DAFTAR UPAH PEKERJA BANGUNAN

NO. JENIS PEKERJA BANGUNAN HARGA UPAH


Rp.

1 PEKERJA 55,000

2 PEKERJA SETENGAH TERAMPIL 65,000

3 PEKERJA TERAMPIL 75,000

4 TUKANG GALI 65,000

5 TUKANG BATU SETENGAH TERAMPIL 70,000

6 TUKANG BATU TERAMPIL 75,000

7 KEPALA TUKANG BATU 80,000

8 TUKANG KAYU SETENGAH TERAMPIL 65,000

9 TUKANG KAYU TERAMPIL 75,000

10 KEPALA TUKANG KAYU 80,000

11 TUKANG CAT / PELITUR SETENGAH TERAMPIL 60,000

12 TUKANG CAT / PELITUR TERAMPIL 65,000

13 KEPALA TUKANG CAT / PELITUR 75,000

14 TUKANG BESI BETON SETENGAH TERAMPIL 65,000

15 TUKANG BESI BETON TERAMPIL 75,000

16 KEPALA TUKANG BESI BETON 75,000

17 TUKANG BESI PROFIL SETENGAH TERAMPIL 65,000

18 TUKANG BESI PROFIL TERAMPIL 75,000

19 KEPALA TUKANG BESI PROFIL 75,000

20 MANDOR 90,000

21 OPERATOR TERLATIH 85,000

22 TUKANG LAS TERAMPIL 85,000


23 SUPIR TRUK 90,000

24 KENEK TRUK 65,000

25 PENJAGA MALAM 50,000


PAH PEKERJA BANGUNAN

SATUAN WAKTU

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM


DAFTAR HARGA BAHAN BANGUNAN

TAHUN ANGGARAN 2016

SAT HARGA SAT.


NO. JENIS BAHAN BANGUNAN
Rp.
1 2 3 4

A AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


1 Pasir Urug m³ 90,000.00
2 Sirtu m³ 75,000.00
3 Pasir Teras m³ 120,000.00
4 Pasir Pasang Kali m³ 132,500.00
5 Pasir Beton I m³ 165,000.00
6 Abu Batu m³ 135,000.00
7 Batu Gosok ( Apung ) kg 220,000.00
8 Batu Pecah Mesin 1/2 m³ 200,000.00
9 Batu Pecah Mesin 2/3 m³ 190,000.00
10 Batu Pecah Mesin 3/5 m³ 175,000.00
11 Batu Pecah Mesin 5/7 m³ 162,500.00
12 Batu Belah Pondasi m³ 110,000.00
13 Batu Bronjol ( Untuk Bronjong ) m³ 125,000.00
14 Batu Koral Beton Kali m³ 145,000.00
15 Batu Tempel Hitam m² 100,000.00
16 Batu Pinggir Beton 10 x 20 x 35 bh 12,500.00
17 Batu Pinggir Beton 15 x 35 x 60 ( K -225 ) bh 30,500.00
18 Bata Merah Bakar Kelas I bh 775.00
19 Bata Merah Bakar Kelas II bh 650.00
20 Roster Beton 20 x 20 bh 10,000.00
21 Roster Beton 30 x 30 bh 15,000.00
22 Paving Blok Natural 8 cm m² 65,000.00
23 Paving Blok Warna 8 cm m² 70,000.00
24 Paving Blok Natural 6 cm m² 55,000.00
25 Paving Blok Warna 6 cm m² 67,500.00
26 Kanstin Paving Blok m1 27,500.00
27 Semen PC Tiga Roda / 50 kg zak 60,000.00
28 Semen Putih zak 65,000.00
1 2 3 4

29 Kanstin Jalan ukuran Besar ( bina Marga ) 1 bh = 60 cm bh 57,500.00


30 Semen Warna kg 8,500.00
31 Tanah Liat m³ 25,000.00
1 2 3 4

B. BAHAN FINISHING :
32 Plamir Tembok kg 12,500.00
33 Cat Tembok Vinilex gln 23,500.00
34 Cat Tembok Falcongold gln 9,700.00
35 Water Profing Emulsion kg 55,000.00
36 Water Profing Membrance ml 45,000.00
37 Rool Cat Tembok bh 15,000.00
38 Kape Tembok bh 5,000.00
39 Kape Kayu bh 4,500.00
40 Kwas 3" bh 9,250.00
41 Terpentin lt 6,500.00
42 Tiner A lt 8,500.00
43 Tiner B lt 14,500.00
44 Kumpon kg 29,000.00
45 Ampelas lbr 2,000.00
46 Dempul Kayu Cap Kucing kg 35,000.00
47 Meni Kayu / Besi kg 15,000.00
48 Sincromat kg 55,000.00
49 Cat Kayu Sieve kg 25,000.00
50 Cat Besi Sieve kg 28,500.00
51 Cat Besi Duco Danaglos/ICI kg 54,500.00
52 Cat Bron kg 57,500.00

C. BAHAN KAYU BERIKUT BAHAN JADINYA


53 Bambu Ø 5 s.d 7 bt 4,000.00
54 Bambu Ø 7 s.d 10 bt 10,000.00
55 Kayu Balok Kelas II m³ 1,850,000.00
56 Kayu Papan Kelas II m³ 2,500,000.00
57 Kayu Balok Rasamala m³ 2,850,000.00
58 Kayu Hutan Kelas I ( Segeng, Mahoni, Laban ) m³ 3,250,000.00
59 Kayu Albasia m³ 1,250,000.00
60 Dolken 5 s/d 7 bt 8,500.00
61 Dolken 7 s/d 10 bt 12,500.00
62 List profil kamper 1 cm m1 3,500.00
63 List profil kamper 2 cm m1 8,500.00
64 List profil kamper 4 cm m1 8,750.00
1 2 3 4

65 List profil kamper 5 cm m1 23,500.00


66 Kayu Reng 2/3 Borneo Super m1 2,500.00
67 Kayu Reng 2/3 Kamper Banjar m1 4,350.00
68 Kayu Reng 3/4 Kamper Banjar m1 4,350.00
69 Roster Kayu uk, 15/25 Kayu Kelas II bh 35,000.00

D. BAHAN PENUTUP RANGKA PLAFOND


70 Bahan plafond GRC 2 mm 120 x 240 lbr 57,500.00
71 Gypsum 120 x 240 t = 9 mm ex DN lbr 45,000.00
72 Gypsum 120 x 240 t = 9 mm ex Luar lbr 50,000.00
73 Acustik Amstrong 60 x 120 lbr 65,000.00
1 2 3 4

E. BAHAN KAYU LAPIS


74 Triplek 3 mm 120 x 240 lbr 50,000.00
75 Triplek 4 mm 120 x 240 lbr 55,000.00
76 Triplek 4 mm Ukuran Pintu lbr 37,500.00
77 Triplek 6 mm 120 x 240 lbr 75,000.00
78 Triplek 9 mm 120 x 240 lbr 115,000.00
79 Multiplek 9 mm 120 x 240 lbr 120,000.00
80 Multiplek 12 mm 120 x 240 lbr 145,000.00
81 Teak Wood 3 mm 120 x 240 lbr 70,000.00
82 Teak Wood 4 mm 120 x 240 lbr 87,000.00
83 Teak Wood 3 mm ukuran Pintu lbr 58,000.00
84 Teak Wood ukuran Pintu 4 mm lbr 67,000.00

