00 047
Sub-total 12.64

79.40 15.88 049


1.50 0.60 037
12.64 0.63 048
Sub-total 17.11

S/. 29.75

P. Unitario Parcial Indice


S/. S/. (INEI)

13.00 1.04 047


10.00 4.00 047
9.00 3.60 047
5.00 4.00 047
Sub-total 12.64

79.40 15.88 049


1.50 0.60 037
12.64 0.63 048
Sub-total 17.11

S/. 29.75
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Desmontaje de Postes de Concreto para Redes Secundarias (Incluye resane de Terreno)

57.35% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

38.01 1.90 39
Sub-total 1.90

13.00 2.34 047


10.00 7.30 047
9.00 6.57 047
5.00 21.80 047
Sub-total 38.01

116.79 21.02 049


18.36 13.40 049
38.01 1.90 048
Sub-total 36.32
S/. 76.23
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

31.65% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

6.32 0.32 039


Sub-total 0.32

13.00 0.52 047


10.00 2.00 047
9.00 1.80 047
5.00 2.00 047
Sub-total 6.32

116.79 11.68 049


1.50 0.60 037
1.50 0.30 048
Sub-total 12.58
S/. 19.22

42.24% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

15.00 7.50 039


35.00 17.50 039
189.38 9.47 039
Sub-total 34.47

13.00 34.71 047


10.00 26.70 047
9.00 47.97 047
5.00 80.00 047
Sub-total 189.38

116.79 78.25 049


3.00 15.99 049
1.50 8.00 037
2.50 20.00 037
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

1.50 12.00 037


189.38 9.47 048
Sub-total 143.71
S/. 367.56

Desmontaje de Pastoral de AºGº y Luminarias con Lámparas de Vapor

44.57% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

7.18 0.36 039


Sub-total 0.36

13.00 0.78 047


10.00 3.20 047
5.00 3.20 047
Sub-total 7.18

116.79 7.01 049


1.50 0.96 037
1.50 0.48 048
7.18 0.36 048
Sub-total 8.81
S/. 16.35
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

33.00% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

24.24 1.21 039


Sub-total 1.21

13.00 1.04 047


10.00 8.00 047
9.00 7.20 047
5.00 8.00 047
Sub-total 24.24

116.79 9.34 049


3.00 2.40 049
1.50 1.20 037
24.24 1.21 048
Sub-total 14.15
S/. 39.60

Desmontaje y reubicación de Acometida Domiciliaria

31.83% NO CALIFICADA
P. Unitario Parcial Indice
S/. S/. (INEI)

24.24 1.21 039


Sub-total 1.21

13.00 1.17 047


10.00 4.40 047
9.00 3.96 047
5.00 4.45 047
Sub-total 13.98

116.79 10.51 049


1.50 1.34 037
1.50 1.34 048
13.98 0.70 048
LISIS DE COSTOS UNITARIOS
ES PRIMARIAS Y REDES SECUNDARIAS
FECHA: MAYO DEL 2017

Sub-total 13.89
S/. 29.08
VALOR REFERENCIAL
RESUMEN GENERAL DE PRESUPUESTO DE OBRA
PROYECTO : : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016

REGION : : PUNO

PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

MAYO DEL 2017

CONTRACTUAL REPLANTEO LIQUIDACION DE OBRA ELPU MAYORES METRADOS REPLANTEO MAYORES METRADOS COMO CONSTRUIDO TOTAL OBRA

MAYORES
% DE INCIDENCIA % DE INCIDENCIA % DE INCIDENCIA % DE INCIDENCIA % DE INCIDENCIA DEDUCTIVO MAYORES METRADOS DEDUCTIVO
ITEM DESCRIPCION ELPU CONTRATISTA TOTAL OBRA (S/.) ELPU CONTRATISTA TOTAL OBRA (S/.) ELPU CONTRATISTA TOTAL OBRA (S/.) DIFERENCIA ADICIONAL NETO DEDUCTIVO ADICIONAL METRADOS ADICIONAL NETO ADICIONAL NETO
DEL CONTRATISTA DEL CONTRATISTA DEL CONTRATISTA DEL CONTRATISTA DE OBRA VINCULADO ADICIONAL VINCULADO
ADICIONAL

A SUMINISTROS DE MATERIALES 814,494.40 889,384.06 1,703,878.46 798,784.63 -1.93% 885,076.39 -0.48% 1,683,861.02 791,282.83 -2.85% 901,385.57 1.35% 1,692,668.40 -0.66% 11,210.06 52,527.78 29,316.21 -23,211.57 35,388.70 31,081.03 52,518.50 64,520.00 12,001.50 -11,210.06
0.00
B MONTAJE ELECTROMECANICO 738,320.28 738,320.28 819,303.22 10.97% 819,303.22 810,119.21 9.72% 810,119.21 9.72% -71,798.93 47,369.69 128,352.64 48,830.38 120,629.32 71,798.94 71,798.93

C DESMONTAJE ELECTROMECANICO 94,274.97 94,274.97 87,245.06 -7.46% 87,245.06 79,047.84 -16.15% 79,047.84 -16.15% 15,227.13 7,211.91 182.01 15,227.12 0.00 -15,227.12 -15,227.13

D TRANSPORTE (% A - DE SUM. MAT. Y EQUIPO) 6.55% 58,254.66 58,254.66 57,972.50 -0.48% 110,292.90 59,040.75 1.35% 110,869.78 90.32% -52,615.12 2,317.96 2,035.81 3,439.96 4,226.06 786.10 52,615.12

TRANSPORTE SUMINSTRO DE MATERIALES ELPU 6.55% 6,322.97 6,354.48 6,322.97 6,354.48

E TRANSPORTE (% C - INTERNAMIENTO ALMACEN ELPU 31.6736% 29,860.26 29,860.26 27,633.65 -7.46% 27,633.65 25,037.30 -16.15% 25,037.30 -16.15% 4,822.97 2,284.27 57.65 4,822.98 0.00 -4,822.98 -4,822.97
MAT. DE DESMONTAJE)

F TOTAL COSTO DIRECTO (C.D.) 814,494.40 1,810,094.23 2,624,588.63 798,784.63 -1.93% 1,883,553.79 4.06% 2,728,335.85 791,282.83 -2.85% 1,880,985.15 3.92% 2,717,742.53 3.55% -93,153.90 52,527.78 29,316.21 -23,211.57 94,572.53 168,032.11 124,838.95 195,729.87 70,890.92 93,153.90

G GASTOS GENERALES (%C. D. CONTRATISTA) 10.0215098% 181,398.77 181,398.77 188,760.53 188,760.53 188,503.11 188,503.11 -7,104.34 S/. 9,477.60 S/. 16,839.35 S/. 12,510.75 S/. 19,615.09 S/. 7,104.34 S/. 7,104.34

H UTILIDADES (%C. D. CONTRATISTA) 8.00% 144,807.54 144,807.54 150,684.30 150,684.30 150,478.81 150,478.81 -5,671.27 S/. 7,565.80 S/. 13,442.57 S/. 9,987.12 S/. 15,658.39 S/. 5,671.27 S/. 5,671.27

I SUB-TOTAL SIN I.G.V. 814,494.40 2,136,300.54 2,950,794.94 798,784.63 -1.93% 2,222,998.62 4.06% 3,067,780.68 791,282.83 -2.85% 2,219,967.07 3.92% 3,056,724.45 3.59% -105,929.51 S/. 52,527.78 S/. 29,316.21 -S/. 23,211.57 S/. 111,615.93 S/. 198,314.01 S/. 147,336.81 S/. 231,003.35 S/. 83,666.53 S/. 105,929.51

J I.G.V. 18.00% 146,608.99 384,534.10 531,143.09 143,781.23 -1.93% 400,139.75 4.06% 543,920.98 142,430.91 -2.85% 399,594.07 3.92% 542,024.98 2.05% -10,881.89 S/. 9,455.00 S/. 5,276.92 -S/. 4,178.08 S/. 20,090.87 S/. 35,696.52 S/. 26,520.63 S/. 41,580.60 S/. 15,059.98 S/. 10,881.89

TOTAL DE PRESUPUESTO 961,103.39 2,520,834.64 3,481,938.03 942,565.86 -1.93% 2,623,138.37 4.06% 3,611,701.66 933,713.74 -2.85% 2,619,561.14 3.92% 3,598,749.43 1.07% -116,811.40 61,982.78 34,593.13 -27,389.65 131,706.79 234,010.53 173,857.44 272,583.95 98,726.51 116,811.40

INCIDENCIA CON RESPECTO AL PRESUPUESTO CONTRACTUAL 98.07% 4.06% 97.15% 3.92% 103.35% 6.45% 3.60% -2.85% 150,000.00 6.90% 10.81% 3.92% 3.35%
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIAS : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO
FECHA : MAYO DEL 2017 EN TERRENO EN TERRENO EN TERRENO EN TERRENO EN TERRENO
NORMAL EN TERRENO NORMAL EN TERRENO ROCOSO TRANSPORTE DE POSTES DESMONTAJE
ALTURAS MENORES A 3900 m.s.n.m. ALTURAS MAYORES A 3900 m.s.n.m. NORMAL ROCOSO NORMAL ROCOSO

CONDUCTOR AAAC (mm²) DESMONTAJE Y


DESCARGADOR DESMONTAJE DE DESMONTAJE DE
ARMADOS CON MENSULAS Y CRUCETAS DE FIERRO GALVANIZADO EN SISTEMA 22.9kV RETENIDAS PUESTAS A TIERRA POSTES DE CONCRETO ARMADO TOTAL SUMINISTRO DE POSTES ZONAS ACCESIBLES ZONAS INAXESIBLES REACOMODO EN Desmontaje de retenidas
TIPO BAYONETA TOTAL SE UBICAN EN EL CONDUCTOR POSTES
No LOCALIDAD km ESTRUCTURA
POSTES LUGAR DE IZAJE
PS1-3(POSTE REDES PRIMARIAS Y/O POSTES DE MADERA
PS1-3 PA2-3 PA3-3 PR3-3 SECC PSVE-3(MFG) PSEC-3 (MFG) PR3-3(MFG) PSH-3 PRH-3 P3A2-3 DS-0 DS-2 DS-3 PS1-3 PA2-3 PA3-3 PR3-3 SECC-3 PSVE-3(MFG) PR3-3(MFG) PSH-3 PRH-3 P3A2-3 DS-0 DS-2 DS-3 BAY-1 RI-A RI-A RY-A PAT-1 PAT-1 50 70 120 12/400/180/360 13/400/180/380 12/400/180/360 13/400/180/380 12/400/180/360 13/400/180/380 12/400/180/360 13/400/180/380 12/400/180/360 13/400/180/380
12/300) SECUNDARIAS (INCLUYE ARMADO)

1 SE Juliaca 64 - 1 12 2 4 - 1 3 - 1 12 1 9 18 3 - 6 - - - - 4 - 6 1 - - 24 40 38 - 3 - 16.30 103 9 29 - 132 9 141 81 9 51 - 16.30 2 77 99


2 SE Azángaro 43 6 2 7 - 30 - - - - 2 9 - 1.00 56 4 1 5 - 5 - 1 2 - 1 6 2 - 25 36 12 17 - - 143 18 12 - 155 18 173 141 18 14 - - 8 49 142
3 SE Ayaviri - - - - - - - - - - - - - - 9 34 2 2 3 - 3 - - - - - 1 - 1 3 18 - - - - 16 2 - 2 16 2 18 16 2 - - 13 13
4 SE Putina - - - - - - - - - - - - - - 13 - 1 7 1 - - - 1 - - - - - 8 11 6 - 1 - 22 1 3 25 1 26 11 1 11 - 5 18 25
5 SE Huancané 21 - - 3 2 - - - - - - 4 - 1 - - - - - - - - - - - - - - 4 6 - - 2 - 22 2 - - 22 2 24 22 2 - - 3 5 24
6 SE Antauta - - - - - - - - - - - - - - 54 2 4 11 2 - - - 3 - 6 4 - 2 25 52 20 - 2 - 77 2 16 - 93 2 95 37 2 56 65 95
7 SE Moho 11 1 - 4 2 - - - - - 4 6 1 - 18 1 - 2 - - - - - - - 1 - 1 16 20 15 - 2 36 1 12 - 48 1 49 13 1 35 29 47
8 SE Puno 11 - 1 - - - - - 10 1 1 4 1 - 9 - - 1 - - - - - - - - - - 13 6 5 - - 38 1 8 - 46 1 47 45 1 1 - 8 46
9 SE Desaguadero 26 - 1 1 - - - - - - - - - 1 - - - 2 - - - - - - - - - - 9 5 2 - - 28 2 30 - 30 24 - 6 - 6 14
10 SE Ilave 54 3 4 6 - 30 - 2 - - - 9 2 2 - - - - - - - - - - - - - - 12 19 - 5 - 2.39 66 35 - 66 35 101 66 33 - 2.39 5 13 66
11 SE Yunguyo 28 - - 7 1 16 - 2 - - - 6 3 3 - - - - - - - - - - - - - - 6 11 2 4 1 4.23 - 32 18 2 1 34 18 52 13 18 21 1 4.23 8 13 42
12 SE Juli 19 - - 2 1 - - - - - - 1 - - - - - - - - - - - - - - - - 7 4 - - 1 - 18 1 2 - 20 1 21 12 1 8 - - 4 19
TOTAL 277 10 9 42 8 80 0 5 13 1 8 51 8 17 177 12 8 37 3 8 0 1 10 0 13 13 2 4 152 228 100 26 12 0 4.23 2.39 16.30 601 90 86 3 687 90 777 481 88 203 1 5 22.92 26 300 632
454 22 17 79 11 88 0 6 23 1 21 64 10 21 34
328
0 ARMADOS CON MENSULAS Y CRUCETAS DE FIERRO GALVANIZADO EN SISTEMA 22.9kV 0 RETENIDAS PUESTAS A TIERRA
No ESPECIFICACIÓN
PS1-3 PA2-3 PA3-3 PR3-3 SECC PSVE-3(MFG) PSEC-3 (MFG) PR3-3(MFG) PSH-3 PRH-3 P3A2-3 DS-0 DS-2 DS-3 PS1-3 PA2-3 PA3-3 PR3-3 SECC-3 PSVE-3(MFG) 0 PR3-3(MFG) PSH-3 PRH-3 P3A2-3 DS-0 DS-2 DS-3 BAY-1 RI-A RI-A RY-A PAT-1 PAT-1

1.00
1.01 1 1
1.02 1
1.03 1 1
1.04 1 1
1.05 1 1
1.06 1
1.07 1 1
1.08 1 1
1.09 1 1
1.10 1 1
1.11 1 1
1.12 1 1
1.13 1
1.14 2 2 6 2 2 2 6 2
1.15
1.16 3 1 3 3 3 3 1 2 3
1.17 3 3 1 3 3 3 3 1 2 3
1.18 1 1 3 1 1 1 3
1.19 2 3 3 3 1 2 3
1.20 2 2 3 3 3 1 2 3
1.21 6 6 6 6 6 6 6 6 6 6 6
1.22 7.5 2.5 7.5 8 15 7.5 7.5 2.5 5 7.5 7.5 7.5 2.5 7.5 15.0 8 7.5 2.5 5.0 7.5
1.23 3 6 3 3 3 3 3 6 3 3 3 3
1.24 5 6 6 6 3 5 6 6 3 1
1.25 2 6 12 2 6 2 2 6 12 2 0 6 2
1.26 3 3
1.27 3 6 6 6 6 6 6 3 6 6 6 6 6 1 1 2
1.28 6 6 6 6 6 6 6 6 2 2 3
POSTES
12/400 13/400
JULIACA 2 6
AZANGARO 23
AYAVIRI 3
PUTINA 9 1
ANTAUTA 10
MOHO 12 2
DESAGUADERO 12
JULI 1

68 13
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIAS : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO
FECHA : MAYO DEL 2017

REPLANTEO C
EN TERRENO NORMAL EN TERRENO ROCOSO TRANSPORTE DE POSTES EN TERRENO NORMAL EN TERRENO ROCOSO

POSTES DE CONCRETO ARMADO TOTAL SUMINISTRO DE POSTES ZONAS ACCESIBLES ZONAS INAXESIBLES POSTES DE CONCRETO ARMADO TOTAL SUMINISTRO DE POSTES
TOTAL SE UBICAN EN EL
No LOCALIDAD TOTAL TOTAL TOTAL
POSTES LUGAR DE IZAJE
12/400/180/360 13/400/180/380 12/400/180/360 13/400/180/380 12/400/180/360 13/400/180/380 12/400/180/360 13/400/180/380 12/400/180/360 13/400/180/380
12/400/180/360 13/400/180/380 12/400/180/360 13/400/180/380 12/400/180/360 13/400/180/380
1 SE Juliaca 103 9 29 - 132 9 141 81 9 90 51 - 51 99 6 29 0 128 6
2 SE Azángaro 143 18 12 - 155 18 173 141 18 159 14 - 14 25 131 15 4 0 135 15
3 SE Ayaviri 16 2 - 2 16 2 18 16 2 18 - - - 78 0 12 0 90 0
4 SE Putina 22 1 3 25 1 26 11 1 12 11 - 11 5 23 1 2 25 1
5 SE Huancané 22 2 - - 22 2 24 22 2 24 - - - 24 1 0 0 24 1
6 SE Antauta 77 2 16 - 93 2 95 37 2 39 56 56 78 1 16 0 94 1
7 SE Moho 38 2 12 - 50 2 52 13 1 14 35 - 35 38 2 9 0 47 2
8 SE Puno 38 1 8 - 46 1 47 45 1 46 1 - 1 45 0 9 0 54 0
9 SE Desaguadero 28 2 30 - 30 24 - 24 6 - 6 24 2 26 0
10 SE Ilave 66 35 66 35 101 66 33 99 - - 59 30 59 30
11 SE Yunguyo 32 18 2 1 34 18 52 13 18 31 21 1 22 34 16 3 0 37 16
12 SE Juli 18 1 2 - 20 1 21 12 1 13 8 - 8 20 1 1 0 21 1
TOTAL 603 91 86 3 689 91 780 481 88 203 1 30 653 73 87 0 740 73
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO E
PROVINCIAS : SAN ROMAN, AZANGARO, MELGAR,
N SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO
FECHA : MAYO DEL 2017
T
E
R
R
CONTRACTUAL
E
N TRANSPORTE DE POSTES
ALTURAS MENORES
O A 3900 m.s.n.m.
SE UBICAN EN EL
NTOTAL POSTES ZONAS ACCESIBLES ZONAS INAXESIBLES
LUGAR DE IZAJE
No LOCALIDAD
O
TOTAL TOTAL OBSERVACION
R 12/400/180/360 13/400/180/380 12/400/180/360 13/400/180/380
M
1 SE Juliaca 134 87 6 93 41 0 41
A
2 SE Azángaro L 150 132 15 147 3 0 3 25
3 SE Ayaviri 90 67 0 67 23 0 23
4 SE Putina 26 22 1 23 3 0 3 5
5 SE Huancané 25 24 1 25 0 0 0
6 SE Antauta 95 80 1 81 14 14
7 SE Moho 49 29 2 31 18 0 18
8 SE Puno 54 50 0 50 4 0 4
9 SE Desaguadero 26 26 0 26 0 0 0
10 SE Ilave 89 59 30 89 0 0
11 SE Yunguyo 53 35 16 51 2 0 2
12 SE Juli 22 19 1 20 2 0 2
TOTAL 813 630 73 110 0 30
| Página 172 de 300

SUMINISTRO DE MATERIALES

PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 20


REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL CO

VALORIZACIONES DE SUMINISTRO
VALORIZACION 01 VALORIZACION 02 VALORIZACION 03 VALORIZACION 04 VALORIZACION 05 VALORIZACION 06 VALORIZACION 07 VALORIZACION MM1

Item DESCRIPCION
Unid. CANT TOTAL CANT TOTAL CANT TOTAL CANT TOTAL CANT TOTAL CANT TOTAL CANT TOTAL CANT TOTAL

1.00 JUEGO DE ARMADO PARA LINEA PRIMARIA


1.01 ARMADO PS1-3, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400) Jgo 0 0 - 0.00 - 0 -
1.02 ARMADO PS1-3, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/300), POSTE EXISTENTE Jgo 0 20 3,700.00 16.00 2,960.00 -1 (185.00)
1.03 ARMADO PR3-3, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400) Jgo 0 0 - - - 1.00 261.61
1.04 ARMADO SEC-3, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400) Jgo 0 0 - - -
1.05 ARMADO PSVE-3(MFG), (SUMINISTRADO POR JUEGO PARA POSTE DE 13/400) Jgo 0 0 - - -
1.06 ARMADO PR3-3(MFG), (SUMINISTRADO POR JUEGO PARA POSTE DE 13/400) Jgo 0 1 1,100.00 - - 3.00 3,300.00
1.07 ARMADO PSH-3, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400) Jgo 0 25 11,250.00 12.00 5,400.00 -13 (5,850.00)
1.08 ARMADO PRH-3, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400) Jgo 0 5 4,500.00 - -4 (3,600.00)
1.09 ARMADO DS-0, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400) Jgo 0 0 - - -
1.10 ARMADO DS-2, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400) Jgo 0 9 1,665.00 - -3 (555.00)
1.11 ARMADO DS-3, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400) Jgo 0 10 1,850.00 10.00 1,850.00 -1 (185.00)
1.12 ARMADO BAY-1, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400) Jgo 0 120 11,400.00 57.00 5,415.00 -
SUB-TOTAL 1: - 35,465.00 15,625.00 (10,375.00) 3,561.61
2.00 POSTES DE CONCRETO ARMADO PARA LINEA PRIMARIA
2.01 POSTE DE CONCRETO ARMADO DE 12/400/180/360 (INCLUYE PERILLA) u 0 73 69,350.00 50 47,500.00 2.00 1,900.00 -14 (13,300.00) -
2.02 POSTE DE CONCRETO ARMADO DE 13/400/180/380 (INCLUYE PERILLA) u 0 48 48,000.00 0 - - - 2.00 2,000.00
SUB-TOTAL 2: - 117,350.00 47,500.00 1,900.00 (13,300.00) 2,000.00
3.00 AISLADORES TIPO PIN Y ACCESORIOS PARA LINEA PRIMARIA
3.01 AISLADOR TIPO PIN, CLASE ANSI 56-3 u 0 900 45,000.00 100 5,000.00 100.00 5,000.00 128 6,400.00
3.02 AISLADOR TIPO PIN, CLASE ANSI 56-4 u 0 650 52,000.00 70 5,600.00 100.00 8,000.00 82 6,560.00
3.03 ESPIGA VERTICE PUNTA DE POSTE DE 50.8mm x 609mm CABEZA PB 35mm u 0 500 15,000.00 50 1,500.00 50.00 1,500.00 64 1,920.00
3.04 ESPIGA DE CRUCETA DE F°G° FORJADO DE 28.6mm x 381mm CABEZA PB 35mm u 0 700 12,600.00 50 900.00 75.00 1,350.00 60 1,080.00
3.05 ESPIGA DE CRUCETA DE F°G° FORJADO DE 28.6mm x 432mm CABEZA PB 35mm u 0 400 10,000.00 70 1,750.00 50.00 1,250.00 61 1,525.00 5.00 125.00
SUB-TOTAL 3: - 134,600.00 14,750.00 17,100.00 17,485.00 125.00
4.00 CONJUNTO CADENA DE AISLADORES Y ACCESORIOS PARA LINEA PRIMARIA
4.01 AISLADOR DE TIPO SUSPENSIÓN, POLIMERICO ANSI RPP-25 u 0 900 90,000.00 150 15,000.00 24.00 2,400.00 100 10,000.00 -1 (100.00)
SUB-TOTAL 4: - 90,000.00 15,000.00 2,400.00 10,000.00 (100.00)
5.00 CONDUCTOR DE ALEACIÓN DE ALUMINIO PARA LINEA PRIMARIA
5.01 CONDUCTOR DE ALEACION DE ALUMINIO DE 50 mm2 km 0 0 - 3 7,500.00 0.82 2,050.00
5.02 CONDUCTOR DE ALEACION DE ALUMINIO DE 70 mm2 km 0 1.5 5,250.00 0 - 0.82 2,870.00 0.06 210.00
5.03 CONDUCTOR DE ALEACION DE ALUMINIO DE 120mm2 km 0 8 39,200.00 5.5 26,950.00 1.84 9,016.00 0.10 490.00
SUB-TOTAL 5: - 44,450.00 34,450.00 13,936.00 700.00
6.00 ACCESORIOS PARA CONDUCTOR DE ALEACION ALUMINIO PARA LINEA PRIMARIA
6.01 GRAPA DE ANCLAJE TIPO PISTOLA CON 3 PERNOS Y ARANDELAS u 0 300 5,100.00 300 5,100.00 120.00 2,040.00 6.00 102.00
6.02 ALAMBRE DE AMARRE DE ALUMINIO RECOCIDO DE 16 mm² m 0 0 - 0 - -
6.03 GRAPA DE ANGULO ACERO/ALUMINIO u 0 35 595.00 0 - 37.00 629.00
6.04 VARILLA DE ARMAR PREFORMADA SIMPLE DE 35mm2 u 0 100 850.00 0 - 155.00 1,317.50
6.05 VARILLA DE ARMAR PREFORMADA SIMPLE DE 50mm2 u 0 200 2,100.00 100 1,050.00 180.00 1,890.00 78.00 819.00
6.06 VARILLA DE ARMAR PREFORMADA SIMPLE DE 70mm2 u 0 400 5,000.00 300 3,750.00 179.00 2,237.50
6.07 VARILLA DE ARMAR PREFORMADA SIMPLE DE 120mm2 u 0 0 - 0 - -
6.06 CINTA PLANA DE ARMAR m 0 0 - 0 - -
6.07 CONECTOR DE AL-AL DE 25/120mm2, 02 PERNOS u 0 500 4,000.00 300 2,400.00 220.00 1,760.00
SUB-TOTAL 6: - 17,645.00 12,300.00 9,874.00 921.00
7.00 MATERIAL DE FERRETERIA PARA POSTES Y CRUCETAS DE LINEA PRIMARIA
PERNO MAQUINADO DE A°G° DE 16 mm ø x 254 mm LONG., PROVISTO DE TUERCA, CONTRATUERCA
7.01 u 450 6,075.00 498.00 6,723.00 - 330.00 4,455.00
Y ARANDELA
PERNO OJO DE A°G° DE 16 mm ø x 305 mm LONG., 152 mm MAQUINADO, PROVISTO DE TUERCA Y
7.02 u 150 1,800.00 177.00 2,124.00 -
CONTRATUERCA
7.03 TUERCA-OJO PARA PERNO DE 16 mm ø u 0 - 0.00 - - 138.00 662.40
7.04 ARANDELA CUADRADA CURVA DE A° G°, 57 x 57 x 5 mm, AGUJERO DE 18 mm ø u 300 600.00 354.00 708.00 -32 (64.00) -
7.05 GRILLETE DE F°G° DE ANCLAJE u 400 2,000.00 599.00 2,995.00 368.00 1,840.00
SUB-TOTAL 7: 10,475.00 0.00 12,550.00 (64.00) 6,957.40
8.00 RETENIDAS Y ANCLAJES
8.01 CABLE DE ACERO GRADO SIEMENS MARTIN, DE 10 mm ø - 7 HILOS m 2000 6,300.00 2718 8,561.70 1,000.00 3,150.00
VARILLA DE ANCLAJE DE A° G° DE 19 mm ø x 2,40 m, PROVISTO DE OJAL GUARDACABO EN UN
8.02 u 0 - 0 - 0.00 -
EXTREMO Y TUERCA
8.03 GRAPA PARALELA DE ACERO DE 152 mm DE LONGITUD, PROVISTA DE TRES PERNOS u 0 - 0 - 0.00 - 173.00 1,029.35
ABRAZADERA DE FºGº DE 195 mm ø x 50 mm, E=6,4 mm, CON 3 PERNOS DE AºGº DE 16 mm ø x 102
8.04 u 190 4,180.00 0 - 191.00 4,202.00
mm LONG, TUERCA Y ARANDELA
8.05 OJAL GUARDACABOS DE FºGº PARA CABLE DE 10 mm ø u 0 - 0 - 0.00 -
8.06 ALAMBRE DE AºGº N° 12; PARA ENTORCHADO m 750 375.00 0 - 782.00 391.00 56.00 28.00
8.07 ARANDELA CUADRADA PLANA DE A° G° DE 102x102x10 mm, AGUJERO DE 21 mm ø u 190 1,140.00 0 - 191.00 1,146.00
8.08 BLOQUE DE CONCRETO DE 0,40 x 0,40 x 0,15 m u 190 7,600.00 0 - 191.00 7,640.00
8.09 CANALETA GUARDACABLE DE F.G. DE E=4.5 mm. X2100 mm DE LONG u 0 - 0 - 0.00 -
8.10 TEMPLADOR DE F.G. DE 19mm øx300mm. LONG. u 0 - 0 - 0.00 - 298.00 6,958.30
BRAZO CONTRAPUNTA DE F°G° DE DIAM=51mm X 1500mm DE LONG.CON ABRAZADERA DE
8.11 u 0 - 0 - 0.00 - 11.00 496.32
DIAM=245mm
SUB-TOTAL 8: 19,595.00 8,561.70 16,529.00 8,511.97
9.00 MATERIAL PARA PUESTA A TIERRA
| Página 173 de 300

SUMINISTRO DE MATERIALES

PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 20


REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL CO

VALORIZACIONES DE SUMINISTRO
VALORIZACION 01 VALORIZACION 02 VALORIZACION 03 VALORIZACION 04 VALORIZACION 05 VALORIZACION 06 VALORIZACION 07 VALORIZACION MM1

Item DESCRIPCION
Unid. CANT TOTAL CANT TOTAL CANT TOTAL CANT TOTAL CANT TOTAL CANT TOTAL CANT TOTAL CANT TOTAL

9.01 PLANCHA DOBLADA TIPO J DE COBRE PARA TOMA A TIERRA DE ESPIGAS Y/ O PERNOS u 0 - 0 - 0.00 - 330.00 1,313.40
PLANCHA DE BRONCE DE 150x400x6.35mm, CON AGUJERO DE 19mm DE DIAM, PROTECCION
9.02 u 0 - 0 - 11.00 220.00
ANTIRROBO
9.03 CONDUCTOR DESNUDO COOPERWELD DE 25 mm2, PARA PUESTA A TIERRA m 3500 22,750.00 2500 16,250.00 1,670.00 10,855.00
VARILLA PARA PUESTA A TIERRA DE COBRE DE 15.875mm DE DIAM, x 2.40m DE LONG, ROSCADO EN
9.04 u 0 - 0 - 0 -
LA PUNTA
9.05 CONECTOR DE COBRE TIPO ANDERSON, PARA VARILLA DE 16 mm ø Y CONDUCTOR DE 25mm2 u 0 - 0 - 0 -
9.06 CONECTOR DE COBRE TIPO PERNO PARTIDO PARA CONDUCTOR 25 mm² u 0 - 0 - 1102 3,306.00
9.07 TUERCA INOXIDABLE PARA VARILLA DE 15.875mm DE DIAM u 0 - 0 - 11 93.50
9.08 CAJA DE REGISTRO DE CONCRETO PARA PUESTA A TIERRA 0,40x0,40x0,3m u 0 - 0 - 0 -
9.09 CEMENTO CONDUCTIVO Bols. 0 - 0 - 0 -
9.10 TIERRA NEGRA m3 0 - 0 - 15.4 1,540.00
SUB-TOTAL 9: 22,750.00 16,250.00 16,014.50 1,313.40
10.00 EQUIPO DE PROTECCION Y MANIOBRA
10.01 SECCIONADOR FUSIBLE UNIPOLAR TIPO EXPULSION (CUT-OUT) DE 27/38 KV, 100A, 170KV-BIL. u 30 12,900.00
10.02 PARARRAYOS TIPO AUTOVALVULA DE OXIDO METALICO, 21 kV, 10 KA,170 KV-BIL u 30 18,600.00
SUB-TOTAL 10: 31,500.00
11.00 INSUMOS
11.01 PIEDRA MEDIANA (PUESTO EN OBRA) m3 43.89296 3,950.37 280 25,200.00 22.05704 1,985.13 33.81 3,042.90
11.02 HORMIGON (PUESTO EN OBRA) m3 20.88801 1,357.72 130 8,450.00 5.75199 373.88 15.30 994.50
11.03 CEMENTO PORTLAND TIPO I (PUESTO EN OBRA) Bols. 184.9679 4,032.30 1100 23,980.00 102.0121 2,223.86 135.47 2,953.25
11.04 YESO EN BOLSAS DE 25 KG Bols. 25 175.00 - -
11.05 ESTACAS DE MADERA (UNO X ESTRUCTURA) u 813 975.60 - -
11.06 PINTURA (PARA PINTADO EN POSTE) Gln 0 - - -

SUB-TOTAL 11: 10,490.99 57,630.00 4,582.88


0.00 6,990.65

TOTAL SUMINISTRO DE MATERIALES 0.00 456,865.00 226,267.69 105,928.50 85,115.00 4,582.88 (23,839.00) 31,081.03
Página 174 de 300
|

: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENI


: PUNO
: SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCU

SUMINISTRO DE MATERIALES ELPU


ELPU ELPU ELPU VALORIZACION 01
METRADO COSTO
Descripción MATERIAL QUE COSTO TOTAL MATERIAL QUE COSTO UNITARIO COSTO TOTAL S/.
Unid. UNITARIO S/. ENTREGADO FALTA ENTREGAR CU S/ TOTAL S/ CU S/ TOTAL S/
SUMINISTRA ELPU S/. ELPU SUMINISTRA ELPU S/. ELPU ELPU
TOTAL ELPU

JUEGO DE ARMADO PARA LINEA PRIMARIA


ARMADO PS1-3, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400) Jgo 454.00 475.00 150.58 71,525.50 454.00 150.58 68,363.32 475.00 -
ARMADO PR3-3, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400) Jgo 79.00 69.00 261.61 18,051.09 79.00 261.61 20,667.19 69.00 2.00 261.61 523.22
ARMADO PR3-3(MFG), (SUMINISTRADO POR JUEGO PARA POSTE DE 13/400) Jgo 7.00 0.00 0.00 2.00 1,100.00 2,200.00
ARMADO SEC-3, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400) Jgo 11.00 10.00 120.95 1,209.50 11.00 120.95 1,330.45 10.00 1.00 -
ARMADO PSVE-3(MFG), (SUMINISTRADO POR JUEGO PARA POSTE DE 13/400) Jgo 88.00 66.00 362.47 23,923.02 88.00 362.47 31,897.36 66.00 19.00 362.47 6,886.93
ARMADO DS-0, (SUMINISTRADO POR JUEGO PARA POSTE DE 12/400) Jgo 64.00 54.00 98.60 5,324.40 64.00 98.60 6,310.40 54.00 10.00 98.60 986.00
-
POSTE DE CONCRETO ARMADO DE 12/400/180/360 (INCLUYE PERILLA) u 676.00 555.00 487.00 68.00 973.87 66,223.16
POSTE DE CONCRETO ARMADO DE 13/400/180/380 (INCLUYE PERILLA) u 115.00 65.00 52.00 13.00 1,059.32 13,771.16
-
ACCESORIOS PARA CONDUCTOR DE ALEACION ALUMINIO PARA LINEA PRIMARIA 0.00 - -
GRAPA DE ANCLAJE TIPO PISTOLA CON 3 PERNOS Y ARANDELAS u 744.00 - - - - - - -
ALAMBRE DE AMARRE DE ALUMINIO RECOCIDO DE 16 mm² m 5305.00 5,332.50 0.45 2,399.63 5,305.00 0.45 2,387.25 5,332.50 75.00 0.45 33.75
VARILLA DE ARMAR PREFORMADA SIMPLE DE 120mm2 u 169.00 171.00 12.87 2,200.77 169.00 12.87 2,175.03 171.00 13.00 12.87 167.31
CINTA PLANA DE ARMAR m 744.00 720.00 0.52 374.40 744.00 0.52 386.88 720.00 24.00 -
-
-
MATERIAL DE FERRETERIA PARA POSTES Y CRUCETAS DE LINEA PRIMARIA 0.00 - -
TUERCA-OJO PARA PERNO DE 16 mm ø u 526.00 466.00 4.80 2,236.80 526.00 4.80 2,524.80 166.00 162.00 4.80 777.60
-
-
RETENIDAS Y ANCLAJES 0.00 - -
VARILLA DE ANCLAJE DE A° G° DE 19 mm ø x 2,40 m, PROVISTO DE OJAL GUARDACABO EN
u 354.00 381.00 24.37 9,284.97 354.00 24.37 8,626.98 381.00 -
UN EXTREMO Y TUERCA
GRAPA PARALELA DE ACERO DE 152 mm DE LONGITUD, PROVISTA DE TRES PERNOS u 1468.00 766.00 5.95 4,557.70 1,468.00 5.95 8,734.60 1,034.00 224.00 5.95 1,332.80
ABRAZADERA DE FºGº DE 195 mm ø x 50 mm, E=6,4 mm, CON 3 PERNOS DE AºGº DE 16 mm
u 354.00 - - - - -
ø x 102 mm LONG, TUERCA Y ARANDELA
OJAL GUARDACABOS DE FºGº PARA CABLE DE 10 mm ø u 1374.00 385.00 0.60 231.00 1,374.00 0.60 824.40 1,263.00 3.00 0.60 1.80
CANALETA GUARDACABLE DE F.G. DE E=4.5 mm. X2100 mm DE LONG u 354.00 381.00 16.07 6,122.67 354.00 16.07 5,688.78 310.00 52.00 16.07 835.64
TEMPLADOR DE F.G. DE 19mm øx300mm. LONG. u 380.00 382.00 23.35 8,919.70 380.00 23.35 8,873.00 75.00 - 23.35 -
-
MATERIAL PARA PUESTA A TIERRA - -
PLANCHA DOBLADA TIPO J DE COBRE PARA TOMA A TIERRA DE ESPIGAS Y/ O PERNOS u 1828.00 1,923.00 3.98 7,653.54 1,500.00 3.98 5,970.00 1,500.00 328.00 3.98 1,305.44
PLANCHA DE BRONCE DE 150x400x6.35mm, CON AGUJERO DE 19mm DE DIAM, PROTECCIO u 12.00 - - - - - - 12.00 -
VARILLA PARA PUESTA A TIERRA DE COBRE DE 15.875mm DE DIAM, x 2.40m DE LONG,
u 12.00 11.00 108.22 1,190.42 12.00 108.22 1,298.64 11.00 1.00 108.22 108.22
ROSCADO EN LA PUNTA
CONECTOR DE COBRE TIPO ANDERSON, PARA VARILLA DE 16 mm ø Y CONDUCTOR DE 25m u 12.00 11.00 2.16 23.76 12.00 2.16 25.92 11.00 1.00 2.16 2.16
CONECTOR DE COBRE TIPO PERNO PARTIDO PARA CONDUCTOR 25 mm² u 1035.00 - - - - - - -
TUERCA INOXIDABLE PARA VARILLA DE 15.875mm DE DIAM u 12.00 - - - - - - -
CAJA DE REGISTRO DE CONCRETO PARA PUESTA A TIERRA 0,40x0,40x0,3m u 12.00 11.00 28.89 317.79 12.00 28.89 346.68 11.00 1.00 28.89 28.89
CEMENTO CONDUCTIVO Bols. 12.00 11.00 152.57 1,678.27 12.00 152.57 1,830.84 12.00 152.57 1,830.84

TOTAL 97,014.9
Página 175 de 300

LINEA PRIMARIA+A3:BA3:BO75
MONTAJE ELECTROMECANICO
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016 1
REGION : PUNO 1
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO 1

JULIACA AZANGARO AYAVIRI PUTINA HUANCANE ANTAUTA MOHO PUNO DESAGUADERO ILAVE YUNGUYO JULI CONTRACTUAL REPLANTEO COMO CONSTRUIDO DEDUCTIVO ADICIONAL VALORIZACION 07 1 VALORIZACIONES MONTAJE
METRADO
REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA TOTAL Metrado Precio S/. Metrado Precio S/. Metrado Precio S/. Metrado Precio S/. Metrado Precio S/. OBSERVACION 1 VALIRIZACION 01 VALIRIZACION 02 VALIRIZACION 03 VALIRIZACION 04 VALIRIZACION 05 VALIRIZACION 06 VALIRIZACION 07 VALIRIZACION 01 MM
Item Descripción Unid. (1) (1) (2) (2) (3) (3) (4) (4) (5) (5) (6) (6) (7) (7) (8) (8) (9) (9) (10) (10) (11) (11) (12) (12) 1
Cant. Unitario Total Cant. Unitario Total Cant. Unitario Total Cant. Total Cant. Total CANT CANT CANT CANT CANT CANT CANT CANT CANT CANT CANT CANT CANT CANT CANT CANT
Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. Cant. 1
1
1.00 OBRAS PROVISIONALES 1
1.01 CARTEL DE IDENTIFICACION DE OBRA Und 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.00 1,283.87 3,851.61 3.00 1,283.87 3,851.61 3.00 1,283.87 3,851.61 0.00 0.00 0.00 0.00 0.00 0.00 1 0.00 3.00 3,851.61 - - - -
1.02 AGUA PARA LA CONSTRUCCIÓN GLB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.00 5,500.00 5,500.00 1.00 5,500.00 5,500.00 1.00 5,500.00 5,500.00 0.00 0.00 0.00 0.00 0.10 550.00 1 0.00 0.90 4,950.00 0.10 550.00
SUB-TOTAL 1: 9,351.61 9,351.61 9,351.61 0.00 0.00 1 0.00 3,851.61 4,950.00 550.00
2.00 TRABAJOS PRELIMINARES 1 0.00
2.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR Pto. 141 134 173 150 18 90 26 26 24 25 95 95 49 49 47 54 30 26 99 89 53 53 21 22 776 813.00 26.50 21,544.50 784.00 26.50 20,776.00 776.00 26.50 20,564.00 37.00 980.50 0.00 0.00 0.00 0.00 Deductivo Ayaviri 1 0.00 406.50 10,772.25 406.50 10,772.25 - - - (29.00) (768.50)
2.02 TipSEGURIDAD Y SALUD GLB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 1.00 10,186.00 10,186.00 1.00 10,186.00 10,186.00 1.00 10,186.00 10,186.00 0.00 0.00 0.00 0.00 0.03 271.63 1 0.00 0.13 1,358.13 0.37 3,768.82 0.37 3,768.82 0.10 1,018.60 0.03 271.63
SUB-TOTAL 2: 31,730.50 30,962.00 30,750.00 980.50 0.00 1 0.00 12,130.38 14,541.07 3,768.82 1,018.60 (496.87)
3.00 TRANSPORTE 1 0.00
3.01 TipTRANSPORTE DE POSTES DE 12/400/180/360 A LUGAR DE IZAJE und 81.00 87 141 107 16 67 9 17 22 24 37 80 13 29 45 50 24 26 66 59 13 35 12 19 479 600.00 77.66 46,596.00 423.00 77.66 32,850.18 479.00 77.66 37,199.14 121.00 9,396.86 0.00 0.00 150.00 11,649.00 Vincula Item 3.02 y 3.03 1 0.00 48.00 3,727.68 94.00 7,300.04 165.00 12,813.90 38.00 2,951.08 105.00 8,154.30 (27.00) (2,096.82) - -
3.02 TRANSPORTE DE POSTES DE 12/400/180/360 A ZONAS INAXESIBLES und 51.00 41 14 3 0 23 11 3 0 0 56 14 35 18 1 4 6 0 0 0 21 2 8 2 203 110.00 466.33 51,296.30 215.00 466.33 100,260.95 203.00 466.33 94,664.99 0.00 0.00 93.00 43,368.69 0.00 0.00 0.00 48.00 22,383.84 - - - - 41.00 19,119.53 21.00 9,792.93 105.00 48,964.65 94.00 43,835.02
3.03 TipTRANSPORTE DE POSTES DE 13/400//180/380 A LUGAR DE IZAJE und 9.00 6 18 15 2 0 1 1 2 1 2 1 1 2 1 0 0 0 35 30 18 16 1 1 90 73.00 96.11 7,016.03 106.00 96.11 10,187.66 90.00 96.11 8,649.90 0.00 0.00 17.00 1,633.87 0.00 0.00 1 0.00 - 30.00 2,883.30 31.00 2,979.41 12.00 1,153.32 - - - - 33.00 3,171.63
SUB-TOTAL 3: 104,908.33 143,298.79 140,514.03 9,396.86 45,002.56 1 0.00 26,111.52 10,183.34 15,793.31 23,223.93 17,947.23 46,867.83 47,006.65
4.00 MOVIMIENTO DE TIERRAS 1 0.00
4.01 ###
EXCAVACION EN TERRENO NORMAL m3 170.73 120.31 228.6062 209.23 38.37 137.96 38.09 44.98 34.47 32.96 148.23 152.65 62.7145 66.04 46.34 62.42 34.18 30.08 125.44 113.2 72.03 72.91 25.01 27.96 1024.2155 1,070.70 76.76 82,186.93 1,011.47 76.76 77,640.44 1024.22 76.76 78,618.78 95.66% 46.48 3,568.15 0.00 0.00 308.77 23,700.88 Deductivo Ayaviri 1 0.00 57.10 4,383.30 63.88 4,903.43 135.41 10,394.07 337.20 25,883.47 168.34 12,921.78 249.54 19,154.69 - -
4.02 ###
EXCAVACION EN TERRENO ROCOSO m3 57.63 69.9 20.843 12.72 0 18.32 9.5658 7.6 0 0 36 34.76 22.0873 23.66 11.8215 16.22 3.8886 3.88 0 0 4.0943 3 1.4 0.7 167.3295 190.76 201.01 38,344.67 192.70 201.01 38,734.63 167.33 201.01 33,634.90 87.72% 23.43 4,709.76 0.00 0.00 131.78 26,489.10 Deductivo Ayaviri 1 0.01 20.30 4,080.50 6.30 1,266.36 8.40 1,688.48 23.98 4,820.22 131.78 26,489.10 1.94 389.96
SUB-TOTAL 4: 120,531.60 116,375.07 112,253.68 8,277.92 0.00 1 0.00 4,383.30 8,983.93 11,660.43 27,571.96 17,742.00 45,643.79 389.96
5.00 IZAJE DE POSTE 1 0.00
5.01 IZAJE DE POSTES DE CONCRETO 12/400/180/360 LUGARES ACCESIBLES (INCLUYE SEÑALIZACIÓN) und 81.00 87 141 132 16 67 11 22 22 24 37 80 13 29 45 50 24 26 66 59 13 35 12 19 481 630.00 77.90 49,077.00 453.00 77.90 35,288.70 481.00 77.90 37,469.90 -23.65% 149.00 11,607.10 0.00 0.00 208.00 16,203.20 Vincula Item 5.02 y 5.03 1 - 87.00 6,777.30 97.00 7,556.30 112.00 8,724.80 126.00 9,815.40 31.00 2,414.90 - -
5.02 IZAJE DE POSTES DE CONCRETO 12/400/180/360 LUGARES NO ACCESIBLES A LA GRUA (INCLUYE SEÑALIZACIÓN) und 51.00 41 14 3 0 23 11 3 0 0 56 14 35 18 1 4 6 0 0 0 21 2 8 2 203 110.00 595.22 65,474.20 215.00 595.22 127,972.30 203.00 595.22 120,829.66 84.55% 0.00 0.00 93.00 55,355.46 43.00 25,594.46 5.00 2,976.10 14.00 8,333.08 - - 42.00 24,999.24 6.00 3,571.32 43.00 25,594.46 40.00 23,808.80
5.03 IZAJE DE POSTES DE CONCRETO 13/400/180/380 LUGARES ACCESIBLES (INCLUYE SEÑALIZACIÓN) und 9.00 6 18 15 2 0 1 1 2 1 2 1 1 2 1 0 0 0 35 30 18 16 1 1 90 73.00 83.10 6,066.30 106.00 83.10 8,808.60 90.00 83.10 7,479.00 23.29% 0.00 0.00 17.00 1,412.70 0.00 0.00 1 - 11.00 914.10 34.00 2,825.40 28.00 2,326.80 - - - - 33.00 2,742.30
SUB-TOTAL 5: 120,617.50 172,069.60 165,778.56 11,607.10 56,768.16 1 2,976.10 16,024.48 10,381.70 36,050.84 13,386.72 28,009.36 26,551.10
6.00 CONCRETO SIMPLE 1
6.01 3xCONCRETO CICLOPEO FC=120 KG/CM2 + 70 % PM EN BASE DE POSTE m3 231.78 134.28 98.97 85.8 10.3 51.3 13.13 14.84 13.72 14.27 54.19 58.89 27.95 27.97 26.81 30.78 17.1 14.82 57.09 51.33 30.59 30.53 11.99 12.56 593.6195 527.37 85.41 45,042.67 578.88 85.41 49,442.14 593.62 85.41 50,701.04 12.56% 0.00 0.00 66.25 5,658.37 43.08 1 2.35 200.71 64.06 5,471.36 67.37 5,754.07 265.10 22,642.19 85.41 7,294.87 43.08 3,679.46 51.51 4,399.47
SUB-TOTAL 6: 45,042.67 49,442.14 50,701.04 - 5,658.37 1 200.71 5,471.36 5,754.07 22,642.19 7,294.87 3,679.46 4,399.47
7.00 INSTALACION DE RETENIDAS Y ANCLAJES 1
7.01 TipINSTALACION DE RETENIDA TIPO RI-A jgo 78.00 80 48 55 18 52 17 20 6 5 72 71 35 30 11 25 7 6 19 16 13 16 4 4 328 380.00 65.10 24,738.00 340.00 65.10 22,134.00 328.00 65.10 21,352.80 52.00 3,385.20 0.00 0.00 161.00 Deductivo Ayaviri 1 44.00 2,864.40 128.00 8,332.80 47.00 3,059.70 121.00 7,877.10
7.02 TipINSTALACION DE RETENIDA TIPO RY-A jgo 0.00 0 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1 4 0 0 0 26 1.00 81.40 81.40 6.00 81.40 488.40 26.00 81.40 2,116.40 0.00 0.00 25.00 2,035.00 0.00 1 - - 1.00 81.40 - - - - 5.00 407.00
7.03 PARELLENO Y COMPACTACION EN EXCAVACIONES DE RETENIDAS m3 80.8 97.6 70.833 67.1 19.59 63.44 20.81 24.4 7.35 6.1 84.18 86.62 31.83 36.6 13.5858 23.18 7.35 7.32 22.44 20.58 19.58 19.52 3.67 4.88 382.0188 457.34 28.79 13,166.82 409.60 28.79 11,792.38 382.02 28.79 10,998.32 75.32 2,168.50 0.00 0.00 188.68 Deductivo Ayaviri 1 81.74 2,353.29 136.90 3,941.35 50.02 1,440.08 140.94 4,057.66
SUB-TOTAL 7: 37,986.22 34,414.78 34,467.52 5,553.70 2,035.00 1 5,217.69 12,355.55 4,499.78 11,934.76 407.00
8.00 MONTAJE DE ARMADOS 1
8.01 MONTAJE DE ARMADO TIPO PS1-3 jgo 81 76 99 102 43 67 13 15 21 22 54 54 29 29 20 23 26 22 54 50 28 31 19 20 487 511.00 97.80 49,975.80 493.00 97.80 48,215.40 487.00 97.80 47,628.60 24.00 2,347.20 0.00 0.00 172.00 Vincula Item 8.06 29.00 2,836.20 98.00 9,584.40 123.00 12,029.40 89.00 8,704.20 143.00 13,985.40 - -
8.02 MONTAJE DE ARMADO TIPO PA2-3 jgo 3 4 10 6 2 7 0 0 0 1 2 2 2 2 0 0 0 0 3 2 0 0 0 0 22 24.00 110.81 2,659.44 23.00 110.81 2,548.63 22.00 110.81 2,437.82 2.00 221.62 0.00 0.00 15.00 6.00 664.86 - - 2.00 221.62 1.00 110.81 14.00 1,551.34 - -
8.03 MONTAJE DE ARMADO TIPO PA3-3 jgo 1 1 3 3 2 2 1 1 0 0 4 4 0 0 1 1 1 1 4 3 0 1 0 0 17 17.00 130.22 2,213.74 16.00 130.22 2,083.52 17.00 130.22 2,213.74 0.00 0.00 0.00 0.00 4.00 - 5.00 651.10 3.00 390.66 5.00 651.10 3.00 390.66 - -
8.04 MONTAJE DE ARMADO TIPO PR3-3 jgo 17 12 12 9 3 5 7 8 3 2 11 10 6 6 1 2 3 3 6 4 7 6 2 2 78 69.00 167.60 11,564.40 74.00 167.60 12,402.40 78.00 167.60 13,072.80 0.00 0.00 9.00 1,508.40 29.00 7.00 1,173.20 6.00 1,005.60 16.00 2,681.60 11.00 1,843.60 29.00 4,860.40 5.00 838.00
8.05 MONTAJE DE ARMADO TIPO SEC-3 jgo 2 2 0 0 0 0 1 1 2 1 2 2 2 2 0 0 0 0 0 0 1 1 1 1 11 10.00 128.02 1,280.20 10.00 128.02 1,280.20 11.00 128.02 1,408.22 0.00 0.00 1.00 128.02 4.00 - - - 4.00 512.08 2.00 256.04 4.00 512.08 - -
8.06 MONTAJE DE ARMADO TIPO PSVE-3(MFG) jgo 4 4 35 15 3 3 0 0 0 0 0 0 0 0 0 0 0 0 30 29 16 15 0 0 88 66.00 124.48 8,215.68 88.00 124.48 10,954.24 88.00 124.48 10,954.24 0.00 0.00 22.00 2,738.56 0.00 - 44.00 5,477.12 38.00 4,730.24 (16.00) (1,991.68) - - 22.00 2,738.56
8.07 MONTAJE DE ARMADO TIPO PR3-3(MFG) jgo 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 1 2 0 0 0 6 1.00 171.14 171.14 6.00 171.14 1,026.84 6.00 171.14 1,026.84 0.00 0.00 5.00 855.70 0.00 - 1.00 171.14 1.00 171.14 (1.00) (171.14) - - 5.00 855.70
8.08 MONTAJE DE ARMADO TIPO PSH-3 jgo 7 7 2 0 0 16 1 1 0 0 3 3 0 0 10 10 0 0 0 0 0 0 0 0 23 37.00 182.22 6,742.14 24.00 182.22 4,373.28 23.00 182.22 4,191.06 14.00 2,551.08 0.00 0.00 16.00 Deductivo Ayaviri - 2.00 364.44 7.00 1,275.54 12.00 2,186.64 3.00 546.66 - -
8.09 MONTAJE DE ARMADO TIPO PRH-3 jgo 0 0 0 0 0 4 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 1 5.00 214.36 1,071.80 1.00 214.36 214.36 1.00 214.36 214.36 4.00 857.44 0.00 0.00 4.00 Deductivo Ayaviri - - - 1.00 214.36 - - - -
8.10 MONTAJE DE ARMADO TIPO P3A2-3 jgo 7 8 3 5 0 3 0 0 0 0 6 6 4 4 1 2 0 0 0 0 0 0 0 0 21 28.00 249.83 6,995.24 24.00 249.83 5,995.92 21.00 249.83 5,246.43 7.00 1,748.81 0.00 0.00 14.00 Deductivo Ayaviri 1.00 249.83 4.00 999.32 8.00 1,998.64 1.00 249.83 10.00 2,498.30 8.00 702.00
8.11 MONTAJE DE ARMADO TIPO DS - 0 (INCLUYE ACOMODO DE SECCIONAMIENTO) jgo 13 8 15 12 1 2 0 0 4 5 4 5 7 4 4 4 0 0 9 8 6 5 1 1 64 54.00 87.75 4,738.50 62.00 87.75 5,440.50 64.00 87.75 5,616.00 0.00 0.00 10.00 877.50 0.00 - 12.00 1,053.00 42.00 3,685.50 - - - - -
8.12 MONTAJE DE ARMADO TIPO DS - 2 (INCLUYE ACOMODO DE SECCIONAMIENTO) jgo 1 1 2 0 0 0 0 0 0 0 0 0 1 0 1 2 0 0 2 3 3 3 0 0 10 9.00 94.17 847.53 6.00 94.17 565.02 10.00 94.17 941.70 0.00 0.00 1.00 94.17 0.00 - 3.00 282.51 7.00 659.19 (1.00) (94.17) (3.00) (282.51) - -
8.13 MONTAJE DE ARMADO TIPO DS - 3 (INCLUYE ACOMODO DE SECCIONAMIENTO) jgo 9 7 1 0 1 1 0 0 1 2 2 2 1 1 0 0 1 1 2 3 3 3 0 0 21 20.00 128.02 2,560.40 19.00 128.02 2,432.38 21.00 128.02 2,688.42 0.00 0.00 1.00 128.02 0.00 - 2.00 256.04 13.00 1,664.26 5.00 640.10 (1.00) (128.02) - -
8.14 MONTAJE DE ARMADO TIPO BAY - 1 (DESCARGADOR TIPO BAYONETA) jgo 24 25 25 25 3 24 8 8 4 4 25 27 16 16 13 14 9 9 12 12 6 6 7 7 152 177.00 51.78 9,165.06 146.00 51.78 7,559.88 152.00 51.78 7,870.56 25.00 1,294.50 0.00 0.00 41.00 Deductivo Ayaviri - 32.00 1,656.96 73.00 3,779.94 31.00 1,605.18 10.00 517.80 - -
8.15 DESMONTAJE Y MONTAJE DE RECLOSER jgo 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1.00 2,730.23 2,730.23 1.00 2,730.23 2,730.23 1.00 2,730.23 2,730.23 0.00 0.00 0.00 0.00 0.00 1 - - - 1.00 2,730.23 - - - -
SUB-TOTAL 8: 110,931.30 107,822.80 108,241.02 9,020.65 6,330.37 1 4,924.09 21,501.63 33,799.81 16,935.10 24,452.11 5,134.26
9.00 MONTAJE DE CONDUCTORES DE ALEACION DE ALUMINIO 1
9.01 TENDIDO Y PUESTA EN FLECHA CONDUCTOR ALEACION DE AL DE 50mm2, POR FASE km 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.23 3.82 0.00 0.00 4.23 3.82 1,943.00 7,422.26 3.82 1,943.00 7,422.26 4.23 1,943.00 8,218.89 0.00 0.00 0.41 796.63 0.00 1 3.82 7,422.26 - - - -
9.02 TENDIDO Y PUESTA EN FLECHA CONDUCTOR ALEACION DE AL DE 70mm2, POR FASE km 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.39 2.32 0.00 0.00 0.00 0.00 2.39 2.32 2,037.03 4,725.91 2.38 2,037.03 4,848.13 2.39 2,037.03 4,868.50 0.00 0.00 0.07 142.59 0.00 1 2.32 4,725.91 - - 0.06 122.22
9.03 TENDIDO Y PUESTA EN FLECHA CONDUCTOR ALEACION DE AL DE 120mm2, POR FASE km 16.30 15.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.3 15.34 2,884.46 44,247.62 15.44 2,884.46 44,536.06 16.30 2,884.46 47,016.70 0.00 0.00 0.96 2,769.08 5.34 1 10.00 28,844.60 5.34 15,403.02 0.10 288.45
SUB-TOTAL 9: 56,395.79 56,806.45 60,104.09 - 3,708.30 1 40,992.77 15,403.02 410.67
10.00 INSTALACION DE PUESTAS A TIERRA 1
10.01 INSTALACION DE PUESTA A TIERRA TIPO PAT-1 (INCLUYE RELLENO CON TIERRA NEGRA) jgo 3 3 0 0 0 0 1 1 2 1 2 2 2 2 0 0 0 0 0 0 1 1 1 1 12 11.00 500.96 5,510.56 11.00 500.96 5,510.56 12.00 500.96 6,011.52 0.00 0.00 1.00 500.96 0.00 - - 11.00 5,510.56 - - -
10.02 INSTALACION DE PUESTA A TIERRA TIPO PAT-C (INCLUYE RELLENO CON MATERIAL ZARANDEADO) jgo 131.00 131.00 171.00 150.00 18.00 90.00 21.00 25.00 22.00 24.00 90.00 93.00 47.00 47.00 36.00 54.00 30.00 26.00 99.00 89.00 51.00 52.00 20.00 21.00 736 802.00 60.51 48,529.02 764.00 60.51 46,229.64 736.00 60.51 44,535.36 66.00 3,993.66 0.00 0.00 90.00 Deductivo Ayaviri 1 117.00 7,079.67 131.00 7,926.81 332.00 20,089.32 132.00 7,987.32 52.00 3,146.52
SUB-TOTAL 10: 54,039.58 51,740.20 50,546.88 3,993.66 500.96 1 7,079.67 7,926.81 25,599.88 7,987.32 3,146.52
11.00 TENDIDO Y ACOMODO DE CONDUCTORES Y FERRETERIA
11.01 MONTAJE, ACOMODO DE CONDUCTORES Y FERRETERIA EN REDES PRIMARIAS Y SECUNDARIAS pto 2.00 2.00 15.00 5.00 0.00 0.00 0.00 0.00 1.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 5.00 8.00 8.00 0.00 0.00 31 23.00 78.20 1,798.60 26.00 78.20 2,033.20 31.00 78.20 2,424.20 0.00 0.00 8.00 625.60 8.00 625.60 15.00 1,173.00 3.00 234.60
SUB-TOTAL 12: 1,798.60 2,033.20 2,424.20 0.00 625.60 625.60 1,173.00 234.60
12.00 IMPACTO AMBIENTAL 935.00
12.01 MITIGACION DE IMPACTO AMBIENTAL Glb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.00 5,500.00 5,500.00 1.00 5,500.00 5,500.00 1 5,500.00 5,500.00 0.00 0.00 0.00 0.00 0.03 0.13 733.33 0.17 935.00 0.17 935.00 0.50 2,750.00 0.03 165.00
SUB-TOTAL 13: 5,500.00 5,500.00 5,500.00 0.00 0.00 733.33 935.00 935.00 2,750.00 165.00
13.00 PRUEBAS Y PUESTA EN SERVICIO 1
13.01 PRUEBAS ELECTRICAS Y PUESTA EN SERVICIO Glb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.00 22,566.58 22,566.58 1.00 22,566.58 22,566.58 1.00 22,566.58 22,566.58 0.00 0.00 0.00 0.00 1.00 1
EXPEDIENTE TÉCNICO FINAL CONFORME A OBRA DE LINEAS PRIMARIAS (1 Original + 3 Copias), INCLUYE COPIA
13.02 mes 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.00 16,920.00 16,920.00 1.00 16,920.00 16,920.00 1.00 16,920.00 16,920.00 0.00 0.00 0.00 0.00 1.00 1
DIGITALIZADA EN CD.
SUB-TOTAL 13: 39,486.58 39,486.58 39,486.58 0.00 0.00 1
TOTAL MONTAJE ELECTROMECÁNICO 738,320.28 819,303.22 810,119.21 48,830.38 120,629.32 1 21,098.63 38,272.27 43,682.94 93,711.72 227,566.35 95,684.61 179,354.98 84,533.71
1

