FT. SATVAMITRA SURYA PERKASA
&. vi eecoenesiiuacenanenee CONSTRUCTION INSPECTION AND TEST PLAN a BLACK & VEATCH
SP tng world ern :
Project: CENTRAL JAVA PROJECT DESCRIPTION : PIPING REV.NO, 1
INo.Contrac_:177214/C4/ 77-3000 DOCUMENT NO. : SSP-ITP-P-001 DATE AT-Nov.2017
RESPONSEILITY
No. ACTIVITY REFERENCE DOCUMENT VERIFICATION INSPECTION REPORT | Discipine REMARK
ssp | eav] sc | art
7,0 [Document Review. —
Tet [Review Documenta
WPSPORS aaa vi BAPVG Seaion 1K Fen ate
i WaT Cerificate. ASME BAPVE Section Ix eee Form (Later
[Calibration Cerificate. Form (Later)
[Bonding Quaiicaton for GRP (Bult Wrap Jaming) Form (Later)
~ [Material Receipt & Storage. am a =
21 [check Spoots-identfcation, damage, cloantiness. —_|Dre i SE name et
[Material GertitatesPacking LSUASME anaes
ection of Mater [Data Reports
_|Storage of Materials,
Wei identcaon/Srientation/Slope of Spook IsometicPaD foes
efity Spool AlgnmentPipe Stess. IBV SpeciManutactrers Instructions
sasecaaad [Ba SpecNiPSIASME Sock | ASME
| 33 |check Weld Preparation/Aignment lp3t.4 Ha For (sie)
344 [Bonding for GRP Manufacture Technical Data Sheet GRP
rm (Later
40___|Valves & Piping Accessories, Erection. —
IP'& 1D , Drawings, Manufacturers
fnstucions Form (Later)
| wetaing
|ASME Section |, ASME B31.1/B&V
I Pre/Post Heat Requirements & Operations. _|speciVPS Form (Later)
heck Purge —|wes Fenn (Late)
|Check Welding 0} lASME Section 1X Form (Later)
7 [Check WPS. = |WPSitine Code Form (Laer)
[Check Consumables.@.
PT. SATVANITRA SURYA PERKASA
Son retin en CONSTRUCTION INSPECTION AND TEST PLAN Ghd Backs vEArcH
Projet cenrnaL ava Paouect DESGRPTION REV.NO 1
Ne caniac_ 7a 7 3000 DOCUMENT NO oare trov2017
FESpOnSEUITY
wo. henry EFERENCE DOCUMENT once ewan,
we] ev] =] om
a |ASME B&PVC Section I, ASME 821.1 B&V Form (Later) . : |
1 |eheck Nor Rearomens See. i
22 aul Emit, sve socton| ASME 82.1 RAV Spee Form (ate
64 _ |Radiography Examination a _|ASME B&PVC Section V | fom ion
85. |ASME B&PVC Section V_ Form (Later)
6 wane Tec BE
|Pre-Test Walkdown & Punchout of System
Pro-Test Documentation Review.
Pressure TesvHtydraulc ProumatichSLT
INFPA, B&V Spec Work Method
IP RID Weometie Spec. Form (Later
—|BRV Spec. orm (Late) —
JASME B&PVC Section | ASME B31.1 eae
Fite Prot Spray Patter Testing INFPA Work Mathod. fae eee Form (Later)
7 Check Requirements of Syaiom [B&W Spec. Wana inet, WoRE Matiea Form (Later = of ———
(General Wale (PotablerDemineralized) Flush JB&V Spoc., Work Method Form (Later) w
|General ie Fuh IBAV Spec., Work Method Form (Later) a w
Lube oi Flush - _ IB&V Spec., Manuf ins. Work Method Form (Later) w. anne Z
95 |contotonriush IBAV Spec, Manuf inst 7 Femtveo w =
| 28 jer Flushing & Chemical Clean, IBAV Spec., Manutinst Work Method Form (ate w See
|steam Blow |B&V Spec., Manuf Inst Work Method pom ate) | we 7
Form (Lete) WFane:
PT SATVANITRA SURYA PERKASA
heck insulation Material Type, Thickness.
__|eheck ciedding
facturers Instctions/ BEV Specs.
Scent rato CONSTRUCTION INSPECTION AND TEST PLAN aemenee
Proje "CENTRAL IAVAPROLEST DESCRIPTION "PNG RENO 7
No: Contac = {77244GWT7 3000 DOGUMENTINO. :S8P=ITP-P-001 Date t7Nov2017
RESPONSSUTY
no actwmry REFERENCE DOCUMENT venricanon/ispecnowreront | oecene ewan
or |eev] =| om
lssec Pant eppaton Speciation,
101 [cneck speofeatonsoter chat ootcatie At, Mnutacurers Ferm (ater w | Ho | wo | so
Incvuctoe Wo Metneds/ BBV Specs
lssec Pant appaton Speeteaton,
102 |cneckataras aan optcale Ait Manutacurere Feet tsi w ss
Incbuctone om Metneds/E&V Specs
35°C Pant eppatonSpetiaton,
103 |eneck sutace contin of Pho roptcatle ATM Manctacurers Ferm (ate wftafs|s
[ncructon rk tnd BEV Specs
(check Primer Touch ISSPC Paint appicaton Speciteatn, = Form (Later wot Sra
~|eheck rere ContOETY ss n Speccaion Form (Late) Mofo
Final Coat OFT). ISSPC Paint appicaton Specification, Form (Later) Mor
101 |potsay etecton (Underground tet Pring) _|Manusetuers War Methods BR Specs Form (te) wif mal
10,8 _ | Walkdown System oom im | _|
Form (ater) w fololo
lanufacturers Instructions/ BV Specs _ ——Form (Later)
INaruacuresIstuctone/ BaV Specs form tad —
IMenufacturers Instuctions/ BAV Specs
ifalkdown Systein Check Insulation Temperature
Review Reports
janufacturers Instucto
~ [construction Completion —
|Maritactirersinstuctons/ B&V Specs
PID, sometcs, Supporting Drawings.
IBAV Start-up Package
[B&V ac Documentation
Drawings, ECN's