F. BAHAN LANTAI DAN PELAPIS DINDING


85 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos m² 35,000.00
86 Plin Keramik 7 x 20 KW I DN Corak / Warna bh 7,500.00
87 Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip m² 37,500.00
88 Keramik 20 x 25 Dinding KM KWI DN Corak m² 42,500.00
89 Keramik 30 x 30 KW I DN putih polos m² 37,500.00
90 Keramik 30 x 30 KW I DN Warna/Corak ( ANTI SLIP ) m² 43,000.00
91 Campuran untuk Kedap Air (AM) ltr 42,500.00

G. BAHAN SALURAN AIR KOTOR / BERSIH


92 Grafel U 20 cm' m1 25,000.00
93 Grafel U 30 cm' m1 32,500.00
94 Grafel U 40 cm' m1 45,000.00
95 Buis Beton Ø 20 cm ( 1 m' ) m1 50,000.00
96 Buis Beton Ø 30 cm ( 1 m' ) m1 60,000.00
97 Buis Beton Ø 40 cm ( 1 m' ) m1 70,000.00
98 Injuk kg 3,000.00

H. BAHAN LOGAM DAN BAHAN JADINYA


99 Besi Beton U-24 Rata - Rata kg 10,000.00
100 Besi Beton U-39 / U-32 Rata - Rata kg 12,500.00
101 Pagar BRC Lengkap Tiang ( Tanpa Pondasi ) m² 120,000.00
102 Bondek m² 105,000.00
103 IWF Ex DN SII kg 10,250.00
104 IWF Ex Jepang kg 11,000.00
1 2 3 4

105 Besi Profil DN SII kg 11,000.00


106 Besi C Lip Chanel kg 11,500.00
107 Kawat Beton kg 15,000.00
108 Kawat Duri m1 17,500.00
109 Kawat Pengikat m1 750.00
110 Kawat Bronjong 4 mm kg 14,500.00
111 Kawat Las Listrik kg 18,000.00
112 Hollow 6x4 cm t=1,8 mm m1 24,000.00
113 Hollow 4x4 cm t= 1,6 mm m1 14,500.00
1 2 3 4

114 Plat Srip L 4cm T 2 mm ( 6 m1) m' 16,666.67


115 Plat Srip Ø 3 x 30 mm ( 6 m1) bt 18,500.00
116 Seng Plat BJLS 30 dia. 60 cm ( 100 m1 ) rool 650,000.00
117 Seng Plat BJLS 30 dia. 90 cm ( 100 m1 ) rool 975,000.00
118 Plat Besi Tipis 1 mm kg 13,500.00
119 Plat Besi Tipis 0.5 mm kg 13,500.00
120 Plat Besi 2 mm s/d 5 mm kg 22,500.00
121 Plat Besi 6 mm s/d 10 mm kg 22,500.00
122 Plat Besi 10 mm Ke atas kg 22,500.00
123 Lem Kuning (aibond) kg 37,000.00
124 Lem Fox kg 30,000.00

I. BAHAN KACA
125 Kaca Polos 3 mm ( ASAHI ) m² 45,000.00
126 Kaca Polos 5 mm ( ASAHI ) m² 72,500.00
127 Kaca Rayband 5 mm ( ASAHI ) m² 100,000.00
128 Glass Block DN 20 x 20 ( Kedawung ) bh 15,000.00
129 Glass Block DN 20 x 20 Ex LN bh 20,000.00

J. BAHAN PAKU DAN MUR BAUT


130 Paku 1 cm s/d 3 cm kg 14,000.00
131 Paku 4 cm s/d 7 cm kg 11,000.00
132 Paku 8 cm s/d 12 cm kg 10,000.00
133 Paku Beton 2 cm s/d 5 cm bh 500.00
134 Paku Kait Lengkap bh 1,250.00
135 Paku Cacing kg 40,000.00
136 Duk Angker bh 35,000.00
137 Angker Mur Baut dia.19 / panjang 60 cm bh 55,000.00
138 Mur Baut HTB dia. 19 s/d 16 (5 cm) bh 9,500.00
139 Mur Baut Biasa dia.19 s/d 16 (5 cm) bh 6,000.00
140 Piser dia. 12 s/d 20 cm bh 4,500.00

K. BAHAN PERPIPAAN 1.²


141 Besi Pipa Hitam Ø 1" t=2 mm bt 56,550.00
142 Besi Pipa Hitam Ø 2" t=2 mm bt 111,000.00
143 Pipa GIP Medium A Ø 1/2" ( 6 m1 ) bt 107,000.00
144 Pipa GIP Medium A Ø 3/4" ( 6 m1 ) bt 129,600.00
145 Pipa GIP Medium A Ø 1" ( 6 m1 ) bt 169,650.00
1 2 3 4

146 Pipa GIP Medium A Ø 1 1/4" ( 6 m1 ) bt 254,000.00


147 Pipa GIP Medium A Ø 1 1/2" ( 6 m1 ) bt 282,750.00
148 Pipa GIP Medium A Ø 1 3/4"( 6 m1 ) bt 339,300.00
149 Pipa GIP Medium A Ø 2" ( 6 m1 ) bt 365,400.00
150 Macam2 Sambungan GIP Ø 1/2" bh 3,450.00
151 Macam2 Sambungan GIP Ø 3/4" bh 4,900.00
152 Macam2 Sambungan GIP Ø 1" bh 6,700.00
153 Macam2 Sambungan GIP Ø 1 1/4" bh 12,600.00
154 Macam2 Sambungan GIP Ø 11/2" bh 15,600.00
155 Macam2 Sambungan GIP Ø 13/4" bh 7,500.00
156 Macam2 Sambungan GIP Ø 2" bh 19,000.00
1 2 3 4