DEDUCTIVO ADICIONAL
DESMONTAJE ELECTROMECÁNICO CONTRACTUAL REPLANTEO COMO CONSTRUIDO VALORIZACION 01 VALORIZACION 02 VALORIZACION 03 VALORIZACION 04 VALORIZACION 05 VALORIZACION 06 VALORIZACION 07 VALORIZACION 08

METRADO
JULIACA AZANGARO AYAVIRI PUTINA HUANCANE ANTAUTA MOHO PUNO DESAGUADERO ILAVE YUNGUYO JULI Metrado Precio S/. Metrado Precio S/. Metrado Precio S/. Metrado Precio S/. Metrado Precio S/. OBSERVACION Metrado Precio S/. Metrado Precio S/. Metrado Precio S/. Metrado Precio S/. Metrado Precio S/. Metrado Precio S/. Metrado Precio S/. Metrado Precio S/.
Item Descripción Unid. TOTAL
REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA REPLA CONTRA Cant. Cant. Unitario Total Cant. Unitario Total Cant. Unitario Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total

1.00 DESMONTAJE DE POSTES, ARMADOS, CONDUCTOR Y RETENIDAS


1.01 DESMONTAJE DE POSTES (INCLUYE ARMADO: CRUCETAS, AISLADORES Y OTROS) jgo. 72 99 131 142 18 88 22 25 24 24 95 95 47 47 40 46 14 14 66 66 42 42 19 19 590 707.00 66.10 46,732.70 632.00 66.10 41,775.20 590.00 66.10 38,999.00 117.00 7,733.70 0.00 0.00 60.00 Deductivo Ayaviri 147 9716.7 250 16525 250 16525 -15 -991.5
1.02 DESMONTAJE DE RETENIDAS (FERRETERIA COMPLETA) jgo. 77 77 49 50 13 46 18 20 5 5 65 65 29 29 8 14 6 6 13 13 13 13 4 4 300 342.00 60.93 20,838.06 305.00 60.93 18,583.65 300.00 60.93 18,279.00 42.00 2,559.06 0.00 0.00 35.00 Deductivo Ayaviri 0 0 157 9566.01 150 9139.5 -2 -121.86
1.03 DESMONTAJE DE CONDUCTOR POR FASE (INCLUYE ACOMODO DE CONDUCTOR) Km 14.91 14.91 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.39 7.86 4.23 4 0 0 21.53 26.41 1,011.14 26,704.21 26.59 1,011.14 26,886.21 21.53 1011.14 21,769.84 4.88 4,934.36 0.00 0.00 0.00 0 0 16.14 16319.7996 10.27 10384.4078 0 0 0.18 182.01
SUB - TOTAL 1 94,274.97 87,245.06 79,047.84 15,227.12 0.00 0.00 0.00 0.00 9716.7 42410.8096 36048.9078 -1113.36 182.01

TOTAL DESMONTAJE ELECTROMECÁNICO 94,274.97 87,245.06 79,047.84 15,227.12 0.00 0.00 0.00 0.00 9,716.70 42,410.81 36,048.91 -1,113.36 182.01

(*) El Contratista realizará el internamiento a los almacenes de ELPU según cuadro del item 1.14, folio 31 del presente proyecto. 1
RESUMEN DEL PRESUPUESTO ADICIONAL N° 01
PRESUPUESTO DEDUCTIVO N° 01
Obra : CAMBIO E INCREMENTO DE ESTRUCTURAS DE LAS LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016

Contrato : Nº 82-2017-ELPU/GG

PRESUPUESTO ADICIONAL N° 01
A. ADICIONALES CON PRECIOS CONTRACTUALES
A.1) REDES PRIMARIAS S/. 231,003.35

SUB-TOTAL A S/. 231,003.35

B. ADICIONALES CON PRECIOS PACTADOS


B.1) REDES PRIMARIAS Y SUBESTACIONES S/. -

SUB-TOTAL B S/. -

PRESUPUESTO ADICIONAL N° 01 (A+B) S/. 231,003.35


IGV (18%) S/. 41,580.60
PRESUPUESTO ADICIONAL N° 01 S/. 272,583.95

PRESUPUESTO DEDUCTIVO VINCULANTE N° 01


D. VINCULADO

D.1) REDES PRIMARIAS S/. 147,336.81

PPTO DEDUCTIVO VINCULADO N° 01 (D.1+D.2+D.3) S/. 147,336.81


IGV (18%) S/. 26,520.63
PRESUPUESTO DEDUCTIVO VINCULANTE N° 01 S/. 173,857.44
PORCENTAJE DE INCIDENCIA DEL PRESUPUESTO ADICIONAL N° 01
PRESUPUESTO DEDUCTIVO Nº 01
MONTO DEL CONTRATO ORIGINAL (MCO) : S/. 2,520,834.64
MONTO DEL PRESUPUESTO ADICIONAL N° 01 (MPA1) : S/. 272,583.95
MONTO DEL PRESUPUESTO DEDUCTIVO VINCULANTE N° 01 (MPD1) : S/. 173,857.44

FORMULA: INCIDENCIA = ( (MPA1-MPD1)/MCOx100% ) < 15%

INCIDENCIA (%) = 3.92% < 15%


ANALISIS DE GASTOS GENERALES DIRECTOS E INDIRECTOS

: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE


PROYECTO
MANTENIMIENTO 2016

REGION : PUNO
PLAZO DE OBRA : 5 meses FECHA: MAYO DEL 2017

1.0 GASTOS GENERALES VARIABLES-GG DIRECTOS

1.1 Personal Profesional Principal


Descripción Unidad Cant. Particip. Tiempo Sueldo Parcial
% (meses) (S/.) (S/.)
Ingeniero Residente de la Obra Und. 1 100.00% 5.00 5 000.00 25 000.00
Ing Asistente de Residencia de obra Und. 1 100.00% 5.00 3 000.00 15 000.00
Ing. De Seguridad Und. 1 50.00% 5.00 3 000.00 15 000.00
PARCIAL 1,1 55 000.00
Nota: El sueldo considerado por cada profesional incluye impuestos y leyes sociales

1.2 Personal de Auxiliar y Apoyo


Descripción Und. Cant. Particip. Tiempo Sueldo Parcial
% (meses) (S/.) (S/.)
Administrador Und. 1 50.00% 2.50 2 500.00 6 250.00
Dibujante en Autocad y otros programas Und. 1 50.00% 3.00 2 000.00 6 000.00
Almacenero Und. 1 100.00% 5.00 1 800.00 9 000.00
Chofer Und. 1 100.00% 5.00 1 800.00 9 000.00
Seguridad en obra (Guardian) Und. 1 50.00% 5.00 1 600.00 4 000.00
PARCIAL 1,2 34 250.00
Nota: El sueldo considerado por trabajador incluye impuestos y leyes sociales

1.3 Hospedajes, Oficina, Campamentos, alimentación y movilidad del personal principal, auxiliar y apoyo
Descripción Und. Cant. Particip. Tiempo Gasto/ Und. Parcial
% (meses) (S/.) (S/.)
Hospedajes Glb/mes 1 75.00% 3.75 1 000.00 3 750.00
Alquiler de Oficina en Obra (Incluye agua y luz) Glb/mes 1 90.00% 5.00 500.00 2 500.00
Alquiler de casas almacén (incluye agua y luz) Glb/mes 1 75.00% 5.00 500.00 2 500.00
Comunicaciones: telefono, fax, internet, radio, etc. Glb/mes 1 90.00% 5.00 450.00 2 250.00
Pasajes Glb/mes 1 25.00% 3.00 1 200.00 3 600.00

PARCIAL 1,3 14 600.00

1.4 Mobiliario, equipo, material de oficina y otros


Descripción Und. Cant. Desgaste Tiempo Gasto/ Und.xmes Parcial
% (meses) (S/.) (S/.)
Mobiliario de oficina Glb/mes 1 6.00% 5.00 10 000.00 3 000.00
Computadora Glb/mes 1 6.00% 5.00 3 500.00 1 050.00
Impresora Glb/mes 1 6.00% 5.00 2 500.00 750.00
Útiles de Oficina Glb/mes 1 50.00% 5.00 750.00 1 875.00
Camioneta pick up Glb/mes 1 100.00% 5.00 4 500.00 22 500.00
Combustible Glb/mes 1 75.00% 5.00 3 000.00 11 250.00
Mantenimiento Glb/mes 1 100.00% 5.00 1 500.00 7 500.00

PARCIAL 1,4 47 925.00


Nota: El desgaste de los equipos ha sido calculado considerando una depreciación líneal en 36 meses de vida útil.
El desgaste de las camionetas ha sido calculado considerando una depreciación líneal en 120 meses de vida útil.

1.5 Gastos financieros y otros gastos


Descripción Und. Costo Directo % de CD Costo/mes Tiempo Parcial
Obra(S/.) al mes S/. (meses) (S/.)
Cartas fianza mes 2,717,742.53 0.06% 1 630.65 5.00 8 153.23
Seguros Gbl 750.00 5.00 3 750.00

PARCIAL 1,5 11 903.23

PARCIAL GASTOS GENERALES VARIABLES (1) 163 678.23


ANALISIS DE GASTOS GENERALES DIRECTOS E INDIRECTOS

: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE


PROYECTO
MANTENIMIENTO 2016

REGION : PUNO
PLAZO DE OBRA : 5 meses FECHA: MAYO DEL 2017

2.0 GASTOS GENERALES FIJOS INDIRECTOS

2.1 Personal en la cede central de la Empresa


Descripción Und. Cant. Participacion Gasto/ Und. Tiempo efectivo Total
% (S/.) meses S/.
Gerente Und. 1 20.00% 5 500.00 5.00 5 500.00
Especialista en Computación Und. 1 20.00% 2 000.00 5.00 2 000.00
Contador Und. 1 20.00% 3 000.00 5.00 3 000.00
Secretaria Und. 1 20.00% 1 800.00 5.00 1 800.00
Chofer Und. 1 20.00% 2 000.00 5.00 2 000.00

PARCIAL 2,1 14 300.00

2.2 Gastos de oficina principal y gastos varios


Descripción Und. Cantidad Participacion Gasto/ Und. Tiempo efectivo Total
% (S/.) meses S/.
Oficina (Incluye agua y luz) Und. 1 20.00% 1 500.00 5.00 1 500.00
Comunicaciones: telef., fax, Internet, radio Glob 1 20.00% 1 000.00 5.00 1 000.00
Material y Equipos de Oficina Glob 1 20.00% 700.00 5.00 700.00
Mantenimiento y limpieza Glob 1 20.00% 500.00 5.00 500.00

PARCIAL 2,2 3 700.00

PARCIAL GASTOS GENERALES FIJOS (2) 18 000.00

3.0 RESUMEN

S/.

GASTOS GENERALES VARIABLES DIRECTOS 163 678.23

GASTOS GENERALES FIJOS INDIRECTOS 18 000.00

TOTAL GASTOS GENERALES (1)+(2) 181 678.23


LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Partida 01.01 CARTEL DE IDENTIFICACION DE OBRA

Rendimiento UND/DIA MO. 1.0000 EQ. 1.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.8000
0147010002 OPERARIO hh 1.0000 8.0000
0147010003 OFICIAL hh 1.0000 8.0000
0147010004 PEON hh 2.0000 16.0000

Materiales
0202010005 CLAVOS PARA MADERA C/C 3" kg 3.0000
0205020020 PIEDRA MEDIANA m3 0.5000
0221000000 CEMENTO PORTLAND TIPO I (42.5KG) BOL 1.0000
0238000000 HORMIGON m3 0.6700
0239900107 CARTEL DE OBRA (INCLUYE TRANSPORTE) GLB 1.0000
0243010003 MADERA TORNILLO p2 47.2500

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000

Partida 01.02 AGUA PARA LA CONSTRUCCION

Rendimiento GLB/DIA MO. 1.0000 EQ. 1.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Materiales
0239050011 AGUA PARA LA CONSTRUCCION GLB 1.0000

Partida 02.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR

Rendimiento pto/DIA MO. 50.0000 EQ. 50.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147000032 TOPOGRAFO hh 1.0000 0.1600
0147010001 CAPATAZ hh 0.1000 0.0160
0147010003 OFICIAL hh 1.0000 0.1600
0147010004 PEON hh 2.0000 0.3200
0147030091 INGENIERO ELECTRO-MECANICO ESPECIALISTA EL LINEA PRIMARIA hh 1.0000 0.1600
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Materiales
0230550059 ESTACION TOTAL (EQUIPO COMPLETO) hm 0.2500

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 3.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0050
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Partida 02.02 SEGURIDAD Y SALUD

Rendimiento GLB/DIA MO. 1.0000 EQ. 1.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Materiales
0202580004 CONO DE SEGURIDAD ANARANJADO H=30 cm und 10.0000
ELABORACIÓN, IMPLEMENTACIÓN Y ADMINISTRACIÓN DEL PLAN DE
0230010101 gln 1.0000
SEGURIDAD Y SALUD EN EL TRABAJO
0239500101 CINTA DE SEÑALIZACIÓN rll 5.0000
0272750002 CASCO DE SEGURIDAD (INCLUYE BARBIQUEJO) und 30.0000
0272750003 LENTES DE POLICARBONA LUNA CLARA und 30.0000
0272750004 MASCARILLA DE 2 VIAS und 6.0000
0272750005 GUANTES DE CUERO PAR 30.0000
0272750006 UNIFORME PARA OBRERO jgo 30.0000
0272750007 ZAPATOS DE CUERO PARA ELECTRICISTA PAR 30.0000
0272750008 ARNES DE SEGURIDAD PARA ELECTRICISTA und 6.0000
0272750009 BOTIQUIN PARA LA OBRA GLB 1.0000

Partida 03.01 TRANSPORTE DE POSTES DE 12/400/180/360 A LUGAR

Rendimiento und/DIA MO. 25.0000 EQ. 25.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.2000 0.0640
0147010003 OFICIAL hh 1.0000 0.3200
0147010004 PEON hh 2.0000 0.6400

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0100
0349340002 CAMION GRUA (BRAZO ARTICULADO) hm 1.0000 0.3200

Partida 03.02 TRANSPORTE DE POSTES DE 12/400/180/360 A ZONAS

Rendimiento und/DIA MO. 5.0000 EQ. 5.0000


LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.1600
0147010002 OPERARIO hh 1.0000 1.6000
0147010003 OFICIAL hh 1.0000 1.6000
0147010004 PEON hh 12.0000 19.2000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0337010100 POLEAS hm 1.0000 1.6000
0337980013 CARRETA 02 LLANTAS (PARA TRANSPORTE MANUAL DE POSTE) día 1.0000 0.2000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0500
0349340002 CAMION GRUA (BRAZO ARTICULADO) hm 0.2500 0.4000
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Partida 03.03 TRANSPORTE DE POSTES DE 13/400//180/380 A LUGAR

Rendimiento und/DIA MO. 20.0000 EQ. 20.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.0400
0147010003 OFICIAL hh 1.0000 0.4000
0147010004 PEON hh 2.0000 0.8000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0125
0349340002 CAMION GRUA (BRAZO ARTICULADO) hm 1.0000 0.4000

Partida 04.01 EXCAVACION EN TERRENO NORMAL

Rendimiento m3/DIA MO. 3.5000 EQ. 3.5000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.2286
0147010004 PEON hh 2.0000 4.5714

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000

Partida 04.02 EXCAVACION EN TERRENO ROCOSO

Rendimiento m3/DIA MO. 5.5000 EQ. 5.5000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.1455
0147010002 OPERARIO hh 1.0000 1.4545
0147010004 PEON hh 2.0000 2.9091

Equipos
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

0337010001 HERRAMIENTAS MANUALES %MO 3.0000


0349060010 MARTILLO NEUMATICO 29 KG C/BARRENO-ACCS hm 0.8900 1.2945
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Partida ´05.01 IZAJE DE POSTES DE CONCRETO 12/400/180/36


SEÑALIZACIÓ
Rendimiento und/DIA MO. 16.0000 EQ. 16.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.0500
0147010002 OPERARIO hh 1.0000 0.5000
0147010004 PEON hh 5.0000 2.5000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0156
0349340002 CAMION GRUA (BRAZO ARTICULADO) hm 0.2500 0.1250

Partida ´05.02 IZAJE DE POSTES DE CONCRETO 12/400/180/360


(INCLUYE SEÑALIZ
Rendimiento und/DIA MO. 4.0000 EQ. 4.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.5000 1.0000
0147010002 OPERARIO hh 1.0000 2.0000
0147010003 OFICIAL hh 1.0000 2.0000
0147010004 PEON hh 15.0000 30.0000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0337010100 POLEAS hm 0.5000 1.0000
0348760057 CABALLETE hm 0.5000 1.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0625

Partida ´05.03 IZAJE DE POSTES DE CONCRETO 13/400/180/38


SEÑALIZACIÓ
Rendimiento und/DIA MO. 15.0000 EQ. 15.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.0533
0147010002 OPERARIO hh 1.0000 0.5333
0147010004 PEON hh 5.0000 2.6667
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0167
0349340002 CAMION GRUA (BRAZO ARTICULADO) hm 0.2500 0.1333
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Partida ´06.01 CONCRETO CICLOPEO FC=120 KG/CM2 + 70 % PM EN

Rendimiento m3/DIA MO. 12.0000 EQ. 12.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.0667
0147010002 OPERARIO hh 1.0000 0.6667
0147010003 OFICIAL hh 1.0000 0.6667
0147010004 PEON hh 5.0000 3.3333

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0208

Partida ´07.01 INSTALACION DE RETENIDA TIPO RI-A

Rendimiento jgo/DIA MO. 10.0000 EQ. 10.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.0800
0147010002 OPERARIO hh 1.0000 0.8000
0147010003 OFICIAL hh 1.0000 0.8000
0147010004 PEON hh 2.0000 1.6000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0250

Partida ´07.02 INSTALACION DE RETENIDA TIPO RY-A

Rendimiento jgo/DIA MO. 8.0000 EQ. 8.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.1000
0147010002 OPERARIO hh 1.0000 1.0000
0147010003 OFICIAL hh 1.0000 1.0000
0147010004 PEON hh 2.0000 2.0000
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0313
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Partida ´07.03 RELLENO Y COMPACTACION EN EXCAVACIONES DE R

Rendimiento m3/DIA MO. 5.0000 EQ. 5.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.1600
0147010004 PEON hh 1.0000 1.6000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000

Partida ´08.01 MONTAJE DE ARMADO TIPO PS1-3

Rendimiento jgo/DIA MO. 7.0000 EQ. 7.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.2000 0.2286
0147010002 OPERARIO hh 1.0000 1.1429
0147010003 OFICIAL hh 1.0000 1.1429
0147010004 PEON hh 2.0000 2.2857

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 7.5000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0357

Partida ´08.02 MONTAJE DE ARMADO TIPO PA2-3

Rendimiento jgo/DIA MO. 6.0000 EQ. 6.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.1333
0147010002 OPERARIO hh 1.0000 1.3333
0147010003 OFICIAL hh 1.0000 1.3333
0147010004 PEON hh 2.0000 2.6667

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 7.5000
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0417


LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Partida ´08.03 MONTAJE DE ARMADO TIPO PA3-3

Rendimiento jgo/DIA MO. 5.0000 EQ. 5.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.1600
0147010002 OPERARIO hh 1.0000 1.6000
0147010003 OFICIAL hh 1.0000 1.6000
0147010004 PEON hh 2.0000 3.2000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0500

Partida ´08.04 MONTAJE DE ARMADO TIPO PR3-3

Rendimiento jgo/DIA MO. 4.0000 EQ. 4.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.2000 0.4000
0147010002 OPERARIO hh 1.0000 2.0000
0147010003 OFICIAL hh 1.0000 2.0000
0147010004 PEON hh 2.0000 4.0000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0625

Partida ´08.05 MONTAJE DE ARMADO TIPO SEC-3

Rendimiento jgo/DIA MO. 5.0000 EQ. 5.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.1600
0147010002 OPERARIO hh 1.0000 1.6000
0147010003 OFICIAL hh 1.0000 1.6000
0147010004 PEON hh 2.0000 3.2000
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 3.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0500
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Partida ´08.06 MONTAJE DE ARMADO TIPO PSVE-3(MFG)

Rendimiento jgo/DIA MO. 5.5000 EQ. 5.5000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.2000 0.2909
0147010002 OPERARIO hh 1.0000 1.4545
0147010003 OFICIAL hh 1.0000 1.4545
0147010004 PEON hh 2.0000 2.9091

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 7.5000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0455

Partida ´08.07 MONTAJE DE ARMADO TIPO PR3-3(MFG)

Rendimiento jgo/DIA MO. 4.0000 EQ. 4.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.2000 0.4000
0147010002 OPERARIO hh 1.0000 2.0000
0147010003 OFICIAL hh 1.0000 2.0000
0147010004 PEON hh 2.0000 4.0000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 7.5000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0625
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Partida ´08.08 MONTAJE DE ARMADO TIPO PSH-3

Rendimiento jgo/DIA MO. 4.5000 EQ. 4.5000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.1778
0147010002 OPERARIO hh 2.0000 3.5556
0147010003 OFICIAL hh 1.0000 1.7778
0147010004 PEON hh 2.0000 3.5556

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0556

Partida ´08.09 MONTAJE DE ARMADO TIPO PRH-3

Rendimiento jgo/DIA MO. 4.0000 EQ. 4.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.2000 0.4000
0147010002 OPERARIO hh 2.0000 4.0000
0147010003 OFICIAL hh 1.0000 2.0000
0147010004 PEON hh 2.0000 4.0000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 7.5000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0625

Partida ´08.10 MONTAJE DE ARMADO TIPO P3A2-3

Rendimiento jgo/DIA MO. 4.0000 EQ. 4.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.2000 0.4000
0147010002 OPERARIO hh 2.0000 4.0000
0147010003 OFICIAL hh 2.0000 4.0000
0147010004 PEON hh 2.0000 4.0000
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 7.5000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0625
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Partida ´08.11
MONTAJE DE ARMADO TIPO DS - 0 (INCLUYE A

Rendimiento jgo/DIA MO. 6.0000 EQ. 6.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.1333
0147010002 OPERARIO hh 1.0000 1.3333
0147010003 OFICIAL hh 1.0000 1.3333
0147010004 PEON hh 1.0000 1.3333

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0417

Partida ´08.12
MONTAJE DE ARMADO TIPO DS - 2 (INCLUYE A

Rendimiento jgo/DIA MO. 5.5000 EQ. 5.5000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.1455
0147010002 OPERARIO hh 1.0000 1.4545
0147010003 OFICIAL hh 1.0000 1.4545
0147010004 PEON hh 1.0000 1.4545

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 3.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0455

Partida ´08.13
MONTAJE DE ARMADO TIPO DS - 3 (INCLUYE A

Rendimiento jgo/DIA MO. 5.0000 EQ. 5.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.1600
0147010002 OPERARIO hh 1.0000 1.6000
0147010003 OFICIAL hh 1.0000 1.6000
0147010004 PEON hh 2.0000 3.2000
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 3.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0500
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Partida ´08.14 MONTAJE DE ARMADO TIPO BAY - 1 (DESCARGADOR T

Rendimiento jgo/DIA MO. 10.0000 EQ. 10.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.0800
0147010002 OPERARIO hh 1.0000 0.8000
0147010003 OFICIAL hh 1.0000 0.8000
0147010004 PEON hh 1.0000 0.8000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 3.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0250

Partida ´08.15 DESMONTAJE Y MONTAJE DE RECLOSER

Rendimiento jgo/DIA MO. 1.0000 EQ. 1.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.2000 1.6000
0147010002 OPERARIO hh 2.0000 16.0000
0147010003 OFICIAL hh 1.0000 8.0000
0147010004 PEON hh 2.0000 16.0000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0337010100 POLEAS hm 4.0000 32.0000
0337010101 ESCALERA DE TRES CUERPOS hm 4.0000 32.0000
0348610091 PORTABOBINAS hm 8.0000 64.0000
0348760057 CABALLETE hm 8.0000 64.0000
0348810006 WINCHE DE 3 TON. hm 4.0000 32.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.5000 0.5000
0349340002 CAMION GRUA (BRAZO ARTICULADO) hm 0.2500 2.0000
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Partida ´09.01
TENDIDO Y PUESTA EN FLECHA CONDUCTOR AL

Rendimiento KM/DIA MO. 2.7000 EQ. 2.7000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147000032 TOPOGRAFO hh 1.0000 2.9630
0147010001 CAPATAZ hh 1.0000 2.9630
0147010002 OPERARIO hh 4.0000 11.8519
0147010003 OFICIAL hh 3.0000 8.8889
0147010004 PEON hh 12.0000 35.5556

Materiales
0230550059 ESTACION TOTAL (EQUIPO COMPLETO) hm 2.0000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 10.0000
0337010100 POLEAS hm 4.0000 11.8519
0337010101 ESCALERA DE TRES CUERPOS hm 4.0000 11.8519
0348350007 RADIO UHF hm 2.0000 5.9259
0348600001 TIRFOR DE 3 TON. hm 4.0000 11.8519
0348600003 TIRALINEA hm 2.0000 5.9259
0348610091 PORTABOBINAS hm 8.0000 23.7037
0348760057 CABALLETE hm 8.0000 23.7037
0348810006 WINCHE DE 3 TON. hm 4.0000 11.8519
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 1.0000 0.3704

Partida ´09.02
TENDIDO Y PUESTA EN FLECHA CONDUCTOR AL

Rendimiento KM/DIA MO. 2.5000 EQ. 2.5000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147000032 TOPOGRAFO hh 1.0000 3.2000
0147010001 CAPATAZ hh 1.0000 3.2000
0147010002 OPERARIO hh 4.0000 12.8000
0147010003 OFICIAL hh 3.0000 9.6000
0147010004 PEON hh 12.0000 38.4000

Materiales
0230550059 ESTACION TOTAL (EQUIPO COMPLETO) hm 2.0000
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0337010100 POLEAS hm 4.0000 12.8000
0337010101 ESCALERA DE TRES CUERPOS hm 4.0000 12.8000
0348350007 RADIO UHF hm 2.0000 6.4000
0348600001 TIRFOR DE 3 TON. hm 4.0000 12.8000
0348600003 TIRALINEA hm 2.0000 6.4000
0348610091 PORTABOBINAS hm 8.0000 25.6000
0348760057 CABALLETE hm 8.0000 25.6000
0348810006 WINCHE DE 3 TON. hm 4.0000 12.8000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 1.0000 0.4000
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Partida ´09.03
TENDIDO Y PUESTA EN FLECHA CONDUCTOR ALE

Rendimiento KM/DIA MO. 1.8000 EQ. 1.8000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147000032 TOPOGRAFO hh 1.0000 4.4444
0147010001 CAPATAZ hh 1.0000 4.4444
0147010002 OPERARIO hh 4.0000 17.7778
0147010003 OFICIAL hh 3.0000 13.3333
0147010004 PEON hh 12.0000 53.3333

Materiales
0230550059 ESTACION TOTAL (EQUIPO COMPLETO) hm 2.0000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 10.0000
0337010100 POLEAS hm 4.0000 17.7778
0337010101 ESCALERA DE TRES CUERPOS hm 4.0000 17.7778
0348350007 RADIO UHF hm 2.0000 8.8889
0348600001 TIRFOR DE 3 TON. hm 4.0000 17.7778
0348600003 TIRALINEA hm 2.0000 8.8889
0348610091 PORTABOBINAS hm 8.0000 35.5556
0348760057 CABALLETE hm 8.0000 35.5556
0348810006 WINCHE DE 3 TON. hm 4.0000 17.7778
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 1.0000 0.5556

Partida ´10.01
INSTALACION DE PUESTA A TIERRA TIPO PAT-1 (IN

Rendimiento jgo/DIA MO. 1.5000 EQ. 1.5000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.5333
0147010002 OPERARIO hh 1.0000 5.3333
0147010003 OFICIAL hh 1.0000 5.3333
0147010004 PEON hh 1.0000 5.3333

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 1.0000 0.6667
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Partida ´10.02 INSTALACION DE PUESTA A TIERRA TIPO PAT-C


ZARANDEADO
Rendimiento jgo/DIA MO. 5.0000 EQ. 5.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.1600
0147010003 OFICIAL hh 1.0000 1.6000
0147010004 PEON hh 1.0000 1.6000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0349140093 ZARANDA día 1.0000 0.2000

Partida ´11.01 DESMONTAJE Y MONTAJE DE REDES SECUNDARIAS

Rendimiento pto/DIA MO. 4.0000 EQ. 4.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.2000
0147010002 OPERARIO hh 1.0000 2.0000
0147010004 PEON hh 1.0000 2.0000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000

Partida ´12.01 MITIGACION DE IMPACTO AMBIENTAL

Rendimiento GLB/DIA MO. 1.0000 EQ. 1.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Subcontratos
0407010005 RESTAURACION DE DAÑOS ACASIONADOS AL MEDIO AMBIENTE GLB 1.0000
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Partida ´13.01 PRUEBAS ELECTRICAS Y PUESTA EN SERVICIO

Rendimiento GLB/DIA MO. 1.0000 EQ. 1.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010002 OPERARIO hh 3.0000 24.0000
0147010003 OFICIAL hh 2.0000 16.0000
PEON hh 3.0000 24.0000
0147010004 INGENIERO ELECTRO-MECANICO ESPECIALISTA EL LINEA PRIMARIA hh 1.0000 8.0000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 10.0000
0348760058 MEDIDOR DE AISLAMIENTO ELÉCTRICO hm 192.0000 1,536.0000
0348760059 MEDIDOR DE RESISTENCIA DE PUESTA A TIERRA hm 40.0000 320.0000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 24.0000 24.0000

Partida ´13.02 EXPEDIENTE TÉCNICO FINAL CONFORME A OBRA DE


INCLUYE COPIA DIGITALI
Rendimiento mes/DIA MO. 1.0000 EQ. 1.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0147000042 DIBUJANTE EN AUTOCAD hh 20.0000 160.0000
0147000043 PERSONAL DE CAMPO NO CALIFICADO hh 20.0000 160.0000
0147030091 INGENIERO ELECTRO-MECANICO ESPECIALISTA EL LINEA PRIMARIA hh 25.0000 200.0000

Materiales
0212490003 FOTOCOPIA DE TEXTOS, PLANOS Y LAMINAS GLB 1.0000
0212490004 OTRO ÚTILES GLB 1.0000
0239500102 PAPEL PARA TEXTOS GLB 1.0000
0239500103 PAPEL PARA PLANOS GLB 1.0000
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Partida ´01.01 DESMONTAJE DE POSTES (INCLUYE ARMADO: CRUCETAS, AISLA

Rendimiento jgo/DIA MO. 8.0000 EQ. 8.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.1000
0147010002 OPERARIO hh 1.0000 1.0000
0147010004 PEON hh 1.0000 1.0000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0349340002 CAMION GRUA (BRAZO ARTICULADO) hm 0.1500 0.1500

Partida ´01.02 DESMONTAJE DE RETENIDAS (FERRETERIA COMPLET

Rendimiento jgo/DIA MO. 8.0000 EQ. 8.0000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.1000
0147010002 OPERARIO hh 1.0000 1.0000
0147010003 OFICIAL hh 1.0000 1.0000
0147010004 PEON hh 1.0000 1.0000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0337010101 ESCALERA DE TRES CUERPOS hm 1.0000 1.0000

Partida ´01.03 DESMONTAJE DE CONDUCTOR POR FASE (INCLUYE A

Rendimiento KM/DIA MO. 4.7000 EQ. 4.7000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 1.0000 1.7021
0147010002 OPERARIO hh 4.0000 6.8085
0147010003 OFICIAL hh 3.0000 5.1064
0147010004 PEON hh 12.0000 20.4255

Equipos
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

0337010001 HERRAMIENTAS MANUALES %MO 5.0000


0337010100 POLEAS hm 4.0000 6.8085
0337010101 ESCALERA DE TRES CUERPOS hm 4.0000 6.8085
0348350007 RADIO UHF hm 2.0000 3.4043
0348600001 TIRFOR DE 3 TON. hm 4.0000 6.8085
0348600003 TIRALINEA hm 2.0000 3.4043
0348610091 PORTABOBINAS hm 8.0000 13.6170
0348760057 CABALLETE hm 8.0000 13.6170
0348810006 WINCHE DE 3 TON. hm 4.0000 6.8085
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 1.0000 0.2128
S

MAYO DEL 2017

Costo unitario directo por : UND 1,283.87

Precio S/. Parcial S/.

23.00 18.40
20.10 160.80
16.50 132.00
14.84 237.44
548.64

4.50 13.50
90.00 45.00
19.50 19.50
65.00 43.55
350.00 350.00
5.00 236.25
707.80

548.64 27.43
27.43

Costo unitario directo por : GLB 5,500.00

Precio S/. Parcial S/.

5,500.00 5,500.00
5,500.00

NTEO PRELIMINAR

Costo unitario directo por : pto 26.50

Precio S/. Parcial S/.

22.66 3.63
23.00 0.37
16.50 2.64
14.84 4.75
35.00 5.60
S

MAYO DEL 2017


16.99

30.00 7.50
7.50

16.99 0.51
300.00 1.50
7.50
S

MAYO DEL 2017

Costo unitario directo por : GLB 10,186.00

Precio S/. Parcial S/.

60.00 600.00

800.00 800.00

49.20 246.00
25.00 750.00
15.00 450.00
20.00 120.00
11.00 330.00
110.00 3,300.00
75.00 2,250.00
165.00 990.00
350.00 350.00
10,186.00

DE 12/400/180/360 A LUGAR DE IZAJE

Costo unitario directo por : und 77.66

Precio S/. Parcial S/.

23.00 1.47
16.50 5.28
14.84 9.50
16.25

16.25 0.81
300.00 3.00
180.00 57.60
61.41

DE 12/400/180/360 A ZONAS INAXESIBLES

Costo unitario directo por : und 466.33


S

MAYO DEL 2017


Precio S/. Parcial S/.

23.00 3.68
20.10 32.16
16.50 26.40
14.84 284.93
347.17

347.17 17.36
3.00 4.80
50.00 10.00
300.00 15.00
180.00 72.00
119.16
S

MAYO DEL 2017

DE 13/400//180/380 A LUGAR DE IZAJE

Costo unitario directo por : und 96.11

Precio S/. Parcial S/.

23.00 0.92
16.50 6.60
14.84 11.87
19.39

19.39 0.97
300.00 3.75
180.00 72.00
76.72

Costo unitario directo por : m3 76.76

Precio S/. Parcial S/.

23.00 5.26
14.84 67.84
73.10

73.10 3.66
3.66

Costo unitario directo por : m3 201.01

Precio S/. Parcial S/.

23.00 3.35
20.10 29.24
14.84 43.17
75.76
S

MAYO DEL 2017


75.76 2.27
95.00 122.98
125.25
S

MAYO DEL 2017


E CONCRETO 12/400/180/360 LUGARES ACCESIBLES (INCLUYE
SEÑALIZACIÓN)
Costo unitario directo por : und 77.90

Precio S/. Parcial S/.

23.00 1.15
20.10 10.05
14.84 37.10
48.30

48.30 2.42
300.00 4.68
180.00 22.50
29.60

CONCRETO 12/400/180/360 LUGARES NO ACCESIBLES A LA GRUA


(INCLUYE SEÑALIZACIÓN)
Costo unitario directo por : und 595.22

Precio S/. Parcial S/.

23.00 23.00
20.10 40.20
16.50 33.00
14.84 445.20
541.40 541.40

541.40 27.07
3.00 3.00
5.00 5.00
300.00 18.75
53.82 53.82

E CONCRETO 13/400/180/380 LUGARES ACCESIBLES (INCLUYE


SEÑALIZACIÓN)
Costo unitario directo por : und 83.10

Precio S/. Parcial S/.

23.00 1.23
20.10 10.72
14.84 39.57
S

MAYO DEL 2017


51.52

51.52 2.58
300.00 5.01
180.00 23.99
31.58
S

MAYO DEL 2017

=120 KG/CM2 + 70 % PM EN BASE DE POSTE

Costo unitario directo por : m3 85.41

Precio S/. Parcial S/.

23.00 1.53
20.10 13.40
16.50 11.00
14.84 49.47
75.40

75.40 3.77
300.00 6.24
10.01

Costo unitario directo por : jgo 65.10

Precio S/. Parcial S/.

23.00 1.84
20.10 16.08
16.50 13.20
14.84 23.74
54.86

54.86 2.74
300.00 7.50
10.24

Costo unitario directo por : jgo 81.40

Precio S/. Parcial S/.

23.00 2.30
20.10 20.10
16.50 16.50
14.84 29.68
S

MAYO DEL 2017


68.58

68.58 3.43
300.00 9.39
12.82
S

MAYO DEL 2017

N EN EXCAVACIONES DE RETENIDAS

Costo unitario directo por : m3 28.79

Precio S/. Parcial S/.

23.00 3.68
14.84 23.74
27.42

27.42 1.37
1.37

Costo unitario directo por : jgo 97.80

Precio S/. Parcial S/.

23.00 5.26
20.10 22.97
16.50 18.86
14.84 33.92
81.01

81.01 6.08
300.00 10.71
16.79

Costo unitario directo por : jgo 110.81

Precio S/. Parcial S/.

23.00 3.07
20.10 26.80
16.50 22.00
14.84 39.57
91.44

91.44 6.86
S

MAYO DEL 2017


300.00 12.51
19.37
S

MAYO DEL 2017

Costo unitario directo por : jgo 130.22

Precio S/. Parcial S/.

23.00 3.68
20.10 32.16
16.50 26.40
14.84 47.49
109.73

109.73 5.49
300.00 15.00
20.49

Costo unitario directo por : jgo 167.60

Precio S/. Parcial S/.

23.00 9.20
20.10 40.20
16.50 33.00
14.84 59.36
141.76

141.76 7.09
300.00 18.75
25.84

Costo unitario directo por : jgo 128.02

Precio S/. Parcial S/.

23.00 3.68
20.10 32.16
16.50 26.40
14.84 47.49
S

MAYO DEL 2017


109.73

109.73 3.29
300.00 15.00
18.29
S

MAYO DEL 2017

Costo unitario directo por : jgo 124.48

Precio S/. Parcial S/.

23.00 6.69
20.10 29.24
16.50 24.00
14.84 43.17
103.10

103.10 7.73
300.00 13.65
21.38

Costo unitario directo por : jgo 171.14

Precio S/. Parcial S/.

23.00 9.20
20.10 40.20
16.50 33.00
14.84 59.36
141.76

141.76 10.63
300.00 18.75
29.38
S

MAYO DEL 2017

Costo unitario directo por : jgo 182.22

Precio S/. Parcial S/.

23.00 4.09
20.10 71.47
16.50 29.33
14.84 52.77
157.66

157.66 7.88
300.00 16.68
24.56

Costo unitario directo por : jgo 214.36

Precio S/. Parcial S/.

23.00 9.20
20.10 80.40
16.50 33.00
14.84 59.36
181.96

181.96 13.65
300.00 18.75
32.40

Costo unitario directo por : jgo 249.83

Precio S/. Parcial S/.

23.00 9.20
20.10 80.40
16.50 66.00
14.84 59.36
S

MAYO DEL 2017


214.96

214.96 16.12
300.00 18.75
34.87
S

MAYO DEL 2017

ADO TIPO DS - 0 (INCLUYE ACOMODO DE SECCIONAMIENTO)

Costo unitario directo por : jgo 87.75

Precio S/. Parcial S/.

23.00 3.07
20.10 26.80
16.50 22.00
14.84 19.79
71.66

71.66 3.58
300.00 12.51
16.09

ADO TIPO DS - 2 (INCLUYE ACOMODO DE SECCIONAMIENTO)

Costo unitario directo por : jgo 94.17

Precio S/. Parcial S/.

23.00 3.35
20.10 29.24
16.50 24.00
14.84 21.58
78.17

78.17 2.35
300.00 13.65
16.00

ADO TIPO DS - 3 (INCLUYE ACOMODO DE SECCIONAMIENTO)

Costo unitario directo por : jgo 128.02

Precio S/. Parcial S/.

23.00 3.68
20.10 32.16
16.50 26.40
14.84 47.49
S

MAYO DEL 2017


109.73

109.73 3.29
300.00 15.00
18.29
S

MAYO DEL 2017

O BAY - 1 (DESCARGADOR TIPO BAYONETA)

Costo unitario directo por : jgo 51.78

Precio S/. Parcial S/.

23.00 1.84
20.10 16.08
16.50 13.20
14.84 11.87
42.99

42.99 1.29
300.00 7.50
8.79

Costo unitario directo por : jgo 2,730.23

Precio S/. Parcial S/.

23.00 36.80
20.10 321.60
16.50 132.00
14.84 237.44
727.84

727.84 36.39
3.00 96.00
4.50 144.00
1.50 96.00
5.00 320.00
25.00 800.00
300.00 150.00
180.00 360.00
2,002.39
S

MAYO DEL 2017

N FLECHA CONDUCTOR ALEACION DE AL DE 50mm2, POR FASE

Costo unitario directo por : KM 1,943.00

Precio S/. Parcial S/.

22.66 67.14
23.00 68.15
20.10 238.22
16.50 146.67
14.84 527.65
1,047.83

30.00 60.00
60.00

1,047.83 104.78
3.00 35.56
4.50 53.33
6.00 35.56
3.50 41.48
0.50 2.96
1.50 35.56
5.00 118.52
25.00 296.30
300.00 111.12
835.17

N FLECHA CONDUCTOR ALEACION DE AL DE 70mm2, POR FASE

Costo unitario directo por : KM 2,037.03

Precio S/. Parcial S/.

22.66 72.51
23.00 73.60
20.10 257.28
16.50 158.40
14.84 569.86
1,131.65

30.00 60.00
60.00
S

MAYO DEL 2017

1,131.65 56.58
3.00 38.40
4.50 57.60
6.00 38.40
3.50 44.80
0.50 3.20
1.50 38.40
5.00 128.00
25.00 320.00
300.00 120.00
845.38
S

MAYO DEL 2017

N FLECHA CONDUCTOR ALEACION DE AL DE 120mm2, POR FASE

Costo unitario directo por : KM 2,884.46

Precio S/. Parcial S/.

22.66 100.71
23.00 102.22
20.10 357.33
16.50 220.00
14.84 791.47
1,571.73

30.00 60.00
60.00

1,571.73 157.17
3.00 53.33
4.50 80.00
6.00 53.33
3.50 62.22
0.50 4.44
1.50 53.33
5.00 177.78
25.00 444.45
300.00 166.68
1,252.73

TA A TIERRA TIPO PAT-1 (INCLUYE RELLENO CON TIERRA NEGRA)

Costo unitario directo por : jgo 500.96

Precio S/. Parcial S/.

23.00 12.27
20.10 107.20
16.50 88.00
14.84 79.15
286.62

286.62 14.33
300.00 200.01
S

MAYO DEL 2017


214.34
S

MAYO DEL 2017


ESTA A TIERRA TIPO PAT-C (INCLUYE RELLENO CON MATERIAL
ZARANDEADO)
Costo unitario directo por : jgo 60.51

Precio S/. Parcial S/.

23.00 3.68
16.50 26.40
14.84 23.74
53.82

53.82 2.69
20.00 4.00
6.69

DE REDES SECUNDARIAS

Costo unitario directo por : pto 78.20

Precio S/. Parcial S/.

23.00 4.60
20.10 40.20
14.84 29.68
74.48

74.48 3.72
3.72

Costo unitario directo por : GLB 5,500.00

Precio S/. Parcial S/.

5,500.00 5,500.00
5,500.00
S

MAYO DEL 2017


UESTA EN SERVICIO

Costo unitario directo por : GLB 22,566.58

Precio S/. Parcial S/.

20.10 482.40
16.50 264.00
14.84 356.16
35.00 280.00
1,382.56

1,382.56 138.26
7.46 11,458.56
7.46 2,387.20
300.00 7,200.00
21,184.02

AL CONFORME A OBRA DE LINEAS PRIMARIAS (1 Original + 3 Copias),


INCLUYE COPIA DIGITALIZADA EN CD.
Costo unitario directo por : mes 16,920.00

Parcial S/.

22.00 3,520.00
15.00 2,400.00
35.00 7,000.00
12,920.00

1,000.00 1,000.00
1,500.00 1,500.00
1,000.00 1,000.00
500.00 500.00
4,000.00
S

MAYO DEL 2017


ARMADO: CRUCETAS, AISLADORES Y OTROS)

Costo unitario directo por : jgo 66.10

Precio S/. Parcial S/.

23.00 2.30
20.10 20.10
14.84 14.84
37.24

37.24 1.86
180.00 27.00
28.86

AS (FERRETERIA COMPLETA)

Costo unitario directo por : jgo 60.93

Precio S/. Parcial S/.

23.00 2.30
20.10 20.10
16.50 16.50
14.84 14.84
53.74

53.74 2.69
4.50 4.50
7.19

TOR POR FASE (INCLUYE ACOMODO DE CONDUCTOR)

Costo unitario directo por : KM 1,011.14

Precio S/. Parcial S/.

23.00 39.15
20.10 136.85
16.50 84.26
14.84 303.11
563.37
S

MAYO DEL 2017


563.37 28.17
3.00 20.43
4.50 30.64
6.00 20.43
3.50 23.83
0.50 1.70
1.50 20.43
5.00 68.09
25.00 170.21
300.00 63.84
447.77
LINEA PRIMARIA
ANALISIS DE COSTOS UNITARIOS
PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

Partida 03.02 TRANSPORTE DE POSTES DE 12/400/180/360 A ZONAS

Rendimiento und/DIA MO. 1.5000 EQ. 1.5000

Código Descripción Recurso Unidad Cuadrilla Cantidad


Mano de Obra
0147010001 CAPATAZ hh 0.1000 0.5333
0147010002 OPERARIO hh 1.0000 5.3333
0147010003 OFICIAL hh 1.0000 5.3333
0147010004 PEON hh 12.0000 64.0000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000
0337010100 POLEAS hm 1.0000 5.3333
0337980013 CARRETA 02 LLANTAS (PARA TRANSPORTE MANUAL DE POSTE) día 1.0000 0.2000
0349120009 CAMIONETA RURAL 4x4 135 HP 5 PASAJEROS DIA 0.2500 0.0500
0349340002 CAMION GRUA (BRAZO ARTICULADO) hm 0.2500 0.4000
S

DE 12/400/180/360 A ZONAS INAXESIBLES

Costo unitario directo por : und 1,287.59

Precio S/. Parcial S/.

23.00 12.27
20.10 107.20
16.50 88.00
14.84 949.76
1,157.23

347.17 17.36
3.00 16.00
50.00 10.00
300.00 15.00
180.00 72.00
130.36
C. CARACTERISTICA DEL TERRENO RESULTADOS
VOLUMEN DEL SOLADO Vs (m3) 0.16
VOLUMEN DEL TRONCO DEL POSTE Vtp (m3) 0.13
VOLUMEN DE SOPORTE Vd (m3) 2.5905
VOLUMEN DE RELENO CON CONCRETO Vr (m3) 1.41
VOLUMEN DE ESCAVACION Vexc (m3) 0.87

C. CARACTERISTICA DEL TERRENO RESULTADOS


VOLUMEN DEL SOLADO Vs (m3) 0.16
VOLUMEN DEL TRONCO DEL POSTE Vtp (m3) 0.16
VOLUMEN DE SOPORTE Vd (m3) 2.5905
VOLUMEN DE RELENO CON CONCRETO Vr (m3) 1.41
VOLUMEN DE ESCAVACION Vexc (m3) 0.87
2.5905
1.41
0.16
0.13
4.0305
FORMULA POLINOMICA
: CAMBIO E INCREMENTO DE ESTRUCTURAS DE LAS LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
: PUNO
: SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

SUB-TOTAL SIN I.G.V. 2,227,319.40

ELEMENTO REPRESENTATIVO INDICE SIMBOLO SIMB. MONOMIO MONTO INCIDENCIA % PARCIAL COEFICIENTE INDICE BASE (MAY)17 INDICE NOV 17 INDICE DIC 17 INDICE ENE 18 INDICE FEB 18 INDICE MAR 18 INDICE ABR 18 INDICE MAY 18 INDICE JUN 18 INDICE JUL 18 INDICE AGO 18 INDICE SET 18
JUEGO DE ARMADO PARA LINEA PRIMARIA 042 PM FE 51090 0.023 0.1149 285.22 283.79 284.08 282.65 284.08 284.22 283.36 285.22 285.07 285.36 285.93 286.92
POSTES DE CONCRETO ARMADO PARA LINEA PRIMARIA 062 PC 196950 0.088 0.443 458.55 461.57 466.21 462.81 465.05 464.29 463.83 467.17 469.04 468.68 472.19 468.31
MATERIAL DE FERRETERIA PARA POSTES Y CRUCETAS DE LINEA PRIMARIA 002 FP 23025 0.01 0.0518 455.78 482.69 491.28 497.78 528.59 529.67 526.55 534.75 532.76 532.4 546.81 550.63
0.2
RETENIDAS Y ANCLAJES 002 RE 44685.7 0.02 0.1005 455.78 482.69 491.28 497.78 528.59 529.67 526.55 534.75 532.76 532.4 546.81 550.63
MATERIAL PARA PUESTA A TIERRA 006 CU 55014.5 0.025 0.1237 829.84 907.22 915.64 925.49 944.54 943.48 932.93 945.8 939.31 944.94 928 923.1
INSUMOS 006 PT 73828.86 0.033 0.1661 829.84 907.22 915.64 925.49 944.54 943.48 932.93 945.8 939.31 944.94 928 923.1
EQUIPO DE PROTECCION Y MANIOBRA 011 AE1 AE 31500 0.014 0.0626 235.4 233.49 233.88 231.87 234.01 234.2 235.08 237.63 238.13 236.99 239.37 239.71
AISLADORES TIPO PIN Y ACCESORIOS PARA LINEA PRIMARIA 011 AE2 329851 0.148 0.6555 0.226 235.4 233.49 233.88 231.87 234.01 234.2 235.08 237.63 238.13 236.99 239.37 239.71
CONDUCTOR DE ALEACIÓN DE ALUMINIO PARA LINEA PRIMARIA 030 DI 141859 0.064 0.2819 466.53 465.87 466.75 462.02 469.31 471.87 469.88 478.04 479.58 481.37 483.02 486.67
MONTAJE, DESMONTAJE ELECTROMECANICO 047 J J 832595.25 0.374 0.9043 563.25 580.90 580.90 582.52 582.52 582.52 582.52 582.52 582.52 582.52 602.11 602.11
0.413
TRANSPORTE (D+E), DE RESUMEN GENERAL 032 FT 88114.92 0.04 0.0957 465.79 468.00 468.42 468.42 468.42 468.41 468.41 468.41 470.47 470.47 470.47 468.39
GASTOS GENERALES Y UTILIDADES 039 GG GG 358805.17 0.161 1 0.161 441.5 441.61 442.30 442.87 443.97 446.14 445.52 445.61 447.1 448.81 449.4 450.26

Reaj. Val 01 Reaj. Val 02 Reaj. Val 03 Reaj. Val 04 Reaj. Val 05 Reaj. Val 06 Reaj. Val 07 Reaj. Val 08

0.210 0.212 0.213 0.217 0.217 0.216 0.218 0.218 0.218 0.218 0.217

0.225 0.225 0.223 0.226 0.226 0.227 0.230 0.230 0.230 0.232 0.233

0.425 0.425 0.426 0.426 0.426 0.426 0.426 0.426 0.426 0.440 0.439

0.161 0.161 0.161 0.162 0.163 0.162 0.162 0.163 0.164 0.164 0.164
K= 1.021 1.024 1.024 1.031 1.032 1.031 1.036 1.037 1.038 1.053 1.053
VALORIZACIONES PAGADAS
ITEM VAL - 01 VAL - 02 VAL - 03 VAL - 04 VAL - 05 VAL - 06 VAL - 07 VAL - 08 VAL - MM1 VAL - MM2
A.- Coeficiente de Reajuste Mensual (K)
TOTAL
1.021 1.024 1.024 1.031 1.032 1.031 1.036 1.037 1.036
B.- VALORIZACIONES PAGADAS (PRECIOS REF x FR) SIN IGV
Valorizaciones Contrato Principal Pagadas 24,900.92 619,686.01 336,091.23 255,274.91 441,518.72 174,712.62 179,969.66 139,135.78 2,171,289.85
Gastos Generales
Reajuste Pagado ( IU. Mes Anterior) 524.80 13,060.28 8,033.26 7,956.95 69.06 (256.00) 655.34 506.65 30,550.34
TOTAL S/ 25,425.72 632,746.29 344,124.49 263,231.86 441,587.78 174,456.62 180,625.00 139,642.43 2,201,840.19
VALORIZACIONES PROGRAMADAS
VAL - 01 VAL - 02 VAL - 03 VAL - 04 VAL - 05 VAL - 06 VAL - 07 VAL - 08 VAL - MM1 VAL - MM2
TOTAL
A.- Coeficiente de Reajuste Mensual (K) 1.024 1.031 1.032 1.031 1.036 1.037 1.038 1.053 1.038 1.053
C.- VALORIZACIONES PROGRAMADAS
Valorizaciones Programadas Según Cronograma Valorizado 24,900.92 619,686.01 336,091.23 255,274.91 441,518.72 174,712.62 180,000.00 150,000.00 40,814.21 2,222,998.62
Reajuste Programado (Indices del Mes) 595.18 19,315.69 10,901.53 7,877.31 16,089.98 6,503.87 6,866.12 - 5,721.77 2,155.09 76,026.55
TOTAL S/ 25,496.10 639,001.70 346,992.76 263,152.22 457,608.70 181,216.49 186,866.12 - 155,721.77 42,969.30 2,256,055.86
VALORIZACIONES REAJUSTADAS
VAL - 01 VAL - 02 VAL - 03 VAL - 04 VAL - 05 VAL - 06 VAL - 07 VAL - 08 VAL - MM1 CIERRE
TOTAL
A.- Coeficiente de Reajuste Mensual (K) 1.024 1.031 1.032 1.031 1.036 1.037 1.038 1.053 1.038 1.038
D.- VALORIZACIONES A PRECIOS DE CONTRATO SIN IGV
Valorizacion a Precios de Contrato 24,900.92 619,686.01 336,091.23 255,274.91 441,518.72 174,712.62 179,969.25 139,135.78 48,677.62 2,219,967.06
Reajustes a Precios de Contrato (I. del Mes) 595.18 19,315.69 10,901.53 7,877.31 16,089.98 6,503.87 6,864.95 5,307.35 1,856.81 75,312.68
Total por valorizacion autorizado S/. 2,219,967.06
Total valorizacion pagado S/. 2,171,289.85
24,900.92 619,686.01 336,091.23 255,274.91 441,518.72 174,712.62 180,000.00 Total autorizado Reajuste S/. 75,312.68
Total reajuste pagado S/: 30,550.34
Saldo por pagar valoriz. S/. 48,677.21
Saldo por pagar reajuste S/. 44,762.33
SUB TOTAL SALDO S/. 93,439.55
IGV 16,819.12
150000 TOTAL SALDO S/. 110,258.66
48314.01
#VALUE!

2300

0.2 FEr/FEo + 0.226 AE/AEo + 0.413 Jr/Jo + 0.161 GGr/GGo

En la fórmula los sub-indices "o" de cada símbolo corresponden al indice de precios según (CREPCO) a la
fecha de Elaboración del Presupuesto (Presupuesto Base) y los sub-indices "r" al indice de precios al
momento de reajuste o fecha de valorización
En el caso de los monomios compuestos por varios indices se ha considerado para efecto de denominación
el símbolo que tiene mayor porcentaje de incidencia
En caso de cambios en el suministro se deberá actualizar la formula polinómica.
CUADRO DE VALORIZACIONES RECALCULADAS
Obra : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016

Propietario ELECTRO PUNO S.A.A SIN IGV


Contratista CONSORCIO LYK MONTO PRESUPUESTO CONTRATADO ( C ) S/. 2,136,300.54
Supervisor ING. GUSTAVO MOYA SOTO MONTO ADELANTO DIRECTO (A) S/. 213,630.05
Residente ING. ARMANDO TINTAYA TAIRO MONTO ADELANTO MATERIALES No. 01 (AM1) S/. -

es es por
VALORIZACIONES Factor Reajuste REAJUSTE
Valorizacion por Adelanto REAJUSTE
No. Fecha Programada Ejecutada K Programado Ejecutado ACUMULADO
Mes AUTORIZADO Reajustada Adelanto de NETO ( L )
A B C D E F = C *(E-1) G = D *(E-1) Programado Ejecutado Dad Dam

F.P. 01 2,222,998.62 2,219,967.06 76,037.05 75,315.11 75,315.11 S/. 2,244,747.74 S/. - S/. - S/. 75,315.11

1 DIC 24,900.92 24,900.92 1.024 Jan-18 597.62 597.62 597.62 597.62 597.62 25,498.54 - - 597.62
2 ENE 619,686.01 619,686.01 1.031 Feb-18 19,315.69 19,315.69 19,913.31 ### 19,315.69 639,001.70 - - 19,315.69
3 FEB 336,091.23 336,091.23 1.032 Mar-18 10,901.53 10,901.53 30,814.84 ### 10,901.53 346,992.76 10,901.53
4 MAR 255,274.91 255,274.91 1.031 Apr-18 7,877.31 7,877.31 38,692.15 ### 7,877.31 263,152.22 7,877.31
5 ABR 441,518.72 441,518.72 1.036 May-18 16,089.98 16,089.98 54,782.13 ### 16,089.98 457,608.70 16,089.98
6 MAY 174,712.62 174,712.62 1.037 Jun-18 6,503.87 6,503.87 61,286.01 ### 6,503.87 181,216.49 6,503.87
7 JUN 180,000.00 179,969.25 1.038 Jul-18 6,866.12 6,864.95 68,152.13 ### 6,864.95 186,834.20 6,864.95
8 JUL - 1.053 Aug-18 - - 68,152.13 ### - -
MAYORES METRADOS
9 JUN 150,000.00 139,135.78 1.038 Jul-18 5,721.77 5,307.35 5,721.77 5,307.35 5,307.35 144,443.13 5,307.35
10 JUL 40,814.21 - 1.053 Aug-18 2,163.15 - 7,884.92 5,307.35 - -
11 CIERRE 48,678 1.038 Jul-18 - 1,856.81 7,884.92 7,164.16 1,856.81 50,534.43 1,856.81
Reajuste NETO POR CONTRATO PRINCIPAL S/. 75,315.11
sin IGV
CUADRO DE COEFICIENTE DE REAJUSTE : K (Definitivos)
CONTRATO PRINCIPAL MESES Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18
F.P. 01 "K" 1.021 1.024 1.024 1.031 1.032 1.031 1.036 1.037 1.038 1.053 1.053 0.000
VALORIZACIONES Y ADELANTOS PAGADOS
Obra : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016

Propietario ELECTRO PUNO S.A.A


Contratista CONSORCIO LYK
Supervisor ING. GUSTAVO MOYA SOTO
Residente ING. ARMANDO TINTAYA TAIRO

Sin IGV Sin IGV


MONTO CONTRATO ( C ) : S/.2,136,300.54 ADELANTO DIRECTO ( A ) : S/. 213,630.05
ADELANTO MATERIALES No. 01 (M1) : S/. -

VALORIZACIONES REAJUSTES Amortizaciones de VALORIZACION NETO PAGADO EN VALORIZACIONES (S/.)


Monto Total Adelantos ( D ) NETA (V.N.)
Por Total
Valorizado Total Reajustado S/. Efectivo IGV 18%
Nº. Fecha Valorizacion Directo Adel. Mater. Total Facturado
S/.
A B C=A+B D1 D2 D= D1 + D2 VN = C - D VN I J = VN + I

1 DIC 24,900.92 524.80 25,425.72 2,542.57 - 2,542.57 22,883.15 22,883.15 4,118.97 27,002.12
2 ENE 619,686.01 13,060.28 632,746.29 126,549.26 - 126,549.26 506,197.03 506,197.03 91,115.47 597,312.50
3 FEB 336,091.23 8,033.26 344,124.49 34,412.45 - 34,412.45 309,712.04 309,712.04 55,748.17 365,460.21
4 MAR 255,274.91 7,956.95 263,231.86 26,323.19 - 26,323.19 236,908.67 236,908.67 42,643.56 279,552.24
5 ABR 441,518.72 69.06 441,587.78 23,797.88 - 23,797.88 417,789.90 417,789.90 75,202.18 492,992.08
6 MAY 174,712.62 - 256.00 174,456.62 - - - 174,456.62 174,456.62 31,402.19 205,858.81
7 JUN 179,969.25 655.34 180,624.59 4.70 - 4.70 180,619.89 180,619.89 32,511.58 213,131.47
MAYORES METRADOS
8 JUN 139,135.78 506.65 139,642.43 - - - 139,642.43 139,642.43 25,135.64 164,778.07

TOTAL CONTRATO 2,171,289.44 ### 2,201,839.78 213,630.04 - 213,630.04 1,988,209.74 1,988,209.74 357,877.75 2,346,087.49

TOTAL PAGADO POR CONTRATO PRINCIPAL 1,988,209.74 357,877.75 2,346,087.49


Deduccion de Reajuste que no corresponde por adelato directo
Obra : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Propietario ELECTRO PUNO S.A.A
Contratista CONSORCIO LYK
Supervisor ING. GUSTAVO MOYA SOTO
Residente ING. ARMANDO TINTAYA TAIRO

Ka= 1.024 AD/C= 0.1

MES VALORIZACION V K DEDUCCION AMORTIZACION


DICIEMBRE VAL 01 24900.92 1.024 - 2542.57
ENERO VAL 02 619686.01 1.024 0.53 126549.26
FEBRERO VAL 03 336091.23 1.031 238.86 34412.45
MARZO VAL 04 255274.91 1.032 212.99 26323.19
ABRIL VAL 05 441518.72 1.031 300.34 23797.88
MAYO VAL 06 174712.62 1.036 214.13
JUNIO VAL 07 179969.25 1.037 234.35 4.7
TOTAL S/ 1,201.20

COEFICIENTES DE REAJUSTE
Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18
1.024 1.024 1.031 1.032 1.031 1.036 1.037 1.038 1.053
directo

Sep-18
1.053
RESUMEN DE LIQUIDACION DE OBRA

: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE


OBRA :
MANTENIMIENTO 2016

Contrato No. N° 82-2017-ELPU/GG


Propietario ELECTRO PUNO S.A.A
Contratista CONSORCIO LYK
Supervisor ING. GUSTAVO MOYA SOTO
Residente ING. ARMANDO TINTAYA TAIRO

Sin IGV Sin IGV


MONTO CONTRATO ( C ) ### ADELANTO DIRECTO ( A ) S/. 213,630.05
ADELANTO MATERIALES No. 01 (M1) S/. -

AUTORIZADO DIFERENCIA
ITEM DESCRIPCION CONTRATADO PAGADO
LIQUIDACION A FAVOR

1.00 CONTRATO
1.01 CONTRATO PRINCIPAL
Monto Contratado y ejecutado

FP. 01 2,136,300.54 2,219,967.06 2,171,289.44 48,677.62


2,136,300.54 2,219,967.06 2,171,289.44 48,677.62

1.02 REAJUSTES

Por Contrato Principal 75,315.11 30,550.34 44,764.77


75,315.11 30,550.34 44,764.77
Deduccion de Reajuste que no corresponde
1,201.20
por adelato directo

SUB TOTAL 01 (T 01) 2,295,282.17 2,201,839.78 93,442.39


IGV 396,331.16
TOTAL 2,598,170.94

2.00 AMORTIZACION ADELANTOS - Contrato principal


OTORGADOS AMORTIZADOS
2.01 Por Adelanto Directo 213,630.05 213,630.05 -
2.02 Por Adelanto de Materiales - -

SUB TOTAL 02 (T 02) 213,630.05 213,630.05 -

3.00 MAYORES GASTOS GENERALES Autorizado Pagado


Por Ampliación de plazo
- -

SUB TOTAL 03 (T 03) - - -

4.00 RESUMEN DE SALDOS


A FAVOR S/. 93,442.39
EN CONTRA S/. 1,201.20
SUB TOTAL S/. 92,241.19

IGV 18.00 % S/. 16,603.41


TOTAL SALDO S/. 108,844.60

RESUMEN
Monto Pagado Inc. IGV S/. 2,598,170.94
Saldo Inc. IGV S/. 108,844.60

COSTO TOTAL DE LA OBRA (ST01 + ST02 + ST03) Inc. IGV S/. 2,707,015.54
Contrato Principal + Reintegro + Mayores Gastos Generales

SALDO AL CONTRATISTA Inc. IGV S/. 108,844.60


DE

DIFERENCIA
EN CONTRA

-
-

-
-
###

###

-
-

1085
900
1985
FORMULA POLINÓMICA

PROYECTO : CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
REGION : PUNO
PROVINCIA : SAN ROMAN, AZANGARO, MELGAR, SAN ANTONIO DE PUTINA, HUANCANE, MOHO, PUNO,CHUCUITO,EL COLLAO Y YUNGUYO

SUB-TOTAL SIN I.G.V. 2,213,612.59


FECHA MAYO DEL 2017

Nº ELEMENTO REPRESENTATIVO INDICE SIMBOLO SIMB. MONOMIO MONTO INCIDENCIA % PARCIAL COEFICIENTE
1 JUEGO DE ARMADO PARA LINEA PRIMARIA 042 PM FE 44,925.29 0.020 10.46% 0.194
POSTES DE CONCRETO ARMADO PARA LINEA PRIMARIA 062 PC 164,950.00 0.075 38.41%
MATERIAL DE FERRETERIA PARA POSTES Y CRUCETAS DE LINEA PRIMARIA 002 FP 38,612.40 0.017 8.99%
RETENIDAS Y ANCLAJES 002 RE 50,266.05 0.023 11.70%
MATERIAL PARA PUESTA A TIERRA 006 CU 47,960.94 0.022 11.17%
INSUMOS 006 PT 82,778.03 0.037 19.27%
2 EQUIPO DE PROTECCION Y MANIOBRA 011 AE1 AE 34,650.00 0.016 7.34% 0.213
AISLADORES TIPO PIN Y ACCESORIOS PARA LINEA PRIMARIA 011 AE2 297,898.00 0.135 63.13%
CONDUCTOR DE ALEACIÓN DE ALUMINIO PARA LINEA PRIMARIA 030 DI 139,344.86 0.063 29.53%
3 MONTAJE, DESMONTAJE ELECTROMECANICO 047 J J 889,167.05 0.402 91.36% 0.440
TRANSPORTE (D+E), DE RESUMEN GENERAL 032 FT 84,078.05 0.038 8.64%
4 GASTOS GENERALES Y UTILIDADES 039 GG GG 338,981.92 0.153 100.00% 0.153

K= 0.194 FEr/FEo + 0.213 AE/AEo + 0.44 Jr/Jo + 0.153 GGr/GGo

NOTAS:

1.- En la fórmula los sub-indices "o" de cada símbolo corresponden al indice de precios según (CREPCO) a la
fecha de Elaboración del Presupuesto (Presupuesto Base) y los sub-indices "r" al indice de precios al
momento de reajuste o fecha de valorización
2.- En el caso de los monomios compuestos por varios indices se ha considerado para efecto de denominación
el símbolo que tiene mayor porcentaje de incidencia
3.- En caso de cambios en el suministro se deberá actualizar la formula polinómica.
CRONOGRAMA DE EJECUCION DE OBRA

ITEM DESCRIPCION MES 1 MES 2 MES 3 MES 4 MES 5 TOTAL

A SUMINISTRO DE MATERIALES

### #REF! 30.00% 40.00% 30.00% 100.00%

#REF! #REF! 50.00% 50.00% 100.00%

#REF! #REF! 50.00% 50.00% 100.00%

#REF! #REF! 50.00% 50.00% 100.00%

#REF! #REF! 50.00% 50.00% 100.00%

6.00 #REF! 25.00% 25.00% 25.00% 25.00% 100.00%

7.00 #REF! 20.00% 20.00% 20.00% 20.00% 20.00% 100.00%

8.00 #REF! 50.00% 50.00% 100.00%

9.00 #REF! 100.00% 100.00%

10.00 #REF! 50.00% 50.00% 100.00%

11.00 #REF! 20.00% 20.00% 20.00% 20.00% 20.00% 100.00%

B MONTAJE ELECTROMECANICO

1.00 OBRAS PROVISIONALES 20.00% 20.00% 20.00% 20.00% 20.00% 100.00%

2.00 TRABAJOS PRELIMINARES 20.00% 20.00% 20.00% 20.00% 20.00% 100.00%

3.00 TRANSPORTE 20.00% 30.00% 30.00% 20.00% 100.00%

4.00 MOVIMIENTO DE TIERRAS 50.00% 50.00% 100.00%

5.00 Err:509 25.00% 25.00% 25.00% 25.00% 100.00%

6.00 IZAJE DE POSTE 10.00% 30.00% 30.00% 30.00% 100.00%

7.00 CONCRETO SIMPLE 10.00% 30.00% 30.00% 30.00% 100.00%

8.00 INSTALACION DE RETENIDAS Y ANCLAJES 30.00% 40.00% 30.00% 100.00%

9.00 MONTAJE DE ARMADOS 20.00% 20.00% 20.00% 20.00% 20.00% 100.00%

10.00 MONTAJE DE CONDUCTORES DE ALEACION DE ALUMINIO 50.00% 50.00% 100.00%

11.00 INSTALACION DE PUESTAS A TIERRA 100.00% 100.00%

12.00 TENDIDO Y ACOMODO DE CONDUCTORES Y FERRETERIA 50.00% 50.00% 100.00%

13.00 IMPACTO AMBIENTAL 20.00% 20.00% 20.00% 20.00% 20.00% 100.00%

14.00 PRUEBAS Y PUESTA EN SERVICIO 100.00% 100.00%

C TRANSPORTE DE MATERIALES #REF! #REF! #REF! #REF! #REF! #REF!

D GASTOS GENERALES #REF! #REF! #REF! #REF! #REF! #REF!

E UTILIDADES #REF! #REF! #REF! #REF! #REF! #REF!

F IGV #REF! #REF! #REF! #REF! #REF! #REF!


CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

ITEM DESCRIPCION MES 1 MES 2 MES 3 MES 4 MES 5 TOTAL

A SUMINISTRO DE MATERIALES #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

6.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF!

7.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF!

8.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF!

9.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF!

10.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF!

11.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF!

B MONTAJE ELECTROMECANICO 108198.21 160575.31 166344.50 153850.57 119833.22 708801.81

1.00 OBRAS PROVISIONALES 1125.01 1125.01 1125.01 1125.01 1125.01 5625.06

2.00 TRABAJOS PRELIMINARES 5926.54 5926.54 5926.54 5926.54 5926.54 29632.70

3.00 TRANSPORTE 18094.36 27141.54 27141.54 18094.36 0.00 90471.79

4.00 MOVIMIENTO DE TIERRAS 28941.71 28941.71 0.00 0.00 0.00 57883.42

5.00 Err:509 14867.55 14867.55 14867.55 14867.55 0.00 59470.21

6.00 IZAJE DE POSTE 11424.73 34274.19 34274.19 34274.19 0.00 114247.30

7.00 CONCRETO SIMPLE 5070.10 15210.31 15210.31 15210.31 0.00 50,701.04

8.00 INSTALACION DE RETENIDAS Y ANCLAJES 0.00 10340.26 13787.01 10340.26 0.00 34467.52

9.00 MONTAJE DE ARMADOS 21648.20 21648.20 21648.20 21648.20 21648.20 108241.02

10.00 MONTAJE DE CONDUCTORES DE ALEACION DE ALUMINIO 0.00 0.00 30052.05 30052.05 0.00 60104.09

11.00 INSTALACION DE PUESTAS A TIERRA 50546.88 50546.88

12.00 TENDIDO Y ACOMODO DE CONDUCTORES Y FERRETERIA 0.00 0.00 1212.10 1212.10 0.00 2424.20

13.00 IMPACTO AMBIENTAL 1100.00 1100.00 1100.00 1100.00 1100.00 5,500.00

14.00 PRUEBAS Y PUESTA EN SERVICIO 0.00 0.00 0.00 0.00 39486.58 39,486.58

C TRANSPORTE DE MATERIALES #REF! #REF! #REF! #REF! #REF! 25037.30

D GASTOS GENERALES #REF! #REF! #REF! #REF! #REF! 188503.11

E UTILIDADES #REF! #REF! #REF! #REF! #REF! 150478.81

F IGV #REF! #REF! #REF! #REF! #REF! 542024.98


CRONOGRAMA DE EJECUCION DE OBRA

12

10

0
MES 1

MES 2

MES 5
MES 3

MES 4
PLANILLA DE ARMADO POR ESTRUCTURA

>3900 = PIN 56- 4 T-N: Terreno NaturAccesible a la Grua = ACC


<=3900 = PIN 65-3 No Accesible a la Grua = INAX

FERRETERIA ELECTRICA ARMADOS DE DERIVACION

CONDUCTOR DESNUDO COOPERWELD DE 25mm2


ALAMBRE DE ALUMINIO PARA AMARRE DE 16mm2
CONDUCTOR DESNUDO COOPERWELD DE 25mm2

CONECTOR DE AL-AL 25/120 mm2 02 PERNOS


TUERCA OJO DE F°G° PARA PERNO DE 16mm2
GRAPA DE ANGULO ACERO/ALUMINIO
E S T R U C T U R A

GRILLETE DE F°G° DE ANCLAJE


CINTA PLANA DE ARMAR
Nro. TIPO N° POSTES NOMINACION VANO (m) MATERIAL DERIVACIÓN

0
NMT000194260 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - - 3912 - - 3 56-4 - T-N ACC - - - - - - - - - - - - - 50
NMT000194262 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 C.A.C. 2 3918 6 - 2 56-4 T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 - 50 2
NMT000194263 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3920 - - 3 56-4 T-N ACC - - - - - - - - - - - - - 50
NMT000194259 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3920 - 3 - 56-3 ROCA INAX - - - - - - - - - - - - - 50
NMT000194260 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3936 - - 3 56-4 1 ROCA INAX - - - - - - - - - - - - - 50 1
NMT000194264 PA2-3 2 2 15 - 3 - - - - - - - - 3 6 3 - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 1 3932 3 - - 56-4 - ROCA INAX - - - - - - - - - - - - - 50 1
NMT000194265 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3926 - - 3 56-4 1 ROCA INAX - - - - - - - - - - - - - 50
NMT000194266 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3 3921 6 - 1 56-4 ROCA INAX - - - - - - - - - - - - - 50 2
NMT000194267 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3909 - - 3 56-4 T-N ACC - - - - - - - - - - - - - 50 sin cimentacion
NMT000198760 PSH-3 1 1 15 7.5 3 - - - 3 - - - - - - - - - - - - - - - - - - - - - - - - - 2 1 2 2 12/400 C.A.C. 3943 - - 3 56-4 T-N INAX - - - - - - - - - - - - 50
NMT000199180 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 1 3946 - - 3 56-4 T-N INAX - - - - - - - - - - - - - 50
NMT000199182 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3953 - - 3 56-4 T-N INAX - - - - - - - - - - - - - 50
NMT000199186 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3975 - - 3 56-4 T-N INAX - - - - - - - - - - - - - 50
NMT000199187 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3 3996 6 - 1 56-4 1 T-N INAX - - - - - - - - - - - - - 50 2
NMT000199189 PSH-3 1 1 15 7.5 3 - - - 3 - - - - - - - - - - - - - - - - - - - - - - - - - 2 1 2 2 12/400 C.A.C. 3958 - - 3 56-4 T-N INAX - - - - - - - - - - - - - 50
NMT000199190 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 | 3 3982 6 - 1 56-4 1 ROCA INAX - - - - - - - - - - - - - 50 2
NMT000194268 PSH-3 1 1 15 7.5 3 - - - 3 - - - - - - - - - - - - - - - - - - - - - - - - - 2 1 2 2 12/400 C.A.C. 3982 - - 3 56-4 T-N INAX - - - - - - - - - - - - 50
NMT000194270 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 4115 - - 3 56-4 1 ROCA INAX - - - - - - - - - - - - - 50
NMT000194275 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3 4151 6 - 1 56-4 1 ROCA INAX - - - - - - - - - - - - - 50 2
NMT000194274 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 4138 - - 3 56-4 ROCA INAX - - - - - - - - - - - - - 50
NMT000194277 P3A2-3 3 3 45 7.5 - - 6 3 - - - - - - 6 3 6 6 3 6 - - - - - - - - - - - - - - - - - 3 12/400 C.A.C. 3 4111 6 - 3 56-4 T-N INAX - - - - - - - - - - - - - 50 3
NMT000194279 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 4108 - - 3 56-4 1 ROCA INAX - - - - - - - - - - - - - 50
NMT000194280 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 4105 - - 3 56-4 ROCA INAX - - - - - - - - - - - - - 50
NMT000194282 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 4098 - - 3 56-4 1 ROCA INAX - - - - - - - - - - - - - 50
NMT000194283 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 4076 - - 3 56-4 ROCA INAX - - - - - - - - - - - - - 50
NMT000194287 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 4033 - - 3 56-4 T-N INAX - - - - - - - - - - - - - 50
NMT000194288 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 4023 - - 3 56-4 T-N INAX - - - - - - - - - - - - - 50
NMT000194289 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 C.A.C. 2 4033 6 - 1 56-4 T-N INAX - - - - - - - - - - - - - 50 2
NMT000194290 P3A2-3 3 3 45 7.5 - - 6 3 - - - - - - 6 3 6 6 3 6 - - - - - - - - - - - - - - - - - 3 12/400 C.A.C. 3 4062 6 - 3 56-4 3 ROCA INAX - - - - - - - - - - - - - 50 3
NMT000194295 P3A2-3 3 3 45 7.5 - - 6 3 - - - - - - 6 3 6 6 3 6 - - - - - - - - - - - - - - - - - 3 12/400 C.A.C. 6 4056 6 - 3 56-4 T-N INAX - - - - - - - - - - - - - 50 3
NMT000194296 P3A2-3 3 3 45 7.5 - - 6 3 - - - - - - 6 3 6 6 3 6 - - - - - - - - - - - - - - - - - 3 12/400 C.A.C. 6 4089 6 - 3 56-4 3 ROCA INAX - - - - - - - - - - - - - 50 6
NMT000194297 PSH-3 1 1 15 7.5 3 - - - 3 - - - - - - - - - - - - - - - - - - - - - - - - - 2 1 2 2 12/400 C.A.C. 4040 - - 3 56-4 T-N ACC - - - - - - - - - - - - - 50
NMT000194298 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 4136 - - 3 56-4 T-N INAX - - - - - - - - - - - - - 50
NMT000194299 PA2-3 2 2 15 - 3 - - - - - - - - 3 6 3 - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 1 4150 3 - - 56-4 1 ROCA INAX - - - - - - - - - - - - - 50 1 varilla
NMT000194302 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 4162 - - 3 56-4 T-N INAX - - - - - - - - - - - - - 50
NMT000194303 PA2-3 2 2 15 - 3 - - - - - - - - 3 6 3 - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 1 4174 3 - - 56-4 1 T-N INAX - - - - - - - - - - - - - 50 1 varilla
NMT000194305 P3A2-3 3 3 45 7.5 - - 6 3 - - - - - - 6 3 6 6 3 6 - - - - - - - - - - - - - - - - - 3 12/400 C.A.C. 6 4183 6 - 3 56-4 3 ROCA INAX - - - - - - - - - - - - - 50 6 2 varilla
NMT000194309 P3A2-3 3 3 45 7.5 - - 6 3 - - - - - - 6 3 6 6 3 6 - - - - - - - - - - - - - - - - - 3 12/400 C.A.C. 6 4088 6 - 3 56-4 ROCA INAX - - - - - - - - - - - - - 50 6
NMT000194310 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3815 - 6 - 56-3 T-N ACC DS-3 1 6 1 1 8 3 3 1 1 2 - 1 50 1
NMT000194311 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 13/400 C.A.C. 1 1 3815 6 1 - 56-3 T-N ACC - - - - - - - - - - - - - 50
SEC 1 1 1 - - - - - - - - - - - - - - - - - - - 3 3 2 1 1 - - - - - - - - - - 3815 - - - 56-3 - - - - - - - - - - - -
NMT000194313 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3816 - 3 - 56-3 1 T-N ACC - - - - - - - - - - - - - 50
NMT000194315 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3817 - 3 - 56-3 T-N ACC - - - - - - - - - - - - 50 2
NMT000194316 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 1 3819 - 4 - 56-3 T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 - 50
NMT000194320 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3821 - 3 - 56-3 T-N ACC - - - - - - - - - - - - - 50
NMT000194325 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3 3821 6 1 - 56-3 T-N ACC - - - - - - - - - - - - - 50
NMT000194326 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3821 - 3 - 56-3 T-N ACC - - - - - - - - - - - - 50
NMT000194327 PSH-3 1 1 15 7.5 3 - - - 3 - - - - - - - - - - - - - - - - - - - - - - - - - 2 1 2 2 12/400 C.A.C. 3821 - 3 - 56-3 T-N ACC - - - - - - - - - - - - - 50
NMT000194329 PSH-3 1 1 15 7.5 3 - - - 3 - - - - - - - - - - - - - - - - - - - - - - - - - 2 1 2 2 12/400 C.A.C. 3824 - 3 - 56-3 1 T-N ACC - - - - - - - - - - - - - 50
NMT000194330 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. 3826 - 3 - 56-3 T-N ACC - - - - - - - - - - - - - 50
NMT000194331 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. 3827 - 3 - 56-3 T-N ACC - - - - - - - - - - - - - 50 3
NMT000194332 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. 3829 - 3 - 56-3 T-N ACC - - - - - - - - - - - - - 50
NMT000194333 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3 3830 6 1 - 56-3 - T-N ACC - - - - - - - - - - - - - 50
NMT000194334 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3869 - 3 - 56-3 T-N ACC - - - - - - - - - - - - - 50
NMT000194347 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3838 - 3 - 56-3 T-N ACC - - - - - - - - - - - - - 50
NMT000194346 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3837 - 3 - 56-3 T-N ACC - - - - - - - - - - - - - 50
NMT000194344 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3836 - 3 - 56-3 T-N ACC - - - - - - - - - - - - - 50
NMT000194343 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3835 - 3 - 56-3 T-N ACC - - - - - - - - - - - - - 50
NMT000199191 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3836 - 3 - 56-3 T-N ACC - - - - - - - - - - - - - 50
NMT000194342 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3835 - 3 - 56-3 T-N ACC - - - - - - - - - - - - - 50
NMT000194341 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3835 - 3 - 56-3 T-N ACC - - - - - - - - - - - - - 50
NMT000194340 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3834 - 3 - 56-3 T-N ACC - - - - - - - - - - - - - 50
NMT000194339 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3833 - 3 - 56-3 T-N ACC - - - - - - - - - - - - - 50
NMT000194338 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - -
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: JULIACA >3900 = PIN 56- 4 T-N: Terreno NaturAccesible a la Grua = ACC
<=3900 = PIN 65-3 No Accesible a la Grua = INAX
JEST00069238 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 C.A.C. 3816 - 3 - 56-3 T-N ACC - - - - - - - - - - - - 120
NMT000195634 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 100 C.A.C. 1 3817 6 1 - 56-3 T-N ACC - - - - - - - - - - - - 120
NMT000195637 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 100 C.A.C. 1 3818 6 1 - 56-3 T-N ACC - - - - - - - - - - - - 120
RECLOSER - - - - - - - - - - - - - - - 120
NMT000195560 PA3-3 4 4 15 - - - - - - - - - - - 6 6 6 6 - - - - - - - - - - - - - - - - - - - 1 12/400 100 C.A.C. 1 3819 6 - - 56-3 T-N ACC - - - - - - - - - - - - 120
NMT000195559 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 13/400 29 C.A.C. - 3820 - 3 - 56-3 T-N ACC - - - - - - - - - - - - 120
P-125 0 0 27.09 C.A.C. 3820 - - - 56-3 - - - - - - - - - - - - 120
CONDUCTOR 120 mm2 - - - - - - - - - - - - - - -
TOTAL 141 5174.98 78 3 171 24 77

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 64 59 18 17 81 76

PA2-3 0 1 3 3 3 4
PA3-3 1 1 0 0 1 1
PR3-3 12 6 6 6 16 12
SEC 2 2 0 0 2 2

PSVE-3(MFG) 4 4 0 0 4 4
PSEC-3(MFG) 0 0 0 0 0 0
PR3-3(MFG) 1 0 0 0 1 0
PSH-3 3 2 4 5 7 7

PRH-3 0 0 0 0 0 0

P3A2-3 1 2 6 6 7 8
DS-0 12 7 1 1 13 8
DS-2 1 1 0 0 1 1
DS-3 9 7 0 0 9 7

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUALREPLANTEO REPLANTEO CONTRACTUAL
POSTES
T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX TOTAL TOTAL
12/400 103 99 29 29 132 128 81 87 51 132 128
13/400 9 6 0 0 9 6 9 6 0 9 6

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUALREPLANTEO REPLANTEO CONTRACTUAL
RETENIDA
T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX TOTAL TOTAL
RI-A 40 40 38 40 78 77 24 27 54 78 80
RY-A 0 0 0 0 0 0

METRADO DE CONDUCTOR
ALEACION DE ALUMINIO AAAC
REPLANTEO CONTRACTUAL

50mm2 70mm2 120mm2 120mm2

0 0.00 15525 14606.4 Metrado


0 0 776.247 730.32 Catenaria 5%
0 0 16301 15336.72 total (m)
0 0 16.3 15.34 total (km)

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO

PS1-3 3 117 126


PA2-3 3 9 0
PSVE-3(MFG) 3 0 0
PSH-3 3 18 1
TOTAL 0 144 0 127

Volumen de excavación (TOTAL DE ESTRUCTURAS) Volumen de relleno cimenetación


(m3 POR UNIDAD) (m3 de relleno x cimentación n° postes con
(m3 POR UNIDAD) sub total factor sub total DOSIFICACIÓN DEL TOTAL DE
cim II unidad) Típica cim tipo II
ITEM CANTIDAD CANTIDAD CONCRETO X 1 m3 MATERIAL
12/400 56 0.7 0.71 72.57 0.57 31.92 31.92 47 3.7184 174.7648
13/400 8 0.75 0.86 6.86 0.59 4.72 4.72 1 3.8447 3.8447 CEMENTO (Bol) 2.63 609.58
12/400 ROCA 29 0.7 0.71 20.3 0.57 16.53 16.53
PIEDRA MEDIANA
(m3)
RI-A 36 1.24 44.79 1.22 44.07 0.656 152.05

RI-A ROCA 30 1.24 37.33 1.22 36.73


RY-A 0 1.08 0 1.06 0 HORMIGÓN (m3) 0.297 68.84
PAT 3 1.53 4.59 1.4 4.2
PAT-C 131 0.32 41.92 41.92

sub total (m3) TN 170.7348 sub total (m3) 80.799 53.17 178.6095

sub total (Tierra


Negra)
4.2 Total (m3) de concreto ciclopeo 231.78

ROCA T-N
12/400 20.30
RI-A 37.33
TOTAL 57.63 170.73
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: JULIACA >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS TIPO DE CONDUCTOR DESMONTAJE DE
A TIERRA A TIERRA (m.s.n.m) AISLADOR RPP 25 AISLADOR 56-3 AISLADOR 56-4 TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
INSTALADAS EXCAVADAS AISLADOR SECCIÓN RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO (m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
0
P-01
P-02
P-03
P-04
P-05
P-06
P-07
P-08
P-09
P-10
P-11
P-12
P-13
P-14
P-15
P-16
P-17
P-18
P-19
P-20
P-21
P-22
P-23
P-24
P-25
P-26
P-27
P-28
P-29
P-30
P-31
P-32
P-33
P-34
P-35
P-36
P-37
P-38

P-39
P-40
P-41
P-42
P-43
P-44
P-45
P-46
P-47
P-48
P-49
P-50
P-51
P-52
P-53
P-54
P-55
P-56
P-57
P-58
P-59
P-60
P-61
P-62
P-63
P-64
P-65
P-66
P-67
P-68
P-69
P-70
P-71
P-72
P-73
P-74
P-75
P-76
P-77
P-78
P-79
P-80

P-81
P-82
P-83
P-84
P-85
P-86
P-87
P-88
P-89
P-90
P-91
P-92
25
P-93
P-94
P-95
P-96 120
P-97
P-98
P-99 1 12/400 C.A.C. 2 - - - T-N ACC
P-100 1 12/400 C.A.C. - - - T-N ACC
P-101 1 12/400 C.A.C. - - - T-N ACC
P-102 1 12/400 C.A.C. - - - T-N ACC
P-103 1 13/400 C.A.C. - - - T-N ACC
P-104 1 12/400 C.A.C. - - - T-N ACC
P-105 1 12/400 C.A.C. - - - T-N ACC
P-106 1 13/400 C.A.C. - - - T-N ACC
P-107 1 12/400 C.A.C. - - - T-N ACC
P-108 1 12/400 C.A.C. - - - T-N ACC
P-109 1 12/400 C.A.C. 2 - - - T-N ACC
P-110 1 12/400 C.A.C. - - - T-N ACC
P-111 1 12/400 C.A.C. - - - T-N ACC
P-112 1 12/400 C.A.C. - - - T-N ACC
P-113 1 12/400 C.A.C. - - - T-N ACC
P-114 1 13/400 C.A.C. - - - T-N ACC
P-115 1 13/400 C.A.C. 1 - - - T-N ACC
P-116 1 12/400 C.A.C. - - - T-N ACC
P-117 1 12/400 C.A.C. - - - T-N ACC
P-118 1 13/400 C.A.C. 2 - - - 1 T-N ACC
CONDUCTOR 120 mm2 0.00 - -
TOTAL 20 6 1 0 - 0 1 25

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 0 59 0 17 0 76
PA2-3 0 1 0 3 0 4
PA3-3 0 1 0 0 0 1
PR3-3 0 6 0 6 0 12
SEC 0 2 0 0 0 2
PSVE-3(MFG) 0 4 0 0 0 4

PSEC-3(MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 0 0 0 0
PSH-3 0 2 0 5 0 7
PRH-3 0 0 0 0 0 0

P3A2-3 0 2 0 6 0 8
DS-0 0 7 0 1 0 8
DS-2 0 1 0 0 0 1
DS-3 0 7 0 0 0 7

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
POSTES
T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 15 99 0 29 15 128 15 87 0 41 15 128
13/400 5 6 0 0 5 6 5 6 0 0 5 6

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
RETENIDA
T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 6 40 0 40 6 77 6 27 0 53 6 80
RY-A 0 0 0 0 0 0

METRADO DE CONDUCTOR
ALEACION DE ALUMINIO AAAC
REPLANTEO CONTRACTUAL
50mm2 70mm2 120mm2 120mm2
0 0.00 0 14606.4 Metrado
0 0 0 730.32 Catenaria 5%
0 0 0 15336.72 total (m)
0 0 0 15.34 total (km)

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: JULIACA >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS TIPO DE CONDUCTOR DESMONTAJE DE
A TIERRA A TIERRA (m.s.n.m) AISLADOR RPP 25 AISLADOR 56-3 AISLADOR 56-4 TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
INSTALADAS EXCAVADAS AISLADOR SECCIÓN RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO (m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 0 0
PSVE-3(MFG) 3 0 0
PSH-3 3 0 0
TOTAL 0 0 0 0

Volumen de excavación (TOTAL DE ESTRUCTURAS) Volumen de relleno cimenetación


(m3 POR (m3 de relleno x cimentación n° postes con cim
sub total factor sub total TOTAL DE
UNIDAD) unidad) Típica tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM CANTIDAD CANTIDAD MATERIAL
12/400 15 0.7 10.5 0.57 0 0 0 3.72 0
13/400 5 0.75 7.29 0.59 0 0 0 1.26 0 CEMENTO (Bol) 2.63 0
PIEDRA MEDIANA
RI-A 6 1.24 7.44 1.22 0 (m3) 0.656 0
RY-A 0 1.08 0 1.06 0 HORMIGÓN (m3) 0.297 0
PAT 1 1.53 1.53 1.4 0
PAT-C 19 0.32 6.08 0

sub total (m3) 32.84 sub total (m3) 0 0 0


sub total (Tierra
Negra)
0 Total (m3) de concreto ciclopeo 0
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 0.00
RI-A 0
TOTAL 0.00 32.84
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: JULIACA >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS TIPO DE CONDUCTOR DESMONTAJE DE
INSTALADAS EXCAVADAS A TIERRA A TIERRA (m.s.n.m) AISLADOR RPP 25 AISLADOR 56-3 AISLADOR 56-4 TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
AISLADOR SECCIÓN RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO (m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
0
P-01 1 1 12/400 C.A.C. - 3912 - - - - T-N ACC
P-02 1 1 12/400 C.A.C. 3918 - - - T-N ACC
P-03 1 1 12/400 C.A.C. 3920 - - - T-N INAX
P-04 1 1 1 12/400 C.A.C. 3891 - - - ROCA INAX
P-05 1 1 1 12/400 C.A.C. 3936 - - - ROCA INAX
P-06 1 1 1 12/400 C.A.C. 3932 - - - ROCA INAX
P-07 1 1 1 12/400 C.A.C. 3926 - - - ROCA INAX
P-08 1 1 1 12/400 C.A.C. 3921 - - - ROCA INAX
P-09 1 1 12/400 C.A.C. 3909 - - - T-N ACC
P-10 2 2 12/400 C.A.C. 3943 - - - T-N INAX
P-11 2 2 12/400 C.A.C. 3946 - - - T-N INAX
P-12 1 1 12/400 C.A.C. 3953 - - - T-N INAX
P-13 1 1 12/400 C.A.C. 3975 - - - T-N INAX
P-14 1 1 12/400 C.A.C. 3996 - - - T-N INAX
P-15 2 2 12/400 C.A.C. 3958 - - - T-N INAX
P-16 1 1 12/400 C.A.C. 3982 - - - ROCA INAX
P-17 12/400 C.A.C. 3982
P-18 1 1 12/400 C.A.C. 4115 - - - ROCA INAX
P-19 1 1 12/400 C.A.C. 4151 - - - ROCA INAX
P-20 1 1 12/400 C.A.C. 4138 - - - ROCA INAX
P-21 3 3 12/400 C.A.C. 4111 - - - T-N INAX
P-22 1 1 12/400 C.A.C. 4108 - - - ROCA INAX
P-23 1 1 12/400 C.A.C. 4105 - - - ROCA INAX
P-24 1 1 12/400 C.A.C. 4098 - - - ROCA INAX
P-25 1 1 12/400 C.A.C. 4076 - - - ROCA INAX
P-26 1 1 12/400 C.A.C. 4033 - - - T-N INAX
P-27 1 1 12/400 C.A.C. 4023 - - - T-N INAX
P-28 1 1 12/400 C.A.C. 4033 - - - T-N INAX
P-29 3 3 12/400 C.A.C. 4062 - - - ROCA INAX
P-30 3 3 12/400 C.A.C. 4056 - - - T-N INAX
P-31 3 3 12/400 C.A.C. 4089 - - - ROCA INAX
P-32 2 2 12/400 C.A.C. 4040 - - - T-N INAX
P-33 1 1 12/400 C.A.C. 4136 - - - T-N INAX
P-34 1 1 12/400 C.A.C. 4150 - - - ROCA INAX
P-35 1 1 12/400 C.A.C. 4162 - - - T-N INAX
P-36 1 1 12/400 C.A.C. 4174 - - - T-N INAX
P-37 3 3 12/400 C.A.C. 4183 - - - ROCA INAX
P-38 3 1 12/400 C.A.C. 4088 - - - ROCA INAX
P-39 - - -
- - -
P-40 1 1 12/400 C.A.C. 3815 - - - T-N ACC
P-41 1 1 12/400 C.A.C. 3816 - - - T-N ACC
P-42 1 1 12/400 C.A.C. 3817 - - - T-N ACC
P-43 1 1 12/400 C.A.C. 3819 - - - T-N ACC
P-44 1 1 12/400 C.A.C. 3821 - - - T-N ACC
P-45 1 1 12/400 C.A.C. 3821 - - - T-N ACC
P-46 2 2 12/400 C.A.C. 3821 - - - T-N ACC
P-47 2 2 12/400 C.A.C. 3824 - - - T-N ACC
P-48 13/400 C.A.C. 3826 - - - T-N ACC
P-49 13/400 C.A.C. 3827 - - - T-N ACC
P-50 13/400 C.A.C. 3829 - - - T-N ACC
P-51 13/400 C.A.C. 3830 - - - T-N ACC
P-52 1 1 12/400 C.A.C. 3830 - - - T-N ACC
P-53 1 1 12/400 C.A.C. 3869 - - - T-N ACC
P-54 1 1 12/400 C.A.C. 3838 - - - T-N ACC
P-55 1 1 12/400 C.A.C. 3837 - - - T-N ACC
P-56 1 1 12/400 C.A.C. 3836 - - - T-N ACC
P-57 1 1 12/400 C.A.C. 3835 - - - T-N ACC
P-58 1 1 12/400 C.A.C. 3836 - - - T-N ACC
P-59 1 1 12/400 C.A.C. 3835 - - - T-N ACC
P-60 1 1 12/400 C.A.C. 3835 - - - T-N ACC
P-61 1 1 12/400 C.A.C. 3834 - - - T-N ACC
P-62 1 1 12/400 C.A.C. 3833 - - - T-N ACC
P-63 1 1 12/400 C.A.C. 3833 - - - T-N ACC
P-64 1 1 12/400 C.A.C. 3832 - - - T-N ACC
P-65
P-66
P-67
P-68
P-69
P-70
P-71
P-72
P-73
P-74
P-75 P3A2-3 3 12/400 100 C.A.C. 3834 ROCA INAX
P-76
P-77
P-78
P-79
P-80
P-81

P-82
P-83
P-84
P-85

P-86
P-87
P-88
P-89
P-90
P-91
P-92
P-93
P-94
P-95 - - -
P-96
P-97
P-98
P-99
P-100
P-101
P-102
P-103
P-104
P-105
P-106
P-107
P-108
P-109
P-110
P-111
P-112
P-113
P-114
P-115
P-116
P-117
P-118
CONDUCTOR 120 mm2 100.00 - -
TOTAL 5 79 74 0 - 0 - 0 0 0

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 0 59 0 17 0 76

PA2-3 0 1 0 3 0 4
PA3-3 0 1 0 0 0 1
PR3-3 0 6 0 6 0 12

SEC 0 2 0 0 0 2
PSVE-3(MFG) 0 4 0 0 0 4
PSEC-3(MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 0 0 0 0

PSH-3 0 2 0 5 0 7
PRH-3 0 0 0 0 0 0
P3A2-3 0 2 0 6 0 8
DS-0 0 7 0 1 0 8

DS-2 0 1 0 0 0 1
DS-3 0 7 0 0 0 7

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
POSTES
T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 50 99 29 29 79 128 26 87 48 41 74 128
13/400 0 6 0 0 0 6 0 6 0 0 0 6

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
RETENIDA
T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 0 40 0 40 0 77 0 27 0 53 0 80
RY-A 0 0 0 0 0 0

METRADO DE CONDUCTOR
ALEACION DE ALUMINIO AAAC
REPLANTEO CONTRACTUAL
50mm2 70mm2 120mm2 120mm2
0 0.00 300 14606.4 Metrado
0 0 15 730.32 Catenaria 5%
0 0 315 15336.72 total (m)
0 0 0.32 15.34 total (km)

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR

UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 0 0
PSVE-3(MFG) 3 0 0
PSH-3 3 0 0
TOTAL 0 0 0 0

Volumen de excavación (TOTAL DE ESTRUCTURAS) Volumen de relleno cimenetación


(m3 POR (m3 de relleno x cimentación n° postes con cim
sub total factor sub total TOTAL DE
UNIDAD) unidad) Típica tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM CANTIDAD CANTIDAD MATERIAL
12/400 79 0.7 55.3 0.57 0 3.72 0
13/400 0 0.75 0 0.59 0 1.26 0 CEMENTO (Bol) 2.63 0
PIEDRA MEDIANA
RI-A 0 1.24 0 1.22 0 (m3) 0.656 0
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: JULIACA >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS TIPO DE CONDUCTOR DESMONTAJE DE
A TIERRA A TIERRA (m.s.n.m) AISLADOR RPP 25 AISLADOR 56-3 AISLADOR 56-4 TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
INSTALADAS EXCAVADAS AISLADOR SECCIÓN RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO (m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
RY-A 0 1.08 0 1.06 0 HORMIGÓN (m3) 0.297 0
PAT 0 1.53 0 1.4 0
PAT-C 0 0.32 0 0

sub total (m3) 55.3 sub total (m3) 0 0 0


sub total (Tierra
Negra)
0 Total (m3) de concreto ciclopeo 0
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 20.30
RI-A 0
TOTAL 20.30 35.00
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: JULIACA >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS TIPO DE CONDUCTOR DESMONTAJE DE
INSTALADAS EXCAVADAS A TIERRA A TIERRA (m.s.n.m) AISLADOR RPP 25 AISLADOR 56-3 AISLADOR 56-4 TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
AISLADOR SECCIÓN RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO (m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
0
P-01 PS1-3 1 3912 56-4 - T-N ACC
P-02 PR3-3 1 3918 56-4 T-N ACC
P-03 PS1-3 1 12/400 C.A.C. 3920 - - 3 56-4 T-N INAX
P-04 PS1-3 3891 56-3
P-05 PS1-3 3936 56-4
P-06 PA2-3 3932 56-4
P-07 PS1-3 3926 56-4
P-08 PR3-3 3921 56-4
P-09 PS1-3 1 3909 56-4 T-N ACC
P-10 2 12/400 C.A.C. 3943 - - - 56-4 T-N INAX
P-11 2 12/400 C.A.C. 3946 - - - 56-4 T-N INAX
P-12 PS1-3 1 12/400 C.A.C. 3953 - - 3 56-4 T-N INAX
P-13 PS1-3 1 12/400 C.A.C. 3975 - - 3 56-4 T-N INAX
P-14 PR3-3 1 12/400 C.A.C. 3996 6 - 1 56-4 T-N INAX
P-15 3958 56-4
P-16
P-17
P-18
P-19
P-20
P-21 P3A2-3 3 12/400 C.A.C. 4111 6 - 3 56-4 T-N INAX
P-22
P-23
P-24
P-25
P-26 PS1-3 1 12/400 C.A.C. 4033 - - 3 56-4 T-N INAX
P-27 PS1-3 1 12/400 C.A.C. 4023 - - 3 56-4 T-N INAX
P-28 PR3-3 1 12/400 C.A.C. 4033 6 - 1 56-4 T-N INAX
P-29
P-30
P-31
P-32
P-33
P-34
P-35
P-36
P-37
P-38
P-39

P-40
P-41
P-42
P-43
P-44
P-45
P-46
P-47
P-48
P-49
P-50
P-51
P-52
P-53
P-54
P-55
P-56
P-57
P-58
P-59
P-60
P-61
P-62
P-63
P-64
P-65
P-66
P-67
P-68
P-69
P-70
P-71
P-72
P-73
P-74
P-75
P-76
P-77
P-78
P-79
P-80
P-81

P-82
P-83
P-84
P-85

P-86
P-87
P-88
P-89
P-90
P-91
P-92
P-93
P-94
P-95 - - -
P-96
P-97
P-98
P-99
P-100
P-101
P-102
P-103
P-104
P-105
P-106
P-107
P-108
P-109
P-110
P-111
P-112
P-113
P-114
P-115
P-116
P-117
P-118
CONDUCTOR 120 mm2 0.00 - -
TOTAL 17 0 0 0 - 18 - 20 0 0

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 1 59 9 17 10 76

PA2-3 0 1 1 3 1 4
PA3-3 0 1 0 0 0 1
PR3-3 0 6 4 6 4 12

SEC 0 2 0 0 0 2
PSVE-3(MFG) 0 4 0 0 0 4
PSEC-3(MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 0 0 0 0

PSH-3 0 2 0 5 0 7
PRH-3 0 0 0 0 0 0
P3A2-3 0 2 1 6 1 8
DS-0 0 7 0 1 0 8

DS-2 0 1 0 0 0 1
DS-3 0 7 0 0 0 7

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
POSTES
T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 14 99 0 29 14 128 0 87 14 41 14 128
13/400 0 6 0 0 0 6 0 6 0 0 0 6

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
RETENIDA
T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 0 40 0 40 0 77 0 27 0 53 0 80
RY-A 0 0 0 0 0 0

METRADO DE CONDUCTOR
ALEACION DE ALUMINIO AAAC
REPLANTEO CONTRACTUAL
50mm2 70mm2 120mm2 120mm2
0 0.00 0 14606.4 Metrado
0 0 0 730.32 Catenaria 5%
0 0 0 15336.72 total (m)
0 0 0 15.34 total (km)

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR

UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 0 0
PSVE-3(MFG) 3 0 0
PSH-3 3 0 0
TOTAL 0 0 0 0