157 Pipa PVC RUCIKA type AW Ø 1/2" bt 12,500.00


158 Pipa PVC RUCIKA type AW Ø 3/4" bt 18,000.00
159 Pipa PVC RUCIKA type AW Ø 1" bt 25,000.00
160 Pipa PVC RUCIKA type AW Ø 1 1/4" bt 35,000.00
161 Pipa PVC RUCIKA type AW Ø 1 1/2" bt 42,500.00
162 Pipa PVC RUCIKA type AW Ø 2" bt 75,000.00
163 Pipa PVC RUCIKA type AW Ø 2 1/2" bt 130,000.00
164 Pipa PVC RUCIKA type AW Ø 3" bt 150,000.00
165 Pipa PVC RUCIKA type AW Ø 4" bt 175,000.00
166 Pipa PVC WAVIN Ø 1/2" (AW) bt 18,000.00
167 Pipa PVC WAVIN Ø 3/4" (AW) bt 24,000.00
168 Pipa PVC WAVIN Ø 1" (AW) bt 30,000.00
169 Pipa PVC WAVIN Ø 1 1/4" (AW) bt 37,500.00
170 Pipa PVC WAVIN Ø 1 1/2" (AW) bt 45,000.00
171 Pipa PVC WAVIN Ø 2" (AW) bt 75,000.00
172 Pipa PVC WAVIN Ø 2 1/2" (AW) bt 100,000.00
173 Pipa PVC WAVIN Ø 3" (AW) bt 175,000.00
174 Pipa PVC WAVIN Ø 4" (AW) bt 225,000.00
174 Pipa PVC WAVIN Ø 5" (AW) bt 325,000.00
174 Pipa PVC WAVIN Ø 6" (AW) bt 375,000.00
175 Macam2 Sambungan Paralon Ø 1/2" bh 2,000.00
176 Macam2 Sambungan Paralon Ø 3/4" bh 2,500.00
177 Macam2 Sambungan Paralon Ø 1" bh 3,000.00
178 Macam2 Sambungan Paralon Ø 1 1/4" bh 4,000.00
179 Macam2 Sambungan Paralon Ø 1 1/2" bh 5,000.00
180 Macam2 Sambungan Paralon Ø 1 3/4" bh 5,000.00
181 Macam2 Sambungan Paralon Ø 2" bh 5,000.00
182 Macam2 Samb. Paralon Ø 2 1/2" bh 6,000.00
183 Macam2 Samb. Paralon Ø 3" bh 8,000.00
184 Macam2 Samb. Paralon Ø 4" bh 10,000.00
184 Dop dia. 5" bh 25,000.00
185 Lem Paralon tb 6,000.00
186 Solatip Leideng gl 1,000.00

L. BAHAN SANITAIR
187 Stop Kran 3/4 " KIT bh 60,000.00
1 2 3 4

188 Stop Kran 1 " KIT bh 95,000.00


189 Stop Kran 1 1/2 " KIT bh 125,000.00
190 Saringan Air Lt KM Stainless Steel bh 25,000.00
191 Kran stain less Lokal Kait bh 28,000.00
192 Shower Dengan Tiang bh 180,000.00
193 Shower Tanpa Tiang bh 95,000.00
194 Closet Jongkok Poslin warna TOTO / INA unit 145,000.00
195 Closet Jongkok Standard Putih Poslin TOTO unit 160,000.00
196 Pintu Fiber KM/WC unit 200,000.00
1 2 3 4

M. BAHAN PENUTUP ATAP


197 Atap Asbes Gel. Kecil 4 mm 80 x 180 lbr 55,000.00
198 Atap Asbes Gel. Besar 5 mm 80 x 180 lbr 85,000.00
199 Polycarbonate ex. XLITE m² 145,500.00
Rangka Atap / Kuda2 Baja Ringan C.75, t=0,35 mm +
200 m2 165,000.00
Penutup Atap Metal Roof Tabur Pasir
202 Nok Atas Metal Roof Stone m1 40,000.00
203 Atap Spandek Zingkalum t = 0,35 mm, L=1,05 m , P= 6-7 m m2 110,000.00
204 Bubungan Atap Spandek Zingkalum t = 0,35 m1 85,000.00
205 Woodplank / Listplank GRC 20x300x3000 m1 30,000.00
206 Listplank Zingkalum + Rangka Besi Hollo 4/4 m1 145,000.00
206 Talang Air Plat Seng + Rangka Besi Siku L.30,30,2,3 m1 145,000.00

O. BAHAN ELEKTRIKAL 1.5


207 Kabel NYM 2 x 1.5 Prima (1 rol = 50 m') ROLL 150,000.00
208 Kabel NYM 3 x 1.5 Prima (1 rol = 50 m') ROLL 250,000.00
209 Box MCB 3 Group bh 105,000.00
210 MCB 1 PAS bh 55,000.00
211 MCB 3 PAS bh 125,000.00
212 Saklar Broko Tunggal Standard ( 1 Phase ) bh 11,000.00
213 Saklar Broko Seri Standard ( 1 Phase ) bh 12,500.00
214 Stop Kontak Broko Standard ( 1 Phase ) bh 17,500.00
215 Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat ) ttk 75,000.00
216 Lampu pijar 25 Watt s/d 100 Watt bh 5,000.00
217 Rumah TL In Bow / Out Bow 2 x 20 W ( Kosongan ) bh 45,000.00
218 Fitting Plafond bh 10,000.00
219 Lampu SL 18 W bh 45,000.00
220 Lampu TL 20 W Lengkap Kap dan gantungan bh 200,000.00
221 Jarum Penangkal Petir 16 bh 50,000.00
222 Kawat BC ( Tembaga ) kg 10,000.00
223 Pentanahan Penangkal Petir ttk 225,000.00
224 Pentanahan Panel ttk 80,000.00

P. BAHAN ALAT PENGANTUNG DAN KUNCI


225 Kunci 2 Slaag ROYAL bh 50,000.00
226 Rel Maraton I Pintu unt 150,000.00
227 Kunci 2 Slaag Ancor Asli bh 95,000.00
228 Kunci 2 Slaag ISO bh 90,000.00
1 2 3 4

229 Kunci KM Bulat Kualitas Biasa bh 45,000.00


230 Kunci 2 Slaag Silinder Utama Standard bh 225,000.00
231 Kunci Gembok Besar bh 75,000.00
232 Kunci 2 Slaag Kuda Terbang bh 95,000.00
233 Espangolet ps 60,000.00
234 Grendel 15 cm bh 16,000.00
235 Grendel 5 cm bh 10,000.00
236 Hak Angin Kait Jendela Biasa ps 7,500.00
237 Sloot Pintu berikut Rantai bh 75,000.00
238 Sloot Jendela Tunggal bh 10,500.00
1 2 3 4

239 Engsel Pintu Kuningan 4" ps 17,500.00


240 Engsel Jendela Kuningan 3" ps 20,000.00
241 Seng BJLS 30 lebar 60cm (1 rol 50 m' ) m1 19,500.00
242 Seng BJLS 30 lebar 90cm (1 rol 50 m' ) m1 27,500.00

Q. BAHAN PENGIKAT UNTUK KONTRUKSI JALAN


243 Hotmix Jadi berikut alat dan bahan bakar ( T = 5 cm => 9 m2 ton 1,150,000.00
244 Aspal ( ESO ) 1 Drum 150 Kg kg 10,500.00
245 Aspal Curah kg 7,000.00
246 Aspal RC 70 ( Cilacap ) kg 8,000.00

R. BAHAN PENGHISAP AIR SUMUR DALAM


247 Mesin Pompa Air 100 W - Sanyo unit 750,000.00
248 Mesin Pompa Air 150 W - Sanyo unit 1,250,000.00
249 Pompa Zet pump 250 W - Sanyo unit 2,900,000.00
250 Pompa Zet pump 450 W - Sanyo unit 5,500,000.00

S. BAHAN PENAMPUNG AIR


251 Tangki Air Fiber Glass 0.5 m3 ( Excel ) bh 900,000.00
252 Tangki Air Fiber Glass 1 m3 ( Excel ) bh 1,250,000.00
253 Tangki Air Fiber Glass 2 m3 ( Excel ) bh 2,000,000.00
253 Tangki Air Fiber Glass 3 m3 ( Excel ) bh 2,400,000.00
253 Tangki Air Fiber Glass 5 m3 ( Excel ) bh 4,400,000.00
254 Bak KM Fiber 60 x 60 bh 100,000.00

V. STANDARD RATA - RATA SEWA ALAT BESAR , ALAT MEKANIK


TRUK, KENDARAAN RODA 4 & LAINNYA
255 Sewa Mesin Gilas 8 Ton s/d 10 ton hari 55,000.00
256 Tamdam Roller 6 - 8 Ton 5 Jam / hr hari 55,000.00
257 Tamdam Roller 8 - 10 Ton 5 Jam / hr hari 55,000.00
258 Roller 3 Wheeled - 8 Ton 5 Jam /hr hari 55,000.00
259 Tamper, Viberator Plate 3 Jam /hari hari 55,000.00
260 Concrete Mixer 0.125 m3 hari 50,000.00
261 Concrete Mixer 0.5 m3 hari 50,000.00
262 Concrete Viberator hari 40,000.00
263 Pick Up hari 55,000.00
264 Dump Truck 3.5 Ton hari 85,000.00
265 Dump Truck 5 Ton 4 Jam /hr hari 85,000.00
266 Truck 3/4 ( Colt Disel ) hari 75,000.00
267 Mesin Las Listrik 18 pk 8 jam hari 40,000.00
1 2 3 4

268 Mesin Pompa Air 3 " hari 40,000.00


269 Stamper 8 Jam hari 40,000.00
270 Compresor Air hari 40,000.00

X. BAHAN BAKAR DAN PELUMAS


271 Minyak Tanah lt 9,500.00
272 Kayu Bakar Dari Kayu Karet m³ 150,000.00
273 Minyak Solar lt 6,900.00
274 Bensin Premium lt 7,400.00
275 Elpiji / botol 15 kg 100,000.00
Y. TAMAN
276 Tanah Urug Gembur m3 130,000.00
277 Rumput Gajah Mini (Pennisetum Purpureum Schamach) m2 38,000.00
278 Bawang Bawangan (Zephyranthes Spp) pbg 15,000.00
279 Cemara Kipas (Thuya occidentalis ‘bakers’) phn 280,000.00
280 Ekor Tupai (Asparagus Densiflorus) pbg 18,000.00
281 Miana Bangkok (Plectranthus Scutellarioides) pbg 15,000.00
282 Brokoli Kuning ( Michelia Shampaka) pbg 23,000.00
283 Pucuk Merah (Oleina Syzygium) pbg 32,000.00
284 Melati Jepang (Graptophylum pictum) pbg 45,000.00
285 Serodotan bh 2,500,000.00
286 Jungkat-jungkit bh 2,500,000.00
287 Batu Koral Mix Hitam Putih m2 95,000.00
289 Huruf Taman 3D m2 15,000.00
290 Lampu Stand Taman bh 300,000.00
291 Lampu Tempel Taman bh 280,000.00
K
o
d
e
b
a
h
###
a
n
AN DIHAPUS

NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH

1 2 3 4 5 6=(3x5)

A001 1 M1 PEK. PENGUKURAN KEMBALI (SITE)


Tukang Batu Terampil 0.0100 org Err:508 750.00
Pekerja Terampil 0.0150 org Err:508 1,125.00
Peralatan 0.5000 lot 1,875.00 937.50
Jumlah 2,812.50
Dibulatkan 2,810.00
A002 1 M3 PEK. GALIAN TANAH
Tukang Gali 0.0250 org 65,000 1,625.00
Pekerja 0.0750 org 55,000 4,125.00

Peralatan 0.5000 lot 5,750.00 2,875.00


Jumlah 8,625.00
Dibulatkan 8,620.00
A003 1 M3 PEK. URUGAN TANAH KEMBALI
Tukang 0.0250 org 65,000 1,625.00
Pekerja 0.0750 org 55,000 4,125.00
Peralatan 0.5000 lot 5,750.00 2,875.00
Jumlah 8,625.00
Dibulatkan 8,620.00
A004 1 M3 PEK. URUGAN PASIR URUG
Pasir Urug 1.2000 org 90,000 108,000.00
Pekerja Terampil 0.0100 org 75,000 750.00
Pekerja 0.3000 lot 55,000 16,500.00
Peralatan 0.5000 lot 17,250.00 8,625.00
Jumlah 133,875.00
Dibulatkan 133,870.00
A005 1 M3 PEK. PONDASI ROLLAG BATA 1 : 5
Batu Bata Merah 475.000 bh 775.00 368,125.00
Semen PC (50 kg) 2.4000 zak 60,000.00 144,000.00
Pasir Pasang 0.4160 m3 132,500.00 55,120.00
Tukang Batu 1.5000 org 75,000 112,500.00
Kepala Tukang Batu 0.1500 org 80,000 12,000.00
1 2 3 4 5 6=(3x5)

Pekerja 3.000 org 55,000 165,000.00


Mandor 0.025 org 90,000 2,250.00
Jumlah 858,995.00
Dibulatkan 858,990.00
A006 1 M2 PEK. Dinding Bata Merah 1 : 4
Batu Bata Merah 75.0000 bh 775.00 58,125.00
Semen PC (50 kg) 0.3540 zak 60,000.00 21,240.00
Pasir beton 0.0570 m3 132,500.00 7,552.50
Tukang Batu 0.2000 org 75,000 15,000.00
Kepala Tukang Batu 0.0200 org 80,000 1,600.00
Pekerja 0.5000 org 55,000 27,500.00
Mandor 0.0250 org 90,000 2,250.00
Jumlah 133,267.50
Dibulatkan 133,260.00
A007 1 M2 PEK. Dinding Batu Alam
Batu Alam ( Andesit Polos 10x20 ) 1.1000 m2 55,000.00 60,500.00
Semen PC (50 kg) 0.2350 zak 60,000.00 14,100.00
Pasir Beton 0.0350 m3 75000.00 2,625.00
Tukang Batu 0.3500 org 75,000.00 26,250.00
Kepala Tukang Batu 0.0350 org 80,000.00 2,800.00
Pekerja 0.7000 org 55,000.00 38,500.00
Mandor 0.0250 org 90,000.00 2,250.00
Jumlah 147,025.00
Dibulatkan 147,020.00
A008 1 M2 PEK. Paving Block
Paving Block K 300 ; 10x20 tebal 6cm 50.0000 bh 1,100.00 55,000.00
Pekerja 0.1250 org 55,000 6,875.00
Kepala Tukang Batu 0.0250 org 80,000 2,000.00
Pasir Pasang Kali 0.5000 m3 132,500 66,250.00
Mandor 0.0250 org 90,000 2,250.00
Jumlah 132,375.00
Dibulatkan 132,370.00
A009 1 M2 PEKERJAAN PAGAR BESI
Besi Hollow 40x40 T:1.6mm 1.1000 m2 261,000.00 287,100.00
Joint pin Ring 4.0000 bh 5,000.00 20,000.00
Plat strip 1.2000 m1 16,666.67 20,000.00
Pekerja 0.0700 org 65,000.00 4,550.00
1 2 3 4 5 6=(3x5)
TUKANG BESI BETON TERAMPIL 0.0500 org 75,000.00 3,750.00
Kepala Tukang Besi Profil 0.0100 org 75,000.00 750.00
Tukang Las Terampil 0.0500 org 85,000.00 4,250.00
Mandor 0.0250 org 90,000.00 2,250.00
Peralatan (Oksigen, Solar, mesin las, dll) 0.5000 lot 342,650.00 171,325.00
Jumlah 513,975.00
Dibulatkan 513,970.00