Volumen de excavación (TOTAL DE ESTRUCTURAS) Volumen de relleno cimenetación


(m3 POR (m3 de relleno x cimentación n° postes con cim
sub total factor sub total TOTAL DE
UNIDAD) unidad) Típica tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM EXCAVACION CONCRETO CANTIDAD MATERIAL
12/400 14 14 0.7 9.8 0.57 7.98 7.98 3.72 0
13/400 0 0.75 0 0.59 0 1.26 0 CEMENTO (Bol) 2.63 20.99
PIEDRA MEDIANA
RI-A 0 1.24 0 1.22 0 (m3) 0.656 5.23
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: JULIACA >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS TIPO DE CONDUCTOR DESMONTAJE DE
A TIERRA A TIERRA (m.s.n.m) AISLADOR RPP 25 AISLADOR 56-3 AISLADOR 56-4 TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
INSTALADAS EXCAVADAS AISLADOR SECCIÓN RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO (m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
RY-A 0 1.08 0 1.06 0 HORMIGÓN (m3) 0.297 2.37
PAT 0 1.53 0 1.4 0
PAT-C 0 0.32 0 0

sub total (m3) 9.8 sub total (m3) 0 7.98 0


sub total (Tierra
Negra)
0 Total (m3) de concreto ciclopeo 7.98
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 0.00
RI-A 0
TOTAL 0.00 9.80
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: JULIACA >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS TIPO DE CONDUCTOR DESMONTAJE DE
INSTALADAS EXCAVADAS A TIERRA A TIERRA (m.s.n.m) AISLADOR RPP 25 AISLADOR 56-3 AISLADOR 56-4 TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
AISLADOR SECCIÓN RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO (m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
0
P-01 12/400 C.A.C. - 3912 - - - 56-4 - T-N ACC
P-02 12/400 C.A.C. 2 3918 - - - 56-4 T-N ACC
P-03 12/400 C.A.C. 3920 - - - 56-4 T-N INAX
P-04 12/400 C.A.C. 3891 - - - 56-3 ROCA INAX
P-05 12/400 C.A.C. 3936 - - - 56-4 ROCA INAX
P-06 12/400 C.A.C. 3932 - - - 56-4 ROCA INAX
P-07 12/400 C.A.C. 3926 - - - 56-4 ROCA INAX
P-08 12/400 C.A.C. 3921 - - - 56-4 ROCA INAX
P-09 12/400 C.A.C. 3909 - - - 56-4 T-N ACC
P-10 12/400 C.A.C. 3943 - - - 56-4 T-N INAX
P-11 12/400 C.A.C. 3946 - - - 56-4 T-N INAX
P-12 12/400 C.A.C. 3953 - - - 56-4 T-N INAX
P-13 12/400 C.A.C. 3975 - - - 56-4 T-N INAX
P-14 12/400 C.A.C. 3 3996 - - - 56-4 T-N INAX
P-15 1 12/400 C.A.C. 3958 - - - 56-4 T-N INAX
P-16 PR3-3 1 12/400 C.A.C. 3982 6 - 1 56-4 ROCA INAX
P-17 1 C.A.C. 56-3
P-18 PS1-3 1 12/400 C.A.C. 4115 - - 3 56-4 ROCA INAX
P-19 PR3-3 1 12/400 C.A.C. 4151 6 - 1 56-4 ROCA INAX
P-20 PS1-3 1 12/400 C.A.C. 4138 - - 3 56-4 ROCA INAX
P-21 12/400 C.A.C. 3 4111 - - - 56-4 T-N INAX
P-22 PS1-3 1 12/400 C.A.C. 4108 - - 3 56-4 ROCA INAX
P-23 PS1-3 1 12/400 C.A.C. 4105 - - 3 56-4 ROCA INAX
P-24 PS1-3 1 12/400 C.A.C. 4098 - - 3 56-4 ROCA INAX
P-25 PS1-3 1 12/400 C.A.C. 4076 - - 3 56-4 ROCA INAX
P-26 12/400 C.A.C. 4033 - - - 56-4 T-N INAX
P-27 12/400 C.A.C. 4023 - - - 56-4 T-N INAX
P-28 12/400 C.A.C. 2 4033 - - - 56-4 T-N INAX
P-29 P3A2-3 1 12/400 C.A.C. 4062 6 - 3 56-4 ROCA INAX
P-30 P3A2-3 1 12/400 C.A.C. 6 4056 6 - 3 56-4 T-N INAX
P-31 1 12/400 C.A.C. 4089 - - - 56-4 ROCA INAX
P-32 1 12/400 C.A.C. 4040 - - - 56-4 T-N INAX
P-33 PS1-3 1 12/400 C.A.C. 4136 - - 3 56-4 T-N INAX
P-34 PA2-3 1 12/400 C.A.C. 4150 3 - - 56-4 ROCA INAX
P-35 PS1-3 1 12/400 C.A.C. 4162 - - 3 56-4 T-N INAX
P-36 PA2-3 1 12/400 C.A.C. 1 4174 3 - - 56-4 T-N INAX
P-37 1 12/400 C.A.C. 4183 - - - 56-4 ROCA INAX
P-38 1 12/400 C.A.C. 4088 - - - 56-4 ROCA INAX
P-39 13/400 C.A.C. 3993 - - - 56-4 T-N ACC
3994 - - - 56-4
P-40 PR3-3 1 12/400 C.A.C. 1 3815 6 1 - 56-3 T-N ACC
P-41 PS1-3 1 12/400 C.A.C. 3816 - 3 - 56-3 T-N ACC
P-42 PS1-3 1 12/400 C.A.C. 3817 - 3 - 56-3 T-N ACC
P-43 PS1-3 1 12/400 C.A.C. 3819 - 3 - 56-3 T-N ACC
P-44 PS1-3 1 12/400 C.A.C. 3821 - 3 - 56-3 T-N ACC
P-45 PR3-3 1 12/400 C.A.C. 3 3821 6 1 - 56-3 T-N ACC
P-46 1 12/400 C.A.C. 3821 - - - 56-3 T-N ACC
P-47 12/400 C.A.C. 3824 - - - 56-3 T-N ACC
P-48 1 13/400 C.A.C. 3826 - - - 56-3 T-N ACC
P-49 1 13/400 C.A.C. 3827 - - - 56-3 T-N ACC
P-50 1 13/400 C.A.C. 3829 - - - 56-3 T-N ACC
P-51 1 13/400 C.A.C. 3830 - - - 56-3 T-N ACC
P-52 PR3-3 1 12/400 C.A.C. 3 3830 6 1 - 56-3 T-N ACC
P-53 PS1-3 1 12/400 C.A.C. 3869 - 3 - 56-3 T-N ACC
P-54 PS1-3 1 12/400 C.A.C. 3838 - 3 - 56-3 T-N ACC
P-55 PS1-3 1 12/400 C.A.C. 3837 - 3 - 56-3 T-N ACC
P-56 PS1-3 1 12/400 C.A.C. 3836 - 3 - 56-3 T-N ACC
P-57 PS1-3 1 12/400 C.A.C. 3835 - 3 - 56-3 T-N ACC
P-58 PS1-3 1 12/400 C.A.C. 3836 - 3 - 56-3 T-N ACC
P-59 PS1-3 1 12/400 C.A.C. 3835 - 3 - 56-3 T-N ACC
P-60 PS1-3 1 12/400 C.A.C. 3835 - 3 - 56-3 T-N ACC
P-61 PS1-3 1 12/400 C.A.C. 3834 - 3 - 56-3 T-N ACC
P-62 PS1-3 1 12/400 C.A.C. 3833 - 3 - 56-3 T-N ACC
P-63 PS1-3 1 12/400 C.A.C. 3833 - 3 - 56-3 T-N ACC
P-64 PS1-3 1 12/400 C.A.C. 3832 - 3 - 56-3 T-N ACC
P-65 1 1 12/400 C.A.C. 3832 56-3 T-N ACC
P-66 13/400 C.A.C. 1 3831 56-3 T-N ACC
P-67 1 12/400 C.A.C. 3869 56-3 T-N ACC
P-68 1 12/400 C.A.C. 3838 56-3 T-N ACC
P-69 1 12/400 C.A.C. 3837 56-3 T-N ACC
P-70 1 13/400 C.A.C. 3836 56-3 T-N ACC
P-71 1 12/400 C.A.C. 3835 56-3 T-N ACC
P-72 1 12/400 C.A.C. 3836 56-3 T-N ACC
P-73 1 12/400 C.A.C. 3835 56-3 T-N ACC
P-74 2 12/400 C.A.C. 2 3835 56-3 T-N ACC
P-75 3 12/400 C.A.C. 3834 56-3 T-N INAX
P-76 13/400 C.A.C. 3833 56-3 T-N ACC
P-77 1 12/400 C.A.C. 3833 56-3 T-N ACC
P-78 1 12/400 C.A.C. 3832 56-3 T-N ACC
P-79 1 13/400 C.A.C. 3832 56-3 T-N ACC
P-80 1 12/400 C.A.C. 3831 56-3 T-N ACC
P-81 1 12/400 C.A.C. 3831 56-3 T-N ACC
3830 56-3
P-82 13/400 C.A.C. 2 3830 56-3 T-N ACC
P-83 1 12/400 C.A.C. 3830 56-3 T-N ACC
P-84 1 12/400 C.A.C. 3829 56-3 T-N ACC
P-85 1 12/400 C.A.C. 1 3829 56-3 T-N ACC
56-3
P-86 1 12/400 C.A.C. 3828 56-3 T-N ACC
P-87 13/400 C.A.C. 3827 56-3 T-N ACC
P-88 1 12/400 C.A.C. 3827 56-3 T-N ACC
P-89 13/400 C.A.C. 2 3826 56-3 T-N ACC
P-90 1 12/400 C.A.C. 3825 56-3 T-N ACC
P-91 1 12/400 C.A.C. 3825 56-3 T-N ACC
P-92 1 12/400 C.A.C. 3824 56-3 T-N ACC
P-93 1 12/400 C.A.C. 3824 56-3 T-N ACC
P-94 1 12/400 C.A.C. 3824 56-3 T-N ACC
P-95 1 12/400 C.A.C. 3823 - - - 56-3 T-N ACC
P-96 1 12/400 C.A.C. 3822 56-3 T-N ACC
P-97 1 12/400 C.A.C. 3822 56-3 T-N ACC
P-98 13/400 C.A.C. 3821 56-3 T-N ACC
P-99 1 12/400 C.A.C. 2 3821 56-3 T-N ACC
P-100 1 12/400 C.A.C. 3820 56-3 T-N ACC
P-101 1 12/400 C.A.C. 3820 56-3 T-N ACC
P-102 1 12/400 C.A.C. 3820 56-3 T-N ACC
P-103 1 13/400 C.A.C. 3819 56-3 T-N ACC
P-104 1 12/400 C.A.C. 3819 56-3 T-N ACC
P-105 1 12/400 C.A.C. 3818 56-3 T-N ACC
P-106 13/400 C.A.C. 3818 56-3 T-N ACC
P-107 1 12/400 C.A.C. 3817 56-3 T-N ACC
P-108 1 12/400 C.A.C. 3817 56-3 T-N ACC
P-109 1 12/400 C.A.C. 2 3816 56-3 T-N ACC
P-110 1 12/400 C.A.C. 3816 56-3 T-N ACC
P-111 1 12/400 C.A.C. 3815 56-3 T-N ACC
P-112 1 12/400 C.A.C. 3815 56-3 T-N ACC
P-113 1 12/400 C.A.C. 3817 56-3 T-N ACC
P-114 13/400 C.A.C. 3816 56-3 T-N ACC
P-115 13/400 C.A.C. 3816 56-3 T-N ACC
P-116 1 12/400 C.A.C. 3815 56-3 T-N ACC
P-117 1 12/400 C.A.C. 3815 56-3 T-N ACC
P-118 13/400 C.A.C. 2 3815 56-3 T-N ACC
CONDUCTOR 120 mm2 0.00 - - 56-3
TOTAL 40 5 47 38 - 48 51 32 0 0

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 16 59 8 17 24 76

PA2-3 0 1 2 3 2 4
PA3-3 0 1 0 0 0 1
PR3-3 3 6 2 6 5 12

SEC 0 2 0 0 0 2
PSVE-3(MFG) 0 4 0 0 0 4
PSEC-3(MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 0 0 0 0

PSH-3 0 2 0 5 0 7
PRH-3 0 0 0 0 0 0
P3A2-3 0 2 2 6 2 8
DS-0 0 7 0 1 0 8

DS-2 0 1 0 0 0 1
DS-3 0 7 0 0 0 7

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
POSTES
T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 1 99 0 29 1 128 41 87 3 41 44 128
13/400 4 6 0 0 4 6 3 6 0 0 3 6

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
RETENIDA
T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 38 40 0 40 38 77 23 27 15 53 38 80
RY-A 0 0 0 0 0 0

METRADO DE CONDUCTOR
ALEACION DE ALUMINIO AAAC
REPLANTEO CONTRACTUAL
50mm2 70mm2 120mm2 120mm2
0 0.00 0 14606.4 Metrado
0 0 0 730.32 Catenaria 5%
0 0 0 15336.72 total (m)
0 0 0 15.34 total (km)

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR

UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 0 0
PSVE-3(MFG) 3 0 0
PSH-3 3 0 0
TOTAL 0 0 0 0

Volumen de excavación (TOTAL DE ESTRUCTURAS) Volumen de relleno cimenetación


(m3 POR (m3 de relleno x cimentación n° postes con cim
sub total factor sub total TOTAL DE
UNIDAD) unidad) Típica tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM EXCAVACION CONCRETO CANTIDAD MATERIAL
12/400 1 12 0.7 0.7 0.57 6.84 6.84 3.72 0
13/400 4 0.75 3 0.59 2.36 1.26 0 CEMENTO (Bol) 2.63 17.99
PIEDRA MEDIANA
RI-A 38 1.24 47.12 1.22 46.36 (m3) 0.656 4.49
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: JULIACA >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS TIPO DE CONDUCTOR DESMONTAJE DE
A TIERRA A TIERRA (m.s.n.m) AISLADOR RPP 25 AISLADOR 56-3 AISLADOR 56-4 TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
INSTALADAS EXCAVADAS AISLADOR SECCIÓN RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO (m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
RY-A 0 1.08 0 1.06 0 HORMIGÓN (m3) 0.297 2.03
PAT 0 1.53 0 1.4 0
PAT-C 0 0.32 0 0

sub total (m3) 50.82 sub total (m3) 46.36 6.84 0


sub total (Tierra
Negra)
0 Total (m3) de concreto ciclopeo 6.84
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 0.00
RI-A 0
TOTAL 0.00 50.82
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: JULIACA >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS TIPO DE CONDUCTOR DESMONTAJE DE
INSTALADAS EXCAVADAS A TIERRA A TIERRA (m.s.n.m) AISLADOR RPP 25 AISLADOR 56-3 AISLADOR 56-4 TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
AISLADOR SECCIÓN RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO (m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
0
P-01 12/400 C.A.C. - - - 3912 - - - 56-4 - T-N ACC - 50
P-02 12/400 C.A.C. 3918 - - 1 56-4 T-N ACC DS-0 50 2
P-03 12/400 C.A.C. 3920 - - - 56-4 T-N INAX - 50
P-04 12/400 C.A.C. 3891 - - - 56-3 ROCA INAX - 50
P-05 12/400 C.A.C. 3936 - - - 56-4 1 ROCA INAX - 50 1
P-06 12/400 C.A.C. 1 1 3932 - - - 56-4 1 ROCA INAX - 50 1
P-07 12/400 C.A.C. 3926 - - - 56-4 ROCA INAX - 50
P-08 12/400 C.A.C. 2 2 3921 - - - 56-4 ROCA INAX - 50 2
P-09 12/400 C.A.C. 3909 - - - 56-4 T-N ACC - 50
P-10 PSH-3 12/400 C.A.C. 3943 - - 3 56-4 T-N INAX 50
P-11 PSH-3 12/400 C.A.C. 3946 - - 3 56-4 T-N INAX - 50
P-12 12/400 C.A.C. 3953 - - - 56-4 T-N INAX - 50
P-13 12/400 C.A.C. 3975 - - - 56-4 T-N INAX - 50
P-14 12/400 C.A.C. 3996 - - - 56-4 T-N INAX - 50 2
P-15 PSH-3 12/400 C.A.C. 3958 - - 3 56-4 T-N INAX - 50
P-16 12/400 C.A.C. 3 3 3982 - - - 56-4 1 ROCA INAX - 50 2
P-17 C.A.C. 56-3
P-18 12/400 C.A.C. 4115 - - - 56-4 1 ROCA INAX - 50
P-19 12/400 C.A.C. 3 3 4151 - - - 56-4 1 ROCA INAX - 50 2
P-20 12/400 C.A.C. 4138 - - - 56-4 ROCA INAX - 50
P-21 12/400 C.A.C. 4111 - - - 56-4 T-N INAX - 50 3
P-22 12/400 C.A.C. 4108 - - - 56-4 1 ROCA INAX - 50
P-23 12/400 C.A.C. 4105 - - - 56-4 ROCA INAX - 50
P-24 12/400 C.A.C. 4098 - - - 56-4 1 ROCA INAX - 50
P-25 12/400 C.A.C. 4076 - - - 56-4 ROCA INAX - 50
P-26 12/400 C.A.C. 4033 - - - 56-4 T-N INAX - 50
P-27 12/400 C.A.C. 4023 - - - 56-4 T-N INAX - 50
P-28 12/400 C.A.C. 4033 - - - 56-4 T-N INAX - 50 2
P-29 12/400 C.A.C. 6 6 4062 - - - 56-4 3 ROCA INAX - 50 3
P-30 12/400 C.A.C. 4056 - - - 56-4 T-N INAX - 50 3
P-31 P3A2-3 12/400 C.A.C. 6 6 4089 6 - 3 56-4 3 ROCA INAX - 50 6
P-32 PSH-3 12/400 C.A.C. 4040 - - 3 56-4 T-N INAX - 50
P-33 12/400 C.A.C. 4136 - - - 56-4 T-N INAX - 50
P-34 12/400 C.A.C. 1 1 4150 - - - 56-4 1 ROCA INAX - 50 1
P-35 12/400 C.A.C. 4162 - - - 56-4 T-N INAX - 50
P-36 12/400 C.A.C. 4174 - - - 56-4 1 T-N INAX - 50 1
P-37 P3A2-3 12/400 C.A.C. 6 6 4183 6 - 3 56-4 3 ROCA INAX - 50 6
P-38 P3A2-3 12/400 C.A.C. 6 6 4088 6 - 3 56-4 ROCA INAX - 50 6
P-39 PS1-3 1 1 1 13/400 C.A.C. 1 1 3993 - - 3 56-4 T-N ACC 50
SEC 3994 - - - 56-4
P-40 12/400 C.A.C. 3815 - - - 56-3 T-N ACC - 50 1
P-41 12/400 C.A.C. 3816 - - - 56-3 1 T-N ACC - 50
P-42 12/400 C.A.C. 3817 - - - 56-3 T-N ACC 50
P-43 12/400 C.A.C. 3819 - 1 - 56-3 T-N ACC DS-0 50
P-44 12/400 C.A.C. 3821 - - - 56-3 T-N ACC - 50
P-45 12/400 C.A.C. 3821 - - - 56-3 T-N ACC - 50 2
P-46 PSH-3 12/400 C.A.C. 3821 - 3 - 56-3 T-N ACC - 50
P-47 PSH-3 1 12/400 C.A.C. 3824 - 3 - 56-3 1 T-N ACC - 50
P-48 PSVE-3(MFG) 1 1 13/400 C.A.C. 3826 - 3 - 56-3 T-N ACC - 50
P-49 PSVE-3(MFG) 1 1 13/400 C.A.C. 3827 - 3 - 56-3 T-N ACC - 50
P-50 PSVE-3(MFG) 1 1 13/400 C.A.C. 3829 - 3 - 56-3 T-N ACC - 50
P-51 PSVE-3(MFG) 1 1 13/400 C.A.C. 3830 - 3 - 56-3 T-N ACC - 50
P-52 12/400 C.A.C. 3830 - - - 56-3 T-N ACC - 50 3
P-53 12/400 C.A.C. 3869 - - - 56-3 T-N ACC - 50
P-54 12/400 C.A.C. 3838 - - - 56-3 T-N ACC - 50
P-55 12/400 C.A.C. 3837 - - - 56-3 T-N ACC - 50
P-56 12/400 C.A.C. 3836 - - - 56-3 T-N ACC - 50
P-57 12/400 C.A.C. 3835 - - - 56-3 T-N ACC - 50
P-58 12/400 C.A.C. 3836 - - - 56-3 T-N ACC - 50
P-59 12/400 C.A.C. 3835 - - - 56-3 T-N ACC - 50
P-60 12/400 C.A.C. 3835 - - - 56-3 T-N ACC - 50
P-61 12/400 C.A.C. 3834 - - - 56-3 T-N ACC - 50
P-62 12/400 C.A.C. 3833 - - - 56-3 T-N ACC - 50
P-63 12/400 C.A.C. 3833 - - - 56-3 T-N ACC - 50
P-64 12/400 C.A.C. 3832 - - - 56-3 T-N ACC - 50
P-65 PS1-3 1 12/400 C.A.C. 3832 56-3 T-N ACC - 50
P-66 PS1-3 1 1 1 13/400 C.A.C. 3831 56-3 T-N ACC 120
P-67 PS1-3 1 1 12/400 C.A.C. 3869 56-3 T-N ACC 120 3
P-68 PS1-3 1 1 12/400 C.A.C. 3838 56-3 T-N ACC 120
P-69 PS1-3 1 1 12/400 C.A.C. 3837 56-3 T-N ACC 120
P-70 PS1-3 1 1 13/400 C.A.C. 3836 56-3 T-N ACC DS-0 120
P-71 PS1-3 1 1 12/400 C.A.C. 3835 56-3 T-N ACC 120
P-72 PS1-3 1 1 12/400 C.A.C. 3836 56-3 T-N ACC 120
P-73 PS1-3 1 1 12/400 C.A.C. 3835 56-3 T-N ACC DS-3 120
P-74 PSH-3 2 2 12/400 C.A.C. 3835 56-3 T-N ACC 120
P-75 12/400 C.A.C. 6 6 3834 56-3 3 T-N INAX 120
P-76 PS1-3 1 1 1 13/400 C.A.C. 3833 56-3 T-N ACC DS-0 120
P-77 PR3-3 1 1 12/400 C.A.C. 3833 56-3 T-N ACC 120
P-78 PS1-3 1 1 12/400 C.A.C. 3832 56-3 T-N ACC 120
P-79 PS1-3 1 1 1 13/400 C.A.C. 3832 56-3 T-N ACC DS-0 120
P-80 PS1-3 1 1 12/400 C.A.C. 3831 56-3 T-N ACC 120
P-81 PS1-3 1 1 12/400 C.A.C. 1 1 3831 56-3 T-N ACC DS-0 120
SEC 3830 56-3
P-82 PS1-3 1 1 1 13/400 C.A.C. 3830 56-3 T-N ACC DS-0 120
P-83 PS1-3 1 1 12/400 C.A.C. 3830 56-3 T-N ACC 120
P-84 PS1-3 1 1 12/400 C.A.C. 3829 56-3 T-N ACC 120
P-85 PS1-3 1 1 12/400 C.A.C. 3829 56-3 T-N ACC 120
56-3
P-86 PS1-3 1 1 12/400 C.A.C. 3828 56-3 T-N ACC 120
P-87 PS1-3 1 1 1 13/400 C.A.C. 3827 56-3 T-N ACC DS-0 120
P-88 PS1-3 1 1 12/400 C.A.C. 3827 56-3 T-N ACC 120
P-89 PR3-3 1 1 1 13/400 C.A.C. 3826 56-3 T-N ACC DS-3 120
P-90 PS1-3 1 1 12/400 C.A.C. 3825 56-3 T-N ACC DS-2 120
P-91 PS1-3 1 1 12/400 C.A.C. 3825 56-3 T-N ACC 120
P-92 PS1-3 1 1 12/400 C.A.C. 3824 56-3 T-N ACC 120
25
P-93 PS1-3 1 1 12/400 C.A.C. 3824 56-3 T-N ACC 120
P-94 PR3-3 1 1 12/400 C.A.C. 3824 56-3 T-N ACC 120
P-95 PS1-3 1 1 12/400 C.A.C. 3823 - - - 56-3 T-N ACC 120
P-96 PS1-3 1 1 12/400 C.A.C. 3822 56-3 T-N ACC DS-3 120
P-97 PS1-3 1 1 12/400 C.A.C. 3822 56-3 T-N ACC 120
P-98 PS1-3 1 1 1 13/400 C.A.C. 3821 56-3 T-N ACC DS-3 120
P-99 PR3-3 1 12/400 C.A.C. 3821 56-3 T-N ACC 120
P-100 PS1-3 1 12/400 C.A.C. 3820 56-3 T-N ACC 120
P-101 PS1-3 1 12/400 C.A.C. 3820 56-3 T-N ACC 120
P-102 PS1-3 1 12/400 C.A.C. 3820 56-3 T-N ACC 120
P-103 PS1-3 1 1 13/400 C.A.C. 3819 56-3 T-N ACC DS-0 120
P-104 PS1-3 1 12/400 C.A.C. 3819 56-3 T-N ACC 120
P-105 PS1-3 1 12/400 C.A.C. 3818 56-3 T-N ACC 120
P-106 PS1-3 1 1 13/400 C.A.C. 3818 56-3 T-N ACC DS-3 120
P-107 PS1-3 1 12/400 C.A.C. 3817 56-3 T-N ACC 120
P-108 PS1-3 1 12/400 C.A.C. 3817 56-3 T-N ACC DS-0 120
P-109 PS1-3 1 12/400 C.A.C. 3816 56-3 T-N ACC 120
P-110 PS1-3 1 12/400 C.A.C. 3816 56-3 T-N ACC 120
P-111 PS1-3 1 12/400 C.A.C. 3815 56-3 T-N ACC 120
P-112 PS1-3 1 12/400 C.A.C. 3815 56-3 T-N ACC 120
P-113 PS1-3 1 12/400 C.A.C. 3817 56-3 T-N ACC 120
P-114 PS1-3 1 1 13/400 C.A.C. 3816 56-3 T-N ACC DS-3 120
P-115 RECLOSER 1 1 13/400 C.A.C. 1 1 3816 56-3 T-N ACC 120
P-116 PS1-3 1 12/400 C.A.C. 3815 56-3 T-N ACC 120
P-117 PS1-3 1 12/400 C.A.C. 3815 56-3 T-N ACC 120
P-118 PA3-3 1 1 13/400 C.A.C. 3815 56-3 1 T-N ACC 120
CONDUCTOR 120 mm2 0.00 - - 56-3
TOTAL 60 34 17 - - - 40 40 3 3 18 19 25 24 77

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 46 59 1 17 47 76

PA2-3 0 1 0 3 0 4
PA3-3 1 1 0 0 1 1
PR3-3 4 6 0 6 4 12

SEC 1 2 1 0 2 2
PSVE-3(MFG) 4 4 0 0 4 4
PSEC-3(MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 0 0 0 0

PSH-3 3 2 4 5 7 7
PRH-3 0 0 0 0 0 0
P3A2-3 0 2 3 6 3 8
DS-0 9 7 1 1 10 8

DS-2 1 1 0 0 1 1
DS-3 6 7 0 0 6 7

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
POSTES
T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 25 99 0 29 25 128 0 87 0 41 0 128
13/400 9 6 0 0 9 6 17 6 0 0 17 6

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
RETENIDA
T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 6 40 34 40 40 77 0 27 40 53 40 80
RY-A 0 0 0 0 0 0

METRADO DE CONDUCTOR
ALEACION DE ALUMINIO AAAC
REPLANTEO CONTRACTUAL
50mm2 70mm2 120mm2 120mm2
0 0.00 0 14606.4 Metrado
0 0 0 730.32 Catenaria 5%
0 0 0 15336.72 total (m)
0 0 0 15.34 total (km)

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR

UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 6 135
PSVE-3(MFG) 3 0 0
PSH-3 3 18 1
TOTAL 0 24 0 136

Volumen de excavación (TOTAL DE ESTRUCTURAS) Volumen de relleno cimenetación


(m3 POR (m3 de relleno x cimentación n° postes con cim
sub total factor sub total TOTAL DE
UNIDAD) unidad) Típica tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM EXCAVACION CONCRETO CANTIDAD MATERIAL
12/400 25 12 0.7 17.5 0.57 6.84 6.84 3.72 0
13/400 9 0.75 6.75 0.59 5.31 1.26 0 CEMENTO (Bol) 2.63 17.99
PIEDRA MEDIANA
RI-A 6 1.24 7.44 1.22 48.8 (m3) 0.656 4.49
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: JULIACA >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS TIPO DE CONDUCTOR DESMONTAJE DE
A TIERRA A TIERRA (m.s.n.m) AISLADOR RPP 25 AISLADOR 56-3 AISLADOR 56-4 TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
INSTALADAS EXCAVADAS AISLADOR SECCIÓN RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO (m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
RY-A 0 1.08 0 1.06 0 HORMIGÓN (m3) 0.297 2.03
PAT 3 1.53 4.59 1.4 4.2
PAT-C 0 0.32 0 0

sub total (m3) 36.28 sub total (m3) 48.8 6.84 0


sub total (Tierra
Negra)
4.2 Total (m3) de concreto ciclopeo 6.84
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 0.00
RI-A 42.16
TOTAL 42.16 -5.88
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

>3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC


<=3900 = PIN 65-3 No Accesible a la Grua = INAX

FERRETERIA ELECTRICA ARMADOS DE DERIVACION

CRUCETA METÁLICA DE FºGº DE 64x64x6.4x2400mm. Según E.T.


RIOSTRA METÁLICA DE F°G° DE 64x64x6.4x1000mm Según E.T.

ABRAZADERA TIPO U DE FºGº 64mm x e=6.4mm, DIAM=210mm

CRUCETA DE Fo Go DE 76x76x6.4x4300mm LONG. SEGUN E.T.

CRUCETA DE Fo Go DE 64x64x6.4x2400mm LONG. SEGUN E.T.


Tubo FºGº de 76.2mm de Ø x 2000mm longitud y espesor =4.75mm

ALAMBRE DE ALUMINIO PARA AMARRE DE 16mm2

RIOSTRA METALICA DE F°G° DE 64x64x6.4x1000mm


CONDUCTOR DESNUDO COOPERWELD DE 25mm2
MENSULA DE F°G° DE 64x64x6.4x2500mm, SEGUN E. T.

CONECTOR DE AL-AL 25/120 mm2 02 PERNOS


ALAMBRE DE ALUMINIO PARA AMARRE DE 16mm2
CONDUCTOR DESNUDO COOPERWELD DE 25mm2

TUERCA OJO DE F°G° PARA PERNO DE 16mm2


E S T R U C T U R A

GRAPA DE ANGULO ACERO/ALUMINIO

GRILLETE DE F°G° DE ANCLAJE


CINTA PLANA DE ARMAR
N° POSTES NOMINACION MATERIAL N° RETENIDAS COTA (m.s.n.m) TIPO DE TERRENO DERIVACIÓN
CODIGO TIPO

NMT000195159 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - - 3930 - - 3 56-4 1 T-N ACC - - - - - - - - - - - - -


NMT000195160 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - - 3928 - 56-4 T-N ACC - - - - - - - - - - - - -
NMT000195161 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - - 3925 - 56-4 T-N ACC - - - - - - - - - - - - -
NMT000195162 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3923 - 56-4 T-N ACC - - - - - - - - - - - - -
NMT000195163 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3918 - 56-4 T-N ACC - - - - - - - - - - - - -
NMT000195164 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 1 - 3916 - 56-4 T-N ACC - - - - - - - - - - - - - INAX
NMT000195165 PSH-3 1 1 15 7.5 3 - - - 3 - - - - - - - - - - - - - - - - - - - - - - - - - 2 1 2 2 12/400 C.A.C. - 3914 - 56-4 T-N ACC - - - - - - - - - - - - -
NMT000195166 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3912 - 56-4 T-N ACC - - - - - - - - - - - - - INAX
NMT000195168 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3911 - 56-4 T-N ACC - - - - - - - - - - - - -
NMT000195169 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3911 - 56-4 T-N ACC - - - - - - - - - - - - 2
NMT000195171 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3907 - 56-4 T-N ACC - - - - - - - - - - - - -
NMT000195176 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3903 - 56-4 T-N ACC - - - - - - - - - - - - -
NMT000195177 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 C.A.C. 2 - 3914 6 56-4 1 T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 -
NMT000195179 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3925 - 56-4 T-N ACC - - - - - - - - - - - -
NMT000195180 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3937 - 56-4 T-N ACC - - - - - - - - - - - -
NMT000195181 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3948 - 56-4 T-N ACC - - - - - - - - - - - - 1
NMT000195182 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3959 - 56-4 T-N ACC - - - - - - - - - - - -
NMT000195183 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3970 - 56-4 T-N ACC - - - - - - - - - - - -
NMT000195184 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3981 - 56-4 1 T-N ACC - - - - - - - - - - - -
NMT000195186 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3868 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195189 PA3-3 4 4 15 - - - - - - - - - - - 6 6 6 6 - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 2 - 3859 6 56-3 T-N ACC - - - - - - - - - - - -
NMT000195190 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3888 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195191 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3887 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195192 PA2-3 2 2 15 - 3 - - - - - - - - 3 6 3 - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. RY-1 - 3887 3 56-3 T-N ACC - - - - - - - - - - - -
NMT000195193 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3887 - 56-3 1 T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 -
NMT000195194 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3887 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195195 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3885 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195196 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3882 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195198 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3900 - 56-4 T-N ACC - - - - - - - - - - - -
NMT000195199 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 C.A.C. 2 3883 6 56-3 1 T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 -
NMT000195200 PA2-3 2 2 15 - 3 - - - - - - - - 3 6 3 - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. RY-1 - 3884 3 56-3 T-N ACC - - - - - - - - - - - -
NMT000195201 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3885 - 56-3 T-N ACC - - - - - - - - - - - - 1
NMT000195204 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3886 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195205 PA2-3 2 2 15 - 3 - - - - - - - - 3 6 3 - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. RY-1 - 3886 3 56-3 T-N ACC - - - - - - - - - - - -
NMT000195206 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. RY-1 - 3888 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195207 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3889 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195210 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3890 - 56-3 T-N ACC - - - - - - - - - - - - 2
NMT000195211 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 C.A.C. 1 - 3891 56-3 1 T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 -
RY-1 T-N ACC - - - - - - - - - - - -
NMT000195214 PA2-3 2 2 15 - 3 - - - - - - - - 3 6 3 - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. RY-1 - 3890 3 56-3 T-N ACC - - - - - - - - - - - -
NMT000195215 PA2-3 2 2 15 - 3 - - - - - - - - 3 6 3 - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. RY-1 - 3891 3 56-3 T-N ACC - - - - - - - - - - - -
NMT000195216 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3891 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195217 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3892 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195218 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3893 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195219 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3893 56-3 T-N ACC - - - - - - - - - - - -
NMT000195220 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3892 56-3 T-N ACC - - - - - - - - - - - -
NMT000195221 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3892 56-3 T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 -
NMT000195222 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 C.A.C. RY-2 - 3891 6 56-3 1 T-N ACC - - - - - - - - - - - -
NMT000195223 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3890 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195225 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3892 - 56-3 T-N ACC - - - - - - - - - - - - 2
NMT000195226 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3892 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195227 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3894 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195230 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. RY-1 - 3893 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195231 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3895 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195235 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3896 - 56-3 T-N ACC - - - - - - - - - - - - 2
NMT000195238 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3897 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195240 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3896 - 56-3 1 T-N ACC - - - - - - - - - - - -
NMT000195241 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3895 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195242 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3895 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195243 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3895 - 56-3 T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 -
NMT000195244 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3895 - 56-3 T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 - 2
NMT000195245 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3894 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195246 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3894 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195247 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3894 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195248 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3893 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195249 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3893 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195250 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 12/400 C.A.C. - 3893 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195251 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3892 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195252 PR3-3
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: AZANGARO >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
<=3900 = PIN 65-3 No Accesible a la Grua = INAX

NMT000195961 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 C.A.C. 1 3912 56-4 T-N ACC - - - - - - - - - - - - 6


RY-1 T-N ACC - - - - - - - - - - - -
NMT000195962 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3913 56-4 T-N ACC - - - - - - - - - - - - 1
NMT000195963 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. - 3909 - 56-4 T-N ACC - - - - - - - - - - - -
NMT000195964 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. - 3912 - 56-4 T-N ACC - - - - - - - - - - - - 6
NMT000195965 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. RY-1 - 3907 - 56-4 T-N ACC - - - - - - - - - - - - 6
NMT000195967 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3912 56-4 T-N ACC - - - - - - - - - - - -
NMT000195968 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3912 56-4 T-N ACC - - - - - - - - - - - -
NMT000195969 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3912 56-4 T-N ACC - - - - - - - - - - - -
NMT000195970 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3913 56-4 T-N ACC - - - - - - - - - - - -
NMT000195971 PA2-3 2 2 15 - 3 - - - - - - - - 3 6 3 - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 1 - 3912 3 56-4 T-N ACC - - - - - - - - - - - -
NMT000195972 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3912 - 56-4 T-N ACC - - - - - - - - - - - -
NMT000195973 PR3-3(MFG) - - 15 7.5 - 2 - - 3 - - - - - - - 6 6 6 6 12 - - - - - - 1 - - - 2 6 1 - - - 1 13/400 C.A.C. RY-1 - 3909 6 56-4 T-N ACC - - - - - - - - - - - -
RY-1 T-N ACC - - - - - - - - - - - - 2
NMT000195974 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. - 3912 - 56-4 T-N ACC - - - - - - - - - - - -
NMT000195975 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. - 3907 - 56-4 T-N ACC - - - - - - - - - - - -
NMT000195976 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. - 3904 - 56-4 T-N ACC - - - - - - - - - - - -
NMT000195977 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. - 3898 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195978 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. - 3898 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195979 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. - 3898 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195980 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. - 3898 - 56-3 T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 -
NMT000195981 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. - 3898 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195982 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. - 3898 - 56-3 T-N ACC - - - - - - - - - - - - 2
NMT000195983 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. - 3898 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195984 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. - 3898 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195985 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. - 3898 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195986 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. - 3898 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195987 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 C.A.C. - 3898 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195988 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 13/400 C.A.C. 2 - 3898 6 56-3 T-N ACC - - - - - - - - - - - -
NMT000195990 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3929 - 56-4 T-N ACC - - - - - - - - - - - -
NMT000195991 PA3-3 4 4 15 - - - - - - - - - - - 6 6 6 6 - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 2 - 3930 6 56-4 T-N ACC - - - - - - - - - - - -
NMT000195993 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3927 - 56-4 1 T-N ACC - - - - - - - - - - - -
NMT000195994 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3929 - 56-4 T-N ACC - - - - - - - - - - - -
NMT000195996 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3928 - 56-4 T-N ACC - - - - - - - - - - - -
NMT000206380 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3927 - 56-4 T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 -
NMT000206381 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3926 - 56-4 T-N ACC - - - - - - - - - - - -
NMT000206382 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3926 - 56-4 T-N ACC - - - - - - - - - - - -
NMT000196757 P3A2-3 3 3 45 7.5 - - 6 3 - - - - - - 6 3 6 6 3 6 - - - - - - - - - - - - - - - - - 3 12/400 C.A.C. 3 3877 6 56-3 3 ROCA INAX - - - - - - - - - - - -
NMT000196758 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3868 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000196759 P3A2-3 3 3 45 7.5 - - 6 3 - - - - - - 6 3 6 6 3 6 - - - - - - - - - - - - - - - - - 3 12/400 C.A.C. 3 3866 6 56-3 T-N ACC - - - - - - - - - - - -
NMT000196760 P3A2-3 3 3 45 7.5 - - 6 3 - - - - - - 6 3 6 6 3 6 - - - - - - - - - - - - - - - - - 3 12/400 C.A.C. 6 3923 6 56-4 3 ROCA INAX - - - - - - - - - - - -
P-147 ROCA - - - - - - - - - - - -
P-148 T-N - - - - - - - - - - - -
P-149 T-N - - - - - - - - - - - -
P-150 T-N - - - - - - - - - - - -
P-151 T-N - - - - - - - - - - - -
P-152 T-N - - - - - - - - - - - -
P-153 T-N - - - - - - - - - - - -
NMT000195997 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3886 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195998 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3883 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000195999 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 C.A.C. 2 3880 6 56-3 T-N ACC - - - - - - - - - - - -
NMT000196000 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3877 - 56-3 1 T-N ACC - - - - - - - - - - - -
NMT000196001 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3874 - 56-3 - T-N ACC - - - - - - - - - - - -
NMT000196002 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3875 - 56-3 T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 -
NMT000196003 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3871 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000196004 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3868 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000196005 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3871 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000196006 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3868 - 56-3 ROCA ACC - - - - - - - - - - - -
NMT000196007 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3890 - 56-3 ROCA ACC - - - - - - - - - - - -
NMT000196008 PA3-3 4 4 15 - - - - - - - - - - - 6 6 6 6 - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3 3890 6 56-3 1 T-N ACC - - - - - - - - - - - -
NMT000196010 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3890 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000196011 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3890 - 56-3 T-N ACC DS-3 1 6 1 1 8 3 3 1 1 2 - 1
NMT000196012 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. - 3874 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000196013 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3890 - 56-3 T-N ACC - - - - - - - - - - - -
NMT000196014 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 C.A.C. 3 - 3871 6 56-3 T-N ACC - - - - - - - - - - - - 2
TOTAL 173 48 0 132 25 49

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 43 55 56 47 99 102
PA2-3 6 4 4 2 10 6
PA3-3 2 3 1 0 3 3
PR3-3 7 5 5 4 12 9
SEC 0 0 0 0 0 0
PSVE-3(MFG) 30 12 5 3 35 15
PSEC-3 (MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 1 0 1 0
PSH-3 0 0 2 0 2 0
PRH-3 0 0 0 0 0 0
P3A2-3 2 4 1 1 3 5
DS-0 9 7 6 5 15 12
DS-2 0 0 2 0 2 0
DS-3 1 0 0 0 1 0 121
141

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 143 131 12 4 155 135 141 132 14 3 155 135
13/400 18 15 0 0 18 15 18 15 0 0 18 15

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 36 47 12 8 48 55 33 49 15 6 48 55
RY-A 17 17 0 13 2 15 0

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
35mm2 50mm2 70mm2 120mm2
ARMADO
3 297
3 30
3 105
3 0
TOTAL 432
Nota: El conductor existente es de 50mm2 en la totalidad de las estructuras

Volumen de excavación Volumen de relleno Cimentación


(m3 de relleno x cimentación n° postes con
(m3 POR UNIDAD) sub total factor sub total TOTAL DE
CANTIDAD unidad) CANTIDAD Típica cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
MATERIAL
144 0.7 100.8 0.57 81.51 81.51 0 1.59 0
18 0.75 13.5 0.59 10.62 10.62 CEMENTO (bol) 2.63 260.29
12 0.7 8.4 0.57 6.84 6.84
PIEDRA MEDIANA m3
34 1.24 42.31 1.2243 41.63 0.656 64.92

10 1.24 12.44 1.2243 12.243


HORMIGÓN (m3)
16 1.08 17.28 1.06 16.96 0.297 29.22
0 1.53 0 1.4 0
171 0.32 54.72 54.72
sub total (m3) 228.61 sub total (m3) 70.83 98.97 0
sub total (Tierra
Negra)
0 Total (m3) de concreto ciclopeo 98.97

ROCA T-N
12/400 8.40
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: AZANGARO >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
<=3900 = PIN 65-3 No Accesible a la Grua = INAX

RI-A 12.443
TOTAL 20.84 228.61 m3
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: AZANGARO >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR AISLADOR AISLADOR TIPO DE DESMONTAJE DE
INSTALADAS EXCAVADAS A TIERRA A TIERRA (m.s.n.m) TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
RPP 25 56-3 56-4 AISLADOR RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
0
1 1 1 12/400 C.A.C. 3930 - - - T-N ACC
2 1 1 12/400 C.A.C. 3928 - - - T-N ACC
3 1 1 12/400 C.A.C. 3925 - - - T-N ACC
4 1 1 12/400 C.A.C. 3923 - - - T-N ACC
5 1 1 12/400 C.A.C. 3918 - - - T-N ACC
6 1 1 12/400 C.A.C. 3916 - - - T-N ACC
7 2 2 12/400 C.A.C. 3914 - - - T-N ACC
8 1 1 12/400 C.A.C. 3912 - - - T-N ACC
9 1 1 12/400 C.A.C. 3911 - - - T-N ACC
10 1 1 12/400 C.A.C. 3894 - - - T-N ACC
11 1 1 12/400 C.A.C. 3907 - - - T-N ACC
12 1 1 12/400 C.A.C. 3895 - - - T-N ACC
13 1 1 12/400 C.A.C. 3914 - - - T-N ACC
14 1 1 12/400 C.A.C. 3898 - - - T-N ACC
15 1 1 12/400 C.A.C. 3911 - - - T-N ACC
16 1 1 12/400 C.A.C. 3903 - - - T-N ACC
17 1 1 12/400 C.A.C. 3894 - - - T-N ACC
18 1 1 12/400 C.A.C. 3893 - - - T-N ACC
19 1 1 12/400 C.A.C. 3891 - - - T-N ACC
20 1 12/400 C.A.C. 3890 - - - T-N ACC
21 1 12/400 C.A.C. 3889 - - - T-N ACC
22 12/400 C.A.C. 3888 - - - T-N ACC
23 12/400 C.A.C. 3887 - - - T-N ACC
24 12/400 C.A.C. 3887 - - - T-N ACC
25 12/400 C.A.C. 3887 - - - T-N ACC
26 12/400 C.A.C. 3887 - - - T-N ACC
27 12/400 C.A.C. 3885 - - - T-N ACC
28 12/400 C.A.C. 3882 - - - T-N ACC
29 12/400 C.A.C. 3900 - - - T-N ACC
30 12/400 C.A.C. 3883 - - - T-N ACC
31 12/400 C.A.C. 3884 - - - T-N ACC
32 12/400 C.A.C. 3885 - - - T-N ACC
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104

105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: AZANGARO >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR AISLADOR AISLADOR TIPO DE DESMONTAJE DE
INSTALADAS EXCAVADAS A TIERRA A TIERRA (m.s.n.m) TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
RPP 25 56-3 56-4 AISLADOR RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
135
136
137
138
139
140
141
142
143
144
145 INSTALACIN DE PAR
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
TOTAL 0 20 22 0 0 0 0 0 0 0

CANTIDADES
REPLANTEO CONTRACTUALREPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 0 55 0 47 0 102
PA2-3 0 4 0 2 0 6
PA3-3 0 3 0 0 0 3
PR3-3 0 5 0 4 0 9
SEC 0 0 0 0 0 0
PSVE-3(MFG) 0 12 0 3 0 15

PSEC-3 (MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 0 0 0 0
PSH-3 0 0 0 0 0 0
PRH-3 0 0 0 0 0 0
P3A2-3 0 4 0 1 0 5
DS-0 0 7 0 5 0 12
DS-2 0 0 0 0 0 0
DS-3 0 0 0 0 0 0

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
REPLANTEO
CONTRACTUAL
REPLANTEO
CONTRACTUAL REPLANTEO CONTRACTUAL
POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 20 131 0 4 20 135 22 132 0 3 22 135
13/400 0 15 0 0 0 15 0 15 0 0 0 15

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
REPLANTEO
CONTRACTUAL
REPLANTEO
CONTRACTUAL REPLANTEO CONTRACTUAL
RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 0 47 0 8 0 55 0 49 0 6 0 55
RY-A 0 13 0 0 0

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 0
PSVE-3(MFG) 3 0
PSH-3 3 0
TOTAL 0
Nota: El conductor existente es de 50mm2 en la totalidad de las estructuras

Volumen de excavación Volumen de relleno Cimentación


(m3 de relleno x n° postes con
(m3 POR UNIDAD) sub total cimentación Típica factor sub total TOTAL DE
ITEM EXCAVACION CONCRETO unidad) CANTIDAD cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
MATERIAL
12/400 20 0 0.7 14 0.57 0 0 0 1.59 0
13/400 0 0.75 0 0.59 0 0 CEMENTO (bol) 2.63 0
PIEDRA MEDIANA m3
RI-A 0 1.24 0 1.22 0 0.656 0
HORMIGÓN (m3)
RY-A 1.08 0 1.06 0 0.297 0
PAT 0 1.53 0 1.4 0
PAT-C 20 0.32 6.4 6.4
sub total (m3) 20.4 sub total (m3) 6.4 0 0
sub total (Tierra
Negra)
0 Total (m3) de concreto ciclopeo 0
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 0.00
RI-A 0
TOTAL 0.00 20.40 m3
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: AZANGARO >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR AISLADOR AISLADOR TIPO DE DESMONTAJE DE
INSTALADAS EXCAVADAS A TIERRA A TIERRA (m.s.n.m) TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
RPP 25 56-3 56-4 AISLADOR RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
0
1 PS1-3 1 12/400 C.A.C. 3930 - - 3 56-4 T-N ACC
2 PS1-3 1 12/400 C.A.C. 3928 - - 3 56-4 T-N ACC
3 PS1-3 1 12/400 C.A.C. 3925 - - 3 56-4 T-N ACC
4 PS1-3 1 12/400 C.A.C. 3923 - - 3 56-4 T-N ACC
5 PS1-3 1 12/400 C.A.C. 3918 - - 3 56-4 T-N ACC
6 PS1-3 1 12/400 C.A.C. 3916 - - 3 56-4 T-N ACC
7 12/400 C.A.C. 3914 - - - 56-4 T-N ACC
8 PS1-3 1 12/400 C.A.C. 3912 - - 3 56-4 T-N ACC
9 PS1-3 1 12/400 C.A.C. 3911 - - 3 56-4 T-N ACC
10 PS1-3 1 12/400 C.A.C. 3894 - 3 - 56-3 T-N ACC
11 PS1-3 1 12/400 C.A.C. 3907 - - 3 56-4 T-N ACC
12 PS1-3 1 12/400 C.A.C. 3895 - 3 - 56-3 T-N ACC
13 PR3-3 1 12/400 C.A.C. 3914 6 - 1 56-4 T-N ACC
14 PS1-3 1 12/400 C.A.C. 3898 - 3 - 56-3 T-N ACC
15 PS1-3 1 12/400 C.A.C. 3911 - - 3 56-4 T-N ACC
16 PS1-3 1 12/400 C.A.C. 3903 - - 3 56-4 T-N ACC
17 PS1-3 1 12/400 C.A.C. 3894 - 3 - 56-3 T-N ACC
18 PS1-3 1 12/400 C.A.C. 3893 - 3 - 56-3 T-N ACC
19 PS1-3 1 12/400 C.A.C. 3891 - 3 - 56-3 T-N ACC
20 PS1-3 1 1 12/400 C.A.C. 3890 - 3 - 56-3 T-N ACC
21 12/400 C.A.C. 3889 - - - 56-3 T-N ACC
22 PS1-3 1 1 1 12/400 C.A.C. 3888 - 3 - 56-3 T-N ACC
23 PS1-3 1 1 1 12/400 C.A.C. 3887 - 3 - 56-3 T-N ACC
24 PA2-3 1 1 1 12/400 C.A.C. 3887 3 - - 56-3 T-N ACC
25 PS1-3 1 1 1 12/400 C.A.C. 3887 - 3 - 56-3 T-N ACC
26 PS1-3 1 1 1 12/400 C.A.C. 3887 - 3 - 56-3 T-N ACC
27 PS1-3 1 1 1 12/400 C.A.C. 3885 - 3 - 56-3 T-N ACC
28 PS1-3 1 1 1 12/400 C.A.C. 3882 - 3 - 56-3 T-N ACC
29 PS1-3 1 1 1 12/400 C.A.C. 3900 - - 3 56-4 T-N ACC
30 PR3-3 1 1 1 12/400 C.A.C. 3883 6 1 - 56-3 T-N ACC
31 PA2-3 1 1 1 12/400 C.A.C. 3884 3 - - 56-3 T-N ACC
32 PS1-3 1 1 1 12/400 C.A.C. 3885 - 3 - 56-3 T-N ACC
33 PS1-3 1 1 1 12/400 C.A.C. 3886 56-3 T-N ACC
34 PA2-3 1 1 1 12/400 C.A.C. 3886 56-3 T-N ACC
35 1 12/400 C.A.C. 3888 56-3 T-N ACC
36 1 12/400 C.A.C. 3889 56-3 T-N ACC
37 1 12/400 C.A.C. 3890 56-3 T-N ACC
38 PR3-3 1 1 1 12/400 C.A.C. 3891 56-3 T-N ACC
39 PA2-3 1 1 12/400 C.A.C. 3890 56-3 T-N ACC
40 PA2-3 1 1 12/400 C.A.C. 3891 56-3 T-N ACC
41 PS1-3 1 12/400 C.A.C. 3891 56-3 T-N ACC
42 PS1-3 1 12/400 C.A.C. 3892 56-3 T-N ACC
43 PS1-3 1 12/400 C.A.C. 3893 56-3 T-N ACC
44 PS1-3 1 12/400 C.A.C. 3893 T-N ACC
45 PS1-3 1 12/400 C.A.C. 3892 T-N ACC
46 PS1-3 1 12/400 C.A.C. 3892 T-N ACC
47 PR3-3 1 12/400 C.A.C. 3891 T-N ACC
48 PSVE-3(MFG) 13/400 C.A.C. 3890 T-N ACC
49 PSVE-3(MFG) 13/400 C.A.C. 3892 T-N ACC
50 PSVE-3(MFG) 13/400 C.A.C. 3892 T-N ACC
51 PSVE-3(MFG) 13/400 C.A.C. 3894 T-N ACC
52 PSVE-3(MFG) 13/400 C.A.C. 3893 T-N ACC
53 PSVE-3(MFG) 13/400 C.A.C. 3895 T-N ACC
54 PSVE-3(MFG) 13/400 C.A.C. 3896 T-N ACC
55 PSVE-3(MFG) 13/400 C.A.C. 3897 T-N ACC
56 PSVE-3(MFG) 13/400 C.A.C. 3896 T-N ACC
57 PSVE-3(MFG) 13/400 C.A.C. 3895 T-N ACC
58 PSVE-3(MFG) 13/400 C.A.C. 3898 T-N ACC
59 PSVE-3(MFG) 13/400 C.A.C. 3901 T-N ACC
60 PSVE-3(MFG) 13/400 C.A.C. 3903 T-N ACC
61 PSVE-3(MFG) 13/400 C.A.C. 3896 T-N ACC
62 PSVE-3(MFG) 13/400 C.A.C. 3903 T-N ACC
63 PSVE-3(MFG) 13/400 C.A.C. 3904 T-N ACC
64 PSVE-3(MFG) 13/400 C.A.C. 3907 T-N ACC
65 PSVE-3(MFG) 13/400 C.A.C. 3908 T-N ACC
66 PSVE-3(MFG) 13/400 C.A.C. 3903 T-N ACC
67 PS1-3 1 12/400 C.A.C. 3910 T-N ACC
68 PR3-3 1 12/400 C.A.C. 3905 T-N ACC
69 PS1-3 1 12/400 C.A.C. 3913 T-N ACC
70 PS1-3 1 12/400 C.A.C. 3913 T-N ACC
71 PS1-3 1 12/400 C.A.C. 3915 T-N ACC
72 PS1-3 1 12/400 C.A.C. 3905 T-N ACC
73 PS1-3 1 12/400 C.A.C. 3908 T-N ACC
74 PS1-3 1 12/400 C.A.C. 3919 T-N ACC
75 PS1-3 1 12/400 C.A.C. 3910 T-N ACC
76 PS1-3 1 12/400 C.A.C. 3921 T-N ACC
77 PS1-3 1 12/400 C.A.C. 3922 T-N ACC
78 PA2-3 1 12/400 C.A.C. 3923 T-N ACC
79 PS1-3 1 12/400 C.A.C. 3924 T-N ACC
80 PS1-3 1 12/400 C.A.C. 3926 T-N ACC
81 PS1-3 12/400 C.A.C. 3927 T-N ACC
82 PS1-3 12/400 C.A.C. 3928 T-N ACC
83 PS1-3 12/400 C.A.C. 3929 T-N ACC
84 PS1-3 12/400 C.A.C. 3930 T-N ACC
85 PS1-3 12/400 C.A.C. 3932 T-N ACC
86 PS1-3 12/400 C.A.C. 3933 T-N ACC
87 PS1-3 12/400 C.A.C. 3934 T-N ACC
88 PS1-3 12/400 C.A.C. 3935 T-N ACC
89 PS1-3 12/400 C.A.C. 3936 T-N ACC
90 PS1-3 12/400 C.A.C. 3938 T-N ACC
91 PS1-3 12/400 C.A.C. 3939 T-N ACC
92 PS1-3 12/400 C.A.C. 3940 T-N ACC
93 PS1-3 12/400 C.A.C. 3941 T-N ACC
94 PS1-3 12/400 C.A.C. 3942 T-N ACC
95 PS1-3 12/400 C.A.C. 3944 T-N ACC
96 PS1-3 12/400 C.A.C. 3945 T-N ACC
97 PS1-3 12/400 C.A.C. 3946 T-N ACC
98 PS1-3 12/400 C.A.C. 3947 T-N ACC
99 PS1-3 12/400 C.A.C. 3948 T-N ACC
100 PS1-3 12/400 C.A.C. 3949 T-N ACC
101 PS1-3 12/400 C.A.C. 3951 T-N ACC
102 PS1-3 12/400 C.A.C. 3952 T-N ACC
103 PS1-3 12/400 C.A.C. 3953 T-N ACC
104 PA2-3 12/400 C.A.C. 3927 T-N INAX
REUBICACION MAD T-N INAX
105 PR3-3 12/400 C.A.C. 3929 ROCA INAX
106 PSH-3 12/400 C.A.C. 3928 ROCA INAX
107 PS1-3 12/400 C.A.C. 3928 ROCA INAX
108 PA2-3 12/400 C.A.C. 3907 T-N INAX
109 PA2-3 12/400 C.A.C. 3904 T-N INAX
110 PR3-3 12/400 C.A.C. 3912 T-N INAX
111 PS1-3 12/400 C.A.C. 3909 T-N ACC
112 PS1-3 12/400 C.A.C. 3912 T-N ACC
113 PS1-3 12/400 C.A.C. 3907 T-N ACC
114 PS1-3 12/400 C.A.C. 3912 T-N ACC
115 PS1-3 12/400 C.A.C. 3912 T-N ACC
116 PS1-3 12/400 C.A.C. 3912 T-N ACC
117 PA2-3 12/400 C.A.C. 3912 T-N ACC
118 PS1-3 12/400 C.A.C. 3912 T-N ACC
119 PR3-3(MFG) 13/400 C.A.C. 3909 T-N ACC
120 PSVE-3(MFG) 13/400 C.A.C. 3912 T-N ACC
121 PSVE-3(MFG) 13/400 C.A.C. 3907 T-N ACC
122 PSVE-3(MFG) 13/400 C.A.C. 3904 T-N ACC
123 PSVE-3(MFG) 13/400 C.A.C. 3912 T-N ACC
124 PSVE-3(MFG) 13/400 C.A.C. 3909 T-N ACC
125 PSVE-3(MFG) 13/400 C.A.C. 3912 T-N ACC
126 PSVE-3(MFG) 13/400 C.A.C. 3907 T-N ACC
127 PSVE-3(MFG) 13/400 C.A.C. 3904 T-N ACC
128 PSVE-3(MFG) 13/400 C.A.C. 3912 T-N ACC
129 PSVE-3(MFG) 13/400 C.A.C. 3907 T-N ACC
130 PSVE-3(MFG) 13/400 C.A.C. 3904 T-N ACC
131 PSVE-3(MFG) 13/400 C.A.C. 3912 T-N ACC
132 PSVE-3(MFG) 13/400 C.A.C. 3907 T-N ACC
133 PSVE-3(MFG) 13/400 C.A.C. 3904 T-N ACC
134 PR3-3(MFG) 13/400 C.A.C. 3912 T-N ACC
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: AZANGARO >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR AISLADOR AISLADOR TIPO DE DESMONTAJE DE
INSTALADAS EXCAVADAS A TIERRA A TIERRA (m.s.n.m) TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
RPP 25 56-3 56-4 AISLADOR RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
135 PS1-3 12/400 C.A.C. 3929 T-N ACC
136 PS1-3 12/400 C.A.C. 3927 T-N ACC
137 PS1-3 12/400 C.A.C. 3929 T-N ACC
138 PS1-3 12/400 C.A.C. 3928 T-N ACC
139 PS1-3 12/400 C.A.C. 3928 T-N ACC
140 PS1-3 12/400 C.A.C. 3928 T-N ACC
141 PS1-3 12/400 C.A.C. 3927 T-N ACC
142 P3A2-3 12/400 C.A.C. 3877 T-N ACC
143 P3A2-3 12/400 C.A.C. 3874 T-N ACC
144 PS1-3 12/400 C.A.C. 3871 T-N ACC
145 PS1-3 12/400 C.A.C. 3868 T-N ACC INSTALACIN DE PAR
146 P3A2-3 12/400 C.A.C. 3866 T-N ACC
147 P3A2-3 12/400 C.A.C. 3923 ROCA INAX
148 P3A2-3 12/400 C.A.C. 3889 ROCA INAX
149 PS1-3 12/400 C.A.C. 3886 T-N ACC
150 PS1-3 12/400 C.A.C. 3883 T-N ACC
151 PS1-3 12/400 C.A.C. 3880 T-N ACC
152 PS1-3 12/400 C.A.C. 3877 T-N ACC
153 PS1-3 12/400 C.A.C. 3874 T-N ACC
154 PS1-3 12/400 C.A.C. 3875 T-N ACC
155 PS1-3 12/400 C.A.C. 3871 T-N ACC
156 PS1-3 12/400 C.A.C. 3868 T-N ACC
157 PS1-3 12/400 C.A.C. 3889 T-N ACC
158 PS1-3 12/400 C.A.C. 3886 T-N ACC
159 PS1-3 12/400 C.A.C. 3883 T-N ACC
160 PS1-3 12/400 C.A.C. 3880 T-N ACC
161 PS1-3 12/400 C.A.C. 3877 T-N ACC
162 PS1-3 12/400 C.A.C. 3874 T-N ACC
163 PS1-3 12/400 C.A.C. 3871 T-N ACC
164 PS1-3 12/400 C.A.C. 3868 ROCA INAX
165 PS1-3 12/400 C.A.C. 3890 ROCA INAX
166 PA3-3 12/400 C.A.C. 3890 ROCA INAX
167 PS1-3 12/400 C.A.C. 3890 T-N ACC
168 PS1-3 12/400 C.A.C. 3890 T-N ACC
169 PS1-3 12/400 C.A.C. 3874 T-N ACC
170 PS1-3 12/400 C.A.C. 3890 T-N ACC
171 PR3-3 12/400 C.A.C. 3871 T-N ACC
TOTAL 35 15 40 0 0 18 43 37 0 0

CANTIDADES
REPLANTEO CONTRACTUALREPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 18 55 12 47 30 102
PA2-3 5 4 0 2 5 6
PA3-3 0 3 0 0 0 3
PR3-3 2 5 1 4 3 9
SEC 0 0 0 0 0 0
PSVE-3(MFG) 0 12 0 3 0 15

PSEC-3 (MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 0 0 0 0
PSH-3 0 0 0 0 0 0
PRH-3 0 0 0 0 0 0
P3A2-3 0 4 0 1 0 5
DS-0 0 7 0 5 0 12
DS-2 0 0 0 0 0 0
DS-3 0 0 0 0 0 0

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
REPLANTEO
CONTRACTUAL
REPLANTEO
CONTRACTUAL REPLANTEO CONTRACTUAL
POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 15 131 0 4 15 135 40 132 0 3 40 135
13/400 0 15 0 0 0 15 0 15 0 0 0 15

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
REPLANTEO
CONTRACTUAL
REPLANTEO
CONTRACTUAL REPLANTEO CONTRACTUAL
RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 0 47 0 8 0 55 0 49 0 6 0 55
RY-A 0 13 0 0 0

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 90
PSVE-3(MFG) 3 0
PSH-3 3 0
TOTAL 90
Nota: El conductor existente es de 50mm2 en la totalidad de las estructuras

Volumen de excavación Volumen de relleno Cimentación


(m3 de relleno x n° postes con
(m3 POR UNIDAD) sub total cimentación Típica factor sub total TOTAL DE
ITEM EXCAVACION CONCRETO unidad) CANTIDAD cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
MATERIAL
12/400 15 15 0.7 10.5 0.57 8.55 8.55 0 1.59 0
13/400 0 0.75 0 0.59 0 0 CEMENTO (bol) 2.63 22.49
PIEDRA MEDIANA m3
RI-A 0 1.24 0 1.22 0 0.656 5.61
HORMIGÓN (m3)
RY-A 1.08 0 1.06 0 0.297 2.54
PAT 0 1.53 0 1.4 0
PAT-C 15 0.32 4.8 4.8
sub total (m3) 15.3 sub total (m3) 4.8 8.55 0
sub total (Tierra
Negra)
0 Total (m3) de concreto ciclopeo 8.55
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 0.00
RI-A 0
TOTAL 0.00 15.30 m3
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: AZANGARO >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR AISLADOR AISLADOR TIPO DE DESMONTAJE DE
INSTALADAS EXCAVADAS A TIERRA A TIERRA (m.s.n.m) TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
RPP 25 56-3 56-4 AISLADOR RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
0
1 12/400 C.A.C. - 3930 - - - 56-4 T-N ACC
2 12/400 C.A.C. - 3928 - - - 56-4 T-N ACC
3 12/400 C.A.C. - 3925 - - - 56-4 T-N ACC
4 12/400 C.A.C. 3923 - - - 56-4 T-N ACC
5 12/400 C.A.C. 3918 - - - 56-4 T-N ACC
6 12/400 C.A.C. 3916 - - - 56-4 T-N ACC
7 PSH-3 12/400 C.A.C. 3914 - - 3 56-4 T-N ACC
8 12/400 C.A.C. 3912 - - - 56-4 T-N ACC
9 12/400 C.A.C. 3911 - - - 56-4 T-N ACC
10 12/400 C.A.C. 3894 - - - 56-3 T-N ACC
11 12/400 C.A.C. 3907 - - - 56-4 T-N ACC
12 12/400 C.A.C. 3895 - - - 56-3 T-N ACC
13 12/400 C.A.C. 2 3914 - - - 56-4 T-N ACC
14 12/400 C.A.C. 3898 - - - 56-3 T-N ACC
15 12/400 C.A.C. 3911 - - - 56-4 T-N ACC
16 12/400 C.A.C. 3903 - - - 56-4 T-N ACC
17 12/400 C.A.C. 3894 - - - 56-3 T-N ACC
18 12/400 C.A.C. 3893 - - - 56-3 T-N ACC
19 12/400 C.A.C. 3891 - - - 56-3 T-N ACC
20 12/400 C.A.C. 3890 - - - 56-3 T-N ACC
21 PA3-3 12/400 C.A.C. 2 3889 6 - - 56-3 T-N ACC
22 12/400 C.A.C. 3888 - - - 56-3 T-N ACC
23 12/400 C.A.C. 3887 - - - 56-3 T-N ACC
24 12/400 C.A.C. 3887 - - - 56-3 T-N ACC
25 12/400 C.A.C. 3887 - - - 56-3 T-N ACC
26 12/400 C.A.C. 3887 - - - 56-3 T-N ACC
27 12/400 C.A.C. 3885 - - - 56-3 T-N ACC
28 12/400 C.A.C. 3882 - - - 56-3 T-N ACC
29 12/400 C.A.C. 3900 - - - 56-4 T-N ACC
30 12/400 C.A.C. 2 3883 - - - 56-3 T-N ACC
31 12/400 C.A.C. 3884 - - - 56-3 T-N ACC
32 12/400 C.A.C. 3885 - - - 56-3 T-N ACC
33 12/400 C.A.C. 3886 56-3 T-N ACC
34 12/400 C.A.C. 3886 56-3 T-N ACC
35 12/400 C.A.C. 3888 56-3 T-N ACC
36 12/400 C.A.C. 3889 56-3 T-N ACC
37 12/400 C.A.C. 3890 56-3 T-N ACC
38 12/400 C.A.C. 3891 56-3 T-N ACC
39 12/400 C.A.C. 3890 56-3 T-N ACC
40 12/400 C.A.C. 3891 56-3 T-N ACC
41 12/400 C.A.C. 3891 56-3 T-N ACC
42 12/400 C.A.C. 3892 56-3 T-N ACC
43 12/400 C.A.C. 3893 56-3 T-N ACC
44 12/400 C.A.C. 3893 56-3 T-N ACC
45 12/400 C.A.C. 3892 56-3 T-N ACC
46 12/400 C.A.C. 3892 56-3 T-N ACC
47 12/400 C.A.C. 3891 56-3 T-N ACC
48 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3890 56-3 T-N ACC
49 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3892 56-3 T-N ACC
50 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3892 56-3 T-N ACC
51 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3894 56-3 T-N ACC
52 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3893 56-3 T-N ACC
53 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3895 56-3 T-N ACC
54 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3896 56-3 T-N ACC
55 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3897 56-3 T-N ACC
56 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3896 56-3 T-N ACC
57 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3895 56-3 T-N ACC
58 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3898 56-3 T-N ACC
59 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3901 56-4 T-N ACC
60 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3903 56-4 T-N ACC
61 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3896 56-3 T-N ACC
62 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3903 56-4 T-N ACC
63 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3904 56-4 T-N ACC
64 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3907 56-4 T-N ACC
65 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3908 56-4 T-N ACC
66 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3903 56-4 T-N ACC
67 12/400 C.A.C. 3910 56-4 T-N ACC
68 12/400 C.A.C. 3905 56-4 T-N ACC
69 12/400 C.A.C. 3913 56-4 T-N ACC
70 12/400 C.A.C. 3913 56-4 T-N ACC
71 12/400 C.A.C. 3915 56-4 T-N ACC
72 12/400 C.A.C. 3905 56-4 T-N ACC
73 12/400 C.A.C. 3908 56-4 T-N ACC
74 12/400 C.A.C. 3919 56-4 T-N ACC
75 12/400 C.A.C. 3910 56-4 T-N ACC
76 12/400 C.A.C. 3921 56-4 T-N ACC
77 12/400 C.A.C. 3922 56-4 T-N ACC
78 12/400 C.A.C. 3923 56-4 T-N ACC
79 12/400 C.A.C. 3924 56-4 T-N ACC
80 12/400 C.A.C. 3926 56-4 T-N ACC
81 PS1-3 1 1 1 12/400 C.A.C. 3927 56-4 T-N ACC
82 PS1-3 1 1 1 12/400 C.A.C. 3928 56-4 T-N ACC
83 PS1-3 1 1 1 12/400 C.A.C. 3929 56-4 T-N ACC
84 PS1-3 1 1 1 12/400 C.A.C. 3930 56-4 T-N ACC
85 PS1-3 1 1 1 12/400 C.A.C. 3932 56-4 T-N ACC
86 PS1-3 1 1 1 12/400 C.A.C. 3933 56-4 T-N ACC
87 PS1-3 1 1 1 12/400 C.A.C. 3934 56-4 T-N ACC
88 PS1-3 1 1 1 12/400 C.A.C. 3935 56-4 T-N ACC
89 PS1-3 1 1 1 12/400 C.A.C. 3936 56-4 T-N ACC
90 PS1-3 1 1 1 12/400 C.A.C. 3938 56-4 T-N ACC
91 PS1-3 1 1 1 12/400 C.A.C. 3939 56-4 T-N ACC
92 PS1-3 1 1 1 12/400 C.A.C. 3940 56-4 T-N ACC
93 PS1-3 1 1 1 12/400 C.A.C. 3941 56-4 T-N ACC
94 PS1-3 1 1 1 12/400 C.A.C. 3942 56-4 T-N ACC
95 PS1-3 1 1 1 12/400 C.A.C. 3944 56-4 T-N ACC
96 PS1-3 1 1 1 12/400 C.A.C. 3945 56-4 T-N ACC
97 PS1-3 1 1 1 12/400 C.A.C. 3946 56-4 T-N ACC
98 PS1-3 1 1 1 12/400 C.A.C. 3947 56-4 T-N ACC
99 PS1-3 1 1 1 12/400 C.A.C. 3948 56-4 T-N ACC
100 PS1-3 1 1 1 12/400 C.A.C. 3949 56-4 T-N ACC
101 PS1-3 1 1 1 12/400 C.A.C. 3951 56-4 T-N ACC
102 PS1-3 1 1 1 12/400 C.A.C. 3952 56-4 T-N ACC
103 PS1-3 1 1 1 12/400 C.A.C. 3953 56-4 T-N ACC
104 PA2-3 1 1 1 12/400 C.A.C. 3927 56-4 T-N INAX
REUBICACION MAD 56-3 T-N INAX
105 1 1 1 12/400 C.A.C. 3929 56-4 ROCA INAX
106 PSH-3 2 2 2 12/400 C.A.C. 3928 56-4 ROCA INAX
107 PS1-3 1 1 1 12/400 C.A.C. 3928 56-4 ROCA INAX
108 PA2-3 1 1 1 12/400 C.A.C. 3907 56-4 T-N INAX
109 PA2-3 1 1 1 12/400 C.A.C. 3904 56-4 T-N INAX
110 PR3-3 1 1 1 12/400 C.A.C. 3912 56-4 T-N INAX
111 PS1-3 1 1 1 12/400 C.A.C. 3909 56-4 T-N ACC
112 PS1-3 1 1 1 12/400 C.A.C. 3912 56-4 T-N ACC
113 PS1-3 1 1 1 12/400 C.A.C. 3907 56-4 T-N ACC
114 PS1-3 1 1 1 12/400 C.A.C. 3912 56-4 T-N ACC
115 PS1-3 1 1 1 12/400 C.A.C. 3912 56-4 T-N ACC
116 PS1-3 1 1 1 12/400 C.A.C. 3912 56-4 T-N ACC
117 PA2-3 1 1 1 12/400 C.A.C. 3912 56-4 T-N ACC
118 PS1-3 1 1 1 12/400 C.A.C. 3912 56-4 T-N ACC
119 PR3-3(MFG) 1 1 1 13/400 C.A.C. 3909 56-4 T-N ACC
120 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3912 56-4 T-N ACC
121 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3907 56-4 T-N ACC
122 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3904 56-4 T-N ACC
123 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3912 56-4 T-N ACC
124 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3909 56-4 T-N ACC
125 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3912 56-4 T-N ACC
126 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3907 56-4 T-N ACC
127 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3904 56-4 T-N ACC
128 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3912 56-4 T-N ACC
129 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3907 56-4 T-N ACC
130 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3904 56-4 T-N ACC
131 13/400 C.A.C. 3912 56-4 T-N ACC
132 13/400 C.A.C. 3907 56-4 T-N ACC
133 13/400 C.A.C. 3904 56-4 T-N ACC
134 13/400 C.A.C. 3912 56-4 T-N ACC
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: AZANGARO >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR AISLADOR AISLADOR TIPO DE DESMONTAJE DE
INSTALADAS EXCAVADAS A TIERRA A TIERRA (m.s.n.m) TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
RPP 25 56-3 56-4 AISLADOR RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
135 PS1-3 1 1 1 12/400 C.A.C. 3929 56-4 T-N ACC
136 PS1-3 1 1 1 12/400 C.A.C. 3927 56-4 T-N ACC
137 PS1-3 1 1 1 12/400 C.A.C. 3929 56-4 T-N ACC
138 PS1-3 1 1 1 12/400 C.A.C. 3928 56-4 T-N ACC
139 PS1-3 1 1 1 12/400 C.A.C. 3928 56-4 T-N ACC
140 PS1-3 1 1 1 12/400 C.A.C. 3928 56-4 T-N ACC
141 PS1-3 1 1 1 12/400 C.A.C. 3927 56-4 T-N ACC
142 3 3 12/400 C.A.C. 3877 56-3 ROCA INAX
143 0 12/400 C.A.C. 3874 56-3 T-N ACC
144 0 12/400 C.A.C. 3871 56-3 T-N ACC
145 PS1-3 1 1 1 12/400 C.A.C. 3868 56-3 T-N ACC INSTALACIN DE PAR
146 1 1 1 12/400 C.A.C. 3866 56-3 T-N ACC
147 12/400 C.A.C. 3923 56-4 ROCA INAX
148 12/400 C.A.C. 3889 56-3 ROCA INAX
149 1 1 12/400 C.A.C. 3886 56-3 T-N ACC
150 1 1 12/400 C.A.C. 3883 56-3 T-N ACC
151 1 1 12/400 C.A.C. 3880 56-3 T-N ACC
152 PS1-3 1 1 1 12/400 C.A.C. 3877 56-3 T-N ACC
153 12/400 C.A.C. 3874 56-3 T-N ACC
154 12/400 C.A.C. 3875 56-3 T-N ACC
155 PS1-3 1 1 1 12/400 C.A.C. 3871 56-3 T-N ACC
156 PS1-3 1 1 1 12/400 C.A.C. 3868 56-3 T-N ACC
157 PS1-3 1 1 1 12/400 C.A.C. 3889 56-3 T-N ACC
158 PS1-3 1 1 1 12/400 C.A.C. 3886 56-3 T-N ACC
159 PS1-3 1 1 1 12/400 C.A.C. 3883 56-3 T-N ACC
160 PS1-3 1 1 1 12/400 C.A.C. 3880 56-3 T-N ACC
161 PS1-3 1 1 1 12/400 C.A.C. 3877 56-3 T-N ACC
162 PS1-3 1 1 1 12/400 C.A.C. 3874 56-3 T-N ACC
163 PS1-3 1 1 1 12/400 C.A.C. 3871 56-3 T-N ACC
164 PS1-3 1 1 12/400 C.A.C. 3868 56-3 ROCA INAX
165 PS1-3 1 1 12/400 C.A.C. 3890 56-3 ROCA INAX
166 PA3-3 12/400 C.A.C. 3890 56-3 ROCA INAX
167 PS1-3 1 1 1 12/400 C.A.C. 3890 56-3 T-N ACC
168 PS1-3 1 1 1 12/400 C.A.C. 3890 56-3 T-N ACC
169 PS1-3 1 1 1 12/400 C.A.C. 3874 56-3 T-N ACC
170 PS1-3 1 1 1 12/400 C.A.C. 3890 56-3 T-N ACC
171 1 1 1 12/400 C.A.C. 3871 56-3 T-N ACC
TOTAL 96 102 100 6 0 6 0 3 0 0

CANTIDADES
REPLANTEO CONTRACTUALREPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 17 55 38 47 55 102
PA2-3 0 4 4 2 4 6
PA3-3 2 3 0 0 2 3
PR3-3 0 5 1 4 1 9
SEC 0 0 0 0 0 0
PSVE-3(MFG) 12 12 18 3 30 15

PSEC-3 (MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 1 0 1 0
PSH-3 0 0 2 0 2 0
PRH-3 0 0 0 0 0 0
P3A2-3 0 4 0 1 0 5
DS-0 0 7 0 5 0 12
DS-2 0 0 0 0 0 0
DS-3 0 0 0 0 0 0

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
REPLANTEO
CONTRACTUAL
REPLANTEO
CONTRACTUAL REPLANTEO CONTRACTUAL
POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 62 131 9 4 71 135 58 132 13 3 71 135
13/400 31 15 0 0 31 15 31 15 0 0 31 15

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
REPLANTEO
CONTRACTUAL
REPLANTEO
CONTRACTUAL REPLANTEO CONTRACTUAL
RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 6 47 0 8 6 55 6 49 0 6 6 55
RY-A 0 13 0 0 0

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 165
PSVE-3(MFG) 3 90
PSH-3 3 0
TOTAL 255
Nota: El conductor existente es de 50mm2 en la totalidad de las estructuras

Volumen de excavación Volumen de relleno Cimentación


(m3 de relleno x n° postes con
(m3 POR UNIDAD) sub total cimentación Típica factor sub total TOTAL DE
ITEM EXCAVACION CONCRETO unidad) CANTIDAD cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
MATERIAL
12/400 71 59 0.7 49.7 0.57 33.63 33.63 0 1.59 0
13/400 31 34 0.75 23.25 0.59 20.06 20.06 CEMENTO (bol) 2.63 141.2
PIEDRA MEDIANA m3
RI-A 6 1.24 7.44 1.22 7.32 0.656 35.22
HORMIGÓN (m3)
RY-A 1.08 0 1.06 0 0.297 15.95
PAT 0 1.53 0 1.4 0
PAT-C 0 0.32 0 0
sub total (m3) 80.39 sub total (m3) 7.32 53.69 0
sub total (Tierra
Negra)
0 Total (m3) de concreto ciclopeo 53.69
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 6.30
RI-A 0
TOTAL 6.30 74.09 m3
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: AZANGARO >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR AISLADOR AISLADOR TIPO DE DESMONTAJE DE
INSTALADAS EXCAVADAS A TIERRA A TIERRA (m.s.n.m) TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
RPP 25 56-3 56-4 AISLADOR RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
0
1 12/400 C.A.C. - - - - 3930 - - - 56-4 1 T-N ACC -
2 12/400 C.A.C. - - - - 3928 - - - 56-4 T-N ACC -
3 12/400 C.A.C. - - - - 3925 - - - 56-4 T-N ACC -
4 12/400 C.A.C. - - 3923 - - - 56-4 T-N ACC -
5 12/400 C.A.C. - - 3918 - - - 56-4 T-N ACC -
6 12/400 C.A.C. - - 3916 - - - 56-4 T-N ACC -
7 2 2 2 12/400 C.A.C. - - 3914 - - - 56-4 T-N ACC -
8 12/400 C.A.C. - - 3912 - - - 56-4 T-N ACC -
9 12/400 C.A.C. - - 3911 - - - 56-4 T-N ACC -
10 12/400 C.A.C. - - 3894 - - - 56-3 T-N ACC 2
11 12/400 C.A.C. - - 3907 - - - 56-4 T-N ACC -
12 12/400 C.A.C. - - 3895 - - - 56-3 T-N ACC -
13 12/400 C.A.C. - - 3914 - - 1 56-4 1 T-N ACC DS-0
14 12/400 C.A.C. - - 3898 - - - 56-3 T-N ACC 1
15 12/400 C.A.C. - - 3911 - - - 56-4 T-N ACC
16 12/400 C.A.C. - - 3903 - - - 56-4 T-N ACC
17 12/400 C.A.C. - - 3894 - - - 56-3 T-N ACC
18 12/400 C.A.C. - - 3893 - - - 56-3 T-N ACC
19 12/400 C.A.C. - - 3891 - - - 56-3 1 T-N ACC
20 12/400 C.A.C. - - 3890 - - - 56-3 T-N ACC
21 1 1 1 12/400 C.A.C. - - 3889 - - - 56-3 T-N ACC
22 12/400 C.A.C. - - 3888 - - - 56-3 T-N ACC
23 12/400 C.A.C. - - 3887 - - - 56-3 T-N ACC
24 12/400 C.A.C. RY-1 RY-1 - - 3887 - - - 56-3 T-N ACC
25 12/400 C.A.C. - - 3887 - 1 - 56-3 1 T-N ACC DS-0
26 12/400 C.A.C. - - 3887 - - - 56-3 T-N ACC
27 12/400 C.A.C. - - 3885 - - - 56-3 T-N ACC
28 12/400 C.A.C. - - 3882 - - - 56-3 T-N ACC
29 12/400 C.A.C. - - 3900 - - - 56-4 T-N ACC
30 12/400 C.A.C. 3883 - 1 - 56-3 T-N ACC DS-0
31 12/400 C.A.C. RY-1 RY-1 - - 3884 - 1 - 56-3 T-N ACC 1
32 12/400 C.A.C. - - 3885 - - - 56-3 T-N ACC
33 12/400 C.A.C. - - 3886 56-3 T-N ACC
34 12/400 C.A.C. RY-1 RY-1 - - 3886 56-3 T-N ACC
35 PS1-3 1 1 12/400 C.A.C. RY-1 RY-1 - - 3888 56-3 T-N ACC
36 PS1-3 1 1 12/400 C.A.C. - - 3889 56-3 T-N ACC 2
37 PS1-3 1 1 12/400 C.A.C. - - 3890 56-3 T-N ACC
38 12/400 C.A.C. 1 1 0 - 3891 56-3 1 T-N ACC DS-0
39 1 12/400 C.A.C. RY-1 RY-1 - - 3890 56-3 T-N ACC
40 1 12/400 C.A.C. RY-1 RY-1 - - 3891 56-3 T-N ACC
41 PS1-3 1 1 12/400 C.A.C. - - 3891 56-3 T-N ACC
42 PS1-3 1 1 12/400 C.A.C. - - 3892 56-3 T-N ACC
43 PS1-3 1 1 12/400 C.A.C. - - 3893 56-3 T-N ACC
44 PS1-3 1 1 12/400 C.A.C. 3893 56-3 T-N ACC
45 PS1-3 1 1 12/400 C.A.C. 3892 56-3 T-N ACC
46 PS1-3 1 1 12/400 C.A.C. 3892 56-3 T-N ACC DS-0
47 PR3-3 1 1 12/400 C.A.C. RY-2 RY-2 - - 3891 56-3 1 T-N ACC
48 13/400 C.A.C. - - 3890 56-3 T-N ACC
49 13/400 C.A.C. - - 3892 56-3 T-N ACC
50 13/400 C.A.C. - - 3892 56-3 T-N ACC
51 13/400 C.A.C. - - 3894 56-3 T-N ACC
52 13/400 C.A.C. RY-1 RY-1 - - 3893 56-3 T-N ACC
53 13/400 C.A.C. - - 3895 56-3 T-N ACC 2
54 13/400 C.A.C. - - 3896 56-3 T-N ACC
55 13/400 C.A.C. - - 3897 56-3 T-N ACC
56 13/400 C.A.C. - - 3896 56-3 1 T-N ACC
57 13/400 C.A.C. - - 3895 56-3 T-N ACC
58 13/400 C.A.C. RY-2 RY-2 - - 3898 56-3 T-N ACC 2
59 13/400 C.A.C. - - 3901 56-4 T-N ACC DS-0
60 13/400 C.A.C. - - 3903 56-4 T-N ACC DS-0
61 13/400 C.A.C. - - 3896 56-3 T-N ACC
62 13/400 C.A.C. - - 3903 56-4 T-N ACC
63 13/400 C.A.C. - - 3904 56-4 T-N ACC
64 13/400 C.A.C. - - 3907 56-4 T-N ACC 2
65 13/400 C.A.C. - - 3908 56-4 T-N ACC
66 13/400 C.A.C. - - 3903 56-4 T-N ACC
67 PS1-3 1 1 12/400 C.A.C. - - 3910 56-4 T-N ACC
68 PR3-3 1 1 12/400 C.A.C. 2 2 - - 3905 56-4 T-N ACC
69 PS1-3 1 1 12/400 C.A.C. 0 - 3913 56-4 T-N ACC
70 PS1-3 1 1 12/400 C.A.C. RY-1 RY-1 - - 3913 56-4 1 T-N ACC
71 PS1-3 1 1 12/400 C.A.C. - - 3915 56-4 T-N ACC
72 PS1-3 1 1 12/400 C.A.C. - - 3905 56-4 T-N ACC
73 PS1-3 1 1 12/400 C.A.C. - - 3908 56-4 T-N ACC DS-0
74 PS1-3 1 1 12/400 C.A.C. - - 3919 56-4 T-N ACC
75 PS1-3 1 1 12/400 C.A.C. - - 3910 56-4 T-N ACC
76 PS1-3 1 1 12/400 C.A.C. - - 3921 56-4 T-N ACC
77 PS1-3 1 1 12/400 C.A.C. - - 3922 56-4 1 T-N ACC 1
78 PA2-3 1 1 12/400 C.A.C. 2 2 3923 56-4 T-N ACC 2
79 PS1-3 1 1 12/400 C.A.C. 3924 56-4 T-N ACC 2
80 PS1-3 1 1 12/400 C.A.C. 3926 56-4 T-N ACC
81 12/400 C.A.C. 3927 56-4 T-N ACC DS-2
82 12/400 C.A.C. 3928 56-4 T-N ACC
83 12/400 C.A.C. 3929 56-4 T-N ACC 2
84 12/400 C.A.C. 3930 56-4 T-N ACC
85 12/400 C.A.C. 3932 56-4 1 T-N ACC
86 12/400 C.A.C. 3933 56-4 T-N ACC DS-0
87 12/400 C.A.C. 3934 56-4 T-N ACC
88 12/400 C.A.C. 3935 56-4 T-N ACC
89 12/400 C.A.C. 3936 56-4 T-N ACC
90 12/400 C.A.C. 3938 56-4 T-N ACC DS-0 1
91 12/400 C.A.C. 2 2 3939 56-4 1 T-N ACC
92 12/400 C.A.C. 3940 56-4 T-N ACC 2
93 12/400 C.A.C. 3941 56-4 T-N ACC
94 12/400 C.A.C. 3942 56-4 T-N ACC
95 12/400 C.A.C. 3944 56-4 T-N ACC
96 12/400 C.A.C. 3945 56-4 T-N ACC DS-0
97 12/400 C.A.C. 3946 56-4 1 T-N ACC
98 12/400 C.A.C. 3947 56-4 T-N ACC DS-0
99 12/400 C.A.C. 3948 56-4 T-N ACC
100 12/400 C.A.C. 3949 56-4 T-N ACC
101 12/400 C.A.C. 3951 56-4 T-N ACC
102 12/400 C.A.C. 3952 56-4 T-N ACC
103 12/400 C.A.C. 3953 56-4 T-N ACC DS-0
104 12/400 C.A.C. 1 1 - - 3927 56-4 1 T-N INAX DS-0
REUBICACION MAD 56-3 T-N INAX
105 PR3-3 12/400 C.A.C. 2 2 - - 3929 56-4 ROCA INAX
106 12/400 C.A.C. - - 3928 56-4 1 ROCA INAX
107 12/400 C.A.C. - - 3928 56-4 ROCA INAX
108 12/400 C.A.C. 1 1 - - 3907 56-4 T-N INAX
109 12/400 C.A.C. 1 1 - - 3904 56-4 1 T-N INAX
110 12/400 C.A.C. 3 3 - - 3912 56-4 T-N INAX
111 12/400 C.A.C. - - 3909 56-4 T-N ACC
112 12/400 C.A.C. - - 3912 56-4 T-N ACC
113 12/400 C.A.C. - - 3907 56-4 T-N ACC 3
114 12/400 C.A.C. 3912 56-4 T-N ACC
115 12/400 C.A.C. 3912 56-4 T-N ACC DS-0
116 12/400 C.A.C. 3912 56-4 T-N ACC
117 12/400 C.A.C. 1 1 - - 3912 56-4 T-N ACC 6
118 12/400 C.A.C. - - 3912 56-4 T-N ACC
119 13/400 C.A.C. 2 2 - - 3909 56-4 T-N ACC 1
120 13/400 C.A.C. - - 3912 56-4 T-N ACC
121 13/400 C.A.C. - - 3907 56-4 T-N ACC 6
122 13/400 C.A.C. - - 3904 56-4 T-N ACC 6
123 13/400 C.A.C. - - 3912 56-4 T-N ACC
124 13/400 C.A.C. - - 3909 56-4 T-N ACC
125 13/400 C.A.C. - - 3912 56-4 T-N ACC
126 13/400 C.A.C. - - 3907 56-4 T-N ACC DS-0
127 13/400 C.A.C. - - 3904 56-4 T-N ACC
128 13/400 C.A.C. - - 3912 56-4 T-N ACC
129 13/400 C.A.C. - - 3907 56-4 T-N ACC
130 13/400 C.A.C. - - 3904 56-4 T-N ACC 2
131 PSVE-3(MFG) 1 1 1 13/400 C.A.C. - - 3912 56-4 T-N ACC
132 PSVE-3(MFG) 1 1 1 13/400 C.A.C. - - 3907 56-4 T-N ACC
133 PSVE-3(MFG) 1 1 1 13/400 C.A.C. - - 3904 56-4 T-N ACC
134 PR3-3(MFG) 1 1 1 13/400 C.A.C. 2 2 - - 3912 56-4 T-N ACC
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: AZANGARO >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
MAYO DEL 2017 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR AISLADOR AISLADOR TIPO DE DESMONTAJE DE
INSTALADAS EXCAVADAS A TIERRA A TIERRA (m.s.n.m) TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
RPP 25 56-3 56-4 AISLADOR RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
135 12/400 C.A.C. - - 3929 56-4 T-N ACC
136 12/400 C.A.C. - - 3927 56-4 T-N ACC
137 12/400 C.A.C. - - 3929 56-4 1 T-N ACC
138 12/400 C.A.C. - - 3928 56-4 T-N ACC
139 12/400 C.A.C. - - 3928 56-4 T-N ACC 2
140 12/400 C.A.C. - - 3928 56-4 T-N ACC
141 12/400 C.A.C. - - 3927 56-4 T-N ACC
142 P3A2-3 3 12/400 C.A.C. 3 3 3877 56-3 3 ROCA INAX
143 P3A2-3 3 3 3 12/400 C.A.C. 6 6 3874 56-3 T-N ACC
144 PS1-3 1 1 1 12/400 C.A.C. 3871 56-3 T-N ACC
145 12/400 C.A.C. 1 1 3868 56-3 T-N ACC INSTALACIN DE PAR
146 P3A2-3 12/400 C.A.C. 3 3 3866 56-3 T-N ACC
147 P3A2-3 3 3 3 12/400 C.A.C. 6 6 3923 56-4 3 ROCA INAX
148 P3A2-3 3 3 3 12/400 C.A.C. 6 6 3889 56-3 ROCA INAX
149 PS1-3 1 12/400 C.A.C. 3886 56-3 T-N ACC
150 PS1-3 1 12/400 C.A.C. 3883 56-3 T-N ACC
151 PS1-3 1 12/400 C.A.C. 3880 56-3 T-N ACC
152 12/400 C.A.C. 3877 56-3 T-N ACC
153 PS1-3 1 1 1 12/400 C.A.C. 3874 56-3 1 T-N ACC
154 PS1-3 1 1 1 12/400 C.A.C. 3875 56-3 T-N ACC
155 12/400 C.A.C. 3871 56-3 T-N ACC
156 12/400 C.A.C. 3868 56-3 T-N ACC
157 12/400 C.A.C. 2 2 3889 56-3 T-N ACC
158 12/400 C.A.C. 3886 56-3 1 T-N ACC
159 12/400 C.A.C. 3883 56-3 T-N ACC
160 12/400 C.A.C. 3880 56-3 T-N ACC DS-0
161 12/400 C.A.C. 3877 56-3 T-N ACC
162 12/400 C.A.C. 3874 56-3 T-N ACC
163 12/400 C.A.C. 3871 56-3 T-N ACC
164 1 12/400 C.A.C. 3868 56-3 ROCA INAX
165 1 12/400 C.A.C. 3890 56-3 ROCA INAX
166 1 1 1 12/400 C.A.C. 2 2 3890 56-3 1 ROCA INAX
167 12/400 C.A.C. 3890 56-3 T-N ACC
168 12/400 C.A.C. - - 3890 56-3 T-N ACC DS-3
169 12/400 C.A.C. - - 3874 56-3 T-N ACC
170 12/400 C.A.C. 3890 56-3 T-N ACC
171 PR3-3 12/400 C.A.C. 2 2 - - 3871 56-3 T-N ACC 2
TOTAL 50 46 22 50 1 0 3 1 25 50

CANTIDADES
REPLANTEO CONTRACTUALREPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 15 55 12 47 27 102
PA2-3 0 4 1 2 1 6
PA3-3 0 3 0 0 0 3
PR3-3 2 5 2 4 4 9
SEC 0 0 0 0 0 0
PSVE-3(MFG) 0 12 3 3 3 15

PSEC-3 (MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 1 0 1 0
PSH-3 0 0 0 0 0 0
PRH-3 0 0 0 0 0 0
P3A2-3 4 4 1 1 5 5
DS-0 5 7 12 5 17 12
DS-2 0 0 1 0 1 0
DS-3 1 0 0 0 1 0

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
REPLANTEO
CONTRACTUAL
REPLANTEO
CONTRACTUAL REPLANTEO CONTRACTUAL
POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 35 131 7 4 42 135 36 132 10 3 46 135
13/400 4 15 0 0 4 15 4 15 0 0 4 15

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
REPLANTEO
CONTRACTUAL
REPLANTEO
CONTRACTUAL REPLANTEO CONTRACTUAL
RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 31 47 19 8 50 55 25 49 25 6 50 55
RY-A 0 13 0 0 0

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 81
PSVE-3(MFG) 3 9
PSH-3 3 0
TOTAL 90
Nota: El conductor existente es de 50mm2 en la totalidad de las estructuras

Volumen de excavación Volumen de relleno Cimentación


(m3 de relleno x n° postes con
(m3 POR UNIDAD) sub total cimentación Típica factor sub total TOTAL DE
ITEM EXCAVACION CONCRETO unidad) CANTIDAD cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
MATERIAL
12/400 42 59 0.7 29.4 0.57 33.63 33.63 0 1.59 0
13/400 4 34 0.75 3 0.59 20.06 20.06 CEMENTO (bol) 2.63 141.2
PIEDRA MEDIANA m3
RI-A 50 1.24 62 1.22 61 0.656 35.22
HORMIGÓN (m3)
RY-A 1.08 0 1.06 0 0.297 15.95
PAT 1 1.53 1.53 1.4 1.4
PAT-C 0 0.32 0 0
sub total (m3) 95.93 sub total (m3) 61 53.69 0
sub total (Tierra
Negra)
1.4 Total (m3) de concreto ciclopeo 53.69
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 4.90
RI-A 23.56
TOTAL 28.46 67.47 m3
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: AYAVIRI >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
<=3900 = PIN 65-3 No Accesible a la Grua = INAX

FERRETERIA ELECTRICA ARMADOS DE DERIVACION

GRAPA DE ANCLAJE TIPO PISTOLA, DE 3 PERNOS Y ARANDELAS

Perno de F°G° de 16mm Ø x 203m, maquinado con tuerca y contratuerca


PERNO HEXAGONAL DE F°G° DE 16mm Diam. x 76mm, TUERCA
PLANCHA DOBLADA TIPO J DE COBRE PARA TOMA A TIERRA

ARANDELA CUADRADA CURVA DE A°G°, 57x57x5mm, 18 mm ∅


CRUCETA METÁLICA DE FºGº DE 64x64x6.4x2400mm. Según E.T.
MAQUINADO, CON TUERCA, CONTRATUERCA Y ARANDELA

RIOSTRA METÁLICA DE F°G° DE 64x64x6.4x1000mm Según E.T.

ABRAZADERA TIPO U DE FºGº 64mm x e=6.4mm, DIAM=210mm


VARILLA DE ARMAR PREFORMADA SIMPLE AL-AL, SEGÚN

ESPIGA DE A°G° PARA CRUCETA Y AISLADOR ANSI, SEGUN

64x6.4mm DIAM=206mm, CON 2 PERNOS F°G° DIAM=16mm x

CRUCETA DE Fo Go DE 76x76x6.4x4300mm LONG. SEGUN E.T.

CRUCETA DE Fo Go DE 64x64x6.4x2400mm LONG. SEGUN E.T.


Tubo FºGº de 76.2mm de Ø x 2000mm longitud y espesor =4.75mm
ABRAZADERA TIPO U DE F°G° DE 64x6.4mm DIAM=196mm,

ALAMBRE DE ALUMINIO PARA AMARRE DE 16mm2

RIOSTRA METALICA DE F°G° DE 64x64x6.4x1000mm


CON 2 PERNOS F°G° DE DIAM=16mm x 102mm, TUERCA Y

CONDUCTOR DESNUDO COOPERWELD DE 25mm2


PERNO MAQUINADO DE A°G°, 16 mm ∅ x 254 mm LONG.,

ESPIGA VERTICE PUNTA DE POSTE DE 50.8mm x 609mm

ABRAZADERA PARTIDA TIPO CAS SIMPLE DE F°G° DE

MENSULA DE F°G° DE 64x64x6.4x2500mm, SEGUN E. T.


CONECTOR DE COBRE TIPO PERNO PARTIDO PARA

CONECTOR DE AL-AL 25/120 mm2 02 PERNOS


ALAMBRE DE ALUMINIO PARA AMARRE DE 16mm2

x 305 mm LONG. R=1


CONDUCTOR DESNUDO COOPERWELD DE 25mm2

TUERCA OJO DE F°G° PARA PERNO DE 16mm2


E S T R U C T U R A

GRAPA DE ANGULO ACERO/ALUMINIO

GRILLETE DE F°G° DE ANCLAJE


102mm, TUERCA Y ARANDELA

PERNO OJO DE A°G°, 16 mm


DE ESPIGAS Y/ O PERNOS

CINTA PLANA DE ARMAR


CONDUCTOR DE 25 mm2

CABEZA PB 35mm
REQUERIMIENTO

NOTA INDICADA
Y ARANDELA

DE AGUJERO
ARANDELA
N° POSTES NOMINACION MATERIAL N° RETENIDAS COTA (m.s.n.m) AISLADOR 56-3 AISLADOR 56-4 TIPO DE TERRENO DERIVACIÓN
Nro. TIPO

1 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,032 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -


2 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,034 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
3 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,024 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
NMT000187008 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 12/400 C.A.C. - - 4,020 - - 6 56-4 - T-N ACC DS-3 1 6 1 1 8 3 3 1 1 2 - 1
NMT000187006 PA2-3 2 2 15 - 3 - - - - - - - - 3 6 3 - - - - - - - - - - - - - - - - - - - - - 1 12/400 12/400 C.A.C. 3 - 4,005 3 - - 56-4 1 T-N ACC - - - - - - - - - - - - - 1
6 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,007 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
7 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,010 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
8 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,015 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
9 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,013 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
10 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,001 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
11 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 3,998 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
NMT000187002 PA3-3 4 4 15 - - - - - - - - - - - 6 6 6 6 - - - - - - - - - - - - - - - - - - - 1 12/400 12/400 C.A.C. 2 - 4,000 6 - - 56-4 - T-N ACC - - - - - - - - - - - - - 2
13 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,006 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
14 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,019 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
15 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,024 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
16 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,013 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
17 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,009 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
NMT000187001 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 12/400 C.A.C. - - 3,999 - - 4 56-4 - T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 -
NMT000186999 PA2-3 2 2 15 - 3 - - - - - - - - 3 6 3 - - - - - - - - - - - - - - - - - - - - - 1 12/400 12/400 C.A.C. 1 - 3,995 3 - - 56-4 - T-N ACC - - - - - - - - - - - - - 1
NMT000186998 PA3-3 4 4 15 - - - - - - - - - - - 6 6 6 6 - - - - - - - - - - - - - - - - - - - 1 12/400 12/400 C.A.C. 3 - 3,993 6 - - 56-4 - T-N ACC - - - - - - - - - - - - - 2
NMT000186997 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 12/400 C.A.C. - - 3,997 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
NMT000186996 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 12/400 C.A.C. - - 4,001 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
23 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,004 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
24 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,010 - - 3 56-4 - T-N ACC - - - - - - - - - - - - - 2
NMT000187817 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 12/400 C.A.C. 3 - 4,015 6 - 1 56-4 - T-N ACC - - - - - - - - - - - - -
NMT000187820 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 12/400 C.A.C. - - 4,017 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
27 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,022 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
28 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,026 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
29 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,029 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
30 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,031 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
NMT000187821 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 12/400 C.A.C. - - 4,033 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
32 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,034 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
33 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,038 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
34 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,039 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
NMT000187822 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 12/400 C.A.C. - - 4,041 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
36 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,041 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
NMT000187823 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 12/400 C.A.C. 3 - 4,042 6 - 1 56-4 1 T-N ACC - - - - - - - - - - - - - 2
NMT000187824 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 13/400 C.A.C. - 4,045 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
NMT000187827 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 0 C.A.C. - - 4,050 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
NMT000187837 PSVE-3(MFG) - - 15 7.5 3 4 - - 3 - 1 - - - - - - - - - - - - - - - - 1 1 1 1 1 3 - - - - 1 13/400 13/400 C.A.C. - - 4,050 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
41 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,049 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
42 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,052 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
NMT000187027 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 12/400 C.A.C. - - 4,053 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
44 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,053 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
45 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,053 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
46 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,052 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
47 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,051 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
48 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,050 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
49 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,048 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
50 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,047 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
51 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 0 EXISTENTE EXISTENTE C.A.C. - - 4,056 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
NMT000187827 PS1-3 1 2 15 7.5 3 3 2 1 2 1 1 2 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 12/400 12/400 C.A.C. - - 4,056 - - 3 56-4 - T-N ACC - - - - - - - - - - - - -
NMT000187828 PR3-3 1 2 15 2.5 - 6 2 1 - - - 4 1 - 2 1 6 6 6 6 4 1 - - - - - - - - - - - - - - - 1 12/400 12/400 C.A.C. 3 - 4,012 6 - 1 56-4 1 T-N ACC - - - - - - - - - - - - - 3
TOTAL 18 18 0 36 3 13

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 0 0 9 31 9 31
PA2-3 0 0 2 7 2 7
PA3-3 0 0 2 2 2 2
PR3-3 0 0 3 5 3 5
SECC 0 0 0 0 0 0
PSVE-3(MFG) 0 0 3 3 3 3
PSEC-3 (MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 0 0 0 0
PSH-3 0 0 0 16 0 16
PRH-3 0 0 0 4 0 4
P3A2-3 0 0 0 3 0 3
DS-0 0 0 1 2 1 2
DS-2 0 0 0 0 0 0
DS-3 0 0 1 1 1 1
PS1-3 12/300 0 0 34 36 34 36

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 16 78 0 12 16 90 16 67 0 23 16 90
13/400 2 0 0 0 2 0 2 0 0 0 2 0

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 18 44 0 8 18 52 18 42 0 10 18 52
RY-A 0 0 0 1 1 0

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR

ITEM 35mm2 50mm2 70mm2 120mm2

PS1-3 3 129
PA2-3 3 6
PSVE-3(MFG) 3 9
PSH-3 3 0
TOTAL 0 144
Nota: El conductor existente es de 70mm2 en la totalidad de las estructuras

Volumen de excavación Volumen de relleno cimentación


(m3 POR UNIDAD) sub total factor sub total
ITEM CANTIDAD CANTIDAD DOSIFICACIÓN DEL CONCRETO X 1 m3
12/400 16 0.7 11.2 0.57 9.12 9.12 0 1.59 0
13/400 2 0.75 1.5 0.59 1.18 1.18 CEMENTO (bol) 2.63 27.09
PIEDRA MEDIANA (m3)
RI-A 16 1.2443 19.91 1.2243 19.59 0.656 6.76
RY-A 1.08 0 1.06 0 HORMIGÓN (m3) 0.297 3.06
PAT 0 1.53 0 1.4 0
PAT-C 18 0.32 5.76
sub total (m3) 38.37 sub total (m3) 19.59 10.3 0
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: AYAVIRI >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
<=3900 = PIN 65-3 No Accesible a la Grua = INAX
sub total (Tierra
Negra)
0 Total (m3) de concreto ciclopeo 10.3
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 0.00
RI-A 0
TOTAL 0.00 38.37
Se considera para metrado 1
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: PUTINA >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
<=3900 = PIN 65-3 No Accesible a la Grua = INAX

E S T R U C T U R A

ACCESIBILIDAD AL
PUESTA A TIPO DE DESCARGADOR DESMONTAJE DE
Nro. CODIGO TIPO N° POSTES NOMINACION MATERIAL N° RETENIDAS COTA (m.s.n.m) TIPO DE TERRENO TERRENO LUGAR DE DERIVACIÓN
TIERRA PAT-1 AISLADOR TIPO BAYONETA
IZAJE RETENIDA

0
1 NMT000191098 PR3-3 1 13/400 C.A.C. 3 1 3,979 56-4 - T-N ACC - 3
SEC 3,979 56-4
2 NMT000191102 PA3-3 1 12/400 C.A.C. 1 - 4,123 56-4 1 ROCA INAX - 2
3 NMT000191104 PR3-3 1 12/400 C.A.C. 3 - 4,133 56-4 1 ROCA INAX - 3
4 P-04 1 12/400 - - 4,241 56-4 T-N ACC -
5 P-05 1 12/400 - - 4,257 56-4 - T-N ACC -
6 P-06 1 12/400 - - 4,293 56-4 - T-N ACC -
7 NMT000191108 PS1-3 1 12/400 C.A.C. - - 4,315 56-4 - T-N INAX -
8 NMT000191109 PS1-3 1 12/400 C.A.C. - - 4,329 56-4 - T-N INAX -
9 NMT000191110 PR3-3 1 12/400 C.A.C. 2 - 4,332 56-4 1 ROCA INAX - 2
10 NMT000191111 PS1-3 1 12/400 C.A.C. - - 4,345 56-4 - T-N INAX -
11 NMT000191112 PS1-3 1 12/400 C.A.C. - - 4,399 56-4 - T-N ACC -
12 NMT000191114 PR3-3 1 12/400 C.A.C. 2 - 4,391 56-4 1 T-N ACC - 2
13 NMT000191115 PS1-3 1 12/400 C.A.C. - - 4,395 56-4 - T-N ACC -
14 NMT000191116 PS1-3 1 12/400 C.A.C. - - 4,502 56-4 - T-N INAX -
15 NMT000191119 PS1-3 1 12/400 C.A.C. - - 4,510 56-4 T-N INAX -
16 NMT000191120 PS1-3 1 12/400 C.A.C. - - 4,520 56-4 - T-N INAX -
17 NMT000191121 PR3-3 1 12/400 C.A.C. 2 - 4,524 56-4 1 T-N INAX - 2
18 NMT000191122 PS1-3 1 12/400 C.A.C. - - 4,531 56-4 - T-N ACC -
19 NMT000191124 PS1-3 1 12/400 C.A.C. - - 4,541 56-4 - T-N ACC -
20 NMT000206387 PS1-3 1 12/400 C.A.C. - - 4,541 56-4 1 T-N ACC -
21 NMT000191125 PR3-3 1 12/400 C.A.C. 2 - 4,555 56-4 - T-N ACC - 2
22 NMT000191126 PSH-3 2 12/400 C.A.C. - - 4,577 56-4 1 T-N ACC -
23 NMT000191127 PS1-3 1 12/400 C.A.C. - - 4,567 56-4 - T-N ACC -
24 NMT000191129 PS1-3 1 12/400 C.A.C. - - 4,580 56-4 - T-N INAX -
25 NMT000191130 PR3-3 1 12/400 C.A.C. 2 - 4,592 56-4 1 T-N ACC - 2
TOTAL 26 17 1 8 18

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 0 0 13 15 13 15
PA2-3 0 0 0 0 0 0
PA3-3 0 0 1 1 1 1
PR3-3 0 0 7 8 7 8
SEC 0 0 1 1 1 1
PSVE-3(MFG) 0 0 0 0 0 0
PSEC-3 (MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 0 0 0 0
PSH-3 0 0 1 1 1 1
PRH-3 0 0 0 0 0 0
P3A2-3 0 0 0 0 0 0
DS-0 0 0 0 0 0 0
DS-2 0 0 0 0 0 0
DS-3 0 0 0 0 0 0

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 22 23 3 2 25 25 11 22 11 3 22 25
13/400 1 1 0 0 1 1 1 1 0 0 1 1

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 11 15 6 5 17 20 9 13 8 7 17 20
RY-A 0 0 0 0

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 39
PSVE-3(MFG) 3 0
PSH-3 3 3
TOTAL 0 0 42
Nota: El conductor existente es de 120mm2 en la totalidad de las estructuras

Volumen de excavación Volumen de relleno cimentación


(m3 POR (m3 de relleno x cimentación n° postes con
sub total factor sub total TOTAL DE
UNIDAD) unidad) Típica cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM CANTIDAD CANTIDAD MATERIAL
12/400 22 0.7 15.4 0.57 10.83 10.83 0 1.59 0
13/400 1 0.75 0.75 0.59 0.59 0.59 CEMENTO BOL 2.63 34.53
12/400 ROCA 3 0.7 2.1 0.57 1.71 1.71
PIEDRA MEDIANA
RI-A 11 1.24 13.6873 1.22 13.46 m3 0.656 8.61

RI-A ROCA 6 1.24 7.4658 1.22 7.35


RY-A 0 1.08 0 1.06 0 HORMIGÓN 0.297 3.90
PAT 1 1.53 1.53 1.4 1.4
PAT-C 21 0.32 6.72
sub total (m3) 38.09 sub total (m3) 20.81 13.13 0

sub total (Tierra


Negra)
1.4 Total (m3) de concreto ciclopeo 13.13
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 2.10
RI-A 7.47
TOTAL 9.57 38.09 m3
Se considera para metrado

1
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: HUANCANE >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
<=3900 = PIN 65-3 No Accesible a la Grua = INAX

MENSULA DE Fo Go DE 64x64x6.4x1200mm LONG.

CRUCETA DE Fo Go DE 64x64x6.4x2400mm LONG.


F°G° DE 16mm x 102mm, TUERCA Y ARANDELA
PERNO HEXAGONAL DE F°G° DE 16mm Diam. x

ABRAZADERA PARTIDA TIPO CAS SIMPLE DE


ESPIGA DE A°G° PARA CRUCETA Y AISLADOR
CONECTOR DE COBRE TIPO PERNO PARTIDO

PLANCHA DOBLADA TIPO J DE COBRE PARA


CONECTOR DE AL-AL 25/120 mm2 02 PERNOS

F°G° DE 64x6.4 DIAM=218mm, CON 2 PERNOS


ALAMBRE DE ALUMINIO PARA AMARRE DE

ABRAZADERA TIPO U DE FºGº DE 208mm ø x


64x6.4mm, CON 2 PERNOS FºGº DE 16mm ø x
CONDUCTOR DESNUDO COOPERWELD DE
TOMA A TIERRA DE ESPIGAS Y/ O PERNOS
E S T R U C T U R A

RIOSTRA METALICA DE F°G° DE


ANSI, SEGUN NOTA INDICADA
PARA CONDUCTOR DE 25 mm2

102mm, TUERCA Y ARANDELA


76mm, TUERCA Y ARANDELA

64x64x6.4x1000mm

SEGUN E.T.

SEGUN E.T.
ACCESIBILIDAD AL
PUESTA A TIPO DE DESCARGADOR DESMONTAJE DE

25mm2

16mm2
Nro. CODIGO TIPO N° POSTES NOMINACION MATERIAL N° RETENIDAS COTA (m.s.n.m) TIPO BAYONETA
TIPO DE TERRENO TERRENO LUGAR DE DERIVACIÓN AISLADOR 56-3 AISLADOR 56-4
TIERRA PAT-1 AISLADOR IZAJE RETENIDA

0
1 NMT000190658 PS1-3 1 12/400 C.A.C. 1 - 3,682 56-3 1 T-N ACC - - - - - - - - - - - - - - - 1
2 NMT000190659 PS1-3 1 12/400 C.A.C. - - 3,684 56-3 - T-N ACC - - - - - - - - - - - - - - -
3 NMT000190660 PS1-3 1 12/400 C.A.C. - - 3,688 56-3 - T-N ACC - - - - - - - - - - - - - - -
4 NMT000190661 PS1-3 1 12/400 C.A.C. - - 3,695 56-3 1 T-N ACC - - - - - - - - - - - - - - -
5 NMT000190662 PS1-3 1 12/400 C.A.C. - - 3,699 56-3 - T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 - 1 -
6 NMT000190664 PS1-3 1 12/400 C.A.C. - - 3,705 56-3 - T-N ACC - - - - - - - - - - - - - - -
7 NMT000190665 PS1-3 1 12/400 C.A.C. - - 3,719 56-3 1 T-N ACC - - - - - - - - - - - - - - -
8 NMT000190666 PS1-3 1 12/400 C.A.C. - - 3,726 56-3 - T-N ACC - - - - - - - - - - - - - - -
9 NMT000190667 PS1-3 1 12/400 C.A.C. - - 3,746 56-3 - T-N ACC - - - - - - - - - - - - - - -
10 NMT000190669 PS1-3 1 12/400 C.A.C. - - 3,752 56-3 - T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 - 1 -
11 NMT000190670 PR3-3 1 12/400 C.A.C. 1 - 3,752 56-3 - T-N ACC - - - - - - - - - - - - - - - 2
12 NMT000190671 PS1-3 1 12/400 C.A.C. - - 3,750 56-3 - T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 - 1 -
13 NMT000190672 PS1-3 1 12/400 C.A.C. - - 3,754 56-3 - T-N ACC - - - - - - - - - - - - - - -
14 NMT000190673 PS1-3 1 12/400 C.A.C. - - 3,834 56-3 - T-N ACC - - - - - - - - - - - - - - -
15 NMT000190674 PS1-3 1 12/400 C.A.C. - - 3,836 56-3 1 T-N ACC - - - - - - - - - - - - - - -
16 NMT000190675 PS1-3 1 12/400 C.A.C. - - 3,839 56-3 - T-N ACC - - - - - - - - - - - - - - -
17 NMT000190676 PS1-3 1 12/400 C.A.C. - - 3,845 56-3 - T-N ACC - - - - - - - - - - - - - - -
18 NMT000190677 PS1-3 1 12/400 C.A.C. - - 3,843 56-3 - T-N ACC - - - - - - - - - - - - - - -
19 NMT000190680 PS1-3 1 12/400 C.A.C. - - 3,851 56-3 - T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 - 1 -
20 NMT000190682 PS1-3 1 12/400 C.A.C. - - 3,823 56-3 - T-N ACC - - - - - - - - - - - - - - -
21 NMT000190684 PS1-3 1 12/400 C.A.C. - - 3,822 56-3 - T-N ACC - - - - - - - - - - - - - - -
22 NMT000190685 PS1-3 1 12/400 C.A.C. - - 3,823 56-3 - T-N ACC DS-3 1 6 1 1 8 3 3 1 1 2 - 1 3 -
NMT000202380 PR3-3 1 13/400 C.A.C. 2 1 3,878 56-3 T-N ACC - - - - - - - - - - - - - -
SEC 56-3 - - - - - - - - - - - - - -
23 NMT000190686 PR3-3 1 13/400 C.A.C. 2 1 3,875 56-3 - T-N ACC - - - - - - - - - - - - - - - 2
SEC 3,875 56-3 - - - - - - - - - - - - - -
TOTAL 24 6 2 4 5

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 21 22 0 0 21 22
PA2-3 0 1 0 0 0 1
PA3-3 0 0 0 0 0 0
PR3-3 3 2 0 0 3 2
SEC 2 1 0 0 2 1
PSVE-3(MFG) 0 0 0 0 0 0
390 PSEC-3 (MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 0 0 0 0
PSH-3 0 0 0 0 0 0
PRH-3 0 0 0 0 0 0
P3A2-3 0 0 0 0 0 0
DS-0 4 5 0 0 4 5
DS-2 0 0 0 0 0 0
DS-3 1 2 0 0 1 2

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 22 24 0 0 22 24 22 24 0 0 22 24
13/400 2 1 0 0 2 1 2 1 0 0 2 1

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 6 5 0 0 6 5 6 5 0 0 6 5
RY-A 0 0 0 0

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 63
PSVE-3(MFG) 3 0
PSH-3 3 0
TOTAL 63 0 0 0
Nota: El conductor existente es de 35mm2 en la totalidad de las estructuras

Volumen de excavación Volumen de relleno cimentación


(m3 de relleno x cimentación n° postes con
(m3 POR UNIDAD) sub total factor sub total TOTAL DE
unidad) Típica cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM CANTIDAD CANTIDAD MATERIAL
12/400 22 0.7 15.4 0.57 12.54 12.54 0 1.59 0
13/400 2 0.75 1.5 0.59 1.18 1.18 CEMENTO (bol) 2.63 36.08
PIEDRA MEDIANA (m3)
RI-A 6 1.24 7.44 1.22 7.35 0.656 9
RY-A 0 1.08 0 1.06 0 HORMIGÓN (m3) 0.297 4.07
PAT 2 1.53 3.06 1.4 2.8
PAT-C 22 0.32 7.04
sub total (m3) 34.47 sub total (m3) 7.35 13.72 0

sub total (Tierra


Negra)
2.8 Total (m3) de concreto ciclopeo 13.72
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 0.00
RI-A 0
TOTAL 0.00 34.47 m3
Se considera para metrado

1
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: ANTAUTA >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
<=3900 = PIN 65-3 No Accesible a la Grua = INAX

64x6.4mm, CON 2 PERNOS FºGº DE 16mm ø x 102mm,


CONDUCTOR DESNUDO COOPERWELD DE 25mm2

F°G° DE 64x6.4 DIAM=218mm, CON 2 PERNOS F°G°

MENSULA DE Fo Go DE 64x64x6.4x1200mm LONG.