A010 1 M2 PENGECATAN BESI (3X)

Meni besi 0.1670 kg 20,000.00 3,340.00

Cat besi merk Seiv 0.4000 kg 28,500.00 11,400.00

Amplas Besi 0.4000 lbr 3,500.00 1,400.00

Minyak cat thiner B 0.1500 ltr 14,500.00 2,175.00

Kwas 3" 0.0500 bh Err:508 Err:508

Pekerja terampil 0.2000 org Err:508 Err:508

Tk. Cat terampil 0.3000 org Err:508 Err:508

Kep. tukang cat 0.0300 org Err:508 Err:508

Mandor 0.0250 org Err:508 Err:508

Jumlah 57,777.50

Dibulatkan 57,770.00

A011 1M2 BONGKARAN BETON

Pekerja 0.0500 org 55,000 2,750.00

Tukang 0.0900 org 65,000 5,850.00

Peralatan 0.5000 lot 15,000.00 7,500.00

Jumlah 16,100.00

Dibulatkan 16,100.00

A012 1M3 PEKERJAAN KAYU

Kayu Mindi 3/20 1.1000 M3 2,500,000.00 2,750,000.00

Pekerja 0.0700 org 55,000 3,850.00

Tukang Kayu Terampil 0.0500 org 75,000 3,750.00

Kepala Tukang Kayu 0.0100 org 80,000 800.00

Peralatan 0.5000 lot 80,000.00 40,000.00

Mandor 0.0250 org 90,000 2,250.00

Jumlah 2,800,650.00

Dibulatkan 2,800,650.00
1 2 3 4 5 6=(3x5)

A013 1M2 PEMASANGAN BATU KORAL STEPPING

Koral 1.1000 m2 95,000 104,500.0000

Pekerja 0.0700 org 75,000 5,250.00

Tukang Kayu Terampil 0.0500 org 75,000 3,750.00

Kepala Tukang Kayu 0.0100 org 65,000 650.00

Mandor 0.0250 org 90,000 2,250.00

Jumlah 116,400.0000

Dibulatkan 116,400.0000

A014 1M2 PEKERJAAN BONGKARAN PAVING BLOCK

Pekerja 0.0500 org 55,000 2,750.00

Tukang 0.0900 org 65,000 5,850.00

Peralatan 0.5000 lot 10,000.00 5,000.00

Jumlah 13,600.00

Dibulatkan 13,600.00

A015 1M2 PEKERJAAN BONGKARAN TANAMAN

Pekerja 0.0500 org 55,000 2,750.00

Tukang 0.0900 org 65,000 5,850.00

Peralatan 0.5000 lot 10,000.00 5,000.00

Jumlah 13,600.00

Dibulatkan 13,600.00

A016 PEK. PEMASANGAN PLAY GROUND

Serodotan 1.1000 bh 2,500,000 2,750,000.00

Pekerja 0.0500 org 55,000 2,750.00

Tukang 0.0900 org 10,000 900.00

Kepala Tukang 0.0100 org 80,000 800.00

Peralatan 0.5000 lot 10,000 5,000.00

Jumlah 2,759,450.00

Dibulatkan 2,759,450.00

A017 PEK PEMASANGAN HURUF TAMAN 3D

Huruf 3D Taman 1.1000 m2 1,500,000.00 1,650,000.00

Plat Strip 1.2000 m1 16,666.67 20,000.00

Pekerja 0.0500 org 55,000 2,750.00


1 2 3 4 5 6=(3x5)

Tukang 0.0900 org 10,000 900.00

Kepala Tukang 0.0100 org 75,000 750.00

Peralatan (Mesin Las , Baud , dll) 0.5000 lot 120,000 60,000.00

Jumlah 1,734,400.00

Dibulatkan 1,734,400.00

A018 PEKERJAAN CAT KAYU

Meni Kayu 0.1670 kg 15,000.00 2,505.00

Cat Kayu 0.2000 kg 28,500.00 5,700.00

Amplas Kayu 0.4000 lbr 2,000.00 800.00

Minyak cat thiner B 0.1500 ltr 14,500.00 2,175.00

Kwas 3" 0.0500 bh 9,250.00 462.50

Pekerja terampil 0.2000 org 75,000.00 15,000.00

Tk. Cat terampil 0.3000 org 65,000.00 19,500.00

Kep. tukang cat 0.0300 org 75,000.00 2,250.00

Mandor 0.0250 org 90,000 2,250.00

Jumlah 50,642.50

Dibulatkan 50,640.00

A019 PEKERJAAN INSTALASI LAMPU TAMAN

1 Pemasangan Kabel Instalasi Listrik

Kabel NYM 3 x 1.5 Prima (1 rol = 50 m') 1.1000 roll 250,000.00 275,000.00

Instalasi Titik Lampu / Stop Kontak 1.0000 ttk 75,000.00 75,000.00

Pekerja 0.4800 org 55,000 26,400.00

Tukang Listrik 0.0480 org 65,000 3,120.00

Kepala Tukang Listrik 0.0480 org 80,000 3,840.00

Jumlah 383,360.00

Dibulatkan 383,360.00

2 Pek Pemasangan Saklar

Saklar Broko Seri Standard ( 1 Phase ) 1.0000 bh 12,500.00 12,500.00

Pekerja 0.2000 org 55,000 11,000.00

Tukang Listrik 0.0200 org 65,000 1,300.00

Kepala Tukang Listrik 0.0200 org 80,000 1,600.00

Jumlah 26,400.00
1 2 3 4 5 6=(3x5)