CRUCETA DE Fo Go DE 64x64x6.4x2400mm LONG.


PERNO HEXAGONAL DE F°G° DE 16mm Diam. x

ABRAZADERA PARTIDA TIPO CAS SIMPLE DE


ESPIGA DE A°G° PARA CRUCETA Y AISLADOR
CONECTOR DE COBRE TIPO PERNO PARTIDO

CONECTOR DE AL-AL 25/120 mm2 02 PERNOS

PLANCHA DOBLADA TIPO J DE COBRE PARA

ALAMBRE DE ALUMINIO PARA AMARRE DE

ABRAZADERA TIPO U DE FºGº DE 208mm ø x


TOMA A TIERRA DE ESPIGAS Y/ O PERNOS

DE 16mm x 102mm, TUERCA Y ARANDELA


E S T R U C T U R A

RIOSTRA METALICA DE F°G° DE


ANSI, SEGUN NOTA INDICADA
PARA CONDUCTOR DE 25 mm2

76mm, TUERCA Y ARANDELA

TUERCA Y ARANDELA

64x64x6.4x1000mm

SEGUN E.T.

SEGUN E.T.
ACCESIBILIDAD AL
PUESTA A TIPO DE DESCARGADOR DESMONTAJE DE

16mm2
Nro. CODIGO TIPO N° POSTES NOMINACION MATERIAL N° RETENIDAS COTA (m.s.n.m) TIPO DE TERRENO TERRENO LUGAR DE DERIVACIÓN AISLADOR 56-3 AISLADOR 56-4
TIERRA PAT-1 AISLADOR TIPO BAYONETA
IZAJE RETENIDA

0
1 NMT000191857 PS1-3 1 12/400 C.A.C. - - 4,140 56-4 - T-N ACC - - - - - - - - - - - - - - -
2 NMT000191858 PS1-3 1 12/400 C.A.C. - - 4,136 56-4 - T-N ACC - - - - - - - - - - - - - - -
3 NMT000191859 PS1-3 1 12/400 C.A.C. - - 4,135 56-4 - T-N ACC - - - - - - - - - - - - - - -
4 NMT000191860 PS1-3 1 12/400 C.A.C. - - 4,133 56-4 - T-N ACC - - - - - - - - - - - - - - -
5 NMT000191862 PS1-3 1 12/400 C.A.C. - - 4,130 56-4 - T-N ACC - - - - - - - - - - - - - - -
6 NMT000191864 PS1-3 1 12/400 C.A.C. - - 4,127 56-4 - T-N ACC - - - - - - - - - - - - - - -
7 NMT000191865 PA3-3 1 12/400 C.A.C. 2 - 4,125 56-4 1 T-N ACC - - - - - - - - - - - - - - - 2
8 NMT000191866 PS1-3 1 12/400 C.A.C. - - 4,124 56-4 - T-N ACC - - - - - - - - - - - - - - -
9 NMT000191867 PS1-3 1 12/400 C.A.C. - - 4,125 56-4 - T-N ACC - - - - - - - - - - - - - - -
10 NMT000191868 PS1-3 1 12/400 C.A.C. - - 4,120 56-4 - T-N ACC - - - - - - - - - - - - - - -
11 NMT000191870 PS1-3 1 12/400 C.A.C. - - 4,126 56-4 - T-N ACC - - - - - - - - - - - - - - -
12 NMT000191871 PS1-3 1 12/400 C.A.C. - - 4,133 56-4 T-N ACC - - - - - - - - - - - - - - -
13 NMT000191874 PA2-3 1 12/400 C.A.C. 1 - 4,127 56-4 1 ROCA INAX - - - - - - - - - - - - - - - 1
14 NMT000191876 PR3-3 1 12/400 C.A.C. 2 - 4,139 56-4 ROCA ACC - - - - - - - - - - - - - - - 2
15 NMT000191877 PS1-3 1 12/400 C.A.C. - - 4,136 56-4 - T-N ACC - - - - - - - - - - - - - - -
16 NMT000191878 PS1-3 1 12/400 C.A.C. - - 4,121 56-4 - ROCA INAX - - - - - - - - - - - - - - -
17 NMT000191879 PR3-3 1 12/400 C.A.C. 2 - 4,118 56-4 1 ROCA INAX - - - - - - - - - - - - - - - 2
18 NMT000191880 PS1-3 1 12/400 C.A.C. - - 4,115 56-4 T-N ACC DS-3 1 6 1 1 8 3 3 1 1 2 - 1 - 3
19 NMT000191881 PA3-3 1 12/400 C.A.C. 3 - 4,134 56-4 - T-N ACC - - - - - - - - - - - - - - - 2
20 NMT000191882 PR3-3 1 13/400 C.A.C. 2 1 4,098 56-4 - T-N ACC - - - - - - - - - - - - - - 2
SEC 4,099 56-4 - - - - - - - - - - - - - - -
21 NMT000191883 P3A2-3 3 12/400 C.A.C. 6 - 4,091 56-4 - ROCA INAX - - - - - - - - - - - - - - - 6
22 NMT000191885 PSH-3 2 12/400 C.A.C. - 0 4,091 56-4 T-N ACC - - - - - - - - - - - - - - -
23 NMT000191888 PSH-3 2 12/400 C.A.C. - - 4,092 56-4 T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 - - 1
24 NMT000191890 P3A2-3 3 12/400 C.A.C. 6 - 4,093 56-4 3 ROCA INAX - - - - - - - - - - - - - - - 6
25 NMT000191894 PS1-3 1 12/400 C.A.C. - - 4,091 56-4 - T-N INAX - - - - - - - - - - - - - - -
26 NMT000191897 PS1-3 1 12/400 C.A.C. - - 4,090 56-4 1 T-N INAX - - - - - - - - - - - - - - -
27 NMT000191899 PS1-3 1 12/400 C.A.C. - - 4,191 56-4 T-N INAX - - - - - - - - - - - - - - -
28 NMT000191900 PSH-3 2 12/400 C.A.C. - - 4,183 56-4 - T-N ACC - - - - - - - - - - - - - - - INAX
29 NMT000191901 PS1-3 1 12/400 C.A.C. - - 4,175 56-4 T-N ACC - - - - - - - - - - - - - - -
30 NMT000191902 PS1-3 1 12/400 C.A.C. - - 4,168 56-4 T-N ACC - - - - - - - - - - - - - - -
31 NMT000191903 PA3-3 1 12/400 C.A.C. 3 - 4,176 56-4 1 T-N ACC - - - - - - - - - - - - - - - 2
32 NMT000191904 PS1-3 1 12/400 C.A.C. - - 4,161 56-4 - T-N INAX - - - - - - - - - - - - - - -
33 NMT000191905 PS1-3 1 12/400 C.A.C. - - 4,119 56-4 - T-N INAX - - - - - - - - - - - - - - -
34 NMT000191906 PS1-3 1 12/400 C.A.C. - - 4,077 56-4 T-N INAX - - - - - - - - - - - - - - -
35 NMT000191907 PS1-3 1 12/400 C.A.C. - - 4,113 56-4 - T-N INAX DS-0 1 2 1 1 3 2 1 1 1 1 1 - - 1
36 NMT000191908 PR3-3 1 12/400 C.A.C. 2 - 4,119 56-4 - T-N INAX - - - - - - - - - - - - - - - 2
37 NMT000191909 PS1-3 1 12/400 C.A.C. - - 4,124 56-4 1 T-N INAX - - - - - - - - - - - - - - -
38 NMT000191910 PS1-3 1 12/400 C.A.C. - - 4,125 56-4 - T-N INAX DS-0 1 2 1 1 3 2 1 1 1 1 1 - - 1
39 NMT000191911 PS1-3 1 12/400 C.A.C. - - 4,127 56-4 - T-N INAX - - - - - - - - - - - - - - -
40 NMT000191912 PR3-3 1 12/400 C.A.C. 3 - 4,130 56-4 1 T-N ACC - - - - - - - - - - - - - - -
41 NMT000191913 P3A2-3 3 12/400 C.A.C. 6 - 4,151 56-4 - T-N INAX - - - - - - - - - - - - - - - 6
42 NMT000191914 P3A2-3 3 12/400 C.A.C. 6 - 4,172 56-4 3 T-N INAX - - - - - - - - - - - - - - - 6
43 NMT000192657 PR3-3 1 12/400 C.A.C. 3 - 4,157 56-4 1 T-N ACC - - - - - - - - - - - - - - - 3
44 NMT000192658 PS1-3 1 12/400 C.A.C. - - 4,149 56-4 - T-N ACC - - - - - - - - - - - - - - -
45 NMT000192660 PS1-3 1 12/400 C.A.C. - - 4,126 56-4 - T-N ACC - - - - - - - - - - - - - - -
46 NMT000192662 PR3-3 1 12/400 C.A.C. 2 - 4,119 56-4 T-N INAX - - - - - - - - - - - - - - - 2
47 NMT000192665 PS1-3 1 12/400 C.A.C. - - 4,101 56-4 1 T-N INAX - - - - - - - - - - - - - - -
48 NMT000192666 PS1-3 1 12/400 C.A.C. - - 4,114 56-4 - T-N INAX - - - - - - - - - - - - - - -
49 NMT000192667 PR3-3 1 12/400 C.A.C. 2 - 4,112 56-4 1 T-N INAX - - - - - - - - - - - - - - - 2
50 NMT000192668 PS1-3 1 12/400 C.A.C. - - 4,184 56-4 T-N ACC DS-3 1 6 1 1 8 3 3 1 1 2 - 1 - 3
51 NMT000192704 PR3-3 1 13/400 C.A.C. 1 1 4,180 56-4 T-N ACC - - - - - - - - - - - - - - - 1
SEC 4,181 56-4 - - - - - - - - - - - - - - -
52 NMT000192673 PS1-3 1 12/400 C.A.C. - - 4,191 56-4 1 T-N ACC - - - - - - - - - - - - - - -
53 NMT000192674 PS1-3 1 12/400 C.A.C. - - 4,201 56-4 T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 - - 1
54 NMT000192675 PS1-3 1 12/400 C.A.C. - - 4,211 56-4 T-N ACC - - - - - - - - - - - - - - -
55 NMT000192676 PS1-3 1 12/400 C.A.C. - - 4,222 56-4 T-N INAX - - - - - - - - - - - - - - -
56 NMT000192677 PS1-3 1 12/400 C.A.C. - - 4,180 56-4 1 T-N INAX - - - - - - - - - - - - - - -
57 NMT000192678 PS1-3 1 12/400 C.A.C. - - 4,175 56-4 1 ROCA INAX - - - - - - - - - - - - - - -
58 NMT000192679 PS1-3 1 12/400 C.A.C. - - 4,176 56-4 - ROCA INAX - - - - - - - - - - - - - - -
59 NMT000192680 PS1-3 1 12/400 C.A.C. - - 4,176 56-4 ROCA INAX - - - - - - - - - - - - - - -
60 NMT000192681 PA3-3 1 12/400 C.A.C. 3 - 4,181 56-4 - ROCA INAX - - - - - - - - - - - - - - - 1
61 NMT000192682 PS1-3 1 12/400 C.A.C. - - 4,183 56-4 - ROCA INAX - - - - - - - - - - - - - - -
62 NMT000192683 PS1-3 1 12/400 C.A.C. - - 4,187 56-4 ROCA INAX - - - - - - - - - - - - - - -
63 NMT000192684 PS1-3 1 12/400 C.A.C. - - 4,190 56-4 T-N INAX - - - - - - - - - - - - - - -
64 NMT000192685 PS1-3 1 12/400 C.A.C. - - 4,220 56-4 1 T-N INAX - - - - - - - - - - - - - - -
65 NMT000192686 PS1-3 1 12/400 C.A.C. - - 4,231 56-4 T-N INAX - - - - - - - - - - - - - - -
66 NMT000192687 PS1-3 1 12/400 C.A.C. - - 4,241 56-4 T-N INAX - - - - - - - - - - - - - - -
67 NMT000192688 PS1-3 1 12/400 C.A.C. - - 4,252 56-4 T-N INAX - - - - - - - - - - - - - - -
68 NMT000192689 P3A2-3 3 12/400 C.A.C. 6 - 4,290 56-4 - T-N INAX - - - - - - - - - - - - - - - 6
69 NMT000192690 P3A2-3 3 12/400 C.A.C. 6 - 4,291 56-4 3 T-N INAX - - - - - - - - - - - - - - - 6
70 NMT000192691 PS1-3 1 12/400 C.A.C. - - 4,294 56-4 T-N INAX - - - - - - - - - - - - - - -
71 NMT000192692 PA2-3 1 12/400 C.A.C. 1 - 4,287 56-4 T-N ACC - - - - - - - - - - - - - - - 1
72 NMT000192694 PS1-3 1 12/400 C.A.C. - - 4,281 56-4 - T-N ACC - - - - - - - - - - - - - - -
73 NMT000192695 PS1-3 1 12/400 C.A.C. - - 4,275 56-4 - T-N ACC - - - - - - - - - - - - - - -
74 NMT000192696 PS1-3 1 12/400 C.A.C. - - 4,267 56-4 T-N ACC - - - - - - - - - - - - - - -
75 NMT000192697 PR3-3 1 12/400 C.A.C. 2 - 4,261 56-4 1 T-N INAX - - - - - - - - - - - - - - - 2
76 NMT000192698 PS1-3 1 12/400 C.A.C. - - 4,257 56-4 - T-N INAX - - - - - - - - - - - - - - -
77 NMT000192699 PS1-3 1 12/400 C.A.C. - - 4,252 56-4 - T-N INAX - - - - - - - - - - - - - - -
78 NMT000192700 PS1-3 1 12/400 C.A.C. - - 4,243 56-4 1 T-N INAX - - - - - - - - - - - - - - -
79 NMT000192701 PS1-3 1 12/400 C.A.C. - - 4,278 56-4 T-N INAX - - - - - - - - - - - - - - -
80 NMT000192702 PR3-3 1 12/400 C.A.C. 2 - 4,301 56-4 - T-N INAX - - - - - - - - - - - - - - - 2
TOTAL 95 72 2 25 65

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 0 0 54 54 54 54

PA2-3 0 0 2 2 2 2
PA3-3 0 0 4 4 4 4
PR3-3 0 0 11 10 11 10
SEC 0 0 2 2 2 2
PSVE-3(MFG) 0 0 0 0 0 0
PSEC-3 (MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 0 0 0 0
PSH-3 0 0 3 3 3 3
PRH-3 0 0 0 0 0 0
P3A2-3 0 0 6 6 6 6
DS-0 0 0 4 5 4 5
DS-2 0 0 0 0 0 0
DS-3 0 0 2 2 2 2

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 77 78 16 16 93 94 37 80 56 14 93 94
13/400 2 1 0 0 2 1 2 1 0 0 2 1

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 52 52 20 19 72 71 20 55 52 16 72 71
RY-A 0 0 0 0

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 162
PA2-3 3 6
PSVE-3(MFG) 3 0
PSH-3 3 9
TOTAL 0 0 177 0
Nota: El conductor existente es de 70mm2 en la totalidad de las estructuras

Volumen de excavación Volumen de relleno cimentación


(m3 POR (m3 de relleno x cimentación n° postes con
sub total factor TOTAL DE
UNIDAD) unidad) Típica cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM CANTIDAD CANTIDAD MATERIAL
12/400 77 0.7 53.9 0.57 43.89 43.89 0 1.75 0

13/400 2 0.75 1.5 0.59 1.18 1.18 CEMENTO (bol) 2.63 142.52

12/400 ROCA 16 0.7 11.2 0.57 9.12 9.12


PIEDRA MEDIANA
RI-A 49 1.24 60.97 1.22 59.78 (m3) 0.656 35.55

RI-A ROCA 20 1.24 24.8 1.22 24.4

HORMIGÓN (m3)
RY-A 0 1.08 0 1.06 0 0.297 16.09
PAT 2 1.53 3.06 1.4 2.8
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: ANTAUTA >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
<=3900 = PIN 65-3 No Accesible a la Grua = INAX

PAT-C 90 0.32 28.8


sub total (m3) 148.23 sub total (m3) 84.18 54.19 0
sub total (Tierra
Negra) 2.8 Total (m3) de concreto ciclopeo 54.19
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 11.20
RI-A 24.8
TOTAL 36.00 148.23 m3
Se considera para metrado

1
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: ANTAUTA >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
Dec-99 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR AISLADOR AISLADOR TIPO DE DESMONTAJE DE
A TIERRA A TIERRA (m.s.n.m) TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
INSTALADAS EXCAVADAS RPP 25 56-3 56-4 AISLADOR RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
0
1 PS1-3 1 12/400 C.A.C. 4,140 - - 3 56-4 - T-N ACC -
2 PS1-3 1 12/400 C.A.C. 4,136 - - 3 56-4 - T-N ACC -
3 PS1-3 1 12/400 C.A.C. 4,135 - - 3 56-4 - T-N ACC -
4 PS1-3 1 12/400 C.A.C. 4,133 - - 3 56-4 - T-N ACC -
5 PS1-3 1 12/400 C.A.C. 4,130 - - 3 56-4 - T-N ACC -
6 PS1-3 1 12/400 C.A.C. 4,127 - - 3 56-4 - T-N ACC -
7 PA3-3 1 12/400 C.A.C. 4,125 6 - - 56-4 1 T-N ACC - 2
8 PS1-3 1 12/400 C.A.C. 4,124 - - 3 56-4 - T-N ACC -
9 PS1-3 1 12/400 C.A.C. 4,125 - - 3 56-4 - T-N ACC -
10 PS1-3 1 12/400 C.A.C. 4,120 - - 3 56-4 - T-N ACC -
11 PS1-3 1 12/400 C.A.C. 4,126 - - 3 56-4 - T-N ACC -
12 PS1-3 1 12/400 C.A.C. 4,133 - - 3 56-4 T-N ACC -
13 PA2-3 12/400 C.A.C. 4,127 3 - - 56-4 - ROCA INAX - 1
14 PR3-3 1 12/400 C.A.C. 4,139 3 - 1 56-4 1 ROCA ACC - 2
15 PS1-3 1 12/400 C.A.C. 4,136 - - 3 56-4 - T-N ACC -
16 PS1-3 12/400 C.A.C. 4,121 - - 3 56-4 - ROCA INAX -
17 PR3-3 12/400 C.A.C. 4,118 3 - 1 56-4 - ROCA INAX - 2
18 PS1-3 1 12/400 C.A.C. 4,115 - - 3 56-4 T-N ACC DS-3
19 PA3-3 1 12/400 C.A.C. 4,134 6 - - 56-4 - T-N ACC - 2
20 PR3-3 13/400 C.A.C. 4,098 3 - 2 56-4 - T-N ACC DS-0 2
SEC 4,099 - - - 56-4 -
21 P3A2-3 12/400 C.A.C. 4,091 - - 3 56-4 - ROCA INAX - 6
22 PSH-3 1 12/400 C.A.C. 4,091 - - 3 56-4 T-N ACC -
23 PSH-3 1 12/400 C.A.C. 4,092 - - 4 56-4 T-N ACC DS-0
24 P3A2-3 12/400 C.A.C. 4,093 - - 3 56-4 ROCA INAX - 6
25 PS1-3 12/400 C.A.C. 4,091 - - 3 56-4 2 T-N INAX -
26 PS1-3 12/400 C.A.C. 4,090 - - 3 56-4 3 T-N INAX -
27 PS1-3 12/400 C.A.C. 4,191 - - 3 56-4 T-N INAX -
28 PSH-3 12/400 C.A.C. 4,183 - - 3 56-4 - T-N INAX -
29 PS1-3 1 12/400 C.A.C. 4,175 - - 3 56-4 T-N ACC -
30 PS1-3 1 12/400 C.A.C. 4,168 - - 3 56-4 T-N ACC -
31 PA3-3 1 12/400 C.A.C. 4,176 6 - - 56-4 1 T-N ACC - 2
32 PS1-3 12/400 C.A.C. 4,161 - - 3 56-4 - T-N INAX -
33 PS1-3 12/400 C.A.C. 4,119 - - 3 56-4 - T-N INAX -
34 PS1-3 12/400 C.A.C. 4,077 - - 3 56-4 T-N INAX -
35 PS1-3 12/400 C.A.C. 4,113 - - 3 56-4 - T-N INAX DS-0
36 PR3-3 12/400 C.A.C. 4,119 3 - 1 56-4 - T-N INAX - 2
37 PS1-3 12/400 C.A.C. 4,124 - - 3 56-4 1 T-N INAX -
38 PS1-3 12/400 C.A.C. 4,125 - - 3 56-4 - T-N INAX DS-0
39 PS1-3 12/400 C.A.C. 4,127 - - 3 56-4 - T-N INAX -
40 PR3-3 1 12/400 C.A.C. 4,130 3 - 1 56-4 - T-N ACC -
41 P3A2-3 12/400 C.A.C. 4,151 - - 3 56-4 - T-N INAX - 6
42 P3A2-3 12/400 C.A.C. 4,172 - - 3 56-4 1 T-N INAX - 6
43 PR3-3 12/400 C.A.C. 4,157 3 - 1 56-4 T-N ACC - 3
44 PS1-3 12/400 C.A.C. 4,149 - - 3 56-4 - T-N ACC -
45 PS1-3 12/400 C.A.C. 4,126 - - 3 56-4 - T-N ACC -
46 PR3-3 12/400 C.A.C. 4,119 3 - 1 56-4 1 T-N INAX - 2
47 PS1-3 12/400 C.A.C. 4,101 - - 3 56-4 1 T-N INAX -
48 PS1-3 12/400 C.A.C. 4,114 - - 3 56-4 - T-N INAX -
49 PR3-3 12/400 C.A.C. 4,112 3 - 1 56-4 1 T-N INAX - 2
50 PS1-3 1 12/400 C.A.C. 4,184 - - 3 56-4 T-N ACC DS-3
51 PR3-3 13/400 C.A.C. 4,180 3 - 1 56-4 T-N ACC - 1
SEC 4,181 - - - 56-4 -
52 PS1-3 1 12/400 C.A.C. 4,191 - - 3 56-4 1 T-N ACC -
53 PS1-3 1 12/400 C.A.C. 4,201 56-4 T-N ACC DS-0
54 PS1-3 1 12/400 C.A.C. 4,211 56-4 T-N ACC -
55 PS1-3 12/400 C.A.C. 4,222 56-4 T-N INAX -
56 PS1-3 12/400 C.A.C. 4,180 - - 3 56-4 1 T-N INAX -
57 PS1-3 12/400 C.A.C. 4,175 - - 3 56-4 1 ROCA INAX -
58 PS1-3 12/400 C.A.C. 4,176 - - 3 56-4 - ROCA INAX -
59 PS1-3 12/400 C.A.C. 4,176 - - 3 56-4 ROCA INAX -
60 PA3-3 12/400 C.A.C. 4,181 6 - - 56-4 - ROCA INAX - 1
61 PS1-3 12/400 C.A.C. 4,183 - - 3 56-4 - ROCA INAX -
62 PS1-3 12/400 C.A.C. 4,187 - - 3 56-4 ROCA INAX -
63 PS1-3 12/400 C.A.C. 4,190 - - 3 56-4 T-N INAX -
64 PS1-3 12/400 C.A.C. 4,220 - - 3 56-4 1 T-N INAX -
65 PS1-3 12/400 C.A.C. 4,231 - - 3 56-4 T-N INAX -
66 PS1-3 12/400 C.A.C. 4,241 - - 3 56-4 T-N INAX -
67 PS1-3 12/400 C.A.C. 4,252 - - 3 56-4 T-N INAX -
68 P3A2-3 12/400 C.A.C. 4,290 - - 3 56-4 - T-N INAX - 6
69 P3A2-3 12/400 C.A.C. 4,291 - - 3 56-4 - T-N INAX - 6
70 PS1-3 12/400 C.A.C. 4,294 - - 3 56-4 T-N INAX -
71 PA2-3 12/400 C.A.C. 4,287 3 - - 56-4 1 T-N INAX - 1
72 PS1-3 12/400 C.A.C. 4,281 - - 3 56-4 - T-N INAX -
73 PS1-3 12/400 C.A.C. 4,275 - - 3 56-4 - T-N INAX -
74 PS1-3 12/400 C.A.C. 4,267 - - 3 56-4 T-N INAX -
75 PR3-3 12/400 C.A.C. 4,261 3 - 1 56-4 - T-N INAX - 2
76 PS1-3 12/400 C.A.C. 4,257 - - 3 56-4 - T-N INAX -
77 PS1-3 12/400 C.A.C. 4,252 - - 3 56-4 - T-N INAX -
78 PS1-3 12/400 C.A.C. 4,243 - - 3 56-4 1 T-N INAX -
79 PS1-3 12/400 C.A.C. 4,278 - - 3 56-4 T-N INAX -
80 PR3-3 12/400 C.A.C. 4,301 3 - 1 56-4 - T-N INAX - 2
TOTAL 0 26 - 0 63 0 193 19 65

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 0 0 54 54 54 54
PA2-3 0 0 2 2 2 2
PA3-3 0 0 4 4 4 4
PR3-3 0 0 11 10 11 10
SEC 0 0 2 2 2 2
PSVE-3(MFG) 0 0 0 0 0 0
PSEC-3 (MFG) 0 0 0 0 0 0

PR3-3(MFG) 0 0 0 0 0 0
PSH-3 0 0 3 3 3 3
PRH-3 0 0 0 0 0 0
P3A2-3 0 0 6 6 6 6
DS-0 0 0 5 5 5 5
DS-2 0 0 0 0 0 0
DS-3 0 0 2 2 2 2

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
REPLANTEO
CONTRACTUAL
REPLANTEO
CONTRACTUAL REPLANTEO CONTRACTUAL
POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 0 78 0 16 0 94 0 80 0 14 0 94
13/400 0 1 0 0 0 1 2 1 0 0 2 1

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
REPLANTEO
CONTRACTUAL
REPLANTEO
CONTRACTUAL REPLANTEO CONTRACTUAL
RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 0 52 0 19 0 71 0 55 0 16 0 71
RY-A 0 0 0 0

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 162
PSVE-3(MFG) 3 0
PSH-3 3 9
TOTAL 0 0 171 0
Nota: El conductor existente es de 70mm2 en la totalidad de las estructuras

Volumen de excavación Volumen de relleno cimentación


(m3 de relleno x cimentación n° postes con
(m3 POR UNIDAD) sub total factor TOTAL DE
unidad) Típica cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM CANTIDAD CANTIDAD MATERIAL
12/400 0 0.7 0 0.57 0 -2.28 4 1.75 7

13/400 0 0.75 0 0.59 0 0 CEMENTO (bol) 2.63 12.41


PIEDRA MEDIANA
RI-A 0 1.24 0 1.22 0 (m3) 0.656 3.1
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: ANTAUTA >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
Dec-99 <=3900 = PIN 65-3 No Accesible a la Grua = INAX

HORMIGÓN (m3)
RY-A 0 1.08 0 1.06 0 0.297 1.4
PAT 0 1.53 0 1.4 0
PAT-C 0 0.32 0
sub total (m3) 0 sub total (m3) 0 -2.28 7
sub total (Tierra
Negra) 0 Total (m3) de concreto ciclopeo 4.72
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 0.00
RI-A 0
TOTAL 0.00 0.00 m3
Se considera para metrado

1
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: MOHO >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
<=3900 = PIN 65-3 No Accesible a la Grua = INAX

ESPIGA DE A°G° PARA CRUCETA Y AISLADOR ANSI, SEGUN

ABRAZADERA TIPO U DE FºGº DE 208mm ø x 64x6.4mm, CON


2 PERNOS FºGº DE 16mm ø x 102mm, TUERCA Y ARANDELA

MENSULA DE Fo Go DE 64x64x6.4x1200mm LONG. SEGUN

CRUCETA DE Fo Go DE 64x64x6.4x2400mm LONG. SEGUN


ABRAZADERA PARTIDA TIPO CAS SIMPLE DE F°G° DE
PLANCHA DOBLADA TIPO J DE COBRE PARA TOMA A

PERNO HEXAGONAL DE F°G° DE 16mm Diam. x 76mm,


ALAMBRE DE ALUMINIO PARA AMARRE DE 16mm2

64x6.4 DIAM=218mm, CON 2 PERNOS F°G° DE 16mm x

RIOSTRA METALICA DE F°G° DE 64x64x6.4x1000mm


CONECTOR DE COBRE TIPO PERNO PARTIDO PARA

CONDUCTOR DESNUDO COOPERWELD DE 25mm2


CONECTOR DE AL-AL 25/120 mm2 02 PERNOS
E S T R U C T U R A

TIERRA DE ESPIGAS Y/ O PERNOS

102mm, TUERCA Y ARANDELA


CONDUCTOR DE 25 mm2

TUERCA Y ARANDELA

NOTA INDICADA
ACCESIBILIDAD AL
PUESTA A AISLADOR RPP AISLADOR 56- AISLADOR 56- DESCARGADOR DESMONTAJE DE
Nro. CODIGO TIPO N° POSTES NOMINACION MATERIAL N° RETENIDAS COTA (m.s.n.m) AISLADOR 56-3 AISLADOR 56-4 TIPO DE AISLADOR TIPO BAYONETA
TIPO DE TERRENO TERRENO LUGAR DE DERIVACIÓN AISLADOR 56-3 AISLADOR 56-4
TIERRA PAT-1 25 311111 4111 IZAJE RETENIDA

E.T.

E.T.
0
1 NMT000189452 PS1-3 1 12/400 C.A.C. - - 3,813 - 3 3 - - 56-3 - T-N ACC - - - - - - - - - - - - - -
2 NMT000189451 P3A2-3 3 12/400 C.A.C. - - 3,818 6 4 3 - - 56-3 - T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 - 1 -
3,818 1 - - - 56-3 DS-0 1 2 1 1 3 2 1 1 1 1 1 - 1 -
3,818 2 - - - 56-3 DS-2 1 4 1 1 5 3 2 1 1 2 - 1 2 -
3 NMT000189450 P3A2-3 3 12/400 C.A.C. 6 - 3,819 6 3 3 - - 56-3 - T-N ACC - - - - - - - - - - - - - - 3
4 NMT000189449 P3A2-3 3 12/400 C.A.C. 6 - 3,868 6 4 3 - - 56-3 3 ROCA INAX DS-0 1 2 1 1 3 2 1 1 1 1 1 - 1 - 6
5 NMT000189448 PA2-3 1 12/400 C.A.C. 1 - 3,854 3 - - - - 56-3 - T-N INAX - - - - - - - - - - - - - - - 1
6 NMT000189447 PS1-3 1 12/400 C.A.C. - - 3,872 - 3 3 - - 56-3 - T-N INAX - - - - - - - - - - - - - - -
7 NMT000189446 PS1-3 1 12/400 C.A.C. - - 3,869 - 3 3 - - 56-3 1 T-N INAX - - - - - - - - - - - - - - -
8 NMT000189445 PS1-3 1 12/400 C.A.C. - - 3,847 - 4 3 - - 56-3 - T-N INAX DS-0 1 2 1 1 3 2 1 1 1 1 1 - 1 -
9 NMT000189444 PS1-3 1 12/400 C.A.C. - - 3,858 - 3 3 - - 56-3 1 T-N INAX - - - - - - - - - - - - - - -
10 NMT000189443 PS1-3 1 12/400 C.A.C. - - 3,851 - 3 3 - - 56-3 - T-N INAX - - - - - - - - - - - - - - -
11 NMT000189442 PR3-3 1 13/400 C.A.C. 2 1 3,842 6 1 1 - - 56-3 - T-N ACC - - - - - - - - - - - - - - - 2
11 SEC 3,842 - - - - - 56-3 T-N INAX - - - - - - - - - - - - - -
12 NMT000189441 PS1-3 1 12/400 C.A.C. - - 3,838 - 4 3 - - 56-3 - T-N ACC DS-0 1 2 1 1 3 2 1 1 1 1 1 - 1 -
13 NMT000189440 PS1-3 1 12/400 C.A.C. - - 3,896 - 3 3 - - 56-3 1 ROCA INAX - - - - - - - - - - - - - - -
14 NMT000189439 PS1-3 1 12/400 C.A.C. - - 3,936 - - - 3 3 56-4 - T-N ACC - - - - - - - - - - - - - - -
15 NMT000189438 PS1-3 1 12/400 C.A.C. - - 3,950 - - - 6 3 56-4 1 T-N ACC DS-3 1 6 1 1 8 3 3 1 1 2 - 1 - 3
16 NMT000189437 PS1-3 1 12/400 C.A.C. - - 3,954 - - - 3 3 56-4 - T-N INAX - - - - - - - - - - - - - - -
17 NMT000189435 PS1-3 1 12/400 C.A.C. - - 3,958 - - - 3 3 56-4 - T-N INAX - - - - - - - - - - - - - - -
18 NMT000189433 PR3-3 1 12/400 C.A.C. 2 - 4,040 6 - - 1 1 56-4 T-N INAX - - - - - - - - - - - - - - - 2
19 NMT000189432 PA2-3 1 12/400 C.A.C. 1 - 4,034 3 - - - - 56-4 1 T-N INAX - - - - - - - - - - - - - - - 1
20 NMT000189430 PS1-3 1 12/400 C.A.C. - - 4,028 - - - 3 3 56-4 - T-N ACC - - - - - - - - - - - - - - -
21 NMT000189429 PS1-3 1 12/400 C.A.C. - - 4,017 - - - 4 3 56-4 1 T-N INAX DS-0 1 2 1 1 3 2 1 1 1 1 1 - - 1
22 NMT000188686 PS1-3 1 12/400 C.A.C. - - 4,013 - - - 3 3 56-4 - T-N ACC - - - - - - - - - - - - - - -
23 NMT000188683 PS1-3 1 12/400 C.A.C. - - 3,935 - - - 3 3 56-4 - T-N INAX - - - - - - - - - - - - - - -
24 NMT000188682 PR3-3 1 12/400 C.A.C. 3 1 3,838 6 1 1 - - 56-3 - T-N INAX - - - - - - - - - - - - - - - 2
SEC 3,838 - - - - - 56-3 T-N INAX - - - - - - - - - - - - - -
25 NMT000205181 PS1-3 1 12/400 C.A.C. - - 3,843 - 3 3 - - 56-3 - T-N INAX - - - - - - - - - - - - - - -
26 NMT000188679 P3A2-3 3 12/400 C.A.C. 6 - 3,876 6 3 3 - - 56-3 3 ROCA INAX - - - - - - - - - - - - - - - 6
27 NMT000188676 PR3-3 1 12/400 C.A.C. 3 - 4,049 6 - - 1 1 56-4 1 ROCA INAX - - - - - - - - - - - - - - - 2
28 NMT000188675 PS1-3 1 12/400 C.A.C. - - 4,047 - - - 3 3 56-4 - ROCA INAX - - - - - - - - - - - - - - -
29 NMT000188674 PS1-3 1 12/400 C.A.C. - - 4,036 - - - 3 3 56-4 - ROCA INAX - - - - - - - - - - - - - - -
30 NMT000188673 PS1-3 1 12/400 C.A.C. - - 4,016 - - - 3 3 56-4 1 ROCA INAX - - - - - - - - - - - - - - -
31 NMT000188672 PS1-3 1 12/400 C.A.C. - - 3,988 - - - 3 3 56-4 - ROCA INAX - - - - - - - - - - - - - - -
32 NMT000188671 PS1-3 1 12/400 C.A.C. - - 3,967 - - - 3 3 56-4 - T-N INAX - - - - - - - - - - - - - - -
33 NMT000188670 PS1-3 1 12/400 C.A.C. - - 3,942 - - - 3 3 56-4 1 T-N INAX - - - - - - - - - - - - - - -
34 NMT000188669 PS1-3 1 12/400 C.A.C. - - 3,930 - - - 3 3 56-4 - T-N INAX - - - - - - - - - - - - - - -
35 NMT000188668 PS1-3 1 12/400 C.A.C. - - 3,918 - - - 3 3 56-4 - T-N INAX - - - - - - - - - - - - - - -
36 NMT000188667 PS1-3 1 12/400 C.A.C. - - 3,905 - - - 3 3 56-4 1 T-N INAX - - - - - - - - - - - - - - -
37 NMT000188666 PS1-3 1 12/400 C.A.C. - - 3,911 - - - 3 3 56-4 - T-N INAX - - - - - - - - - - - - - - -
38 NMT000188665 PS1-3 1 12/400 C.A.C. - - 3,880 - 3 3 - - 56-3 - T-N INAX - - - - - - - - - - - - - - -
39 NMT000188664 PS1-3 1 12/400 C.A.C. - - 3,880 - 3 3 - - 56-3 - T-N INAX - - - - - - - - - - - - - - -
40 NMT000188663 PR3-3 1 12/400 C.A.C. 2 - 3,870 6 2 1 - - 56-3 - T-N INAX DS-0 1 2 1 1 3 2 1 1 1 1 1 - 1 - 2
41 NMT000188662 PR3-3 1 12/400 C.A.C. 3 - 3,860 6 1 1 - - 56-3 - T-N ACC - - - - - - - - - - - - - - - 2
TOTAL 49 35 2 66 49 56 16 29

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 11 11 18 18 29 29
PA2-3 1 1 1 1 2 2
PA3-3 0 0 0 0 0 0
PR3-3 4 4 2 2 6 6
SEC 2 2 0 0 2 2
PSVE-3(MFG) 0 0 0 0 0 0
PSEC-3 (MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 0 0 0 0
PSH-3 0 0 0 0 0 0
PRH-3 0 0 0 0 0 0

P3A2-3 4 4 0 0 4 4
DS-0 6 4 1 0 7 4
DS-2 1 0 0 0 1 0
DS-3 0 0 1 1 1 1

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 36 38 12 9 48 47 13 29 35 18 48 47
13/400 1 2 0 0 1 2 1 2 0 0 1 2

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 20 16 15 14 35 30 11 16 24 14 35 30
RY-A 0 0 0 0

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 0 87
PA2-3 3 6
PSVE-3(MFG) 3 0 0
PSH-3 3 0 0
TOTAL 0 0 93 0
Nota: El conductor existente es de 70mm2 en la totalidad de las estructuras

Volúmen de excavación Volúmen de relleno cimentación


(m3 de relleno x cimentación n° postes con cim
(m3 POR UNIDAD) sub total factor sub total TOTAL DE
unidad) Típica tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM CANTIDAD CANTIDAD MATERIAL
12/400 36 0.7 25.2 0.57 20.52 20.52 0 1.59 0
13/400 1 0.75 0.75 0.59 0.59 0.59 CEMENTO (bol) 2.63 73.51
12/400 ROCA 12 0.7 8.4 0.57 6.84 6.84
PIEDRA MEDIANA
RI-A 15 1.2443 18.6645 1.2243 18.36 (m3) 0.656 18.34

RI-A ROCA 11 1.2443 13.69 1.2243 13.47


RY-A 0 1.08 0 1.06 0 HORMIGÓN (m3) 0.297 8.3
PAT 2 1.53 3.06 1.4 2.8
PAT-C 47 0.32 15.04
sub total (m3) 62.7145 sub total (m3) 31.83 27.95 0

sub total (Tierra


Negra)
2.8 Total (m3) de concreto ciclopeo 27.95
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 8.40
RI-A 13.69
TOTAL 22.09 62.71 m3
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: PUNO >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
<=3900 = PIN 65-3 No Accesible a la Grua = INAX

ESPIGA DE A°G° PARA CRUCETA Y AISLADOR ANSI,


ALAMBRE DE ALUMINIO PARA AMARRE DE 16mm2
PLANCHA DOBLADA TIPO J DE COBRE PARA TOMA
CONECTOR DE COBRE TIPO PERNO PARTIDO PARA

RIOSTRA METALICA DE F°G° DE 64x64x6.4x1000mm


ABRAZADERA PARTIDA TIPO CAS SIMPLE DE F°G°

64x6.4mm, CON 2 PERNOS FºGº DE 16mm ø x 102mm,


CONDUCTOR DESNUDO COOPERWELD DE 25mm2

MENSULA DE Fo Go DE 64x64x6.4x1200mm LONG.

CRUCETA DE Fo Go DE 64x64x6.4x2400mm LONG.


DE 64x6.4 DIAM=218mm, CON 2 PERNOS F°G° DE
PERNO HEXAGONAL DE F°G° DE 16mm Diam. x
CONECTOR DE AL-AL 25/120 mm2 02 PERNOS

ABRAZADERA TIPO U DE FºGº DE 208mm ø x


16mm x 102mm, TUERCA Y ARANDELA
A TIERRA DE ESPIGAS Y/ O PERNOS
E S T R U C T U R A

76mm, TUERCA Y ARANDELA

SEGUN NOTA INDICADA


CONDUCTOR DE 25 mm2

TUERCA Y ARANDELA

SEGUN E.T.
SEGUN E.T.
ACCESIBILIDAD AL
PUESTA A TIPO DE DESCARGADOR DESMONTAJE DE
Nro. CODIGO TIPO MATERIAL N° RETENIDAS COTA (m.s.n.m) TIPO BAYONETA
TIPO DE TERRENO TERRENO LUGAR DE DERIVACIÓN AISLADOR 56-3 AISLADOR 56-4
N° POSTES NOMINACION NOMINACION TIERRA PAT-1 AISLADOR IZAJE RETENIDA

0
1 NMT000194357 PS1-3 1 12/400 C.A.C. - - 3,856 56-3 - T-N ACC DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 -
2 NMT000194359 PS1-3 1 12/400 12/300 C.A.C. - - 3,865 56-3 - T-N ACC - - - - - - - - - - - - - - -
3 NMT000194360 PS1-3 1 12/400 12/300 C.A.C. - - 3,855 56-3 - T-N ACC - - - - - - - - - - - - - - -
4 NMT000194361 PS1-3 1 12/400 12/300 C.A.C. - - 3,883 56-3 1 T-N ACC - - - - - - - - - - - - - - -
5 NMT000194362 PS1-3 1 12/400 12/300 C.A.C. - - 3,893 56-3 - T-N ACC - - - - - - - - - - - - - - -
6 NMT000194363 PR3-3 1 12/400 C.A.C. 2 - 3,904 56-4 1 ROCA ACC - - - - - - - - - - - - - - - 2
7 NMT000194364 PS1-3 1 12/400 C.A.C. - - 3,899 56-3 - ROCA ACC - - - - - - - - - - - - - - -
8 NMT000194365 PS1-3 1 12/400 C.A.C. - - 3,901 56-4 1 ROCA ACC - - - - - - - - - - - - - - -
9 NMT000194366 PS1-3 1 12/400 C.A.C. - - 3,895 56-3 - T-N ACC - - - - - - - - - - - - - - -
10 NMT000194367 PSH-3 2 12/400 C.A.C. - - 3,894 56-3 1 T-N ACC - - - - - - - - - - - - - - -
11 NMT000194368 PSH-3 2 12/400 C.A.C. - - 3,894 56-3 - T-N ACC DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 -
12 NMT000194369 PSH-3 2 12/400 C.A.C. - - 3,891 56-3 - T-N ACC - - - - - - - - - - - - - - -
13 NMT000194373 PSH-3 2 12/400 C.A.C. - - 3,889 56-3 - T-N ACC DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 -
14 NMT000194375 PSH-3 2 12/400 C.A.C. - - 3,894 56-3 - T-N ACC DS-2 2 2 2 2 2 2 2 2 2 2 2 2 2 -
15 NMT000194376 PS1-3 1 12/400 C.A.C. 3,894 56-3 T-N ACC - - - - - - - - - - - - - -
16 NMT000194377 PS1-3 1 12/400 C.A.C. - - 3,880 56-3 - T-N ACC - - - - - - - - - - - - - - -
17 NMT000194378 P3A2-3 3 12/400 C.A.C. 3 - 3,883 56-3 3 ROCA ACC - - - - - - - - - - - - - - - 2
18 NMT000194379 PRH-3 2 12/400 12/300 C.A.C. 4 - 3,867 56-3 - T-N ACC - - - - - - - - - - - - - - - 4
PS1-3 1 13/400 C.A.C. 3,894 56-3 T-N ACC - - - - - - - - - - - - - -
19 NMT000194380 PSH-3 2 12/400 12/300 C.A.C. - - 3,857 56-3 - T-N ACC - - - - - - - - - - - - - - -
20 NMT000194381 PSH-3 2 12/400 12/300 C.A.C. - - 3,849 56-3 - T-N ACC - - - - - - - - - - - - - - -
21 NMT000194382 PSH-3 2 12/400 12/300 C.A.C. - - 3,841 56-3 1 T-N ACC DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 -
22 NMT000194383 PSH-3 2 12/400 12/300 C.A.C. - - 3,841 56-3 - T-N ACC - - - - - - - - - - - - - - -
23 NMT000194384 PSH-3 2 12/400 12/300 C.A.C. - - 3,842 56-3 - T-N ACC - - - - - - - - - - - - - - -
24 NMT000194385 PA3-3 1 12/400 C.A.C. 2 - 3,842 56-3 1 T-N ACC - - - - - - - - - - - - - -
25 NMT000194386 PS1-3 1 12/400 12/300 C.A.C. - - 3,875 56-3 - T-N INAX - - - - - - - - - - - - - - -
26 NMT000194387 PS1-3 1 12/400 12/300 C.A.C. - - 3,978 56-4 1 ROCA ACC - - - - - - - - - - - - - - -
27 NMT000194388 PS1-3 1 12/400 C.A.C. - - 3,916 56-4 1 ROCA ACC - - - - - - - - - - - - - - -
28 NMT000194389 PS1-3 1 12/400 C.A.C. - - 3,917 56-4 - T-N ACC - - - - - - - - - - - - - - -
29 NMT000194390 PS1-3 1 12/400 C.A.C. - - 3,916 56-4 - T-N ACC - - - - - - - - - - - - - - -
30 NMT000194391 PS1-3 1 12/400 C.A.C. - - 3,915 56-4 1 T-N ACC - - - - - - - - - - - - - - -
31 NMT000194392 PS1-3 1 12/400 C.A.C. - - 3,913 56-4 - T-N ACC - - - - - - - - - - - - - - -
32 NMT000194393 PS1-3 1 12/400 C.A.C. - - 3,913 56-4 - T-N ACC - - - - - - - - - - - - - - -
33 NMT000194394 PS1-3 1 12/400 C.A.C. - - 3,909 56-4 1 T-N ACC - - - - - - - - - - - - - - -
TOTAL 47 11 0 13 8

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 11 10 9 13 20 23
PA2-3 0 0 0 0 0 0
PA3-3 1 1 0 0 1 1
PR3-3 0 0 1 2 1 2
SEC 0 0 0 0 0 0

PSVE-3(MFG) 0 0 0 0 0 0
PSEC-3 (MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 0 0 0 0
PSH-3 10 10 0 0 10 10
PRH-3 1 1 0 0 1 1
P3A2-3 1 1 0 1 1 2
DS-0 4 3 0 1 4 4
DS-2 1 2 0 0 1 2
DS-3 0 0 0 0 0 0

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 38 45 8 9 46 54 45 50 1 4 46 54
13/400 1 0 0 0 1 0 1 0 0 0 1 0

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 6 11 5 8 11 19 11 16 0 3 11 19
RY-A 0 0 0 0

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 60
PSVE-3(MFG) 3 0
PSH-3 3 30
TOTAL 90 0 0 0
Nota: El conductor existente es de 35mm2 en la totalidad de las estructuras

Volumen de excavación Volumen de relleno cimentación


(m3 de relleno x cimentación n° postes con
(m3 POR UNIDAD) sub total factor sub total TOTAL DE
unidad) Típica cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM CANTIDAD CANTIDAD MATERIAL
12/400 38 0.7 26.6 0.57 21.66 21.66 0 1.59 0
13/400 1 0.75 0.75 0.59 0.59 0.59 CEMENTO (bol) 2.63 70.51
12/400 ROCA 8 0.7 5.6 0.57 4.56 4.56

PIEDRA MEDIANA (m3)


RI-A 6 1.24 7.47 1.22 7.4658 0.656 17.59

RI-A ROCA 5 1.24 6.22 1.22 6.12


RY-A 0 1.08 0 1.06 0 HORMIGÓN (m3) 0.297 7.96
PAT 0 1.53 0 1.4 0
PAT-C 36 0.32 11.52
sub total (m3) 46.34 sub total (m3) 13.5858 26.81 0

sub total (Tierra


Negra)
0 Total (m3) de concreto ciclopeo 26.81
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 5.60
RI-A 6.22
TOTAL 11.82 46.34 m3
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: DESAGUADERO >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
<=3900 = PIN 65-3 No Accesible a la Grua = INAX

MENSULA DE Fo Go DE 64x64x6.4x1200mm LONG. SEGUN

CRUCETA DE Fo Go DE 64x64x6.4x2400mm LONG. SEGUN


ABRAZADERA PARTIDA TIPO CAS SIMPLE DE F°G° DE

ABRAZADERA TIPO U DE FºGº DE 208mm ø x 64x6.4mm,


PLANCHA DOBLADA TIPO J DE COBRE PARA TOMA A

PERNO HEXAGONAL DE F°G° DE 16mm Diam. x 76mm,

64x6.4 DIAM=218mm, CON 2 PERNOS F°G° DE 16mm x


ESPIGA DE A°G° PARA CRUCETA Y AISLADOR ANSI,
ALAMBRE DE ALUMINIO PARA AMARRE DE 16mm2
CONECTOR DE COBRE TIPO PERNO PARTIDO PARA

CON 2 PERNOS FºGº DE 16mm ø x 102mm, TUERCA Y

RIOSTRA METALICA DE F°G° DE 64x64x6.4x1000mm


CONDUCTOR DESNUDO COOPERWELD DE 25mm2
CONECTOR DE AL-AL 25/120 mm2 02 PERNOS
E S T R U C T U R A

TIERRA DE ESPIGAS Y/ O PERNOS

102mm, TUERCA Y ARANDELA


CONDUCTOR DE 25 mm2

SEGUN NOTA INDICADA


TUERCA Y ARANDELA

ARANDELA
ACCESIBILIDAD AL
PUESTA A TIPO DE DESCARGADOR DESMONTAJE DE
Nro. CODIGO TIPO N° POSTES NOMINACION MATERIAL N° RETENIDAS COTA (m.s.n.m) TIPO BAYONETA
TIPO DE TERRENO TERRENO LUGAR DE DERIVACIÓN AISLADOR 56-3 AISLADOR 56-4
TIERRA PAT-1 AISLADOR IZAJE RETENIDA

E.T.

E.T.
0
1 NMT000188661 PS1-3 1 12/400 C.A.C. - - 3,843 56-3 - T-N ACC - - - - - - - - - - - - - - -
2 NMT000188659 PS1-3 1 12/400 C.A.C. 3,843 56-3 T-N ACC - - - - - - - - - - - - - -
3 NMT000188658 PS1-3 1 12/400 C.A.C. - - 3,843 56-3 - T-N ACC - - - - - - - - - - - - - - -
4 NMT000188657 PS1-3 1 12/400 C.A.C. - - 3,844 56-3 - T-N ACC - - - - - - - - - - - - - - -
5 NMT000188656 PS1-3 1 12/400 C.A.C. 3,845 56-3 T-N ACC - - - - - - - - - - - - - -
6 NMT000188655 PS1-3 1 12/400 C.A.C. 3,846 56-3 T-N ACC - - - - - - - - - - - - - -
7 NMT000188654 PS1-3 1 12/400 C.A.C. 3,848 56-3 T-N INAX - - - - - - - - - - - - - -
8 NMT000188653 PS1-3 1 12/400 C.A.C. - - 3,849 56-3 1 T-N INAX - - - - - - - - - - - - - - -
9 NMT000188652 PS1-3 1 12/400 C.A.C. - - 3,851 56-3 - T-N INAX - - - - - - - - - - - - - - -
10 NMT000188651 PS1-3 1 12/400 C.A.C. - - 3,852 56-3 T-N INAX - - - - - - - - - - - - - - -
11 NMT000188650 PS1-3 1 12/400 C.A.C. - - 3,853 56-3 - T-N INAX - - - - - - - - - - - - - - -
12 NMT000188649 PS1-3 1 12/400 C.A.C. - - 3,854 56-3 1 T-N INAX - - - - - - - - - - - - - - -
13 NMT000188648 PR3-3 1 12/400 C.A.C. 2 - 3,848 56-3 - T-N ACC - - - - - - - - - - - - - - - 2
14 NMT000188646 PS1-3 1 12/400 C.A.C. - - 3,861 56-3 - T-N ACC - - - - - - - - - - - - - - -
15 NMT000188645 PS1-3 1 12/400 C.A.C. - - 3,862 56-3 - T-N ACC - - - - - - - - - - - - - - -
16 NMT000188644 PS1-3 1 12/400 C.A.C. - - 3,864 56-3 1 T-N ACC - - - - - - - - - - - - - - -
17 NMT000188643 PS1-3 1 12/400 C.A.C. - - 3,860 56-3 - T-N ACC - - - - - - - - - - - - - - -
18 NMT000188642 PS1-3 1 12/400 C.A.C. - - 3,849 56-3 1 T-N ACC - - - - - - - - - - - - - - -
19 NMT000188641 PS1-3 1 12/400 C.A.C. - - 3,848 56-3 T-N ACC - - - - - - - - - - - - - - -
20 NMT000188640 PS1-3 1 12/400 C.A.C. - - 3,852 56-3 - T-N ACC - - - - - - - - - - - - - - -
21 NMT000188639 PS1-3 1 12/400 C.A.C. - - 3,851 56-3 1 T-N ACC - - - - - - - - - - - - - - -
22 NMT000188638 PS1-3 1 12/400 C.A.C. - - 3,853 56-3 - T-N ACC - - - - - - - - - - - - - - -
23 NMT0001886437 PS1-3 1 12/400 C.A.C. - - 3,853 56-3 1 T-N ACC - - - - - - - - - - - - - - -
24 NMT0001886436 PS1-3 1 12/400 C.A.C. - - 3,857 56-3 - T-N ACC - - - - - - - - - - - - - - -
25 NMT0001886435 PA3-3 1 12/400 C.A.C. 2 - 3,855 56-3 - T-N ACC - - - - - - - - - - - - - - 2
26 NMT0001886434 PS1-3 1 12/400 C.A.C. 1 - 3,871 56-3 1 T-N ACC DS-3 1 6 1 1 8 3 3 1 1 2 - 1 3 -
27 NMT0001886427 PS1-3 1 12/400 C.A.C. - - 3,870 56-3 - T-N ACC - - - - - - - - - - - - - - -
28 NMT0001886429 PS1-3 1 12/400 C.A.C. - - 3,870 56-3 - T-N ACC - - - - - - - - - - - - - - -
29 NMT000206383 PR3-3 1 12/400 C.A.C. 1 - 4,078 56-4 1 ROCA ACC - - - - - - - - - - - - - - - 2
30 NMT000206384 PR3-3 1 12/400 C.A.C. 1 - 4,078 56-4 1 ROCA ACC - - - - - - - - - - - - - - -
TOTAL 30 7 0 9 6

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 26 22 0 0 26 22
PA2-3 0 0 0 0 0 0
PA3-3 1 1 0 0 1 1
PR3-3 1 1 2 2 3 3
SEC 0 0 0 0 0 0

PSVE-3(MFG) 0 0 0 0 0 0
PSEC-3 (MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 0 0 0 0
PSH-3 0 0 0 0 0 0
PRH-3 0 0 0 0 0 0
P3A2-3 0 0 0 0 0 0
DS-0 0 0 0 0 0 0
DS-2 0 0 0 0 0 0
DS-3 1 1 0 0 1 1

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 28 24.00 2 2.00 30 26 24 26 6 0 30 26

13/400 0 0.00 0 0.00 0 0 0 0 0 0 0 0

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 5 4.00 2 2.00 7 6 7 6 0 7 6
RY-A 0 0 0 0

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 78
PSVE-3(MFG) 3 0
PSH-3 3 0
TOTAL 0 0 78 0
Nota: El conductor existente es de 70mm2 en la totalidad de las estructuras

Volumen de excavación Volumen de relleno cimentación


(m3 de relleno x cimentación n° postes con
(m3 POR UNIDAD) sub total factor sub total TOTAL DE
unidad) Típica cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM CANTIDAD CANTIDAD MATERIAL
12/400 28 0.7 19.6 0.57 15.96 15.96 0 1.59 0
13/400 0 0.75 0 0.59 0 0 CEMENTO (bol) 2.63 44.97
12/400 ROCA 2 0.7 1.4 0.57 1.14 1.14

PIEDRA MEDIANA (m3)


RI-A 4 1.2443 4.98 1.2243 4.9 0.656 11.22

RI-A ROCA 2 1.2443 2.49 1.2243 2.45


RY-A 0 1.08 0 1.06 0 HORMIGÓN (m3) 0.297 5.08
PAT 0 1.53 0 1.4 0
PAT-C 30 0.32 9.6
sub total (m3) 34.18 sub total (m3) 7.35 17.1 0

sub total (Tierra


Negra)
0 Total (m3) de concreto ciclopeo 17.1
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 1.40
RI-A 2.49
TOTAL 3.89 34.18 m3
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: ILAVE >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
<=3900 = PIN 65-3 No Accesible a la Grua = INAX

ARMADOS DE DERIVACION

ABRAZADERA TIPO U DE FºGº DE 208mm ø x 64x6.4mm,


ABRAZADERA PARTIDA TIPO CAS SIMPLE DE F°G° DE
PLANCHA DOBLADA TIPO J DE COBRE PARA TOMA A

PERNO HEXAGONAL DE F°G° DE 16mm Diam. x 76mm,

64x6.4 DIAM=218mm, CON 2 PERNOS F°G° DE 16mm x


ESPIGA DE A°G° PARA CRUCETA Y AISLADOR ANSI,
CONECTOR DE COBRE TIPO PERNO PARTIDO PARA

CON 2 PERNOS FºGº DE 16mm ø x 102mm, TUERCA Y


ALAMBRE DE ALUMINIO PARAAMARRE DE 16mm2

RIOSTRA METALICA DE F°G° DE 64x64x6.4x1000mm


CONDUCTOR DESNUDO COOPERWELD DE 25mm2

MENSULA DE Fo Go DE 64x64x6.4x1200mm LONG.

CRUCETA DE Fo Go DE 64x64x6.4x2400mm LONG.


CONECTOR DE AL-AL 25/120 mm2 02 PERNOS
E S T R U C T U R A

TIERRA DE ESPIGAS Y/ O PERNOS

102mm, TUERCA Y ARANDELA


SEGUN NOTA INDICADA
CONDUCTOR DE 25 mm2

TUERCA Y ARANDELA

ARANDELA

SEGUN E.T.

SEGUN E.T.
ACCESIBILIDAD AL
PUESTA A TIPO DE DESCARGADOR TIPO DESMONTAJE
Nro. CODIGO TIPO N° POSTES NOMINACION VANO (m) MATERIAL N° RETENIDAS COTA (m.s.n.m) BAYONETA
TIPO DE TERRENO TERRENO LUGAR DE DERIVACIÓN AISLADOR 56-3 AISLADOR 56-4
TIERRA PAT-1 AISLADOR IZAJE DE RETENIDA

0
1 NMT000193457 PS1-3 1 12/400 C.A.C. - - 3,846 56-3 - T-N ACC - - - - - - - - - - - - - - -
2 NMT000193458 PS1-3 1 12/400 C.A.C. - - 3,842 56-3 T-N ACC - - - - - - - - - - - - - -
3 NMT000193459 PS1-3 1 12/400 C.A.C. - - 3,840 56-3 1 T-N ACC - - - - - - - - - - - - - -
4 NMT000193460 PS1-3 1 12/400 C.A.C. - - 3,838 56-3 1 T-N ACC - - - - - - - - - - - - - -
5 NMT000193461 PS1-3 1 12/400 C.A.C. - 3,830 56-3 - T-N ACC DS-2 2 2 2 2 2 2 2 2 2 2 2 2 2 - 2
6 NMT000193462 PSVE-3(MFG) 1 13/400 C.A.C. - - 3,843 56-3 - T-N ACC - - - - - - - - - - - - - -
7 NMT000193463 PSVE-3(MFG) 1 13/400 C.A.C. - - 3,834 56-3 T-N ACC - - - - - - - - - - - - - - -
8 NMT000193464 PS1-3 1 12/400 C.A.C. - - 3,833 56-3 - T-N ACC - - - - - - - - - - - - - - -
9 NMT000193465 PS1-3 1 12/400 C.A.C. - - 3,833 56-3 1 T-N ACC - - - - - - - - - - - - - - -
10 NMT000193467 PS1-3 1 12/400 C.A.C. - - 3,832 56-3 T-N ACC - - - - - - - - - - - - - -
11 NMT000193468 PS1-3 1 12/400 C.A.C. - - 3,832 56-3 T-N ACC DS-3 3 3 3 3 3 3 3 3 3 3 3 3 3 -
12 NMT000193470 PS1-3 1 12/400 C.A.C. - 3,831 56-3 T-N ACC - - - - - - - - - - - - - - - 2
13 NMT000193471 PS1-3 1 12/400 C.A.C. - 3,831 56-3 T-N ACC - - - - - - - - - - - - - -
14 NMT000193472 PR3-3 1 12/400 C.A.C. 2 - 3,832 56-3 T-N ACC - - - - - - - - - - - - - - -
15 NMT000193473 PS1-3 1 12/400 C.A.C. 1 - 3,833 56-3 T-N ACC DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 -
16 NMT000193474 PS1-3 1 12/400 C.A.C. - - 3,833 56-3 1 T-N ACC - - - - - - - - - - - - - - -
17 NMT000193475 PS1-3 1 12/400 C.A.C. - - 3,832 56-3 T-N ACC - - - - - - - - - - - - - - -
18 NMT000193476 PS1-3 1 12/400 C.A.C. - - 3,831 56-3 T-N ACC - - - - - - - - - - - - - - -
19 NMT000193477 PS1-3 1 12/400 C.A.C. - - 3,830 56-3 T-N ACC - - - - - - - - - - - - - - -
20 NMT000193479 PS1-3 1 12/400 C.A.C. - - 3,829 56-3 T-N ACC - - - - - - - - - - - - - - -
21 NMT000193481 PS1-3 1 12/400 C.A.C. - - 3,829 56-3 1 T-N ACC - - - - - - - - - - - - - - -
22 NMT000193482 PR3-3 1 12/400 C.A.C. 2 - 3,826 56-3 T-N ACC - - - - - - - - - - - - - -
23 NMT000193483 PS1-3 1 12/400 C.A.C. - - 3,826 56-3 T-N ACC - - - - - - - - - - - - - -
24 NMT000193484 PS1-3 1 12/400 C.A.C. - - 3,826 56-3 T-N ACC - - - - - - - - - - - - - -
25 NMT000193485 PS1-3 1 12/400 C.A.C. - - 3,826 56-3 T-N ACC - - - - - - - - - - - - - -
26 NMT000193486 PS1-3 1 12/400 C.A.C. - - 3,826 56-3 1 T-N ACC - - - - - - - - - - - - - -
27 NMT000193487 PS1-3 1 12/400 C.A.C. - - 3,824 56-3 T-N ACC - - - - - - - - - - - - - -
28 NMT000193488 PS1-3 1 12/400 C.A.C. - - 3,823 56-3 T-N ACC - - - - - - - - - - - - - -
29 NMT000193490 PS1-3 1 12/400 C.A.C. - - 3,821 56-3 1 T-N ACC - - - - - - - - - - - - - - -
POSTE 1 13/400 C.A.C. T-N
30 NMT000193492 PS1-3 1 12/400 C.A.C. - - 3,822 56-3 T-N ACC - - - - - - - - - - - - - - -
POSTE 1 13/400 C.A.C. T-N
31 NMT000193493 PS1-3 1 12/400 C.A.C. - - 3,823 56-3 T-N ACC - - - - - - - - - - - - - -
32 NMT000193495 PS1-3 1 12/400 C.A.C. - - 3,820 56-3 T-N ACC - - - - - - - - - - - - - - -
33 NMT000193496 PS1-3 1 12/400 C.A.C. - - 3,819 56-3 T-N ACC - - - - - - - - - - - - - - -
34 NMT000193497 PR3-3(MFG) 1 13/400 C.A.C. RY-1 - 3,821 56-3 T-N ACC - - - - - - - - - - - - - - -
35 NMT000193499 PSVE-3(MFG) 1 13/400 C.A.C. - - 3,821 56-3 T-N ACC - - - - - - - - - - - - - - -
36 NMT000193500 PSVE-3(MFG) 1 13/400 C.A.C. - - 3,821 56-3 T-N ACC DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 -
37 NMT000193501 PSVE-3(MFG) 1 13/400 C.A.C. - - 3,820 56-3 T-N ACC - - - - - - - - - - - - - - -
38 NMT000193502 PSVE-3(MFG) 1 13/400 C.A.C. - - 3,820 56-3 T-N ACC - - - - - - - - - - - - - - - 2
39 NMT000193505 PSVE-3(MFG) 1 13/400 C.A.C. - 3,819 56-3 T-N ACC - - - - - - - - - - - - - - -
40 NMT000193506 PR3-3(MFG) 1 13/400 C.A.C. 1 - 3,819 56-3 T-N ACC DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 -
41 NMT000193507 PA2-3 1 12/400 C.A.C. 1 3,819 56-3 1 T-N ACC - - - - - - - - - - - - - -
42 NMT000193508 PR3-3 1 12/400 C.A.C. 2 3,819 56-3 T-N ACC - - - - - - - - - - - - - -
43 NMT000193509 PS1-3 1 12/400 C.A.C. - - 3,816 56-3 T-N ACC - - - - - - - - - - - - - - -
44 NMT000193510 PS1-3 1 12/400 C.A.C. - - 3,815 56-3 T-N ACC - - - - - - - - - - - - - - -
45 NMT000193512 PS1-3 1 12/400 C.A.C. - - 3,816 56-3 T-N ACC - - - - - - - - - - - - - - -
46 NMT000193513 PS1-3 1 12/400 C.A.C. - - 3,815 56-3 T-N ACC - - - - - - - - - - - - - -
47 NMT000193514 PS1-3 1 12/400 C.A.C. - - 3,813 56-3 T-N ACC - - - - - - - - - - - - - -
48 NMT000193515 PS1-3 1 12/400 C.A.C. - - 3,812 56-3 T-N ACC - - - - - - - - - - - - - -
49 NMT000193516 PS1-3 1 12/400 C.A.C. - - 3,811 56-3 T-N ACC DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 -
50 NMT000193517 PS1-3 1 12/400 C.A.C. - - 3,810 56-3 T-N ACC - - - - - - - - - - - - - -
51 NMT000193518 PS1-3 1 12/400 C.A.C. 3,810 56-3 1 T-N ACC - - - - - - - - - - - - - -
52 NMT000193519 PS1-3 1 12/400 C.A.C. - - 3,813 56-3 T-N ACC - - - - - - - - - - - - - -
53 NMT000193520 PSVE-3(MFG) 1 13/400 C.A.C. - 3,813 56-3 T-N ACC - - - - - - - - - - - - - -
54 NMT000193521 PSVE-3(MFG) 1 13/400 C.A.C. - 3,814 56-3 T-N ACC - - - - - - - - - - - - - -
55 NMT000193522 PSVE-3(MFG) 1 13/400 C.A.C. - - 3,814 56-3 T-N ACC - - - - - - - - - - - - - -
56 NMT000193523 PS1-3 1 12/400 C.A.C. - - 3,814 56-3 T-N ACC - - - - - - - - - - - - - -
57 NMT000193524 PS1-3 1 12/400 C.A.C. - - 3,815 56-3 T-N ACC - - - - - - - - - - - - - -
58 NMT000193526 PA3-3 1 13/400 C.A.C. 2 - 3,815 56-3 T-N ACC - - - - - - - - - - - - - - 2
RY-1 T-N ACC - - - - - - - - - - - - - -
59 NMT000193527 PSVE-3(MFG) 1 13/400 C.A.C. RY-1 3,815 56-3 T-N ACC DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 -
60 NMT000193528 PSVE-3(MFG) 1 13/400 C.A.C. - - 3,815 56-3 T-N ACC - - - - - - - - - - - - - -
61 NMT000193529 PSVE-3(MFG) 1 13/400 C.A.C. - - 3,815 56-3 T-N ACC - - - - - - - - - - - - - -
62 NMT000193530 PSVE-3(MFG) 1 13/400 C.A.C. - 3,815 56-3 T-N ACC - - - - - - - - - - - - - - 2
63 NMT000193537 PSVE-3(MFG) 1 13/400 C.A.C. - - 3,815 56-3 T-N ACC - - - - - - - - - - - - - -
64 NMT000193538 PSVE-3(MFG) 1 13/400 C.A.C. - - 3,815 56-3 T-N ACC - - - - - - - - - - - - - -
65 NMT000193539 PSVE-3(MFG) 1 13/400 C.A.C. - - 3,816 56-3 T-N ACC DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 -
66 NMT000193540 PSVE-3(MFG) 1 13/400 C.A.C. - - 3,816 56-3 T-N ACC - - - - - - - - - - - - - -
67 NMT000193541 PSVE-3(MFG) 1 13/400 C.A.C. - - 3,816 56-3 T-N ACC - - - - - - - - - - - - - -
68 NMT000193542 PSVE-3(MFG) 1 13/400 C.A.C. - - 3,816 56-3 T-N ACC - - - - - - - - - - - - - -
69 NMT000193543 PA3-3 1 12/400 C.A.C. 1 - 3,816 56-3 T-N ACC - - - - - - - - - - - - - -
70 NMT000193544 PA2-3 1 12/400 C.A.C. 1 3,816 56-3 1 T-N ACC - - - - - - - - - - - - - -
71 NMT000193545 PA3-3 1 12/400 C.A.C. RY-1 3,816 56-3 T-N ACC - - - - - - - - - - - - - -
72 NMT000193546 PS1-3 1 12/400 C.A.C. - - 3,816 56-3 T-N ACC - - - - - - - - - - - - - -
73 NMT000193547 PS1-3 1 12/400 C.A.C. - - 3,816 56-3 T-N ACC DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 -
74 NMT000193548 PS1-3 1 12/400 C.A.C. - - 3,816 56-3 T-N ACC - - - - - - - - - - - - - -
75 NMT000193549 PS1-3 1 12/400 C.A.C. - - 3,816 56-3 T-N ACC - - - - - - - - - - - - - -
76 NMT000193550 PS1-3 1 12/400 C.A.C. - 3,816 56-3 T-N ACC DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 - 2
77 NMT000193552 PS1-3 1 12/400 C.A.C. - 3,816 56-3 T-N ACC - - - - - - - - - - - - - -
78 NMT000193553 PR3-3 1 12/400 C.A.C. 2 - 3,817 56-3 1 T-N ACC - - - - - - - - - - - - - -
79 NMT000193554 PS1-3 1 12/400 C.A.C. - - 3,817 56-3 T-N ACC - - - - - - - - - - - - - -
80 NMT000193555 PS1-3 1 12/400 C.A.C. - - 3,817 56-3 T-N ACC - - - - - - - - - - - - - -
81 NMT000193564 PSVE-3(MFG) 1 13/400 C.A.C. 3,814 56-3 T-N ACC - - - - - - - - - - - - - -
82 NMT000193565 PSVE-3(MFG) 1 13/400 C.A.C. 3,814 56-3 T-N ACC - - - - - - - - - - - - - -
83 NMT000193568 PSVE-3(MFG) 1 13/400 C.A.C. 3,814 56-3 T-N ACC DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 -
84 NMT000193569 PSVE-3(MFG) 1 13/400 C.A.C. 3,815 56-3 T-N ACC - - - - - - - - - - - - - -
85 NMT000193570 PSVE-3(MFG) 1 13/400 C.A.C. 3,815 56-3 T-N ACC - - - - - - - - - - - - - -
86 NMT000193571 PSVE-3(MFG) 1 13/400 C.A.C. 3,815 56-3 T-N ACC DS-2 2 2 2 2 2 2 2 2 2 2 2 2 2 -
87 NMT000193572 PSVE-3(MFG) 1 13/400 C.A.C. 3,815 56-3 T-N ACC - - - - - - - - - - - - - -
88 NMT000193573 PSVE-3(MFG) 1 13/400 C.A.C. 3,815 56-3 T-N ACC - - - - - - - - - - - - - -
89 NMT000193574 PSVE-3(MFG) 1 13/400 C.A.C. 3,815 56-3 T-N ACC - - - - - - - - - - - - - -
90 NMT000193575 PSVE-3(MFG) 1 13/400 C.A.C. 3,815 56-3 T-N ACC - - - - - - - - - - - - - -
91 NMT000193576 PA3-3 1 12/400 61.06 C.A.C. RY-1 3,816 56-3 T-N ACC - - - - - - - - - - - - - -
92 NMT000193577 PR3-3 1 12/400 91.42 C.A.C. 2 3,816 56-3 T-N ACC - - - - - - - - - - - - - -
93 NMT000193578 PS1-3 1 12/400 102.88 C.A.C. 3,816 56-3 T-N ACC - - - - - - - - - - - - - -
94 NMT000193580 PS1-3 1 12/400 99.37 C.A.C. 3,816 56-3 1 T-N ACC - - - - - - - - - - - - - -
95 NMT000193582 PS1-3 1 12/400 100.9 C.A.C. 3,816 56-3 T-N ACC - - - - - - - - - - - - - -
96 NMT000193583 PS1-3 1 12/400 99.37 C.A.C. 3,816 56-3 T-N ACC - - - - - - - - - - - - - -
97 NMT000193584 PS1-3 1 12/400 99.62 C.A.C. 3,817 56-3 T-N ACC - - - - - - - - - - - - - -
98 NMT000193585 PA2-3 1 12/400 104.45 C.A.C. 1 3,817 56-3 T-N ACC - - - - - - - - - - - - - -
99 NMT000193586 PR3-3 1 12/400 C.A.C. 1 - 3,818 56-3 T-N ACC DS-3 3 3 3 3 3 3 3 3 3 3 3 3 3 - 1
TOTAL 101 759.07 19 0 12 13

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 54 50 0 0 54 50
PA2-3 3 2 0 0 3 2
PA3-3 4 3 0 0 4 3

PR3-3 6 4 0 0 6 4
SEC 0 0 0 0 0 0
PSVE-3(MFG) 30 29 0 0 30 29
PSEC-3(MFG) 0 0 0 0 0 0
PR3-3(MFG) 2 1 0 0 2 1

PSH-3 0 0 0 0 0 0
PRH-3 0 0 0 0 0 0
P3A2-3 0 0 0 0 0 0
DS-0 9 8 0 0 9 8
DS-2 2 3 0 0 2 3

DS-3 2 3 0 0 2 3

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 66 59 0 0 66 59 66 59 0 0 66 59
13/400 35 30 0 0 35 30 33 30 0 0 33 30

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 19 16 0 0 19 16 19 16 0 0 19 16
RY-A 5 1 5 1 5 5 0

METRADO DE CONDUCTOR
ALEACION DE ALUMINIO AAAC
REPLANTEO CONTRACTUAL
50mm2 70mm2 70mm2 120mm2
2277.21 2206.5 Metrado
0 113.86 110.33 0 Catenaria 5%
0 2391.07 2316.83 0 total (m)
0 2.39 2.32 0 total (km)

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 162
PA2-3 3 9
PSVE-3(MFG) 3 90
PSH-3 3 0
TOTAL 0 0 261 0
Nota: El conductor existente es de 70mm2 en la totalidad de las estructuras

Volumen de excavación Volumen de relleno cimentación


(m3 de relleno x cimentación n° postes con
(m3 POR UNIDAD) sub total factor TOTAL DE
unidad) Típica cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM CANTIDAD CANTIDAD MATERIAL
12/400 66 0.7 46.2 0.57 37.62 37.62 0 1.03 0
13/400 33 0.75 24.75 0.59 19.47 19.47 CEMENTO (bol) 2.63 150.15
PIEDRA MEDIANA
RI-A 14 1.24 17.42 1.22 17.14 (m3) 0.656 37.45
RY-A 5 1.08 5.39 1.06 5.3 HORMIGÓN (m3) 0.297 16.96
PAT 0 1.53 0 1.4 0
PAT-C 99 0.32 31.68
sub total (m3) 125.44 sub total (m3) 22.44 57.09 0

sub total (Tierra


Negra)
0 Total (m3) de concreto ciclopeo 57.09
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 0.00
RI-A 0
TOTAL 0.00 125.44 m3
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: ILAVE >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
Dec-99 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR AISLADOR AISLADOR TIPO DE DESMONTAJE
A TIERRA A TIERRA (m.s.n.m) TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
INSTALADAS EXCAVADAS RPP 25 56-3 56-4 AISLADOR DE RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO(m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
0
1 PS1-3 1 1 12/400 C.A.C. - - 3,846 - 3 - 56-3 - T-N ACC -
2 PS1-3 1 1 12/400 C.A.C. - - 3,842 - 3 - 56-3 T-N ACC
3 PS1-3 1 1 12/400 C.A.C. - - 3,840 - 3 - 56-3 1 T-N ACC
4 PS1-3 1 1 12/400 C.A.C. - - 3,838 - 3 - 56-3 1 T-N ACC
5 PS1-3 1 1 12/400 C.A.C. - 3,830 - 3 - 56-3 - T-N ACC DS-2 2
6 1 1 13/400 C.A.C. - - 3,843 - - - 56-3 - T-N ACC
7 1 1 13/400 C.A.C. - - 3,834 - - - 56-3 T-N ACC -
8 PS1-3 1 1 12/400 C.A.C. - - 3,833 - 3 - 56-3 - T-N ACC DS-3
9 PS1-3 1 1 12/400 C.A.C. - - 3,833 - 3 - 56-3 T-N ACC -
10 PS1-3 1 1 12/400 C.A.C. - - 3,832 - 3 - 56-3 1 T-N ACC
11 PS1-3 1 1 12/400 C.A.C. - - 3,832 - 3 - 56-3 T-N ACC DS-3
12 PS1-3 1 1 12/400 C.A.C. - 3,831 - 3 - 56-3 T-N ACC - 2
13 PS1-3 1 1 12/400 C.A.C. - 3,831 - 3 - 56-3 T-N ACC
14 PR3-3 1 1 12/400 C.A.C. 2 - 3,832 6 1 - 56-3 T-N ACC -
15 PS1-3 1 1 12/400 C.A.C. - - 3,833 - 3 - 56-3 T-N ACC DS-0
16 PS1-3 1 1 12/400 C.A.C. - - 3,833 - 3 - 56-3 1 T-N ACC -
17 PS1-3 1 1 12/400 C.A.C. - - 3,832 - 3 - 56-3 T-N ACC -
18 PS1-3 1 1 12/400 C.A.C. - - 3,831 - 3 - 56-3 T-N ACC -
19 PS1-3 1 1 12/400 C.A.C. - - 3,830 - 3 - 56-3 T-N ACC -
20 PS1-3 1 1 12/400 C.A.C. - - 3,829 - 3 - 56-3 T-N ACC -
21 PS1-3 1 1 12/400 C.A.C. - - 3,829 - 3 - 56-3 1 T-N ACC -
22 PR3-3 1 1 12/400 C.A.C. 2 - 3,826 6 1 - 56-3 T-N ACC
23 PS1-3 1 1 12/400 C.A.C. - - 3,826 - 3 - 56-3 T-N ACC
24 PS1-3 1 1 12/400 C.A.C. - - 3,826 - 3 - 56-3 T-N ACC
25 PS1-3 1 1 12/400 C.A.C. - - 3,826 - 3 - 56-3 1 T-N ACC
26 PS1-3 1 1 12/400 C.A.C. - - 3,826 - 3 - 56-3 T-N ACC
27 PS1-3 1 1 12/400 C.A.C. - - 3,824 - 3 - 56-3 T-N ACC
28 PS1-3 1 1 12/400 C.A.C. - - 3,823 - 3 - 56-3 T-N ACC
29 PS1-3 1 1 12/400 C.A.C. - - 3,821 - 3 - 56-3 1 T-N ACC -
30 PS1-3 1 1 12/400 C.A.C. - - 3,822 - 3 - 56-3 T-N ACC -
31 PS1-3 1 1 12/400 C.A.C. - - 3,823 - 3 - 56-3 T-N ACC
32 PS1-3 1 1 12/400 C.A.C. - - 3,820 - 3 - 56-3 T-N ACC -
33 PS1-3 1 1 12/400 C.A.C. - - 3,819 - 3 - 56-3 T-N ACC -
34 1 1 13/400 C.A.C. RY-1 - 3,821 - - - 56-3 T-N ACC -
35 1 1 13/400 C.A.C. - - 3,821 - - - 56-3 T-N ACC -
36 1 1 13/400 C.A.C. - - 3,821 - - - 56-3 T-N ACC DS-0
37 1 1 13/400 C.A.C. - - 3,820 - - - 56-3 T-N ACC -
38 1 1 13/400 C.A.C. - - 3,820 - - - 56-3 T-N ACC - 2
39 1 1 13/400 C.A.C. - - 3,819 - - - 56-3 T-N ACC -
40 1 1 13/400 C.A.C. 1 - 3,819 - - - 56-3 T-N ACC DS-0
41 PA2-3 1 1 12/400 C.A.C. 1 3,819 3 - - 56-3 T-N ACC
42 PR3-3 1 1 12/400 C.A.C. 3,819 6 1 - 56-3 T-N ACC
43 1 1 12/400 C.A.C. - - 3,816 - - - 56-3 T-N ACC -
44 1 1 12/400 C.A.C. - - 3,815 - - - 56-3 T-N ACC -
45 1 1 12/400 C.A.C. - - 3,816 - - - 56-3 T-N ACC -
46 1 1 12/400 C.A.C. - - 3,815 - - - 56-3 1 T-N ACC
47 1 1 12/400 C.A.C. - - 3,813 - - - 56-3 T-N ACC
48 1 1 12/400 C.A.C. - - 3,812 - - - 56-3 T-N ACC
49 1 1 12/400 C.A.C. - - 3,811 - - - 56-3 T-N ACC DS-0
50 1 1 12/400 C.A.C. - - 3,810 - - - 56-3 T-N ACC
51 1 1 12/400 C.A.C. 3,810 - - - 56-3 T-N ACC
52 1 1 12/400 C.A.C. - - 3,813 - - - 56-3 1 T-N ACC
53 1 1 13/400 C.A.C. 2 - 3,813 - - - 56-3 T-N ACC
54 1 1 13/400 C.A.C. 1 - 3,814 - - - 56-3 T-N ACC
55 1 13/400 C.A.C. - - 3,814 - - - 56-3 T-N ACC
56 12/400 C.A.C. - - 3,814 - - - 56-3 T-N ACC
57 12/400 C.A.C. - - 3,815 - - - 56-3 T-N ACC
58 1 13/400 C.A.C. - 3,815 - - - 56-3 T-N ACC
59 1 13/400 C.A.C. RY-1 3,815 - - - 56-3 T-N ACC DS-0
60 1 13/400 C.A.C. - - 3,815 - - - 56-3 T-N ACC
61 1 13/400 C.A.C. - - 3,815 - - - 56-3 T-N ACC
62 1 13/400 C.A.C. 2 - 3,815 - - - 56-3 T-N ACC 2
63 1 13/400 C.A.C. - - 3,815 - - - 56-3 T-N ACC
64 1 13/400 C.A.C. - - 3,815 - - - 56-3 T-N ACC
65 1 13/400 C.A.C. - - 3,816 - - - 56-3 T-N ACC DS-0
66 1 13/400 C.A.C. - - 3,816 - - - 56-3 T-N ACC
67 1 13/400 C.A.C. - - 3,816 - - - 56-3 T-N ACC
68 1 13/400 C.A.C. - - 3,816 - - - 56-3 T-N ACC
69 12/400 C.A.C. 1 - 3,816 - - - 56-3 T-N ACC
70 PA2-3 1 1 12/400 C.A.C. 1 3,816 3 - - 56-3 T-N ACC
71 12/400 C.A.C. 1 3,816 - - - 56-3 T-N ACC
72 12/400 C.A.C. - - 3,816 - - - 56-3 1 T-N ACC
73 12/400 C.A.C. - - 3,816 - - - 56-3 T-N ACC DS-0
74 1 1 12/400 C.A.C. - - 3,816 - - - 56-3 T-N ACC
75 1 1 12/400 C.A.C. - - 3,816 - - - 56-3 T-N ACC
76 1 1 12/400 C.A.C. - 3,816 - - - 56-3 T-N ACC DS-0 2
77 1 1 12/400 C.A.C. - - 3,816 - - - 56-3 1 T-N ACC
78 PR3-3 1 1 12/400 C.A.C. 2 - 3,817 6 1 - 56-3 T-N ACC
79 1 1 12/400 C.A.C. - - 3,817 - - - 56-3 T-N ACC
80 1 1 12/400 C.A.C. - - 3,817 - - - 56-3 T-N ACC
81 1 13/400 C.A.C. 3,814 - - - 56-3 T-N ACC
82 1 13/400 C.A.C. 3,814 - - - 56-3 T-N ACC
83 1 13/400 C.A.C. 3,814 - - - 56-3 T-N ACC
84 1 13/400 C.A.C. 3,815 - - - 56-3 T-N ACC DS-0
85 1 13/400 C.A.C. 3,815 - - - 56-3 T-N ACC
86 1 13/400 C.A.C. 3,815 - - - 56-3 T-N ACC DS-2
87 1 13/400 C.A.C. 3,815 - - - 56-3 T-N ACC
88 13/400 C.A.C. 3,815 - - - 56-3 T-N ACC
89 13/400 C.A.C. 3,815 - - - 56-3 T-N ACC
90 13/400 C.A.C. 3,815 - - - 56-3 T-N ACC
91 12/400 C.A.C. 1 3,816 - - - 56-3 T-N ACC
92 PR3-3 1 1 12/400 57.8 C.A.C. 1 3,816 6 1 - 56-3 T-N ACC
93 12/400 92.33 C.A.C. 3,816 - - - 56-3 T-N ACC
94 12/400 100.93 C.A.C. 3,816 - - - 56-3 1 T-N ACC
95 12/400 103.47 C.A.C. 3,816 - - - 56-3 T-N ACC
96 12/400 100.3 C.A.C. 3,816 - - - 56-3 T-N ACC
97 12/400 98.43 C.A.C. 3,817 - - - 56-3 T-N ACC
98 PA2-3 1 1 12/400 100.9 C.A.C. 1 3,817 3 - - 56-3 T-N ACC
99 PR3-3 1 1 12/400 102.57 C.A.C. 1 - 3,818 6 1 - 56-3 T-N ACC DS-3 3
TOTAL 65 0 84 756.73 20 0 45 93 0 12 13

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 29 50 0 0 29 50
PA2-3 3 2 0 0 3 2
0 PA3-3 0 3 0 0 0 3
PR3-3 6 4 0 0 6 4
SEC 0 0 0 0 0 0
PSVE-3(MFG) 0 29 0 0 0 29
PSEC-3(MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 1 0 0 0 1
PSH-3 0 0 0 0 0 0
PRH-3 0 0 0 0 0 0
P3A2-3 0 0 0 0 0 0
DS-0 9 8 0 0 9 8
DS-2 2 3 0 0 2 3
DS-3 3 3 0 0 3 3

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO
CONTRACTUAL
REPLANTEO
CONTRACTUAL
REPLANTEO CONTRACTUAL
POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 54 59 0 0 54 59 54 59 0 0 54 59
13/400 11 30 0 0 11 30 30 30 0 0 30 30

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO
CONTRACTUAL
REPLANTEO
CONTRACTUAL
REPLANTEO CONTRACTUAL
RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 20 16 0 0 20 16 20 16 0 0 20 16
RY-A 2 1 2 1 2 2 0

METRADO DE CONDUCTOR
ALEACION DE ALUMINIO AAAC
REPLANTEO CONTRACTUAL
50mm2 70mm2 70mm2 120mm2
2270.19 2206.5 Metrado
0 113.51 110.33 0 Catenaria 5%
0 2383.7 2316.83 0 total (m)
0 2.38 2.32 0 total (km)
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: ILAVE >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
Dec-99 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR AISLADOR AISLADOR TIPO DE DESMONTAJE
INSTALADAS EXCAVADAS A TIERRA A TIERRA (m.s.n.m) TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
RPP 25 56-3 56-4 AISLADOR DE RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO(m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 87
PSVE-3(MFG) 3 0
PSH-3 3 0
TOTAL 0 0 87 0
Nota: El conductor existente es de 70mm2 en la totalidad de las estructuras

Volumen de excavación Volumen de relleno cimentación


(m3 de relleno x cimentación n° postes con
(m3 POR UNIDAD) sub total factor TOTAL DE
unidad) Típica cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM EXCAVACION CONCRETO CANTIDAD MATERIAL
12/400 54 54 0.7 37.8 0.57 30.78 30.78 0 1.03 0
13/400 11 11 0.75 8.25 0.59 6.49 6.49 CEMENTO (bol) 2.63 98.02
PIEDRA MEDIANA
RI-A 20 1.24 24.8 1.22 24.4 (m3) 0.656 24.45
RY-A 2 1.08 2.16 1.06 2.12 HORMIGÓN (m3) 0.297 11.07
PAT 0 1.53 0 1.4 0
PAT-C 0 0.32 0
sub total (m3) 73.01 sub total (m3) 63.79 37.27 0

sub total (Tierra


Negra)
0 Total (m3) de concreto ciclopeo 37.27
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 0.00
RI-A 0
TOTAL 0.00 73.01 m3
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: ILAVE >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
Dec-99 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR AISLADOR AISLADOR TIPO DE DESMONTAJE
A TIERRA A TIERRA (m.s.n.m) TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
INSTALADAS EXCAVADAS RPP 25 56-3 56-4 AISLADOR DE RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO(m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
0
1 1 12/400 C.A.C. - 3,846 - - - 56-3 - T-N ACC -
2 1 12/400 C.A.C. - 3,842 - - - 56-3 T-N ACC
3 1 12/400 C.A.C. - 3,840 - - - 56-3 1 T-N ACC
4 1 12/400 C.A.C. - 3,838 - - - 56-3 1 T-N ACC
5 1 12/400 C.A.C. - 3,830 - - - 56-3 - T-N ACC DS-2 2
6 13/400 C.A.C. - 3,843 - - - 56-3 - T-N ACC
7 13/400 C.A.C. - 3,834 - - - 56-3 T-N ACC -
8 1 12/400 C.A.C. - 3,833 - - - 56-3 - T-N ACC DS-3
9 1 12/400 C.A.C. - 3,833 - - - 56-3 T-N ACC -
10 1 12/400 C.A.C. - 3,832 - - - 56-3 1 T-N ACC
11 1 12/400 C.A.C. - 3,832 - - - 56-3 T-N ACC DS-3
12 1 12/400 C.A.C. - 3,831 - - - 56-3 T-N ACC - 2
13 1 12/400 C.A.C. - 3,831 - - - 56-3 T-N ACC
14 1 12/400 C.A.C. - 3,832 - - - 56-3 T-N ACC -
15 1 12/400 C.A.C. - 3,833 - - - 56-3 T-N ACC DS-0
16 1 12/400 C.A.C. - 3,833 - - - 56-3 1 T-N ACC -
17 1 12/400 C.A.C. - 3,832 - - - 56-3 T-N ACC -
18 12/400 C.A.C. - 3,831 - - - 56-3 T-N ACC -
19 12/400 C.A.C. - 3,830 - - - 56-3 T-N ACC -
20 12/400 C.A.C. - 3,829 - - - 56-3 T-N ACC -
21 12/400 C.A.C. - 3,829 - - - 56-3 1 T-N ACC -
22 12/400 C.A.C. - 3,826 - - - 56-3 T-N ACC
23 12/400 C.A.C. - 3,826 - - - 56-3 T-N ACC
24 12/400 C.A.C. - 3,826 - - - 56-3 T-N ACC
25 12/400 C.A.C. - 3,826 - - - 56-3 1 T-N ACC
26 12/400 C.A.C. - 3,826 - - - 56-3 T-N ACC
27 12/400 C.A.C. - 3,824 - - - 56-3 T-N ACC
28 12/400 C.A.C. - 3,823 - - - 56-3 T-N ACC
29 12/400 C.A.C. - 3,821 - - - 56-3 1 T-N ACC -
30 12/400 C.A.C. - 3,822 - - - 56-3 T-N ACC -
31 12/400 C.A.C. - 3,823 - - - 56-3 T-N ACC
32 12/400 C.A.C. - 3,820 - - - 56-3 T-N ACC -
33 12/400 C.A.C. - 3,819 - - - 56-3 T-N ACC -
34 13/400 C.A.C. - 3,821 - - - 56-3 T-N ACC -
35 PSVE-3(MFG) 13/400 C.A.C. - 3,821 - 3 - 56-3 T-N ACC -
36 PSVE-3(MFG) 13/400 C.A.C. - 3,821 - 3 - 56-3 T-N ACC DS-0
37 PSVE-3(MFG) 13/400 C.A.C. - 3,820 - 3 - 56-3 T-N ACC -
38 PSVE-3(MFG) 13/400 C.A.C. - 3,820 - 3 - 56-3 T-N ACC - 2
39 PSVE-3(MFG) 13/400 C.A.C. - 3,819 - 3 - 56-3 T-N ACC -
40 13/400 C.A.C. - 3,819 - - - 56-3 T-N ACC DS-0
41 12/400 C.A.C. 3,819 - - - 56-3 T-N ACC
42 12/400 C.A.C. 3,819 - - - 56-3 T-N ACC
43 PS1-3 12/400 C.A.C. - 3,816 - 3 - 56-3 T-N ACC -
44 PS1-3 12/400 C.A.C. - 3,815 - 3 - 56-3 T-N ACC -
45 PS1-3 12/400 C.A.C. - 3,816 - 3 - 56-3 T-N ACC -
46 PS1-3 12/400 C.A.C. - 3,815 - 3 - 56-3 1 T-N ACC
47 PS1-3 12/400 C.A.C. - 3,813 - 3 - 56-3 T-N ACC
48 PS1-3 12/400 C.A.C. - 3,812 - 3 - 56-3 T-N ACC
49 PS1-3 12/400 C.A.C. - 3,811 - 3 - 56-3 T-N ACC DS-0
50 PS1-3 12/400 C.A.C. - 3,810 - 3 - 56-3 T-N ACC
51 PS1-3 12/400 C.A.C. 3,810 - 3 - 56-3 T-N ACC
52 PS1-3 12/400 C.A.C. - 3,813 - 3 - 56-3 1 T-N ACC
53 PSVE-3(MFG) 13/400 C.A.C. - 3,813 - 3 - 56-3 T-N ACC
54 PSVE-3(MFG) 13/400 C.A.C. - 3,814 - 3 - 56-3 T-N ACC
55 PSVE-3(MFG) 13/400 C.A.C. - 3,814 - 3 - 56-3 T-N ACC
56 PS1-3 1 1 12/400 C.A.C. - 3,814 - 3 - 56-3 T-N ACC
57 PS1-3 1 1 12/400 C.A.C. - 3,815 - 3 - 56-3 T-N ACC
58 13/400 C.A.C. - 3,815 - - - 56-3 T-N ACC
59 PSVE-3(MFG) 13/400 C.A.C. 3,815 - 3 - 56-3 T-N ACC DS-0
60 PSVE-3(MFG) 13/400 C.A.C. - 3,815 - 3 - 56-3 T-N ACC
61 PSVE-3(MFG) 13/400 C.A.C. - 3,815 - 3 - 56-3 T-N ACC
62 PSVE-3(MFG) 13/400 C.A.C. - 3,815 - 3 - 56-3 T-N ACC 2
63 PSVE-3(MFG) 13/400 C.A.C. - 3,815 - 3 - 56-3 T-N ACC
64 PSVE-3(MFG) 13/400 C.A.C. - 3,815 - 3 - 56-3 T-N ACC
65 13/400 C.A.C. - 3,816 - - - 56-3 T-N ACC DS-0
66 13/400 C.A.C. - 3,816 - - - 56-3 T-N ACC
67 13/400 C.A.C. - 3,816 - - - 56-3 T-N ACC
68 13/400 C.A.C. - 3,816 - - - 56-3 T-N ACC
69 PA3-3 1 1 12/400 C.A.C. - 3,816 6 - - 56-3 T-N ACC
70 12/400 C.A.C. 3,816 - - - 56-3 T-N ACC
71 PA3-3 1 1 12/400 C.A.C. 3,816 6 - - 56-3 T-N ACC
72 PS1-3 1 1 12/400 C.A.C. - 3,816 - 3 - 56-3 1 T-N ACC
73 PS1-3 1 1 12/400 C.A.C. - 3,816 - 3 - 56-3 T-N ACC DS-0
74 PS1-3 12/400 C.A.C. - 3,816 - 3 - 56-3 T-N ACC
75 PS1-3 12/400 C.A.C. - 3,816 - 3 - 56-3 T-N ACC
76 PS1-3 12/400 C.A.C. - 3,816 - 3 - 56-3 T-N ACC DS-0 2
77 PS1-3 12/400 C.A.C. - 3,816 - 3 - 56-3 1 T-N ACC
78 12/400 C.A.C. - 3,817 - - - 56-3 T-N ACC
79 PS1-3 12/400 C.A.C. - 3,817 - 3 - 56-3 T-N ACC
80 PS1-3 12/400 C.A.C. - 3,817 - 3 - 56-3 T-N ACC
81 13/400 C.A.C. 3,814 - - - 56-3 T-N ACC
82 13/400 C.A.C. 3,814 - - - 56-3 T-N ACC
83 13/400 C.A.C. 3,814 - - - 56-3 T-N ACC
84 13/400 C.A.C. 3,815 - - - 56-3 T-N ACC DS-0
85 13/400 C.A.C. 3,815 - - - 56-3 T-N ACC
86 13/400 C.A.C. 3,815 - - - 56-3 T-N ACC DS-2
87 13/400 C.A.C. 3,815 - - - 56-3 T-N ACC
88 13/400 C.A.C. 3,815 - - - 56-3 T-N ACC
89 13/400 C.A.C. 3,815 - - - 56-3 T-N ACC
90 13/400 C.A.C. 3,815 - - - 56-3 T-N ACC
91 PA3-3 1 1 12/400 C.A.C. 3,816 6 - - 56-3 T-N ACC
92 12/400 C.A.C. 3,816 - - - 56-3 T-N ACC
93 PS1-3 1 1 12/400 C.A.C. 3,816 - 3 - 56-3 T-N ACC
94 PS1-3 1 1 12/400 C.A.C. 3,816 - 3 - 56-3 1 T-N ACC
95 PS1-3 1 1 12/400 C.A.C. 3,816 - 3 - 56-3 T-N ACC
96 PS1-3 1 1 12/400 C.A.C. 3,816 - 3 - 56-3 T-N ACC
97 1 1 12/400 C.A.C. 3,817 - - - 56-3 T-N ACC
98 12/400 C.A.C. 3,817 - - - 56-3 T-N ACC
99 12/400 C.A.C. - 3,818 - - - 56-3 T-N ACC DS-3 3
TOTAL 12 15 12 0 - 0 18 114 0 12 13

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 24 50 0 0 24 50
PA2-3 0 2 0 0 0 2
0 PA3-3 3 3 0 0 3 3
PR3-3 0 4 0 0 0 4
SEC 0 0 0 0 0 0
PSVE-3(MFG) 14 29 0 0 14 29
PSEC-3(MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 1 0 0 0 1
PSH-3 0 0 0 0 0 0
PRH-3 0 0 0 0 0 0
P3A2-3 0 0 0 0 0 0
DS-0 9 8 0 0 9 8
DS-2 2 3 0 0 2 3
DS-3 3 3 0 0 3 3

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO
CONTRACTUAL
REPLANTEO
CONTRACTUAL
REPLANTEO CONTRACTUAL
POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 15 59 0 0 15 59 12 59 0 0 12 59
13/400 0 30 0 0 0 30 0 30 0 0 0 30

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO
CONTRACTUAL
REPLANTEO
CONTRACTUAL
REPLANTEO CONTRACTUAL
RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 0 16 0 0 0 16 0 16 0 0 0 16
RY-A 2 1 2 1 2 2 0

METRADO DE CONDUCTOR
ALEACION DE ALUMINIO AAAC
REPLANTEO CONTRACTUAL
50mm2 70mm2 70mm2 120mm2
0 2206.5 Metrado
0 0 110.33 0 Catenaria 5%
0 0 2316.83 0 total (m)
0 0 2.32 0 total (km)

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: ILAVE >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
Dec-99 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR AISLADOR AISLADOR TIPO DE DESMONTAJE
INSTALADAS EXCAVADAS A TIERRA A TIERRA (m.s.n.m) TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
RPP 25 56-3 56-4 AISLADOR DE RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO(m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 72
PSVE-3(MFG) 3 42
PSH-3 3 0
TOTAL 0 0 114 0
Nota: El conductor existente es de 70mm2 en la totalidad de las estructuras

Volumen de excavación Volumen de relleno cimentación


(m3 de relleno x cimentación n° postes con
(m3 POR UNIDAD) sub total factor TOTAL DE
unidad) Típica cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM EXCAVACION CONCRETO CANTIDAD MATERIAL
12/400 15 15 0.7 10.5 0.57 8.55 8.55 0 1.03 0
13/400 0 0 0.75 0 0.59 0 0 CEMENTO (bol) 2.63 22.49
PIEDRA MEDIANA
RI-A 0 1.24 0 1.22 0 (m3) 0.656 5.61
RY-A 2 1.08 2.16 1.06 2.12 HORMIGÓN (m3) 0.297 2.54
PAT 0 1.53 0 1.4 0
PAT-C 0 0.32 0
sub total (m3) 12.66 sub total (m3) 10.67 8.55 0

sub total (Tierra


Negra)
0 Total (m3) de concreto ciclopeo 8.55
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 0.00
RI-A 0
TOTAL 0.00 12.66 m3
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: ILAVE >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
Dec-99 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR AISLADOR AISLADOR TIPO DE DESMONTAJE
A TIERRA A TIERRA (m.s.n.m) TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
INSTALADAS EXCAVADAS RPP 25 56-3 56-4 AISLADOR DE RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO(m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
0
1 1 12/400 C.A.C. - - - 3,846 - - - 56-3 - T-N ACC -
2 1 12/400 C.A.C. - - - 3,842 - - - 56-3 T-N ACC
3 1 12/400 C.A.C. - - - 3,840 - - - 56-3 1 T-N ACC
4 1 12/400 C.A.C. - - - 3,838 - - - 56-3 1 T-N ACC
5 1 12/400 C.A.C. - 3,830 - - - 56-3 - T-N ACC DS-2 2
6 PSVE-3(MFG) 1 13/400 C.A.C. - - - 3,843 - 3 - 56-3 - T-N ACC
7 PSVE-3(MFG) 1 13/400 C.A.C. - - - 3,834 - 3 - 56-3 T-N ACC -
8 1 12/400 C.A.C. - - - 3,833 - - - 56-3 - T-N ACC DS-3
9 1 12/400 C.A.C. - - - 3,833 - - - 56-3 T-N ACC -
10 1 12/400 C.A.C. - - - 3,832 - - - 56-3 1 T-N ACC
11 1 12/400 C.A.C. - - - 3,832 - - - 56-3 T-N ACC DS-3
12 1 12/400 C.A.C. - 3,831 - - - 56-3 T-N ACC - 2
13 1 12/400 C.A.C. - 3,831 - - - 56-3 T-N ACC
14 1 12/400 C.A.C. 2 2 - 3,832 - - - 56-3 T-N ACC -
15 1 12/400 C.A.C. - - - 3,833 - - - 56-3 T-N ACC DS-0
16 1 12/400 C.A.C. - - - 3,833 - - - 56-3 1 T-N ACC -
17 1 12/400 C.A.C. - - - 3,832 - - - 56-3 T-N ACC -
18 1 12/400 C.A.C. - - - 3,831 - - - 56-3 T-N ACC -
19 1 12/400 C.A.C. - - - 3,830 - - - 56-3 T-N ACC -
20 1 12/400 C.A.C. - - - 3,829 - - - 56-3 T-N ACC -
21 1 12/400 C.A.C. - - - 3,829 - - - 56-3 1 T-N ACC -
22 1 12/400 C.A.C. 2 2 - 3,826 - - - 56-3 T-N ACC
23 1 12/400 C.A.C. - - - 3,826 - - - 56-3 T-N ACC
24 1 12/400 C.A.C. - - - 3,826 - - - 56-3 T-N ACC
25 1 12/400 C.A.C. - - - 3,826 - - - 56-3 1 T-N ACC
26 1 12/400 C.A.C. - - - 3,826 - - - 56-3 T-N ACC
27 1 12/400 C.A.C. - - - 3,824 - - - 56-3 T-N ACC
28 1 12/400 C.A.C. - - - 3,823 - - - 56-3 T-N ACC
29 1 12/400 C.A.C. - - - 3,821 - - - 56-3 1 T-N ACC -
30 1 12/400 C.A.C. - - - 3,822 - - - 56-3 T-N ACC -
31 1 12/400 C.A.C. - - - 3,823 - - - 56-3 T-N ACC
32 1 12/400 C.A.C. - - - 3,820 - - - 56-3 T-N ACC -
33 1 12/400 C.A.C. - - - 3,819 - - - 56-3 T-N ACC -
34 PR3-3(MFG) 1 13/400 C.A.C. RY-1 RY-1 - 3,821 6 3 - 56-3 T-N ACC -
35 1 13/400 C.A.C. - - - 3,821 - - - 56-3 T-N ACC -
36 1 13/400 C.A.C. - - - 3,821 - - - 56-3 T-N ACC DS-0
37 1 13/400 C.A.C. - - - 3,820 - - - 56-3 T-N ACC -
38 1 13/400 C.A.C. - - - 3,820 - - - 56-3 T-N ACC - 2
39 1 13/400 C.A.C. - - - 3,819 - - - 56-3 T-N ACC -
40 PR3-3(MFG) 1 13/400 C.A.C. 1 1 - 3,819 6 3 - 56-3 T-N ACC DS-0
41 1 12/400 C.A.C. 1 1 3,819 - - - 56-3 T-N ACC
42 1 12/400 C.A.C. 3,819 - - - 56-3 T-N ACC
43 1 12/400 C.A.C. - - - 3,816 - - - 56-3 T-N ACC -
44 1 12/400 C.A.C. - - - 3,815 - - - 56-3 T-N ACC -
45 1 12/400 C.A.C. - - - 3,816 - - - 56-3 T-N ACC -
46 1 12/400 C.A.C. - - - 3,815 - - - 56-3 1 T-N ACC
47 1 12/400 C.A.C. - - - 3,813 - - - 56-3 T-N ACC
48 1 12/400 C.A.C. - - - 3,812 - - - 56-3 T-N ACC
49 1 12/400 C.A.C. - - - 3,811 - - - 56-3 T-N ACC DS-0
50 1 12/400 C.A.C. - - - 3,810 - - - 56-3 T-N ACC
51 1 12/400 C.A.C. 3,810 - - - 56-3 T-N ACC
52 1 12/400 C.A.C. - - - 3,813 - - - 56-3 1 T-N ACC
53 1 13/400 C.A.C. 2 2 - 3,813 - - - 56-3 T-N ACC
54 1 13/400 C.A.C. 1 1 - 3,814 - - - 56-3 T-N ACC
55 1 1 13/400 C.A.C. - - - 3,814 - - - 56-3 T-N ACC
56 1 1 1 12/400 C.A.C. - - - 3,814 - - - 56-3 T-N ACC
57 1 1 1 12/400 C.A.C. - - - 3,815 - - - 56-3 T-N ACC
58 PA3-3 1 1 13/400 C.A.C. - 3,815 6 - - 56-3 T-N ACC
59 1 1 13/400 C.A.C. RY-1 RY-1 3,815 - - - 56-3 T-N ACC DS-0
60 1 1 13/400 C.A.C. - - - 3,815 - - - 56-3 T-N ACC
61 1 1 13/400 C.A.C. - - - 3,815 - - - 56-3 T-N ACC
62 1 1 13/400 C.A.C. 2 2 - 3,815 - - - 56-3 T-N ACC 2
63 1 1 13/400 C.A.C. - - - 3,815 - - - 56-3 T-N ACC
64 1 1 13/400 C.A.C. - - - 3,815 - - - 56-3 T-N ACC
65 PSVE-3(MFG) 1 1 13/400 C.A.C. - - - 3,816 - 3 - 56-3 T-N ACC DS-0
66 PSVE-3(MFG) 1 1 13/400 C.A.C. - - - 3,816 - 3 - 56-3 T-N ACC
67 PSVE-3(MFG) 1 1 13/400 C.A.C. - - - 3,816 - 3 - 56-3 T-N ACC
68 PSVE-3(MFG) 1 1 13/400 C.A.C. - - - 3,816 - 3 - 56-3 T-N ACC
69 1 1 1 12/400 C.A.C. 1 1 - 3,816 - - - 56-3 T-N ACC
70 1 12/400 C.A.C. 1 1 3,816 - - - 56-3 T-N ACC
71 1 1 1 12/400 C.A.C. 1 1 3,816 - - - 56-3 T-N ACC
72 1 1 1 12/400 C.A.C. - - - 3,816 - - - 56-3 1 T-N ACC
73 1 1 1 12/400 C.A.C. - - - 3,816 - - - 56-3 T-N ACC DS-0
74 1 12/400 C.A.C. - - - 3,816 - - - 56-3 T-N ACC
75 1 12/400 C.A.C. - - - 3,816 - - - 56-3 T-N ACC
76 1 12/400 C.A.C. - 3,816 - - - 56-3 T-N ACC DS-0 2
77 1 12/400 C.A.C. - - - 3,816 - - - 56-3 1 T-N ACC
78 1 12/400 C.A.C. 2 2 - 3,817 - - - 56-3 T-N ACC
79 1 12/400 C.A.C. - - - 3,817 - - - 56-3 T-N ACC
80 1 12/400 C.A.C. - - - 3,817 - - - 56-3 T-N ACC
81 PSVE-3(MFG) 1 1 13/400 C.A.C. 3,814 - 3 - 56-3 T-N ACC
82 PSVE-3(MFG) 1 1 13/400 C.A.C. 3,814 - 3 - 56-3 T-N ACC
83 PSVE-3(MFG) 1 1 13/400 C.A.C. 3,814 - 3 - 56-3 T-N ACC
84 PSVE-3(MFG) 1 1 13/400 C.A.C. 3,815 - 3 - 56-3 T-N ACC DS-0
85 PSVE-3(MFG) 1 1 13/400 C.A.C. 3,815 - 3 - 56-3 T-N ACC
86 PSVE-3(MFG) 1 1 13/400 C.A.C. 3,815 - 3 - 56-3 T-N ACC DS-2
87 PSVE-3(MFG) 1 1 13/400 C.A.C. 3,815 - 3 - 56-3 T-N ACC
88 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3,815 - 3 - 56-3 T-N ACC
89 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3,815 - 3 - 56-3 T-N ACC
90 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3,815 - 3 - 56-3 T-N ACC
91 1 1 1 12/400 C.A.C. 1 1 3,816 - - - 56-3 T-N ACC
92 1 12/400 C.A.C. 1 1 3,816 - - - 56-3 T-N ACC
93 1 1 1 12/400 C.A.C. 3,816 - - - 56-3 T-N ACC
94 1 1 1 12/400 C.A.C. 3,816 - - - 56-3 1 T-N ACC
95 1 1 1 12/400 C.A.C. 3,816 - - - 56-3 T-N ACC
96 1 1 1 12/400 C.A.C. 3,816 - - - 56-3 T-N ACC
97 PS1-3 1 1 1 12/400 C.A.C. 3,817 - 3 - 56-3 T-N ACC
98 1 12/400 C.A.C. 1 1 3,817 - - - 56-3 T-N ACC
99 1 12/400 C.A.C. 1 1 - 3,818 - - - 56-3 T-N ACC DS-3 3
TOTAL 34 99 15 0 20 0 18 57 0 12 13

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 1 50 0 0 1 50
PA2-3 0 2 0 0 0 2
0 PA3-3 1 3 0 0 1 3
PR3-3 0 4 0 0 0 4
SEC 0 0 0 0 0 0
PSVE-3(MFG) 16 29 0 0 16 29
PSEC-3(MFG) 0 0 0 0 0 0
PR3-3(MFG) 2 1 0 0 2 1
PSH-3 0 0 0 0 0 0
PRH-3 0 0 0 0 0 0
P3A2-3 0 0 0 0 0 0
DS-0 9 8 0 0 9 8
DS-2 2 3 0 0 2 3
DS-3 3 3 0 0 3 3

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO
CONTRACTUAL
REPLANTEO
CONTRACTUAL
REPLANTEO CONTRACTUAL
POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 66 59 0 0 66 59 12 59 0 0 12 59
13/400 33 30 0 0 33 30 22 30 0 0 22 30

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO
CONTRACTUAL
REPLANTEO
CONTRACTUAL
REPLANTEO CONTRACTUAL
RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 20 16 0 0 20 16 20 16 0 0 20 16
RY-A 2 1 2 1 2 2 0

METRADO DE CONDUCTOR
ALEACION DE ALUMINIO AAAC
REPLANTEO CONTRACTUAL
50mm2 70mm2 70mm2 120mm2
0 2206.5 Metrado
0 0 110.33 0 Catenaria 5%
0 0 2316.83 0 total (m)
0 0 2.32 0 total (km)

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: ILAVE >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
Dec-99 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR AISLADOR AISLADOR TIPO DE DESMONTAJE
INSTALADAS EXCAVADAS A TIERRA A TIERRA (m.s.n.m) TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
RPP 25 56-3 56-4 AISLADOR DE RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO(m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 3
PSVE-3(MFG) 3 48
PSH-3 3 0
TOTAL 0 0 51 0
Nota: El conductor existente es de 70mm2 en la totalidad de las estructuras

Volumen de excavación Volumen de relleno cimentación


(m3 de relleno x cimentación n° postes con
(m3 POR UNIDAD) sub total factor TOTAL DE
unidad) Típica cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM EXCAVACION CONCRETO CANTIDAD MATERIAL
12/400 66 66 0.7 46.2 0.57 37.62 37.62 0 1.03 0
13/400 33 33 0.75 24.75 0.59 19.47 19.47 CEMENTO (bol) 2.63 150.15
PIEDRA MEDIANA
RI-A 20 1.24 24.8 1.22 24.4 (m3) 0.656 37.45
RY-A 2 1.08 2.16 1.06 2.12 HORMIGÓN (m3) 0.297 16.96
PAT 0 1.53 0 1.4 0
PAT-C 0 0.32 0
sub total (m3) 97.91 sub total (m3) 83.61 57.09 0

sub total (Tierra


Negra)
0 Total (m3) de concreto ciclopeo 57.09
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 0.00
RI-A 0
TOTAL 0.00 97.91 m3
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: YUNGUYO >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
<=3900 = PIN 56-3 No Accesible a la Grua = INAX

DE 64x6.4 DIAM=218mm, CON 2 PERNOS F°G° DE 16mm


PLANCHA DOBLADA TIPO J DE COBRE PARA TOMA A

PERNO HEXAGONAL DE F°G° DE 16mm Diam. x 76mm,

ESPIGA DE A°G° PARA CRUCETA Y AISLADOR ANSI,


ALAMBRE DE ALUMINIO PARA AMARRE DE 16mm2
CONECTOR DE COBRE TIPO PERNO PARTIDO PARA

RIOSTRA METALICA DE F°G° DE 64x64x6.4x1000mm


ABRAZADERA PARTIDA TIPO CAS SIMPLE DE F°G°

64x6.4mm, CON 2 PERNOS FºGº DE 16mm ø x 102mm,


CONDUCTOR DESNUDO COOPERWELD DE 25mm2

MENSULA DE Fo Go DE 64x64x6.4x1200mm LONG.