Dibulatkan 26,400.00

3 Pek Lampu SL + Box Lampu Taman Stand

Lampu SL 18 W 1.0000 bh 45,000.00 45,000.00

Lampu Stand Taman 1.0000 bh 300,000.00 300,000.00

Pekerja 0.2000 org 55,000 11,000.00

Tukang Listrik 0.0200 org 65,000 1,300.00

Kepala Tukang Listrik 0.0200 org 80,000 1,600.00

Jumlah 358,900.00

Dibulatkan 358,900.00

4 Pek Lampu SL + Box Lampu Tempel

Lampu SL 18 W 1.0000 bh 45,000.00 45,000.00

Lampu Tempel Taman 1.0000 bh 280,000.00 280,000.00

Pekerja 0.2000 org 55,000 11,000.00

Tukang Listrik 0.0200 org 65,000 1,300.00

Kepala Tukang Listrik 0.0200 org 80,000 1,600.00

Jumlah 338,900.00

Dibulatkan 338,900.00

5 Pek MCB

MCB 1 PAS 1.0000 bh 55,000.00 55,000.00

Pekerja 0.2000 org 55,000 11,000.00

Tukang Listrik 0.0200 org 65,000 1,300.00

Kepala Tukang Listrik 0.0200 org 80,000 1,600.00

Jumlah 68,900.00

Dibulatkan 68,900.00

6 Pek Pipa Paralon Untuk Jalur Instalasi Kabel

Pipa PVC RUCIKA type AW Ø 1/2" 1.0000 bt 12,500.00 12,500.00

Macam2 Sambungan Paralon Ø 1/2" 1.0000 bh 2,000.00 2,000.00

Lem Paralon 1.0000 tb 6,000.00 6,000.00

Solatip Leideng 1.0000 gl 1,000.00 1,000.00

Pekerja 0.2000 org 55,000 11,000.00

Tukang Listrik 0.0200 org 65,000 1,300.00

Kepala Tukang Listrik 0.0200 org 80,000 1,600.00


1 2 3 4 5 6=(3x5)

Jumlah 35,400.00

Dibulatkan 35,400.00

A020 PEKERJAAN PENATAAN TAMAN

1 1M3 Pek Galian Lubang Tanam Pada Tanah Biasa Maks Kedalaman 1M'

Pekerja Terampil 0.0450 org 75,000 3,375.0000

Mandor 0.0250 org 90,000 2,250.0000

Jumlah 5,625.0000

Dibulatkan 5,620.0000

2 1M3 Urugan Tanah Humus/Timbunan

Tanah Urug Gembur 1.0000 m3 130,000.00 130,000.00

Pekerja 0.0450 org 75,000 3,375.0000

Mandor 0.0250 org 90,000 2,250.0000

Jumlah 135,625.00

Dibulatkan 135,620.00

3 1 lbg Pek Galian Tanam dan Pengolahan Pohon

Galian Tanah 60x60x60 0.2160 m3 5,620.0000 1,213.92

Penimbunan Kembali Lubang Tanam 0.0648 m3 135,620.00 8,788.18

Urugan Tanah Humus Perlubang 0.0432 m3 135,620.00 5,858.78

Jumlah 15,860.88

Dibulatkan 15,860.00

4 1 lbg Pek Galian Tanam dan Pengolahan Semak

Galian Tanah 30x30x40 0.0360 m3 5,620.0000 202.32

Penimbunan Kembali Lubang Tanam 0.0216 m3 135,620.00 2929.392

Urugan Tanah Humus Perlubang 0.0144 m3 135,620.00 1952.928

Jumlah 5,084.64

Dibulatkan 5,080.00

5 1M2 Treping dan Pengolahan LahanGround Cover

Pekerja Terampil 0.0500 org 75,000.00 3,750.00

Mandor 0.0500 org 90,000.00 4,500.00

Jumlah 8,250.00

Dibulatkan 8,250.00

6 1M2 Penyiraman Tanaman


1 2 3 4 5 6=(3x5)

Air Baku 8.0000 lt 40.00 320.00

Pekerja terampil 0.0500 org 75,000.00 3,750.00

Mandor 0.0050 org 90,000.00 450.00

Peralatan 0.0010 Lot 10,000.00 10.00

Jumlah 4,210.00

Dibulatkan 4,210.00

7 1M2 Penanaman Rumput Gajah Mini (Pennisetum Purpureum Schamach)

Rumput Gajah Mini 1.0000 m2 38,000.00 38,000.00


Pekerja terampil 0.2500 org 75,000.00 18,750.00
Kepala Tukang Taman 0.0096 org 80,000.00 768.00
Mandor 0.0050 org 90,000.00 450.00
Jumlah 57,968.00

Dibulatkan 57,960.00

8 1 Phn Tanaman Bawang-bawangan

Bawang-bawangan 1.0000 phn 15,000.00 15,000.00

Lubang Tanam dan Pengolahan Semak 1.0000 m3 5,080.00 5,080.00

Penyiraman 0.0360 m2 4,210.00 151.56

Pekerja Terampil 0.0096 org 75,000 720.00

Mandor 0.0050 org 90,000 450.00

Jumlah 21,401.56

Dibulatkan 21,400.00

9 1 Phn Pohon Cemara Kipas

Cemara Kipas 1.0000 phn 280,000.00 280,000.0000

Lubang Tanam dan Pengolahan Pohon 1.0000 m3 15,860.00 15,860.0000

Penyiraman 0.0360 m2 4,210.00 151.5600

Pekerja Terampil 0.0096 org 75,000.00 720.0000

Mandor 0.0050 org 90,000.00 450.0000

Jumlah 297,181.56

Dibulatkan 297,180.00

10 1 Phn Ekor Tupai

Ekor Tupai 1.0000 phn 18,000.00 18,000.00

Lubang Tanam dan Pengolahan Semak 1.0000 m3 5,080.00 5,080.00


1 2 3 4 5 6=(3x5)

Penyiraman 0.0360 m2 4,210.00 151.56

Pekerja Terampil 0.0096 org 75,000.00 720.00

Mandor 0.0050 org 90,000.00 450.00

Jumlah 24,401.56

Dibulatkan 24,400.00

11 1 Phn Miana Bangkok

Miana Bangkok 1.0000 phn 15,000.00 15,000.00

Lubang Tanam dan Pengolahan Semak 1.0000 m3 15,860.00 15,860.00

Penyiraman 0.0360 m2 4,210.00 151.56

Pekerja Terampil 0.0096 org 75,000.00 720.00

Mandor 0.0050 org 90,000.00 450.00

Jumlah 32,181.56

Dibulatkan 32,180.00

12 1 Phn Brokolli Kuning

Brokolli Kuning 1.0000 phn 23,000.00 23,000.00

Lubang Tanam dan Pengolahan Semak 1.0000 m3 5,080.00 5,080.00

Penyiraman 0.0360 m2 4,210.00 151.56

Pekerja Terampil 0.0096 org 75,000.00 720.00

Mandor 0.0050 org 90,000.00 450.00

Jumlah 29,401.56

Dibulatkan 29,400.00

13 1 Phn Pucuk Merah

Pucuk Merah 1.0000 phn 30,000.00 30,000.00

Lubang Tanam dan Pengolahan Semak 1.0000 m3 15,860.00 15,860.00

Penyiraman 0.0360 m2 4,210.00 151.56

Pekerja Terampil 0.0096 org 75,000.00 720.00

Mandor 0.0050 org 90,000.00 450.00

Jumlah 47,181.56

Dibulatkan 47,180.00

14 1 Phn Melati Jepang

Melati Jepang 1.0000 phn 45,000.00 45,000.00

Lubang Tanam dan Pengolahan Semak 1.0000 m3 5,080.00 5,080.00


1 2 3 4 5 6=(3x5)