CRUCETA DE Fo Go DE 64x64x6.4x2400mm LONG.


CONECTOR DE AL-AL 25/120 mm2 02 PERNOS

ABRAZADERA TIPO U DE FºGº DE 208mm ø x


E S T R U C T U R A

TIERRA DE ESPIGAS Y/ O PERNOS

x 102mm, TUERCA Y ARANDELA


SEGUN NOTA INDICADA
CONDUCTOR DE 25 mm2

TUERCA Y ARANDELA

TUERCA Y ARANDELA

SEGUN E.T.

SEGUN E.T.
ACCESIBILIDAD
PUESTA A TIPO DE DESCARGADOR CONDUCTOR DESMONTAJE DESMONTAJE DE
Nro. CODIGO TIPO N° POSTES NOMINACION VANO (m) MATERIAL N° RETENIDAS COTA (m.s.n.m) TIPO BAYONETA
TIPO DE TERRENO AL TERRENO DERIVACIÓN AISLADOR 56-3 AISLADOR 56-4 DE CONDUCTOR
RETENIDA
TIERRA PAT-1 AISLADOR LUGAR DE IZAJE SECCIÓN (m)

0
1 NMT000191097 PR3-3 1 12/400 C.A.C. 1 - 3,874 56-3 1 T-N ACC - - - - - - - - - - - - - - 50 2
2 NMT000191095 PS1-3 1 12/400 C.A.C. - - 3,865 56-3 - T-N INAX - - - - - - - - - - - - - - 50
3 NMT000191094 PS1-3 1 12/400 C.A.C. - - 3,861 56-3 - T-N INAX DS-3 3 3 3 3 3 3 3 3 3 3 3 3 3 - 50
4 NMT000191091 PS1-3 1 12/400 C.A.C. - - 3,857 56-3 - T-N INAX DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 - 50
5 NMT000191090 PS1-3 1 12/400 C.A.C. - - 3,858 56-3 - T-N ACC - - - - - - - - - - - - - - 50
6 NMT000191088 PR3-3 1 12/400 C.A.C. 1 - 3,851 56-3 - T-N INAX DS-3 3 3 3 3 3 3 3 3 3 3 3 3 3 - 50
7 NMT000191085 PS1-3 1 12/400 C.A.C. - - 3,861 56-3 - ROCA ACC - - - - - - - - - - - - - - 50 1
8 NMT000191084 PR3-3 1 12/400 C.A.C. 1 - 3,859 56-3 1 T-N ACC - - - - - - - - - - - - - - - 50
9 NMT000191083 PS1-3 1 12/400 C.A.C. - - 3,855 56-3 - T-N INAX - - - - - - - - - - - - - - 50
10 NMT000191082 PS1-3 1 12/400 C.A.C. - - 3,847 56-3 - T-N INAX - - - - - - - - - - - - - - 50
11 NMT000191081 PS1-3 1 12/400 C.A.C. - - 3,845 56-3 - T-N INAX DS-2 2 2 2 2 2 2 2 2 2 2 2 2 2 - 50
12 NMT000191080 PS1-3 1 12/400 C.A.C. - - 3,846 56-3 - T-N INAX DS-2 2 2 2 2 2 2 2 2 2 2 2 2 2 - 50
13 NMT000191079 PS1-3 1 12/400 C.A.C. - - 3,854 56-3 - ROCA INAX - - - - - - - - - - - - - - 50
14 NMT000191078 PR3-3 1 13/400 C.A.C. 2 1 3,870 56-3 - ROCA INAX - - - - - - - - - - - - - - 50 2
SEC 3,870 56-3 - - - - - - - - - - - - - - 50
15 NMT000191077 PS1-3 1 12/400 C.A.C. - - 3,839 56-3 - T-N ACC - - - - - - - - - - - - - - 50
16 NMT000191076 PR3-3 1 12/400 C.A.C. 2 - 3,880 56-3 - T-N ACC - - - - - - - - - - - - - - 50
17 NMT000191075 PS1-3 1 12/400 C.A.C. - - 3,879 56-3 1 T-N INAX - - - - - - - - - - - - - - 50
18 NMT000191073 PS1-3 1 12/400 C.A.C. - - 3,871 56-3 - T-N INAX - - - - - - - - - - - - - - 50
19 NMT000191072 PS1-3 1 12/400 C.A.C. - - 3,869 56-3 - T-N INAX DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 - 50
20 NMT000191071 PS1-3 1 12/400 C.A.C. - - 3,864 56-3 - T-N INAX - - - - - - - - - - - - - - 50
21 NMT000191070 PS1-3 1 12/400 C.A.C. - - 3,860 56-3 - T-N INAX - - - - - - - - - - - - - - 50
22 NMT000191067 PS1-3 1 12/400 C.A.C. - - 3,857 56-3 T-N INAX - - - - - - - - - - - - - - 50
23 NMT000191066 PS1-3 1 12/400 C.A.C. - - 3,852 56-3 - T-N ACC - - - - - - - - - - - - - - 50
24 NMT000191065 PS1-3 1 12/400 C.A.C. - - 3,857 56-3 - T-N INAX DS-3 3 3 3 3 3 3 3 3 3 3 3 3 3 - 50 3
25 NMT000191064 PS1-3 1 12/400 C.A.C. - - 3,851 56-3 1 T-N INAX - - - - - - - - - - - - - - 50
26 NMT000191062 PS1-3 1 12/400 C.A.C. - - 3,847 56-3 - T-N INAX - - - - - - - - - - - - - - 50
27 NMT000191059 PS1-3 1 12/400 C.A.C. - - 3,853 56-3 - T-N INAX - - - - - - - - - - - - - - 50
28 NMT000191058 PS1-3 1 12/400 C.A.C. - - 3,856 56-3 - T-N INAX - - - - - - - - - - - - - - 50
29 NMT000191057 PS1-3 1 12/400 C.A.C. - - 3,860 56-3 - T-N INAX - - - - - - - - - - - - - - 50
30 NMT000189482 PS1-3 1 12/400 C.A.C. 3,846 56-3 T-N ACC - - - - - - - - - - - - - - 50
31 NMT000189480 PS1-3 1 12/400 C.A.C. 3,844 56-3 T-N ACC - - - - - - - - - - - - - - 50
32 NMT000189476 PS1-3 1 12/400 C.A.C. 3,844 56-3 T-N ACC DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 - 50
33 NMT000189475 PS1-3 1 12/400 C.A.C. 3,843 56-3 T-N ACC - - - - - - - - - - - - - - 50
34 NMT000189474 PR3-3 1 12/400 C.A.C. 2 3,845 56-3 T-N ACC - - - - - - - - - - - - - - 50 2
35 NMT000189473 PSVE-3(MFG) 1 13/400 C.A.C. 3,845 56-3 T-N ACC - - - - - - - - - - - - - - 50
36 NMT000189472 PSVE-3(MFG) 1 13/400 C.A.C. 3,845 56-3 T-N ACC - - - - - - - - - - - - - - 50 2
37 NMT000189471 PR3-3(MFG) 1 13/400 75.06 C.A.C. RY-2 3,845 56-3 1 T-N ACC - - - - - - - - - - - - - - 50 75.06
38 NMT000189469 PSVE-3(MFG) 1 13/400 75.00 C.A.C. 3,845 56-3 T-N ACC - - - - - - - - - - - - - - 50 75.00
39 NMT000189468 PSVE-3(MFG) 1 13/400 75.00 C.A.C. 3,845 56-3 T-N ACC DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 - 50 75.00
40 NMT000189467 PSVE-3(MFG) 1 13/400 75.00 C.A.C. 1 3,845 56-3 T-N ACC - - - - - - - - - - - - - - 50 75.00
41 NMT000189466 PSVE-3(MFG) 1 13/400 75.76 C.A.C. 3,846 56-3 T-N ACC - - - - - - - - - - - - - - 50 75.76
42 NMT000189465 PSVE-3(MFG) 1 13/400 70.00 C.A.C. 3,846 56-3 T-N ACC - - - - - - - - - - - - - - 50 70.00
43 NMT000189464 PSVE-3(MFG) 1 13/400 70.00 C.A.C. 3,847 56-3 T-N ACC - - - - - - - - - - - - - - 50 70.00
44 NMT000189463 PR3-3(MFG) 1 13/400 73.45 C.A.C. RY-2 3,847 56-3 T-N ACC - - - - - - - - - - - - - - 50 73.45
45 NMT000189462 PSVE-3(MFG) 1 13/400 70.00 C.A.C. 3,848 56-3 T-N ACC - - - - - - - - - - - - - - 50 70.00
46 NMT000189461 PSVE-3(MFG) 1 13/400 71.18 C.A.C. 3,847 56-3 T-N ACC - - - - - - - - - - - - - - 50 71.18
47 NMT000189460 PSVE-3(MFG) 1 13/400 70.00 C.A.C. 3,844 56-3 T-N ACC - - - - - - - - - - - - - - 50 70.00
48 NMT000189459 PSVE-3(MFG) 1 13/400 70.00 C.A.C. 3,845 56-3 T-N ACC - - - - - - - - - - - - - - 50 70.00
49 NMT000189458 PSVE-3(MFG) 1 13/400 91.00 C.A.C. 1 3,846 56-3 1 T-N ACC DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 - 50 91.00
50 NMT000189457 PSVE-3(MFG) 1 13/400 74.37 C.A.C. 3,842 56-3 T-N ACC - - - - - - - - - - - - - - 50 74.37
51 NMT000189456 PSVE-3(MFG) 1 13/400 74.38 C.A.C. 3,841 56-3 T-N ACC DS-2 2 2 2 2 2 2 2 2 2 2 2 2 2 - 50 74.38
52 NMT000189455 PSVE-3(MFG) 1 13/400 110.70 C.A.C. 1 3,843 56-3 T-N ACC - - - - - - - - - - - - - - 50 110.70 1
53 NMT000189454 PR3-3 1 12/400 123.35 C.A.C. 1 3,842 56-3 T-N ACC DS-0 1 1 1 1 1 1 1 1 1 1 1 1 1 - 50 123.35
TOTAL 53 1344.25 13 1 6 1,344.25 13

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 28 31 0 0 28 31
PA2-3 0 0 0 0 0 0
PA3-3 0 1 0 0 0 1
PR3-3 7 6 0 0 7 6

SEC 1 1 0 0 1 1
PSVE-3(MFG) 16 15 0 0 16 15
PSEC-3 (MFG) 0 0 0 0 0 0
PR3-3(MFG) 2 0 0 0 2 0
PSH-3 0 0 0 0 0 0
PRH-3 0 0 0 0 0 0

P3A2-3 0 0 0 0 0 0
DS-0 6 5 0 0 6 5
DS-2 3 3 0 0 3 3

DS-3 3 3 0 0 3 3

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 32 34 2 3 34 37 13 35 21 2 34 37
13/400 18 16 1 0 19 16 18 16 1 0 19 16
TOTAL 53

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL

RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 11 16 2 0 13 16 10 16 3 0 13 16
RY-A 4 4 0 4 4 0

METRADO DE CONDUCTOR
ALEACION DE ALUMINIO AAAC
REPLANTEO CONTRACTUAL
50mm2 50mm2 70mm2 120mm2
4032.75 3642 Metrado
201.6375 182.1 0 0 Catenaria 5%
4234.39 3824.1 0 0 total (m)
4.23 3.82 0 0 total (km)

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 0 84
PSVE-3(MFG) 3 0
PSH-3 3 0
TOTAL 0 84 0 0

Volumen de excavación Volumen de relleno cimentación


(m3 POR (m3 de relleno x cimentación n° postes con
sub total factor sub total DOSIFICACIÓN DEL CONCRETO X 1 TOTAL DE
UNIDAD) unidad) Típica cim tipo II
ITEM CANTIDAD CANTIDAD m3 MATERIAL
12/400 31 0.7 21.70 0.57 17.67 17.67 0 1.03 0
13/400 18 0.75 13.5 0.59 10.62 10.62 CEMENTO (bol) 2.63 80.45
12/400 ROCA 3 0.7 2.1 0.57 1.71 1.71
13/400 ROCA 1 0.75 0.75 0.59 0.59 0.59
PIEDRA
RI-A 15 1.2443 18.66 1.2243 18.36 MEDIANA (m3) 0.656 20.07

RI-A ROCA 1 1.2443 1.2443 1.2243 1.22


HORMIGÓN
RY-A 0 1.08 0 1.06 0 (m3) 0.297 9.09
PAT 1 1.53 1.53 1.4 1.4
PAT-C 52 0.32 16.64
sub total (m3) 72.03 sub total (m3) 19.58 30.59 0

sub total (Tierra


Negra)
1.4 Total (m3) de concreto ciclopeo 30.59
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 2.10
13/400 0.75 2.1
RI-A 1.2443
TOTAL 4.09 72.03 m3
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: YUNGUYO >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
Dec-99 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR RPP TIPO DE Sección de DESMONTAJE DE DESMONTAJE DE
A TIERRA A TIERRA (m.s.n.m) AISLADOR 56-3 AISLADOR 56-4 TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
INSTALADAS EXCAVADAS 25 AISLADOR Conductor CONDUCTOR (m) RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO (m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
0
1 PR3-3 1 12/400 C.A.C. - 3,874 6 1 - 56-3 1 T-N ACC DS-0 35 2
2 PS1-3 12/400 C.A.C. - 3,865 - 3 - 56-3 T-N INAX - 35
3 PS1-3 12/400 C.A.C. 3,861 56-3 T-N INAX DS-3 35
4 PS1-3 12/400 C.A.C. 3,857 56-3 T-N INAX DS-0 35
5 PS1-3 12/400 C.A.C. 3,858 56-3 T-N INAX 35
6 PR3-3 12/400 C.A.C. 3,851 56-3 1 T-N INAX DS-3 35
7 PS1-3 12/400 C.A.C. 3,861 56-3 ROCA INAX 35 1
8 PR3-3 1 12/400 C.A.C. 3,859 56-3 T-N ACC 35
9 PS1-3 12/400 C.A.C. 3,855 56-3 T-N INAX 35
10 PS1-3 12/400 C.A.C. 3,847 56-3 T-N INAX 35
11 PS1-3 12/400 C.A.C. 3,845 56-3 T-N INAX 35
12 PS1-3 12/400 C.A.C. 3,846 56-3 T-N INAX DS-2 35
13 PS1-3 12/400 C.A.C. 3,854 56-3 ROCA INAX DS-2 35
14 PS1-3 12/400 C.A.C. 3,870 56-3 ROCA INAX 35
15 PR3-3 13/400 C.A.C. 1 3,870 56-3 T-N ACC 35
SEC 3,839 56-3 35
16 PS1-3 1 12/400 C.A.C. 3,880 56-3 T-N ACC 35
17 PA3-3 1 12/400 C.A.C. 3,879 56-3 T-N ACC 35 3
18 PS1-3 12/400 C.A.C. 3,871 56-3 1 T-N INAX 35
19 PS1-3 12/400 C.A.C. 3,869 56-3 T-N INAX 35
20 PS1-3 12/400 C.A.C. 3,864 56-3 T-N INAX DS-0 35
21 PS1-3 12/400 C.A.C. 3,860 56-3 T-N INAX 35
22 PS1-3 12/400 C.A.C. 3,857 56-3 T-N INAX 35
23 PS1-3 12/400 C.A.C. 3,852 56-3 T-N INAX 35
24 PS1-3 1 12/400 C.A.C. 3,857 56-3 T-N ACC 35
25 PS1-3 12/400 C.A.C. 3,851 56-3 T-N INAX DS-3 35
26 PS1-3 12/400 C.A.C. 3,847 56-3 1 T-N INAX 35
27 PR3-3 12/400 C.A.C. 3,853 56-3 T-N INAX 35
28 PS1-3 12/400 C.A.C. 3,856 56-3 T-N INAX 35 2
29 PS1-3 12/400 C.A.C. 3,860 56-3 T-N INAX 35
30 PS1-3 12/400 C.A.C. 3,847 56-3 T-N INAX DS-0 35 2
31 PS1-3 1 12/400 C.A.C. 3,846 56-3 T-N ACC 35
32 PS1-3 1 12/400 C.A.C. 3,844 56-3 T-N ACC 35
33 PS1-3 1 12/400 C.A.C. 3,844 56-3 T-N ACC 50
34 PS1-3 1 12/400 C.A.C. 3,843 56-3 T-N ACC 50
35 PS1-3 1 12/400 C.A.C. 3,845 56-3 T-N ACC 50
36 PSVE-3(MFG) 13/400 C.A.C. 3,845 56-3 T-N ACC 50
37 PR3-3(MFG) 13/400 C.A.C. 3,845 56-3 1 T-N ACC 50
38 PSVE-3(MFG) 13/400 75 C.A.C. 3,845 56-3 T-N ACC 50 75
39 PSVE-3(MFG) 13/400 75 C.A.C. 3,845 56-3 T-N ACC 50 75
40 PSVE-3(MFG) 13/400 75 C.A.C. 3,845 56-3 T-N ACC 50 75
41 PSVE-3(MFG) 13/400 75 C.A.C. 3,845 56-3 T-N ACC 50 75
42 PSVE-3(MFG) 13/400 75 C.A.C. 3,846 56-3 T-N ACC 50 75
43 PSVE-3(MFG) 13/400 70 C.A.C. 3,846 56-3 T-N ACC 50 70
44 PSVE-3(MFG) 13/400 70 C.A.C. 3,847 56-3 T-N ACC 50 70
45 PR3-3(MFG) 13/400 70 C.A.C. 3,847 56-3 T-N ACC 50 70
46 PSVE-3(MFG) 13/400 70 C.A.C. 3,848 56-3 T-N ACC 50 70
47 PSVE-3(MFG) 13/400 70 C.A.C. 3,847 56-3 T-N ACC 50 70
48 PR3-3(MFG) 13/400 70 C.A.C. 3,844 56-3 T-N ACC 50 70
49 PSVE-3(MFG) 13/400 70 C.A.C. 3,845 56-3 T-N ACC 50 70
50 PSVE-3(MFG) 13/400 91 C.A.C. 3,846 56-3 T-N ACC DS-0 50 91
51 PSVE-3(MFG) 13/400 74 C.A.C. 3,842 56-3 T-N ACC 50 74
52 PSVE-3(MFG) 13/400 74 C.A.C. 3,841 56-3 T-N ACC DS-2 50 74
53 PSVE-3(MFG) 13/400 110 C.A.C. 3,843 56-3 1 T-N ACC 50 110 3
54 PR3-3 1 12/400 C.A.C. 3,842 56-3 T-N ACC 50
TOTAL 0 0 11 1214 0 1 6 4 0 6 1214 13

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 29 31 0 0 29 31
PA2-3 0 0 0 0 0 0
PA3-3 1 1 0 0 1 1
PR3-3 6 6 0 0 6 6
SEC 1 1 0 0 1 1
PSVE-3(MFG) 15 15 0 0 15 15
PSEC-3 (MFG) 0 0 0 0 0 0
PR3-3(MFG) 3 0 0 0 3 0
PSH-3 0 0 0 0 0 0
PRH-3 0 0 0 0 0 0
P3A2-3 0 0 0 0 0 0
DS-0 5 5 0 0 5 5
DS-2 3 3 0 0 3 3
DS-3 3 3 0 0 3 3

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO
CONTRACTUAL
POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 0 34 0 3 0 37 11 35 0 2 11 37
13/400 0 16 0 0 0 16 0 16 0 0 0 16
TOTAL 0

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO
CONTRACTUAL
RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 0 16 0 0 0 16 0 16 0 0 0 16
RY-A 0 0 0 0

METRADO DE CONDUCTOR
ALEACION DE ALUMINIO AAAC
REPLANTEO CONTRACTUAL
50mm2 50mm2 70mm2 120mm2
3642 3642 Metrado
182.1 182.1 0 0 Catenaria 5%
3824.1 3824.1 0 0 total (m)
3.82 3.82 0 0 total (km)

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 78 9
PSVE-3(MFG) 3 0
PSH-3 3 0
TOTAL 78 9 0 0

Volumen de excavación Volumen de relleno cimentación


(m3 POR (m3 de relleno x cimentación n° postes con TOTAL
sub total factor sub total DOSIFICACIÓN DEL CONCRETO DE
UNIDAD) unidad) Típica cim tipo II
ITEM CANTIDAD CANTIDAD X 1 m3 MATERIA
12/400 0 0.7 0 0.57 0 0 0 1.03 0 L

13/400 0 0.75 0 0.59 0 0 CEMENTO (bol) 2.63 0


PIEDRA
MEDIANA
RI-A 0 1.24 0 1.22 0 (m3) 0.656 0
HORMIGÓN
RY-A 0 1.08 0 1.06 0 (m3) 0.297 0
PAT 1 1.53 1.53 1.4 1.4
PAT-C -1 0.32 -0.32
sub total (m3) 1.21 sub total (m3) 0 0 0

sub total (Tierra


Negra)
1.4 Total (m3) de concreto ciclopeo 0
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 0.00
RI-A 0
TOTAL 0.00 1.21 m3
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: YUNGUYO >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
Dec-99 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR RPP TIPO DE Sección de DESMONTAJE DE DESMONTAJE DE
A TIERRA A TIERRA (m.s.n.m) AISLADOR 56-3 AISLADOR 56-4 TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
INSTALADAS EXCAVADAS 25 AISLADOR Conductor CONDUCTOR (m) RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION VANO (m) MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
0
1 PR3-3 1 1 12/400 C.A.C. 2 2 - - 3,874 6 1 - 56-3 1 T-N ACC DS-0 35 2
2 PS1-3 1 1 1 12/400 C.A.C. 0 - - - 3,865 - 3 - 56-3 T-N INAX - 35
3 PS1-3 1 1 1 12/400 C.A.C. 3,861 56-3 T-N INAX DS-3 35
4 PS1-3 1 1 1 12/400 C.A.C. 3,857 56-3 T-N INAX DS-0 35
5 PS1-3 1 1 1 12/400 C.A.C. 3,858 56-3 T-N INAX 35
6 PR3-3 1 1 1 12/400 C.A.C. 1 1 3,851 56-3 1 T-N INAX DS-3 35
7 PS1-3 1 1 1 12/400 C.A.C. 3,861 56-3 ROCA INAX 35 1
8 PR3-3 1 1 12/400 C.A.C. 1 1 3,859 56-3 T-N ACC 35
9 PS1-3 1 1 1 12/400 C.A.C. 3,855 56-3 T-N INAX 35
10 PS1-3 1 1 1 12/400 C.A.C. 3,847 56-3 T-N INAX 35
11 PS1-3 1 1 1 12/400 C.A.C. 3,845 56-3 T-N INAX 35
12 PS1-3 1 1 1 12/400 C.A.C. 3,846 56-3 T-N INAX DS-2 35
13 PS1-3 1 1 1 12/400 C.A.C. 3,854 56-3 ROCA INAX DS-2 35
14 PS1-3 1 1 1 12/400 C.A.C. 3,870 56-3 ROCA INAX 35
15 PR3-3 1 1 1 13/400 C.A.C. 3 3 1 1 3,870 56-3 T-N ACC 35
SEC 3,839 56-3 35
16 PS1-3 1 1 12/400 C.A.C. 3,880 56-3 T-N ACC 35
17 PA3-3 1 1 12/400 C.A.C. 2 2 3,879 56-3 T-N ACC 35 3
18 PS1-3 1 1 1 12/400 C.A.C. 3,871 56-3 1 T-N INAX 35
19 PS1-3 1 1 1 12/400 C.A.C. 3,869 56-3 T-N INAX 35
20 PS1-3 1 1 1 12/400 C.A.C. 3,864 56-3 T-N INAX DS-0 35
21 PS1-3 1 1 1 12/400 C.A.C. 3,860 56-3 T-N INAX 35
22 PS1-3 1 1 1 12/400 C.A.C. 3,857 56-3 T-N INAX 35
23 PS1-3 1 1 1 12/400 C.A.C. 3,852 56-3 T-N INAX 35
24 PS1-3 1 1 12/400 C.A.C. 3,857 56-3 T-N ACC 35
25 PS1-3 1 1 1 12/400 C.A.C. 3,851 56-3 T-N INAX DS-3 35
26 PS1-3 1 1 1 12/400 C.A.C. 3,847 56-3 1 T-N INAX 35
27 PR3-3 1 1 1 12/400 C.A.C. 3,853 56-3 T-N INAX 35
28 PS1-3 1 1 1 12/400 C.A.C. 3,856 56-3 T-N INAX 35 2
29 PS1-3 1 1 1 12/400 C.A.C. 3,860 56-3 T-N INAX 35
30 PS1-3 1 1 1 12/400 C.A.C. 3,847 56-3 T-N INAX DS-0 35 2
31 PS1-3 1 1 12/400 C.A.C. 3,846 56-3 T-N ACC 35
32 PS1-3 1 1 12/400 C.A.C. 3,844 56-3 T-N ACC 35
33 PS1-3 1 1 12/400 C.A.C. 3,844 56-3 T-N ACC 50
34 PS1-3 1 1 12/400 C.A.C. 3,843 56-3 T-N ACC 50
35 PS1-3 1 1 12/400 C.A.C. 2 2 3,845 56-3 T-N ACC 50
36 PSVE-3(MFG) 1 1 1 13/400 C.A.C. 3,845 56-3 T-N ACC 50
37 PR3-3(MFG) 1 1 1 13/400 C.A.C. RY-2 RY-2 3,845 56-3 1 T-N ACC 50
38 PSVE-3(MFG) 1 1 1 13/400 75 C.A.C. 3,845 56-3 T-N ACC 50 75
39 PSVE-3(MFG) 1 1 1 13/400 75 C.A.C. 3,845 56-3 T-N ACC 50 75
40 PSVE-3(MFG) 1 1 1 13/400 75 C.A.C. 3,845 56-3 T-N ACC 50 75
41 PSVE-3(MFG) 1 1 1 13/400 75 C.A.C. 0 - 3,845 56-3 T-N ACC 50 75
42 PSVE-3(MFG) 1 1 1 13/400 75 C.A.C. 3,846 56-3 T-N ACC 50 75
43 PSVE-3(MFG) 1 1 1 13/400 70 C.A.C. 3,846 56-3 T-N ACC 50 70
44 PSVE-3(MFG) 1 1 1 13/400 70 C.A.C. 3,847 56-3 T-N ACC 50 70
45 PR3-3(MFG) 1 1 1 13/400 70 C.A.C. RY-2 RY-2 3,847 56-3 T-N ACC 50 70
46 PSVE-3(MFG) 1 1 1 13/400 70 C.A.C. 3,848 56-3 T-N ACC 50 70
47 PSVE-3(MFG) 1 1 1 13/400 70 C.A.C. 3,847 56-3 T-N ACC 50 70
48 PR3-3(MFG) 1 1 1 13/400 70 C.A.C. 3,844 56-3 T-N ACC 50 70
49 PSVE-3(MFG) 1 1 1 13/400 70 C.A.C. 3,845 56-3 T-N ACC 50 70
50 PSVE-3(MFG) 1 1 1 13/400 91 C.A.C. 1 1 3,846 56-3 T-N ACC DS-0 50 91
51 PSVE-3(MFG) 1 1 1 13/400 74 C.A.C. 3,842 56-3 T-N ACC 50 74
52 PSVE-3(MFG) 1 1 1 13/400 74 C.A.C. 3,841 56-3 T-N ACC DS-2 50 74
53 PSVE-3(MFG) 1 1 1 13/400 110 C.A.C. 1 1 3,843 56-3 1 T-N ACC 50 110 3
54 PR3-3 12/400 C.A.C. 1 1 3,842 56-3 T-N ACC 50
TOTAL 53 53 43 1214 14 14 1 1 6 4 0 6 1214 13

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 29 31 0 0 29 31
PA2-3 0 0 0 0 0 0
PA3-3 1 1 0 0 1 1
PR3-3 6 6 0 0 6 6
SEC 1 1 0 0 1 1
PSVE-3(MFG) 15 15 0 0 15 15
PSEC-3 (MFG) 0 0 0 0 0 0

PR3-3(MFG) 3 0 0 0 3 0
PSH-3 0 0 0 0 0 0
PRH-3 0 0 0 0 0 0
P3A2-3 0 0 0 0 0 0
DS-0 5 5 0 0 5 5
DS-2 3 3 0 0 3 3

DS-3 3 3 0 0 3 3

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 31 34 3 3 34 37 10 35 24 2 34 37
13/400 19 16 0 0 19 16 19 16 0 0 19 16
TOTAL 53

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 14 16 0 0 14 16 13 16 1 0 14 16
RY-A 4 4 0 4 4 0

METRADO DE CONDUCTOR
ALEACION DE ALUMINIO AAAC
REPLANTEO CONTRACTUAL
50mm2 50mm2 70mm2 120mm2
3642 3642 Metrado
182.1 182.1 0 0 Catenaria 5%
3824.1 3824.1 0 0 total (m)
3.82 3.82 0 0 total (km)

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 78 9
PSVE-3(MFG) 3 0
PSH-3 3 0
TOTAL 78 9 0 0

Volumen de excavación Volumen de relleno cimentación


(m3 POR (m3 de relleno x cimentación n° postes con
sub total factor sub total DOSIFICACIÓN DEL CONCRETO X 1 TOTAL DE
UNIDAD) unidad) Típica cim tipo II
ITEM CANTIDAD CANTIDAD m3 MATERIAL
12/400 34 0.7 23.8 0.57 19.38 19.38 0 1.03 0
13/400 19 0.75 14.25 0.59 11.21 11.21 CEMENTO (bol) 2.63 80.45
PIEDRA
RI-A 14 1.24 17.36 1.22 17.08 MEDIANA (m3) 0.656 20.07
RY-A 4 1.08 4.32 1.06 4.24 HORMIGÓN (m3) 0.297 9.09
PAT 1 1.53 1.53 1.4 1.4
PAT-C 52 0.32 16.64
sub total (m3) 77.9 sub total (m3) 51.91 30.59 0

sub total (Tierra


Negra)
1.4 Total (m3) de concreto ciclopeo 30.59
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 3.00
RI-A 0
TOTAL 3.00 74.90 m3
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: JULI >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
<=3900 = PIN 65-3 No Accesible a la Grua = INAX

ABRAZADERA TIPO U DE FºGº DE 208mm ø x 64x6.4mm,


ABRAZADERA PARTIDA TIPO CAS SIMPLE DE F°G° DE
PLANCHA DOBLADA TIPO J DE COBRE PARA TOMA A

PERNO HEXAGONAL DE F°G° DE 16mm Diam. x 76mm,


ALAMBRE DE ALUMINIO PARA AMARRE DE 16mm2

RIOSTRA METALICA DE F°G° DE 64x64x6.4x1000mm


64x6.4 DIAM=218mm, CON 2 PERNOS F°G° DE 16mm x
ESPIGA DE A°G° PARA CRUCETA Y AISLADOR ANSI,
CONECTOR DE COBRE TIPO PERNO PARTIDO PARA

CONDUCTOR DESNUDO COOPERWELD DE 25mm2

CON 2 PERNOS FºGº DE 16mm ø x 102mm, TUERCA Y

MENSULA DE Fo Go DE 64x64x6.4x1200mm LONG.

CRUCETA DE Fo Go DE 64x64x6.4x2400mm LONG.


CONECTOR DE AL-AL 25/120 mm2 02 PERNOS
E S T R U C T U R A

TIERRA DE ESPIGAS Y/ O PERNOS

102mm, TUERCA Y ARANDELA


SEGUN NOTA INDICADA
CONDUCTOR DE 25 mm2

TUERCA Y ARANDELA

ARANDELA

SEGUN E.T.

SEGUN E.T.
ACCESIBILIDAD AL
PUESTA A AISLADOR RPP AISLADOR 56- AISLADOR 56- TIPO DE DESCARGADOR DESMONTAJE DE
Nro. CODIGO TIPO N° POSTES NOMINACION MATERIAL N° RETENIDAS COTA (m.s.n.m) AISLADOR 56-3 AISLADOR 56-4 TIPO DE TERRENO TERRENO LUGAR DE DERIVACIÓN AISLADOR 56-3 AISLADOR 56-4
TIERRA PAT-1 25 311111 4111 AISLADOR TIPO BAYONETA
IZAJE RETENIDA

0
1 NMT000190227 PS1-3 1 12/400 C.A.C. - - 3,874 - 3 3 - - 56-3 - T-N INAX - - - - - - - - - - - - - - -
2 NMT000190228 PS1-3 1 12/400 C.A.C. - - 3,865 - 3 3 - - 56-3 - T-N INAX - - - - - - - - - - - - - - -
3 NMT000190231 PS1-3 1 12/400 C.A.C. - - 3,861 - 3 3 - - 56-3 - T-N ACC - - - - - - - - - - - - - - -
4 NMT000190237 PS1-3 1 12/400 C.A.C. - - 3,857 - 3 3 - - 56-3 - T-N INAX - - - - - - - - - - - - - - -
5 NMT000190238 PR3-3 1 12/400 C.A.C. 2 - 3,858 6 1 1 - - 56-3 1 T-N INAX - - - - - - - - - - - - - - -
6 NMT000190240 PS1-3 1 12/400 C.A.C. - - 3,851 - 3 3 - - 56-3 - T-N INAX - - - - - - - - - - - - - - - 2
7 NMT000190243 PS1-3 1 12/400 C.A.C. - - 3,861 - 3 3 - - 56-3 - T-N INAX - - - - - - - - - - - - - - -
8 NMT000190245 PR3-3 1 13/400 C.A.C. 2 1 3,859 6 1 1 - - 56-3 - T-N ACC - - - - - - - - - - - - - - - 2
SEC 3,859 - - - - - 56-3 - - - - - - - - - - - - - -
9 NMT000190254 PS1-3 1 12/400 C.A.C. - - 3,847 - 3 3 - - 56-3 - T-N ACC - - - - - - - - - - - - - - -
10 NMT000190258 PS1-3 1 12/400 C.A.C. - - 3,845 - 3 3 - - 56-3 - T-N ACC - - - - - - - - - - - - - - -
11 NMT000190259 PS1-3 1 12/400 C.A.C. - - 3,846 - 3 3 - - 56-3 - T-N ACC - - - - - - - - - - - - - - -
12 NMT000190261 PS1-3 1 12/400 C.A.C. - - 3,839 - 3 3 - - 56-3 1 T-N ACC - - - - - - - - - - - - - - -
13 NMT000190262 PS1-3 1 12/400 C.A.C. - - 3,880 - 3 3 - - 56-3 1 T-N ACC - - - - - - - - - - - - - - -
14 NMT000190263 PS1-3 1 12/400 C.A.C. - - 3,879 - 3 3 - - 56-3 - T-N ACC - - - - - - - - - - - - - - -
15 NMT000190264 PS1-3 1 12/400 C.A.C. - - 3,871 - 3 3 - - 56-3 1 T-N ACC - - - - - - - - - - - - - - -
16 NMT000190265 PS1-3 1 12/400 C.A.C. - - 3,869 - 3 3 - - 56-3 T-N ACC - - - - - - - - - - - - - - -
17 NMT000190266 PS1-3 1 12/400 C.A.C. - - 3,864 - 3 3 - - 56-3 1 T-N ACC - - - - - - - - - - - - - - -
18 NMT000190267 PS1-3 1 12/400 C.A.C. - - 3,860 - 3 3 - - 56-3 T-N ACC - - - - - - - - - - - - - - -
19 NMT000190268 PS1-3 1 12/400 C.A.C. 3,860 - 3 3 - - 56-3 1 ROCA INAX - - - - - - - - - - - - - -
20 NMT000190269 PS1-3 1 12/400 C.A.C. - - 3,860 - 3 3 - - 56-3 1 ROCA ACC - - - - - - - - - - - - - - -
21 NMT000190270 PS1-3 1 12/400 C.A.C. - - 3,857 - 4 3 - - 56-3 - T-N INAX DS-0 1 2 1 1 3 2 1 1 1 1 1 - 1 -
TOTAL 21 4 1 12 59 0 7 4

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUALREPLANTEOCONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 19 20 0 0 19 20
PA2-3 0 0 0 0 0 0
PA3-3 0 0 0 0 0 0
PR3-3 2 2 0 0 2 2
SEC 1 1 0 0 1 1
PSVE-3(MFG) 0 0 0 0 0 0
PSEC-3 (MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 0 0 0 0 120 106
PSH-3 0 0 0 0 0 0 50
PRH-3 0 0 0 0 0 0
P3A2-3 0 0 0 0 0 0
DS-0 1 1 0 0 1 1
DS-2 0 0 0 0 0 0
DS-3 0 0 0 0 0 0

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUALREPLANTEOCONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 18 20 2 1 20 21 12 19 8 2 20 21
13/400 1 1 0 0 1 1 1 1 0 0 1 1

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUALREPLANTEOCONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 4 4 0 0 4 4 2 2 2 2 4 4
RY-A 0 0 0

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 57
PSVE-3(MFG) 3
PSH-3 3
TOTAL 0 0 57 0
Nota: El conductor existente es de 70mm2 en la totalidad de las estructuras

Volumen de excavación Volumen de relleno cimentación


(m3 POR (m3 de relleno x cimentación n° postes con
sub total factor TOTAL DE
UNIDAD) unidad) Típica cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM CANTIDAD CANTIDAD MATERIAL
12/400 18 0.7 12.6 0.57 10.26 10.26 0 1.03 0
13/400 1 0.75 0.75 0.59 0.59 0.59 CEMENTO (bol) 2.63 31.53
12/400 ROCA 2 0.7 1.4 0.57 1.14 1.14
PIEDRA MEDIANA
RI-A 3 1.24 3.73 1.22 3.66 (m3) 0.656 7.87
RY-A 0 1.08 0 1.06 0 HORMIGÓN (m3) 0.297 3.56
PAT 1 1.53 1.53 1.4 1.4
PAT-C 20 0.32 6.4
sub total (m3) 25.01 sub total (m3) 3.66 11.99 0

sub total (Tierra


Negra)
1.4 Total (m3) de concreto ciclopeo 11.99
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 1.40
RI-A 0
TOTAL 1.40 25.01 m3
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: JULI >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
Dec-99 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR RPP TIPO DE DESMONTAJE DE
A TIERRA A TIERRA (m.s.n.m) AISLADOR 56-3 AISLADOR 56-4 TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
INSTALADAS EXCAVADAS 25 AISLADOR RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
0
1 PS1-3 12/400 C.A.C. 3,874 - 3 - 56-3 - T-N INAX -
2 PS1-3 12/400 C.A.C. 3,865 - 3 - 56-3 - T-N INAX -
3 PS1-3 1 12/400 C.A.C. 3,861 - 3 - 56-3 - T-N ACC -
4 PS1-3 12/400 C.A.C. 3,857 - 3 - 56-3 - T-N INAX -
5 PR3-3 12/400 C.A.C. 3,858 6 1 - 56-3 1 T-N INAX -
6 PS1-3 12/400 C.A.C. 3,851 - 3 - 56-3 - T-N INAX - 2
7 PS1-3 12/400 C.A.C. 3,861 - 3 - 56-3 - T-N INAX -
8 PR3-3 13/400 C.A.C. 3,859 6 1 - 56-3 - T-N ACC - 2
SEC 3,859 - - - 56-3
9 PS1-3 1 12/400 C.A.C. 3,847 - 3 - 56-3 - T-N ACC -
10 PS1-3 1 12/400 C.A.C. 3,845 - 3 - 56-3 - T-N ACC -
11 PS1-3 1 12/400 C.A.C. 3,846 - 3 - 56-3 - T-N ACC -
12 PS1-3 1 12/400 C.A.C. 3,839 - 3 - 56-3 1 T-N ACC -
13 PS1-3 1 12/400 C.A.C. 3,880 - 3 - 56-3 - T-N ACC -
14 PS1-3 1 12/400 C.A.C. 3,879 - 3 - 56-3 1 T-N ACC -
15 PS1-3 1 12/400 C.A.C. 3,871 - 3 - 56-3 - T-N ACC -
16 PS1-3 1 12/400 C.A.C. 3,869 - 3 - 56-3 1 T-N ACC -
17 PS1-3 1 12/400 C.A.C. 3,864 - 3 - 56-3 - T-N ACC -
18 PS1-3 1 12/400 C.A.C. 3,860 - 3 - 56-3 1 T-N ACC -
19 PS1-3 12/400 C.A.C. 3,860 - 3 - 56-3 ROCA INAX
20 PS1-3 1 12/400 C.A.C. 3,860 - 3 - 56-3 1 ROCA ACC -
21 PS1-3 12/400 C.A.C. 3,857 - 3 - 56-3 - T-N INAX DS-0
TOTAL 0 0 12 0 0 12 59 0 6 4

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 19 20 0 0 19 20
PA2-3 0 0 0 0 0 0
PA3-3 0 0 0 0 0 0
PR3-3 2 2 0 0 2 2
SEC 1 1 0 0 1 1
PSVE-3(MFG) 0 0 0 0 0 0
PSEC-3 (MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 0 0 0 0
PSH-3 0 0 0 0 0 0
PRH-3 0 0 0 0 0 0
P3A2-3 0 0 0 0 0 0
DS-0 1 1 0 0 1 1
DS-2 0 0 0 0 0 0
DS-3 0 0 0 0 0 0

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 0 20 0 1 0 21 12 19 0 2 12 21
13/400 0 1 0 0 0 1 1 1 0 0 1 1

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 0 4 0 0 0 4 0 0 0 0 0 0
RY-A 0 0 0

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 57
PSVE-3(MFG) 3
PSH-3 3
TOTAL 0 0 57 0
Nota: El conductor existente es de 70mm2 en la totalidad de las estructuras 1

Volumen de excavación Volumen de relleno cimentación


(m3 de relleno x cimentación n° postes con
(m3 POR UNIDAD) sub total factor TOTAL DE
unidad) Típica cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM CANTIDAD CANTIDAD MATERIAL
12/400 0 0.7 0 0.57 0 0 0 1.03 0
13/400 0 0.75 0 0.59 0 0 CEMENTO (bol) 2.63 0
PIEDRA MEDIANA
RI-A 0 1.24 0 1.22 0 (m3) 0.656 0
RY-A 0 1.08 0 1.06 0 HORMIGÓN (m3) 0.297 0
PAT 0 1.53 0 1.4 0
PAT-C 0 0.32 0
sub total (m3) 0 sub total (m3) 0 0 0

sub total (Tierra


Negra)
0 Total (m3) de concreto ciclopeo 0
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 0.00
RI-A 0
TOTAL 0.00 0.00 m3
Se considera para metrado
PLANILLA DE ARMADO POR ESTRUCTURA

Proyecto: CAMBIO E INCREMENTO DE ESTRUCTURAS EN LINEAS PRIMARIAS SEGÚN EL PLAN DE MANTENIMIENTO 2016
Servicio Electrico: JULI >3900 = PIN 56- 4 T-N: Terreno Natural Accesible a la Grua = ACC
Dec-99 <=3900 = PIN 65-3 No Accesible a la Grua = INAX
PUESTA PUESTA COTA DESCARGADOR ACCESIBILIDAD
E S T R U C T U R A N° RETENIDAS N° RETENIDAS AISLADOR RPP TIPO DE DESMONTAJE DE
A TIERRA A TIERRA (m.s.n.m) AISLADOR 56-3 AISLADOR 56-4 TIPO TIPO DE TERRENO AL TERRENO DERIVACIÓN
INSTALADAS EXCAVADAS 25 AISLADOR RETENIDA
Nro. TIPO POSTE IZADO POSTE EXCAVADO POSTE TRASNP NOMINACION MATERIAL PAT-1 INSTALADA PAT-1 EXCAVADA BAYONETA LUGAR DE IZAJE
0
1 PS1-3 1 1 1 12/400 C.A.C. 3,874 - 3 - 56-3 - T-N INAX -
2 PS1-3 1 1 1 12/400 C.A.C. 3,865 - 3 - 56-3 - T-N INAX -
3 PS1-3 1 1 12/400 C.A.C. 3,861 - 3 - 56-3 - T-N ACC -
4 PS1-3 1 1 1 12/400 C.A.C. 3,857 - 3 - 56-3 - T-N INAX -
5 PR3-3 1 1 1 12/400 C.A.C. 2 2 0 3,858 6 1 - 56-3 1 T-N INAX -
6 PS1-3 1 1 1 12/400 C.A.C. 3,851 - 3 - 56-3 - T-N INAX - 2
7 PS1-3 1 1 1 12/400 C.A.C. 3,861 - 3 - 56-3 - T-N INAX -
8 PR3-3 1 1 1 13/400 C.A.C. 2 2 1 1 3,859 6 1 - 56-3 - T-N ACC - 2
SEC 3,859 - - - 56-3
9 PS1-3 1 1 12/400 C.A.C. 3,847 - 3 - 56-3 - T-N ACC -
10 PS1-3 1 1 12/400 C.A.C. 3,845 - 3 - 56-3 - T-N ACC -
11 PS1-3 1 1 12/400 C.A.C. 3,846 - 3 - 56-3 - T-N ACC -
12 PS1-3 1 1 12/400 C.A.C. 3,839 - 3 - 56-3 1 T-N ACC -
13 PS1-3 1 1 12/400 C.A.C. 3,880 - 3 - 56-3 - T-N ACC -
14 PS1-3 1 1 12/400 C.A.C. 3,879 - 3 - 56-3 1 T-N ACC -
15 PS1-3 1 1 12/400 C.A.C. 3,871 - 3 - 56-3 - T-N ACC -
16 PS1-3 1 1 12/400 C.A.C. 3,869 - 3 - 56-3 1 T-N ACC -
17 PS1-3 1 1 12/400 C.A.C. 3,864 - 3 - 56-3 - T-N ACC -
18 PS1-3 1 1 12/400 C.A.C. 3,860 - 3 - 56-3 1 T-N ACC -
19 PS1-3 1 1 1 12/400 C.A.C. 3,860 - 3 - 56-3 ROCA INAX
20 PS1-3 1 1 12/400 C.A.C. 3,860 - 3 - 56-3 1 ROCA ACC -
21 PS1-3 1 1 1 12/400 C.A.C. 3,857 - 3 - 56-3 - T-N INAX DS-0
TOTAL 21 21 9 4 4 1 1 12 59 0 6 4

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
ARMADO <3900 <3900 >3900 >3900 TOTAL TOTAL
PS1-3 19 20 0 0 19 20
PA2-3 0 0 0 0 0 0
PA3-3 0 0 0 0 0 0
PR3-3 2 2 0 0 2 2
SEC 1 1 0 0 1 1
PSVE-3(MFG) 0 0 0 0 0 0
PSEC-3 (MFG) 0 0 0 0 0 0
PR3-3(MFG) 0 0 0 0 0 0
PSH-3 0 0 0 0 0 0
PRH-3 0 0 0 0 0 0
P3A2-3 0 0 0 0 0 0
DS-0 1 1 0 0 1 1
DS-2 0 0 0 0 0 0
DS-3 0 0 0 0 0 0

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
POSTES T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
12/400 18 20 2 1 20 21 12 19 8 2 20 21
13/400 1 1 0 0 1 1 1 1 0 0 1 1

CANTIDADES
REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL REPLANTEO CONTRACTUAL
RETENIDA T-N T-N ROCA ROCA TOTAL TOTAL ACC ACC INAX INAX TOTAL TOTAL
RI-A 4 4 0 0 4 4 2 2 2 2 4 4
RY-A 0 0 0

CÁLCULO DE VARILLAS DE ARMAR SEGÚN CONDUCTOR


UNIDADES X
ITEM 35mm2 50mm2 70mm2 120mm2
ARMADO
PS1-3 3 57
PSVE-3(MFG) 3
PSH-3 3
TOTAL 0 0 57 0
Nota: El conductor existente es de 70mm2 en la totalidad de las estructuras 1

Volumen de excavación Volumen de relleno cimentación


(m3 de relleno x cimentación n° postes con
(m3 POR UNIDAD) sub total factor TOTAL DE
unidad) Típica cim tipo II DOSIFICACIÓN DEL CONCRETO X 1 m3
ITEM CANTIDAD CANTIDAD MATERIAL
12/400 20 0.7 14 0.57 11.4 11.4 0 1.03 0
13/400 1 0.75 0.75 0.59 0.59 0.59 CEMENTO (bol) 2.63 31.53
PIEDRA MEDIANA
RI-A 4 1.24 4.96 1.22 4.88 (m3) 0.656 7.87
RY-A 0 1.08 0 1.06 0 HORMIGÓN (m3) 0.297 3.56
PAT 1 1.53 1.53 1.4 1.4
PAT-C 20 0.32 6.4
sub total (m3) 27.64 sub total (m3) 16.87 11.99 0

sub total (Tierra


Negra)
1.4 Total (m3) de concreto ciclopeo 11.99
Nota: volumen del dado de concreto de retenida =0.02m3
Relleno en puesta a tierra se considera con tierra negra ROCA T-N
PAT-C: No se instalaran en puntos de PAT-1 12/400 1.40
RI-A 0
TOTAL 1.40 26.24 m3
Se considera para metrado
BASE DE DATOS DE PRECIOS UNITARIOS
MONTAJE ELECTROMECÁNICO / TRANSPORTE DE EQUIPOS Y MATERIALES
0

UBICACIÓN
SECCION 3
LOCALIDADES

Item
Descripción de Partidas Und.

1.00 MANO DE OBRA


1.01 Ingeniero h-h
Arqueologo h-h
Especialista en Estudios de Impacto Ambiental h-h
Asistente h-h
Ingeniero Especialista en Líneas Primarias h-h
Ingeniero Especialista en Redes Primarias h-h
Especialista en Coordinación de Protección h-h
Especialista en cimentaciones y cálculos de estructuras h-h
Ingeniero Especialista en software para diseño de Líneas h-h
Ingeniero Especialista en gestión de servidumbre h-h
Especialista en Geotécnica h-h
1.02 Capataz h-h
1.03 Operario h-h
1.04 Oficial h-h
1.05 Peón h-h
1.06 Topógrafo h-h
1.07 Asistente en topografia h-h
1.08 Dibujante en Autocad h-h

2.00 INSUMOS PARA MONTAJE


2.01 Agua m³
2.02 Arena gruesa m³
2.03 Cemento Portland tipo I en bolsa de 42,5 kg. bls
2.04 Clavos c/c de 3" kg
2.05 Gasolina gln
2.06 Hormigón m3
2.07 Madera tornillo cepillado p2
2.08 Piedra Chancada de 1/2" m³
2.09 Piedra Grande de Cantera m³
2.10 Piedra Mediana de Cantera m³
2.11 Pintura esmalte sintético gln
2.12 Soga de manila kg
2.13 Soga de nylon kg
2.14 Triplay Lupuna 4' x8' x9 mm pl
2.15 Material varios (Estaca,wincha metálica de 50 m., yeso, cordel, pintura,
etc., útilies y equipos de gabinete) %MO
2.16 Material varios (útiles y materiales de gabinete) %MO
2.17 Material varios (Yeso,estacas,cordel,etc) %MO
2.18 Material varios (Estrobo,soga,etc) %MO
2.19 Material varios (estribo,soga,pintura, brochas, etc) %MO
2.15 Materiales varios %MO

3.00 EQUIPOS Y HERRAMIENTAS


3.00 Bote plataforma h-m
3.01 Caballete Alzabobina h-m
3.02 Cable Guía h-m
3.03 Caja de herramientas h-m
3.04 Camión plataforma 4X2, 122 HP, 8 TN. h-m
3.05 Camioneta Rural 4x4 de 135 HP h-m
3.06 Compresor Neumático, perforador y barrenos ( incluye Explosivos,
fulminantes y mechas) h-m
3.07 Equipo de comunicación h-m
3.08 Equipo de Estación Total y accesorios h-m
3.09 Escalera h-m
3.10 Freno hidráulico 3 Ton. h-m
3.11 Grúa hidráulica c/camión 5 ton. h-m
3.12 Medidor de aislamiento eléctrico h-m
3.13 Medidor de resistencia de puesta a tierra h-m
3.14 Motosierra h-m
3.15 Pluma de Izaje h-m
3.16 Poleas h-m
3.17 Teodolito h-m
3.18 Termometro de línea h-m
3.19 Tirfor 3 ton. h-m
3.20 Winche de 3 Ton. h-m
3.21 Herramientas % mano de obra %
OS DE PRECIOS UNITARIOS
ICO / TRANSPORTE DE EQUIPOS Y MATERIALES
0

PRECIO PRECIO
S/. S/. x dia

18.80 150.40
20.00 160.00
20.83 166.64
14.58 116.64
18.80 150.40
17.00 136.00
18.80 150.40
18.80 150.40
16.00 128.00
16.00 128.00
18.80 150.40
13 104.00
10 80.00
9 72.00
5.00 40.00
14 112.00
9 72.00
10 80.00

3.15
28.00
20.00
2.94
10.00
28.00
3.50
40.00
35.00
35.00
31.33
15.00
35.00
40.00

5.00
30.00
5.00
5.00
5.00
5.00

0
16
30
1.5
116.79
79.40

92.63
2.50
35.00
1.50
25.00
258.60
6.00
6.00
5.50
18.36
2.5
10.00
3.00
3.00
30
5