Penyiraman 0.0360 m2 4,210.00 151.56

Pekerja Terampil 0.0096 org 75,000.00 720.00

Mandor 0.0050 org 90,000.00 450.00

Jumlah 51,401.56

Dibulatkan 51,400.00
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE ( EE )

INSTANSI : DINAS PENGELOLAAN SAMPAH, PERTAMANAN, DAN PEMAKAMAN


KEGIATAN : PENINGKATAN SARANA dan PRASARANA
PERUMAHAN BAROS KOTA SUKABUMI
PEKERJAAN : PENATAAN TAMAN
PERUMAHAN BAROS KOTA SUKABUMI
LOKASI : KOTA SUKABUMI
SUMBER DANA : APBD PEMERINTAH KOTA SUKABUMI

URAIAN HARGA JUMLAH


NO. VOLUME SAT.
PEKERJAAN SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6=3x5
A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Kembali Site 1.00 ls 250,000.00 250,000.00
2 Pek. Pembersihan Lokasi 1.00 ls 500,000.00 500,000.00
3 Papan Nama Kegiatan 1.00 ls 200,000.00 200,000.00
4 Biaya Administasi + Pelaporan, Asbuilddrawing 1.00 ls 350,000.00 350,000.00
5 Penyediaan Listrik Kerja 1.00 ls 1,200,000.00 1,200,000.00
Jumlah A 2,500,000.00
B PEKERJAAN PEMBONGKARAN
1 Pek. Pembongkaran Paving Playground 78.01 m' 13,600.00 1,060,908.80
2 Pek. Pembongkaran Lapang Beton 48.50 m' 16,100.00 780,850.00
3 Pek. Pembongkaran Tanaman Existing 197.80 m2 13,600.00 2,690,080.00
Jumlah B 4,531,838.80
C PEKERJAAN SCLUPTURE
1 Pek. Paving Block t 4 cm k : 300 110.00 m2 132,370.00 14,560,700.00
2 Pot Taman
- Pondasi Rollag Bata Merah 1:5 4.60 m3 858,990.00 3,951,354.00
- Pasangan Bata Merah 1:4 11.40 m3 133,260.00 1,519,164.00
- Pas Batu Alam Andesit ( 10x20 ) 8.30 m2 147,025.00 1,220,307.50
- Pek. Cat Kayu 8.02 m2 50,640.00 406,132.80
Jumlah C 21,657,658.30
D PEKERJAAN TAMAN
1 Rumput Gajah Mini (Pennisetum Purpureum) 90.00 m2 57,960.00 5,216,400.00
2 Bawang2an (Zephyranthes Spp) 100.00 pbg 21,400.00 2,140,000.00
3 Cemara Kipas (Thuya occidentalis ‘bakers’) 2.00 phn 297,180.00 594,360.00
4 Ekor Tupai (Asparagus Densiflorus) 20.00 pbg 24,400.00 488,000.00
5 Miana Bangkok (Plectranthus Scutellarioides) 50.00 pbg 32,180.00 1,609,000.00
6 Brokoli Kuning ( Michelia Shampaka) 50.00 pbg 29,400.00 1,470,000.00
7 Pucuk Merah (Oleina Syzygium) 10.00 pbg 47,180.00 471,800.00
8 Melati Jepang (Graptophylum pictum) 20.00 pbg 51,400.00 1,028,000.00
Jumlah D 13,017,560.00
E PEKERJAAN LAMPU TAMAN + INSTALASI
1 Lampu SL 18W + Box Lampu Taman Stand 4.00 bh 358,900.00 1,435,600.00
2 Lampu SL 18W + Box Lampu Taman Tempel 2.00 bh 338,900.00 677,800.00
3 Pemasangan Kabel Instalasi Listrik 1.00 roll 383,360.00 383,360.00
4 Pek Pemasangan Saklar 4.00 m1 26,400.00 105,600.00
5 Pek MCB 3.00 bh 68,900.00 206,700.00
6 Pek Pipa Paralon Untuk Jalur Instalasi Kabel 25.00 btg 35,400.00 885,000.00
Jumlah E 3,694,060.00
F PEKERJAAN AKSESORIS TAMAN & PLAYGROUND
1 Bangku Taman
- Pondasi Rollag Bata Merah 1:5 1.55 m3 858,995.00 1,331,442.25
- Pek Dinding Bata Merah 4.50 m2 133,260.00 599,670.00
- Kayu Papan Mindi 3/20 0.20 m3 2,800,650.00 560,130.00
- Balok Kayu 6/12 0.05 m3 2,800,650.00 140,032.50
2 Stepping taman
- Kayu papan mindi 3/20 0.80 m3 2,800,650.00 2,240,520.00
- Batu koral 35.00 m2 116,400.00 4,074,000.00
3 Huruf Taman + Kaki 2.60 m2 1,734,400.00 4,509,440.00
4 Pekerjaan Playground
- Serodotan 1.00 bh 2,759,450.00 2,759,450.00
- Jungkat-jungkit 1.00 bh 2,759,450.00 2,759,450.00
- Pondasi Rollag Bata Merah 1:5 1.20 m3 858,995.00 1,030,794.00
Jumlah F 22,764,378.75
G PEKERJAAN PAGAR TAMAN
1 Pekerjaan Pagar Taman T= 60 cm 52.50 m2 513,970.00 26,983,425.00
2 Pekerjaan Pengecatan Besi Pagar 52.50 m2 57,770.00 3,032,925.00
Jumlah G 30,016,350.00
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
ENGINEERING ESTIMATE ( EE )
NO. JENIS PEKERJAAN TOTAL HARGA (Rp.)
I.PEKERJAAN PERSIAPAN Rp. 2,500,000.00
II.PEKERJAAN PEMBONGKARAN Rp. 4,531,838.80
III.PEKERJAAN SCLUPTURE Rp. 21,657,658.30
IV.PEKERJAAN TAMAN Rp. 13,017,560.00
V.PEKERJAAN LAMPU TAMAN + INSTALASI Rp. 3,694,060.00
VI. PEKERJAAN AKSESORIS TAMAN & PLAYGROUND Rp. 22,764,378.75
VII.PEKERJAAN PAGAR TAMAN Rp. 30,016,350.00
Real Cost Rp. 98,181,845.85
PPN 10% Rp. 9,818,184.59
Pengawasan 4% Rp. 4,500,000.00
Total Biaya Fisik Rp. 112,500,030.44
Dibulatkan Rp. 112,500,000.00
Terbilang : SERATUS DUA BELAS JUTA LIMA RATUS RIBU RUPIAH

Mengetahui, Dibuat Oleh,


Pejabat Pembuat Komitmen (PPK) Konsultan Perencana
Badan Lingkungan Hidup Daerah Gowa CV. KARYA NIAGARA KONSULTAN

ZULFIADY MAS'UD S,Si, M.Si ASEP SIDIK MULYANA, ST


Nip. 19801008 201001 1016 Direktur
Mengetahui,
Kepala Kantor Lingkungan Hidup
Kota Sukabumi

Drs.Adil Budiman, M.Si


Nip. 19690316 199010 1 001
RENCANA ANGGARAN BIAYA

PROYEK LANSEKAP RUMAH TINGGAL BAPAK SYAFIUDDIN

HARGA
TOTAL
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN (Rp.)
SATUAN (Rp.) HARGA (Rp.)

I PEKERJAAN PERSIAPAN

1 Pekerjaan pembersihan lahan 1.00 ls 1,000,000.00 1,000,000.00


2 Pekerjaan penambahan dan pembetukan tanah 19.18 m3 200,000.00 3,835,000.00
3 Pekerjaan pemupukan 50.00 krg 15,000.00 750,000.00

Total I 5,585,000.00

II PEKERJAAN PENANAMAN

II.A Taman Halaman Depan

Pohon
1 Palem Chinensis t btg : 2 m 2.00 phn 3,500,000.00 7,000,000.00
2 Kamboja Bonggol t : 3 - 4 m dia. Btg : 25 cm 2.00 phn 6,000,000.00 12,000,000.00
4 Bonsai Serut t : 1,5 - 2 m 2.00 phn 3,500,000.00 7,000,000.00

Perdu
1 Sikas Halus t ; 1,25 cm 3.00 phn 2,000,000.00 6,000,000.00
2 Sikas Halus t ; 0,75 cm 3.00 phn 1,250,000.00 3,750,000.00

Semak/ Groundcover
1 Paching Pentol 138.00 plb 15,000.00 2,070,000.00
2 Aralea 86.00 plb 12,000.00 1,032,000.00
3 Spatiphyllum 87.00 plb 15,000.00 1,305,000.00
4 Phyllodendron Jari 123.00 plb 15,000.00 1,845,000.00
5 Ruellia Rebah 496.00 plb 7,500.00 3,720,000.00
6 Irys Bung Kuning 123.00 plb 7,500.00 922,500.00
7 Cemara Buaya 75.00 plb 30,000.00 2,250,000.00
8 Kembang Coklat 168.00 plb 5,000.00 840,000.00
9 Sambang Darah 221.00 plb 17,500.00 3,867,500.00
10 Soka Hawaii 130.00 plb 15,000.00 1,950,000.00
11 Korumbusa Mini 221.00 plb 9,000.00 1,989,000.00

Rumput
1 Rumput Gajah Mini 40.00 m2 35,000.00 1,400,000.00

Subtotal II.A 58,941,000.00

II.B Taman Halaman Belakang


Pohon
1 Palem Chinensis t btg : 2 m 1.00 phn 3,500,000.00 3,500,000.00
2 Kamboja Bonggal t : 3 - 4 m dia. Btg : 20 cm 2.00 phn 5,000,000.00 10,000,000.00
3 Bonsai Serut t : 1,5 - 2 m 1.00 phn 3,500,000.00 3,500,000.00
4 Cemara Udang Bonsai t : 1,25 m 1.00 phn 2,000,000.00 2,000,000.00
5 Pisang Kipas 3.00 phn 2,000,000.00 6,000,000.00

Perdu
1 Sikas Halus t ; 1,25 cm 1.00 phn 2,000,000.00 2,000,000.00
2 Sikas Halus t ; 0,75 cm 2.00 phn 1,250,000.00 2,500,000.00
3 Pandan Bali Cabang Tiga t ; 2 m 2.00 phn 1,500,000.00 3,000,000.00
4 Siklok t ; 0,3 - 0,5 m 3.00 phn 200,000.00 600,000.00
5 Agave 3.00 phn 150,000.00 450,000.00

Semak/ Groundcover
1 Paching Pentol 133.00 plb 15,000.00 1,995,000.00
2 Aralea 133.00 plb 12,000.00 1,596,000.00
3 Spatiphyllum 87.00 plb 15,000.00 1,305,000.00
4 Phyllodendron Jari 195.00 plb 15,000.00 2,925,000.00
5 Ruellia Rebah 122.00 plb 7,500.00 915,000.00
6 Cemara Buaya 44.00 plb 30,000.00 1,320,000.00
7 Korumbusa Mini 98.00 plb 9,000.00 882,000.00
8 Sente Ungu 15.00 plb 75,000.00 1,125,000.00
9 Maranta Macan 79.00 plb 12,500.00 987,500.00
10 Puring Bali 62.00 plb 12,500.00 775,000.00
11 Puring Jari 44.00 plb 12,500.00 550,000.00
12 Kucai Mini 65.00 plb 3,500.00 227,500.00
13 Marantah Batik 25.00 plb 12,500.00 312,500.00
14 Bromelia 30.00 plb 35,000.00 1,050,000.00
15 Lily Paris Umbi 52.00 plb 3,500.00 182,000.00

Rumput
1 Rumput Gajah Mini 50.00 m2 35,000.00 1,750,000.00

Subtotal II.B 51,447,500.00

II.C Taman Dekat Kolam dan Taman Kering

Taman Dekat Kolam

Pohon
1 Kamboja Bonggal t : 3 - 4 m dia. Btg : 20 cm 1.00 phn 5,000,000.00 5,000,000.00

Perdu
1 Pandan Bali Cabang Tiga t ; 2 m 1.00 phn 1,500,000.00 1,500,000.00

Semak/ Groundcover
1 Pucuk Merah t : 1.00 m 88.00 plb 120,000.00 10,560,000.00
2 Lily Paris Umbi 32.00 plb 3,500.00 112,000.00
3 Spatiphyllum 77.00 plb 15,000.00 1,155,000.00
Rumput
Rumput Gajah Mini 3.00 m2 35,000.00 105,000.00

Taman Kering
Perdu
1 Bonsai t ; 0,5 2.00 phn 2,000,000.00 4,000,000.00
2 Pandan Bali Cabang Tiga t ; 2 m 2.00 phn 1,500,000.00 3,000,000.00

Semak/ Groundcover
1 Ruellia Rebah 64.00 plb 7,500.00 480,000.00
2 Spatiphyllum 144.00 plb 15,000.00 2,160,000.00
3 Bromellia Besar 12.00 plb 35,000.00 420,000.00
4 Bromelia Kecil 24.00 plb 25,000.00 600,000.00
6 Kucai Mini 122.00 plb 3,500.00 427,000.00
7 Maratha Batik 1.00 plb 12,500.00 12,500.00
8 Nanas Hias 4.00 plb 9,000.00 36,000.00

Subtotal II.C 29,567,500.00

III ELEMEN TAMAN

1 Koral Putih 23.00 krg 125,000.00 2,875,000.00


2 Batu Kali 9.00 bh 250,000.00 2,250,000.00
3 Batu Fosil ( Kayu ) 12.00 bh 350,000.00 4,200,000.00

Subtotal II.D 9,325,000.00


Subtotal II 149,281,000.00

TOTAL ( I+II ) 154,866,000.00


DIBULATKAN 154,800,000.00

Jakarta, 29 April 2015


Dibuat Oleh,

BUDI SETIAWAN